1 Rockford Board of Education 501 Seventh Street Rockford, IL May 15, 2014 Addendum No. 2: JEFFERSON HIGH SCHOOL ADDITIONS AND RENOVATIONS To All Bidders: Attached are modification, clarifications and/or corrections for the Project Manual and is hereby made a part of the contract documents. Please see attached to this addendum the Project Manual(s) in your possession. Please note the receipt of this addendum on the bid form. Bidders shall review changes to all portions of this work as changes to one portion may affect the work of another. Please use updated AIA form as well as updated Addendum forms which are included in this addendum. Refer all questions relative to the business aspect, Instructions to Bidders, Special Conditions, and questions concerning the technical aspect of the documents to the Executive Director of Budget and Purchasing by at stacie.scott@rps205.com. ROCKFORD BOARD OF EDUCATION By: Stacie Talbert Scott Executive Director of Budget and Purchasing

2 BID RELEASE 2 ADDITIONS AND RENOVATIONS LARSON & DARBY GROUP ARCHITECTS-ENGINEERS-INTERIORS 4949 Harrison Avenue, Suite 100 P. O. Box 5207, Rockford, IL FAX TO: ALL BIDDERS RE: ADDENDUM #2 Changes to Bidding Documents dated April 25, 2014 PROJECT: JEFFERSON HIGH SCHOOL BID RELEASE 2 ADDITIONS AND RENOVATIONS, PROJECT NO.: (BR2) (RPS 205: IFB No ) DATE: May 14, 2014 Please attach this Addendum to the Project Manual and Drawings for the referenced project. Take the changes to the Project Manual and Drawings into consideration in preparing your Bid. Bidders shall make note in writing on Bid Form that this Addendum has been taken into consideration. Failure to do so may be sufficient cause to reject the Bid. LARSON & DARBY GROUP By: Jennifer Deuth Fritts, AIA This Addendum consists of 6 page(s), plus materials itemized herein. I. REQUESTS FOR INFORMATION RESPONSES General Note: If additional site visits are needed, bidders may visit Jefferson High School after 3:45 pm. Enter the building at A and check in with security. You may ask if a custodian is available to assist with locked rooms. RFI #1 HVAC Controls see below for response. RFI #2 Wall sensors see below for response. RFI #3 (KB-01) Auditorium ceiling patching and painting: RFI #3 Response: See sheet D6.2 of the original bid set, demolition note 1 calls for patching of the existing gypsum board ceiling. See sheet A6.2 of the original bid set, note 1 calls for patching and painting of the existing gypsum board ceiling for the house lighting fixture replacement. See additional clarification under E1.2, note 6 below. RFI #4 Clarifications on Interior Design work: I1.1 detail 5: The letters JHS on the bleachers is that our responsibility to paint on the new bleachers or will the bleacher suppliers responsibility? The manufacturer of the bleachers will provide lettering. I1.1 Detail 1: verify the small words citizenship, responsibility, trustworthiness, and respect are to be blended behind the large words of fairness and respect. No. They are to be in front of the words Fairness and Respect. Please clarify floor finish material in rooms 516, 517, and 518. finish schedule shows CPTT, but is not numbered...finish legend shows CPTT1, CPTT2, CPTT3, and CPTT4. Room 516: Sound Closet should be SC sealed concrete. Room 517 Tickets should be CPTT4. Room 518 Training should be SC sealed concrete. L&D #24036 (BR2) ADDENDUM #2 Page-1

3 BID RELEASE 2 ADDITIONS AND RENOVATIONS RFI #5 (KB-03) Clarifications on Ceiling Fans: The 5 ceiling fans in the gymnasium shall be installed under division 23. The controllers for fans shall be installed under division 26. All wiring shall be provided under division 26. See additional clarification under M1.1 note below. RFI #6 (KB-04) Clarification on Sound Systems: The (Local) sound system associated with Auditorium performances and gym activities are not part of this contractor. The (house paging) speakers shown on Sheets E1.2 and E2.1 shall be part of this contract. RFI #7 (KB-05) Division 28: See attached section RFI #8 Stage Curtains: ADD General Notes-Curtain Schedule: 1. Dimensions, fullness, sections, and hardware stated are approximate and based on original construction documents curtain matrices. 2. Sub-Contractor/vendor is to site verify type, dimensions, fullness, sections and hardware needed to fabricate each curtain. 3. Sub-contractor/vendor is to field verify locations of each type of curtain. 4. Storage bags are to include an informational tag noting school name, department, type and location of curtain each is used for. Questions with responses: 1. The front and teaser curtains are called out to have Ranger Lining but are currently not lined. Should they be lined? Yes, the front and teaser curtains shall be lined. 2. The teaser curtain is listed with 50% fullness but the current teaser is sewn flat so a weight pipe can be used. Should the teaser be sewn flat? The teaser curtain shall be sewn flat. 3. The Cyclorama is listed as 54 wide but the pipe batten it hangs on is only 48 wide. Should the cyc be 48 wide? Keep size to 48 as rigging and battens are not planned to be replaced. 4. The Cyclorama is listed to be natural muslin. The current cyc is white. Should the cyc be white? Cyclorama shall be white. 5. There is a protective skirt listed but the fabric is TBD. The size listed is which seems large for a skirt. I have no notes on it from What should the fabric be? The protective skirt shall be removed by Owner and not replaced. 6. There are storage bags listed with no quantities. Are any bags required? Yes, provide storage bag for each curtain with a sewn-in tag indicating type and location of curtain. RFI #9 (KB-06) Ceiling fan feeds: See clarification under 2.1, note 6 below. RFI #10 Clarifications on carpet tile and LVT finishes: 1. Carpet tile and rolled goods are FBO for all projects. 2. LVT1-3 is shown on the Room Finish Schedule for Room 523 Ramp 1. Details for pattern are on drawing I1.1. RFI #11 From the pre bid meeting notes for additional work not in this contract, the theatrical lighting system is listed. How is that work getting handled? We are working on a separate bid package to be released shortly. RFI #12 (KB-07) Drawing D1.2 (Notes 7, 8, 9) describes selective demolition regarding speakers, microphones, and the control room which are not shown on the ED Drawings. Drawing D6.2 (Notes 2, 3) describe selective demolition regarding the control room, sound control board, and amplifiers which are also not shown on the ED drawings. Are these items to be included in the electrical scope of work? See ED1.2 clarification below. RFI #13 (KB-08) Drawing E 1.2 (Note 4 & Note 8) describes switching for Screen No. 1 and projector No. 1. These single pole switches are shown on the stage, as well as in the Control Booth. What is the correct location for the switches? Please advise. Delete switches from Booth and provide only on stage. L&D #24036 (BR2) ADDENDUM #2 Page-2

4 BID RELEASE 2 ADDITIONS AND RENOVATIONS RFI #14 (KB-09) On Drawing E 1.2, there is no fixture designation for the 3 Dressing Room Fixtures, fed from Panel GR3 (circuits 2, 4, 6 respectively), controlled by a separate switch independent of the Type "T" fixtures. Please advise. The items served from circuits 2, 4 6 are not lighting fixtures. They are plugmolds as indicated by note 25. See E1.2 below for the reference for note 25. II. ADDITIONS OR CHANGES TO THE PROJECT MANUAL General note: for any item solely identified in the bid documents as Basis of Design, Owner Approved Equal products shall be considered. 1. Invitation for Bid a. REVISE (as stated in the cover letter of Addendum No. 1): i. Offers will be received until: 1:00 P.M. (CDST) on WEDNESDAY, MAY 21, AIA Document A701 a. General Terms and Conditions / Supplementary Conditions i. DELETE references to Program Manager for this project throughout the bid documents. 3. AIA Document A101 a. General Note: i. The bid documents refer to a Program Manager. There is not a Program Manager on this project. All references to Program Manager are hereby changed to Owner s representative or his designee REACTIVE CHEMICAL CONCRETE STAIN ADD the attached section DOOR HARDWARE a. REPLACE with attached revised section. Changes are in bold GYMNASIUM EQUIPMENT a. Part 2 Products ADD Draper, Inc. as an approved equal to the lists of manufacturers for gymnasium equipment throughout this section INSTRUMENTATION AND CONTROL FOR HVAC-REVISED REPLACE section in its entirety with attached revised section R. RFI #1 The Temperature control work shall be limited to expanding the existing system to include the new equipment. Refer to revised specification section R. RFI #2 The room sensor type has been changed per the revised section R MODULAR INDOOR CENTRAL-STATION AIR-HANDLING UNITS REVISE Paragraph 2.1.A and add the following to the list of approved manufacturers: a. McQuay. b. Trane. c. York DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM ADD attached section which was inadvertently omitted from the bid documents. L&D #24036 (BR2) ADDENDUM #2 Page-3

5 BID RELEASE 2 ADDITIONS AND RENOVATIONS III. ADDITIONS OR CHANGES TO THE DRAWINGS General note: for any item solely identified in the bid documents as Basis of Design, Owner Approved Equal products shall be considered. DRAWING A See ATTACHED (8 ½ x11 ) sheet AD-02/A1.5.b for revised Media Production Lab: Alternate Bid # 4 - Opening Schedule. DRAWING A REVISE Opening Schedule: a. See ATTACHED (8 ½ x11 ) sheet AD-02/A2.2.a for Triangle Base Bid - Opening Schedule DRAWING A CLARIFICATION Refer to the display case details, all of the vertical panels shall be 3/8 tempered glass. The tops and shelves shall be 3/8 acrylic or Lexan clear panels. DRAWING A CLARIFICATION Refer to the Triangle display case details, the vertical front and side panels and sliding doors shall be 3/8 tempered glass. The shelves shall be 1/2 acrylic or Lexan clear panels. The back panels shall be 3/4 laminated MDF board. DRAWING M ADD new General Construction Note #1 to read: Contractor shall provide and install (5) new ceiling fans as specified in section Ceiling Fans and shown on the Architectural Reflected Ceiling Plan A6.1. DRAWING M ADD new General Construction Note #1 to read: Provide a ½ drain line from RHC-1 drip pan to sink in Stage Craft room below. DRAWING M REVISE The Hot Water Baseboard Unit Heater Schedule to read: a. Model shall be JV-4. b. Delete any reference to specification from the schedule foot note. DRAWING ED Notes 7, 8 and 9 shown in sheet D1.2 also apply to this sheet. 2. Notes 2 and 3 shown in Sheet D6.2 also apply to this sheet. DRAWING ED Refer to Detail 3. Remove the existing switch located on east end of central corridor (located on north wall of Screen Prep 150). 2. Refer to Detail 4. The existing receptacle and data outlet on south wall of Media storage Room 164 shall remain. 3. Refer to Detail 4. Note 2 applies to ACT Storage Room Refer to Detail 4. Replace X with XP located next to receptacle in Screen Prep Refer to Keyed Note 2. It shall begin with This wall was blocked in lieu of This was blocked. DRAWING E Refer to Detail 1. Add verbiage Provide fire stopping material. L&D #24036 (BR2) ADDENDUM #2 Page-4

