Kramer RAS Removal. Presentation to RASRS. Edison Team Members: Bill Z. Zhang, Protection Engineering Haroun Idris, Electric System Planning

Size: px
Start display at page:

Download "Kramer RAS Removal. Presentation to RASRS. Edison Team Members: Bill Z. Zhang, Protection Engineering Haroun Idris, Electric System Planning"

Transcription

1 Kramer RAS Removal Edison Team Members: Bill Z. Zhang, Protection Engineering Haroun Idris, Electric System Planning Presentation to RASRS November 14, 2018

2 Objective APPROVAL TO remove SCE s Kramer RAS (SOB-209) 2 Southern California Edison

3 Objective Introduction/Background Purpose and operating principles Protection design requirements 3 Southern California Edison

4 Kramer RAS The existing Kramer RAS (SOB-209) is designed to prevent thermal overload and system instability under loss of the Kramer-Inyokern- Randsburg No kv line. The appropriate generation resource is armed or disarmed based on the status of the Inyo phase shifter (PS) and the total power flow on the Kramer-Inyokern-Randsburg No. 1 & No kv lines metered at Kramer substation Line Flow (Inyo PS not In Service) Line Flow (Inyo PS In Service) Arming Requirement 150 MW 160 MW Arm Calgen or McGen (retired) 200 MW 210 MW Arm remaining generator As of December 1, 2014, ACE Cogeneration Company retired its McGen facility with a total capacity of 108 MW 4 Southern California Edison

5 Kramer RAS Map Inyokern Sub Randsburg Sub Kramer Sub 5 Southern California Edison

6 Kramer/Bishop RAS Area Diagram To Dixie Valley (NVE) Bishop Creek Units 2-4 Morgan 55 KV (LDWP) Inyo Haiwee (LDWP) Coso Control Oxbow Mt. Tom 55 KV Calgen 55 KV BISHOP RAS AREA BLM West Downs BLM East Navy 2 McGen (Retired) Inyokern Searles KRAMER RAS AREA Randsburg Mogen (Retired) Sungen LSP Borax Edwards Southbase Holgate Rocket Test Kramer 6 Southern California Edison Legend (#) 500 kv line 230 kv line 115 kv line Non-SCE owned lines (any color line) No. of lines (any color line) Phase Shifter

7 Interface Line Flow (MW) Kramer RAS Review The maximum total path flow on the Kramer-Inyokern-Randsburg No. 1 & No kv lines trended for 2016 is 107 MW, 2015 is 92 MW, and 179 MW for The downward trend from 2014 can be attributed to the generation retirement at McGen (108 MW) Inyokern-Randsburg-Kramer Path 115 kv HOURS 2014 DATA 2015 DATA 2016 Data 7 Southern California Edison

8 Kramer RAS Review (cont.) A 2017 study case was developed with maximum flows on Kramer- Inyokern-Randsburg No. 1 and No kv lines Under off peak load conditions Max. generation on-line in North of Inyokern area With and without Inyo phase shifter in-service Maximum total path flow achieved on Kramer-Inyokern-Randsburg No. 1 and No kv lines was: 115 MW with Inyo PS in-service 120 MW with Inyo PS NOT in-service Total path flow greater than 120 MW on the path is difficult to achieve with existing generation and the retirement of 108 MW at McGen facility. The Kramer RAS is not required at current generation levels and is not triggered at the maximum achievable path flow of 120 MW with the P1 contingency of the Kramer-Inyokern-Randsburg No kv line. The existing Kramer RAS describes the current procedure used to curtail and maintain Inyokern/Bishop area generation as a mitigation for a forced/scheduled outage of either Kramer-Inyokern-Randsburg No. 1 or No kv transmission lines 8 Southern California Edison

9 Conclusion Because the Kramer RAS is obsolete due to the retirement of the 108 MW McGen project and also not WECC compliant, SCE believes it should be retired. In the event future generation(s) materializes in the area and/or a reliability project reconfigures the system topology in the area which could result in increased flow on the Kramer-Inyokern-Randsburg lines, a new WECC-compliant RAS will be proposed to address potential overloads and/or dynamic instability. 9 Southern California Edison

10 Protection relays to be removed Substation No. of Relays Relay Type Designation Comments Kramer: 3 ASEA RXIL Undercurrent Relays: Monitors Inyokern 115kV Line Monitors Lugo No kV Line Monitors Lugo No kV Line 4 RFL-6745-RX 1B 5B 5C 5D Receive from: Inyokern Lugo 1AA & 2AA Lugo (Kramer No. 1 Line) Lugo (Kramer No. 1 Line) 5 RFL-6745-TX/RX 5 RFL-Logic Devices 2A 2B 4A 4B 4C 3F 3H 3J 3K 3L Transmit/Receive To: Coolwater CT31 Coolwater CT 32 Coolwater CT 41 Coolwater CT 42 McGen Test Logic Alarm Test Alarm Test Trip Matrix Arming Sw. Interface 10 Southern California Edison

11 Protection relays to be removed (cont d) Lugo: 3 ASEA RXIL Undercurrent Relays: Monitors 1AA (BDD Ckt) Monitors 1AA (T60 Ckt) Monitors 2AA (BDD Ckt) 3 ASEA RXIL Undercurrent Relays: Monitors 2AA (T60 Ckt) Monitors Kramer No kV Line Monitors Kramer No kV Line Inyokern: 3 RFL-6745-TX Transmit to Kramer: 1AA and 2AA Status Kramer No kV Line Status Kramer No kV Line Status 1 RFL Device 85T-1 Auto Test (Not in Service) 1 ASEA RXIL Undercurrent Relay: Monitors Kramer 115kV Line 1 RFL-6745-TX 85-1 Transmit to Kramer: Kramer 115kV Line Status 1 RFL-6745-RX 85-2 Receive From Kramer: Trip CalGen Signal 1 RFL Device Generator Test (Not in Service) 11 Southern California Edison

