FIGURE 1 OUTAGAMIE COUNTY LANDFILL PROJECT LOCATION EAST LANDFILL LANDFILL OFFICE AND SCALE WEST LANDFILL EXISTING MRF COUNTY ROAD OO EXISTING FLARE

Size: px
Start display at page:

Download "FIGURE 1 OUTAGAMIE COUNTY LANDFILL PROJECT LOCATION EAST LANDFILL LANDFILL OFFICE AND SCALE WEST LANDFILL EXISTING MRF COUNTY ROAD OO EXISTING FLARE"

Transcription

1 EAST LANDFILL LANDFILL OFFICE AND SCALE WEST LANDFILL HOLLAND ROAD EXISTING MRF COUNTY ROAD OO PROJECT LOCATION EXISTING FLARE EXISTING COMPRESSOR BUILDING FIGURE 1 PROJECT LOCATION 15 0 JANUARY, 2015 Revision MRS Checked By: DJM4 Project: 15O X:\FOTH\IE\Outagamie Co Recyc SW WI\15O002-00\CAD\2015 gas blower modification\figure 1 PROJECT LOCATION.dgn /1/2015 9:17:42 AM

2 EXISTING FLARE EXISTING EQUIPMENT SKID EXISTING " GAS PIPING (TO BE REMOVED, SEE NOTE ) EXISTING NATURAL GAS FLARE IGNITOR PILOT TRAIN (TO BE RELOCATED) EXISTING CONTROL PANEL W/OVERHEAD SHELTER (TO BE REMOVED) OLD FLARE FOUNDATION (TO BE REMOVED) APPROXIMATE LOCATION OF UNDERGROUND NATURAL GAS PIPE (SEE NOTE 2) OLD FLARE PIPING (TO BE REMOVED) EXISTING BLOWER SKID (TO BE REMOVED) LEGEND 70 EXISTING GROUND CONTOUR EXISTING ABOVE GROUND PIPING EXISTING KNOCKOUT POT AND CONDENSATE PUMP G EXISTING UNDERGROUND NATURAL GAS PIPE NOTES: 1. CONTRACTOR SHALL VERIFY ALL EXISTING EQUIPMENT LOCATION AND SIZES. EXISTING ABOVE GROUND PIPING EXISTING CONDENSATE MANHOLES UNDERGROUND NATURAL GAS PIPE TRANSITIONS TO ABOVE GROUND PIPING AT OLD FLARE FOUNDATION AND. MIRRORS ABOVE GROUND OLD FLARE PIPING LAYOUT TO EQUIPMENT SKID. CONTRACTOR SHALL REMOVE EXISTING " GAS PIPING FROM SKID PIPING TIE-IN TO OUTSIDE OF BUILDING. CONTRACTOR 70 SHALL SEAL-OFF PIPE AND INSULATION END OUTSIDE OF MH BUILDING. MH EXISTING COMPRESSOR BUILDING FIGURE 2 EXISTING CONDITIONS 5 1 FEBRUARY, 2015 Revision MRS Checked By: DJM4 Project: 15O X:\FOTH\IE\Outagamie Co Recyc SW WI\15O002-00\CAD\2015 gas blower modification\figure 2 EXISTING CONDITIONS.dgn /1/2015 9:17:46 AM

3 REMOVE AND DISPOSE OF ALL EQUIPMENT, PIPING AND UNUSED WIRING/CONDUITS ELECTRICAL CONTROL RACK W/OVERHEAD SHELTER CONDENSATE TRANSFER PUMP ~26 ~8 UTILITY FLARE STACK FLAME ARRESTOR FLOW METER (RELOCATE) NATURAL GAS IGNITER PILOT TRAIN (RELOCATE) GAS BLOWER SKID (WITH 50 HP MOTOR) KNOCK-OUT POT REMOVE GAS PIPING (SEE DETAIL 2/6) NOTES: 1. CONTRACTOR SHALL REMOVE ALL EQUIPMENT, CONTROLS, PIPING AND UNUSED ELECTRICAL WIRING/CONDUITS WITHIN BALLOONED AREA. 2. CONTRACTOR SHALL BE RESPONSIBLE FOR DISPOSAL AND/OR SALVAGE OF ALL REMOVED ITEMS. FIGURE EXISTING EQUIPMENT SKID DEMOLITION PLAN 1 2 JANUARY, 2015 Revision MRS Checked By: DJM4 Project: 15O X:\FOTH\IE\Outagamie Co Recyc SW WI\15O002-00\CAD\2015 gas blower modification\figure EXISTING SKID DEMOLITION PLAN.dgn /1/2015 9:17:46 AM

4 INSTALL BLOWER SKID (WELD TO EXISTING PLATFORM) RELOCATE EXISTING 8" PNEUMATIC AUTOBLOCK VALVE W/-WAY SOLENOID VALVE (FLOWLINE) CONNECT TO EXISTING 8" FLANGE ~26 HEAT TRACE AND INSULATE EQUIPMENT (SEE NOTE ) CONNECT TO EXISTING 8" FLANGE HEAT TRACE AND INSULATE EQUIPMENT (SEE NOTE ) ~8 EXISTING UTILITY FLARE STACK EXISTING FLAME ARRESTOR THREE 0 HP GAS BLOWERS INSTALL BURIED PIPING TO EXISTING UNDERGROUND NATURAL GAS PIPE INSTALL PRESSURE INDICATOR AND TRANSMITTER PRESERVE EXISTING KNOCKOUT POT CONNECTION, CONDENSATE PUMP AND CONTROLS RELOCATE NATURAL GAS IGNITER PILOT TRAIN (RELOCATE) NOTES: CONTRACTOR SHALL VERIFY ALL EXISTING DIMENSIONS AND MATERIAL TYPES. CONTRACTOR SHALL MODIFY COMPRESSED AIR LINE SERVING AUTOBLOCK VALVE AS NECESSARY FOR NEW MOUNTING LOCATION. OPTIONAL BID ITEM B - IF OWNER SELECTED, CONTRACTOR SHALL HEAT TRACE EQUIPMENT AS SHOWN ON THE FIGURES AND DETAILED IN THE SPECIFICATIONS. FIGURE 4 PROPOSED GAS BLOWER SKID INSTALLATION 1 2 MARCH, 2015 Revision MRS Checked By: DJM4 Project: 15O X:\FOTH\IE\Outagamie Co Recyc SW WI\15O002-00\CAD\2015 gas blower modification\figure 4 PROPOSED BLOW SKID INSTALLATION.dgn /1/2015 9:17:47 AM

