SECTION 7 EVACUATION PROCEDURES
|
|
- Clyde McDaniel
- 5 years ago
- Views:
Transcription
1 SECTION 7 EVACUATION PROCEDURES 7.1 Refinery Evacuation Procedure Procedures for Operating Critical Equipment Prior to Evacuation Sulfur Recovery Unit Evacuation Procedure HF Alkylation Unit Evacuation Procedure Surrounding Community Evacuation Procedure Post Evacuation Personnel Accounting Procedure Evacuation Training and Drills Evacuation Wardens Refinery Personnel 5 Figure Contingency and Emergency Response Plan Procedures and Plant Evacuation Routes 6 March 2006 Page 7-1
2 7.1 REFINERY EVACUATION PROCEDURE Factor EVACUATION FACTORS Description Spill Flow Direction: Refer to SECTION Emergency Personnel Arrival Route: Water Currents, Tides, or Wave Conditions: Injured Personnel Transportation / Directions to the Nearest Hospital: Facility Shelter Location: Route will vary depending on location of Spill. Refer to SECTION N/A Leaving the refinery Main Gate, head west on Stinson Ave. Take Stinson Ave. to Hill Ave., Turn right (north) on Hill Ave. and go to 28 th Street, Turn left (west) on 28 th Street and go to Hammond Ave., Turn left (south) on Hammond Ave. to 34 th St., Turn right (west) on 34 th St. to the Emergency Room entrance of St. Mary s Hospital of Superior Facility is not intended for shelter in place emergencies such as fires, explosions, vapor clouds, etc. When an evacuation is signaled, personnel must recognize and avoid locations downwind of the emergency. Even after the initial evacuation perimeter has been established, it will be necessary to continuously monitor and reassess conditions since changes in the rate and volume of leakage, wind direction, speed, temperature, etc. could drastically alter the perimeter of the safe zone. There are no areas within the refinery that are an adequate distance from process equipment or tanks to be considered Safe Haven Areas, including existing buildings and control rooms. Therefore, all persons except those who are immediately involved in mitigating the incident will evacuate the facility when the evacuation signal is sounded. The prescribed evacuation routes are shown in FIGURE 7.1. Plant personnel have been instructed to take the following steps: Shut off all machinery and be sure equipment is out of the aisles to allow safe passage for other employees. Keep all aisles to exits and to fire fighting equipment free from obstructions at ALL times. Proceed quietly and orderly to the proper fire exit, unless otherwise instructed. REMEMBER, there is always time for an orderly and safe evacuation. Do not return for personal belongings. April 2010 Page 7-2 Technical Response Planning Corporation 2010
3 Upon exiting the facility, MOUSA personnel and contractors are to proceed to the nearest designated Assembly Area via the safest route, depending upon wind direction. Orange wind socks are strategically placed throughout the refinery to identify wind direction. If there is a vapor release, exit the refinery upwind out of the vapor cloud. Assembly Areas are indicated on FIGURE 7.1. Upon arrival at the Assembly Area, report to your supervisor so he/she can account for all his/her employees. Supervisor's will report to the MOUSA supervisory staff upon accounting for all employees. Egress from the Plant should be along main roadways, when possible, and not through process areas. Employees are not to leave the refinery assembly areas until given permission by their supervisor. All employees not assigned a task should remain in the assembly areas until given specific instructions for an assigned task. Upon completion of the assigned task, the employee will return to the staging area or assembly area to await further instructions. The employee will check in with the Staging Area Manager when he/she returns to the staging area. If in a vehicle, park off the roadway, turn off the engine, and leave the keys in the vehicle. Then proceed on foot to the nearest Assembly Area. Contractor and MOUSA supervisors will report to the Supervisor of Administrative Services and will check the head count with the security access system log-in. Supervisors will also provide additional instructions and specify initial isolation and protective action distances, depending on the emergency Procedures for Operating Critical Equipment Prior to Evacuation During an emergency incident, depending on the incident, shut down of certain critical plant operations may be delayed or not shut down at all. Shutdown of any unit or portion of the Refinery requires that the operator of that unit follow the proper procedures to ensure a safe shutdown, or a more severe emergency may develop as the result of an improper shutdown. Procedures are in place for those personnel who remain in the Refinery during an evacuation to monitor these selected plant operations until their evacuation becomes completely necessary. These procedures are included in the individual unit=s operating manuals. March 2006 Page 7-3