12 Protection relays to be removed (cont d) Generators: Coolwater: 4 RFL-6745-RX/TX Receive from Kramer: Trip CT-31 Trip CT-32 Trip CT-41 Trip CT-42 McGen: 1 RFL-6745-RX/TX 85 Receive from Kramer: Trip McGen CalGen No Relays Receives trip directly from Inyokern 12 Southern California Edison

13 Questions 13 Southern California Edison

14 SCE is requesting approval to Remove SCE s Kramer RAS (SOB-209) 14 Southern California Edison

15 Thank You! 15 Southern California Edison

Synchrophasor Technology in Control Centers Clemson University, SC March 12, 2014 Vikram S. Budhraja

Synchrophasor Technology in Control Centers Clemson University, SC March 12, 2014 Vikram S. Budhraja Clemson University Power Systems Conference Synchrophasor Technology in Control Centers Clemson University, SC March 12, 2014 Vikram S. Budhraja Outline Synchrophasor Technology Infrastructure Lessons

More information

Innovative Real-Time Contingency Analysis Enhancements for Transmission Operations

Innovative Real-Time Contingency Analysis Enhancements for Transmission Operations Innovative Real-Time Contingency Analysis Enhancements for Transmission Operations Xiaodong Liu Trevor W. Tessin Richard A. Flynn 2016 IEEE PES General Meeting, Boston July 17-21, 2016 Outline Eversource

More information

POWER SYSTEM INCIDENT REPORT: TRIP OF DOUBLE CIRCUIT MACKAY- COLLINSVILLE TEE - PROSERPINE 132 KV LINES AND STRATHMORE SVC ON 29 DECEMBER 2010

POWER SYSTEM INCIDENT REPORT: TRIP OF DOUBLE CIRCUIT MACKAY- COLLINSVILLE TEE - PROSERPINE 132 KV LINES AND STRATHMORE SVC ON 29 DECEMBER 2010 POWER SYSTEM INCIDENT REPORT: TRIP OF DOUBLE CIRCUIT MACKAY- COLLINSVILLE TEE - PROSERPINE 132 KV LINES AND STRATHMORE ON 29 PREPARED BY: Electricity System Operations Planning and Performance FINAL Disclaimer

More information

Standard PRC Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance

Standard PRC Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance A. Introduction 1. Title: Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance 2. Number: PRC-005-6 3. Purpose: To document and implement programs for the maintenance of all

More information

Standard PRC Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance

Standard PRC Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance Standard PRC-005-5 Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance Standard Development Timeline This section is maintained by the drafting team during the development

More information

Three Terminal 230kV System Protection and Restoration at Calpine s Creed and Goose Haven Energy Centers Suisun City, California

Three Terminal 230kV System Protection and Restoration at Calpine s Creed and Goose Haven Energy Centers Suisun City, California Three Terminal 230kV System Protection and Restoration at Calpine s Creed and Goose Haven Energy Centers Suisun City, California Larry Henriksen POWER Engineers, Inc. Hailey, Idaho Daren Phelps Calpine

More information

WM3000 WIRELESS MODULES

WM3000 WIRELESS MODULES WM3000 WIRELESS MODULES $$:05 $$:07 INSTALLATION INSTRUCTIONS Table of Contents Installation... 3 Mounting Instructions & Connections... 3 Setting the Dip Switches... 4 Setting the Recognition Time...

More information

Standard PRC-005-3(i) Protection System and Automatic Reclosing Maintenance

Standard PRC-005-3(i) Protection System and Automatic Reclosing Maintenance A. Introduction 1. Title: Protection System and Automatic Reclosing 2. Number: PRC-005-3(i) 3. Purpose: To document and implement programs for the maintenance of all Protection Systems and Automatic Reclosing

More information

Installation Guide for AL600ULM. Multi-Output Access Control Power Supply Charger. Rev

Installation Guide for AL600ULM. Multi-Output Access Control Power Supply Charger. Rev Installation Guide for AL600ULM Multi-Output Access Control Power Supply Charger Rev. 091800 1 AL600ULM - Multi-Output Access Control Power Supply/Charger Overview: The AL600ULM multi-output access control

More information

Need for a Bipole III rating of 2300 Mw to transmit Keeyask power.

Need for a Bipole III rating of 2300 Mw to transmit Keeyask power. Need for a Bipole III rating of 2300 Mw to transmit Keeyask power. Introduction Further to the Technical Assessment of the Need for the Bipole III Line, dated 21 November 2014- Dennis Woodford P. Eng.

More information

What Utility Analytics means to Exelon

What Utility Analytics means to Exelon What Utility Analytics means to Exelon Presented by Bart Enright IT Director Smart Grid Initiatives at ComEd Exelon s Analytic Journey Exelon Utilities Overview T&D Grids Data Visualization Data Analytics/Notifications

More information

Standard PRC-005-4(X) Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance

Standard PRC-005-4(X) Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance Standard PRC-005-4(X) Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance Standard Development Timeline This section is maintained by the drafting team during the development

More information

Dennis Mullen System Operations Manager

Dennis Mullen System Operations Manager Dennis Mullen System Operations Manager EPRI Power Switching Safety and Reliability Conference September 14, 2009 Electric System Control Center (ESCC) Member Companies PSNH Operating Company of NU Retail

More information

Standard PRC-005-3(X) Protection System and Automatic Reclosing Maintenance

Standard PRC-005-3(X) Protection System and Automatic Reclosing Maintenance Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed

