ARROYO SIMI GREENWAY SPECIFIC PLAN. Winter, 2011

Size: px
Start display at page:

Download "ARROYO SIMI GREENWAY SPECIFIC PLAN. Winter, 2011"

Transcription

1 ARROYO SIMI GREENWAY SPECIFIC PLAN Winter, 2011

2

3 ARROYO SIMI GREENWAY SPECIFIC PLAN Prepared For: and ACKNOWLEDGMENTS Prepared By: (805)

4 ACKNOWLEDGMENTS ARROYO SIMI GREENWAY SPECIFIC PLAN ACKNOWLEDGMENTS Arroyo Simi Committee Members Steven T. Sojka, City of Simi Valley Council Member - Chair Barbra Williamson, City of Simi Valley Council Member Vice Chair Michael McGuigan, City of Simi Valley Planning Commissioner Tim Shannon, Chair, former City of Simi Valley Planning Commissioner Elaine Freeman, Rancho Simi Recreation and Park District Board Member Mark Johnson, Rancho Simi Recreation and Park District Board Member Eric Lundstrom, Simi Valley Unified School District Casie Bailey, District Representative Supervisor Peter C. Foy, Fourth District, Ventura County Board of Supervisors City of Simi Valley Council Members Bob Huber, Mayor Steven Sojka, Mayor Pro Tem Glen Becerra, Council Member Mike Judge, Council Member Barbra Williamson, Council Member

5 ARROYO SIMI GREENWAY SPECIFIC PLAN City of Simi Valley Planning Commissioners Jim Dantona Jr., City of Simi Valley Planning Commissioner, Chairperson Michael McGuigan, City of Simi Valley Planning Commissioner, Vice Chairperson Mary Bibb, City of Simi Valley Planning Commissioner Ken Rice, City of Simi Valley Planning Commissioner Scott Santino, City of Simi Valley Planning Commissioner ACKNOWLEDGMENTS City of Simi Valley Staff Mike Sedell, City Manager Brian Gabler, Deputy Director of Economic Development/Assistant City Manager Marjorie Baxter, Senior Assistant City Attorney Peter Lyons, Director of Environmental Services Paul Drury, Deputy Director/City Planner Tony Stewart, Project Manager Jerry Clark, Landscape Architect Jim Brunner, Principal Engineer Monica Dionne, Assistant Planner

6 ARROYO SIMI GREENWAY SPECIFIC PLAN ACKNOWLEDGMENTS Rancho Simi Recreation and Park District Board of Directors Gene Hostetler, Chair Kate O Brien, Vice Chair Dee Dee Cavanaugh, Director Elaine Freeman, Director Mark Johnson, Director Rancho Simi Recreation and Park District Staff Larry Peterson, General Manager Ed Hayduk, Assistant General Manager Ventura County Watershed Protection District Sergio Vargas, Deputy Director of Planning & Regulatory Division Tom Wolfington, Permit Manager, Planning & Regulatory Division Karl Novak, Manager of Operations & Maintenance Division RRM Design Group Jeff Ferber, ASLA, Principal/Project Manager Debbie Jewell, Project Designer

7 CONTENTS ARROYO SIMI GREENWAY SPECIFIC PLAN TABLE OF CONTENTS 1.3 Safe Routes to School CHAPTER 1: INTRODUCTION Section 1.1: Project Description Section 1.2: Relationship to Simi Valley Municipal Code and General Plan Section 1.3: Connections to the Greenway a. b. c. d. Project Location and Setting a.1 Specific Plan Area Boundary Project Goals and Objectives Regional Watershed Conservation of Natural Resources a. b. Relationship to Simi Valley Municipal Code and General Plan Specific Plan Authority and Policy b.1 Relationship to the California Environmental Quality Act (CEQA) b.2 Concurrent and Subsequent Review and Approval b.3 Specific Plan Administration a. b. c. Safe Routes to Schools a.1 The SR2S Program a.2 The SRTS Program Expanding the Greenway b.1 School Connections b.2 Regional Trail Connections b.3 Class 2 and 3 Bike Lanes Transit Improvements

8 ARROYO SIMI GREENWAY SPECIFIC PLAN TABLE OF CONTENTS CHAPTER 2: PROJECT DEVELOPMENT STANDARDS Section 2.1: Site Development Plan a. b. c. d. Key Study Areas Site Development Plan Visioning Study Refinements Project Development Standards Section 2.2: School Entry Enhancements a. b. c. School Entry Plaza Standards Katherine Elementary School b.1 Katherine School Entry Plaza Standards Sinaloa Middle School c.1 Sinaloa Middle School Entry Plaza Standards Development Plan Symbol Section 2.3: At Grade Crossings a. b. c. d. Traffic Calming Measures Decorative Crosswalks b.1 Crosswalk Standards b.2 Street Crosswalk Standards b.3 Driveway Crosswalk Standards b.4 Sustainable Crosswalk Elements Signalized Intersections Unsignalized Intersections Development Plan Symbol Section 2.4: Trailheads/Parking Trailhead/Parking Standards Trailhead Key Study Areas Sustainable Elements a. Tierra Rejada Trailhead b. c. d. Rancho Simi Community Park Trailhead Sycamore Community Center Trailhead Other Trailheads d.1 d.2 d.3 d.4 Sequoia Avenue Trailhead Darrah Volunteer Park Trailhead Rancho Santa Susana Park Trailhead Corriganville Park Trailhead Trailheads/ Parking

9 ARROYO SIMI GREENWAY SPECIFIC PLAN 2.5 Trails Program TABLE OF CONTENTS Development Plan Symbol Section 2.5: Trails Program Section 2.6: Greenway Bridges Section 2.7: Lighting Program Sustainable Elements Trails Key Study Areas Greenway Trail Standards New Trail Standards Trail Striping Standards N/A Sustainable Elements Sustainable Elements Lighting Standards a. Existing Automobile Bridges a. Entry Lighting a.1 Entry Lighting Standards a. b. Existing Paved Trail to Remain a.1 First Street Views, Key Study Area New Paved Trail Type b. c. Existing Pedestrian/ Bicycle Bridges Proposed Pedestrian/ Bicycle Bridges b. Trail Lighting b.1 Trail Lighting Standards c. New Paved Trail - Type d. Drainage Trail e. New Drainage Sidewalk f. Widened Sidewalk g. Equestrian Trail h. Existing Dirt Trail to Remain

10 TABLE OF CONTENTS Development Plan Symbol ARROYO SIMI GREENWAY SPECIFIC PLAN Section 2.8: Parks a. Sustainable Elements Pocket Parks a.1 Pocket Park Standards a.2 Easy Street Pocket Park Standards a.3 Sycamore Community Center Park Standards a.4 S-Curve Pocket Park Standards Overlooks/ Rest Areas b. Park Expansion b.1 Park Expansion Standards b.2 Rancho Simi Community Park Expansion Standards b.3 Darrah Volunteer Park Expansion Standards Section 2.9: Overlooks/Rest Areas Sustainable Elements Overlook/Rest Area Standards Section 2.10: Landscaping Program Section 2.11: Project Entries a. b. c. Existing Overlooks/Rest Areas a.1 Existing Overlook/Rest Area Standards a.2 Madera Road Overlook/Rest Area a.3 Erringer Road Overlook/Rest Area Minor Overlooks/Rest Areas b.1 Minor Overlook/Rest Area Standards b.2 Sycamore Drive Overlook/Rest Area Major Overlooks/Rest Areas c.1 c.2 c.3 Major Overlook/Rest Area Standards Tierra Rejada Overlook/Rest Area Cascade Overlook/Rest Area a. b. Sustainable Elements Landscape Standards Landscape Enhancement/Screening a.1 a.2 Landscape Enhancement Landscape Screening Preliminary Plant List Project Entry Standards Sustainable Elements a. Primary Gateway Entry a.1 Primary Gateway Standards a.2 Accent Paving Standards a.3 Madera Road Gateway a.4 Erringer Road Gateway a.5 Community Center Gateway a.6 S-Curve Park Gateway b. Secondary Gateway Entry b.1 Secondary Gateway Standards b.2 Yosemite Avenue Gateway

11 Development Plan Symbol ARROYO SIMI GREENWAY SPECIFIC PLAN Section 2.12: Greenway Signage Program a. b. c. d. Greenway Logo a.1 Logo Standards Standard Logo Colors b.1 Logo Color Standards Information Trailhead Kiosks c.1 Materials Standards c.2 Information Standards c.3 Locations c.4 Signage Standards Primary Gateway Monuments d.1 Materials Standards d.2 Signage Standards d.3 Locations d.4 Two-Column Monument d.5 One-Column Monument d.6 Masonry Signage Standards e. f. g. h. Secondary Gateway Monuments e.1 Materials Standards e.2 Signage Standards e.3 Locations Mile Markers f.1 Materials Standards f.2 Signage Standards f.3 Locations Greenway Banners g.1 Materials Standards g.2 Signage Standards g.3 Locations g.4 Banners along Trails g.5 Banners along Streets Interpretive Exhibits h. 1 h. 2 h. 3 h. 4 Materials Standards Signage Standards Mounting Systems Locations and Information i. j. k. l. Major Directional Signage i.1 i.2 i.3 i.4 Materials Standards Information Standards Signage Standards Locations Minor Directional Signage j.1 Materials Standards j.2 Signage Standards j.3 Information Standards j.4 Locations Roadway Approach Signs k.1 Materials Standards k.2 Signage Standards k.3 Median Approach Sign Standards k.4 Curbside Approach Sign Standards Traffic and Safety Signage l.1 Information Standards l.2 Signage Standards TABLE OF CONTENTS m. Trailhead Parking Signs m.1 Materials Standards m.2 Signage Standards m.3 Parking Entry Sign Standards m.4 Parking Space Sign Standards Greenway Signage Program

12 ARROYO SIMI GREENWAY SPECIFIC PLAN TABLE OF CONTENTS Section 2.13: Fencing and Walls Sustainable Elements a. Greenway Fencing a.1 Greenway Fencing Standards a.2 Entry and Park Fencing a.3 Trail Fencing a.4 Chain Link Enhancements a.5 Property Fencing b. Greenway Walls b.1 Greenway Wall Standards b.2 Entry and Park Walls b.3 Retaining Walls c. Rhino Gates c.1 Rhino Gate Standards Fencing and Walls Section 2.14: Site Furnishings Program Development Plan Symbol Section 2.15: Focal Points/Public Art a. Benches, Tables and Receptacles e. Structures a. Focal Points/Public Art Locations a.1 Standards e.1 Restroom Standards a.2 Sustainable Elements e.2 Sustainable Elements b. Themes and Materials a.3 Metal Amenities e.3 Shade Structure Standards a.4 Recycled Timber & Concrete f. Playgrounds Section 2.16: Arroyo Simi Channel Improvements Amenities f.1 Playground Standards b. Bike Racks f.2 Sustainable Elements a. Habitat Enhancement b.1 Standards f.3 Playground Surfacing Standards a.1 Wildlife Habitat b.2 Sustainable Elements g. Workout Areas a.2 Trees and Woody Plants c. Bollards a.3 Arroyo Simi Levee Areas g.1 Workout Area Locations c.1 Standards a.4 Pilot Restoration Strategy g.2 Sustainable Elements c.2 Removable Bollards g.3 Workout Area Standards c.3 Fold-Down Bollards b. Access to the Water c.4 Telescoping Bollards d. Enhanced Paving c. Under Crossings d.1 Standards c.1 Sustainable Elements d.2 Sustainable Elements c.2 Existing Under Crossings c.3 Proposed Under Crossings c.3.a Erringer Road Under Crossing c.3.b Sycamore Drive Under Crossing

13 ARROYO SIMI GREENWAY SPECIFIC PLAN CHAPTER 3: SUSTAINABILITY PROGRAM Section 3.1: Sustainability Program a. b. Sustainability Program Goals Sustainable Materials a.1 Choosing Sustainable Materials a.2 Incorporate Salvaged and/or Recycled Materials a.3 Integrate Permeable Paving a.4 Use Reclaimed Asphalt Paving (RAP) and Sustainable Sealants a.5 Use Alternative Energy a.6 Specify Low Volatile Organic Compound (VOC) Products a.7 Specify Sustainable Wood Materials Sustainable Programs b.1 Provide a Variety of Learning Environments and Endorse Alternative Transportation CHAPTER 4: IMPLEMENTATION AND STEWARDSHIP Section 4.1: Greenway Phasing a. b. a. b. Overall Conceptual Phasing Plan Development of the Greenway Section 4.2: Implementation Necessary Implementation Actions a.1 Adopt Specific Plan, Zone Change and Conditional Use Permit a.2 Obtain Encroachment Permits a.3 asements Potential Revenue Sources b.1 Contributions/Donor Program b.2 Volunteerism b.3 General Obligation Bonds b.4 Grants Section 4.3: Stewardship Program a. b. Greenway Maintenance a.1 Sustainable Maintenance Practices Stewardship Program Development b.1 Safety and Security b.2 Opportunities for Education Section 4.4: City & Park District Greenway Partnership a. b. District Responsibilities City Responsibilities TABLE OF CONTENTS 4.3 Stewardship Program

14 TABLE OF CONTENTS

15 INTRODUCTION PROJECT DESCRIPTION section Project Description 1-1

16 INTRODUCTION section 1.1 PROJECT DESCRIPTION SECTION CONTENTS PAGE 1.1 a a.1... Project Location and Setting... Specific Plan Area Boundary b... Project Goals and Objectives c... Regional Watershed d... Conservation of Natural Resources PROJECT DESCRIPTION

