51 Third Avenue Queen s Park New Westminster, BC. BID DUE: 3:00 PM (Local Time) on Wednesday, September 1, 2010

Size: px
Start display at page:

Download "51 Third Avenue Queen s Park New Westminster, BC. BID DUE: 3:00 PM (Local Time) on Wednesday, September 1, 2010"

Transcription

1 Fire Alarm Panel Upgrade, Queen s Park Arena NWIT TENDER DOCUMENTS COVERING PAGE PROJECT TITLE: Fire Alarm Panel Upgrade PROJECT LOCATION: Queen s Park Arena 51 Third Avenue Queen s Park New Westminster, BC BID DUE: 3:00 PM (Local Time) on Wednesday, September 1, 2010 MANDATORY BIDDERS MEETING: 10:00 am (Local Time) on Wednesday, August 18, 2010 Queen s Park Arena Queen s Park See Queen s Park Map for location New Westminster, BC DATE: August 12, 2010 CITY OF NEW WESTMINSTER 511 Royal Avenue New Westminster, B.C. V3L 1H9 Document #140829

2 Fire Alarm Panel Upgrade, Queen s Park Arena BID DOCUMENTS: NWIT TENDER DOCUMENTS COVERING PAGE Pages 1. Covering Pages Instructions to Bidders Bid Form General Requirements Supplementary Conditions to CCDC Drawings & Specifications listed below Title Dwg. No. Pages Key Plan and Specifications E100 1 Page Main Level Floor Plan E101 1 Page Upper Level Floor Plan E102 1 Page Specifications E103 1 Page Queen s Park Map 1 Page Document #140829

3 Fire Alarm Panel Upgrade, Queen s Park Arena INSTRUCTIONS TO BIDDERS Page 1 of Scope Of Work 1.1 Provide all labour, materials, plant, and equipment necessary to replace the existing fire alarm system with new, utilizing existing wiring and conduit infrastructure, as specified in the Tender Documents, General Requirements, Specifications, and Drawings. 2.0 Owner 2.1 The owner is the City of New Westminster, 511 Royal Avenue, New Westminster, B.C., V3L 1H9, herein after referred to as the City. 3.0 Submission Of Tender 3.1 Bidders shall submit the Tender on the enclosed Bid Form in a sealed envelope, clearly marked NWIT Fire Alarm Panel Upgrade, Queen s Park Arena. 3.2 The completed Tender shall be submitted to: Information Desk City of New Westminster 511 Royal Avenue New Westminster, B.C. V3L 1H9 Attention: Purchasing Manager 3.3 The City shall receive Tenders at the location specified in 3.2 above, prior to 3:00 PM (Local Time) on Wednesday, September 1, Bidders shall submit the Bid Form with all blank spaces filled in. Alterations, qualifications, or omissions to the Bid Form may render the Bid liable for rejection by the City. The Bidder shall initial any erasures or corrections to the entries on the Bid Form. 3.5 The City does not accept facsimile, electronic mail, or other unsealed Bids. 3.6 The official time will be that on the clock located at the Information Desk. The City will not accept late submissions. 3.7 The City will not open this Tender in public. 4.0 Addenda 4.1 Should addenda to the Bid Documents be required for any reason, it is the City s intention not to issue addenda during a period three (3) days prior to the Bid Closing date and time. 4.2 All Addenda become part of the Contract Documents. Bidders should include adjustment costs in the Bid Price. 4.3 Failure to acknowledge any Addendum may result in the disqualification of the Bidder. Document #140829

4 Fire Alarm Panel Upgrade, Queen s Park Arena INSTRUCTIONS TO BIDDERS Page 2 of Acceptance Of Bid 5.1 The City is not obligated to accept the lowest or any tender and may reject all bids. 5.2 The City may waive any non-compliance with the Bid Documents. 5.3 The City may, prior to contract award, negotiate changes to the scope of work with the low bidder or any one or more bidders without having any duty or obligation to advise any other bidders or to allow them to vary their bid prices due to changes to the scope of work. 5.4 Bids shall remain open for acceptance by the City for a period of sixty (60) days from the closing date. 6.0 Revision Of Bid 6.1 A Bid Form already delivered to the City may only be revised in the manner described below and, to qualify, the revision must be actually received by the City at the address given herein prior to the time and date specified for the closing of this Tender. 6.2 Bidders shall submit written Bid Revisions only in a sealed envelope. The Bidder may revise only the Bidder s entries on the delivered Bid Form. 6.3 The City will not accept revisions of Bids by facsimile or Knowledge Of Site And Work 7.1 Bidders shall visit the site of the work and make allowances in their bids for such conditions as in the sole opinion of the bidder are warranted. The City makes no representation or warranty as to the conditions of the site. 8.0 Proof Of Insurance 8.1 Within seven (7) days of acceptance of the Bid by the City and prior to the work starting, the Contractor shall provide proof of the insurance required by the Contract by delivering a completed certificate of insurance to the City. 9.0 Permits 9.1 If requested, the Contractor shall apply and pay for all permits required, by authorities having jurisdiction, to carry out the work. The City will apply for and pay for the building permit. 9.2 The successful Bidder is required to obtain a City of New Westminster Business license prior to commencement of work. Document #140829

5 Fire Alarm Panel Upgrade, Queen s Park Arena INSTRUCTIONS TO BIDDERS Page 3 of Pricing Requirements 10.1 All prices shall be firm and shall include the cost of labour, materials, equipment, permits, transportation, services, fuel charges, and all Federal and Provincial taxes in force as of the date of submission of the offer, except that the HST (Harmonized Sales Tax) shall be excluded from the price Queries 11.1 The City requests Bidders to advise the City of any errors, conflicts, or omissions in the Bid Documents so the City may issue an addendum After the Bid is accepted, bidders shall abide by the City's decision in the correction of previously unidentified obvious errors, conflicts, or omissions Address all queries or requests for additional information to: Heather Rossi, Purchasing Department, City of New Westminster, hrossi@newwestcity.ca 12.0 Mandatory Bidders Meeting 12.1 The City has arranged a Mandatory Bidders Meeting on Wednesday, August 18, 2010 at 10:00 am at Queen s Park Arena, Queen s Park, New Westminster. See enclosed Queen s Park Map for location To be eligible to submit a Bid for this Tender, Bidders must attend the Mandatory Bidders Meeting. Failure to attend the Mandatory Bidders Meetings will result in disqualification of the Bidder Bid Security, Performance Bonding and Guarantees 13.1 All Bidders are required to provide with their Bid, Bid Security in a form acceptable to and payable to the City of New Westminster. The amount of the Bid Security must be equal to ten percent (10%) of the Bid Price (excluding HST), and one of the following types: a) Bid Bond; b) Certified Cheque; c) Irrevocable Letter of Credit; or d) Bank Draft If, after Award of Contract, the Bidder refuses to enter into the Contract, the Bid Security (if any) may be forfeited to the City of New Westminster because of its damages, without prejudice to the City s remedies for the Bidder s breach of contract Failure to provide Bid Security (when required) will result in disqualification of the Bidder. Document #140829

6 Fire Alarm Panel Upgrade, Queen s Park Arena INSTRUCTIONS TO BIDDERS Page 4 of Form Of Contract 14.1 Any contract arising from this Invitation to Tender will use the CCDC Stipulated Price Contract (not bound in the tender documents) and the Supplementary Conditions included in the Tender Documents Ownership Of Tenders And Freedom Of Information 15.1 All documents submitted to the City of New Westminster become the property of the City, and as such, the City advises Bidders that parts, or all, of their bids may be subject to the provisions of British Columbia s Freedom of Information and Privacy Protection Act (FOIPP) and Community Charter. Bidders who wish to protect particular parts of their bids from disclosure under the FOIPP Act should specifically identify any information or records with their bids that constitute trade secrets and that are supplied in confidence, and the release of which could significantly harm their competitive position. Information that does not meet all three of the foregoing categories may be subject to disclosure to third parties. Please refer to the Freedom of Information and Protection of Privacy Act for further information. The City, as owner of the documents submitted, retains the right to copy the documents. End of Instructions to Bidder Document #140829

7 NWIT BID FORM Fire Alarm Panel Upgrade, Queen s Park Page 1 of 4 Arena 1.0 PROJECT Title: Fire Alarm Panel Upgrade Location: Queen s Park Arena, 51 Third Avenue, New Westminster, BC 2.0 BIDDER Name: (Hereinafter referred to as the Bidder ) Address: (including postal code) Contact Name: Telephone No: Facsimile No: Address: 3.0 OWNER The Owner is the City of New Westminster, 511 Royal Avenue, New Westminster, BC, V3L 1H9, hereinafter referred to as the City. 4.0 OFFER 4.1 The Bidder, having examined the Bid Documents and having gained full knowledge of the scope, character and location of the work and having become familiar with the local conditions, hereby offers to the City to execute the Work for the above named project in accordance with the Bid Documents for the amount of: dollars ($ ), the contract price, which price shall be subject to adjustments as may be provided in the Tender Documents. The contract price excludes the HST (Harmonized Sales Tax). 4.2 The Contractor acknowledges that the City may, prior to contract award, negotiate changes to the scope of work with the low bidder or any one or more bidders without having any duty or obligation to advise any other bidders or to allow them to vary their bid prices due to changes to the scope of work. 5.0 ADJUSTMENTS TO CONTRACT PRICE 5.1 The Contractor further offers to carry out any changes to the work authorized by the City and to be compensated as provided in the General Conditions. Document #140829

8 NWIT BID FORM Fire Alarm Panel Upgrade, Queen s Park Page 2 of 4 Arena 6.0 SCHEDULE 6.1 The Contractor offers to commence the Work and to achieve substantial performance of the Work in a manner acceptable to the City within fourteen (14) days from the date of the Notice to Proceed. 6.2 Failure to commence or complete the Work within the time stated may result in cancellation of the contract and completion of the Work by others. 7.0 ADDENDA 7.1 Any addenda issued by the City shall become part of the Bid Documents. 7.2 The Contractor acknowledges receipt of the following addenda and confirms that the Bid has been prepared in accordance therewith: Addendum No. Dated No. of Pages 8.0 SUBCONTRACTORS 8.1 The Contractor confirms that following is a list of all the subcontractors who will be employed for the Work. No other subcontractors will be employed unless prior written approval is received from the City. Name of Subcontractor Item of Work Document #140829

9 NWIT BID FORM Fire Alarm Panel Upgrade, Queen s Park Page 3 of 4 Arena 9.0 CONTRACTOR NUMBERS 9.1 Contractor's WorkSafe BC Firm Number is 9.2 Contractor's City of New Westminster Business License Number is (to be obtained before contract award) 10.0 REFERENCES Note: Failure to complete this section may result in disqualification Bidders shall provide sources for three (3) references (companies for whom work of a similar nature was done in the past two (2) years, including the City of New Westminster). 1 Company Name: Contact Person: Phone: Nature of Contract: Project Date: Approximate Value: 2 Company Name: Contact Person: Phone: Nature of Contract: Project Date: Approximate Value: 3 Company Name: Contact Person: Phone: Nature of Contract: Project Date: Approximate Value: 11.0 ACCEPTANCE 11.1 Acceptance of this offer by the City will be made by the issuance of a Letter of Award. Document #140829

10 NWIT BID FORM Fire Alarm Panel Upgrade, Queen s Park Page 4 of 4 Arena 12.0 SIGNATURES SIGNED, SEALED, AND DELIVERED by the Contractor: (Contractor's Name) (Legal Signing Authority) (Corporate Seal) (Print Name and Title) (Date) End of Bid Form Document #140829

11 GENERAL REQUIREMENTS Fire Alarm Upgrade, Queen s Park Arena Page 1 of Summary Of Work 1.1 The Contractor shall provide all labour, materials, products, equipment, services, and incidentals required to complete the Contract Work as indicated in the Contract Documents and amendments. 2.0 Coordination 2.1 The Contractor shall coordinate and direct the execution of the work including directing the subcontractors. 3.0 Cutting and Patching 3.1 As it is necessary to carry out the Contract Work, areas of cutting, removal, or opening up of exiting floors, walls, ceilings, or other existing site or building areas shall be fully restored to match the previously existing conditions or adjacent existing conditions in construction and finish. Obtain written approval from the structural engineer, retained and paid for by the contractor, prior to cutting, coring, and/or drilling into building structural elements. 4.0 Submittals 4.1 Pre-Construction Submittals.1 The following submittals shall be provided by the contractor for the Consultant's review within seven (7) days of award of the contract: a) Construction Schedule; b) Proof of Insurance (see General Conditions); c) Clearance Letter from WorkSafe BC 4.2 Shop Drawings & Samples.1 The Contractor shall provide to the Consultant in a timely manner prior to ordering of the material and equipment. 4.3 Submittals For Substantial Performance.1 The following submittals shall be provided by the contractor for the Consultant's review upon the Contractor's request for Certificate of Completion of the Contract: a) Final inspection certificates from the authorities having jurisdiction; b) Deficiency list, complete with a cost estimate of the value of remaining deficiencies; c) Record Set Drawings - one set of white print working drawings neatly marked up in red indicating any as-built conditions that vary from the original drawings; d) Data Manuals - 2 copies, typed 8.5 x 11 format, submitted in 3 ring hard cover binders including the following: i) List of Sub-trades; ii) Shop drawings; iii) Operation and maintenance information; iv) Warranties. Document #140831

12 GENERAL REQUIREMENTS Fire Alarm Upgrade, Queen s Park Arena Page 2 of Maintenance Manuals 5.1 At the time of application for Substantial Performance, provide the City with maintenance manuals as specified in the Contract Documents. 6.0 Utilities And Services 6.1 The City shall provide, at no cost to the Contractor for the related work, cold water, and electrical power. 6.2 The Contractor may use washrooms as designated by the City. 6.3 All other utilities and/or services required by the Contractor shall be the responsibility of the Contractor. 7.0 Security 7.1 The Contractor shall be responsible for the security of the job site building as related to the Work. Comply with all fire regulations during the period of construction. Leave no portion of existing buildings unlocked after public visiting hours at any time. Coordinate with the City as necessary. Except for designated public entrances, all doors will remain locked at all times. 7.2 The contractor s employees are to wear photo identification (provided by the City) at all times when in the work area inside the building. 8.0 Access 8.1 Coordinate with City staff prior to commencing work. Parking is available on site. 9.0 Dangerous Materials 9.1 No gasoline or other dangerous materials shall be stored on the site. 9.2 The Contractor shall separate any dangerous or hazardous materials removed from the site and take to the appropriate recycling or disposal station(s) Site Control And Organization 10.1 The Contractor shall at all times keep the site orderly and, as work allows, generally clean. Remove all trash and debris daily. Sweep clean all floor areas in, and adjacent to, the work area on a daily basis Site Meetings 11.1 The Contractor shall coordinate and attend regular site meetings at such intervals as may be deemed necessary for the purpose of coordinating and expediting the progress of the work. Document #140831

13 GENERAL REQUIREMENTS Fire Alarm Upgrade, Queen s Park Arena Page 3 of An authorized representative of the City will attend these meetings, as and when required. The Contractor agrees to attend in person or send an authorized representative to any such meetings that the City may call. The Contractor s subcontractors shall attend meetings as required to expedite the Work The Consultant shall record and distribute the minutes of any such meetings Pre-Construction Conference 12.1 The City shall advise the Contractor of the time and location of a pre-construction meeting that representatives of the Contractor and his trades shall attend prior to the start of any construction of this contract. The purpose of the meeting is to review site conditions, scheduling and other contractual items Rectify Damages 13.1 The Contractor shall make good any damage or spillage to adjacent buildings, areas, grounds, or vehicles at no cost to the City and leave the site in the same state as it was prior to commencement of the contract and to the satisfaction of the City. The Contractor shall perform all work in a manner that ensures the minimum interference with normal use of public spaces and facilities Rejected Work 14.1 Defective work whether the result of poor workmanship, use of defective products or damage through carelessness or other act or omission of the Contractor, shall be removed from the site by the Contractor and replaced and/or re-examined promptly in accordance with the Contract Documents, all at the Contractor's expense Quality Of Work 15.1 Workmanship shall be of the highest quality. When not specified elsewhere, the Contractor shall perform work in accordance with recognized trade standards and according to product manufacturer s recommendations Temporary Supports 16.1 The Contractor shall be responsible for all temporary supports, bracing, or similar structural work as may be required during the carrying out of the Contract Work Consultation With Owner 17.1 The Contractor shall contact the City immediately:.1 For clarification regarding the Contract Work for information in addition to what is provided in the Contract Documents;.2 If any conflicts or inaccuracies are discovered in the Contract Documents;.3 If any site conditions become apparent that require revisions to the project design and Contract Documents..4 For coordination and approval of shutdowns of building systems. The City prohibits any shutdown of building systems during normal working hours. Document #140831

14 GENERAL REQUIREMENTS Fire Alarm Upgrade, Queen s Park Arena Page 4 of Protection Of The Public And Others 18.1 The Contractor shall take adequate measures to protect the public, City of New Westminster staff, and others on site from injury, damage, or other loss resulting from construction and related activities. Included within the Contractor's work are hoarding, signage, and similar items appropriate for construction conditions and the progress of the job. The City shall have complete jurisdiction over entry of Contractor's workers and vehicle access to site and existing buildings. The Contractor shall make building access arrangements in consultation with applicable staff The Contractor will be required to meet with the City s representative on site to review and accept responsibilities as identified in the City s Prime Contractor Designation, Risk Assessment, and Pre-Job Meeting forms Hours Of Work 19.1 The Contractor shall carry out all work from 7:30 am through 7:00 pm, Monday through Friday The Contractor shall coordinate schedule with the applicable City staff. City staff must approve the schedule prior to the commencement of work. No workers can be on site outside of pre-approved hours Contractor Closeout 20.1 Final Accounting.1 Final statement of account - submit to Owner reflecting all adjustments and the following: a) Original Contract Sum; b) Additions and deductions resulting from: i) Change Orders; ii) Unit Prices; iii) Other adjustments; iv) Deductions for uncorrected work; c) Total Contract sum as adjusted; d) Previous payments; e) Sum remaining due..2 The City retains the right to obtain proof of payment, in the form of a Statutory Declaration, of all sub-trades and material suppliers from the Contractor prior to making final payment Project Closeout.1 Flush clear all drains affected by the work;.2 Clean site of materials and debris created by the Construction;.3 Submit written acceptance that utility companies have inspected services to their satisfaction; Document #140831

