1 ontents Introduction Issues Affecting orinth Regional Initiatives ommunity Issues Thoroughfare Planning Functional Street lassifications ontext-sensitive Design Transit Oriented Development Mobility Plan Increased Vehicular irculation Quality Roadway Design Standards Pedestrian Walkability Trail System Greenway orridors Transit Mobility Plan Administration Plan Amendment Process Funding Thoroughfare System Improvements Summary of Recommendations Plates Plate 3-1. Mobility Plan

2

3 Introduction The thoroughfare system forms one of the most visible and permanent elements of a community. It establishes the framework for community growth and development and, along with the Future Land Use Plan, forms a long-range statement of public policy. As the alignment and right-of-way of major transportation facilities are established and adjacent property developed, it is difficult to facilitate system changes without significant financial impacts. However, by incorporating programmed land uses and densities of the Future Land Use Plan, strategies can be developed that maximize the land use/transportation relationship. The changing social and economic climate dictates that an integrated network of transportation systems should be considered in order to support and sustain long-term growth. This includes the incorporation of a variety of considerations which extend beyond vehicular mobility and circulation. Such considerations include bike and pedestrian trails, pedestrian walkability, and the growing importance of transit opportunities. Several key principles were recognized in the preparation of Plan recommendations and should continue to serve the ity in future transportation-related decisions and they include: Improve vehicular circulation Develop quality thoroughfares Ensure pedestrian design Incorporate bike and pedestrian trails Explore transit opportunities This chapter will therefore begin with an overview and brief discussion of several issues which will directly impact mobility within orinth. A brief discussion of thoroughfare planning, with specific emphasis on roadway types, cross sections, and context-sensitive design will follow. The chapter will conclude with the new Mobility Plan and a discussion of the new recommended components of the Plan. 3-1

4 Issues Affecting orinth This Mobility Plan is aimed at addressing the dynamic and changing needs that have occurred in orinth since the 2004 Master Plan Update. Before examining specific mobility recommendations, several key regional and local initiatives must first be discussed. A brief examination of several regional issues which will directly impact mobility in orinth will be addressed. These issues are pertinent to future planning considerations and stand to have substantial impacts upon orinth. Some projects, such as construction of light rail and expansion of Interstate 35-E, can create physical barriers through the ity and, if not planned for appropriately, can negatively impact the ity. Therefore, mobility recommendations will seek to understand and incorporate the following regional initiatives and will seek to utilize these projects as an asset for orinth. Regional Initiatives Regional transportation initiatives which have the possibility to substantially affect transportation within orinth include; the Lake Lewisville Toll Bridge, the widening of Interstate 35-E, the development and widening of F.M and F.M. 2499, and the positioning of commuter rail through orinth by the Denton ounty Transportation Authority (DTA). Figure 3-1. Toll Bridge onstruction Lake Lewisville Toll Bridge The North Texas Tollway Authority, in conjunction with the Texas Department of Transportation (TxDOT) and Denton ounty, has recently constructed the Lewisville Lake Toll Bridge project connecting Interstate 35-E with the Dallas North Tollway, and beyond, via Eldorado Parkway, Garza Lane and Swisher Road. This arterial provides much needed regional connectivity for Lake Lewisville communities. The 13.8 mile corridor was constructed as a 4/6-lane facility, at a cost of around $220 million, and began operation in the fall of The 1.7 mile toll bridge, which features a tied arch spanning 360 feet at its center and is flanked by lighted columns, was constructed at a cost of nearly $122 million. The toll bridge itself accommodates four lanes of travel. 3-2

5 This project has implications for orinth due to the connection of the toll bridge with Swisher Road and Interstate 35-E in the extreme southern portions of orinth. orinth s geographical location positions the ity in an area where water is a physical buffer to the east and to the south. This physical barrier limits regional arterial possibilities. The Lewisville Toll Bridge essentially creates a major west to east regional arterial, connecting orinth to Lakewood Village, Little Elm, and Frisco. A project of this scale can be expected to substantially increase traffic volumes along F.M and therefore is significant to all future transportation and mobility planning considerations. Figure 3-2. Lake Lewisville Toll Bridge Source: NTTA 3-3

6 F.M. 2181/F.M Review of both the thoroughfare plan as well as the regional thoroughfare plan provided by the North entral Texas ouncil of Governments, reveals two specific and major roadways which are considered major arterials or regional arterials. The first of which is F.M. 2181, Swisher Road. This roadway is specifically important due to its connection to the Lake Lewisville Toll Bridge, discussed previously. F.M is a continuation of the Toll Bridge past Interstate 35-E eventually connecting to Interstate 35-E in Denton. urrent plans indicate the expansion of F.M from two lanes to a six lane divided roadway from Interstate 35-E in orinth to Lillian Miller in Denton. The project has thus far received $23.4 million in funding from the North entral Texas ouncil of Governments Strategic Program Initiative and the approximate date for completion of this project is May Figure 3-3. F.M Phase 4 and 5 Project Location: FM 2499 Section 4 From: FM 407 To: FM2181 Project Location: FM 2499 Section 5 From: FM2181 To: IH 35-E Denton ounty Precinct 1 Task Force Report, December 3, Source: TxDOT

7 F.M is a second major arterial which is planned for construction through orinth. Although only a small portion of this roadway is within the ity limits, this project has the opportunity to substantially affect transportation patterns, particularly in the western areas of the ity. This roadway will serve as a major north to south regional arterial and will help alleviate traffic congestion on Post Oak Drive, particularly the intersection of Post Oak and Interstate 35-E. Reviewing the regional future thoroughfare map provided by NTOG indicates that F.M is much more than simply an arterial in orinth. This roadway will eventually connect with Long Prairie Road/International Parkway bridging orinth to Highland Village and Flower Mound further connecting to Highway 121 at DFW airport. Section 5 is specifically slated to construct a 6 lane divided roadway from Interstate 35-E in Denton to F.M in orinth at an estimated cost of $23.3 million. There is currently no date of completion for Stage 5, however utility relocation is expected to begin in Stage 4, currently in progress, is the construction of a bridge which will connect orinth to Flower Mound and Highland Village. Due to the relative proximity to Lake Lewisville, orinth and the Lake ities have limited arterial capabilities and connections. It is for this reason that the two major arterials, F.M and F.M. 2499, serve as important focal points for design, traffic management, and land use. Interstate 35-E Interstate 35-E serves as the major transportation venue through orinth and therefore has major land use and transportation implications for the city. Recent expansion of Interstate 35-E was completed in 2005 which widened the interstate to 6 lanes from Lake Lewisville to just south of orinth Parkway. Future expansion and widening plans are currently in place which drastically change the current capacity of the interstate and such plans will also dramatically change the current landscape and visual relationship that the interstate plays with the ity. Future expansion plans for the Interstate, provided by TxDOT, show eventual design to include four managed HOV lanes, eight freeway lanes, and four frontage lanes. Figure 3-4. urrent Post Oak Intersection lanes. Figure 3-5. At-Grade Intersection (F.M. 2181) 2 Denton ounty Precinct 1 Task Force Report, December 3,

8 A new component of Interstate 35-E freeway design is the incorporation of X style freeway ramps rather than more traditional diamond style freeway ramps. X style designs essentially allow for better utilization of land along the frontage roads, creating better and easier accessibility to properties along the interstate. With increased accessibility come opportunities for development and growth. Modernizing the access ramps through orinth will create opportunities for development and allow for better utilization of land along Interstate 35-E. Expansion plans also reflect at grade intersections for orinth Parkway, Dobbs Road and Post Oak Drive; these intersections currently go over Interstate 35-E. As with the intersection of Swisher Road and Interstate 35-E, the freeway will be elevated over these intersections throughout the ity increasing the aerial view for motorists passing through orinth. Visual perception, therefore, will become an increasingly important consideration in regards to roadway standards and roadway design, as will be discussed later in this chapter. Figure 3-6. Future Meadows Oak intersection at Interstate 35-E Source: TxDOT 3-6

9 Regional Rail Due to the rapid growth of Denton ounty over the past few decades, and a forecast for continued growth in the near future, Denton ounty Transportation Authority (DTA) began construction of the A-Train rail line in March The project consists of 21 miles of regional rail, five rail stations, a bicycle/pedestrian trail, and a regional rail operations and maintenance facility. The project is intended to provide rail service between Denton and arrollton and provide a transfer point for easy connection to the Dallas Area Rapid Transit (DART) Green Line at Trinity Mills Station in arrollton creating accessibility to locations throughout the metroplex via rail. The rail analysis process began with the Alternatives Analysis (AA) study in 2004 where it was determined that rail would be one of the best possible solutions to improve accessibility in the area, create alternate modes of transportation, and ultimately help mitigate growing traffic congestion along Interstate 35-E. This process also determined the exact location of the 21 mile route and the best possible locations for future rail stations. The process determined that five rail stations would be built; Hebron Station in Lewisville, Lewisville Lake Station in Highland Village and Medpark Station and Downtown Station in Denton. Funding for the project consists of 80 percent from the Regional Toll Revenue Funding Initiative with the remaining 20 percent coming from the cities of Lewisville, Denton and Highland Village. Member cities approved a one-half percent sales tax increase on September 13, 2003 which ultimately funds DTA transportation initiatives as well as the future A-Train commuter rail. At the time of the election, orinth was faced with certain budgetary issues and concerns. Due to the state sales tax cap of 8.25 percent, Figure 3-7. DTA A-Train and Stations 3-7

10 if DTA membership was approved, reduced sales tax funding for economic development, streets, and safety would have been considered. No station is planned for orinth during the initial phases of construction; however, NTOG Mobility 2030 indicates the eventual inclusion of a transit stop within the ity. Therefore, decisions regarding whether or not rail is desired within orinth must be examined and decisions regarding what role the station will play within the ity must be made. Proactive planning can help initiate discussion as well as mitigate associated costs of development and implementation if residents decide in the future that transit and rail is appropriate for orinth. For this reason, transit will be discussed in more detail throughout this section, specifically the impact and role it can play in general mobility. Figure 3-8. A-Train Regional onnection to Downtown Dallas/Fort Worth 3-8