4 7.2 SULFUR RECOVERY UNIT EVACUATION PROCEDURE The Sulfur Recovery Unit (SRU) utilizes air monitors to detect the presence of hydrogen sulfide. Detection of hydrogen sulfide causes activation of red flashing lights and a continuous horn. All personnel working in the SRU must evacuate cross wind, then upwind to a safe area until the emergency subsides. 7.3 HF ALKYLATION UNIT EVACUATION PROCEDURE The HF Alkylation Unit utilizes red flashing warning lights to communicate the presence of hydrogen fluoride. These warning lights are manually activated if there is a suspected release. All personnel working in the HF Alkylation Unit must evacuate cross wind, then upwind to a safe area until the emergency subsides. 7.4 SURROUNDING COMMUNITY EVACUATION PROCEDURE The Incident Commander (most senior company official present at the site of the emergency) will assess the impact of the emergency on the community and will direct the main guard gate to notify local fire, police and hospitals if community evacuation is warranted. Initial isolation and protective action distances in all directions and downwind have been developed by the U.S. Department of Transportation (DOT) on the basis of a Gaussian dispersion model. These distances are only evacuation guidelines and protective action distances may be increased depending on circumstances. The Environmental Unit Leader will coordinate downwind air monitoring with the local authorities until the emergency has subsided, and protective action distances will be adjusted, accordingly. If community evacuation is warranted, it will be implemented in accordance with the Community Evacuation Plan developed by Douglas County Emergency Management. Additional procedures related to the alarm/notification system: Portable radios and telephones may also be used during an emergency. During an alarm, visitors will report to their respective MOUSA contact for instructions. 7.5 POST EVACUATION PERSONNEL ACCOUNTING PROCEDURE All personnel should be familiar with the procedures to account for employees after an emergency evacuation has been completed. These procedures are: The Supervisor of Administrative Services is responsible for accounting for all employees after an emergency. March 2006 Page 7-4
5 A written report of the head count will be given to the Incident Commander. The Incident Commander and appropriate agencies will be informed if any person is believed missing. Various personnel may try to account for a missing person. However, an employee will not place himself/herself or someone else at risk through his/her actions. 7.6 EVACUATION TRAINING AND DRILLS Evacuation Wardens All Maintenance Foremen will be trained as Evacuation Wardens to assist in the safe and orderly evacuation of personnel at the Refinery during regular hours. During off hours, Shift Foremen will act as Evacuation Wardens. Evacuation Wardens are trained in the Refinery layout and in the various escape routes available. The responsibility of the Evacuation Wardens are to assist in directing employees from danger locations to safe areas. Evacuation Wardens must also check rooms and other enclosed spaces in the refinery for employees who may be trapped or otherwise unable to evacuate the area. After the desired degree of evacuation is completed, the Wardens are to account for all employees in the safe area. In addition, Evacuation Wardens are made aware of handicapped personnel who may need additional assistance Refinery Personnel All personnel are briefed on evacuation procedures during periodic Emergency Response Plan review sessions. March 2006 Page 7-5
6
University of Maryland FIRE EVACUATION PLAN NATIONAL DENTAL MUSEUM POLICE FIRE MEDICAL EMERGENCY Anyone discovering excessive heat,
University of Maryland FIRE EVACUATION PLAN NATIONAL DENTAL MUSEUM POLICE - 711 FIRE - 711 MEDICAL EMERGENCY - 711 Anyone discovering excessive heat, smoke, or fire inside your building will immediately
More informationMulch fires, trash can fires, or other fire outside a building should be reported by the following methods:
University of Maryland FIRE EVACUATION PLAN HEALTH SCIENCE FACILITY I (HSF I) POLICE - 711 FIRE - 711 MEDICAL EMERGENCY - 711 Anyone discovering excessive heat, smoke, or fire inside your building will
More informationFIRE EVACUATION PLAN PRATT STREET PARKING GARAGE AND ATHLETIC CENTER POLICE FIRE MEDICAL EMERGENCY
University of Maryland FIRE EVACUATION PLAN PRATT STREET PARKING GARAGE AND ATHLETIC CENTER POLICE - 711 FIRE - 711 MEDICAL EMERGENCY - 711 Anyone discovering excessive heat, smoke, or fire inside your
More informationSCALES NW EMERGENCY ACTION PLAN
Purpose Each SCALES NW, INC location shall have a written Emergency Action Plan, appropriate to the hazards of the workplace, in order to respond to an emergency that may require rescue or evacuation.
