1 SECTION WET-PIPE SPRINKLER SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. Includes But Not Limited To: 1. Furnish and install complete wet-pipe fire sprinkler system as specified in Contract Documents. B. Products Installed But Not Supplied Under This Section: 1. Firestopping C. Related Sections: 1. Section : Quality of Firestopping. 2. Section : Fire Detection and Alarm Annunciation Panels including connection of tamper switches and flow detectors to alarm system and furnishing and installing of low temperature switch. 3. Section : Fire Suppression Utility Water Distribution Piping. 1.2 REFERENCES A. American Society For Testing And Materials: 1. ASTM A 53-02, 'Standard Specification for Pipe, Steel and Hot-Dipped, Zinc-Coated, Welded and Seamless.' 2. ASTM A , 'Standard Specification for Piping Fittings of Wrought Carbon Steel and Alloy Steel for Moderate and Elevated Temperature Service.' 3. ASTM A (2004), Standard Specification for Ferritic Ductile Iron Pressure-Retaining Casting for Use at Elevated Temperatures. 4. ASTM A (2004), 'Standard Specification for Ductile Iron Castings.' 5. ASTM A , Standard Specification for Black and Hot-Dipped -Coated (Galvanized) Welded and Seamless Steel Pipe for Fire Protection Use. B. American Society of Mechanical Engineers / American National Standards Institute: 1. ASME / ANSI B , 'Malleable-Iron Threaded Fittings.' 2. ASME / ANSI B , 'Gray Iron Threaded Fittings.' 3. ASME / ANSI B , ' Pipe Flanges and Flanged Fittings NPS 1/2 Through NPS 24.' C. American Water Works Association: 1. AWWA C , Joints, Grooved and Shoulder Type. D. National Fire Protection Association / American National Standards Institute: 1. NFPA / ANSI , 'Installation of Sprinkler Systems.' 1.3 SUBMITTALS A. Shop Drawings: 1. Size sprinkler system by one of following methods: a. Pipe schedule method in accordance with NFPA/ANSI 13. b. Hydraulic calculation design method based on water supply evaluation performed at building site Section
2 c. On submittals, refer to sprinkler heads by sprinkler identification or model number published in appropriate agency listing or approval. Trade names and other abbreviated designations are not acceptable 2. Submittal Procedure: a. After award of Contract and before purchase of equipment, submit seven sets of shop drawings with specifications and hydraulic calculations, if pipe schedule method is not used, to Architect and two sets to local jurisdiction having authority for fire prevention for review. b. After integrating Architect's and AHJ's comments into drawings, licensed certified fire protection engineer of record submitting fire sprinkler system design construction documents shall stamp, sign, and date each sheet of shop drawings and first page of specifications and calculations. c. Submit stamped documents to Owner and to AHJ for fire prevention for final approval. d. After final approval, submit four copies of approved stamped documents to Architect. e. Failure of system to meet requirements of authority having jurisdiction shall be corrected at no additional cost to Owner. B. Closeout: 1. Operation And Maintenance Manual Data: a. Modify and add to requirements of Section as follows: 1) Provide master index showing items included. 2) Provide name, address, and phone number of Architect, Architect's Fire Sprinkler Consultant, General Contractor, and Fire Protection subcontractor. 3) Provide operating instructions to include: a) General description of fire protection system. b) Step by step procedure to follow in putting system into operation. 4) Maintenance instructions shall include: a) List of system components used indicating name and model of each item. b) Manufacturer's maintenance instructions for each component installed in Project. Instructions shall include installation instructions, parts numbers and lists, operation instructions of equipment, and maintenance and lubrication instructions. 5) Include copies of approved shop drawings and copies of required warranties. b. If system has both wet and dry segments, provide single Operations And Maintenance Manual for total Fire Suppression System. 2. Inspection Checklist: a. Provide Owner with checklist and brief explanation of following inspections: 1) Weekly Inspection. 2) Monthly Inspection. 3) Quarterly Inspection. 4) Semi-Annual Inspection. 5) Annual Inspection. 1.4 QUALITY ASSURANCE A. Qualifications: 1. Designer: a. Licensed fire protection engineer or fire protection system designer certified by NICET to level three minimum and engaged in design of fire protection systems. Engineer / designer shall: 1) Design system so it can be completely drained. 2) Be responsible for overseeing preparation of shop drawings, hydraulic calculations where applicable, and system installation. 3) Make complete inspection of installation including capability of being completely drained. 4) Provide corrected record drawings to Owner with letter of acceptance. 5) Certify that installation is in accordance with Contract Documents. 2. Installer: Licensed by jurisdiction having authority over installed fire protection systems for location of Project. Furnish verified list of similar projects installed during past 5 years minimum Section
3 B. Requirements of Regulatory Agencies: 1. Unless noted otherwise, system shall conform to: a. NFPA / ANSI 'Light & Ordinary Hazard Occupancies.' b. NFPA / ANSI 'Service Mains and Their Appurtenances, Private.' c. NFPA / ANSI 'Life Safety Code.' d. Requirements of local water department and local authority having jurisdiction for fire protection. e. Applicable rules, regulations, laws, and ordinances. f. Underwriter's Laboratories Publication, 'Fire Protection Equipment Directory', current edition at time of Pre-Bid Meeting. g. Comply with backflow prevention requirements and, if required, include device in hydraulic calculations. 1.5 OWNER'S INSTRUCTIONS A. Instruction Sessions: 1. Instruct Owner's personnel in operation and maintenance of system utilizing Operation And Maintenance Manual when so doing. Minimum instruction period shall be four hours. 2. Instruction sessions shall occur after Substantial Completion inspection when system is properly working and before final payment is made. B. Posted System Diagram: 1. Provide single, color-coded floor plan diagram showing total system. Color dry pipe system elements BLUE and wet pipe system elements RED. Indicate locations of dry pipe system drains and inspector test valve station. 2. Include following information on diagram sheet: a. Explanation of principles behind operation of dry pipe system alarm valve. b. Step by step shut down procedure. c. Step by step system drainage procedure. d. Step by step start-up procedure. e. Step by step procedure for protection of system from freezing. 3. Laminate diagram with plastic and mat or frame suitable for hanging near riser. 1.6 MAINTENANCE A. Extra Materials: Furnish twelve spare heads of each type and temperature rating used, properly boxed with sprinkler head wrench. PART 2 - PRODUCTS 2.1 COMPONENTS A. General: Use only domestically manufactured pipe, pipe fittings, valves, sprinkler heads, and other components. B. Pipe 1. Schedule 40 Welded Steel a. Exterior, Above Ground: Schedule 40 hot-dip galvanized welded steel meeting requirements of ASTM A 53 or ASTM A 795. b. Interior, Above Ground: Schedule 40 black welded steel meeting requirements of ASTM A 53 or ASTM A Schedule 40 Mechanical Grooved Pipe And Fittings: Mechanical grooved pipe, couplings, and fittings by Victaulic. 3. Grooved Coupling Gaskets: a. Class Two Quality Standard: Section
4 1) Victaulic E EPDM-Type A, Grade, temperature rated minus 30 deg F to 150 deg Fminus one deg C to 65 deg C. C. Fittings: 1. Usage: a. 2 inches 50 mm And Smaller: Welded, screwed, flanged, or roll grooved coupling system. At Contractor s option, piping 1-1/4 inches 32 mm and smaller, may be Victaulic FIT locking lug fittings with pressure responsive gasket. For use with schedule 40 carbon steel pipe. b. 2-1/2 inches 63 mm And Larger: Welded, flanged, or roll grooved coupling system. 2. Types And Quality: a. Screwed: 1) Cast iron meeting requirements of ANSI B 16.4 or ductile iron meeting requirements of ANSI B 16.3 and ASTM A 536, Grade ) Threaded fittings and pipe shall have threads cut to ANSI B a) Do not extend pipe into fittings to reduce waterway. b) Ream pipe after cutting to remove burrs and fins. b. Flanged: Steel meeting requirements of ANSI B16.5. c. Welded: 1) Carbon steel meeting requirements of ASTM A ) Weld pipe using methods complying with AWS D10.9, level AR-3. Welding procedures and performance of welders shall comply with ASW D10.9, level AR3. d. Roll Grooved Pipe Coupling System: 1) Ductile iron meeting requirements of ASTM A 395 and ASTM A 536, and UL listed and FM approved. 2) Couplings: a) UL listed and FM approved. b) Rigid: (1) Cast to provide rigidity for support and hanging in accordance with NFPA-13. (2) Category Four Approved Products. See Section for definition of Categories. (a) Gruvlok (b) Tyco (Grinnell) 772 (c) Victaulic Style 005. c) Flexible: (1) Use in locations where vibration attenuation and stress relief are required. (2) Category Four Approved Products. See Section for definition of Categories. (a) Gruvlok (b) Tyco (Grinnell) 705 (a) Victaulic Style 75. d) Flange Adapters: (1) Class 125 or 150. (2) Category Four Approved Products. See Section for definition of Categories. (a) Gruvlok 70R. (b) Tyco (Grinnell) 71 (a) Victaulic Style ) Grooved products used on Project shall be from same manufacturer. Grooving tools shall be as recommended by manufacturer of grooved products. D. Hangers, Rods, And Inserts 1. Galvanized, unless specified otherwise, and UL approved for service intended. 2. Class One Quality Standard: a. Hangers and accessories shall be Anvil numbers specified or equals by B-Line. b. Clevis Hangers: Equal to Anvil Fig 65. c. Roller Assembly: Equal to Anvil Fig 181. d. Riser Clamps: Equal to Anvil Fig Concrete Inserts: Section
