Transmission Planning and Siting For Current and Future Needs: A Federal or State Function?
|
|
- Hilary Foster
- 5 years ago
- Views:
Transcription
1 Transmission Planning and Siting For Current and Future Needs: A Federal or State Function? Laurence G. Chaset California Public Utilities Commission National Conference of State Legislatures December 10, 2009 San Diego, California Disclaimer: The substance of this presentation represents the views of the author and does not represent the views of the California Public Utilities Commission.
2 Overview of Presentation Transmission Planning in California and the West to Date Federal Regulation Federal Energy Regulatory Commission (FERC) Order 890 Federal Law: Energy Policy Act of 2005 and the Department of Energy s National Corridors Pending Federal Legislation on Transmission Planning and Siting Transmission Planning and Siting in the Future: A State or Federal Function? 2
3 Transmission i Planning in California i and the West to Date Regional and sub-regional transmission planning has been happening in the West for over a decade Formal initiative of Western Governors Association in 2001 Seams Steering Group Western Interconnection (SSG-WI) Formed in the 1990 s to address physical and market interface issues across the sub-regions and (actual and potential) Regional Transmission Organizations (RTOs) in the West Functions of SSG-WI were handed over to Western Electricity Coordinating Council (WECC) several years ago April 2006: WECC Board formally approved a Transmission i Expansion Planning Policy Committee (TEPPC) 3 Goal: Consistent and transparent input assumptions and robust methodologies to allow for comparison of results of transmission planning exercises to be conducted throughout the Western Interconnection
4 Transmission Planning in California and the West to Date - 2 Western Congestion Assessment Task Force (WCATF) Helped to prepare the Western Interconnection portion of the congestion studies required under Section 1221 of the Energy Policy Act of 2005 (EPAct) WCATF Study analyzed locations, prevalence and costs of congestion out to 2015 Southwest Transmission Expansion Plan (STEP), a sub-group of SSG-WI, includes Southern California WCATF identified congestion east and west of the Colorado River Two proposed projects would alleviate this congestion: Devers-Palo Verde 2 and the Sunrise Powerlink Both projects were reviewed through the STEP process and have been approved by the CPUC 4
5 Transmission i Planning in California i and the West to Date - 3 In California, the California Independent System Operator (CAISO), the only formal RTO in the West, serves as the sub-regional planning group for the utilities and other entities that are its participating transmission owners (PTOs) The CAISO oversees the transmission expansion planning process within its control area Determines the reliability and economic need of proposed new projects California has also initiated a state-wide transmission planning effort that will include non-caiso participants 5 Goal: to identify transmission upgrades that will be needed state-wide in order to meet future needs Includes the large, unregulated municipal utilities (Los Angeles Dept. of Water and Power, Sacramento Municipal Utility District & Imperial Irrigation District) that do not participate in the CAISO
6 Federal Regulation In May 2006, the Federal Energy Regulatory Commission (FERC) issued a Notice of Proposed Rulemaking proposing reforms to its Order No. 888 pro forma Open Access Transmission Tariff (OATT) Preventing Undue Discrimination and Preference in Transmission Services FERC s Order 890, adopted in March 2007 (72 Fed. Reg ), requires all transmission providers to amend their existing pro forma Open Access Transmission Tariffs to include a transmission planning requirement 6 A coordinated, open and transparent planning process that complies with nine principles stated in the Order: (1) Coordination; (2) Openness; (3) Transparency; (4) Information exchange; (5) Comparability; (6) Dispute resolution; (7) Regional participation; (8) Economic planning studies; and (9) Cost allocation Acknowledges that independent transmission operators already have transmission planning processes that are more open than traditional vertically-integrated utility transmission providers
7 Federal Regulation - 2 The CAISO conducted a lengthy stakeholder process through 2007 to develop an Order 890 compliance filing Filed with FERC on December 21, 2007 (Docket No. OA ) Establishes a formal, annual Transmission Planning Process (TPP) FERC conditionally approved the CAISO s filing on June 19, 2008 The CAISO knows best how to structure the planning process to suit its needs and the needs of its members and customers and has the flexibility to structure t this process as it sees fit But FERC was concerned that the CAISO filing does not clearly describe: The relationship between the CAISO and its PTOs How stakeholders can participate in the PTOs development of needed expansions How and when PTO projects are evaluated by the CAISO and assimilated into the CAISO transmission plan, and The ability of non-ptos to offer alternatives to PTO projects given the apparent difference between the treatment of PTOs and non-ptos 7
8 Federal Regulation - 3 Generally, the FERC accepted the transmission planning processes submitted by CAISO and others subject to further compliance filings In September 2009, the FERC held three regional technical conferences: To determine progress and benefits realized by Order 890 transmission planning processes and discuss areas that may need improvement To examine whether these processes adequately consider needs and solutions on a regional or interconnection-wide basis; and To explore whether these planning processes are sufficient to meet emerging challenges to the transmission system Development of inter-regional transmission facilities Integration of large amounts of location-constrained generation Interconnection of distributed energy resources FERC is currently soliciting written comments (Transmission Planning Processes Under Order No. 890, Docket No. AD