6 BID RELEASE 2 ADDITIONS AND RENOVATIONS DRAWING E REVISE General Note A to read Unless noted otherwise, all normal lighting loads shown on this sheet shall be fed from existing panel LP and all exit sign and emergency lighting load shall be fed from existing emergency panel. 2. REVISE Occupancy Sensors and switch with integral occupancy sensors with vacancy sensors for all rooms except main gymnasium 503, Nest Room 514 and Storage Room 515. DRAWING E Refer to Aisle Lighting Detail. Add or owner approved equal after Celestial Lighting (Phone ). 2. Refer to note 18. Replace verbiage at the end of the sentence as directed by Owner with the verbiage in the nearest corridor. 3. REPLACE note reference 18 with note reference 27 for data outlet shown in the rear of the stage near column 112. Add note 27 to read Data cable to be provided by owner. 4. Refer to Dressing Rooms 427 and 428. Add note reference 25 next to each Wiremold. 5. Refer to note reference 23 shown in Stage and added under Addendum-1. This reference should be clouded. 6. ADD following at the end of General Note B. Perform modification of existing light fixture openings to accommodate and support new fixtures as required. Cutting of existing opening shall be performed by electrical contractor and the patching shall be done by dry wall contractor. Refer to note 1 on Sheets D6.2 and A6.2. DRAWING E1.3 and E Refer to Triangle Room 424. Fixture type L is provided to illuminate Triangle shown in Sheets A5.5 and A5.6. Base bid shall include this fixture and it shall be deleted under Alternate No. 9. DRAWING E REVISE note reference shown next to speaker above south bleacher from number 16 to number 23. Note 23 shall read Install approximately 7 above top landing of bleacher. 2. REVISE circuit number for west EWC from 28(GR1A) to REVISE circuit number for Batting cage from38 to Circuit numbers for fans A, B and C shall be 8/10/12 (LP). (All fans will be fed from same circuit.) Fans D and E shall be fed from circuits 14/16/18 (LP). 5. ADD EF-2 and FCU-1 in Sound Closet 516 and PE Storage 519 accordingly. 6. Revise note 20 to read The fans and controllers shall be furnished under division 23. The fans shall be installed under division 23. The controllers shall be installed under division 26. All wiring shall be provided under division 26. DRAWING E Refer to Panel GR3 schedule. Circuit 5 shall be used for receptacle in Gym. Circuits 2, 4 and 6 shall be used for plug molds in Girls and Boys dressing rooms. Circuit 15 through 25 shall be made spare. 2. Panel LG1 shall have 150 Amp M.L.O. 3. Refer to Panel LP schedule. Circuits 8/10/12 shall be 20A-3P and shall feed fans A, B and C. Circuits 14/16/18 shall be 20A-3P and shall feed fans D and E. 4. Refer to Panel RC1 schedule. This panel shall be renamed as RO1. This panel shall have 42 poles in lieu of 30 poles. Circuits 12,14,16,18, 19, 20, 21, 22, 23, 24 and 26 shall be used to feed lighting and receptacle load in Media Center Rooms shown on Sheet E1.4. Circuit 35 through 42 shall be Space. Remaining circuits shall be as shown in the schedule or spare. DRAWING E Refer to Lighting Fixture Schedule. Add nlight in fixture description for fixture types F, I, Q, and AD4. ADD NEPP at the end of catalog numbers for fixture types F, I, Q and AD4. L&D #24036 (BR2) ADDENDUM #2 Page-5

7 BID RELEASE 2 ADDITIONS AND RENOVATIONS 2. Refer to Lighting Fixture Schedule. In catalog numbers for fixture types A and AA replace OUTR with OUTCTR. DRAWING E Refer to General Note 13. REVISE the 3rd sentence to read As much as practical, wherever feasible, install conduits behind a wall in an unfinished room and penetrate into an electrical device to be installed in finished area. If this is not feasible, the surface metal raceway shall be provided and routed in the corner and/or adjacent to window, door frame etc. so it is as inconspicuous as possible. The remaining part of the note beginning with For sake of simplicity...shall remain as written. 2. Refer to Schematic Diagram. REVISE note reference inside Switchboard MS1 from number 8 to Refer to Gym Equipment Wiring Diagram. REVISE Panel GR1 to read Panel GR1 or GR2 4. DELETE Motor Feeder Schedule from this sheet. 5. REVISE symbol for clock outlet since this symbol is not used anywhere in the drawing. The correct symbol shall be letter C in a circle with a base. The description for this symbol shall read Clock outlet and clock to be compatible with existing clocks. Connect to master clock system. 6. ADD verbiage to Magnetic Door Hold Open device to read Connect to Fire Alarm System END OF ADDENDUM #2 L&D #24036 (BR2) ADDENDUM #2 Page-6

8 BID RELEASE 2 - ADDITIONS & RENOVATIONS SECTION REACTIVE CHEMICAL CONCRETE STAIN PART 1 - GENERAL 1.1 SUMMARY A. Section includes: 1. Chemically stained concrete floor finish. 2. Sealer. B. Related Sections: 1. Section Cast-In-Place Concrete for general concrete applications. 2. Section Joint Sealants for colored sealant installed in horizontal traffic-bearing joints. 1.2 REFERENCES A. ASTM International (ASTM): 1. ASTM C 171: Standard Specification for Sheet Materials for Curing Concrete. 2. ASTM C 309: Standard Specification for Liquid Membrane-Forming Compounds for Curing Concrete. 3. ASTM F 1869: Standard Test Method for Measuring Moisture Vapor Emission Rate of Concrete Subfloor Using Anhydrous Calcium Chloride. 1.3 SUBMITTALS A. Product Data: Manufacturer s technical data for each product specified. B. Samples for Initial Selection: Manufacturer s color charts showing full range of colors available. C. Qualification Data: For manufacturer and Installer. 1.4 QUALITY ASSURANCE A. Manufacturer Qualifications: Minimum 10 years of documented experience producing the specified products. B. Installer Qualifications: Minimum 5 years of documented experience with work of similar scope and complexity required by this Project and acceptable to, or certified by, concrete stain manufacturer. C. Regulatory Requirements: L&D #24036 REACTIVE CHEMICAL CONCRETE STAIN

9 BID RELEASE 2 - ADDITIONS & RENOVATIONS 1. Products to comply with United States Clean Air Act for maximum Volatile Organic compound (VOC) content as specified in this Section. D. Material Source: Obtain each specified material from the same source. E. Notification: Give a minimum 7 calendar days notice to manufacturer s authorized field representative before date established for commencement of concrete stain work. F. Concrete Stain Mockups: 1. Construct a 10 foot by 10 foot mockup at location selected by Architect. 2. Provide individual mockups for each color and pattern required. 3. Construct mockup using materials, processes, and techniques required for the work, including curing procedures. Incorporate representative control, construction, and expansion joints according to Project requirements. Installer for the work to construct mockup. 4. Mockup to be stained and sealed by the Installer who will actually perform the work for the Project. Record the amount of chemical stain needed per square foot of application to establish coverage rates for the work. 5. Notify Architect and Owner a minimum of seven calendar days in advance of the date scheduled for each mockup construction. 6. Obtain the Architect s and Owner s acceptance of each mockup prior to commencement of the work. 7. Each mockup to remain until completion of the work to serve as a quality control standard for the work. Provide suitable protections to preclude damage to mockup. 8. If mockup is acceptable to Owner and Architect, it may remain as part of the Work. 1.5 DELIVERY, STORAGE, AND HANDLING A. Deliver products in original factory unopened, undamaged packaging bearing identification of product, manufacturer, batch number, and expiration date as applicable. B. Store products in a location protected from damage, construction activity, and adverse environmental conditions, and away from combustible materials and sources of heat, according to manufacturer s printed instructions and current recommendations. C. Handle products according to manufacturer s printed instructions. 1.6 PROJECT CONDITIONS A. Environmental Conditions: Maintain an ambient temperature between 50 deg F and 90 deg F during application and at least 48 hours after application. 1.7 PREINSTALLATION CONFERENCE A. Seven calendar days prior to scheduled date of installation, conduct a meeting at Project site to discuss requirements, including application methods. Attendees to include Architect, Owner, Contractor, Installer, and manufacturer s authorized field representative. L&D #24036 REACTIVE CHEMICAL CONCRETE STAIN

10 BID RELEASE 2 - ADDITIONS & RENOVATIONS PART 2 - PRODUCTS 2.1 ACCEPTABLE MANUFACTURERS A. Basis of Design: Provide products specified herein manufactured by L. M. Scofield Company (Scofield). 2.2 MATERIALS A. Reactive Chemical Concrete Stain: Reactive, water-based solution of metallic salts which react with calcium hydroxide in cured concrete substrates to produce permanent variegated or translucent color effects. Zero VOC content. 1. Basis-of-Design Product: Scofield s LITHOCHROME Chemstain Classic. 2. Color: a. CS-1 Black 3. Sealer: a. CEMENTONE Clear Sealer PART 3 - EXECUTION 3.1 EXAMINATION A. Examine areas and conditions under which the concrete stain work will be performed and identify conditions detrimental to the proper and timely completion of the work. Do not proceed until unsatisfactory conditions have been corrected. B. Interior Applications: Concrete substrates must have a moisture vapor emission rate of less than 5 lbs./1000 sq. ft. per 24 hour based on a 72 hour test period according to ASTM F PREPARATION A. New Concrete: Comply with the following: 1. Newly placed concrete to sufficiently cure for concrete to become reactive. Minimum cure time is 14 days. 2. Interior Applications: Minimum cure time of concrete is 30 to 60 days, or longer if necessary to meet the specified water vapor transmission requirements. 3. Do not use liquid curing materials. Cure concrete flatwork with new, unwrinkled, nonstaining, high quality curing paper complying with ASTM C 171. Do not overlap curing paper. 4. Immediately prior to chemically staining, thoroughly clean concrete to remove any contaminants deleterious to subsequent chemical stain application. Sweep surfaces, then pressure wash or scrub using a rotary floor machine with a Mal-Grit Brush from the Malish Corporation. Use suitable, non-acidic, high quality commercial detergents to facilitate cleaning. Rinse surfaces after cleaning until rinse water is completely clean. Allow floor to dry completely prior to application of concrete stain. L&D #24036 REACTIVE CHEMICAL CONCRETE STAIN

