USER MANUAL C15SPV24MEFM C17SPV31MEF

Size: px
Start display at page:

Download "USER MANUAL C15SPV24MEFM C17SPV31MEF"

Transcription

1 KÖBER SRL VADURI BRANCH USER MANUAL MURAL CENTRAL HEATING STATION C15SPV24MEFM C17SPV31MEF KÖBER SRL, no. 25 Vaduri, Alexandru cel Bun Commune, Neamt , Romania Tel.: , , Fax:

2 Contents 1 Safety instructions and symbols Valability of instructions EC Marking Use according to destination Safety instructions Instalation and adjustment Gas smell Changes in the area adjiacent to the heating station Technical and functional characteristics Mounting Mounting set Dimensions and mounting positions Installation Conditions for the installation of the central heating station Installation directions Protection of the station in order to keep the warranty Gas connecting pipe General directions for the heating installation General directions for the hot water circuit Connecting pipe of the safety valve Air/ burnt gases input/ output pipes Electric grid connection Installation filling and emptying Operation instructions Control Panel Description of functions and of graphic contexts diplayed on the control panel LMC LIGHT function Graphic context station startup Graphic context - Stand-by Graphic context error state Graphic context waiting state Graphic context functioning state Graphic context adjustment of functioning parameters Graphic context - Service submenu Central heating station startup Functioning as waste hot water station (WHW) Functioning as heating station (HS) Preset functions related to station safety Setting additional functions Error signals Station switch off in safety conditions User training Quality Conditions and Warranty Inspection and maintenance Inspection and maintenance intervals Drawings necessary for mounting and commissioning Types of input-output configurations for mounting Minimum distances for mounting the co-axial kit Hydraulic pump characteristic Functioning schemes covered by warranty din 17

3 1 Safety instructions and symbols When installing the central heating station we ask you to respect the safety instructions contained in this manual! This manual is the property of KÖBER SRL-Vaduri branch. Copying or reproduction without written consent KÖBER SRL-Vaduri branch is strictly forbidden. The following lines explain the symbols used in the text: Danger! - direct danger for corporal integrity and life; Danger! - danger of death by electrocution; - pontentially dangerous situation for the product and the environment; Note! - useful notes and information. This symbol indicates a necessary activity; 2 Valability of instructions These instructions are valid exclusively for central heating station type C15SPV24MEFM / C17SPV31MEF. 3 EC Marking EC marking applied on this product guarantees that the equipment complies with the esential conditions stipulated in the applicable European legislation: - Directive regarding gas equipment 2009/142/CE (ex. 90/396/CEE) - Directive regarding energy efficiency 92/42/EEC - Directive regarding electromagnetic compatibility 2014/30/EU (ex. 2004/108/EC) - Directive for low frequency 2014/35/EU (ex. 2006/95/EC). 4 Use according to destination - Central heating station C15SPV24MEFM/C17SPV31MEF is designed following current technical standards and observing recognized safety norms; - In case of misuse or inappropriate use, the health or life of users or third parties can be put in danger, as well as the central heating station and other goods; - This equipment must not be used by people with limited psychological and sensitive capacities (including children), or by people with no experience or/ and no knowledge; - The station provides both heating in closed circuit central heating installations, as well as hot water. Use for other purposes or for additional purposes other than stipulated is considered inappropriate use. The manufacturer is not responsible for possible damage resulting from inappropriate use. The user is the only one responsible; - Compliance with the use and installation instructions, the additional documentation, as well as with the inspection and maintenance stipulations is part of what is understood by use according to destination. 5 Safety instructions 5.1 Instalation and adjustment Installation and commissioning can be done only by a company authorized and agreed by KÖBER SRL-Vaduri Branch! This company will assume responsibility for the correct installation and commissioning. Adjustment work, as well as maintenance and repair are allowed to be performed only by a company authorized and agreed by KÖBER SRL-Vaduri Branch! 5.2 Gas smell Danger! Danger of death by poisoning and explosion because of breeches in the gas pipes and connections in case of incorrect installation! Danger of deterioration when inappropriate tools are used. For tightening or unscrewing connection screws use appropriate wrenches (no box wrenches, extensions etc). When gas smell appears, take the following into account: - Do not activate electric switches in the dangerous zone; - Do not smoke in the dangerous zone; - Do not use mobile phones in the dangerous zone; - Turn off the gas tap; - Air the dangerous zone; - Notify the gas distribution company. 5.3 Changes in the area adjiacent to the heating station Modifications of the following installations are not allowed: - The central heating station; - The gas or water pipes or electric cables; - Air/ gas incoming/ outgoing pipes. 3 din 17

4 6 Technical and functional characteristics Tab. 1 Functional and constructive characteristics Type C15SPV24MEFM C17SPV31MEF Commercial name OPTIMUS MAXOPTIMUS Energy efficiency symbol *** *** Usable gas category II2H3B/P; II2ELL3B/P II2H3B/P (GN-G20, G25; GPL-G30/G31) (GN-G20, GPL-G30/G31) Flue Forced Forced Burning room Air-tight Air-tight Maximum power efficiency 92 % 93 % Class NOx 3 3 Rated power (min/max), 24 kw 31 kw Rated power 10 kw 11 kw Gas pressure in the network(on the regulator) 20 mbar 20 mbar Rated maximum fuel GN consumption 2.52 Nmc/h 3,1 Nmc/h Maximum pressure on the thermal circuit bar bar Maximum pressure on the house hot water circuit bar bar Maximum temperature on the thermal circuit C C Temperature on the house hot water circuit C C Hot water flow t = 30 C 10 min 12l/min Input ~230V/50 Hz ~230V/50 Hz Electric characteristics Nominal power (EEI pump <0.2) 80 W 80 W Height (mm) Width (mm) Depth (mm) Height with mounted corner Weight 32 kg 34.5 Capacity primary heat switch 0.5 l 1.8l Thermal input, output 3/4 3/4 Construction characteristics Connector s Cold water input, house hot water output 1/2' 1/2' Gas input 3/4' 3/4' Expansion vessel with membrane 7 l 7l Air/ gas incoming/ outgoing pipes Co-axial - Ø100/Ø60 Co-axial - Ø100/Ø60 Dual - Ø80 ** Dual - Ø80 ** Length of burnt gases pipe Co-axial - maximum 3m** Co-axial - maximum 3m** Dual - maximum 5m** Dual - maximum 5m** Burnt gases (maximum temperature) ~150 C ~150 C Class of electric protection Class I Class I Protection class IP 40 IP 40 ** Standard central heating station is delivered with co-axial kit; dual kit is delivered as accessory only on request. 4 din 17

5 7 Mounting 7.1 Mounting set Check whether the mounting set is complete and undamaged see table2. 4 Tab. 2 Mounting set Pos. Item Name 1 1 Station 2 1 Station support 3 1 Bag of small elements - it contains: - mounting screws 8x80-2 items. 4 1 Printed packet it contains: - user manual - 1 item - conformity statement - 1 item - warranty certificate 1item - commissioning statement -1 item 3 Fig Dimensions and mounting positions Installation site When choosing the installation site, please take into consideration the following safety instructions: Do not install the station in spaces that are exposed to freezing! In case of freezing the sation can be damaged. This equipment can not be installed and used in open air. Outdoor installation can cause functioning flaws. It is not recommended to install the central heating station in bathrooms or kitchens or other areas with high humidity. The station can be installed only in rooms with maximum 60% humidity between C in order to prevent the damaging of electronic components. The burning air of the station must not contain substances such as flourine vapours, chlorine, sulphur, dissolvants, colorants, adhesives or gasoline. These substances can lead in time to the corrosion of the equipment and air/ gas incoming/ outgoing pipes. Legend: A - Racord tur termoficare B - Racord iesire apa calda menajera C- Racord alimentare combustibil D - Racord intrare apa rece E - Racord retur termoficare Fig. 1.2 Dimensions and mounting positions Fig. 1.2 Model Dimensions (mm) a b c d e f C15SPV24MEFM C17SPV31MEF din 17

6 7.2.2 Minimum necessary distances/ free spaces for mounting Both for the mounting/ installation of the central heating stations and for later maintenance operations you will need the following minimum distances (fig. 1.3), respectively minimum free spaces for mounting: distance to the lateral: 100 mm distance to the bottom part: 250 mm distance to the upper part: 400 mm - distance to front: 400 mm Danger of damaging the equipment by incorrect setting! The equipment can be mounted only on a flat, fixed surface. of furniture. Note! Minimum necessary distances/ free spaces for mounting are valid also for mounting with/ within pieces 8 Installation Danger! Danger of death by poisoning and explosion because of breeches in the gas pipes and connections in case of incorrect installation! Installation and commissioning can be done only by a company authorized and agreed by KÖBER SRL-Vaduri Branch! This company will assume responsibility for the correct installation and commissioning. 8.1 Conditions for the installation of the central heating station Installation directions Fig.1.3 The central heating station will be subject to corrosion from the moment it is filled with water! To receive warranty during the entire warranty period it is essential to take into consideration the following directions in order not to increase the corrosion! - The burning gas must have the sulphur content within the limits of the applicable European standard: it is accepted for a short period of time to have a maximum of 150 mg/m3, but the yearly average must be of 30 mg/m3. - The burning air must not contain chlorine, ammonia, alkaline agents, halogenated hydrocarbs, freon, plaster particles, lints, dirt or dust; - Installation of the central heating station in the proximity of a swimming pool, washing machine or cleaner can result in the contamination of the burning air with these compounds. - - Water ph must be within the following limits: 7,5<pH<9,,5 It is recommended to check the water and thermal agent ph frequently and if the value does not fall within the limits provided by the manufacturer, it will be treated again. - Water asperity must be within the limits 5 F <TH <15 F (5 F (French degrees), equivalent to 50 mg CaCO3 or an equivalent quantity of other Ca and Mg salts). - It is recommended to have repeated station startup cycles with the fuel tap off in order to air the installation. - If the central heating station is not used for a long period of time during the cold season, full emptying of the installation is recommended to prevent damage caused by freezing Protection of the station in order to keep the warranty Before and during installation, the central heating station must be kept away from impurities: construction dust, sand, copper dust, fats etc as well as welding splashes, scoria. In any of theses cases, the installation must be washed with clean water mixed with a highly concentrated cleaning agent. Genereally, in order to keep the warranty it is necessary to apply any neccesary treatment to prevent the contamination of water with the following: Black mud (magnetite - Fe3O4) formed as a result of the continuous electrolyte corrosion occurring in any installation which is not protected with an inhibitor. Red mud (rust - Fe2O3) produced during oxidation. Calcarous deposits produced especially on the hottest areas of the central heating station. A combination of these three factors mentioned above causes the majority of the problems occurring with heating systems. 6 din 17