More informationUniversity of Maryland FIRE EVACUATION PLAN Columbus Center POLICE FIRE MEDICAL EMERGENCY - 911
University of Maryland FIRE EVACUATION PLAN Columbus Center POLICE - 911 FIRE - 911 MEDICAL EMERGENCY - 911 Anyone discovering excessive heat, smoke, or fire will immediately sound an alarm and report
More informationEMERGENCY PREPAREDNESS & RESPONSE PROCEDURE
1 of 12 2 of 12 CONTENTS 1.0 OBJECTIVES...3 2.0 SCOPE...3 3.0 DEFINITION OF TERMS...3 4.0 RESPONSIBILITIES & AUTHORITIES...4 5.0...4 5.1 Emergency Scenario Identification...4 5.2 Emergency Response Team...4
More informationProperty Name & Address [ Property Name ] - [ Property Address ]
Emergency Procedure FIRE Property Name & Address [ Property Name ] - [ Property Address ] Purpose To ensure effective response and evacuation, by the property s Emergency Response Organization, to a fire
More informationKaufert Laboratory Building Emergency Plan
Kaufert Laboratory Building Emergency Plan Building #387 2004 FOLWELL AVENUE ST. PAUL, MN 55108 Information Desk Phone: 612-625-5200 Information Desk Email: bbe@umn.edu NEVER ENDANGER YOUR PERSONAL SAFETY
More informationTake your keys, coat, and any important information with you.
7. Responsibilities Building Emergency Team Building Emergency Teams are present in most buildings on campus. It is the function of the Building Emergency Team to assist and coordinate a prompt and organized
More informationKELSO HIGH SCHOOL EMERGENCY EVACUATION PROCEDURE
KELSO HIGH SCHOOL EMERGENCY EVACUATION PROCEDURE AIM The aim of the Emergency Evacuation procedure is to ensure the safe and speedy evacuation of the school buildings and to provide an accurate method
More informationUniversity of Maryland FIRE EVACUATION PLAN
University of Maryland FIRE EVACUATION PLAN PLAZA PARKING GARAGE POLICE - 711 FIRE - 711 MEDICAL EMERGENCY - 711 Anyone discovering excessive heat, smoke, or fire inside your building will immediately
More informationFIRE SAFETY POLICY and FIRE SAFETY ARRANGMENTS
FIRE SAFETY POLICY and FIRE SAFETY ARRANGMENTS The Joint Heads of Cundall Manor School have overall responsibility for ensuring that statutory fire precautions in relation to the Health & Safety at Work
More informationDutchess Community College. Emergency Action Plan. Conklin Hall College Residence
Dutchess Community College Emergency Action Plan Conklin Hall College Residence June 2014 1 TABLE OF CONTENTS Purpose Page 3 Introduction Page 3 Evacuation Page 4 Fire Emergencies Page 5 Evacuating Individuals
More informationEMERGENCY RESPONSE GUIDELINES
EMERGENCY RESPONSE GUIDELINES ROBERT MORRIS PROVIDED BY THE PUBLIC SAFETY DEPARTMENT AND THE UNIVERSITY SAFETY COMMITTEE 1921 412-397-2424 DO NOT REMOVE FROM THIS AREA INTRODUCTION CLASSROOM EMERGENCY
More informationLivingston Intl. Emergency Procedures Guide
Livingston Intl. Emergency Procedures Guide Table of Contents Introduction... 2 EMERGENCY CONTACTS... 3 Emergency Procedures... 3 Employee Responsibilities... 3 Management Responsibilities... 3 Fire Warden/Searcher
More informationInitial Version Revision No. 0 Next Review Date: Preparation: Safety Mgr Authority: President Issuing Dept: Safety Page: Page 1 of 6
Revision Preparation: Safety Mgr Authority: President Issuing Dept: Safety Page: Page 1 of 6 PURPOSE The emergency response plan designates safe assembly areas, emergency coordinators, and procedures to
More informationEmergency Action Plans (OSHA ) Abstract. Introduction. Emergency Action Plan (EAP) Elements of an EAP
1 Fire Protection Report Number: FP-45-10 Release Date: July 12, 2000 Section Title: Emergency Management Abstract OSHA 1910.38 requires employers of more than ten people to establish a written emergency
More informationEMERGENCY PREPAREDNESS: EVACUATIONS
GUIDELINE I. EMERGENCY PREPAREDNESS: EVACUATIONS 1.0 PURPOSE 1.1 To provide guidance for the safe and orderly evacuation of faculty, staff, students and visitors to the University of Pennsylvania campus
More informationBusiness Emergency Plan
Business Name Date Company Name Address Telephone Contact Name Title Last Revision Date Policy and Organizational Statements Identify the goals and objectives for the emergency response plan. Define what
More informationCrisis Response Manual
Crisis Response Manual The procedures listed in this manual are provided for ready reference by all AlphaBEST staff should a drill or an actual emergency occur. 1. The Site Manager will secure a copy of
More informationPollution Incident Response Management Plan
