1 PROJECT CELL C HEAD OFFICE Waterfall Park, Midrand DEVELOPERS Atterbury Property Holdings ARCHITECTS Bentel Associates International ARCHITECTS - WAREHOUSE Empowered Spaces QUANTITY SURVEYORS NWS Quantity Surveyors STRUCTURAL ENGINEERS L&S Consulting ELECTRICAL ENGINEERS Eksteen & Le Roux Consulting Electrical Engineers MECHANICAL ENGINEERS WSP Group (Mechanical) FIRE CONSULTANTS Specialised Fire Technology LANDSCAPE ARCHITECTS Insite Landscape Architects ENVIRONMENTAL CONSULTANTS Seaton Thomson & Associates MAIN CONTRACTOR Group 5 Cell C Head Office Cell C Head Office makes a highly visible statement and cements the company as a major mobile phone operator in South Africa PHOTOGRAPHY BY PHILIP MOSTERT PHOTOGRAPHY, INSITE LANDSCAPING, ATTERBURY (AERIALS) The brief was to consolidate Cell C s various operations into one cohesive and welldesigned campus, taking into account the excellent visibility, access and natural amenities that were inherent to the site. ARCHITECT S REPORT In designing the main office campus, the Architects, Bentel Associates International, made use of the natural slope on the site to create a platform that protrudes from the natural ground level. This places the building on a podium, giving it maximum exposure to the adjoining highway. The site was identified not only for its location, which is easily accessible to major highways and Gauteng s main business district, but for the natural wetland in the area. The wetland would be restored and incorporated as part of the Campus grounds. Cell C s new home in Midrand comprises 46,000m 2 of under cover space with 14,000m 2 planned for future development. 18 Cell C Head Office
2 Cell C Head Office 19
3 The brief was to consolidate Cell C s various operations into one cohesive and welldesigned campus taking into account the excellent visibility, access and natural amenities that were inherent to the site The campus includes 24,000m 2 of office space as well as a national network operations centre (NOC) data centre, customer walk in centre, call centre and Cell C retail shop. A distribution warehouse is also located on the campus. The contemporary design includes simple and bold elements, incorporating a play on texture with natural stone walls and glass façades, thus making maximum use of light and view. All elements were designed to be very sympathetic to the natural softness of the surrounding environment and landscape. The building s perimeter walling systems were constructed from a lightweight steel mesh which was installed without the use of bricks and mortar, and in less time than conventional methods. The officescape is understated and calming, with some lively punches of colour. The use of natural timber and timber look floor vinyl successfully mingle with the sophistication of the balance of finishes. An impressive four storey, 3 dimensional dark charcoal wall cladding and large scale pendant lights that illuminate the foyer space are dominant elements. The interiors draw inspiration from the site and landscaping, with shafts of natural 20 Cell C Head Office
4 The campus includes 24,000m 2 of office space as well as a national network operations centre (NOC) data centre, customer walk in centre, call centre and Cell C retail shop. A distribution warehouse is also located in the campus. light present at all faces thanks to three triple volume, glazed atriums within the building. Panoramic views of the landscaping from all offices and open plan workspaces unite the exterior with the interior, further enhancing the relaxed and productive atmosphere of the building. Cell C customers will be welcomed into the new walk-in centre. Alongside this, customers can drop into the light, fresh and contemporary coffee shop which overlooks the grasslands and enjoy a break with the feel of a surrounding Highveld countryside. Primarily for staff, but also available for customers, there is a restaurant with world class elements. Patrons can either sit in a relaxed contemporary interior, or go outside to the landscaped atriums surrounding the ground floor space. Added to this, there is a clinic located on the ground floor which is fully equipped, with ER trained personal in attendance. Completion took place in December 2013 and all the Cell C business units have moved in and settled into their new castle on the hill. It appeared to just grow out the ground overnight. were the comments received. As SITE PLAN 1 - Main Campus 2 - Warehouse 3 - Service Centre Cell C Head Office 21
5 22 Cell C Head Office
6 An impressive four storey, 3 dimensional dark charcoal wall cladding and large scale pendant lights that illuminate the foyer space are dominant elements the construction was planned on a fast track program, the complete professional team, contractors and suppliers all worked very hard and diligently together to pull this huge feat off within the time allocated within budget and to specification. Cell C presented a co-operative platform of their own skilled technical team, supporting the process along the way. All this made the project a very integrated seamless operation amid all the various players. ELECTRICAL ENGINEER S REPORT Although the building was not aiming to achieve Green Building Status, the brief to Eksteen & Le Roux Consulting Electrical Engineers was to use energy efficient lighting sources in the entire exterior parking areas and roadways, pedestrian walkways and interior common areas such as passages and toilets. To achieve this, extensive use was made of LED light sources. Special luminaires were designed for this purpose to accommodate the LED light sources and blend in with the design of the buildings. Approximately 1500 Low Brightness fluorescent lights and 800 LED down-lighters were used in the office block alone. Chilled water is distributed throughout the building via chilled water risers located within the air handling unit (AHU) plant rooms on each level. The fresh air is introduced into each mechanical plant-room by means of external weather louvres or ducted fresh air systems. Heating is by means of electric resistance type elements located in either the air handling units in the mechanical plant-rooms, within the fan coil units or terminal diffuser reheats. MECHANICAL ENGINEER S REPORT HVAC - OFFICE BUILDING The air conditioning for the office component of the development is by means of a series of air cooled chillers located on the rooftop plant area, generating the required chilled water. The chilled water is distributed to the terminal air handling units via of thermally insulated steel piping. Cell C Head Office 23