11 BID RELEASE 2 - ADDITIONS & RENOVATIONS a. Pressure Washing: Use a pressure washer equipped with a fan tip and rated for a minimum pressure capability of 4000 psi. B. Surface Preparation for New or Existing Concrete: 1. Concrete surfaces should be completely penetrable before applying the initial application of chemical stain. The surface of the concrete should be lightly mechanically abraded to remove weak cement paste and contaminants. The final surface preparation should approximate a Concrete Surface Profile of 1, (CSP1 as designated by the International Concrete Repair Institute, Alexandria, Virginia). Methods for mechanical abrasion include: a. Pressure Washing: Use a pressure washer equipped with a fan tip and rated for a minimum pressure capability of 4000 psi. b. Scrubbing with a rotary floor machine with a Mal-Grit Brush from the Malish Corporation. c. Light sanding of the surface. Surfaces should be tested to receive stain by spotting with water. Water should immediately darken the substrate and be readily absorbed. If water beads and does not penetrate or only penetrates in some areas, perform additional surface preparation and testing. On denser concrete floors, sand lightly to open up surfaces. Retest and continue surface preparation until water spots immediately darken and uniformly penetrate concrete surfaces. 2. Rinse concrete substrates until rinse water is completely clean. C. Scoring: Score decorative jointing in concrete surfaces 1/8 inch deep with diamond blades. Rinse until water is completely clean. 1. Single Color Stain Applications: Score after staining. 2. Multiple Color Stain Applications: Score before staining. 3.3 CHEMICAL STAIN APPLICATION A. General: Comply with chemical stain manufacturer s printed instructions and current recommendations. 1. Do not mix the specified chemical stain with highly alkaline materials. Doing so will result in a dangerous chemical reaction. B. Protect surrounding areas, landscaping, and adjacent surfaces from overspray, runoff, and tracking. Divide surfaces into small work sections using walls, joint lines, or other stationary breaks as natural stopping points. C. Apply chemical stains at the coverage rate recommended by the manufacturer and use application equipment according to the chemical stain manufacturer s printed instructions. Note the color of the liquid chemical stain will not be the final color produced on the concrete substrate. D. Transfer chemical stain to the substrate by brush or spray and immediate scrub into surface. Reaction time depends on wind conditions, temperatures, and humidity levels. E. When multiple coats of one or more colors are required, washing and drying between colors is desirable to evaluate the color prior to the next coat. L&D #24036 REACTIVE CHEMICAL CONCRETE STAIN

12 BID RELEASE 2 - ADDITIONS & RENOVATIONS F. Rinsing: After the final coat of chemical stain has remained on the surface for a minimum of four hours, neutralize unreacted chemical stain residue and then remove completely prior to sealing. After neutralization, thoroughly rinse surface with clean water several times to remove soluble salts. While rinsing, lightly abrade surface using a low-speed floor machine and red pad to remove residue and weakened surface material. Runoff may stain the adjacent areas or harm plants. Collect rinse water by wet vacuuming or absorbing with an inert material. 1. Failure to completely remove all residue prior to sealing the surface will cause appearance defects, adhesion loss or peeling, reduced durability, and possible bonding failure and delamination of sealer. 2. All stain residue, runoff liquid, and rinse water must be collected and disposed of according to applicable Federal regulations and governing authorities having jurisdiction. 3.4 SEALING APPLICATION A. Concrete substrate must be completely dry. Test surface for proper ph prior to applying sealer. A ph value of 7 or higher indicates all acid has been neutralized. If the tested ph value is less than 7, repeat neutralization step until the required ph value is achieved. B. Conduct a moisture vapor emission test prior to applying any sealer. Refer to the specific sealer s Technical-Data Bulletin for acceptable MVER. C. Apply sealer according the sealer manufacturer s printed instructions at a rate of 300 to 500 square feet per gallon per coat. Maintain a wet edge at all times. D. Allow sealer to completely dry before applying additional coats. E. Apply second coat of sealer at 90 degrees to the direction of the first coat using the same application method and rates. F. Seal horizontal joints in areas subject to pedestrian or vehicular traffic. 3.5 PROTECTION A. The General Contractor is responsible for using Temporary Floor Protection throughout the project to safeguard the surface quality of concrete slabs before and after application of decorative finishes or installations of other materials. B. All concrete floors that will be not be covered by other materials will be protected throughout the project. The concrete slab must be treated as a finished floor at all times during construction. C. Temporary Floor Protection will be removed only while finish work to the concrete is being performed and will be replaced after the final finish has cured sufficiently. D. Temporary Floor Protection will be Proguard Duracover as manufactured by L. M. Scofield Company, Douglasville, GA ( ). Seaming of the temporary floor protection will be performed with Scofield Proguard Heavy Duty Seaming Tape. Both products will be installed following the manufacturer s published installation procedures. L&D #24036 REACTIVE CHEMICAL CONCRETE STAIN

13 BID RELEASE 2 - ADDITIONS & RENOVATIONS E. Do not apply the heavy duty seaming tape to bare or finished floors or wall surfaces at any time. It will permanently damage the floor. 3.6 MAINTENANCE A. Maintain chemically stained and sealed floors by sweeping. Clean spills when they occur and rinse dirt off with water. Wet-clean heavily soiled areas by mopping or by scrubbing with a rotary floor machine equipped with a scrubbing brush and a suitable, high quality commercial detergent. Maintain interior floors that require polishing by using a compatible, premium-grade, emulsion-type, commercial floor polish, according to manufacturer s printed instructions and safety requirements. END OF SECTION L&D #24036 REACTIVE CHEMICAL CONCRETE STAIN

14 BID RELEASE 2 ADDITIONS & RENOVATIONS SECTION DOOR HARDWARE PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes commercial door hardware for the following: 1. Swinging doors. 2. Sliding doors. 3. Other doors to the extent indicated. B. Door hardware includes, but is not necessarily limited to, the following: 1. Mechanical door hardware. 2. Cylinders specified for doors in other sections. C. Related Sections: 1. Division 08 Section Hollow Metal Doors and Frames. 2. Division 08 Section Interior Aluminum Doors and Frames. 3. Division 08 Section Flush Wood Doors. 4. Division 28 Section Access Control. D. Codes and References: Comply with the version year adopted by the Authority Having Jurisdiction. 1. ANSI A Accessible and Usable Buildings and Facilities. 2. ICC/IBC - International Building Code. 3. NFPA 80 - Fire Doors and Windows. 4. NFPA Life Safety Code. 5. NFPA Installation of Smoke Door Assemblies. 6. State Building Codes, Local Amendments. E. Standards: All hardware specified herein shall comply with the following industry standards: 1. ANSI/BHMA Certified Product Standards - A156 Series 2. UL10C Positive Pressure Fire Tests of Door Assemblies L&D #24036 DOOR HARDWARE R - 1

15 BID RELEASE 2 ADDITIONS & RENOVATIONS 1.3 SUBMITTALS A. Product Data: Manufacturer's product data sheets including installation details, material descriptions, dimensions of individual components and profiles, operational descriptions and finishes. B. Door Hardware Schedule: Prepared by or under the supervision of supplier, detailing fabrication and assembly of door hardware, as well as procedures and diagrams. Coordinate the final Door Hardware Schedule with doors, frames, and related work to ensure proper size, thickness, hand, function, and finish of door hardware. 1. Format: Comply with scheduling sequence and vertical format in DHI's "Sequence and Format for the Hardware Schedule." 2. Organization: Organize the Door Hardware Schedule into door hardware sets indicating complete designations of every item required for each door or opening. Organize door hardware sets in same order as in the Door Hardware Sets at the end of Part 3. Submittals that do not follow the same format and order as the Door Hardware Sets will be rejected and subject to resubmission. 3. Content: Include the following information: a. Type, style, function, size, label, hand, and finish of each door hardware item. b. Manufacturer of each item. c. Fastenings and other pertinent information. d. Location of door hardware set, cross-referenced to Drawings, both on floor plans and in door and frame schedule. e. Explanation of abbreviations, symbols, and codes contained in schedule. f. Mounting locations for door hardware. g. Door and frame sizes and materials. 4. Submittal Sequence: Submit the final Door Hardware Schedule at earliest possible date, particularly where approval of the Door Hardware Schedule must precede fabrication of other work that is critical in the Project construction schedule. Include Product Data, Samples, Shop Drawings of other work affected by door hardware, and other information essential to the coordinated review of the Door Hardware Schedule. C. Shop Drawings: Details of electrified access control hardware indicating the following: 1. Wiring Diagrams: Upon receipt of approved schedules, submit detailed system wiring diagrams for power, signaling, monitoring, communication, and control of the access control system electrified hardware. Differentiate between manufacturer-installed and field-installed wiring. Include the following: a. Elevation diagram of each unique access controlled opening showing location and interconnection of major system components with respect to their placement in the respective door openings. b. Complete (risers, point-to-point) access control system block wiring diagrams. 2. Electrical Coordination: Coordinate with related Division 26 Electrical Sections the voltages and wiring details required at electrically controlled and operated hardware openings. L&D #24036 DOOR HARDWARE R - 2