Pollution Incident Response Management Plan Location - 129 Mitchell Avenue, Kurri Kurri Nearest Cross Street - Johnson Avenue, Kurri Kurri Enter from - Mitchell Avenue, Kurri Kurri Version 6 August 2017
More informationAL NOORI MUSLIM SCHOOL. Emergency Evacuation and Lockdown Policy Policies & Documents
AL NOORI MUSLIM SCHOOL Emergency Evacuation and Lockdown Policy Policies & Documents Year 2016 2 Table of Contents Introduction... 3 Evacuation Procedure... 4 Staff Instructions... 5 Principal/Welfare
More informationCITY AND COUNTY OF DENVER
CITY AND COUNTY OF DENVER DEPARTMENT OF SAFETY FIRE POLICE SHERIFF 9-1-1 COMMUNITY CORRECTIONS CRIME PREVENTION & CONTROL SAFE CITY Office of Fire Prevention Denver Fire Department 745 W. Colfax Avenue
More informationCOUNTY OF ALAMEDA County Administrator s Office Risk Management Unit th Street, 3 rd Floor, Oakland, CA 94607
SAMPLE COUNTY OF ALAMEDA County Administrator s Office Risk Management Unit 125 12 th Street, 3 rd Floor, Oakland, CA 94607 EMERGENCY ACTION PLAN (As of October 2010) TO REPORT AN EMERGENCY: 1. Activate
More informationEmergency Evacuation Plan South Patterson Building (SPB)
Emergency Evacuation Plan 1700 South Patterson Building (SPB) 2014 Table of Contents Section I: Purpose and Objectives Section II: General Guidelines Section III: Responsibilities of Emergency Coordinator
More information(Fire) Emergency Evacuation Plan
LAZARI INVESTMENTS LIMITED (Fire) Emergency Evacuation Plan Lazari Investments Maple House 149 Tottenham Court Road London W1T 7BN Version: September 2016 MKDS (Services) Ltd Fire Safety Services & Solutions
More informationEmergency Procedures for Clients
Emergency Procedures for Clients We are happy to welcome you to our facility, and we want you to know that your event is very important to us. We plan to do everything possible to ensure that your event
More informationFire Evacuation Manual
Fire Evacuation Manual PIONEER HOME OF THE PLAZA CLUB PLAZA PIONEER HOME OF THE PLAZA CLUB PLAZA Fire Evacuation Manual Table of Contents: Section 1: Overview 1 Section 2: The Evacuation Team 2-3 Section
More informationSection 3. Preparedness. Shelton School District Emergency Response Plan
Section 3 Preparedness Preparedness Preparedness: Developing a School-Based Emergency Plan...3.1 Importance of Preparedness...3.1 Organization of this Preparedness Section...3.1 Developing a Site-Specific
More informationKEARNS HIGH SCHOOL. Memo No. 33 August, 2010
KEARNS HIGH SCHOOL Memo No. 33 August, 2010 SUBJECT: EMERGENCY PREPAREDNESS PLAN This plan is developed to be used in case of fire, blizzard, earthquake, nuclear attack, bomb in building, civil disturbances,
More informationHarvard University - OEB Glasshouse Emergency Evacuation Plan
Harvard University - OEB Glasshouse Emergency Evacuation Plan Table of Contents Section I: Purpose and Objectives Section II: General Guidelines Section III: Responsibilities of Emergency Coordinator and
More informationEMERGENCY RESPONSE/ FIRE PREVENTION
10.0 ARKANSAS TECH UNIVERSITY EMERGENCY RESPONSE/ FIRE PREVENTION This Emergency Response / Fire Prevention Plan has been developed for the Office of Facilities Management to comply with Local, State and
More informationGREAT DENHAM PRIMARY SCHOOL FIRE SAFETY POLICY September 2017
GREAT DENHAM PRIMARY SCHOOL FIRE SAFETY POLICY September 2017 OBJECTIVE This policy is designed to help our school comply with our duties under the Regulatory Reform (Fire Safety Order) 2005. Contents:
More informationEmergency Action Plan
Emergency Action Plan Within this document is a model Emergency Action Plan for you to develop after you have performed your risk assessment and gathered key individuals to maintain responsibility in development,
More informationCharlotte Building, 17 Gresse Street, London W1T 1QL
Charlotte Building, 17 Gresse Street, London W1T 1QL Fire Safety Management & Evacuation Procedures Contents 1.0 Introduction 2.0 Means of Escape in Case of Fire 3.0 Means for Giving Warning in Case of
More informationRAMBLER PARK FIRE SAFETY INFORMATION
RAMBLER PARK FIRE SAFETY INFORMATION Parmenter Realty Partners 7557 Rambler Rd. Dallas, Texas 75231 214-373-9561 214-373-9620 (fax) RAMBLER PARK RAMBLER PARK FIRE SAFETY INFORMATION II. Objective To provide
More informationEmergency Action Plan Program
Page 1 Emergency Action Plan Program Daniel Schmid 4-7-17 Dan Schmid Safety Director Todd Osman 4-10-17_ Dave Gelhar 4-11-17 Todd Osman Dave Gelhar RVI President SpecSys President Page 2 Table of Contents
More informationAlternate Evacuation Route B: Secondary direction of egress considered safe with the information available.