9 DOE s Corridor Planning Processes EPAct Section 368 Corridor Designation Limited, for now, to Western Interconnection Programmatic EIS was completed about 2 years ago Requires federal agencies (e.g. Forest Service, BLM) to amend land management plans in conformance with corridor designation Section 368 designation could facilitate greater efficiencies in CPUC transmission siting process Section 368 designation is appropriate for Southern California corridors necessary to deliver Tehachapi wind generation to load Forest Service has been an obstacle to the efficient review of a major proposed project ( Tehachapi Renewable Transmission Project ) that would deliver over 4,000 additional megawatts of wind power to the Greater Los Angeles load pocket (with over 15 million residents) 9
10 DOE s Corridor Planning Processes - 2 Section 1221(a) of EPAct directed the Secretary of Energy to conduct a nationwide study of electric transmission congestion by August 8, 2006 Based on the Congestion Study, the Secretary of Energy was authorized to designate any geographic area experiencing electric energy transmission capacity constraints or congestion that adversely affects customers as a National Interest Electric Transmission Corridor (NIETC) The Congestion Study is to be updated every three years The Congestion Study issued in August 2006 identified constrained transmission paths in many areas of the Nation Identification is based on historical studies of transmission conditions, existing studies of transmission expansion needs, and region-wide modeling of both the Eastern and Western Interconnections 10
11 DOE s Corridor Planning Processes - 3 The Congestion Study found three classes of congestion areas meriting further federal attention: 11 Critical Congestion Areas: Areas where it is critically important to remedy existing or growing congestion problems because the current and/or projected effects of the congestion are severe DOE identified two such areas (each of which is large, densely populated, and economically vital to the Nation), one of which is Southern California Congestion Areas of Concern: Areas where a large-scale congestion problem exists or may be emerging, but more information and analysis appear to be needed to determine the magnitude of the problem and the likely relevance of transmission expansion and other solutions DOE identified four Congestion Areas of Concern, including the San Francisco Bay Area Conditional Congestion Areas: Areas where there is some transmission congestion at present, but significant congestion would result if large amounts of new generation resources were to be developed without simultaneous development of associated transmission capacity
12 DOE s Corridor Planning Processes - 4 DOE proposed the designation i of two NIETCs in May 2007: Mid-Atlantic Area National Corridor: New York to Virginia Southwest Area National Corridor: all of Southern California and southwestern Arizona These corridors were formally designated in October 2007 DOE denied rehearing in March 2008 Numerous lawsuits challenging DOE s corridor designations were filed in May 2008 States filing appeals include: Arizona, California, New York, New Jersey, Pennsylvania, and Virginia All cases have been consolidated for hearing in the Ninth Circuit Briefing is complete and parties are awaiting a date for oral argument 12
13 Problems with Federal Preemption of State Siting Authority Once a NIETC is designated, if a state fails to approve a project proposed in that corridor within 12 months, FERC can preempt the state and grant permits to construct It was a mistake for DOE to designate the Southwest Area NIETC The corridor was grotesquely overbroad Given the progress that we are making both in planning for the future and in moving forward on the projects currently under review at the CPUC, NIETC designation was unnecessary in connection with any of DOE s identified Congestion Areas in California NIETC designation provides incentives for parties to delay state siting process, particularly on troubled projects NIETC designation does not require federal agencies to conform land management plans to corridor designations 13
14 Pending Federal Legislation on Transmission Planning and Siting Waxman-Markey (H.R. 2454) Is broadly inclusive of other important energy policies, such as demand response and energy efficiency, in connection with transmission planning Leaves the establishment of "transmission planning principles" in the hands of FERC, which will allow stakeholders to have a substantial say (through FERC's rulemaking process) in the final form that these principles take Grants FERC backstop siting authority in the Western Interconnection, but not in the Eastern Interconnection Some Western states support this However, does not provide explicit funding for state participation in regional transmission planning processes In view of states budget problems, such funding is essential if states are to play a significant ifi role 14
15 Tx Planning and Siting Provisions in Sen. Bingaman s Bill (S. 1462) Requires FERC to ensure that regional plans are integrated into an interconnection-wide plan for high-priority national projects Gives FERC regulatory authority over regional planning entities Directs FERC to issue planning principles by rule Allows utilities and RTOs to develop and submit regional transmission plans for FERC approval within 2 years of enactment Plans must be consistent with FERC s planning principles FERC is authorized to require modification of a submitted plan Query: what happens if a given region does not submit a plan? Directs DOE to identify areas with significant potential for the development of location-constrained resources Continues requirement for DOE to conduct congestion studies every 3 years 15 But there is no provision for the establishment of NIETCs