More information

1 Descriptions of Function

1 Descriptions of Function The Use Case #4 implements integrated management of s 1 Descriptions of Function 1.1 Function Name Date 12-15-2009, Version 1.13 implements integrated management of s 1.2 Function ID L-11.1.4 1.3 Brief

More information

TRANSMISSION ENGINEERING STANDARDS SUBSTATIONS

TRANSMISSION ENGINEERING STANDARDS SUBSTATIONS This standard was reviewed and approved by key managers with final approval by an officer of Oncor Electric Delivery on. 1.0 SCOPE 1.1 This guide applies to the interconnection of a Customer with the Company

More information

OPUCN CUSTOM INCENTIVE RATE PLAN PERFORMANCE REPORT

OPUCN CUSTOM INCENTIVE RATE PLAN PERFORMANCE REPORT Page 1 of 6 OPUCN CUSTOM INCENTIVE RATE PLAN 2015-2019 2015-2016 PERFORMANCE REPORT 1. In its 2015 Decision the OEB directed OPUCN report on the following metrics which it proposed for its CIR Plan: (a)

More information

PRC-005. Tips and Updates. February 25th, Jonathan Hayes

PRC-005. Tips and Updates. February 25th, Jonathan Hayes PRC-005 Tips and Updates February 25th, 2014 Jonathan Hayes jhayes@spp.org 501.614.3509 NERC Standards Violations 3 Overview PRC-005-1 Current Issues / Best Practices PRC-005-2 Standard Implementation

More information

2000 System Disturbances

2000 System Disturbances 2000 System Disturbances Review of Selected Electric System Disturbances in North America North American Electric Reliability Council Princeton Forrestal Village 116-390 Village Boulevard Princeton, New

More information

Standard PRC-005-X Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance

Standard PRC-005-X Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed

More information

LineVision TM. Non-Contact Transmission Line Monitoring and Dynamic Line Rating

LineVision TM. Non-Contact Transmission Line Monitoring and Dynamic Line Rating LineVision TM Non-Contact Transmission Line Monitoring and Dynamic Line Rating Jonathan Marmillo, Business Development M: 484-368-4630 E: jmarmillo@genscape.com www.genscape.com 2017 Genscape Incorporated.

More information

Demand Responsive Lighting Controls

Demand Responsive Lighting Controls Demand Responsive Lighting Controls California Statewide Utility Codes and Standards Program Josh Rasin Heschong Mahone Group, Inc. Lighting Stakeholder Meeting #3 February 24, 2011 Demand Responsive Lighting

More information

Hot Food Holding Cabinets Test for FWE HLC

Hot Food Holding Cabinets Test for FWE HLC Design & Engineering Services Hot Food Holding Cabinets Test for Report Prepared by: Design & Engineering Services Customer Service Business Unit Southern California Edison January 4, 2011 Acknowledgements

More information

Power System Protection Part 2 Dr.Prof. Mohammed Tawfeeq. Zones of Protection

Power System Protection Part 2 Dr.Prof. Mohammed Tawfeeq. Zones of Protection 84 Power System protection Dr. Mohamad Tawfeeq Zones of protection Zone of protection of a relay is the place or the distance that the relay can protect easily.fig.1 shows an example of protection zones

More information

Installation Guide for AL400ULM. Multi-Output Access Control Power Supply Charger

Installation Guide for AL400ULM. Multi-Output Access Control Power Supply Charger Installation Guide for AL400ULM Multi-Output Access Control Power Supply Charger R AL400ULM - Multi-Output Access Control Power Supply/Charger Rev. 072500 Overview: The AL400ULM multi-output access control

More information

Fan Coil Unit (FCU) Application Guide

Fan Coil Unit (FCU) Application Guide Fan Coil Unit (FCU) Series Room Controllers TABLE OF CONTENTS and SCs Fan coil terminal equipment controllers 2 A5000 - VC3500E5000: Heating/cooling: 4-pipe fan coil unit with 3-speed fan, 2-position valves

More information

Installation Guide for AL300ULM. Multi-Output Access Control Power Supply Charger

Installation Guide for AL300ULM. Multi-Output Access Control Power Supply Charger Installation Guide for AL300ULM Multi-Output Access Control Power Supply Charger R AL300ULM - Multi-Output Access Control Power Supply/Charger Overview: The AL300ULM multi-output access control power supply/charger

More information

Transformer On-Line Monitoring

Transformer On-Line Monitoring Transformer On-Line Monitoring Rowland James Entergy November 8, 2004 Prologue Why On-Line Monitoring & Diagnostics? Aging and Failure Modes Failure Statistics Current Monitoring & Analysis Methods Why

More information

National Grid / DG Installation Process Guide per NY SIR / July 2011 ver. 1.0

National Grid / DG Installation Process Guide per NY SIR / July 2011 ver. 1.0 Distributed Generation Installation Process Guide for Connections to National Grid Distribution Facilities per the New York Standardized Interconnection Requirements Introduction National Grid ( The Company

More information

To: Honorable Public Utilities Board Submitted by: /s/ Douglas Draeger AGM Engineering and Operations

To: Honorable Public Utilities Board Submitted by: /s/ Douglas Draeger AGM Engineering and Operations AGENDA ITEM NO.: 5.D.1 MEETING DATE: 0/4/014 ADMINISTRATIVE REPORT NO.: 014-48 To: Honorable Public Utilities Board Submitted by: /s/ Douglas Draeger AGM Engineering and Operations From: Tito R. Nagrampa

