1 EROSION AND SEDIMENT POLLUTION CONTROL PLAN FOR COOPERSTOWN BRIDGE REPLACEMENT PROJECT S.R. 0427, SECTION B01 BOROUGH OF COOPERSTOWN, VENANGO COUNTY, PENNSYLVANIA BY: SAI CONSULTING ENGINEERS, INC PENN AVENUE, SUITE 300 PITTSBURGH, PA JANUARY 2007

2 EROSION AND SEDIMENT POLLUTION CONTROL NARRATIVE TABLE OF CONTENTS A. GENERAL PLAN REQUIREMENTS Page 1.0 General Information Plan Preparers Qualifications Alternative Erosion and Sediment Pollution Control Measures and Facilities...2 B. SPECIFIC PLAN REQUIREMENTS 1.0 Topographic Features of Project Area Project Soil Characteristics Proposed Alterations to Project Area Project Area Runoff and Watershed Characteristics Location of Receiving Waters and Chapter 93 Classification Temporary and Permanent BMP Control Facilities for Use Before, During, and After Earth Disturbance Activities Sequence of BMP Installation and Earth Disturbance Maintenance Program for BMP Control Facilities Measures for Disposal of Material References...18 Figure 1 Location Map Figure 2 Soils and Boundaries Map List of Figures List of Tables Table 1 Soil Types and Characteristics Table 2 Maximum Slope Length Above Fence APPENDIX A... Resumes APPENDIX B... Soils Information Tables APPENDIX C... Erosion and Sediment Pollution Control Calculations APPENDIX D...Drainage Areas i

3 EROSION AND SEDIMENT POLLUTION CONTROL PLAN COOPERSTOWN BRIDGE REPLACEMENT PROJECT BOROUGH OF COOPERSTOWN, VENANGO COUNTY, PENNSYLVANIA Prepared for PennDOT, District 1-0 Prepared by SAI Consulting Engineers, Inc. Pittsburgh, PA January 2007 ii

4 A. GENERAL PLAN REQUIREMENTS 1.0 General Information 1.1 Location The Cooperstown Bridge is located along S.R. 0427, Section B01, approximately 5.0 miles north of the intersection with US-322. The area of concern is located in the Borough of Cooperstown, Venango County, Pennsylvania (see Figure 1). 1.2 Description The work documented in this Erosion and Sediment (E&S) Pollution Control Plan involves the replacement and widening of the Cooperstown Bridge which carries S.R over Sugar Creek. The existing 127-foot, two-span bridge, constructed in 1969, is being replaced due to structural deterioration. The proposed work will place the new bridge along a new alignment 70 feet downstream permitting the existing bridge to remain open to traffic during construction. The project consists of the following: Construction of a new two-lane bridge. Reconstruction of approximately 400 feet of S.R on each approach to the new bridge. Realignment of Riverside Drive, Factory Street, and S.R Replacement of minor quantities of guiderail, pavement markings, signing, drainage improvements, etc., related to the above construction. This work also includes grading and alignment improvements for the proposed roadway and connectors. Guiderail and concrete bridge parapets will be constructed where required. Relevant information to the project is as follows: Quadrangle: Franklin, PA Coordinates: Latitude/Longitude: Watercourse(s): Chapter 93 Stream Designation: 0.25" S 0.60" E (from top left of Franklin Quadrangle) Lat/41 o 29'55.3"N Long/79 o 52'13.6"W Sugar Creek CWF 1

5 FIGURE 1 PROJECT LOCATION LOCATION MAP U.S.G.S. QUADRANGLE FRANKLIN, PA SCALE: 1 = 2000

6 Site Conditions: Previous Land Use: Bridge and Roadway Roadway, Residential 1.3 Project Construction Schedule Replacement of the Cooperstown Bridge, S.R. 0427, Section B01, is anticipated to begin in the spring of 2008 with an anticipated completion in the fall of Plan Preparers Qualifications Resumes of the principal preparers of this report are included in Appendix A. Principal preparers include Messrs. Jeffrey S. Shaffer, P.E., Department Manager - Highways; John S. Weres, P.E., Project Manager; Lawrence P. Maher, P.E., Project Engineer; Sean G. McKeever, E.I.T., Civil/Highway Engineering; and Jodi L. Sabol, E.I.T., Civil/Highway Engineering. 3.0 Alternative Erosion and Sediment Pollution Control Measures and Facilities 3.1 Description This work consists of the construction, erection, and/or maintenance of all temporary or permanent erosion and sediment pollution control features indicated on the plans and specified but does not include all temporary control measures ordered by the Engineer during the life of the contract. These items will be as directed by the Engineer and as specified in the Pennsylvania Department of Transportation (PennDOT) Publication 408, Section 845, Unforeseen Water Pollution Control (Soil Erosion), and will be paid accordingly. Erosion and Sediment Pollution Control During Construction complements PennDOT Publication 408, Section , Waterway Regulations and Water Pollution Control. In accordance with PennDOT Publication 408, Section , the Contractor may submit his own plan for approval and acceptance at the pre-construction conference. The Contractor's plan for E&S pollution control during construction must include a schedule of accomplishment as an alternative to the contract plans and schedule. In the event the Contractor chooses to develop his own plan, no work will start until the E&S pollution control plan schedules and methods of operation have been approved by the Pennsylvania Department of Environmental Protection (PADEP), the Venango Conservation District, and PennDOT. 2

7 Application will be made for any permit amendments or revisions to the permitted plans that are required because of changes in the anticipated construction procedures. The required applications, plans, and documents will be furnished to PennDOT and the Venango Conservation District. 3.2 Materials All materials and erosion control devices necessary for the control of erosion and sedimentation during construction will conform to the applicable requirements of the specifications (PennDOT Publication 408, 2003) and the special provisions of the proposal. 3.3 Construction Requirements The Contractor is required to incorporate all permanent and temporary erosion control features indicated on the approved plan into the project at the earliest practicable time, as outlined in the approved schedule. The Engineer will limit the area of excavation and embankment operations to 15-foot vertical-height increments commensurate with the Contractor's seeding and other specified temporary and permanent pollution control measures, in accordance with the accepted schedule. If seasonal limitations make such coordination unrealistic, temporary control measures will be taken to the extent feasible and justified. B. SPECIFIC PLAN REQUIREMENTS 1.0 Topographic Features of Project Area Topographic features of the project area are indicated on the attached E&S plan sheets. The project site is an existing 127-foot bridge and roadway passing through a small residential and commercial area. The past and present land use of the concerned area and surrounding vicinity is urban. The existing terrain consists mainly of slightly rolling residential and woodlands. Refer to the project location map (Figure 1) with USGS contours for surrounding project information. 3

8 2.0 Project Soil Characteristics Soils have been delineated on the attached map showing soil types and boundaries (see Figure 2). Soil types were determined from the soil survey of Venango County, Pennsylvania. The soil association for the project area is the Alton-Monongahela-Philo association. A table of the soil types and their features are given in Table 1. General descriptions of each soil type (taken from the VCSS) are summarized below. 2.1 Soil Description Alton Gravelly Loam, 3 to 8 percent slopes (AhB) consists of deep, nearly level to very steep, well-drained soils on glacial outwash terraces and kames. These soils formed in gravel, sand, and silt deposited by running water. Slopes are convex. The native vegetation is maple, mixed oaks, ash, and black cherry. This soil is on terraces near flood plains along the major streams in the county. Available moisture capacity is low, and permeability is rapid. Most limitations are related to the rapid permeability and low available moisture capacity. Included with this soil in mapping were small areas of Allegheny and Monongahela soils. Monongahela Silt Loam, 3 to 8 percent slopes (MoB) consists of deep, nearly level to gently sloping, moderately well-drained soils on terraces. These soils formed in sediment deposited by streams. The native vegetation is mixed oaks, red maple, beech, and hickory. This soil is on terraces in stream valleys. Available moisture capacity is moderate, and permeability is slow. The water table is with 18 to 36 inches of the surface during winter and spring. Most limitations are related to the erosion hazard, slow permeability, and the seasonal high water table. Included with this soil in mapping were small areas of Allegheny and Tyler soils and some areas where surface layer is gravelly. Philo Silt Loam (Ph) consists of deep, nearly level, moderately well-drained soils on flood plains of streams. These soils formed in sediments washed from surrounding uplands. The native vegetation is red oak, white oak, hickory, ash, cherry, and elm. This nearly level soil is in long, narrow bands along small streams and in strips on the flood plains of major streams. 4

9 Figure 2 - Soils and Boundaries Map Cooperstown Bridge Borough of Cooperstown Venango County, Pennsylvania Map Scale 1:2372, 1 inch = 198 feet Created by SoilMap, 10/4/ :13:29 AM Soil maps are subject to change and may be copied without permission. Enlarging the maps may cause misunderstanding of the detail of mapping. Help in using soil surveys is available from the local office of the NRCS.

