L0.1A DEMOLITION PLAN DEMOLITION LEGEND DEMOLITION NOTES TREE PROTECTION NOTES LUCAS VALLEY HOA COMMUNITY CENTER CLUB HOUSE IMPROVEMENTS
|
|
- Loraine Walton
- 5 years ago
- Views:
Transcription
1 DEMOLITION LEGEND The base site plan is based on the Topographic & Boundary Survey dated 5/23/12, prepared by R.W. Davis & Associate Land Surveyors. Base information and utility locations may not be accurate and have not been verified by Landscape Architect. It is the contractor's responsibility to test and verify the location of all utility lines, vaults, and boxes prior to demolition and construction. Report any conflicts or discrepancies to Landscape Architect prior to demolition/construction. If discrepancies/conflicts arise and the contractor does not report to the Landscape Architect before commencement of work, any necessary repairs or replacement of walls, paving, utilites, clean outs, catch basins, site furniture, existing to remain vegetation, etc. will be the contractor's sole responsibility. The Contractor shall be responsible for repair or replacement of any walls, paving, utilites, clean outs, catch basins, site furniture, existing to remain vegetation, etc. meant to remain damaged or destroyed by him, his employees, or subcontractors at his own expense. The Contractor shall be responsible for coordination with electrical and plumbing work. See written specifications for complete requirements related to the demolition and removal of materials from the site. Mark area of demolition in the field for review and approval by Landscape Architect before proceeding with work. Protect existing catch basins from debris. Verify with Structural Engineer any precautions to be taken while demolishing portions of existing walls. Contractor shall protect existing utilities, trees, and site amenities to remain. 1. TREE PROTECTION NOTES 1. Protect existing trees scheduled to remain against injury, compaction of root zone, or injury due to cutting, breaking or skinning of roots, trunks, or branches smothering by stockpiled construction materials, excavated materials or vehicular traffic within drip line of trees. 2. No pruning of existing trees shall be completed without prior approval by the Landscape Architect. Great care is to be taken in excavation under tree canopies to avoid unnecessary damage to the root system or cutting of major structural roots. If major roots are encountered, the contractor shall immediately consult with an arborist and notify the Landscape Architect as to the recommended solution. 3. Protect trees to remain with temporary fence of six (6) foot high plastic or wire mesh, wired to 8 foot posts of 2" galvanized pipe, driven 2 feet minimum into the ground at the drip line beyond. 4. If any portion of the protective fence is in conflict with construction, that portion must be relocated, not removed. The fence may not be closer than 8 feet to the trunk of the tree. 5. No storage of materials to be allowed within the protective fencing. 6. All subcontractors should be warned in writing against disposing of any material other than clean water in any area beneath the canopy of the tree or within the protective fencing. 7. Trees severely damaged by construction operations, as determined by the Landscape Architect, must be replaced with tree species selected by Landscape Architect. Replacement tree must be of comparable size to damaged trees being replaced, at least 60" box trees. 8. Replacement of trees scheduled to remain and damaged by construction operations shall be at contractor's expense. 9. Contractor to take special care when working within drip line of trees. Use hand methods for all work to minimize potential root damage within the drip line of the existing to remain trees. Avoid cutting roots 21" diameter and greater. Date: 8/19/16 DEMOLITION NOTES Issue: Progress 10. Do not stockpile materials, store tools, clean equipment or tools within the drip line/root zone of existing vegetation to remain. 11. Maintain existing to remain vegetation in a healthy and vigorous growing condition. DEMOLITION 0 5' 10' 20' 30' rth o N L0.1A
2 Date: 8/19/16 0 5' 10' 20' 30' N th r o Issue: Progress DEMOLITION L0.1B
3 0 5' 10' 20' 30' North NOTE: SEE SHEET L1.0 FOR NOTES AND LEGEND MATERIALS & CALLOUT L1.1