11 ommunity Issues During the community input process, there were several issues which were identified by the PA in relation to transportation and mobility in orinth and included: The need for better vehicular circulation between neighborhoods, core community assets, retail centers, and other special districts that may be created in the future, such as a ity enter. Ensure quality roadway design standards along roadways, in particular F.M and F.M which give a quality visual perception for both residents and visitors. oncern for the visibility of property along Interstate 35-E after elevated intersections are constructed (as previously discussed under the Interstate 35-E Section). Ensure quality design standards at intersections. Incorporation of pedestrian standards and pedestrian design along roadways in order to encourage and create walkable neighborhoods and districts within the ity. reate additional options for other modes of transportation and work to incorporate the Non-Motorized System Master Plan. ontinue to pursue relationship ties with DTA in regards to any long term future rail transit possibilities. Key Roadway Improvements Several key roadway improvements have been either recently completed or are in the planning stages in orinth in order to address growth, community access, and circulation. Recent major roadway improvements or projects in design are shown in Table 3-1. Table 3-1. Key Roadway Improvements Project Segment* Details hurch Street IH-35E to Post Oak Dr. Expansion from 2 to 3 lanes (From 18 to 37 feet) F.M IH-35E to West ity Limits Expansion from 2 lanes to 6 lane divided thoroughfare F.M S.W. Portion of orinth. reation of 6 lane divided thoroughfare Post Oak F.M to Lake Sharon Dr. 2 to 4 lane divided thoroughfare Post Oak Robinson Rd to IH-35E 2 to 4 lane divided thoroughfare w/landscaping orinth Parkway IH-35E to Dobbs Rd 2 to 4 lane divided thoroughfare w/landscaping *Only within orinth ity Limits, project may be on a larger scale. 3-9

12 Additional Planning Efforts The has also recently implemented various additional planning tools which, although not directly related to transportation, have the opportunity to affect the appearance of roadways within the ity and are important to remember while considering transportation and mobility. Ordinance Number : Landscape Ordinance The landscape ordinance, which was enacted in June 1999, also has an influence upon the aesthetic quality and appearance of roadways within orinth. These regulations were applied to all non-residential uses and created stipulations regulating the amount of landscape setbacks, number of trees per 500 square feet of landscape area and number of shrubs per 500 square feet of landscape area if parking abuts the landscape buffer. Such landscape requirements are especially beneficial along F.M due to the location of primarily retail uses. In terms of roadways, these design standards do not apply. Such landscape requirements work to create appealing roadways when also used in medians of roadways and in R.O.W which is occupied by the ity. Ordinance Number : Sign Regulation Signage, with little or no regulation, can clutter the visual perception of roadways which has an impact on how residents and visitors perceive orinth. This is especially important in orinth due to Interstate 35-E and the traditional use of pole signs along the Interstate, reflected in the picture to the left. The ity, in September 2004, passed a sign ordinance which regulates the size, setback, height, number of signs, and general visual appearance of signs. This step, along with landscape and tree preservation requirements, will help to increase the aesthetic quality of roadways and thoroughfares within orinth. 3-10

13 Non-Motorized System Master Plan The has taken an aggressive approach to the creation and implementation of a system of pedestrian and bicyclist trails throughout the ity. urrently, the ity contains 1.69 miles of soft trails (unpaved) and 5.74 miles of hard trails (paved)and it is anticipated that nearly seven miles of additional soft trails will be added to the current trail plan within the near future. As identified by the PA, circulation is one of the major concerns for orinth. When considering mobility and transportation options, it is important to refer to the Non-Motorized System Master Plan as a component of mobility and accessibility. Keeping this in mind, future transportation improvements should work to implement various components of the trail plan, where possible. For example, where bike lanes or pedestrian lanes are adjacent to a roadway, pedestrians and bicyclists should be taken into consideration through the incorporation of a multi-use lane or sidewalk separate from vehicular traffic flows. A focus on the master trail plan in relation to thoroughfare planning will therefore accomplish the goal of continuing to expand trails throughout the ity while also providing for increased circulation between neighborhoods and areas of the ity. Figure 3-9. Non-Motorized System Master Plan 3-11

14 2009 Projected Level of Service Level of service (LOS) is a way of evaluating levels of roadway congestion using a rating scale of A through F with A reflecting roadways with little or no congestion and F reflecting roadways with severe congestion. Level of service estimates for 2009 are included in Figure 3-10 below and are reflective of the Mobility Amendment. Interstate 35-E generally has a service level A, B or. Exceptions include intersections at Post Oak Drive, orinth Parkway and Swisher Road, where service levels D and E are depicted. Examining level of service along F.M reveals severe traffic congestion with a level of service rating F depicted between Interstate 35-E and Post Oak Road. Additional areas of roadway congestion in orinth include Post Oak Road between Lake Sharon and hurch Street, orinth Street between Interstate 35-E and Meadows Oak and Shady Shores Road just east of Interstate 35-E all locations reflect a service rating F. The newly constructed Lake Lewisville Toll Bridge is noteworthy due to its regional influence upon orinth projections reflect service levels A, B or across the bridge. Figure NTOG 2009 LOS Estimates 3-12 Source: NTOG

15 2030 Projected Level of Service Information obtained from NTOG projects roadway level of service for orinth and the surrounding area in Interstate 35-E generally contains higher levels of congestion reflected by service levels D and E through the ity. Expected roadway updates to F.M and Lake Sharon/Meadows Oak Drive may improve level of service ratings generally levels D and E along F.M and Levels A, B and along Lake Sharon/Meadows Oak Drive are depicted. The Lake Lewisville Toll Bridge service level is expected to decrease dramatically to service level F by 2030 reflecting the expected increase in population and congestion. Additionally, F.M is included as a service level A, B or north of F.M and service level F south of F.M It is important to note that these projections include planned or projected roadway improvements are not reflective of current roadway capacities. If future projects are not built in orinth, including the reconfiguration of Interstate 35-E, congestion and service levels will generally be much worse than depicted below. Figure NTOG 2030 LOS Projections (Mobility 2030) Source: NTOG 3-13

16 Thoroughfare Planning orinth s existing Thoroughfare Plan is built upon traditional thoroughfare planning concepts which focus on functionality and are designed primarily to accomodate vehicular traffic. In order to address the community s goals of providing multi-modal options to residents, it will be important to incorporate concepts of context-sensitive design (SD) which consider the automobile as one element, among other users of the thoroughfare. To that end, the potential long-term implementation of regional rail through the ity offers opportunity for transit oriented development (TOD) that encourages pedestrian orientation among multi-modal urban design concepts. Functional Street lassifications A functional street classification recognizes that streets are part of a system having diverse origins and destinations. A typical trip involves the following stages: primary movement, transition, collection/distribution, access and termination. Functional classifications also describe and reflect a set of characteristics common to all roadways within each class. Functions range from providing mobility for through traffic and major traffic flows, to providing access to specific properties. haracteristics unique to each classification include the degree of continuity, general capacity, and traffic control characteristics. Figure 3-12 and Figure 3-13 illustrate the relative roles of each classification to achieve its intended function. In short, the functional classification of streets provides for the circulation of traffic in a hierarchy of movement from one classification to the next. Functional classes can be subdivided further into major and minor designations to further detail their role in the community. For each classification, there is typically a recommended set of operational and design criteria. Figure Relationship between Access and Movement Figure Functional Street lassification System Major Arterial ompleteaccess control, littlelocal traffic FUNTION Major Arterial AESS FUNTION ollector INREASING AESS MOVEMENT FUNTION No through traffic, unrestricted access ALLAESS FREEWAY 3-14 ARTERIAL OLLETOR LOAL ollector UL DE SA Minor Arterial DEREASING AESS ALLMOVEMENT

17 orinth s Thoroughfare Plan recognizes three general classes of roadways which include Major Thoroughfare, Thoroughfare, and ollector. These were classifications developed under the 2004 Master Plan Update. Major Thoroughfare: These thoroughfares are able to provide a high degree of mobility, service relatively high traffic volumes, have higher operational speeds, and will service a significant portion of through travel and cross city trips. Generally, the two major thoroughfares in orinth, F.M and F.M. 2499, are also considered to be regional arterials and are included in both the Denton ounty Master Thoroughfare Plan as well as the regional arterial plan by the NTOG. Typically, right-of-way for such roads would be between 120 to 180 feet. Thoroughfare: Thoroughfares are streets which also provide a higher degree of mobility and also are designed to accommodate increased traffic flow. Such roads serve as cross city connectors but are not necessarily regional arterials. For this reason, some designated thoroughfares may be more appropriate for the incorporation of bike or pedestrian trails into the design especially in areas with close proximity to residential areas which may create a greater demand for safety and aesthetics rather than speed. Specified right-of-way for thoroughfares in orinth are 84 feet and examples include Post Oak, Lake Sharon/Meadows Oak, and Robinson. ollectors: serve as connections between thoroughfares and local/residential streets and serve to collect and distribute traffic to the thoroughfare network. ollectors also serve to provide direct service to neighborhoods, commercial developments, and other local areas and their design involves site specific considerations. ollectors accommodate smaller volumes of traffic over shorter distances and may border or traverse neighborhood boundaries. ollector streets should be discontinuous to discourage cut-through traffic through neighborhoods. Specified right-of-way for collector streets in orinth is 60 feet. Examples of collector class facilities include; Oakmont, Meadowview, and Parkridge. Typically, collector class facilities are divided into Major (lass III) and Minor (lass IV) ollector. Major collectors are four-lane undivided roadways located within feet of right-of-way. Minor collector roadways are undivided roads with two to four-lanes in 60 feet of right-of-way. Figure 3-14 and Figure 3-15 illustrate the cross-section of major and minor collector streets. 3-15

18 As a component of this, it is recommended that the 2004 roadway classifications listed above be changed to major arterial, minor arterial, and collector. These cross-sections will maintain original R.O.W provisions but are updated in order to ensure compatibility with a regional thoroughfare system (See Figure 3-14, Figure 3-15, Figure 3-16 and Figure 3-17). Figure Major Arterial Figure Minor Arterial Figure Major ollector 3-16 Figure Minor ollector