10 Available moisture capacity is high, and permeability is moderately slow. The water table is within 18 to 36 inches of the surface during winter and spring. Most limitations are related to the seasonal high water table and the flooding. Included with this soil in mapping were small areas of Pope and Atkins soils. Also included, in the western part of the county along some streams, were a few acres of soils that were less acid than Philo soils. Pope Loam (Po) consists of deep, nearly level, well-drained soils on flood plains and streams. These soils formed in sediment washed from surrounding uplands. The native vegetation is mixed oaks, maple, elm, and sycamore. This nearly level soil is near the channels of the larger streams in the county and in narrow bands adjacent to small streams. Available moisture capacity is high, and permeability is moderate. Most limitations are related to flooding. Included with it in mapping were small areas of Philo soils and gravelly Pope soils. The soil limitations encountered will be addressed by maintaining the existing slope where possible, minimizing cut and fill slopes, and promptly seeding and mulching exposed soils. Pavement base drains, additional inlet locations, and new retaining walls are included in this project and will reduce the effects of potential frost action, rapid surface runoff, and the severe slope. Symbol AhB MoB Ph Po TABLE 1 SOIL TYPES AND CHARACTERISTICS Type; Slope Soil Features Affecting Highway and Road Location Kinds of Soil Limitations Alton Gravelly Loam, 3 to 8 Cut slopes are droughty Low available moisture percent slopes capacity Monongahela Silt Loam, 3 to Seasonal high water table, high Erosion hazard, high water 8 percent slopes frost heave potential table, restricted permeability Philo Silt Loam Seasonal high water table, high Flooding, seasonal high frost heave potential, flooding water table Pope Loam Moderate frost heave potential, Flooding flooding Major Hydric No No* No* No* *Map units with inclusions of hydric components. 5

11 2.2 Wetland Impacts A Categorical Exclusion Evaluation, including wetland delineation, for this project is being completed by A.D. Marble and Company. There are no wetlands located in the project area. 3.0 Proposed Alteration to Project Area No existing facilities outside the legal right-of-way and temporary construction easements will be utilized for erosion and sediment pollution control. The NPDES Permit Boundary is the legal right-of-way, easements, station work limits, and as shown on the plan. This area is 2.30 acres. The actual disturbed area for the S.R. 0427, Section B01, project is approximately 2.18 acres, which is delineated by the limit of disturbance line on the E&S Pollution Control Plan. There are no planned foreign borrow sites outside the project work limits. However, based on earthwork calculations, there may be a need for foreign borrow site(s) outside the project work limits. Should this be the case, the Contractor must follow procedures outlined in Section A.3.0 in accordance with PennDOT Publication 408/2003, Section Construction debris removed from the site shall be either recycled or disposed of at an approved landfill and in accordance with the Department s Solid Waste Management Regulations at 25 PA Code et seq., et seq., and et seq. 3.1 Earthmoving Activities Outside Project Limits With the exception of possible waste areas or foreign borrow sites selected by the Contractor, earthmoving activities are not required outside the project area, legal right-of-way, or temporary construction easements unless the required approvals are obtained, as described in Section A.3.0, prior to disturbance. 3.2 Permanent Site Features and Facilities All of the permanent site features have been indicated on the plan drawings. The utilization of these permanent site features, such as pipes, inlets, and channels, has been described in Section 5.0, Sequence of BMP Installation and Earthmoving Activities, of this report. 6

12 4.0 Project Area Runoff and Watershed Characteristics Copies of all supporting drainage calculations are included in this report in Appendix C. 4.1 Drainage Calculations The hydraulic analysis on this project has been performed based on PennDOT design criteria as documented in Design Manual Part 2, Chapter 10, Drainage Design, Division 1, Roadway Drainage Structures. Design computations and drainage area boundaries are available upon request. a. Roadway Drainage The Rational formula (Q = CiA) was used to determine the expected runoffs for roadway drainage for this project. Contributing areas were determined from 1" = 25' scale project mapping and USGS mapping. b. Storm Sewer Criteria A 10-year frequency storm of five-minute duration was used to design the storm sewer systems for this project. c. Inlet Spacing Inlet spacing was computed for a 10-year frequency storm of five-minute duration. Values for inlet capacities were based on PennDOT Design Manual Part 2, Chapter 10, Tables and d. Swale Capacities A 10-year frequency storm of five-minute duration was used to determine expected stormwater runoff. Swale capacities were computed using Manning's Equation. e. Channel Capacities A 10-year frequency storm of five-minute duration was used to determine expected stormwater runoff for permanent channels. A two-year frequency storm of fiveminute duration was used to determine expected stormwater runoff for temporary channels. 7

13 5.0 Location of Receiving Waters and Chapter 93 Classification 5.1 Drainage Discharge Point The proposed drainage for the project will carry runoff from the bridge to the east approach and outlet the collected stormwater on the south side of the structure into Sugar Creek. 5.2 Chapter 93 Classification Runoff generated from this project discharges into one watershed. This area contributes runoff flow to Sugar Creek. Sugar Creek drains south and enters French Creek at the Village of Sugar Creek. According to the Pennsylvania Code, Title 25, Chapter 93, Sugar Creek is classified as a Cold Water Fishes (CWF) protected use. The existing stream and 100-year floodway are shown on the E&S plan sheets. The existing and proposed 100-year flood elevations are feet. 6.0 Temporary and Permanent BMP Control Facilities for Use Before, During, and After Earth Disturbance Activities To minimize accelerated erosion and off-site sedimentation, the following items have been included in this project and are indicated on the E&S plan sheets. 6.1 Rock Construction Entrances An item for rock construction entrances is also included in this project. The Contractor will construct these entrances for use in accessing construction work sites at the locations indicated on the E&S Pollution Control Plan, and as needed. Refer to the E&S Pollution Control Plans for details. The rock construction entrances will be constructed of No. 1 Coarse Aggregate and placed at an eight-inch minimum thickness. These entrances will extend across the traveled way for a minimum length of 50 feet with a minimum width of 20 feet, or as required to minimize the amount of material tracked onto the roadway by heavy-construction equipment. Soil and debris deposited on the roadway from construction vehicles will be returned to the construction site. Upon completion of the construction entrances, unsuitable material will be removed and the area graded, seeded, and mulched. 6.2 Silt Barrier Fence Silt barrier fence placed during construction will meet the following criteria: 8

14 Silt barrier fence will be placed at level grade. Both ends of a fence section will be extended up the slope so that the bottom of the fence ends at the top of the fence elevation. Silt barrier fence will be designed to control runoff from drainage areas that do not exceed the maximum slope-to-slope length relationships shown below. TABLE 2 - MAXIMUM SLOPE LENGTH (FT.) ABOVE FENCE Slope - Percent 18"-high Fence 30"-high Fence Super Silt Fence 2 (or less) , The formation of concentrated flows is not permitted on the drainage slope above a silt barrier fence installation. If concentrated flows do occur, direct slope stabilization measures must be employed to prevent such conditions. Silt barrier fences will not be placed in any area of concentrated flows such as swales, channels, etc. Silt barrier fences will not be used in areas where rock or rocky soils prevent full and uniform anchoring of the fence toe. Silt barrier fence material will not be placed across entrances to pipes or culverts and will not be wrapped around the principal spillway structures of the sediment traps or the sediment basin. 9

15 Typical silt barrier fence dimensions, post spacings, and embedment depths are shown on the typical drawing in RC-70M. 6.3 Definition of Stabilization Stabilization will occur in accordance with Chapter 102, Rules and Regulations, Sections and Vegetated areas shall be considered permanently stabilized when a uniform 70% perennial vegetative cover of erosion resistant perennial species has been achieved or the disturbed areas are covered with an acceptable BMP which permanently minimizes accelerated erosion and sedimentation. Interim erosion and sediment pollution controls, such as sediment filters and silt fence, will be utilized until permanent stabilization has occurred. 6.4 Vegetative Surface Stabilization Vegetative surface stabilization will be required as listed in Sections 804 and 805 of PennDOT Publication 408, 2003, for denuded areas, swales, and in the construction of embankment cut and fill slopes in lifts of 15 feet. All areas disturbed by construction that are not stabilized with pavement or rock lining must be seeded and mulched. All permanent swales, permanent channels, and temporary channels within and along the roadway will be seeded and mulched in accordance with PennDOT Publication 408, Sections 804, 805, and 806, Formula B Seeding and Soil Supplement, including straw mulch at a rate of 1200 Lbs./1,000 S.Y., is to be placed on lawn areas with slopes flatter than 3:1. Seeding Rates: Formula B = 21.0 Lbs./1,000 S.Y. Uniformly consisting of: Perennial Ryegrass 4.0 Lbs./1,000 S.Y. Creeping Red Fescue or Chewings 6.0 Lbs./1,000 S.Y. Kentucky Bluegrass Mixture 11.0 Lbs./1,000 S.Y. 2. Formula D Seeding and Soil Supplement, including straw mulch at a rate of 1200 Lbs./1,000 S.Y., is to be placed on slopes flatter than 3:1 where mowing may or may not be designated. Seeding Rates: Formula D = 21.0 Lbs./1,000 S.Y. Uniformly consisting of: 10

16 Tall Fescue 15.0 Lbs./1,000 S.Y. Creeping Red Fescue or Chewings 6.0 Lbs./1,000 S.Y. 3. Formula L Seeding and Soil Supplement, including bonded fiber matrix spray on Erosion Control Blanket, is to be placed on slopes 3:1 or steeper. Seeding Rates: Formula L = 24.0 Lbs./1,000 S.Y. Uniformly consisting of: Hard Fescue Mixture 13.0 Lbs./1,000 S.Y. Creeping Red Fescue 8.5 Lbs./1,000 S.Y. Annual Ryegrass 2.5 Lbs./1,000 S.Y. 4. Formula E Seeding and Soil Supplement, including hay mulch at a rate of 1200 Lbs./1,000 S.Y., is to be placed in areas requiring temporary seeding. Seeding Rates: Formula E 10.0 Lbs./1,000 S.Y. Uniformly consisting of: Annual Ryegrass 10.0 Lbs./1,000 S.Y. 6.5 Gravel Filters for Area and Curb Inlets Proposed gravel filters for area/curb inlets have been utilized where heavy concentrated flows are expected but not where ponding around the structure might cause excessive inconvenience or damage to adjacent structures and unprotected areas. Gravel filters will be installed using wire mesh fabric with 1/4-inch openings and No. 57 Coarse Aggregate as specified in Sections 865.2(b) and of the PennDOT Specifications, Publication 408, 2003, and in accordance with the details in the E&S Pollution Control Plan Sheets. 6.6 Temporary Causeway A temporary causeway will be utilized to provide construction vehicle access to allow for construction of the pier and its foundation and to prevent accelerated erosion. The causeway will be constructed as indicated on the contract plans, in accordance with the guidelines presented in PennDOT Design Manual Part 2, Chapter 10; PennDOT Specifications, Publication 408, 2003, Section 600; the PADEP Erosion and Sedimentation Pollution Control Manual, 2000; and the Bureau of Dams and Waterway Management, General Permit B.D.W.M., GP-8. 11