SOG NUMBER: MC-ER-04 REVISION NO: 13 PAGE 1 OF 5 I. PURPOSE To identify and establish Emergency Action and Response plans for regulatory compliance and to provide an operational framework for emergency
More information[Name/title] is the Alternate Safety Officer/ Alternate Emergency Coordinator.
Community Health Center ================================================================= Subject: EMERGENCY EVACUATION PROCEDURE ================================================================= Policy
More informationEmergency Procedures Policy
Emergency Procedures Policy Evacuation, Lockdown and Lockout Policies and Procedures Safe and Supportive Environment Address: 22A Cedar Ave, West Croydon SA5008 Tel: (08) 8340-7799 Email: info@aic.sa.edu.au
More informationEmergency Evacuation Plan. Kettering Labs. School of Engineering
Emergency Evacuation Plan Kettering Labs School of Engineering May 2018 Table of Contents Section I: Purpose and Objectives Section II: General Guidelines Section III: Responsibilities of Emergency Coordinator
More informationFire Evacuation Plan Bressler Research Building. UMB POLICE or
UMB POLICE - 711 or 410-706-3333 If you discover fire, smoke, or excessive heat inside your building, immediately: 1. Activate fire alarm by pulling manual fire alarm pull station (located near exits)
More informationEmergency Evacuation Plan
Emergency Evacuation Plan Scope and Applicability This procedure applies to a wide variety of emergencies both man-made and natural which may require a workplace to be evacuated. These emergencies include
More informationEmergency Evacuation Plan and Implementation Guidelines The Pennsylvania State University
Emergency Evacuation Plan and Implementation Guidelines The Pennsylvania State University DOWNTOWN THEATRE CENTER (0998-141) SEPTEMBER 2015 Table of Contents Introduction Implementation Guidelines and
More informationSchool EMERGENCY PLAN
School EMERGENCY PLAN The following outline covers the main criteria for emergency guidelines for this facility and its operations. The outline will be under review with local officials and details are
More informationFire Prevention and Procedures Policy
Fire Prevention and Procedures Policy Last Reviewed: October 2017 Next review due: October 2018 Policy Owner: School Business Manager Policy Statement Lyndhurst School is committed to ensuring that, as
More informationINDUCTION PACK. for Supply Workers, Contractors, Consultants and Volunteers. at Woodcroft Primary School. Keeping Children Safe In Education
1 INDUCTION PACK for Supply Workers, Contractors, Consultants and Volunteers at Woodcroft Primary School This Induction Pack was issued to: Contents: SECTION 1 SECTION 2 SECTION 3 SECTION 4 SECTION 5 APPENDIX
More informationFire Evacuation Plan Davidge Hall. UMB POLICE or
UMB POLICE - 711 or 410-706-3333 If you discover fire, smoke, or excessive heat inside your building, immediately: 1. Activate fire alarm by pulling manual fire alarm pull station (located near exits)
More informationEmergency Action Plan For All City Facilities. Employee Orientation
Emergency Action Plan For All City Facilities Employee Orientation 2014 INTRODUCTION Workplace emergencies can have a significant impact on employees, citizens and visitors, as well as interrupt city services.
More informationEMERGENCY EVACUATION POLICY FOR 100 CHEROKEE STREET BUILDING
EMERGENCY EVACUATION POLICY FOR 100 CHEROKEE STREET BUILDING In the event of a fire or other emergency, seconds count. The safe, orderly and prompt evacuation of building occupants depends on having the
More informationFACILITY OF EMERGENCY PLAN. (Template)
FACILITY OF EMERGENCY PLAN (Template) Date: Table of Contents RECORD OF AMENDMENTS... 2 DISTRIBUTION LIST... 3 EMERGENCY PLAN AUTHORIZATION... 4 INTRODUCTION... 5 PURPOSE... 6 AIM... 6 ACTIVATING AND IMPLEMENTING
More informationAlternate Evacuation Route B: Secondary direction of egress considered safe with the information available.