7 Panoramic views of the landscaping from all offices and open plan workspaces unite the exterior with the interior Toilet extraction is achieved by mechanical axial fans located in the rooftop plant area and sheet metal ducting from each toilet core. The relative humidity is not positively controlled but would be indirectly controlled within the comfort range as a result of the design and selection of the cooling plant. Chilled Water Generation & Distribution The series of air cooled chillers generate the required chilled water. The chillers utilise environmentally friendly refrigerants. The chilled water is distributed to the terminal air handling units by mechanical pumps and thermally insulated steel piping. The pump arrangement is duty-standby to ensure continuous operation during system maintenance. When required, the chilled water is distributed horizontally through the co-ordinated ceiling void to in ceiling mounted fan coil units serving dedicated spaces (cellular offices, boardrooms). Conditioned Air Distribution: Open Plan Spaces The open plan office space is conditioned by means of floor standing variable air volume (VAV) AHU s located in various mechanical plant rooms, located on each floor. The open plan areas are zoned, as necessary, to ensure optimal thermal comfort for the occupants. Conditioned air is supplied to the space by means of externally insulated sheet metal ducting and ceiling mounted diffusers (constant and variable volume type as required). Air is returned to the units via ceiling mounted ceiling curved blade return air grilles. The outdoor air (fresh air) is delivered to the space via external weather louvres located on the façade of the building within the mechanical plant room. Heating in winter will be by means of electric resistance elements located in the AHU s, FCU s and at the terminal diffusers as required. The AHU s maintain the desired internal conditions automatically. Conditioned Air Distribution: Cellular Offices and Boardrooms The cellular offices and boardrooms are conditioned by means of dedicated FCU s allowing full individual control to these spaces. These areas have been identified as requiring dedicated units due to their unique heat load profiles; this ensures optimal thermal comfort for the occupants within these areas. The outdoor air (fresh air) is delivered to each unit by means of uninsulated sheet metal 24 Cell C Head Office
8 Cell C Head Office 25
9 Cell C s new home in Midrand comprises of 46,000m 2 of under cover space with 14,000m 2 planned for future development ducting, mechanical fans and attenuators. The outdoor air supply equipment is located either within the nearest mechanical plant room on floor or within the ceiling void of the space. Toilet & Basement Ventilation The toilets are mechanically ventilated by means of ceiling mounted extract disc valves, uninsulated sheet metal ducting and axial fans located in the rooftop open air plant area. The basements are naturally ventilated with adequate openings, available and suitable. Stairwell & Lift Shaft Pressurization The escape stairs are pressurized in accordance with EN HVAC - CUSTOMER CARE & REPAIR CENTRE Air Conditioned Spaces These areas are served by a separate plant, comprising packaged, air cooled air conditioning units, situated in open plant areas. Conditioned air from each unit is supplied by means of externally insulated sheet metal ducting and distributed to the space through constant volume ceiling type diffusers. Re-circulated air is returned through grilles positioned at the rear of the space and shall be ducted back to the plant area. The required quantity of fresh air is introduced through louvres mounted on the sides of the return air ducts before they connect to the units. Heating in Winter is provided by means of electric resistance type heaters mounted in the units. The plants are automatically controlled to provide the required temperature conditions in Summer and Winter and shall be switched on and off automatically at the plant control. Toilet Ventilation The toilets are proposed to be mechanically ventilated by means of ceiling mounted extract disc valves, uninsulated sheet metal ducting and axial fans located in the rooftop open air plant area. Basement Ventilation The basements are mechanically ventilated by means of fans located in agreed positions extracting to atmosphere. These fans are dual purpose, providing everyday ventilation and smoke extract in fire conditions. They are operated by variable speed drives and carbon monoxide sensors, located throughout the basement. 26 Cell C Head Office
10 LANDSCAPE ARCHITECT S REPORT Cell C Campus design realm was split into three diverse legs, namely the inside site boundary landscape, the outside site boundary landscape and the wetland area. For Insite Landscaping Architects, each site had their own design challenges resulting in unique solutions, but still honouring a central design fabric that binds them together to form a collective unit. The Cell C brand was given centre stage in the landscape design. Elements like the custom designed furniture, innovative tree grids and planting patterns were extruded from the Cell C logo and interpreted into functioning Landscape Architecture. Sidewalk Area The landscape outside the site boundary compliments the rest of the design as well as creating a visually striking contrast with the manicured lawn areas. This contrast is further highlighted by being offset against the backdrop of natural grassy woodland. The soil shaping played an important role to assist drainage away from inside the site to the intended natural lawn swale along the roadway. Clusters of natural woodland were created with openings acting as preview windows to the Campus, and once fully grown this would also limit roadway noise in the Campus area. Another aim of the sidewalk area was to create low cost installation that will mature over time whilst keeping long term maintenance costs in mind. Main Campus The landscape area inside site boundary is functional, interesting, and innovative. Here the branding of Cell C becomes strongly evident in the design of the landscape furniture, where bollards were in the form of an extruded C, benches had a C profile, round planters were custom designed with a timber seating inlay to resemble a C. To include Cell C s black colour palette, some of these elements were designed to have a fusion of materials; for instance, the bollards and bins were custom concrete features combined with black steel to form striking elements. The overall landscape design was used to unify the three loose standing buildings as a singular campus. The main landscape intervention was to link the buildings with a striking central boulevard from north to south. Focus was placed on this boulevard by THIS SPREAD: Cell C Walk-in Centre Cell C Head Office 27