16 BID RELEASE 2 ADDITIONS & RENOVATIONS D. Keying Schedule: Prepared under the supervision of the Owner, separate schedule detailing final keying instructions for locksets and cylinders in writing. Include keying system explanation, door numbers, key set symbols, hardware set numbers and special instructions. Owner to approve submitted keying schedule prior to the ordering of permanent cylinders. E. Operating and Maintenance Manuals: Provide manufacturers operating and maintenance manuals for each item comprising the complete door hardware installation in quantity as required in Division 01, Closeout Submittals. The manual to include the name, address, and contact information of the manufacturers providing the hardware and their nearest service representatives. The final copies delivered after completion of the installation test to include "as built" modifications made during installation, checkout, and acceptance. F. Warranties and Maintenance: Special warranties and maintenance agreements specified in this Section. 1.4 QUALITY ASSURANCE A. Manufacturers Qualifications: Engage qualified manufacturers with a minimum 5 years of documented experience in producing hardware and equipment similar to that indicated for this Project and that have a proven record of successful in-service performance. B. Installer Qualifications: Installers, trained by the primary product manufacturers, with a minimum 3 years documented experience installing both standard and electrified builders hardware similar in material, design, and extent to that indicated for this Project and whose work has resulted in construction with a record of successful in-service performance. C. Door Hardware Supplier Qualifications: Experienced commercial door hardware distributors with a minimum 5 years documented experience supplying both mechanical and electromechanical hardware installations comparable in material, design, and extent to that indicated for this Project. Supplier recognized as a factory direct distributor in good standing by the manufacturers of the primary materials with a warehousing facility in Project's vicinity. Supplier to have on staff a certified Architectural Hardware Consultant (AHC) available during the course of the Work to consult with Contractor, Architect, and Owner concerning both standard and electromechanical door hardware and keying. 1. Scheduling Responsibility: Preparation of door hardware and keying schedules. D. Source Limitations: Obtain each type and variety of Door Hardware specified in this Section from a single source, qualified supplier unless otherwise indicated. 1. Electrified modifications or enhancements made to a source manufacturer's product line by a secondary or third party source will not be accepted. 2. Provide electromechanical door hardware from the same manufacturer as mechanical door hardware, unless otherwise indicated. E. Regulatory Requirements: Comply with NFPA 70, NFPA 80, NFPA 101 and ANSI A117.1 requirements and guidelines as directed in the model building code including, but not limited to, the following: 1. NFPA 70 "National Electrical Code", including electrical components, devices, and accessories listed and labeled as defined in Article 100 by a testing agency acceptable to authorities having jurisdiction, and marked for intended use. L&D #24036 DOOR HARDWARE R - 3

17 BID RELEASE 2 ADDITIONS & RENOVATIONS 2. Where indicated to comply with accessibility requirements, comply with Americans with Disabilities Act (ADA), "Accessibility Guidelines for Buildings and Facilities (ADAAG)," ANSI A117.1 as follows: a. Handles, Pulls, Latches, Locks, and other Operating Devices: Shape that is easy to grasp with one hand and does not require tight grasping, tight pinching, or twisting of the wrist. b. Door Closers: Comply with the following maximum opening-force requirements indicated: 1) Interior Hinged Doors: 5 lbf applied perpendicular to door. 2) Fire Doors: Minimum opening force allowable by authorities having jurisdiction. c. Thresholds: Not more than 1/2 inch high. Bevel raised thresholds with a slope of not more than 1:2. 3. NFPA 101: Comply with the following for means of egress doors: a. Latches, Locks, and Exit Devices: Not more than 15 lbf to release the latch. Locks shall not require the use of a key, tool, or special knowledge for operation. b. Thresholds: Not more than 1/2 inch high. 4. Fire-Rated Door Assemblies: Provide door hardware for assemblies complying with NFPA 80 that are listed and labeled by a testing and inspecting agency acceptable to authorities having jurisdiction, for fire ratings indicated, based on testing according to NFPA 252 (neutral pressure at 40" above sill) or UL-10C. a. Test Pressure: Positive pressure labeling. F. Each unit to bear third party permanent label demonstrating compliance with the referenced standards. G. Keying Conference: Conduct conference to comply with requirements in Division 01 Section "Project Meetings." Keying conference to incorporate the following criteria into the final keying schedule document: 1. Function of building, purpose of each area and degree of security required. 2. Plans for existing and future key system expansion. 3. Requirements for key control storage and software. 4. Installation of permanent keys, cylinder cores and software. 5. Address and requirements for delivery of keys. H. Pre-Submittal Conference: Conduct coordination conference in compliance with requirements in Division 01 Section "Project Meetings" with attendance by representatives of Supplier(s), Installer(s), and Contractor(s) to review proper methods and the procedures for receiving, handling, and installing door hardware. 1. Prior to installation of door hardware, conduct a project specific training meeting to instruct the installing contractors' personnel on the proper installation and adjustment of their respective products. Product training to be attended by installers of door hardware (including electromechanical hardware) for aluminum, hollow metal and wood doors. L&D #24036 DOOR HARDWARE R - 4

18 BID RELEASE 2 ADDITIONS & RENOVATIONS Training will include the use of installation manuals, hardware schedules, templates and physical product samples as required. 2. Inspect and discuss electrical roughing-in, power supply connections, and other preparatory work performed by other trades. 3. Review sequence of operation narratives for each unique access controlled opening. 4. Review and finalize construction schedule and verify availability of materials. 5. Review the required inspecting, testing, commissioning, and demonstration procedures I. At completion of installation, provide written documentation that components were applied to manufacturer's instructions and recommendations and according to approved schedule. 1.5 DELIVERY, STORAGE, AND HANDLING A. Inventory door hardware on receipt and provide secure lock-up and shelving for door hardware delivered to Project site. Do not store electronic access control hardware, software or accessories at Project site without prior authorization. B. Tag each item or package separately with identification related to the final Door Hardware Schedule, and include basic installation instructions with each item or package. C. Deliver, as applicable, permanent keys, cylinders, cores, access control credentials, software and related accessories directly to Owner via registered mail or overnight package service. Instructions for delivery to the Owner shall be established at the "Keying Conference". 1.6 COORDINATION A. Templates: Obtain and distribute to the parties involved templates for doors, frames, and other work specified to be factory prepared for installing standard and electrified hardware. Check Shop Drawings of other work to confirm that adequate provisions are made for locating and installing hardware to comply with indicated requirements. B. Door Hardware and Electrical Connections: Coordinate the layout and installation of scheduled electrified door hardware and related access control equipment with required connections to source power junction boxes, low voltage power supplies, detection and monitoring hardware, and fire and detection alarm systems. C. Door and Frame Preparation: Related Division 08 Sections (Steel, Aluminum and Wood) doors and corresponding frames are to be prepared, reinforced and pre-wired (if applicable) to receive the installation of the specified electrified, monitoring, signaling and access control system hardware without additional in-field modifications. 1.7 WARRANTY A. General Warranty: Reference Division 01, General Requirements. Special warranties specified in this Article shall not deprive Owner of other rights Owner may have under other provisions of the Contract Documents and shall be in addition to, and run concurrent with, other warranties made by Contractor under requirements of the Contract Documents. B. Warranty Period: Written warranty, executed by manufacturer(s), agreeing to repair or replace components of standard and electrified door hardware that fails in materials or workmanship L&D #24036 DOOR HARDWARE R - 5

19 BID RELEASE 2 ADDITIONS & RENOVATIONS within specified warranty period after final acceptance by the Owner. Failures include, but are not limited to, the following: 1. Structural failures including excessive deflection, cracking, or breakage. 2. Faulty operation of the hardware. 3. Deterioration of metals, metal finishes, and other materials beyond normal weathering. 4. Electrical component defects and failures within the systems operation. C. Standard Warranty Period: One year from date of Substantial Completion, unless otherwise indicated. D. Special Warranty Periods: 1. Ten years for mortise locks and latches. 2. Five years for exit hardware. 3. Twenty five years for manual surface door closers. 4. Two years for electromechanical door hardware. 1.8 MAINTENANCE SERVICE A. Maintenance Tools and Instructions: Furnish a complete set of specialized tools and maintenance instructions as needed for Owner's continued adjustment, maintenance, and removal and replacement of door hardware. B. Continuing Service: Beginning at Substantial Completion, and running concurrent with the specified warranty period, provide continuous (6) months full maintenance including repair and replacement of worn or defective components, lubrication, cleaning, and adjusting as required for proper door opening operation. Provide parts and supplies as used in the manufacture and installation of original products. PART 2 - PRODUCTS 2.1 SCHEDULED DOOR HARDWARE A. General: Provide door hardware for each door to comply with requirements in Door Hardware Sets and each referenced section that products are to be supplied under. 1. Designations: Requirements for quantity, item, size, finish or color, grade, function, and other distinctive qualities of each type of door hardware are indicated in the Door Hardware Sets at the end of Part 3. Products are identified by using door hardware designations, as follows: a. Named Manufacturer's Products: Product designation and manufacturer are listed for each door hardware type required for the purpose of establishing requirements. Manufacturers' names are abbreviated in the Door Hardware Schedule. B. Substitutions: Requests for substitution and product approval for inclusive mechanical and electromechanical door hardware in compliance with the specifications must be submitted in writing and in accordance with the procedures and time frames outlined in Division 01, L&D #24036 DOOR HARDWARE R - 6

20 BID RELEASE 2 ADDITIONS & RENOVATIONS Substitution Procedures. Approval of requests is at the discretion of the architect, owner, and their designated consultants. 2.2 HANGING DEVICES A. Hinges: ANSI/BHMA A156.1 certified butt hinges with number of hinge knuckles as specified in the Door Hardware Sets. 1. Quantity: Provide the following hinge quantity, unless otherwise indicated: a. Two Hinges: For doors with heights up to 60 inches. b. Three Hinges: For doors with heights 61 to 90 inches. c. Four Hinges: For doors with heights 91 to 120 inches. d. For doors with heights more than 120 inches, provide 4 hinges, plus 1 hinge for every 30 inches of door height greater than 120 inches. 2. Hinge Size: Provide the following, unless otherwise indicated, with hinge widths sized for door thickness and clearances required: a. Widths up to 3 0 : 4-1/2 standard or heavy weight as specified. b. Sizes from 3 1 to 4 0 : 5 standard or heavy weight as specified. 3. Hinge Weight and Base Material: Unless otherwise indicated, provide the following: a. Exterior Doors: Heavy weight, non-ferrous, ball bearing or oil impregnated bearing hinges unless Hardware Sets indicate standard weight. b. Interior Doors: Standard weight, steel, ball bearing or oil impregnated bearing hinges unless Hardware Sets indicate heavy weight. 4. Hinge Options: Comply with the following where indicated in the Hardware Sets or on Drawings: a. Non-removable Pins: Provide set screw in hinge barrel that, when tightened into a groove in hinge pin, prevents removal of pin while door is closed; for the following applications: 1) Out-swinging exterior doors. 2) Out-swinging access controlled doors. 3) Out-swinging lockable doors. 5. Acceptable Manufacturers: a. Hager Companies (HA). b. McKinney Products (MK). B. Continuous Geared Hinges: ANSI/BHMA A certified continuous geared hinge with minimum inch thick extruded 6060 T6 aluminum alloy hinge leaves and a minimum overall width of 4 inches. Hinges are non-handed, reversible and fabricated to template screw locations. Provide concealed flush mount (with or without inset), full surface, or half surface, in standard and heavy duty models, as specified in the Hardware Sets. Concealed continuous hinges to be U.L. listed for use on up to and including 90 minute rated door installations and L&D #24036 DOOR HARDWARE R - 7