5 ABANDONED ABOVE GROUND PIPE ABANDONED FLARE FOUNDATION RELOCATED FLARE PILOT IGNITOR TRAIN EXISTING ABOVE GROUND PIPING APPROXIMATE LOCATION OF EXISTING GAS PIPE EXISTING COMPRESSOR BUILDING EQUIPMENT CONNECTIONS EXISTING EQUIPMENT SKID EXISTING FLARE SV EXISTING LIGHTING PANEL GAS BLOWER NO. GAS BLOWER NO.2 GAS BLOWER NO.1 LSC PIT FCV 15 7 MAINTAIN EXISTING SCADA NETWORKING LSH LSL E E E E E E 11 4 EXISTING MCC ROOM E SV MH E E FCV EXISTING KNOCKOUT POT MH CLASS I, DIVISION 1 HAZARDOUS LOCATION PROPOSED BLOWER SKID REPLACE EXISTING SERVICE FEEDER, CONTROLS, AND SIGNAL WIRING RELOCATED FLOW METER 728 MAINTAIN EXISTING FLOW METER PANEL CONNECTION 70 REPLACE EXISTING 100 AMP FUSED SWITCH WITH 175 AMP FUSED SWITCH 72 GENERAL NOTES: 1. DO NOT SCALE DRAWINGS TO DETERMINE EXACT LOCATION OF ELECTRICAL EQUIPMENT AND CONNECTIONS V HOMERUN WIRING SHALL BE A MINIMUM OF (2) #12 & #12G IN 4"C UNLESS OTHERWISE NOTED. SIZE FOR VOLTAGE DROP.. ALL EXTERIOR RACEWAY TO BE GRC. 4. CONTRACTOR SHALL CONFIRM ALL EXISTING CONTROL EQUIPMENT AND CONNECTIONS. ELECTRICAL PLAN NOTES: X 1. EXTEND THE FOLLOWING RACEWAY AND CONDUCTOR FROM THE EXISTING FLARE TO THE GAS BLOWER CONTROL PANEL: 1.1. ANALOG CIRCUITS - (2) TWISTED SHIELDED PAIR, (2) PAIR THERMOCOUPLE CABLES IN 4 "C DISCRETE CONTROL (7) #12 AND #12 GND IN /4"C. 2. EXTEND THE FOLLOWING RACEWAY AND CONDUCTOR FROM THE PILOT IGNITOR TRAIN TO THE GAS BLOWER CONTROL PANEL: 2.1. DISCRETE CONTROL (2) #12 AND #12 GND IN /4"C.. SEE ELECTRICAL ONE-LINE DRAWING FOR MOTOR FEEDERS. PROVIDE STAINLESS STEEL MOUNTING STRUT AND LOCAL NEMA 7 EXPLOSION PROOF DISCONNECTS. 4. PROVIDE RACEWAY AND CONDUCTOR FROM EXISTING FIELD DEVICES SHOWN TO GAS BLOWER PANEL. EXISTING RACEWAY MAY BE RE-USED IF FEASIBLE. CIRCUITS SHALL BE AS FOLLOWS: 4.1. PRESSURE INDICATING TRANSMITTER (PIT) - ANALOG CIRCUIT - (1) TWISTED SHIELDED PAIR IN /4"C LIMIT SWITCH CLOSED (LSC), FLOW CONTROL VALVE (FCV), LEVEL SWITCH HIGH (LSH) & LEVEL SWITCH LOW (LSL) - (8) #12 & #12 GND IN /4"C. 4.. SOLENOID VALVE (SV) - (4) #12 & #12 GND IN /4"C. 5. EXTEND RACEWAY AND CONDUCTOR FROM RELOCATED FLOW METER EXISTING RACEWAY MAY BE RE-USED, IF FEASIBLE. CIRCUIT TO EXISTING FLOW TRANSMITTER IN MCC ROOM AS INDICATED ANALOG CIRCUITS - (2) TWISTED SHIELDED PAIR AND DC POWER (2) #12 AND #12 GND IN /4"C. 6. PROVIDE (4) LOCAL DISCONNECTS IN NEMA 7, EXPLOSION PROOF ENCLOSURES FOR HEAT TRACE CIRCUITS. SEE PROCESS PIPING DRAWINGS FOR HEAT TRACE LOCATIONS. 7. RE-USE OF EXISTING RACEWAY, WHERE PRACTICAL, IS PERMITTED. PROVIDE SEAL-OFF FITTINGS AT HAZARDOUS LOCATION BOUNDARIES. RE-USE EXISTING CONDUIT SUPPORT RACK. SEE FIGURE 6 FOR PHOTOGRAPHS OF EXISTING CONDUIT RACK. 8. ROUTE NEW RACEWAY AND CONDUCTOR ON EXISTING CONDUIT SUPPORT STRUCTURE. MODIFY AS NEEDED TO SUPPORT NEW RACEWAY. 9. PROVIDE NEMA 4X STAINLESS STEEL JUNCTION BOXES FOR TRANSITION FROM EXTERIOR TO INTERIOR WIRING. PROVIDE SEPARATE JUNCTION BOXES FOR DIFFERENT CIRCUIT TYPES. 10. OPTIONAL BID ITEM B- PROVIDE (4) 20 AMP, CLASS B GFCI CIRCUIT BREAKERS FOR HEAT TRACE CIRCUITS. 11. REMOVE EXISTING 100 AMP FUSED SWITCH BUCKET AND REPLACE WITH A 200 AMP FUSED SWITCH BUCKET. PROVIDE 175 AMP TIME DELAY FUSES. PROVIDE 175AMP FEEDER TO SERVE THE GAS BLOWER PANEL. SEE ONE LINE DRAWING. 12. INSTALL WALL MOUNTED PANEL AT LOCATION SHOWN PER DETAIL MAINTAIN NEC REQUIRED WORKING CLEARANCES. 1. PROVIDE CAT 6 ETHERNET CABLE IN /4" EMT FOR INTERCONNECTION OF THE GAS BLOWER PANEL AND THE SCADA NETWORK SWITCH. 14. RELOCATE THE SCADA NETWORKING EQUIPMENT TO PROVIDE A MINIMUM OF 42" WORKING CLEARANCE IN FRONT OF THE GAS BLOWER PANEL. 15. DEDUCTIVE BID ITEM A- PROVIDE EXTERIOR, HAZARDOUS RATED TRAY CABLE AND CABLE TRAY SYSTEM IN LIEU OF CONVENTIONAL RACEWAY FOR POWER, CONTROL, AND INSTRUMENTATION CIRCUITS. PROVIDE HAZARDOUS LOCATION RATED CABLE TERMINATION FITTINGS IN HAZARDOUS LOCATIONS EXISTING MCC INSTALL NEW POWER DISTRIBUTION AND CONTROL PANEL GAS BLWR PANEL FIGURE 5 ELECTRICAL PLAN SCADA PANEL 5 1 MARCH, 2015 Revision SRM Checked By: SRM Project: 15O X:\FOTH\IE\Outagamie Co Recyc SW WI\15O002-00\CAD\2015 gas blower modification\figure 5 ELECTRICAL plan.dgn /1/2015 9:17:49 AM

