1 St. Elizabeths West Campus 106 Consulting Meeting Agenda Utility Infrastructure Tunnels Direct Bury 1

2 HPASE 1 UTILITIES No Impact Trees: No precautions required Trees whose optimum tree protection zone, as defined by Matheny and Clark (1998) in Trees and Development, is not intersected by the Phase I Utility LOD and require no care. Potential Special Consideration Trees: Take precautions to minimize or eliminate impact Trees whose optimum tree protection zone, as defined by Matheny and Clark, is intersected by the Phase I Utility LOD; These trees are not necessarily going to be negatively impacted, but precautions should be taken due to the historical, cultural, environmental and horticultural significance of the trees. Potential Transplant Trees: Impacted dtrees that tcan be saved dthrough htransplant t Trees whose assumed location directly conflicts with the utility LOD, cannot be avoided and identified as a good candidate for transplanting. Lost Trees: Impacted trees that t can t be saved Trees whose assumed location directly conflicts with the utility LOD, cannot be avoided and not identified as a good candidate for transplanting. *All proposed tree care/ actions are dependent on an accurate survey, the locations used for this study originated from the Bartlett survey 2 Phase 1 Utilities - TERMINOLOGY

3 Notes: 1. Effects to each Contributing Feature are described with in the Cultural Resource Impacts Exhibit. 2. Contributing Features are per the Draft CLR/LPMP. 3. No Contractor parking or vehicle access outside of designated construction zone 4. Eagle Habitat to be protected according to US Fish and Wildlife Service Regulations. 5. Phase 1B Adaptive Reuse Limit of Disturbance included F1 1 C16 3 S14 F12 S14 S26 C3 T13b T32 W3 C12 T7 S14 S26 F8 T13e 2 Proposed Laydown S14 C16 C14 Proposed Laydown S21 S14 S22 C14 T26 C14 C14 C28 V9 Construction Perimeter (LOD) C16 Proposed Trailer Location Bald Eagle Protection Zone T6 S9 S8 Historic Sweetgum C16 LEGEND T22 4 NOC C25 Phase A C16 Historic A2 cemetery 5 Construction Zone/ LOD Temporary Fence Woodlands Bald Eagle Protection Zone Tree Canopy Outline of Tunnel Below C12 Contributing Features T6 Site Boundary Existing Buildings Proposed Buildings-NIC Existing Roads Proposed Access Road - NIC NORTH 3 Construction Laydown, & Staging Areas Building 52 included in Phase 1b MOA Proposed Roads-NIC Proposed Laydown Area

4 4 Phase 1 Utilities TUNNEL OPTION TREE IMPACTS

5 5 Phase 1 Utilities DIRECT BURY OPTION

6 - + 6 Phase 1 Utilities COMPARATIVE ANALYSIS TUNNEL & DIRECT BURY LOD

7 TUNNEL PROS: PERMANENT ACCESS FOR MAINTENANCE AND REPLACEMENT OF UTILITIES UTILITIES ARE STACKED ALLOWS FLEXIBILITY FOR MULTIPLE CONTRACTORS TO SEQUENCE THE WORK TUNNEL CONS: HIGHER UPFRONT COSTS REQUIRES SANITARY AND STORM LINES TO BE SHALLOW REQUIRING PUMP SYSTEMS DOES NOT ALLOW FOR MODIFIED CONSTRUCTION METHODS TO PRESERVE TREES DIRECT BURY PROS: FLEXIBILITY IN CONSTRUCTION METHODS ALLOWING THE PRESERVATION OF VEGETATION DOES NOT REQUIRE SHEETING AND SHORING (COSTS) ALLOWS FOR SANITARY AND STORM LINES TO GO DEEPER ALLOWING FOR GRAVITY DRAINAGE SYSTEMS DIRECT BURY CONS: REPLACEMENT OF UTILITIES REQUIRES REPLACEMENT OF ABOVE GRADE FEATURES (ROADS, SIDEWALKS ETC.) VISUAL INSPECTION OF UTILITIES IS NOT POSSIBLE CONTRACTOR COORDINATION ALL TRADES AT THE SAME TIME 7 TYPICAL SECTION TUNNEL VS. DIRECT BURY: PROS AND CONS

8 Close Monitoring by GSA Horticulturist, Landscape Architect and Arborist Root and/ or Canopy Pruning by Arborist Supplemental Irrigation During Construction Period Hand Excavation/ Air Spade Root/ Soil Protection (woodchips, gravel, geotextile, metal plates) Protection Matting Directional Boring Retaining Walls Discontinuous Footings/Grade Beams 8 Phase 1 Utilities TREE/SITE PROTECTION MEASURES

9 Close Monitoring by GSA Horticulturist, Landscape Architect and Arborist Root and/ or Canopy Pruning by Arborist Supplemental Irrigation During Construction Period Hand Excavation/ Air Spade Root/ Soil Protection (woodchips, gravel, geotextile, metal plates) Protection Matting Directional Boring Retaining Walls Discontinuous Footings/Grade Beams 9 Phase 1 Utilities TREE/SITE PROTECTION MEASURES

10 10 PRECEDENT LOANTAKA BROOK PRESERVE PIPELINE PROJECT

11 St. Elizabeths West Campus 106 Consulting Meeting 11 End

University of Delaware

University of Delaware SECTION 01 56 18 _ Tree Protection University Contact: UD Assistant Director of Grounds: Office (302) 831 2797 UD Landscape Planner: Office (302) 831 1817 PART 1 GENERAL 1.1 SUMMARY Information in this