17 1.1 PROJECT DESCRIPTION INTRODUCTION This Specific Plan describes in detail how to revitalize the Arroyo Simi and develop a scenic Greenway which includes healthy recreational opportunities and provides transportation alternatives other than the automobile. This is a joint effort of the City of Simi Valley (City), Rancho Simi Recreation and Park District (RSRPD) and the Ventura County Watershed Protection District (VCWPD) to revitalize the existing pathway along the top of the Arroyo Simi into a Greenway for multi-modal recreational transportation and with connections to existing and new parks, schools, trails and other community amenities. The Arroyo Simi Greenway will also provide opportunities to enhance the riparian wildlife within the Arroyo Simi and improve water quality while also preserving the Ventura County Watershed Protection District s (VCWPD) flood control capacity and maintenance requirements. The project consists of the following components. PROJECT DESCRIPTION section 1.1 SP-S-0028 A request to establish development standards for improvements to the trails along the entire length of the top of both sides of the Arroyo Simi and along portions of the Arroyo s tributaries, rights-of-way improvements where the Arroyo Simi crosses streets and along the west side of Fifth Street, from Los Angeles Avenue to Sinaloa Middle School, and for new parks or expanded parks in several locations along the Arroyo Simi. The overall project area is very large and there are many different components (parks and amenities, trail types, signage, landscaping, lighting, furniture, etc.) that will potentially be built out over the next years, depending on funding availability. Therefore, to ensure that the Greenway is built out per a cohesive design, the Specific Plan document includes detailed standards for each project component. Additionally, the Specific Plan includes a Sustainability Program to ensure the Greenway is constructed and maintained in an environmentally sound manner and Implementation and Stewardship Programs for the build-out and long-term maintenance of the Greenway. CUP-S-0677 A request to create a master Conditional Use Permit to construct park improvements per the design standards set forth in SP-S-0028 on the properties within the project area that are owned by the City, the RSRPD, or the VCWPD. Note that the Specific Plan and Zone Change are legislative and will not, by themselves, condition properties within the project area. However, at this time, the privately-owned properties located within the project area are not included within the CUP application, as these property owners have not given their permission at this time to have development conditions placed upon their properties. In the future, should the City and/or RSRPD be successful in acquiring these properties for the purposes of developing new parks per the Specific Plan standards, CUP-S-0677 would be modified at that time. Z-S-0677 A request to apply a SP (Specific Plan) Overlay designation over the properties located within the project area. The underlying development standards will not change, and therefore, the properties within the Specific Plan Overlay area will not be affected should they not be developed with recreational uses. PROJECT DESCRIPTION 1.1-1

18 INTRODUCTION section 1.1 PROJECT DESCRIPTION In 2007, City and Park District staff, Simi Valley Unified School District, Ventura County Watershed Protection District, and the community cooperated to develop a Visioning Study and to gather preliminary ideas and identify goals for the revitalization of the Arroyo Simi Visioning Study which was adopted October 23, Using the Visioning Study as a base, the Arroyo Simi Greenway Specific Plan will build upon the preliminary ideas and concepts from the Visioning Study, and result in implementable development standards and guidelines necessary to turn the Arroyo Simi into a recreational and scenic asset for the community. The Visioning Study prepared for the City of Simi Valley and the Rancho Simi Recreation and Parks District in 2007 developed the framework for this Specific Plan Specific Plan Intent Establish standards that are unique to, and allow for, the development of the 12-mile long Arroyo Simi Greenway Provide guidelines and standards which describe how to put all the design elements of the Greenway together Develop Key Study Areas with plans and sketches to provide tangible visual representation of design aesthetics and required elements Create a Specific Plan that is easy to read with ample visual examples of design concepts and concise bulleted text, reference related sections within the Specific Plan to allow the reader to go directly to a specific element, such as a Park or Overlook, and not necessarily need to read the entire document Allow for design flexibility as the project progresses to adapt to changing priorities and economic swings as well as varying situations along the Greenway Encourage connections to the Greenway, and suggest public transit opportunities where possible Create a Greenway trail system and site amenities that are accessible to all users Increase safety along the Greenway, especially on routes to schools Refine the 2007 Arroyo Simi Greenway Visioning Study into a set of development standards that will ensure that the Greenway is developed into a recreational amenity that is unique to Simi Valley and will be enjoyed by the community for generations to come Ensure that the Arroyo Simi will continue to convey the water flow, and will be able to be maintained, per the Ventura County Watershed Protection District s standards Discuss sustainable materials, programs and maintenance practices for the Greenway Create a phasing plan that remains fluid and blends proposed improvements with existing facilities and new construction PROJECT DESCRIPTION

19 INTRODUCTION During the Specific Plan development, City and Park District staff and RRM Design Group met with Ventura County Watershed and Protection District to discuss design concepts and flood control requirements and maintenance practices. This Specific Plan provides standards for the Greenway development while maintaining the functional flood control and maintenance aspects of the Arroyo Simi. As specific projects are being implemented along the Greenway, VCWPD shall review design plans and provide comments regarding construction methods and project timing. Strong consensus has been reached by the agencies that the project needs to be completed. The revitalization of the Arroyo Simi into a Greenway meets many City and Park District policies, including but not limited to the City of Simi Valley General Plan, City of Simi Valley Bicycle Master Plan, Rancho Simi Recreation and Park District 1986 General Plan for Parks, Recreation and Open Space, Calleguas Management Plan Study, and the Integrated Regional Water Management Plan. PROJECT DESCRIPTION section 1.1 The Arroyo Simi Committee has overseen the development of the Specific Plan. The Committee includes members of the Simi Valley City Council, City Planning Commission, Rancho Simi Recreation & Park District Board, representatives from Ventura County Board of Supervisors District 4 office, and the Simi Valley Unified School District. Photos from the Public Town Hall Meeting The community had the opportunity to review and comment on the Specific Plan progress throughout the design process including at a Public Town Hall Meeting conducted on June 24, 2009, a display of the project at the Simi Valley Public Library, and via information on the City s web site. With this Specific Plan and associated Conditional Use Permit (CUP), the City is able to create development standards that are unique to the Arroyo Simi Greenway. This Specific Plan reflects policy, outlines a uniformity of methods and procedures, and communicates vital information. This Specific Plan and CUP will allow the City and Park District to implement construction documents as funding comes available and eliminates the need for formal amendments to existing entitlement permits. The Arroyo Simi Greenway Committee, City and Park District Staff selected several areas out of the Visioning Study to develop plans and sketches as Key Study Areas which portray how areas might be typically treated and be used to develop the standards and guidelines within this Specific Plan. Refer to Site Development Plan, Section 2.1a for further discussion of the Key Study Areas PROJECT DESCRIPTION 1.1-3

20 INTRODUCTION a. PROJECT LOCATION AND SETTING a. Project Location and Setting The project area consists of the Arroyo Simi and adjacent Watershed Protection District s right-of-way for most of the length of the City. The Arroyo Simi Greenway covers an mile long project study area, and extends from the western City limits line to Corriganville Park at the Greenway s east end. The Arroyo Simi Greenway runs through the center of the full length of the City of Simi Valley and has numerous points of entry and connects to multiple parks, schools, and neighborhoods. The Greenway is located along the banks of the Arroyo Simi on primarily flat level ground. There are existing trails along most of the Arroyo Simi, with a paved trail located along most of the northern portion of the Greenway, and unpaved trails generally located along the south side. a.1 Specific Plan Area Boundary The Arroyo Simi Greenway project is primarily located within an established public right-of-way along the top of the Arroyo Simi channel that is owned by VCWPD or the Park District. The Park District has a joint use agreement with VCWPD that allows the Park District to develop and maintain recreational facilities along most of the Arroyo Simi rights-of-way. The majority of the improvements will occur on VCWPD property along the top of the Arroyo Simi channel, or on property located outside the rights-of-way, on land generally owned by the City or the Park District. All improvements proposed within the Arroyo Simi channel would be subject to VCWPD review and approval and would have to allow the 100-year flood level to be maintained. This will also include locating Greenway improvements, such as landscaping used as project mitigation, furnishings and amenities, out of the 100- year floodplain unless otherwise approved by the VCWPD. The Specific Plan boundary also includes properties where the Park District currently does not have easements rights. In addition, the properties on Easy Street, Darrah Volunteer Park and S-Curve are privately owned and are proposed for trailhead parking or future parks. Easement rights to allow the trail and permission to develop the Easy Street and at the S-Curve Parks and parking lot at Darrah Volunteer Park will be required in later phases. The Greenway boundary includes portions of Tierra Rejada Park, portions of Rancho Simi Community Park, and all of Darrah Volunteer Park. The boundary also includes a Park District owned parcel on the northeast side of the Arroyo Simi and Royal Avenue intersection. This parcel currently has Oak trees growing on a grid pattern, and incorporating and naturalizing this area will significantly increase green space along the trail system PROJECT DESCRIPTION

21 INTRODUCTION Arroyo Simi Greenway Specific Plan Boundary is shown in black a. PROJECT LOCATION AND SETTING 9 The project boundary includes some key street connections along existing sidewalks, such as: 1 5th Street from Sinaloa Middle Los Angeles Avenue from School to Los Angeles Avenue 6 Hidden Ranch Drive to Sycamore Drive from Heywood proposed S-Curve Park 2 Street to the Sycamore Drive 7 Along Hidden Ranch Drive at Community Center the north side of the railroad School Street from the Tapo Los Angeles Avenue from 3 Canyon Drain to signalized 8 the drainage channel leading crossing at Church Street to White Oak School to the Cochran Street from the Tapo signalized crossing at Christine 4 Canyon Drain to signalized Avenue crossing at Sequoia Avenue Alamo Street from the Tapo 5 Canyon Drain to signalized crossing at Santa Ynez Avenue 9 Smith Road to Corriganville Park PROJECT DESCRIPTION 1.1-5

22 INTRODUCTION c. PROJECT GOALS AND OBJECTIVES b. Project Goals and Objectives The overall goal of this Specific Plan is to outline a comprehensive course of action and set forth design ideas for visual, recreational, habitat, and educational enhancements that aid in redefining the image of the Arroyo Simi and create a special place within the heart of Simi Valley. The Specific Plan will be used to further develop the initial concepts from the Visioning Study, and provide standards and guidelines to direct the implementation of a scenic recreational destination with ample natural resources that attracts local residents and visitors. The Specific Plan will assist in redefining the image of the Arroyo Simi and create a special place Upon completion of the Specific Plan, the document will provide plans for the development of the Arroyo Simi Greenway; a phasing and implementation plan for the multi-phased, multi-year project; a sustainability program, to ensure that the Greenway project protects the environment by choosing appropriate construction materials and restoring and preserving the natural environment; and a stewardship program for the longterm maintenance of the Greenway. The Specific Plan illustrates and describes all primary elements of the Greenway and defines a trail system that is convenient and safe for people of all abilities and ages. The Specific Plan discusses methods of implementing programs and events that foster an enjoyable experience for both frequent and occasional trail users, and encourages social interaction and a healthy lifestyle. The Specific Plan provides design solutions that identify methods of providing recreational opportunities along the Arroyo Simi Greenway, while allowing for security and privacy of adjacent land owners and maintaining VCWPD flood control functions. The information, guidance, and references contained within this Specific Plan are to be used as a basis for future improvements but they are not intended as a substitute for sound engineering judgment, and cannot realistically cover all the possible design scenarios PROJECT DESCRIPTION

23 INTRODUCTION The primary objectives of this Arroyo Simi Greenway Specific Plan are to: Meet statutory requirements for Specific Plans under the Government Code Provide a phasing plan along with discussions of stewardship programs to allow for informed and flexible implementation of improvements for the Greenway Create a Greenway that serves pedestrian and bicycle commuter and recreational needs and to lessen vehicle trips and traffic congestion and improve air quality Promote Greenway use with enhanced trail access and transit connections, clearly defined street crossings, the installation of pedestrian/bicycle bridges and under crossings in key locations, and the development of trailhead areas with support facilities such as restrooms and bicycle parking Increase recreational opportunities by linking the trail system to existing and proposed adjacent parks and overlooks/ rest areas Create a unique sense of place for the Arroyo Simi Greenway with ample visitor amenities and improved aesthetics Promote the use of sustainable materials, programs and maintenance practices along the Greenway Foster awareness of sustainability and conservation along the Greenway to trail users Create a pedestrian-friendly environment that emphasizes human scale development, and safe opportunities to rest and gather Incorporate existing amenities found along the Arroyo Simi whenever feasible Develop a heightened visual awareness of the Greenway from public streets using consistent and recognizable design elements Incorporate public art programs to develop a vibrancy and unique identity for the Greenway Develop a unified and consistent signage program with maps installed in strategic locations to provide directions and visual indicators of the extent of the Greenway Install interpretive exhibits to provide education about the Arroyo Simi such as watershed and water quality, history, and native flora and fauna Educate the public and transform the Greenway into a popular destination for school field trips and outdoor classrooms Use a consistent landscape palette to create microclimates, highlight desirable areas, and provide buffered pedestrian zones Enhance riparian habitats along the Arroyo Simi and improve water quality c. PROJECT GOALS AND OBJECTIVES PROJECT DESCRIPTION 1.1-7

24 INTRODUCTION d. REGIONAL WATERSHED c. Regional Watershed Watersheds are natural boundaries for water runoff and encompass all areas that drain to a common water body. All water within the watershed either flows to the ocean or percolates through the soil to the groundwater. As the water flows through the watershed it picks up pollutants and debris. The Arroyo Simi is part of the larger Calleguas Creek Watershed Management Plan area which is implemented by the Ventura County Watershed Protection District to provide a cooperative strategy for resource management and protection of this watershed. The Arroyo Simi is the main drainage channel for the Simi Valley area and there are streams from both the Simi Hills and the Santa Susana Mountains draining into the Arroyo Simi, and it ultimately flows to the Pacific Ocean through Mugu Lagoon. The Arroyo Simi channels and creeks have more than 2,300 acres of floodplain. Riparian plants are natural filters for trapping sediment and contaminants Corriganville Park is the most easterly portion of the Greenway and contains the start of the Arroyo Simi. According to the Calleguas Creek Watershed Management Plan, it is very important to preserve essential upland habitat because the quality of water and habitat in the upper watershed has a significant effect on the downstream and ocean health. Increasing the use along the Arroyo Simi will foster public stewardship of the Greenway, thereby deterring detrimental activities currently occurring in the stream area, such as dumping of trash. Native plant restoration throughout the Greenway along with increased sustainable maintenance practices and decreased littering will significantly improve the water quality of the Arroyo Simi while creating better habitat areas for local wildlife. Riparian plant communities are very important as habitat, and they are natural filters for trapping fine sediment and decomposing and degrading contaminants PROJECT DESCRIPTION

25 INTRODUCTION d. REGIONAL WATERSHED Approximate Project Area Callegus Creek Watershed PROJECT DESCRIPTION 1.1-9

26 INTRODUCTION e. CONSERVATION OF NATURAL RESOURCES d. Conservation of Natural Resources The Greenway will be managed for habitat conservation and recreational purposes, and natural resource protection and enhancement is a vital component to the project. Greenway trails will be sensitive of the existing riparian habitat, and protect creek banks and riparian vegetation. Areas where bicyclists and pedestrians have access to the creek will be limited in number and will avoid areas that would require the removal or disruption of significant habitat areas. Preservation and enhancement of the Arroyo Simi and its adjacent open space areas are important to maintain the habitat value that the natural environment brings to residents and visitors. The development of the Greenway will require consideration of both the natural systems and the community s desire for recreational opportunities. Amenities like recreation and education can help to maintain the stability of the ecological systems because visitors appreciate them and care for them. The Greenway trail system will provide a variety of wildlife viewing and community volunteer activities, and allow for trail users to experience nature within the Arroyo with minimal environmental impacts PROJECT DESCRIPTION Preserve the habitat value of the natural environment