21 BID RELEASE 2 ADDITIONS & RENOVATIONS U.L. listed for windstorm components where applicable. Factory cut hinges for door size and provide with removable service power transfer panel where indicated at electrified openings. 1. Acceptable Manufacturers: a. Bommer Industries (BO). b. McKinney Products (MK). c. Pemko Manufacturing (PE). C. Pin and Barrel Continuous Hinges: ANSI/BHMA A certified pin and barrel continuous hinges with minimum 12 gauge (.105) Type 304 stainless steel hinge leaves, concealed tefloncoated stainless pin, and twin self-lubricated nylon bearings at each knuckle separation. Fabricate hinges non-handed and U.L. listed for use on up to and including 3 hour rated doors and U.L. listed for windstorm components where applicable. Provide hinges with power transfer cutouts where indicated at electrified openings. 1. Acceptable Manufacturers: a. Markar Products (MR). b. McKinney Products (MK). c. Pemko Manufacturing (PE). 2.3 POWER TRANSFER DEVICES A. Electrified Quick Connect Continuous Geared Transfer Hinges: Provide electrified transfer continuous geared hinges with a 12" removable service panel cutout accessible without demounting door from the frame. Furnish with Molex standardized plug connectors with sufficient number of concealed wires (up to 12) to accommodate the electrified functions specified in the Door Hardware Sets. Connectors plug directly to through-door wiring harnesses for connection to electric locking devices and power supplies. Wire nut connections are not acceptable. 1. Acceptable Manufacturers: a. Bommer Industries (BO) - SER-QC (# of wires) Option. b. McKinney Products (MK) - SER-QC (# wires) Option. c. Pemko Manufacturing (PE) - SER-QC (# wires) Option. B. Electrified Quick Connect Stainless Steel Continuous Transfer Hinges: Provide electrified transfer stainless steel continuous hinges with electrical transfer access prep accessible without de-mounting door from the frame. Furnish with Molex standardized plug connectors with sufficient number of concealed wires (up to 12) to accommodate the electrified functions specified in the Door Hardware Sets. Connectors plug directly to through-door wiring harnesses for connection to electric locking devices and power supplies. Wire nut connections are not acceptable. 1. Acceptable Manufacturers: a. Markar Products (MR) - MP-ETAP-EL (# wires) Option. b. McKinney Products (MK) - MCK-ETAP-EL (# wires) Option. L&D #24036 DOOR HARDWARE R - 8

22 BID RELEASE 2 ADDITIONS & RENOVATIONS 2.4 DOOR OPERATING TRIM A. Flush Bolts and Surface Bolts: ANSI/BHMA A156.3 and A156.16, Grade 1, certified automatic, self-latching, and manual flush bolts and surface bolts. Manual flush bolts to be furnished with top rod of sufficient length to allow bolt location approximately six feet from the floor. Furnish dust proof strikes for bottom bolts. Surface bolts to be minimum 8 in length and U.L. listed for labeled fire doors and U.L. listed for windstorm components where applicable. Provide related accessories (mounting brackets, strikes, coordinators, etc.) as required for appropriate installation and operation. 1. Acceptable Manufacturers: a. Burns Manufacturing (BU). b. Rockwood Manufacturing (RO). c. Trimco (TC). 2.5 CYLINDERS AND KEYING A. General: Cylinder manufacturer to have minimum (10) years experience designing secured master key systems and have on record a published security keying system policy. B. Source Limitations: Obtain each type of keyed cylinder and keys from the same source manufacturer as locksets and exit devices, unless otherwise indicated. C. Cylinders: Original manufacturer cylinders complying with the following: 1. Mortise Type: Threaded cylinders with rings and straight- or clover-type cam. 2. Rim Type: Cylinders with back plate, flat-type vertical or horizontal tailpiece, and raised trim ring. 3. Bored-Lock Type: Cylinders with tailpieces to suit locks. 4. Mortise and rim cylinder collars to be solid and recessed to allow the cylinder face to be flush and be free spinning with matching finishes. 5. Keyway: Match Facility Standard. D. Keying System: Each type of lock and cylinders to be factory keyed. Conduct specified "Keying Conference" to define and document keying system instructions and requirements. Furnish factory cut, nickel-silver large bow permanently inscribed with a visual key control number as directed by Owner. Incorporate decisions made in keying conference, and as follows: 1. Master Key System: Cylinders are operated by a change key and a master key. 2. Grand Master Key System: Cylinders are operated by a change key, a master key, and a grand master key. 3. Great-Grand Master Key System: Cylinders are operated by a change key, a master key, a grand master key, and a great-grand master key. 4. Existing System: Master key or grand master key locks to Owner's existing system. 5. Keyed Alike: Key all cylinders to same change key. E. Key Quantity: Provide the following minimum number of keys: 1. Top Master Key: One (1) 2. Change Keys per Cylinder: Two (2) 3. Master Keys (per Master Key Group): Two (2) L&D #24036 DOOR HARDWARE R - 9

University of Rochester October 17, 2008 Brooks Landing Business Center

University of Rochester October 17, 2008 Brooks Landing Business Center SECTION 087100 - DOOR HARDWARE PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Commercial door hardware. 2. Cylinders for doors specified in other Sections. 1.2 SUBMITTALS A. Product

More information

B. Shop Drawings: Details of electrified door hardware, including wiring diagrams.

B. Shop Drawings: Details of electrified door hardware, including wiring diagrams. SECTION 087100 - PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Commercial door hardware for the following: a. Swinging doors. b. Other doors to the extent indicated. B. Related

More information

Lake County / Multi-Department Storage Facility / Project / December 05, 2016 SECTION DOOR HARDWARE

Lake County / Multi-Department Storage Facility / Project / December 05, 2016 SECTION DOOR HARDWARE PART 1 - GENERAL SECTION 087100 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to

More information

Job No. EGOS

Job No. EGOS SECTION 087100 DOOR HARDWARE PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

New Bedford, Massachusetts Tel: (617) CBI Job No.: Fax: (617)

New Bedford, Massachusetts Tel: (617) CBI Job No.: Fax: (617) SECTION 08 71 00 PART 1 - GENERAL 1.01 GENERAL REQUIREMENTS A. Include the General Conditions, Modifications to the General Conditions, and applicable parts of Division 01 as part of this Section. B. Examine

More information

ADDENDUM - 01 REGAN YOUNG ENGLAND BUTERA

ADDENDUM - 01 REGAN YOUNG ENGLAND BUTERA ADDENDUM - 01 REGAN YOUNG ENGLAND BUTERA REFERENDUMS ENGINEERING ARCHITECTURE DESIGN 456 HIGH ST. MT. HOLLY, NJ 08060 USA DATE:... Tuesday, 19 March 2019 FROM:...Angelo P. Butera, AIA VIA:... Facsimile

More information

DSC BUILDING 1200 ALTERATIONS OCTOBER 2011

DSC BUILDING 1200 ALTERATIONS OCTOBER 2011 SECTION 087100 - DOOR HARDWARE PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Commercial door hardware. 1.2 SUBMITTALS A. Product Data: For each type of product indicated. B. Other

More information

A. AMERICAN ARCHITECTURAL MANUFACTURERS ASSOCIATION (AAMA) 101: Appendix Dissimilar Materials.

A. AMERICAN ARCHITECTURAL MANUFACTURERS ASSOCIATION (AAMA) 101: Appendix Dissimilar Materials. B B11.0 DIVISION 08 - OPENINGS SECTION 08 17 00 INTEGRATED DOOR OPENING ASSEMBLIES Specifier Note: Coordinate and edit articles and paragraphs below to suit project requirements. Add section numbers and

More information

ARCHITECTURAL SPECIFICATIONS

ARCHITECTURAL SPECIFICATIONS 1 B9.1 In Ground Page 1 of 6, Aug 12 DIVISION 08 - OPENINGS SECTION 08 71 13 POWER DOOR OPERATORS Specifier Note: Coordinate and edit articles and paragraphs below to suit project requirements. Add section

More information

ONONDAGA COMMUNITY COLLEGE FERRANTE HALL RENOVATIONS - PHASE

ONONDAGA COMMUNITY COLLEGE FERRANTE HALL RENOVATIONS - PHASE SECTION 08 71 00 - DOOR HARDWARE PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION DOOR HARDWARE

SECTION DOOR HARDWARE McClellan Blakemore Architects New Warehouse Facility for SECTION 08710 DOOR HARDWARE PART 1 GENERAL 1.01 SECTION INCLUDES A. Hardware for wood and hollow steel doors. B. Hardware for fire-rated doors.

More information

DETEX ARCHITECTURAL SPECIFICATIONS, June 2012 AO19 SERIES HEAVY DUTY LOW-ENERGY ELECTRIC SWING DOOR OPERATOR

DETEX ARCHITECTURAL SPECIFICATIONS, June 2012 AO19 SERIES HEAVY DUTY LOW-ENERGY ELECTRIC SWING DOOR OPERATOR DETEX ARCHITECTURAL SPECIFICATIONS, June 2012 AO19 SERIES HEAVY DUTY LOW-ENERGY ELECTRIC SWING DOOR OPERATOR SECTION 08 71 13 LOW ENERGY AUTOMATIC OPERATORS Specifier Note: Coordinate and edit articles

More information

1. Items known commercially as finish hardware or builders hardware, required for swing, sliding, or folding doors.

1. Items known commercially as finish hardware or builders hardware, required for swing, sliding, or folding doors. PART 1 - GENERAL 1.1 SUMMARY: A. Section Includes: SECTION 08710 FINISH HARDWARE 1. Items known commercially as finish hardware or builders hardware, required for swing, sliding, or folding doors. 2. Types

More information

PROJECT NO. CWA SEPTEMBER 24, 2014 ADDENDUM NO. 6 BESSEMER RECREATION & WELLNESS CENTER

PROJECT NO. CWA SEPTEMBER 24, 2014 ADDENDUM NO. 6 BESSEMER RECREATION & WELLNESS CENTER PROJECT NO. CWA 2013-04 SEPTEMBER 24, 2014 ADDENDUM NO. 6 BESSEMER RECREATION & WELLNESS CENTER BIDS RECEIVED: CITY HALL, CITY OF BESSEMER TIME: 2:00pm DATE: October 2, 2014 City of Bessemer --------------------------------------------------------------------------------------------------------------------------------------------

More information

SECTION DOOR HARDWARE

SECTION DOOR HARDWARE PART 1 GENERAL 1.01 SECTION INCLUDES SECTION 08 7100 DOOR HARDWARE A. Hardware for wood, aluminum, and hollow metal doors. B. Hardware for fire-rated doors. C. Electrically operated and controlled hardware.