More information

Transportation Systems and Utility Infrastructure

Transportation Systems and Utility Infrastructure 77 Audience Local and regional units of government, Landowners and developers, Community and citizen organizations, and Transportation/utility planners and engineers. Overview Transportation systems and

More information

SECTION TREE AND PLANT PROTECTION

SECTION TREE AND PLANT PROTECTION SECTION 01 56 39 TREE AND PLANT PROTECTION PART 1 GENERAL 1.1 SUMMARY A. As a condition of project approval, all trees within the project limit including lay down or staging areas shall be inventoried

More information

A. Site plan notes. Include the heading Site Plan Notes.

A. Site plan notes. Include the heading Site Plan Notes. Community Development and Neighborhood Services Planning Services 281 North College Ave. P.O. Box 580 Fort Collins, CO 80522 970.221.6750 970.224.6134 - fax fcgov.com/developmentreview The following City

More information

PROTECTIVE MEASURES FOR TREES DURING CONSTRUCTION

PROTECTIVE MEASURES FOR TREES DURING CONSTRUCTION PROTECTIVE MEASURES FOR TREES DURING CONSTRUCTION NO CONSTRUCTION OR EXCAVATION IS TO OCCUR ON LOTS THAT REQUIRE TREE PRESERVATION UNTIL PROPER APPROVALS HAVE BEEN GIVEN BY A CITY ARBORIST 1. When trees

More information

2013 Annual Status Report St. Elizabeths Programmatic Agreement. January 29, 2014 Page 1 of 8. PA Ref. Line Begin End. Description Timeframe Category

2013 Annual Status Report St. Elizabeths Programmatic Agreement. January 29, 2014 Page 1 of 8. PA Ref. Line Begin End. Description Timeframe Category Page 1 of 8 60 64 Finalize deed conveyance per Exchange Recitals Completed. Agreement to Transfer Five Buildings and Related Land From DC to GSA 71 74 Finalize Occupancy Agreements Recitals Completed.

More information

LAND & GARDEN PROFESSIONALS

LAND & GARDEN PROFESSIONALS LAND & GARDEN PROFESSIONALS General Contracting Landscape Design & Site Planning Landscape Construction Land & Property Maintenance Food Production Farm Managers & Property Consultants Welcome to the Grow

More information

Project: Developer/Designer: Reviewer: I. Narrative: 1. Project Description: Describes the nature and purpose of the land disturbing activity.

Project: Developer/Designer: Reviewer: I. Narrative: 1. Project Description: Describes the nature and purpose of the land disturbing activity. City of Charlottesville, Virginia Erosion and Sediment Control Plan Review Checklist 610 East Market Street, Charlottesville, VA 22902 Telephone 434-970-3182; Fax 434-970-3359 Project: Developer/Designer:

More information

Plan Review Checklist

Plan Review Checklist Plan Review Checklist FOR EROSION AND SEDIMENT CONTROL PLANS _ Minimum Standards - All applicable Minimum Standards must be addressed. All minimum Standards must be adhered to during the entire project

More information

Case Study Bioretention Installation and Maintenance

Case Study Bioretention Installation and Maintenance Case Study Bioretention Installation and Maintenance Bioretention Crime Scene Investigation A reality TV series where you get to watch disturbing bioretention crimes and use advanced forensics to solve

More information

January 29, 2015 Page 1 of Annual Status Report St. Elizabeths Programmatic Agreement. PA Ref. Line Begin End. Description Timeframe Category

January 29, 2015 Page 1 of Annual Status Report St. Elizabeths Programmatic Agreement. PA Ref. Line Begin End. Description Timeframe Category 2014 Annual Report Page 1 of 7 60 64 Finalize deed conveyance per Exchange Not Specified Recitals Completed. Agreement to Transfer Five Buildings and Related Land From DC to GSA 71 74 Finalize Occupancy

More information

SITE PREPARATION GRADING

SITE PREPARATION GRADING 17 SITE PREPARATION GRADING Objectives 1. Be able to describe and explain why grading is done in the landscape. 2. Be able to define and summarize how cutting and filling affect plant growth. 3. Be able

More information

Key Topics. Bioretention Crime Scene Investigation The Bioretention Construction and Maintenance Sequence

Key Topics. Bioretention Crime Scene Investigation The Bioretention Construction and Maintenance Sequence Key Topics Bioretention Crime Scene Investigation The Bioretention Construction and Maintenance Sequence Bioretention Crime Scenes Investigation A 9 part reality TV series where you get to watch disturbing

More information

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT NOT WELL 800 - Urban Stormwater Wetlands A constructed system of shallow pools that create growing conditions for wetland plants to lessen the impacts of stormwater quality and quantity in urban areas.

More information

WMU Tree Care Plan and Policies

WMU Tree Care Plan and Policies WMU Tree Care Plan and Policies PURPOSE The purpose of the Western Michigan University Tree Care Plan and Policies is to define protocols and give guidance and direction as to the best practices for any

More information

E16: MAINTENANCE OF LANDSCAPED AREAS

E16: MAINTENANCE OF LANDSCAPED AREAS HIGH SPEED TWO INFORMATION PAPER E16: MAINTENANCE OF LANDSCAPED AREAS This paper outlines the proposed approach to the maintenance of landscaped areas created for HS2 Phase One. It will be of particular

More information

Update on the Bayfront Canal Bypass Project. Recommendation This an informational item only. No City Council action is required at this time.