More information

Relay Performance Index for a Sustainable Relay Replacement Program

Relay Performance Index for a Sustainable Relay Replacement Program Relay Performance Index for a Sustainable Relay Replacement Program Aaron Feathers, Abesh Mubaraki, Nai Paz, Anna Nungo Pacific Gas & Electric Company San Francisco, CA Western Protective Relay Conference

More information

TOP R4 Unknown Operating State

TOP R4 Unknown Operating State TOP-004-2 R4 Unknown Operating State September 30, 2014 Greg Sorenson, PE Senior Compliance Engineer gsorenson.re@spp.org 501.688.1713 Outline Requirement Language Study Outcomes and Limitations Self-Check

More information

Root Cause Analysis Report Tesoro Golden Eagle Refinery Refinery Power Outage

Root Cause Analysis Report Tesoro Golden Eagle Refinery Refinery Power Outage Summary of Event: The Golden Eagle Refinery (Refinery) experienced a partial electrical outage December 10, 2010 at 10:12 hrs when a transformer at Switching Station #7 failed. A CWS Level 1 report was

More information

Multi-Output Access Control Power Supply Charger VDC or 24VDC VDC or 3 24VDC.

Multi-Output Access Control Power Supply Charger VDC or 24VDC VDC or 3 24VDC. M Series Multi-Output Access Control Power Supply Charger Installation Guide Models Include: AL300ULM AL400ULM - 2.5 amp @ 12VDC or 24VDC. - 4 amp @ 12VDC or 3 amp @ 24VDC. AL600ULM AL1012ULM - 6 amp @

More information

Arc Flash and Selective Coordination

Arc Flash and Selective Coordination PowerHour webinar series for consulting engineers Experts you trust. Excellence you count on. Arc Flash and Selective Coordination Wednesday June 8 1:00 CDT / 2:00 EDT (1PDH issued by Cummins) Welcome!

More information

Ground Fault Protection Improvement Study

Ground Fault Protection Improvement Study Ground Fault Protection Improvement Study Greg Ball DNV KEMA Solar ABCs Stakeholder Meeting July 11, 2013 San Francisco, CA Study Authors 2 Bill Brooks Brooks Engineering Andy Rosenthal New Mexico State

More information

TRANSMISSION ENGINEERING STANDARDS SUBSTATIONS

TRANSMISSION ENGINEERING STANDARDS SUBSTATIONS This standard was reviewed and approved by key managers on September 6, 2011. Officer approval of this revision is not required. 1.0 SCOPE 1.1 This guide applies to the interconnection of a Utility with

More information

Transmission Planning and Siting For Current and Future Needs: A Federal or State Function?

Transmission Planning and Siting For Current and Future Needs: A Federal or State Function? Transmission Planning and Siting For Current and Future Needs: A Federal or State Function? Laurence G. Chaset California Public Utilities Commission National Conference of State Legislatures December

More information

ELECTRIC SERVICE RELIABILITY IN PENNSYLVANIA 2008

ELECTRIC SERVICE RELIABILITY IN PENNSYLVANIA 2008 El e c t r i cse r v i c e Re l i a b i l i t yi n P e n n s y l v a n i a 2008 P e n n s y l v a n i apu b l i cut i l i t yco mmi s s i o n ELECTRIC SERVICE RELIABILITY IN PENNSYLVANIA 2008 Published

More information

Honeywell Control Panels FOR RESIDENTIAL AND COMMERCIAL INSTALLATIONS. Feature Charts

Honeywell Control Panels FOR RESIDENTIAL AND COMMERCIAL INSTALLATIONS. Feature Charts Honeywell Control Panels FOR RESIDENTIAL AND COMMERCIAL INSTALLATIONS Feature Charts Control Panels FEATURE CHART LYNX Plus (L3000) (Supported Feature) (Not Supported) N/A (Not Applicable) LYNX Touch (L5210)

More information

APS-300 SERIES DUAL VOLTAGE UL 294 LISTED ACCESS CONTROL POWER SUPPLIES

APS-300 SERIES DUAL VOLTAGE UL 294 LISTED ACCESS CONTROL POWER SUPPLIES APS-300 SERIES DUAL VOLTAGE UL 294 LISTED ACCESS CONTROL POWER SUPPLIES POWER SUPPLY AND BATTERY CHARGER AC AND DC STATUS INDICATORS ENOUGH POWER TO SUPPORT UP TO 3 MAGLOCKS OR ELECTRIC STRIKES PLUS REQUIRED

More information

SACE PR021/K SIGNALLING UNIT

SACE PR021/K SIGNALLING UNIT SACE PR021/K SIGNALLING UNIT 1SDH000559R0002 L3016 1/52 EN CONTENTS 1. GENERAL INFORMATION...4 1.1. FOREWORD...4 1.2. APPLICABLE SCENARIOS...5 2. TECHNICAL SPECIFICATIONS...6 2.1. ELECTRICAL CHARACTERISTICS...6

More information

Multi-Output Access Control Power Supply Chargers VDC or 24VDC VDC or 4 24VDC.

Multi-Output Access Control Power Supply Chargers VDC or 24VDC VDC or 4 24VDC. M Series Multi-Output Access Control Power Supply Chargers Installation Guide Models Include: AL300ULM AL400ULM - 2.5 amp @ 12VDC or 24VDC. - 3 amp @ 12VDC or 4 amp @ 24VDC. AL600ULM AL1012ULM - 6 amp

More information

4. Applicability: 4.1. Functional Entities: 4.2. Facilities:

4. Applicability: 4.1. Functional Entities: 4.2. Facilities: Standard PRC-005-2(i) Protection System A. Introduction 1. Title: Protection System 2. Number: PRC-005-2(i) 3. Purpose: To document and implement programs for the maintenance of all Protection Systems

More information

Standard PRC Transmission Relay Loadability

Standard PRC Transmission Relay Loadability A. Introduction 1. Title: Transmission Relay Loadability 2. Number: PRC-023-2 3. Purpose: Protective relay settings shall not limit transmission loadability; not interfere with system operators ability

More information

See the table on the following Page for full descriptions of each Pin Type.