19 Table 3-2 describes the most important characteristics of the various functional street classes. The arterial and collector classifications have been divided to include major and minor subclasses. These planning guidelines are utilized, in developing areas, to form a basic framework for the thoroughfare system. Also included in Table 3-2 is information on the typical level-of-service each roadway class is intended to provide. Level-of-service refers to a measure of capacity that a section of roadway or intersection can accommodate during peak traffic conditions. It is defined in terms of delay with six categories ranging from "A" through "F" being assigned to reflect the relationship between the design capacity and the traffic demand upon a particular segment. As demand approaches capacity, the level of service decreases. Level of service is typically recommended for design purposes. While the above described conditions are ideal, it may not be practical or even possible to modify existing streets in already developed areas to conform to the desired design standards for all the street functional classifications. In cases where neighborhood areas are bisected by major roadways, alternative cross-sections may be applied to ensure that neighborhood integrity is preserved while providing traffic access. 3-17

20 omments Parking Planning Level of Service (mph) Speed Limit Ranges (veh./day) Volume (3) Spacing Intersection Roadway Access Direct Land (1) Spacing (Miles) Function Roadway Type of Table 3-2. Functional Street lassification Supplements capacity 4-5 Freeway/ Traffic Movement; long distance travel. Tollway None 1 mile 45,000 to , of arterial street system D-E and provides high speed mobility. Restricted some movements may Major Arterial community, intra-metro area, movement. traffic be prohibited; number and 1/4 mile spacing of Serves long trip lengths. 36,000 to 40- Backbone of the 45, street system. None Moderate distance inter- -E ½ -1 ½ (2) driveways controlled. May be limited to Mobility function is major generators; Minor primary; access function is number and Arterial secondary. Serves spacing of moderate trip lengths. driveways 1/8 mile 20,000 to 30-34, Provides route and spacing continuity with major arterials. controlled. Primary collect / Major local streets and arterial 12,000 to 30- ollector system. Secondary land 28, (2) limited regulation. Primary internal to one Through traffic should neighborhood; serves short 1,000 to 30- ollector trip lengths. Secondary 15, land access. A-B 2 lot lengths Land access. Limited 300 feet Minor Local B- Safety control 200 to 20- only. 1, (1) Spacing determination should also include consideration of (travel within the area or corridor based upon) ultimate anticipated development. (2) Denser spacing needed for commercial and high-density residential districts. (3) Spacing and intersection design should be in accordance with state and local thoroughfare standards Permitted traffic movement. ¼ -½ access; inter-neighborhood Safety controls; Limited distribute traffic between be discouraged.

21 ontext-sensitive Design ontext-sensitive Design (SD) is the practice of developing transportation projects that serve all users and meet the needs of the neighborhoods through which they pass. It is a collaborative process that involves all stakeholders in developing street designs that fit into the character of surrounding neighborhoods while maintaining safety and mobility. The key is that elements of the street should complement the context of the surroundings or adjacent development to generate a roadway experience. For instance, a roadway may need to be designed as a six-lane boulevard as it travels through a commercial area, but may need to be altered to a minor street configuration as it travels through a town center or mixed use area. Beyond functional purposes permitting people to get from one place to another and to gain access to property, streets most assuredly the best streets can and should help to do other things: bring people together, help build community, cause people to act and interact, to achieve together what they might not alone. As such, streets should encourage socialization and participation of people in the community The best streets create SD Principles The process of designing SD roadways is similar to the process of designing traditional thoroughfares in that automobile traffic is considered with traffic counts, traffic demand, and level of service and leave strong, lasting, positive impressions; they catch the eyes and the imagination. Jacobs, Allan B. Great Streets, page 312 information-gathering efforts. However, the difference is that automobile traffic is only one element considered, among numerous others, in the design of SD roadways. The Institute of Transportation Engineers (ITE) has recently released a publication entitled An ITE Recommended Practice: ontext-sensitive Solutions in Designing Major Urban Thoroughfares for Walkable ommunities. This publication outlines various principles that should be considered during the design process to arrive at a solution for a context-sensitive roadway project. These principles are as follows3: The project satisfies the purpose and needs as agreed to by a full range of stakeholders. This agreement is forged in the earliest phase of the project and amended as warranted as the project develops. The project is a safe facility for both the user and the community. The project is in harmony with the community, and it preserves environmental, scenic, aesthetic, historic and natural resource values of the area; in other words, exhibits context-sensitive design. of The project exceeds the expectations of both designers and stakeholders and achieves a level of excellence in people s minds. 3 Outlined on page 9 of An ITE Recommended Practice: ontext-sensitive Solutions in Designing Major Urban Thoroughfares for Walkable ommunities (2006). 3-19

22 The project involves efficient and effective use of the resources (time, budget, and community) of all involved parties. The project is designed and built with minimal disruption to the community. The project is seen as having added lasting value to the community. SD initiates discussion between traffic engineers, the ity, and residents which ultimately leads to roadway design which considers multiple transportation modes and roadway character. This process gives opportunities for the incorporation of pedestrian walkability, within certain designated areas, and the incorporation of multi-purpose pathways where appropriate. Additionally, SD coupled with a streetscape planning initiative could turn major roadway projects into gateway corridors. More on these topics will be discussed to follow. TxDOT has begun to incorporate SD concepts into its newer projects. The ity should explore the possibilities of SD solutions on any of its joint projects with TxDOT (i.e., F.M and F.M. 2499). Figure Roadway Elements Pedestrian Street Area Parking Buffer Roadway 3-20 Roadway Median Median Roadway Roadway Street Pedestrian Parking Area Buffer Building Buffer Building Sidewalk Sidewalk Parking

23 Transit Oriented Development Transit oriented development (TOD) is a concept that has evolved out of a need to balance residential Figure Plano Transit Village communities, retail divisions and employment locations by integrating the transition between locations via the most efficient and accessible means. TOD has been defined as a set of urban design and land use characteristics conducive to generating non-automotive making4. trip In addition to reducing vehicular dependence, TOD creates a sustainable environment through mixed land uses and pedestrian orientation. The Urban Land Institute (ULI) has identified ten key principles that must be addressed in order to create a successful and sustaining development and include: Establishment of a common vision, Development of public/private partnerships, Incorporating development around a transit station, Provide flexibility in parking; employ shared parking components, Build a place, not a project ; create a sense of place, Understand market factors for appropriate retail development; not transit driven, Establish a mix of land uses, Incorporate buses to station routes, Establish varying prove points for living, and Engage corporate attention. Transit oriented development has proven to be very successful in the short time frame since its inception in the Dallas area. Variations in style of TOD development along DART s light rail transit lines have strengthened the benefits that can be achieved with this type development. Similar style development is in planning by Irving and arrollton along the TRE and Southern Pacific rail lines as well as along the new DART Green and Orange Lines. The current A-Train Plans by the Denton ounty Transit Authority which extend through orinth create an opportunity for future TOD development within the ity. If such development is desired within orinth, early decisions must be made which facilitate 4 althorpe, P. The Next American Metropolis: Ecology, ommunity, and the American Dream, Princeton Architectural Press, New York,

24 relationships between the ity, residents, and development interests. Many incentives and regulatory approaches are often utilized in order to attract Transit Oriented Developments because such developments often serve as prime locations for development. ities often utilize the creation of a TIRZ (Tax Increment Reinvestment Zones), Neighborhood Empowerment Zones, 380 Incentives, as well as the mitigation of regulatory controls (i.e., density allowances, zero lot line, parking requirements, etc.). Transit oriented developments have differing levels of density Figure Top: ommuter Surface Parking Lot Bottom: Utilization of transit stop to create a sense of place. and therefore are adaptable within a specific context. Some examples of TOD, such as Mockingbird Station in Dallas, are examples of dense development surrounding a transit station. On the other hand, suburban communities throughout the United States have adapted the concept to best suit their specific needs. Examples include Plano Transit Village in Plano, as well as numerous examples from Arlington, VA in suburban Washington D.. Finally, TOD best utilizes land surrounding a transit station. Often times, commuter rail stations are surrounded by vast expanses of surface parking which is only used by commuters during the day and lays vacant and underutilized at night. Although a certain degree of parking is an essential component of suburban commuter rail due to general lack of density, too much parking can lead to financial shortfalls by underutilizing developable land. apitalization of land values around transit stations creates opportunity for development which enhances vibrancy around stations making transit a community advantage not only due to increased mobility, but through tax revenue generated by property values and sales taxes. It is therefore recommended that development be utilized around transit stops and that surface parking be minimized. The location of North entral Texas ollege to the potential TOD location also creates opportunities for decreased parking within the TOD area itself. Shared parking agreements may be utilized which allow for shared parking or shared structured parking between the college and retail destinations in order to ensure that surface parking may be limited. Examining activities occurring in and around the TOD may help in these efforts. For example, certain establishments may be daytime destinations while others may be primarily nighttime destinations (after-work). Parking may be shared to accommodate both needs without compromising the financial benefits of development. 3-22

25 3-23

26 Plate 3-1. Mobility Plan 3-24

27 (Page intentionally left blank for double sided printing.) 3-25

28 Mobility Plan Discussed thus far are regional and local issues which are currently impacting mobility or which have the possibility to impact mobility in the future. Several concepts, such as functional street classifications, context-sensitive design, and transit oriented development have been introduced in order to help with the following discussion. Below is a specific and more detailed analysis of issues identified by the PA. Increased Vehicular irculation One of the key mobility issues identified by the members of the PA during the issue identification process was the need for increased circulation in orinth. Figure 3-21 is the 2030 Metropolitan Transportation Plan prepared by the North entral Texas ouncil of Governments. Information within this map is important to note due to the dramatic projected deterioration of vehicular mobility within orinth by the year urrently, orinth is considered an area with light congestion. The only area of severe congestion is found in Dallas ounty, north of Interstate 635 and between Interstate 35-E and the Dallas North Tollway. Future projections, however, reveal that new areas of severe congestion will develop by the year The current severe congestion area expands to encompass much of North Dallas and Plano. The second major area of severe congestion is southeast Denton ounty, including orinth. This creates a strong incentive to begin planning for projected Figure NTOG Mobility 2030 System Performance Levels of ongestion 3-26 Source: NTOG