7 The presence of these substances (black mud/ red mud/ calcarous deposits) means that the standard measures to prevent problems of the heating system were not observed. This is one of the causes resulting in losing warranty! 8.2 Gas connecting pipe Danger of death by poisoning and explosion because of breeches in the gas pipes and connections in case of incorrect installation! Installation of gas pipes is allowed to be performed only by an authorized agent. During installation all legal stipulations, as well as the local regulations of gas distribution companies are to be observed. When installing the gas pipe it is essential that it is not tensed so as not to create areas of leakage! Maximum safety pressure for the gas valve is 60 mbar! Going above this pressure limite may resul in damage. Work pressure with G20 natural gas functioning must be 20 mbar! Gas pressure at the entry into the gas valve if GPL gas is used must be maintained between mbar! Is is obligatory to istall a pressure regulator on the fuel input circuit, adjusted at 20 mbar. In case parasite voltage appears on the gas pipe, it can be insulated by installing an electroinsulating piece (according to the Technical Norms for the planning and execution of natural gas input systems). Central heating boilers C15SPV24MEFM/C17SPV31MEF function on GN natural gas or liquefied gas GPL. The gas connecting pipe is made of stainless steel with an interior diameter of 16.4 mm. The gas input pipe must not have a diameter smaller than that of the gas connecting pipe of the central heating station. The fuel input must be done according to applicable legal stipulations. 8.3 General directions for the heating installation Before connecting the central heating station carefully wash the entire heating installation! In this way, you eliminate from the pipes various debris such as welding splashes, scoria, grummet, putty, dirt or similar. Otherwise, these substances can form deposits in the heating switcher and can cause damage or malfunctioning. It is obligatory to install an impurity filter on the return of the thermal circuit installation! When installing connecting pipes it is essential for these not to be tensed to avoid creating areas of leakage! Maximum working pressure allowed is 3bar. Recommended working pressure is 1.5 bar! It is forbidden to use the central heating station without thermal agent or partilally filled danger of explosion! It is forbidden to use the central heating station if it is not completely aired! The equipment is provided with a 7l capacity and 1 bar loading pressure expansion vessel. Before installing the equipment, check whether this volume is sufficient. If not, an additional expansion vessel must be installed on the aspiration side of the pump. Check the pressure inside the expansion vessel before commissioning. Pressure inside the expansion vessel must be 0.8 1bar. 8.4 General directions for the hot water circuit Connect the central heating station to the hot water installation. It is obligatory to install filters to de-harden the water and a mechanical impurity filter on the cold water input connecting pipe! When installing connecting pipes it is essential for these not to be tensed to avoid creating areas of leakage! The apparition of pressure shocks (input pressures higher than 3-4 bars in addition to symoultaneously activating quick closing taps) can affect the components of the hydraulic circuit inside the central heating station. We recommend the installation of a pressure regulator adjusted to 3-4 bars! Damage caused by the apparition of pressure shocks or by the use of higher pressure than recommended on the cold water input circuit is not covered by the warranty! We recommend the installation of a pressure regulator! Damage caused by the use of pressure higher than recommended on the cold water input circuit is not covered by the warranty! It is forbidden to install one-way valves on the the cold water input circuit. The cold water input pipe of the hot water preparation circuit will always be open (closing the network is done only by activating the taps at the consumer points) to allow take-over of possible dilatations on this circuit. Note! It is recommended that the distance between the hot water connecting pipe of the central heation station and the nearest conumer is minimum 6m of pipe. Otherwiswe, there is always the risk of hot water burns. 7 din 17

8 8.5 Connecting pipe of the safety valve Danger of hot water burns! The connecting pipe of the pressing of the safety valve is connected to the drain pipe to the sewage system. Otherwise, there is always the risk of flooding, for which the manufacturer of the central heating station is not responsible. 8.6 Air/ burnt gases input/ output pipes The central heating station does not use air from the room where it is installed or from the neighbouring rooms. Admission of air necessary to an efficient and not dangerous burning is always from the outside. The kit will obligatory have an incline of 3% (approximately 2 ) in order to eliminate condensation towards the exterior. It is obligatory to install central heating stations in rooms with ventilation in accordance with applicable norms. Danger! It is forbidden to run the station without the air/ burnt gases input/ output pipes because it endangers the life and health of people. Installation is carried out only by authorized personnel using original spare parts provided by the manufacturer. In order to obtain the efficiency declared by the manufacturer, while at the same time observing the limits of compounds from resulting burning gases, it is necessary to mount the diaphragms delivered with the central heationg station. 8.7 Electric grid connection The central heating station must be connected to one-phase network of 230V - 50Hz with protection null. Dispersion withstand of the earthing switch (earthing) must comply with applicable norms (maximum 4 ohm, and the working null must not have residual current). Electric powering of the central heating station will be executed from a separate circuit provided with differential protection fuses of 30 ma. External connections must comply with applicable norms. Connection to the electric grid of the building must allow the entire electric insulataion of the central heating station for situations when interventions are required. Grid connection is done taking into account the symbolism of colours as follows: Brown = phase, Blue = null, Green and Yellow = earthing. The current plug must be accessible so that the user can easily disconnect it. It is not allowed to mount the central heating station with a defective electric installation or with no earthing. Danger of death by electric shock with electric contacts! 8.8 Installation filling and emptying The following operations are executed to fill the installation: - electrically power the central heating station; - open the filling tap (fig. 1.4) of the central heating station and of the thermal/ house water installation: - charge the boiler with a pressure of 0.4 bar shown on the display; - open the air vent of the pump; - activate the boiler pump to air the installation: for activation long press J7 ( ) and the pump will turn on, while the central heating station is OFF (Stand-by); - set the needed hydraulic characteristic on the pump (5, 6 or 7 m H2O); - continuue to charge the boiler up to 1.5 bar, pressure shown on the display; - close the filling tap of the central heating station; - check the system to be water-proof. If there is leakage, solve the problem; - leave the pump on until all noises on the installation stop. It is needed 2-3 complete airvent cicles of sec each; - airvent the radiators; *figure conains ERP pump Fig check the pressure in the installation shown on the display. If necessary, fill with thermal agent observing the above mentioned steps; - turn off the station pump by pressing J7 ( ) or by turning on the station by pressing POWER. Obligatory operation! Check the correct functioning of the pump with no fuel in the central heating station. Defficient thermal transfer can cause the melting of the vent pipe of the ventilator, errors of the central heating station damage of the main switch of the station. Incorrect airing of the installation can cause damage of the main heating switch. Note! Recommended pressure on the thermal circuit is 1.5 bars. 8 din 17

9 Emptying the central heating station Emptying of the station implies the following: - turn off the station by pressing Power si switch off the electric power, close the gas tap; - close the thermal tap and the cold water input tap; - open the filling tap (fig.1.4), and then the consumer point of hot house water. Danger of hot water burns when emptying the station. 9 Operation instructions 9.1 Control Panel The LMC1112 control panel (fig.1.5) allows the visualization and change of parameters defining the functioning of the central heating station. It consists of: - 8 keys (J1 J8) - tab.3 - LCD display, where communication messages (graphic symbols) are displayed. The meaning of the 10 types of symbols (S1 S10) is presented in table 4. Fig. 1.8 Functions of keys on the control panel Table 3: Control panel keys Key Symbol Description: J1 CH + Used to increase the set thermal temperature or to navigate the installation submenu J2 CH - Used to decrease the set thermal temperature or to navigate the installation submenu J3 DHW + Used to increase the set temperature on hot water circuit or the value of the current parameter in the installation submenu J4 DHW - Used to decrease the set temperature on hot water circuit or the value of the current parameter in the installation submenu J5 POWER Used to switch the station on/ off J6 RESET Used to reset the electronic control board from an error state J7 Used to change the functioning mode winter/ summer J8 LIGHT Used to activate/ deactivate the light on the display Table 4: Description of graphic symbols in the LCD display Tasta Adnotare Descriere: S1 It diplays the temperature ( C), set value, parameter values, informative values, various messages ( On, SP, Co, EI, SI, etc.) S2 It displays informative values, parameter values, pressure S3 It shows the state of the central heating station (Closed (OFF) = active symbol, Open (ON) = inactive symbol) S4 S5 S6 S7 S8 S9 S10 It shows the presence of flame It shows whether the set functioning mode is SUMMER (active symbol) It shows whether the set functioning mode is WINTER (active symbol) Fig. 1.5 LMC1112 Control panel The symbol is displayed continuously, which means that the station functions as thermal station. The symbol is displayed interrupted whenthe thermal temperature is set. If this symbol is displayed continuously it means that the station functions as hot water station. The symbol is displayed interrupted whenthe hot water temperature is set. It shows the fact that the S2 symbol displays the value of the pressure inside the installation (active symbol) It shows the fact that there was an unsaved change of parameters in the EEPROM memory (it flashes) 9.1 Description of functions and of graphic contexts diplayed on the control panel LMC LIGHT function LIGHT key(j8 fig.1.5) is used to activate/ deactivate the light on display function. Fig din 17