See the table on the following Page for full descriptions of each Pin Type. 8 Pin Comms-22-1 8 Pin Comms Task Format IMPORTANT NOTES: Hardware Compatability. The 8 Pin Comms Task can only be used in Type 2 (CE) Control Module Hardware. 22. Firmware Compatablility. INTRODUCTION.

More information

CITY OF WHITEHORSE SERVICING STANDARDS MANUAL SECTION 2 - CONSTRUCTION DESIGN CRITERIA SUB-SECTION 2.A SCADA STANDARDS.

CITY OF WHITEHORSE SERVICING STANDARDS MANUAL SECTION 2 - CONSTRUCTION DESIGN CRITERIA SUB-SECTION 2.A SCADA STANDARDS. CITY OF WHITEHORSE SERVICING STANDARDS MANUAL SECTION 2 - CONSTRUCTION DESIGN CRITERIA SUB-SECTION 2.A SCADA STANDARDS Table of Contents 2.A.1 SCADA Standards 2.5-2 2.A.1.1 Generators 2.5-2 2.A.1.2 Building

More information

INTEGRATION OF DEMAND RESPONSE INTO TITLE 20 FOR HOT FOOD HOLDING CABINETS

INTEGRATION OF DEMAND RESPONSE INTO TITLE 20 FOR HOT FOOD HOLDING CABINETS Design & Engineering Services INTEGRATION OF DEMAND RESPONSE INTO TITLE 20 FOR HOT FOOD HOLDING CABINETS Phase1: Demand Response Potential DR 09.05.07 Report Prepared by: Design & Engineering Services

More information

Electrical Safety Through Design. Mersen EP formerly Ferraz Shawmut

Electrical Safety Through Design. Mersen EP formerly Ferraz Shawmut Electrical Safety Through Design Mersen EP formerly Ferraz Shawmut Agenda Who is Mersen? Selective Coordination Code Requirements Coordination Made Easy Mitigating Arc Flash Energy on Transformer Secondary

More information

Standard PRC Protection System Misoperation Identification and Correction

Standard PRC Protection System Misoperation Identification and Correction Standard PRC-004-4 Protection System Misoperation Identification and Correction Standard Development Timeline This section is maintained by the drafting team during the development of the standard and

More information

A REPORT TO THE BOARD OF COMMISSIONERS OF PUBLIC UTILITIES. Electrical. Mechanical. Civil. i Protection & Control. b^n Telecontrol.

A REPORT TO THE BOARD OF COMMISSIONERS OF PUBLIC UTILITIES. Electrical. Mechanical. Civil. i Protection & Control. b^n Telecontrol. A REPORT TO THE BOARD OF COMMISSIONERS OF PUBLIC UTILITIES Electrical ^ Q ^pfi;sslo4rq Mechanical Civil R LE GD SiG ira rte, E pv/a-07 ^^ O i Protection & Control ^ Gi + 0'''' Transmission & Distribution

More information

Microgrid Fault Protection Based on Symmetrical and Differential Current Components

Microgrid Fault Protection Based on Symmetrical and Differential Current Components Microgrid Fault Protection Based on Symmetrical and Differential Current Components Prepared for Public Interest Energy Research California Energy Commission Prepared by Hassan Nikkhajoei and Robert H.

More information

600 Range Dialer Installation Manual. Version 1.0

600 Range Dialer Installation Manual. Version 1.0 600 Range Dialer Installation Manual Version 1.0 The information contained is supplied without liability for any errors or omissions. No part may be reproduced or used except as authorised by contract

More information

4. Applicability: 4.1. Functional Entities: 4.2. Facilities: 5. Effective Date: See Implementation Plan

4. Applicability: 4.1. Functional Entities: 4.2. Facilities: 5. Effective Date: See Implementation Plan Standard PRC-005-2 Protection System Maintenance A. Introduction 1. Title: Protection System Maintenance 2. Number: PRC-005-2 3. Purpose: To document and implement programs for the maintenance of all Protection

More information

MT-374B/364B Operation User s Guide. The Anti-Sweat Energy Saving Controller user s manual

MT-374B/364B Operation User s Guide. The Anti-Sweat Energy Saving Controller user s manual MT-374B/364B Operation User s Guide Parker Hannifin Canada Micro Thermo Technologies TM 12855 Brault Street Mirabel, QC J7J 0C4 Office phone 450-668-3033 Introduction The Anti-Sweat Energy Saving Controller

More information

TRACENET TM GENESIS CONTROL AND MONITORING SYSTEM SPECIFICATION GUIDE

TRACENET TM GENESIS CONTROL AND MONITORING SYSTEM SPECIFICATION GUIDE TRACENET TM GENESIS CONTROL AND MONITORING SYSTEM SPECIFICATION GUIDE TRACENET TM GENESIS APPLICATION OVERVIEW Control and monitoring systems can play an essential role in heat tracing applications which

More information

Standard PRC Protection System and Automatic Reclosing Maintenance. Standard Development Roadmap

Standard PRC Protection System and Automatic Reclosing Maintenance. Standard Development Roadmap Standard Development Roadmap This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed:

More information

Long-Range Barrier Sensors

Long-Range Barrier Sensors Troubleshooting: Receiver LED never turns ON and the buzzer never sounds Buzzer does not sound if the sensor is triggered Receiver LED is ON and the buzzer sounds all the time Test the power and ground