17 6.7 Rock Apron Outlet Protection Rock outlet protection will be constructed in accordance with the plan detail sheet and calculations in Appendix C. The rock outlet protection is designed to stop erosion at the end of culverts and storm drains. 6.8 Rock Filter Outlets Rock filter outlets will be used to control runoff in all areas where channelized flow has undermined silt barrier fence. Rock filter outlets shall be constructed to a height equal to 5/6 the height of the surrounding silt barrier fence. Rock filter outlets will be constructed as specified in Section 856 of the PennDOT Specifications, Publication 408, Temporary Stream Diversion Device The proposed temporary stream diversion device has been utilized to divert stream flow away from construction allowing the construction to be dewatered. The water diversion device will be installed in accordance with the detail in the E&S Pollution Control Plan Sediment Filter Bag Proposed sediment filter bags have been utilized to trap sand, silt, and fines from the pumped water. Sediment filter bags will be installed in accordance with the detail in the E&S Pollution Control Plan, Standard Drawing RC-70M of PennDOT Publication 72. Sediment filter bags will be sized using manufacturer s specifications. Contractor must ensure proper size and maintenance of the pump. 7.0 Sequence of BMP Installation and Earth Disturbance The following is a description of the anticipated construction sequence for this project. The goal of this sequence is to limit the amount of exposed areas and thus reduce, to the extent possible, production of erosion and sediment during construction. This sequence is included on the E&S Pollution Control Plan as listed in the stages below. The information is presented in three stages, based on traffic management, and should be constructed sequentially with one stage being completed before the next stage begins. However, it should be noted that the E&S pollution controls as designed are not dependent on the stages proceeding in this order. 12

18 Therefore, should the Contractor be unable to proceed with construction in this order for reasons unknown at this time, or at the direction of PennDOT, the erosion and sediment control measures will still be effective at controlling erosion. Sequence General Notes Install all applicable perimeter erosion and sediment control BMP s prior to clearing and grubbing and earthmoving activities as indicated on the E&S pollution control plans. Additional BMP's will be installed during construction activities as indicated on the E&S pollution control plans. The Contractor is responsible for the creation and submission of an E&S pollution control plan to Venango Conservation District (VCD) for each spoil, borrow, staging, stockpile, or other work area not detailed on the plan or for unexpected work outside the project limits. If any permit modifications are required, they are the responsibility of the Contractor. Borrow and waste areas shall be in accordance with PennDOT Publication 408, 2003, Section Stage 1- Factory Drive and Riverside Drive Construction During Stage 1-Phase 1 of the Traffic Control Plan, the southbound lane of Riverside Drive and Factory Street from Station to Station will be completed. Local traffic will access Factory Street via the local detour route which is included in the traffic control plans. Riverside Drive traffic will be maintained through the workzone by utilizing flaggers on the existing single northbound lane. During Stage 1- Phase 2 of the Traffic Control Plan, the remaining northbound portion of Riverside Drive will be constructed. Traffic will be shifted to the newly constructed southbound lane of Riverside Drive while utilizing flaggers. The following operations should be completed with minimal earth disturbance: 1. Implement the Traffic Control Plan. Install perimeter E&S pollution controls, such as a rock construction entrance at Station CL Factory Street and silt barrier fence along Riverside Drive, as shown on the Plans. 2. Construct Riverside Drive and Factory Street in accordance with the traffic control plans. Remove rock construction entrance as construction activities progress. Remove existing Factory Drive pavement within the legal right-of-way. 3. Seed and mulch disturbed areas along Riverside Drive and Factory Street with permanent seeding in accordance with the seeding legend on the plans. 13

19 4. When all areas are stabilized with a uniform 70% perennial vegetative cover, remove all temporary E&S pollution control measures. 7.2 Stage 2- Bridge Construction During Stage 2- Phase 1 of the Traffic Control Plan, the proposed bridge and abutments will be constructed. Local traffic will continue to access Factory Street and Riverside Drive via the existing roadway network and newly constructed Riverside Drive and Factory Street. S.R traffic will remain on the existing bridge while the new bridge is constructed. During Stage 2- Phase 2 of the Traffic Control Plan, the section of roadway between Station and the south bridge abutment will be constructed. Two lanes of traffic will remain on the existing bridge during this phase. disturbance: During Stage 2, the following operations should be completed with minimal earth 1. Implement Stage 2 of the Traffic Control Plans. 2. Install perimeter E&S pollution controls, such as rock construction entrances at Station LT and Station LT and silt barrier fence along S.R from Stations LT to Station RT. Install temporary excavation and support system, temporary causeway, temporary stream diversion device near the proposed pier area and along Abutment 2, and sediment filter bags all in accordance with the Erosion and Sediment Pollution Control Plans and Details. 3. After the perimeter controls are in place, construct the south abutment, and perform grading and construction activities for the abutment and roadway approach to Station Dewater temporary stream diversion device around abutment as necessary. Remove rock construction entrance and temporary stream diversion device at Station as construction activities progress. 4. Seed and mulch disturbed areas with permanent seeding in accordance with the seeding legend on the Plans. 5. When all areas are stabilized with a uniform 70% perennial vegetative cover, remove silt barrier fence. 6. Construct pier at Station CL. Dewater temporary diversion system around pier as necessary. 14

20 7. Perform grading and construction activities for the north abutment. Install pipes and inlets for the drainage system B-0, B-1, and B-2 at approximately Station LT and RT. Install the rock apron outlet protection at B-0 in accordance with the Plans. 8. Complete grading and construction of the bridge and roadway approaches. 9. Seed and mulch disturbed areas along S.R with permanent seeding in accordance with the seeding legend on the plans. 10. Install the temporary E&S pollution control measures, including temporary causeway, temporary diversion device, and sediment filter bag. The rock construction entrance at Station LT and silt barrier fence will remain in place for the duration of Stage Stage 3- S.R Tie-ins, S.R. 4020, and Driveway Construction During Stage 3- Phase 1 of the Traffic Control Plan, the S.R tie-ins will be constructed along with S.R S.R traffic will be detoured. During Stage 3- Phase 2 of the Traffic Control Plan, the parking access grading and parking entrance off of S.R will be constructed. S.R and S.R will be reopened to unrestricted traffic during this phase. The existing bridge will be demolished. disturbance: During Stage 3, the following operations should be completed with minimal earth 1. Implement Stage 3 of the Traffic Control Plans. 2. Install drainage system from A-0 to A-1 at Station LT and RT. Install rock apron outlet protection at A-0 in accordance with the Plans. 3. Install the inlet and pipe for the drainage system C-0 to C-1 at Station RT and LT in accordance with the Construction Plans. Install inlet protection at inlet C-1. Outlet C-O will be flush with the streamside of the existing concrete wall. 4. Perimeter E&S pollution controls, such as silt barrier fence along the south bridge abutment and the rock construction entrance at Station LT, will remain in place during this phase. The rock construction entrance may need adjusted due to the widening of S.R at Station LT. 5. After the perimeter controls are in place, perform and complete roadway and parking entrance construction activities. 15

21 6. Demolish the bridge. Remove any debris from the waterway immediately. Construction debris removed from the site shall be either recycled or disposed of at an approved landfill and in accordance with the Department s Solid Waste Management Regulations at PA Code et seq., et seq., and et seq. Restore disturbed area to its original condition. 7. Seed and mulch disturbed areas with permanent seeding in accordance with the seeding legend on the Plans. 8. When all areas are stabilized with a uniform 70% perennial vegetative cover, remove all remaining temporary E&S pollution control measures, including temporary causeway, temporary diversion device, sediment filter bag, silt barrier fence, rock construction entrance, and inlet sediment filter. Seed and mulch areas disturbed by the removal of the temporary facilities. 8.0 Maintenance Program for BMP Control Facilities 8.1 Silt Barrier Fence Inspect the silt barrier fence weekly and after any precipitation event. After reviewing the results of the inspection with the Engineer, immediately clean, repair, or replace all silt barrier fence found to be in unsatisfactory condition. Promptly remove accumulated sediment to an approved upland site when it reaches one-half (1/2) of the above ground height of the fence. Repair immediately, with a rock outlet filter, all undercutting or erosion of the toe anchor. Adhere to any of the manufacturer's recommendations for replacing the silt barrier fence due to weathering. 8.2 Rock Construction Entrances Constantly maintain the rock construction entrance thickness to the specified dimension by adding rock. Maintain a stockpile of rock material on the site for this purpose. At the end of each construction day, remove all sediment deposited on public roadways and return it to the construction site. Washing of the roadway with water is not permitted. 16

22 8.3 Gravel Filters for Area and Curb Inlets Inspect all gravel filters weekly and after each runoff event. Remove gravel filters when clogged with sediment. Materials must be washed completely free of all foreign matter or, when directed, new rock must be used to rebuild the filter. Remove and dispose of the sediment so it does not erode into construction areas and/or natural waterways. Accomplish clean-out or replacement within three (3) working days of the inspection. 8.4 Rock Apron Outlet Protection Inspect the rock apron outlet weekly and after every runoff event. Inspect for erosion and loose rock at the outlets. If needed, add rock to the outlet protection. 8.5 Vegetative Surface Stabilization Permanent vegetated areas will be inspected after each precipitation event until a uniform erosion resistant cover of at least 70% is achieved. Maintenance will also be in accordance with PennDOT Publication 408, 2003, Section 804.3(j). 8.6 Temporary Stream Diversion Device Inspect daily to ensure that the sandbags, barrier, and polyethylene liner remain intact and in good working condition. Remove and replace any damaged sandbags, barrier, and liner as required. 8.7 Sediment Filter Bags Inspect daily to ensure that the filter bags are in good working order. Remove and clean out or replace sediment filter bag within three (3) working days following the inspection. Accomplish the necessary clean-out or replacement immediately following inspection. 8.8 Permanent Maintenance Operations Upon completion of the project, the maintenance of all permanent E&S pollution controls will become part of PennDOT s regular maintenance program. This will include periodic inspections (at least once a year) of facilities and all required repairs. 9.0 Measures for Disposal of Material No earthmoving activities will be permitted outside the limit of work. All of the permanent site features have been indicated on the plan drawings. The utilization of these permanent site features, such as inlets and channels, has been described in Section 7.0, 17