Update on the Bayfront Canal Bypass Project. Recommendation This an informational item only. No City Council action is required at this time. AGENDA ITEM H-7 continued from 4/18 Public Works STAFF REPORT City Council Meeting Date: 4/18/2017 Staff Report Number: 17-081-CC Informational Item: Update on the Bayfront Canal Bypass Project Recommendation

More information

ADDENDUM TO BIOLOGICAL SCOPING SURVEY REPORT, BOTANICAL SURVEY AND WETLAND DELINEATION

ADDENDUM TO BIOLOGICAL SCOPING SURVEY REPORT, BOTANICAL SURVEY AND WETLAND DELINEATION ADDENDUM TO BIOLOGICAL SCOPING SURVEY REPORT, BOTANICAL SURVEY AND WETLAND DELINEATION FOR AVALON INN (APN 069-241-27 & -04) 1201 & 1211 NORTH MAIN STREET FORT BRAGG, CA MENDOCINO COUNTY prepared for:

More information

Milpitas College Extension Milpitas Dry Landscape

Milpitas College Extension Milpitas Dry Landscape SAN JOSÉ / EVERGREEN COMMUNITY COLLEGE DISTRICT Milpitas College Extension Milpitas Dry Landscape PROJECT MANUAL VOLUME II TABLE OF CONTENTS DIVISION 02 through 30 Not Used DIVISION 31 - EARTHWORK Document

More information

WILLIAM STREET STORM SEWER OUTFALL. PUBLIC INFORMATION CENTRE March 23, 2017

WILLIAM STREET STORM SEWER OUTFALL. PUBLIC INFORMATION CENTRE March 23, 2017 WILLIAM STREET STORM SEWER OUTFALL Municipal Class Environmental Assessment PUBLIC INFORMATION CENTRE March 23, 2017 ACCESSIBILITY Under the Accessibility Standards 2015 for Customer Service Regulation

More information

L1.00 REFER TO: L1.01 TREE PRESERVATION PLAN L2.01 LANDSCAPE PLAN REFER TO: L1.02 TREE PRESERVATION PLAN L2.02 LANDSCAPE PLAN MATCHLINE

L1.00 REFER TO: L1.01 TREE PRESERVATION PLAN L2.01 LANDSCAPE PLAN REFER TO: L1.02 TREE PRESERVATION PLAN L2.02 LANDSCAPE PLAN MATCHLINE 06/2/204 C 204 THIS DOCUMENT AND THE DESIGNS CONTAINED THEREIN REMAINS THE PROPERTY OF PROSS DESIGN GROUP, INC. AS AN INSTRUMENT OF PROFESSIONAL SERVICE. IT IS NOT TO BE USED IN WHOLE OR IN PART FOR ANY

More information

Green Infrastructure Recommendations For Parks and Public Spaces

Green Infrastructure Recommendations For Parks and Public Spaces Green Infrastructure Recommendations For Parks and Public Spaces Issued by the Jersey Water Works Green Infrastructure Committee And Prepared by Meliora Design This document recommends ways to integrate

More information

Methods, approaches, and procedures to minimize active agricultural land impacts during pipeline construction, surface restoration, and pipeline

Methods, approaches, and procedures to minimize active agricultural land impacts during pipeline construction, surface restoration, and pipeline Agricultural Impact Minimization Plan Methods, approaches, and procedures to minimize active agricultural land impacts during pipeline construction, surface restoration, and pipeline operation. PennEast

More information

Methods, approaches, and procedures to minimize active agricultural land impacts during pipeline construction, surface restoration, and pipeline

Methods, approaches, and procedures to minimize active agricultural land impacts during pipeline construction, surface restoration, and pipeline Agricultural Impact Minimization Plan Methods, approaches, and procedures to minimize active agricultural land impacts during pipeline construction, surface restoration, and pipeline operation. PennEast

More information

Highway 12 Sibley Avenue Reconstruction. Project Overview and Progress To Date Litchfield City Council April 17, 2017

Highway 12 Sibley Avenue Reconstruction. Project Overview and Progress To Date Litchfield City Council April 17, 2017 Highway 12 Sibley Avenue Reconstruction Project Overview and Progress To Date Litchfield City Council April 17, 2017 Agenda Item Topic 1) Project Purpose and Need 2) Key Recommendations from Study 3) Preliminary

More information

USF System Campus Master Plan Updates Goals, Objectives and Policies

USF System Campus Master Plan Updates Goals, Objectives and Policies 2015-2025 USF System Campus Master Plan Updates Goals, Objectives and Policies Tampa Goals, Objectives, and Policies Table of Contents Executive Summary 2015 2025 USF Campus Master Plan Update Introduction

More information

PLAN SUBMITTER'S CHECKLIST

PLAN SUBMITTER'S CHECKLIST Page 1 of 8 PLAN SUBMITTER'S CHECKLIST FOR EROSION AND SEDIMENT CONTROL PLANS Please fill in all blanks and reference the plan sheets/pages where the information may be found, where appropriate, or write

More information

REVIEW GUIDELINES FOR THE DONATION OF PUBLIC ART

REVIEW GUIDELINES FOR THE DONATION OF PUBLIC ART REVIEW GUIDELINES FOR THE DONATION OF PUBLIC ART OR MEMORIALS This document outlines the process for the review of proposed donations of public art or memorials to be sited in Vancouver parks. Many conditions

More information

Preliminary Sediment & Stormwater Management Plan Review Checklist DATE RECEIVED: PROJECT NUMBER: PROJECT NAME:

Preliminary Sediment & Stormwater Management Plan Review Checklist DATE RECEIVED: PROJECT NUMBER: PROJECT NAME: Preliminary Sediment & Stormwater Management Plan Review Checklist DATE RECEIVED: PROJECT NUMBER: PROJECT NAME: General Information: 1. Completed application signed by the owner, review fee, one set of