SOG NUMBER: MC-ER-04 REVISION NO: 10 PAGE 1 OF 5 I. PURPOSE To identify and establish Emergency Action and Response plans for regulatory compliance and to provide an operational framework for emergency
More informationFIRE SAFETY PLAN ADMINISTERED BY: DEPARTMENT OF ENVIRONMENTAL HEALTH AND SAFETY
FIRE SAFETY PLAN ADMINISTERED BY: DEPARTMENT OF ENVIRONMENTAL HEALTH AND SAFETY WRIGHT STATE UNIVERSITY FIRE SAFETY PLAN INTRODUCTION: Occupational Safety and Health (OSHA) standards for fire safety are
More informationDEF Fire Evacuation and Emergency Planning Criteria
DEF Fire Evacuation and Emergency Planning Criteria This criteria should be used to devise individual DEF specific fire evacuation and emergency plans. It is the responsibility of the Clinic Team Leader
More informationHaecker Hall Building Emergency Plan
Haecker Hall Building Emergency Plan Building 350 1364 Eckles Avenue, St. Paul, MN 55108 Information Desk Phone: 612-624-2722 Information Desk Email: bjrae@umn.edu NEVER ENDANGER YOUR PERSONAL SAFETY Building
More informationPeninsula Dental Social Enterprise (PDSE)
Peninsula Dental Social Enterprise (PDSE) Fire Safety Policy and Procedure Version 2.0 Date approved: September 2016 Approved by: The Board Review due: September 2017 Policy will be updated as required
More informationFIRE AND EMERGENCY EVACUATION PROCEDURES STARCROSS PRIMARY SCHOOL
FIRE AND EMERGENCY EVACUATION PROCEDURES STARCROSS PRIMARY SCHOOL This document details the fire and emergency evacuation procedures for the premises. Staff should ensure that they are familiar with these
More informationFire Safety Code of Vienna University of Technology
Fire Safety Code of Vienna University of Technology 1 General provisions 2 Scope of application 3 Responsibility and jurisdiction 4 General obligations to cooperate 5 Training and instruction of members
More informationHazard Zone Locations: HAZARD ZONE CHECKLIST
LOGO HAZARD ZONE CHECKLIST Hazards, Risks, and Threats Levels of Concern Fire Control Measures Defensive Action Objectives Reference: SIMPLE Playbook and SOP s Hazard Zone Locations: Generally Applied
More information161 Rosebery Avenue, London, EC1 Fire Safety Management Plan & Evacuation Procedures
161 Rosebery Avenue, London, EC1 Fire Safety Management Plan & Evacuation Procedures Contents 1.0 Introduction 2.0 Means of Escape in Case of Fire 3.0 Means for Giving Warning in Case of Fire 4.0 Means
More informationThe Dell Out of School Club
Page 1 of 5 FIRE SAFETY The Dell is vigilant in ensuring that the risk of fire is kept to a minimum. This involves clear, well-understood procedures in the case of fire. Staff and volunteers must be able
More informationFire Safety Plan (FSP) Review Checklist 1
Fire Safety Plan (FSP) Review Checklist 1 (Component of a BC Fire Code (BCFC) compliance inspection) COMPANY INFORMATION Company name: Building Name: Address: Street # and name City/Province Postal Code
More information5.0 CONTINGENCY PLAN. It is necessary to amend the plan if:
5.0 CONTINGENCY PLAN This Contingency Plan for the Safety-Kleen Systems, Inc. - Denton Recycle Center is prepared in accordance with the requirements of 40 CFR 264 Subpart D and 40 CFR 264.37. The intent
More informationFire Safety Plan (FSP) Review Checklist 1
Fire Inspection & Prevention Initiative Fire Safety Plan (FSP) Review Checklist 1 (Component of a BC Fire Code (BCFC) compliance inspection) Date: COMPANY INFORMATION Company Name: Building Name: Address:
More informationFire Evacuation Plan Health Sciences & Human Services Library. UMB POLICE or
UMB POLICE - 711 or 410-706-3333 If you discover fire, smoke, or excessive heat inside your building, immediately: 1. Activate fire alarm by pulling manual fire alarm pull station (located near exits)
More informationDUNCAN STUDENT CENTER. Emergency Action Plan
DUNCAN STUDENT CENTER Emergency Action Plan August 21, 2017 DUNCAN STUDENT CENTER - EMERGENCY ACTION PLAN An emergency action plan describes the actions employees should take in case of fire or other emergency
More informationFire and Bomb. Evacuation Policy
Fire and Bomb Evacuation Policy January 2017 1 FIRE SAFETY 1. PROCEDURE Manford Primary School follows procedures on the Blue Dot RIDDER poster. Any person discovering a fire must sound the alarm immediately
More informationJL Office Tower Emergency Action Plan