4 MATERIAL SCHEDULE A1 C1 ASPHALT PAVING CONCRETE PAVING (SEEDED) -Integral color: Davis 860 2lbs -Lightly seed with 1/4"-1/2" Black La Paz (White Shell Free -Light wash finish, Provide (1) 2'x2' sample for approval or adjustment. -Tooled joints 1" deep, 3/8" radius R1 T1 RUBBERIZED PLAY SURFACE playbound tiles 2-3/8" thick, POOL TILE: By Pool Contractor, TBD C2 CONCRETE PAVING -Integral Color: Davis PIGMENT 860, 2 Pounds Light Broom Finish W/ 1" deep, 3 8" radius C3 CONCRETE WALLS Integral color to match C1, smooth trowel finish, 1" deep, 3 8" radius tooled joints expressed. Provide (2) 24" x 24" color and finish samples - one with spec above and another after review and adjustment. See details. C4 CMU WALLS Standard CMU Block 8x8x16, single score CMU unit, by Basilite, C5 POOL COPING Pre-cast concrete, match C1 color. Light sandblast finish Provide a sample of one coping piece. E1 STEEL EDGING By JD Russell (800) , or approved equal 1 4" min thickness, 5" min depth ABBREVIATIONS (N) (E) PA TYP DETAIL CALL-OUT DETAIL # DETAIL SHEET STEPS W/ DIRECTION DOWN SHOWN NEW EXISTING TING AREA TYPICAL PROPERTY LINE MATERIALS & CALLOUT 0 5' 10' 20' 30' North L1.0
5 LEGEND DOWN LIGHT: B-K lighting Micro Nite Star C-CAP, Color: Dark Gray/Black WALL LIGHT: W.A.C. Lighting, Model #: WL-LED100-C (3,000k)-BZ (Bronze), 120v BALLARDS BEGA Lighting, Model 7340LED, Dark Gray/Black Finish LIGHT POST: Cooper Lighting, Model: Invue, 400w, Color: Graphite Metallic G E S W GFCI RECPTACLE - Wall mounted SWITCH LOCATION NATURAL GAS LINE FROM BUILDING 120 VOLT ELECTRICAL LINE IN CONDUIT SANITARY SEWER LINE DOMESTIC WATER LINE POOL LIGHT: BY CONTRACTOR, For Design Review purposes, light to be Hayward Astrolite Pool Lighting or equal. Date: Issue: 2 WALL LIGHT Scale: NTS 1 DOWN LIGHT Scale: NTS LIGHTING & UTILITY 0 5' 10' 20' 30' North 4 POST LIGHT Scale: NTS 3 BALLARDS Scale: NTS L2.0
6 0 5' 10' 20' 30' North LIGHTING & UTILITY L2.1
7 TING LEGEND SYMBOL BOTANICAL NAME COMMON NAME SIZE MATURE SIZE/T TYPE WUCOLS TREES MAL PRA MALUS X 'PRAIRIFIRE' PRAIRIFIRE CRABAPPLE 36 " BOX 15'-20' TALL M PLA ACE PLATANUS X ACERIFOLIA CHINESE EVERGREEN ELM 36" BOX 18'-30' TALL, STD L TRI LAU TRISTANIA LAURINA LITTLE LEAF MYRTLE 36" BOX 10'-20' TALL STD M SHRUB & PERENNIALS ARC SUN CHO TEC ARCTOSTAPHYLOS 'SUNSET' CHONDROPETALUM TECTORUM MANZANITA 5 GAL 3'-5' TALL L CAPE REED 5 GAL 2'-3' TALL L COP KIR COPROSMA X KIRKII CREEPING COPROSMA 1 GAL 1'-2' TALL L DIA BAB DIANELLA REVOLUTA 'BABY BLISS' BABY BLISS FLAX LILY 1 GAL 1' TALL M DIA LIT DIANELLA REVOLUTA 'LITTLE REV' LITTLE REV FLAX LILY 5 GAL 2'-3' TALL L LOM LON LOMANDRA LONGIFOLIA BREEZE DWARF MAT RUSH 1 GAL 2'-3' TALL L NEP COR RHA CAL SAC RUS NEPHROLEPIS CORDIFOLIA RHAMNUS CALIFORNICA 'EVE CASE' SARCOCOCCA RUSCIFOLIA 'EVE CASE' SWORD FERN 1 GAL 2'-3' TALL M COFFEEBERRY 5 GAL 6'-8'' TALL L FRAGRANT SWEET BOX 5 GAL 3'-5' TALL L LAWN LAWN MEDALLION DWARF FESCUE WITH BONSAI TURF SOD SOD FROM PACIFIC SOD ( S ODD) M TING 0 5' 10' 20' 30' North L4.0
8 0 5' 10' 20' 30' North TING L4.1
9 4 ADA RAMP SECTION 1 ENTRANCE STAIR SECTION 5 ADA RAMP ELEVATION 2 ENTRANCE SECTION SECTION & ELEVATIONS L6.0 3 ENTRANCE SECTION
10 1 2 3 CHILDRENS POOL AREA SECTION POOL TERRACE SECTION BBQ AREA SECTION SECTION & ELEVATIONS L6.1
11 7 AMPHITHEATER STYLE SEAT WALL Scale: 3/4"=1'-0" 4 CONC. CMU RETAINING WALL 1 CONC. PAVING 8 CONC. RETAINING WALL Scale: 3/4"=1'-0" 5 CONC. RETAINING WALL 2 GRAVEL PAVING DETAILS L7.0 6 CONC. SEAT WALL 3 CONC. CMU FREESTANDING WALL
12 1 HANDRAIL 2 GLASS GUARDRAIL Scale: 3/4"=1'-0" 3 STEEL GUARDRAIL Scale: 1/2"=1'-0" DETAILS L7.1
13 1 TRASH ENCLOSURE Scale: 1/2"=1'-0" 2 TRELLIS DETAILS L7.2
14 2 OUTDOOR BBQ/COUNTER Scale: 3/4"=1'-0" 1 FIRE PIT DETAILS L7.3
15 3 4 BIKE RAKE Scale: 1-1/2"=1'-0" PLAY RUBBER TILES Scale: 1-1/2"=1'-0" 1 2 WATER FOUNTAIN-A Scale: 1/2"=1'-0" FOUNTAINS, WATER FOUNTAIN-B Scale: 1/2"=1'-0" DETAILS L7.4
LOT 66 VACANT Ca (4) 3 BICYCLE PARKING SPACES. REFER ARCH. CANOPY ABOVE (SHOWN DASHED) REFER ARCH.
LEGEND L O G I S B O U L E V A R D PROPOSED TREE PROPOSED SHRUB PROPOSED GROUNDCOVERS LlT (49) Ll (26) MINIMUM 10000 LITRE UNDER GROUND RAINWATER TANK FOR THE PURPOSE OF LANDSCAPE IRRIGATION & TOILET FLUSHING.
