1 Eglinton West LRT Update Community Consultation Update May 16, 2016
2 Background Rapid transit along Eglinton Ave between Kennedy Station and Pearson Airport was included in the Metrolinx Regional Transportation Plan (The Big Move) in 2008 The TTC and City of Toronto completed an Environmental Assessment in 2010 for an LRT along Eglinton Avenue West as part of the Transit City Plan Initial funding for the Crosstown LRT has allowed for construction to start between Mt. Dennis and Kennedy Station in the east In 2015, the City of Toronto and TTC, with input from Metrolinx, began planning for SmartTrack, which included at that time a heavy rail option on the Eglinton West corridor The SmartTrack Western Corridor Feasibility Study was undertaken by the City of Toronto and concluded that an LRT was the preferred option for the corridor; in March 2016, Toronto City Council directed its staff to work with Metrolinx to study LRT options Metrolinx and the City of Toronto are now studying options to enhance the design of the LRT, including optimizing the number of stations and considering potential grade separations; this work is still in its early stages 2
3 SmartTrack Western Corridor Feasibility Study Findings Study considered feasibility of SmartTrack corridor options connecting Mount Dennis Station and the Mississauga Airport Corporate Centre Heavy rail would need to be grade-separated from other traffic and pedestrians (tunneled or elevated) Heavy rail on Eglinton would have significant community impacts Disruptions to Eglinton Flats and Black Creek Extensive property takings Impacts to municipal roads and bridges New infrastructure/tracks would be needed along Eglinton and Kitchener GO Corridor 3 Costs Heavy Rail - Northern Corridor Heavy Rail - Eglinton Corridor Light Rail - Eglinton Crosstown Extension $2.7 - $4.8 Billion $3.7 - $7.7 Billion $1.3 - $1.4 Billion
4 Current Proposal RER/SmartTrack Integration Analysis Covers Two Parts 1. Options to integrate GO Regional Express Rail and SmartTrack on the Stouffville and Kitchener GO Rail corridors 2. Options for LRT on Eglinton Avenue West 4
5 Approved Environmental Assessment Early plans for the Eglinton Crosstown LRT extended from Kennedy Rd in the east to Pearson Airport in the west The EA did not finalize the alignment at Pearson Airport Commitments were made for further traffic analysis and community consultation EA Approved LRT Option ( ) 2010 EA Alignment: 14 stops on Eglinton West 3 stops to the airport Surface alignment Link between Mississauga Transitway and Eglinton Crosstown (currently under construction 5
6 Key Questions on the 2010 EA Why does the LRT need to run in the median of Eglinton rather than to the north or south of the road? The entire Toronto LRT Program uses median running LRT designs because it allows for better traffic operation The transit lanes do not block access to property or minor streets and in turn transit vehicles are not blocked by right-turning automobiles; LRT vehicles in centre lanes are more easily and more safely controlled at intersections when they are in the centre of the road rather than on either side; and A similar amount of right-of-way is required regardless of whether the transit lanes are on the side or in the centre New development along the north side of Eglinton Avenue complicates running the LRT to the north of the traffic lanes 6
7 Key Questions on the 2010 EA Will the LRT take lanes away from traffic on Eglinton? Some site-specific modifications were included but the current four lanes of traffic are maintained across the entirety of the corridor Will the LRT require left hand turn restrictions? 7 The 2010 EA included special left turn designs at major intersections, where drivers would have to perform a U-turn beyond the intersection and turn right at the desired cross-street The local community has expressed significant concern with this arrangement The 2010 EA also acknowledged that further traffic analysis was required and a commitment was made to the community to study the matter further New detailed traffic analysis that considers community concerns will be undertaken as planning on this project proceeds
8 Eglinton West LRT Options Option Number of Stops Suggested Stop Locations Degree of Grade Separation 1. EA Approved - Designed for Local Access at Airport At grade 2. Speed and Access Balance 8 +3 at Airport At grade 3. Maximize Speed at Airport At grade 4. Grade Separated at Intersections 5. Reduced Stops + Highest Speed at Airport at Airport Grade separated at major arterials Elevated or underground 8