11 The Cell C brand was given centre stage in the landscape design. Elements like the custom designed furniture, innovative tree grids and planting patterns were extruded from the Cell C logo and interpreted into functioning Landscape Architecture. planting four rows of London plane trees along the edges. The central connector was further emphasized by projecting the pedestrian paving pattern across the roadways cutting through the boulevard. A great level difference across the site resulted in different podiums being created for each building. This allowed for innovative landscape solutions to render a serene, connected picture. At the entrance to the campus, neatly packed gabion structures were used to offset the big level difference on either side of the entrance road, and this created space to plant trees and shrubs next to the entrance to soften the retaining structures. All the retaining walls were planted with creeping groundcovers to green the walls. On request from the CEO of Cell C, Mr Alan Knot Graig, an impressive rose garden design was incorporated along the internal roads in the campus, to give explosive colour and fragrance. Apart from the London Plane trees and the Roses, most plant species that were used are indigenous and water wise. Courtyard Included in the Main Campus Office Building are three central courtyards. These courtyards provide ample break-away spaces for office workers during lunch hour. The courtyards were designed as striking patterned environments that are both visual and functional. Again, branding was a strong focus on the design of these courtyards, the custom concrete coping was done in two colours to allow a C shape to be seen on each of the circle planters from the offices above. Wetland The wetland landscaping serves the purpose of allowing people to enjoy the natural surroundings next to the campus development. Due to the fact that it is a pre-existing wetland area, the design and execution were governed by strict regulations regarding interventions and use of material. A permeable paving walkway meanders through the natural veldt area with benches along the way to give the opportunity to enjoy nature. The walkway leads to custom designed bridges as stream crossings, which had to be manufactured off-site and only assembled on-site to limit the impact of construction on the 28 Cell C Head Office
12 ADVERTISERS ON THIS PROJECT: Alania Building Systems High-performance façade cladding and related building systems Bentel Associates International Architects Eksteen & Le Roux Consulting Electrical Engineers Geustyn & Horak Glass & Aluminium Specialists Insite Landscape Architects Landscape Architects L & S Consulting Consulting Structural & Civil Engineers Norval Wentzel Steinberg Quantity Surveyors Ohlhorst & Partners Lightweight Building Solutions, Tiling and Plastering Contractor Specialised Fire Technology Fire Consultants WSP Group Africa Consulting Multi-Disciplinary Engineers natural area. Indigenous trees were planted in clusters to eventually create a green woodland backdrop to the campus and to integrate the campus placement on site. Focus was placed on the type of plant species to have an intermediate area between the wetland area and the campus landscape, thus allowing a natural flow from natural to sculptural. Exotic invader eradication is an ongoing exercise to leave the wetland in a better state than it was before. Conclusion Overall planting design was focused on the ability to create a visually striking landscape that functions really well with all requirements. Plant species were chosen not only for visual appeal but also for ease of maintenance and serving a specific purpose; for example the creeping groundcovers to green the retaining structures. The landscape installation happened in the midst of construction, thus allowing plants to have grown substantially by the time the campus was completed. By using interesting materials, functional planting design and innovative custom design elements, Insite Landscape Architects were able to successfully unify these three different areas into one successful landscape for Cell C Campus. Cell C Head Office 29
AIRPORT BUSINESS PARK
PIER MAC PETROLEUM INSTALLATION LTD. AIRPORT BUSINESS PARK DEVELOPMENT APPLICATIONS March 2003 4.1 Airport Business Park Development Permit Area 4.1.1 Justification/Design Concept The design concept envisioned
More informationPlatinum Square. Platinum Square is a contemporary retail centre located in Rustenburg, North West PROJECT
PROJECT Platinum Square The 32,000m 2 contemporary retail centre is designed in a contemporary style with warm and neutral colours, accentuated by splashes of colour on vertical fin elements PLATINUM SQUARE
More information36 TFG Design Centre. In keeping with the spirit of TFG s (The Foschini Group) vision of becoming a leading clothing PROJECT
PROJECT TFG Design Centre The modern box office space is set out on a simple grid to enable efficient parking in the semi-basement and offer well-lit open plan office space on three floors above THE FOSCHINI
More informationBROWNFIELD REGENERATION LONDON
P A V I N G CASE STUDY October 2015 Edition 2 Uniclass 572/1677 Public realm regeneration Iconic conservation area Shared surfaces Designing in detail BROWNFIELD REGENERATION www.paving.org.uk Introduction
More informationELK GROVE TOWN CENTER DESIGN GUIDELINES
......... ELK GROVE TOWN CENTER DESIGN GUIDELINES LAGUNA RIDGE SPECIFIC PLAN... June 2008 ............ DESIGN GUIDELINES Table of Contents Contents Section A: Town Center Overview...1 A.1. Purpose and
More information/05 Architectural Response
/05 Architectural Response 5.1 Inspiration Stacked Boxes (Artist : Rachael Whiteread) Cubism ( Architect : Le Corbusier) 52 1133 Melville Rezoning Submission Patterns ( Textile Artist : Annie Albers) Overlapping
More informationSchematic Design Presentation December 15, 2006 David Smith
Schematic Design Presentation December 15, 2006 David Smith Overview Located in Lancaster, PA 65,000 square feet 4 stories, 3 above grade Architect of record is Philip Johnson-Alan Ritchie Architects Ground
More informationCentury Park to Ellerslie Road Preliminary Engineering
Century Park to Ellerslie Road Preliminary Engineering South LRT Extension Stakeholder Information Panel Brochure March 2010 www.edmonton.ca/lrtprojects LRT Station (left) and Transit Centre Architectural
More information4. MASTERPLAN FRAMEWORK
6a 6b 4. MASTERPLAN FRAMEWORK 6. Car Parks 6c Car Parks 6a and 6b will provide permanent parking. Area 6a will serve the foodstore with tarmac surfacing within a defined area to the west of the adjacent
More informationCorridor Identity. Section 9. Introduction. Corridor Guiding Principles
Corridor Identity An attractive and healthy community is a critical element of a quality place, and the design of quality places is a balance between environmental, economic, and social considerations.