15 GENERAL REQUIREMENTS Fire Alarm Upgrade, Queen s Park Arena Page 5 of 5.4 Provide Consultant with all Warranty and Bond Certificates with: a) The proper name and address of the Owner and of the Project; b) The date the warranty commences, which corresponds to the date of Substantial Performance; c) A clear statement of what is being warranted as referenced in the Specifications; d) The signature and seal of the company issuing the warranty, countersigned by the Contractor;.5 Attend a final walk-through with the City and Consultant to identify any final deficiencies;.6 Make good all known deficiencies in the work and notify the Consultant of readiness for final inspection only after completion of these items;.7 The Consultant will review completion of deficiencies during one review only. Additional reviews required to check un-rectified deficiencies or incomplete work will be back-charged by the Owner on the Contractor s progress payments and paid from those funds Special Instructions 21.1 The City does not permit smoking in or on the premises at any time Waste Management 22.1 The Contractor shall remove all waste from the site within forty-eight (48) hours after demolition The waste bins shall be located in an area that does not interfere with the normal operations of the building The City does not permit the use of existing on site waste receptacles by the Contractor Unless otherwise specified, all materials removed become the property of the Contractor, and must be disposed of in conformance with municipal, provincial, federal and WorkSafe BC requirements Separate recyclable and toxic waste materials from the waste stream. Deliver to a local waste management facility. End of General Requirements Document #140831

16 SUPPLEMENTARY GENERAL CONDITIONS CCDC Page 1 of 1 The Supplementary Conditions revise the General Conditions in the CCDC Stipulated Price Contract as follows: ARTICLE A-5 PAYMENT Paragraph 5.3 Interest Paragraph (1) Delete..2%.. and substitute..0%.. Paragraph (2) Delete..4%.. and substitute..0%.. GENERAL CONDITIONS OF THE STIPULATED PRICE CONTRACT PART 1 GENERAL PROVISIONS GC 1.1 CONTRACT DOCUMENTS, Between the Agreement between the Owner and the Contractor and Definitions Insert Addenda PART 2 ADMINISTRATION OF THE CONTRACT GC 4.2 CONTINGENCY ALLOWANCE Delete in its entirety. PART 5 PAYMENT GC 5.1 FINANCING INFORMATION REQUIRED OF THE OWNER Delete in its entirely. GC 5.3 PROGRESS PAYMENT Delete 10 calendar days and substitute with thirty (30) calendar days PART 6 CHANGES IN THE WORK GC 6.2 CHANGE ORDER Add 6.2.3: The allowance for overhead and profit charged by the Contractor and subcontractors shall be as follows:.1 Cost of materials and labour plus 10% mark-up by the Contractor for changes in the work performed by the Contractor..2 Cost of labour and materials plus 10% mark up by the Contractor on changes in the work performed by the subcontractors..3 Cost of labour and materials plus 10% mark-up by the subcontractors for changes in the work performed by the subcontractors..4 The overhead and profit for changes in the work shall include supervision, administrative costs, small tools, miscellaneous materials, layout, additional bonding costs, and recording of the changes on the record drawings. PART 11 INSURANCE AND CONTRACT SECURITY GC 11.1 INSURANCE In line 2, after Owner and the Consultant insert, sub-consultants and special consultants as identified by the Owner,.4 In line 1, after Owner and the Consultant insert, sub-consultants and special consultants as identified by the Owner, Delete in its entirety Delete in its entirety CCDC 41 CCDC INSURANCE REQUIREMENTS Delete paragraphs 3 and 5

17 PRODUCTION WAY BURNABY, BC V5A 4X1 PH ACUMENENGINEERING.CA THIS DRAWING AND ALL ASSOCIATED DOCUMENTS ARE AN INSTRUMENT OF SERVICE AND ARE, AND WILL, AT ALL TIMES REMAIN EXCLUSIVE PROPERTY OF ACUMEN ENGINEERING LTD. ALL DESIGNS AND OTHER INFORMATION SHOWN ON THIS DRAWING ARE FOR USE ONLY ON THE SPECIFIED PROJECT; AND MAY BE USED ONLY FOR THE ISSUED PURPOSE AS STATED HEREIN. PAYMENT OF ALL SUMS DUE TO ACUMEN ENGINEERING LTD. UP TO THE DATE OF THE INTENDED USE OF THIS DRAWING IS A CONDITION PRECEDENT TO THE USE THEREOF. COPYRIGHT OF THIS DRAWING, ITS CONTENT AND DESIGN ARE RESERVED BY ACUMEN ENGINEERING LTD. THE DRAWING AND THE INFORMATION CONTAINED HEREIN SHALL NOT BE REPRODUCED IN WHOLE, OR IN PART, WITHOUT PRIOR WRITTEN PERMISSION FROM ACUMEN ENGINEERING LTD. FIRE ALARM INITIATION ZONES: QUEENS PARK ARENA FIRE ALARM ADDRESS DEVICE LOCATION FLOOR 001 PULLSTATION SOUTH END SECTION #2 UPPER LEVEL 002 PULLSTATION MEETING ROOM SOUTH UPPER LEVEL 003 PULLSTATION SOUTH END SECTION #25 UPPER LEVEL 004 PULLSTATION EAST END SECTION #24 UPPER LEVEL FIRE ALARM UPGRADE 005 PULLSTATION EAST END SECTION #22 UPPER LEVEL 006 PULLSTATION EAST END SECTION #18 UPPER LEVEL 007 PULLSTATION NORTH END SECTION #15 UPPER LEVEL QUEENS PARK NEW WESTMINSTER, BC 008 PULLSTATION WEST SIDE SECTION #9 UPPER LEVEL 009 PULLSTATION WEST SIDE SECTION #5 UPPER LEVEL 010 PULLSTATION WEST SIDE SECTION #3 UPPER LEVEL 011 PULLSTATION FRONT OFFICE LOWER LEVEL 012 PULLSTATION FRONT LOBBY MAIN ENTRANCE LOWER LEVEL 013 PULLSTATION FRONT LOBBY CENTER DOORS LOWER LEVEL 014 PULLSTATION FRONT LOBBY EAST EXIT LOWER LEVEL 015 PULLSTATION EAST SIDE EXIT/ENTRANCE LOWER LEVEL 016 PULLSTATION DRESSING ROOM #5 OUTSIDE EXIT LOWER LEVEL 017 PULLSTATION EAST DRESSING ROOM TUNNEL EXIT LOWER LEVEL 018 PULLSTATION LOWER NORTH TUNNEL EAST LOWER LEVEL 019 PULLSTATION LOWER NORTH TUNNEL WEST LOWER LEVEL 020 PULLSTATION WEST DRESSING ROOM TUNNEL EXIT LOWER LEVEL 021 PULLSTATION WEST SIDE EXIT/ENTRANCE LOWER LEVEL 022 PULLSTATION ASSISTANT'S OFFICE EXIT LOWER LEVEL 023 PULLSTATION CONCESSION STOCK ROOM LOWER LEVEL 024 PULLSTATION NORTH LOBBY EAST DOORS UPPER LEVEL 025 PULLSTATION NORTH LOBBY WEST STAIRS UPPER LEVEL HEAT DETECTOR SOUTH OFFICE LOBBY UPPER LEVEL 027 HEAT DETECTOR SOUTH OFFICE #1 UPPER LEVEL 027 HEAT DETECTOR SOUTH OFFICE #2 UPPER LEVEL 027 HEAT DETECTOR SOUTH OFFICE STORAGE UPPER LEVEL 028 SMOKE DETECTOR SOUTH STAIR SECTION 2 UPPER LEVEL 029 SMOKE DETECTOR SOUTH STAIR SECTION 25 UPPER LEVEL 030 SMOKE DETECTOR NORTH STAIR SECTION 15 UPPER LEVEL 031 SMOKE DETECTOR STAIR NORTH LOBBY WEST SIDE UPPER LEVEL 032 HEAT DETECTOR LOBBY BREAKER ROOM LOWER LEVEL 033 HEAT DETECTOR ENGINE ROOM LOWER LEVEL 033 HEAT DETECTOR ENGINE ROOM LOWER LEVEL 033 PULLSTATION ENGINE ROOM LOWER LEVEL 034 AMMONIA ALARM ENGINE ROOM LOWER LEVEL 035 HEAT DETECTOR ELECTRICAL VAULT LOWER LEVEL 036 HEAT DETECTOR ELECTRICAL ROOM ENTRANCE LOWER LEVEL 037 HEAT DETECTOR ZAMBONI AREA LOWER LEVEL 037 PULLSTATION ZAMBONI AREA LOWER LEVEL 038 HEAT DETECTOR MAINTENANCE ENTRANCE LOWER LEVEL 039 HEAT DETECTOR MAINTENANCE WORK AREA LOWER LEVEL 040 WET SPRINKLER FLOW CANOPY SPRINKLERS LOWER LEVEL FIRE ALARM NOTES: 1. DRAWINGS SHALL BE READ IN CONJUNCTION WITH FRONT END TENDER DOCUMENTS PROVIDED BY THE CITY. ALL DOCUMENTS INCLUDING ADDENDA SHALL BE AVAILABLE ON THE CITY OF NEW WESTMINSTER WEB SITE. 2. CONTRACTOR SHALL ATTEND MANDATORY SITE ORIENTATION MEETING, DATE AND TIME TO BE AS PER FRONT END TENDER DOCUMENTS. FAILURE TO ATTEND EXCLUDES WILL RESULT IN DISQUALIFICATION OF THE BIDDER. 3. WHERE APPLICABLE AND WITH THE EXCEPTION OF CONCRETE CEILINGS, ALL FIRE ALARM WIRING SHALL BE RUN RECESSED IN ACCESSIBLE CEILING SPACE WHERE POSSIBLE. SURFACE MOUNTED CONDUIT OR RACEWAY SHALL BE UTILIZED FOR ALL REMAINING AREAS. 4. FIRE ALARM SYSTEM SHALL REMAIN FULLY OPERATIONAL DURING RENOVATION. SHOULD THE SYSTEM BE SHUT DOWN DURING BUSINESS HOURS FOR ANY REASON, NOTIFY ACUMEN ENGINEERING IMMEDIATELY. FOR EXTENDED PERIODS, FIRE WATCH MAY HAVE TO BE IMPLEMENTED FOR ALL DEACTIVATED AREAS AT CONTRACTOR'S COST. 5. EXISTING FIRE ALARM SYSTEM IS CURRENTLY MONITORED BY AN OUTSIDE SOURCE. PROVIDE FULL COORDINATION WITH MONITORING COMPANY PRIOR TO ANY WORK. FIRE ALARM SYSTEM SHALL BE FULLY OPERATIONAL AND MONITORED AFTER HOURS PRIOR TO LEAVING SITE. 6. NOTIFY THE OWNER PRIOR TO TESTING OF ANY FIRE ALARM BELLS OR VISUAL DEVICES. 7. NOTIFY ACUMEN ENGINEERING ON SCHEDULED FINAL FIRE ALARM VERIFICATION TO COORDINATE BETWEEN PARTIES, VERIFICATION SHALL BE WITNESSED BY CONSULTANT, FIRE AND BUILDING DEPARTMENT. AUTHORITIES MAY REQUEST TESTING OF RANDOM DEVICES ANYWHERE IN THE BUILDING OF THEIR CHOOSING. 8. EXISTING FIRE ALARM CONTROL PANEL BEING REPLACED IS CERBERUS IDENTIFIRE NETWORK SYSTEM 2. FIRE ALARM INITIATING DEVICES COMPRISE OF MIXTURE OF CERBERUS, SIMPLEX AND EDWARDS DEVICES, ALL DEVICES SHALL BE REPLACED WITH NEW SINGLE MANUFACTURER. 9. CITY OF NEW WESTMINSTER PREFERRED STANDARD FIRE ALARM SYSTEM IS SIMPLEX. REFER TO FIRE ALARM SPECIFICATIONS FOR PRE-APPROVED MANUFACTURERS. NEW SYSTEM SHALL BE ADDRESSABLE, SINGLE STAGE AND FULLY COMPATIBLE WITH EXISTING WIRING INFRASTRUCTURE. 10. ALL PULLSTATIONS WITHIN ARENA AREA DESIGNATED 'PE' SHALL BE COMPLETE WITH PROTECTIVE WEATHER RESISTANT ENCLOSURE. 11. PROVIDE ALL NECESSARY DETECTOR BASES AS REQUIRED. 12. NEW BEAM SMOKE DETECTORS IN OPEN ARENA AREA TO BE INSTALLED AS PER MANUFACTURER'S RECOMMENDATION. THIS INCLUDES MOUNTING HEIGHTS, MOUNTING HARDWARE, AVOIDANCE OF BANNERS/PUCK NETS/LIGHTING, ETC. TO PREVENT TROUBLE ALARMS AND TO ENSURE PROPER ACTIVATION DURING ALL SEASONS 13. BEAM DETECTORS FORM INTEGRAL PART OF THE SYSTEM AND HAS BEEN PROBLEMATIC IN PAST WITH HUMIDITY, ROOF FLEXING, ETC. REFER TO FIRE ALARM SPECIFICATIONS FOR DETAILS. Legal Description QUEEN'S PARK NEW WESTMINSTER GROUP 1; LAND DISTRICT PLAN 2620 Civic Address 51 THIRD AVENUE, NEW WESTMINSTER, B.C. Seal REVISIONS NO. DATE REVISION # YY/MM/DD DESCRIPTION ISSUES NO. DATE ISSUE # YY/MM/DD DESCRIPTION 1 10/07/16 ISSUED FOR PERMIT ONLY 2 10/08/13 ISSUED FOR TENDER 041 WET SPRINKLER FLOW ARENA SPRINKLERS LOWER LEVEL 042 PRESSURE SWITCH DRY SPRINKLER LOW AIR LOWER LEVEL 043 TAMPER SWITCH CANOPY SPRINKLERS LOWER LEVEL 044 TAMPER SWITCH MAIN SPRINKLER LOWER LEVEL 045 PRESSURE SWITCH LOW WATER PRESSURE LOWER LEVEL 046 SMOKE BEAM DETECTOR ARENA WEST UPPER LEVEL 047 SMOKE BEAM DETECTOR ARENA CENTER WEST UPPER LEVEL 048 SMOKE BEAM DETECTOR ARENA CENTER EAST UPPER LEVEL 049 SMOKE BEAM DETECTOR ARENA EAST UPPER LEVEL 050 REMOTE ANNUNCIATOR STAFF ROOM - EVACUATION LOWER LEVEL 051 REMOTE ANNUNCIATOR STAFF ROOM - BELL SILENCE LOWER LEVEL Date Job Number Sheet Information Drawn JL FIRE ALARM NOTIFICATION ZONES: Checked Approved RM RM SIGNAL CIRCUIT DEVICE LOCATION FLOOR 001 FIRE ALARM GONG AMMONIA ROOM LOWER LEVEL 001 FIRE ALARM GONG NORTH EAST TUNNEL EXIT LOWER LEVEL 001 FIRE ALARM GONG SOUTH EAST TUNNEL EXIT LOWER LEVEL 001 FIRE ALARM GONG LOBBY SOUTH WEST LOWER LEVEL 001 FIRE ALARM GONG LOBBY SOUTH EAST LOWER LEVEL Title KEY PLAN AND SPECIFICATIONS 001 FIRE ALARM GONG SOUTH WALL UPPER FLOOR 001 FIRE ALARM GONG SOUTH EAST WALL UPPER FLOOR 001 FIRE ALARM GONG NORTH EAST WALL UPPER FLOOR 001 FIRE ALARM GONG TUNNEL CENTER EAST LOWER LEVEL 001 FIRE ALARM STROBE CHANGE ROOM EAST LOWER LEVEL 002 FIRE ALARM GONG ROYALS LOCKER ROOM LOWER LEVEL 8/11/2010 7:44:04 AM 6757-E100.DWG 002 FIRE ALARM GONG TUNNEL WEST SIDE LOWER LEVEL 002 FIRE ALARM GONG TUNNEL WEST SIDE LOWER LEVEL 002 FIRE ALARM GONG TUNNEL NORTH WEST SIDE LOWER LEVEL 002 FIRE ALARM GONG NORTH EXIT - ZAMBONI LOWER LEVEL 002 FIRE ALARM GONG NORTH EXIT - ZAMBONI STORAGE LOWER LEVEL 002 FIRE ALARM GONG NORTH EXIT - ADJACENT TO ZAMBONI LOWER LEVEL 002 FIRE ALARM GONG NORTH WALL UPPER FLOOR 002 FIRE ALARM GONG NORTH WEST WALL UPPER FLOOR 002 FIRE ALARM GONG SOUTH WEST WALL UPPER FLOOR Key Plan N.T.S. QUEENS PARK ARENA Sheet E100 Copyright 2009 Acumen Engineering