9 Benefits of the Project: Making Eglinton Work Extending the Crosstown LRT along Eglinton West could give residents of Central Etobicoke access to a rapid transit corridor across Toronto and Mississauga New connections, currently under construction, at Renforth Gateway and Mt. Dennis, will provide fast and reliable transit connections across the region Connections to the West Direct route to Pearson Airport Mississauga Transitway BRT Connections to the East GO Regional Express Rail (to Union Station and Brampton/Kitchener) UP Express TTC Subway at Eglinton West station Mississauga Midtown Yonge/Eglinton Kennedy Station 9 Mt Dennis Mobility Hub Study
10 Benefits of the Project: Improved Transit Travel Time The LRT would improve transit travel time to a variety of destinations across the region including Pearson Airport and its surrounding employment lands, Mississauga and mid-town Toronto Below is an example of how it would improve travel time from Martingrove C.I. to Union Station in downtown Toronto during the morning rush hour: Martingrove Collegiate Institute to Union Station: Today using TTC Future With LRT and GO RER TTC 32A Bus East to Eglinton West Station, Line 1 Subway south to Union Station LRT East to Mt. Dennis, GO RER South to Union Station 1 hour, 4 minutes minutes 10
11 Eglinton West LRT Next Steps Business case analysis, including: Strategic analysis advancing understanding of the effects of stop spacing and grade separation on traveler behaviour, local traffic and travel patterns Ridership modelling Community impacts analysis Capital cost and operating cost estimates Economic analysis Feasibility analysis Further detailed Traffic Analysis and Micro-Simulation Finalize alignment at Pearson Airport Continued community consultation 11
12 Estimated Timelines Enhanced Options Initial Business Case Grade Separation Analysis Confirm Number of Stops Detailed Traffic Analysis Alignment to Pearson Airport Continued Meetings with GTAA June 2016 Metrolinx Board and Toronto City Council Meetings Further Project Definition Work Bus Network Analysis (with MiWay and TTC) Refine Transport Demand Modelling Review Property Requirements Interface with Renforth Gateway Possible EA Amendment Continued Collaboration with City of Toronto and City of Mississauga Community Consultation 12
Coordinated Transit Planning in Toronto SmartTrack GO RER Scarborough Relief Line Waterfront Transit
Coordinated Transit Planning in Toronto SmartTrack GO RER Scarborough Relief Line Waterfront Transit Public Information Centres February 2016 Transportation Planning Section City Planning Division Toronto
More informationENHANCED EGLINTON WEST RAPID TRANSIT
APPENDIX 4 ENHANCED EGLINTON WEST RAPID TRANSIT INITIAL BUSINESS CASE ANALYSIS JUNE 2016 Cover Image: Marcus Bowman TABLE OF CONTENTS Problem Statement II 1.0 Introduction 1 2.0 Context 2 3.0 Study Overview
More informationAPPENDIX 6 TRANSIT NETWORK ANALYSIS
APPENDIX 6 TRANSIT NETWORK ANALYSIS 1. COORDINATED TRANSIT PLANNING Transit in Toronto Toronto's transit system is critical to the functioning of the Toronto city region. With the Toronto region population
More informationSubject: Transit Planning in Toronto: roles, priorities and our decision making framework
INFORMATION ONLY Subject: Transit Planning in Toronto: roles, priorities and our decision making framework Date: July 29, 2015 At the TTC Board meeting on July 29, 2015, Jennifer Keesmaat, Chief Planner,
More informationSCARBOROUGH SUBWAY EXTENSION. Scarborough Subway Extension. Final Terms of Reference
Scarborough Subway Extension Final Terms of Reference 1 1.0 Introduction and Background 1.1 Introduction Toronto City Council recently confirmed support for an extension of the Bloor-Danforth Subway from
More information1 Metrolinx overview. Mission We connect our communities. Vision Getting you there better, faster and easier
Mission We connect our communities Vision Getting you there better, faster and easier Values Play as a team Think forward Serve with passion 1 Metrolinx overview go transit, up express, presto Serve a
More informationActing Director, Transportation Services Division. p:\2010\cluster B\TRA\EtobicokeYork\eycc tp
STAFF REPORT ACTION REQUIRED Closing Sections of Indian Line between Eglinton Avenue West and Renforth Drive, and Eglinton Avenue West between Orbitor Drive to West of Spectrum Way Date: July 14, 2010