10 Graphic context station startup When started, the station is in an intermediary state for 5 seconds, necessary to initialise the system. During this interval the diplay shows only the message On on the S1 symbol on the interface (see figure 1.6) Graphic context - Stand-by This context is associated with an inactive/ waiting state of the central heating station. In the stand-by state all the activation elements are inactive and every burning demand is ignored. An exception to the rule: the anti-freezing function (generated by a value of water temperature Fig.1.7 in the installation lower than 9 C, which will initiate a burning cycle to prevent the freezing of the thermal agent in the installation. Intrarea si iesirea din acest regim se face prin apasarea tastei POWER cel putin o secunda. Actiuni posibile: - POWER - comutarea intre starea ON/ Entering and exiting this regine is done by pressing POWER key for at least one second. Possible actions: - POWER comute between ON/OFF states; - LIGHT activation or deactivation of light functions. Figure 1.7 is a good example of display in the stand-by state (pressure on the thermal installation 1,8 bar) Graphic context error state The display of an error is sometimes asociated with a state of malfunctioning/ error of the station. There are three types of errors: - Critical errors: all the activating/state elements of the central heating station are inactive and any burning request is ignored. Getting out of this critical error state is done by pressing the RESET key; Fig Normal errors: all the activating/state elements of the central heating station are active and any burning request is ignored. Getting out of a normal error state is done by pressing the RESET key; - Informative errors: all the activating/state elements of the central heating station are active and all burning requests are accepted. Getting out of an informative state is done automatically when the cause of error disappears. In this context the diplay flashes a message with the error code. Possible actions: - RESET reset critical or normal errors; - LIGHT - activation or deactivation of light functions possible only if the central heating station is not in a state of critical error. Figura 1.8 is a good example of display of an error (in our case E20) Graphic context waiting state Waiting state is associated with a functioning state of the station, but with no burning request. All the activating/state elements of the central heating station are active and all burning requests are accepted if no error is present. In this state, the display shows pressure and thermal temperature, as well as the functioning mode summer/ winter. Fig.1.9 Possible actions: - POWER - comute between ON/OFF states; - IN/SU comute between summer/ winter functioning modes; - LIGHT - activation or deactivation of light functions; - CH+ - display and setting of maximum thermal temperature; - CH- - display and setting of minimum thermal temperature; - DHW+ - display and setting of maximum hot water temperature; - DHW- - display and setting of minimum hot water temperature. Figura 1.9 is an example of display in the waiting state (pressure in the heating installation is 1,4 bar, working mode is summer, and the temperature in the installation is 17 C) Graphic context functioning state This state is associated with the presence of flame or the functioning of the circulation pump of the station. In this state, all the activating/state elements of the central heating station are active and the burning request is accepted. The display shows the delivered instant temperature on the circuit meeting the request (heating ot hot water symbols S5 or S6), regardless of the presence or lack of flame, the pressure inside the installation and the functioning mode summer/ winter. Possible actions: - POWER - comute between ON/OFF states; - IN/SU comute between summer/ winter functioning modes; - LIGHT - activation or deactivation of light functions; - CH+ - display and setting of maximum thermal temperature; Fig CH- - display and setting of minimum thermal temperature; - DHW+ - display and setting of maximum hot water temperature; - DHW- - display and setting of minimum hot water temperature. Figures 1.10 and 1.11 are two examples of graphic display of this context. Figure 1.10 pressure in the heating installation is 1,8 bar, central heating station is in winter mode, flame is present, heating demand is satisfied and the instant thermal temperature is 43 C; Figura 1.11 pressure in the heating installation is 1,7 bar, central heating station is set on winter mode, flame is present, station deliveres hot water, and the instant hot water temperature is 53 C Graphic context adjustment of functioning parameters The adjustment of the main functions of the station (thermal temperature, hot water temperature) can be Fig.1.11 done both in the waiting state and in the functioning state When we enter the state display of these values, the last value previously set will be displayed. Only in the period the set value is displayed we can make changes of its value. Practically, at any moment of functioning of the station, by pressing J1 (CH+) or J2 (CH-) keys, the set value of the thermal temperature will be displayed and can be changed. 10 din 17

11 Similarlry, at any moment of functioning of the station, by pressing the J3 (DHW+) or J4 (DHW-) keys, the set value of the hot water temperature will be displayed and can be changed. While doing these settings, the display will show the value of the set temperature (thermal or hot water), the pressure in the installation and the functioning mode of the station (winter/ summer). Getting out of this setting mode is done automatically if no key is pressed for at least 3 seconds. Fig.1.12 Figures 1.12 and 1.13 are two examples of displaying temperature in the setting mode. Figure 1.12 pressure in the heating installation is 1,8 bar, central heating station is set on winter mode, set value of thermal temperature is 42 C; Figure 1.13 pressure in the heating installation 1,6 bar, central heating station is set on winter mode, set value of hot water temperature is 60 C. Fig Graphic context - Service submenu In the Service submenu, various functioning parameters of the central heating station can be viewed/ changed/ checked. This submenu can be accessed only by service personnel authorised by KOBER SRL Vaduri Branch, 9.2 Central heating station startup To startup the station press POWER key fig.1.5. Choosing the functioning mode winter/ summer By pressing J7 key ( ) you can change the functioning mode winter/ summer. This can be viewed on the display, symbol S5/S6 will be activated; Adjusting temperature on the thermal circuit The adjustment of temperature is done by pressing J1 and J2 keys. Press J1 to increase temperature and J2 respectively to decrease temperature; Adjusting water temperature on the hot water circuit The adjustment of temperature is done by presing J3 and J4 keys. Press J3 to increase temperature and J4 respectively to decrease temperature; 9.3 Functioning as waste hot water station (WHW) The station can function as WHW in both seasons winter and summer. The WHW request has priority over the heating request in the winter mode. The station can function as instant WHW or as accumulation boiler WHW (the boiler is purchased separately). For the functioning of the station as an accumulation boiler WHW station please contact an authorised service company. In intant regime, the minimum flow of hot water detected by the station is 2.4 l/min. For confort in using the station as a WHW station we recommend to exploit the station at a flow of approximately 7-8 l/min. When the station functions with low flows, the station functions continuously at the minimum charge as long as the hot water temperature is under the threshold limit of 63 C. When the hot water temperature reaches the mentioned limit of 63 C, the burner is closed and a new burning will happen when the hot water temperature is lower than the limit of 60 C. When the station functions with high flows, the hot water temperature will be the opposite of the hot water flow, but lower than the set temperature. With instant WHW configuration on request the CONFORT function can be activated/ deactivated. Please contact an authorized service company. This function allows the delivery of hot water as soon as possible, while keeping the boiler hot. If the function is active, the boiler starts when the hot water temperature is equal to the set hot water temperature; the boiler stops when the hot water temperature is 8 C ( fixed value) higher than the set hot water temperature. If the water heated in this way is not consumed within one hour, the CONFORT function is automatically deactivated. 9.4 Functioning as heating station (HS) The station functions in this mode when winter season is selected. For the selection of the type of heating installation (floor or radiators) please contact an authorised service company. If a thermoregulator is connected to the electronic board, the stations functions in thermal mode only when the surrounding temperature is lower than the set temperature in the thermoregulator. 9.5 Preset functions related to station safety 1. Anti-freezing protection function. If the temperature in the installation drops below 9 C, the system turns on the heating at minimum charge until the temperature reaches 30 C. 2. Post-circulation of the hot water and heating pump function. The post-circulation cycle starts only if the system is not in the BURNING state. Advantages: a) it prevents the water from becoming stationary at high temperatures inside the heat switch. In this way, calcareous deposits are reduced significantly b) it prevents water from boiling inside the heat switch in the post-heat interval. These advantages have as result the protection of the heat switch. 3. Pump anti-blocking system and three-way valve. If the station did not go through a burning cycle in the last 24h, the pump will be started for 12 seconds to avoid its blocking. In this time the three-way valve is also activated and deactivated. 4. Post-ventilation After each station stop, the ventilator still functions for some time to evacuate completely the burning gases out of the station and also the water vapours they contain. In this way, both the ventilator control electric circuit and the primary heat switch, which cools down partially, are protected. 5. Legionella bacteria prevention function This function is active for the functioning of the station as accumulation boiler WHW. When hot water is prepared in the boiler, the ANTILEGIONELLA function is actived automatically. This function implies that once a week (on Wednesdays, between 03AM 04AM) the temperature of the water in the boiler is kept at the value of 65 C. 9.6 Setting additional functions Setting additional functions is done only in the "Service" menu. Please contact an authorised service company. 11 din 17