16 Tx Planning and Siting Provisions i in Sen. Bingaman s Bill (S. 1462) - 2 Provides federal siting authority for "high priority" national transmission projects (345 kv AC/300kV DC or higher) included in the FERC-approved plan If state fails to approve its construction within 1 year after submission of completed application Encourages use of EPAct Section 368 corridors to the maximum extent practicable Authorizes additional corridors if necessary Directs FERC to establish by rule a methodology for allocation of costs of high priority national transmission projects This methodology must be just and reasonable Costs allocated to a given region must be reasonably proportionate to measurable economic and reliability benefits 16
17 Other Senate Bills in the Hopper The Reid bill (S. 539) provides for FERC transmission siting jurisdiction for "green grid" projects This jurisdiction is not preemptive, because bill also allows transmission developers to "seek siting authority from a State Query: what developer would voluntarily default to multiple state siting jurisdiction if federal authority is available? The Dorgan bill (S. 774) has many similarities to the Reid bill, but is more problematic Eliminates the current DOE national corridor/ferc backstop provision Replaces it with a Clean Energy Superhighway planning requirement, accompanied by preemptive FERC siting authority over projects included in the plan Also includes some complex procedural mechanisms, including a Siting Dispute Resolution Board, which would have authority to override siting constraints and mitigation measures proposed by States. 17
18 Transmission i Planning and Siting in the Future: A State or Federal Function? Pending federal legislation, if passed, is likely to dramatically increase the role of the federal government in transmission planning and siting. Will this make things better or worse? Siting: FERC and DOE should provide the same degree of urgency in coordinating federal agency approvals of siting applications for projects brought before state siting authorities, as is ostensibly mandated under EPAct for projects bought before FERC in its backstop siting role FERC s siting process should build upon and be coordinated with the state process as fully as possible 18 Or else, the FERC process should not start until it has been determined with high h likelihood lih that t FERC siting preemption will in fact be triggered
19 Transmission Planning and Siting in the Future: A State or Federal Function? - 2 Planning: FERC should defer to existing transmission planning processes Transmission planning needs to be coordinated with state energy policies e.g., California s Renewable Portfolio Standard FERC should recognize and accommodate state planning processes e.g., integrated resource planning Better integration of resource planning and siting considerations is needed, especially at the front end of the transmission planning process FERC s rules need to address how project proponents expect to initially finance their projects and ultimately recover costs 19
20 Questions? Larry Chaset Legal Division California i Public Utilities Commission i lau@cpuc.ca.gov Phone: (415)
COASTAL CONSERVANCY. Staff Recommendation March 25, 2004 LOS ANGELES GREEN VISION PLAN. File No.: Project Manager: Marc Beyeler
COASTAL CONSERVANCY Staff Recommendation March 25, 2004 File No.: 04-014 Project Manager: Marc Beyeler RECOMMENDED ACTION: Authorization to disburse up to $50,000 to the University of Southern California
More informationPlanning and Permitting
SCE Transmission Project Planning and Permitting DRECP Stakeholder Meeting August 17, 2011 California s renewable energy and climate goals are among the most ambitious in the nation. Substantial investments
More informationFIREFIGHTING RESOURCES OF CALIFORNIA ORGANIZED FOR POTENTIAL EMERGENCIES
FIREFIGHTING RESOURCES OF CALIFORNIA ORGANIZED FOR POTENTIAL EMERGENCIES PAST, CURRENT AND FUTURE DIRECTIONS A PROGRESS REPORT OCTOBER 1988 PAST, CURRENT, AND FUTURE Coordinate multi-agency resources during
More informationStreets for People, Place-Making and Prosperity. #TOcompletestreets
COMPLETE STREETS FOR TORONTO Streets for People, Place-Making and Prosperity COMPLETE STREETS: A NEW APPROACH A Complete Streets design approach considers the needs of all users people who walk, bicycle,
More informationSTUDY ISSUE PAPER ON THE RESIDENTIAL SPRINKLER ORDINANCE
STUDY ISSUE PAPER ON THE RESIDENTIAL SPRINKLER ORDINANCE REPORT IN BRIEF In 1996, Council asked staff to study and report on "City imposed mandates." The report was completed by the Office of the City
More informationSAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY
THIS PRINT COVERS CALENDAR ITEM NO. : 10.3 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Approving the removal of Municipal Railway bus zones at various
More informationFire and Emergency Services Newfoundland and Labrador. Public Hearings Proposed Lower Churchill Hydroelectric Generation Project March 2011
Fire and Emergency Services Newfoundland and Labrador Public Hearings Proposed Lower Churchill Hydroelectric Generation Project March 2011 1 Overview Fire and Emergency Services- Newfoundland and Labrador
More informationThe Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass
The Illinois Department of Transportation and Lake County Division of Transportation welcome you to this Public Hearing for U.S. Route 45 from Illinois Route 132 to Illinois Route 173, including the Millburn
More informationmaster plan of highways bus rapid transit amendment
Scope of Work master plan of highways bus rapid transit amendment September 2011 Montgomery County Planning Department M-NCPPC MontgomeryPlanning.org 1 Scope of Work master plan of highways bus rapid transit
More informationBILLING CODE P DEPARTMENT OF ENERGY FEDERAL ENERGY REGULATORY COMMISSION COMBINED NOTICE OF FILINGS #1
This document is scheduled to be published in the Federal Register on 02/07/2018 and available online at https://federalregister.gov/d/2018-02383, and on FDsys.gov BILLING CODE 6717-01-P DEPARTMENT OF
More information1.4 To establish opportunities for local pride in public open spaces. 1.5 To clarify Council s role as an enabler and supporter of this policy.