More informationUniversity of California, San Diego Cal IT 2 Brian Smith. Schematic Design Presentation 06 December 2005
University of California, San Diego Cal IT 2 Brian Smith Schematic Design Presentation 06 December 2005 Building Overview Location: University of California, San Diego Size: 220,000 s.f. Architect: NBBJ
More informationWINDSOR GLEN DESIGN GUIDELINES
WINDSOR GLEN DESIGN GUIDELINES Adopted by Council, 2006 WINDSOR GLEN REDEVELOPMENT DESIGN GUIDELINES August 2006 1.0 Master Plan Organization For this area of the Coquitlam Town Centre, a mix of high,
More informationWest pedestrian entry to Car Park One with view of interior atrium. West elevation detail of elevator and stair of Car Park One.
Client: Chesapeake Energy Corporation Completion: July 2011 Scope: 383,250 sf -5 levels with 170 cars per level Cost: Withheld at Owner s Request Awards: Architizer A+ Awards Finalist; AIA, Central Oklahoma,
More informationGUIDELINES REPLACEMENT HOUSING GUIDELINES LOCATION INTRODUCTION URBAN DESIGN GUIDELINES
Replacement housing in the former City of North York will be consistent with the following urban design guidelines. They provide a framework for residential re-development in the former City of North York
More informationBuilding and Site Design Standards
Commercial Design Standards All Business and Industrial Uses as Described in Section 2234 Requiring Special Permit Review Except Large-Scale Ground Mounted Solar Photovoltaic Installations and Wireless
More information(DC1) Direct Development Control Provision DC1 Area 4
. General Purpose (DC) Direct Development Control Provision DC Area 4 The purpose of this Provision is to provide for an area of commercial office employment and residential development in support of the
More informationVivid Architects were appointed by Rabie Property Group as the lead Urban Designers
PROJECT NO 1 AND 3 BRIDGEWAY Century City PROPERTY DEVELOPERS & PROJECT MANAGERS Rabie Property Group ARCHITECTS & PRINCIPAL AGENTS Vivid Architects QUANTITY SURVEYORS B&L Quantity Surveyors CIVIL & STRUCTURAL
More informationPLANNING STATEMENT. Market House Market Place Kingston upon Thames KT1 1JS
PLANNING STATEMENT To support planning and listed building consent applications for change of use from Class A1 shop and Class A3 cafe to Class A3 restaurant at: Market House Market Place Kingston upon
More information38 Alice Lane. This building was designed to form an important piece of an urban puzzle. The building PHASE ONE PROJECT
PROJECT ALICE LANE PHASE ONE Sandton OWNERS Standard Bank, Pivotal Fund & the Alice Lane Trust DEVELOPERS & PROJECT MANAGERS Abland ARCHITECTS Paragon Architects QUANTITY SURVEYORS Quanticost CONSULTING
More information13. New Construction. Context & Character
13. New Construction Context & Character While historic districts convey a sense of time and place which is retained through the preservation of historic buildings and relationships, these areas continue
More informationD. Landscape Design. 1. Coverage Intent: To provide adequate landscaping materials that enhance the appearance of development projects.