29 increases in traffic congestion and working immediately to implement plans and ideas which may help to mitigate congestion or which create alternative modes of transportation to increase general mobility within orinth. Vehicular traffic circulation can be influenced by a number of different issues ranging from roadway design, a functional street classification system, a functional non-mobility plan, and transit. Generally speaking, transit and non-motorized opportunities allow for the removal of some automobile traffic from roadways helping the overall traffic flow. onsidering vehicular circulation ironically means considering other mobility options. irculation contains a number of key issues but the basic premise behind circulation is the ability of individuals to move from one point to another point within their neighborhood or community. Several key issues arise in relation to increased vehicular circulation and will be discussed below. Roadway lassifications As provided by Objective 1.1, it is recommended that the thoroughfare system in orinth be updated to provide for a safe and convenient flow of traffic through the ity. urrently, the ity uses a system which divides roadways into three categories; Major Thoroughfare, Thoroughfare, and ollector. Traditionally, most cities use the classifications of Freeway, Major Arterial, Minor Arterial, and ollector to describe street classifications (Table 3-2). Due to orinth being a part of a greater metropolitan planning area, adjusting the current classification system would be beneficial towards regional cooperation and cohesion. urrent Mobility Deficiencies urrently, the ity has a Transportation Plan which reflects future expansion goals. When completed and built to capacity, the system in place will serve to meet the transportation needs of the ity for the foreseeable future. The recommended change, in regards to roadway capacity, is for Post Oak between Lake Sharon and Robinson Road. This roadway was previously classified as a collector roadway with the north and south sections being classified as thoroughfares. The new Mobility Plan recommends this section of Post Oak be in accordance with its north and south sections as a unified minor arterial classification. Regional irculation Put forth in Objective 1.5 is the necessity to ensure that the transportation system within orinth is adequately connected to regional transportation goals and improvements. The 3-27

30 following are regional transportation issues which have an impact upon circulation within the ity and require conjunctive planning considerations by the ity. Lake Lewisville Toll Bridge As previously discussed in more detail, several major projects stand to have major mobility implications for the. The first of which is the completion of the Lake Lewisville Toll Bridge. The implications of the toll bridge for orinth are immense, considering the fact that an entirely new east-west regional connection through the ity is being created. This will essentially connect orinth to the rapidly growing areas of ollin ounty and will increase through-traffic in the ity. Interstate 35-E Also in regards to regional circulation improvements, Interstate 35-E will be expanded to include eight lanes of traffic and four HOV lanes. This will expand the capabilities of the interstate as far as a regional connector and will help to alleviate some of the projected transportation congestion issues. Also important with this project is new design features which will help to mitigate the dividing factor that a large highway can often create. Atgrade intersections will help connect the east and west sections of orinth as well as create visual opportunities for landscape and architectural design features which promote orinth to visitors along Interstate 35-E. Design features will be discussed under the Roadway Design section. F.M. 2181/F.M Additionally, F.M and F.M are scheduled to be expanded within the very near future. F.M. 2181, in particular, is currently a retail destination within the ity. This roadway connects to the Lake Lewisville Toll Bridge and will eventually serve as a major regional arterial. Expansion of the roadway at current standards will help alleviate long term congestion in this corridor. F.M will also play a significant role in helping improve mobility within the city. F.M will create a new north-south arterial which will run very near to the western borders of orinth. F.M will also create a major arterial which will eventually connect orinth with Flower Mound and DFW Airport in Grapevine. Lake Sharon/Meadows Oak/Dobbs Road Reflected in the ity s current thoroughfare plan is the desire for the creation of a new east/west minor arterial within the ity. The chosen location for this is the Lake Sharon, Meadows Oak and Dobbs Road corridor. This section runs directly through the middle of orinth and a new intersection with Interstate 35-E is planned during the construction of the Interstate. The creation of this minor arterial would also create another connecting roadway between areas on the east and west sides of the interstate and would serve one of the 3-28

31 possible city center locations. The implementation of this roadway is encouraged for increased circulation within the ity. Quality Roadway Design Standards Another issue related to mobility, as expressed by the PA, is the incorporation of quality design standards for city streets in order to create positive visual perceptions of orinth for residents as well as visitors. Questions such as what type and how much roadway design or landscaping is desired should be addressed. When considering design standards, several issues must be discussed. First, as previously mentioned and described in Objective 2.1, design standards must be in conformance with the functional street classification system. Secondly, roadway design standards should take into consideration the desired functionality of roadways, traffic volumes, as well as adjacent land use. ontextsensitive Design techniques, introduced earlier, should be explored in order to ensure conforming standards which take into consideration roadway character as well as traffic volumes. Further, roadway design standards should strive to incorporate other components such as consistent landscaping, quality business signage, entranceway features, and quality light fixtures. orinth has already taken steps towards this goal through the creation of ordinance number regulating the design of signs along F.M and Interstate 35-E. In addition, ordinance number places landscape requirements on businesses within the city. It is recommended that such landscape requirements also be explored for ity right-of-way and uses adjacent to residential areas. 3-29

32 Interstate 35-E A major transportation corridor in orinth is Interstate 35-E. PA members expressed concern over the visibility of property along the interstate and a desire to create a more positive visual perception of orinth for traffic along the interstate. orinth currently has the opportunity to work with TxDOT to ensure quality design along the interstate during future construction, especially along intersections such as Post Oak Road, Meadows Oak Drive, and orinth Parkway. Gateway opportunities, landscaping, and incorporation of artistic design are encouraged at such intersections. F.M. 2181/Swisher Road F.M. 2181, or Swisher Road, is one of the primary arterials through orinth. It is expected that traffic will only increase due to the completion of the Lake Lewisville Toll Bridge and the projected widening of the roadway from two lanes to six lanes. oncentrations of retail uses exist along Swisher Road, especially near the Interstate 35-E intersection. Roadway design features in this area should focus on improving traffic flow as well as ensuring safe pedestrian options. Access management is an important design tool that can be used to both visually enhance the roadway and promote opportunities for walkability in areas with high retail or commercial uses. Shared access driveways and cross access driveways limit the number of commercial entrances and cause adjoining businesses to utilize one combined driveway (Figure 3-22). This creates more available land for landscaping which enhances the visual perception of commercial areas by buffering roadways from parking areas. Figure Shared Access Driveway 3-30

33 Pedestrian Walkability According to the Victoria Transport Policy Institute, walking can be considered the most basic form of transport, for the following reasons: It is universal. Virtually everybody walks, and virtually all trips include walking links. It is very affordable. Economically and socially disadvantaged people tend to rely heavily on walking for transport. It provides connections between other modes of transport. Automobile, transit and air travel trips all depend on walking. It provides additional benefits, including exercise and enjoyment. 5 The first major issue in addressing walkability is the necessity for pathways. In order for individuals to be able to walk from one location to another there must be the provision of pathways along streets, especially thoroughfares and major thoroughfares. Although this may seem common, there are often times where roadways do not incorporate safe pedestrian options. These types of roadways are uninviting for pedestrians who may not visually perceive a safe walkway to reach their destination. The second issue related to walkability is connectivity. Planning efforts should strive to ensure that sidewalks and pathways are not connections to nowhere but rather extend to different areas of the ity and different land uses. onnections should strive to connect residential neighborhoods to schools ensuring safe pathways for children. Pathways should also connect neighborhoods to nearby parks or recreational facilities. Furthermore, connectivity should also focus beyond residential areas to include retail centers, especially where large concentrations of retail or services are present. The desire in such locations should be to create a sense of walkability between different retail uses encouraging patrons to walk between stores in order to accomplish the individuals shopping needs. Finally, the last major issue related to walkability is the perceived safety of the pedestrian. Safety is often the deciding factor in why some individuals choose to drive to nearby locations rather than 5 Litman, Alexander. Economic Value of Walkability, Victoria Transport Policy Institute. July

34 walk. Automobile dominated development patterns have tended to give greater focus to the automobile rather than the pedestrian. As discussed under quality design standards, access management along major thoroughfares with high retail and commercial concentrations reduces the number of areas where pedestrians must cross flows of traffic. Such standards both visually enhance the roadway while at the same time create a sense of safety for pedestrians. In addition to access management, various traffic calming techniques, landscape design standards, and pedestrian crosswalks can help create a sense of safety Walkways thereby encouraging walkability withinpedestrian the community. Below are images depicting safe and clearly identified pedestrian design (left) as well as images with a lack of safe or clearly designated design (right). Pedestrian rossing Access ontrol 3-32

35 Trail System An essential component of mobility is considering the impact that bike trails, hike trails, or multi-modal pathways can have on increasing connectivity, especially between various neighborhoods. Many cities incorporate bike trails into the mobility plan due to a desire to create alternative modes of transportation beyond the automobile. Multi-modal pathways are seen as opportunities for residents to walk or bike between neighborhoods and public spaces as well as a means of improving the general quality of life within a community. The has taken proactive measures through the creation of a Non-Motorized System Master Plan which has provided numerous provisions for pedestrian and bike trails throughout the ity. Therefore, all transportation improvements should refer to the Plan and should seek to incorporate and implement suggested pathways wherever possible. The current trail system is an incorporation of both soft and hard surface trails. The system includes trails and pathways along roadways as well as trails through parks and open space locations. In regards to implementation of the Non-Motorized System Master Plan, there are several options which may be examined. 3-33

36 Figure 3-23 examines three feasible options for the inclusion of pathways and trails into the mobility system. The first image depicts an example of separate bike and pedestrian pathways. This is an important consideration in areas with higher levels of pedestrian and bicycle traffic. Separation protects pedestrians from collision and injury. This example is often difficult to implement due to the required right-of-way; however it is appropriate for areas where right-of-way acquisition is possible. The second image depicts a multi-modal Figure Thoroughfare Trail Options trail which incorporates both modes of transportation. Such a provision requires a greater trail width in order to safely accommodate bicyclists. both pedestrians and It is often a more feasible option due to the light nature of pedestrian and bicycle traffic in North Texas. It is also a more economical option due to the reduced amount of right-ofway needed for acquisition. An area of landscaping is recommended between the multiuse pathway and vehicular traffic lanes for safety measures. The third image depicts an option for collector roadways within orinth. Many cities have begun incorporating a painted bicycle lane into roadway design where traffic volumes permit. This is especially popular in more urban environments or areas near concentrations employment. universities of or housing mixed and This method, however, is still applicable in orinth and can be used along collector roadways throughout the ity, such as Meadowview Drive or Oakmont Drive. This is depicted on the Mobility Plan, Plate 3-1, as a Bicycle orridor. This option is often attractive due to the low economic cost of implementation. 3-34