23 Sequence of BMP Installation and Earth Disturbance, of this report. There are no foreign borrow or waste sites anticipated outside the project work limits. However, based on earthwork calculations, there may be a need for foreign borrow or waste site(s) outside the project work limits. If the Contractor has to disturb areas outside the proposed grading for any other reason, the required approvals must be obtained prior to disturbance in accordance with Section A Other Regulations Comply with the requirements of Title 25 - Rules and Regulations: Part 1 - Department of Environmental Protection, Subpart C - Protection of Natural Resources, Article II - Water Resources, Chapter Erosion Control. In the event of a conflict between these requirements and the pollution control laws, rules, or regulations of other Federal, State, or Local Agencies, the more restrictive laws, rules, or regulations will apply References 1. Erosion and Sediment Pollution Control Program Manual, April 2000, Pennsylvania Department of Environmental Protection, Bureau of Soil and Water Conservation. 2. Design Manual Part 2 - Publication 13M, Change #1 - July 2002, Pennsylvania Department of Transportation. 3. Roadway Specifications - Publication 408, 2003, Pennsylvania Department of Transportation. 4. Roadway Construction Standards - Publication 72M, April 2004, Pennsylvania Department of Transportation. 5. Soil Survey of Venango County, Pennsylvania, December 1975, United States Department of Agriculture, Soil Conservation Service. 6. SoilMap Version 2. Penn State College of Agricultural Sciences. 5 October < 7. Flowmaster, 2003, Haestad Methods. 18

24 APPENDIX A Resumes

25

26

27

28

29

30 APPENDIX B Soils Information Tables

31 ! " #$%& # & '( $ & ' ( ) * * # # ' * *+ *)! * ' PA121 - Venango County, Pennsylvania AhB - Alton gravelly loam, 3 to 8 percent slopes $ * All areas are prime farmland Well drained ' 2s,'- A./ very deep & ) >60 in $ none./' 1.55 gm/cm3 * ' moderate &/ 0.24 /$/ 0.32 ) 3 + High " 0,' no

32 ! " #$%& # & '( $ & ' ( ) * * # # ' * *+ *)! * ' PA121 - Venango County, Pennsylvania Ph - Philo silt loam $ * All areas are prime farmland Moderately well drained ' 2w,'- B./ very deep & ) in $ occasional./' 1.30 gm/cm3 * ' moderate &/ 0.37 /$/ 0.37 ) 5 + Medium " 0,' no

33 ! " #$%& # & '( $ & ' ( ) * * # # ' * *+ *)! * ' PA121 - Venango County, Pennsylvania MoB - Monongahela silt loam, 3 to 8 percent slopes $ * Farmland of statewide importance Moderately well drained ' 2e,'- C./ very deep & ) in $ none./' 1.45 gm/cm3 * ' slow &/ 0.43 /$/ 0.43 ) 3 + Low " 0,' no

34 ! " #$%& # & '( $ & ' ( ) * * # # ' * *+ *)! * ' PA121 - Venango County, Pennsylvania Po - Pope loam $ * All areas are prime farmland Well drained ' 2w,'- B./ very deep & ) >60 in $ occasional./' 1.45 gm/cm3 * ' moderate &/ 0.37 /$/ 0.37 ) 5 + Medium " 0,' no

35

36 Figure 2 - Soils and Boundaries Map Cooperstown Bridge Borough of Cooperstown Venango County, Pennsylvania Map Scale 1:2372, 1 inch = 198 feet Created by SoilMap, 10/4/ :13:29 AM Soil maps are subject to change and may be copied without permission. Enlarging the maps may cause misunderstanding of the detail of mapping. Help in using soil surveys is available from the local office of the NRCS.

37 Venango Conservation District Received 10/19/06 Revised 8/83 By: GHL LIST OF SOIL MAPPING UNITS THAT QUALIFY AS ADDITIONAL FARMLAND OF STATEWIDE IMPORTANCE Venango County, Pennsylvania Manuscript Symbol AlA AlB AlC At CdC ClA ClB ClC CoC ErB FeA FeB GlC HaC HeC MoB RaC Re Ty WhC WoC Mapping Unit Name Alvira silt loam, 0 to 3 percent slopes Alvira silt loam, 3 to 8 percent slopes Alvira silt loam, 8 to 15 percent slopes Atkins silt loam Canfield gravelly silt loam, 8 to 15 percent slopes Cavode silt loam, 0 to 3 percent slopes Cavode silt loam, 3 to 8 percent slopes Cavode silt loam, 8 to 15 percent slopes Cookport loam, 8 to 15 percent slopes Ernest silt loam, 3 to 8 percent slopes Frenchtown silt loam, 0 to 3 percent slopes Frenchtown silt loam, 3 to 8 percent slopes Gilpin silt loam, 8 to 15 percent slopes Hanover silt loam, 8 to 15 percent slopes Hazleton channery loam, 8 to 15 percent slopes Monongahela silt loam, 3 to 8 percent slopes Ravenna silt loam, 8 to 15 percent slopes Rexford silt loam Tyler silt loam Wharton silt loam, 8 to 15 percent slopes Wooster gravelly silt loam, 8 to 15 percent slopes

38 Venango Conservation District Received 10/19/06 HYDRIC SOILS VENANGO COUNTY, PENNSYLVANIA Map Hydric Location Symbol Map Name Component Notes Map units with major components hydric: As Armagh silt loam Armagh (PA0094) At Atkins silt loam Atkins (WV0008) BrA Brinkerton silt loam, 0 to 3 percent slopes Brinkerton (PA0090) BrB Brinkerton silt loam, 3 to 8 percent slopes Brinkerton (PA0090) Bt Brinkerton and Frenchtown very stony silt loams Brinkerton (PA0091) Frenchtown (OH0085) FeA Frenchtown silt loam, 0 to 3 percent slopes Frenchtown (OH0085) FeB Frenchtown silt loam, 3 to 8 percent slopes Frenchtown (OH0085) Re Rexford silt loam Rexford (PA0017) Map unites with inclusions of hydric components: AlA Alvira silt loam, 0 to 3 percent slopes Frenchtown Depressions, drainageways, potholes AlB Alvira silt loam, 3 to 8 percent slopes Frenchtown Depressions, drainageways, potholes AlC Alvira silt loam, 8 to 15 percent slopes Frenchtown Depressions, drainageways, potholes ArB Alvira and Ravenna very stony silt loams, 0 to 8 percent slopes Frenchtown Depressions, drainageways, potholes CdB Canfield gravelly silt loam, 3 to 8 percent slopes Frenchtown Depressions, drainageways, potholes CdC Canfield gravelly silt loam, 8 to 15 percent slopes Frenchtown Depressions, drainageways, potholes CeB Canfield very stony silt loam, 0 to 8 percent slopes Frenchtown Depressions, drainageways, potholes CeC Canfield very stony silt loam, 8 to 25 percent slopes Frenchtown Depressions, drainageways, potholes ClA Cavode silt loam, 0 to 3 percent slopes Armagh Low flats, drainageways ClB Cavode silt loam, 3 to 8 percent slopes Armagh Low flats, drainageways ClC Cavode silt loam, 8 to 15 percent slopes Armagh Low flats, drainageways CoA Cookport loam, 0 to 3 percent slopes Wet spots Depressions

39 Venango Conservation District Received 10/19/06 CoB Cookport loam, 3 to 8 percent slopes Wet spots Depressions CoC Cookport loam, 8 to 15 percent slopes Wet spots Depressions CpB Cookport very stony loam, 0 to 8 percent slopes Wet spots Depressions CpO Cookport very stony loam, 8 to 15 percent slopes Wet spots Depressions ErB Ernest silt loam, 3 to 8 percent slopes Brinkerton Depressions, drainageways EsB Ernest very stony silt loam, 0 to 8 percent slopes Brinkerton Depressions, drainageways EsC Ernest very stony silt loam, 8 to 15 percent slopes Brinkerton Depressions, drainageways MoA Monongahela silt loam, 0 to 3 percent slopes Rexford Potholes, drainageways MoB Monongahela silt loam, 3 to 8 percent slopes Rexford Potholes, drainageways Ph Philo silt loam Atkins Bottom lands Po Pope Loam Atkins Bottom lands RaA Ravenna silt loam, 0 to 3 percent slopes Frenchtown Drainageways, potholes RaB Ravenna silt loam, 3 to 8 percent slopes Frenchtown Drainageways, potholes RaC Ravenna silt loam, 8 to 15 percent slopes Frenchtown Drainageways, potholes Sm Strip mines Wet spots 1/ Drainageways, potholes Ty Tyler silt loam Rexford Drainageways, potholes Um Urban land-monongahela complex Wet spots Drainageways, potholes WhB Wharton silt loam, 3 to 8 percent slopes Armagh Depressions, drainageways WhC Wharton silt loam, 8 to 15 percent slopes Armagh Depressions, drainageways 1/ May need soil scientist s verfication.

40 APPENDIX C Erosion and Sediment Pollution Control Calculations

41 Drainage Calculations

42 Sheet No. Of Comp.By SGM Date 12/20/06 Revised Date PROJECT: COOPERSTOWN BRIDGE REPLACEMENT Chkd.By JLS Date 12/21/06 Revised Date Revised Date RUNOFF GRATE ANALYSIS HYDRAULIC DESIGN FROM INLET TO INLET ROUTE STATION OF FROM INLET SIDE OFFSET AREA COMPOSITE "C" VALUE TIME OF CONCENTRATION RAINFALL INTENSITY INCREMENTAL OVERLAND RUNOFF BYPASS FROM UPSTREAM INLET GRATE CAPTURE DISTANCE FROM TOP GRATE TO INSIDE TOP PIPE FLOW IN PIPE TOP OF GRATE OR RIM PIPE INVERT IN [ + ] PIPE INVERT OUT [ - ] LENGTH OF PIPE SLOPE OF PIPE TYPE OF PIPE MANNINGS - n VALUE SIZE OF PIPE phi ( assumed) AREA OF PARTIALLY FULL PIPE DESIGN FLOW MEAN VELOCITY PIPE CAPACITY FLOWING FULL REMARKS (ac) (min) (in/hr) (cfs) (cfs) (cfs) (ft) (cfs) (ft) (ft) (ft) (ft) (ft/ft) (in) (degree) (ft 2 ) (cfs) (fps) (cfs) B-2 A-1 S.R ' L RCP TYPE M INLET B-1 A-0 S.R ' R RCP TYPE M INLET B-0 OUTLET S.R ' L Flow at Outlet A-0 = C-1 B-0 S.R ' L RCP TYPE M INLET C-0 OUTLET S.R ' R Flow at Outlet B-0 = OUTLET 1/19/2007 I:\Jobs\ Cooperstown\Highway\Drainage\Stormsewer.xls STM