5 a. Equal to Anvil Fig 282. Suitable for special nuts size 3/8 inch10 mm through 7/8 inch22 mm, with yoke to receive concrete reinforcing rods, and with malleable iron lugs for attaching to forms. b. Continuous Inserts: 1) Class Two Quality Standard. See Section (1) Unistrut P-3246 through P Steel Deck Bracket: a. Class Two Quality Standard. See Section ) Unistrut P1000 with clamp nut, minimum 6 inch150 mm length. E. Valves: 1. Butterfly Valves: a. UL / FM approved. b. Indicating type. c. Category Four Approved Products. See Section for definitions of Categories. 1) Milwaukee: a) Model BB-SC502 threaded ends with tamper switch One to 2 inches. b) Model BBVSC502 Grooved ends with tamper switch 2 to 2-1/2 inches. 2) Nibco: a) Model WD Wafer type with valve tamper switch. b) Model GD4765-8N Grooved type with valve tamper switch, 2-1/2 to 8 inches. 3) Tyco (Grinnell): a) Model TFP1515 wafer. b) Model TFP1510 Grooved. 4) Victaulic: Series 705W Grooved end type with internal supv. switches. 2. Gate Valves: a. UL / FM approved. b. Outside Screw and Yoke Type (O.S.&Y). c. Class 150 psi. 1) Nibco: a) T-1040 with Threaded Ends 1/2 to 2 inches. b) F Flanged Ends. 2) Mueller: R Flanged Ends. 3) Victaulic: Series 771 Grooved Ends 3. Ball Valves: a. UL / FM approved. b. Valve tamper switch. c. Category Four Approved Products. See Section for definitions of Categories. 1) Milwaukee: BB-SC502 with threaded ends. 2) Nibco: KT-505 with threaded ends. 3) Nibco: KG-505 with grooved ends. 4) Victaulic: Series 728 with grooved or threaded ends. 4. Swing Check Valves: a. 1/2 to 3 inch 13 to 75 mm horizontal check. 1) Regrinding type. 2) Renewable disk. 3) Bronze Class 125 with threaded ends. 4) Category Four Approved Products. See Section for definitions of Categories. a) Nibco: KT-403-W. b) Victaulic: Series 712. b. 2 to 4 inch 50 to 100 mm Horizontal check: 1) Grooved ends.. 2) Ductile iron body. 3) Rated 300 psi. 4) Category Four Approved Products. See Section for definitions of Categories. a) Tyco (Grinnell): CV-1F Grooved ends. b) Victaulic: Series 712. c) Viking: D-1 Grooved ends. c. 2-1/2 to 12 inch 63 to 300 mm Horizontal check: Section
6 1) Bolted bonnet. 2) Raised face flanges. 3) Bronze mounted with ductile iron body. 4) 125 lb Class A. 5) Category Four Approved Products. See Section for definitions of Categories. a) Nibco: F b) Mueller: A c) Tyco (Grinnell) CV-2 grooved and flanged. d) Viking: G-1 grooved and flanged 5. Wafer Type Check Valves: a. 4 to 8 inch 100 to 300 mm cast iron body. b. 175 psi 1200 KPa minimum working pressure. c. Rubber Seat. 1) Nibco: KW-900-W. 2) Mueller: A Grooved-End Check Valves: a. UL listed and FM approved to 250 psi 1725 kpa maximum operating pressure. b. 2-1/2 to 12 inch 63 to 300 mmductile iron body. c. Disc And Seat: 1) 2-1/2 And 3 Inch 63 to 75 mm: Aluminum bronze disc with mounted elastomer seal and PPS (polyphenylene sulfide) coated seat. 2) 4 Inch 100 mm And Larger: Elastomer encapsulated ductile iron disc with welded in nickel seat. 1) Nibco: KG-900-W grooved ends 2) Victaulic Series Alarm Check Valves: a. Category Four Approved Products. See Section for definitions of Categories. 1) Reliable: E with gauges and drain. 2) Tyco (Grinnell): Model AV ) Victaulic: Series 751 with gauges and drain. 4) Viking: J-1 with gauges and drain. 8. Backflow Preventer: Make and model shown on Drawings or as required by local codes. 9. Retard Chamber: a. Self-draining. b. Category Four Approved Products. See Section for definitions of Categories. 1) Reliable: E-1. 2) Victaulic: Series ) Viking: C Inspector's Test Valve: a. Bronze body with threaded or grooved ends. b. Combination sight glass / orifice. c. Category Four Approved Products. See Section for definitions of Categories. 1) Tyco (Grinnell): Model F350. 2) Victaulic: Testmaster Alarm Test Module Style 720. F. Sprinkler Heads: 1. Concealed Pendant: a. Adjustable cover. b. Coordinate concealed cover finish with Architect. c. Type One Acceptable Products: 1) Wet Pendant, Flat Profile: a) Reliable: F4FR. b) Victaulic: Model c) Viking: Model VK462. d) Tyco (Grinnell): Model RF11. e) Equal as approved by Architect before bidding. See Section ) Dry Pendant: a) Flat Profile: Section
7 (1) Tyco (Grinnell): DS-C. (2) Victaulic: V3618. b) Equal as approved by Architect before bidding. See Section Horizontal Sidewall Sprinkler: b. Recess adjustable. c. Where guards are required, use chrome plated sprinkler guards that are listed, that are approved by Sprinkler Manufacturer for use with head, and that are supplied by Sprinkler Manufacturer. d. Type One Acceptable Products: 1) Wet System: a) Reliable: F1FR. b) Tyco (Grinnell): Model TY3331. c) Victualic: Model V2710. d) Viking: VK305. e) Equal as approved by Architect before bidding. See Section ) Dry System: a) Reliable: F3. b) Tyco (Grinnell): TY3338. c) Victualic: Model V3610. d) Viking: VK162. e) Equal as approved by Architect before bidding. See Section Attic Sprinklers, Upright: b. Approved for use in roof structures, combustible and non-combustible, with ceiling below. c. Category Four Approved Products. See Section for definitions of Categories. 1) Tyco: BB, SD, or HIP. 4. Pendant Sprinklers: b. Where guards or escutcheons are required, use chrome plated sprinkler guards and escutcheons that are listed, that are approved by Sprinkler Manufacturer for use with head, and that are supplied by Sprinkler Manufacturer. c. Type One Acceptable Products: 1) Reliable: F1FR. 2) Tyco: TY ) Victaulic: Model V ) Viking: VK302. 5) Equal as approved by Architect before bidding. See Section Upright Sprinklers: b. Type One Acceptable Products: 1) Reliable: F1FR. 2) Tyco: TY ) Victaulic: Models V ) Viking: VK300. 5) Equal as approved by Architect before bidding. See Section G. Water Flow Alarm: 1. Mechanical Flow Alarm: Water Gong. b. Category Four Approved Products. See Section for definitions of Categories. 1) Reliable: C. 2) System Sensor: SSV 120 or SSM 24 Series. 3) Tyco: WMA-1. 4) Victaulic: Series ) Viking: F-2. H. Pressure Gauges: 1. Mechanical Water Pressure Gauges: Section
8 b. 3-1/2 inch 88 mm diameter dial. c. 0 to 300 psi0 to KPa in 5 psi50 Kpa increments. 1) Reliable: UA. 2) HO Trerice: ) Viking: 01124A. I. Waterflow Detectors: 1. Electrical Water Flow Switch: a. UL / FM approved. b. Switch activates with flow of 10 gpm or more. c. Two single pole double throw switches. d. Automatic reset. e. Category Four Approved Products. See Section for definitions of Categories. 1) Potter-Roemer: Model ) System Sensor: WFD. 3) Viking: VSR-F and VS-SP. J.Tamper Switch 1. Weather and Tamper Resistant Switch. a. UL listed and FM approved. b. Two Single Pole Double Throw Switches, contact rating 5 amps at 120 VAC. c. Removal of switch or cover shall activate trouble signal. d. Alarm shall activate between first and second revolution of valve wheel. e. Mount to monitor valve and not interfere with operation. f. Shall operate in horizontal and vertical position. g. Category Four Approved Products. See Section for definitions of Categories. 1) Control Valves, Butterfly Valves, Post Indicator Valves: a) Federal: Model PIV b) Potter-Roemer: Model 6223 c) Notifier: Model PIBV2 d) System Sensor: Model PIBV2. 2) O.S. & Y Valves: a) Federal: Model OSY b) Notifier: Model OSY2 c) Potter-Roemer: Model 6220 d) System Sensor: Model OSY2 K. Automatic Drain Device: 1. Straight Design, 3/4 inch19 mm. 2. Category Four Approved Products. See Section for definitions of Categories. a. Nibco: Ball-Drip. b. Potter-Roemer: Figure c. Viking: B-1 L. Fire Department Connection: 1. Two-way Inlet with single clapper. 2. Polished Brass. 3. Class One Quality Standards. See Section a. Round 'AUTO SPKR' identification plate, polished brass by Potter-Roemer Fig Category Four Approved Products. See Section for definitions of Categories. a. Croker: 6405-PB. b. Potter-Roemer: Fig M. Post Indicating Valve: 1. Polished brass. 2. Supervisory switch. 3. Category Four Approved Products. See Section for definitions of Categories. a. As required by Authority Having Jurisdiction (AHJ) Section