Relevant Legislation Reserves Act 1977 Local Government Act 2002 1. Policy Objective 1.1 To provide options for members of the community who lack sufficient private open space to have their own vegetable
More informationPERFORMANCE GOALS 5 RESPONSIBILITIES 6 M=manufacturer. Y Recommended based on recycling rate
PSI Model Legislation Developed through multistakeholder dialogue. http://productstewardship.us/di splaycommon.cfm?an=1&subart iclenbr=99 Y Y Y Options: 1. Specify amount but not cash v. rebate 2. Specify
More informationTelecom Decision CRTC
Telecom Decision CRTC 2017-389 PDF version Reference: Telecom Regulatory Policy 2016-165 Ottawa, 27 October 2017 File number: 8665-C12-201507008 CISC Emergency Services Working Group Consensus report ESRE0076
More informationAlternative Routes. St. Vital to La Verendrye Station - Southern Loop Transmission Corridor. 20 different segments 4 segments common to all routes
Alternative Routes St. Vital to La Verendrye Station - Southern Loop Transmission Corridor In a fixed right-of-way St. Vital to Letellier Station 20 different segments 4 segments common to all routes Goal
More informationCHAPTER Committee Substitute for Senate Bill No. 1472
CHAPTER 2007-99 Committee Substitute for Senate Bill No. 1472 An act relating to beaches and shores; amending s. 161.021, F.S.; amending a definition; amending s. 161.085, F.S.; restricting the use of
More informationStandard PRC Transmission Relay Loadability
A. Introduction 1. Title: Transmission Relay Loadability 2. Number: PRC-023-2 3. Purpose: Protective relay settings shall not limit transmission loadability; not interfere with system operators ability
More informationPresentation Item C Annotated Model Outline for a Framework for a Green Infrastructure Plan
Date: August 17, 2016 To: From: Subject: Management Committee Dan Cloak, Consultant Presentation Item C Annotated Model Outline for a Framework for a Green Infrastructure Plan Recommendation: Receive the
More information12 AMENDMENT NO. 149, TOWN OF MARKHAM HIGHWAY 404 NORTH SECONDARY PLAN
12 AMENDMENT NO. 149, TOWN OF MARKHAM HIGHWAY 404 NORTH SECONDARY PLAN The Planning and Economic Development Committee recommends the adoption of the recommendation contained in the following report August
More information- Residential Fire Sprinkler -
- Residential Fire Sprinkler - Update as of September 15, 2014 The information provided is a state-by-state status of the 2009 IRC adoption and legislation activities as reported by HBA s. NAHB staff monitors
More informationProject Summary. Rationale
Modeling and Evaluating Potential Constraints Between Siting of Commercial Wind Power and Ecological and Social Values in the Mountains of the Northern Forest Principal Investigator(s): Dr. David Publicover
More informationESSENTIAL PUBLIC FACILITIES
ESSENTIAL PUBLIC FACILITIES PURPOSE This section contains guidelines and policies which outline a process and define a set of criteria to be used to identify sites for development of facilities classified
More information2.7 ac park. TOTAL 5,403 DU 1,297,900 sf 1,105,450 sf 3.87 ac 5,563 DU 1,121,200 sf 1,105,450 sf 3.87 ac
PLAN AMENDMENT 2013-I-B1: SEVEN CORNERS SPECIAL STUDY Summary of Pre-staffing Comments Planner: Bernard Suchicital bsuchi@fairfaxcounty.gov (703) 324-1254 Background On October 29, 2013, the Board of Supervisors
More informationGlenborough at Easton Land Use Master Plan
Implementation 114 9.0 IMPLEMENTATION 9.1 OVERVIEW This chapter summarizes the administrative procedures necessary to implement the proposed land use plan, infrastructure improvements, development standards,
More informationLU Encourage schools, institutions, and other community facilities that serve rural residents to locate in neighboring cities and towns.
Application No. 891627: Comprehensive Plan Text Amendment - Rural School Policies - Amend policies consistent with State Legislation allowing schools in the rural area and extension of sewer service to
More informationParks Master Plan Implementation: Phase I Waterfront Use and Design REPORT #: September 7, 2016 File #
0 'O DI Lan-171-14 1 - THE CORPORATION OF THE TOWN OF COBOURG..,. STAFF REPORT TO: FROM: Mayor and Members of Council Dean A. Hustwick, Director of Recreation and Culture DATE OF MEETING: Committee of
More informationCOMMISSION DELEGATED REGULATION (EU) /... of
EUROPEAN COMMISSION Brussels, 29.6.2017 C(2017) 4408 final COMMISSION DELEGATED REGULATION (EU) /... of 29.6.2017 amending Commission Delegated Regulation (EU) No 151/2013 of 19 December 2012 supplementing
More informationE-Waste Frequently Asked Questions August 1, 2017
CHRIS CHRISTIE DEPARTMENT OF ENVIRONMENTAL PROTECTION BOB MARTIN Governor Commissioner Division of Solid & Hazardous Waste Bureau of Recycling & Hazardous Waste Management KIM GUADAGNO 401 East State Street
More informationLandscaping Securities August 28, 2014
Landscaping Securities August 28, 2014 The Office of the City Auditor conducted this project in accordance with the International Standards for the Professional Practice of Internal Auditing Office of
More informationSENATE, No. 759 STATE OF NEW JERSEY. 217th LEGISLATURE PRE-FILED FOR INTRODUCTION IN THE 2016 SESSION
SENATE, No. STATE OF NEW JERSEY th LEGISLATURE PRE-FILED FOR INTRODUCTION IN THE 0 SESSION Sponsored by: Senator BOB SMITH District (Middlesex and Somerset) Senator JIM WHELAN District (Atlantic) SYNOPSIS
More informationsystems is available on the Colorado Wetland Information Center (CWIC) website.