37 Additionally, many collector roadways are currently built to capacity and the acquisition of further right away is not possible. A painted bicycle lane would be ideal in such a situation. Options to implement and preserve bicycle safety within such areas should be examined and considere Figure Painted Bicycle Lane d. The Non-Motorized System Master Plan includes several proposed hard and soft surface trails adjacent to roadways. The ity should continue land acquisition to complete the trails proposed. Grants available from the Texas Parks and Wildlife Department specifically aimed at trail construction should be examined as funding sources in order to complete land acquisition. Such grants totaled $5.3 million dollars in Additionally, two specific amendments to the NonMotorized System Master Plan are recommended. First, a pedestrian and bicycle crossing which would go underneath Interstate 35-E between Meadows Oak Figure Proposed Trail Amendments (In Red) Drive and orinth Parkway, is recommended. Secondly, a trail connection between the far southern point of future F.M and the proposed trail below the Bluffs at Pinnell Point subdivision is also recommended. This land area is currently floodplain which may help facilitate private funding opportunities and grants specifically aimed at open space and wetland preservation. Finally, a component of the new DTA A-Train rail line is the inclusion of a hard surface trail which will run adjacent to the new rail line linking orinth to surrounding communities. This trail segment is currently reflected in the ity s Non6 Harvey, Tom. TPW ommission Approves $5.3 Million in Recreational Trails Grants. Texas Parks and Wildlife Department. August 21,

38 Motorized System Master Plan. Attempts should be made to integrate this trail segment into the broader context of trail connectivity within orinth, giving residents 3-36 greater mobility options.

39 Greenway orridors Discussed in the previous section was the need to incorporate pathways and trails into the city thoroughfare plan. The incorporation of greenway corridors into the ity s thoroughfare plan, as well as its cross-sections, is one way of ensuring that multi-modal transportation options are included and considered within thoroughfare design. urrently, the Non-Motorized System Master Plan designates several areas as bike friendly. These locations are located primarily within the confinement of certain neighborhoods or are located along collector roadways which have lower traffic levels, such as Meadowview Drive and Oakmont Drive. The goal of the ity should be to expand the current bicycle friendly options beyond the confinement of the neighborhood and allow bike and pedestrian friendly options throughout the ity. Greenway corridors can accomplish this specific goal by creating safe nonmotorized options along roadways which may carry larger volumes of traffic and create safe options for residents to walk or bike to different neighborhoods, recreational facilities, land uses, and eventually any city center or transit oriented development locations. Greenway corridors not only serve as a means of creating additional non-motorized mobility, but they often can serve to visually enhance roadways within a community through landscaping and perception. Landscaping is encouraged between pathways and vehicle lanes in order to create a feeling of safety for pedestrians and bicyclists, but also for aesthetic quality. The three specific areas recommended for the implementation of greenway corridors in orinth are Post Oak Drive between F.M and Robinson Road, Lake Sharon/Meadow Oaks Drive, and orinth parkway. Both Post Oak Drive and Lake Sharon/Meadows Oak Drive are thoroughfares which extend through primarily residential uses. Implementation of these roadways as greenway corridors would ensure compatible roadways with existing neighborhood character and would increase recreational opportunities for residents within surrounding neighborhoods. orinth Parkway is recommended to be included as a greenway corridor due to the locations of ity Hall, North entral Texas ollege, orinth ommunity Park, and the possible transit oriented development opportunity. 3-37

40 Figure Minor Arterial Greenway ross-section The greenway cross-section shown in Figure 326 would be appropriate for areas with sufficient easement or right-of-way opportunities. Opportunities for separate bike and pedestrian lanes or a linear park with a multiuse pathway are feasible considerations. Figure Minor Arterial Greenway ross-section Figure 3-27 would be appropriate for major arterial cross-sections through residential areas. Multi-use pathways may be incorporated on one or both sides and opportunities for landscaping buffers between residential homes and roadways are possible. Figure ollector Greenway ross-section Figure 3-28 would be appropriate for collector roadways in orinth. Hard surface trails may be incorporated for pedestrians and, depending on traffic flow, bicyclists are able to utilize roadways, preferably with the inclusion of a striped lane. 3-38

41 Transit Finally, as previously discussed, DTA is in the process of constructing its A-Train commuter rail line which will run through orinth. Although no current plans exist which would include a station in orinth, planning now for long term possibilities can help increase mobility and circulation within the ity if any changes or opportunities arise in the future. Based upon the location of the rail line, the Figure DTR A-Train oncept most probable location for a future transit stop in orinth would be on the east side of orinth Parkway and Interstate 35-E. This site location is important for several reasons. First, the location of North entral Texas ollege is a significant feature in this area. Secondly, the location of ity Hall is an important focal point for this section of the ity. Additionally, there are several community parks and recreational facilities within this area of the ity creating both a local and regional draw. Finally, there is the availability of vacant land in this general area which would create opportunities for development around a potential transit stop. The existence of vacant land allows for the creation of unique development which enhances the stations capabilities while also leaving room to mitigate the effects of denser development upon surrounding neighborhoods. The importance of planning now for potential rail stem from the fact that rail stations contain many opportunities, such as transit oriented development, which can be utilized. In addition, transit is only one part of the greater plan for mobility and, therefore, needs to be connected to the greater mobility plan recommendations. If this is done effectively, a station can be much more than simply a stop with in a city. If effectively incorporated into the greater mobility plan, it can serve to enhance the thoroughfare plan as well as the nonmotorized plan and can become a functional part of the greater city it serves. Transit opportunities within orinth go far beyond rail. urrently, DTA operates ommuter Express, ONNET, and the UNT Shuttle in addition to the future A-Train. ommuter Express connects Denton ounty with the DART North arrollton Transit enter and, with eight stops downtown Dallas, it serves as an important transportation option for commuters via bus. ONNET is a local transportation network between Denton, Lewisville and Highland Village. urrently, ONNET operates 286 stops within these three communities. 3-39

The transportation system in a community is an

The transportation system in a community is an 7 TRANSPORTATION The transportation system in a community is an important factor contributing to the quality of life of the residents. Without a sound transportation system to bring both goods and patrons

More information

4.1.3 LAND USE CATEGORIES

4.1.3 LAND USE CATEGORIES 4.1.3 LAND USE CATEGORIES a. City Center District The City Center District incorporates the existing character and mix of uses in downtown Belmont to encourage redevelopment and new development in keeping

More information

Table of Contents. Elm Avenue Improvement Plan City of Waco, Texas. Introduction 1. Existing Context 1 Figure 1 2.

Table of Contents. Elm Avenue Improvement Plan City of Waco, Texas. Introduction 1. Existing Context 1 Figure 1 2. Table of Contents Introduction 1 Existing Context 1 Figure 1 2 Plan Guidelines 3 Future Urban Form 4 The West-End 4 Main Street 6 The East-End 7 Figure 2 9 Public Improvement Recommendations 7 General

More information

ARLINGTON COUNTY, VIRGINIA

ARLINGTON COUNTY, VIRGINIA ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting October 15, 2005 DATE: September 28, 2005 SUBJECT: Request to Advertise the adoption of the 2005 Clarendon Sector Plan C. M. RECOMMENDATION:

More information

CHAPTER 7: Transportation, Mobility and Circulation

CHAPTER 7: Transportation, Mobility and Circulation AGLE AREA COMMUNITY Plan CHAPTER 7 CHAPTER 7: Transportation, Mobility and Circulation Transportation, Mobility and Circulation The purpose of the Transportation, Mobility and Circulation Chapter is to

More information

City of Farmington. Downtown Plan. Amendment to the 1998 Master Plan Adopted October 11, 2004

City of Farmington. Downtown Plan. Amendment to the 1998 Master Plan Adopted October 11, 2004 City of Farmington Amendment to the 1998 Master Plan Adopted October 11, 2004 Introduction Planning Background 1 Scope and Components of the Plan Amendment 2 Concept Introduction 3 Plan Concepts 3 Conceptual

More information

hermitage town center

hermitage town center hermitage town center A Community Vision prepared by Strada for The City of Hermitage and The Mercer County Regional Planning Commission January 2007 table of contents introduction 3 design principles

More information

COMMUNITY DESIGN. GOAL: Create livable and attractive communities. Intent

COMMUNITY DESIGN. GOAL: Create livable and attractive communities. Intent COMMUNITY DESIGN Intent An attractive, well-designed County will attract quality development, instill civic pride, improve the visual character of the community, and create a strong, positive image for

More information

Executive Summary. NY 7 / NY 2 Corridor

Executive Summary. NY 7 / NY 2 Corridor Executive Summary NY 7 / NY 2 Corridor Transportation and Land Use Study December 2005 Prepared for: Town of Colonie Capital District Transportation Committee Prepared by: Introduction: Land use decisions

More information

Hockessin Community Redevelopment Plan

Hockessin Community Redevelopment Plan Hockessin Community Redevelopment Plan 3.1 Introduction The Community Redevelopment Plan for the Village of Hockessin is the result of the people s vision for a distinct village center that serves as the

More information

Corridor Vision. 1Pursue Minnehaha-Hiawatha Community Works Project. Mission of Hennepin County Community Works Program

Corridor Vision. 1Pursue Minnehaha-Hiawatha Community Works Project. Mission of Hennepin County Community Works Program 1Pursue Minnehaha-Hiawatha Community Works Project Minnehaha-Hiawatha Community Works is a project within the Hennepin Community Works (HCW) program. The mission of the HCW program is to enhance how the

More information

Transportation. Strategies for Action

Transportation. Strategies for Action Transportation A major priority for the Overlake Neighborhood is to develop a multimodal transportation system. To achieve this system, a balance has to be found among travel, circulation and access needs;

More information

Definitions. Average Daily Traffic Demand (ADT): The actual number or projected number of cars that pass a point in a 24-hour period.