9 N. Propylene Glycol: 1. Category Four Approved Product. See Section for definition of Categories. a. Dow Frost by Dow Chemical. 2.2 MANUFACTURERS A. Contact Information: 1. Anvil International, Portsmouth, NH 2. Croker Corp, Elmsford, NY 3. Dow Chemical, Midland, MI 4. Gruvlock by Anvil International, Portsmouth, NH 5. HO Trerice Company, Oak Park, MI 6. Milwaukee Valve Co, Milwaukee, WI 7. Mueller Company, Decatur, IL 8. Nibco Inc, Elkhart, IN 9. Potter-Roemer, Cerritos, CA Reliable Automatic Sprinkler Co, Mount Vernon, NY System Sensor, St Charles, IL TYCO Fire & Building Products, Oak Creek, WI Victualic Company of America, Easton, PA or Victualic Company of Canada, Rexdale, ON Viking Corp, Hastings, MI PART 3 - EXECUTION 3.1 EXAMINATION A. Drawings: 1. Fire Protection Drawings show general arrangement of piping. Follow as closely as actual building construction and work of other trades will permit. Install system so it can be completely drained as designed. 2. Consider Architectural and Structural Drawings part of this work insofar as these drawings furnish information relating to design and construction of building. These Drawings take precedence over Fire Protection Drawings. 3. Because of small scale of Drawings, it is not possible to indicate all offsets, fittings, and accessories that may be required. Investigate structural and finish conditions affecting this work and arrange work accordingly, providing such fittings, valves, and accessories required to meet conditions and to enable system to be completely drained. 3.2 INSTALLATION A. Interface With Other Work: Provide inserts for attaching hangers in concrete floor construction at time floors are placed. B. Connect system to flange provided under Section C. Install sprinkler systems in accordance with requirements of latest editions of NFPA 13, FM Global, and as specified below: 1. Install to enable complete drainage of system. Drain trapped piping in accordance with NFPA 13, Paragraph and a. Install main drain from riser. b. Install auxiliary drains in low points of piping system and inspector's test valve drain to mechanical pad located outside building unless otherwise directed by Architect. 2. Install piping system so it will not be exposed to freezing temperatures. 3. Do not use dropped, damaged, or used sprinkler heads Section
10 4. Install sprinkler lines concealed. 5. Install tamper switches and flow detectors where located by Architect. 6. Install automatic ball drip device in lowest point of piping to fire department connection and drain to floor drain or to exterior of building. 7. Brace and support system to meet seismic zone requirements for building site. 8. Incorporate provisions for manual introduction of propylene glycol mixture into antifreeze loop system at highest point. Prepare and introduce into system mixture of water and propylene glycol at concentration appropriate for winter design conditions. a. Propylene Glycol Winter Design Percent by Weight Temp 10 percent 27 Deg F 15 percent 19 Deg F 20 percent 17 Deg F 25 percent 11 Deg F 30 percent 5 Deg F 35 percent minus 3 Deg F 40 percent minus 11 Deg F 45 percent minus 23 Deg F 50 percent minus 41 Deg F 55 percent minus 60 Deg F D. Flush system at full design flow rate for minimum five minutes. Route water to outside of building. Protect landscaping and other exterior elements from damage during flow tests. 3.3 FIELD QUALITY CONTROL A. Site Tests: 1. Test system according to 'Contractor's Material And Testing certificate for Above Ground Piping' NFPA-13, figure Tests shall be witnessed by Architect and representative of local jurisdiction over fire prevention. 3. Test blanks shall have red painted lugs protruding beyond flange to clearly indicate their presence and be numbered to assure their removal when testing is completed. END OF SECTION Section
11 SECTION DRY-PIPE SPRINKLER SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. Includes But Not Limited To: 1. Furnish and install complete fire sprinkler system as specified in Contract Documents. B. Products Installed But Not Supplied Under This Section: 1. Firestopping. C. Related Sections 1. Section : Quality of Firestopping. 2. Section : Fire Detection and Alarm Annunciation Panels including connection of tamper switches and pressure flow detectors to alarm system and furnishing and installing of low temperature switch. 3. Section : Fire Suppression Utility Water Distribution Piping. 1.2 REFERENCES A. American Society For Testing And Materials: 1. ASTM A 53-02, 'Standard Specification for Pipe, Steel and Hot-Dipped, Zinc-Coated, Welded and Seamless.' 2. ASTM A , 'Standard Specification for Piping Fittings of Wrought Carbon Steel and Alloy Steel for Moderate and Elevated Temperature Service.' 3. ASTM A (2004), Standard Specification for Ferritic Ductile Iron Pressure-Retaining Casting for Use at Elevated Temperatures. 4. ASTM A (2004), 'Standard Specification for Ductile Iron Castings.' 5. ASTM A , Standard Specification for Black and Hot-Dipped -Coated (Galvanized) Welded and Seamless Steel Pipe for Fire Protection Use. B. American Society of Mechanical Engineers / American National Standards Institute: 1. ASME / ANSI B , 'Cast Iron Pipe Flanges and Flanged Fittings, Class 25, 125, 250, and 800.' 2. ASME / ANSI B , 'Malleable-Iron Threaded Fittings.' 3. ASME / ANSI B , 'Gray Iron Threaded Fittings.' C. National Fire Protection Association / American National Standards Institute: 1. NFPA / ANSI , 'Installation of Sprinkler Systems.' 1.3 SUBMITTALS A. Shop Drawings: 1. Size sprinkler system by one of following methods: a. Pipe schedule method in accordance with NFPA / ANSI 13. b. Hydraulic calculation design method based on water supply evaluation performed at building site Section Hickory Flat, Canton Wards June 10, 2009 (Rev) Dry-Pipe Sprinkler Systems
12 c. On submittals, refer to sprinkler heads by sprinkler identification or model number published in appropriate agency listing or approval. Trade names and other abbreviated designations are not acceptable. 2. Submittal Procedure: a. After award of Contract and before purchase of equipment, submit seven sets of shop drawings with specifications and hydraulic calculations, if pipe schedule method is not used, to Architect and two sets to local jurisdiction having authority for fire prevention for review. b. After integrating Architect's and local jurisdiction's comments into drawings, licensed certified fire protection engineer of record submitting fire sprinkler system design construction documents shall stamp, sign, and date each sheet of shop drawings and first page of specifications and calculations. c. Submit stamped documents to area office and local jurisdiction having authority for fire prevention for final approval. d. After final approval, submit four copies of approved stamped documents to Architect. e. Failure of system to meet requirements of authority having jurisdiction shall be corrected at no additional cost to Owner. B. Closeout: 1. Operation And Maintenance Manual Data: a. Modify and add to requirements of Section as follows: 1) Provide master index showing items included. 2) Provide name, address, and phone number of Architect, Architect's Fire Sprinkler Consultant, General Contractor, and Fire Protection subcontractor. 3) Provide operating instructions to include: a) General description of fire protection system. b) Step by step procedure to follow in putting system into operation. 4) Maintenance instructions shall include: a) List of system components used indicating name and model of each item. b) Manufacturer's maintenance instructions for each component installed in Project. Instructions shall include installation instructions, parts numbers and lists, operation instructions of equipment, and maintenance and lubrication instructions. 5) Include copies of approved shop drawings and copies of required warranties. b. If system has both wet and dry segments, provide single Operations And Maintenance Manual for total Fire Suppression System. 2. Inspection Checklist: a. Provide Owner with checklist and brief explanation of following inspections: 1) Weekly Inspection. 2) Monthly Inspection. 3) Quarterly Inspection. 4) Semi-Annual Inspection. 5) Annual Inspection. 1.4 QUALITY CONTROL A. Qualifications: a. Licensed fire protection engineer or fire protection system designer certified by NICET to level three minimum and engaged in design of fire protection systems. Engineer / designer shall: 1) Be responsible for overseeing preparation of shop drawings, hydraulic calculations where applicable, and system installation. 2) Make complete inspection of installation. 3) Provide corrected record drawings to Owner with letter of acceptance. 4) Certify that installation is in accordance with Contract Documents. 2. Installer: Licensed by jurisdiction over installed fire protection systems for area of Project. Furnish verified list of similar projects installed during past five years minimum. B. Requirements of Regulatory Agencies: 1. Unless noted otherwise, system shall conform to: Section Hickory Flat, Canton Wards June 10, 2009 (Rev) Dry-Pipe Sprinkler Systems