27 INTRODUCTION The Arroyo Simi Greenway will provide environmental education and stewardship opportunities for both adults and children to learn about natural resource protection and enhancement e. CONSERVATION OF NATURAL RESOURCES An important part of the Arroyo Simi Greenway will include environmental education about natural resource protection and enhancement. Interpretive exhibits will be located along the Greenway to provide information to both adults and children about the importance of preserving habitat areas while learning about Simi Valley s rich cultural heritage. Interpretive exhibits will be located along the Greenway to provide information about preserving and enhancing habitat areas PROJECT DESCRIPTION

28 PROJECT DESCRIPTION

29 RELATIONSHIP TO SIMI VALLEY MUNICIPAL CODE AND GENERAL PLAN section 1.2 INTRODUCTION 1.2 Relationship to Simi Valley Municipal Code and General Plan 1-1

30 INTRODUCTION section 1.2 RELATIONSHIP TO SIMI VALLEY MUNICIPAL CODE AND GENERAL PLAN SECTION CONTENTS PAGE 1.2 a... Relationship to the Simi Valley Municipal Code and General Plan b... Specific Plan Authority b.1... Relationship to the California Environmental Quality Act b.2... Concurrent and Subsequent Review and Approval b.3... Specific Plan Administration RELATIONSHIP I TO SIMI I VALLEY L MUNICIPAL I CODE AND GENERAL E PLAN

31 INTRODUCTION SECTION 1.2 RELATIONSHIP TO SIMI VALLEY MUNICIPAL CODE AND GENERAL PLAN A Specific Plan document is a detailed version of the City s General Plan for a focused area. The document specifically provides for concepts, regulations and controls for the specified area. The adoption of the Specific Plan establishes the planned character for the project area and ensures that responsible planning and development of the area occurs by establishing the standards by which development will occur. The Specific Plan, when adopted by the City of Simi Valley, will serve as both planning and regulatory functions. The authority to prepare, adopt and implement Specific Plans is granted by the California Government Code (Title 7, Division 1, Chapter 3, Article 8, and Sections through 65457). California Government Code Section also stipulates that the Specific Plan shall include a statement of the relationship of the Specific Plan to the local government s General Plan. RELATIONSHIP TO SIMI VALLEY MUNICIPAL CODE AND GENERAL PLAN section 1.2 To adopt a Specific Plan, the Simi Valley Planning Commission must hold a public hearing before it can make a recommendation for adoption of the Specific Plan to the City Council. The City Council must also hold a public hearing to adopt the Specific Plan. Per the California Government Code, a Specific Plan may be adopted either by a Resolution or an Ordinance. This Specific Plan will be adopted by Ordinance, since the document will establish specific zoning standards for the Greenway project area. Specific Plan Authority and Policy Intent Ensure that the Greenway will be compatible with surrounding uses and the environment Provide for development that is consistent with the Simi Valley General Plan land use and zoning designations Discuss recommendations and approvals that are necessary for Specific Plan adoption Provide information regarding CEQA compliance Develop a Specific Plan administration procedure Provide a process for potential future Specific Plan amendments Discuss Specific Plan enforcement RELATIONSHIP I TO SIMI I VALLEY L MUNICIPAL I CODE AND GENERAL E PLAN 1.2-1

32 INTRODUCTION a. RELATIONSHIP TO SIMI VALLEY MUNICIPAL CODE AND GENERAL PLAN a. Relationship to Simi Valley Municipal Code and General Plan Due to the length of the Greenway, the project area consists of many General Plan land use designations, which include: Open Space; Low-, Medium, High, and Very High-Density Residential; Mobile Home; Public Services Center; Elementary School; Community Park; Community Park with Community Activity Facility Overlay; Neighborhood Park; Cemetery; Brandeis- Bardin Institute; Office Commercial; District Commercial; and Light Industrial. The Specific Plan does not propose to change these land uses, as the project will either consist of right-ofway improvements or public park improvements, which are considered public services, and which are compatible with all General Plan Land Use designations, per Table A-1 of Simi Valley General Plan, Appendix A. The Simi Valley Greenway Specific Plan is also consistent with the following General Plan policies: Land Use Element Policy III-1.3: Highly visible public improvements should be designed and landscaped to blend into the environment. Policy III-1.3.1: Major linear valley-floor improvements, such as the railroad, arroyo, major roadways and the freeway, should be well landscaped. Major hillside linear improvements should be located to avoid a prominent appearance from urban areas, should blend into the natural topography, and shall utilize attractive, low-maintenance, drought-tolerant materials where appropriate. Policy III-1.3.3: Structures to channel or retain water should be designed and constructed of materials and colors so as to blend with the natural environment. Policy III-1.5: The design of a project should respect, work with, and complement the natural features of the land. Policy III-1.5.1: Natural scenic features such as mature trees, rock outcroppings, watercourses, and views should be integrated into project design RELATIONSHIP TO SIMI VALLEY MUNICIPAL CODE AND GENERAL PLAN

33 INTRODUCTION The Arroyo Simi Greenway Specific Plan will implement landscaping plans that will protect and enhance the natural landscaping that occurs within the Arroyo Simi. Per Section 2.16 of the Specific Plan, the new landscaping will be native and drought-tolerant, and will be designed to create a more natural and beautiful environment with wildlife habitats and to incorporate plants to filter pollutants and provide better water quality, be compatible with FEMA requirements (per Section 2.16.a.3) and also require that all planting along the Arroyo should be carefully considered in order to minimize operations and maintenance impacts, and preserve unobstructed access to VCWPD facilities. Policy III Architecture should be integrated with the terrain and should blend with the natural environment. Section 2.14.e of the Specific Plan requires Craftsman architecture for Greenway structures, such as restroom facilities and picnic shelters, which will be low and horizontal, and will use natural materials, such as stone, wood and/or earth-tone colors that blend with the natural environment. a. RELATIONSHIP TO SIMI VALLEY MUNICIPAL CODE AND GENERAL PLAN RELATIONSHIP I TO SIMI I VALLEY L MUNICIPAL I CODE AND GENERAL E PLAN 1.2-3

34 INTRODUCTION a. RELATIONSHIP TO SIMI VALLEY MUNICIPAL CODE AND GENERAL PLAN Policy III-1.6: Projects should be designed to provide a compatible relationship with adjoining uses. Policy III-1.6.1: The pattern of existing neighborhoods, land use and architecture should be respected. The Arroyo Simi Greenway Specific Plan project will result in improvements to the recreational opportunities currently provided by the Arroyo Simi and the Ventura County Watershed Protection District s rights-of-way along the top of each side of the Arroyo. These improvements will include paving the Watershed Protection District s rights-of-way to provide multiuse (pedestrian/bicycle/equestrian) trails, installing overlooks, rest stops, trail heads, and pedestrian bridges over the Arroyo, expanding or creating parks, creating connections to adjacent residences, businesses and nearby schools, and installing new gateways, signs and lighting along the Greenway. Per General Plan Appendix A, public services, such as parks, are considered compatible with all zones in the City. In addition, the landscaping and amenities installed within the project area will be located and situated to be compatible with surrounding uses. For example, per Specific Plan Section 2.14.e, new buildings within the Greenway will have a Craftsman design, which uses natural materials and warm, earth tone colors, to blend with the surrounding environment, and per Specific Plan Section 2.8.a, Parks shall provide buffered boundaries with fencing and planting between adjacent residential areas to provide privacy RELATIONSHIP TO SIMI VALLEY MUNICIPAL CODE AND GENERAL PLAN

35 INTRODUCTION Policy III-1.6.5: Lighting and signs should be designed, located and directed such that they do not disturb adjacent uses. Per the Arroyo Simi Greenway Specific Plan Section 2.7.2, lighting within the Greenway will be installed in strategic locations to provide security. However, the light standards will be designed to prevent glare and light spillover onto adjacent properties, per Simi Valley Development Code requirements. Per Specific Plan Section 2.12, Greenway signage will be used both to tie the different elements of the Greenway together and to provide information and safety for the Greenway users. The Greenway signage will be directed toward the Greenway or toward motorists on adjacent streets, and not at adjacent uses (Specific Plan Section 2.12.k). Greenway lighting and signs will be designed, located and directed such that they do not disturb adjacent uses a. RELATIONSHIP TO SIMI VALLEY MUNICIPAL CODE AND GENERAL PLAN RELATIONSHIP I TO SIMI I VALLEY L MUNICIPAL I CODE AND GENERAL E PLAN 1.2-5

36 INTRODUCTION a. RELATIONSHIP TO SIMI VALLEY MUNICIPAL CODE AND GENERAL PLAN Policy III-2.1: The overall pattern of land use should promote efficient development, minimize the impact of traffic congestion, reduce transportation distances and air pollution, ensure compatibility between uses, and protect the natural hillsides, major watercourses, trees and tree rows. Per General Plan Appendix A, public services, such as parks, are considered compatible with all zones in the City. In addition, the landscaping and amenities installed within the Arroyo Simi Greenway Specific Plan project area will be designed and situated to be compatible with surrounding uses, as specified in Arroyo Simi Greenway Specific Plan Sections 2.8.a and 2.14.e. Further, the Greenway Specific Plan provides standards that will protect and enhance the natural features of the Arroyo Simi and the trees within the project area (refer to Specific Plan Sections 1.1.b and 2.10.a.1). The Greenway will also provide a multi-modal trail along the entire length of the Specific Plan project area (approximately 12 miles), which will also connect to nearby schools, parks, residential neighborhoods and business areas, thus providing several means of transportation (pedestrian, bicycle, equestrian) other than vehicular, to reduce transportation distances, vehicle miles traveled and air pollution, per Greenway Specific Plan Section 2.5, Trails Program RELATIONSHIP TO SIMI VALLEY MUNICIPAL CODE AND GENERAL PLAN

37 INTRODUCTION Open Space and Conservation Element Policy IV-1.1.1: Watershed, watercourses, and underground aquifers in outlying areas shall be maintained in their natural state to the fullest extent possible. Policy IV-1.7.4: The City should encourage the use of attractive, low-maintenance, drought-tolerant landscaping materials in all public and private developments and improvements. Policy IV-2.4: Landscaping should complement the character of each neighborhood or area. Policy IV-2.6: Development should be sensitive to the preservation and protection of wildlife and vegetation, which is indigenous to Simi Valley, consistent with the public health, safety or general welfare. Policy IV-2.6.3: Riparian habitat outside of the valley floor or adjacent to the western end of the Arroyo Simi should be preserved and protected to the fullest extent practical, consistent with the public health, safety or general welfare. Arroyo Simi Specific Plan Section 2.10 provides standards that will protect the natural features of the Greenway project area, including the riparian habitat adjacent to the western end of the Arroyo. In addition, Specific Plan Section 2.10 mandates the following: Design for local environmental conditions and incorporate non-invasive/drought-tolerant plants that can adapt to the natural rainfall of the area. Further, Specific Plan Section 2.8.a requires: Parks shall provide buffered boundaries with fencing and planting between adjacent residential areas to provide privacy, to ensure that landscaping compliments the character of the surrounding neighborhoods and areas. a. RELATIONSHIP TO SIMI VALLEY MUNICIPAL CODE AND GENERAL PLAN Encourage the use of attractive, low-maintenance, drought-tolerant landscaping materials RELATIONSHIP I TO SIMI I VALLEY L MUNICIPAL I CODE AND GENERAL E PLAN 1.2-7

38 INTRODUCTION a. RELATIONSHIP TO SIMI VALLEY MUNICIPAL CODE AND GENERAL PLAN Recreation Element Policy VI-1.2: Parks and recreation areas, facilities, programs, and service should be planned on the basis of public interest and need, and reviewed by the City on the basis of local neighborhood input. Policy VI-1.3: The City shall continue to review park and recreation facilities to avoid adverse impacts on adjacent land uses. Policy VI-1.4.1: Activities with high traffic levels, noise and nightlighted recreational facilities should be located in such a manner to minimize impacts on adjacent areas. Policy VI-1.6: Flood control rights-of-way such as arroyos, maintenance roads, open reservoirs, spreading and retention basins, should be developed in such a way that they can also be used for recreational purposes where appropriate. A trail/bikeway system has existed along portions of the top of the Arroyo Simi for many years. However, in 2007, with guidance by the Arroyo Simi Committee and with public input from workshops and public meetings, the Arroyo Simi Greenway Visioning Study was completed. Using the Visioning Study as a base, the Arroyo Simi Greenway Specific Plan provides development standards to implement the design concepts of the Visioning Study to improve the project area into a recreational amenity. Opportunities for public input have occurred at four Arroyo Simi Committee meetings, two presentations of the project at each Neighborhood Council, and at informational presentations and workshops at a variety of venues, additionally, the formal application for the project will be presented to the Simi Valley Planning Commission for a recommendation to the City Council and to the City Council for approval at public hearings. As with all parks in the City of Simi Valley, the project is being reviewed through the Conditional Use Permit process to ensure that the proposed improvements, including playgrounds, trailheads and lighting will be sensitive to, and compatible with, surrounding land uses RELATIONSHIP TO SIMI VALLEY MUNICIPAL CODE AND GENERAL PLAN

39 INTRODUCTION Policy VI-1.13: The City shall encourage and pursue the development of an interconnecting and safe system of paths and trails for pedestrians, joggers, bicyclists and equestrians. A primary component of the Arroyo Simi Greenway will be the improvement of the existing bike/walkway along the Ventura County Watershed Protection District s rights-of-way along the top of the Arroyo. Currently, the bike/walkway does not extend in paved sections along the entire length of the Arroyo. Once constructed per the Greenway Specific Plan, the Watershed District s rights-of-way will be fully paved along the entire length of the Greenway project area (approximately 12 miles in length) on the north and/or south sides of the Arroyo. Standards are provided throughout the Greenway Specific Plan document for the development of trails and adjacent amenities. For example, Specific Plan Section 2.5, Trails Program, provides development standards for pavement surfaces and lane designs for different uses (pedestrians vs. bicyclists), Section 2.12, Greenway Signage Program provides standards for directional signage and mile markers, Section 2.7, Lighting Program provides trail lighting standards, and Section 2.14, Site Furnishings Program provides standards for bike racks, bollards, enhanced paving and structures such as restrooms. New bridges will be installed at strategic locations across the Arroyo Simi to connect the trail to the north and south sides of the Arroyo. Standards for these bridges are provided in Section 2.6 of the Specific Plan. Further, the Greenway will also connect to nearby schools and parks, and to other trail systems, such as the trail that leads from Tierra Rejada park to Mt. McCoy and beyond, and the equestrian trail that leads from the equestrian center near Sequoia Avenue into the hills to the south of the City, per Section 1.3.b of the Specific Plan. The Greenway will be used for recreational purposes and contain an interconnected safe system of trails for pedestrians, joggers, bicyclists and equestrians RELATIONSHIP I TO SIMI I VALLEY L MUNICIPAL I CODE AND GENERAL E PLAN a. RELATIONSHIP TO SIMI VALLEY MUNICIPAL CODE AND GENERAL PLAN