6 REMOVE EQUIPMENT NORTH OF FLANGE CONNECT TO EXISTING FLANGE CONNECT TO EXISTING FLANGE REMOVE EQUIPMENT NORTH OF FLANGE REMOVE EXISTING CONTROL RACK AND SHELTER REMOVE ABANDONED PIPE AND ACTUATED VALVE (END BLIND FLANGED) REPLACE NATURAL GAS SUPPLY LINE WITH EXISTING FLARE BURIED PIPE STACK (TO REMAIN) REMOVE EXISTING GAS RECIRCULATION PIPING LOOP TO GAS COMPRESSOR BUILDING EXISTING KNOCKOUT POT (TO REMAIN) EXISTING FLAME ARRESTOR (TO REMAIN) EXISTING STRUCTURAL STEEL PLATFORM TO REMAIN AS FOUNDATION FOR NEW SKID RELOCATE NATURAL GAS IGNITOR PILOT TRAIN 1 6 SOUTH END OF EXISTING BLOWER SKID (VIEW FROM WEST) 2 6 NORTH END OF EXISTING BLOWER SKID (VIEW FROM WEST) REPLACE FLOW METER WITH RELOCATED UNIT CAUTION: FLARE STACK GUY SETS REMOVE OLD FLARE PIPING REMOVE EXISTING GAS PIPING. TERMINATE AND CAP PIPING, INSULATION AND ALUMINUM SHIELDING OUTSIDE OF BUILDING. REPLACE NATURAL GAS SUPPLY LINE WITH BURIED PIPE REMOVE OLD FLARE FOUNDATION, ABANDON ELECTRICAL CONDUIT 4 6 EXISTING BLOWER SKID (VIEW FROM SOUTH) ABANDONED FLARE FOUNDATION 6 FIGURE 6 DETAILS FEBRUARY, 2015 Revision MRS Checked By: DJM4 Project: 15O X:\FOTH\IE\Outagamie Co Recyc SW WI\15O002-00\CAD\2015 gas blower modification\figure 6 DETAILS.dgn /1/2015 9:17:50 AM

7 MOUNT NEW POWER DISTRIBUTION AND CONTROL PANEL ON WALL SOUTH OF MCC PANEL RACK CONTRACTOR TO REPLACE EXISTING 100 AMP SERVICE WITH 175 AMP SERVICE CONTRACTOR TO REPLACE EXISTING 100 AMP FUSED SWITCH WITH 175 AMP FUSED SWITCH BUCKET FOR SERVICE TO NEW POWER DISTRIBUTION AND CONTROL PANEL CONTRACTOR TO REMOVE EXISTING GAS PIPING. CAP PIPING, INSULATION AND SHIELDING OUTSIDE OF BUILDING. 2 EXISTING ABOVE GROUND SERVICE LINE (VIEW FROM EAST) 1 EXISTING MCC BUCKET PANEL (VIEW FROM WEST) 7 7 REMOVE EXISTING GAS PIPING REMOVE UNUSED POWER AND CONTROL CONDUIT, REPLACE FOR SERVICE BETWEEN CONTROL PANEL AND NEW BLOWER SKID CAUTION: FLARE STACK GUY SETS REMOVE EXISTING CONTROL RACK AND SHELTER REMOVE ALL EXISTING POWER DISTRIBUTION AND CONTROL EQUIPMENT, CONDUITS, AND SUPPORTS LAND EXISTING POWER AND CONTROLS AT NEW CONTROL PANEL REPLACE FLOW METER WITH RELOCATED UNIT CONTRACTOR TO MODIFY RACEWAY RUNS AS NECESSARY FOR NEW CONTROLS AND SERVICE REMOVE EXISTING CONTROLS RACK 4 7 EXISTING CONTROL PANEL EXISTING BLOWER SKID (VIEW FROM SOUTH) 7 FIGURE 7 ELECTRICAL DETAILS MARCH, 2015 Revision MRS Checked By: DJM4 Project: 15O X:\FOTH\IE\Outagamie Co Recyc SW WI\15O002-00\CAD\2015 gas blower modification\figure 7 DETAILS.dgn /1/2015 9:17:51 AM

8

Building Division 201 SE 3 rd STREET (Second Floor) OCALA, FL Phone: (352) BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS

Building Division 201 SE 3 rd STREET (Second Floor) OCALA, FL Phone: (352) BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS Building Code compliance is the obligation of design professionals and/or contractors. Plan Review and Inspection Guidelines are intended to be used

More information

Public Safety DAS Annunciator Panel

Public Safety DAS Annunciator Panel Public Safety DAS Annunciator Panel 120 VAC Models: 1221-A, 1221-B, 1221-C Revision D 91117 48 VDC Models: 1221-A-48, 1221-B-48, 1221-C-48 24 VDC Models: 1221A-24, 1221-B-24, 1221-C-24 CAUTION: (Read This

More information

OPERATING AND MAINTENANCE MANUAL FOR PLATE HEAT EXCHANGER INDIRECT FIRED WATER HEATER. Electric Heater Company Base Model "BWXP"

OPERATING AND MAINTENANCE MANUAL FOR PLATE HEAT EXCHANGER INDIRECT FIRED WATER HEATER. Electric Heater Company Base Model BWXP OPERATING AND MAINTENANCE MANUAL FOR PLATE HEAT EXCHANGER INDIRECT FIRED WATER HEATER Electric Heater Company Base Model "BWXP" HUBBELL ELECTRIC HEATER COMPANY P.O. BOX 288 STRATFORD, CT 06615 PHONE: (203)

More information

Models NFPA 1221-A, NFPA 1221-B Public Safety DAS Annunciator Panel. Revision E 61117

Models NFPA 1221-A, NFPA 1221-B Public Safety DAS Annunciator Panel. Revision E 61117 Models NFPA 1221-A, NFPA 1221-B Public Safety DAS Annunciator Panel Revision E 61117 CAUTION: (Read This First) This panel has been designed to make it nearly bullet proof to mistakes made when wiring

More information

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards Change History Date Description of Change Pages / Sections Modified Change Approver Initials 8/1/17 Updated section on Manufacturers 3 1. 6/15/16 Updated division section from 16120 to 26 05 00, - mgl44

More information

MEDIUM, LOW AND CONTROL VOLTAGE CABLES

MEDIUM, LOW AND CONTROL VOLTAGE CABLES Related Sections U-M Design Guideline Sections: 260800 - Electrical Acceptance Tests Products Medium Voltage Primary Cables Primary power distribution cable shall be single conductor stranded copper, with

More information

M001. Revenue Services ISSUED FOR CONSTRUCTION SEPTEMBER. 2, East State Parkway Schaumburg, Illinois Do Not Scale Drawings

M001. Revenue Services ISSUED FOR CONSTRUCTION SEPTEMBER. 2, East State Parkway Schaumburg, Illinois Do Not Scale Drawings 1 T Consultant: NOTES, SYMBOLS & ABBREVIATIONS - MECHANICAL Number Description M001 Vestibule 117 LAN/IT Coffee 115 116 Mail Room 118 114 113 112 Scanning 119 Open Office 101 FIRST FLOOR PLAN - MECHANICAL

More information

SECTION C. Section Cable Trays for Electrical Systems: Additional identification requirements for cable tray systems.

SECTION C. Section Cable Trays for Electrical Systems: Additional identification requirements for cable tray systems. SECTION 26 0553 PART 1 GENERAL 1.1 SECTION INCLUDES A. Electrical identification requirements. B. Identification nameplates and labels. C. Wire and cable markers. D. Voltage markers. E. Underground warning

More information

SLATE. Base Module INSTALLATION INSTRUCTIONS R8001A1001

SLATE. Base Module INSTALLATION INSTRUCTIONS R8001A1001 SLATE Base Module R8001A1001 INSTALLATION INSTRUCTIONS Scan for more information Application SLATE brings configurable safety and programmable logic together into one single platform. The platform can

More information

Operator: Save these instructions for future use!