13 a. NFPA / ANSI 'Light & Ordinary Hazard Occupancies.' b. NFPA / ANSI 'Service Mains and Their Appurtenances, Private.' c. NFPA / ANSI 'Life Safety Code.' d. Requirements of local water department and local authority having jurisdiction for fire protection. e. Underwriter's Laboratories Publication, 'Fire Protection Equipment Directory', current edition at time of Pre-Bid Meeting. f. Comply with backflow prevention requirements and, if required, include device in hydraulic calculations. g. Applicable rules, regulations, laws, and ordinances. 1.5 OWNER'S INSTRUCTIONS A. Instruction Sessions: 1. Instruct Owner's personnel in operation and maintenance of system utilizing Operation And Maintenance Manual when so doing. Minimum instruction period shall be four hours. 2. Instruction sessions shall occur after Substantial Completion inspection when system is properly working and before final payment is made. B. Posted System Diagram: 1. Provide single, color-coded floor plan diagram showing total system. Color dry pipe system elements BLUE and wet pipe system elements RED. Indicate locations of dry pipe system drains and inspector test valve station. 2. Include following information on diagram sheet: a. Explanation of principles behind operation of dry pipe system alarm valve. b. Step by step shut down procedure. c. Step by step system drainage procedure. d. Step by step start-up procedure. e. Step by step procedure for protection of system from freezing. 3. Laminate diagram with plastic and mat or frame suitable for hanging near riser. 1.6 MAINTENANCE A. Extra Materials: Furnish six spare heads of each type and temperature rating used, stored in cabinet properly sized by Sprinkler Manufacturer, and sprinkler head wrench. PART 2 - PRODUCTS 2.1 COMPONENTS A. General: Use only domestically manufactured pipe, pipe fittings, valves, sprinkler heads, and other components. B. Pipe: 1. Above Ground: Schedule 40 hot-dip galvanized welded steel meeting requirements of ASTM A 53. a. 2 Inches 50 mm And Smaller: Screwed, flanged, or roll grooved coupling system. b. 2-1/2 Inches 62 mm And Larger: Flanged or roll grooved coupling system. C. Fittings 1. Screwed: Cast iron meeting requirements of ANSI B 16.4 or ductile iron meeting requirements of ANSI B 16.3 and ASTM A 536, Grade Flanged: Cast iron meeting requirements of ANSI B Roll Grooved Pipe Coupling System: Section Hickory Flat, Canton Wards June 10, 2009 (Rev) Dry-Pipe Sprinkler Systems
14 a. Ductile iron meeting requirements of ASTM A 395 and ASTM A 536, and UL listed and FM approved. b. Couplings: 1) Rigid: a) Cast to provide rigidity for support and hanging in accordance with NFPA-13. b) Category Four Approved Products. See Section for definition of categories. (1) Gruvlok: (2) Tyco (Grinnell): 772 (3) Victaulic: Style ) Flexible: a) Use in locations where vibration attenuation and stress relief are required. b) Category Four Approved Products. See Section for definition of categories. (1) Gruvlok: (2) Tyco (Grinnell): 705 (3) Victaulic: Style 75. 3) Flange Adapters: a) Class 125 or 150. b) Category Four Approved Products. See Section for definition of categories. (1) Gruvlok: (2) Tyco (Grinnell): 71 (3) Victaulic: Style 744. c. Grooved products used on Project shall be from same manufacturer. Grooving tools shall be as recommended by manufacturer of grooved products. D. Valves: 1. Butterfly Valves: a. UL / FM / CASA approved. b. Indicating type. c. Category Four Approved Products. See Section for definitions of Categories. 1) Milwaukee: a) Model BB-SC502 threaded ends with tamper switch One to 2 inches. b) Model BBV SC502 Grooved ends with tamper switch 2 to 2-1/2 inches. 2) Mueller: a) Model B wafer type with tamper switch. b) Model grooved end type with tamper switch. 3) Nibco: a) WD Wafer type with valve tamper switch. b) GD4765-8N Grooved type with valve tamper switch, 2-1/2 to 8 inches. 4) Tyco (Grinnell): a) Model TFP1515 wafer. b) Model TFP1510 Grooved. 5) Victaulic: Series 705-W Grooved end type with internal supervisory switches. 2. Gate Valves: a. UL / FM / CASA approved. b. Outside Screw and Yoke Type (O.S.&Y). c. Class 150 psi. 1) Nibco: a) T-1040 with Threaded Ends 1/2 to 2 inches. b) F Flanged Ends. 2) Mueller: R Flanged Ends. 3) Victaulic: Series 771 Grooved Ends 3. Ball Valves: a. UL / FM / CASA approved. b. Valve tamper switch. c. Category Four Approved Products. See Section for definitions of Categories. 1) Milwaukee: BB-SC502 with threaded ends Section Hickory Flat, Canton Wards June 10, 2009 (Rev) Dry-Pipe Sprinkler Systems
15 2) Nibco: a) KT-505 with threaded ends. b) KG-505 with grooved ends. 3) Victaulic: Series 728 with grooved or threaded ends. 4. Swing Check Valves: a. 2 to 4 inch 25 to 100 m, groved ends, ductile iron, 300 psi. 1) Regrinding type. 2) Renewable disk. 3) Bronze Class 125 with threaded ends. 4) Category Four Approved Products. See Section for definitions of Categories. a) Nibco: KT-403-W. b) Tyco (Grinnell): CV-1F grooved ends. c) Victaulic: 712 d) Viking: D-1 grooved ends. b. 2-1/2 to 12 inch 63 to 300 mm Horizontal check: 1) Bolted bonnet. 2) Raised face flanges. 3) Bronze mounted with ductile iron body. 4) 125 lb Class A. 5) Category Four Approved Products. See Section for definitions of Categories. a) Nibco: F b) Mueller: A c) Tyco (Grinnell): CV-2 grooved and flanged. d) Viking: G-1 grooved and flanged. 5. Wafer Type Check Valves: a. 4 to 8 inch 100 to 300 mm cast iron body. b. 175 psi minimum working pressure. c. Rubber Seat. 1) Nibco: KW-900-W. 2) Mueller: A Grooved-End Check Valves: a. 2-1/2 to 12 inch 63 to 300 mmductile iron body. b. 250 psi maximum working pressure. c. Disc And Seat: 1) 2-1/2 And 3 Inch 63 to 75 mm: Aluminum bronze disc with mounted elastomer seal and PPS (polyphenylene sulfide) coated seat. 2) 4 Inch 100 mm And Larger: Elastomer encapsulated ductile iron disc with welded in nickel seat. 1) Victaulic Series Dry Pipe Alarm Valves: a. Category Four Approved Products: 1) Reliable: D with gauges, drain, and trim. 2) Tyco: DPV-1. 3) Victaulic: Series ) Viking: F-1 with gauges, drain, and trim. 8. Air Maintenance Device: a. Maximum inlet air pressure 125 psi, minimum outlet air pressure 65 psi. b. Category Four Approved Products. See Section for definitions of Categories. 1) Reliable: B-1. 2) Tyco: AHD-1. 3) Victaulic: 757P. 4) Viking: D Accelerator: a. Install with pressure gauge. b. Category Four Approved Products. See Section for definitions of Categories. 1) Reliable: B-1. 2) Tyco: AMD-1. 3) Victaulic: 757P Section Hickory Flat, Canton Wards June 10, 2009 (Rev) Dry-Pipe Sprinkler Systems
16 4) Viking: E Inspector's Test Valve: a. Combination sight glass/orifice. b. Bronze top works. c. Category Four Approved Products. See Section for definitions of Categories. 1) Tyco (Grinnell): Model F350. 2) Victaulic: Testmaster II Alarm Test Module Style 720. E. Sprinkler Heads: 1. Dry Concealed Pendant: b. Coordinate concealed cover finish with Architect. c. Flush Ceiling profile. d. Adjustable cover. e. Type One Acceptable Products: 1) Flat Profile: a) Tyco (Grinnell) DS-2 b) Victaulic: Model V3618. c) Equal as approved by Architect before Bidding. See Section Upright Sprinklers: b. Include flush chrome escutcheon equal to Reliable C. c. Where guards are required, include chrome plated sprinkler guards that are listed, that are approved by Sprinkler Manufacturer for use with head, and that are supplied by Sprinkler Manufacturer. 1) Reliable: F1FR. 2) Tyco: TY ) Victaulic: Models V ) Viking: VK Attic Sprinklers, Upright: b. Approved for use in roof structures, combustible and non-combustible, with ceiling below. c. Category Four Approved Products. See Section for definitions of Categories. 1) Tyco: BB, SD, or HIP. 4. Horizontal Sidewall Sprinkler: b. Recessed escutcheon. c. Where guards are required, include chrome-plated guard equal to Viking A-1. 1) Reliable: F3. 2) Tyco (Grinnell): TY ) Victaulic: V3610 4) Viking: VK162. F. Water Flow Alarm: 1. Mechanical Flow Alarm: b. Category Four Approved Products. See Section for definitions of Categories. 1) Reliable: C. 2) System Sensor: WFD. 3) Tyco: WMA-1. 4) Victaulic: Series ) Viking: F-2. G. Pressure Gauges: 1. Mechanical Water Pressure Gauges: b. 3-1/2 inch 88 mm diameter dial Section Hickory Flat, Canton Wards June 10, 2009 (Rev) Dry-Pipe Sprinkler Systems