More informationWHY INVEST THE EGLINTON CONDOS
WHY INVEST THE EGLINTON CONDOS By Mark Li Sales Representative Century 21 Leading Edge Realty Inc., Brokerage 416-500-5355 mark@mycondopro.com The Eglinton Yonge At Heart Yonge/Eglinton Area The Eglinton
More informationAssessing City of Toronto and Metrolinx Rapid Transit Priorities
STAFF REPORT ACTION REQUIRED Assessing City of Toronto and Metrolinx Rapid Transit Priorities Date: June 3, 2013 To: From: Ward: Reference Number: Planning and Growth Management Committee Chief Planner
More informationRelief Line Project Assessment
Relief Line Project Assessment Public Information Centre April 5, 2017 Tonight s Meeting PURPOSE To review the preferred alignment for the Local Segment. AGENDA 6:30 Open House 7:00 Presentation / Discussion
More informationHurontario/Main Street Corridor Master Plan Mississauga and Brampton Building a new and integrated vision for the corridor
Hurontario/Main Street Corridor Master Plan Mississauga and Brampton Building a new and integrated vision for the corridor Martin Powell, Commissioner of Transportation and Works, City of Mississauga Paper
More informationRelief Line Project Assessment
6/9/2015 Relief Line Project Assessment Stakeholder Advisory Meeting #2 June 9, 2015 Meeting Purpose Report on the Evaluation Results for Potential Station Locations Seek your Input on Potential Corridors
More informationEdward R. Sajecki Commissioner of Planning and Building
Corporate Report Clerk s Files Originator s Files CD.04.HUR DATE: TO: FROM: Chair and Members of Planning and Development Committee Meeting Date: April 14, 2014 Edward R. Sajecki Commissioner of Planning
More informationPUBLIC MEETING April, 20161
PUBLIC MEETING April, 20161 The Study Area Study Area Focus Area Corridor Neighbourhoods 2 Today s Presentation This material is aimed at providing viewers with enough background to be able to think about
More informationMount Dennis Mobility Hub Study Public Meeting December 12 th, :30pm 9:30pm York Memorial Collegiate, Cafeteria 2690 Eglinton Avenue West
Mount Dennis Mobility Hub Study Public Meeting December 12 th, 2012 6:30pm 9:30pm York Memorial Collegiate, Cafeteria 2690 Eglinton Avenue West MEETING SUMMARY On December 12 th, 2012, over 89 people participated
More informationNOTE: PLEASE REFER TO MISSISSAUGA PLAN FOR ADDITIONAL CITY-WIDE POLICIES WHICH APPLY TO THIS DISTRICT.
NOTE: THE POLICIES IN THIS DOCUMENT ARE SPECIFIC TO THE AIRPORT CORPORATE PLANNING DISTRICT OF, AND MUST BE READ IN CONJUNCTION WITH ALL THE POLICIES OF PLEASE REFER TO FOR ADDITIONAL CITY-WIDE POLICIES
More informationPUBLIC OPEN HOUSE HURONTARIO-MAIN CORRIDOR SECONDARY PLAN
PUBLIC OPEN HOUSE HURONTARIO-MAIN CORRIDOR SECONDARY PLAN Tuesday, February 28, 2012 6pm 9pm 1 st Floor Atrium, City Hall 2 Wellington Street West, Brampton 1 POLICY FRAMEWORK The 2006 Provincial Growth
More information3 MARKHAM NORTH-SOUTH LINK CORRIDOR PUBLIC TRANSIT IMPROVEMENTS ENVIRONMENTAL ASSESSMENT UPDATE
3 MARKHAM NORTH-SOUTH LINK CORRIDOR PUBLIC TRANSIT IMPROVEMENTS ENVIRONMENTAL ASSESSMENT UPDATE The Rapid Transit Public/Private Partnership Steering Committee recommends the adoption of the recommendations
More informationCROSSTOWN LRT Central Open House March 21, 2018
CROSSTOWN LRT Central Open House March 21, 2018 Metrolinx was created in 2006 by the Province of Ontario to improve the coordination and integration of all modes of transportation in the Greater Toronto
More information1.3 TRANSIT VISION 2040 FROM VISION TO ACTION THEME 1: PUTTING TRANSIT AT THE CENTRE OF COMMUNITIES. Fully integrate transit with community planning
TRANSIT VISION 2040 FROM VISION TO ACTION TRANSIT VISION 2040 defines a future in which public transit maximizes its contribution to quality of life with benefits that support a vibrant and equitable society,
More informationCROSSTOWN LRT Central-West Open House April 18, 2018
CROSSTOWN LRT Central-West Open House April 18, 2018 Metrolinx was created in 2006 by the Province of Ontario to improve the coordination and integration of all modes of transportation in the Greater Toronto
More informationThe Commissioner of Engineering and Public Works recommends that this report be received for information purposes.
COMMITTEE OF THE WHOLE FEBRUARY 1, 2011 407 TRANSITWAY - ENVIRONMENTAL PROJECT REPORT MINISTRY OF TRANSPORTATION CITY WIDE Recommendation The Commissioner of Engineering and Public Works recommends that
More informationTORONTO TRANSIT COMMISSION REPORT NO.
Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: NOVEMBER 17, 2009 SUBJECT: REQUEST FOR APPROVAL OF THE EGLINTON CROSSTOWN LRT TRANSIT PROJECT ASSESSMENT STUDY ACTION ITEM
More informationSouth Corridor Rapid Transit Project Public Kick-Off Meeting
Department of Transportation and Public Works (DTPW) South Corridor Rapid Transit Project Public Kick-Off Meeting Wednesday, May 31, 2017 Please use same 4 pictures from Fact Sheet 1 Meeting Overview Miami-Dade
More informationPort Credit Local Advisory Panel October 20 th Meeting
Port Credit Local Advisory Panel October 20 th Meeting Focus Of This Evening s Meeting: 1. Hurontario Main Street Higher Order Transit Study 2. Port Credit Mobility Hub & GO Station Parking Structure Study
More informationKeele Finch Plus Downsview Airport Operational Needs Assessment Executive Summary
City of Toronto Keele Finch Plus Downsview Airport Operational Needs Assessment Executive Summary It is not intended for and should not be relied upon by any third party and no responsibility is undertaken
More informationTOWN OF WHITBY REPORT RECOMMENDATION REPORT
TOWN OF WHITBY REPORT RECOMMENDATION REPORT REPORT TO: Council REPORT NO: PL 95-09 DATE OF MEETING: October 13, 2009 PREPARED BY: Planning/Public Works Joint Report FILE NO(S): N/A LOCATION: N/A REPORT
More information7 HIGHWAY 7 CORRIDOR AND VAUGHAN N-S LINK ENVIRONMENTAL ASSESSMENT RECOMMENDED ALIGNMENT
7 HIGHWAY 7 CORRIDOR AND VAUGHAN N-S LINK ENVIRONMENTAL ASSESSMENT RECOMMENDED ALIGNMENT The Rapid Transit Public/Private Partnership Steering Committee recommends the adoption of the recommendations contained
More informationBuilding the transportation network we need for the future
Building the transportation network we need for the future WHO IS METROLINX? Metrolinx was created in 2006 by the Province of Ontario with a mandate to create greater connection between the communities
More information3. Endorse the LRT vision in transforming Surrey into Connected-Complete-Livable communities, and more specifically, the official vision statement:
CORPORATE REPORT NO: R038 COUNCIL DATE: February 20, 2017 REGULAR COUNCIL TO: Mayor & Council DATE: February 16, 2017 FROM: General Manager, Engineering FILE: 8740-01 SUBJECT: Surrey Light Rail Transit
More informationTORONTO TRANSIT COMMISSION REPORT NO.
Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: AUGUST 26, 2009 SUBJECT: REQUEST FOR APPROVAL OF THE SCARBOROUGH-MALVERN LRT ENVIRONMENTAL ASSESSMENT STUDY ACTION ITEM RECOMMENDATION
More informationShift Rapid Transit Public Participation Meeting May 3, 2017
Shift Rapid Transit Public Participation Meeting May 3, 2017 Shift Rapid Transit Initiative Largest infrastructure project in the city s history. Rapid Transit initiative will transform London s public
More informationMobility Hub Guidelines: Tools for Achieving Successful Station Areas
Mobility Hub Guidelines: Tools for Achieving Successful Station Areas This paper introduces Metrolinx s recently released Mobility Hub Guidelines and highlights two key aspects of the document: the importance
More information9 CITY OF VAUGHAN OFFICIAL PLAN AMENDMENT NO BOCA EAST INVESTMENTS LIMITED
9 CITY OF VAUGHAN OFFICIAL PLAN AMENDMENT NO. 631 - BOCA EAST INVESTMENTS LIMITED The Planning and Economic Development Committee recommends the adoption of the recommendations contained in the following
More informationCorridor Vision. 1Pursue Minnehaha-Hiawatha Community Works Project. Mission of Hennepin County Community Works Program
1Pursue Minnehaha-Hiawatha Community Works Project Minnehaha-Hiawatha Community Works is a project within the Hennepin Community Works (HCW) program. The mission of the HCW program is to enhance how the
More informationAshland BRT Environmental Assessment: logos of CTA, CDOT, Chicago Department of Housing and Economic Development
Ashland BRT Environmental Assessment: logos of CTA, CDOT, Chicago Department of Housing and Economic Development Overview The Chicago Transit Authority (CTA), in partnership with the Chicago Department
More informationCOUNCIL ATTACHMENT 2 HIGHWAY 7 CORRIDOR AND VAUGHAN NORTH-SOUTH LINK
COUNCIL ATTACHMENT 2 HIGHWAY 7 CORRIDOR AND VAUGHAN NORTH-SOUTH LINK Welcome! The purpose today is to: Present the Study Background; Describe Alignment Alternatives Analyzed; Present the Evaluation of
More informationRelief Line Project Assessment
Relief Line Project Assessment Stakeholder Advisory Meeting #4 May 30, 2016 Tonight s Meeting PURPOSE To present and discuss: Results of the evaluation of potential alignments Emerging preferred alignment