More information

PUBLIC HEARING. DRAFT Environmental Impact Statement. Matthews Memorial Baptist Church Washington, DC October 18, National Capital Region

PUBLIC HEARING. DRAFT Environmental Impact Statement. Matthews Memorial Baptist Church Washington, DC October 18, National Capital Region National Capital Region DRAFT Environmental Impact Statement PUBLIC HEARING Matthews Memorial Baptist Church Washington, DC October 18, 2007 Introduction Welcome and team introduction Hearing procedures

More information

Analyzing the Bioretention Construction Sequence

Analyzing the Bioretention Construction Sequence Analyzing the Bioretention Construction Sequence Avoiding future problems through careful installation procedures, construction inspection and first year maintenance 20 Steps to Better Bioretention Step

More information

PERMANENT SEEDING. Overview of Sedimentation and Erosion Control Practices. Practice no. 6.11

PERMANENT SEEDING. Overview of Sedimentation and Erosion Control Practices. Practice no. 6.11 Overview of Sedimentation and Erosion Control Practices Practice no. 6.11 PERMANENT SEEDING Permanent vegetation controls erosion by physically protecting a bare soil surface from raindrop impact, flowing

More information

Extension of Naugatuck Street Hartford, Connecticut

Extension of Naugatuck Street Hartford, Connecticut Extension of Naugatuck Street Hartford, Connecticut DEVELOPMENT TEAM LIST OF DRAWINGS Property Owner - Right of Way Construction Manager- Roadway Residential Developer Civil Engineer Landscape Architect

More information

LAND USE ASSESSMENT REPORT (LUAR) PROPOSED AFFORDABLE HOUSING COMPLEX MAIN ROAD PDE FILE NUMBER: REZ

LAND USE ASSESSMENT REPORT (LUAR) PROPOSED AFFORDABLE HOUSING COMPLEX MAIN ROAD PDE FILE NUMBER: REZ LAND USE ASSESSMENT REPORT (LUAR) PROPOSED AFFORDABLE HOUSING COMPLEX 560-564 MAIN ROAD PDE FILE NUMBER: REZ13-00008 PREPARED FOR P.O. BOX 908 ST. JOHN'S, NL CANADA A1B 4C4 PROPONENT BROOKSIDE DEVELOPMENTS

More information

CITY OF ALPHARETTA, GEORGIA LANDSCAPE STANDARDS INDEX

CITY OF ALPHARETTA, GEORGIA LANDSCAPE STANDARDS INDEX CITY OF ALPHARETTA, GEORGIA LANDSCAPE STANDARDS INDEX L-1 TREE PLANTING (TYPICAL SECTION) L-2 TREE ANCHORING - TYPE A (FOR TREES LARGER THAN 2 INCHES CALIPER) L-3 TREE ANCHORING - TYPE B (FOR TREES UP

More information

DIVISION 40 PUMP STATION SITE WORK AND LANDSCAPING

DIVISION 40 PUMP STATION SITE WORK AND LANDSCAPING DIVISION 40 PUMP STATION SITE WORK AND LANDSCAPING 40.01 SCOPE: The contractor shall furnish all labor, materials, equipment, and supplies; and shall perform all work necessary for the installation of

More information

Dear High Meadows Community,

Dear High Meadows Community, Dear High Meadows Community, We are excited that the work on our new animal care facility and parking area will be completed in short order, to the benefit of our children, animals, and animal caretakers.

More information

TABLE OF CONTENTS 1.0 INTRODUCTION DESIGN GUIDELINES 3

TABLE OF CONTENTS 1.0 INTRODUCTION DESIGN GUIDELINES 3 TABLE OF CONTENTS 1.0 INTRODUCTION 2 2.0 DESIGN GUIDELINES 3 2.1 Site Layout 4 2.2 Character and Context 5 2.3 Materials 6 2.4 Height, Mass, and Scale 7 2.5 Garages and Driveways 9 2.6 Site Grading 9 2.7

More information

4 January 11, 2012 Public Hearing APPLICANT:

4 January 11, 2012 Public Hearing APPLICANT: . 4 January 11, 2012 Public Hearing APPLICANT: MID-ATLANTIC AUTO PROPERTY OWNER: DZR, LLC STAFF PLANNER: Leslie Bonilla REQUEST: Conditional Use Permit (truck rental, automobile service, and automotive/bulk

More information

WASHINGTON COUNTY OREGON

WASHINGTON COUNTY OREGON WASHINGTON COUNTY OREGON LONG RANGE PLANNING DIVISION North Bethany Subarea Stream Corridors: Existing Regulations In Oregon, there is a distinct difference between the land use rules that apply in rural

More information

Lake Nokomis Shoreline Enhancement Project

Lake Nokomis Shoreline Enhancement Project Lake Nokomis Shoreline Enhancement Project Community Meeting 2 February 13, 2018 Agenda Current Problems Project Goals Project Status Existing Conditions Community Input Draft Schematic Design Long-term

More information

Chaska Oaks Preservation Plan September 29, 2017

Chaska Oaks Preservation Plan September 29, 2017 Prepared For: Trent Mayberry TOLD Development Company Kathy Anderson, AIA Architect Consortium, LLC Prepared By: Faith Appelquist ASCA Registered Consulting Arborist #495 ISA Board Certified Master Arborist

More information

Rezoning Petition Pre-Hearing Staff Analysis May 21, 2018

Rezoning Petition Pre-Hearing Staff Analysis May 21, 2018 Rezoning Petition 2018-018 Pre-Hearing Staff Analysis May 21, 2018 REQUEST Current Zoning: R-5 (single family residential), R-5 HD-O (single family residential, historic district overlay) and B-2(CD) HD-O

More information

BUFFERS, TREE PROTECTION AND LANDSCAPING. Sec Purpose and Intent.