Colorado Natural Heritage Program Wetland Program Plan -- Dec 2015 Status Update and Addendum -- The Colorado Natural Heritage Program (CNHP) developed a Wetland Program Plan (WPP) in 2010 for the planning
More informationDRAFT MAP AMENDMENT FLU 04-4
DRAFT MAP AMENDMENT FLU 04-4 SW 24 TH AVENUE ROADWAY CORRIDOR The University of Florida participates with the Metropolitan Transportation Planning Organization (MTPO) in its responsibilities for the continuing,
More informationNASSAU COUNTY TOWN HALL NEW YORK & CONNECTICUT SUSTAINABLE COMMUNITIES. A Unique Bi-State Partnership to Improve Jobs, Housing and Transportation
NASSAU COUNTY TOWN HALL NEW YORK & CONNECTICUT SUSTAINABLE COMMUNITIES A Unique Bi-State Partnership to Improve Jobs, Housing and Transportation Police Headquarters Auditorium Mineola, NY December 9 th,
More informationPlanning Department. Director of Planning. Manager of Planning. Planning Technician/ Sustainability Coordinator. Planner II/ Heritage Coordinator
Department Director of Manager of Policy Planner Planner II (2) Planner II/ Heritage Coordinator Technician/ Sustainability Coordinator Technician Administrative Clerk March 2017 Department 2018 Business
More informationCHAPTER 12 IMPLEMENTATION
CHAPTER 12 IMPLEMENTATION The 2010 Town of Denton Comprehensive Plan is intended to capture a vision of the future of Denton. As such, it provides a basis for a wide variety of public and private actions
More informationFAQ S about Restoration Planning FROM THE Department of Ecology WEBSITE:
FAQ S about Restoration Planning FROM THE Department of Ecology WEBSITE: http://www.ecy.wa.gov/programs/sea/sma/st_guide/smp/restoration/qanda.html Notations in parentheses are staff notes directing you
More informationCITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA
CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA Agenda Date: December 16, 2013 Action Required: Adoption of Resolution Presenter: Staff Contacts: Title: James E. Tolbert, AICP, Director of NDS James
More informationSECTION E. Realizing the Plan
SECTION E Realizing the Plan 60 DESIGN REGINA - OFFICIAL COMMUNITY PLAN SECTION E Realizing the Plan Design Regina has been an ambitious plan-making exercise, with a high level of community, stakeholder,
More informationScope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan
Scope of Services River Oaks Boulevard (SH 183) Corridor Master Plan PROJECT AREA The project area consists of the River Oaks Boulevard (SH 183) corridor bounded by SH 199 at the northern end and the Trinity
More informationFire Sprinklers Working Group Final Report
Introduction The Building Act received Royal Assent on March 25, 2015. The Act aims to establish more consistent building requirements across British Columbia and create a more robust and modern building
More informationPurpose of the Master Plan
Purpose of the Master Plan 4 Master Plan Purpose The Master Plan is a policy framework for decisions that affect the physical, social and economic environment of the Town. The Parker 2035: Master Plan
More informationRESOLUTION NO. R Refining the route, profile and stations for the Downtown Redmond Link Extension
RESOLUTION NO. R2018-32 Refining the route, profile and stations for the Downtown Redmond Link Extension MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Capital Committee Board PROPOSED ACTION 09/13/2018
More informationCOASTAL CONSERVANCY. Staff Recommendation June 5, 2008 SAN DIEGO RIVER TRIBUTARY CANYONS PROJECT. File No Project Manager: Megan Johnson
COASTAL CONSERVANCY Staff Recommendation June 5, 2008 SAN DIEGO RIVER TRIBUTARY CANYONS PROJECT File No. 08-059 Project Manager: Megan Johnson RECOMMENDED ACTION: Authorization to disburse an amount not
More informationTable of Contents TABLE OF CONTENTS SECTION TITLE PAGE
TABLE OF CONTENTS SECTION TITLE PAGE 1 INTRODUCTION AND OVERVIEW 1-1 1.1 Purpose and Need 1-1 1.2 Goals and Objectives 1-3 1.3 Overview of the Planning Process 1-5 1.4 Federal and State Requirements and
More information1.0 PROJECT PURPOSE AND NEED
1.0 PROJECT PURPOSE AND NEED The FasTracks Plan includes the extension of the Central Corridor from its current terminus at 30th/Downing to a connection to the East Corridor commuter rail service planned
More information3. VISION AND GOALS. Vision Statement. Goals, Objectives and Policies
Vision Statement Queen Creek s interconnected network of parks, trails, open spaces and recreation opportunities provide safe and diverse activities and programs that sustain its unique, small town, equestrian
More informationDGE 2 EUROPEAN UNION. Brussels, 20 September 2017 (OR. en) 2016/0287 (COD) PE-CONS 28/17 TELECOM 158 FC 54 CODEC 1008
EUROPEAN UNION THE EUROPEAN PARLIAMT THE COUNCIL Brussels, 20 September 2017 (OR. en) 2016/0287 (COD) PE-CONS 28/17 TELECOM 158 FC 54 CODEC 1008 LEGISLATIVE ACTS AND OTHER INSTRUMTS Subject: REGULATION
More informationCity of Tacoma Planning and Development Services
Agenda Item D-1 City of Tacoma Planning and Development Services To: Planning Commission From: Elliott Barnett, Planning Services Division Subject: Application #2014-08 Open Space Element Update Meeting
More informationINTERGOVERNMENTAL COORDINATION ELEMENT