Definitions. Average Daily Traffic Demand (ADT): The actual number or projected number of cars that pass a point in a 24-hour period. Definitions Access Management: A combination of physical techniques and transportation policies used to control the flow of traffic between roads and the surrounding lands. Alternative City Form Scenarios:

More information

V. Vision and Guiding Principles

V. Vision and Guiding Principles V. Vision and Guiding Principles The Master Plan for the Powers Ferry Corridor seeks a foundation in the desires of the community. At times, various elements of the community offered opposing viewpoints,

More information

Policies and Code Intent Sections Related to Town Center

Policies and Code Intent Sections Related to Town Center Policies and Code Intent Sections Related to Town Center The Town Center Vision is scattered throughout the Comprehensive Plan, development code and the 1994 Town Center Plan. What follows are sections

More information

Access Management: An Overview

Access Management: An Overview Figures 1-5 Below Evolution of development along a highway. In the early stages, land along the road is used for farming with little traffic generated. As time passes, the highway corridor becomes a de

More information

VILLAGE OF CLEMMONS PLANNING BOARD DRAFT STAFF REPORT

VILLAGE OF CLEMMONS PLANNING BOARD DRAFT STAFF REPORT VILLAGE OF CLEMMONS PLANNING BOARD DRAFT STAFF REPORT PETITION INFORMATION Docket # C-226 Staff Megan Ledbetter Petitioner(s) JBJH Properties, LLC Owner(s) JBJH Properties, LLC Subject Property 5892-49-1766

More information

4.500 Preston Road Overlay District

4.500 Preston Road Overlay District Section 4.500 Preston Road Overlay District 2004 Zoning Ordinance 4.500 Preston Road Overlay District (ZC 98-29; Ordinance No. 98-9-12) 4.501 Purpose To provide appropriate design standards for the use

More information

Chapter 1: Introduction

Chapter 1: Introduction Chapter 1: Introduction The Penn Avenue Community Works Corridor Vision and Implementation Framework presents an integrated communitybased vision and a coordinated, long-term implementation framework for

More information

Scope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan

Scope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan Scope of Services River Oaks Boulevard (SH 183) Corridor Master Plan PROJECT AREA The project area consists of the River Oaks Boulevard (SH 183) corridor bounded by SH 199 at the northern end and the Trinity

More information

TIRZ 17/Redevelopment Authority Capital Improvements Plan Projects

TIRZ 17/Redevelopment Authority Capital Improvements Plan Projects Gessner Widening: T-1701 What: Widen the road from a six-lane divided boulevard to an eight-lane divided boulevard street section, increase turn lanes, update traffic signal system, improve drainage by

More information

Southern Gateway Project and Public Green

Southern Gateway Project and Public Green Southern Gateway Project and Public Green Transportation and Trinity River Project Committee May 23, 2016 Purpose of Presentation Provide the history and an overview of the Southern Gateway Project (SGP)

More information

13 THORNHILL YONGE STREET STUDY IMPLEMENTATION CITY OF VAUGHAN OPA 669 AND TOWN OF MARKHAM OPA 154

13 THORNHILL YONGE STREET STUDY IMPLEMENTATION CITY OF VAUGHAN OPA 669 AND TOWN OF MARKHAM OPA 154 13 THORNHILL YONGE STREET STUDY IMPLEMENTATION CITY OF VAUGHAN OPA 669 AND TOWN OF MARKHAM OPA 154 The Planning and Economic Development Committee recommends the adoption of the recommendations contained

More information

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan Appendix F Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan Introduction and Purpose of the Plan The Gold Line Bus Rapid Transit facility is an eleven-mile dedicated

More information

2.0 AREA PLANS. Lakeside Business District. Lakeside Business District Land Use Categories:

2.0 AREA PLANS. Lakeside Business District. Lakeside Business District Land Use Categories: Lakeside Business District Lakeside Business District Land Use Categories: Campus Commercial Campus Commercial means a mixture of uses which includes corporate offices, office parks, hotels, commercial,

More information

Bourne Downtown Site Planning

Bourne Downtown Site Planning Prepared for: The Town of Bourne, MA In Cooperation with: Bourne Financial Development Corporation Prepared by:, Inc. June 24, 2009 Table of Contents Introduction and Summary... 1 Site Existing Conditions...

More information

RECREATION AND OPEN SPACE ELEMENT GOALS, OBJECTIVES, AND POLICIES

RECREATION AND OPEN SPACE ELEMENT GOALS, OBJECTIVES, AND POLICIES RECREATION AND OPEN SPACE ELEMENT GOALS, OBJECTIVES, AND POLICIES Goal 7 To provide park facilities, recreation programs, and open space resources that are safe, adequate, and accessible to all City residents,

More information

Port Lavaca Future Land Use

Port Lavaca Future Land Use Port Lavaca Future Land Use Introduction The City of Port Lavaca is beginning to see sustained growth, after many years of relative stable population. New single family homes, apartments, and businesses

More information

CHAPTER 3 VISION, GOALS, & PLANNING PRINCIPLES. City of Greensburg Comprehensive Plan. Introduction. Vision Statement. Growth Management Goals.

CHAPTER 3 VISION, GOALS, & PLANNING PRINCIPLES. City of Greensburg Comprehensive Plan. Introduction. Vision Statement. Growth Management Goals. CHAPTER 3 VISION, GOALS, & PLANNING PRINCIPLES Introduction The Greensburg Comprehensive Plan is intended as a working community document. A combination of long and short-term goals, this document is intended

More information

Urban Planning and Land Use

Urban Planning and Land Use Urban Planning and Land Use 701 North 7 th Street, Room 423 Phone: (913) 573-5750 Kansas City, Kansas 66101 Fax: (913) 573-5796 Email: planninginfo@wycokck.org www.wycokck.org/planning To: From: City Planning

More information

7Page 91 CLEMMONS COMMUNITY COMPASS 7 COMMUNITY CHARACTER

7Page 91 CLEMMONS COMMUNITY COMPASS 7 COMMUNITY CHARACTER 7 Community Character The beauty of Clemmons won t necessarily be a reflection of our past, but our future. This quote from Comprehensive Plan Steering Committee member Wayne Dodson captures the essence

More information

Urban Design 9Identity

Urban Design 9Identity Urban Design 9Identity URBAN DESIGN IDENTITY Urban design is about connecting people to their places through the built environment, nature, and overall urban form. Done well, it creates a memorable space

More information

CHAPTER 1. Ms. Guajardo s Class - Central Elementary CH 1 1

CHAPTER 1. Ms. Guajardo s Class - Central Elementary CH 1 1 INTRODUCTION CHAPTER 1 Ms. Guajardo s Class - Central Elementary CH 1 1 1.1 SETTING South Centre City is a linear corridor south of Downtown Escondido paralleling Centre City Parkway and South Escondido

More information

Access Management Strategies for Major Corridors. Town of Amherst, New York Erie County

Access Management Strategies for Major Corridors. Town of Amherst, New York Erie County Access Management Strategies for Major Corridors Town of Amherst, New York Erie County September 2004 Table of Contents Section I Introduction to the Project A. Project Background 2 Section II Overview

More information

Existing Transportation System 5-1

Existing Transportation System 5-1 5-1 The Jackson County transportation system is served by several modes of transportation including streets and highways, multi-modal, non-motorized, rail, and aviation. While the focus of the transportation

More information

Planning Districts INTRODUCTION

Planning Districts INTRODUCTION INTRODUCTION To facilitate detailed examination of development prospects for all areas of the community, Delano has been divided into 14 planning districts. The location of these planning districts is

More information

REQUEST FOR QUALIFICATIONS

REQUEST FOR QUALIFICATIONS REQUEST FOR QUALIFICATIONS VILLAGE OF HAMBURG COMPREHENSIVE ZONING/LAND USE REGULATIONS UPDATE Prepared By: Village of Hamburg 100 Main Street Hamburg, New York 14075 Village of Hamburg RFQ Page 1 of 10

More information

EXHIBIT A. Tax Increment Reinvestment Zone No. 1 (Town Center) First Amended Project Plan 1

EXHIBIT A. Tax Increment Reinvestment Zone No. 1 (Town Center) First Amended Project Plan 1 EXHIBIT A Tax Increment Reinvestment Zone No. 1 (Town Center) First Amended Project Plan 1 1 As amended by Resolution No. 2008-02-001(TR1R) of the Tax Increment Reinvestment Zone No.1, and approved to

More information

CHARLES PUTMAN CHARLES PUTMAN AND ASSOCIATES, INC

CHARLES PUTMAN CHARLES PUTMAN AND ASSOCIATES, INC MEMORANDUM CHARLES PUTMAN & ASSOCIATES, INC. LAND DEVELOPMENT CONSULTANTS PLANNING ZONING PERMITTING 4722 NW Boca Raton Boulevard, Suite C-106 Boca Raton, Florida 33431 Phone: 561/994-6411 FAX: 561/994-0447

More information

EXISTING COMPREHENSIVE PLAN

EXISTING COMPREHENSIVE PLAN EXISTING COMPREHENSIVE PLAN Town Center Land Use Element: V. LAND USE POLICIES Town Center Mercer Island's business district vision as described in "Your Mercer Island Citizen-Designed Downtown" was an

More information

Midtown Greenway Land Use and Development Plan Executive Summary

Midtown Greenway Land Use and Development Plan Executive Summary Midtown Greenway Land Use and Development Plan Executive Summary Introduction The Midtown Greenway Land Use and Development Plan sets policy direction for land use and development in the Midtown Greenway

More information

Zoning Ordinance Section 1.100

Zoning Ordinance Section 1.100 4.800 (ZC 98-45; Ordinance No. 98-9-13) 4.801 Purpose To provide appropriate design standards for the development of properties within the State Highway 121 corridor. These standards recognize the significance