More informationX X W W W W W W W W W W W W UG UG OHE OHE OHE OHE OHE OHE OHE FO UGE FO FO UGE UGE FO FO FO FO FO FO FO UGE UGE UGE UGE UGE UGE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE EXISTING
More informationFHWA 534_J031. TEA-5A01(833) EN , P101,M501 See Tabulation Below for Section Numbers
FHWA 534_J31 TEA-5A1(833), P1,M51 See Tabulation Below for Section Numbers ALL CONSTRUCTION IS TO BE PERFORMED WITHIN EXISTING RIGHT OF WAY STP-5A1(611) M51 TEA-5A1(833) RECOMMENDED FOR CONSTRUCTION 12/28/216
More informationL1.00 REFER TO: L1.01 TREE PRESERVATION PLAN L2.01 LANDSCAPE PLAN REFER TO: L1.02 TREE PRESERVATION PLAN L2.02 LANDSCAPE PLAN MATCHLINE
06/2/204 C 204 THIS DOCUMENT AND THE DESIGNS CONTAINED THEREIN REMAINS THE PROPERTY OF PROSS DESIGN GROUP, INC. AS AN INSTRUMENT OF PROFESSIONAL SERVICE. IT IS NOT TO BE USED IN WHOLE OR IN PART FOR ANY
More informationSTUMP STORAGE BUILDING F.F.E.=96.0± APRON CONC. Mag NailTEMP CHARGE STA STAFF PARKING ONLY STUMP EOP ELEC. VEHICLES ONLY CBN CBN SMH PARKING LOT
VCC CC RICK ALK GRANITE F.F.E.=98.9± RICK ALK F.F.E.=.± F.F.E.=99.±. Existing conditions and topography data are from a survey prepared by Cavanaro Consulting, 687 Main St, P.O. ox 7, Norwell, MA 006,
More informationBUSINESS PARK TOWN OF OKOTOKS
@ TOWN OF OKOTOKS LANDSCAPE TENDER DRAWINGS - 31 JANUARY 2016 L1. DEMOLITION PLAN L2. LAYOUT PLAN L3. GRADING PLAN L4. PLANTING PLAN. SECTIONS AND DETAILS File Location: N:\Projects\. Business Park MR
More informationDan, this is a list of the items included in the submittal package for the Plan Commission Public Hearing on May 24, 2018:
To: Dan Nakahara, Senior Planner Village of Deerfield From: Mary M. Bak, Development Services Advisor Kinzie Real Estate Services Subject: 702 Elm Street Townhomes, 1219 Partners Submittal for Plan Commission
More informationCITY OF ALPHARETTA, GEORGIA LANDSCAPE STANDARDS INDEX
CITY OF ALPHARETTA, GEORGIA LANDSCAPE STANDARDS INDEX L-1 TREE PLANTING (TYPICAL SECTION) L-2 TREE ANCHORING - TYPE A (FOR TREES LARGER THAN 2 INCHES CALIPER) L-3 TREE ANCHORING - TYPE B (FOR TREES UP
More informationBUFFERS, TREE PROTECTION AND LANDSCAPING. Sec Purpose and Intent.
ARTICLE 20 BUFFERS, TREE PROTECTION AND LANDSCAPING Sec. 20.1. Purpose and Intent. Trees improve air and water quality, reduce soil erosion, reduce noise and glare, provide habitat for desirable wildlife,
More informationDIVISION 32 EXTERIOR IMPROVEMENTS LANDSCAPING TURF AND GRASSES
32 92 00 PART 1 - GENERAL 1.01 INTRODUCTION A. Preferred Methods for Installation of Turf: On the Pullman, Tri-Cities and Spokane campuses, sod is the preferred method of turf installation. On the Vancouver
More informationCITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS CONTRACT NO CONFLUENCE BIKE/PED RAMPS-SOUTH PLATTE GREENWAY STATEMENT OF QUANTITIES
01050-1 Construction Surveying 1 LS 01500-1 Temporary Fences & Barricades 1,500 LF 02600-1 Shoring, Cofferdam, Temp. Sheeting, & Dewatering 1 LS 01565-1 Storm Drainage & Erosion Sediment Control 1 LS 01565-2
More informationUBC Technical Guidelines Section Edition Planting Preparation Page 1 of 6
Page 1 of 6 1.0 GENERAL 1.1 Scope.1 This guideline addresses the materials, and equipment necessary for the supply, placement, and amendment of the growing medium. 1.2 Related Work:.1 Section 32 93 00
More informationDITTMAR ROSSLYN ARLINGTON COUNTY, VIRGINIA
JANUARY 8, 2019 CLIENT DITTMAR COMPANY 8321 OLD COURTHOUSE ROAD, #300 VIENNA, VA 22182 TEL: (703) 356-6900 SHEET INDEX SHEET NE SHEET TITLE L1.01 STREETSCAPE HARDSCAPE PLAN L1.02 LEVEL 6 ROOF HARDSCAPE
More informationCITY OF SOUTH BURLINGTON, VERMONT SOUTH BURLINGTON CITY OFFICE STORMWATER IMPROVEMENTS JUNE 2014
CITY OF SOUTH BURLINGTON, VERMONT SOUTH BURLINGTON CITY OFFICE STORMWATER IMPROVEME PROJECT LOCATION JUNE 2014 PREPARED BY:. 125 COLLEGE STREET - 4TH FLOOR BURLINGTON, VERMONT 05401 GENERAL NOTES: LEGEND:
More informationGPCID Mall Boulevard & Gwinnett Place Drive Complete Street: Sectional View of Concepts
Sectional View of Concepts PAVEMENT FEATURES PAVEMENTS INTERSECTION INTERSECTION TREATMENTS LANDSCAPE BUFFER LANDSCAPE DESIGN GPCID CD D: GWINNETT P LACE DRIVE & MALL B COMPLETE STREET DESIGN ELEMENTS
More informationWILSON PLACE FINAL DESIGN
WILSON PLACE FINAL DESIGN SANTA MONICA, CA P:\2007\07-812.1_Borderline_Neighborhood\04 Design\Sheetfiles\_Phases\DD Wilson Place\C4.0 Grading and Drainage Plan.dwg,C1.0 Coversheet,Mike Amodeo,4/9/2009
More informationL0.1 E BROADWAY TREE MANAGEMENT LEGEND. TREE MANAGEMENT PLAN Scale: 1:100. Vancouver, BC September 2018
E BROADWAY. ALL COMPONENTS AND WORKMANSHIP TO CONFORM TO BCLNA STANDARDS TYPICAL. TREE MANAGEMENT LEGEND 2. POSITION TREE STAKES INTO DIRECTION OF PREVAILING WINDS IF MINIMUM UTILITY SETBACKS PERMIT. 3.
More informationDIVISION 32 EXTERIOR IMPROVEMENTS LANDSCAPING TREES
PART 1 - GENERAL 1.01 SCOPE A. Work covered by this section includes all of the planning, compliance, design, installation, and warranty elements for new landscaping using trees. Contractor shall furnish
More informationSPL-2.2 MECHANICALS POOL LAWN. 3rd FLOOR TERRACES AMENITY RESTAURANT 230 EAST AVENUE AMENITY NORWALK, CT
8 8 CONCRETE RAMP WOOD STEPS SWIMMING POOL 8 METAL POOL ENCLOSURE FENCE 9 SINGLE LEAF METAL GATE 0 LAWN HANGING CANOPY WITH DOWN LIGHTS METAL & GLASS AWNING AMENITY ROOM WITH FOLDING GLASS WALLS CONCRETE
More informationL0.01. PWL partnership 1:250 TREE PROTECTION GENERAL NOTES TREE LEGEND TREE PROTECTION BARRIER FENCING DETAIL NTS.