12 9.7 Error signals Possible errors of the system are indicated by the following codes which appear on the display. Table 5: Meaning of error signals which appear on the display: Code Nonvolatile Meaning Resetting mode E01 YES Problems of the feeding source AUTO- RESETTABLE when the cause disappears E02 NO Malfunction of the electronic board AUTO- RESETTABLE when the cause disappears E04 NO Malfunctions of the interface mode AUTO- RESETTABLE when the cause disappears E06 NO Frequent resetting of the electronic board E07 NO Installation parameters in the electronic board memory are corrupted E08 YES Internal memory is corrupt E10 NO Water system pressure is incorrect. Water pressure in the installation is too low (lower than 0,8 bars). Resettable error! Fill the installation with water to the recommended working pressure (1.5 bars) and monitor the pressure for a few days.if pressure continues to drop, check for water leakage on one of the joints of the thermal installation. If you checked and it is allright, but the presuure continues to drop, contact an authorised service company. E11 YES Rapid increase of the output water temperature E13 NO Difference between input/ output temperatures too big AUTO- RESETTABLE when the cause disappears AUTO- RESETTABLE when the cause disappears i AUTO- RESETTABLE when the cause disappears E15 YES No water flow signal when the boiler pump is activated E20 YES Failed burning after three attempts E22 YES Malfunction of flame detection E23 YES Malfunction of flame detection E25 YES BCU malfunction E30 YES Malfunctioning burnt gases sensor E31 NO Malfunctioning thermal input sensor E32 NO Malfunctioning thermal output sensor E35 NO Malfunctioning external temperature sensor E36 NO Mafunctioning WHW temperature E37 NO Malfunctioning boiler temperature sensor 1 E38 NO Malfunctioning boiler temperature sensor 2 E40 YES Temperature of burning gases is too high E41 NO Temperature of thermal agent on the thermal input is too high or too low E42 NO Temperature of thermal agent on the thermal output is too high or too low E45 NO External temperature too high E46 NO WHW temperature too low/ too high E47 NO Temperature displayed by boiler sensor 1 is too low/ high E48 NO Temperature displayed by boiler sensor 2 is too low/ high E50 YES Malfunctioning with feeding of ventilator at 230VAC E51 YES Error with command/ state of ventilator E52 YES Incorrect ventilator functioning (ex. turation) 12 din 17

13 9.8 Station switch off in safety conditions If the user observes abnormal functioning of the equipment, if error codes are displayed repreatedly or if the user cannot understand the actions of the central heating station, the user must stop the functioning of the station immediately and in maximum safety conditions. For this, the user must perform the following operations: - Press ON-OFF key and interrupt the functioning of the station; -Disconnect the central heating station from the main power line by unplugging it (if applicable); - Interrupt the fuel circuit by turning off the gas taps; -Interrupt the flow of house water and of heatined water by turning off the corresponding taps for these circuits; After the station is switched off in safety conditions, the user will contact the authorized service company in the area. 9.9 User training It is obligatory for the specialized personnel commissioning the station to instruct the user about the following aspects: 1. Central heating station switch on/ off procedure in safety conditions by checking the following elements: - electrical power connection; - fuel (gas) connection; - feeding and filling the thermal circuit; - the station filling tap must be turned off; - the pressure in the installation by reading the control panel (1.5bar); - the station taps on the house water circuit must be turned on. 2. The functioning way of the station and possible problems that may occur. Also each key and symbol on the control panel must be explained. 3. Warn the user that a drop in the water pressure of the system is caused by loss of thermal agent which needs to be mended before using the station again. 4. Warn the user on the works performed on the air/ gases input/ output systems. Warn the user that changing them is strictly forbidden. 5. It is recommended that the user should have the station verified by an authorized person at least once a year. 6. Warn the user about the the precautions that need to be taken against freezing. 7. Hand the user the user manual of the central heating station. At the end of training a commissioning statement is signed (table 2), by which the user signs that they are aware of the correct way of using the central heating station.. This statement is also signed by the authorized person who commissioned the central heating station. The authorised person who commissions the station has the right to refuse to sign the station commissioning statement if they notice defects of the local connecting installations and will not sign the commissioning statement until these defects have been remedied Quality Conditions and Warranty The company KÖBER S.R.L. - VADURI BRANCH as the manufacturer, guarantees the correct functioning of the central heating station if are observed ALL conditions for the installation, commissioning, use and periodical technical revision established in the Warranty Certificate given by the manufacturer and signed by the authorized company in the presence of the beneficiary when the product is purchased. The Warranty Certificate that comes with the product details all the limits of the warranty. Please carefully follow the directions in the Warranty Certificate and before reporting any malfunctioning of the station make sure that all the local connecting installations are of the required quality! Not observing the conditions of the warranty certificate results in losing warranty. 10 Inspection and maintenance 10.1 Inspection and maintenance intervals It is obligatory to perform the periodical technical inspection in accordance to applicable law. In the warranty period of the station the periodical technical inspection will be performed by companies authorised by KÖBER S.R.L. - VADURI BRANCH. In order to ensure permanent availability, safety in functioning, efficiency and extended working life, it is recommended that a yearly technical inspection should be performed by the authorized agreed company. This is why we recommend that you sign a service and maintenance agreement. It is recommended that this inspection should be performed before the cold season when the station is used at full capacity. Danger! Inspections, maintenabce and repair work are allowed only to technicians authorised and agreed by KÖBER S.R.L. - VADURI BRANCH. Not having inspections/ maintenance work can result in material and physical damage. In order to benefit from all the station function for an extended period of time we recommend the use of original spare parts. 13 din 17

14 10. Drawings necessary for mounting and commissioning Types of input-output configurations for mounting C 12 C12 x C 32 C32 x C 12 C 12x C8 2 C22 C 12 C Minimum distances for mounting the co-axial kit H GARAGE, ANNEX, ETC LEGEND: A distance under the window/ ventilation hole = 300mm B - distance over the window/ ventilation hole = 300mm C distance left/ right to the window/ ventilation hole = 300mm D, E distance from the roof/ gutter = 250mm F distance from the garage roof/ balcony = 250mm G distance to vertical gutter = 250mm H distance to internal/ external corners = 250mm H* - distance to windows/ doors = 300mm I distance to ground/ balcony = 300mm J distance over the door = 600m L distance to the door/ window in the garage = 1200mm M vertical distance to another terminal = 1500mm N horizontal distance to another terminal = 300mm O distance to the wall of another construction = 1200m 14 din 17

15 10.3 Hydraulic pump characteristic When designing the thermal installation, the hydraulic pump characteristics need to be taken into consideration. 80 P Pump pressure [kpa] Pump setting: The pump can be set to function in four modes (4 steps). Table 6 Pump functioning modes (*)functioning mode set in the factory. Pump flow Q[mc/h] UPM3 Flex As [m] LED 1 red LED 2 yellow LED 3 yellow LED 4 yellow 4 5* 6 7 LED 5 yellow LED 1 To set on another curve please contact the authorized service company. NOTE! To save on energy and to maintain the possible functioning noises to a low level, please choose a low characteristic curve. 15 din 17

16 10.4 Functioning schemes covered by warranty Central heating with radiators and instant preparation of hot water BOTTOM PLAN Legend : TA - Ambient thermostat SE - Exterior temperature sensor TT - Central heating Output V3C SC PC RT - Central heating Input A - Cold water input PC - Boiler circulation pump SE CMC1X CMC1X - Boiler BCU ACM - DHW domestic hot water ACM A V3C - Three-way valve SC - Primary heating exchanger TT RT This note is informative. KÖBER Ltd don t assumes no responsibility for its proper functioning. TA RADIATORS NETWORK Floor central heating and instant preparation of hot water BOTTOM PLAN Legend : TA - Ambient thermostat SE - Exterior temperature sensor V3C SC PC TT - Central heating Output RT - Central heating Input A - Cold water input SE CM C1X PC - Boiler circulation pump CMC1X - Boiler BCU TT ACM A RT ACM - DHW domestic hot water V3C - Three-way valve SC - Primary heating exchanger This note is informative. KÖBER Ltd don t assumes no responsibility for its proper functioning. TA FLOOR HE ATING 16 din 17

17 Central heating with radiators and accumulated preparation of hot water (accummulation boiler) TA BOTTOM PLAN Legend : TA - Ambient thermostat SE - Exterior temperature sensor TT - Central heating Output RT - Central heating Input A - Cold water input PC - Boiler circulation pump SE V 3C SC CMC1X TB RB PC RT TI CMC1X - Boiler BCU ACM - DHW domestic hot water V3C - Three-way valve TS - Thermostat TI - Thermometer TB - Water tank output RB - Water tank input SC - Primary heating exchanger TT A ACM P C TS This note is informative. KÖ BER Ltd don t assumes no responsibility for its proper functioning. RADIATORS NETWORK AR Floor central heating and accumulated preparation of hot water (accummulation boiler) TA BOTTOM PLAN Legend : TA - Ambient thermostat SE - Exterior temperature sensor TT - Central heating Output RT - Central heating Input A - Cold water input PC - Boiler circulation pump SE V 3C CMC1X TB S C A RB PC RT TI CMC1X - Boiler BCU ACM - DHW domestic hot water V3C - Three-way valve TS - Thermostat TI - Thermometer TB - Water tank output RB - Water tank input SC - Primary heating exchanger TT ACM PC TS This note is informative. KÖBER Ltd don t assumes no responsibility for its proper functioning. FLOOR HE ATING AR 17 din 17

USER MANUAL C32SPV24MEFB C32SPV31MEFB C22SPV23MEF

USER MANUAL C32SPV24MEFB C32SPV31MEFB C22SPV23MEF KÖBER SRL VADURI BRANCH USER MANUAL GAS BOILER C32SPV24MEFB C32SPV31MEFB C22SPV23MEF Image for presentation only. Product may look slightly different depending on the area and the purchase period. KÖBER

More information

Operating instructions

Operating instructions Operating instructions For the operator Operating instructions HOME SYSTEM GB, IE Publisher/manufacturer Vaillant GmbH Berghauser Str. 40 D-42859 Remscheid Tel. +49 21 91 18 0 Fax +49 21 91 18 28 10 info@vaillant.de

More information

Wall Hung Gas Boilers EKO range, type C32

Wall Hung Gas Boilers EKO range, type C32 Page: 1 of 52 Manufacturer KÖBER SRL Dumbrava Rosie, Wall Hung Gas Boilers EKO range, type C32 Brand name TYPE DRAUGHT POWER EKO OPTIMUS C32SPV24MEFA FORCED 24 kw EKO MT TF C32SPV24MEFB FORCED 24 kw EKO

More information

User s Information Manual

User s Information Manual User s Information Manual Model NPE-24AWE NPE-24SWE NPE-32AWE NPE-32SWE Condensing Water Heater These appliances are for use with natural gas or LPG. (An LPG conversion kit is included with the water heater.)