Goals, Objectives and Policies COORDINATION ELEMENT GOAL 8.1.: ESTABLISH EFFECTIVE COORDINATION MEASURES AMONG ALL PERTINENT PUBLIC AND QUASI-PUBLIC ENTITIES SO TO BEST MAINTAIN PALM BEACH GARDENS' QUALITY
More informationTHE REGIONAL MUNICIPALITY OF YORK BYLAW NO A bylaw to adopt Amendment No. 6 to the Official Plan for The Regional Municipality of York
THE REGIONAL MUNICIPALITY OF YORK BILL NO. 13 BYLAW NO. 2014-13 A bylaw to adopt Amendment No. 6 to the Official Plan for The Regional Municipality of York WHEREAS the Planning Act, R.S.O. 1990, c.p.13,
More informationAuthority of the General Plan
Authority of the General Plan This La Habra Heights General Plan will serve as the blueprint for future planning and development in the City. This General Plan describes the City s vision for the future
More informationNORTH-SOUTH CORRIDOR STUDY EXECUTIVE SUMMARY. Executive Summary
Executive Summary Background As congestion continues to affect mobility in the region, the Ozarks Transportation Organization (OTO) is particularly concerned with traffic movement. The North-South Corridor
More informationVEOLIA ES TECHNICAL SOLUTIONS, L.L.C. REGULATORY UPDATE June 2013
VEOLIA ES TECHNICAL SOLUTIONS, L.L.C. REGULATORY UPDATE June 2013 ENVIRONMENTAL UPDATES A. EPA Approves New Recycling Method for Processed Glass in Cathode Ray Tubes (CRT s) B. Colorado Ban on the Land
More informationCITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF NOVEMBER 15, 2016
Item 11, Report No. 38, of the Committee of the Whole, which was adopted without amendment by the Council of the City of Vaughan on November 15, 2016. Regional Councillor Di Biase declared an interest
More informationIssues Requiring Future Study
Issues Requiring Future Study Transportation planning is an ongoing process that tends to identify new issues as it finds solutions for others. Some issues are so complex that a solution to one problem
More informationCONSULTING SERVICES FOR THE WHITEBELT VISIONING EXERCISE ADDENDUM TO THE GTA WEST LAND USE STUDY WORK PROGRAM
CONSULTING SERVICES FOR THE WHITEBELT VISIONING EXERCISE ADDENDUM TO THE GTA WEST LAND USE STUDY 1. Introduction WORK PROGRAM The Town of Caledon is a large, local municipality located in the Greater Toronto
More informationKibworth Harcourt. Introduction. Introduction
Introduction Introduction Welcome to this public exhibition on the proposals for the delivery of new homes on land at The Kibworths. The purpose of today s exhibition is to give you the opportunity to
More informationPresentation Outline. Southwest Area Plan. Slide 1. Slide 2. Presentation to the Committee of the Whole. September 20, 2011
Slide 1 Southwest Area Plan Presentation to the Committee of the Whole September 20, 2011 Slide 2 Presentation Outline City-Wide Growth Planning Link Official Plan Policies Current Situation and Projections
More informationCity of Hermosa Beach Administrative Policy #
City of Hermosa Beach Administrative Policy # SUBJECT: Living Streets Policy Date: Approved by: City Council Authority: Public Works Department & Community Development Department Mayor, PURPOSE The City
More informationPlanning Commission Report
Planning Commission Report To: From: Subject: Planning Commission Meeting: January 6, 2016 Agenda Item: 8-B Planning Commission David Martin, Planning & Community Development Director Introduction to the
More informationPurpose of the Master Plan
Purpose of the Master Plan 4 Master Plan Purpose The Master Plan is a policy framework for decisions that affect the physical, social and economic environment of the Town. The Parker 2035: Master Plan
More informationKEY ISSUES W.R.T. URBAN PLANNING GUIDELINES
Land and Poverty Conference 2017: Responsible Land Governance - Towards an Evidence-Based Approach Source: Javier Mozas, Aurora Fernandez Per (2006), Density: New Collective Housing; UNHabitat 2013 NATIONAL-LEVEL
More informationOutlawing Sprawl. Pennsylvania Chapter American Planning Association October 6, 2009
Outlawing Sprawl Pennsylvania Chapter American Planning Association October 6, 2009 Presented by: Ronald T. Bailey, AICP Executive Director Chester County Planning Commission Location: 2009 PA Chapter
More informationUpdate on the State of California Model Water Efficient Landscape Ordinance (CA MWELO)
AGENDA ITEM K-1 Public Works STAFF REPORT City Council Meeting Date: 10/6/2015 Staff Report Number: 15-151-CC Informational Item: Update on the State of California Model Water Efficient Landscape Ordinance
More informationFERC DAM SAFETY PROGRAM
National Hydropower Association Northeast Regional Meeting September 17, 2009 Albany, NY FERC DAM SAFETY PROGRAM FERC Presenter Jerry Cross Supervisor-Dam Safety Engineering Division of Dam Safety and
More informationADOPTION OF THE REVISED OPEN SPACE AND CONSERVATION ELEMENT OF THE GENERAL PLAN
TO: FROM: SUBJECT: Honorable Mayor and City Council Planning Department ADOPTION OF THE REVISED OPEN SPACE AND CONSERVATION ELEMENT OF THE GENERAL PLAN RECOMMENDATION: It is recommended that the City Council:
More informationBUSINESS PLAN. CEN/TC 336 BITUMINOUS BINDERS Version 2018 EXECUTIVE SUMMARY
Page: 1 BUSINESS PLAN CEN/TC 336 BITUMINOUS BINDERS Version 2018 EXECUTIVE SUMMARY BUSINESS ENVIRONMENT The parties interested in the bituminous binder market are the following industries: - the bituminous