Operator: Save these instructions for future use! WHITE-RODGERS 50A55-286 Integrated Furnace Control INSTALLATION INSTRUCTIONS Operator: Save these instructions for future use FAILURE TO READ AND FOLLOW ALL INSTRUCTIONS CAREFULLY BEFORE INSTALLING OR

More information

INSTALLATION, OPERATING & MAINTENANCE INSTRUCTIONS FOR 870 SERIES INDUSTRIAL CONTROL PANELS

INSTALLATION, OPERATING & MAINTENANCE INSTRUCTIONS FOR 870 SERIES INDUSTRIAL CONTROL PANELS INSTALLATION, OPERATING & MAINTENANCE INSTRUCTIONS FOR 870 SERIES INDUSTRIAL CONTROL PANELS GENERAL INDEECO Industrial Control Panels are designed to provide years of trouble free operation if properly

More information

TM Series. Induced Draft, Counter Flow Optional Accessories

TM Series. Induced Draft, Counter Flow Optional Accessories ANTIFREEZE PACKAGE / RESISTANCE HEATING OPTION The antifreeze package is supplied to provide protection against freezing of standing water in the cooling tower sump due to shutdown during winter operation.

More information

Greentrol Automation, Inc.

Greentrol Automation, Inc. Model GA-100 Technical Manual GreenAlert 100 Series Greentrol Automation, Inc. Installation, Operation and Maintenance Technical Manual GA-100 Document Name: TM_GA-100_R1C TM_GA-100_R1C Part Number: 960--0000

More information

YP7999A1000 ControLinks Fuel Air Ratio Control Panel

YP7999A1000 ControLinks Fuel Air Ratio Control Panel YP7999A1000 ControLinks Fuel Air Ratio Control Panel FEATURES INSTALLATION INSTRUCTIONS Pre-wired and ready to install Includes the R7999A control, wiring subbase and S7999D1048 touchscreen display Commission,

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 11/06/2018

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 11/06/2018 SECTION 26 2913 - ENCLOSED CONTROLLERS GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

SLATE. Sub-Base Module INSTALLATION INSTRUCTIONS R8001S9001

SLATE. Sub-Base Module INSTALLATION INSTRUCTIONS R8001S9001 SLATE Sub-Base Module R8001S9001 INSTALLATION INSTRUCTIONS Scan for more information Application SLATE brings configurable safety and programmable logic together into one single platform. The platform

More information

Installation Instructions Remote Blowers

Installation Instructions Remote Blowers Installation Instructions Remote Blowers Models: REMP3, REMP16 Suitable for use in a household cooking area. Suitable for use with solid state controls. To complete this blower, a Dacor hood assembly or

More information

Operator: Save these instructions for future use!

Operator: Save these instructions for future use! 031-01284-000/50A55-241 Integrated Furnace Control INSTALLATION INSTRUCTIONS Operator: Save these instructions for future use! FAILURE TO READ AND FOLLOW ALL INSTRUCTIONS CAREFULLY BEFORE INSTALLING OR

More information

Operator: Save these instructions for future use!

Operator: Save these instructions for future use! WHITE-RODGERS 50A55-474 & 50A55-571 Integrated Furnace Controls INSTALLATION INSTRUCTIONS Operator: Save these instructions for future use! FAILURE TO READ AND FOLLOW ALL INSTRUCTIONS CAREFULLY BEFORE

More information

CHAPTER 8 ELECTRICAL

CHAPTER 8 ELECTRICAL CHAPTER 8 0 8.1 GENERAL... 3 8.2 REQUEST FOR PROPOSAL DEVELOPMENT... 3 8.3 DESIGN DEVELOPMENT... 3 8.3.1 CONCEPT (30%) DESIGN SUBMITTAL REQUIREMENTS... 3 8.3.1.1 Concept Design Analysis... 3 8.3.1.1.1

More information

S5JB Quick Setup Guide. Refer to the instructions on the following pages for complete details on the steps outlined below.

S5JB Quick Setup Guide. Refer to the instructions on the following pages for complete details on the steps outlined below. Intelligent Junction Box -, HW 1 Mount, Lighting Fixtures and Control Equipment Mount the on C-strut or other suitable mounting location. Install the lighting fixtures and other specified control equipment

More information

SECTION LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES (600 VOLTS AND BELOW)

SECTION LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES (600 VOLTS AND BELOW) SECTION 26 05 21 PART 1 - GENERAL 1.1 DESCRIPTION This section specifies the furnishing, installation, and connection of the low voltage power and lighting wiring. 1.2 RELATED WORK A. Excavation and backfill

More information

BURNERS/ FLARES. VAREC BIOGAS 244W Series WASTE GAS BURNER & IGNITION SYSTEM

BURNERS/ FLARES. VAREC BIOGAS 244W Series WASTE GAS BURNER & IGNITION SYSTEM BURNERS/ FLARES VAREC BIOGAS 4W Series WASTE GAS BURNER & IGNITION SYSTEM The Varec Biogas 4W Series Waste Gas Burner is a highly reliable flare and ignition system ideal for use in burning excess biogas.

More information

TABLE OF CONTENTS CHAPTER 5 SPECIAL OCCUPANCIES CHAPTER 1 GENERAL RULES... 19

TABLE OF CONTENTS CHAPTER 5 SPECIAL OCCUPANCIES CHAPTER 1 GENERAL RULES... 19 TABLE OF CONTENTS About This Textbook...xiii How to Use the National Electrical Code... 1 Article 90 Introduction to the National Electrical Code... 7 90.1 Purpose of the NEC... 7 90.2 Scope of the NEC...

More information

Cimco Series 21. Series 21 - Specifications INDEX. Description. Operational Specification 2

Cimco Series 21. Series 21 - Specifications INDEX. Description. Operational Specification 2 Series 21 - Specifications INDEX Description Page Operational Specification 2 Analog Operational Specification - Communications Options 3 Digital Operational Specification - Communications Options 4 Hardware

More information

Photovoltaic (Solar) Array Installation Guide

Photovoltaic (Solar) Array Installation Guide Building & Safety Division Community Development Department 7351 Rosanna Street, Gilroy, CA 95020 Phone: 408 846-0451 Fax: 408 846-0429 Visit us: www.cityofgilroy.org Photovoltaic (Solar) Array Installation

More information

SPECIFICATIONS - DETAILED PROVISIONS Section Magnetic Flowmeters C O N T E N T S

SPECIFICATIONS - DETAILED PROVISIONS Section Magnetic Flowmeters C O N T E N T S Revised 04/13/16 SPECIFICATIONS - DETAILED PROVISIONS Section 17210 - Magnetic Flowmeters C O N T E N T S PART 1 - GENERAL... 1 1.01 GENERAL REQUIREMENTS... 1 1.02 PROJECT SPECIFIC REQUIREMENTS... 1 1.03

More information

Paragon. Induced Draft, Counter Flow Optional Accessories

Paragon. Induced Draft, Counter Flow Optional Accessories ANTIFREEZE PACKAGE / RESISTANCE HEATING OPTION The antifreeze package is supplied to provide protection against freezing of standing water in the cooling tower sump due to shutdown during winter operation.