17 c. 0 to 300 psi in 5 psi increments. 1) Reliable: UA. 2) H O Trerice: ) Viking: 01124A H. Pressure Detectors: 1. Electrical Water Pressure Switch: b. Switch activates on pressure rise between 4 and 8 psi. c. Two single pole double throw switches. d. Automatic reset. e. Category Four Approved Products. See Section for definitions of Categories. 1) Potter Electric Signal Co: PS10. 2) System Sensor: EPS10. I. Low Pressure Supervisory Switch: 1. UL listed and approved. 2. Adjustable pressure range 1 to 100 psi. 3. Automatic reset. 4. Factory adjusted to separate on pressure decrease of 30 psi. 5. Category Four Approved Products. See Section for definitions of Categories. a. Potter Electric Signal Co: PS40-1. b. System Sensor: EPS10. J. Tamper Switch: 1. Weather and tamper resistant switch. 2. UL listed and approved. 3. Two single pole double throw switches. 4. Category Four Approved Products. See Section for definitions of Categories. a. Potter Electric Signal Co: PCVS. b. System Sensor: P1BV2. K. Fire Department Connection: 1. Two-way Inlet with single clapper. 2. Polished Brass. 3. 3/4 inch 19 mm Straight Design Automatic Drain Device by Potter-Roemer Fig Round 'AUTO. SPKR.' Identification Plate, Polished Brass by Potter-Roemer Fig Category Four Approved Products. See Section for definitions of Categories. a. Croker: 6405PB. b. Potter-Roemer: Fig L. Air Compressor: 1. Tank-mounted, 20 gallon 70 liter tank. ASME coded industrial receiver and safety valve. 2. Set tank-mounted air compressor on neoprene isolation pads located at each corner and sized 4 inches by 4 inches by 3/4 inches 100 mm by 100 mm by 19 mm high. 3. Wire air compressor to circuit breaker. 4. Furnish with air intake filter and silencer. 5. Overload protected 1750 RPM motor. One hp, single phase, 115V. 6. Industrial grade with OSHA compliant enclosed belt guard. 7. Auto control group mounted and pre-wired. Auto group includes pressure switch, check valve, manifold, safety valve, and mounting. 8. Type One Acceptable Products: a. Model LT by General Air Products. b. Equal as approved by Architect before bidding. See Section Section Hickory Flat, Canton Wards June 10, 2009 (Rev) Dry-Pipe Sprinkler Systems
18 2.2 MANUFACTURERS A. Contact Information: 1. Anvil International, Portsmouth, NH 2. Croker Corp, Elmsford, NY 3. Gruvlock by Anvil International, Portsmouth, NH 4. General Air Products, Exton, PA 5. H O Trerice Company, Oak Park, MI 6. Merit Manufacturing Corp, Pottstown, PA 7. Milwaukee Valve Co, Milwaukee, WI 8. Mueller Company, Decatur, IL 9. Nibco Inc, Elkhart, IN Potter Electric Signal Co, St Louis, MO Potter-Roemer, Cerritos, CA Reliable Automatic Sprinkler Co, Mount Vernon, NY System Sensor, St Charles, IL TYCO Fire & Building Products, Oak Creek, WI Victualic Company of America, Easton, PA or Victualic Company of Canada, Rexdale, ON Viking Corp, Hastings, MI PART 3 - EXECUTION 3.1 EXAMINATION A. Drawings: 1. Fire Protection Drawings show general arrangement of piping. Follow as closely as actual building construction and work of other trades will permit. 2. Consider Architectural and Structural Drawings part of this work insofar as these drawings furnish information relating to design and construction of building. These drawings take precedence over Fire Protection Drawings. 3. Because of small scale of Drawings, it is not possible to indicate all offsets, fittings, and accessories that may be required. Investigate structural and finish conditions affecting this work and arrange work accordingly, providing such fittings, valves, and accessories required to meet conditions. 3.2 INSTALLATION A. Install system in accordance with NFPA / ANSI 13, Ordinary 1 Hazard B. Connect system to flange provided under Section C. Install system to drain. Drain trapped piping in accordance with NFPA / ANSI 13, Paragraphs and Install main drain from riser. 2. Install auxiliary drains in low points of piping system and inspector's test valve drain to mechanical pad located outside building, unless directed otherwise by Architect. D. Install piping system so it will not fail due to freezing temperatures. E. Do not use dropped, damaged, or used sprinkler heads. F. Pendants: 1. Do not use regular pendants. 2. Install dry pendants with tees and not elbows. Do not adjust length with pipe nipples and couplings Section Hickory Flat, Canton Wards June 10, 2009 (Rev) Dry-Pipe Sprinkler Systems
19 3. Individually measure and order each dry pendant based on measured distance from ceiling to face of branch line tee. G. Minimum slope of branch lines is 1/2 inch per 10 feet 12 mm in 3 meters. Minimum slope of main lines is 1/4 inch per 10 feet 6 mm in 3 meters. H. Install sprinkler lines concealed. I. Install tamper switches and pressure flow detectors where located by Architect. J.Install automatic ball drip device in lowest point of piping to the fire department connection and drain to exterior of building. K. Brace and support system to meet seismic zone requirements for building site. 3.3 FIELD QUALITY CONTROL A. Site Tests: 1. Test system according to 'Contractor's Material & Testing Certificate for Above Ground Piping' NFPA-13, figure Tests shall be witnessed by Architect and by representative of local jurisdiction having authority for fire prevention. 3. Test blanks shall have red painted lugs protruding beyond flange to clearly indicate their presence and be numbered to assure their removal when testing is completed. END OF SECTION Section Hickory Flat, Canton Wards June 10, 2009 (Rev) Dry-Pipe Sprinkler Systems
SECTION WET-PIPE FIRE-SUPPRESSION SPRINKLERS
SECTION 13930 WET-PIPE FIRE-SUPPRESSION SPRINKLERS PART 1 GENERAL 1.1 SUMMARY A. Includes But Not Limited To 1. Furnish and install complete wet-pipe fire sprinkler system in new addition only as specified
More informationADDENDUM NO. 3 March 19, 2018
ADDENDUM NO. 3 March 19, 2018 PROJECT: MT. VIEW ELEMENTARY CASSIA SCHOOL DISTRICT NO 151 BURLEY, IDAHO The following addenda apply to the Project Manual and / or Drawings for this project and shall be
More informationSECTION DRY-PIPE FIRE-SUPPRESSION SPRINKLERS
SECTION 13935 DRY-PIPE FIRE-SUPPRESSION SPRINKLERS PART 1 GENERAL 1.1 SUMMARY A. Includes But Not Limited To 1. Furnish and install complete fire sprinkler system as specified in Contract Documents. B.
More informationMay 2017 Middleton Heritage 09T SC DIVISION 21: FIRE SUPPRESSION END OF TABLE OF CONTENTS
DIVISION 21: FIRE SUPPRESSION 21 1000 WATER BASED FIRE SUPPRESSION SYSTEMS 21 1313 Wet-Pipe Sprinkler Systems END OF TABLE OF CONTENTS Table of Contents - 1-21 0000 B L A N K P A G E Table of Contents
More informationDIVISION 21: FIRE SUPPRESSION WATER BASED FIRE SUPRESSION SYSTEMS
DIVISION 21: FIRE SUPPRESSION 21 1000 WATER BASED FIRE SUPRESSION SYSTEMS 21 1200 FIRE-SUPPRESSION DRY STANDPIPES 21 1313 WET PIPE SPRINKLER PROTECTION SYSTEM 21 1314 WET-PIPE AUTOMATIC SPRINKLER SYSTEM
More informationCubeSmart Gulf Breeze Storage AUTOMATIC FIRE SPRINKLER SYSTEM
SECTION 21 0000 AUTOMATIC FIRE SPRINKLER SYSTEM PART 1 GENERAL 1.1 QUALITY ASSURANCE A. Codes and Standards: 1. FBC (Florida Building Code 2015) 2. FBC (Florida Fire Code 2015) 3. NFPA #13R (Standard for
More informationB. Product Data: Provide manufacturers catalogue information. Indicate valve data and ratings.
DIVISION 21 21 05 00 COMMON WORK RESULTS FOR FIRE SUPPRESSION PART 1 GENERAL 1.1 SECTION INCLUDES A. Pipe, fittings, sleeves, escutcheons, seals, and connections for sprinkler systems. 1.2 RELATED REQUIREMENTS
More informationDIVISION 21 FIRE SUPPRESSION SECTION FIRE PROTECTION SPECIALTIES
DIVISION 21 FIRE SUPPRESSION PART 1 GENERAL 1.01 DESCRIPTION A. Provide UL listed, FM approved listed fire protection specialties or accessories as required by either the equipment manufacturer or the
More informationTHE JAMES RUSHTON EARLY LEARNING AND FAMILY SUCCESS CENTER #2616 ISSUE FOR CONSTRUCTION
SECTION 21 1301- FIRE-SUPPRESSION SYSTEMS PART 1 - GENERAL 1.1 SUMMARY: A. This Section includes fire-suppression piping and equipment for the following building systems: 1. Wet-pipe, fire-suppression
More informationWest District Library Section Campeau Drive, Ottawa SPRINKLER SYSTEMS City of Ottawa Project No. CR Page 1 of 8
City of Ottawa Project No. CR006230 Page 1 of 8 PART 1 - GENERAL 1.1 Reference Standards.1 Conform to the following:.1 Provincial and municipal building and fire regulations as approved by Provincial Fire
More informationC. All components of the systems described shall meet the requirements as stated herein and shall be approved by the Architect and Consultant.