40 INTRODUCTION a. RELATIONSHIP TO SIMI VALLEY MUNICIPAL CODE AND GENERAL PLAN Circulation Element Policy VII-1.2: To ensure the smooth and safe flow of vehicles and bicycles, access points onto arterial roadways should be safe and limited in number and location. Section 2.16.c of the Arroyo Greenway Specific Plan provides development standards for under crossings below bridges where acceptable clearance heights under the bridges can be accommodated, to minimize points where the Greenway will intersect with roadways. However, where such intersections are necessary, to ensure safety, crosswalks that have a design that is unique to the Greenway, signage and/or synchronized traffic signals are proposed, per Specific Plan Section 2.3, to ensure the smooth and safe flow of vehicles and bicycles. Policy VI-1.21: The City shall encourage the provision of off-street bicycle paths. Bicycle racks and storage facilities should be encouraged at public buildings, commercial buildings and industrial building sites with a large work force. Policy VII-2.6: Traffic system management measures such as high-occupancy company-sponsored vehicles, ride-sharing programs, development features to encourage bicycle use, or utilizing the labor force close to the workplace should be developed to reduce vehicle-miles traveled. A primary component of the Arroyo Simi Greenway Specific Plan, per Section 1.1, Project Description, will be to fully improve the off-street bikeway located along the top of the Arroyo Simi s banks for the entire 12-mile length of the Greenway project area. Section 2 of the Greenway Specific Plan also provides development standards for dedicated connections to nearby parks, schools, residential neighborhoods and commercial and industrial areas, to encourage students, residents, employees, etc. to use the Greenway as their means of travel, rather than personal vehicles RELATIONSHIP TO SIMI VALLEY MUNICIPAL CODE AND GENERAL PLAN

41 INTRODUCTION Safety Element Policy VIII-3.5: Drainage channels that do not create an unacceptable flood risk or public safety hazard should be retained in their natural state. Required flood improvements, where feasible, shall incorporate aesthetic design treatments. Section 2.10 of the Arroyo Simi Greenway Specific Plan provides standards for landscape plans that maintain and enhance the native landscaping found along the Arroyo Simi. Section 2.16.a also mandates that all planting along the Arroyo Simi Greenway shall minimize operations and maintenance impacts and preserve unobstructed access to VCWPD facilities. Where enhanced flood improvements are deemed necessary (i.e., at bridge under crossings), enhanced pavement, public art, riprap, etc. will be used, to provide aesthetic design treatments that are unique to the Arroyo Simi Greenway, per Specific Plan Section 2.15.a. Policy VIII-8.5.1: The arrangement of buildings, access, outdoor lighting and landscaping should facilitate police protection and ensure resident security. Doors, windows and hardware shall meet minimum burglar-resistant standards. Greenway Specific Plan Section 2.14.e requires that Restrooms shall be safely lit per City standards and have entries oriented towards the trail or main path of travel. Specific Plan Section , Landscape Standards provides several requirements, such as plant heights, massing and location to ensure that plants must not obscure safe sight lines or pose obstructions which limit the visibility of trail users or patrolling vehicles. The improvements provided in Sections 2.5 and 2.13 of the Specific Plan to the bike/walkway along the top of the Arroyo channel, such as paving, replacement of wood chicanes with movable bollards and Rhino gates, etc. will improve access for emergency vehicles. Further, the enhancements to the Greenway project area will encourage more users along the Greenway, thus by its nature providing more surveillance and fewer opportunities for crime to occur. a. RELATIONSHIP TO SIMI VALLEY MUNICIPAL CODE AND GENERAL PLAN RELATIONSHIP I TO SIMI I VALLEY L MUNICIPAL I CODE AND GENERAL E PLAN

42 INTRODUCTION a. RELATIONSHIP TO SIMI VALLEY MUNICIPAL CODE AND GENERAL PLAN Community Services Element Policy IX-1.1: The City shall promote public participation to encourage public involvement regarding levels of public services, which the community desires. In 2007, with guidance by the Arroyo Simi Committee, and with public input from workshops and public meetings, the Arroyo Simi Greenway Visioning Study was completed. Using the Visioning Study as a base, the Arroyo Simi Greenway Specific Plan provides development standards to implement the design concepts of the Visioning Study. Arroyo Simi Committee meetings that were open to the public and a public workshop were held for the Specific Plan, the project was presented to all four Neighborhood Councils and displayed at the Simi Valley Library, and the formal application for the project will be presented to the Simi Valley Planning Commission for a recommendation to the City Council and to the City Council for approval at public hearings. The Arroyo Simi Greenway will promote public participation to encourage public involvement regarding levels of public services RELATIONSHIP TO SIMI VALLEY MUNICIPAL CODE AND GENERAL PLAN

43 INTRODUCTION Policy IX-1.4: The City shall continue to pursue grants, matching funds, and other available financing mechanisms to provide community services at desirable levels without the imposition of a City general fund property tax. The Arroyo Simi Greenway Specific Plan includes an Implementation Program (Section 4.2) and a Stewardship Program (Section 4.3). The purpose of these programs is to explore funding sources other than the City s General Fund for the construction of the Greenway s components and for the long-term maintenance of the Greenway. The park facility improvements within the Greenway project area will be maintained by the Rancho Simi Recreation and Park District, the City s partner in the Greenway project (per Specific Plan Section 4.4.a). However, the Greenway will not only function as a park, but it will also serve as an alternative transportation mode (pedestrian, bicycle, equestrian), and will incorporate sustainable construction and landscaping methods, public art, etc. Therefore, Specific Plan Sections 4.2 and 4.3 explore funding mechanisms related to the development and maintenance of these items, including developer impact fees and sponsorship programs. The Arroyo Simi Greenway Specific Plan includes an implementation program and a stewardship program a. RELATIONSHIP TO SIMI VALLEY MUNICIPAL CODE AND GENERAL PLAN RELATIONSHIP I TO SIMI I VALLEY L MUNICIPAL I CODE AND GENERAL E PLAN

44 INTRODUCTION b. SPECIFIC PLAN AUTHROITY b. Specific Plan Authority b.2 Concurrent and Subsequent Review and Approval b.1 Relationship to the California Environmental Quality Act (CEQA) A Mitigated Negative Declaration will serve as the CEQA documentation for the Arroyo Simi Greenway Specific Plan. To implement the Arroyo Simi Greenway Specific Plan, the following formal entitlement applications are concurrently required: Specific Plan SP-S-0028: Establishes development standards for the Arroyo Simi Greenway project area. The Specific Plan requires Planning Commission recommendation to the City Council and City Council adoption by Ordinance. Zone Change Z-S-0677: Establishes a Specific Plan Overlay over the existing zoning designations within the Greenway project area. The Zone Change requires Planning Commission recommendation to the City Council and City Council adoption by Ordinance. Conditional Use Permit CUP-S-0723: All parks within the City of Simi Valley must be processed with a Conditional Use Permit (CUP). CUP-S-0723 establishes a master CUP for the Greenway project area. The CUP requires Planning Commission approval only (contingent upon approval of SP-S-0028 and Z-S Subsequent to approval of the following entitlements, all further discretionary review of projects within the Specific Plan project area will be done through the post-approval, plan check process, provided that the plans substantially conform to the standards and conditions of approval established by the Specific Plan and Conditional Use Permit RELATIONSHIP TO SIMI VALLEY MUNICIPAL CODE AND GENERAL PLAN b.3 Specific Plan Administration The Arroyo Simi Greenway Specific Plan shall be administered and enforced by the City of Simi Valley Planning Division. Amendments to the Specific Plan will require a formal Specific Plan Amendment application to be filed with the City of Simi Valley, Department of Environmental Services for Planning Commission and City Council action. Per California Government Code Sections , Specific Plans shall be prepared, adopted and amended in the same manner as General Plans. The Arroyo Simi Greenway Specific Plan may be amended as necessary, with any amendment being approved by Ordinance. These amendments shall not require a concurrent General Plan amendment, unless it is determined by the City of Simi Valley that the proposed amendment would conflict with the General Plan.

45 CONNECTIONS TO THE GREENWAY section1.3 INTRODUCTION 1.3 Connections to the Greenway 1-1

46 INTRODUCTION section 1.3 CONNECTIONS TO THE GREENWAY SECTION CONTENTS PAGE 1.3 a... Safe Routes to Schools a.1... The SR2S Program a.2... The SRTS Program b b b b.3... Expanding the Greenway... School Connections... Regional Trail Connections... Class 2 and 3 Bike Lanes c... Transit Improvements CONNECTIONS TO THE GREENWAY

47 INTRODUCTION 1.3 CONNECTIONS TO THE GREENWAY The Arroyo Simi Greenway is approximately 12 miles in length, and is located in the middle of the City of Simi Valley. The Greenway is within easy walking distance of several schools and parks, and proposes to link to the City s Civic Center. The Greenway is located adjacent to many business and residential areas, and provides proximity and opportunity to commute to work or school. Many employees working along the Greenway could also use the trail system and its amenities during their lunch hour. The Arroyo Simi Greenway will also provide regional transportation and commuting opportunities. The Greenway is proposed to eventually connect with the City of Moorpark s planned trail system along the Arroyo Simi, and one day link the trail with other communities. The Greenway will link to the Metrolink/Amtrak Station and multiple bus stops, so trail users can easily take a bus or train as part of their commute. Trailhead facilities will be located throughout the Greenway so trail users can arrive with bikes on their cars, and conveniently access the trail. CONNECTIONS TO THE GREENWAY section 1.3 Connections to the Greenway Intent Increase the number of children who walk or bicycle to school Create safe walking and bicycling conditions for all ages and abilities Reduce traffic collisions and slow down vehicles Enhance the community so that it is easier to travel locally without a car Foster physical activity and encourage healthy lifestyles Educate the community about Greenway transit linkages Highlight and make use of the multiple connections of the Greenway through town Link alternative modes of transportation to the Greenway and make them safe, comfortable and more appealing CONNECTIONS TO THE GREENWAY 1.3-1

48 INTRODUCTION a. SAFE ROUTES TO SCHOOL a. Safe Routes to Schools Walking and bicycling to school is less common today for many students. Today, fewer children walk to school regularly, and even those living close to their school often arrive at school in automobiles or buses. This decline in walking and bicycling has adverse effects on traffic congestion and air quality around schools, as well as decreasing pedestrian and bicycle safety. Many parents feel that traffic dangers and safety issues are currently too great to allow their children to bicycle or walk to school. The Safe Routes to School program seeks to increase the number of children who choose to walk or bicycle to school and remove the barriers that prevent them from doing so. The goal is to create safe walking and bicycling conditions for children with accessible crosswalks and well-maintained walkways that are separated from vehicles. The program also aims to slow traffic in neighborhoods and near schools, and have fewer cars at the school entrances. The concept is to promote and encourage more active children by providing educational programs aimed at children, parents, and the community. The programs will address safety skills and teach children to cross streets at marked crossings. It also involves educating the community and reminding drivers to slow down and watch for bikes and pedestrians on the road. There are two separate and distinct Safe Routes to School programs. SR2S Program: State-Legislated Program for children in grades K-12 SRTS Program: Federal Program for children in grades K-8 Although both programs have similar goals and objectives, their funding source, local funding match requirements and other program requirements are different. Refer to Section 4.2, Implementation Program for addition funding information The Safe Routes to School program seeks to increase the number of children who choose to walk or bicycle to school CONNECTIONS TO THE GREENWAY

49 INTRODUCTION a.1 The SR2S Program The State-legislated SR2S program is primarily a construction program, and the improvements must be made on public property. The amount of funds available for the program will depend on how much funding is available for the program in the annual state budget. SR2S funds can support both infrastructure and non-infrastructure projects. Infrastructure projects must be constructed within a 2-mile radius of the school; non-infrastructure projects are considered incidental and limited to 10% of the construction costs. Infrastructure projects must be constructed within a 2-mile radius of schools Project implementation activities and infrastructure projects related to the Greenway that are eligible for reimbursement include: Preliminary engineering: o Environmental clearance o Preparation of Plans, Specifications and Estimate (PS&E) Right-of-way: o Engineering o Appraisals and acquisition o Utilities Construction: o Construction costs o Construction engineering Sidewalks o New sidewalks o Sidewalk widening and gap closures o Curbs and gutters o Curb ramps On-street and off-street bicycle and pedestrian facilities o Pedestrian and bicycle crossing improvements o Pedestrian under crossings o New or upgraded bikeways and trails o Bicycle trail geometric improvements o Bicycle trail shoulder widening o Bicycle parking facilities, racks and lockers Traffic calming and speed reduction o Traffic diversion improvements in the vicinity of schools o Incorporate Traffic Calming Measures, refer to Section 2.3a, and Traffic Control Devices, refer to Section 2.3c. a. SAFE ROUTES TO SCHOOL CONNECTIONS TO THE GREENWAY 1.3-3

50 INTRODUCTION a. SAFE ROUTES TO SCHOOL a.2 The SRTS Program The federal legislation specifies the following purposes for the SRTS program: To enable and encourage children in grades K-8, including those with disabilities, to walk and bike to school To make bicycling and walking to school a safer and more appealing alternative, thereby encouraging a healthy and active lifestyle from an early age To facilitate the planning, development and implementation of projects and activities that will improve safety and reduce traffic, fuel consumption, and air pollution in the vicinity of schools All components of the SRTS program require coordination with local government officials, law enforcement, school officials, parents, and the general public. The SRTS program application should address issues and strategies related to five main topics: Engineering Education Encouragement Enforcement Evaluation Make bicycling and walking to school a safer and more appealing alternative CONNECTIONS TO THE GREENWAY