More information

c. Oko-Tex (European environmental health standard)

c. Oko-Tex (European environmental health standard) SECTION 09720 Wall Covering Texturglas WALL FINISH SYSTEM GENERAL 1.1 SUMMARY A. Section Includes: Texturglas Wall Finish System. B. Related Sections: Section(s) related to this section include: 1. Gypsum

More information

SECTION WET-PIPE SPRINKLER SYSTEMS

SECTION WET-PIPE SPRINKLER SYSTEMS SECTION 21 13 13 WET-PIPE SPRINKLER SYSTEMS PART 1 - GENERAL 1.1 SCOPE OF WORK A. Design, installation and testing shall be in accordance with NFPA 13 except for specified exceptions. B. The demolition

More information

Architect s Specification Guideline:

Architect s Specification Guideline: Architect s Specification Guideline: Hollow Metal Section 08 11 00 Wood Door Section 08 14 00 Aluminum Door/Frame Section 08 11 16 Door Hardware Section 08 71 00 The University of Texas at Dallas Richardson,

More information

SEQUOYAH SCHOOLS FI&R 06 G01 Cherokee Nation Tahlequah, Oklahoma

SEQUOYAH SCHOOLS FI&R 06 G01 Cherokee Nation Tahlequah, Oklahoma Eastern Oklahoma Tribal Schools Facilities Management Program Choctaw Nation of Oklahoma 601 North Kelly Avenue, Suite 105 Edmond, Oklahoma 73003 Voice: (405) 330 9236 Fax: (405) 330 9261 Serving the schools

More information

M001. Revenue Services ISSUED FOR CONSTRUCTION SEPTEMBER. 2, East State Parkway Schaumburg, Illinois Do Not Scale Drawings

M001. Revenue Services ISSUED FOR CONSTRUCTION SEPTEMBER. 2, East State Parkway Schaumburg, Illinois Do Not Scale Drawings 1 T Consultant: NOTES, SYMBOLS & ABBREVIATIONS - MECHANICAL Number Description M001 Vestibule 117 LAN/IT Coffee 115 116 Mail Room 118 114 113 112 Scanning 119 Open Office 101 FIRST FLOOR PLAN - MECHANICAL

More information

1. Vinyl wall covering. 2. Woven glass-fiber wall covering. 3. Textile wall covering. 4. Wallpaper. 5. Heavy-duty, synthetic, textile wall covering.

1. Vinyl wall covering. 2. Woven glass-fiber wall covering. 3. Textile wall covering. 4. Wallpaper. 5. Heavy-duty, synthetic, textile wall covering. SECTION 09950 - WALL COVERINGS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections,

More information

HALIFAX HUMANE SOCIETY ADDITIONS AND ALTERATIONS. B. See Division 08 door sections for astragals and door silencers.

HALIFAX HUMANE SOCIETY ADDITIONS AND ALTERATIONS. B. See Division 08 door sections for astragals and door silencers. SECTION 087100 - DOOR HARDWARE PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Commercial door hardware. 2. Cylinders for doors specified in other Sections. B. See Division 08 door

More information

DIVISION 08 OPENINGS HARDWARE AND KEYING PART 1 - GENERAL 1.01 SUMMARY

DIVISION 08 OPENINGS HARDWARE AND KEYING PART 1 - GENERAL 1.01 SUMMARY 08 70 00 PART 1 - GENERAL 1.01 SUMMARY A. Section includes the design and coordination for all necessary hardware and coordination for all doors. Hardware shall include but not necessarily be limited to

More information

ADDENDUM #1: MODIFICATIONS AND ADDITIONS TO CONTRACT DOCUMENTS

ADDENDUM #1: MODIFICATIONS AND ADDITIONS TO CONTRACT DOCUMENTS Annex Laundry and Shower Alterations ADDENDUM #1 March 7, 2019 ADDENDUM #1: MODIFICATIONS AND ADDITIONS TO CONTRACT DOCUMENTS A. Invitation to Bid - Call for Bids has been modified as follows: 1. Notice

More information

DIVISION 08 OPENINGS HARDWARE AND KEYING PART 1 - GENERAL 1.01 SUMMARY

DIVISION 08 OPENINGS HARDWARE AND KEYING PART 1 - GENERAL 1.01 SUMMARY 08 70 00 PART 1 - GENERAL 1.01 SUMMARY A. Section includes the design and coordination for all necessary hardware and coordination for all doors. Hardware shall include but not necessarily be limited to

More information

SECTION FINISH HARDWARE

SECTION FINISH HARDWARE SECTION 08710 FINISH HARDWARE PART I GENERAL 1.01 SUMMARY A. SECTION INCLUDES 1. The work in this section includes furnishing all items of finish hardware as hereinafter specified or obviously necessary

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 11/06/2018

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 11/06/2018 SECTION 26 2913 - ENCLOSED CONTROLLERS GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

Addendum # 2 Wicomico County Circuit Court Second Floor Renovations Date of Addendum: 2/6/2017

Addendum # 2 Wicomico County Circuit Court Second Floor Renovations Date of Addendum: 2/6/2017 Wicomico County Purchasing 125 N. Division St. Room B-3 Salisbury, MD 21801 Ph. 410-548-4805 Fax 410-334-3130 Email: purchasing@wicomicocounty.org Addendum # 2 Wicomico County Circuit Court Second Floor

More information

DIVISION 10 SPECIALTIES

DIVISION 10 SPECIALTIES DIVISION 10 SPECIALTIES 11/11 SECTION 10 21 13.16 PLASTIC LAMINATE TOILET COMPARTMENTS PART 1 - GENERAL 1.01 SECTION INCLUDES Plastic laminate toilet compartments, urinal screens, head rail braced. 1.02

More information

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 10 - SPECIALTIES

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 10 - SPECIALTIES SECTION 105200 - FIRE-PROTECTION SPECIALTIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

SECTION PANELBOARDS. A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section.

SECTION PANELBOARDS. A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section. PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section. 1.2 SUMMARY A. This Section includes the

More information

DOOR HARDWARE SECTION DESIGN REQUIREMENTS GENERAL INFORMATION

DOOR HARDWARE SECTION DESIGN REQUIREMENTS GENERAL INFORMATION DOOR HARDWARE GENERAL INFORMATION 1.1 CU Morningside, Manhattanville, Nevis and Lamont Dougherty Campus have specific hardware requirements. Standardized door hardware, systems, and components are described

More information

SECTION FIRE EXTINGUISHER CABINETS

SECTION FIRE EXTINGUISHER CABINETS SECTION 104413 FIRE EXTINGUISHER CABINETS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and General Provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION INTEGRATED DOOR ASSEMBLIES

SECTION INTEGRATED DOOR ASSEMBLIES SECTION 08 17 10 INTEG DOOR ASSEMBLIES SPEC WRITER NOTE: Delete text between // // not applicable to project. Edit remaining text to suit project. PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Integrated

More information

SECTION &.40 DOOR HARDWARE

SECTION &.40 DOOR HARDWARE SECTION 08 71 00.10 &.40 DOOR HARDWARE PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

SPECIFICATION SECTION : FIRE RATED GLASS & FRAMING GPX Builders Series Temperature Rise Door Framing

SPECIFICATION SECTION : FIRE RATED GLASS & FRAMING GPX Builders Series Temperature Rise Door Framing Welcome to the SAFTIFIRST TM Guide Specification System prepared as an aid to specifiers in preparing written construction documents. For specification assistance with specific product applications, please

More information

C. Thresholds, weatherstripping, seals and door gaskets. A. ANSI/ICC A117.1 Standard for Accessibility and Usable Buildings and Facilities; 1998

C. Thresholds, weatherstripping, seals and door gaskets. A. ANSI/ICC A117.1 Standard for Accessibility and Usable Buildings and Facilities; 1998 SECTION 08 71 00 - Page 1 PART 1 GENERAL 1.1 SECTION INCLUDES A. Hardware for steel doors. B. Electrified door hardware. C. Thresholds, weatherstripping, seals and door gaskets. 1.2 RELATED SECTIONS A.

More information

SECTION DOOR HARDWARE HSC Guide Specification for Capital Construction. [Adjust to Suit Project]

SECTION DOOR HARDWARE HSC Guide Specification for Capital Construction. [Adjust to Suit Project] SECTION 08 71 00 DOOR HARDWARE HSC Guide Specification for Capital Construction [Adjust to Suit Project] PART 4 - GENERAL 4.1 GENERAL REQUIREMENTS A. Drawings and general provisions of the Contract, including

More information

SECTION GYPSUM PLASTER

SECTION GYPSUM PLASTER SECTION 09210 PART I - GENERAL 1.01 DESCRIPTION A. Scope: Work under this Section shall include all materials and installation for support of gypsum plaster used as a finish for partitions and ceilings

More information

B. Product Data: Provide manufacturers catalogue information. Indicate valve data and ratings.

B. Product Data: Provide manufacturers catalogue information. Indicate valve data and ratings. DIVISION 21 21 05 00 COMMON WORK RESULTS FOR FIRE SUPPRESSION PART 1 GENERAL 1.1 SECTION INCLUDES A. Pipe, fittings, sleeves, escutcheons, seals, and connections for sprinkler systems. 1.2 RELATED REQUIREMENTS

More information

Recommended location under the current MasterFormat 2004 is Section Elevator Door Smoke Containment System.