D. Landscape Design The standards and guidelines in this section give design guidance for the landscaping components of industrial and office projects. City regulations require that all landscaping be
More informationlight guide How to illuminate car showrooms
light guide How to illuminate car showrooms Illuminating the brand Today people have great awareness and knowledge about the different car brands on the market. They identify with the car they drive and
More information10 Proposed Redevelopment, Tewkesbury Road, Cheltenham SCHEME EVOLUTION STARBUCKS
SCHEME EVOLUTION STARBUCKS The proposed Starbucks Drive Thru alongside the proposed food store provides an appropriate mix of uses, suitable for this location. The proposed store is bespoke, designed specifically
More informationLandscape and Streetscape Design 2.5
Landscape and Streetscape Design 2.5 2.5.1 Goals 2.5.2 Planting 2.5.3 Sidewalks and Pavement 2.5.4 Furnishings 2.5.5 Walls 2.5.6 Lighting 2.5.7 Stormwater 2.5.8 Street Cross Sections 2.5 LANDSCAPE AND
More informationdesign & access statement Proposed Erection of 68 Bedroom Hotel and Restaurant with Associated Landscaping
Proposed Erection of 68 Bedroom Hotel and Restaurant with Associated Landscaping Promenade, design & access statement lawrencemcphersonassociates 6 new road, ayr, ka8 8ex On Behalf of July 2015 CONTENTS
More informationCommunity Design Plan
Gardena General Plan 2006 Authority While the is not a required element of a General Plan, it is included because improving the community appearance and image is paramount to the overall quality of life
More informationSMG Rocks. The MINI brand has, over the years, been associated with a fresh, young, vibrant and PROJECT
PROJECT SMG Rocks The key design feature of the project was the MINI brand s retro, funky and fun attitude, which can be experienced in all MINI cars SMG Rocks Umhlanga Client SMG Rocks Architects Reynolds
More informationPlanning Board Hearing October 20th, 2016
Planning Board Hearing October 0th, 06 Developer: Real Estate Management & Leasing: Architect: Transportation Engineers: Landscape Architect: Civil Engineer: THE ARSENAL PROJECT Planning Board AGENDA Introduction
More informationsplit level SUCCESS SAHOMES
split level SUCCESS After three years of planning, the dilapidated house on this inner-city block was demolished to make way for a striking two-storey testament to stylish contemporary living. 138 139
More informationNew-Cast Mixed-use Development Proposal King Street West, Newcastle, Ontario
URBAN DESIGN BRIEF New-Cast Mixed-use Development Proposal King Street West, Newcastle, Ontario TABLE OF CONTENTS: 1.0 Executive Summary 2.0 Creating Vibrant and Sustainable Urban Places: Excerpts from
More informationDesign Guidelines General Criteria
Design Guidelines General Criteria Architectural details should be restored or replaced. Repainting & general repair is usually required. The overall design of the façade should be fully integrated, with
More informationAPPENDIX MATAKANA COMMERCIAL URBAN DESIGN GUIDELINES
APPENDIX MATAKANA COMMERCIAL URBAN DESIGN GUIDELINES 1.0 INTRODUCTION The following urban design guidelines are to be utilised by landowners, planners and other persons involved in development at early
More informationB L A C K D I A M O N D D E S I G N G U I D E L I N E S for Multi-family Development
B L A C K D I A M O N D D E S I G N G U I D E L I N E S for Multi-family Development Adopted June 18, 2009 This section of the Design and focuses on site planning and design guidance for new multi-family
More informationAffordable, luxurious extensions to your living space, that stay warm in the winter and cool in the summer.
Affordable, luxurious extensions to your living space, that stay warm in the winter and cool in the summer. is a modern building system that provides the best way to build the best rooms. It builds stunning
More informationVILLAGE OF SKOKIE Design Guidelines for Mixed-Use Districts NX Neighborhood Mixed-Use TX Transit Mixed-Use CX Core Mixed-Use
VILLAGE OF SKOKIE Design Guidelines for Mixed-Use Districts NX Neighborhood Mixed-Use TX Transit Mixed-Use CX Core Mixed-Use TABLE OF CONTENTS CHAPTER 1 SITE DESIGN Purpose 1 CHAPTER 2 SITE DESIGN Streetscape
More informationA SMALL SITE. Architect Schulberg Demkiw Architects Photographer Derek Swalwell Stylist Rachel Vigor Location Melbourne
A SMALL SITE Achieving the seemingly impossible, Schulberg Demkiw Architects have designed a generous family home on a mere 8 square metre buildable area Ray Demkiw takes us through this ingenious design,
More informationPotten End C of E First School Proposed Expansion to One Form Entry Primary Planning Consultation Presentation
01 05 06 01 02 06 EXISTING SITE The school is located in an attractive village with predominately two storey pitched roofed houses, gardens and open common land. The existing school building is more modern
More informationLandscaping And Site Details
Landscaping And Site Details Adopted by the Barrio Latino Commission on August 20, 1996 Addition to Ybor City Design Guidelines, Street Furniture. The City of Tampa maintains and is responsible for installation
More informationArchitectural Review Board Report
Architectural Review Board Report To: From: CC: Subject: Architectural Review Board Architectural Review Board Meeting: May 21, 2018 Agenda Item: 8-A Grace Page, Senior Planner Stephanie Reich, AIA, LEED
More informationTENANCY DESIGN REVIEW PROCESS GUIDE
TENANCY DESIGN REVIEW PROCESS GUIDE RETAIL GUIDELINES & INSPIRATION MARCH 2018 Aventus Property PG. 1 CONTENTS - Retail design guidelines and inspiration. Concept submission - Requirements PG. 3 Final
More informationPROJECT HEART CREATES MAJOR NEW NATIONAL BUSINESS AND LEARNING CENTRE FOR TESCO
November 2018 PROJECT HEART CREATES MAJOR NEW NATIONAL BUSINESS AND LEARNING CENTRE FOR TESCO Project Heart, an innovative well-being, collaboration and quality assessment centre - designed for Tesco by
More informationappendix and street interface guidelines
appendix five: building and street interface guidelines appendix 5 building and street interface guidelines BOULEVARDS Boulevards are generally characterized by higher levels of traffic movement at higher