More informationInventory of the Alfred R. Golzé Photographs, (bulk ) No online items
http://oac.cdlib.org/findaid/ark:/13030/tf558004f0 No online items Processed by Randal Brandt. Water Resources Collections and Archives Orbach Science Library, Room 118 PO Box 5900 University of California,
More informationCOMMUNITY SERVICES DIVISION Parks and Recreation Department. Chair and Members of the Community and Corporate Services Committee
Pg 1 of Report PR 33-09 COMMUNITY SERVICES DIVISION Parks and Recreation Department TO: SUBJECT: Chair and Members of the Community and Corporate Services Committee Naval Memorial Monument Report Number:
More information5.0 IMPLEMENTATION STRATEGIES
5.0 IMPLEMENTATION STRATEGIES 5.1 Recommended Alternative This chapter discusses the anticipated steps needed to move each project from recommendation to construction. Since full funding for these alternatives
More informationCOLVER ROAD INDUSTRIAL CONCEPT PLAN
COLVER ROAD INDUSTRIAL CONCEPT PLAN A CONCEPTUAL LAND USE AND TRANSPORTATION PLAN FOR TA-4 AN URBAN RESERVE AREA OF THE CITY TALENT City of Talent Adopted by City Council Resolution No., June, 2015 PART
More informationPLANNING IN ARLINGTON. Briefing to Katie Cristol
1 PLANNING IN ARLINGTON Briefing to Katie Cristol Overview 2 Comprehensive Plan - Background Administration of the Comprehensive Plan Review of the Comprehensive Plan Implementation of the Comprehensive
More informationSteering Committee for Water Efficient Products 1001 Connecticut Avenue, NW Suite 801 Washington, DC 20036
Steering Committee for Water Efficient Products 1001 Connecticut Avenue, NW Suite 801 Washington, DC 20036 Potential Changes to Energy Star Criteria for Residential Dishwashers Stakeholders Meeting Washington,
More informationIowa s Statewide Urban Design Standards Promote Improved Access Management
Iowa s Statewide Urban Design Standards Promote Improved Access Management David J. Plazak and Dale S. Harrington Center for Transportation Research and Education Iowa State University 2901 South Loop
More informationRECREATION AND OPEN SPACE ELEMENT GOALS, OBJECTIVES, AND POLICIES
RECREATION AND OPEN SPACE ELEMENT GOALS, OBJECTIVES, AND POLICIES Goal 7 To provide park facilities, recreation programs, and open space resources that are safe, adequate, and accessible to all City residents,
More informationA Profile of a Refrigerator Recycling Program
A Profile of a Refrigerator Recycling Program Cynthia M. Austin, Heschong Mahone Group Cathy Chappell, Heschong Mahone Group Ed Hamzawi, Sacramento Municipal Utility District Warren Lindeleaf, Sacramento
More informationREPORT TO COUNCIL City of Sacramento
Honorable Mayor and Members of the City Council REPORT TO COUNCIL City of Sacramento 915 I ' Street, Sacramento, CA 95814-2604 www. CityofSacramento.org Consent April 1, 2010 Title: Initiation of the Establishment
More informationTHAT the attached Terms of Reference for the Thornhill Centre Street Study be approved.
COMMITTEE OF THE WHOLE AUGUST 18, 2003 THORNHILL CENTRE STREET STUDY PLANNING FILE: 15.92 Recommendation The Commissioner of Planning recommends: THAT the attached Terms of Reference for the Thornhill
More informationPort of San Diego Sea Level Rise Ad Hoc Committee Meeting 1 of 3.. September 18, 2018
Port of San Diego Sea Level Rise Ad Hoc Committee Meeting 1 of 3. September 18, 2018 Agenda Welcome Introductions Rules of the Ad-Hoc Presentation Background Vulnerability Assessment Results Non-Agenda
More informationSOUTH AFRICA S PREPARATIONS FOR HABITAT III COMMON AFRICAN POSITION FOR HABITAT III. Habitat III Urban Breakfast 5 October 2016
SOUTH AFRICA S PREPARATIONS FOR HABITAT III COMMON AFRICAN POSITION FOR HABITAT III Habitat III Urban Breakfast 5 October 2016 Context and Background 1. Africa intends actively shaping the New Urban Agenda,
More information9 CITY OF VAUGHAN OFFICIAL PLAN AMENDMENT NO BOCA EAST INVESTMENTS LIMITED
9 CITY OF VAUGHAN OFFICIAL PLAN AMENDMENT NO. 631 - BOCA EAST INVESTMENTS LIMITED The Planning and Economic Development Committee recommends the adoption of the recommendations contained in the following
More informationOnondaga County Sustainable Streets Project. Onondaga County Planning Federation June 7, Onondaga County Sustainable Streets Project 1
Onondaga County Sustainable Streets Project Onondaga County Planning Federation June 7, 2012 Onondaga County Sustainable Streets Project 1 Sustainable Streets 1. Introduction to the SMTC 2. Sustainable
More informationCITY OF PUYALLUP. Background. Development Services
CITY OF PUYALLUP Development Services 333 South Meridian Puyallup WA 98371 To: City Council From: Katie Baker, AICP, Planning Division Re: South Hill Neighborhood Plan Adoption Date: (Meeting date: February
More informationDEPARTMENT OF PUBLIC SAFETY DIVISION OF FIRE PREVENTION AND CONTROL
DEPARTMENT OF PUBLIC SAFETY DIVISION OF FIRE PREVENTION AND CONTROL RULES AND REGULATIONS CONCERNING 8 CCR 1507-57 BUILDING AND FIRE CODE ENFORCEMENT AND CERTIFICATION OF INSPECTORS FOR LIMITED GAMING
More informationCITY CLERK. Consolidated Clause in North York Community Council Report 8, which was considered by City Council on October 26, 27 and 28, 2004.