18 PTD PROVIDE NEW CEILING MOUNTED COMBINATION STROBE/BUZZER IN WOOD CEILING. WIRING SHALL BE RUN VIA ACCESSIBLE CEILING ABOVE VAULT 035 ENGINE ROOM FIRE ALARM DEVICES IN THIS ROOM (ZONE 33) TO HAVE SEPARATE ADDRESSES. PROVIDE ALL NECESSARY MODULES/WIRING AS REQUIRED S AMMONIA DECTECTION SYSTEM N.I.C. PROVIDE VERIFICATION OF ZONE ONLY FIRE ALARM ZONE #33 INPUT MODULE FIRE ALARM ZONE #34 INPUT MODULE PROVIDE NEW STROBE 017 RECESSED IN WOOD 016 CEILING PANEL. MECH S01 C C S01 DRESSING ROOM #1 S01 DRESSING ROOM #2 STOR. STOR. STOR. STOR. STOR. STOR. CUSTODIAN S01 PROVIDE NEW CEILING MOUNTED HEAT DETECTOR W/R W/R S01 S01 LOCKER ROOM S W/R MENS W/R PRODUCTION WAY BURNABY, BC V5A 4X1 PH ACUMENENGINEERING.CA THIS DRAWING AND ALL ASSOCIATED DOCUMENTS ARE AN INSTRUMENT OF SERVICE AND ARE, AND WILL, AT ALL TIMES REMAIN EXCLUSIVE PROPERTY OF ACUMEN ENGINEERING LTD. ALL DESIGNS AND OTHER INFORMATION SHOWN ON THIS DRAWING ARE FOR USE ONLY ON THE SPECIFIED PROJECT; AND MAY BE USED ONLY FOR THE ISSUED PURPOSE AS STATED HEREIN. PAYMENT OF ALL SUMS DUE TO ACUMEN ENGINEERING LTD. UP TO THE DATE OF THE INTENDED USE OF THIS DRAWING IS A CONDITION PRECEDENT TO THE USE THEREOF. COPYRIGHT OF THIS DRAWING, ITS CONTENT AND DESIGN ARE RESERVED BY ACUMEN ENGINEERING LTD. THE DRAWING AND THE INFORMATION CONTAINED HEREIN SHALL NOT BE REPRODUCED IN WHOLE, OR IN PART, WITHOUT PRIOR WRITTEN PERMISSION FROM ACUMEN ENGINEERING LTD. QUEENS PARK ARENA WASH ROOM WASH ROOM PTD 036 ELEC ROOM 014 FIRE ALARM UPGRADE QUEENS PARK NEW WESTMINSTER, BC Seal S STAFF EXISTING REMOTE FIRE ALARM ANNUNCIATOR PANEL AND SILENCING SWITCHES TO BE REMOVED. PROVIDE NEW WIRING TO NEW ANNUNCIATOR PANEL LOCATION AS REQUIRED. 013 ISSUES NO. DATE ISSUE # YY/MM/DD DESCRIPTION 1 10/07/16 ISSUED FOR PERMIT ONLY 2 10/08/13 ISSUED FOR TENDER ZAMBONI 037 FIRE ALARM ZONE #37 INPUT MODULE 037 FIRE ALARM DEVICES IN THIS ROOM (ZONE 37) TO HAVE SEPARATE ADDRESSES. PROVIDE ALL NECESSARY MODULES/WIRING AS REQUIRED. 019 REVISIONS NO. DATE REVISION # YY/MM/DD DESCRIPTION EXISTING FIRE ALARM PANEL SEMI-RECESSED IN ASBESTOS WALL TO BE REPLACED WITH NEW ANNUNCIATOR PANEL. REUSE EXISTING WALL OPENING OR CABINET AS REQUIRED TO AVOID ASBESTOS ABATEMENT. COORDINATE WITH FIRE ALARM MANUFACTURER. 012 STOR. 038 PROPOSED LOCATION FOR NEW FIRE ALARM PANEL c/w CONDUIT SLEEVE INTO ANNUNCIATOR PANEL FIRST AID FRONT OFFICE 011 WASH ROOM STOR. STOR. STOR. STOR. STOR. STOR. REPLACE EXISTING FIRE ALARM GONG WITH COMBINATION STROBE/BUZZER OFFICE OFFICE PROVIDE NEW HEAT DETECTOR IN STORAGE BELOW STAIRS Main Floor Plan 3/32"=1'-0" MAINTENANCE DRESSING ROOM #4 C PROVIDE NEW STROBE RECESSED IN WOOD CEILING PANEL. C DRESSING ROOM #5 MECH ASBESTOS MATERIAL NOTES: 021 PROVIDE NEW CEILING MOUNTED HEAT DETECTOR LOCKER ROOM OFFICE Renovation Legend 022 STAFF FIRE ALARM ZONE #?? INPUT MODULE 023 SPRINKLER ROOM. SEE LAYOUT FOR DETAILS. Symbol Schedule PROVIDE NEW COMBINATION STROBE/BUZZER UNIT. WOMENS W/R Date Job Number Drawn Checked Approved Sheet Information JL RM RM Title MAIN LEVEL FLOOR PLAN 8/11/2010 7:44:07 AM 6757-E101.DWG ZONE 45 ZONE 44 ZONE 41 ZONE 40 ZONE 42 ZONE 43 Sprinkler Room Layout 1/4"=1'-0" EXISTING SPRINKLER FLOW, TAMPER AND PRESSURE SWITCHES TO REMAIN 1. WORK SHALL BE PERFORMED IN CONJUNCTION WITH THE CITY OF NEW WESTMINSTER'S AIM PROGRAM AND WORKER'S COMPENSATION BOARD REQUIREMENTS TO PREVENT THE RELEASE OF AIRBORNE ASBESTOS FIBERS. 2. ELECTRICAL CONTRACTOR SHALL BE FAMILIAR WITH THE PRESENCE AND LOCATION OF ASBESTOS CONTAINING MATERIALS. THESE LOCATIONS HAVE BEEN IDENTIFIED (BUT NOT LIMITED TO) FLOOR TILES, GYPSUM BOARD FILLING COMPOUNDS, CEILING TILE ADHESIVES, MECHANICAL SYSTEM INSULATION, FIRESTOPPING (PACKINGS, GROUTS, PUTTIES), DUCTWORK MASTIC JOINTS, CEMENT BOARDS, FIREDOORS, ROOFING MATERIALS AND UNDERGROUND CEMENT PIPING. 3. IN THE EVENT THAT ASBESTOS BE DISTURBED, ELECTRICAL CONTRACTOR SHALL NOTIFY THE AIM PROGRAM MANAGER IMMEDIATELY. TAKE ALL NECESSARY PRECAUTIONS TO ISOLATE THE AREA FROM THE REST OF THE BUILDING BY CLOSING DOORS AND OR ERECTING BARRIERS TO RESTRICT ACCESS. SIGNAGE SHALL BE PROVIDED AT ALL ENTRANCES TO THE AREA TO PREVENT PERSONNEL DURING CLOSED HOURS FROM INADVERTANTLY ENTERING THE AREA. ALL MECHANICAL SYSTEMS THAT ARE IN, SUPPLY OR PASS THROUGH THE AREA MUST BE SHUT DOWN AND ISOLATED. SEAL ALL INTAKE AND EXHAUST VENTS IN THE AREA WITH POLYETHYLENE AND TAPE. EXISTING ELECTRICAL EQUIPMENT TO BE REMOVED AND TURNED OVER TO THE OWNER OR AS DIRECTED BY ENGINEER. REMOVE, BLANK OFF, EXTEND OR RELOCATE ALL ASSOCIATED WIRING AND MAKE SAFE. EXISTING ELECTRICAL EQUIPMENT TO BE REMOVED AND RE-INSTALLED OR RELOCATED AS SHOWN UPON COMPLETION OF NEW CEILING OR WALL FINISH. REWIRE OR EXTEND WIRING AS REQUIRED. EXISTING ELECTRICAL EQUIPMENT TO REMAIN IN IT'S PRESENT LOCATION. REWIRE OR EXTEND WIRING AS REQUIRED. EXISTING ELECTRICAL EQUIPMENT TO BE REMOVED. RE-INSTALL ALL NEW EQUIPMENT AS SHOWN. REWIRE OR EXTEND WIRING AS REQUIRED. EXISTING ELECTRICAL EQUIPMENT TO BE REMOVED AND RE-INSTALLED IN SAME LOCATION ONCE ALL OTHER WORK IS COMPLETED. AUTOMATIC RATE OF RISE HEAT DETECTOR AUTOMATIC FIXED TEMP. HEAT DETECTOR AUTOMATIC SMOKE DETECTOR AUTOMATIC DUCT SMOKE DETECTOR AUTOMATIC SMOKE ALARM 120V AUTOMATIC SMOKE DETECTOR c/w AUX SMOKE BEAM DETECTOR SMOKE BEAM REFLECTOR FIRE ALARM MANUAL PULL STATION FIRE ALARM GONG OR BELL FIRE ALARM BUZZER FIRE ALARM STROBE LIGHT FIRE ALARM COMBINATION STROBE/BUZZER ANALOG TO ADDRESSABLE ZONE ADAPTER MODULE (OR EQUIVALENT) SPRINKLER SYSTEM TAMPER SWITCH SPRINKLER SYSTEM FLOW SWITCH SPRINKLER SYSTEM PRESSURE SWITCH FIRE ALARM END OF LINE RESISTOR FIRE ALARM REMOTE ANNUNCIATOR FIRE ALARM CONTROL PANEL MAGNETIC DOOR HOLDER INTERCONNECTED WITH F.A. TO RELEASE UPON ALARM Sheet E101 Copyright 2009 Acumen Engineering

19 MOUNTED ON WOOD STRUCTURE. REPLACE MOUNTING HARDWARE AS DIRECTED BY FIRE ALARM MANUFACTURER TO PREVENT TROUBLE SIGNAL AS REQUIRED MOUNTED ON WOOD STRUCTURE. REPLACE MOUNTING HARDWARE AS DIRECTED BY FIRE ALARM MANUFACTURER TO PREVENT TROUBLE SIGNAL AS REQUIRED. 049 FIRE ALARM ZONE #49 INPUT MODULE S01 PE PE PE '-10" 005 S CONCESSION SURFACE MOUNT NEW FIRE DETECTOR, EXTEND CONDUIT AND WIRING AS REQUIRED TO EXISTING ZONE PRODUCTION WAY BURNABY, BC V5A 4X1 PH ACUMENENGINEERING.CA THIS DRAWING AND ALL ASSOCIATED DOCUMENTS ARE AN INSTRUMENT OF SERVICE AND ARE, AND WILL, AT ALL TIMES REMAIN EXCLUSIVE PROPERTY OF ACUMEN ENGINEERING LTD. ALL DESIGNS AND OTHER INFORMATION SHOWN ON THIS DRAWING ARE FOR USE ONLY ON THE SPECIFIED PROJECT; AND MAY BE USED ONLY FOR THE ISSUED PURPOSE AS STATED HEREIN. PAYMENT OF ALL SUMS DUE TO ACUMEN ENGINEERING LTD. UP TO THE DATE OF THE INTENDED USE OF THIS DRAWING IS A CONDITION PRECEDENT TO THE USE THEREOF. COPYRIGHT OF THIS DRAWING, ITS CONTENT AND DESIGN ARE RESERVED BY ACUMEN ENGINEERING LTD. THE DRAWING AND THE INFORMATION CONTAINED HEREIN SHALL NOT BE REPRODUCED IN WHOLE, OR IN PART, WITHOUT PRIOR WRITTEN PERMISSION FROM ACUMEN ENGINEERING LTD. QUEENS PARK ARENA PE 029 FIRE ALARM UPGRADE PE QUEENS PARK NEW WESTMINSTER, BC 030 Seal 024 FIRE ALARM ZONE #48 INPUT MODULE 249'-11" 048 MOUNTED ON CONCRETE WALL MOUNTED ON WOOD STRUCTURE. REPLACE MOUNTING HARDWARE AS DIRECTED BY FIRE ALARM MANUFACTURER TO PREVENT TROUBLE SIGNAL AS REQUIRED. S01 FIRE ALARM DEVICES IN THIS ROOM (ZONE 27) TO HAVE SEPARATE ADDRESSES. PROVIDE ALL NECESSARY MODULES/WIRING AS REQUIRED. S01 PROVIDE (4) NEW SMOKE DETECTORS IN CONCESSION AREA AS SHOWN. OFFICE OFFICE OFFICE ISSUES NO. DATE ISSUE # YY/MM/DD DESCRIPTION 1 10/07/16 ISSUED FOR PERMIT ONLY 2 10/08/13 ISSUED FOR TENDER CONCESSION 027 OFFICE 002 FIRE ALARM ZONE #27 INPUT MODULE 047 FIRE ALARM ZONE #47 INPUT MODULE MOUNTED ON WOOD STRUCTURE. REPLACE MOUNTING HARDWARE AS DIRECTED BY FIRE ALARM MANUFACTURER TO PREVENT TROUBLE SIGNAL AS REQUIRED. 249'-11" PROVIDE NEW DETECTOR SURFACE MOUNTED IN CORRIDOR. MOUNTED ON CONCRETE WALL REVISIONS NO. DATE REVISION # YY/MM/DD DESCRIPTION PE Sheet Information FIRE ALARM ZONE #46 INPUT MODULE Date Job Number '-10" Drawn JL MOUNTED ON WOOD STRUCTURE. REPLACE MOUNTING HARDWARE AS DIRECTED BY FIRE ALARM MANUFACTURER TO PREVENT TROUBLE SIGNAL AS REQUIRED. 046 Upper Floor Plan 3/32"=1'-0" PE PE PE 010 SOUND ROOM MOUNTED ON WOOD STRUCTURE. REPLACE MOUNTING HARDWARE AS DIRECTED BY FIRE ALARM MANUFACTURER TO PREVENT TROUBLE SIGNAL AS REQUIRED. SURFACE MOUNT NEW FIRE DETECTOR, EXTEND CONDUIT AND WIRING AS REQUIRED TO EXISTING ZONE. Checked Approved RM RM Title UPPER LEVEL FLOOR PLAN 8/11/2010 7:44:10 AM 6757-E102.DWG Sheet E102 Copyright 2009 Acumen Engineering