43 Sheet No. Of Comp.By: SGM Date 12/20/06 Revised Date PROJECT: COOPERSTOWN BRIDGE REPLACEMENT Chkd.By: JLS Date 12/21/06 Revised Date Revised Date Q s = (0.56 / n) * S 5/3 X * SL 1/2 * (T-W) 8/3 Q t (Uniform Gutter) = Total Flow Capacity of the Gutter Section Qt = Total Gutter Flow Rate (cfs) SL = Longitudinal Slope (ft/ft) References: Q t (Uniform) = (0.56 / n) * S 5/3 X * SL 1/2 * T 8/3 Q s (Composite Gutter) = Flow Capacity of the Gutter Section n = Manning's Roughness Coefficient T = Allowable Width of Flow (ft) HEC-22, Chapter 4 E O = 1/ (1+(S W /S X )/((1+(S W /S X )/((T/W)-1)) 8/3-1) Above the Depressed Section (cfs) SX 1 & SX 2 = Cross Slopes (ft/ft) For V-Shape Gutter W = Width of Depressed Section (ft) PennDOT DM 2, Chapter 10 Q = Q S /(1-E O ) E 0 = Ratio of Flow in a Chosen Width (usually the width of a SX = (SX1*SX2)/(SX1+SX2) For Uniform Gutter Qi = Inlet Capacity (cfs) (PennDot DM2, Chapter 10) grate to total gutter flow : Q w /Q ) SX = Pav't Cross Slope (ft/ft) For Composite Gutter SW = Gutter Cross Slope (ft/ft) GUTTER SECTION INLET NO. INLET TYPE ROUTE STATION SIDE OFFSET OFFSET DIST. C AREA Tc I Q INCR Q INCR + Q BYPASS GUTTER TYPE COMPOSITE (C) UNIFORM (U) SL SX1 OR SW (C) SX2 (8 = curb) SX n W T ALLOWED KC E O Q S Qt GUTTER d at T allowed Qi Q BYPASS COMMENTS (ft) (ac) (min) (in/hr) (cfs) (cfs) (ft/ft) (ft/ft) (ft/ft) (ft/ft) (ft) (ft) (cfs) (ft) (cfs) (cfs) B-2 B-1 B M S.R L C TYPE M INLET M S.R R C TYPE M INLET OUTLET S.R L OUTLET OUTLET C-1 C M S.R L C TYPE M INLET OUTLET S.R R OUTLET OUTLET 1/19/2007 I:\Jobs\ Cooperstown\Highway\Drainage\Stormsewer.xls INLT

44

45

46

47

48 Outlet Protection Calculations

49 PROJECT: COOPERSTOWN BRIDGE REPLACEMENT PROJECT DESIGN BY: SGM DATE: 12/21/2006 DESRIPTION: OUTLET PROTECTION CHECKED BY: JLS DATE: 12/27/2006 CALCULATIONS OUTLET NO. ROUTE STATION OFFSET Q, Discharge PIPE DIA. (D o ) SLOPE V TAILWATER, ( > ) OR ( < ) 0.5*DIA. OUTLET PROTECTION PER VELOCITY OR WORST CASE BLANKET THICKNESS PER VELOCITY LENGTH OF RIPRAP (La) WIDTH OF RIPRAP (W) DEPTH OF FLOW IN CHANNEL AT OUTFALL= TAILWATER CHANNEL OUTFALL TO REMARKS (cfs) (in) (ft/ft) (ft/sec) (ft) (ft) (ft) A-0 SR ' LT < R-4 18 in SUGAR CREEK 18" CULVERT OUTLET TO ROCK APRON B-0 SR ' LT < R-4 18 in SUGAR CREEK 18" PIPE OUTLET TO ROCK APRON Outlet Condition: 1. TW < 0.5 D 2. TW > 0.5 D OUTLET PROTECTION VELOCITY RANGES ROCK BLANKET THICKNESS (ft) VELOCITY RANGES R-4* R-5* R-6 R-7 ROCK BASIN PER RC-70M 9.0 F.P.S F.P.S F.P.S F.P.S F.P.S. ROCK ENERGY DISSIPATOR PER RC-70M 19.0 F.P.S. * Use R-4 Rock Minimum at Pipe Outlets For Dia. < 30" * Use R-5 Rock Minimum at Pipe Outlets For Dia. > 30" Outlet Protection.xls 1/19/2007

50 Silt Barrier Fence Worksheets

51

52

53 APPENDIX D Drainage Areas

54

June Pennsylvania Department of Transportation Engineering District Herr Street Harrisburg, PA 17103

June Pennsylvania Department of Transportation Engineering District Herr Street Harrisburg, PA 17103 EROSION & SEDIMENT CONTROL REPORT FOR S.R. 0462 BOX CULVERT REPLACEMENT OVER TRIBUTARY TO STRICKLER RUN WEST HEMPFIELD TWP., LANCASTER CO. Prepared for: June 2006 Pennsylvania Department of Transportation

More information

Shelbyville, KY Stormwater Best Management Practices. Section 2 EROSION PREVENTION AND SEDIMENT CONTROL PLAN

Shelbyville, KY Stormwater Best Management Practices. Section 2 EROSION PREVENTION AND SEDIMENT CONTROL PLAN Section 2 EROSION PREVENTION AND SEDIMENT CONTROL PLAN 2.1 Requirements The City of Shelbyville, KY will require an Erosion Prevention and Sediment Control (EPSC) Plan for most types of development construction.

More information

Gloucester County PLAN SUBMITTER'S CHECKLIST

Gloucester County PLAN SUBMITTER'S CHECKLIST Page 1 of 9 Gloucester County PLAN SUBMITTER'S CHECKLIST FOR EROSION AND SEDIMENT CONTROL PLANS Please fill in all blanks and please reference the plan sheets/pages where the information may be found,

More information

MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS

MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS May 2007 SECTION 1 Responsibility of Applicant TABLE OF CONTENTS A. Stormwater Management Plan Required Information

More information

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT NOT WELL 800 - Urban Stormwater Wetlands A constructed system of shallow pools that create growing conditions for wetland plants to lessen the impacts of stormwater quality and quantity in urban areas.

More information

PLAN SUBMITTER'S CHECKLIST

PLAN SUBMITTER'S CHECKLIST Page 1 of 8 PLAN SUBMITTER'S CHECKLIST FOR EROSION AND SEDIMENT CONTROL PLANS Please fill in all blanks and reference the plan sheets/pages where the information may be found, where appropriate, or write

More information

Town of Essex Small Site Erosion Control Guide

Town of Essex Small Site Erosion Control Guide Town of Essex Small Site Erosion Control Guide Why do we need to protect against erosion? Water Quality: Erosion and the transport of sediment and pollutants impacts the water quality of nearby streams

More information

Erosion & Sediment Control Plan Application Form & Checklist

Erosion & Sediment Control Plan Application Form & Checklist Erosion & Sediment Control Plan Application Form & Checklist GENERAL INFORMATION Application Date: Project Address: Tax Map / Parcel Number(s): PROPERTY OWNER / DEVELOPER Firm Name: Contact Person: Title:

More information

City of Stoughton Erosion Control Permit Application (effective 2/6/2018)

City of Stoughton Erosion Control Permit Application (effective 2/6/2018) City of Stoughton Erosion Control Permit Application (effective 2/6/2018) Incomplete applications will not be accepted Project Name: Address of subject property: Landowner Name(s): Applicant Name: Landowner

More information

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS 5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS Low Impact Development (LID) requires a shift in stormwater management away from conveying runoff to a small number of downstream points through hydraulically

More information

SUPPORTING DOCUMENT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE

SUPPORTING DOCUMENT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE SUPPORTING DOCUMENT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE Please complete this narrative form and submit with your SWPPP drawings. Refer to Kitsap County Stormwater Design Manual Vol.

More information

Plan Review Checklist

Plan Review Checklist Plan Review Checklist FOR EROSION AND SEDIMENT CONTROL PLANS _ Minimum Standards - All applicable Minimum Standards must be addressed. All minimum Standards must be adhered to during the entire project

More information

EROSION & SEDIMENT CONTROL

EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL Surface Water Protection During Well Site Construction Kelly Kees, PE WVDEP, Office of Oil and Gas SEDIMENT & EROSION CONTROL PLANS Per West Virginia State Code 22-6-6(d) 22-6A-7(c),

More information

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance. The language provided in these specifications is meant to serve as a reminder and provide a generic example of the type of language that should be provided in final construction documents. This language

More information

CHAPTER 9 STORM DRAINAGE. Minimum Requirements for New Development and Redevelopment

CHAPTER 9 STORM DRAINAGE. Minimum Requirements for New Development and Redevelopment CHAPTER 9 STORM DRAINAGE 9.01 General The standards established by this chapter are intended to represent the minimum standards for the design and construction of storm drainage facilities. 9.02 Design

More information

Huntington Stormwater Utility

Huntington Stormwater Utility Huntington Stormwater Utility Stormwater Management & Sediment and Erosion Control Requirements for Construction Sites Authorized by Huntington City Code Articles: 971, 970, 930, 935, 955, Revised April

More information

Wisconsin Contractors Institute Continuing Education

Wisconsin Contractors Institute Continuing Education Wisconsin Contractors Institute Continuing Education Erosion & Sediment Control Course # 12775 2 hours Wisconsin Contractors Institute N27 W23953 Paul Road, Suite 203 Pewaukee, WI 53072 Website: www.wicontractorsinstitute.com

More information

STANDARD SPECIFICATIONS SECTION TEMPORARY EROSION AND SEDIMENT CONTROL

STANDARD SPECIFICATIONS SECTION TEMPORARY EROSION AND SEDIMENT CONTROL STANDARD SPECIFICATIONS SECTION 01570 TEMPORARY EROSION AND SEDIMENT CONTROL PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements, procedures, and methods related to responsibilities for providing

More information

Project: Developer/Designer: Reviewer: I. Narrative: 1. Project Description: Describes the nature and purpose of the land disturbing activity.