More information

Operating instructions

Operating instructions Operating instructions Capriz 2 24c 28c GB, IE Contents Contents 1 Safety... 3 1.1 Action-related warnings... 3 1.2 Intended use... 3 1.3 General safety information... 4 2 Notes on the documentation...

More information

Operating instructions

Operating instructions The energy you need Operating instructions Betacom 3 24c -A (H-GB) 30c -A (H-GB) GB, IE Contents Contents 1 Safety... 3 1.1 Action-related warnings... 3 1.2 Intended use... 3 1.3 General safety information...

More information

WHE 2.24 / WHE 2.24 FF

WHE 2.24 / WHE 2.24 FF EN Wall-hung gas boilers WHE 2.24 WHE 2.24 FF User Guide 300011777-001-C . Contents 1 Introduction.............................................................................3 1.1 Symbols used...........................................................................................3

More information

USERS MANUAL FOR GAS BOILERS

USERS MANUAL FOR GAS BOILERS USERS MANUAL FOR GAS BOILERS PLEASE READ THE MANUAL CAREFULLY: IT CONTAINS IMPORTANT INFORMATION REGARDING SAFETY, INSTALLATION, USE AND MAINTENANCE OF THE APPLIANCE MODELS: NOVADENS 24 NOVADENS 24C NOVADENS

More information

Operating instructions

Operating instructions Operating instructions Gas-fired condensing boiler Logano plus GB312 For the user Please read carefully before use 7 747 009 296-01/2007 EN Contents 1 For your safety..............................................

More information

User s Information Manual

User s Information Manual Condensing Combi Boiler User s Information Manual These appliances are for use with natural gas or LPG. (An LPG conversion kit is included with the boiler.) Type: B23-B33-B53-C13-C33-C43-C53-C63-C83 Gas

More information

/2010 US/CA

/2010 US/CA 6 720 646 148-11/2010 US/CA (en) For the user User s Instructions Condensing gas boiler Logamax plus GB162-L.B. 80 kw/100 kw Please read thoroughly before operating This manual is available in the English

More information

E-COMBI EVO E-SYSTEM EVO

E-COMBI EVO E-SYSTEM EVO E-COMBI EVO E-SYSTEM EVO User s manual CONDENSING WALL-HUNG GAS BOILER G.C.N.:47-116-68 (24 kw) G.C.N.:47-116-69 (30 kw) G.C.N.:47-116-70 (38 kw) G.C.N.:41-116-39 (24 kw) G.C.N.:41-116-40 (30 kw) Country

More information

Installation, operating and servicing instructions

Installation, operating and servicing instructions English 57-115 - 144-1 - 259 Installation, operating and servicing instructions ITALIA EN 1 ITALIA English INDEX WARnINGS 3 Who should read these instructions 3 Symbols 3 Recommendations 3 Importants notes

More information

T UNI 7000 F. Operating instructions For the user (2006/05) AU/GB

T UNI 7000 F. Operating instructions For the user (2006/05) AU/GB 6 720 648 662-00.1T UNI 7000 F Operating instructions For the user AU/G 2 Contents Contents Contents 2 1 Safety information and explanation of symbols 3 1.1 For your safety 3 1.2 Explanation of symbols

More information

MP920 SALT CHLORINATOR

MP920 SALT CHLORINATOR MP920 SALT CHLORINATOR Index 1 Safety Instructions... 3 1.1 Warnings... 3 2 EC Conformity... 3 3 System Contents... 3 4 Installation... 4 4.1 Hydraulic Installation... 4 4.1.1 Electrolysis Cell... 4 4.2

More information

USER MANUAL ACQUAHOME 32 B BLU

USER MANUAL ACQUAHOME 32 B BLU USER MANUAL ACQUAHOME 32 B BLU Dear Customer, Thank you for preferring a T heating unit, a modern, high-quality product that is able to guarantee your maximum well-being for a long period of time, with

More information

User Manual FLOWMAX-90. for model. Condensing water heater 85,000 BTU. Installation, operating, commissioning and maintenance instructions.

User Manual FLOWMAX-90. for model. Condensing water heater 85,000 BTU. Installation, operating, commissioning and maintenance instructions. User Manual for model FLOWMAX-90 Condensing water heater 85,000 BTU WARNING If the information in these instructions is not followed exactly, a fire or explosion may result, causing property damage, personal

More information

E-Combi One E-System ONE

E-Combi One E-System ONE discover more @ariston.com G.C.N.: 47-116-83 (24 kw) G.C.N.: 47-116-84 (30 kw) G.C.N.: 41-116-47 (24 kw) G.C.N.: 41-116-48 (30 kw) E-Combi One E-System ONE USER S MANUAL CONDENSING WALL-HUNG GAS BOILER

More information

TECHNICAL MANUAL MULTI-ELEC STANDARD BOILER 09/2011 CODE:

TECHNICAL MANUAL MULTI-ELEC STANDARD BOILER 09/2011 CODE: TECHNICAL MANUAL MULTI-ELEC STANDARD BOILER 09/2011 CODE: 560955 CE Directive 2006/95/CEE British Standard EN 60335-1 (C 73800) 1 CONTENTS Page 1) INTRODUCTION 1.1) Description 3 1.2) Dimensions & connections

More information

Residential Gas Condensing Boiler Greenstar ZBR16/21/28/35/42-3A... ZWB28/35/42-3A...

Residential Gas Condensing Boiler Greenstar ZBR16/21/28/35/42-3A... ZWB28/35/42-3A... 70 80 99-00-O Residential Gas Condensing Boiler ZBR//8/35/4-3A... ZWB8/35/4-3A... 70 80 993 (03/03) CA/US Operating Instructions Contents Contents Key to symbols and safety instructions............................

More information

CentroPelet ZV14 TECHNICAL INSTRUCTIONS HEATING TECHNIQUE. for regulation, use and maintenance of pellet stove

CentroPelet ZV14 TECHNICAL INSTRUCTIONS HEATING TECHNIQUE. for regulation, use and maintenance of pellet stove HEATING TECHNIQUE Centrometal d.o.o. - Glavna 12, 40306 Macinec, Croatia, tel: +385 40 372 600, fax: +385 40 372 611 TECHNICAL INSTRUCTIONS for regulation, use and maintenance of pellet stove CentroPelet

More information

SATK50-60 series CONTENTS. Recess Mounted Heat Interface Unit - SATK series INSTRUCTIONS FOR INSTALLATION, COMMISSIONING AND MAINTENANCE

SATK50-60 series CONTENTS. Recess Mounted Heat Interface Unit - SATK series INSTRUCTIONS FOR INSTALLATION, COMMISSIONING AND MAINTENANCE 780EN www.caleffi.com Recess Mounted Heat Interface Unit - SATK series SATK0-60 series INSTRUCTIS FOR INSTALLATI, COMMISSIING AND MAINTENANCE Function The SATK series HIU allows independent control of

More information

RVA /109. Heating Circuit ZONE Controller. Instructions for the INSTALLER

RVA /109. Heating Circuit ZONE Controller. Instructions for the INSTALLER Heating Circuit ZONE Controller RVA 46.531/109 Zonal temperature controller for control of a lowtemperature heating system, for use with condensing gas boilers Instructions for the INSTALLER INDEX Page

More information

JUMBO INDIRECT FIRED DIESEL HEATER OPERATING INSTRUCTIONS

JUMBO INDIRECT FIRED DIESEL HEATER OPERATING INSTRUCTIONS JUMBO INDIRECT FIRED DIESEL HEATER OPERATING INSTRUCTIONS Before using the heater, read and understand all instructions and follow them carefully. The manufacturer is not responsible for damages to goods

More information

Installer manual AG-AA10. Air/air heat pump IHB GB AG-AA10-30 AG-AA10-40/50

Installer manual AG-AA10. Air/air heat pump IHB GB AG-AA10-30 AG-AA10-40/50 -30 Installer manual Air/air heat pump -40/50 IHB GB 1516-1 331554 Table of Contents 1 Important information 2 5 Installation 7 Safety information 2 Model combinations 7 Read before starting the installation

More information

Operating instructions

Operating instructions Operating instructions For the operator Operating instructions ecotec plus Gas-fired wall-hung high-efficiency boiler GB, IE Publisher/manufacturer Vaillant GmbH Berghauser Str. 40 D-42859 Remscheid Telefon

More information

SOTTOSTAZIONI PER TELERISCALDAMENTO DISTRICT HEATING SUBSTATIONS

SOTTOSTAZIONI PER TELERISCALDAMENTO DISTRICT HEATING SUBSTATIONS SOTTOSTAZIONI PER TELERISCALDAMENTO DISTRICT HEATING SUBSTATIONS INDEX Ed. 20150422 GENERAL INFORMATION... 2 Before installing... 2 Materials and PED (97/23/CE) Standards... 3 SKID-TYPE DISTRICT HEATING

More information

INSTRUCTION MANUAL T30 1MN0107 REV. 0. operates with ISO9001 certified quality system

INSTRUCTION MANUAL T30 1MN0107 REV. 0. operates with ISO9001 certified quality system INSTRUCTION MANUAL 1MN0107 REV. 0 operates with ISO9001 certified quality system TECSYSTEM S.r.l. 20094 Corsico (MI) Tel.: +39-024581861 Fax: +39-0248600783 http://www.tecsystem.it R. 1.1 25/08/16 ENGLISH

More information

INSTALLATION AND OPERATION MANUAL

INSTALLATION AND OPERATION MANUAL INSTALLATION AND OPERATION MANUAL PRESSURISED STEEL BOILERS AR 30 AR 1000 RADIALAND - BOILER's INSTALLATION MANUAL version 1.0 / 15-02-2008 The company E. is outstanding in the field of central heating