More information

FCD-wire Contents. List of Figures

FCD-wire Contents. List of Figures FCD-wire Contents FCD-X21 Configuration 1 Introduction... 1 2 Opening the FCD Application... 1 3 FCD Window... 2 4 FCD LEDs... 3 5 Configuration Operations... 4 FCD Info...4 FCD System Info...5 FCD Interface

More information

1SPP Notification to Construct

1SPP Notification to Construct May 23, 2013 1SPP Notification to Construct Mr. Philip Crissup Oklahoma Gas and Electric Co. P.O. Box 321, M/C 903 Oklahoma City, OK 73101 RE: Notification to Construct Approved ITP10 Network Upgrades

More information

Department of Planning and Community Development

Department of Planning and Community Development DEPARTMENT OF PLANNING AND COMMUNITY DEVELOPMENT 1010 10 TH Street, Suite 3400, Modesto, CA 95354 Phone: 209.525.6330 Fax: 209.525.5911 August 1, 2011 MEMO TO: FROM: Agricultural Advisory Board Department

More information

SETTING UP A VIRTUAL KEYPAD WITH A DSC POWERSERIES ALARM SYSTEM

SETTING UP A VIRTUAL KEYPAD WITH A DSC POWERSERIES ALARM SYSTEM DN1902-0909 SETTING UP A VIRTUAL KEYPAD WITH A DSC POWERSERIES ALARM SYSTEM The purpose of this application note is to configure the EntraPass system to interface with the DSC PowerSeries tm alarm systems

More information

CMD420 / CMD421 Series

CMD420 / CMD421 Series 3 T M CMD420 / CMD421 Series Digital Current Relay (Overcurrent and Undercurrent) For Three-Phase AC Systems Technical Bulletin NAE1032810 / 06.2016 CMD420 / CMD421 Digital overcurrent and undercurrent

More information

SIMULCAST ALARM SYSTEM

SIMULCAST ALARM SYSTEM Mobile Communications SIMULCAST ALARM SYSTEM TABLE OF CONTENTS ALARM SHELF 19D902821G1................. LBI-38496 COMPUTER SHELF 19D438294G2............... LBI-38497 TUA1/TEST UNIT........................

More information

Real-Time Root Cause Analysis for Complex Technical Systems

Real-Time Root Cause Analysis for Complex Technical Systems Real-Time Root Cause Analysis for Complex Technical Systems Jan Eric Larsson, Joseph DeBor IEEE HPRCT Monterey, CA, August 29 th 2007 Handling Alarm Cascades Root cause analysis: find the initiating events

More information

DemandAire. amaximize Energy Efficiency aincreased Kitchen Comfort acustomizable Systems. Demand Control Kitchen Ventilation System

DemandAire. amaximize Energy Efficiency aincreased Kitchen Comfort acustomizable Systems.  Demand Control Kitchen Ventilation System Demand Control Kitchen Ventilation System Standard 0. Compliant 08 Listed amaximize Energy Efficiency aincreased Kitchen Comfort acustomizable Systems www.streivor.com Standard and Code Requirements for

More information

UNIVERSITY OF NEVADA, LAS VEGAS

UNIVERSITY OF NEVADA, LAS VEGAS UNIVERSITY OF NEVADA, LAS VEGAS NORTH LAS VEGAS LAND OPPORTUNITY North Campus Background Information November 2009 Regional Context 6 7 18 Small Arms Range Site Context Guiding Principles You cannot depend

More information

wireless. web-based. worthy of the name RACO.

wireless. web-based. worthy of the name RACO. wireless. web-based. worthy of the name RACO. reliable monitoring unequalled accessibility on-demand reporting wireless, web-based alarm detection and notification system from RACO designed specifically

More information

Leaside to Main Infrastructure Refurbishment Project

Leaside to Main Infrastructure Refurbishment Project N6667_Leaside to Main Panels Feb 2016_Clarington Panels 16-02-01 3:22 PM Page 1 Leaside to Main Infrastructure Refurbishment Project Strengthening the transmission system in your neighbourhood N6667_Leaside

More information

EARTH LEAKAGE RELAY. User Manual - Issue 1.0

EARTH LEAKAGE RELAY. User Manual - Issue 1.0 Earth Leakage Relay www.sifamtinsley.co.uk Multifunction Meters Transducers & Isolators Temperature Controllers Converters & Recorders Digital Panel Meters Current Transformers Analogue Panel Meters EARTH

More information

ACM8 Series UL Listed Sub-Assembly Access Power Controllers. Installation Guide. ACM8 - Eight (8) Fuse Protected Outputs

ACM8 Series UL Listed Sub-Assembly Access Power Controllers. Installation Guide. ACM8 - Eight (8) Fuse Protected Outputs ACM8 Series UL Listed Sub-Assembly Access Power Controllers Installation Guide Models Include: ACM8 - Eight (8) Fuse Protected Outputs ACM8CB - Eight (8) PTC Protected Outputs Rev. 042811 More than just

More information

Chexit, RCM and DE5300

Chexit, RCM and DE5300 Launch Presentation Chexit, RCM and DE5300 July 2015 Overview Chexit Overview Designed for controlled egress applications Meets both life safety and security & NFPA 101 for "Special Locking Arrangement"

More information

Improvements in Transmission Control Center Alarm Management Practices

Improvements in Transmission Control Center Alarm Management Practices Improvements in Transmission Control Center Alarm Management Practices Navin Bhatt, Mahendra Patel, Bill Hollifield, Andrew Hunter 2017 CIGRE Grid of the Future Symposium Cleveland, Ohio, U.S.A. 22-25