Recommended location under the current MasterFormat 2004 is Section Elevator Door Smoke Containment System. SMOKE GUARD SYSTEM MODEL 400 SPECIFICATION Smoke Guard, Inc. 287 N. Maple Grove Boise, ID 83704 Toll Free: 800.574.0330 Fax: 208.376.1600 e-mail: info@smokeguard.com website: http://www.smokeguard.com/

More information

SECTION AIR COILS

SECTION AIR COILS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Specification Sections, apply to this Section. B. Related Sections:

More information

SPECIFICATION SECTION : FIRE RATED GLASS & FRAMING GPX Builders Series Fire Protective

SPECIFICATION SECTION : FIRE RATED GLASS & FRAMING GPX Builders Series Fire Protective Welcome to the SAFTIFIRST TM Guide Specification System prepared as an aid to specifiers in preparing written construction documents. For specification assistance with specific product applications, please

More information

SPECIFICATION SECTION : FIRE RATED GLASS & FRAMING GPX Builders Series Fire Protective

SPECIFICATION SECTION : FIRE RATED GLASS & FRAMING GPX Builders Series Fire Protective Welcome to the SAFTIFIRST TM Guide Specification System prepared as an aid to specifiers in preparing written construction documents. For specification assistance with specific product applications, please

More information

SECTION (09950) - WALL COVERINGS

SECTION (09950) - WALL COVERINGS PART 1 GENERAL 1.01 SUMMARY A. Section Includes: SECTION 09 72 00 (09950) - WALL COVERINGS 1. Vinyl Wall Covering a. Furnished by Owner, installed by Contract 2. Prime Coat on Walls 3. Adhesives and Cleaning

More information

Northpointe Renovation EPN #1701 F/A Project #17027 September 8, 2017

Northpointe Renovation EPN #1701 F/A Project #17027 September 8, 2017 SECTION 104413 - FIRE PROTECTION CABINETS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

H BUTCH BROWNING FIRE MARSHAL BUILDING REHABILITATION

H BUTCH BROWNING FIRE MARSHAL BUILDING REHABILITATION STATE OF LOUISIANA Department of Public Safety and Corrections Office of State Fire Marshal Code Enforcement and Building Safety 8181 Independence Boulevard Baton Rouge, Louisiana 70806 225-925-4920 H

More information

A. Product Data: Include rated capacities, operating characteristics, furnished specialties, and accessories.

A. Product Data: Include rated capacities, operating characteristics, furnished specialties, and accessories. SECTION 238113 - PACKAGED TERMINAL AIR CONDITIONERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 12/12/2018

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 12/12/2018 SECTION 10 2800 - TOILET, BATH, AND LAUNDRY ACCESSORIES GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01

More information

UBC Technical Guidelines Section Edition Door Hardware Page 1 of 7

UBC Technical Guidelines Section Edition Door Hardware Page 1 of 7 Page 1 of 7 1.0 GENERAL 1.1 Related UBC Guidelines.1 Division 26.2 Division 28.3 Section 08 00 10 Openings General Requirements.4 Section 28 05 00 Common Work Results for Electronic Safety and Security.5

More information

1. Distribution panelboards. 2. Lighting and appliance branch-circuit panelboards. 3. Load centers.

1. Distribution panelboards. 2. Lighting and appliance branch-circuit panelboards. 3. Load centers. September 2012, rev. 00 26 2416 Panelboards PART 1. GENERAL 1.01 Summary A. Section includes: 1.02 Definitions 1. Distribution panelboards. 2. Lighting and appliance branch-circuit panelboards. 3. Load

More information

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS SECTION

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS SECTION SECTION 237433, PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to

More information

Recommended location under the current MasterFormat 2004 is Section Elevator Door Smoke Containment System.

Recommended location under the current MasterFormat 2004 is Section Elevator Door Smoke Containment System. SMOKE GUARD SYSTEM MODEL 600 REV. 3 SPECIFICATION Smoke Guard, Inc 287 Maple Grove Boise, ID 83704 Toll Free: 800.574.0330 Fax: 208.639.7851 e-mail: info@smokeguard.com website: http://www.smokeguard.com/

More information

DESIGN AND CONSTRUCTION STANDARDS SPECIFICATION GUIDELINES

DESIGN AND CONSTRUCTION STANDARDS SPECIFICATION GUIDELINES SECTION 10 00 00 - SPECIALTIES 10 28 12 - TOILET PARTITIONS: Owner Preferences: Solid core phenolic, polymer based solid surfacing, and solid plastic toilet compartment and screen systems. No Stainless

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 11/06/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 11/06/2017 SECTION 10 2800 - TOILET, BATH, AND LAUNDRY ACCESSORIES GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01

More information

SECTION ELECTRICAL IDENTIFICATION

SECTION ELECTRICAL IDENTIFICATION SECTION 16075 - ELECTRICAL IDENTIFICATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

EXAMPLE SPECIFICATION ONLY

EXAMPLE SPECIFICATION ONLY SECTION 097200 WALL COVERINGS PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Prime Agreement, including General and Supplementary Conditions, when referenced by the Prime

More information

ADDENDUM #3 DATE: August 8, 2018 Page 1 of 1. The Curators of the University of Missouri

ADDENDUM #3 DATE: August 8, 2018 Page 1 of 1. The Curators of the University of Missouri ADDENDUM #3 DATE: August 8, 2018 Page 1 of 1 TO CONTRACT DOCUMENTS ENTITLED: PROJECT MANUAL FOR: Women s and Children s Hospital New Water Service Main PROJECT NUMBER: CP172631 ADVERTISEMENT DATE: July

More information

DONALD H. BERG, ARCHITECT

DONALD H. BERG, ARCHITECT DONALD H. BERG, ARCHITECT DVA PROJECT 632-CSI-402 PET/CT ROOM #A0-10 RENOVATION BASEMENT LEVEL, BUILDING 200 ARCHITECT S PROJECT No. 0917-02 ADDENDUM NO. 1 JUNE 25, 2018 Page 1 of 1 ARCHITECTURAL 1. Specifications:

More information

SPECIFICATIONS: FIREGUARD CROSS CORRIDOR CC

SPECIFICATIONS: FIREGUARD CROSS CORRIDOR CC SPECIFICATIONS: FIREGUARD CROSS CORRIDOR CC SECTION 08 35 13.23 ACCORDION FOLDING FIRE DOORS PART 1 GENERAL 1.01 SUMMARY OF WORK A. Division 0 and 1, as indexed, apply to this section. B. Furnish and install

More information

.4 Do complete installation in accordance with latest Electrical Bulletins of the local inspection authority.

.4 Do complete installation in accordance with latest Electrical Bulletins of the local inspection authority. Fitness Facility Addition Page 1 1.1 CODES AND STANDARDS.1 Do complete installation in accordance with the latest edition of the CSA C22.1 as amended by the latest editions of the National Building Code

More information

SECTION LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES (600 VOLTS AND BELOW)

SECTION LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES (600 VOLTS AND BELOW) SECTION 26 05 21 PART 1 - GENERAL 1.1 DESCRIPTION This section specifies the furnishing, installation, and connection of the low voltage power and lighting wiring. 1.2 RELATED WORK A. Excavation and backfill

More information

About the Instructor & Presenter:

About the Instructor & Presenter: About the Instructor & Presenter: Paul G. Baillargeon, AHC, FDAI Vice President, Technical Consulting Door Security & Safety Foundation A noted veteran in the door and hardware industry, Mr. Baillargeon

More information

SECTION XPRESS II INCLINED WHEELCHAIR PLATFORM LIFT. Display hidden notes to specifier by using Tools / Options / View / Hidden Text.

SECTION XPRESS II INCLINED WHEELCHAIR PLATFORM LIFT. Display hidden notes to specifier by using Tools / Options / View / Hidden Text. SECTION 14 42 13 XPRESS II INCLINED WHEELCHAIR PLATFORM LIFT Display hidden notes to specifier by using Tools / Options / View / Hidden Text. PART 1 GENERAL 1.1 SECTION INCLUDES A. Indoor inclined platform

More information

SECTION AUTOMATIC TRANSFER SWITCHES

SECTION AUTOMATIC TRANSFER SWITCHES PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 36 23 SPEC WRITER NOTE: Use this section only for NCA projects. Delete between //--// if not applicable to project. Also, delete any other item or paragraph

More information

Recommended location under the current MasterFormat 2004 is Section Elevator Door Smoke Containment System.

Recommended location under the current MasterFormat 2004 is Section Elevator Door Smoke Containment System. SMOKE GUARD SYSTEM MODEL 200 SPECIFICATION Smoke Guard inc. 287 N. Maple Grove Boise, ID 83704 Toll Free: 800.574.0330 Fax: 208.639.7851 e-mail: info@smokeguard.com website: http://www.smokeguard.com/

More information

SECTION ELECTRICAL GENERAL PROVISIONS

SECTION ELECTRICAL GENERAL PROVISIONS PART 1 GENERAL 1.01 SECTION INCLUDES A. General provisions for Electrical Systems B. Wire and cable for 600 volts and less. C. Wiring connectors. D. Electrical tape. E. Heat shrink tubing. F. Wire pulling

More information

SECTION P01 LIGHTING AND APPLIANCE PANELBOARDS - A-SERIES

SECTION P01 LIGHTING AND APPLIANCE PANELBOARDS - A-SERIES PART 1 GENERAL A. The requirements of the Contract, Division 1, and Division 16 apply to work in this Section. 1.01 SECTION INCLUDES A. Lighting and appliance panelboards 1.02 RELATED SECTIONS A. 16475,

More information

Construction Standards Page

Construction Standards Page Construction Standards Page 236313-1 SECTION 236313 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

A. Product Data: For each electrical identification product indicated. B. Comply with 29 CFR and 29 CFR

A. Product Data: For each electrical identification product indicated. B. Comply with 29 CFR and 29 CFR September 2012, rev. 00 26 0553 Identification for Electrical Systems PART 1. GENERAL 1.01 Summary A. Section Includes: 1.02 Submittals 1. Identification for raceways. 2. Identification of power and control

More information

1.3 REFERENCE STANDARDS

1.3 REFERENCE STANDARDS SECTION 28 4600 FIRE DETECTION AND ALARM PART 1 -GENERAL 1.1 SECTION INCLUDES A. Fire alarm system design and installation, including all components, wiring, and conduit. B. Circuits from protected premises