More information

INSTRUCTIONS FOR USE OF COMBINED BOILER INTENDED FOR COMBUSTION OF BOTH PELLETS AND SOLID FUEL ABC COMBO

INSTRUCTIONS FOR USE OF COMBINED BOILER INTENDED FOR COMBUSTION OF BOTH PELLETS AND SOLID FUEL ABC COMBO INSTRUCTIONS FOR USE OF COMBINED BOILER INTENDED FOR COMBUSTION OF BOTH PELLETS AND SOLID FUEL ABC COMBO .Technical specifications Boiler power DESCRIPTION Water content in a boiler Required draft Supply

More information

CITY PLUS. Wall-hung condensing boilers. ErP 24 HE 30 HE. Ready

CITY PLUS. Wall-hung condensing boilers. ErP 24 HE 30 HE. Ready CITY PLUS Wall-hung condensing boilers 24 HE 30 HE ErP Ready Quality first of all! Quality components Only the best components are used in the Italtherm boilers Noble materials Brass hydraulic groups,

More information

INSTRUCTION FOR THE USER THC V E OIL BLU

INSTRUCTION FOR THE USER THC V E OIL BLU INSTRUCTION FOR THE THC V E OIL BLU CONTENTS General safety information 4 Precautions 4 Control panel 5 Mode selection 8 User levels 10 Start-up 12 Temporary shutdown 15 Preparing for extended periods

More information

For the owner. Operating manual. ecotec plus 937. Gas condensing storage combination boiler VUI

For the owner. Operating manual. ecotec plus 937. Gas condensing storage combination boiler VUI For the owner Operating manual ecotec plus 937 Gas condensing storage combination boiler GB VUI Contents Appliance characteristics Recommended accessories Contents Appliance characteristics... Recommended

More information

ir-range 8G /03.15 Changes reserved.

ir-range 8G /03.15 Changes reserved. U s e r m a n u a l ic-range is-range ir-range 8G.52.80.00/03.15 Changes reserved. Contents 1. Introduction...3 2. Safety...5 3. Boiler description...6 4. Display and functions...7 4.1 DHW and Heating

More information

VIESMANN. Operating instructions VITODENS 100. for system users. Heating system with control unit for constant temperature operation

VIESMANN. Operating instructions VITODENS 100. for system users. Heating system with control unit for constant temperature operation Operating instructions for system users VIESMANN Heating system with control unit for constant temperature operation VITODENS 100 2/2005 Please keep safe Safety instructions For your safety Please follow

More information

INSTALLATION AND OPERATING INSTRUCTIONS BIOCLASS HM

INSTALLATION AND OPERATING INSTRUCTIONS BIOCLASS HM INSTALLATION AND OPERATING INSTRUCTIONS BIOCLASS HM Thank you for choosing a DOMUSA TEKNIK heating boiler. Within the product range offered by DOMUSA TEKNIK you have chosen BioClass HM model. With a suitable

More information

User Manual for model

User Manual for model User Manual for model RKA 24 /20 Wall mounted storage combi boiler premix condensing boiler CE 0694 Technical specification RADIANT BRUCIATORI S.p.A. Montelabbate RKA 24.20 - RAD - ING - MAN.UT - 1309.1

More information

GH10PA USER MANUAL. Program version 01 MANUAL FOR CONTROLLER FOR CONTROLLING CENTRAL HEATING BOILERS FIRED WITH PELLETS AND OATS

GH10PA USER MANUAL. Program version 01 MANUAL FOR CONTROLLER FOR CONTROLLING CENTRAL HEATING BOILERS FIRED WITH PELLETS AND OATS MANUAL FOR CONTROLLER GH10PA FOR CONTROLLING CENTRAL HEATING BOILERS FIRED WITH PELLETS AND OATS Program version 01 USER MANUAL We request that users carefully study applicable Instructions before connecting

More information

SMART EVO 2 - User Manual ELECTRICAL PANEL FOR 2 MOTORS

SMART EVO 2 - User Manual ELECTRICAL PANEL FOR 2 MOTORS SMART EVO 2 - User Manual ELECTRICAL PANEL FOR 2 MOTORS CONTENTS 1. INTRODUCTION... 5 2. WARNINGS... 6 3. GENERAL DESCRIPTION... 7 4. INSTALLATION... 8 5. LUMINOUS INDICATORS AND COMMANDS... 9 6. DIP-SWITCH

More information

Multi-Elec COMPACTE BOILER

Multi-Elec COMPACTE BOILER Multi-Elec COMPACTE BOILER TECHNICAL MANUAL 03/2013 CODE: 560956 CE Directive 2006/95/CEE British Standard EN 60335-1 (C 73800) FOR TECHNICAL HELP/ADVICE Call 0161 621 5960 or email info@atlanticboilers.com

More information

Instructions for the fan motor control system with integrated wiring terminals SILVER C

Instructions for the fan motor control system with integrated wiring terminals SILVER C Instructions for the fan motor control system with integrated wiring terminals SILVER C 1. General The motor control system is used for controlling the type EC, 0.41-10 kw fan motors in the SILVER C units.

More information

Warning: 230V / 1ph / 50Hz V / 3ph / 50Hz. Remarks: Make sure that you have enough power. (See page 15 Cable table)

Warning: 230V / 1ph / 50Hz V / 3ph / 50Hz. Remarks: Make sure that you have enough power. (See page 15 Cable table) 1 2 Warning: - Do not place your hand or any other objects into the air outlet and fan. It could damage the heat pump and cause injuries; - In case of any abnormality with the heat pump, cut off the power

More information

MDX. Non-Cycling Refrigerated Compressed Air Dryers with Intellidrain Condensate Drain Trap. Operation & Maintenance Manual

MDX. Non-Cycling Refrigerated Compressed Air Dryers with Intellidrain Condensate Drain Trap. Operation & Maintenance Manual MDX Non-Cycling Refrigerated Compressed Air Dryers with Intellidrain Condensate Drain Trap Operation & Maintenance Manual MODELS MDX 1500 1800 2400 3000 TABLE OF CONTENTS 1.0 GENERAL 2 1.1 How to use this

More information

Smart Smart IR. Service instruction SALES DATE MANUFACTURED ON (DATE): APPROVAL MARK SOLD. model (check applicable) is recognized as serviceable

Smart Smart IR. Service instruction SALES DATE MANUFACTURED ON (DATE): APPROVAL MARK SOLD. model (check applicable) is recognized as serviceable Smart Smart IR model (check applicable) is recognized as serviceable Service instruction SALES DATE MANUFACTURED ON (DATE): SOLD APPROVAL MARK SMART-EN-04 BLAUBERG Company is happy to offer your attention

More information

PROGRAMMABLE 7-DAY RF THERMOSTAT

PROGRAMMABLE 7-DAY RF THERMOSTAT PROGRAMMABLE 7-DAY RF THERMOSTAT Installation and user instruction This instructions to be retained by the user 1 Thank you for choosing Beretta s radio frequency (RF) Radiostat. This central heating control

More information

INSTRUCTION MANUAL. operates with ISO9001 certified quality system. TECSYSTEM S.r.l Corsico (MI) Tel.: Fax:

INSTRUCTION MANUAL. operates with ISO9001 certified quality system. TECSYSTEM S.r.l Corsico (MI) Tel.: Fax: INSTRUCTION MANUAL TTG SERIES FANS 1MN0069 Rev 0 operates with ISO9001 certified quality system TECSYSTEM S.r.l. 20094 Corsico (MI) Tel.: +9-024581861 Fax: +9-024860078 http://www.tecsystem.it R. 1. 20/02/17

More information

Aqua Balance. User s Information Manual. WMB-155C Wall Mount Gas-Fired Combination Boiler Heating and Domestic Hot Water

Aqua Balance. User s Information Manual. WMB-155C Wall Mount Gas-Fired Combination Boiler Heating and Domestic Hot Water Aqua Balance WMB-155C Wall Mount Gas-Fired Combination Boiler Heating and Domestic Hot Water User s Information Manual * Low Lead Content If the information in this manual is not followed exactly, a fire

More information

Universal Fire Tube Boiler Wall Mount Models

Universal Fire Tube Boiler Wall Mount Models Universal Fire Tube Boiler Wall Mount Models USER S INFORMATION MANUAL Models WBRU**80W / 100W / 120W / 140W / 175W / 199W **NG denotes Natural Gas Model, LP Denotes Propane Model Heat Exchanger Bears

More information

1 DOCUMENT REVISION CONTROL ELEMENTS... 9

1 DOCUMENT REVISION CONTROL ELEMENTS... 9 CONTENTS Contents 1 DOCUMENT REVISION... 8 2 SOFTWARE VERSION... 8 3 BASIC DESCRIPTION... 8 4 CONTROL ELEMENTS... 9 4.1 BASIC DISPLAYS...10 4.2 CONTROL KEYS...11 4.2.1 Rotary button (Press / Turn)...11

More information

INSTALLATION INSTRUCTIONS POINT OF USE WATER HEATERS EPU - US10 EPU - US15

INSTALLATION INSTRUCTIONS POINT OF USE WATER HEATERS EPU - US10 EPU - US15 INSTALLATION INSTRUCTIONS POINT OF USE WATER HEATERS EPU - US10 EPU - US15 01 CONTENTS Special information 2 General information 3 Safety 5 Appliance description, cleaning, care & maintenance 7 Appliance

More information

smardy - pure water Reverse osmosis system YR100-A 75 GPD

smardy - pure water Reverse osmosis system YR100-A 75 GPD smardy - pure water Reverse osmosis system YR100-A 75 GPD Instruction manual [EN] Please read this manual carefully before operating the device and subsequently keep the instruction manual safely and within

More information

Instructions for the fan motor control system, SILVER C

Instructions for the fan motor control system, SILVER C Instructions for the fan motor control system, SILVER C 1. General The motor control system is used for controlling the type EC, 0.41-10 kw fan motors in the SILVER C units. The motor control system is