JL Office Tower Emergency Action Plan Presented By: Sabrina Swanson Senior Property Manager JL Properties, LLC. Purpose Discuss Evacuation Procedures Outline Responsibilities of the Evacuation Brigade
More informationEmergency Response Planning
Emergency Response Planning Dan Sadler, CBCP Sr. Business Continuity Planning Analyst Emergency Response Planning Plans Awareness Drills/Exercises Plans Proactive Approach Site Risk Assessments Interviews
More informationEMERGENCY EVACUATION PROCEDURE Temporary Instructions w.e.f 5 th September 2018
EMERGENCY EVACUATION PROCEDURE Temporary Instructions w.e.f 5 th September 2018 INTRODUCTION This document outlines the main procedures to be followed in the event of a fire incident at Sir Christopher
More informationFIRE PROCEDURES 1. APPOINTMENTS
12b FIRE PROCEDURES 1. APPOINTMENTS Responsible Person In compliance with the Regulatory Reform (Fire Safety) Order 2005 (FSO), the School s Head, Mrs C Cameron is appointed as the Responsible Person for
More informationCampus Emergency Response Plan Standard Operating Procedure
Campus Emergency Response Plan Standard Operating Procedure August 2015 Austin Campus Brownsville Campus Corpus Christi Campus Harlingen Campus Pharr Campus San Antonio South Campus San Antonio North Campus
More information"EVACUATION PROCEDURES"
PRESENTER'S GUIDE "EVACUATION PROCEDURES" Part of the "SAFETY MEETING KIT" Series Quality Safety and Health Products, for Today...and Tomorrow OUTLINE OF MAJOR PROGRAM POINTS OUTLINE OF MAJOR PROGRAM POINTS
More informationLeader s Guide Marcom Group Ltd.
1520 EVACUATION PROCEDURES Leader s Guide Marcom Group Ltd. Structure and Organization Information in this program is presented in a definite order so that employees will see the relationships between
More informationFIRE EMERGENCY PLAN PHYSICS BUILDING
FIRE EMERGENCY PLAN FOR THE PHYSICS BUILDING UNIVERSITY OF SASKATCHEWAN SASKATOON FIRE-20071023.doc Maintained by Yannis Pahatouroglou CONTENTS I. REASONS FOR THE PLAN 3 II. PURPOSE OF THE PLAN... 3 III.
More informationUNIVERSITY OF WEST GEORGIA Crisis Management Plan. Prepare. Respond. Recover.
UNIVERSITY OF WEST GEORGIA Crisis Management Plan.. Recover. Crisis Management Plan.. Recover. Safety and preparation is a responsibility for everyone, both for yourself and for the University of West
More informationEmergency Action Plan
The San Francisco Conservatory of Music Emergency Action Plan Revised January 4, 2013 2 Table of Content Emergency Phone Numbers... 5 Emergency Information Phone Numbers... 5 Emergency Alert Radio Stations...
More informationBoard Policy 6819 Fire Safety and Prevention Plan
Board Policy 6819 Fire Safety and Prevention Plan The West Hills Community College District is committed to the safety of faculty, staff, students and visitors. The Fire Safety and Prevention Plan is designed
More informationMcLean High School 2017 All-Night Graduation Party. Volunteer Security and Emergency Procedures. Emergency Contact Information
McLean High School 2017 All-Night Graduation Party Volunteer Security and Emergency Procedures Date June 15, 2017 June 16, 2017 Time Location 11:00 pm 4:30 am Set-up scheduled to be completed by 10:00
More informationEmergency Evacuation Plan and Implementation Guidelines The Pennsylvania State University BLUE BAND BUILDING ( )
Emergency Evacuation Plan and Implementation Guidelines The Pennsylvania State University BLUE BAND BUILDING (0761-000) OCTOBER 2017 Table of Contents Introduction Implementation Guidelines and Instructions
More informationHEALTH AND SAFETY FIRE SAFETY POLICY Putnoe Primary School
HEALTH AND SAFETY FIRE SAFETY POLICY Putnoe Primary School OBJECTIVE This Fire Safety Policy is designed to help Putnoe Primary School comply with their duties under the Regulatory Reform (Fire Safety
More informationNon-Emergency Direct Line Telephone Numbers. Emergency Direct Line Telephone Numbers
Introduction The Emergency Evacuation Plan (EEP) is the building s official response to fire and other life safety emergencies, and serves as an operational guide for the security and protection of building
More informationREGULATORY REFORM (FIRE SAFETY) ORDER 2005 FIRE EMERGENCY PLAN
REGULATORY REFORM (FIRE SAFETY) ORDER 2005 FIRE EMERGENCY PLAN This Emergency Plan has been developed following fire risk assessments of the relevant building. The purpose of the Plan is to ensure the
More informationExit Routes. Introduction/Overview. OSHA Regulations. Exit Route