TREE PROTECTION GENERAL NOTES THIS INCLUDES TREE SECTION, TREE RETENTION, PROTECTION AND FENCE THINNING. SUBJECT TO TREE LEGEND TREES TO BE REMOVED A. EXCAVATION AROUND TREES. EXCAVATION WITHIN DRIP LINE
More information3.13. Development Guidelines
3.3 Landscaping Elements Landscaping should be used to frame and soften structures, define site functions, enhance the quality of the environment, and screen undesirable views. Safety, environmental impacts,
More informationExtension of Naugatuck Street Hartford, Connecticut
Extension of Naugatuck Street Hartford, Connecticut DEVELOPMENT TEAM LIST OF DRAWINGS Property Owner - Right of Way Construction Manager- Roadway Residential Developer Civil Engineer Landscape Architect
More informationI. DEFINITIONS For the purpose of this policy the following terms, phrases, words and their derivations shall have the meaning given herein.
CITY OF DYERSVILLE TREE AND LANDSCAPING ON PUBLIC RIGHT-OF-WAY POLICY This policy shall regulate the planting, maintenance, and removal of trees and shrubs in public rights-of-way. An approval from the
More informationDIVISION 32 EXTERIOR IMPROVEMENTS
32 10 00 PARKING LOTS UTAH STATE UNIVERSITY DIVISION 32 A. Standard Layout: Layout parking lots with nine by eighteen foot (9 x18 ) stalls perpendicular to the drive lane. Widths of all drive lanes will
More informationVEHICULAR AND PEDESTRIAN CIRCULATION
This perspective sketch communicates the intended character and quality of a proposed streetscape design. Locate benches near a major intersection where people tend to gather. Seating and lighting provide
More informationThe following specific definitions shall apply to the landscaping and screening regulations contained in this article:
ARTICLE XII. LANDSCAPING Sec. 5-421. Purpose. The purpose of landscaping and screening requirements is to improve certain setback and yard areas, including off-street vehicular parking and open-lot sales
More informationC7.1 PUBLIC ROADWAY PLAN TRILLIUM AVENUE RESOURCE INTERNATIONAL INC. Description. Issued By Drawing Issue & Revision Status. Date.
C7.1 www.resourceinternational.com 6350 PRESIDENTIAL GATEWAY COLUMBUS, OHIO 43231 PHONE: (614) 823-4949 FAX: (614) 823-4990 RESOURCE INTERNATIONAL INC. OUTLOT "A" OUTLOT "B" WINCHESTER PIKE WATER LINE
More informationTABLE OF CONTENTS: PROJECT TEAM:
TABLE OF CONTENTS: 1. AERIAL VIEW - PROPOSED DESIGN IN CCSP. LANDSCAPE PLAN - LEVEL 01 3. LANDSCAPE PLAN - LEVEL 0 4. CRYTAL DRIVE AND 3RD STREET OPEN SPACE 5. CRYTAL DRIVE AND 3RD STREET OPEN SPACE 6.
More informationREV DESCRIPTION BY DATE 1 ISSUED FOR REZONING/DP jl/vh/sl AUG ISSUED FOR 100% DD kk SL JUL
Issued For DP/Rezoning July 8, 0 DRAWING LIST Landscape L.00 Rendered Landscape Plan L.0 Rendered Landscape Plan Roof L.0 Landscape Plan Ground Floor L.0 Landscape Plan Roof L.0 Landscape Sections Landscape
More informationDIVISION 32 EXTERIOR IMPROVEMENTS
A. Standard DIVISION 32 EXTERIOR IMPROVEMENTS PARKING LOTS Layout: Layout parking lots with nine by eighteen foot (9 x18 ) stall perpendicular to the drive lane. Widths of all drive lanes will be twenty-four
More informationOVERALL KEY SHEET L201 (NOT USED) L202 L203 L208 L209 (NOT USED) L207 L206 L213 L214 (NOT USED) L210 L212 L211 L217 L218 L219 L215 L216.
L1 (NOT USED) L2 L3 L4 L5 L6 L7 L8 L9 (NOT USED) (NOT USED) L210 L211 L212 L213 L214 (NOT USED) (NOT USED) (NOT USED) L215 L215a (NOT USED) L2 (NOT USED) L217 (NOT USED) L2 (NOT USED) L218 L2 L221 L222
More informationApplicant Submittal HWANG HOSPITALITY, LLC ARCHITECTS OVERLAND PARK, KANSAS 6470 W. 151ST STREET FIRST FLOOR PLAN A NEW MULTIFAMILY DEVELOPMENT FOR:
1 LOUNGE 11'-6" 23'-0" ENTRY RECEPTION 8'-0" 11'-0" OFFICE 7'-2" 11'-0"+ GAME ROOM 7'-2" 11'-0"+ DINING/ GATHERING ROOM 7'-2" 11'-0"+ CATERING KITCHEN PANTRY L T ELEVATOR TRELLISED PATIO A1.01 FIRST FLOOR
More informationDISCOUNT TIRE - IAD 10739
1229 NW 86TH STREET CLIVE, IOWA 50325 PRELIMINARY ENGINEERING PLANS PLAN INDEX SITE LOCATION TITLE SHEET PLAN DATE: 07/13/2015 Beyond Surveying and Engineering NW 86th STREET 0 20 40 EXISTING CONDITIONS
More informationVan Buren Bridge Project. IFB # VBB Attachment K PROVISIONS DEPARTMENT OF PUBLIC WORKS FOR CITY OF FALLS CHURCH CITY PROJECTS
Van Buren Bridge Project IFB #0721-17-VBB GENERAL TREE & LANDSCAPE PROVISIONS CONSTRUCTION SPECIFICATIONS PROJECTS DEPARTMENT OF PUBLIC WORKS FOR CITY OF FALLS CHURCH CITY PROJECTS DEPARTMENT OF PUBLIC
More informationDARTMOUTH COLLEGE DESIGN March 15, 2003 & CONSTRUCTION GUIDELINES
PART 1 DESIGN DIRECTIVES 1.1 GENERAL SECTION 02951 PLANTING DETAILS A. This section consists of AutoCad drawings depicting typical landscape details governing the installation of plant materials on the
More informationLIVE WALL LIVE WALL TRELLIS FROM SECOND FLOOR 36"H LOW WALL W/ STUCCO FINISH. COLOR TO MATCH ARCHITECTURE TRELLIS, SEE ARCHITECTURAL'S DRAWINGS
LIVE WA LIVE WA TREIS FROM SECOND FLOOR 36"H WA W/ STUCCO FINI. COLOR TO MATCH ARCHITEURE FERING ST ARCHITEURAL'S DRAWINGS STAMP CONCRETE PAVING, COLOR: PEWTER PATTERN: 2 X 2 STACK BOND ARCHITEURAL'S DRAWINGS
More informationA. Surface parking areas shall be constructed of bituminous paving.