More information

FIRE ALARM: BY OTHERS, IF REQUIRED.

FIRE ALARM: BY OTHERS, IF REQUIRED. x x x x x x OS LIGHTING S FLUORESCENT LIGHT FIXTURE, SEE LIGHT FIXTURE SCHEDULE FOR SIZE AND MOUNTING. FLUORESCENT STRIP LIGHT FIXTURE, SEE LIGHT FIXTURE SCHEDULE FOR SIZE AND MOUNTING. WALL BRACKET FLUORESCENT

More information

WATLOW IND. WATROD Modular Duct Heater Installation & Maintenance Manual I&M NUMBER: Page: 1 Date:6/11/2008 Rev: 2

WATLOW IND. WATROD Modular Duct Heater Installation & Maintenance Manual I&M NUMBER: Page: 1 Date:6/11/2008 Rev: 2 I&M NUMBER: 316-42-15-1 Page: 1 _ Pre Installation Check to make sure that heater received is the same as that ordered. Elements may come in contact with each other during shipment. Minor adjustments to

More information

SECTION DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM

SECTION DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM SECTION 283111 - DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

STATEWIDE CAREER/TECHNICAL EDUCATION COURSE ARTICULATION REVIEW MINUTES

STATEWIDE CAREER/TECHNICAL EDUCATION COURSE ARTICULATION REVIEW MINUTES STATEWIDE CAREER/TECHNICAL EDUCATION COURSE ARTICULATION REVIEW MINUTES Articulation Agreement Identifier: ELT 118 (2005-1) Identifier is the postsecondary course prefix followed by Plan-of-Instruction

More information

NATIONAL ELECTRICAL CODE (NEC) & NFPA 70E ARC FLASH ELECTRICAL SAFETY

NATIONAL ELECTRICAL CODE (NEC) & NFPA 70E ARC FLASH ELECTRICAL SAFETY A new twist on the National Electrical Code - a practical application workshop. If you sign up in this class, prepare to work! Day 1: Fundamentals of OSHA requirements for performing electrical work -

More information

ABH BASIN HEATER CONTROLS PACKAGE. engineering data and specifications

ABH BASIN HEATER CONTROLS PACKAGE. engineering data and specifications BH BSIN HETER CONTROLS PCKGE engineering data and specifications BH Basin Heater Control Package 2 BH DVNCED BSIN HETER CONTROLS The Marley BH basin heater package controls the ON and OFF operation of

More information

Responsibility No. Item description CC TPI Owner 5. Instrument items 5.1 Installation of equipment 5.1.1 Pre-installation check 1) Foundation and setting bolts - Dimension - Visual check 2) Visuals check

More information

RESIDENTIAL ELECTRICAL INSPECTIONS CHECKLISTS

RESIDENTIAL ELECTRICAL INSPECTIONS CHECKLISTS RESIDENTIAL ELECTRICAL INSPECTIONS CHECKLISTS Key Questions for Residential Inspections 1. What wiring methods will be used, and are the wiring methods suitable for the conditions? 2. Will multiwire branch

More information

SECTION SOLAR PHOTOVOLTAIC (PV) POWER GENERATION SYSTEM

SECTION SOLAR PHOTOVOLTAIC (PV) POWER GENERATION SYSTEM SECTION 48 14 14 SOLAR PHOTOVOLTAIC (PV) POWER GENERATION SYSTEM PART 1 GENERAL 1.1 SECTION INCLUDES The work of this section consists of furnishing a complete Solar Photovoltaic (PV) Power Generation

More information

SECTION DOMESTIC WATER PRESSURE BOOSTING SYSTEMS (VFD) PART 1 - GENERAL 1.1 SUMMARY

SECTION DOMESTIC WATER PRESSURE BOOSTING SYSTEMS (VFD) PART 1 - GENERAL 1.1 SUMMARY SECTION 22 11 23.13 DOMESTIC WATER PRESSURE BOOSTING PART 1 - GENERAL 1.1 SUMMARY A. Where utility water pressure cannot adequately meet the pressure requirements of the domestic water systems and where

More information

Breezex (BX) Heavy Duty Reversible Supply/Exhaust Fans with Reversing Switch. IMPORTANT! Read before proceeding! OPERATION & MAINTENANCE MANUAL

Breezex (BX) Heavy Duty Reversible Supply/Exhaust Fans with Reversing Switch. IMPORTANT! Read before proceeding! OPERATION & MAINTENANCE MANUAL Breezex (BX) Heavy Duty Reversible Supply/Exhaust Fans with Reversing Switch OPERATION & MAINTENANCE MANUAL IMPORTANT! Read before proceeding! Please read and save these instructions. Read carefully before

More information

B.C.S. Shop Heaters 26, 30 & 36 (36 shown)

B.C.S. Shop Heaters 26, 30 & 36 (36 shown) BIOMASS COMBUSTION SYSTEMS, INC. 67 MILLBROOK ST., SUITE 502 WORCESTER, MA 01606 508-798-5970 - FAX 508-798-5971 B.C.S. Shop Heaters 26, 30 & 36 (36 shown) INSTALLATION MANUAL HAND FIRED SYSTEMS 8-09 Biomass

More information

UL Electrical Equipment for Measurement, Control, and Laboratory Use; Part 1: General Requirements, Second Edition

UL Electrical Equipment for Measurement, Control, and Laboratory Use; Part 1: General Requirements, Second Edition File E315190 Project 07CA39477 March 5, 2008 REPORT on PROCESS CONTROL EQUIPMENT FOR USE IN HAZARDOUS LOCATIONS Litre Meter Ltd. Buckinghamshire, England Copyright 2008 Underwriters Laboratories Inc. Underwriters

More information

PL140 Sump Liquid Sensor-Controller Kit With Local or Remote Notification

PL140 Sump Liquid Sensor-Controller Kit With Local or Remote Notification PL140 Sump Liquid Sensor-Controller Kit With Local or Remote Notification Installation and Operation Manual Beaudreau Sensor Systems, LLC 21 Canal St. Westerly, RI 02891 401-439-7032 Revision History:

More information

IDENTIFICATION FOR ELECTRICAL SYSTEMS July Electrical Systems

IDENTIFICATION FOR ELECTRICAL SYSTEMS July Electrical Systems SECTION 26 05 54 IDENTIFICATION FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Nameplates. 2. Labels. 3. Wire markers. 4. Conduit markers. 5. Permanent Marking. 6. Underground

More information

Electrical Design Guidelines Table of Contents

Electrical Design Guidelines Table of Contents C: Compliant Rev. 3 Dated June 13 11 NC: Non-Compliant NA: Not Applicable Page1 16.1 General 16.2 Single Line Diagrams 16.3 Electric Motor Equipment and Controls 16.4 Lighting 16.5 Emergency Lighting 16.6

More information

FIRE ALARM: BY OTHERS, IF REQUIRED.