BUFFERS, TREE PROTECTION AND LANDSCAPING. Sec Purpose and Intent. ARTICLE 20 BUFFERS, TREE PROTECTION AND LANDSCAPING Sec. 20.1. Purpose and Intent. Trees improve air and water quality, reduce soil erosion, reduce noise and glare, provide habitat for desirable wildlife,

More information

STREAM BUFFERS

STREAM BUFFERS 88-415 STREAM BUFFERS 88-415-01 PURPOSE In the Kansas City region and throughout the nation, vegetated stream buffers have been clearly shown to protect stream stability and related infrastructure, improve

More information

DIVISION 32 EXTERIOR IMPROVEMENTS LANDSCAPING TREES

DIVISION 32 EXTERIOR IMPROVEMENTS LANDSCAPING TREES PART 1 - GENERAL 1.01 SCOPE A. Work covered by this section includes all of the planning, compliance, design, installation, and warranty elements for new landscaping using trees. Contractor shall furnish

More information

Protecting Existing Landscape Trees from Construction Damage Due to Grade Changes

Protecting Existing Landscape Trees from Construction Damage Due to Grade Changes Protecting Existing Landscape Trees from Construction Damage Due to Grade Changes Douglas F. Welsh, Professor and Extension Horticulturist Everett E. Janne, Extension Landscape Horticulturist (deceased)

More information

A300 Specification writing guideline

A300 Specification writing guideline A300 writing guideline Clearly written specifications ensure that pruning objectives are communicated and understood. Pruning specifications must address individual plant, site, and client requirements.

More information

Homeowners Guide to Stormwater BMP Maintenance

Homeowners Guide to Stormwater BMP Maintenance Homeowners Guide to Stormwater BMP Maintenance What You Need to Know to Take Care of Your Property Rain Barrel Dry Well Rain Garden Pervious Asphalt Porous Pavers City of El Monte Stormwater BMP Management

More information

FACILITY STANDARDS (FS) 2 TABLE OF CONTENTS

FACILITY STANDARDS (FS) 2 TABLE OF CONTENTS FACILITY STANDARDS (FS) 2 TABLE OF CONTENTS FS 2 Orientation and Navigation Volume I- Introduction and Principles A. Overview 1. Guideline Compliance 2. Process B. Economic Impact Program 1. Economic Impact

More information

DRAWING LIST GENERAL NOTES

DRAWING LIST GENERAL NOTES OWNER CITY OF VANCOUVER Capital Maintenance - Real Estate and Facilities Management 507 West Broadway - Suite 30 Vancouver, BC, V5Z 0B4 CONSULTANT LANDSCAPE ARCHITECT Durante Kreuk Ltd. 0-637 West 5th

More information

Site design measures. Chapter. This Chapter explains how site design measures can reduce the size of your project s stormwater treatment measures.

Site design measures. Chapter. This Chapter explains how site design measures can reduce the size of your project s stormwater treatment measures. Chapter 4 Site Design Measures This Chapter explains how site design measures can reduce the size of your project s stormwater treatment measures. Site design measures for water quality protection are

More information

Shelbyville, KY Stormwater Best Management Practices. Section 2 EROSION PREVENTION AND SEDIMENT CONTROL PLAN

Shelbyville, KY Stormwater Best Management Practices. Section 2 EROSION PREVENTION AND SEDIMENT CONTROL PLAN Section 2 EROSION PREVENTION AND SEDIMENT CONTROL PLAN 2.1 Requirements The City of Shelbyville, KY will require an Erosion Prevention and Sediment Control (EPSC) Plan for most types of development construction.

More information

What is the EDPA? The EDPA has three objectives: 1. Protect biodiversity. 2. Mitigate damage during development. 3. Restore degraded ecosystems

What is the EDPA? The EDPA has three objectives: 1. Protect biodiversity. 2. Mitigate damage during development. 3. Restore degraded ecosystems What is the EDPA? Environmental Development Permit Areas are the best tool available to municipalities to protect ecosystems and habitat on private land. The EDPA has three objectives: 1. Protect biodiversity

More information

WELCOME NEIGHBORS! April 11, 2019

WELCOME NEIGHBORS! April 11, 2019 District of Columbia Water and Sewer Authority David L. Gadis, CEO and General Manager Clean Rivers Project Northeast Boundary Tunnel Tunnel Forum Meeting WELCOME NEIGHBORS! April 11, 2019 0 Welcome! 1

More information

Stormwater Management Plan Narrative Quality Fleet Services, Inc. SITE RE-DEVELOPMENT 548 New Ludlow Road South Hadley, MA The project proposed by Quality Fleet Services, Inc. consists of the site improvements

More information

Low Impact Development Site Design

Low Impact Development Site Design Chapter 4 Low Impact Development Site Design In this Chapter: How site design measures can reduce stormwater treatment measure size Tree preservation and planting Self-treating and self-retaining areas

More information

Using Garden Roof Systems to Achieve Sustainable Building Envelopes

Using Garden Roof Systems to Achieve Sustainable Building Envelopes Construction Technology Update No. 65 Using Garden Roof Systems to Achieve Sustainable Building Envelopes By K.Y. Liu and A. Baskaran There is increasing interest in the garden roof system as a sustainable

More information

The petition proposes to renovate two existing buildings in order to allow a mix of uses as permitted in MUDD (mixed use development).