September 2008 32 12 16 Asphalt Paving 1.0 General A. Surface parking areas shall be constructed of bituminous paving. 2.0 Products A. Aggregate Base Course conform to IDOT Std. Spec. Sect. 1000, ref.
More informationA/E REVIEW CHECKLIST SITE & LANDSCAPE
A/E REVIEW CHECKLIST SITE & LANDSCAPE Reviewers should - Use Checklists when reviewing any type of VA construction project for the following disciplines: Architectural, Boiler Safety Devices Operation
More informationPROTECTIVE MEASURES FOR TREES DURING CONSTRUCTION
PROTECTIVE MEASURES FOR TREES DURING CONSTRUCTION NO CONSTRUCTION OR EXCAVATION IS TO OCCUR ON LOTS THAT REQUIRE TREE PRESERVATION UNTIL PROPER APPROVALS HAVE BEEN GIVEN BY A CITY ARBORIST 1. When trees
More informationGRAND ARBOR RESERVE GRAND ARBOR RESERVE, LLC ULIAN KISSIOV D'ONOFRIO KOTTKE & ASSOC., INC.
GRAND ARBOR RESERVE BIRCHWOOD POINT, LOT-1 10203 MINERAL POINT ROAD MADISON, WISCONSIN GRAND ARBOR RESERVE, LLC 6417 ODANA RD MADISON, WISCONSIN 53719 CONTACT: DAN SCHMIDT PHONE: 608-285-8680 FAX: 608-255-3387
More informationSection 9 Landscaping and Street Trees
Section 9 Landscaping and Street Trees GENERAL REQUIREMENTS...9-1 I. MATERIALS...9-1 9.1 GRASS...9-1 9.2 STREET TREES...9-1 A. General...9-1 B. Species...9-2 C. Design Standards...9-2 9.3 LANDSCAPING...9-3
More informationS T I R L I N G ARCHITECTS IN C Second Street Suite A188 Tel: (925)
P R O J E C T D A T A V I C I N I T Y M A P P R O J E C T T E A M S H E E T I N D E X MAIN STREET PROJECT SITE 5 TH STREET DEL ANTICO AVENUE 7 TH STREET NORTH N.T.S. 45 Second Street Suite A88 Tel: (925)
More informationUniversity of Delaware
SECTION 01 56 18 _ Tree Protection University Contact: UD Assistant Director of Grounds: Office (302) 831 2797 UD Landscape Planner: Office (302) 831 1817 PART 1 GENERAL 1.1 SUMMARY Information in this
More informationSoil Erosion & Sediment Control Plan Requirements for Submittal to the Cape Atlantic Conservation District
Soil Erosion & Sediment Control Plan Requirements for Submittal to the Cape Atlantic Conservation District The following is a list of the minimum requirements required on Soil Erosion and Sediment Control
More information2-B-18-UR. Revised: 3/27/2018
Revised: 3/27/2018 Revised: 3/27/2018 GI FOR KIDS A MEDICAL OFFICE BLDG. 0000 BOARDWALK BLVD. KNOXVILLE, TENNESSEE CONSTRUCTION PRELIMINARY - NOT FOR Landscape Plan Target Publix Town Center Boulevard
More informationSECTION TREE AND PLANT PROTECTION
SECTION 01 56 39 TREE AND PLANT PROTECTION PART 1 GENERAL 1.1 SUMMARY A. As a condition of project approval, all trees within the project limit including lay down or staging areas shall be inventoried
More informationPART TWO: PROJECT SPECIFIC DESIGN GUIDELINES
PART TWO: PROJECT SPECIFIC DESIGN GUIDELINES 2.1.0 GENERAL REQUIREMENTS: 1. Approved warm season turf varieties shall be used for LMD/CFD, commercial, industrial, and public landscape areas. The use of
More informationWednesday, November 26, 2008.max
Wednesday, November 26, 2008.max Sheet L-1 - Site Perimeter Code # of Units COMMON NAME TREES UA 4 WINGED ELM QV 16 LIVE OAK SHRUBS AND VINES IVS 168 SCHILLINGS HOLLY PM 216 DWARF PRINGLES PODOCARPUS SR
More information2. HORIZONTAL DATUM = NAD 83. VERTICAL DATUM = NAVD 88.
1. EXISTING CONDITIONS AND UTILITY INFORMATION SHOWN ON THESE PLANS ARE BASED ON A SET OF PLANS ENTITLED "SCHOOL OF COMMUNICATIONS AND MEDIA BUILDING AND LIFE HALL RENOVATION" DATED MARCH 11, 2015 REVISED
More informationThe open space system should provide connective elements, relate to natural resources, and enhance the suburban character of the landscape..