SECTION 218800 - FIRE PROTECTION 1. GENERAL A. Provisions of Division 1, GENERAL REQUIREMENTS, and Section 230000, MECHANICAL GENERAL CONDITIONS, and Section 230050, SEISMIC PROTECTION are a part of this
More informationSECTION FIRE PROTECTION. A. Examine all conditions as they exist at the project, prior to submitting a bid for the work of this section
PART 1 - GENERAL 1.00 GENERAL PROVISIONS A. Examine all conditions as they exist at the project, prior to submitting a bid for the work of this section 1.01 DESCRIPTION OF WORK A. Work Included: Provide
More informationSECTION SPRINKLER SYSTEMS
SECTION 13900 SPRINKLER SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections,
More informationNorth Hanover Township School District North Hanover Township, New Jersey
SECTION 211313 - WET-PIPE SPRINKLER SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Pipes, fittings, and specialties. 2. Fire-protection valves. 3. Fire-department connections. 4. Sprinklers.
More informationGas Station & C Store SECTION CWM Job No
SECTION 21 1300 - PART 1 - GENERAL 1.1 WORK INCLUDED A. Provide labor, materials, equipment and services to perform operations required for the complete installation and related Work as required in Contract
More informationWET-PIPE SPRINKLER SYSTEMS
SECTION 211313 - WET-PIPE SPRINKLER SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Pipes, fittings, and specialties. 2. Fire-protection valves. 3. Fire-department connections. 4. Sprinklers.
More informationSECTION DRY-PIPE SPRINKLER SYSTEMS
SECTION 21 1300 S PART 1 -GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply
More informationSECTION WET-PIPE SPRINKLER SYSTEMS
SECTION 21 13 13 WET-PIPE SPRINKLER SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationA. Section includes wet-pipe sprinkler system, system design, installation, and certification.
SECTION 21 13 13 WET-PIPE SPRINKLER SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. Section includes wet-pipe sprinkler system, system design, installation, and certification. 1.2 REFERENCES A. General: Comply
More informationFIRE PROTECTION. 1. Vertical fire pumps shall not be used at the University.
15500 - FIRE PROTECTION PART I DESIGN GUIDELINES A. General 1. Vertical fire pumps shall not be used at the University. 2. coupling piping shall be permitted for sprinkler and standpipe systems only. B.
More informationSECTION DRY-PIPE SPRINKLER SYSTEMS
Ul611-0l SECTION 211316- DRY-PIPE SPRINKLER SYSTEMS PARTl-GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Supplementary Conditions, and Division 1 Specification
More informationSECTION AUTOMATIC SPRINKLER PIPING
SECTION 15330 AUTOMATIC SPRINKLER PIPING ****** ***** **** *** ** * ** *** **** ***** ****** NOTE TO SPECIFIER: This section contains several types of automatic sprinkler piping. Some piping is allowed
More informationB. Related Sections: The following Sections contain requirements that relate to this Section.
SECTION 211313- FIRE-SUPPRESSION PIPING PART1 -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general prov1s1ons of the Contract, including General and Supplementary Conditions and Division 1 Specification
More informationSECTION WET-PIPE SPRINKLER SYSTEMS
SECTION 21 1300 S PART 1 -GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply
More informationA. Standard-Pressure Piping System Component: Listed for 175-psig minimum working pressure.
SECTION 211313 - WET-PIPE SPRINKLER SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Pipes, fittings, and specialties. 2. Fire-protection valves. 3. Fire-department connections. 4. Sprinklers.
More informationMLA Architects Pierz Public Schools ISD #484 Healy High School Multi-Purpose & Choir Additions Pioneer Elementary School Class Room Addition Pierz, MN
DIVISION 21 - FIRE SUPPRESSION (REFER TO SECTION 23 05 00 FOR BASIC FIRE SUPPRESSION REQUIREMENTS) 21 05 00 Common Work Results for Fire Suppression 21 13 13 Wet-Pipe Sprinkler Systems END OF SECTION FIRE
More informationFIRE SUPPRESSION SPRINKLER SYSTEM
PART 1 GENERAL 1.01 DESCRIPTION A. The provisions of the General Requirements, Supplementary Requirements, and Division 1 apply to the plumbing work specified in this Division. B. The requirements of this
More information1.1 Refer to Section for General Mechanical Requirements. 1.3 Refer to Section for Pipe and Equipment Identification Requirements.
FIRE PROTECTION GENERAL INFORMATION 1.1 Refer to Section 230000 for General Mechanical Requirements. 1.2 Refer to Section 230529 for Hangers and Supports. 1.3 Refer to Section 230553 for Pipe and Equipment
More informationNORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017
SECTION 21 1314D - AUTOMATIC SPRINKLER SYSTEMS (DRY-PIPE) PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division
More informationNORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017
SECTION 21 1314W - AUTOMATIC SPRINKLER SYSTEMS (WET PIPE SYSTEMS) PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions
More informationSPRINKLERS TABLE OF CONTENTS
SPRINKLERS TABLE OF CONTENTS SECTION 21 13 13 WET PIPE SPRINKLER SYSTEMS SECTION 211313 - WET PIPE SPRINKLER SYSTEMS PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract,
More informationUniversity of Houston Master Construction Specifications Insert Project Name SECTION DRY-PIPE FIRE SPRINKLER SYSTEM PART 1 - GENERAL
SECTION 21 13 16 DRY-PIPE FIRE SPRINKLER SYSTEM PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section
More informationB. Standard-Pressure Standpipe Piping: Fire-suppression standpipe piping designed to operate at working pressure 175 psig (1200 kpa) maximum.
Page 211200-1 SECTION 211200 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationSECTION FIRE PROTECTION
SECTION 15300 - FIRE PROTECTION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Basic Requirements: Provisions of Section 15010, BASIC MECHANICAL REQUIREMENTS, and Section 15030, ELECTRICAL REQUIREMENTS FOR
More informationUNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:
SECTION 211313 - WET-PIPE SPRINKLER SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationSECTION PREACTION SPRINKLER SYSTEMS
PART 1 GENERAL SECTION 211316 - PREACTION SPRINKLER SYSTEMS 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationMercury Plastics New Building February TABLE OF CONTENTS
DIVISION 21: FIRE SUPPRESSION 210500 COMMON REQUIREMENTS FOR FIRE SUPPRESSION 210548 VIBRATION AND SEISMIC CONTROLS FOR FIRE SUPPRESSION PIPING AND EQUIPMENT 211300 WET PIPE FIRE SUPPRESSION SPRINKLERS
More informationADDENDUM #3 DATE: August 8, 2018 Page 1 of 1. The Curators of the University of Missouri
ADDENDUM #3 DATE: August 8, 2018 Page 1 of 1 TO CONTRACT DOCUMENTS ENTITLED: PROJECT MANUAL FOR: Women s and Children s Hospital New Water Service Main PROJECT NUMBER: CP172631 ADVERTISEMENT DATE: July
More information1.2 CODES AND REGULATIONS A. Sprinkler system design, equipment, materials, devices, and installation shall conform to the following:
SECTION 21 10 00 - WATER-BASED FIRE-SUPPRESSION PART I - GENERAL 1.1 SUMMARY A. Inclusion of sprinkler and standpipe systems shall be as determined by NFPA National Fire Code pamphlet 101 and program statement.
More informationSECTION WET-PIPE SPRINKLER SYSTEMS EASY RISER CHECK VALVE
SECTION 21 1313 WET-PIPE SPRINKLER SYSTEMS PART 1 GENERAL 1.01 SECTION INCLUDES A. Wet-pipe sprinkler system. B. System design, installation, and certification. C. Fire department connections. 1.02 RELATED
More informationSECTION FIRE-SUPPRESSION STANDPIPES
PART 1 - GENERAL 1.1 DESCRIPTION Fire-suppression wet and manual dry standpipes. 1.2 SCOPE OF WORK SECTION 21 12 00 A. Design, installation and testing shall be in accordance with NFPA 14 except for specified
More informationA. All Fire Suppression System design and installation shall comply with the most current and adopted version of NFPA 13.
21 10 00 PART 1 - GENERAL 1.01 SCOPE A. The following standards and procedures apply to the design and installation of all wet pipe and dry pipe sprinkler systems. The design of fire suppression systems
More informationDIVISION 21: FIRE SUPPRESSION
DIVISION 21: FIRE SUPPRESSION 210500 COMMON REQUIREMENTS FOR FIRE SUPPRESSION 210548 VIBRATION AND SEISMIC CONTROLS FOR FIRE SUPPRESSION PIPING AND EQUIPMENT 210553 IDENTIFICATION FOR FIRE SUPPRESSION
More informationDARTMOUTH COLLEGE DESIGN November 15, 2007 & CONSTRUCTION GUIDELINES
SECTION 15300 FIRE PROTECTION PART 1 DESIGN DIRECTIVES 1.1 DESIGN CRITERIA A. Dartmouth College is currently insured by Factory Mutual. References to the owner s insurance company in this specification
More informationA. This Section includes the following fire-suppression piping inside the building:
SECTION 211000 - WATER-BASED FIRE-SUPPRESSION SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following fire-suppression piping inside the building: 1. Automatic wet-type, standpipe systems.