The petition proposes to renovate two existing buildings in order to allow a mix of uses as permitted in MUDD (mixed use development). Rezoning Petition 2017-156 Pre-Hearing Staff Analysis December 18, 2017 REQUEST Current Zoning: I-2 (general industrial) Proposed Zoning: MUDD-O (mixed use development, optional) with five-year vested

More information

RAIN GARDEN ILLINOIS URBAN MANUAL PRACTICE STANDARD. (feet) CODE 897 DEFINITION

RAIN GARDEN ILLINOIS URBAN MANUAL PRACTICE STANDARD. (feet) CODE 897 DEFINITION ILLINOIS URBAN MANUAL PRACTICE STANDARD RAIN GARDEN (feet) CODE 897 Source: Kendall County Soil and Water Conservation District DEFINITION Rain gardens are small, shallow, flat bottomed depressions constructed

More information

SITE PLAN REVIEW ITEMS - REFERENCE CHECKLIST

SITE PLAN REVIEW ITEMS - REFERENCE CHECKLIST City of Seminole 9199 113 th Street N. Seminole, FL 33772 Ph: (727) 392-1966 Fx: (727) 319-6583 SITE PLAN REVIEW ITEMS - REFERENCE CHECKLIST Note: This checklist is designed to aid designers in the review

More information

University of Minnesota Duluth Stormwater Features on the UMD Campus

University of Minnesota Duluth Stormwater Features on the UMD Campus University of Minnesota Duluth Stormwater Features on the UMD Campus Erik Larson - Senior Engineer University of Minnesota Duluth Facilities Management Northland Innovative Stormwater Management Conference

More information

Suggestions. Energy Advisory Board Meeting 09/02/2010

Suggestions. Energy Advisory Board Meeting 09/02/2010 Reclamation Strategies and Suggestions Energy Advisory Board Meeting 09/02/2010 First thing first: Planning stage Scope of project»group wells/pads in same general area under one project»utilize existing

More information

APPROXIMATE LIMIT OF CITY LANDFILL LIMIT OF CONTRACTOR WORK ZONE. INSTALL CONSTRUCTION SNOW FENCE.

APPROXIMATE LIMIT OF CITY LANDFILL LIMIT OF CONTRACTOR WORK ZONE. INSTALL CONSTRUCTION SNOW FENCE. EX. 5Ø WM EX. 6Ø SAN EX. 4Ø STM EX. 5Ø SAN EX. 75Ø SAN APPROXIMATE LIMIT OF CITY LANDFILL ZONE. INSTALL CONSTRUCTION SNOW FENCE. STUB FOR FUTURE 6Ø WATERMAIN 4 6 8 ZONE. INSTALL CONSTRUCTION SNOW FENCE.

More information

The Planting of Trees and Shrubs

The Planting of Trees and Shrubs THE HIGHWAYS AGENCY THE SCOTTISH OFFICE DEVELOPMENT DEPARTMENT THE WELSH OFFICE Y SWYDDFA GYMREIG THE DEPARTMENT OF THE ENVIRONMENT FOR NORTHERN IRELAND The Planting of Trees and Shrubs Summary: This Advice

More information

Planting Landscape Trees Larry A. Sagers Extension Horticulture Specialist Utah State University Thanksgiving Point Office

Planting Landscape Trees Larry A. Sagers Extension Horticulture Specialist Utah State University Thanksgiving Point Office Trees and Shrubs Provide Beauty Wind protection Shade Wildlife habitat Visual Screening Topics of the Day Buying Trees Digging Holes Planting Trees Planting Landscape Trees Larry A. Sagers Extension Horticulture

More information

Rule D Wetland and Creek Buffers

Rule D Wetland and Creek Buffers Rule D Wetland and Creek Buffers 1 Policy It is the policy of the Board of Managers to ensure the preservation of the natural resources, recreational, habitat, water treatment and water storage functions

More information

North Metro Natural Gas Pipeline Project Routing Study. Exhibit I: Comment and Response Document

North Metro Natural Gas Pipeline Project Routing Study. Exhibit I: Comment and Response Document North Metro Natural Gas Pipeline Project Routing Study Exhibit I: Comment and Response Document North Metro Natural Gas Pipeline Project Routing Study This page intentionally left blank. North Metro Natural

More information

Section 3 Non-Structural BMPs

Section 3 Non-Structural BMPs 3.1 Stream Buffers A stream buffer or stream setback is a designated area around a stream, lake, or wetland left in a natural, densely vegetated state so as to protect the receiving water quality and provide

More information

City of Bonney Lake Allan Yorke Park. MASTER PLAN SUMMARY REPORT June 30, 2016

City of Bonney Lake Allan Yorke Park. MASTER PLAN SUMMARY REPORT June 30, 2016 City of Bonney Lake Allan Yorke Park MASTER PLAN SUMMARY REPORT June 30, 2016 TABLE OF CONTENTS INTRODUCTION PUBLIC INVOLVEMENT PROCESS MASTER PLAN North Park Central Park South Park East Park Field Development

More information

26/Old Dominion Task Force

26/Old Dominion Task Force 26/Old Dominion Task Force Meeting #9: March 21, 2019 Study Area Overview Staff Name, Department (DEPT ACRONYM) Preferred Scenarios Outline 1. Task Force Feedback from 3/7 2. Refined Concepts 3. Implementation

More information

Highway 15 Project - Hutchinson

Highway 15 Project - Hutchinson Highway 15 Project - Hutchinson Agenda What are we going to talk about today? Goals and benefits of the project Details about the proposed work Project schedule and costs Any questions you may have about

More information

SECTION 1 CLEARING /GRADING PERMIT APPLICATION:

SECTION 1 CLEARING /GRADING PERMIT APPLICATION: PLEASE REFER TO THE CLEARING & GRADING PERMIT CHECKLIST BELOW FOR SUBMITTAL REQUIREMENTS. SECTION 1 CLEARING /GRADING PERMIT APPLICATION: PROJECT ADDRESS (Street, Suite #): Parcel(s) #: Total Site Area

More information

CropHealth Advising & Research Kelowna, B.C.