20 FIRE ALARM SPECIFICATIONS: Fire Alarm Autodialer: CONTRACTOR TO ARRANGE FOR AND COORDINATE TO ENSURE THAT FIRE ALARM SYSTEM IS CORRECTLY MONITORED VIA AN N.F.P.A. APPROVED METHOD TO A CENTRAL DEDICATED ULC-LISTED MONITORING FACILITY. 8/11/2010 7:44:25 AM E103.DWG PART 1 GENERAL 1.1 REFERENCES.1 CSA C CANADIAN ELECTRICAL CODE, PART I (19TH EDITION), SAFETY STANDARD FOR ELECTRICAL INSTALLATIONS.2 CAN/ULC-S524, INSTALLATION OF FIRE ALARM SYSTEMS.3 ULC-S525, AUDIBLE SIGNAL APPLIANCES FOR FIRE ALARM SYSTEMS.4 CAN/ULC-S526, VISUAL SIGNAL APPLIANCES, FIRE ALARM.5 CAN/ULC-S527, CONTROL UNITS, FIRE ALARM.6 CAN/ULC-S528, MANUAL PULL STATIONS.7 CAN/ULC-S529, SMOKE DETECTORS, FIRE ALARM.8 CAN/ULC-S530, HEAT ACTUATED FIRE DETECTORS, FIRE ALARM.9 CAN/ULC-S531, SMOKE ALARMS.10 CAN/ULC-S536, INSPECTION AND TESTING OF FIRE ALARM SYSTEMS.11 CAN/ULC-S537, VERIFICATION OF FIRE ALARM SYSTEMS.12 NBC, NATIONAL BUILDING CODE OF CANADA.13 CSA C22.1 SECTION 32, FIRE ALARM SYSTEMS AND FIRE PUMPS.14 LOCAL BUILDING CODE.15 CSA C22.2 NO TEST METHODS FOR ELECTRICAL WIRES AND CABLES.16 CSA C22.2 NO (R2004) - THERMOSET INSULATED WIRES AND CABLES.17 NFPA 72E _ AUTOMATIC FIRE DETECTORS.18 NFPA 72G _ NOTIFICATION APPLIANCES FOR PROTECTIVE SIGNALLING SYSTEMS.19 NFPA 72H _ GUIDE FOR TEST PROCEDURES FOR PROTECTIVE SIGNALLING SYSTEMS.20 NFPA 101 _ LIFE SAFETY CODE.21 UNDERWRITERS LABORATORIES OF CANADA - LISTINGS.22 UNDERWRITERS LABORATORIES, INC., - LISTINGS 1.2 SYSTEM DESCRIPTION.1 FIRE ALARM SYSTEM: FULLY ADDRESSABLE LOCAL FIRE ALARM SYSTEM WITH CONNECTIONS TO REMOTE CENTRAL MONITORING STATION AND (2) REMOTE LCD ANNUNCIATOR PANELS. SYSTEM INCLUDES BUT IS NOT LIMITED TO:.1 CONTROL PANEL TO CARRY OUT FIRE ALARM AND PROTECTION FUNCTIONS INCLUDING RECEIVING ALARM SIGNALS, INITIATING GENERAL ALARM, SUPERVISING SYSTEM CONTINUOUSLY, ACTUATING ZONE ANNUNCIATOR AND INITIATING TROUBLE SIGNALS..2 TROUBLE SIGNAL DEVICES.3 POWER SUPPLY FACILITIES.4 MANUAL ALARM STATIONS.5 AUTOMATIC ALARM INITIATING DEVICES.6 AUDIBLE SIGNAL DEVICES.7 END-OF-LINE DEVICES.8 REMOTE ANNUNCIATOR PANEL.9 VISUAL ALARM SIGNAL DEVICES.10 ANCILLARY DEVICES 1.3 SUBMITTALS.1 PRODUCT DATA: PROVIDE ELECTRICAL CHARACTERISTICS AND CONNECTION REQUIREMENTS.2 TEST REPORTS: INDICATE SATISFACTORY COMPLETION OF REQUIRED TESTS AND INSPECTIONS.3 MANUFACTURER'S INSTALLATION INSTRUCTIONS: INDICATE APPLICATION CONDITIONS AND LIMITATIONS OF USE STIPULATED BY PRODUCT TESTING AGENCY. INCLUDE INSTRUCTIONS FOR STORAGE, HANDLING, PROTECTION, EXAMINATION, PREPARATION, INSTALLATION, AND STARTING OF PRODUCTS. 1.4 OPERATION AND MAINTENANCE DATA.1 PROVIDE OPERATION AND MAINTENANCE DATA FOR FIRE ALARM SYSTEM FOR INCORPORATION INTO MANUAL. INCLUDE:.1 OPERATION AND MAINTENANCE AND REPAIR INSTRUCTIONS FOR COMPLETE FIRE ALARM SYSTEM TO PERMIT EFFECTIVE OPERATION AND MAINTENANCE.2 TECHNICAL DATA - ILLUSTRATED PARTS LISTS WITH PARTS CATALOGUE NUMBERS.3 COPY OF APPROVED SHOP DRAWINGS.4 LIST OF RECOMMENDED SPARE PARTS FOR SYSTEM 1.5 QUALIFICATIONS.1 MANUFACTURER: COMPANY SPECIALIZING IN MANUFACTURING THE PRODUCTS SPECIFIED IN THIS SECTION WITH MINIMUM 10 YEARS DOCUMENTED EXPERIENCE, AND WITH SERVICE FACILITIES WITHIN 160 KM FROM PROJECT SITE..2 INSTALLER: COMPANY SPECIALIZING IN INSTALLING THE PRODUCTS SPECIFIED IN THIS SECTION WITH MINIMUM 5 YEARS DOCUMENTED EXPERIENCE, AND CERTIFIED BY PROVINCE OF BC AS FIRE ALARM INSTALLER. 1.6 REGULATORY REQUIREMENTS.1 PROVIDE PRODUCTS LISTED AND CLASSIFIED BY ULC.2 VERIFICATION COMPANY/FIRM SHALL BE ACCEPTABLE TO AUTHORITY HAVING JURISDICTION 1.7 MAINTENANCE SERVICE.1 PROVIDE SERVICE AND MAINTENANCE OF FIRE ALARM SYSTEM FOR ONE YEAR FROM DATE OF SUBSTANTIAL COMPLETION 1.8 TRAINING.1 ARRANGE AND PAY FOR TWO ON-SITE LECTURES AND DEMONSTRATIONS BY FIRE ALARM EQUIPMENT MANUFACTURER TO TRAIN OPERATIONAL PERSONNEL IN USE AND MAINTENANCE OF FIRE ALARM SYSTEM. SEMINARS WILL USE ACTUAL DEMONSTRATION..2 A REPRESENTATIVE FROM THE MANUFACTURERS SHALL ATTEND THE SEMINAR 1.9 EXTRA MATERIALS PART 2.1 PROVIDE 10 MANUAL STATION BREAK_GLASS RODS.2 PROVIDE (5) SPARE SMOKE AND (5) SPARE HEAT DETECTORS PRODUCTS 2.1 GENERAL.1 ALL EQUIPMENT AND DEVICES WILL BE ULC LISTED AND LABELLED AND SUPPLIED BY A SINGLE MANUFACTURER.2 POWER SUPPLY: TO CAN/ULC-S524.3 AUDIBLE SIGNAL DEVICES: TO ULC-S525.4 VISUAL SIGNAL DEVICES: TO CAN/ULC-S526.5 CONTROL UNIT: TO CAN/ULC-S527.6 MANUAL PULL STATIONS: TO CAN/ULC-S528.7 THERMAL DETECTORS: TO CAN/ULC-S530.8 SMOKE DETECTORS: TO CAN/ULC-S529.9 SMOKE ALARMS: TO CAN/ULC-S SYSTEM OPERATION.1 OPERATION OF ANY ALARM INITIATING DEVICE TO:.1 CAUSE AUDIBLE SIGNAL DEVICES TO SOUND THROUGHOUT BUILDING..2 TRANSMIT SIGNAL TO FIRE DEPARTMENT VIA FIRE ALARM AUTODIALER TO REMOTE MONITORING STATION..3 CAUSE ZONE OF ALARM DEVICE TO BE INDICATED ON CONTROL PANEL AND REMOTE ANNUNCIATOR..4 CAUSE AIR CONDITIONING AND VENTILATING FANS TO SHUT DOWN OR TO FUNCTION SO AS TO PROVIDE REQUIRED CONTROL OF SMOKE MOVEMENT..5 CAUSE FIRE DOORS AND SMOKE CONTROL DOORS IF NORMALLY HELD OPEN, TO CLOSE AUTOMATICALLY. 2.3 PRE-APPROVED MANUFACTURERS.1 MIRCOM, EDWARDS, SIMPLEX, NOTIFIER 2.4 FIRE ALARM CONTROL PANEL.1 CLASS A, ZONED, NON-CODED..2 ENCLOSURE: CSA ENCLOSURE 4, C/W LOCKABLE CONCEALED HINGED DOOR, FULL VIEWING WINDOW, FLUSH LOCK AND 2 KEYS. ENCLOSURE TO BE SUITABLE FOR SURFACE WALL MOUNTING.3 SUPERVISED, MODULAR DESIGN WITH PLUG-IN MODULES:.1 ALARM RECEIVER WITH TROUBLE AND ALARM INDICATIONS FOR CLASS A INITIATING CIRCUIT.2 SPARE ZONES: COMPATIBLE WITH SMOKE DETECTORS AND OPEN CIRCUIT DEVICES.3 SPACE FOR FUTURE MODULES.4 LATCHING TYPE SUPERVISORY RECEIVER CIRCUITS, DISCRETE INDICATION FOR BOTH OFF-NORMAL AND TROUBLE.4 ALARM RECEIVER PANEL WITH TROUBLE AND ALARM INDICATIONS FOR CLASS A INITIATING CIRCUIT..5 PANEL SIGNAL CIRCUITS TO PROVIDE TEMPORAL SOUND RATE UPON ANY ALARM INITIATION..6 PANEL TO BE COMPLETE WITH MINIMUM (BUT NOT LESS THAN REQUIRED BY LOAD) OF 4 SIGNAL CIRCUITS WIRED IN A CLASS A CONFIGURATION (UP TO 1.7A PER SIGNAL CIRCUIT)..7 COMMON CONTROL AND POWER UNITS:.1 CONTROL AND ANNUNCIATOR PANELS CONTAINING FOLLOWING INDICATIONS AND CONTROLS:.1 "POWER ON" LED (GREEN) TO MONITOR PRIMARY SOURCE OF POWER TO SYSTEM.2 "POWER TROUBLE" INDICATION.3 "GROUND TROUBLE" INDICATION.4 "REMOTE ANNUNCIATOR TROUBLE" INDICATION.5 "SYSTEM TROUBLE" INDICATION.6 "SYSTEM TROUBLE" BUZZER AND SILENCE SWITCH C/W TROUBLE RESOUND FEATURE.7 SYSTEM RESET SWITCH.8 "LED TEST" SWITCH IF APPLICABLE.9 "ALARM SILENCE" SWITCH TO SILENCE SIGNALS MANUALLY. IF NEW ALARM OCCURS AFTER SIGNALS HAVE BEEN SILENCED, SIGNALS TO RESOUND.10 "SIGNALS SILENCED" INDICATION.2 MASTER POWER SUPPLY PANEL TO PROVIDE 24 V DC TO SYSTEM FROM 120 V AC, 60 HZ INPUT..3 FIRE DEPARTMENT AND REMOTE MONITORING:.1 PANEL TO INCLUDE; ALARM, SPRINKLER FLOW, SUPERVISORY, AND TROUBLE RELAYS FOR REMOTE MONITORING CONNECTIONS..2 FIRE DEPARTMENT BYPASS SWITCH C/W INDICATOR FOR TROUBLE AT PANEL..8 AUXILIARY RELAYS: PLUG-IN TYPE, DUST COVER, SUPERVISED AGAINST UNAUTHORIZED REMOVAL BY COMMON TROUBLE CIRCUIT AND C/W INDIVIDUAL BYPASS SWITCH..1 CONTACTS: 1.0 A, 28V, FOR FUNCTIONS SUCH AS RELEASE OF DOOR HOLDERS OR INITIATION OF FAN SHUT DOWN..2 CONTACT TERMINAL SIZE: CAPABLE OF ACCEPTING AWG WIRE..9 CONTROL PANEL: MODULAR CONSTRUCTION WITH SURFACE WALL MOUNTED ENCLOSURE..10 LIST EACH AUXILIARY DEVICE, SUCH AS DOOR HOLDERS, DAMPERS, AND EXTERNAL RELAYS THAT MUST BE OPERATED FROM THE FIRE ALARM CONTROL PANEL POWER SUPPLY..11 POWER SUPPLY: ADEQUATE TO SERVE CONTROL PANEL MODULES, REMOTE ANNUNCIATOR, DOOR HOLDERS, SMOKE DAMPERS, RELAYS, AND ALARM SIGNALLING DEVICES. INCLUDE BATTERY OPERATED EMERGENCY POWER SUPPLY WITH CAPACITY FOR OPERATING SYSTEM IN STANDBY MODE FOR 24 HOURS FOLLOWED BY ALARM MODE FOR 30 MINUTES..12 SYSTEM SUPERVISION: COMPONENT OR POWER SUPPLY FAILURE PLACES SYSTEM IN TROUBLE MODE..13 CONSULT MUNICIPAL FIRE SERVICE TO DETERMINE AVAILABILITY OF MUNICIPAL CONNECTION, OR CHOOSE EITHER REMOTE STATION OR CENTRAL STATION SYSTEM. CONSULT WITH MANUFACTURER AND REMOTE STATION SERVICE PROVIDER TO DETERMINE REQUIREMENTS..14 REMOTE STATION SIGNAL TRANSMITTER: EXISTING TO REMAIN..15 AUXILIARY RELAYS: PROVIDE SUFFICIENT SPDT AUXILIARY RELAY CONTACTS TO PROVIDE ACCESSORY FUNCTIONS SPECIFIED..16 PROVIDE TROUBLE ACKNOWLEDGE, DRILL, AND ALARM SILENCE SWITCH..17 TROUBLE SIGNAL SEQUENCE OF OPERATION: SYSTEM OR CIRCUIT TROUBLE PLACES SYSTEM IN TROUBLE MODE, WHICH CAUSES THE FOLLOWING SYSTEM OPERATIONS:.1 VISUAL AND AUDIBLE TROUBLE ALARM INDICATED (BY ZONE) AT FIRE ALARM CONTROL PANEL..2 VISUAL AND AUDIBLE TROUBLE ALARM INDICATED AT REMOTE ANNUNCIATOR PANEL..3 TROUBLE SIGNAL TRANSMITTED TO REMOTE STATION..4 MANUAL ACKNOWLEDGE FUNCTION AT FIRE ALARM CONTROL PANEL SILENCES AUDIBLE TROUBLE ALARM; VISUAL ALARM IS DISPLAYED UNTIL INITIATING FAILURE OR CIRCUIT TROUBLE IS CLEARED..18 SUPERVISORY SIGNAL SEQUENCE OF OPERATION: SYSTEM OR CIRCUIT TROUBLE PLACES SYSTEM IN TROUBLE MODE, WHICH CAUSES THE FOLLOWING SYSTEM OPERATIONS:.1 VISUAL AND AUDIBLE TROUBLE ALARM INDICATED (BY ZONE) AT FIRE ALARM CONTROL PANEL..2 VISUAL AND AUDIBLE TROUBLE ALARM INDICATED AT REMOTE ANNUNCIATOR PANEL..3 TROUBLE SIGNAL TRANSMITTED TO REMOTE STATION..4 MANUAL ACKNOWLEDGE FUNCTION AT FIRE ALARM CONTROL PANEL SILENCES AUDIBLE TROUBLE ALARM; VISUAL ALARM IS DISPLAYED UNTIL INITIATING FAILURE OR CIRCUIT TROUBLE IS CLEARED..19 ALARM SEQUENCE OF OPERATION: ACTUATION OF INITIATING DEVICE PLACES CIRCUIT IN ALARM MODE, WHICH CAUSES THE FOLLOWING SYSTEM OPERATIONS:.1 SOUND AND DISPLAY LOCAL FIRE ALARM SIGNALLING DEVICES WITH TEMPORAL CODE SIGNAL.2 TRANSMIT SIGNAL TO REMOTE STATION EQUIPMENT.3 INDICATE LOCATION OF ALARM ZONE ON FIRE ALARM CONTROL PANEL AND ON REMOTE ANNUNCIATOR PANEL.4 ACTIVATE BUILDING SMOKE REMOVAL SYSTEM (IF APPLICABLE).5 TRANSMIT SIGNAL TO BUILDING MECHANICAL SYSTEMS TO INITIATE SHUTDOWN OF FANS AND DAMPER OPERATION (IF APPLICABLE).6 TRANSMIT SIGNAL TO RELEASE DOOR HOLD OPEN DEVICES..20 ALARM RESET: SYSTEM REMAINS IN ALARM MODE UNTIL MANUALLY RESET WITH KEY ACCESSIBLE RESET FUNCTION..21 LAMP TEST: MANUAL LAMP TEST FUNCTION CAUSES ALARM INDICATION AT EACH ZONE AT FIRE ALARM CONTROL PANEL AND AT ANNUNCIATOR PANEL..22 DRILL SEQUENCE OF OPERATION: MANUAL DRILL FUNCTION CAUSES ALARM MODE OPERATION AS DESCRIBED ABOVE..23 ZONING: AS INDICATED ON THE DRAWINGS AND AS REQUIRED. 2.5 POWER SUPPLY V, AC, 60 HZ INPUT, 24 V DC OUTPUT FROM RECTIFIER TO OPERATE ALARM AND SIGNAL CIRCUITS. INCLUDE SURGE PROTECTION ON INCOMING POWER WIRING..2 STANDBY SLA (SEALED LEAD ACID) BATTERY UNIT WITH AUTOMATIC BATTERY CHARGER TO PROVIDE SUPERVISORY AND TROUBLE SIGNAL CURRENT FOR 24 HOURS, PLUS GENERAL ALARM LOAD FOR MINIMUM OF 30 MINUTES. UNIT TO BE SIZED TO CARRY THE COMPLETE FULL LOAD OF FIRE ALARM SYSTEM. PART 3 BEAM SMOKE DETECTORS 3.1 BEAM SMOKE DETECTORS SHALL: PART 4.1 BE COMPLETE WITH HEATER TO SUIT TEMPERATURES BELOW 5 DEGREES CELCIUS. UNIT TEMPERATURE RANGE SHALL BE BETWEEN -30 TO 55 DEGREES CELCIUS..2 BE COMPLETE WITH LONG RANGE ACCESSORIES OR REFLECTORS AS NECESSARY TO SUIT BEAM DISTANCES AS SHOWN ON DRAWINGS..3 HUMIDITY FACTOR OF 10 TO 93% NONCONDENSING..4 COMPLETE WITH INTEGRAL SENSITIVITY TEST FILTER AND EXTERNAL POWER SUPPLY. UNIT SHALL HAVE LOCAL TEST AND RESET SWITCHES..5 COMPLETE WITH LOCAL ALARM, TROUBLE AND NORMAL STATUS LED INDICATORS..6 INTEGRAL SIGNAL STRENGTH INDICATION VIA DIGITAL DISPLAY..7 MINIMUM OF 4 SENSITIVITY LEVELS WITH ABILITY TO AUTOMATICALLY ADJUST TO SUIT ENVIRONMENT..8 PREFERRED UNIT IS MIRCOM BEAM200SA OR APPROVED EQUAL. EXECUTION 4.1 INSTALLATION.1 INSTALL PRODUCTS TO MANUFACTURER'S WRITTEN INSTRUCTIONS..2 USE 14 AWG MINIMUM SIZE CONDUCTORS FOR FIRE ALARM DETECTION AND SIGNAL CIRCUIT CONDUCTORS..3 MOUNT END_OF_LINE DEVICE IN BOX WITH LAST DEVICE OR SEPARATE BOX ADJACENT TO LAST DEVICE IN CIRCUIT..4 MOUNT OUTLET BOX FOR ELECTRIC DOOR HOLDER TO WITHSTAND 36 KG PULLING FORCE..5 MAKE CONDUIT AND WIRING CONNECTIONS TO DOOR RELEASE DEVICES, SPRINKLER FLOW SWITCHES, SPRINKLER VALVE TAMPER SWITCHES, DUCT SMOKE DETECTORS AND ANY OTHER DEVICES AS REQUIRED..6 INSTALL SYSTEMS IN ACCORDANCE WITH CAN/ULC-S USE ISOLATION MODULES AS REQUIRED TO ISOLATE TROUBLE FOR SEPARATE ZONES..8 INSTALL MAIN CONTROL PANEL AND CONNECT TO AC POWER SUPPLY, AND DC STANDBY POWER..9 LOCATE AND INSTALL MANUAL ALARM STATIONS AND CONNECT TO ALARM CIRCUIT WIRING..10 LOCATE AND INSTALL DETECTORS AND CONNECT TO ALARM CIRCUIT WIRING. DO NOT MOUNT DETECTORS WITHIN 1 M OF AIR OUTLETS. MAINTAIN AT LEAST 600 MM RADIUS CLEAR SPACE ON CEILING, BELOW AND AROUND DETECTORS. LOCATE DUCT TYPE DETECTORS IN STRAIGHT PORTIONS OF DUCTS..11 CONNECT ALARM CIRCUITS TO MAIN CONTROL PANEL..12 LOCATE AND INSTALL AUDIBLE SIGNAL AND VISUAL SIGNAL DEVICES AND CONNECT TO SIGNALLING CIRCUITS..13 CONNECT SIGNALLING CIRCUITS TO MAIN CONTROL PANEL..14 INSTALL END-OF-LINE DEVICES AT END OF ALARM AND SIGNALLING CIRCUITS, IN A SEPARATE BOX NOT MORE THAN 1730 MM ABOVE FINISHED FLOOR..15 INSTALL REMOTE ANNUNCIATOR PANELS AND CONNECT TO ANNUNCIATOR CIRCUIT WIRING..16 LOCATE AND INSTALL DOOR RELEASING DEVICES..17 LOCATE AND INSTALL REMOTE RELAY UNITS TO CONTROL FAN SHUT DOWN..18 SPRINKLER SYSTEM: WIRE ALARM AND SUPERVISORY SWITCHES AND CONNECT TO CONTROL PANEL..19 MOUNT BATTERY PACK AND CHARGER IN THE CONTROL CABINET. 4.2 WIRING.1 USE COMMUNICATION CHANNEL CLASS A (ADDRESSABLE SYSTEM).2 ENSURE CONDUCTORS ARE ROUTED IN SUCH A MANNER TO PROVIDE REQUIRED FIRE RATING..3 SIGNAL CIRCUITS TO BE WIRED WITH A MINIMUM 2 - #14 RW90 PER ZONE. IN NO CASE SHALL THE VOLTAGE DROP TO ANY SIGNAL EXCEED 3%..4 ALARM INITIATING DEVICES TO BE WIRED WITH MULTI CONDUCTOR #18 RW90 CABLES AS REQUIRED IN ACCORDANCE WITH THE CANADIAN ELECTRICAL CODE. CIRCUIT RESISTANCE SHALL NOT EXCEED 50 OHMS..5 ALL WIRING WILL BE TERMINATED INTO THE TERMINAL STRIPS IN THE FIRE ALARM CABINET WITH ALL WIRING FULLY LABELLED. ALL CABLING TO BE NEAT WITH CABLES BUNDLED AND WRAPPED INSIDE THE CABINETS. NO SPLICING WILL BE ALLOWED WITHIN THE CABINETS. A COMPLETE SCHEDULE OF ALL WIRING TERMINATIONS WILL BE MOUNTED INSIDE EACH CONTROL UNIT. A COMPLETE SCHEMATIC WITH ALL DEVICES, CABLE LABELLING INFORMATION, DESTINATIONS, ETC. WILL BE INCLUDED WITH THE SHOP DRAWINGS. 4.3 FIELD QUALITY CONTROL.1 SIMULATE GROUNDS AND BREAKS ON ALARM AND SIGNALLING CIRCUITS TO ENSURE PROPER OPERATION OF SYSTEM..2 CLASS A CIRCUITS..1 TEST EACH CONDUCTOR ON ALL CIRCUITS FOR CAPABILITY OF PROVIDING ALARM SIGNAL ON EACH SIDE OF SINGLE OPEN-CIRCUIT FAULT CONDITION IMPOSED NEAR MIDMOST POINT OF CIRCUIT. RESET CONTROL UNIT AFTER EACH ALARM FUNCTION AND CORRECT IMPOSED FAULT AFTER COMPLETION OF EACH TEST..2 TEST EACH CONDUCTOR ON ALL CIRCUITS FOR CAPABILITY OF PROVIDING ALARM SIGNAL DURING GROUND-FAULT CONDITION IMPOSED NEAR MIDMOST POINT OF CIRCUIT. RESET CONTROL UNIT AFTER EACH ALARM FUNCTION AND CORRECT IMPOSED FAULT AFTER COMPLETION OF EACH TEST. 4.4 MANUFACTURER'S FIELD SERVICES.1 INCLUDE SERVICES OF CERTIFIED TECHNICIAN TO SUPERVISE INSTALLATION, ADJUSTMENTS, FINAL CONNECTIONS, AND SYSTEM TESTING. 