More informationMidtown Corridor Alternatives Analysis. Appendix A - Initially Considered Alternatives Screening
Midtown Corridor Alternatives Analysis Appendix A - Initially Considered Alternatives Screening Arterial BRT on Lake Street - Overall Rating: RATING Metropolitan Council recommendations stated in the Transportation
More informationKanata Light Rail Transit Planning and Environmental Assessment Study
Kanata Light Rail Transit Planning and Environmental Assessment Study Public Open House #2 Transportation Services Department December 7, 2017 Agenda Review study progress Confirm the Preferred Corridor
More informationRoute 110 Alternatives Analysis
Route 110 Alternatives Analysis Public Meeting #1 December 15, 2014 Source: Town of Babylon Agenda Welcome/Introduction Hon. Antonio A. Martinez Deputy Supervisor, Town of Babylon Update on East Farmingdale
More informationKnoxville Area Transit (KAT) Transit Development Plan Corridor Analysis
Knoxville Area Transit (KAT) Transit Development Plan Submitted to: Knoxville-Knox County Metropolitan Planning Commission Submitted by: PB Americas, Inc. Under contract to: The Corradino Group, Inc. October
More information5 Existing and Future Conditions
5 Existing and Future Conditions The description of the existing and future environment within the study area is presented in this section to establish an inventory of the baseline conditions against which
More informationCITY COUNCIL AGENDA REPORT
CITY COUNCIL AGENDA REPORT Subject: COUNCIL MOTION LRT ALIGNMENT REMOVAL FROM THE TRANSPORTATION MASTER PLAN On February 10, 2016 Councillor Hughes provided notice in accordance with Section 23 of Procedure
More informationPlanning and Growth Management Committee. Acting Chief Planner and Executive Director, City Planning Division
STAFF REPORT ACTION REQUIRED Eglinton Planning Study Status Report Date: August 23, 2012 To: From: Planning and Growth Management Committee Acting Chief Planner and Executive Director, City Planning Division
More informationMOBILITY HUB GUIDELINES 2012 TAC Sustainable Urban Transportation Award Submission BACKGROUND MOBILITY HUB GUIDELINES
MOBILITY HUB GUIDELINES 2012 TAC Sustainable Urban Transportation Award Submission BACKGROUND Rapid population growth, increasing congestion, and years of under investment in transit in the Greater Toronto
More information2
CROSSTOWN LRT 2 3 4 5 6 Construction of the Eglinton Crosstown LRT Line Background In September 2008, Metrolinx launched a regional transportation plan a 25-year, $50 billion plan -- to coordinate and
More informationWelcome. Walk Around. Talk to Us. Write Down Your Comments
Welcome This is an information meeting introducing the applications for proposed redevelopment of the Yorkdale Shopping Centre site at 3401 Dufferin Street and 1 Yorkdale Road over the next 20+ years,
More informationGOLDEN MILE SECONDARY PLAN. Community Consultation Meeting #3 June 26, 2018
GOLDEN MILE SECONDARY PLAN Community Consultation Meeting #3 June 26, 2018 Meeting Overview 1. Introduction 2. Principles + Vision 3. Street + Block Alternatives 4. Parks + Open Space Alternatives 5. Land
More informationSpectrum Square The EATERY Spectrum Way and Eglinton Avenue West, Mississauga, ON Airport Corporate Centre
Spectrum Square The EATERY Spectrum Way and Eglinton Avenue West, Mississauga, ON SPACE AVAILABLE OPENING THIS YEAR Cory Rosen Sales Representative (416) 523-7749 crosen@rogers.com Overview OVERVIEW: Spectrum
More informationLocal Growth Planning in North Central Green Line Communities
2018 April 30 Page 1 of 6 EXECUTIVE SUMMARY This report outlines a high-level scope for local growth planning for north central Green Line communities. The catalyst for this review is the significant investments
More informationBus Rapid Transit Backgrounder. December 2016
Bus Rapid Transit Backgrounder December 2016 Background The City of London is completing the second stage of Shift, its public transit planning exercise. Shift, focuses on rapid transit, along with vehicular
More informationFigure 1- Site Plan Concept
Figure 1- Site Plan Concept Parking will be provided underground on three levels at rate of 1.0 space/ unit; this rate includes all visitors parking. MMM Group has prepared a parking assessment (April,
More informationEquity and Environmental Justice B. MINORITY, ELDERLY, AND LOW INCOME POPULATIONS IN THE STUDY AREA
Chapter 16: Equity and Environmental Justice A. INTRODUCTION The proposed project alternatives would traverse a large study area that contains a wide range of neighborhoods, residents, and workers. The