CropHealth Advising & Research Kelowna, B.C. To CropHealth Advising & Research Kelowna, B.C. www.crophealth.com Date Thursday April 23, 2009 5 pages from Mario Lanthier The Up By Roots regional workshop was held on April 14 in Oregon City, near Portland.

More information

STAFF REPORT FOR STANDARD COASTAL DEVELOPMENT PERMIT #CDP FEBRUARY 26, 2015 CPA - 1 PO BOX 238 APTOS, CA 94001

STAFF REPORT FOR STANDARD COASTAL DEVELOPMENT PERMIT #CDP FEBRUARY 26, 2015 CPA - 1 PO BOX 238 APTOS, CA 94001 STAFF REPORT FOR STANDARD COASTAL DEVELOPMENT PERMIT #CDP 2014-0030 FEBRUARY 26, 2015 CPA - 1 OWNER/APPLICANT: AGENT: REQUEST: HANS HEIM PO BOX 238 APTOS, CA 94001 JAMES HAY PO BOX 762 MENDOCINO, CA 95460

More information

DESIGN CRITERIA PACKAGE

DESIGN CRITERIA PACKAGE RFQ: 17-C-00003 DESIGN-BUILD SERVICES FOR THE DESIGN CRITERIA PACKAGE PREPARED BY: JAMES E. JACKSON, JR. AIA CITY ARCHITECT CONTRACT ADMINISTRATION DEPARTMENT and INTERFLOW ENGINEERING, L.L.C DESIGN CRITERIA

More information

Rannoch 132 / 33 kv Substation Extension

Rannoch 132 / 33 kv Substation Extension Who we are Scottish and Southern Energy Power Distribution is part of the SSE plc group of companies. We own, maintain and invest in the networks in the north of Scotland the electricity transmission network

More information

St Elizabeths Master Plan

St Elizabeths Master Plan Department of Homeland Security Consolidated Headquarters at St. Elizabeths Washington, DC Presentation to CFA St Elizabeths Master Plan November 20, 2008 Preserving The Legacy / Realizing Potential 1

More information

Information for File # JTF

Information for File # JTF Information for File # 2013-04665-JTF Applicant Corps Contact Enbridge Energy, Limited Partnership Josh Fitzpatrick Address 1554 Highway 2, Suite 2, Two Harbors, MN 55616 E-Mail joshua.t.fitzpatrick@usace.army.mil

More information

Working Group Meeting

Working Group Meeting April 4,, 2017 Parks Operations Bldg Working Group Meeting Arts Districts Overview Stormwater/RPA/Stream Considerations First Principles Agenda 7:00pm 7:05pm 7:10pm 7:40pm 8:30pm 9:40pm 9:45pm Welcome

More information

RECEIVE AN UPDATE ON THE ALMOND GROVE PHASE II PROJECT

RECEIVE AN UPDATE ON THE ALMOND GROVE PHASE II PROJECT TOWN OF LOS GATOS COUNCIL AGENDA REPORT MEETING DATE: 12/20/2016 ITEM NO: 12 DATE: TO: FROM: SUBJECT: MAYOR AND TOWN COUNCIL LAUREL PREVETTI, TOWN MANAGER RECEIVE AN UPDATE ON THE ALMOND GROVE PHASE II

More information

Soil Erosion and Sediment Control

Soil Erosion and Sediment Control PDHonline Course C188 (3 PDH) Soil Erosion and Sediment Control Instructor: John Poullain, PE 2012 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA 22030-6658 Phone & Fax: 703-988-0088 www.pdhonline.org

More information

1: Excavation Permit Terms and Conditions

1: Excavation Permit Terms and Conditions 1: Excavation Permit Terms and Conditions IMPORTANT A. The holder of this Excavation Permit understands and agrees to be liable for and indemnify, defend and save harmless The City and all of its employees,

More information

Add Value DECORATIVE PONDS NATURAL PONDS REFLECTION PONDS KOI PONDS WATER GARDENS STREAMS WATERFALLS PONDLESS WATER FEATURES

Add Value DECORATIVE PONDS NATURAL PONDS REFLECTION PONDS KOI PONDS WATER GARDENS STREAMS WATERFALLS PONDLESS WATER FEATURES Add Value DECORATIVE PONDS NATURAL PONDS REFLECTION PONDS KOI PONDS WATER GARDENS STREAMS WATERFALLS PONDLESS WATER FEATURES IMAGINE YOUR HOME S POTENTIAL Today, more and more homeowners are looking at

More information

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance. The language provided in these specifications is meant to serve as a reminder and provide a generic example of the type of language that should be provided in final construction documents. This language

More information

SUPPORTING DOCUMENT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE

SUPPORTING DOCUMENT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE SUPPORTING DOCUMENT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE Please complete this narrative form and submit with your SWPPP drawings. Refer to Kitsap County Stormwater Design Manual Vol.