More information

INSTALLATION, COMMISSIONING AND OPERATING MANUAL

INSTALLATION, COMMISSIONING AND OPERATING MANUAL INSTALLATION, COMMISSIONING AND OPERATING MANUAL 1 YTBV-D-CE42_0109 CONTENT Available models and capacities Supplier information Warranty Safety Emergency stops/ shutdowns About this manual Models Physical

More information

PROGRAMMABLE 7-DAY THERMOSTAT

PROGRAMMABLE 7-DAY THERMOSTAT PROGRAMMABLE 7-DAY THERMOSTAT Installation and user instruction This instructions to be retained by the user 1 Thank you for choosing Riello s weekly programmer.. This central heating control device is

More information

TERMO-Blok TERMO-Extra TERMO-Blok PTV

TERMO-Blok TERMO-Extra TERMO-Blok PTV ELECTRIC BOILERS FOR CENTRAL HEATING TERMO-Blok TERMO-Extra TERMO-Blok PTV Contents 1. Introduction... 1 1.1. Applicable documents... 1 1.2. Retention of documents... 1 1.3. Introduction... 1 1.4. Heating

More information

Tankless Water Heater

Tankless Water Heater Tankless Water Heater USER S INFORMATION MANUAL Models WGRT**150 / WGRT**199 / WGRTC**199 **A suffix of LP denotes propane gas **A suffix of NG denotes natural gas NOTICE: Westinghouse reserves the right

More information

User Manual RBS 24. for model CE series ENERGY. Wall mounted instantaneous combi boiler room sealed chamber

User Manual RBS 24. for model CE series ENERGY. Wall mounted instantaneous combi boiler room sealed chamber User Manual for model RBS 24 series ENERGY Wall mounted instantaneous combi boiler room sealed chamber CE 0694 RBS 24 - SERIE ENERGY - RAD - ING - MAN.UT - 1407.1 - DIGITECH TR - MIAH6 - E04 Technical

More information

1. Information before installation General terms of delivery, storage and transport

1. Information before installation General terms of delivery, storage and transport EN Read this manual carefully before installing, maintaining or repairing this device! The symbol indicates important information that must be taken into account in order to avoid risk of personal injury

More information

INSTALLATION AND OPERATING INSTRUCTIONS AVANTTIA

INSTALLATION AND OPERATING INSTRUCTIONS AVANTTIA INSTALLATION AND OPERATING INSTRUCTIONS AVANTTIA CGM-04/392 ER-0170/1996 Thank you for choosing a DOMUSA TEKNIK heating boiler. From the range of DOMUSA TEKNIK products you have chosen the Avanttia model.

More information

OPERATING AND INSTALLATION MANUAL

OPERATING AND INSTALLATION MANUAL OPERATING AND INSTALLATION MANUAL TANKLESS ELECTRIC WATER HEATER WITH ELECTRO-MECHANICAL FLOW SWITCH» MINI 2» MINI 2.5» MINI 3» MINI 3.5» MINI 4» MINI 6 The Mini series is tested and certified by WQA against

More information

HG 675 CX 60 HG 675 CN 60 HG 675 CW 60

HG 675 CX 60 HG 675 CN 60 HG 675 CW 60 HG 675 X 60 HG 675 CX 60 HG 675 CN 60 HG 675 CW 60 1 2 1. : 93/68: 90/396: 2006/95/CE: 2004/108/CE: - 1935/2004:. 2002/95/CE: RoHS 2.,.,,,,...,. (,..)..,,.,. ( ),,, ;,,.,.....,.,,,,,,...,. (..),,.,..,.,,,,

More information

Great Britain en. Installation, user and service manual. Control panel HMI Gas 310/610 ECO PRO

Great Britain en. Installation, user and service manual. Control panel HMI Gas 310/610 ECO PRO Great Britain en Installation, user and service manual Control panel HMI Gas 310/610 ECO PRO Dear Customer, Thank you very much for buying this appliance. Please read through the manual carefully before

More information

MAX O GAZ. Condensing water heater TECHNICAL MANUAL

MAX O GAZ. Condensing water heater TECHNICAL MANUAL MAX O GAZ Condensing water heater TECHNICAL MANUAL 2 CONTENTS THE COMPONENTS OF THE MAX O GAZ.. 1 4 BALANCED FLUE AND CONVENTIONAL FLUE MAX O GAZ FEATURES. 3 6 INSTALLATION OF THE MAX O GAZ... 5 8 STANDARD

More information

O. Gas boiler. Gaz 6000 W WBN H-E-N/L-S2400. Operating instructions for the end customer (2017/09) en

O. Gas boiler. Gaz 6000 W WBN H-E-N/L-S2400. Operating instructions for the end customer (2017/09) en 8 716 473 216-00.3O Gas boiler WBN 6000-30-H-E-N/L-S2400 Operating instructions for the end customer en 2 Contents Contents 1 Key to symbols and safety instructions................... 2 1.1 Key to symbols..................................

More information

INSTRUCTIONS FOR INSTALLATION AND MAINTENANCE (GB)

INSTRUCTIONS FOR INSTALLATION AND MAINTENANCE (GB) INSTRUCTIONS FOR INSTALLATION AND MAINTENANCE (GB) Pag. 1 Fig - Fig. - Abb.- Fig.- Fig.- Фиг.- Obr.- Fig.- Εικ. - Joonis - Kuva - Sl. -.ábra - Fig. -.att. - Afbeelding - Fig. - Rys.- Fig.- Fig. - Схема

More information

Ultracom cxi. Instructions for Use. High Efficiency Condensing System Boilers. To b e l e f t w i t h t h e u s e r.

Ultracom cxi. Instructions for Use. High Efficiency Condensing System Boilers. To b e l e f t w i t h t h e u s e r. Ultracom cxi High Efficiency Condensing System Boilers Instructions for Use To b e l e f t w i t h t h e u s e r WARNING GAS LEAK OR FAULT Turn off the gas emergency control valve immediately. Eliminate

More information

Installation Manual. Instrucciones de instalación y manual de usuario 1

Installation Manual. Instrucciones de instalación y manual de usuario 1 Installation Manual Instrucciones de instalación y manual de usuario 1 Installation instructions and user manual V8 2 INDEX 1 GENERAL SAFETY WARNINGS... 4 2 OPERATING PRINCIPLE... 5 3 TECHNICAL FEATURES...

More information

Electronically controlled instantaneous water heater. CEX 9-U: C models. Installation instructions

Electronically controlled instantaneous water heater. CEX 9-U: C models. Installation instructions Electronically controlled instantaneous water heater CEX 9-U: 27910-50 C models Installation instructions For 50 ºC models, the appliance delivers water not exceeding 50 ºC in accordance with AS3498. 1.

More information

INSTRUCTION MANUAL T119 1MN0110 REV. 0. operates with ISO9001 certified quality system

INSTRUCTION MANUAL T119 1MN0110 REV. 0. operates with ISO9001 certified quality system INSTRUCTION MANUAL 1MN0110 REV. 0 operates with ISO9001 certified quality system TECSYSTEM S.r.l. 20094 Corsico (MI) Tel.: +39-024581861 Fax: +39-0248600783 http://www.tecsystem.it R. 1.1 25/08/16 ENGLISH

More information

OPERATING AND INSTALLATION MANUAL

OPERATING AND INSTALLATION MANUAL OPERATING AND INSTALLATION MANUAL TANKLESS ELECTRIC WATER HEATER WITH ELECTRO-MECHANICAL FLOW SWITCH» MINI 2» MINI 2.5» MINI 3» MINI 3.5» MINI 4» MINI 6 The Mini series is tested and certified by WQA against

More information

Electronic Pellet Burner Controller NPBC-V3-1

Electronic Pellet Burner Controller NPBC-V3-1 Electronic Pellet Burner Controller NPBC-V3- SOFTWARE VERSION 3.2/3. page of 3 CHANGES IN THE TECHNICAL AND USER GUIDE OR IN THE SOFTWARE VERSION Technical and User Guide's version Changes Page 2.8. The

More information

USER INSTRUCTIONS & CUSTOMER CARE GUIDE Si II SERIES

USER INSTRUCTIONS & CUSTOMER CARE GUIDE Si II SERIES 24-28Si II SERIES G.C. NUMBERS APPLIANCE NATURAL GAS L.P.G. 24Si II 47 311 65 47 311 66 28Si II 47 311 67 47 311 68 USER INSTRUCTIONS & CUSTOMER CARE GUIDE EXCELLENCE COMES AS STANDARD CONTENTS Page No.

More information

WARNINGS FOR THE USER: Connect BASE conforms to: Low Voltage Directive 73/23/EEC. Electromagnetic Compatibility Directive 89/336/EEC

WARNINGS FOR THE USER: Connect BASE conforms to: Low Voltage Directive 73/23/EEC. Electromagnetic Compatibility Directive 89/336/EEC Connect BASE conforms to: Low Voltage Directive 73/23/EEC Electromagnetic Compatibility Directive 89/336/EEC Warnings and safety considerations Page 13 Description of the equipment 14 Technical data 14

More information

RC411 Operator Manual

RC411 Operator Manual RC411 Operator Manual Page 1 of 14 FOREWORD 1. Read the instructions contained in the enclosed booklet carefully, because it contains important information on installation, operation and maintenance safety.