The open space system should provide connective elements, relate to natural resources, and enhance the suburban character of the landscape.. Mixed-use and infill development should maintain or enhance
More informationParks & Recreation Tree Board - Tree Ordinance Angola, Indiana
Parks & Recreation Tree Board - Tree Ordinance Angola, Indiana 97.01 PURPOSE. (A) Promote and enhance the beauty of the city through tree preservation and landscaping. (B) Safeguard the ecological environment
More informationLong Branch-Wayne Local Park Renovation Project
Montgomery Parks Long Branch-Wayne Local Park Renovation Project Community Meeting #2 September 20, 2016 Oak View Elementary School 7:00-9:00 PM Welcome / Team Introductions M-NCPPC (Montgomery Parks)
More informationREFERENCE DRAWINGS FOR 332 W. MAIN STREET ROCK HILL, SOUTH CAROLINA
REFERENCE DRAWINGS FOR REET ROCK HILL, SOUTH CAROLINA COVER SHEET 1 OF 6 GENERAL NOTES 2 OF 6 REMOVE WIRE AND NYLON TWINE FROM BALL AND CANOPY. SOAK ROOT BALL AND PLANT PIT IMMEDIATELY AFTER INSTALLATION.
More informationUNAUTHORIZED CHANGES ACCURACY OF UTILITIES
BENCHMARK/DATUM RECORD DRAWINGS UNAUTHORIZED CHANGES REVISIONS ACCURACY ACCURACY UTILITIES VICINITY MAP LOCATION MAP DESCRIPTION H:\9 SF Estuary Partnership\9 00 San Pablo Ave GSS\Engineering\ Drawings\TITLE
More informationCounty of El Dorado Standard Plans
County of El Dorado Standard Plans Table of Contents Section 1 General Standards GS-01 General Legend and Abbreviations Section 2 Roads and Streets RS-01 RS-02 RS-03 RS-04 RS-05 RS-06 RS-07 RS-08 RS-20
More informationLANDSCAPE/STREETSCAPE GUIDELINES FOR ADOPT-A-MEDIAN PROGRAM. I. Drawings submitted to the City for approval should contain the following:
LANDSCAPE/STREETSCAPE GUIDELINES FOR ADOPT-A-MEDIAN PROGRAM I. Drawings submitted to the City for approval should contain the following: 1. Site Plan drawn at 1/4 or 1/8 : min. scale showing what you want
More informationSt. Elizabeths West Campus 106 Consulting Meeting. Agenda. Tunnels. Direct Bury ST. ELIZABETHS WEST CAMPUS WASHINGTON, DC
St. Elizabeths West Campus 106 Consulting Meeting Agenda Utility Infrastructure Tunnels Direct Bury 1 HPASE 1 UTILITIES No Impact Trees: No precautions required Trees whose optimum tree protection zone,
More informationTown of Fuquay-Varina
170 LANDSCAPING 170.01 GENERAL 170.01.01 Street trees shall be provided in accordance with the Land Development Ordinance for site plans and subdivisions 170.01.02 Street trees, landscape areas, landscape
More informationOffice of the Chief Medical Examiner Building. 1 Newhall Street, San Francisco, California
Office of the Chief Medical Examiner Building 1 Newhall Street, San Francisco, California OCME Agenda: Introductions Goals Property / Project Description Project Site Surrounding Context Existing Building
More informationSECTION FINE GRADING AND SOIL PREPARATION
SECTION 32 90 00 PART 1 GENERAL 1.01 SECTION INCLUDES A. Examination. B. Preparation. C. Subsoil Preparation. D. Placing Topsoil. E. Soil Tests. F. Coordination of Soil Amendments. G. Fine Grading. H.
More informationVSA SEWAGE PUMP. Capacities to 1600 gpm, Heads to 120, Horsepower range 3/4 thru 40, 3 thru 6 discharge, 1750 and 1150 operation.
Brochure# 228E 122011 TYPE VSA SEWAGE PUMP Capacities to 100 gpm, Heads to 120, Horsepower range 3/ thru 0, 3 thru discharge, 1750 and 1150 operation. HIGHLIGHTS Wet-Pit Installations Pumps Suspend From
More informationA. Section Includes: Labor, materials, necessary equipment and services to complete the tree relocation work.
SECTION 02910 TREE RELOCATION PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Labor, materials, necessary equipment and services to complete the tree relocation work. B. Related Section: 1. 02900 - Landscaping.
More informationExhibit A. Scope of Work
Exhibit A Scope of Work TURF / LAWNS Mowing Lawns shall be mowed weekly during growing season and as required during winter months. The height of mowing shall be maintained consistently to prevent scalping
More informationPLANTING SCHEDULE KEYNOTES Quant. Min. Planting Size* 212" cal. 7 gal. Hibiscus syriacus 'Helene' Hydrangea panculata 'Jane' or Rosa x Radsunny
PLANTING SCHEDULE KEYNOTES Quant. EXISTING ROCK DRAINAGE SWELL EXISTING ELECTRICAL TRANSFORMER LAVENDER TWIST REDBUD Cercis canadensis var. texensis 'Oklahoma' 2"" cal 4. PREPARE SITE FOR PLANTING BY GRUBBING
More informationCity of San Juan Capistrano PROJECT PRESENTATION NORTHWEST OPEN SPACE COMMUNITY PARK (CIP 09209) March 22, 2016 FOR THE PROJECT PRESENTATION
City of San Juan Capistrano PROJECT PRESENTATION PROJECT PRESENTATION FOR THE NORTHWEST OPEN SPACE COMMUNITY PARK (CIP 09209) PLANNING COMMISSION 1 PROCESS & OBJECTIVES A. Develop a new Concept Plan for
More informationSTANDARD SPECIFICATIONS Book 2 ENGINEERING DRAWINGS INCLUDES ADDENDUMS
STANDARD SPECIFICATIONS Book 2 ENGINEERING DRAWINGS INCLUDES ADDENDUMS July 23, 2018 Page 1 of 7 STANDARD LEGEND SYMBOLS (September, 1973)... AS-101A STANDARD LEGEND SYMBOLS (September, 1973)... AS-101B
More informationDesign Guidelines and Standards for Sight Triangles. Sight Triangle MANUAL
Design Guidelines and Standards for Sight Triangles Sight Triangle MANUAL Table of Contents 1.0 Introduction..............................................7 1.1 Key Terms..............................