51 INTRODUCTION Engineering Engineering is a broad concept used to describe the design, implementation, operation and maintenance of traffic control devices or physical measures. Encouragement Encouragement strategies are about having fun, and they generate excitement and interest in walking and bicycling. Encouragement programs can be organized by parents, students, teachers or community volunteers. Evaluation After the program begins, careful monitoring will identify which strategies are increasing the number of children safely walking and bicycling to school, and how to sustain energy and interest in the program so that children continue to walk and bicycle to school safely. a. SAFE ROUTES TO SCHOOL Education Education involves: developing a network of community members working together to promote and teach safe walking, bicycling and driving skills; creating a wellrounded group that represents a wide range of interests and expertise, and designate a permanent committee within the PTA, school site council or other group means that SRTS will continue to receive attention and energy, involving children in the SRTS program to learn what is important to them around their school and neighborhood; and making the work fun and positive so that that people will want to continue and others will want to become involved. Encouragement strategies can jumpstart a community s interest in walking and bicycling by generating enthusiasm early in the program and by providing ways for parents and children to discover, or rediscover, that walking and bicycling are a lot of fun. Enforcement Enforcement includes students, parents, crossing guards, school personnel and neighborhood watch programs all working in conjunction with law enforcement to create safe routes to school. Consider crossing guards for peak school travel times CONNECTIONS TO THE GREENWAY 1.3-5

52 INTRODUCTION a. SAFE ROUTES TO SCHOOL b. Expanding the Greenway The Arroyo Simi Greenway is not just a linear trail system; it links to multiple areas throughout the City. The Greenway will provide an off-street trail route through the center of the City that has ample opportunities for conveniently and safely linking commuters and recreational riders to other areas in the City and surrounding communities. The Class 1 trail will encourage walking and biking by providing many connections to schools, parks, work and shopping. The Greenway will link to surrounding regional trails on both the west and east side of the City and significant increase the recreational opportunities of the trail system. The Greenway will also enhance on-street bike and alternative transportation systems so trail users can easily and comfortably take a bike from the Greenway to a bus or train as part of their commute CONNECTIONS TO THE GREENWAY The Arroyo Simi Greenway is within easy walking and biking distance of many schools

53 INTRODUCTION b.1 School Connections The Arroyo Simi Greenway is within easy walking and biking distance of many schools, including one of the City s largest high schools. There are 24 public schools within 2 miles of the Greenway, and 20 of them are elementary schools. Many of these schools are proposed to be linked by Class 1 trails along existing drainages to the Greenway, and become safe routes to schools. Schools which meet 2 mile requirements of the SR2S Program (Grades K-12), includes all schools listed under SRTS Program, plus: a. SAFE ROUTES TO SCHOOL Schools that meet the 2-mile requirements of the SRTS Program (Grades K-8): Arroyo Elementary School Atherwood Elementary School Berylwood Elementary School Crestview Elementary School Garden Grove Elementary School Hillside Middle School Hollow Hills Elementary School Justin Elementary School Katherine Elementary School Knolls Elementary School Lincoln Elementary School Madera Elementary School Mountain View Elementary School Park View Elementary School Santa Susana Elementary School Simi Elementary School Sinaloa Middle School Sycamore Elementary School Vista Elementary School White Oak Elementary School Apollo High School Royal High School Santa Susana High School Simi Valley High School CONNECTIONS TO THE GREENWAY There are 24 public schools within 2 miles of the Greenway 1.3-7

54 INTRODUCTION a. SAFE ROUTES TO SCHOOL Of all the schools within 2 miles of the Greenway, there are 10 specifically linked to the Arroyo Simi Greenway through proposed trail system enhancements (refer to Section 2.2, School Entry Enhancements for additional information): Apollo High School o New bridge connection at School Street Arroyo Elementary School o Proposed connection to the Greenway at Aristotle Street and Sinaloa Road Berylwood Elementary School o New Drainage Trail connection o Widened sidewalks along Sycamore Drive Santa Susana Elementary School o New Drainage Trail connection Simi Elementary School o New bridge connection at School Street Sinaloa Middle School o New Drainage Sidewalk connection and entry plaza o Refer to Section 2.5e for Key Study Area 4, and 2.2b for Key Study Area 4a Sycamore Elementary School o New Drainage Trail connection Katherine Elementary School o New entry and safety enhancements o Refer to Section 2.2a Knolls Elementary School o Connection to the Greenway White Oak Elementary School o New Drainage Trail connection CONNECTIONS TO THE GREENWAY There are 10 schools which could use the Greenway as a primary school travel route

55 INTRODUCTION One of the items listed under the SRTS education category is to collect traffic injury data that can help identify driver-related safety issues. According to the Simi Valley Bicycle Master Plan, December 2008, most of the bicycle related injuries occurred on roads with high speeds and large traffic volumes. Most incidents in the City occurred on major arterials surrounding the Greenway, and were primarily concentrated on Los Angeles Avenue, Royal Avenue, Cochran Street, First Street, and Erringer Avenue. a. SAFE ROUTES TO SCHOOL Unfortunately many of these roads are current routes students take to schools in the City. The Bicycle Master Plan recommended that projects address diverting bicycle traffic away from some of these busy corridors. The Greenway is located between Los Angeles and Royal Avenue, and having this off-street travel alternative may reduce the number of bicycle accidents in the City. The Greenway is located between two major roadways within the City, and the enhancement of the Class 1 trail system will divert bicycle traffic away from these busy road corridors CONNECTIONS TO THE GREENWAY 1.3-9

56 INTRODUCTION b. EXPANDING THE GREENWAY b.2 Regional Trail Connections On the west, the Greenway will There are several existing regional trails within the City of Simi Valley, and the Arroyo Simi Greenway will conveniently link to most of them. Incorporating these existing amenities into the Greenway will significantly increase potential users from other areas of the City, and also provide for a more extensive recreational trail system. The Greenway can connect to many regional trails connect to Mt. McCoy Trail at Stargaze Place and Tierra Rejada Road o Mt. McCoy Trail is located relatively close to the Wood Ranch Trail and Canyon View Trail In the center of the Greenway, the trail system links with the Rim of the Valley Trail o The proximity of the existing Arroyo Simi Equestrian Center makes this an ideal trail for horses On the east, the proposed future trailhead at Corriganville Park is located close to the Hummingbird Trail entrance o The proposed drainage trail to the south of White Oak School could potentially link to this trail through an on-street connection along Kuehner Drive o The Hummingbird Trail connects to the Peak Trail, which is in very close proximity to the Chumash Trail which links to the Ridge Trail The Arroyo Simi Greenway is a vital section of the planned regional system that will ultimately connect to a trail that spans from Mexico to Canada. The Arroyo Simi is envisioned to connect to the City of Moorpark, and eventually provide a regional link to several communities in both Ventura and Los Angeles Counties through the California Coastal Trail. Ultimately the California Coastal Trail is planned to connect various trail routes and link the entire west coast together. The Arroyo Simi Greenway will help complete this regional trail system, and bring it closer to becoming a reality CONNECTIONS TO THE GREENWAY

57 INTRODUCTION b.3 Class 2 and 3 Bike Lanes The Simi Valley Bicycle Master Plan was revised in December This update occurred after the 2007 Visioning Study was completed, and many of the Class 2 and 3 recommendations from the Visioning Study were incorporated into the Bicycle Master Plan. b. EXPANDING THE GREENWAY The Bicycle Master Plan suggests coloring bike lanes to increase visibility to drivers. This has been used in many other cities and makes the bike lanes much more visible to cars. This concept could integrate well around the Greenway to highlight the on-street bicycle connections. There are two streets, 5th Street and Heywood Drive, that are not indicated by the Bicycle Master Plan as proposed Class 2 or 3 connections. This Specific Pan provides an opportunity to add well marked Class 3 routes, bicycle boulevards or shared lane markings on these roads to raise driver awareness of bicyclists and increase bike safety along routes to schools from the Greenway. Ample signage should be provided with any of these options to indicate safely sharing the road for the bicyclists and motorists. Consider well marked Class 3 routes, bicycle boulevards or shared lane markings with ample signage to raise driver awareness of bicyclists on roads which can not accomodate Class 2 bike lanes CONNECTIONS TO THE GREENWAY

58 INTRODUCTION c. TRANSIT IMPROVEMENTS c. Transit Improvements Development standards within this Specific Plan should be coordinated with transit facilities to create a safe and convenient environment for pedestrians and bicyclists and provide a better integration of bicycling with transit facilities. Allow for convenient movement between outlying areas and the Arroyo Simi Greenway by connecting the Class 1 multi-use trail system to transit stops that serve the entire community. Bicycling can be an easy and inexpensive way to get to a transit stop or park-and-ride lot, and improving the bicycle-transit link will make bicycling a larger part of daily life in Simi Valley. The Amtrak/Metrolink Station is directly adjacent to the Arroyo Simi Greenway, and provides an excellent opportunity for commuters and travelers to use the trail system. Link the Greenway to other regional centers by Amtrak and Metrolink o Metrolink trains provide space for two bicycles per train car o The Simi Valley Metrolink station features 24 bicycle lockers Develop alternative transportation programs and foster connections between the Greenway and transit opportunities CONNECTIONS TO THE GREENWAY

59 SITE DEVELOPMENT PLAN section 2.1 PROJECT DEVELOPMENT STANDARDS 2.1 Site Development Plan 1-1

60 PROJECT DEVELOPMENT STANDARDS section 2.1 SITE DEVELOPMENT PLAN DEV.PLAN SYMBOL SECTION CONTENTS PAGE N/A N/A N/A N/A 2.1 a... Key Study Areas b... Site Development Plan c... Visioning Study Refinements d... Project Development Standards SITE DEVELOPMENT PLAN

61 PROJECT DEVELOPMENT STANDARDS 2.1 SITE DEVELOPMENT PLAN The Site Development Plan is an overall view of the approximately 12-mile long Arroyo Simi Greenway. Viewing the Greenway in its entirety allows relationships and connections to be better understood and master planned. The Site Development Plan provides a cohesive view of the comprehensive elements required to implement the Arroyo Simi Greenway. There are conceptual symbols within the Site Development Plan that depict locations for existing facilities and proposed improvements, and illustrate the intended arrangement and uses of the Greenway. The legend explains each symbol and makes reference to related sections within this Specific Plan. SITE DEVELOPMENT PLAN section 2.1 Site Development Plan Intent Incorporate the 2007 Arroyo Simi Greenway Visioning Study as a framework to build upon Use the Site Development Plan as a tool for developing the Greenway in an orderly manner, provide a foundation for flexible phasing, and use as a quick reference from the legend to Specific Plan sections Graphically depict the 12-mile trail system in a concise and easy to read format, and locate amenities and inventory what is planned for the Greenway Locate Key Study Areas on the Site Development Plan to better understand their relationship to the Greenway and reference them to related Specific Plan sections Ensure uses depicted on the Site Development Plan are compatible with neighboring properties and that there is a balance between development, recreation and natural resources Provide property owners adjacent to the Greenway with knowledge about the type of uses planned in their neighborhood SITE DEVELOPMENT PLAN 2.1-1

62 PROJECT DEVELOPMENT STANDARDS a. KEY STUDY AREAS a. Key Study Areas When designing any type of development designated by this Site Development Plan but outside a Key Study Area, related Key Study Areas should be referred Because it would be very costly and time consuming to look at the entire Greenway in detail, Key Study Areas (KSAs) were chosen to develop plans and sketches which portray how areas might be typically treated. The plans and sketches for these Key Study Areas have been used to develop the standards within this Specific Plan, and they have been designed as typical situations and design elements that might occur along the Arroyo Simi. The Key Study Area plans and sketches correspond to a type of development. For example, Darrah Volunteer Park is a Park Expansion area, and there is a related section within this Specific Plan, which describes it in detail and includes design standards. to for design inspiration and guidelines, and it shall meet the standards of the corresponding section of this Specific Plan. For example, a design for a park that is not a Key Study Area shall incorporate the design elements and intent of the Key Study Areas plans and sketches within Section 2.8, Parks, and meet all required standards within this related Specific Plan section. The Key Study Areas assist in establishing the development standards for the Greenway elements and amenities. In the construction document stage the Key Study Areas may be refined and/or incorporate alternate designs, but the general character, program and aesthetic of the Key Study Areas will be integrated into the final plans. The ultimate construction of the Key Study Areas may vary slightly as long as it meets the standards and design intent of this Specific Plan and contains the elements shown in the Key Study Areas. Site Development Plan Depicts the Key Study Area Example of plan and sketch views of the Cascade Overlook Key Study Area Key Study Area - Plan View SITE DEVELOPMENT PLAN Key Study Area - Sketch

63 PROJECT DEVELOPMENT STANDARDS The design elements and materials selection shown within this Specific Plan are examples of amenities that meet the Arroyo Simi Greenway design aesthetic, but are not limited to those shown in this Specific Plan. Final selections of design elements and materials may vary based on unforeseen situations such as budget limitations, technological advancements, and manufacturing availability that may occur after this Specific Plan was created. However, the information shown, scale and massing, and character and aesthetic shall be incorporated into final construction plans. Final selections of design elements and materials chosen at time of construction shall consist of amenities that are equal to the selections shown in this section, and meet the design intent and standards of this Specific Plan in regards to scale and the aesthetic look and feel of materials. Refer to pages and for Site Development Plan and Key Study Area locations The limits of the Key Study Areas are shown on the Site Development Plan, and within it are symbols that depict elements included in the plans and sketches. For example, Darrah Volunteer Park includes symbols for items such as a secondary gateway, playground, workout area, and bridge. Each of these symbols is linked to the Site Development Plan legend which references to a corresponding section of this Specific Plan. The symbols also allow for future variation of the Key Study Area plans and sketches, but identify the elements, which should be included within each area. The following list of Key Study Areas is shown according to the Specific Plan section where they are described (the numbers refer to the plans, and number with a letter refers to a sketch or section). Sections within this Specific Plan that are not included in the following list are general topics that are incorporated into the Key Study Areas but did not specifically have a plan or sketch prepared, but incorporates concepts from other KSAs. For example, Section 2.7 is the Greenway Lighting Program, and it contains design elements and standards developed from the Key Study Areas. Section 2.4, Trailheads/Parking Key Study Area 1: Tierra Rejada Trailhead Key Study Area 9 and 9a: Community Center Trailhead Section 2.5, Trails Key Study Area 4 and 4a: Sinaloa Middle School Connection Section 2.8, Parks Key Study Area 3: Easy Street Pocket Park Key Study Area 7: Rancho Simi Community Park Key Study Area 10 and 10a: Sycamore Community Center Park Key Study Area 11 and 11a: Darrah Volunteer Park Key Study Area 12 and 12a: S-Curve Pocket Park Section 2.9, Overlooks/Rest Areas Key Study Area 6 and 6a: Cascade Overlook Section 2.10, Landscaping Key Study Area 5a: First Street Views Section 2.11, Project Entries Key Study Area 2 and 2a: Madera Road Gateway Key Study Area 13: Yosemite Avenue Section 2.16, Arroyo Simi Channel Improvements Key Study Area 8 and 8a: Sycamore Drive Bridge SITE DEVELOPMENT PLAN a. KEY STUDY AREAS