More information

4. Applicability: 4.1. Functional Entities: 4.2. Facilities: 5. Effective Date: See Implementation Plan

4. Applicability: 4.1. Functional Entities: 4.2. Facilities: 5. Effective Date: See Implementation Plan Standard PRC-005-2 Protection System Maintenance A. Introduction 1. Title: Protection System Maintenance 2. Number: PRC-005-2 3. Purpose: To document and implement programs for the maintenance of all Protection

More information

AIS750 Series Alarm Annunciator User Manual (Ver. 2.3 / JUNE. 2014)

AIS750 Series Alarm Annunciator User Manual (Ver. 2.3 / JUNE. 2014) AIS750 Series Alarm Annunciator User Manual (Ver 23 / JUNE 2014) 3-350 John Street, Thornhill, tario L3T 5W6 Phone: 289 597 APEX (2739) Fax: 289 597 2200 Toll Free: 1 866 776 2943 Email: mail@annunciatorca

More information

5. How and Why the Blackout Began in Ohio

5. How and Why the Blackout Began in Ohio 5. How and Why the Blackout Began in Ohio Summary This chapter explains the major events electrical, computer, and human that occurred as the blackout evolved on August 14, 2003, and identifies the causes

More information

AUTO SWITCH ALARM PS1 PS2 CH2 MANUAL REMOTE HISTORY ALARM ONLINE AUTO MANUAL SELECT SWITCH RESET

AUTO SWITCH ALARM PS1 PS2 CH2 MANUAL REMOTE HISTORY ALARM ONLINE AUTO MANUAL SELECT SWITCH RESET Instruction Manual Model 1582-125L 1:1 Switch February 2017, Rev. 0 CH1 HISTORY LINE HISTORY RESET AUTO MANUAL SELECT CH2 HISTORY LINE RESET MANUAL REMOTE AUTO PS1 PS2 MODEL 1582 CROSS TECHNOLOGIES INC.

More information

Wireless D.I.Y. Alarm Kit

Wireless D.I.Y. Alarm Kit Wireless D.I.Y. Alarm Kit User Manual December 2010 MAMI 21 Hubert Mathew Road Illiondale 1610 Tel: +27 11 452 4737 Email: sales@mami.co.za page 2/10 General The Wireless DIY kit, is a pre-programmed,

More information

Bulletin 1608N MiniDySC Dynamic Sag Corrector

Bulletin 1608N MiniDySC Dynamic Sag Corrector User Manual Bulletin 1608N MiniDySC Dynamic Sag Corrector Single Phase Voltage Sag Correction 2...6 Amps (250...750 VA) Important User Information Solid-state equipment has operational characteristics

More information

System 9000TS Event Recorder

System 9000TS Event Recorder Important notes The 9000TS System described herein operates on a logic voltage of VDC and as standard +VDC is used for the field contact supply voltage. External power supplies using higher voltage ac/dc

More information

COMMUNITY DEVELOPMENT SERVICES PLANNING AND BUILDING DEPARTMENT PLACERVILLE OFFICE:

COMMUNITY DEVELOPMENT SERVICES PLANNING AND BUILDING DEPARTMENT   PLACERVILLE OFFICE: COMMUNITY DEVELOPMENT SERVICES PLANNING AND BUILDING DEPARTMENT http://www.edcgov.us/devservices/ PLACERVILLE OFFICE: LAKE TAHOE OFFICE: 2850 Fair Lane Court, Placerville, CA 95667 924 B Emerald Bay Rd.

More information

ACM4 Series UL Listed Sub-Assembly Access Power Controllers

ACM4 Series UL Listed Sub-Assembly Access Power Controllers ACM4 Series UL Listed Sub-Assembly Access Power Controllers Installation Guide Models Include: ACM4 - Four (4) Fuse Protected Outputs ACM4CB - Four (4) PTC Protected Outputs Rev. 051311 More than just

More information

Department of Planning and Community Development

Department of Planning and Community Development DEPARTMENT OF PLANNING AND COMMUNITY DEVELOPMENT 1010 10 TH Street, Suite 3400, Modesto, CA 95354 Phone: 209.525.6330 Fax: 209.525.5911 August 1, 2011 MEMO TO: FROM: Agricultural Advisory Board Department

More information

NY LCC Data Specification

NY LCC Data Specification NY LCC Data Specification Purpose: This specification is prepared for and by Central Hudson Gas & Electric Corporation, Consolidated Edison Company of New York, Inc.; Long Island Power Authority; Niagara

More information

COUNTY OF INYO COUNTY COMMERCIAL CANNABIS PERMITTING OFFICE

COUNTY OF INYO COUNTY COMMERCIAL CANNABIS PERMITTING OFFICE COUNTY OF INYO COUNTY COMMERCIAL CANNABIS PERMITTING OFFICE 207 WEST SOUTH STREET BISHOP, CA 93514 760.873.7860 NOTICE OF AVAILABLE COMMERCIAL CANNABIS BUSINESS LICENSE(S) AND REQUEST FOR APPLICATIONS

More information

LA5579 Wireless Siren Operation Manual

LA5579 Wireless Siren Operation Manual LA5579 Wireless Siren Operation Manual Introduction The Wireless Siren is based on advanced wireless technology using in home automation system, between the Wireless Siren and Control Panel communicated

More information

Burglar Alarm System 12: 30. Fri 03rd March. Partial Armed Disarmed. Technical Manual 03_

Burglar Alarm System 12: 30. Fri 03rd March. Partial Armed Disarmed. Technical Manual 03_ Burglar Alarm System B2 1 2 3 4 5 6 7 8 9 10 12: 30 Fri 03rd March Partial Armed Disarmed Technical Manual 03_09-24848601 1 2 CONTENTS 1- GENERAL SETTING INFORMATION Page 5 Introduction... 6 General Information