4.5 VERIFICATION AND CERTIFICATION.1 THE MANUFACTURER SHALL MAKE AN INSPECTION OF THE FIRE ALARM EQUIPMENT, INCLUDING THOSE COMPONENTS NECESSARY TO THE DIRECT OPERATION OF THE SYSTEM SUCH AS DETECTORS AND CONTROLS, WHETHER OR NOT MANUFACTURED BY THE MANUFACTURER ADDED UNDER THIS CONTRACT. THE INSPECTOR SHALL COMPRISE AN EXAMINATION OF SUCH EQUIPMENT FOR THE FOLLOWING:.1 THAT THE TYPE OF EQUIPMENT INSTALLED IS THAT DESIGNATED BY THE SPECIFICATION.2 THAT THE WIRING CONNECTIONS TO ALL EQUIPMENT COMPONENTS SHOW THAT THE INSTALLER UNDERTOOK TO HAVE OBSERVED ULC AND CSA REQUIREMENTS.3 THAT EQUIPMENT OF THE MANUFACTURER'S MANUFACTURE HAS BEEN INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS AND THAT ALL SIGNALLING DEVICES OF WHATEVER MANUFACTURE HAVE BEEN OPERATED OR TESTED TO VERIFY THEIR OPERATION.4 THAT THE SUPERVISORY WIRING OF THOSE ITEMS OF EQUIPMENT CONNECTED TO A SUPERVISED CIRCUIT IS OPERATING AND THAT THE GOVERNMENTAL REGULATIONS, IF ANY, CONCERNING SUCH SUPERVISORY WIRING HAVE BEEN MET TO THE SATISFACTION OF INSPECTING OFFICIALS.5 TO ASSIST THE CONTRACTOR IN PREPARING HIS BID THE MANUFACTURER SHALL INDICATE THE NUMBER OF HOURS NECESSARY TO COMPLETE THIS INSPECTION PRIOR TO CLOSING OF TENDERS, AND THE NUMBER OF HOURS NECESSARY TO PROVIDE A SEMINAR ON THE SYSTEM FOR THE BUILDING OWNER.2 TEST, VERIFY AND COMMISSION THE SYSTEM ACCORDING TO REQUIREMENTS OF CAN/ULC_S537 STANDARD FOR VERIFICATION OF FIRE ALARM SYSTEM INSTALLATIONS CAN/ULC-S524, INSTALLATION OF FIRE ALARM SYSTEMS. THE SERVICES OF THE CONTRACTOR AND REPRESENTATIVES OF THE FIRE ALARM MANUFACTURER ARE REQUIRED FOR THE VERIFICATION THE CONTRACTOR SHALL SUPPLY AND INSTALL ALL NECESSARY DEVICES TO ALLOW FOR CORRECT MONITORING OF: - FIRE ALARM SPRINKLER ACTIVATED - FIRE ALARM NON-SPRINKLER ACTIVATED - FIRE ALARM SYSTEM TROUBLE, AND - SPRINKLER SUPERVISORY SIGNALS DEVICES SHALL INCLUDE BUT NOT BE LIMITED TO FIRE ALARM PANEL INCLUDING ALL NECESSARY ADDITIONAL MODULES, AUTO DIALER, ULC-LISTED TRANSPONDER. SILENT KNIGHT MODEL #5104 FIRE CONTROL COMMUNICATOR OR APPROVED ULC-LISTED SHALL BE USED. CONTRACTOR SHALL USE EXISTING AUTODIALER LEASED TELEPHONE LINE AND CONNECTIONS TO AUTODIALER AS REQUIRED. BREAKER FOR FIRE ALARM PANEL AND AUTODIALER TO BE PAINTED RED. PROVIDE LAMICOID LABELS TO READ: "FIRE ALARM-DO NOT OPEN EXCEPT TO TEST" AND "FIRE ALARM DIALER-DO NOT OPEN EXCEPT TO TEST". CONTRACTOR TO ENSURE AUTODIALER IS TESTED AND INSPECTED DURING THE FIRE ALARM VERIFICATION AND IS REPORTED ON THE WORKSHEETS. THE CONTRACTOR SHALL COORDINATE TO ENSURE THE MONITORING COMPANY SUBMITS TO THE ENGINEER A LETTER CONFIRMING THE FOLLOWING: A. MONITORING OF FIRE ALARM, SPRINKLER SUPERVISORY AND FIRE ALARM SYSTEM TROUBLE SIGNALS B. USE OF ULC-LISTED FIRE TRANSPONDERS, ETC. C. USE AND TYPE OF DEDICATED TELEPHONE LINES. General Specifications 1.0 GENERAL PROVISIONS.01 THE GENERAL CONDITIONS OF THE CONTRACT SHALL FORM AN INTEGRAL PART OF THE SPECIFICATION..02 PROVIDE ALL LABOUR AND MATERIALS NECESSARY FOR COMPLETE AND OPERATING SYSTEMS AS INDICATED ON THE DRAWINGS AND SPECIFIED HEREIN. ANY WORK, AND MATERIAL, EVEN IF NOT SHOWN OR SPECIFIED, WHICH IS OBVIOUSLY NECESSARY OR REASONABLY IMPLIED TO COMPLETE THE WORK, SHALL BE PROVIDED AS IF IT WAS BOTH SHOWN, AND SPECIFIED..03 ALL ELECTRICAL WORK SHALL BE CARRIED OUT IN ACCORDANCE WITH THE NATIONAL BUILDING CODE, ELECTRICAL SAFETY ACT OF THE PROVINCE OF BRITISH COLUMBIA, CURRENT PURSUANT REGULATION (B.C. ELECTRICAL CODE REGULATION, ELECTRICAL SAFETY BULLETINS, ETC.), TO THE SATISFACTION OF THE LOCAL INSPECTION AUTHORITY HAVING JURISDICTION AND TO THE APPROVAL OF THE CONSULTANT..04 WHERE, IN THE FOLLOWING CLAUSES OF THE SPECIFICATION, REFERENCE IS MADE TO THE "CANADIAN ELECTRICAL CODE", IT SHALL REFER TO THE CURRENT EDITIONS OF THE NATIONAL BUILDING CODE, ELECTRICAL SAFETY ACT AND REGULATIONS AS STATED ABOVE..05 THE CONTRACTOR SHALL VISIT THE SITE AND ASCERTAIN CONDITIONS AFFECTING THE WORK PRIOR TO SUBMITTING A TENDER QUOTE. REFER TO TENDER DOCUMENTS FOR SCHEDULED DATE AND TIME. NO EXTRAS FOR WORK WILL BE PAID UNLESS AUTHORIZED BY THE ARCHITECT OR OWNER..06 ALL WORK SHALL CONFORM TO THE CURRENT EDITION OF THE CANADIAN ELECTRICAL CODE, BUILDING CODE, NATIONAL BUILDING CODE AND LOCAL, MUNICIPAL AND PROVINCIAL CODES, BY-LAWS AND REGULATIONS..07 THE CONTRACTOR SHALL APPLY FOR ALL PERMITS, SERVICES, AND INSPECTIONS, AND PAY FOR ALL FEES TO THE AUTHORITIES HAVING JURISDICTION. INCLUDE ALL COSTS IN TENDER QUOTE..08 OBTAIN APPROVALS FROM THE ELECTRICAL INSPECTION AUTHORITY AND NOTIFY THE CONSULTANT OF ANY CHANGES REQUESTED IN THE DESIGN PLANS AND SPECIFICATIONS BY THE LOCAL INSPECTION AUTHORITY. INCLUDE ALL COSTS TO ACCOMMODATE THESE CHANGES IN TENDER QUOTE..09 CHECK DRAWINGS AND SPECIFICATIONS FOR ERRORS, OMISSIONS AND CONFORMITY WITH APPLICABLE REGULATIONS PRIOR TO TENDER SUBMISSION. REPORT DISCREPANCIES TO CONSULTANT PRIOR TO TENDER CLOSING, OR INCLUDE ALLOWANCE IN TENDER PRICE TO COVER COST OF REQUIRED CORRECTION. WHERE DOUBT EXISTS AS TO THE MEANING TO THE DRAWINGS OR SPECIFICATIONS, OBTAIN CLARIFICATION PRIOR TO TENDER SUBMISSION OR BASE TENDER PRICE ON MOST EXPENSIVE INTERPRETATION OF DISCREPANCY..10 ALL WORK SHALL BE SUBJECT TO REVIEW AND APPROVAL BY THE CONSULTANT. IN THE EVENT A REQUESTED FINAL REVIEW REVEALS DEFICIENCIES, THE CONTRACTOR SHALL TAKE ALL REASONABLE STEPS TO COMPLETE ALL DEFICIENCIES PRIOR TO THE SUBSEQUENT REVISIT AND DEFICIENCY REVIEW BY THE CONSULTANT. WHERE THE CONTRACTOR HAS NOT COMPLETED ALL DEFICIENCIES, AND THE CONSULTANT IS REQUESTED TO ATTEND THE SITE FOR DEFICIENCY SIGN OFF, THE CONTRACTOR SHALL BE LIABLE TO THE CONSULTANT'S FOR THE COSTS OF THE REVIEW AT NORMAL HOURLY RATES, PLUS REIMBURSABLE EXPENSES AND THE COST OF AN ADDITIONAL REVIEW WHICH MAY BE REQUIRED AT DEFICIENCY COMPLETION..11 THE CONTRACTOR SHALL SUPPLY, INSTALL, WIRE AND CONNECT ALL EQUIPMENT AS SPECIFIED, SHOWN AND/OR AS REQUIRED FOR A COMPLETE AND OPERATIONAL INSTALLATION..12 SHOP DRAWINGS FOR ELECTRICAL EQUIPMENT AND FIXTURES SHALL BE SUBMITTED FOR REVIEW BY CONSULTANT PRIOR TO MANUFACTURER OR INSTALLATION. CORRECTIONS OR COMMENTS MADE ON THE SHOP DRAWINGS DURING THIS REVIEW DO NOT RELIEVE THE CONTRACTOR FROM COMPLIANCE WITH REQUIREMENTS OF THE DRAWINGS AND SPECIFICATIONS. THIS REVIEW IS FOR GENERAL CONFORMANCE WITH THE DESIGN CONCEPT OF THE PROJECT AND GENERAL COMPLIANCE WITH THE INFORMATION GIVEN IN THE CONTRACT DOCUMENTS. THE CONTRACTOR IS RESPONSIBLE FOR: CONFIRMING AND CORRELATING ALL QUANTITIES AND DIMENSIONS; SELECTING FABRICATION PROCESSES AND TECHNIQUES OF CONSTRUCTION; COORDINATING ALL WORK WITH THAT OF ALL OTHER TRADES AND PERFORMING ALL WORK IN A SAFE AND SATISFACTORY MANNER..13 INCLUDE ALL FEDERAL, PROVINCIAL AND MUNICIPAL TAXES FOR THE WORK IN THE TENDER PRICE..14 ALL ELECTRICAL MATERIAL AND/OR EQUIPMENT SUPPLIED BY ANY CONTRACTOR OR SUBCONTRACTOR FOR INSTALLATION ON THIS PROJECT MUST BEAR EVIDENCE OF CERTIFICATION BY AUTHORIZED ORGANIZATION (E.G. CSA, WARNOCK HERSEY) OR SPECIAL CERTIFICATION ACCEPTABLE TO THE CHIEF INSPECTOR OF ELECTRICAL ENERGY FOR THE PROVINCE OF BRITISH COLUMBIA..15 ALL ELECTRICAL EQUIPMENT MOUNTED OR CONNECTED SHALL BE IDENTIFIED BY MEANS OF BLACK LAMACOID LABELS C/W MINIMUM 3/8" WHITE LETTERING..16 CLEAN ALL EQUIPMENT DURING CONSTRUCTION AND THOROUGHLY CLEAN ON COMPLETION OF THE CONTRACT..17 REMOVE ALL SURPLUS MATERIALS, CUTTINGS, PACKAGING AND DEBRIS FROM THE SITE DURING THE PROGRESS AND AT FINAL COMPLETION OF THE WORK..18 THE OWNER RESERVES THE RIGHT OF TRIAL OR TEMPORARY USAGE PRIOR TO ACCEPTING THE INSTALLATION..19 EXECUTE ALL WORK IN A PROFESSIONAL, WORKMANLIKE MANNER, TO PRESENT A NEAT MECHANICAL APPEARANCE..20 ONLY QUALIFIED WORKMEN SHALL BE EMPLOYED ON THIS CONTRACT. SUPERVISION SHALL BE BY JOURNEYMEN ELECTRICIANS AND WORK CARRIED OUT BY JOURNEYMEN AND/OR REGISTERED APPRENTICES ONLY..21 CO-ORDINATE WITH ALL OTHER TRADES AND ARRANGE EQUIPMENT IN PROPER RELATION WITH OTHER APPARATUS, DUCTS, PIPES, ETC., AND WITH BUILDING CONSTRUCTION ARCHITECTURAL FINISHES, AND DECOR..22 SUPPLY AND INSTALL ALL DRILLING, CORE DRILLING, WEATHERPROOFING, SEALING, SETTING OF INSERTS FIXTURE BACKING, PANEL AND DISTRIBUTION BACKBOARDS. CO-ORDINATE ALL CUTTING, PATCHING, EXCAVATION, BACKFILLING AND CONCRETE FOR THE CARRYING OUT OF THE WORK. INCLUDE ALL COSTS IN TENDER PRICE..23 ANY ELECTRICAL AND COMMUNICATION WORK CARRIED OUT ON BEHALF OF, OR BY, OTHER CONTRACTORS SHALL BE IN ACCORDANCE WITH THE REGULATIONS OF THE CANADIAN ELECTRICAL CODE AND THE APPLICABLE CLAUSES OF THIS SPECIFICATION..24 IT SHALL BE THE ELECTRICAL CONTRACTOR'S RESPONSIBILITY TO ENSURE THAT ALL SUBCONTRACTORS AND SUPPLIERS OF ELECTRICAL EQUIPMENT OBSERVE THE APPLICABLE CLAUSES OF THE ELECTRICAL SPECIFICATIONS..25 IN CASE OF DIFFERENCES BETWEEN CONTRACTORS REGARDING EXTENT OF WORK RESPONSIBILITIES, SUCH MATTERS SHALL BE REFERRED TO THE CONSULTANT. SHOULD ANY DISCREPANCY BETWEEN THE SPECIFICATION AND DRAWINGS LEAVE THE CONTRACTOR IN DOUBT AS TO THE TRUE INTENT AND MEANING, A RULING SHALL BE OBTAINED FROM THE CONSULTANT BEFORE THE TENDER IS SUBMITTED. IF THIS IS NOT DONE IT WILL BE THE CONTRACTOR'S RESPONSIBILITY TO ENSURE THAT THE MORE EXPENSIVE ALTERNATE HAS BEEN INCLUDED..26 ALTERNATES WILL NOT BE ACCEPTED, NEW DEVICES SHALL BE OF SAME MANUFACTURER AS EXISTING SYSTEMS..27 CONTRACTOR SHALL SUBMIT TO CONSULTANT FOR REVIEW AND APPROVAL A DETAILED BREAKDOWN OF MATERIAL AND LABOR COSTS TO PERMIT A REVIEW OF PROGRESS CLAIM SUBMISSIONS IN ACCORDANCE WITH PROVINCIAL LIEN LEGISLATION. FAILURE TO SUBMIT THIS BREAKDOWN WILL AFFECT THE REVIEW PROCESS AND MAY DELAY PAYMENT..28 THE CONTRACTOR SHALL GUARANTEE ALL WORK AND MATERIAL COVERED IN THIS CONTRACT FOR A PERIOD OF ONE YEAR FROM THE DATE OF SUBSTANTIAL PERFORMANCE OF THE CONTRACT. THIS IS IN ADDITION TO ANY MANUFACTURER'S WARRANTY PROVIDED FOR SUPPLY OF MATERIALS AND EQUIPMENT..29 ALL WIRING SHALL BE COPPER, MINIMUM #12, LOOMEX WILL NOT BE PERMITTED. 2.0 RENOVATION AREA SPECIFICATIONS.01 CONTRACTOR IS TO ENSURE THAT A MINIMUM OF DISRUPTION OCCURS TO THE OWNERS PRIMARY BUSINESS DURING THEIR NORMAL HOURS OF OPERATION. THIS MAY INVOLVE THE CONTRACTORS WORK BEING PERFORMED ON EVENINGS, WEEKENDS, AND/OR HOLIDAYS. THE CONTRACTOR SHALL INCLUDE ALL COSTS OF THIS PROVISION IN THEIR BASE TENDER QUOTE. NO ALLOWANCE WILL BE SUBSEQUENTLY BE MADE FOR FAILURE TO INCLUDE THESE COSTS IN BASE TENDER QUOTE..02 CONTRACTOR SHALL REWIRE, EXTEND WIRES, CONDUITS, ETC. OR INSTALL NEW FOR ANY RELOCATED ELECTRICAL DEVICES AS SHOWN ON THE DRAWINGS AND/OR AS REQUIRED..03 ALL ELECTRICAL DEVICES SHOWN ON THE DRAWINGS AND/OR AS REQUIRED SHALL BE NEW UNLESS OTHERWISE NOTED..04 ALL MODIFIED/NEW ELECTRICAL SYSTEMS SHALL BE FULLY OPERATIONAL AFTER RENOVATION IS COMPLETE AND BE ACCEPTED BY THE CONSULTANT AND OWNER..05 ALL REMOVED AND UNUSED ELECTRICAL DEVICES FROM THE RENOVATED AREAS SHALL BE TURNED OVER TO OWNER UNLESS OTHERWISE NOTED. INTERM STORAGE LOCATION OF THESE DEVICES SHALL BE COORDINATED WITH THE OWNER AND STORED SECURELY TO PREVENT DAMAGE..06 CONTRACTOR SHALL RELOCATE, REWIRE, OR REROUTE ALL WIRING WHICH PASSES THROUGH RENOVATED AREAS TO ENSURE PROPER OPERATION OF ALL ELECTRICAL SYSTEMS OUTSIDE OF RENOVATED AREAS..07 ANY FIXTURES, WIRING DEVICES, ETC. DAMAGED DURING AND AFTER REMOVAL SHALL BE REPLACED WITH NEW APPROVED EQUIPMENT AT CONTRACTOR'S COST..08 CONTRACTOR IS RESPONSIBLE FOR ADEQUATE PROTECTION OF EQUIPMENT, FURNITURE, ETC. (PLASTIC COVERS, MOVEMENT OF OWNER FURNITURE, ETC.) DURING THE EXECUTION OF THE WORK..09 CONTRACTOR IS RESPONSIBLE FOR CLEANING UP THE WORK AREA EACH DAY BEFORE LEAVING THE JOB SITE..10 ALL MATERIALS SHALL BE SUPPLIED AND INSTALLED AS SPECIFIED AND/OR SHOWN ON THE DRAWINGS..11 CONTRACTOR TO CONFIRM ALL LOCATIONS OF EXISTING EQUIPMENT, WIRING, CIRCUIT NUMBERS, ETC..12 ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING, PATCHING AND PAINT FOR ALL AREAS AFFECTED BY THE RENOVATION. FINAL FINISHES SHALL MATCH EXISTING AND IS SUBJECT TO FINAL APPROVAL BY THE CITY. SHOULD THE CITY ASSESS THAT THE COLORS OR FINISHES DO NOT MATCH, THE CONTRACTOR WILL BE REQUIRED TO PAINT ENTIRE WALL AND/OR CEILING. 3.0 FIRESTOPPING.01 ALL ELECTRICAL WIRES, CABLES, NONCOMBUSTIBLE RACEWAYS, OUTLET BOXES AND OTHER SIMILAR SERVICES THAT PENETRATE FIREWALL, FIRE SEPARATION OR ASSEMBLY REQUIRED TO HAVE A FIRE RESISTANCE RATING OR FIRE SEPARATION, SHALL BE SEALED BY FIRE STOP SYSTEM WHICH HAS AN "F" AND/OR "FT" RATING NOT LESS THAN REQUIRED FIRE PROTECTION RATING OF FIRE SEPARATION..02 "F" AND "FT" RATINGS SHALL BE DETERMINED BY FIRE TEST METHOD AS DETAILED IN CAN 4-S115-M "STANDARD METHOD OF FIRE TESTS OF FIRE STOP SYSTEMS". REFER TO RELEVANT SECTIONS OF THE NATIONAL BUILDING CODE..03 CONTRACTOR SHALL ONLY USE LISTED MATERIALS AND METHODS AS LISTED AND INDICATED IN ULC LIST OF EQUIPMENT AND MATERIALS, VOLUME 2, BUILDING CONSTRUCTION" (NO. 40U18 FIRE SEPARATION)..04 SERVICE PENETRATION AND FIRE STOPPING OF SERVICE PENETRATION IN FIRE SEPARATION AND FIRE RATED ASSEMBLIES SHALL COMPLY WITH RELEVANT SECTIONS OF THE NATIONAL BUILDING CODE..05 PROVIDE FIRE STOPS IN CONCEALED SPACES AS REQUIRED AS PER RELEVANT SECTIONS OF THE NATIONAL BUILDING CODE. FIRE STOPPING MATERIAL SHALL BE USED TO SEAL ANY PENETRATION OF COMPARTMENT SEPARATION IN CONCEALED SPACES. 4.0 FINAL ACCEPTANCE.01 SUBMIT TO THE CONSULTANT, PRIOR TO SUBMISSION FOR SUBSTANTIAL PERFORMANCE, TWO MARKED UP SETS OF AS-BUILT DRAWINGS AND THREE SETS OF MAINTENANCE MANUALS FOR ALL ELECTRICAL COMPONENTS USED ON THIS PROJECT. AS-BUILT DRAWINGS SHALL HAVE ELECTRICAL CONTRACTOR COMPANY NAME, ADDRESS, PHONE NUMBER, DATE AND SIGNATURE STAMPED ON DRAWINGS. AS-BUILT DRAWINGS SHALL BE CONVERTED TO AUTOCAD BY THE CONSULTANT AND SUBMITTED TO THE OWNER WITH MANUALS..02 DELIVER TO THE CONSULTANT CERTIFICATE OF APPROVAL AND FINAL INSPECTION FROM AUTHORITIES HAVING JURISDICTION PRIOR TO FINAL OCCUPANCY. THESE MUST BE PROVIDED THREE WORKING DAYS PRIOR TO CONSULTANT FINAL OCCUPANCY REVIEW..03 AFTER THE CONTRACT IS COMPLETED, FURNISH TO OWNER A WRITTEN GUARANTEE THAT FOR ONE YEAR FROM DATE OF ACCEPTANCE, ANY DEFECTS IN MATERIALS OR WORKMANSHIP WILL BE CORRECTED AT NO COST TO THE OWNER. SUBMIT COPY OF GUARANTEE TO THE CONSULTANT..04 AS THE CONSULTANT IS REQUIRED TO GIVE PROFESSIONAL ASSURANCE THAT ALL ELECTRICAL SYSTEMS HAVE BEEN INSTALLED, TESTED AND VERIFIED IN ACCORDANCE WITH THE NATIONAL BUILDING CODE AND THE CANADIAN ELECTRICAL CODE, THE CONSULTANT REQUIRES THE FOLLOWING ITEMS FROM THE CONTRACTOR PRIOR TO ISSUANCE OF "LETTER OF PROFESSIONAL ASSURANCE " FOR BUILDING OCCUPANCY: - WRITTEN REPORTS OF SITE REVIEWS BY AUTHORITIES. - LETTER OF ASSURANCE OF PROFESSIONAL FIELD REVIEW AND COMPLIANCE. - FIRE ALARM VERIFICATION REPORT..06 ALL COSTS FOR THE ABOVE SHALL BE INCLUDED IN BASE TENDER QUOTE. 5.0 DIV. 16 EXCLUSIONS 5.01 THE FOLLOWING WORK IS EXCLUDED FROM DIV. 16 SCOPE OF WORK BUT HAS TO BE DONE TO FACILITATE THE INSTALLATION OF ELECTRICAL SYSTEMS AND/OR IS AFFECTED BY ELECTRICAL INSTALLATIONS. THIS WORK HAS TO BE PERFORMED UNDER THE DIRECTION OF OTHER RELEVANT PROFESSIONAL SUCH AS AN ARCHITECT, MECHANICAL, CIVIL, BUILDING ENVELOPE, ETC, ENGINEER. THIS WORK SHALL BE PERFORMED UNDER OTHER RELEVANT SPECIFICATION SECTIONS (OTHER THAN DIV. 16). CONTRACTOR SHALL COORDINATE DIV. 16 WORK WITH ALL OTHER RELEVANT WORK. FOR DIRECTIONS, GUIDANCE, SPECIFICATION REGARDING THIS WORK, CONTRACTOR SHALL CONTACT RELEVANT PROFESSIONALS (NOT ELECTRICAL) NON-EXHAUSTIVE LIST OF EXCLUSIONS:.1 WATERPROOFING OF NON-ELECTRICAL COMPONENTS LIKE BUILDING ENVELOPE, WALLS, ROOF, ETC..2 X-RAYS FOR CUTTING, CORING, PATCHING..3 CONTROL WIRING UNLESS SPECIFIED IN THIS SECTION..4 ALL CIVIL CONCRETE, EXCAVATION OR BACKFILL WORK INCLUDING SHORING AND BEDDING..5 COVERS FOR PULL PITS..6 PRECAST AND/OR CAST IN PLACE CONCRETE PRODUCTS SUCH AS PULLBOXES, LIGHT POLE BASES, TRANSFORMER CONCRETE PADS, ETC..7 DUCT DRAINAGE AND ASSOCIATED BACKWATER VALVES..8 BACKING..9 PAINTING UNLESS SPECIFIED IN THIS SECTION..10 FIRE RATED DRYWALL ENCLOSURES FOR PANELBOARD AND LIGHT FIXTURES..11 CUTTING, PATCHING OR CORING..12 TEMPORARY LIGHTING UNLESS SPECIFICALLY DETAILED AS PART OF DIV. 16 WORK. THIS DRAWING AND ALL ASSOCIATED DOCUMENTS ARE AN INSTRUMENT OF SERVICE AND ARE, AND WILL, AT ALL TIMES REMAIN EXCLUSIVE PROPERTY OF ACUMEN ENGINEERING LTD. ALL DESIGNS AND OTHER INFORMATION SHOWN ON THIS DRAWING ARE FOR USE ONLY ON THE SPECIFIED PROJECT; AND MAY BE USED ONLY FOR THE ISSUED PURPOSE AS STATED HEREIN. PAYMENT OF ALL SUMS DUE TO ACUMEN ENGINEERING LTD. UP TO THE DATE OF THE INTENDED USE OF THIS DRAWING IS A CONDITION PRECEDENT TO THE USE THEREOF. COPYRIGHT OF THIS DRAWING, ITS CONTENT AND DESIGN ARE RESERVED BY ACUMEN ENGINEERING LTD. THE DRAWING AND THE INFORMATION CONTAINED HEREIN SHALL NOT BE REPRODUCED IN WHOLE, OR IN PART, WITHOUT PRIOR WRITTEN PERMISSION FROM ACUMEN ENGINEERING LTD. Seal REVISIONS NO. DATE REVISION # YY/MM/DD DESCRIPTION ISSUES NO. DATE ISSUE # YY/MM/DD DESCRIPTION PRODUCTION WAY BURNABY, BC V5A 4X1 PH ACUMENENGINEERING.CA QUEENS PARK ARENA FIRE ALARM UPGRADE QUEENS PARK NEW WESTMINSTER, BC 1 10/07/16 ISSUED FOR PERMIT ONLY 2 10/08/13 ISSUED FOR TENDER Date Job Number Drawn Checked Approved Sheet Information JL RM RM Title SPECIFICATIONS Sheet E103 Copyright 2009 Acumen Engineering