More informationTABLE OF CONTENTS DIVISION 21- FIRE SUPPRESSION PAGES SECTION WATER BASED FIRE PROTECTION SYSTEMS... 5
DOC Cremer Heating and Hot Water Plant Project Number: M 1411-04 TABLE OF CONTENTS DIVISION 21- FIRE SUPPRESSION PAGES SECTION 21 30 00- WATER BASED FIRE PROTECTION SYSTEMS... 5 SECTION 22 40 00 -PLUMBING
More informationSECTION WET PIPE FIRE PROTECTION SPRINKLER SYSTEM
SECTION 213100 WET PIPE FIRE PROTECTION SPRINKLER SYSTEM PART 1 - GENERAL 1.01 GENERAL REQUIREMENTS A. The requirements of the General Conditions and Supplementary Conditions apply to all work herein.
More informationPort of St Helens SIA Aircraft Hanger Scappoose, OR
Port of St Helens SIA Aircraft Hanger Scappoose, OR AUTOMATIC FIRE SPRINKLER SYSTEM REVISION 2 MARCH 12, 2018 Scope: Furnish and install foam and water fire protection system including underground entrance
More informationSECTION FIRE-SUPPRESSION PIPING
SECTION 211313 FIRE-SUPPRESSION PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification
More informationPART 1 - GENERAL SECTION FIRE PROTECTION BASIC MATERIALS AND METHODS
FIRE PROTECTION BA SECTION 13910 - FIRE PROTECTION BASIC MATERIALS AND METHODS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Pipe, fittings, valves, and connections for sprinkler, standpipe and fire hose,
More informationA. This section includes design and performance information for fire protection and suppression systems.
SECTION 21 00 10: FIRE PROTECTION SYSTEM DESIGN 1. SUMMARY A. This section includes design and performance information for fire protection and suppression systems. 2. GENERAL A. All fire protection materials
More information2016 CDM Smith All Rights Reserved July 2016 SECTION FIRE PROTECTION - SPRINKLER AND STANDPIPE SYSTEMS
PART 1 GENERAL 1.01 SCOPE OF WORK SECTION 21 13 13 FIRE PROTECTION - SPRINKLER AND STANDPIPE SYSTEMS A. Furnish all labor, materials, equipment services and incidentals required to design and install properly
More informationSECTION DRY PIPE SPRINKLER SYSTEMS MODEL F SERIES DRY VALVE
SECTION 21 1316 DRY PIPE SPRINKLER SYSTEMS MODEL F SERIES DRY VALVE PART 1 GENERAL 1.01 SECTION INCLUDES A. Dry-pipe sprinkler system. B. System design, installation, and certification. C. Fire department
More informationB. The sprinkler system shall be designed to meet the more stringent of the requirements of NFPA 13 and FM Global requirements.
SECTION 21 13 13 FIRE PROTECTION SPRINKLER SYSTEMS PART 1 - GENERAL 1.01 SUMMARY A. Section includes labor and materials for the installation of a hydraulically calculated automatic, wet-pipe sprinkler
More informationEnvironmental Health & Safety
Environmental Health & Safety Oklahoma State University FIRE SPRINKLER SYSTEM STANDARD Environmental Health and Safety University Health Services Suite 002 Stillwater, OK 74078 (405) 744-7241 www.ehs.okstate.edu
More informationMASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 21 FIRE SUPPRESSION
SECTION 211200 - FIRE-SUPPRESSION STANDPIPES PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Pipes, fittings, and specialties. 2. Fire-protection valves. 3. Hose connections. 4. Fire-department connections.
More informationSECTION DRY PIPE SPRINKLER SYSTEMS MODEL G SERIES DRY VALVE
SECTION 21 1316 DRY PIPE SPRINKLER SYSTEMS MODEL G SERIES DRY VALVE PART 1 GENERAL 1.01 SECTION INCLUDES A. Dry-pipe sprinkler system. B. System design, installation, and certification. C. Fire department
More informationAddendum No. 2 to the Contract Documents
Addendum No. 2 to the Contract Documents Lewis County Jefferson Community College Education Center Project CONTRACT 2A: GENERAL CONSTRUCTION CONTRACT 2B: ELECTRICAL CONSTRUCTION CONTRACT 2C: MECHANICAL
More informationTABLE OF CONTENTS
DIVISION 21: FIRE SUPPRESSION 21 05 00 COMMON REQUIREMENTS FOR FIRE SUPPRESSION 21 05 53 IDENTIFICATION FOR FIRE SUPPRESSION PIPING AND EQUIPMENT 21 13 00 WET PIPE FIRE SUPPRESSION SPRINKLERS END TABLE
More information2. Welding Materials and Procedures shall conform to the ASME Code.
PART 1 GENERAL 1.01 Scope of Standard A. The design guidelines contained herein include the requirements for systems, materials, fittings and valves utilized for fire protection systems at Sam Houston
More informationA. Hydraulic calculations shall be prepared in accordance with Chapter 23 of NFPA 13 with the following exceptions:
SECTION 21 13 13 WET-PIPE FIRE SPRINKLER SYSTEM PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section
More informationDIVISION 21: FIRE SUPPRESSION
DIVISION 21: FIRE SUPPRESSION 21 0500 COMMON REQUIREMENTS FOR FIRE SUPPRESSION 21 0553 IDENTIFICATION FOR FIRE SUPPRESSION PIPING AND EQUIPMENT 21 1300 WET PIPE FIRE SUPPRESSION SPRINKLERS Kenworth Sales
More informationB. Section Identification for Fire Suppression Piping and Equipment.
SECTION 211300 - FIRE SUPPRESSION SPRINKLERS PART 1 GENERAL 1.1 SECTION INCLUDES A. Dry-pipe sprinkler system. B. System design, installation, and certification. C. Fire department connections. 1.2 RELATED
More informationSECTION WET AUTOMATIC FIRE SPRINKLER SYSTEMS
SECTION 15501 WET AUTOMATIC FIRE SPRINKLER SYSTEMS PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Wet automatic fire sprinkler systems including fire pump, fire pump controller, alarms, safety devices,
More informationB. Galvanized-Steel-Sheet Sleeves: inch minimum thickness; round tube closed with welded longitudinal joint.
(816) 373-4878 U1208-01/FAI29-029 (573) 751-2624 SECTION 2 105 17 - SLEEVES AND SLEEVE SEALS FOR FIRE-SUPPRESSION PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the
More informationDIVISION 21 - FIRE SUPPRESSION
DIVISION 21 - FIRE SUPPRESSION DESIGN CRITERIA It is the policy of UC Davis to install fire sprinkler systems in all new construction/facilities. If the building is classified as a pole barn, shed, carport,
More informationSECTION FIRE-SUPPRESSION SYSTEMS
SECTION 13900 FIRE-SUPPRESSION SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. Section includes: 1. Automatic wet-type, Class I, fire-suppression standpipes and branches for sprinklers. 2. Wet-pipe, fire-suppression
More informationSECTION WET-PIPE SPRINKLER SYSTEMS
SECTION 211313 WET-PIPE SPRINKLER SYSTEMS PRT 1 GENERL 1.01 RELTED DOCUMENTS. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationNew Rigby Elementary School February TABLE OF CONTENTS
DIVISION 21: FIRE SUPPRESSION 21 0500 COMMON REQUIREMENTS FOR FIRE SUPPRESSION 21 0548 VIBRATION & SEISMIC CONTROLS FOR FIRE SUPPRESSION PIPING & EQUIPMENT 21 0553 IDENTIFICATION FOR FIRE SUPPRESSION PIPING
More informationEssex County College - West Essex Campus Addition And Renovations dlb # / 11-14
SECTION 210523 - GENERAL-DUTY VALVES FOR WATER-BASED FIRE-SUPPRESSION PIPING PART 1- GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary
More informationDIVISION 21 - FIRE SUPPRESSION
DIVISION 21 - FIRE SUPPRESSION DESIGN CRITERIA It is the policy of UC Davis to install fire sprinkler systems in all new construction/facilities. If the building is classified as a pole barn, shed, carport,
More informationDIVISION 21: FIRE SUPPRESSION
DIVISION 21: FIRE SUPPRESSION 21 0500 COMMON REQUIREMENTS FOR FIRE SUPPRESSION 21 0548 VIBRATION AND SEISMIC CONTROLS FOR FIRE SUPPRESSION PIPING AND EQUIPMENT 21 0553 IDENTIFICATION FOR FIRE SUPPRESSION
More informationUNIVERSITY OF MISSOURI Fire Protection System Design 2016 Q1
GENERAL: 1. All fire protection systems shall be installed in accordance with the International Fire Code and applicable NFPA standards. This guideline provides additional requirements for the design and
More informationMASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 21 FIRE SUPPRESSION
SECTION 211313 - WET-PIPE SPRINKLER SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Pipes, fittings, and specialties. 2. Fire-protection valves. 3. Fire-department connections. 4. Sprinklers.