More informationComplete Streets Guidelines & Implementation Strategy. Public Open House #2 June 12, :30-8:00 pm
Complete Streets Guidelines & Implementation Strategy Public Open House #2 June 12, 2018 5:30-8:00 pm Purpose The purpose of this project is to develop Complete Streets guidelines and an implementation
More informationTrafalgar Road Corridor Planning Study Open House
Trafalgar Road Corridor Planning Study Open House June 24, 2013 6:30-8:30 p.m. Oakville & Trafalgar Rooms Overview The Livable Oakville Plan identifies the lands along Trafalgar Road, between the QEW and
More information13 THORNHILL YONGE STREET STUDY IMPLEMENTATION CITY OF VAUGHAN OPA 669 AND TOWN OF MARKHAM OPA 154
13 THORNHILL YONGE STREET STUDY IMPLEMENTATION CITY OF VAUGHAN OPA 669 AND TOWN OF MARKHAM OPA 154 The Planning and Economic Development Committee recommends the adoption of the recommendations contained
More informationFinch Avenue West and Sheppard Avenue East Corridors - Planning Study Approach. Planning and Growth Management Committee
PG8.9 STAFF REPORT ACTION REQUIRED Finch Avenue West and Sheppard Avenue East Corridors - Planning Study Approach Date: October 13, 2015 To: From: Planning and Growth Management Committee Chief Planner
More informationEXISTING AMENDED DRAFT MAP 'A' Part of Schedule 1 Urban System of Mississauga Official Plan L A K E O N TA R I O L A K E O N TA R I O
LEGED: Green System Green System City Structure Downtown Major ode Community ode eighbourhood Corporate Centre Employment Area Special Purpose Area Corridors EAST Corridor Intensification Corridor ote:
More informationGlen Road Pedestrian Bridge Environmental Assessment
Glen Road Pedestrian Bridge Environmental Assessment Presentation to Design Review Panel July 18, 2017 Glen Road Pedestrian Bridge Class Environmental Assessment STUDY AREA Bloor Street East Streetscape
More informationEastern Terminus TECHNICAL MEMORANDUM CENTRAL BROWARD EAST-WEST TRANSIT ANALYSIS BROWARD COUNTY, FLORIDA
Eastern Terminus TECHNICAL MEMORANDUM CENTRAL BROWARD EAST-WEST TRANSIT ANALYSIS BROWARD COUNTY, FLORIDA FINANCIAL PROJECT ID NUMBER 411189-2-22-01 FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 4 Prepared
More informationPrincipal development issues
Principal development issues The transformation of the Bonaventure Expressway from Saint- Jacques to Brennan Streets will create a major urban boulevard with lanes located on either side of a string of
More informationELMVALE ACRES SHOPPING CENTRE MASTER PLAN
ELMVALE ACRES SHOPPING CENTRE MASTER PLAN Contents 1.0 INTRODUCTION... 2 2.0 LOCATION... 2 3.0 EXISTING CONTEXT... 2 4.0 VISION & GUIDING PRINCIPLES... 2 5.0 LAND USE AND BUILT FORM... 4 5.1 St. Laurent
More informationDon Mills Crossing Study and Celestica Lands Development Application Community Meeting, Open House, and Breakout Discussions
Consultation Summary Don Mills Crossing Study and Celestica Lands Development Application Community Meeting, Open House, and Breakout Discussions This report is not intended to provide a verbatim transcript
More informationPortage Parkway Environmental Assessment Public Information Centre No. 1
City of Vaughan Portage Parkway Environmental Assessment Public Information Centre No. 1 November 25, 2015 Welcome to the Public Information Centre This first Public Information Centre (PIC) introduces
More informationRight-of-Way Acquisitions and Relocations Technical Memorandum
Right-of-Way Acquisitions and Relocations Technical Memorandum Southeast Extension Project Lincoln Station to RidgeGate Parkway Prepared for: Federal Transit Administration Prepared by: Denver Regional
More informationTransit-supportive development and city-building
Photo: Michael Hiemstra (CC BY 2.0) Transit-supportive development and city-building Brief 3: Tools for building infrastructure and policy conditions Building the policy and infrastructure conditions Municipalities
More informationSUBJECT: GO Station Mobility Hubs Preferred Concepts: Aldershot GO, Burlington GO and Appleby GO. Planning and Development Committee - Public Meeting
Page 1 of Report PB-76-17 SUBJECT: GO Station Mobility Hubs Preferred Concepts: Aldershot GO, Burlington GO and Appleby GO TO: FROM: Planning and Development Committee - Public Meeting Planning and Building
More informationSCARBOROUGH RAPID TRANSIT ENVIRONMENTAL PROJECT REPORT CHAPTER 2 PROJECT DESCRIPTION. Table 2-4: North Segment Alignment Analysis 2-21