More information

Complete Neighbourhood Guidelines Review Tool

Complete Neighbourhood Guidelines Review Tool Complete Neighbourhood Guidelines Review Tool Prepared By: City of Regina Planning Department October 2014 Page 1 of 14 Community Development Review Checklist for Secondary Plans and Concept Plans The

More information

Issues Requiring Future Study

Issues Requiring Future Study Issues Requiring Future Study Transportation planning is an ongoing process that tends to identify new issues as it finds solutions for others. Some issues are so complex that a solution to one problem

More information

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass The Illinois Department of Transportation and Lake County Division of Transportation welcome you to this Public Hearing for U.S. Route 45 from Illinois Route 132 to Illinois Route 173, including the Millburn

More information

TRANSPORTATION ELEMENT

TRANSPORTATION ELEMENT TRANSPORTATION ELEMENT GOAL I: To create and maintain a safe, efficient and aesthetic transportation system that encourages multi-modal transportation and promotes the mobility strategies of the Ocala

More information

5.1 Site Plan Guidelines

5.1 Site Plan Guidelines 5. Community Core Guidelines Development of the Community Core will take place by plan of subdivision and site plan approval. It will occur in a phased manner that will reflect the timing of residential

More information

Small Area Plan. South Gateway

Small Area Plan. South Gateway Small Area Plan Adopted May 12, 2008 South Gateway Purpose. The South Gateway Small Area Plan defines the City s expectations for the future of the southern entrance to the City at Interstate 85 and Highway

More information

Chapter 2: Preliminary Analysis

Chapter 2: Preliminary Analysis State Highway 5 Corridor Context Sensitive Master Plan ADOPTED June 17, 2014 (Resolution 2014-06-071) Chapter 2: Preliminary Analysis Before looking to the future of the State Highway 5 (SH 5) Corridor,

More information

Public input has been an important part of the plan development process.

Public input has been an important part of the plan development process. Lakewood s Comprehensive Plan recognizes that transportation helps shape the community, and that the way the community provides for the safe and efficient movement of people affects the character of the

More information

2.0 THE PLATINUM TRIANGLE VISION

2.0 THE PLATINUM TRIANGLE VISION 2.0 THE PLATINUM TRIANGLE VISION The envisions an exciting future for the area surrounding Angel Stadium of Anaheim, the Honda Center and The Grove of Anaheim. 2.1 Planning Principles In order to further

More information

State Highway 121 Southwest Parkway. Fort Worth s Transportation Success Story in Design and Cooperation

State Highway 121 Southwest Parkway. Fort Worth s Transportation Success Story in Design and Cooperation State Highway 121 Southwest Parkway Fort Worth s Transportation Success Story in Design and Cooperation Greater Fort Worth Association of Realtors October 24, 2007 Presented by: Dan Lamers, P.E. North

More information

Robbinsdale LRT Station. CDI Development Guidelines. August Overview

Robbinsdale LRT Station. CDI Development Guidelines. August Overview Robbinsdale LRT Station August 2018 Overview The City of Robbinsdale may have the coolest opportunity site along the 13 mile stretch of the Bottineau LRT corridor / Blue Line extension. Located a block

More information

The West Vaughan Employment Area Secondary Plan Policies

The West Vaughan Employment Area Secondary Plan Policies Part 2: The West Vaughan Employment Area Secondary Plan Policies 2.1 General Policies It is the policy of Council: 2.1.1. That the West Vaughan Employment Area (the WVEA), identified on Schedule 1, will

More information

Implementation Guide Comprehensive Plan City of Allen

Implementation Guide Comprehensive Plan City of Allen Implementation Guide 2030 Comprehensive Plan City of Allen DRAFT 2015 Implementation Guide Allen 2030 Comprehensive Plan INTRODUCTION The Comprehensive Plan serves as a guide for the growth and development

More information

Section 1. Executive Summary

Section 1. Executive Summary Executive Summary (This page left blank intentionally) Executive Summary Background Economic growth in southern Leavenworth County over the past decade has been strong. As both the number of business and

More information

Town of Portola Valley General Plan. Nathhorst Triangle Area Plan

Town of Portola Valley General Plan. Nathhorst Triangle Area Plan Town of Portola Valley General Plan Amended December 10, 1997 Table of Contents Introduction... 1 Planning Area... 1 Objectives... 2 Principles... 2 Standards... 4 Description... 4 Community Commercial...

More information

The Five Components of the McLoughlin Area Plan

The Five Components of the McLoughlin Area Plan The Five Components of the McLoughlin Area Plan This documents contains the complete language of the five components of the McLoughlin Area Plan: The Vision Statement The Values The Guiding Principles

More information

ITEM #8. Regional Smart Growth Program. Regional Smart Growth Program. Presentation Overview. Coast Highway Vision and Stategic Plan.

ITEM #8. Regional Smart Growth Program. Regional Smart Growth Program. Presentation Overview. Coast Highway Vision and Stategic Plan. Regional Smart Growth Program Economic Development Commission What is Smart Growth? Adopted as part of the Regional Comprehensive Plan (RCP) RCP provides vision for region based on Smart Growth and sustainability

More information

Introduction. Chapter 1. Purpose of the Comprehensive Plan Plan Organization Planning Process & Community Input 1-1

Introduction. Chapter 1. Purpose of the Comprehensive Plan Plan Organization Planning Process & Community Input 1-1 Chapter 1 Introduction Lakewood 2025: Moving Forward Together Purpose of the Comprehensive Plan Plan Organization Planning Process & Community Input 1-1 Purpose of the Comprehensive Plan The Comprehensive

More information

CHAPTER 7: VISION AND ACTION STATEMENTS. Noble 2025 Vision Statement

CHAPTER 7: VISION AND ACTION STATEMENTS. Noble 2025 Vision Statement CHAPTER 7: VISION AND ACTION STATEMENTS This chapter presents the vision, policy and action statements that transform the comprehensive planning study, an analysis of Noble s past, future trends and community

More information

City of Tacoma Planning and Development Services

City of Tacoma Planning and Development Services Agenda Item D-3 City of Tacoma Planning and Development Services To: Planning Commission From: Stephen Atkinson, Associate Planner, Planning Services Division Subject: Land Use Designations - Phase 2 Meeting

More information

Appendix L SH 360 OVERLAY DISTRICT. LAST UPDATE: December 10, 2013 CASE NUMBER: TA ORDINANCE NO

Appendix L SH 360 OVERLAY DISTRICT. LAST UPDATE: December 10, 2013 CASE NUMBER: TA ORDINANCE NO Appendix L SH 360 OVERLAY DISTRICT LAST UPDATE: December 10, 2013 CASE NUMBER: TA131201 ORDINANCE NO. 9655 2013 Unified Development Code Grand Prairie, Texas Planning Department APPENDIX L: SH 360 OVERLAY

More information

Creating Complete Roadway Corridors:

Creating Complete Roadway Corridors: Creating Complete Roadway Corridors: The AASHTO Guide to Transportation Landscape Architecture and Environmental Design NCHRP Project 15-33 Status Report AASHTO Standing Committee on Design Technical Committee

More information

FUTURE LAND USE ELEMENT

FUTURE LAND USE ELEMENT FUTURE LAND USE ELEMENT GOAL I: To create and sustain a great place to live, play, and prosper Objective 1: The City of Ocala shall incorporate the principles and strategies of the Ocala 2035 Vision into

More information

Appendix D North Road/N. Leroy Street Subarea Plan

Appendix D North Road/N. Leroy Street Subarea Plan North Road/N. Leroy Street Subarea Plan INTRODUCTION The City of Fenton Master Plan was updated in 1996 and included a subarea plan for the North Leroy Street area of the City. It was recognized at that

More information

Town Center (part of the Comprehensive Plan)

Town Center (part of the Comprehensive Plan) Town Center (part of the Comprehensive Plan) Mercer Island Town Center Looking North (2014) In 1994, a year-long process culminated in a set of design guidelines and code requirements for the Town Center

More information

Route 347. New York State Department of Transportation Region 10, Long Island. THE GREENING of ROUTE 347

Route 347. New York State Department of Transportation Region 10, Long Island. THE GREENING of ROUTE 347 The GREENING of Route 347 The Greening of Route 347 The Greening of Route 347: History 3 The Greening of Route 347 4 The Greening of Route 347 5 The Greening of Route 347 Smith Haven Mall 6 The Greening

More information

DOWNTOWN JACKSONVILLE MASTER PLAN S T R E E T H I E R A R C H Y

DOWNTOWN JACKSONVILLE MASTER PLAN S T R E E T H I E R A R C H Y DOWNTOWN JACKSONVILLE MASTER PLAN S T R E E T H I E R A R C H Y Gateway Intra-District Business Inter-District 44 CELEBRATING THE RIVER: A PLAN FOR DOWNTOWN JACKSONVILLE The Transportation Network This

More information

The Neighbourhood Unit

The Neighbourhood Unit DESIGN... Site Framework PROCESS IMPLEMENTATION 22 TOOL DESCRIPTION The neighbourhood unit is a holistic planning and design strategy that addresses the configuration of the major physical components of

More information

I-35 CORRIDOR VISION PLAN INTRODUCTION. Purpose. Background

I-35 CORRIDOR VISION PLAN INTRODUCTION. Purpose. Background INTRODUCTION Purpose The Interstate 35-E Corridor Plan is intended to work conjunctively with the 2010 Red Oak Comprehensive Plan to promote positive and quality development and redevelopment along Interstate

More information

City of Heath. Town Center Concept

City of Heath. Town Center Concept In the give-and-take of getting projects designed, financed, and approved, the famous refrain from the film Field of Dreams is heard often: if you build it, they will come. From the perspective of the

More information

9 th Street Sub Area Plan

9 th Street Sub Area Plan 9 th Street Sub Area Plan In the 1990 s, when the Township prepared the last Master Plan, the 9 th Street corridor was studied as part of a larger 9 th Street Focus Area that included the West Main Street

More information

Regional Context Statement

Regional Context Statement Regional Context Statement REGIONAL CONTEXT STATEMENT 3. REGIONAL CONTEXT STATEMENT In 1995, the Provincial Government passed into law the Growth Strategies Act. The purpose of this provincial initiative