CITY CLERK Consolidated Clause in Report 8, which was considered by City Council on October 26, 27 and 28, 2004. 28 Request for Direction Report - Site Plan Approval Application 03 200020 NNY 24 SA - Marek
More information6 Growth Management Challenges and Opportunities
6 Growth Management Challenges and Opportunities The Town has established a goal of attaining a 50% participation rate with respect to employment opportunities versus residential population. The Town s
More informationStandard Development Timeline
Standard Development Timeline The drafting team maintained this section while developing the standard. It will be removed when the standard becomes effective. Description of Current Draft This draft is
More informationOverview of Southwestern Pennsylvania Commission s (SPC) 2040 Long Range Transportation Plan (LRTP)
Overview of Southwestern Pennsylvania Commission s (SPC) 2040 Long Range Transportation Plan (LRTP) Presented to Pennsylvania Agency Coordination Meeting May 27, 2015 Doug Smith & Ryan Gordon 1 Southwestern
More informationVentura County Stormwater Technical Guidance Manual
Ventura County Stormwater Technical Guidance Manual City of San Buenaventura Standard Construction Details c. Technical Guidance Manual for Stormwater Quality Control Measures d. County of Ventura Standard.
More informationCalifornia Environmental Quality Act (CEQA) Environmental Review Process
California Environmental Quality Act (CEQA) Environmental Review Process Los Angeles Union Station Forecourt and Esplanade Improvements constitute a Project Los Angeles County Metropolitan Transportation
More informationSEWRPC. Joint Meeting of the Advisory Committees on Regional Land Use Planning and Regional Transportation Planning APRIL 26, 2018
SEWRPC Joint Meeting of the Advisory Committees on Regional Land Use Planning and Regional Transportation Planning APRIL 26, 2018 WISCONSIN DEPARTMENT OF TRANSPORTATION BRETT WALLACE, FOXCONN PROJECT DIRECTOR
More informationC. Westerly Creek Village & The Montview Corridor
C. Westerly Creek Village & The VISION Community Vision When the goals of the city are achieved Westerly Creek Village, a distinctive community defined by Montview Boulevard and Westerly Creek, is a strong
More informationCity of Los Angeles, Bureau of Engineering staff report - dated October 14, 2009 and the Hearing Examiner Report signed October 21, 2009.
- the Rifkin Transportation Los Feliz Towers 4455 Los Feliz Boulevard Suite 1403 Planning Group E-mail allynrifkin@gmail.com Telephone and fax -- (323) 664-2805 Mobile phone - (323) 697-1594 February 3,
More informationChapter 11. Implementation Plan
Chapter 11 Implementation Plan 127 D O W N T O W N T AV A R E S R E D E V E L O P ME N T MA S T E R P L A N IMPLEMENTATION PLAN This section shows how the Master Plan translates to a phased series of
More informationPublic Open House. Overview of the Downtown Plan Official Plan Amendment April 23, 2018
Public Open House Overview of the Downtown Plan Official Plan Amendment April 23, 2018 1 A 25-Year Plan for Downtown To ensure growth contributes positively to Toronto s Downtown as a great place to live,
More informationINTRODUCTION. 1.1 What is a General Plan? 1.2 Requirements for a General Plan. 1.3 Introduction to Monterey County
1.1 What is a General Plan? INTRODUCTION California state law requires each city and county to adopt a comprehensive, long-term general plan for the physical development of the county or city, and any
More informationRidgefield and the Growth Management Act
1 2 Ridgefield and the Growth Management Act 3 Why Do We Plan History of Planning in Ridgefield Washington experiences rapid growth in the late 1980 s that began to change the perceived quality of life.
More informationParks, Trails, and Open space Element
Parks, Trails, and Open space Element Parks, Trails, and Open Space element Parks, Recreation, and Open Space are important components of the quality of life desired by the residents of Elk Grove. This
More informationSAFETY CODES COUNCIL ORDER. BEFORE THE FIRE TECHNICAL COUNCIL On June 21, 2012
SAFETY CODES COUNCIL #1000, 10665 Jasper Avenue N.W., Edmonton, Alberta, Canada, T5J 389 Tel: 780-413-0099 I 1-888-413-0099 Fax: 780-424-5134 I 1-888-424-5134 www.safetycodes.ab.ca COUNCIL ORDER No. 0015423
More informationAlternative Route Selection
Alternative Route Selection Multiple routes are developed within the Alternative Corridors Developed by Project Team taking into account all information gathered to date Buildings St. Vital Station to
More informationBASIC ASSESSMENT PROCESS
BASIC ASSESSMENT PROCESS NOTICE OF A BASIC ASSESSMENT PROCESS FOR THE PROPOSED MIXED USE DEVELOPMENT ON THE REMAINDER OF PORTION 2, REMAINDER OF PORTION 7, PORTION 7, REMAINDER OF PORTION 9, REMAINDER