Table 2-4: North Segment Alignment Analysis 2-21 SCARBOROUGH RAPID TRANSIT Based on the above analysis (detailed analysis is contained in Appendix A-4), North Alignment 3 is preferred because it: Has the
More informationCHAPTER 7: Transportation, Mobility and Circulation
AGLE AREA COMMUNITY Plan CHAPTER 7 CHAPTER 7: Transportation, Mobility and Circulation Transportation, Mobility and Circulation The purpose of the Transportation, Mobility and Circulation Chapter is to
More informationEmployment and Commercial Review Analysis of Policy Directions
Employment and Commercial Review Analysis of Policy Directions Appendix A The following analysis is town staff s response to the policy directions provided by the consultants who prepared the Employment
More informationToronto Transit Consultation Meetings June 2 nd, 2016 Highlights Report
Toronto Transit Consultation Meetings June 2 nd, 2016 Highlights Report This concise Highlights Report has been prepared to provide the City of Toronto, TTC, Waterfront Toronto and Metrolinx with a snapshot
More informationPublic Information Centre #1
and Highway 401 Interchange Improvements WELCOME Public Information Centre #1 Veterans Memorial Parkway Extension and Highway 401 Interchange Improvements Study May 23, 2012 4 p.m. to 7 p.m. Brief Overview
More informationWelcome. Green Line LRT. Beltline Alignment Options. Stay engaged! Follow the Green Line story at calgary.ca/greenline
Welcome Green Line LRT Beltline Alignment Options Stay engaged! Follow the Green Line story at calgary.ca/greenline Green Line LRT Why are we here? Our Challenge Determine the best alignment in the Beltline.
More informationChapter 1: Introduction
Chapter 1: Introduction The Penn Avenue Community Works Corridor Vision and Implementation Framework presents an integrated communitybased vision and a coordinated, long-term implementation framework for
More informationWelcome. Northern Segment of Hwy 100 I-90 to South of Madison Street Meeting Goals:
Welcome Northern Segment of Hwy 100 I-90 to South of Madison Street Meeting Goals: - Review Environmental Assessment - Share Preferred Alternative -Receive Public Comments 2003 EA Preferred Alternative
More informationLaird in Focus Community Information Session
Laird in Focus Community Information Session Tuesday, December 5, 2017 St. Anslem Catholic School, 182 Bessborough Drive Session 1: 5:30 pm - Presentation and Question and Answer Period 6:15 pm - Breakout
More information770 Don Mills Road and 805 Don Mills Road - Official Plan Amendment and Zoning By-law Amendment Application Preliminary Report
REPORT FOR ACTION 770 Don Mills Road and 805 Don Mills Road - Official Plan Amendment and Zoning By-law Amendment Application Preliminary Report Date: To: From: Wards: June 22, 2018 North York Community
More informationplanningalliance City of Toronto Lawrence Allen Revitalization Project Transportation Master Plan
planningalliance City of Toronto Lawrence Allen Revitalization Project Transportation Master Plan September 2011 This report takes into account the particular instructions and requirements of our client.
More informationWELCOME! Town of Halton Hills Transit Service Strategy. Public Information Centre
WELCOME! Town of Halton Hills Transit Service Strategy Public Information Centre 2 GET INVOLVED. GET INFORMED. GET ON-BOARD! TONIGHT S OBJECTIVES 3 To provide an update on the work completed to date; To
More informationIntegration of Trees into Roads Policy - the road to success -
Integration of Trees into Roads Policy - the road to success - Trees, People and the Built Environment 3 City of Birmingham, UK April 5 th, 2017 Ian Buchanan Natural Heritage and Forestry Regional Municipality
More informationWestern Light Rail Transit Corridor Planning and Environmental Assessment Study. Public Open House #2 25 April 2013
Western Light Rail Transit Corridor Planning and Environmental Assessment Study Public Open House #2 25 April 2013 1 Presentation Overview 2 1. Where We Began Background and Study Area 2. Understanding
More informationRiverside South. Rapid Transit Study. Riverside South. Value Planning Workshop
Riverside South Rapid Transit Study Peter Steacy, P. Eng. Program Manager Transportation Environmental Assessments City of Ottawa Value Planning Workshop Christopher Gordon, P. Eng. Project Manager Transportation
More informationIssues Requiring Future Study
Issues Requiring Future Study Transportation planning is an ongoing process that tends to identify new issues as it finds solutions for others. Some issues are so complex that a solution to one problem