Project: Developer/Designer: Reviewer: I. Narrative: 1. Project Description: Describes the nature and purpose of the land disturbing activity. City of Charlottesville, Virginia Erosion and Sediment Control Plan Review Checklist 610 East Market Street, Charlottesville, VA 22902 Telephone 434-970-3182; Fax 434-970-3359 Project: Developer/Designer:

More information

PERMANENT SEEDING. Overview of Sedimentation and Erosion Control Practices. Practice no. 6.11

PERMANENT SEEDING. Overview of Sedimentation and Erosion Control Practices. Practice no. 6.11 Overview of Sedimentation and Erosion Control Practices Practice no. 6.11 PERMANENT SEEDING Permanent vegetation controls erosion by physically protecting a bare soil surface from raindrop impact, flowing

More information

Draft Rhode Island Stormwater Design and Installation Standards Manual

Draft Rhode Island Stormwater Design and Installation Standards Manual Draft Rhode Island Stormwater Design and Installation Standards Manual Summary The May 2009 Public Review Draft version of the RI Stormwater Design and Installation Standards Manual consists of approximately

More information

WQ-23 MOUNTAINOUS AND STEEP SLOPE SITES

WQ-23 MOUNTAINOUS AND STEEP SLOPE SITES Greenville County Technical Specification for: WQ-23 MOUNTAINOUS AND STEEP SLOPE SITES 1.0 Mountainous and Steep Slope Sites 1.1 Description The geographic locations of portions of Greenville County are

More information

Structural Storm Water Best Management Practices (BMPs)

Structural Storm Water Best Management Practices (BMPs) Structural Storm Water Best Management Practices (BMPs) Storm Water Permitting: The SWPPP Revealed By Deron Austin, PE January 11, 2006 3:30-5:00 PM Orlando, Florida Presentation Outline Preface About

More information

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360) (360) (FAX)

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360) (360) (FAX) CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA 98501 (360) 754-4180 (360) 754-4126 (FAX) Email: cdd@ci.tumwater.wa.us APPENDIX II-C SHORT FORM CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN (SWPPP)

More information

Pollutant Removal Benefits

Pollutant Removal Benefits Bioswales Bioswales Similar to biocells, but have a slight, but positive grade toward an outlet Designed to convey the WQv event at very low velocities Promote filtration through native vegetation, infiltration

More information

CHECKLIST FOR PHASE II DRAINAGE REPORT

CHECKLIST FOR PHASE II DRAINAGE REPORT I. COVER SHEET CHECKLIST FOR PHASE II DRAINAGE REPORT A. Name of Project B. Address C. Owner D. Developer E. Engineer F. Submittal date and revision dates as applicable II. GENERAL LOCATION AND DESCRIPTION

More information

Soil Erosion & Sediment Control Plan Requirements for Submittal to the Cape Atlantic Conservation District

Soil Erosion & Sediment Control Plan Requirements for Submittal to the Cape Atlantic Conservation District Soil Erosion & Sediment Control Plan Requirements for Submittal to the Cape Atlantic Conservation District The following is a list of the minimum requirements required on Soil Erosion and Sediment Control

More information

SECTION 6. Routine Maintenance Activity Details

SECTION 6. Routine Maintenance Activity Details SECTION 6 Routine Maintenance Activity Details 80. DEBRIS REMOVAL When Deadfall, and other objects, such as shopping carts, tires, appliances, and mattresses have accumulated in the drain. Why To prevent

More information

The Low Risk Site Handbook

The Low Risk Site Handbook The Low Risk Site Handbook for Erosion Prevention and Sediment Control The content of this Handbook is adapted from the New York State Standards and Specifications for Erosion and Sediment Control-August

More information

ATTACHMENT 1 WILSON MINE LECROY AREA SEMIPERMANENT DEWATERING SYSTEM

ATTACHMENT 1 WILSON MINE LECROY AREA SEMIPERMANENT DEWATERING SYSTEM ATTACHMENT 1 WILSON MINE LECROY AREA SEMIPERMANENT DEWATERING SYSTEM Reclamation plans for the Wilson Mine Lecroy area were approved by the Arkansas Department of Environmental Quality with a passive barrier

More information

ST. MARY S SOIL CONSERVATION DISTRICT (SMSCD) AND DPW&T CONCEPT EROSION AND SEDIMENT CONTROL AND STORMWATER MANAGEMENT GUIDELINES AND CHECKLIST

ST. MARY S SOIL CONSERVATION DISTRICT (SMSCD) AND DPW&T CONCEPT EROSION AND SEDIMENT CONTROL AND STORMWATER MANAGEMENT GUIDELINES AND CHECKLIST St. Mary s Soil Conservation District 26737 Radio Station Way, Suite B Leonardtown, MD 20650 Phone: 301-475-8402 ext. 3 Fax: 301-475-8391 www.stmarysscd.com St. Mary s County Government Department of Public

More information

Using the Updated RI Soil Erosion and Sediment Control Handbook. The Introductory Workshop for RIDEM/CRMC Staff January 23, 2015

Using the Updated RI Soil Erosion and Sediment Control Handbook. The Introductory Workshop for RIDEM/CRMC Staff January 23, 2015 Using the Updated RI Soil Erosion and Sediment Control Handbook The Introductory Workshop for RIDEM/CRMC Staff January 23, 2015 URI Cooperative Extension NEMO URI Cooperative Extension NEMO White Oak,

More information

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance. The language provided in these specifications is meant to serve as a reminder and provide a generic example of the type of language that should be provided in final construction documents. This language

More information

Project Applicant Checklist for NPDES Permit Requirements SAN MATEO COUNTYWIDE STORMWATER POLLUTION PREVENTION PROGRAM

Project Applicant Checklist for NPDES Permit Requirements SAN MATEO COUNTYWIDE STORMWATER POLLUTION PREVENTION PROGRAM Project Applicant Checklist for NPDES Permit Requirements SAN MATEO COUNTYWIDE STORMWATER POLLUTION PREVENTION PROGRAM I. PROJECT DATA Project Name Bay Meadows Development Phase II Project Address 2600

More information

a. Site Topography and Relationship to Surrounding Topography

a. Site Topography and Relationship to Surrounding Topography C. Topography and Slopes 1. Existing Conditions a. Site Topography and Relationship to Surrounding Topography The Site is gently rolling, as is the surrounding topography (Figure I.A-8). The Property is

More information

EROSION & SEDIMENT POLLUTION CONTROL NARRATIVE SOUTH MAIN ST

EROSION & SEDIMENT POLLUTION CONTROL NARRATIVE SOUTH MAIN ST EROSION & SEDIMENT POLLUTION CONTROL NARRATIVE SOUTH MAIN ST S.R. 2071, SECTION CS2 MAIN STREET DRAINAGE IMPROVEMENTS YARDLEY BOROUGH, BUCKS COUNTY, PENNSYLVANIA PREPARED FOR: PENNSYLVANIA DEPARTMENT OF

More information

SOP 6: Erosion and Sedimentation Control SOP 6: EROSION AND SEDIMENTATION CONTROL

SOP 6: Erosion and Sedimentation Control SOP 6: EROSION AND SEDIMENTATION CONTROL Standard Operating Procedures Central Massachusetts Regional Stormwater Coalition SOP 6: Erosion and Sedimentation Control SOP 6: EROSION AND SEDIMENTATION CONTROL Erosion and sedimentation from land-disturbing

More information

New Development Stormwater Guidelines

New Development Stormwater Guidelines New Development Stormwater Guidelines CITY OF MOUNTLAKE TERRACE Table of Contents Introduction... 2 Ecology s Minimum Requirements for stormwater management... 2 Description of the 9 Minimum Requirements...

More information

SOIL EROSION AND SEDIMENT CONTROL

SOIL EROSION AND SEDIMENT CONTROL SOIL EROSION AND SEDIMENT CONTROL SECTION 1: AUTHORITY, TITLE AND PURPOSE 11. STATUTORY AUTHORIZATION This ordinance is adopted pursuant to the provisions of the Federal Water Pollution Control Act 86

More information

4. Contractor (and subcontractors if applicable) certification statement(s)

4. Contractor (and subcontractors if applicable) certification statement(s) CHEMUNG COUNTY STORMWATER COALITION STORMWATER POLLUTION PREVENTION PLAN (SWPPP) SUBMITTAL CHECKLIST GENERAL INFORMATION: 1. Owner/Operator name, legal address, phone number 2. Copy of signed Notice of

More information

Project Name: Project Address or Location: Principal Designer Name and Company: Principal Designer Phone Number:

Project Name: Project Address or Location: Principal Designer Name and Company: Principal Designer Phone Number: SECTION 1: GENERAL INFORMATION Plan Submission Date: Total Disturbed Acreage: _ Project Name: Project Address or Location: Principal Designer Name and Company: Principal Designer Phone Number: email: SECTION

More information

Chapter 14. Stormwater Quality Introduction

Chapter 14. Stormwater Quality Introduction 14.0 Introduction This chapter addresses requirements and design criteria related to post-construction stormwater best management practices (requirements for construction erosion and sediment control are

More information

When planning stormwater management facilities, the following principles shall be applied where possible.