More informationBylaw A Bylaw to amend Bylaw 12800, as amended, The Edmonton Zoning Bylaw Amendment No. 2239
Bylaw 17672 A Bylaw to amend Bylaw 12800, as amended, The Edmonton Zoning Bylaw Amendment No. 2239 WHEREAS City Council at its meeting of February 22, 2001, gave third reading to Bylaw 12800, as amended;
More informationMUTUAL OPERATIONS PHYSICAL PROPERTY. Landscape Mutual Twelve Only
1 Shareholder Garden. Shareholders may garden in the bordered common area in front of their units in compliance with this policy. The border itself is Mutual property and shareholders must be in possession
More informationSECOND LEVEL REAR TERRACE ENLARGEMENT SEE SHEET L.104 EXHAUST SHAFT STAIR C ELEV. SERVICE CORR. RESIDENTIAL STORAGE RESIDENTIAL/RETAIL LOADING DOCK
Xref CompositeBackground_KGD.dwg SPACES 99505 KISHIMOTO.GORDON.DALAYA PC expressly reserves its common law copyright and other Xref..\..\ FILES\XREF\VC_A_Section Marks.dwg SOUTH GEORGE MASON STREETSCAPE
More informationPer your request, we have reviewed the proposed land development application for this property and the Code requirements for landscape compliance.
LANDSCAPE REVIEW #1 MEMO TO: Tom Fountain, P.E. Richard Baron, AICP Upper Dublin Township FROM: Richard Collier, Jr., AICP, ASLA David Cavanaugh, RLA, ASLA LandConcepts Group DATE: March 17, 2017 Re: The
More informationENGINEERS AND SURVEYORS INSTITUTE A public/private partnership CITY OF ALEXANDRIA, VIRGINIA MINIMUM SUBMISSION REQUIREMENTS SITE PLAN
ENGINEERS AND SURVEYORS INSTITUTE A public/private partnership CITY OF ALEXANDRIA, VIRGINIA MINIMUM SUBMISSION REQUIREMENTS SITE PLAN PROJECT NAME: PROJECT ADDRESS: TAX MAP REFERENCES: ENGINEER: E-MAIL:
More informationSITE PREPARATION GRADING
17 SITE PREPARATION GRADING Objectives 1. Be able to describe and explain why grading is done in the landscape. 2. Be able to define and summarize how cutting and filling affect plant growth. 3. Be able
More informationCARVER COUNTY DIVISION OF PUBLIC WORKS LANDSCAPE POLICY. Adopted by the Carver County Board of Commissioners March 3, 2015
CARVER COUNTY DIVISION OF PUBLIC WORKS LANDSCAPE POLICY Adopted by the Carver County Board of Commissioners March 3, 2015 Policy Statement Goals It is the goal of Carver County Public Works to provide
More informationCITY OF LATHROP. Department of Public Works. DESIGN & CONSTRUCTION Standard Details
CITY OF LATHROP Department of Public Works DESIGN & CONSTRUCTION Standard Details January 2014 General G-1A Signature Blocks G-1B Signature Blocks G-2 Drafting Standards G-3 Drafting Standards G-4 Drafting
More informationSECTION LANDSCAPE
1 SECTION 02900 LANDSCAPE PART 1 GENERAL 1.1 Summary A. This section contains requirements relating to lawns, trees, shrubs, flowering plants and ground covers including site preparation, material installation
More informationUrban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT
NOT WELL 800 - Urban Stormwater Wetlands A constructed system of shallow pools that create growing conditions for wetland plants to lessen the impacts of stormwater quality and quantity in urban areas.
More informationSECTION 910 LANDSCAPING
SECTION 910 911.0 DESCRIPTION This section covers the furnishing of all labor, material, equipment, and performance of all work and services necessary or incidental to plant removal and installation as
More informationROME CANALWAY TRAIL ERIE BOULEVARD WEST AND SOUTH CHARLES STREET ROME, NEW YORK DELTA PROJECT NO SEPTEMBER 2017 ISSUED FOR BID
ROME CANALWAY TRAIL ERIE BOULEVARD WEST AND SOUTH CHARLES STREET ROME, NEW YORK 13440 DELTA PROJECT NO. 2017.226.001 SEPTEMBER 2017 ISSUED FOR BID INDEX OF DRAWINGS GENERAL CIVIL ARCHITECT/ENGINEER PROJECT
More informationTown of Essex Small Site Erosion Control Guide
Town of Essex Small Site Erosion Control Guide Why do we need to protect against erosion? Water Quality: Erosion and the transport of sediment and pollutants impacts the water quality of nearby streams
More informationCITY OF GILROY CONSOLIDATED LANDSCAPING POLICY
CITY OF GILROY CONSOLIDATED LANDSCAPING POLICY Adopted by the City Council January 19, 1988 And amended September 17, 1990, October 18, 1999 THE PURPOSE OF THIS LANDSCAPING POLICY IS TO PROVIDE A COMPREHENSIVE
More informationWithersRavenel WILDWOOD SUBDIVISION RECREATION SITE LANDSCAPE PLAN L1.0 PRELIMINARY. Engineers Planners Surveyors HOLLY SPRINGS, NC
WILDWOOD SUBDIVISION - PLANT SCHEDULE PLANT TYPE QTY KEY BOTANICAL NAME COMMON NAME ROOT CALIPER HEIGHT NOTES 3 ACB Acer buergerianum Trident Maple B&B 2 1/2" 12'-14' BUFFER TREE (2%) CANOPY TREES ORN.