More informationSECTION FIRE SUPRESSION
PART 1 GENERAL 1.1 SCOPE SECTION 21 00 00 FIRE SUPRESSION A. The work under this section of the specifications consists of furnishing all materials, equipment, labor, testing, appurtenances, engineering
More informationSECTION SPRINKLER SYSTEMS
SECTION 15325 SPRINKLER SYSTEMS PART 1 - GENERAL 1.1 SECTION INCLUDES A. Wet-pipe sprinkler systems. B. Preaction sprinkler systems. C. System design, installation, and certification. D. Fire department
More informationFacility Fire-Suppression Water-Service Piping
University of New Hampshire University of New Hampshire Scholars' Repository Division 21 Fire Supression Chapter 5 Technical Construction and Renovation Standards 4-23-2015 211100 - Facility Fire-Suppression
More informationKenworth Sales Co. - North Las Vegas, Nevada November TABLE OF CONTENTS
DIVISION 21: FIRE SUPPRESSION 21 0500 COMMON REQUIREMENTS FOR FIRE SUPPRESSION 21 0548 VIBRATION AND SEISMIC CONTROLS FOR FIRE SUPPRESSION PIPING AND EQUIPMENT 21 0553 IDENTIFICATION FOR FIRE SUPPRESSION
More informationDIVISION 21 FIRE PROTECTION ISSUE DATE REVISION
Table of Contents TOC Page 1 DIVISION 21 FIRE PROTECTION ISSUE DATE REVISION 210517 SLEEVES AND SLEEVE SEALS FOR FIRE-SUPPRESSION PIPING 08/15/18 0 210523 GENERAL-DUTY VALVES FOR FIRE PROTECTION PIPING
More informationDivision 21: FIRE SUPRESSION WET-PIPE SPRINKLER PROTECTION SYSTEM. The Academy Sept Table of Contents 1 Division 21
Division 21: FIRE SUPRESSION 21 1313 WET-PIPE SPRINKLER PROTECTION SYSTEM Table of Contents 1 Division 21 SECTION 21 1313 WET-PIPE SPRINKLER PROTECTION SYSTEM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A.
More informationSECTION SLEEVES AND SLEEVE SEALS FOR FIRE-SUPPRESSION PIPING
SECTION 210517- SLEEVES AND SLEEVE SEALS FOR FIRE-SUPPRESSION PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS. A. Drawings and general provisions of the Contract, including General and Supplementary Conditions
More informationModel F3-80 Dry K8.0 (115 metric) Standard-Response, Standard Spray Sprinklers
Bulletin 060 Rev. A Bulletin 060 Rev. A Model F3-80 Dry K8.0 (115 metric) Standard-Response, Standard Spray Sprinklers Features 1. Available in the following configurations: Pendent with standard escutcheon
More informationUC Santa Cruz Campus Design Guide. Includes the following sections: None DESIGN REQUIREMENTS
DIVISION 21 - FIRE SUPPRESSION Includes the following sections: None DESIGN REQUIREMENTS It is the policy of City of Santa Cruz to install fire sprinkler systems in all new construction/facilities. If
More informationDesign and Construction Standards SECTION FIRE SUPPRESSION
SECTION 13900 FIRE SUPPRESSION PART 1 GENERAL 1.1 SCOPE A. The work under this section of the specifications consists of furnishing all materials, equipment, labor, testing, appurtenances, engineering
More informationCopyright 2016 AIA MasterSpec Full Length 09/16 PRODUCT MASTERSPEC LICENSED BY AVITRU, LLC TO VICTAULIC COMPANY.
This Product MasterSpec Section is licensed by AVITRU, LLC to Victaulic Company ("Licensee"). This Product MasterSpec Section modifies the original MasterSpec text and does not include the full content
More informationSECTION WET FIRE SPRINKLER SYSTEMS
SUNY GENESEO 211310-1 PART 1 - GENERAL 1.1 WORK INCLUDED A. Provide labor, materials, equipment and services to perform operations required for the complete installation and related Work as required in
More informationLucy s Pizza 100% CD Specification 06/22/2018
DIVISION 21: FIRE SUPPRESSION 210500 COMMON REQUIREMENTS FOR FIRE SUPPRESSION 210548 VIBRATION & SEISMIC CONTROLS FOR FIRE SUPPRESSION PIPING & EQUIPMENT 210553 IDENTIFICATION FOR FIRE SUPPRESSION PIPING
More informationSECTION (13900) - FIRE SUPPRESSION SYSTEMS
PART 1 GENERAL 1.01 SUMMARY SECTION 21 10 00 (13900) - FIRE SUPPRESSION SYSTEMS A. Section Includes: 1. Pipe and Fittings. 2. Sprinklers. B. Related Documents: 1. Marriott s Fire Protection and Life Safety
More informationCOBB COUNTY SCHOOLS /S&A % BID DOCUMENTS 2/18/11 SECTION SPRINKLER SYSTEM
SECTION 21 10 00 PART 1 - GENERAL 1.1 CODES A. Work shall conform to NFPA 13 Sprinkler Systems, 2002 Edition and NFPA 24 Outside Protection, 2002 Edition. NFPA 14 Standpipe Systems, 2000 Edition and International
More informationCopyright 2016 AIA MasterSpec Full Length 09/16 PRODUCT MASTERSPEC LICENSED BY AVITRU, LLC TO VICTAULIC COMPANY.
Copyright 2016 by The American Institute of Architects (AIA) Exclusively published and distributed by AVITRU, LLC for the AIA This Product MasterSpec Section is licensed by AVITRU, LLC to Victaulic Company
More informationACADEMIC SUCCESS CENTER THE COLLEGE AT BROCKPORT STATE UNIVERSITY OF NEW YORK PROJECT NO
SECTION 210523 - GENERAL-DUTY VALVES FOR WATER-BASED FIRE-SUPPRESSION PIPING PART 1 - GENERAL 1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary
More informationUMC El Paso Far East Clinic and Neighborhood Healthcare Center West Issue for Construction Page Project No and April 13, 2015
SECTION 211000 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Related Documents: Drawings, Notice to Bidders, General Conditions, Project Coordination, RFP Format, Requested RFP Alternatives, Cutting and
More informationSECTION WET-PIPE SPRINKLER SYSTEMS
SECTION 21 13 13 WET-PIPE SPRINKLER SYSTEMS PART 1 - GENERAL 1.1 SCOPE OF WORK A. Design, installation and testing shall be in accordance with NFPA 13 except for specified exceptions. B. The demolition
More informationSECTION GENERAL-SERVICE COMPRESSED-AIR SYSTEMS
PART 1 GENERAL 1.01 SECTION INCLUDES A. Pipe and Pipe Fittings. B. Air compressor. C. Air receiver and accessories. D. Aftercooler. E. Refrigerated air dryer. F. Pressure reducing station. 1.02 RELATED
More informationSECTION KITCHEN HOOD AND DUCT FIRE SUPPRESSION SYSTEM
PART 1 GENERAL 1.01 SUMMARY SECTION 15371 KITCHEN HOOD AND DUCT FIRE SUPPRESSION SYSTEM A. Section Includes: A complete wet chemical automatic fire suppression system for the exhaust hood, including necessary
More informationDIVISION 21: FIRE SUPPRESSION SYSTEMS SECTION Fire Protection Systems Protecting Cold Storage and Unheated Warehouses
PART 1 - GENERAL 1.1 SCOPE A. Through Class III Commodity Classification, up to 12.2m of single, double or multiple row rack storage, up to 14.6m building height (VanQuish Fire Sprinkler System). Cartoned
More informationUNIFIED FACILITIES GUIDE SPECIFICATIONS
USACE / NAVFAC / AFCEC / NASA UFGS-21 13 17.00 10 (May 2009) Change 1-02/13 ------------------------------ Preparing Activity: USACE Superseding UFGS-21 13 17.00 10 (November 2008) UNIFIED FACILITIES GUIDE
More informationFire Pump Specification
GPS Amsterdam Phase 2 Expansion Project No: 1703 Fire Pump Specification Rev. Description Date Issued by 00 First Issue 10-09-2017 1703-F02-403-001 GPS Amsterdam Phase 2 Expansion Table of Contents 1 F02-403-001
More informationKITCHEN HOOD AND DUCT FIRE SUPPRESSION SYSTEM
PART 1 GENERAL 1.01 SUMMARY SECTION 15371 KITCHEN HOOD AND DUCT FIRE SUPPRESSION SYSTEM A. Section Includes: A complete automatic fire suppression system for the exhaust hood, including necessary accessories.
More informationUniversity of Missouri St. Louis September 9, 2013 Recreation and Wellness Center #S
SECTION 210548 - VIBRATION AND SEISMIC CONTROLS FOR FIRE-SUPPRESSION PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Isolation pads. 2. Isolation mounts. 3.
More information