More information

URBAN DESIGN BRIEF URBAN DESIGN BRIEF 721 FRANKLIN BLVD, CAMBRIDGE August 2018

URBAN DESIGN BRIEF URBAN DESIGN BRIEF 721 FRANKLIN BLVD, CAMBRIDGE August 2018 URBAN DESIGN BRIEF URBAN DESIGN BRIEF 721 FRANKLIN BLVD, CAMBRIDGE August 2018 DESIGN BRIEF CONTENTS PART A 1.0 INTRODUCTION 2.0 DESCRIPTION & ANALYSIS OF SITE CONTEXT 3.0 DESIGN CONSTRAINTS AND OPPORTUNITIES

More information

SQUAMISH 2010 AND BEYOND COMMUNITY VISION

SQUAMISH 2010 AND BEYOND COMMUNITY VISION Our plan has been imagined and created to be both pragmatic and visionary. At the core of the strategy is a consideration of the highway s role and its impact on the community. First and foremost in creating

More information

ESTABLISH AN EFFICIENT TOWN CENTER

ESTABLISH AN EFFICIENT TOWN CENTER ESTABLISH AN EFFICIENT TOWN CENTER 4 Overview Lisbon residents are proud of the history of Newent and at the same time recognize its current importance as a centralized location for a variety of municipal

More information

The Vision. Photo provided by The Minervini Group. 46 Vision, Objectives & Strategies

The Vision. Photo provided by The Minervini Group. 46 Vision, Objectives & Strategies Vision, Objectives & Strategies The is the public framework and guide for future development of the Grand Traverse Commons. The establishes public polices for infrastructure, the preservation of natural

More information

Chapter Master Planned Communities (MPC) District

Chapter Master Planned Communities (MPC) District Sections 14.53.010 Purpose and Intent 14.53.020 Applicability 14.53.030 Procedure 14.53.040 MPC Standards 14.53.050 Required Findings 14.53.010 Purpose and Intent Chapter 14.53 Master Planned Communities

More information

Figure 5. Previously Identified Viable Corridors

Figure 5. Previously Identified Viable Corridors OVERVIEW The Central Florida Expressway Authority (CFX) is evaluating the potential to expand SR 408 from its current eastern terminus along SR 50 to SR 520 in northeastern Orange County, Fl. This new

More information

7Page 72 CLEMMONS COMMUNITY COMPASS 5 DEVELOPMENT AND GROWTH

7Page 72 CLEMMONS COMMUNITY COMPASS 5 DEVELOPMENT AND GROWTH 5 Development and Growth WHHAATT DDOOEESS IITT I MMEEAANN TTOO BBEE SSUUSSTTAAI IINNAABBLLEE?? Many communities throughout the U.S. are taking on the challenge of becoming more sustainable. But what exactly

More information

Date: April 10, 2017 City Council Work Session April 24, 2017: Status Report on the Comprehensive Plan Update and Transportation Master Plan

Date: April 10, 2017 City Council Work Session April 24, 2017: Status Report on the Comprehensive Plan Update and Transportation Master Plan AGENDA REPORT To: From: By: Honorable Mayor and City Council Members Warren Hutmacher, City Manager Sharon Ebert, Director Community Development Date: April 10, 2017 Agenda: City Council Work Session April

More information

Chapter PEDESTRIAN COMMERCIAL (PC) ZONING DISTRICT

Chapter PEDESTRIAN COMMERCIAL (PC) ZONING DISTRICT Chapter 11-17 PEDESTRIAN COMMERCIAL (PC) ZONING DISTRICT Sections: 11-17-01 GENERAL PURPOSE 11-17-02 PERMITTED BUILDING TYPES 11-17-03 USES PERMITTED WITH DESIGN REVIEW 11-17-04 USES PERMITTED BY CONDITIONAL

More information

1.0 Circulation Element

1.0 Circulation Element 5/9/18 1.0 Circulation Element 1.1 Introduction As growth and development occur in Apache County, enhancements to its circulation system will be necessary. With time, more roads will be paved and air and

More information

SDOT DPD. SDOT Director s Rule DPD Director s Rule DCLU DR SED DR of 7 CITY OF SEATTLE

SDOT DPD. SDOT Director s Rule DPD Director s Rule DCLU DR SED DR of 7 CITY OF SEATTLE SDOT SDOT Director s Rule 2-07 DPD Applicant: CITY OF SEATTLE Page 1 of 7 Supersedes: DCLU DR 11-93 SED DR 93-4 Seattle Department of Transportation (SDOT) Department of Planning and Development (DPD)

More information

Mississippi Skyway Preliminary Engineering Report

Mississippi Skyway Preliminary Engineering Report EXECUTIVE SUMMARY Mississippi Skyway Preliminary Engineering Report CITY OF RAMSEY, MINNESOTA DECEMBER 2014 City of RAMSEY EXECUTIVE SUMMARY Project Need and Intent The Mississippi Skyway pedestrian bridge

More information

TRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES

TRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES TRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES GOAL 2 The City shall provide a safe, convenient, effective, and energy efficient multimodal transportation system which is coordinated with the Future

More information

CHAPTER 2: FUTURE LAND USE CONCEPTS

CHAPTER 2: FUTURE LAND USE CONCEPTS CHAPTER 2: FUTURE LAND USE CONCEPTS INTRODUCTION The future land use concepts presented in this chapter are an expression of community support for a viable and vital US 50 Corridor. Land use recommendations

More information

The Village of Sugar Grove, in partnership with Kane County, the Illinois Department of Transportation, and the Illinois Tollway welcomes you to the

The Village of Sugar Grove, in partnership with Kane County, the Illinois Department of Transportation, and the Illinois Tollway welcomes you to the The Village of Sugar Grove, in partnership with Kane County, the Illinois Department of Transportation, and the Illinois Tollway welcomes you to the first Public Meeting for the proposed interchange improvement

More information

DRAFT Subject to Modifications

DRAFT Subject to Modifications TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M To: Council Members AGENDA ITEM 8 From: Date: Subject: Staff May 19, 2017 Council Meeting Florida Department of Transportation Complete Streets

More information

141 GEORGE STREET PLANNING RATIONALE

141 GEORGE STREET PLANNING RATIONALE 141 GEORGE STREET PLANNING RATIONALE MINOR ZONING BY-LAW AMENDMENT NOVEMBER 2, 2016 PLANNING RATIONALE 223 McLeod Street Ottawa, ON K2P 0Z8 613.730.5709 fotenn.com INTRODUCTION FOTENN Consultants is acting

More information

IH35 Corridor Plan Amendment to the Comprehensive Plan

IH35 Corridor Plan Amendment to the Comprehensive Plan IH35 Corridor Plan Amendment to the Comprehensive Plan Background The corridor plan for the IH35 corridor is an amendment to the Burleson comprehensive plan. Generally, the purpose of a corridor plan is

More information

Economic Development & Housing Council Committee Comprehensive Plan Update September 20, 2005

Economic Development & Housing Council Committee Comprehensive Plan Update September 20, 2005 1 Economic Development & Housing Council Committee Comprehensive Plan Update September 20, 2005 Purpose To update the Committee on the ForwardDallas! Plan, including: Status Anticipated Products Public

More information

TENNESSEE STATE ROUTE 109 CORRIDOR MANAGEMENT AGREEMENT MEMORANDUM OF UNDERSTANDING CORRIDOR MANAGEMENT ALONG STATE ROUTE 109

TENNESSEE STATE ROUTE 109 CORRIDOR MANAGEMENT AGREEMENT MEMORANDUM OF UNDERSTANDING CORRIDOR MANAGEMENT ALONG STATE ROUTE 109 TENNESSEE STATE ROUTE 109 CORRIDOR MANAGEMENT AGREEMENT MEMORANDUM OF UNDERSTANDING CORRIDOR MANAGEMENT ALONG STATE ROUTE 109 I. Purpose The purpose of this Agreement is to provide a framework for the

More information

U n i v e r s i t y o f S o u t h C a r o l i n a A i k e n. Land Plan Study

U n i v e r s i t y o f S o u t h C a r o l i n a A i k e n. Land Plan Study U n i v e r s i t y o f S o u t h a r o l i n a A i k e n Land Plan Study 06.27.2008 Goals ampus Growth Develop a Land Plan that allows for the orderly expansion of the campus over the next ten years and

More information

I-70 Corridor Enhancement Plan

I-70 Corridor Enhancement Plan i - Table of Contents Table of Contents Chapter I Overview Chapter II Bridge and Roadway Improvements Chapter III Landscape Enhancements Chapter IV Riparian Corridors Chapter V Showcase Missouri Plan Chapter

More information

DRAFT MAJOR CORRIDORS 48 EAST BENCH MASTER PLAN

DRAFT MAJOR CORRIDORS 48 EAST BENCH MASTER PLAN DRAFT MAJOR CORRIDORS 48 EAST BENCH MASTER PLAN DRAFT 05 Introduction Foothill Drive, Parley s Way, Sunnyside Avenue and 1300 East serve as thoroughfares into the City and are important pieces in the regional

More information

RESOLUTION NO. R Refining the route, profile and stations for the Downtown Redmond Link Extension

RESOLUTION NO. R Refining the route, profile and stations for the Downtown Redmond Link Extension RESOLUTION NO. R2018-32 Refining the route, profile and stations for the Downtown Redmond Link Extension MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Capital Committee Board PROPOSED ACTION 09/13/2018

More information

The University District envisions, in its neighborhood

The University District envisions, in its neighborhood Envisioning the University District Link Light Rail in Seattle s neighborhoods CIY OF SEALE CONCEP-LEVEL SAION AREA PLANNING RECOMMENDAION RESOLUION # 30165 EXHIBI L Vision 08.2000 he University District

More information

PLAN ELEMENTS WORKSHOP. April 5, 2016

PLAN ELEMENTS WORKSHOP. April 5, 2016 PLAN ELEMENTS WORKSHOP April 5, 2016 needs more housing. But there is no one-size fits-all solution. Every neighborhood has its own character. In some places, density is not only appropriate it is badly

More information