64 PROJECT DEVELOPMENT STANDARDS b. SITE DEVELOPMENT PLAN Site Development Plan b. The Site Development Plan allows relationships and connections to be better understood and it provides a cohesive view of the elements required to implement the Greenway. See plan enlargements and legend on following pages Site Development Plan SITE DEVELOPMENT PLAN

65 PROJECT DEVELOPMENT STANDARDS Key Study Areas are located on the Site Development Plan to demonstrate their relationship to the Greenway and reference them to related Specific Plan sections. b. SITE DEVELOPMENT PLAN SITE DEVELOPMENT PLAN 2.1-5

66 PROJECT DEVELOPMENT STANDARDS See Enlargement B b. SITE DEVELOPMENT PLAN LEGEND SITE DEVELOPMENT PLAN Site Development Plan Enlargement A

67 KEY MAP PROJECT DEVELOPMENT STANDARDS Enlargement A PAGE Enlargement B PAGE See Enlargement A b. SITE DEVELOPMENT PLAN See Enlargement C Site Development Plan Enlargement B SITE DEVELOPMENT PLAN 2.1-7

68 2.1-8 PROJECT DEVELOPMENT STANDARDS SITE DEVELOPMENT PLAN Site Development Plan Enlargement C See legend on page See Enlargement B b. SITE DEVELOPMENT PLAN See Enlargement D

69 PROJECT DEVELOPMENT STANDARDS See Enlargement C b. SITE DEVELOPMENT PLAN Site Development Plan Enlargement D KEY MAP Enlargement C SITE DEVELOPMENT PLAN PAGE Enlargement D PAGE

70 PROJECT DEVELOPMENT STANDARDS c. VISIONING STUDY REFINEMENTS c. Visioning Study Refinements There were some refinements to the trail alignment that occurred in the creation of the Specific Plan. Refer to the map comparisons on the following page: The Site Development Plan has taken the 2007 Visioning Study and built upon it to further develop the Greenway concepts and to design key areas and specify site amenities to create a unified Greenway trail system. 1 The Visioning Study showed Strathearn Historical Park as a trailhead, and the Site Development Plan has replaced it with Tierra Rejada Trailhead o Strathearn Historical Park is farther away from the Arroyo Simi and would require Class 3 on-street bicycle use through an industrial area, and parking was not as convenient to access the Greenway o The Tierra Rejada Trailhead is directly adjacent to the Arroyo Simi, and a Class 1 trail could connect it to the Greenway. It has outstanding views and the potential for further development as a larger park, and connections to other trail systems such as Mt. McCoy Trail. 3 2 The Visioning Study showed the drainage trail south of the Arroyo Simi east of Sycamore Drive extending south to Royal Avenue, but the Site Development Plan shows the drainage trail ending at Elizondo Avenue. There is existing private property ownership west of the drainage connection at Royal Avenue with a developed parking lot where the schematic trail was shown in the Visioning Study. The Site Development Plan shows the trail continuing up the Tapo Canyon Drainage east of Sycamore Drive to Alamo Street to connect with City Hall and Rancho Tapo Community Park, and this trail terminated at East Los Angeles in the Visioning Study o The trail connection did not seem feasible at the time of the Visioning Study, but it was shown on the City s revised Bicycle Master Plan and upon closer inspection deemed a possibility for future development with some under crossings and widened sidewalks SITE DEVELOPMENT PLAN

71 PROJECT DEVELOPMENT STANDARDS The Site Development Plan shows potential areas for new equestrian trails, and the Visioning Study mentioned them but did not specify areas on the plan 4 5 o The Site Development Plan carefully looked at existing equestrian use areas adjacent to the Arroyo Simi and studied patterns of existing horse trails, and connected them in a comprehensive trail system (refer to Trails, Section 2.5g) 3 In developing the Specific Plan boundary, the Connector Trail Alignments from the Visioning Study were carefully studied, and some were removed if they were not directly linking into the Greenway. However, should the opportunity become available, the Greenway is flexible in design to allow future connections to these Connector Trail Alignments. c. VISIONING STUDY REFINEMENTS Visioning Study Plan Site Development Plan 2 4 SITE DEVELOPMENT PLAN

72 PROJECT DEVELOPMENT STANDARDS c. VISIONING STUDY REFINEMENTS There were some general refinements that occurred during the preparation of the Specific Plan: The trail alignments in the Site Development Plan were updated based on designing the Key Study Areas and categorized by method of construction. For example, a trail segment labeled Primary Trail Alignment in the Visioning Study occurred on both north side (paved) and south side (unpaved). In the Site Development Plan, the south side became Existing Dirt Trail to Pave and the north side became Existing Paved Trail to Remain because the trails method of construction is different Primary Trail Alignment Visioning Study Plan The Site Development Plan located additional traffic signals on the plan Site Development Plan Existing Paved Trail to Remain Existing Dirt Trail to Pave Trail alignments in the Site Development Plan are categorized by method of construction SITE DEVELOPMENT PLAN

73 PROJECT DEVELOPMENT STANDARDS Under crossings were discussed in the Visioning Study text but not on the Overall Map. However, they are located on the Site Development Plan. o Some under crossings were removed if further site investigation and engineering consultation proved them impractical or infeasible (refer to Section 2.16c) The Site Development Plan locates trail alignments envisioned to have lighting, and the Visioning Study did not (refer to Section 2.7) The Site Development Plan determines the location of Primary and Secondary Gateways where the Visioning Study grouped them all Gateways and generally discussed the fact that some were to be Primary (refer to Section 2.11) The Site Development Plan locates several signage elements based on the Greenway Signage Program which was developed for the Specific Plan (refer to Section 2.12): o Major Directional Signage o Mile Markers o Greenway Banners Another change from the 2007 Visioning Study is that the Visioning Study developed concepts for on-street bicycle linkages, but the Site Development Plan focuses on the land within immediate Arroyo Simi Greenway boundary, and suggests connections to it but does not specify where they should occur. The recently updated City of Simi Valley Bicycle Master Plan incorporated many of the on-street connections suggested in the Visioning Study, but this Specific Plan identifies some additional opportunities for key Class 3 routes, bicycle boulevards or shared lane markings to raise awareness of bicyclists and increase bike safety along routes to schools from the Greenway. (Refer to Section 1.3b.3 for additional information) c. VISIONING STUDY REFINEMENTS The Visioning Study located Pocket Parks, however, the Site Development Plan further breaks them down into potential new Pocket Parks and Park Expansion (refer to Section 2.8) The Site Development Plan shows Overlook/Rest Areas as Major, Minor and Existing, where the Visioning Study depicted them as Overlook/Rest Areas (refer to Section 2.9) The Site Development Plan locates potential playground and work out facilities (refer to Section 2.14f and 2.14g) The Site Development Plan locates Focal Point/Public Art Opportunities based on Key Study Area refinements (refer to Section 2.15) SITE DEVELOPMENT PLAN

74 PROJECT DEVELOPMENT STANDARDS d. PROJECT DEVELOPMENT STANDARDS d. Project Development Standards The Site Development Plan legend is tied to related Specific Plan sections, and each symbol shown in the legend has been developed into standards and guidelines within this document. The Specific Plan sections are also tied to the Site Development Plan and when elements are discussed in the text, there is a symbol that matches the plan placed in the upper corner and within the Table of Contents. This provides an easy way to locate information for the type of construction planned for the Greenway. Quick reference Project Entries Sample page from the Project Entries section of the Specific Plan depicts the use of a Site Development Plan symbol to indicate that information in this section relates to a particular element from the Site Development Plan Example page from the Table of Contents depicts use of Site Development Plan symbols linking to relevant sections within the Specific Plan SITE DEVELOPMENT PLAN

75 PROJECT DEVELOPMENT STANDARDS 2.2 SCHOOL ENTRY ENHANCEMENTS section 2.2 School Entry Enhancements SCHOOL ENTRY ENHANCEMENTS

76 PROJECT DEVELOPMENT STANDARDS DEV.PLAN SYMBOL SECTION CONTENTS PAGE N/A 2.2 a... School Entry Plaza Standards N/A 2.2 b b.1... Katherine Elementary School... Katherine School Entry Plaza Standards N/A 2.2 c c.1... Sinaloa Middle School... Sinaloa School Entry Plaza Standards SCHOOL ENTRY ENHANCEMENTS

77 PROJECT DEVELOPMENT STANDARDS 2.2 SCHOOL ENTRY ENHANCEMENTS There are several schools that will be directly connecting to the Greenway due to proximity. Connections to Katherine Elementary School and Sinaloa Middle School were conceptually developed to improve the aesthetics and safety of the school entrances as part of this Specific Plan. These concepts will be used at other school connections along the Greenway to highlight the Greenway connectivity while developing a safer and more functional area for the children. Refer to Section 1.3b.1 for a list of schools in close proximity to the Arroyo Simi Greenway SCHOOL ENTRY ENHANCEMENTS section 2.2 Intent of School Entry Enhancements Increase the number of children who walk or bicycle to school Make biking and walking more socially acceptable and more appealing Enhance the existing entrances to schools where they intersect with the Greenway Foster physical activity and encourage healthy lifestyles Educate the community about the Greenway s linkage to schools SCHOOL ENTRY ENHANCEMENTS 2.2-1

78 PROJECT DEVELOPMENT STANDARDS a. KATHERINE ELEMENTARY SCHOOL a. School Entry Plaza Standards The school entry plazas connecting to the Arroyo Simi Greenway shall contain: Benches and pedestrian scale lighting Decorative paving Trees and planting Bollards to restrict vehicular entry if necessary Greenway Banners if feasible (refer to the Greenway Signage Program, Section 2.12g) New fencing or screen or improve existing fencing if feasible (refer to Section 2.13, Fencing and Walls) Vandal resistant materials A formal drop-off area and/or bus turnout if space permits b. Katherine Elementary School Katherine Elementary School has linkage from Aurelia Street over the Arroyo Simi to the school entrance off Kristen Avenue. This linkage contains the only pedestrian bridge currently crossing the Arroyo, and a recently completed portion of the Greenway trail system on the north side of the Arroyo. The Katherine Elementary School entrance linkage has a lot of potential to turn a relatively bare space into a beautiful and functional gateway. This entrance has a relatively new concrete walkway, but there is no landscaping and the fencing and bridge are not visually attractive. When viewed from Aurelia Street it appears stark and needs to be enhanced. There is no lighting currently installed and many children use this linkage in the fall or winter evenings. existing views looking south Katherine Elementary School entrance linkage has the potential to turn a bare space into a beautiful and functional gateway SCHOOL ENTRY ENHANCEMENTS

79 PROJECT DEVELOPMENT STANDARDS b.1 Katherine School Entry Plaza Standards Katherine School entry plaza shall incorporate the standards from Section 2.2a, and: Concrete stain applied to the existing walkway for decorative paving Cut into the existing walkway to provide planting areas Line planting areas with river rock Upgrade the existing pedestrian bridge to have a design consistent with the other Greenway bridges as described in Section 2.6 of this Specific Plan Katherine Elementary School Connection looking south a. KATHERINE ELEMENTARY SCHOOL Proposed view with new bench, stained concrete, lighting and landscaping SCHOOL ENTRY ENHANCEMENTS 2.2-3

80 PROJECT DEVELOPMENT STANDARDS a. KATHERINE ELEMENTARY SCHOOL c. Sinaloa Middle School The Sinaloa Middle School entry plaza is Key Study Area 4a, and is located on the southern terminus of the New Drainage Sidewalk in Key Study Area 4 (refer to Section 2.5e for additional information). The Key Study Areas addressed how the trail would connect with the school, and developed a conceptual design for an entry plaza. c.1 Sinaloa Middle School Entry Plaza Standards Sinaloa Middle School entry plaza shall incorporate the standards from Section 2.2a, and contain: Provide new fencing around the Sinaloa School entry plaza and trail, but keep existing fencing along property lines The entry plaza is proposed at an existing entrance at the back of Sinaloa Middle School. The current entrance is a dirt path flanked on all sides by chain link fencing. The area does not have landscaping or lighting, and many children are currently using this entrance. Parents currently drop off and pick up their children in this location. 1 View looking north at the existing drainage, trail would be on the right side looking northwest looking southwest 1 2 Location of the Sinaloa Middle School Connection 2 Group of photos show the area proposed for school entry plaza improvements SCHOOL ENTRY ENHANCEMENTS

81 PROJECT DEVELOPMENT STANDARDS Sinaloa Middle School Connection looking west b. SINALOA MIDDLE SCHOOL Proposed view with new paving, benches, lighting, banners and fencing SCHOOL ENTRY ENHANCEMENTS 2.2-5

82 SCHOOL ENTRY ENHANCEMENTS

83 AT GRADE CROSSINGS section 2.3 PROJECT DEVELOPMENT STANDARDS 2.3 At Grade Crossings 1-1

84 PROJECT DEVELOPMENT STANDARDS section 2.3 AT GRADE CROSSINGS DEV.PLAN SYMBOL SECTION CONTENTS PAGE N/A N/A 2.3 a... Traffic Calming Measures b... Decorative Crosswalks b.1... Crosswalk Standards b.2... Street Crosswalk Standards b.3... Driveway Crosswalk Standards b.4... Sustainable Crosswalk Elements c... Signalized Intersections d... Unsignalized Intersections AT GRADE CROSSINGS

85 PROJECT DEVELOPMENT STANDARDS 2.3 AT GRADE CROSSINGS It is essential that any improvements to the trail system address pedestrian safety at intersections. Whenever possible, new trail alignments should take advantage of existing crosswalks and traffic signals in order to allow trail users to travel safely across vehicle lanes. At Grade Crossings standards within this section describe the roadway intersections from the back side of a corner or sidewalk within the Arroyo Simi Greenway. Project entries describe the area adjacent to the At Grade Crossings and they are described in Section At Grade Crossings must be consistent with Project Entries improvements and create a seamless transition from the street into the Arroyo Simi Greenway. AT GRADE CROSSINGS section 2.3 At Grade Crossings Intent Incorporate traffic calming measures that reduce potential conflicts with trail users and motor vehicles, and make drivers more aware of upcoming Greenway crossings Reduce pedestrian crossing time and limit pedestrian exposure to interfaces with automobiles Use traffic calming features which enhance the community s appearance and provide safe street crossings, and highlight the Arroyo Simi Greenway street crossings and roadway connectivity Develop uniform and consistent crosswalks that can conform to variable situations that occur along the 12-mile long Greenway Incorporate traffic calming measures that improve sight distances AT GRADE CROSSINGS 2.3-1