More information

PRODUCT CATALOGUE. Cape Town 18 Darter Road Blue Water Estate Kommetjie. Gauteng 245 Louis Botha Avenue Orchards Johannesburg

PRODUCT CATALOGUE.   Cape Town 18 Darter Road Blue Water Estate Kommetjie. Gauteng 245 Louis Botha Avenue Orchards Johannesburg PRODUCT CATALOGUE Cape Town 18 Darter Road Blue Water Estate Kommetjie Luke Fowles - 076 161 8124 luke@providenttech.co.za Frank Fowles - 082 445 1541 frank@providenttech.co.za www.providenttech.co.za

More information

Standard PRC Protection System Misoperation Identification and Correction

Standard PRC Protection System Misoperation Identification and Correction Standard PRC-004-3 Protection System Misoperation Identification and Correction A. Introduction 1. Title: Protection System Misoperation Identification and Correction 2. Number: PRC-004-3 3. Purpose: Identify

More information

HTC-915-CONT. Heat-Trace Control system

HTC-915-CONT. Heat-Trace Control system Heat-Trace Control system Product overview The Raychem HTC-915 system is a compact, full-featured microprocessor-based single-point heat-trace controller. The HTC-915-CONT provides control and monitoring

More information

Commissioning the Fire Suppression System for 500/230 kv Transformers of EGAT s Nongchok Substation

Commissioning the Fire Suppression System for 500/230 kv Transformers of EGAT s Nongchok Substation Commissioning the Fire Suppression System for 500/230 kv Transformers of EGAT s Nongchok Substation S. Chaipitak, Electricity Generating Authority of Thailand, +6624362432, Chaipitak.som@egat.co.th ABSTRACT

More information

IF-L/RF Protection Switch

IF-L/RF Protection Switch Instruction Manual Model 1582-1152 IF-L/RF Protection Switch August 2014, Rev. 0 CH1 HISTORY ALARM LINE HISTORY RESET AUTO MANUAL SELECT CH2 HISTORY ALARM LINE RESET MANUAL REMOTE AUTO ALARM PS1 PS2 MODEL

More information

installation & operation manual

installation & operation manual installation & operation manual TABLE OF CONTENTS INTRODUCTION... 2 FEATURES... 2 PROGRAMMING CONTACT ID... 3 INSTALLATION... 3 OPENING THE HAWK COVER... 3 POWER SUPPLY... 5 CHECK AC... 5 DRY CONTACTS

More information

WIRELESS TEMPERATURE & HUMIDITY STATION INSTRUCTION MANUAL

WIRELESS TEMPERATURE & HUMIDITY STATION INSTRUCTION MANUAL WIRELESS TEMPERATURE & HUMIDITY STATION INSTRUCTION MANUAL MODEL: S82967 DC: 071118 FIND MANUALS, FAQS, AND MORE UNDER THE SUPPORT TAB HERE: www.lacrossetechnology.com/s82967 TABLE OF CONTENTS 3. Power

More information

The system is expanded via the RCC network with each RCC capable of passing information to and from up to 31 detection or output devices.

The system is expanded via the RCC network with each RCC capable of passing information to and from up to 31 detection or output devices. FireCell Radio Hub Fully addressable Wireless activation Third party approved (EN54) 2-way radio communication Loop powered Diagnostics port Range in excess of 150 metres Overview The model FCX-500-001

More information

INSTALLATIONSANVISNING INSTALLATION MANUAL INSTALLATIONS ANLEITUNG. LD-64 Profibus

INSTALLATIONSANVISNING INSTALLATION MANUAL INSTALLATIONS ANLEITUNG. LD-64 Profibus LD-64 Profibus INSTALLATISANVISNING INSTALLATI MANUAL INSTALLATIS ANLEITUNG Galvanic Isolation 6073-2031 Transient Protection Balanced Transmission CE Approved Westermo Teleindustri AB 2001 REV. B Fiberoptiskt

More information

Type 8001 PRIME MOVER CONTROLS INC. ALARM ANNUNCIATOR TYPE8001 FEATURES SB 8001B

Type 8001 PRIME MOVER CONTROLS INC. ALARM ANNUNCIATOR TYPE8001 FEATURES SB 8001B PRODUCT BULLETIN SB 8001B Type 8001 ALARM ANNUNCIATOR TYPE8001 FEATURES 16 or 32 alarm points per flush mount enclosure Displays are backlit with long life LEDs and engraved to suit Dimmer controls built

More information

Campus Infrastructure Overlay Land Use Designation

Campus Infrastructure Overlay Land Use Designation Appendix G LRDP Amendment 3 Campus Infrastructure Overlay Land Use Designation Introduction The West Campus Solar Farm Project will provide sustainable and renewable energy to serve the UCR campus. The

More information

BARREN RIDGE RENEWABLE TRANSMISSION PROJECT

BARREN RIDGE RENEWABLE TRANSMISSION PROJECT August 2011 BARREN RIDGE RENEWABLE TRANSMISSION PROJECT Visual Resources Technical Report PROJECT NUMBER: 115244 PROJECT CONTACT: GINA FEGLER EMAIL: gina.fegler@powereng.com PHONE: 208-288-6281 Draft Visual

More information

Fire control panel detect 3004 plus and accessories

Fire control panel detect 3004 plus and accessories Fire control panel detect 3004 and accessories The modular fire alarm panel detect 3004 is the basic version of a broad product portfolio of the system detect 3000. Up to 20 fire control panels can be

More information