FIRE ALARM: BY OTHERS, IF REQUIRED. x x x x x x OS LIGHTING S FLUORESCENT LIGHT FIXTURE, SEE LIGHT FIXTURE SCHEDULE FOR SIZE AND MOUNTING. CAPITAL LETTER DENOTES TYPE, LOWER CASE LETTER DENOTES SWITCH LEG. FLUORESCENT STRIP LIGHT FIXTURE,

More information

INTRODUCTION THIS MANUAL INCLUDES IMPORTANT SAFETY INFORMATION

INTRODUCTION THIS MANUAL INCLUDES IMPORTANT SAFETY INFORMATION INSTALLATION AND OPERATING INSTRUCTIONS FOR THE HARDY Fuel Oil Furnace Models D-140 & D-350 HARDY MANUFACTURING COMPANY, INC. 12345 ROAD 505 PHILADELPHIA, MS 39350 PHONE: (601) 656-5866 FAX: (601) 656-4559

More information

USER INSTRUCTIONS FOR FLANGE IMMERSION HEATERS USED IN HAZARDOUS LOCATIONS

USER INSTRUCTIONS FOR FLANGE IMMERSION HEATERS USED IN HAZARDOUS LOCATIONS USER INSTRUCTIONS FOR FLANGE IMMERSION HEATERS USED IN HAZARDOUS LOCATIONS APPLICATION INDEECO Explosion proof Electric Immersion Heaters for Hazardous Locations are ccsaus Certified for use in areas (external

More information

SECTION ELECTRICAL IDENTIFICATION

SECTION ELECTRICAL IDENTIFICATION SECTION 16075 - ELECTRICAL IDENTIFICATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

Operator: Save these instructions for future use!

Operator: Save these instructions for future use! 50A65-843 Universal Integrated Furnace Control INSTALLATION INSTRUCTIONS Operator: Save these instructions for future use! FAILURE TO READ AND FOLLOW ALL INSTRUCTIONS CAREFULLY BEFORE INSTALLING OR OPERATING

More information

SVF-8DC. Manual No. BLWR007 Rev. 3 February 2014

SVF-8DC. Manual No. BLWR007 Rev. 3 February 2014 Manual No. BLWR007 Rev. 3 February 2014 OPERATING MANUAL SVF-8AC SVF-6ACAN SVF-15ACAN SVF-25ACAN MODELS: SVF-8DC SVF-6DCAN SVF-15DCAN SVF-25DCAN Air Systems International, Inc. 829 Juniper Crescent, Chesapeake,

More information

50A Integrated Furnace Control

50A Integrated Furnace Control Goodman White-Rodgers 0130F00005 PCBBF110 PCBBF123 50A55-743 0130F00005S PCBBF110S PCBBF123S 50A55-289 B1809926 PCBBF112 50T55-289 B1809926S PCBBF112S 50A55-743 Integrated Furnace Control INSTALLATION

More information

Installation, operation & service manual. AlarmScout 961/962 loop powered

Installation, operation & service manual. AlarmScout 961/962 loop powered AlarmScout 961/962 (loop powered) Installation, operation & service manual AlarmScout 961/962 loop powered @@ UNPACKING Unpack the instrument carefully. Make sure all components have been removed from

More information

Chapter 1 General...9 Article 100 Definitions...11 Article 100 Questions Article 110 Requirements for Electrical Installations...

Chapter 1 General...9 Article 100 Definitions...11 Article 100 Questions Article 110 Requirements for Electrical Installations... Article 90 Introduction...1 90.1 Purpose of the NEC...1 90.2 Scope of the NEC...2 90.3 Code Arrangement...4 90.4 Enforcement...5 90.5 Mandatory Requirements and Explanatory Material...6 90.6 Formal Interpretations...6

More information

SECTION IDENTIFICATION FOR ELECTRICAL SYSTEMS

SECTION IDENTIFICATION FOR ELECTRICAL SYSTEMS SECTION 260553 IDENTIFICATION FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 SECTION INCLUDES A. Nameplates and labels B. Wire and cable markers C. Conduit markers 1.2 REFERENCES A. NFPA 70 - National Electrical

More information

FX5 Series Explosion-Proof Electric Air Heaters

FX5 Series Explosion-Proof Electric Air Heaters FX5 Series Explosion-Proof Electric Air Heaters Ruffneck FX5 heaters are C UL US certified for use in hazardous locations. They are designed for the harshest environments such as: dry indoor industrial

More information

A. Product Data: For each electrical identification product indicated. B. Comply with 29 CFR and 29 CFR

A. Product Data: For each electrical identification product indicated. B. Comply with 29 CFR and 29 CFR September 2012, rev. 00 26 0553 Identification for Electrical Systems PART 1. GENERAL 1.01 Summary A. Section Includes: 1.02 Submittals 1. Identification for raceways. 2. Identification of power and control

More information

Company, Inc. Location

Company, Inc. Location Electrical Company, Inc. Location Electrical Compliance Audit December 04, 2007 Solutions Corp. Electrical Solutions Corporation 2368 Eastman Ave, Suite 13, Ventura CA 93003 Greetings, On December 4, 2007,

More information

SLATE. Burner Control Module INSTALLATION INSTRUCTIONS R8001B2001

SLATE. Burner Control Module INSTALLATION INSTRUCTIONS R8001B2001 SLATE Burner Control Module R8001B2001 INSTALLATION INSTRUCTIONS Scan for more information Application SLATE brings configurable safety and programmable logic together into one single platform. The platform

More information

Emergency Lighting Transfer System Model: ELTS2 Installation and User Operation Manual

Emergency Lighting Transfer System Model: ELTS2 Installation and User Operation Manual Emergency Lighting Transfer System Model: ELTS2 Installation and User Operation Manual Part Number: 1096M1200 Rev: E Released: 2018-07 ETC is a registered trademark of Electronic Theatre Controls, Inc.

More information

WATLOW IND. WATROD Flange Heater Installation & Maintenance Manual I&M NUMBER: Page: 1 Date:6/11/2008 Rev: 2.00

WATLOW IND. WATROD Flange Heater Installation & Maintenance Manual I&M NUMBER: Page: 1 Date:6/11/2008 Rev: 2.00 I&M NUMBER: 316-42-8-1 Page: 1 _ Pre Installation Check to make sure that heater received is the same as that ordered. Elements may come in contact with each other during shipment. Minor adjustments to

More information

SECTION PANELBOARDS. A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section.

SECTION PANELBOARDS. A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section. PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section. 1.2 SUMMARY A. This Section includes the

More information

INDUSTRIAL MAINTENANCE E&I TECHNICIAN

INDUSTRIAL MAINTENANCE E&I TECHNICIAN NCCER 13614 Progress Blvd, Alachua, Florida 32615 Phone: (888) 622-3720 E-mail: info@nccer.org INDUSTRIAL MAINTENANCE E&I TECHNICIAN Competencies / Objectives Level One MODULE 40101-07 ORIENTATION TO THE

More information

Technical Data. Minimum Inlet Supply Pressure All MCC Models...0 psi. Minimum Inlet Supply Capacity Match system design calculations

Technical Data. Minimum Inlet Supply Pressure All MCC Models...0 psi. Minimum Inlet Supply Capacity Match system design calculations Worldwide Contacts www.tyco-fire.com AQUAMIST Mist Control Center (MCC) Pump Skid Unit General Description Center (MCC) Pump Skid Unit is a preassembled, self-contained, control center for Ultra Low Flow