86 PROJECT DEVELOPMENT STANDARDS a. TRAFFIC CONTROL MEASURES a. Traffic Calming Measures Where possible, bulb-outs may Bulb-outs should extend to the be used to reduce pedestrian width of the parking lane, which is crossing distances typically 8 feet Bulb-outs may be used to Avoid interrupting bicycle traffic Traffic calming measures may be implemented along improve the visibility of with bulb-outs streets, which intersect the Arroyo Simi Greenway, and pedestrians and motorists o Streets with bike lanes shall shall be consistent with City of Simi Valley s regulations by eliminating sight distance maintain City of Simi Valley regarding traffic volumes and speed limits. problems due to parked cars standards for travel lanes and Bulb-outs may be used to allow bike lanes, with bicycle lanes The City of Simi Public Works Department shall determine the most appropriate forms of traffic calming measures to implement on the various street crossings for a consistent curb ramp design along the Greenway Bulb-outs should continue to clearly marked around the bulb-outs and through the intersection whenever possible along the Greenway. allow uninterrupted street drainage to the extent feasible o Streets without bike lanes should maintain City of Simi Valley standards for travel lanes around bulb-outs for bikes to pass safely Incorporate bulb-outs to reduce pedestrian crossing distance Gateway Monuments and Roadway Approach Signs should be placed to identify upcoming crossings to passing motorists. Refer to Greenway Signage Program, Section 2.12 for additional information AT GRADE CROSSINGS

87 PROJECT DEVELOPMENT STANDARDS Curb ramps are required at all Greenway and roadway intersection corners and midblock crossings to provide an accessible connection, and must meet ADA requirements for wheelchair access Curb ramps and barrier-free passageways are to provide a smooth transition between the shared-use path and the roadway Determine the grades along the curb line and verify that the base of the curb ramp is not the lowest point of the gutter to minimize chances of flooding Provide catch basins or inlets to prevent the flooding of the ramps o Drainage grates must be bicycle safe, and grates should be perpendicular to path of travel o Curb ramps should be provided which match the gutter grade without an elevated lip Design curb ramps with a width equal to the shared-use path width Consider a 5-foot radius or flare to facilitate right turns for bicycles Install curb ramps that highlight the crossing and facilitate direction-finding for the visually impaired a. TRAFFIC CONTROL MEASURES AT GRADE CROSSINGS 2.3-3

88 PROJECT DEVELOPMENT STANDARDS a. TRAFFIC CONTROL MEASURES Use signage to clearly identify upcoming crossings to passing motorists Center islands and refuge islands may be considered at uncontrolled crossings, especially on roadways with the following criteria: o Large pedestrian volumes o High use by the elderly, children, or disabled users o Reducing pedestrian collisions o High motor vehicle traffic volume and speeds above 45 mph o Roadways with four or more lanes o Crossing distance exceeds 60 feet o Complex or irregularly shaped intersections Center medians and refuge islands should be used to reduce pedestrian crossing distances and allow pedestrians to confront traffic one direction at a time Detectable warning surfaces are required on both sides of a median cut-through The minimum width of a raised median refuge area is 6 feet to provide pedestrian refuge The width of the pedestrian pass-through (perpendicular to the direction of pedestrian travel) is recommended to be a minimum of 5 feet, 10 feet desired, and cannot exceed a grade of 5 percent AT GRADE CROSSINGS Incorporate refuge islands on large busy roadways to reduce pedestrian crossing distances

89 PROJECT DEVELOPMENT STANDARDS Additional traffic calming measures to consider for the Greenway: o o Prohibit right turns on red lights at locations where streets intersect with the Greenway Restrict left turns at certain times or on green arrows only o o o o Raised crosswalks or intersections Decorative paving within intersections Narrowed traffic lanes or lane reductions Vehicle speed feedback signs a. TRAFFIC CONTROL MEASURES Refer to Section 2.3d for additional traffic calming concepts Raised crosswalks could be implemented to increase visibility of pedestrians Consider decorative paving within intersections to slow down motorists AT GRADE CROSSINGS 2.3-5

90 PROJECT DEVELOPMENT STANDARDS b. DECORATIVE CROSSWALKS b. Decorative Crosswalks All crosswalks along the Arroyo Simi Greenway should have a consistent decorative crosswalk treatment to create a unifying theme and indicate gateways, while maintaining Simi Valley Public Works Department standards and ADA accessibility. Decorative crosswalks should only occur on direct crossings from one trail to another, while other crosswalks in the intersection should remain as typical crosswalk patterns to further highlight the Greenway and reduce costs. Crosswalk size, angle and curb alignment varies considerably along the Greenway. A method of constructing the crosswalks should be developed which allows for similar patterns with varying end treatments, and accounts for all crosswalk types prior to construction. b.1 Crosswalk Standards Greenway crosswalks should enhance both the Greenway and pedestrian safety. Crosswalks should be unique to the Greenway, and develop an easily recognizable and consistent element for trail crossings. All crosswalks shall incorporate the following features where feasible: Crosswalk pattern shall be consistent and unique to the Arroyo Simi Greenway Crosswalks should use a repeating pattern to reduce costs and allow for consistency throughout the Greenway All pedestrian crossings need to provide an accessible route that meets ADA guidelines with a relatively smooth and trip free surface Crosswalks at a 75 angle are acceptable, but 90 is preferred Incorporate 1-foot wide bands of white paint (yellow if school crossing) on both sides of the crosswalk Align with center line of trails on both sides of the street when possible Provide truncated domes to indicate the crossing to the visually impaired, but not conflict with bicycle travel Crosswalk pattern and color shall be highly visible to both automobile driver and trail users Crosswalks shall be low maintenance, and repairs and re-coloring should be relatively seamless Consider raised asphalt crosswalks on existing concrete bridges to provide higher visibility and allow for a consistent crosswalk treatment throughout the Greenway There are two types of crosswalks proposed for the Arroyo Simi Greenway: 1. Street Crosswalks, used at roadway and Greenway intersections 2. Driveway Crosswalks, used at driveways which cross sidewalks indicated on the Site Development Plan as Greenway connections (refer to Section 2.1) AT GRADE CROSSINGS

91 PROJECT DEVELOPMENT STANDARDS Consider using the following products or an equivalent for Greenway crosswalks. The first two are decorative surfacing systems that come in a variety of patterns and colors, and allow for the implementation of custom designs. They are designed specifically for high-traffic crosswalks, and they are very durable and will last for many years. Fast installation and easy maintenance and seamless repairs means there will be minimal community disruption. 1. DuraTherm, used for high-traffic street crosswalks - thermoplastic material inlaid into imprinted asphalt 2. StreetPrint, used for driveway crossings heats the asphalt base, applies a template, and coats with polymer and cement mixture 3. Painted, used for concrete street and/or driveway crossings pattern developed for the DuraTherm and StreetPrint crossings is reproduced in a template for painting Four examples of decorative custom paving designs by DuraTherm & StreetPrint b. DECORATIVE CROSSWALKS There are many design options available, and the City can develop a unique pattern or use a pattern similar to those shown in this Specific Plan for the Greenway. As the project is implemented a final selection of crosswalk design and color shall be decided upon, and used consistently throughout the project. The DuraTherm and StreetPrint process involves heating the asphalt base and inlaying a pattern and color, and there are many design options available AT GRADE CROSSINGS 2.3-7

92 PROJECT DEVELOPMENT STANDARDS b. DECORATIVE CROSSWALKS b.2 Street Crosswalk Standards All street crosswalks should incorporate the Crosswalk Standards from Section 2.3b.1, and also have the following features: Crosswalks shall be 12 feet wide typical, with a minimum width of 10 feet Crosswalks may display street names in clear, bold lettering when space allows Warning signs about the crossing should be located along the trail and on the vehicular approach (refer to Roadway Approach Signs, Section 2.12k, and Traffic and Safety Signage in Section 2.12l) Crosswalk patterns should be able to fit multiple configurations Street Crosswalks could be a traditional stone pattern such as examples on the left, or a custom design such as shown on right AT GRADE CROSSINGS

93 PROJECT DEVELOPMENT STANDARDS b.3 Driveway Crosswalk Standards There are many locations along the Greenway where sidewalks and trails cross driveways. These driveways can be barriers for persons with disabilities, and potentially hazardous for trail users, and crosswalks should be provided to caution trail users and automobile drivers of the crossing. All driveway crosswalks should incorporate the Crosswalk Standards from Section 2.3b.1, and also have the following features: Crosswalks shall have a minimum width of adjoining trails or sidewalks Warning signs about the crossing should be located along the sidewalk and at vehicular entries and exits (refer to Roadway Approach Signs, Section 2.12k, and Traffic and Safety Signage in Section 2.12l) b.4 Sustainable Crosswalk Elements Crosswalks shall include sustainable materials and maintenance practices whenever feasible. Crosswalk designs shall use existing asphalt rather than remove it when it is in good condition Crosswalks shall use water-based coatings which contain no harsh chemical solvents if applicable Low VOC paints shall be used b. DECORATIVE CROSSWALKS Driveways along the Greenway linkages should incorporate crosswalks to warn trail users and drivers of the crossing AT GRADE CROSSINGS 2.3-9

94 PROJECT DEVELOPMENT STANDARDS c. Signalized Intersections c. SIGNALIZED INTERSECTIONS Standards and guidelines within this section apply to Existing Signals to Remain and Proposed Additional Signals on the Site Development Plan in Section 2.1. Locations listed as primary relate to the primary trail alignments identified in the Site Development Plan, and improvements should occur as the trail is developed. Locations designated as secondary may occur in later phases as needed. Primary Existing Signalized Intersections to Remain are located at: Tierra Rejada Road and Stargaze Place Madera Road and Easy Street/ West Los Angeles Avenue (Key Study Area 2) Los Angeles Avenue and 5th Street (Key Study Area 4) Los Angeles Avenue and Hidden Ranch Drive Kuehner Drive and Smith Road Secondary Existing Signalized to Remain are located at: Erringer Road and north side of the Arroyo Simi (Key Study Area 7) Royal Avenue and north side of the Arroyo Simi Sycamore Drive and Heywood Street Los Angeles Avenue and Church Street Cochran Street and Sequoia Avenue Alamo Street and Santa Ynez Avenue Los Angeles Avenue and Christine Avenue Locations of Existing Traffic Signals along the Greenway AT GRADE CROSSINGS

95 Signalized intersections shall include applicable Traffic Calming Measures from Section 2.3a and Decorative Crosswalks as described in Section 2.3b, plus include the following: PROJECT DEVELOPMENT STANDARDS Provide smart crossings or pedestrian activated signals in areas with existing traffic signals Provide traffic signals with countdown clocks where appropriate Locations of Proposed Traffic Signals along the Greenway Place the manually operated signal button in a location that complies with ADA requirements and within reasonable proximity to the curb ramp and crosswalk (see the Manual on Uniform Traffic Control Devices) o Provide a level surface at each push button for wheelchair users o Locate push button a maximum height of 3 feet 6 inches from level landing surface and place them so cyclists can activate them without dismounting Proposed Additional Signals are located on the south primary side of the Greenway to allow for safe controlled crossings on busy streets. Where these new signals occur, there is typically an existing signal on the north side of the Arroyo Simi, which would remain (not at Sequoia Avenue). Proposed Additional Signals shall be timed with the existing signal on the north side. Primary Proposed Additional Signals are located at: Erringer Road and south side of the Arroyo Simi (Key Study Area 7) Sycamore Drive and south side of the Arroyo Simi (Key Study Area 8) Royal Avenue and south side of the Arroyo Simi Sequoia Avenue and south side of the Arroyo Simi Los Angeles Avenue and Ralston Avenue (Key Study Area 12) Stow Street and the Arroyo Simi Yosemite Avenue and the Arroyo Simi (Key Study Area 13) Katherine Road and the Arroyo Simi Kuehner Drive and the Arroyo Simi c. SIGNALIZED INTERSECTIONS AT GRADE CROSSINGS

96 PROJECT DEVELOPMENT STANDARDS d. Unsignalized Intersections c. UNSIGNALIZED INTERSECTIONS Many unsignalized intersections exist along the Arroyo Simi Greenway, and although traffic volumes do not warrant a new traffic signal, traffic calming measures may be implemented to provide for safer street crossings. Locations listed as primary relate to the primary trail alignments identified in the Site Development Plan, and improvements should occur as trail is developed. Locations designated as secondary may occur in later phases as needed. Primary Unsignalized Intersections are located at: th 5 Street and Sinaloa Villa Driveway Crossing (Key Study Area 4) Tapo Canyon Road and north side of Arroyo Simi Hidden Valley Drive at the Railroad Secondary Unsignalized Intersections are located at: School Street and Church Street Sequoia Avenue and north side of Arroyo Simi Locations of Unsignalized Intersections along the Greenway AT GRADE CROSSINGS

97 PROJECT DEVELOPMENT STANDARDS Unsignalized intersections may include applicable Traffic Calming Measures from Section 2.3a and Decorative Crosswalks as described in Section 2.3b, and include the following: Rumble strips, dots, street painting and/or speed bumps to warn and slow vehicles Speed bumps are not permitted on bike lanes to provide a smooth ride for bikes In addition to City of Simi Valley Department of Public Works Signing and Striping for Speed Humps, street painting and signage should be use to clearly indicate a crossing ahead Decorative crosswalks should include smart crossings with pedestrian activated flashing lights to signal when pedestrians are in the crosswalk when feasible Dots on a roadway to slow drivers and alert them of an upcoming crossing c. UNSIGNALIZED INTERSECTIONS Smart crossing with flashing lights to warn drivers when a pedestrian is in the crosswalk Solar powered crossing sign that flashes when pedestrian activated AT GRADE CROSSINGS

98 AT GRADE CROSSINGS

99 TRAILHEADS/PARKING section 2.4 PROJECT DEVELOPMENT STANDARDS 2.4 Trailheads/Parking 1-1

100 PROJECT DEVELOPMENT STANDARDS section 2.4 TRAILHEADS/PARKING DEV.PLAN SYMBOL SECTION CONTENTS PAGE Trailhead/Parking Standards... Trailhead Key Study Areas... Sustainable Elements b... Rancho Simi Community Park Trailhead a... Tierra Rejada Trailhead c... Sycamore Drive Community Center Trailhead d d d d d.4... Other Trailheads... Sequoia Avenue Trailhead... Darrah Volunteer Park Trailhead... Rancho Santa Susana Trailhead... Corriganville Park Trailhead TRAILHEADS/PARKING