More information4. INDUSTRIAL 53 CASTLE ROCK DESIGN
4. INDUSTRIAL 53 CASTLE ROCK DESIGN CASTLE ROCK DESIGN 54 4. INDUSTRIAL Overview Well-designed and attractive industrial centers are the product of blending economic realities with both functional and
More informationCALA HO ME S WELCOME
WELCOME Welcome to this public consultation event for our proposed residential development of 56 high quality homes on land to the north east of Station Road in Earls Colne. Thank you for taking the time
More informationBLACKHEATH SQUASH CLUB Blackheath Sports Club, Rectory Field, Charlton Road, London, SE7 7EY. Planning, Design and Access Statement
Planning, Design and Access Statement Revised: 28 th Jan 2016 Peter Pendleton & Associates Ltd Introduction Planning permission will be sought for a refurbishment of existing courts and extension to provide
More informationWORDS: renovate summer 2012
thinking Blue sky Two new extensions, including an atrium-style kitchen, and remodeling of the return, transformed a dark, cramped interior into a light-filled, streamlined space that brings the outdoors
More informationR STREET CORRIDOR NEIGHBORHOOD Site Plan and Design Review Supplemental Guidelines Checklist
R STREET CORRIDOR NEIGHBORHOOD Site Plan and Design Review Supplemental Guidelines Checklist Applicant s Name: Project Address: Phone: Email: Applicant shall fill out the design guidelines checklist for
More informationLindsey Beane. Executive Summary
Executive Summary The purpose of this technical assignment is to compile lighting information and make an analysis about the existing spaces. This report will include a list of the equipment used, required
More informationENGINEERING BUILDING UNIVERSITY OF CAPE TOWN
ENGINEERING BUILDING UNIVERSITY OF CAPE TOWN In a time of changing education in South Africa, the architectural updates to the engineering buildings at UCT signify a bold step towards upgrading and modernising
More informationProposed Student Accommodation Development
Statement of Response to the Notice of Pre- Application Consultation Opinion Former "Matts of Cabra" public house and lands to the rear, Fassaugh Avenue, Cabra, Dublin 7 Proposed Student Accommodation
More informationPoole Park Furniture Strategy February Design Stage C. Prepared by the Borough of Poole. First issue. Doc.no. PPL-SW-03
Poole Park Furniture Strategy February 2017 Prepared by the Borough of Poole Design Stage C Doc.no. PPL-SW-03 First issue Prepared by the Borough of Poole, Environmental Services Team Address: Environmental
More informationWestside Berry Lane, Howbrook, Sheffield. Park Estates
Westside Berry Lane, Howbrook, Sheffield Park Estates A Fabulous Character Property with Far Reaching Views Westside Reception Hall 15 9 x 9 3 (4.8m x 2.8m) Having external lighting and a timber front
More informationHYGGE IN CITY THE. The Danish concept of snug is at the heart of this kitchen, which draws inspiration from London and New York as well as Scandinavia
OUTSIDE IN Exposed brickwork on the interior walls matches the brick on the garden walls, to blend the outside and inside spaces HYGGE IN THE CITY The Danish concept of snug is at the heart of this kitchen,
More information97 Lea Bridge Road, Leyton, E10 7QL London Borough of Waltham Forest December 2015
97 Lea Bridge Road, Leyton, E10 7QL London Borough of Waltham Forest December 2015 Public Realm and Landscape Proposals LEA BRIDGE ROAD, WALTHAMSTOW Public Realm & Landscape Proposals BDP(90)RPT001 December
More informationOFFICE FURNITURE Desks & Conference Tables
OFFICE FURNITURE Desks & Conference Tables 01992 709 420 www.gbnofficefurniture.co.uk DESKING Contemporary Design CREATIVE & PRACTICAL DESKING The majority of work-space is still dedicated to independent
More informationPDP DESIGN & ACCESS STATEMENT
PDP The Planning & Design Partnership Planning.. Architecture.. Interiors.. Landscape The Chicory Barn Studio, The Old Brickyards, Moor Lane, Stamford Bridge York, The East Riding Of Yorkshire, YO41 1HU.
More informationSHAPESHIFTER A clever approach with an all-natural twist
WE LOVE The curved timber screen that encases the home project // NORTH MANLY HOUSE SHAPESHIFTER A clever approach with an all-natural twist 116 117 WORDS // ANNABELLE CLOROS PHOTOGRAPHY // MARIAN RIABIC
More informationBRICKWORKS CREATE. the ultimate home
STYLE INSPIRATION BRICKWORKS CREATE the ultimate home Brickworks Building Products is Australia s leader in style and innovation of building products. More than just roof tiles, timber and brick, we create
More information18 / MATERIALS 22 / MEET SACHA COLES 06 / SHEPHERD SIDE 20 / RIVER SIDE
04 / 08 / MEET DOMENIC ALVARO 18 / MATERIALS 22 / MEET SACHA COLES 06 / SHEPHERD SIDE 10 / SHEPHERD SIDE INTERIORS 20 / RIVER SIDE 26 / RIVER SIDE INTERIORS Stunning architecturally designed apartment
More informationlot flankage Y street 16m 6m landscape strip for large site 3m landscape strip for small medium site
Commercial General Commercial Objectives Create developments compatible with adjacent land uses in scale, function and character Define a consistent and attractive street edge with quality landscaping,
More informationDRAFT City Road Cardiff CF24 3BJ DESIGN & ACCESS STATEMENT
11-13 City Road Cardiff CF24 3BJ DESIGN & ACCESS STATEMENT DRAFT PROPOSAL: Full planning application for the creation of a new eleven storey building comprising purpose built student accommodation for
More informationSUNNY LANE TERRACE HOMES
SUNNY LANE TERRACE HOMES Well Located Park or Lakefront homes Relaxed Lifestyle Backdrop for living Well Designed In your element Well Balanced Naturally inspired Well Styled Matters of taste Inclusions
More informationNew Street Proposed Redevelopment Architecture & Urban Design Brief
2130 2136 New Street Proposed Redevelopment Architecture & Urban Design Brief Prepared By: Cynthia Zahoruk Architect Inc. 3077 New Street, Burlington, ON, L7N 1M6 TABLE OF CONTENTS Background and Objective
More informationPUBLIC REALM STRATEGY
Concept PUBLIC REALM STRATEGY The design approach for of the public realm is to provide a streetscape interface appropriate to supporting Alberni s consistent scale and residential character. A series