Project No Belleville Fire Hall/Headquarters and Emergency Operations Centre Section Belleville, Ontario Page 1 of 10

Project No Belleville Fire Hall/Headquarters and Emergency Operations Centre Section Belleville, Ontario Page 1 of 10 Belleville, Ontario Page 1 of 10 1 GENERAL 1.1 GENERAL REQUIREMENTS.1 The General Conditions of CCDC2-2008, and the General requirements of Division 1, form part of this Section and must read in conjunction

More information

CALL FOR TENDER - MUNICIPALITY OF THE DISTRICT OF CLARE LITTLE BROOK, N.S.

CALL FOR TENDER - MUNICIPALITY OF THE DISTRICT OF CLARE LITTLE BROOK, N.S. CALL FOR TENDER - MUNICIPALITY OF THE DISTRICT OF CLARE LITTLE BROOK, N.S. NAME OF TENDER: CONSTRUCT, DELIVER AND COMMISSION 3 (THREE) LIFT STATION ELECTRICAL LOCATION OF WORK: 3 Separate work sites in

More information

FIRE ALARM SYSTEM 1.1 GENERAL REQUIREMENTS

FIRE ALARM SYSTEM 1.1 GENERAL REQUIREMENTS VALOUR COMMUNITY CENTRE FIRE ALARM SYSTEM Section 28 00 00 GYMNASIUM ADDITION & RENOVATION Page 1 of 3 28 00 00 FIRE ALARM SYSTEM 1.1 GENERAL REQUIREMENTS 1.2 SCOPE 1. The specification covering the General

More information

PWGSC Ontario MULTIPLEX FIRE ALARM SYSTEM Sect Region Project Page 1 Number R

PWGSC Ontario MULTIPLEX FIRE ALARM SYSTEM Sect Region Project Page 1 Number R Region Project Page 1 PART 1 - GENERAL 1.1 REFERENCES.1 CAN/ULC-S524-2006, Standard for the Installation of Fire Alarm Systems..2 CAN/ULC-S525-2007, Audible Signal Device for Fire Alarm Systems..3 CAN/ULC-S526-2007,

More information

FIRE & LIFE SAFTEY STANDARD

FIRE & LIFE SAFTEY STANDARD Title: Effective Date: 01/01/14 Revised Date: 1/1/14 Code References: Title 16, Chapter 16.16 of the Roseville Municipal Code, NFPA 72 Note: This standard is a summary of Fire Department clarifications

More information

Rancho Cucamonga Fire Protection District Prevention Bureau Standard

Rancho Cucamonga Fire Protection District Prevention Bureau Standard Rancho Cucamonga Fire Protection District Prevention Bureau Standard Title: Fire Alarm and Monitoring Systems Standard # 9-3 Effective: May 2002 Number of Pages: 7 Updated: December 2016 for consistency

More information

Replacement of Fire Pump and Generator Upgrade, H Building, Sexton Campus

Replacement of Fire Pump and Generator Upgrade, H Building, Sexton Campus ADDENDUM FORM INVITATION TO TENDER: 2016-067 ADDENDUM NO: 1 DATE ISSUED: June 23, 2016 ISSUED BY: Monty Thibeault DESCRIPTION: Replacement of Fire Pump and Generator Upgrade, H Building, Sexton Campus

More information

Bold items are particular to the City of Euless

Bold items are particular to the City of Euless EULESS FIRE DEPARTMENT FIRE MARSHAL S OFFICE INFORMATION LINE: Revised 8/2004 Fire Chief Lee Koontz Fire Marshal Paul Smith EFD-FMO 3-1 2003 International Fire & Building Code as Amended NFPA Standards

More information

SECTION DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM

SECTION DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM SECTION 283111 - DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

Fort Rouge Leisure Centre Section HVAC Upgrades Phase 2 Page 1 of 5 Bid Opportunity No March 2013 FIRE ALARM SYSTEMS

Fort Rouge Leisure Centre Section HVAC Upgrades Phase 2 Page 1 of 5 Bid Opportunity No March 2013 FIRE ALARM SYSTEMS HVAC Upgrades Phase 2 Page 1 of 5 Part 1 General 1.1 SUMMARY.1 Section Includes:.1 Materials and installation for fire alarm systems upgrades..2 Audible signal devices..3 End-of-line devices..4 Sustainable

More information

SECTION WET-PIPE SPRINKLER SYSTEMS

SECTION WET-PIPE SPRINKLER SYSTEMS SECTION 21 13 13 WET-PIPE SPRINKLER SYSTEMS PART 1 - GENERAL 1.1 SCOPE OF WORK A. Design, installation and testing shall be in accordance with NFPA 13 except for specified exceptions. B. The demolition

More information

The following information shall become and form part of the contract documents.

The following information shall become and form part of the contract documents. October 4, 206 To: Attention: Re: All Bidders All Bidders JCBE Gymnasium HVAC Upgrades BC#: 206433 Edmonds Project No.: BHM6090 All bidders, The following information shall become and form part of the

More information

STATEMENT OF WORK ELECTRICAL REPAIR / MAINTENANCE BUILDING PROJECT FDC RACCOON CREEK STATE PARK (BEAVER COUNTY)

STATEMENT OF WORK ELECTRICAL REPAIR / MAINTENANCE BUILDING PROJECT FDC RACCOON CREEK STATE PARK (BEAVER COUNTY) STATEMENT OF WORK ELECTRICAL REPAIR / MAINTENANCE BUILDING PROJECT FDC-213-100797 RACCOON CREEK STATE PARK (BEAVER COUNTY) I. SCOPE OF WORK: The Commonwealth of Pennsylvania, Department of Conservation

More information

SMALL WORKS PROJECT REQUEST FOR SEALED BIDS

SMALL WORKS PROJECT REQUEST FOR SEALED BIDS SMALL WORKS PROJECT REQUEST FOR SEALED BIDS PIERCE COUNTY FIRE PROTECTION DISTRICT #22 18421 OLD BUCKLEY HIGHWAY BONNEY LAKE, WA 98391 (253) 863-1800 (253) 863-1848 (FAX) Date Bid Requested: 5/24/2012

More information

SECTION INTRUSION DETECTION

SECTION INTRUSION DETECTION (NOTE TO DESIGNER: These Specifications are basic minimum criteria to be met in preparing the final specifications for this section, which is the responsibility of the Designer.) SECTION 28 16 00 INTRUSION

More information

Sidney, Ohio 1204 FORMAL ISSUANCE OF CERTIFICATE OF SUBSTANTIAL COMPLETION... ON OR BEFORE JULY 30, 2015.