More information

Installation Instructions

Installation Instructions Installation Instructions Electric Heater Packages KFAEH -CIRCUIT GROUND LUG TERMINAL BLOCK MULTI-CIRCUIT GROUND LUG COOLING CONTROL PLATE ADAPTER PLATE (MUST BE REMOVED WHEN INSTALLING LARGE HEATER) BLOCK

More information

WATLOW IND. FIREBAR Flange Heater Installation & Maintenance Manual I&M NUMBER: Page: 1 Date: 6/11/2008 Rev: 2.00

WATLOW IND. FIREBAR Flange Heater Installation & Maintenance Manual I&M NUMBER: Page: 1 Date: 6/11/2008 Rev: 2.00 I&M NUMBER: 316-42-2-1 Page: 1 Pre Installation Check to make sure that heater received is the same as that ordered. Elements may come in contact with each other during shipment. Minor adjustments to elements

More information

SWP. (Models SWP08 through SWP20) IMPORTANT! Read before proceeding! OPERATION & MAINTENANCE MANUAL

SWP. (Models SWP08 through SWP20) IMPORTANT! Read before proceeding! OPERATION & MAINTENANCE MANUAL SWP (Models SWP08 through SWP20) OPERATION & MAINTENANCE MANUAL IMPORTANT! Read before proceeding! Read carefully before attempting to assemble, install, operate or maintain the product described. Protect

More information

MaxGard. Interconnection Systems. Durability. Performance. Safety

MaxGard. Interconnection Systems. Durability. Performance. Safety 8Russellstoll Pin and Sleeve Power Connectors Safety Different power supply ratings can t mix: 24 single-rate device polarizations ensure exact voltage, frequency and phase differentiation Safe connections:

More information

SECTION EXTERIOR LIGHTING

SECTION EXTERIOR LIGHTING SECTION 26 56 00 PART 1 - GENERAL 1.1 DESCRIPTION This section specifies the furnishing, installation, and connection of exterior luminaries, controls, poles and supports. 1.2 RELATED WORK A. Section 26

More information

ELECTRICAL SAFETY Information Bulletin

ELECTRICAL SAFETY Information Bulletin ELECTRICAL SAFETY Information Bulletin October 2007 Page 1 of 11 CANADIAN ELECTRICAL CODE SUBJECT: Section 18 Hazardous Locations Rule 18-006 Division of Class I Locations General For classification requirements

More information

Page 1 of General

Page 1 of General Page 1 of 8 16.1 General 1. This section covers items common to sections of CSI s Master Format - Division 16. 2. Dalhousie University is certified by IBEW for new construction and all electrical contractors

More information

LABORATORY AIR COMPRESSORS AND VACUUM PUMPING SYSTEMS

LABORATORY AIR COMPRESSORS AND VACUUM PUMPING SYSTEMS SECTION 22 20 00 LABORATORY AIR COMPRESSORS AND VACUUM PUMPING SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements",

More information

REPLACEMENT PARTS MANUAL

REPLACEMENT PARTS MANUAL REPLACEMENT PARTS MANUAL WALL-MOUNTED VARIABLE CAPACITY ENVIRONMENTAL CONTROL UNIT WRV-S WRV-T Models: WLV-S WLV-T Contents Description Page Cabinet Components Right (Extreme Duty Door) Exploded View...

More information

SECTION AUTOMATIC TRANSFER SWITCHES

SECTION AUTOMATIC TRANSFER SWITCHES SECTION 26 36 23 AUTOMATIC TRANSFER SWITCHES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. General provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

G Series SAVE THESE INSTRUCTIONS. (Model B) Convector Heater for Hazardous Locations GENERAL! INSTALLATION

G Series SAVE THESE INSTRUCTIONS. (Model B) Convector Heater for Hazardous Locations GENERAL! INSTALLATION G Series (Model B) Convector Heater for Hazardous Locations Type G-Series Convection Heaters are designed for use in Class I, Div. I hazardous environments. Units without control options are suitable for

More information

K*ES120 DESCRIPTION TECHNICAL GUIDE SPLIT-SYSTEM EVAPORATOR BLOWERS 10 NOMINAL TONS EER 8.5 ACCESSORIES FIELD INSTALLED TABLE 1: ARI RATINGS*

K*ES120 DESCRIPTION TECHNICAL GUIDE SPLIT-SYSTEM EVAPORATOR BLOWERS 10 NOMINAL TONS EER 8.5 ACCESSORIES FIELD INSTALLED TABLE 1: ARI RATINGS* TECHNICAL GUIDE SPLIT-SYSTEM EVAPORATOR BLOWERS K*ES120 10 NOMINAL TONS EER 8.5 DESCRIPTION These completely assembled dual circuit evaporator blower units include a well-insulated cabinet, a DX cooling

More information

Installation Instructions Type XPMC Air Heater for Hazardous Locations

Installation Instructions Type XPMC Air Heater for Hazardous Locations Installation Instructions Type XPMC Air for Hazardous Locations 1 PF500-1 161-302639-005 May 2017 XPMC Air for Hazardous Locations 12", 2 Heat Sinks with Fixed Thermostat 12", 2 Heat Sinks with Adjustable

More information

Division 26 ELECTRICAL TABLE OF CONTENTS

Division 26 ELECTRICAL TABLE OF CONTENTS Division 26 ELECTRICAL TABLE OF CONTENTS 26 1000 GENERAL... 33 A. CODE... 3 B. RELATED SECTIONS... 3 C. ABBREVIATIONS... 3 D. DEFINITIONS... 3 E. DRAWING REQUIREMENTS... 3 F. EQUIPMENT SERVICE ACCESS AND

More information

COMMON WORK RESULTS FOR ELECTRICAL: Basic Electrical Materials Methods

COMMON WORK RESULTS FOR ELECTRICAL: Basic Electrical Materials Methods 1. BASIC ELECTRICAL MATERIALS 1. All conduit and raceway must be 3/4" or larger. Exposed raceway in finished areas shall be in 700 or larger wiremold. Exception: runs to individual devices 10 or less,

More information

SECTION 2 NEC REFERENCES SECTION 1 LOW-VOLTAGE AND POWER- LIMITED SYSTEMS...1. CHAPTER 1 GENERAL Introduction...35

SECTION 2 NEC REFERENCES SECTION 1 LOW-VOLTAGE AND POWER- LIMITED SYSTEMS...1. CHAPTER 1 GENERAL Introduction...35 SECTION 1 LOW-VOLTAGE AND POWER- LIMITED SYSTEMS...1 Overview of Low-Voltage and Power-Limited Systems...3 Chapter 4 Equipment for General Use...3 Chapter 5 Special Occupancies...3 Chapter 6 Special Equipment...4

More information

AM-14/AM-14C DISHWASHERS

AM-14/AM-14C DISHWASHERS AM-14/AM-14C DISHWASHERS Item # Quantity C.S.I. Section 11400 AM-14/AM-14C DISHWASHERS STANDARD FEATURES 53 racks per hour hot water sanitizing 16 gauge stainless steel tank, chamber, doors, frame and

More information

2016 CDM Smith All Rights Reserved July 2016 SECTION FIBER OPTIC DATA NETWORK

2016 CDM Smith All Rights Reserved July 2016 SECTION FIBER OPTIC DATA NETWORK PART 1 GENERAL 1.01 SCOPE OF WORK SECTION 27 12 23 FIBER OPTIC DATA NETWORK A. Furnish, install, terminate, and test all fiber optic equipment and cabling necessary for a complete and functional data highway