More informationEXTERIOR IMPROVEMENTS PLANTING. .02 Lawns and Grasses. A. General. 1. Intent:
32 00 00 EXTERIOR IMPROVEMENTS 32 90 00 PLANTING.02 Lawns and Grasses A. General 1. Intent: a. The work in this section specifies the labor, materials, and installation methods necessary to establish the
More informationSAN LEANDRO TECHNOLOGY CAMPUS
40 South Market St #400 San Jose, CA 95113 Tel 408.294.8000 Fax 408.294.1747 SAN LEANDRO TECHNOLOGY PLANNED DEVELOPMENT SUBMISSION DECEMBER 10TH 2013 CONCEPT RENDERING DATA SHEET LIST Sheet Number Sheet
More information101 TILIA 102 PYRUS 103 PYRUS 104 PYRUS
WITH TREE PROTECTION FENCING, TYP. CONCRETE SIDEWALK SAW CUT CONCRETE CONCRETE PAVERS 101 TILIA 102 PYRUS 103 PYRUS 104 PYRUS 1 BETULA KEY TREE QTY BOTANICAL NAME 2 MAGNOLIA KOBUS STELLATA 'PINK STAR'
More informationAustin, Texas GENERAL LEGEND SYMBOL ABBREVIATIONS DESCRIPTION DETAIL REFERENCE MATERIAL OR FINISH REFERENCE SYMBOL SECTION CUT REFERENCE
CITY OF AUSTIN LANDSCAPE NOTES: 1. ALL PROPOSED LANDSCAPE AREAS WITHIN PROPERTY LINE TO RECEIVE 100% HEAD TO HEAD IRRIGATION COVERAGE. 2. ALL LANDSCAPE AREAS ADJACENT TO VEHICULAR USE SHALL BE PROTECTED
More informationNC State University Design and Construction Guidelines Division 32 Exterior Improvements Plants, Turf Grass, and Soil Preparation
1.0 Purpose These guidelines are for the use of all Campus landscaping. 2.0 General Requirements 1. Native trees and shrubs appropriate for this region are strongly preferred. The university has a do not
More informationGROUND LEVEL ENLARGEMENT / STREETSCAPE AT PIER AVENUE STRAND & PIER HOTEL HERMOSA BEACH HARDSCAPE MATERIAL KEY MAP PIER AVENUE
COMPOSITE LANDSCAPE LOT B ( MAX SPACES) WILSHIRE BLVD, SUITE 0 BEVERLY HILLS, CA 0 TH STREET WILSHIRE BLVD, SUITE 0 BEVERLY HILLS, CA 0 BRYANT STREET, SUITE 00 SAN FRANCISCO, CA 0 S. FIGUEROA ST. TH FLOOR
More informationUNIVERSITY OF ROCHESTER DESIGN STANDARDS OCTOBER 2006
SECTION 02900 - LANDSCAPING 1.1 SUMMARY A. Landscaping includes the layout, soil preparation, excavation for and planting of landscape materials, including trees, shrubs, ground covers, plants, and lawns,
More informationWATER QUALITY IMPACT ASSESSMENT (WQIA) FORM
WATER QUALITY IMPACT ASSESSMENT (WQIA) FORM Name: CCW Development Associates, L.L.C. Street Address: Telephone Number(s): 1209 Laskin Road, Virginia Beach, VA 23451 (757) 491-1996 Email: chris@vbhomesliving.com
More informationGYPSUM PARKWAY CORRIDOR ENHANCEMENT Gypsum, Colorado. Schematic Design January 2015
GYPSUM PARKWAY CORRIDOR ENHANCEMENT Gypsum, Colorado Schematic Design January 2015 1 2 3 4 5 6 7 8 9 DESIGN WORKSHOP Landscape Architecture Land Planning Urban Design Tourism Planning Asheville Aspen Austin
More information5.0 Storm Water Landscape Guidance Introduction
5.0 Storm Water Landscape Guidance Introduction Landscaping is a critical element to improve both the function and appearance of storm water management practices. Integrated storm water landscapes can
More informationSECTION RESIDENTIAL LANDSCAPING, STREETSCAPING, AND AMENITY STANDARDS
SECTION 3.5400 RESIDENTIAL LANDSCAPING, STREETSCAPING, AND AMENITY STANDARDS 3.5401 RESIDENTIAL LANDSCAPE STANDARDS a) These standards shall apply to any single family detached and duplex residential zoning
More informationTHE GUTHRIE TRACT 2 - PROGRESS SET
CONSTRUCTION DRAWINGS FOR: - PROGRESS SET Sitework/Planting/Irrigation VICINITY MAP A PROJECT BY INDEX OF SHEETS OWNER: ARGYLE RESIDENTIAL LANDSCAPE ARCHITECT: TBG Partners Reference CONTACT: John Burnham
More informationCalifornia Native Garden
California Native Garden See pricing, information, and more pictures of all plants featured in this video! Click on the name of the plant you want to view or click the View Plants > button. Shopping List
More informationOffice of the Chief Medical Examiner Building
Office of the Chief Medical Examiner Building 1 Newhall Street, San Francisco, California Department of Public Works Phase 1 & 2 (Schematic Design & Design Development) SFAC Civic Design Review Committee
More informationMaster Project List Report
Blue Hills Elementary School 01-8215 Site Utilities Replacement $52,835 01-8502 Modernization $3,135,933 01-8525 Exterior Painting $181,478 01-8552 Kindergarden Fencing $13,180 Install new backflow preventer.
More informationA. Site plan notes. Include the heading Site Plan Notes.
Community Development and Neighborhood Services Planning Services 281 North College Ave. P.O. Box 580 Fort Collins, CO 80522 970.221.6750 970.224.6134 - fax fcgov.com/developmentreview The following City
More informationWatering Guide. 1. Trees, Shrubs, Perennials, Annuals Sod Seed Pruning Plants Fertilizing Plants...
Watering Guide The following instructions provide general guidelines for maintaining and improving plant and lawn health, longevity and appearance. Properly watering all new plant material and transplanted
More informationL1.1 COPYRIGHT 2008 HKIT ARCHITECTS
CITY STANDARD STREET LIGHT, TYP. TRANSIT STOP BUILT-IN BUS SHELTER RAISED TER, TYP. COLOR AND FINISH TO MATCH BUILDING FACADE. FLOWERING ACCENT TREES IN RAISED STONE TER DECORATIVE SCORED VEHICULAR CONCRETE
More information