Exit Routes Introduction/Overview Knowing how to evacuate your workplace is very important for your safety. An evacuation may be required for a number of different emergencies, including: Fire or smoke
More informationEVACUATION PLAN FOR THE CLINTON COUNTY OFFICE BUILDING
EVACUATION PLAN FOR THE CLINTON COUNTY OFFICE BUILDING James R. Langley, Jr. Chairman, Clinton County Legislature 2002 Table of Contents Section I: General Considerations and Planning Guidelines Introduction
More informationProject: Location: Date Prepared: Last Reviewed:
Project: Location: Date Prepared: Last Reviewed: Contents Premises Essential Information 4 Definitions & Acronyms 5 Introduction 5 Building Description and Safety Systems 7 General Strategy, Responsibilities
More informationOctober 1, Full *2 Sprinkler System
School of Visual Arts Safety Report In compliance with the federal Jeanne Clery Disclosure of Campus Security Policy and Campus Crime Statistics Act {20 U.S.C. 1092(f)} October 1, 2016 Introduction The
More informationX0.01 Emergency Management. Approved: September 27, 2002 Revised: July 15, Next Scheduled Review: July 15, 2014 PROCEDURE STATEMENT
Texas A&M AgriLife Extension Service Procedures 34.07.99.X0.01 Emergency Management Approved: September 27, 2002 Revised: July 15, 2012 Next Scheduled Review: July 15, 2014 PROCEDURE STATEMENT Texas A&M
More informationEMERGENCY ACTION PLAN
Preparation: Safety Mgr Authority: President Issuing Dept: Safety Page: Page 1 of 17 Purpose Each location shall have a written Emergency Action Plan, appropriate to the hazards of the workplace, in order
More informationSam Houston State University Emergency Response Plan
Sam Houston State University Emergency Response Plan Emergency Telephone Numbers University Police Dispatch 936-294-1000 (24-hours) Environmental Health & Safety 936-294-1921 (8 am -5 pm) Walker County
More informationSafety Manual: Emergency Response
Safety Manual: Emergency Response January, 2017 6.0 Emergency Preparedness Introduction This Chapter provides guidelines for dealing with Emergencies. Fires, no matter how small, must be reported to management
More informationFire. This policy applies to all members of our school community, including those within the EYFS setting.
Fire Contents Pages Policy Statement 1 Policy 1-3 Fire Procedures 3-4 Out of Hours 4 Visitors 4 Fire Prevention Measures 5-6 Fire Safety Checks and Records 6-7 All Employees should 7 Risk Assessment on
More informationEmergency Planning and Preparedness
Emergency Planning and Preparedness Writing an Emergency Evacuation Plan A thorough emergency plan will include the following components: The procedure for reporting emergencies The procedure for relocating
More informationFire Safety Protocol
CORPORATE HEALTH AND SAFETY POLICY: Part 3 Arrangements Fire Safety Protocol Document Status: [ ] Guidance for Managers [] Protocol [ ] Procedures Version 0.1/ August 2013 DRAFT EALING NCIL Table of Contents
More informationEmergency Evacuation Plan
Emergency Evacuation Plan A Guide to Help Episcopal Churches Reduce Risk to People and Property in the Event of a Fire 2000 Church Risk Management Services INDEX I. Emergency Action Planning General list
More informationFIRE EMERGENCY POLICY
University Policies and Procedures 11-01.01 FIRE EMERGENCY POLICY I. Policy Statement: This is a statement of official University policy for the reporting of fire emergencies and for the evacuation of
More informationSection 5 Brieser Construction SH&E Manual
Brieser Construction SH&E Manual May 31 2011 The purpose for this procedure is to identify organizational responsibilities needed to manage in the event of a disaster or emergency evacuation. This procedure
More informationCORPORATE SERVICES HEALTH AND SAFETY
CORPORATE SERVICES HEALTH AND SAFETY Mandate OHS Act No 85, 1993 Every employer which employs more than 20 person must comply with the OHS Act. To provide for the health and safety of persons at work and
More informationEmergency Response Team Plan. Shoal Island Office
Emergency Response Team Plan Shoal Island Office EMERGENCY RESPONSE TEAM LOCATION LIST ERT Team Leader Ed James (246-5452) Top Floor ERT Members Danny Anderson (246-5459) Main Floor ERT Members Ed Sinclair
More informationSAFETY BEGINS WITH YOU!
EMERGENCY PREPAREDNESS QUICK-REFERENCE GUIDE NOTE: This guide is intended for employees who occupy buildings on the University of Colorado Anschutz Medical Campus. University of Colorado Hospital has a
More information