More informationInspiration. Wall Street. Innovative Dynamic. Original. Established. Powerful Enlightened. Competitive. Modern. Intrigue
Building Information Located in Washington DC on the George Washington University Campus Addition to existing Business School 170,000 Sq Ft 6 floors above grade, 2 floors below Educational Building Mission
More informationsensations window & door range
sensations window & door range Product Features At a Glance The windows and doors in the Sensations range are renowned for their high quality materials. The Sensations quality captive bead gasket, a high
More informationCENTERS AND CORRIDORS
INITIAL DESIGN STANDARDS AND GUIDELINES for CENTERS AND CORRIDORS City of Spokane Planning Services Third Floor, City Hall 808 W. Spokane Falls Blvd. Spokane, WA 99201-3329 (509) 625-6300 www.spokaneplanning.org
More informationTECHNICAL ASSIGNMENT #3: SCHEMATIC LIGHTING DESIGN
TECHNICAL ASSIGNMENT #3: SCHEMATIC LIGHTING DESIGN Jason Weaver 12/13/2007 Background The central role of a college is to help students develop a worldview. The three things one needs to understand in
More informationAffordable, luxurious extensions of your living space, that stay warm in the winter and cool in the summer.
Affordable, luxurious extensions of your living space, that stay warm in the winter and cool in the summer. Italian Inspiration is a modern building system that provides the best way to build the best
More information4.3 Dudley Area Plan. Introduction. History and Existing Character. Desired Future Character for Dudley
4.3 Dudley Area Plan Introduction The suburb of Dudley has developed as a result of various circumstances including its topography, history and mineral resources. Dudley development has been identified
More informationArtists impression of the Park Promenade and plot H4 with café and restaurant uses that is still subject to change
The Park Promenade Artists impression of how a café might look Artists impression of the Park Promenade and plot H4 with café and restaurant uses that is still subject to change Precedent images for balconies
More informationSite Planning. 1.0 Site Context. 2.0 Pedestrian Circulation Systems. Pag e 2-23
The following photographs from throughout the country illustrate key urban design principles. Photographs are provided to illustrate the overall urban design concepts described in Chapter 1 of the Downtown
More informationX-Stream Air Natural Ventilation kits are predominantly designed for self-installation. Suitable for ventilating existing and new build applications.
X- StreamSystems X-Stream Air Natural Ventilation kits are predominantly designed for self-installation. Suitable for ventilating existing and new build applications. Contact us on: 01384 455811 Visit
More informationGARDENS AND ESTATES HORTON COUNTRY HOUSE LONGCROSS ESTATE LA GRANDE MAISON SUDELEY LAWN BARN NEAR BRIXWORTH WINGROVE HOUSE
Our garden and estate work encompasses both traditional and contemporary design, informed by our skills in historic landscape conservation, and has been consistently well received. We like to work closely
More informationDESIGN REVIEW STANDARDS CITY OF LANGLEY
DESIGN REVIEW STANDARDS CITY OF LANGLEY I. INTRODUCTION The City of Langley is fortunate to have a strong sense of place and unique quality. This comes in part from its special setting along Saratoga Passage,
More informationlight guide How to illuminate car showrooms
light guide How to illuminate car showrooms Illuminating the brand Today people have great awareness and knowledge about the different car brands on the market. They identify with the car they drive and
More informationTRAFALGAR PLACE LONDON
January 2017 Uniclass L534:L217 Award-winning and Stirling Prize shortlisted Urban regeneration high density housing scheme Exemplary public realm with precast concrete paving Careful detailing carried
More informationGUIDING PRINCIPLES IN THIS CHAPTER
GUIDING PRINCIPLES The guiding principles and design concepts in this chapter work together with the Chapel Hill 2020 Comprehensive Plan to support new public places that can be enjoyed by all while also
More information1. General Purpose. 3. Uses
1. General Purpose The purpose of this DC1 Provision is to facilitate the development of a pedestrian friendly Community Commercial Centre that may accommodate a range of commercial, residential, office,
More informationHousing Development at Balloonagh Tralee Co Kerry
Design Statement Housing Development at Balloonagh Tralee Co Kerry Area of site 10,400m2 24 houses-12no 3 bed, 12no 2 bed and 4 single bed apartments total residential area of 2411m2 Open space provided
More informationDesign Guidelines Checklist
Design Guidelines Checklist A quick reference to the City of Vista Design Guidelines City of Vista Community Development Department Planning Division 600 Eucalyptus Avenue Vista, CA 92084 760.639.6100
More informationKEY MAP DEVELOPMENT PERMIT AREA MAP. Sunnymede North Sub-Area Plan
Richmond Official Community Plan BROADMOOR AREA SUNNYMEDE NORTH SUB-AREA PLAN Bylaw 7100 Schedule 2.6C SUNNYMEDE NORTH SUB-AREA PLAN SUNNYMEDE NORTH SUB-AREA PLAN SUNNYMEDE NORTH SUB-AREA PLAN KEY MAP
More informationSurface Materials Strategy Reference Images
2.0 RETAIL & HOTEL PLOTS, BRENT CROSS MAIN SQUARE THRESHOLD SPACES & ENERGY CENTRE Surface Materials Strategy Reference Images Riparian themes and patterns reflected in the paving Palette of warm granite
More informationB.A.T center paul mickula
05-01 05-02 05-03 B.A.T center paul mickula 05-04 5.2 5.1 5.3 5.4 5.5 the bat center was established as a platform for artist to express themselves. their interventions completed the project and draws
More informationCity of Farmington. Downtown Plan. Amendment to the 1998 Master Plan Adopted October 11, 2004
City of Farmington Amendment to the 1998 Master Plan Adopted October 11, 2004 Introduction Planning Background 1 Scope and Components of the Plan Amendment 2 Concept Introduction 3 Plan Concepts 3 Conceptual
More informationExisting Area Description: The area is an angle around the North point of the building. It is a wide patio wrapping the façade of the building.