More information

BN30 OPERATING MANUAL SOCKET THERMOSTAT TRT-BA-BN30-TC-001-EN

BN30 OPERATING MANUAL SOCKET THERMOSTAT TRT-BA-BN30-TC-001-EN BN30 EN OPERATING MANUAL SOCKET THERMOSTAT TRT-BA-BN30-TC-001-EN table of contents Notes regarding the operating manual... 1 Safety... 2 Information about the device... 2 Technical data... 3 Transport

More information

TH100 Three in One Instant Hot Water Tap

TH100 Three in One Instant Hot Water Tap TH100 Three in One Instant Hot Water Tap Installation, Use and Maintenance Customer Care Department The Group Ltd. Harby Road Langar Nottinghamshire NG13 9HY T : 01949 862 012 F : 01949 862 003 E : customer.care@cda.eu

More information

General safety precautions English

General safety precautions English English 1 1 1.1 About the documentation The original documentation is written in English. All other languages are translations. The precautions described in this document cover very important topics, follow

More information

Remeha. Fuel oil/gas boilers P 520. Installation and Service Manual A

Remeha. Fuel oil/gas boilers P 520. Installation and Service Manual A Remeha Fuel oil/gas boilers EN Installation and Service Manual 300016859-001-A 63115 Declaration of conformity The appliance complies with the standard model described in declaration of compliance. It

More information

Instruction manual. Remote control electric IR HEATER

Instruction manual. Remote control electric IR HEATER Instruction manual Remote control electric IR HEATER battery consumption rate hour temperature (preset or measured) current operation mode (e.g. comfort) current day heating activated buttons for adjustment

More information

ATM Lighting sp. z o.o

ATM Lighting sp. z o.o INSTALLATION AND MAINTENANCE MANUAL FOR EXPLOSIONPROOF LIGHT FITTING EXL210LED Carefully read the instructions before mounting the light fitting. ATM Lighting sp. z o.o., ul. Budowlanych 31, 80-298 Gdańsk,

More information

Read installation manual prior to installation of this appliance! Read user manual before putting this unit in operation!

Read installation manual prior to installation of this appliance! Read user manual before putting this unit in operation! 6720808877-00.1V Gas continuous flow water heaters OptiFlow Professional GWH12 1 CTD E23/31 F3 OL Operating Manual 6 720 813 938 (2016/06) AU Read installation manual prior to installation of this appliance!

More information

INSTALLATION AND OPERATING INSTRUCTIONS BIOCLASS HM OD (FOR EXTERNAL USE)

INSTALLATION AND OPERATING INSTRUCTIONS BIOCLASS HM OD (FOR EXTERNAL USE) INSTALLATION AND OPERATING INSTRUCTIONS BIOCLASS HM OD (FOR EXTERNAL USE) Thank you for choosing a DOMUSA TEKNIK heating boiler. Within the product range offered by DOMUSA TEKNIK you have chosen BioClass

More information

Operating instructions Oil condensing boiler

Operating instructions Oil condensing boiler Operating instructions Oil condensing boiler COB COB-CS Boiler for heating Boiler with stratification cylinder Wolf GmbH Postfach 1380 D-84048 Mainburg Tel. +49-8751/74-0 Fax +49-8751/741600 Internet:

More information

TIH 300 S / TIH 400 S / TIH 500 S / TIH 700 S / TIH 900 S / TIH 1100 S

TIH 300 S / TIH 400 S / TIH 500 S / TIH 700 S / TIH 900 S / TIH 1100 S TIH 300 S / TIH 400 S / TIH 500 S / TIH 700 S / TIH 900 S / TIH 1100 S EN OPERATING MANUAL INFRARED HEATING PANEL TRT-BA-TIH300S-TIH400S-TIH500S-TIH700S-TIH900S-TIH1100S-TC-002-EN Table of contents Notes

More information

Conversion Instructions Logano G234X. Gas boiler. Please read carefully before installing and servicing. Gas boiler

Conversion Instructions Logano G234X. Gas boiler. Please read carefully before installing and servicing. Gas boiler Gas boiler UPON COMPLETION OF THE INSTALLATION THE INSTALLER MUST INSTRUCT THE OWNER AND OPERATOR ON THE FUNCTIONALITY AND THE PROPER OPERATION OF THE BOILER AND THE HEATING SYSTEM. INSTALLER MUST REVIEW

More information

User instructions DHP-AT

User instructions DHP-AT User instructions DHP-AT VUGFC202 If these instructions are not followed during installation and service, Danfoss A/S liability according to the applicable warranty is not binding. Danfoss A/S retains

More information

ST 53.1 User s manual

ST 53.1 User s manual Tech - 1 - ST 53.1 User s manual Table of contents I. Safety... 3 II. Description... 4 III. Installation... 4 IV. Operating the Controller... 6 IV.a) Principle of Operation... 6 IV.b) Control... 6 V. Controller

More information

SPECIFICATIONS - NIKE

SPECIFICATIONS - NIKE Wall-mounted instant boilers NIKE Mini kw Special is the ideal Immergas solution for modern building and wherever space is limited and has to be made the most of. Simple to use and easy to install, thanks

More information

VIESMANN. Service instructions VITOLADENS 300-T. for contractors. Vitoladens 300-T Type VW3B Inox-Radial heat exchanger for oil fired condensing Unit

VIESMANN. Service instructions VITOLADENS 300-T. for contractors. Vitoladens 300-T Type VW3B Inox-Radial heat exchanger for oil fired condensing Unit Service instructions for contractors VIESMANN Vitoladens 300-T Type VW3B Inox-Radial heat exchanger for oil fired condensing Unit VITOLADENS 300-T 1/2007 Please keep safe. Safety instructions Safety instructions

More information

Dry Bath Heating Systems

Dry Bath Heating Systems Dry Bath Heating Systems Instruction Manual N2400-4001 Dry Bath Heating System, Single Block, Digital N2400-4002 Dry Bath Heating System, Dual Block, Digital www.starlabgroup.com DECLARATION OF CONFORMITY

More information

Operation manual. Daikin Altherma Low temperature split EHBH04CBV EHBH08CBV EHBH11CBV EHBH16CBV

Operation manual. Daikin Altherma Low temperature split EHBH04CBV EHBH08CBV EHBH11CBV EHBH16CBV EHBH04CBV EHBH08CBV EHBH11CBV EHBH16CBV EHVH04S18CBV EHVH08S18CBV EHVH08S26CBV EHVH11S26CBV EHVH16S26CBV English Table of contents Table of contents 1 About this document 2 2 About the system 2 2.1 Components

More information

CRU-S Series Stainless Steel Condensate Recovery Unit

CRU-S Series Stainless Steel Condensate Recovery Unit IM-UK-CRU-S UK Issue 1 CRU-S Series Stainless Steel Condensate Recovery Unit 1. Safety information 2. General product information 3. Installation 4. Commissioning 5. Storage, shutdown and equipment protection

More information

HVG620 & HVG720 Gas Hob Manual for Installation, Use and Maintenance

HVG620 & HVG720 Gas Hob Manual for Installation, Use and Maintenance HVG620 & HVG720 Gas Hob Manual for Installation, Use and Maintenance Customer Care Department The Group Ltd. Harby Road Langar Nottinghamshire NG13 9HY T : 01949 862 012 F : 01949 862 003 E : customer

More information

Gas Fired Residential Combi Boiler Floor and Wall Mount Models

Gas Fired Residential Combi Boiler Floor and Wall Mount Models Gas Fired Residential Combi Boiler Floor and Wall Mount Models USER S INFORMATION MANUAL Models WBRC**140W WBRC**199W WBRC**140F WBRC**199F ** NG Refers to Natural Gas Operation LP Refers to Propane Gas

More information

Electronic Pellet Burner Controller NPBC-V3M

Electronic Pellet Burner Controller NPBC-V3M Electronic Pellet Burner Controller NPBC-V3M SOFTWARE VERSION 3.3a/3.2 page of 27 CHANGES IN THE USER MANUAL OR IN THE CONTROLLER'S SOFTWARE Version of the user manual Changes Page 2.2. The software version

More information

GENUS HE GENUS HE 24 GENUS HE 30 GENUS HE 38. User Manual. Condensing wall hung system boiler

GENUS HE GENUS HE 24 GENUS HE 30 GENUS HE 38. User Manual. Condensing wall hung system boiler User Manual GENUS HE Condensing wall hung system boiler G.C.N : 47-116-54 (24 kw) G.C.N : 47-116-55 (30 kw) G.C.N : 47-116-56 (38 kw) GENUS HE 24 GENUS HE 30 GENUS HE 38 The code of practice for the installation,

More information

SELF-PRIMING JET PUMPS

SELF-PRIMING JET PUMPS SS Anti-Rust SS Shaft Copper & Cold-rolled SELF-PRIMING JET PUMPS CONTENTS 1. Applications.... Model Description.... Technical Data... 4. Implementation Standards... 5. Safety Precautions... 6. Product

More information

USER S INFORMATION MANUAL Model: HSE 125 N/P, HSE 145 N/P Gas-fired, Condensing Boiler and Instantaneous Water Heater

USER S INFORMATION MANUAL Model: HSE 125 N/P, HSE 145 N/P Gas-fired, Condensing Boiler and Instantaneous Water Heater USER S INFORMATION MANUAL Model: HSE 125 N/P, HSE 145 N/P Gas-fired, Condensing Boiler and Instantaneous Water Heater Contents Section Page Major Components... 2 1 About Our Manual... 2 2 Refractory Handling...

More information

Forced draught gas burner

Forced draught gas burner Installation, use and maintenance instructions Forced draught gas burner Code Model Type 3751982 GAS 3 519T80 291 (3) - 02/2010 DECLARATION Declaration of conformity in accordance with ISO / IEC 17050-1

More information

GB24 & GB30. User Manual

GB24 & GB30. User Manual GB24 & GB30 User Manual BOILER OUTPUT To Domestic Hot Water:To Central Heating: GB24/30 Minimum 8.0 kw (27,296 Btu/h) GB24 Maximum 24.2 kw (82,570 Btu/h) GB30 Maximum 30.3 kw (103,384 Btu/h) GB24/30 Minimum

More information