More information

RV30, RV36, RV46. 30, 36, 46 Wide, Raised Vent. Adjustable anchor legs. Front View

RV30, RV36, RV46. 30, 36, 46 Wide, Raised Vent. Adjustable anchor legs. Front View Document # PG08-003 Revised 04/30/09 Page 1/7 1/2 (13 mm) thick stiffener across back 3 1/8" (79 mm) 2" (51 mm) 1 15/16" (49 mm) 1 13/16" (46 mm) 3/16" (5 mm) 2 5/16" (59 mm) Top cap with vent down 15/16"

More information

Hydroflo Prepackaged Pumping Systems

Hydroflo Prepackaged Pumping Systems Hydroflo Prepackaged Pumping Systems Presented to: Presented by: John Curls Jr., P.E. BARNEY S PUMPS INC. What is it? Hydroflo A Hydroflo Packaged Pumping System provides variable volume at a constant

More information

WATLOW IND. WATROD Circulation Heater Installation & Maintenance Manual I&M NUMBER: Page: 1 Date: 6/11/2008 Rev: 2.00

WATLOW IND. WATROD Circulation Heater Installation & Maintenance Manual I&M NUMBER: Page: 1 Date: 6/11/2008 Rev: 2.00 I&M NUMBER: 316-42-5-1 Page: 1 Pre Installation Check to make sure that heater received is the same as that ordered. Watlow heaters are built to comply with UL and CSA dielectric requirements, it may be

More information

Analog Room Pressure Monitor RPC Series

Analog Room Pressure Monitor RPC Series Description The Room Pressure Monitor is used to measure differential pressure in the range of 0.125 to 1"wc or 30 to 250 Pa. It combines precision high sensitivity silicon sensing capabilities and the

More information

RK-02 Multi Point Detector Operator s Manual

RK-02 Multi Point Detector Operator s Manual 65-2485RK-02 Multi Point Detector Operator s Manual Part Number: 71-0237RK Revision: A Released: 11/26/14 RKI Instruments, Inc. www.rkiinstruments.com WARNING Read and understand this instruction manual

More information

50M Integrated Single or Two-Stage HSI Integrated Furnace Control Kit INSTALLATION INSTRUCTIONS

50M Integrated Single or Two-Stage HSI Integrated Furnace Control Kit INSTALLATION INSTRUCTIONS 50M56-743 Integrated Single or Two-Stage HSI Integrated Furnace Control Kit INSTALLATION INSTRUCTIONS FAILURE TO READ AND FOLLOW ALL INSTRUCTIONS CAREFULLY BEFORE INSTALLING OR OPERATING THIS CONTROL COULD

More information

ThermoCable Linear Heat Detection System

ThermoCable Linear Heat Detection System ThermoCable Linear Heat Detection System Estimating Guide 1. INTRODUCTION 1.1 Linear Heat Detection ThermoCable digital linear heat detection wire is a combination of advanced polymer and digital technologies

More information

A. Furnish and install wiring devices and plates as specified herein and as shown on the Drawings.

A. Furnish and install wiring devices and plates as specified herein and as shown on the Drawings. DIVISION 26 ELECTRICAL SECTION 26 27 26 PART 1 GENERAL 1.01 DESCRIPTION A. Furnish and install wiring devices and plates as specified herein and as shown on the Drawings. B. Specialty switches and outlets

More information

ue short form catalog Leaders in Safety, Alarm & emergency Shutdown

ue short form catalog Leaders in Safety, Alarm & emergency Shutdown ue short form catalog Leaders in Safety, Alarm & emergency Shutdown WirelessHART Gas Detector for Toxic & Combustible Gases Electronic and Electromechanical Switches for Vacuum, Pressure, Differential

More information

Installation Instructions

Installation Instructions H6HK Series Installation Instructions Electric Heater Kits Installation in Standard and Variable Speed Indoor Air Handlers IMPORTANT: The instructions included with this heater kit are for installations

More information

Installation, Operation & Service Manual

Installation, Operation & Service Manual Installation, Operation & Service Manual WARNING Improper installation, adjustment, alteration, service or maintenance can result in death, injury or property damage. Read the Installation, Operation and

More information

IMPORTANT CB26UH CBX26UH. Service Literature. CB26UH and CBX26UH Series Table of Contents. Model Number Information... 2

IMPORTANT CB26UH CBX26UH. Service Literature. CB26UH and CBX26UH Series Table of Contents. Model Number Information... 2 Service Literature Corp. 0527 L10 Revised May 2011 CB26UH and CBX26UH Series Table of Contents CB26UH CBX26UH Model Number Information................... 2 Specifications / Electrical Data................

More information

.4 Do complete installation in accordance with latest Electrical Bulletins of the local inspection authority.

.4 Do complete installation in accordance with latest Electrical Bulletins of the local inspection authority. Fitness Facility Addition Page 1 1.1 CODES AND STANDARDS.1 Do complete installation in accordance with the latest edition of the CSA C22.1 as amended by the latest editions of the National Building Code

More information

PSN-1000 & PSN 1000(E) Installation Manual

PSN-1000 & PSN 1000(E) Installation Manual PSN-1000 & PSN 1000(E) Installation Manual Potter Electric Signal Company, LLC St. Louis, MO Customer Service: (866) 240-1870 Technical Support: (866) 956-1211 Fax: (314) 595-6999 www.pottersignal.com

More information

TECHNICAL SERVICES DIVISION

TECHNICAL SERVICES DIVISION TECHNICAL SERVICES DIVISION Electrical and Instrumentation new construction, installations, repairs & upgrades, and maintenance services Panel Design & Manufacturing electro/pneumatic, generator/control,

More information

Installation Instructions

Installation Instructions HHK Series Installation Instructions Electric Heater Kits Installation in Standard and Variable Speed Indoor Air Handlers! IMPOTANT: The instructions included with this heater kit are for installations

More information

B. Configuration of system shall be through Schneider Electric in Homewood, Illinois (Jerry Lanfear ).

B. Configuration of system shall be through Schneider Electric in Homewood, Illinois (Jerry Lanfear ). SECTION 28 13 00 - ACCESS CONTROL PART I - GENERAL 1.1 SUMMARY A. This specification section describes the furnishing, installation, commissioning, and programming of a complete, turnkey, hardwired Andover

More information

A. Shop Drawing submittals shall include, but not be limited to, the following:

A. Shop Drawing submittals shall include, but not be limited to, the following: SECTION 26 05 53 IDENTIFICATION FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Divisions 0 and 1 and Section 26 00 01, Electrical

More information

CHAPTER 8 ELECTRICAL

CHAPTER 8 ELECTRICAL CHAPTER 8 ELECTRICAL 8.1 GENERAL... 3 8.2 REQUEST FOR PROPOSAL DEVELOPMENT... 3 8.3 DESIGN DEVELOPMENT... 3 8.3.1 CONCEPT (30%) DESIGN SUBMITTAL REQUIREMENTS... 3 8.3.1.1 Concept Design Analysis... 3 8.3.1.1.1

More information