When planning stormwater management facilities, the following principles shall be applied where possible. 2.0 Principles When planning stormwater management facilities, the following principles shall be applied where possible. 2.0.1 Drainage is a regional phenomenon that does not respect the boundaries between

More information

Bioretention cell schematic key

Bioretention cell schematic key Bioretention Cells Bioretention cell schematic key 1 3 Hardwood mulch 2 Curb cut 3 18-30 Modified soil 4 Stone aggregate choker layer 5 Stone aggregate base layer 6 Subdrain 7 Undisturbed soil 8 Overflow/Cleanout

More information

Alternative Names: Erosion Control Matting, Erosion Control Netting, Rolled Erosion Control Products (RECP)

Alternative Names: Erosion Control Matting, Erosion Control Netting, Rolled Erosion Control Products (RECP) 4.5-s EROSION CONTROL BLANKET SYSTEM Alternative Names: Erosion Control Matting, Erosion Control Netting, Rolled Erosion Control Products (RECP) DESCRIPTION Erosion control blanket systems are woven or

More information

STREAM ALTERATION PRACTICES

STREAM ALTERATION PRACTICES STREAM ALTERATION PRACTICES Stream Diversion Channel SDC DEFINITION A temporary channel constructed to convey stream flow around in-stream construction. PURPOSE Stream diversion channels are used to allow

More information

Chapter 4 - Preparation of Stormwater Site Plans

Chapter 4 - Preparation of Stormwater Site Plans Chapter 4 - Preparation of Stormwater Site Plans The Stormwater Site Plan is the comprehensive report containing all of the technical information and analysis necessary for the City to evaluate a proposed

More information

A. INTRODUCTION AND SUMMARY OF FINDINGS B. EXISTING CONDITIONS. Table 10-1 Adjacent Storm Drains

A. INTRODUCTION AND SUMMARY OF FINDINGS B. EXISTING CONDITIONS. Table 10-1 Adjacent Storm Drains Chapter 10: Stormwater Management A. INTRODUCTION AND SUMMARY OF FINDINGS This chapter describes existing and proposed stormwater management on the Site. Potential impacts to stormwater infrastructure

More information

City of Waco Stormwater Management Regulations

City of Waco Stormwater Management Regulations 1.0 Applicability: City of Waco Stormwater Management Regulations These regulations apply to all development within the limits of the City of Waco as well as to any subdivisions within the extra territorial

More information

Appendix I. Checklists

Appendix I. Checklists Appendix I Checklists Town of Greenwich Drainage Manual Department of Public Works - Engineering Division Town Hall - 101 Field Point Road, Greenwich, CT 06836-2540 Phone 203-622-7767 - Fax 203-622-7747

More information

APPLICATION FOR MINOR SITE PLAN REVIEW

APPLICATION FOR MINOR SITE PLAN REVIEW www.appleton.org APPLICATION FOR MINOR SITE PLAN REVIEW Community and Economic Development Department 100 N. Appleton St. PH: 920-832-6468 Appleton, WI 54911 FAX: 920-832-5994 Stamp date received PROPERTY

More information

Article 20 Stormwater Management

Article 20 Stormwater Management Article 20 Section 20.01 Intent Article 20 The purpose of this Article is to protect the health, safety, and general welfare of the citizens by requiring compliance with accepted standards and practices

More information

M-231 and Water Quality. Ottawa County Water Quality Forum November 21, 2016 James Fortney, MDOT

M-231 and Water Quality. Ottawa County Water Quality Forum November 21, 2016 James Fortney, MDOT M-231 and Water Quality Ottawa County Water Quality Forum November 21, 2016 James Fortney, MDOT M-231 Facts: 7-Miles long 2-Lane Limited Access Highway Connects I-96 and M-45 M-231 Facts: Includes Michigan

More information

5/15/2013. Basin Area. Vegetation. Rainfall & Runoff. Soil Type. Topics. Factors Influencing Erosion. Factors Influencing Erosion

5/15/2013. Basin Area. Vegetation. Rainfall & Runoff. Soil Type. Topics. Factors Influencing Erosion. Factors Influencing Erosion Topics Erosion, TESC and Construction sequencing Procedures and timing Remedies for failing sites Curtis Hinman WSU Extension and Bio Systems Eng. Faculty Low Impact Development Specialist chinman@wsu.edu

More information

POST CONSTRUCTION STORMWATER MANAGEMENT FOR "WHITE OAK SEWER INTERCEPTOR"

POST CONSTRUCTION STORMWATER MANAGEMENT FOR WHITE OAK SEWER INTERCEPTOR POST CONSTRUCTION STORMWATER MANAGEMENT PLAN FOR "WHITE OAK SEWER INTERCEPTOR" Located in Newberry Township, York County March 21, 2008 Prepared by: Mellott Engineering, Inc. 7500 Devonshire Heights Road

More information

Urban Planning and Land Use

Urban Planning and Land Use Urban Planning and Land Use 701 North 7 th Street, Room 423 Phone: (913) 573-5750 Kansas City, Kansas 66101 Fax: (913) 573-5796 Email: planninginfo@wycokck.org www.wycokck.org/planning To: From: City Planning

More information

STORMWATER SITE PLAN INSTRUCTIONS AND SUBMITTAL TEMPLATE Medium and Large Projects

STORMWATER SITE PLAN INSTRUCTIONS AND SUBMITTAL TEMPLATE Medium and Large Projects DEPARTMENT OF COMMUNITY DEVELOPMENT 621 Sheridan Street, Port Townsend, WA 98368 Tel: 360.379.4450 Fax: 360.379.4451 Web: www.co.jefferson.wa.us/communitydevelopment E-mail: dcd@co.jefferson.wa.us STORMWATER

More information

Appendix K. Stormwater Management Plan

Appendix K. Stormwater Management Plan Regional Municipality of Halton - Steeles Avenue (Regional Road 8) Class EA - Industrial Drive to Regional Road 25/Martin Street Appendix K Stormwater Management Plan PR226401.001 Rev. 2 PR.DOT, 00/01

More information

Erosion Control for Home Builders in the. City of Jacksonville

Erosion Control for Home Builders in the. City of Jacksonville Erosion Control for Home Builders in the City of Jacksonville Eroding construction sites are a leading cause of water quality problems in Jacksonville. For every acre under construction, about a dump truck

More information

Key elements : Filter Strips must be designed within parameters required by the Fort Wayne s Development Standards/Criteria Manual.

Key elements : Filter Strips must be designed within parameters required by the Fort Wayne s Development Standards/Criteria Manual. 4.4. Filter Strips Filter Strips are densely vegetated lands that treat sheet flow storm water from adjacent pervious and impervious areas. They function by slowing runoff, trapping sediment and pollutants,

More information

Checklists. Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Applicant: Contact Name: Phone Number:

Checklists. Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Applicant: Contact Name: Phone Number: Applicant: Contact Name: Phone Number: Email: Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Concept Plan Requirements: I. General Project Information 1. Address or parcel number

More information

SILT FENCE MACHINE SLICED ERO-1A STEEL FENCE POST (T-POST), MINIMUM 5' LONG, 6' MAXIMUM SPACING.

SILT FENCE MACHINE SLICED ERO-1A STEEL FENCE POST (T-POST), MINIMUM 5' LONG, 6' MAXIMUM SPACING. STEEL FENCE POST (T-POST), MINIMUM 5' LONG, 6' MAXIMUM SPACING. ATTACH FABRIC TO POSTS WITH MINIMUM 3 ZIP TIES (50 LB. TENSILE) PER POST IN TOP 8" OF FABRIC. MONOFILAMENT GEOTEXTILE FABRIC PER MNDOT TABLE

More information

A. Regional Detention Requirements

A. Regional Detention Requirements I. GENERAL DESIGN GUIDELINES A. Full-spectrum detention is provided for all new development, redevelopment or expansion of a site to provide for water quality and flood control detention. B. Detention

More information

12/7/2007. Christopher B. Burke Engineering West, Ltd Aux Sable Creek Watershed Plan Update 1

12/7/2007. Christopher B. Burke Engineering West, Ltd Aux Sable Creek Watershed Plan Update 1 The ABC s of BMP s Aux Sable Watershed Plan St. Charles, IL Why are BMP s Important Best Management Practices (BMPs) developed as a set of practices which help to achieve goals of the Clean Water Act and

More information

NAPA COUNTY PUBLIC WORKS Standards & Specifications

NAPA COUNTY PUBLIC WORKS Standards & Specifications Roadway Design & Construction Manual (Table of Contents) 1. Chapter 1: General Provisions 1.1 Short Title 1.2 Jurisdiction 1.3 Purpose and Effect 1.4 Enactment Authority 1.5 Amendment and Revisions 1.6

More information

Department of Agriculture. Conservation Service. United States. Natural Resources REVISED 8/26/16

Department of Agriculture. Conservation Service. United States. Natural Resources REVISED 8/26/16 GENERAL NOTES: SYMBOL LEGEND 1. All work shall comply with the constriction specifications, drawings, project-specific quality assurance plan and other contract requirements. 2. All notes on the drawings

More information

Vegetated Filter Strips and Buffers

Vegetated Filter Strips and Buffers 3.15 Sediment Control Description: Buffer strips (existing vegetation) and filter strips (planted vegetation) are sections of vegetated land adjacent to disturbed areas. They are designed with low slopes

More information

Section 9 Landscaping and Street Trees

Section 9 Landscaping and Street Trees Section 9 Landscaping and Street Trees GENERAL REQUIREMENTS...9-1 I. MATERIALS...9-1 9.1 GRASS...9-1 9.2 STREET TREES...9-1 A. General...9-1 B. Species...9-2 C. Design Standards...9-2 9.3 LANDSCAPING...9-3

More information

ACT 167 STORMWATER CONSISTENCY VERIFICATION REPORT FOR CHESTER COUNTY 1.0 INTRODUCTION

ACT 167 STORMWATER CONSISTENCY VERIFICATION REPORT FOR CHESTER COUNTY 1.0 INTRODUCTION ACT 167 STORMWATER CONSISTENCY VERIFICATION REPORT FOR CHESTER COUNTY 1.0 INTRODUCTION Tetra Tech, Inc. (Tt) has prepared this Act 167 Stormwater Consistency Verification Report. The report verifies consistency

More information

Soil Erosion and Sediment Control

Soil Erosion and Sediment Control PDHonline Course C188 (3 PDH) Soil Erosion and Sediment Control Instructor: John Poullain, PE 2012 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA 22030-6658 Phone & Fax: 703-988-0088 www.pdhonline.org

More information

October 7, City of Thornton 9500 Civic Center Drive Thornton, CO (303) RE: Maverik Thornton, CO - Drainage Report

October 7, City of Thornton 9500 Civic Center Drive Thornton, CO (303) RE: Maverik Thornton, CO - Drainage Report October 7, 2016 City of Thornton 9500 Civic Center Drive Thornton, CO 80229 (303) 538-7295 RE: Maverik Thornton, CO - Drainage Report As per your request, we are submitting to you the drainage report and

More information

General Information. Site Conditions. 9b 9b. 9a 1b. Best Management Practices Illustration

General Information. Site Conditions. 9b 9b. 9a 1b. Best Management Practices Illustration Model Construction SWPPP Planning & Development Services 1800 Continental Place Mount Vernon WA 98273 voice 360-416-1320 inspections 360-416-1330 www.skagitcounty.net/stormwaterpermitting Permit #: General

More information

APPENDIX A SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS. In West Sadsbury Township, Chester County, Pennsylvania