Sidney, Ohio 1204 FORMAL ISSUANCE OF CERTIFICATE OF SUBSTANTIAL COMPLETION... ON OR BEFORE JULY 30, 2015. SECTION 000050 - INVITATION AND NOTICE TO BIDDERS PROJECT: OWNER: 3003 Cisco Road Sidney, Ohio 45365 Ohio Presbyterian Retirement Services 1001 Kingsmill Parkway Columbus, Ohio 43229 ARCHITECT: 4685 Larwell

More information

BID PROPOSAL-REVISED

BID PROPOSAL-REVISED BID PROPOSAL-REVISED PROJECT: B17-13, Bldg 1300 HVAC ( the Work ) CABRILLO COMMUNITY COLLEGE DISTRICT Bidder Name Bidder Representative(s) Bidder Representative(s) Contact Information Bidder Mailing Address

More information

Item No. Description 1. BID PROPOSAL FORM Make the following revisions: a. Replace the BID PROPOSAL FORM with the attached BID PROPOSAL FORM.

Item No. Description 1. BID PROPOSAL FORM Make the following revisions: a. Replace the BID PROPOSAL FORM with the attached BID PROPOSAL FORM. City of Raleigh, Fire Station No. 11 Renovation September 28, 2018 274-CM2018-15A Page 1 HUFFMAN ARCHITECTS, PA 632 PERSHING ROAD RALEIGH, NORTH CAROLINA 27608 PHONE (919) 740-5669 TO: ALL PRIME BIDDERS

More information

COMMISSION ORDER. IT IS FURTHER ORDERED that the Request for Bid and Notice to Bidders be displayed on the Franklin County website.

COMMISSION ORDER. IT IS FURTHER ORDERED that the Request for Bid and Notice to Bidders be displayed on the Franklin County website. 4.e STATE OF MISSOURI County of Franklin ss. COMMISSION ORDER Commission Order No. 2016-316 Third Quarter Term 2016 Tuesday,August,09,2016 Bid Notice IN THE MATTER OF ADVERTISING FOR SEALED BIDS FOR SMOKE

More information

COMMERCIAL (IBC) FIRE ALARM SUBMITTAL GUIDE

COMMERCIAL (IBC) FIRE ALARM SUBMITTAL GUIDE COMMERCIAL (IBC) FIRE ALARM SUBMITTAL GUIDE SUPERVISION OF AUTOMATIC FIRE SPRINKLER SYSTEMS SUPERVISION OF ALTERNATIVE AUTOMATIC FIRE-EXTINGUISHING SYSTEMS FIRE ALARM AND DETECTION SYSTEMS The Fire Alarm

More information

TABLE OF CONTENTS GENERAL... 2 A. DEFINITIONS DIGITAL, ADDRESSABLE FIRE ALARM SYSTEM... 2

TABLE OF CONTENTS GENERAL... 2 A. DEFINITIONS DIGITAL, ADDRESSABLE FIRE ALARM SYSTEM... 2 Division 28 ELECTRONIC SAFETY AND SECURITY TABLE OF CONTENTS 28 0000 GENERAL... 2 A. DEFINITIONS...2 28 3111 DIGITAL, ADDRESSABLE FIRE ALARM SYSTEM... 2 A. DESIGN REQUIREMENTS...2 B. CONSTRUCTION REQUIREMENTS...2

More information

.4 Do complete installation in accordance with latest Electrical Bulletins of the local inspection authority.

.4 Do complete installation in accordance with latest Electrical Bulletins of the local inspection authority. Fitness Facility Addition Page 1 1.1 CODES AND STANDARDS.1 Do complete installation in accordance with the latest edition of the CSA C22.1 as amended by the latest editions of the National Building Code

More information

INVITATION TO BID. Allendale Elementary School 3670 Penniman Avenue, Oakland, CA 94619

INVITATION TO BID. Allendale Elementary School 3670 Penniman Avenue, Oakland, CA 94619 DOCUMENT 00 11 16 INVITATION TO BID 1. Notice is hereby given that the governing board ( Board ) of the Oakland Unified School District will receive sealed bids for the following: Project No. 07127 Allendale

More information

Update all extract references to NFPA documents (including NFPA 72) in Chapter 3 and related annex material to the latest editions.

Update all extract references to NFPA documents (including NFPA 72) in Chapter 3 and related annex material to the latest editions. 11/16/12 TerraView First Revision No. 15-NFPA 720-2012 [ Global Input ] Update all extract references to NFPA documents (including NFPA 72) in Chapter 3 and related annex material to the latest editions.

More information

Moreno Valley Fire Department Fire Prevention Bureau. New and Existing Fire Alarm & Signaling Systems Guideline

Moreno Valley Fire Department Fire Prevention Bureau. New and Existing Fire Alarm & Signaling Systems Guideline Moreno Valley Fire Department Guideline Approved and Authorized By: Adria Reinertson, Fire Marshal Issued: May 8, 2017 Alarm & Signaling Systems PURPOSE Fire alarm and signaling systems are designed to

More information

1.3 REFERENCE STANDARDS

1.3 REFERENCE STANDARDS SECTION 28 4600 FIRE DETECTION AND ALARM PART 1 -GENERAL 1.1 SECTION INCLUDES A. Fire alarm system design and installation, including all components, wiring, and conduit. B. Circuits from protected premises

More information

CONTENTS AUTOMATIC TRANSFER SWITCHES

CONTENTS AUTOMATIC TRANSFER SWITCHES CONTENTS AUTOMATIC TRANSFER SWITCHES PART 1 GENERAL 1.1 Related Documents 1.2 Summary 1.3 References 1.4 Quality Assurance 1.5 Submittals 1.6 Delivery, Storage and Handling 1.7 Instructions And Training

More information

DONALD H. BERG, ARCHITECT

DONALD H. BERG, ARCHITECT DONALD H. BERG, ARCHITECT DVA PROJECT 632-CSI-402 PET/CT ROOM #A0-10 RENOVATION BASEMENT LEVEL, BUILDING 200 ARCHITECT S PROJECT No. 0917-02 ADDENDUM NO. 1 JUNE 25, 2018 Page 1 of 1 ARCHITECTURAL 1. Specifications:

More information

HIGH-RISE RETROFIT ORDINANCES - NO and NO

HIGH-RISE RETROFIT ORDINANCES - NO and NO INFORMATION BULLETIN / PUBLIC - BUILDING CODE REFERENCE NO.: LAMC 91.8604 Effective: 9-06-90 DOCUMENT NO. P/BC 2002-054 Revised: 4-15-03 Previously Issued As: MGD 88 HIGH-RISE RETROFIT ORDINANCES - NO.

More information

INVITATION TO QUOTE. Page 1 of 7. Fire & Emergency Safety Plan Control Number: 2018-CFS-003 Issue Date: March 7, Purpose

INVITATION TO QUOTE. Page 1 of 7. Fire & Emergency Safety Plan Control Number: 2018-CFS-003 Issue Date: March 7, Purpose INVITATION TO QUOTE Title: Fire & Emergency Safety Plan Control Number: 2018-CFS-003 Issue Date: March 7, 2018 Purpose The District of Sparwood (Sparwood) invites interested parties (Respondents) to submit

More information

1. Floor above/floor below notification. 2. Private alarm notification. 3. Not Used 4. Voice alarm notification. 5. Not Used.

1. Floor above/floor below notification. 2. Private alarm notification. 3. Not Used 4. Voice alarm notification. 5. Not Used. PART 1 GENERAL 1.01 Scope of Standard A. This Standard is intended to assure that fire alarm and signaling systems at Sam Houston State University provide the highest level of life safety possible. This

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 21 0800 - COMMISSIONING OF FIRE SUPPRESSION SYSTEMS GENERAL 1.1 SUMMARY General 1. Work under this contract shall meet the requirements of Division 01, General Requirements, Conditions of Contract,

More information

ADDENDUM #1: MODIFICATIONS AND ADDITIONS TO CONTRACT DOCUMENTS

ADDENDUM #1: MODIFICATIONS AND ADDITIONS TO CONTRACT DOCUMENTS Annex Laundry and Shower Alterations ADDENDUM #1 March 7, 2019 ADDENDUM #1: MODIFICATIONS AND ADDITIONS TO CONTRACT DOCUMENTS A. Invitation to Bid - Call for Bids has been modified as follows: 1. Notice

More information

Full Service Central Station Fire Alarm Listing Evaluation

Full Service Central Station Fire Alarm Listing Evaluation Full Service Central Station Fire Alarm Listing Evaluation Listing Evaluation A UL Listing project includes: 1. Evaluating the central station facility for compliance with UL 827, Central-Station Alarm

More information

SECTION FIRE ALARM SYSTEMS

SECTION FIRE ALARM SYSTEMS SECTION 28 3100 PART 1 -GENERAL 1.01 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this

More information

Architect s Project Number of 12 Fire Alarm/Smoke Detection Systems District Master Specs 2013 Edition

Architect s Project Number of 12 Fire Alarm/Smoke Detection Systems District Master Specs 2013 Edition PART 1 GENERAL 1.1 SECTION INCLUDES SECTION 28 31 00 FIRE ALARM AND SMOKE DETECTION SYSTEMS A. Fire alarm and smoke detection systems 1.2 REFERENCES A. NFPA 72 B. NFPA 101 1.3 REGULATORY REQUIREMENTS A.

More information

SECTION SECURITY TESTING AND COMMISSIONING

SECTION SECURITY TESTING AND COMMISSIONING SECTION 280800 - SECURITY TESTING AND COMMISSIONING PART 1 - GENERAL 1.1 WORK INCLUDES A. General Description: This specification section covers the provision of preliminary testing, acceptance testing,

More information

SECTION FIRE ALARM AND SMOKE DETECTION SYSTEMS

SECTION FIRE ALARM AND SMOKE DETECTION SYSTEMS PART 1 GENERAL 1.1 SECTION INCLUDES A. Fire alarm and smoke detection systems 1.2 REFERENCES A. NFPA 72 B. NFPA 101 1.3 REGULATORY REQUIREMENTS A. System: UL listed B. Conform to requirements of NFPA 101

More information

Smoke Detector Activation of any smoke detector shall start the alarm verification mode.

Smoke Detector Activation of any smoke detector shall start the alarm verification mode. Description: The purpose of the section is to provide the UMCP Design Standards for the design and implementation of Fire Alarm Systems at the UMCP campus. Related Sections: TBD Effective Date: July 10,

More information

INVITATION TO BID SUPPLY OF VARIOUS PORTABLE FIRE EXTINGUISHERS

INVITATION TO BID SUPPLY OF VARIOUS PORTABLE FIRE EXTINGUISHERS ASIAN DEVELOPMENT BANK 6 ADB Avenue, Mandaluyong City 550 Metro Manila, Philippines Tel: 632-4298; Fax: 636-2577 or 63-6899 Email: malbano@adb.org and sdiano@adb.org INVITATION TO BID SUPPLY OF VARIOUS

More information

MANUAL OF DESIGN CRITERIA AND SPECIFICATIONS FOR FIRE DETECTION AND ALARM SYSTEMS PUBLIC SCHOOLS IN NEW MEXICO

MANUAL OF DESIGN CRITERIA AND SPECIFICATIONS FOR FIRE DETECTION AND ALARM SYSTEMS PUBLIC SCHOOLS IN NEW MEXICO MANUAL OF DESIGN CRITERIA AND SPECIFICATIONS FOR FIRE DETECTION AND ALARM SYSTEMS PUBLIC SCHOOLS IN NEW MEXICO Prepared For: Public Schools Facilities Authority State of New Mexico 2019 Galisteo, Suite

More information

CITY OF LONG BEACH Department of Development Services BUILDING AND SAFETY BUREAU FIRE ALARM / ELECTRICAL FIRE PLAN REVIEW CHECKLIST

CITY OF LONG BEACH Department of Development Services BUILDING AND SAFETY BUREAU FIRE ALARM / ELECTRICAL FIRE PLAN REVIEW CHECKLIST CITY OF LONG BEACH Department of Development Services BUILDING AND SAFETY BUREAU FIRE ALARM / ELECTRICAL FIRE PLAN REVIEW CHECKLIST DATE: PROJECT NO.: EXPIRATION DATE: STATUS: INFORMATION PROJECT ADDRESS:

More information

SECTION AUTOMATIC TRANSFER SWITCHES

SECTION AUTOMATIC TRANSFER SWITCHES PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 36 23 SPEC WRITER NOTE: Use this section only for NCA projects. Delete between //--// if not applicable to project. Also, delete any other item or paragraph

More information

Brighton Area Fire Authority

Brighton Area Fire Authority 615 W. Grand River Ave. Brighton, MI 48116 o: 810-229-6640 f: 810-229-1619 January 14, 2019 Fire Alarm Contractors RE: Fire Alarm Credential & Submittal Requirements To Whom It May Concern: The following

More information

THIS ORDINANCE ONLY AFFECTS EXISTING FIRE ALARM SYSTEMS.

THIS ORDINANCE ONLY AFFECTS EXISTING FIRE ALARM SYSTEMS. THIS ORDINANCE ONLY AFFECTS EXISTING FIRE ALARM SYSTEMS. IF YOU RECEIVED A NOTICE BY MAIL AND YOU DO NOT CURRENTLY HAVE A FIRE ALARM INSTALLED IN YOUR BUILDING, YOU MAY DISREGARD THE NOTICE. Dear Building

More information

CHAPTER LOCAL AMENDMENTS TO THE INTERNATIONAL FIRE CODE, 2000 EDITION SECTIONS

CHAPTER LOCAL AMENDMENTS TO THE INTERNATIONAL FIRE CODE, 2000 EDITION SECTIONS CHAPTER 23.45 LOCAL AMENDMENTS TO THE INTERNATIONAL FIRE CODE, 2000 EDITION SECTIONS 23.45.100 Local Amendments To The International Fire Code, 2000 Edition 23.45.102.1 Construction and Design Provisions

More information

SECTION INSPECTION AND TESTING OF WORK

SECTION INSPECTION AND TESTING OF WORK SECTION 01455 PART I - GENERAL 1.01 SECTION INCLUDES A. Project Inspections and Procedures B. Scheduling Inspectors Notification requirements 1.02 RELATED SECTIONS A. Section 01310 COORDINATION B. Section

More information

SANTA CLARA COUNTY Winchester Blvd., Los Gatos, CA (408) (408) (fax)

SANTA CLARA COUNTY Winchester Blvd., Los Gatos, CA (408) (408) (fax) FIRE DEPARTMENT SANTA CLARA COUNTY 14700 Winchester Blvd., Los Gatos, CA. 95032-1818 (408) 378-4010 (408) 378-9342 (fax) www.sccfd.org STANDARD DETAILS & SPECIFICATIONS Spec No C-4 Rev. Date 03/10/10 SUBJECT:

More information

SPECIFICATION MICROMIST FIRE SUPPRESSION SYSTEM WITH SHP-PRO CONTROL PANEL

SPECIFICATION MICROMIST FIRE SUPPRESSION SYSTEM WITH SHP-PRO CONTROL PANEL SECTION 1 - GENERAL CONDITIONS I. SCOPE: This specification outlines the requirements for a Fike Micromist Water Mist Fire Suppression System with automatic detection and control. The work described in

More information

BULLETIN. Temperature Controls (10/2013)

BULLETIN. Temperature Controls (10/2013) BULLETIN Temperature Controls (10/2013) This bulletin is to advise you of the fees and responsibilities associated with the tenant s temperature controls. This applies to Phase I & II only. Tenant Responsibility:

More information

SECTION : FIRE ALARM & DETECTION SYSTEMS

SECTION : FIRE ALARM & DETECTION SYSTEMS SECTION 28 31 10: FIRE ALARM & DETECTION SYSTEMS 1. GENERAL A. This section applies to fire detection/alarm system and carbon monoxide system components and equipment installed during new construction

More information

SECTION AUTOMATIC TRANSFER SWITCHES

SECTION AUTOMATIC TRANSFER SWITCHES PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 36 23 This section specifies the furnishing, complete installation, and connection of automatic transfer switches. 1.2 RELATED WORK A. Section 14 21 00, ELECTRIC

More information

PROJ. NO SECTION PAGING, SPEAKERS AND HARD-WIRED CLOCK SYSTEMS

PROJ. NO SECTION PAGING, SPEAKERS AND HARD-WIRED CLOCK SYSTEMS SECTION 26 92 50 PAGING, SPEAKERS AND HARD-WIRED CLOCK SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

BULLETIN. Temperature Controls (VAV) (3/11/2010)

BULLETIN. Temperature Controls (VAV) (3/11/2010) BULLETIN Temperature Controls (VAV) (3/11/2010) This bulletin is to advise you of the fees and responsibilities associated with Tenant s temperature controls. Tenant Responsibility: 1. Unit power is by

More information

Annual Fire Systems and Backflow Preventers Testing

Annual Fire Systems and Backflow Preventers Testing Facilities Management Request for Qualifications Annual Fire Systems and Backflow Preventers Testing At Various Facilities Proposals Due: 2:30 PM, Tuesday May 15, 2018 Deliver to: Attn: Sara Winger, Purchasing

More information

CITY OF LOCKPORT FIRE SPRINKLER & FIRE ALARM SYSTEM INSTALLATION ASSISTANCE PROGRAM

CITY OF LOCKPORT FIRE SPRINKLER & FIRE ALARM SYSTEM INSTALLATION ASSISTANCE PROGRAM CITY OF LOCKPORT FIRE SPRINKLER & FIRE ALARM SYSTEM INSTALLATION ASSISTANCE PROGRAM The City of Lockport has implemented a Fire Sprinkler & Fire Alarm System Installation Assistance Program for eligible

More information

CAN/ULC-S INTEGRATED SYSTEMS TESTING OF FIRE PROTECTION AND LIFE SAFETY SYSTEMS

CAN/ULC-S INTEGRATED SYSTEMS TESTING OF FIRE PROTECTION AND LIFE SAFETY SYSTEMS 2013 Randal Brown & Associates Engineering Ltd. 1 RANDAL BROWN & ASSOCIATES ENGINEERING LTD. CONSULTING ENGINEERS LIFE SAFETY & FIRE PROTECTION 105 6 LANSING SQUARE TORONTO, ONTARIO CAN/ULC-S1001-11 INTEGRATED

More information

Tenant Heat Pump Bulletin Temperature Controls Buildings A1, C1, and H1

Tenant Heat Pump Bulletin Temperature Controls Buildings A1, C1, and H1 12/4/2017 Tenant Heat Pump Bulletin Temperature Controls Buildings A1, C1, and H1 This bulletin is to advise you of the fees and responsibilities associated with the tenant s temperature controls. Tenant

More information

SECTION FIRE DETECTION AND ALARM

SECTION FIRE DETECTION AND ALARM PART 1 - GENERAL 1.1 RELATED SECTIONS: Refer to Section 15300 for requirements regarding fire protection systems. 1.2 SCOPE OF SECTION: This section contains the requirements for equipment and installation

More information

MUNICIPALITY OF GREENSTONE BOX 70, 1800 Main Street Geraldton, Ontario P0T 1M0 Telephone Facsimile

MUNICIPALITY OF GREENSTONE BOX 70, 1800 Main Street Geraldton, Ontario P0T 1M0 Telephone Facsimile MUNICIPALITY OF GREENSTONE BOX 70, 1800 Main Street Geraldton, Ontario P0T 1M0 Telephone 807-854-1100 Facsimile 807-854-1150 PUBLIC SERVICES DEPARTMENT TENDER NO. PS-2016-2 INSPECTION OF FIRE ALARM SYSTEMS

More information

NOTICE TO CONTRACTORS

NOTICE TO CONTRACTORS NOTICE TO CONTRACTORS Notice is hereby given that sealed bids will be received by the City Council of the City of Reedley for furnishing all labor, materials, services, and equipment and performing all

More information

Use this product according to this instruction manual. Please keep this instruction manual for future reference.