More informationFDOT D4 Complete Streets
FDOT D4 Complete Streets Context Sensitive Solutions Directs that complete street solutions will complement the context of the community. Collaborative approach to decision making, project development,
More information1.0 PROJECT PURPOSE AND NEED
1.0 PROJECT PURPOSE AND NEED The FasTracks Plan includes the extension of the Central Corridor from its current terminus at 30th/Downing to a connection to the East Corridor commuter rail service planned
More informationSilver Line Gateway. Extension of Silver Line Bus Rapid Transit (BRT) to Chelsea and East Boston. Public Informational Meeting Chelsea, MA
Silver Line Gateway Extension of Silver Line Bus Rapid Transit (BRT) to Chelsea and East Boston Public Informational Meeting Chelsea, MA August 18, 2014 Introduction / Design Process Design Team Joe Pavao,
More informationMETRO Gold Line BRT CBAC Meeting. August 23, 2018
METRO Gold Line BRT CBAC Meeting August 23, 2018 1 Today s Topics Introductions Corridor Management Committee Update Public Engagement Update History of Alignment Project Scope Discussions Upcoming CBAC
More informationSTUDY AREA LOCATION & CONTEXT:
UNLOCKING THE POTENTIAL OF THE KEATING CROSS ROAD BUSINESS CORRIDOR A PLAN TO CREATE + RETAIN JOB-GENERATING BUSINESSES AND TO GUIDE INFRASTRUCTURE INVESTMENT The Keating Cross Road Corridor (the Keating
More informationD-O LRT Zoning Discussion. Chapel Hill Boards & Commissions October 16, 2017
D-O LRT Zoning Discussion Chapel Hill Boards & Commissions October 16, 2017 Update on Overall D-O LRT Station Area Initiative Objectives Design and educate on principles of Good Transit-Oriented Development
More informationWELCOME and introduction
1 WELCOME and introduction Mobility Hub Locations within Burlington STUDY OVERVIEW STUDY OBJECTIVES The City of Burlington is developing four Area Specific Plans, one for each of Burlington s Mobility
More informationNew. Stations. Smart Track I tlo MTDRONIO. Public Information Centre
Public Information Centre New Smart Track I tlo - - -E>- - Stations Public Information Centre. King-Liberty SmartTrack Station. St. Clair-Old Weston SmartTrack Station. Spadina-Front GO Station. Bloor-Lansdowne
More informationTransportation Committee
Transportation Committee Business Item No. 2013-286SW Meeting date: October 14, 2013 For the Metropolitan Council meeting of October 16, 2013 Subject: Southwest Light Rail Transit (Green Line Extension):
More informationRECOMMENDATION REPORT
I8-4-1 Date: November 4, 2008 File: Subject: Contact: P40 Greater Toronto Transportation Authority/Metrolinx RECOMMENDATION REPORT Metrolinx Regional Transportation Plan Update: Comments on the Draft Regional
More information1.4 TRANSIT VISION 2040 FROM VISION TO ACTION THEME 1: PUTTING TRANSIT AT THE CENTRE OF COMMUNITIES. Fully integrate transit with community design
TRANSIT VISION 2040 FROM VISION TO ACTION TRANSIT VISION 2040 defines a future in which public transit maximizes its contribution to quality of life with benefits that support a vibrant and equitable society,
More informationEXPANDING THE NETWORK ALEXANDRIA, VIRGINIA
EXPANDING THE NETWORK ALEXANDRIA, VIRGINIA David Whyte david.whyte@kimley-horn.com Overview Project Context Corridors Land Use Coordination Concepts Outreach and Coordination Results Core of the region
More informationSTATION AND STOP NAMES Eglinton Line. September 2015
STATION AND STOP NAMES Eglinton Line September 2015 Naming Conventions. Why? There are ten transit agencies operating in the GTHA The planned construction of hundreds of kilometers of new rapid transit
More informationNorthwest Rail Corridor and US 36 BRT Development Oriented Transit Analysis 4.4 STATION AREA FINDINGS
4.4 STATION AREA FINDINGS Each station is different, and each one requires a separate set of recommendations based on the vision for the site. This section outlines an initial TOD strategy and recommendations
More informationI-84 Hartford Project Open Planning Studio #12. April 25, 2017
I-84 Hartford Project Open Planning Studio #12 April 25, 2017 Meeting Agenda 1. I-84 Hartford Project alternatives update 2. Multimodal station area planning 3. I-84 / I-91 Interchange Study coordination
More informationTysons Circulator Study: Process and Preliminary Results Summary. March 2012
Tysons Circulator Study: Process and Preliminary Results Summary March 2012 Background: 1. The Comprehensive Plan for the Tysons Corner Urban Center calls for a System of Circulators in Tysons Corner to:
More information