More information

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II SECTION 104413 FIRE EXTINGUISHER CABINETS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

A. Furnish and install luminaires, lamps, ballasts and in-line fuses as herein specified and shown on the Drawings.

A. Furnish and install luminaires, lamps, ballasts and in-line fuses as herein specified and shown on the Drawings. DIVISION 26 ELECTRICAL SECTION 26 51 13 PART 1 GENERAL 1.01 DESCRIPTION A. Furnish and install luminaires, lamps, ballasts and in-line fuses as herein specified and shown on the Drawings. B. Luminaire

More information

1. Portable fire extinguishers. 2. Fire-protection cabinets for portable fire extinguishers.

1. Portable fire extinguishers. 2. Fire-protection cabinets for portable fire extinguishers. SECTION 10 44 13 - FIRE-PROTECTION SPECIALTIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

PROJ. NO SECTION PAGING, SPEAKERS AND HARD-WIRED CLOCK SYSTEMS

PROJ. NO SECTION PAGING, SPEAKERS AND HARD-WIRED CLOCK SYSTEMS SECTION 26 92 50 PAGING, SPEAKERS AND HARD-WIRED CLOCK SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

SECTION DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM

SECTION DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM SECTION 283111 - DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

UNIVERSITY OF ROCHESTER DESIGN STANDARDS FEBRUARY 2005MARCH 2007

UNIVERSITY OF ROCHESTER DESIGN STANDARDS FEBRUARY 2005MARCH 2007 SECTION 08710 - DOOR HARDWARE 1.1 SUMMARY A. Door hardware required for swinging doors. No pocket or folding doors permitted at U of R. 1.2 SUBMITTALS A. Hardware Schedule: To be coordinated with doors,

More information

B. Shop Drawings: For fire protection cabinets. Include plans, elevations, sections, details, and attachments to other work.

B. Shop Drawings: For fire protection cabinets. Include plans, elevations, sections, details, and attachments to other work. PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

More information

SECTION PACKAGED, OUTDOOR, CENTRAL-STATION AIR-HANDLING UNITS

SECTION PACKAGED, OUTDOOR, CENTRAL-STATION AIR-HANDLING UNITS SECTION 237413 - PACKAGED, OUTDOOR, CENTRAL-STATION AIR-HANDLING UNITS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes packaged, outdoor, central-station air-handling units (rooftop units) with the

More information

SECTION PANELBOARDS Painting Wire and Cable Overcurrent Protective Devices.

SECTION PANELBOARDS Painting Wire and Cable Overcurrent Protective Devices. SECTION 16470 PANELBOARDS PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 09900 - Painting. 2. 16120 - Wire and Cable. 3. 16475 - Overcurrent Protective Devices. 1.02 SYSTEM DESCRIPTION A. Performance

More information

SECTION ENCLOSED CONTROLLERS

SECTION ENCLOSED CONTROLLERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section. 1.2 SUMMARY A. This Section includes ac,

More information

LABORATORY AIR COMPRESSORS AND VACUUM PUMPING SYSTEMS

LABORATORY AIR COMPRESSORS AND VACUUM PUMPING SYSTEMS SECTION 22 20 00 LABORATORY AIR COMPRESSORS AND VACUUM PUMPING SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements",

More information

SECTION INCLINE WHEELCHAIR LIFTS. Display hidden notes to specifier by using Tools / Options / View / Hidden Text.

SECTION INCLINE WHEELCHAIR LIFTS. Display hidden notes to specifier by using Tools / Options / View / Hidden Text. SECTION 14 42 13 INCLINE WHEELCHAIR LIFTS Display hidden notes to specifier by using Tools / Options / View / Hidden Text. PART 1 GENERAL 1.1 SECTION INCLUDES A. Indoor inclined platform wheelchair lifts.

More information

Springpoint Architects, pc SECTION Childcare Center Architect s Project No TABLE OF CONTENTS Monroe County Comm. Sch. Corp.

Springpoint Architects, pc SECTION Childcare Center Architect s Project No TABLE OF CONTENTS Monroe County Comm. Sch. Corp. Volume 1 Bidding Requirements, Contract Forms, Conditions of the Contract, Division 1, Architectural and Site Specifications 000107 Certification Page 000110 Table of Contents DIV00 PROCUREMENT AND CONTRACTING

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-21 21 03.00 10 February 2009) ---------------------------------- Preparing Activity: USACE Superseding UFGS-21 21 03.00 10 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

B. Galvanized-Steel-Sheet Sleeves: inch minimum thickness; round tube closed with welded longitudinal joint.

B. Galvanized-Steel-Sheet Sleeves: inch minimum thickness; round tube closed with welded longitudinal joint. (816) 373-4878 U1208-01/FAI29-029 (573) 751-2624 SECTION 2 105 17 - SLEEVES AND SLEEVE SEALS FOR FIRE-SUPPRESSION PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the

More information

SECTION (15767) - UNIT HEATERS

SECTION (15767) - UNIT HEATERS SECTION 23 82 39 (15767) - UNIT HEATERS PART 1 GENERAL 1.01 SUMMARY A. Section includes: 1. Unit Heaters. 2. Cabinet Unit Heaters. 3. Duct Heaters. 4. Baseboard Heaters. B. Related Sections: 1. Section

More information

VACUUM BREAKER MEDIUM VOLTAGE AUTOMATIC TRANSFER SWITCHES

VACUUM BREAKER MEDIUM VOLTAGE AUTOMATIC TRANSFER SWITCHES Part One General 1.01 Scope A. It is the intent of this specification to provide a medium voltage automatic transfer system. B. All components, testing and services specified and required for a complete

More information

University of Houston Master Construction Specifications Insert Project Name SECTION DRY-PIPE FIRE SPRINKLER SYSTEM PART 1 - GENERAL

University of Houston Master Construction Specifications Insert Project Name SECTION DRY-PIPE FIRE SPRINKLER SYSTEM PART 1 - GENERAL SECTION 21 13 16 DRY-PIPE FIRE SPRINKLER SYSTEM PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section

More information

SECTION FIRE-SUPPRESSION STANDPIPES

SECTION FIRE-SUPPRESSION STANDPIPES PART 1 - GENERAL 1.1 DESCRIPTION Fire-suppression wet and manual dry standpipes. 1.2 SCOPE OF WORK SECTION 21 12 00 A. Design, installation and testing shall be in accordance with NFPA 14 except for specified

More information

DESIGN & CONSTRUCTION GUIDELINES

DESIGN & CONSTRUCTION GUIDELINES ADMINISTRATIVE SERVICES 4202 E. FOWLER AVENUE, FPC110 PHONE: (813) 974-2625 FACILITIES PLANNING & CONSTRUCTION TAMPA, FLORIDA 33620-7550 WEBSITE: USF.EDU/FPC DESIGN & CONSTRUCTION GUIDELINES DIVISION 21

More information

B. Shop Drawings: List of legends and description of materials and process used for premarking wall plates.

B. Shop Drawings: List of legends and description of materials and process used for premarking wall plates. SECTION 262726 - WIRING DEVICES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

ARBOR SERIES DIVISION FLEXIBLE WOOD VENEER WALLCOVERING

ARBOR SERIES DIVISION FLEXIBLE WOOD VENEER WALLCOVERING PART 1 - GENERAL 1.01 SUMMARY A. Provide wood wallcovering, complete. B. Related Sections 1. Section 165000 - Lighting: Permanent during installation. 2. Section 092500 - Gypsum Board: Wall Substrates.

More information

SECTION C. Section Cable Trays for Electrical Systems: Additional identification requirements for cable tray systems.

SECTION C. Section Cable Trays for Electrical Systems: Additional identification requirements for cable tray systems. SECTION 26 0553 PART 1 GENERAL 1.1 SECTION INCLUDES A. Electrical identification requirements. B. Identification nameplates and labels. C. Wire and cable markers. D. Voltage markers. E. Underground warning

More information

BRADLEY HALO EMERGENCY PLUMBING FIXTURES

BRADLEY HALO EMERGENCY PLUMBING FIXTURES BRADLEY HALO EMERGENCY PLUMBING FIXTURES Bradley Halo Emergency Plumbing Fixtures are a new generation in safety equipment, featuring separate supply and waste piping to eye/face wash, ergonomic hand activation

More information

NITROGEN-GENERATING SPRINKLER CORROSION INHIBITING SYSTEM

NITROGEN-GENERATING SPRINKLER CORROSION INHIBITING SYSTEM NITROGEN-GENERATING SPRINKLER CORROSION INHIBITING SYSTEM PART 1 - GENERAL 1.1 SUMMARY A. This section outlines the requirements for the nitrogen-generating sprinkler corrosion inhibiting system. The work

More information

THE LEDGE AT CABOT DRIVE. NASHVILLE, TN

THE LEDGE AT CABOT DRIVE. NASHVILLE, TN SECTION 087100 DOOR HARDWARE PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections,

More information

YORK COUNTY DEPARTMENT OF FIRE SAFETY BUILDING PLAN REVIEW REQUIREMENTS

YORK COUNTY DEPARTMENT OF FIRE SAFETY BUILDING PLAN REVIEW REQUIREMENTS YORK COUNTY DEPARTMENT OF FIRE SAFETY BUILDING PLAN REVIEW REQUIREMENTS The York County Department of Fire Safety reviews all commercial building plan submittals for compliance with the 2015 International

More information

SECTION AIR DUCT ACCESSORIES

SECTION AIR DUCT ACCESSORIES SECTION 23 33 00 AIR DUCT ACCESSORIES PART 1 - GENERAL 1.1 SUMMARY A. Section includes back-draft dampers, combination fire-and-smoke dampers, duct access doors, fire dampers, smoke dampers, volume control

More information

Sidney, Ohio 1204 FORMAL ISSUANCE OF CERTIFICATE OF SUBSTANTIAL COMPLETION... ON OR BEFORE JULY 30, 2015.

Sidney, Ohio 1204 FORMAL ISSUANCE OF CERTIFICATE OF SUBSTANTIAL COMPLETION... ON OR BEFORE JULY 30, 2015. SECTION 000050 - INVITATION AND NOTICE TO BIDDERS PROJECT: OWNER: 3003 Cisco Road Sidney, Ohio 45365 Ohio Presbyterian Retirement Services 1001 Kingsmill Parkway Columbus, Ohio 43229 ARCHITECT: 4685 Larwell

More information