Exterior Street Entrance: Overview of Space: The street entrance is the main entrance for the members of the community who are entering the library. The purpose of this space is to effectively and aesthetically
More informationSierra Springs Regional Commercial Master Site Plan Airdrie, Alberta Hopewell Development Corporation Project No May 26, 2010
Sierra Springs Regional Commercial Master Site Plan Airdrie, Alberta Hopewell Development Corporation Project No. 205-077 May 26, 2010 TABLE OF CONTENTS Purpose... 2 Master Site Plan Guidelines... 3 Overall
More information22 Stanford Drive - Model Home Under 1399 sq. ft.
When designing this home we wanted to provide a home that felt spacious and inviting; while providing a very minimalist home. The exterior of this home has been completed with a modern two-toned acrylic
More informationVEHICULAR AND PEDESTRIAN CIRCULATION
This perspective sketch communicates the intended character and quality of a proposed streetscape design. Locate benches near a major intersection where people tend to gather. Seating and lighting provide
More informationContact details Lacock Abbey, Lacock, Chippenham, SN152LG T: E:
Lacock Abbey, Fox Talbot Museum, Grounds, Café and High street shop Access Statement The estate of Lacock Abbey, located at the heart of Lacock village within its own woodland grounds, is a quirky country
More informationILLUSTRATIVE DESIGN GUIDELINES FOR OFFICE DEVELOPMENT
The purpose of this guide is to provide a helpful illustration of the objectives and action strategies contained in the Comprehensive Plan concerning the promotion of high-quality office buildings within
More informationCommercial Development Permit Area
City of Kamloops KAMPLAN Commercial Development Permit Area PURPOSE The purpose of this Development Permit Area (DPA) is to establish objectives and provide guidelines for the form and character of commercial
More informationCity of Redlands Architectural Guidelines for Non-Residential Development
14. Building articulation shall be included in the design of building, in order to create a formal entry statement. Avoid this Do this Page 11 15. Give special attention to creating pedestrian scale and
More informationJakarta, Indonesia. site area 51.9 acres / 21 hectares. total GBA 9,632,847 sq ft / 895,246 sq m. office 5,528,994 sq ft / 513,847 sq m
Jakarta, Indonesia BINTARO JAYA XCHANGE 2013 site area 51.9 acres / 21 hectares total GBA 9,632,847 sq ft / 895,246 sq m office 5,528,994 sq ft / 513,847 sq m hotel 612,793 sq ft / 56,951 sq m convention
More informationThe Village. Chapter 3. Mixed Use Development Plan SPECIFIC PLAN
The Village SPECIFIC PLAN Chapter 3 3.1 INTRODUCTION 3.1.1 Purpose This Chapter describes the development regulations applicable to the Mixed-Use and Transit Center Planning Areas. These form-based regulations
More informationURBAN DESIGN BRIEF. 2136&2148 Trafalgar Road. Town of Oakville
URBAN DESIGN BRIEF 2136&2148 Trafalgar Road Town of Oakville Prepared By: METROPOLITAN CONSULTING INC For 2500674 Ontario Inc November 2016 TABLE OF CONTENTS Page No. 1.0 Introduction/Description of Subject
More informationHamilton Road Corridor Streetscape Master Plan. Open House October 4 th, 2017
Hamilton Road Corridor Streetscape Master Plan Open House October 4 th, 2017 Agenda 1. Introductions Agenda Overview 2. Project Background 3. Existing Conditions 4. Strengths, Weaknesses, Opportunities
More information4 Semi-Private & Private Open Spaces
4 Semi-Private & Private Open Spaces 4.1 Semi-private Open Space 4.1.1 Common Courtyards The common courtyards for each complex will be designed and programmed for the typical owners living there. They
More information4. OVERVIEW OF MECHANICAL SYSTEM
4. OVERVIEW OF MECHANICAL SYSTEM The 87,000 SF SLCC is served by six (6) Trane M-Series Climate Changer Air Handing Units (AHUs). Each unit serves a distinct zone within the facility that is unique in
More informationExterior Façade Lighting Design
Exterior Façade Lighting Design Duques Hall is located on George Washington campus in downtown Washington DC. It is located amidst some other university buildings, however, the façade is very visible from
More information