More information

CARVER COUNTY DIVISION OF PUBLIC WORKS LANDSCAPE POLICY. Adopted by the Carver County Board of Commissioners March 3, 2015

CARVER COUNTY DIVISION OF PUBLIC WORKS LANDSCAPE POLICY. Adopted by the Carver County Board of Commissioners March 3, 2015 CARVER COUNTY DIVISION OF PUBLIC WORKS LANDSCAPE POLICY Adopted by the Carver County Board of Commissioners March 3, 2015 Policy Statement Goals It is the goal of Carver County Public Works to provide

More information

Discussion: ELSI comments re Colwood Draft Official Community Plan

Discussion: ELSI comments re Colwood Draft Official Community Plan File: 0360-20 Esquimalt Lagoon Stewardship Initiative AGENDA Steering Committee Tuesday, December 12, 2017 2:30 4:30 p.m. Committee Room, Colwood Municipal Hall TIME ACTIVITY RESPONSIBILITY 2:30 Approval

More information

INFRASTRUCTURE EXISTING INFRASTRUCTURE A. Circulation B. Signals C. Drainage D. Utilities

INFRASTRUCTURE EXISTING INFRASTRUCTURE A. Circulation B. Signals C. Drainage D. Utilities 7.01. EXISTING INFRASTRUCTURE A. Circulation B. Signals C. Drainage D. Utilities 7.02. PROPOSED INFRASTRUCTURE A. Overall Concept B. Circulation C. Signals D. Drainage 7.03. INFRASTRUCTURE MAP A. Key Infrastructure

More information

ANDERSON RIVER PARK SIDE CHANNEL HABITAT RESTORATION PROJECT. Public Outreach Meeting June 5, 2017

ANDERSON RIVER PARK SIDE CHANNEL HABITAT RESTORATION PROJECT. Public Outreach Meeting June 5, 2017 ANDERSON RIVER PARK SIDE CHANNEL HABITAT RESTORATION PROJECT Public Outreach Meeting June 5, 2017 Welcome and Introductions Providing Feedback Anderson River Park is an important part of the community

More information

CGM Certification Brandon Martin

CGM Certification Brandon Martin CGM Certification Brandon Martin SITE INVENTORY Overall Map of Selected Area Responsibilities within Grounds Turf Trees Shrubs Ground Covers Flowers (3 Seasonal Change-outs, Tulips, Mums) Mulch Irrigation

More information

Station Street/Haig Road Extension Environmental Assessment (EA)Study. Welcome

Station Street/Haig Road Extension Environmental Assessment (EA)Study. Welcome Station Street/Haig Road Extension Environmental Assessment (EA)Study Welcome Welcome to this Public Information Centre (PIC) meeting. Please record your attendance and obtain a comment sheet at the registration

More information

MARBLE RIVER WIND POWER PROJECT Agricultural Protection Measures

MARBLE RIVER WIND POWER PROJECT Agricultural Protection Measures MARBLE RIVER WIND POWER PROJECT Siting Considerations 1. Locate access roads and, to the extent allowed by local laws, wetlands and topography, individual wind turbines and other structures along field

More information

30% DRAFT GAINSBORO PARK IMPROVEMENT PROJECT THE CITY OF PLEASANT RIDGE CITY OF PLEASANT RIDGE, OAKLAND COUNTY, MICHIGAN

30% DRAFT GAINSBORO PARK IMPROVEMENT PROJECT THE CITY OF PLEASANT RIDGE CITY OF PLEASANT RIDGE, OAKLAND COUNTY, MICHIGAN LEGAL PROPERTY DESCRIPTION SEE NOTES SHEET FOR LEGAL PROPERTY DESCRIPTIONS THE CITY OF PLEASANT RIDGE GAINSBORO PARK IMPROVEMENT PROJECT CITY OF PLEASANT RIDGE, OAKLAND COUNTY, MICHIGAN 4444 Second Avenue

More information

City of Grande Prairie Development Services Department

City of Grande Prairie Development Services Department City of Grande Prairie Development Services Department ROYAL OAKS NORTH OUTLINE PLAN OP-07-03 NW 35-71-6 W6M May 7, 2007 Royal Oaks North Outline Plan TABLE OF CONTENTS 1.0 INTRODUCTION........ 3 1.1 Purpose

More information

14 HIGHWAY PLANTING AND IRRIGATION

14 HIGHWAY PLANTING AND IRRIGATION 14 HIGHWAY PLANTING AND IRRIGATION 14.1 General The Design-Builder shall conduct all Work necessary to meet the requirements for highway planting and irrigation, including erosion control, weed control,

More information

Department of Agriculture. Conservation Service. United States. Natural Resources REVISED 8/26/16

Department of Agriculture. Conservation Service. United States. Natural Resources REVISED 8/26/16 GENERAL NOTES: SYMBOL LEGEND 1. All work shall comply with the constriction specifications, drawings, project-specific quality assurance plan and other contract requirements. 2. All notes on the drawings

More information

Plat Requirements CHECKLIST FOR SITE PLAN REVIEW

Plat Requirements CHECKLIST FOR SITE PLAN REVIEW This checklist is to be used as a guide for complying with the Town of Hollis Site Plan Regulations. It is to be used for each individual site plan review application submitted. Applicants are encouraged

More information

DC Clean Rivers Project - Green Infrastructure Program. ACEC What s New at DC Water?

DC Clean Rivers Project - Green Infrastructure Program. ACEC What s New at DC Water? District of Columbia Water and Sewer Authority George S. Hawkins, General Manager Briefing on: DC Clean Rivers Project - Green Infrastructure Program Briefing for: ACEC What s New at DC Water? April 7,

More information

Thorncrest Village Neighbourhood Improvements Public Drop-In Event

Thorncrest Village Neighbourhood Improvements Public Drop-In Event Thorncrest Village Neighbourhood Improvements 2018-2020 Public Drop-In Event Thorncrest Village Clubhouse February 27 th 2018 Drop-In From 3:30 5:00 or 7:00 9:00 0 1 Purpose of the Drop-In Event The purpose

More information