APPENDIX A SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS. In West Sadsbury Township, Chester County, Pennsylvania APPENDIX A SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS In West Sadsbury Township, Chester County, Pennsylvania TABLE OF CONTENTS I. Introduction 3 II. Importance of Stormwater Management

More information

CHAPTER 102 REQUIREMENTS CRITCAL STAGES DURING CONSTRUCTION ACTIVITIES

CHAPTER 102 REQUIREMENTS CRITCAL STAGES DURING CONSTRUCTION ACTIVITIES CHAPTER 102 REQUIREMENTS CRITCAL STAGES DURING CONSTRUCTION ACTIVITIES TOPICS Steps Prior to construction Pre-Construction Meeting Defining the Critical Stages with the Contractor Brady s Run Lake Site

More information

Severn River Sub-Watershed: BMP 09-Retrofit

Severn River Sub-Watershed: BMP 09-Retrofit Project ID: BMP_09 Total Treated Drainage Area: 4.57 acres Total Treated Impervious Area: 2.9 acres Total Water Quality Volume (WQv): ~10,300 cubic feet; 0.236 acre-foot Rainfall Depth Treated (Pe): 1

More information

Environmental Protection Ordinances (Performance Zoning) Bedminster Township, Bucks County

Environmental Protection Ordinances (Performance Zoning) Bedminster Township, Bucks County Environmental Protection Ordinances (Performance Zoning) Bedminster Township, Bucks County ARTICLE VI. PERFORMANCE STANDARDS Section 600 Compliance All uses, activities, subdivisions and/or land developments

More information

HYDRAULIC DESIGN involves several basic

HYDRAULIC DESIGN involves several basic Chapter 6 Tools for Hydr draulic and Road Design HYDRAULIC DESIGN involves several basic concepts that must be considered to build successful projects with a minimum risk of failure (Photo 6.1). Use of

More information

EROSION & SEDIMENTATION CONTROL NARRATIVE AND CALCULATIONS

EROSION & SEDIMENTATION CONTROL NARRATIVE AND CALCULATIONS EROSION & SEDIMENTATION CONTROL NARRATIVE AND CALCULATIONS SR 1026, SECTION C01 BRIDGE REPLACEMENT WEST PIKELAND TOWNSHIP CHESTER COUNTY, PENNSYLVANIA April 3, 2006 TPD PROJECT #PA06.I.00095 Prepared For:

More information

ORDINANCE NO LC

ORDINANCE NO LC ORDINANCE NO. 07-52-LC AN ORDINANCE OF THE CITY OF DESTIN, FLORIDA RELATING TO EROSION AND SEDIMENT CONTROL; PROVIDING FOR AUTHORITY; PROVIDING FOR FINDINGS OF FACT; PROVIDING FOR THE CREATION OF LAND

More information

1.6 IMPLEMENTATION GUIDELINES

1.6 IMPLEMENTATION GUIDELINES 1.6 IMPLEMENTATION GUIDELINES Planning Planning is necessary if effective solutions are to be provided for erosion and sediment control on construction sites. Plans can guide development and prevent waste.

More information

SECTION 900 TURF ESTABLISHMENT

SECTION 900 TURF ESTABLISHMENT SECTION 900 901.0 DESCRIPTION This section covers the furnishing of all labor, materials, tools, equipment and performances of all work and services necessary or incidental to turf restoration as indicated

More information

RAIN GARDEN ILLINOIS URBAN MANUAL PRACTICE STANDARD. (feet) CODE 897 DEFINITION

RAIN GARDEN ILLINOIS URBAN MANUAL PRACTICE STANDARD. (feet) CODE 897 DEFINITION ILLINOIS URBAN MANUAL PRACTICE STANDARD RAIN GARDEN (feet) CODE 897 Source: Kendall County Soil and Water Conservation District DEFINITION Rain gardens are small, shallow, flat bottomed depressions constructed

More information

Vegetated Filter Strips and Buffers

Vegetated Filter Strips and Buffers 3.15 Sediment Control Description: Buffer strips (existing vegetation) and filter strips (planted vegetation) are sections of vegetated land adjacent to disturbed areas. They are designed with low slopes

More information

ARIZONA WATER COMPANY

ARIZONA WATER COMPANY ARIZONA WATER COMPANY East Sedona Water Storage Facility February 21, 2018 Community Meeting STORMWATER RUNOFF Issue: Runoff sometimes flows out of the wash at bottlenecks in front of several homes on

More information

EROSION PREVENTION BMP SUGGESTED USES MATRIX

EROSION PREVENTION BMP SUGGESTED USES MATRIX EROSION PREVENTION SUGGESTED USES MATRIX Processed Based Tools Software Aids Slope Waterway Surface Concentrated Flows Large Flat Stock Pile Borrow Adjacent Property Impacts Erosion Prevention Measures

More information

The following general requirements will be met for all planter box installations:

The following general requirements will be met for all planter box installations: Greenville County Technical Specification for: WQ-25 PLANTER BOX 1.0 Planter Box 1.1 Description Planter boxes are designed to capture and temporarily store stormwater runoff. Planter Boxes are intended

More information

STORMWATER PERMIT SUBMITTAL REQUIREMENTS

STORMWATER PERMIT SUBMITTAL REQUIREMENTS STORMWATER PERMIT SUBMITTAL REQUIREMENTS Most development within the City of Bellingham that involves disruption of soils, or construction of buildings, streets, parking lots, etc. requires a Stormwater

More information

PROPOSED DRAINAGE PATTERNS

PROPOSED DRAINAGE PATTERNS 1121 1118.50 Basin Floor 1120 1119 0 N 100 200 PROPOSED DRAINAGE PATTERNS Deroiser Drive Riverwood Drive County 260 0 100 200 Project Name: Riverwood Drive LITTLE FALLS TOWNHOMES Project Location: LITTLE

More information

Lincoln 270. City of Lincoln. Stormwater Management Plan. April 2, 2013

Lincoln 270. City of Lincoln. Stormwater Management Plan. April 2, 2013 Lincoln 270 City of Lincoln Stormwater Management Plan April 2, 2013 # 2005.48 Prepared By: Civil Engineering Solutions, Inc. 590 E Street Lincoln, Ca 95648 (916) 645 5700 1.0 Background: The project site

More information

Zoning Ordinance Article 3

Zoning Ordinance Article 3 Article 3 Natural Resources Protection Section 301 Natural Resources Protection 301.1. Purpose - The following natural resources protection standards are established to protect the public health, safety

More information

Low Gradient Velocity Control Short Term Steep Gradient [1] Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent

Low Gradient Velocity Control Short Term Steep Gradient [1] Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent Grass Linings DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient [1] Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] May be used on short, steep

More information

APPLICATION FOR MINOR SITE PLAN REVIEW

APPLICATION FOR MINOR SITE PLAN REVIEW www.appleton.org APPLICATION FOR MINOR SITE PLAN REVIEW Community and Economic Development Department 100 N. Appleton St. PH: 920-832-6468 Appleton, WI 54911 FAX: 920-832-5994 Stamp date received PROPERTY

More information

Attachment 2: Permeable Pavement Design Guidelines

Attachment 2: Permeable Pavement Design Guidelines Attachment 2: Permeable Pavement Design Guidelines Design of permeable pavement systems is critical if they are to function properly and efficiently. The area and shape are dependent on the site design,

More information

Grass Buffer T-1. Description. Site Selection. Designing for Maintenance

Grass Buffer T-1. Description. Site Selection. Designing for Maintenance Description Grass buffers are densely vegetated strips of grass designed to accept sheet flow from upgradient development. Properly designed grass buffers play a key role in LID, enabling infiltration

More information

26 Attachment 2. Township of New Britain APPENDIX B STORMWATER MANAGEMENT DESIGN CRITERIA

26 Attachment 2. Township of New Britain APPENDIX B STORMWATER MANAGEMENT DESIGN CRITERIA (26, APPENDIX B) 26 Attachment 2 Township of New Britain APPENDIX B STORMWATER MANAGEMENT DESIGN CRITERIA TABLE B-1 DESIGN STORM RAINFALL AMOUNT Source: Field Manual of Pennsylvania Department of Transportation

More information

Part IV(a): BMPs for Erosion, Sediment, Velocity Control

Part IV(a): BMPs for Erosion, Sediment, Velocity Control Part IV(a): BMPs for Erosion, Sediment, Velocity Control Find Design Standards and Specifications for Iowa Erosion and Sediment Control Practices at: www.iowasudas.org Erosion Control Keeping the soil

More information

EROSION & SEDIMENT CONTROL NARRATIVE AND DRAINAGE CALCULATIONS

EROSION & SEDIMENT CONTROL NARRATIVE AND DRAINAGE CALCULATIONS EROSION & SEDIMENT CONTROL NARRATIVE AND DRAINAGE CALCULATIONS PARK STREET SIDEWALK IMPROVEMENTS PHASE II CHRISTIANSBURG, VIRGINIA VDOT Project # U-154-ROS, P11, R21, M51 UPC# 1577 April 7, 216 Calculations

More information

TENNESSEE GAS PIPELINE COMPANY, L.L.C.

TENNESSEE GAS PIPELINE COMPANY, L.L.C. TENNESSEE GAS PIPELINE COMPANY, L.L.C. HYDROLOGIC AND HYDRAULIC CALCULATIONS FOR ACCESS ROADS ALONG THE CONNECTICUT PIPELINE EXPANSION PROJECT CONNECTICUT LOOP Submitted by: Tennessee Gas Pipeline Company,

More information

Stormwater Management Plan Narrative Quality Fleet Services, Inc. SITE RE-DEVELOPMENT 548 New Ludlow Road South Hadley, MA The project proposed by Quality Fleet Services, Inc. consists of the site improvements

More information

VALLEY COUNTY MINIMUM STANDARDS FOR PRIVATE ROAD DESIGN AND CONSTRUCTION

VALLEY COUNTY MINIMUM STANDARDS FOR PRIVATE ROAD DESIGN AND CONSTRUCTION MINIMUM STANDARDS FOR PRIVATE ROAD DESIGN AND CONSTRUCTION Adopted November 28, 2005 TABLE OF CONTENTS DEFINITION OF TERMS...II I. DESIGN CRITERIA... 1 A. GENERAL DESIGN CRITERIA... 1 B. ROADWAY CLASSIFICATION...

More information