Use this product according to this instruction manual. Please keep this instruction manual for future reference. 273 Branchport Avenue Long Branch, NJ 07740 (732) 222-6880 Thank you for using our products. INSTALLATION INSTRUCTIONS REMOTE MICROPHONE (SINGLE CIRCUIT) Use this product according to this instruction

More information

cbever LY) \HILLS/ AGENDA REPORT

cbever LY) \HILLS/ AGENDA REPORT cbever LY) \HILLS/ AGENDA REPORT Meeting Date: April 5, 2016 Item Number: D 20 To: Honorable Mayor & City Council From: Charles Ackerman, Associate Project Administrator Julio Guerrero, Contract Administrative

More information

Clarification. Summary of Changes. Summary of Changes. Alan Cavers Area Manager Fire & Security Systems Group

Clarification. Summary of Changes. Summary of Changes. Alan Cavers Area Manager Fire & Security Systems Group Summary of Changes CAN/ULC-S524-06 Installation of Fire Alarm Systems Alan Cavers Area Manager Fire & Security Systems Group Course Title Rev Date: Summary of Changes Correct Deficiencies noted CAN/ULC-S524-01

More information

PIP PCTPA001 Testing of Process Analyzer Systems

PIP PCTPA001 Testing of Process Analyzer Systems January 2016 Process Control PIP PCTPA001 Testing of Process Analyzer Systems PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities, this Practice

More information

VERIFICATION OF FIRE ALARM SYSTEMS

VERIFICATION OF FIRE ALARM SYSTEMS DEVELOPMENT, BUILDINGS AND LICENSING Chief Building Official (CBO) and Building Code and Policy Building Policy Branch The intent of this bulletin is to clarify requirements of verification of the fire

More information

NFPA 72 Code Changes vs 2013

NFPA 72 Code Changes vs 2013 NFPA 72 Code Changes - 2010 vs 2013 AFAA-NE Westborough, MA February 7, 2018 Richard Roux NFPA 72 National Fire Alarm and Signaling Code Overview and 2013 Changes NFPA 72 1993 Edition Aug 20, 1993 1996

More information

Florida Building Code 2010

Florida Building Code 2010 Introduction Florida Building Code 2010 Chapter 9 Fire Protection Systems This course will cover specific sections of Chapter 9 that relate to fire alarm systems. While many contractors are familiar with

More information

Florida Building Code Chapter 9 Fire Protection Systems Advanced Course

Florida Building Code Chapter 9 Fire Protection Systems Advanced Course Florida Building Code 2010 Chapter 9 Fire Protection Systems Advanced Course 1 Introduction This course will cover specific sections of Chapter 9 that relate to fire alarm systems. While many contractors

More information

Pakenham Branch Library Section MacFarlane Street MULTIPLEX FIRE ALARM SYSTEM Project No Page 1 of 12

Pakenham Branch Library Section MacFarlane Street MULTIPLEX FIRE ALARM SYSTEM Project No Page 1 of 12 Project No. 16563.001 Page 1 of 12 1. General 1.1. WORK INCLUDED 1.1.1. Section 26 05 01 GENERAL INSTRUCTIONS FOR ELECTRICAL SECTIONS. 1.1.2. Section 26 05 04 SUBMITTALS/SHOP DRAWINGS. 1.1.3. Section 26

More information

Changes in NFPA

Changes in NFPA Changes in NFPA 72-2002 2002 Oregon Fire Code Committee November 25, 2003 Michael B. Baker, SET Automatic Fire Alarm Association MikeBaker@afaa.org 2003 Michael B. Baker 1 Table of Contents 1. Administration

More information

Campus Wide Fire Alarm Repairs

Campus Wide Fire Alarm Repairs BID # 15-24 Campus Wide Fire Alarm Repairs SECTION "C" TECHNICAL SPECIFICATIONS OWNER Board of Trustees Middlesex County College 2600 Woodbridge Avenue P.O. Box 3050 Edison, New Jersey 08818-3050 PREPARED

More information

SECTION FIRE ALARM STANDARDS REVISED CONSTRUCTION STANDARD

SECTION FIRE ALARM STANDARDS REVISED CONSTRUCTION STANDARD PART 1 - GENERAL PURPOSE This Standard is intended to assure that fire detection/alarm systems at The University of Texas at Austin provide the highest level of fire safety possible. SCOPE This standard

More information

SECTION (13900) - FIRE SUPPRESSION SYSTEMS

SECTION (13900) - FIRE SUPPRESSION SYSTEMS PART 1 GENERAL 1.01 SUMMARY SECTION 21 10 00 (13900) - FIRE SUPPRESSION SYSTEMS A. Section Includes: 1. Pipe and Fittings. 2. Sprinklers. B. Related Documents: 1. Marriott s Fire Protection and Life Safety

More information

REQUEST FOR PROPOSALS CLEANING SERVICES

REQUEST FOR PROPOSALS CLEANING SERVICES REQUEST FOR PROPOSALS CLEANING SERVICES Jeffrey Gray City Manager City of Jonesville 265 E. Chicago Street Jonesville, MI 49250 manager@jonesville.org (517) 849-2104 Overview The City of Jonesville is

More information

SUWANNEE RIVER WATER MANAGEMENT DISTRICT REQUEST FOR BID NO. 15/16-003AO FIRE ALARM SYSTEM INSTALLATION AND MONITORING.

SUWANNEE RIVER WATER MANAGEMENT DISTRICT REQUEST FOR BID NO. 15/16-003AO FIRE ALARM SYSTEM INSTALLATION AND MONITORING. SUWANNEE RIVER WATER MANAGEMENT DISTRICT REQUEST FOR BID NO. 15/16-003AO FIRE ALARM SYSTEM INSTALLATION AND MONITORING Table of Contents Section Title Page 1 Introduction 2 2 Proposed Schedule 2 3 Instructions

More information

LOCAL AMENDMENTS TO THE INTERNATIONAL FIRE CODE 2006 EDITION

LOCAL AMENDMENTS TO THE INTERNATIONAL FIRE CODE 2006 EDITION CHAPTER 23.45 Sections LOCAL AMENDMENTS TO THE INTERNATIONAL FIRE CODE 2006 EDITION 23.45.100 Local amendments to the International Fire Code, 2006 Edition... 2 23.45.102.1 Construction and design provisions...

More information

Public Notice of Amendment to New Shoreham General Ordinances Chapter 5 Fire Prevention and Protection New Article IV Fire Alarm Ordinance

Public Notice of Amendment to New Shoreham General Ordinances Chapter 5 Fire Prevention and Protection New Article IV Fire Alarm Ordinance Public Notice of Amendment to New Shoreham General Ordinances Chapter 5 Fire Prevention and Protection New Article IV Fire Alarm Ordinance It is ordained by the Town Council of the Town of New Shoreham

More information

CAN/ULC-S1001, INTEGRATED SYSTEMS TEST OF FIRE PROTECTION AND LIFE SAFETY SYSTEMS

CAN/ULC-S1001, INTEGRATED SYSTEMS TEST OF FIRE PROTECTION AND LIFE SAFETY SYSTEMS RANDAL BROWN & ASSOCIATES ENGINEERING LTD. CONSULTING ENGINEERS LIFE SAFETY & FIRE PROTECTION 105 6 LANSING SQUARE TORONTO, ONTARIO CAN/ULC-S1001, INTEGRATED SYSTEMS TEST OF FIRE PROTECTION AND LIFE SAFETY

More information

ADDENDUM NO. 1. for. MARQUETTE HOUSING COMMISSION Pine Ridge Apartments Fire Alarm Replacement Project #A1140. Marquette, Michigan.

ADDENDUM NO. 1. for. MARQUETTE HOUSING COMMISSION Pine Ridge Apartments Fire Alarm Replacement Project #A1140. Marquette, Michigan. ADDENDUM NO. 1 for MARQUETTE HOUSING COMMISSION Pine Ridge Apartments Fire Alarm Replacement Project #A1140 Marquette, Michigan December 12, 2016 TO: ALL BIDDERS OF RECORD This addendum forms a part of

More information

2. The Group F occupancy has have an a combined occupant load of 500 or more above or below the lowest level of exit discharge.

2. The Group F occupancy has have an a combined occupant load of 500 or more above or below the lowest level of exit discharge. 2. The Group F occupancy has have an a combined occupant load of 500 or more above or below the lowest level of exit discharge. Exception: Manual fire alarm boxes are not required where the building is

More information

CAN/ULC S Integrated Systems Testing of Fire Protection and Life Safety Systems and Fire Protection Commissioning

CAN/ULC S Integrated Systems Testing of Fire Protection and Life Safety Systems and Fire Protection Commissioning CAN/ULC S1001-11 Integrated Systems Testing of Fire Protection and Life Safety Systems and Fire Protection Commissioning Presentation To: Canadian Fire Alarm Association (CFAA) National Capital Region

More information

TABLE OF CONTENTS Part 6 Legal Basis for Fire Safety Planning... 2

TABLE OF CONTENTS Part 6 Legal Basis for Fire Safety Planning... 2 TABLE OF CONTENTS Part 6 Legal Basis for Fire Safety Planning... 2 6.1] GENERAL... 2 6.2] EXCERPTS FROM 2012 BC FIRE CODE PART 2 BUILDING AND OCCUPANT FIRE SAFETY... 3 6.3] EXCERPTS FROM 2012 BC FIRE CODE

More information

Revised March 2015 Fire Alarm Systems Verification. Schedule I(A) Services. *Manditory Site visit required*

Revised March 2015 Fire Alarm Systems Verification. Schedule I(A) Services. *Manditory Site visit required* 1.0 Description of Services Required: Revised March 2015 Fire Alarm Systems Verification Schedule I(A) Services *Manditory Site visit required* Perform the annual fire alarm system and sprinkler system

More information

SPECIFICATION: AlarmLine TM INTELLIGENT LINEAR HEAT DETECTION

SPECIFICATION: AlarmLine TM INTELLIGENT LINEAR HEAT DETECTION 1. GENERAL SPECIFICATION 1.1 The contractor shall provide an Intelligent AlarmLine Linear Heat Detection System to perform the following functionality: A. Fire Alarm, Supervisory and Trouble-Event Initiation

More information

Chapter 4: Fire Protection Systems

Chapter 4: Fire Protection Systems Chapter 4: Fire Protection Systems Automatic Extinguishing Systems (Fire Sprinklers) One of the most important aspects of a storage warehouse inspection is ensuring that the automatic extinguishing system

More information

Fire Alarm System Fundamentals

Fire Alarm System Fundamentals Fire Alarm System Fundamentals Mircom is the largest and oldest privately owned fire alarm and life safety manufacturer in North America and 5th largest overall with 50 years of industry experience. Mircom

More information

DOCUMENT ADVERTISEMENT FOR BIDS

DOCUMENT ADVERTISEMENT FOR BIDS IFB 15-014 - 2015 Fire Alarm Upgrades for 4-15078 DOCUMENT 00 11 13 ADVERTISEMENT FOR BIDS 1.1 PROJECT INFORMATION A. Notice to Bidders: Qualified bidders may submit bids for project as described in this

More information

WEST VIRGINIA UNIVERSITY

WEST VIRGINIA UNIVERSITY WEST VIRGINIA UNIVERSITY Environmental Health and Safety (SOP) WV State Fire Marshal (SFM) Project Plans Review Process & Procedures West Virginia University Environmental Health & Safety Page 1 of 10

More information

Matrix2000. User Guide - CPD Advanced Analog Fire Alarm Control Panel 4 24 Zones. Version: 2.0 Revision: 1

Matrix2000. User Guide - CPD Advanced Analog Fire Alarm Control Panel 4 24 Zones. Version: 2.0 Revision: 1 Matrix2000 User Guide - CPD Advanced Analog Fire Alarm Control Panel 4 24 s Version: 2.0 Revision: 1 IMPORTANT INFORMATION Limitation of liability It is mandatory, Matrix2000 panel to be installed in accordance

More information

SECTION GENERATOR PARALLELING CONTROLS

SECTION GENERATOR PARALLELING CONTROLS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 23 13 GENERATOR PARALLELING CONTROLS SPEC WRITER NOTE: Delete between // -- // if not applicable to project. Also delete any other item or paragraph not applicable

More information

Winnipeg Fire Department Fire Prevention Branch

Winnipeg Fire Department Fire Prevention Branch Winnipeg Fire Department Fire Prevention Branch Manitoba Fire Code Life-Safety Equipment Maintenance Requirements The Fire Prevention Branch of the Winnipeg Fire Department has prepared this document of

More information

SPECIFICATION MICROMIST FIRE SUPPRESSION SYSTEM WITH CHEETAH Xi 50 CONTROL PANEL

SPECIFICATION MICROMIST FIRE SUPPRESSION SYSTEM WITH CHEETAH Xi 50 CONTROL PANEL SECTION 1 - GENERAL CONDITIONS I. SCOPE: This specification outlines the requirements for a Fike Micromist Water Mist Fire Suppression System with a Cheetah Xi 50 addressable detection and control system.

More information

PART 1 GENERAL Quality Assurance A. Fire Alarm Contractor Qualifications:

PART 1 GENERAL Quality Assurance A. Fire Alarm Contractor Qualifications: PART 1 GENERAL 1.01 Quality Assurance A. Fire Alarm Contractor Qualifications: 1 The Fire Alarm contractor shall be an Edwards Systems Technology (EST) designated representative and authorized to sell,

More information

SPECIFICATIONS FOR TENDER # SUPPLY OF A FIRE ALARM SYSTEMS SERVICE AGREEMENT FOR WESTERN HEALTH

SPECIFICATIONS FOR TENDER # SUPPLY OF A FIRE ALARM SYSTEMS SERVICE AGREEMENT FOR WESTERN HEALTH SPECIFICATIONS FOR TENDER #0371-0739 SUPPLY OF A FIRE ALARM SYSTEMS SERVICE AGREEMENT FOR WESTERN HEALTH CLOSING DATE: 8 June 2007 CLOSING TIME: 11:00 AM (Newfoundland Time) Invitation to Tender for a

More information

New Construction Fire Inspection Process

New Construction Fire Inspection Process New Construction Fire Inspection Process This document is intended to provide the Owner, Designer, and/or Contractor of new construction with an outline of required fire inspections and with the specific

More information

British Columbia Building Code 2006 Division B Part 3 Fire Protection, Occupant Safety and Accessibility Section 3.2 Building Fire Safety

British Columbia Building Code 2006 Division B Part 3 Fire Protection, Occupant Safety and Accessibility Section 3.2 Building Fire Safety Div B 3.2.1.1.(4), (5) & (6) Exceptions in Determining Building Height BCBC1998-3.2.1.1.(4), (5) & (7) replace (harmonize with NBC) - NBC 2005 has significant revisions to provisions for mezzanines. These

More information

BULLETIN. Temperature Controls (Chilled Water) Phase III only (3/11/2010)

BULLETIN. Temperature Controls (Chilled Water) Phase III only (3/11/2010) BULLETIN Temperature Controls (Chilled Water) Phase III only (3/11/2010) This bulletin is to advise you of the fees and responsibilities associated with the tenant s temperature controls. Tenant Responsibility:

More information

Fire Alarm, Water Flow Alarm & Signaling Systems

Fire Alarm, Water Flow Alarm & Signaling Systems Orange County Fire Authority Community Risk Reduction 1 Fire Authority Road, Building A, Irvine, CA 92602 www.ocfa.org 714-573-6100 Fire Alarm, Water Flow Alarm & Signaling Systems Guideline D-03 Serving

More information

DIGITAL, ADDRESSABLE FIRE ALARM SYSTEM

DIGITAL, ADDRESSABLE FIRE ALARM SYSTEM SECTION 283111 - DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information