101 PROJECT DEVELOPMENT STANDARDS 2.4 TRAILHEADS/PARKING Arroyo Simi Greenway Trailhead/Parking areas generally occur at regional or community parks with existing available parking and public amenities such as a restroom. Trailhead/ Parking areas are located near or on the Greenway and allow trail users to park their car and walk, run or take a bike ride along the Greenway. Trailhead/Parking areas will also facilitate convenient drop-off and pick up areas, and provide a location for groups to meet before embarking. Trailhead/Parking areas will be very visible from the public streets and in most cases will be used to highlight the Greenway and encourage those who live further away from the Greenway to use the trail system. The use of signage, lighting and landscaping will enhance the trailhead in its setting and provide a visual link to unique character found in Arroyo Simi Greenway. TRAILHEADS/PARKING section 2.4 Trailhead Intent Allow for safe and convenient parking for Greenway Develop a uniform and consistent trailhead design and character Highlight the Greenway and the ability to park and use the trail Draw attention to the trailhead with special planting, paving, signage and seating TRAILHEADS/PARKING 2.4-1

102 PROJECT DEVELOPMENT STANDARDS Trailhead/Parking Standards section 2.4 TRAILHEADS/PARKING The following amenities shall be considered as part of the trailhead development: Accent or Enhanced Paving (refer to Section 2.11a.2 and Section 2.14d) Trash and Recycling Receptacles (refer to Section 2.14a) Bicycle racks and/or lockers (refer to Section 2.14b) Landscape Enhancements (refer to Section 2.10a) Greenway Light Fixtures (in select locations) Restrooms and drinking fountains (in select locations) Bus stops or bus shelters (in select locations) Vehicle drop-offs with painted curbs for unloading (in select locations) At least one police parking space shall be clearly designated at all trailhead parking area with signage Greenway Signage ( refer to Section 2.12) o Trailhead Parking Signage o Informational kiosks and/or directional signs o Greenway Banners Reserved parking spaces for Greenway trail users o The number of Greenway parking spaces is flexible based on site availability, but a minimum of 5 spaces is recommended o Consider clearly designated police parking areas to highlight police presence o Some Greenway Trailheads may not have specified parking spaces due to high existing use, but will have Trailhead Parking Signs and Informational Kiosks (refer to Greenway Signage Program) as well as the typical Trailhead Standards described in this section o New parking spaces shall conform to the City of Simi Valley Parking Standards Trailhead/Parking areas will allow trail users to park their car, unload, and take a bike ride along the Greenway TRAILHEADS/PARKING Parking Entry Signs will be easily seen from roadways to highlight Greenway parking

103 PROJECT DEVELOPMENT STANDARDS Trailhead Key Study Areas Sustainable Elements Several trailheads described within this section are shown in the Key Study Areas (KSAs). In order to consolidate information and reduce repetition, this section may reference plans and sketches from other sections within this Specific Plan. Tierra Rejada Trailhead: Key Study Area 1 o Refer to Page Rancho Simi Community Park Trailhead: Key Study Area 7 o Refer to Page Sycamore Drive Community Center Trailhead: Key Study Area 9 and 9a o Refer to Page There are other trailheads within the Greenway that are not Key Study Areas, and they are described in Section 2.4d. Trailheads shall include sustainable materials and maintenance practices whenever feasible. Refer to Section 3.0 for additional information Use permeable paving where feasible, specify recycled materials for paving (such as concrete, tiles, and blue glass), and use reclaimed materials (such as boulders, river rock, bricks, pavers, and granite cobblestones) Specify native and/ or drought-tolerant vegetation Consider using Reclaimed Asphalt Pavement (RAP) to remove and/or reprocess asphalt pavement materials Incorporate sustainable sealants such as Solar Reflective Coating, Recyclable Paving Mats, Cementitious Surface Treatments, and/or Tire Rubber Modified Surface Seal Use low VOC paints TRAILHEADS/PARKING section 2.4 Locations of Trailhead/Parking Key Stucy Areas TRAILHEADS/PARKING 2.4-3

104 PROJECT DEVELOPMENT STANDARDS a. Tierra Rejada Trailhead Tierra Rejada Trailhead incorporates all standards from Section 2.4.1, and also includes the following: a. TIERRA REJADA TRAILHEAD Tierra Rejada Trailhead has been schematically designed within Key Study Area 1 and will be the Greenway s westernmost trailhead. The close proximity to the Arroyo, abundant open space currently owned by the Rancho Simi Park and Recreation District, existing dirt roads and developable flat areas makes this area an ideal potential trailhead facility. Tierra Rejada Park is directly adjacent to the Arroyo Simi, a Class 1 trail could connect it to the Greenway, and it has an excellent viewshed. Incorporate permeable parking areas Use the existing graded roadway to the extent feasible Incorporate gates and fencing at the entry road to close the trailhead in the evening (refer to Section 2.13) Tie the trailhead into the existing adjacent trail networks and proposed overlook/rest areas Consider equestrian trailer parking Install landscaping to screen views onto adjacent residential properties while still maintaining views of the surrounding hills 1 View of the area proposed for trailhead improvements looking northwest View of the existing cascade waterfall looking east Location of the Tierra Rejada Trailhead TRAILHEADS/PARKING 3 View of the existing dirt road looking north

CITY OF SIMI VALLEY MEMORANDUM

CITY OF SIMI VALLEY MEMORANDUM CITY OF SIMI VALLEY MEMORANDUM AGENDA ITEM NO. 9.1 May 18, 2016 TO: FROM: Planning Commission Department of Environmental Services SUBJECT: REVIEW OF POTENTIAL FISCAL YEAR (FY) 2016-17 CAPITAL IMPROVEMENT

More information

CITY OF SIMI VALLEY MEMORANDUM

CITY OF SIMI VALLEY MEMORANDUM CITY OF SIMI VALLEY MEMORANDUM AGENDA ITEM NO. Consent (3) August 15, 2016 TO: FROM: City Council Department of Public Works SUBJECT: ADOPTION OF PLANS AND SPECIFICATIONS AND AUTHORIZATION TO SOLICIT CONSTRUCTION

More information

Town of Portola Valley General Plan. Nathhorst Triangle Area Plan

Town of Portola Valley General Plan. Nathhorst Triangle Area Plan Town of Portola Valley General Plan Amended December 10, 1997 Table of Contents Introduction... 1 Planning Area... 1 Objectives... 2 Principles... 2 Standards... 4 Description... 4 Community Commercial...

More information

Standards (R-3) Figure B-11: R-3 Residential Standards Exhibit

Standards (R-3) Figure B-11: R-3 Residential Standards Exhibit Avila Ranch Avila Ranch Specific Plan Development Standards High Medium Density - High Residential Density Residential Lot and Building Lot and Standards Building (R-3) Standards (R-3) EXAMPLES These sketches

More information

VEHICULAR AND PEDESTRIAN CIRCULATION

VEHICULAR AND PEDESTRIAN CIRCULATION This perspective sketch communicates the intended character and quality of a proposed streetscape design. Locate benches near a major intersection where people tend to gather. Seating and lighting provide

More information

3. VISION AND GOALS. Vision Statement. Goals, Objectives and Policies

3. VISION AND GOALS. Vision Statement. Goals, Objectives and Policies Vision Statement Queen Creek s interconnected network of parks, trails, open spaces and recreation opportunities provide safe and diverse activities and programs that sustain its unique, small town, equestrian

More information

The open space system should provide connective elements, relate to natural resources, and enhance the suburban character of the landscape..

The open space system should provide connective elements, relate to natural resources, and enhance the suburban character of the landscape.. The open space system should provide connective elements, relate to natural resources, and enhance the suburban character of the landscape.. Mixed-use and infill development should maintain or enhance

More information

Neighborhood Districts

Neighborhood Districts NEIGHBORHOOD DISTRICTS SEVEN MAIN DISTRICTS Neighborhood Districts While the Development Plan provides a broad-scale overview of the neighborhood, this section focuses on uses and relationships at the

More information

Parks, Open Space and Trails

Parks, Open Space and Trails Introduction Parks have often been referred as the lungs of our cities, cleansing the air of pollutants and particulate matter. Parks are also gathering places for families and community. They offer spaces

More information

Sheridan Boulevard S TAT I O N A R E A P L A N S H E R I D A N B O U L E VA R D S TAT I O N A R E A P L A N

Sheridan Boulevard S TAT I O N A R E A P L A N S H E R I D A N B O U L E VA R D S TAT I O N A R E A P L A N Sheridan Boulevard S TAT I O N A R E A P L A N 1 City of Lakewood Adopted November, 2006 S H E R I D A N B O U L E VA R D S TAT I O N A R E A P L A N The Vision The City of Lakewood s overall vision is

More information

1. Parks & Recreation Neighborhood Parks Community Parks Special Use Sites 2. Open Space 3. Trails

1. Parks & Recreation Neighborhood Parks Community Parks Special Use Sites 2. Open Space 3. Trails Appendix A: Park Classifications The intent of parks and recreation classifications is to aid in making acquisition and design decisions for park sites, facilities and the organization of recreation space

More information

Daniels Park Master Plan

Daniels Park Master Plan Daniels Park Master Plan Prepared for: Douglas County & The City and County of Denver October, 2007 EXHIBIT A Contents Daniels Park Overview 2 Project History & Goals 2-3 Regional Context Map 4 Park Zone

More information

V. Gateways GATEWAYS / V-1

V. Gateways GATEWAYS / V-1 V. GATEWAYS / V-1 Many of Chesapeake s gateways are located on highways and call for bold and attractive designs that motorists can understand, appreciate, and enjoy. can also take the form of natural

More information

4.1 AESTHETICS AND VISUAL QUALITY

4.1 AESTHETICS AND VISUAL QUALITY SCOPE AND METHODOLOGY 4.1 AESTHETICS AND VISUAL QUALITY This section evaluates the potential impacts to aesthetics and visual quality. Aesthetics refers to visual resources and the quality of what can

More information

CHAPTER 7: Transportation, Mobility and Circulation

CHAPTER 7: Transportation, Mobility and Circulation AGLE AREA COMMUNITY Plan CHAPTER 7 CHAPTER 7: Transportation, Mobility and Circulation Transportation, Mobility and Circulation The purpose of the Transportation, Mobility and Circulation Chapter is to

More information

GREENING THE BOULEVARD Master Plan Concepts for Venice Boulevard between Lincoln and Sawtelle

GREENING THE BOULEVARD Master Plan Concepts for Venice Boulevard between Lincoln and Sawtelle GREENING THE BOULEVARD Katherine Spitz Associates Inc. 4212½ Glencoe Avenue Marina Del Rey, CA 90292 310 574 4460 Fax 574 4462 January 2008 Table of Contents Overview Proposed Design Improvements Illustration

More information

ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET ARROYO PROJECTS

ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET ARROYO PROJECTS ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET ARROYO PROJECTS HAHAMONGNA FY 212-216 Capital Improvement Program Priority Description Total Estimated Costs Appropriated Through FY 211 Adopted FY 212 FY 213

More information

PUBLIC RIGHT-OF-WAY IN THIS CHAPTER PUBLIC REALM

PUBLIC RIGHT-OF-WAY IN THIS CHAPTER PUBLIC REALM PUBLIC RIGHT-OF-WAY This section provides design guidelines for improvements in the public right-of-way. The public right-of-way refers to streets, sidewalks, non-vehicular thoroughfares, parks and greenways

More information

Improving Communities Through the Arroyo Seco Sustainability Campaign and Watershed Assessment

Improving Communities Through the Arroyo Seco Sustainability Campaign and Watershed Assessment Improving Communities Through the Arroyo Seco Sustainability Campaign and Watershed Assessment Arroyo Seco Headwaters in the San Gabriel Mountains Major tributary to the Los Angeles River 44 square mile

More information

Whitemarsh Comprehensive Plan Update: Housing & Land Use. Public Workshop #3: September 20, 2018

Whitemarsh Comprehensive Plan Update: Housing & Land Use. Public Workshop #3: September 20, 2018 Whitemarsh Comprehensive Plan Update: Housing & Land Use Public Workshop #3: September 20, 2018 Agenda Welcome Process Recap What We ve Heard The Plan Framework Review of Recommended Actions Land Use Housing

More information

Planned Development Review Revisions (Project No. PLNPCM )

Planned Development Review Revisions (Project No. PLNPCM ) Planned Development Review Revisions (Project No. PLNPCM2014-00139) Standard residential development Planned Development Example: Smaller lot sizes than what is allowed to create open space amenity. What

More information

Asbury Chapel Subdivision Sketch Plan

Asbury Chapel Subdivision Sketch Plan Asbury Chapel Subdivision Sketch Plan PART 1: PROJECT SUMMARY Applicant: NVR Inc. Project Size: +/- 76.13 acres Parcel Numbers: 02101112,02116101,02116112, 02116113 Current Zoning: Transitional Residential

More information

The following principles guide the development of goals and strategies to protect and promote these amenities:

The following principles guide the development of goals and strategies to protect and promote these amenities: OPEN SPACE/PARKS/TRAILS/RECREATION GOALS/STRATEGIES Cherry Hills Village is a living environment that offers low density development, open areas, public scenic vistas, public trails and public parks. This

More information

The Vision. Photo provided by The Minervini Group. 46 Vision, Objectives & Strategies

The Vision. Photo provided by The Minervini Group. 46 Vision, Objectives & Strategies Vision, Objectives & Strategies The is the public framework and guide for future development of the Grand Traverse Commons. The establishes public polices for infrastructure, the preservation of natural

More information

Wadsworth Boulevard S TAT I O N A R E A P L A N

Wadsworth Boulevard S TAT I O N A R E A P L A N Wadsworth Boulevard S TAT I O N A R E A P L A N City of Lakewood Adopted November, 2006 The Vision The City of Lakewood s overall vision is to transform the area around the light rail station into a mixed-use

More information

Mendota Heights 2040 Comprehensive Plan Draft Vers

Mendota Heights 2040 Comprehensive Plan Draft Vers 4 Parks and Trails The City of Mendota Heights boasts a variety of recreational and open space opportunities. Few cities can claim access to regional trails, riverside and lakeside parks, scenic bluffs

More information

FY Capital Improvement Program Arroyo Projects

FY Capital Improvement Program Arroyo Projects FY 219-223 Capital Improvement Program FY 218 FY 219 FY 22 FY 221 FY 222 FY 223 1 2 3 4 5 6 7 8 9 1 Hahamongna - Implement Master Plan - Oak Grove Area Improvements (7756) Hahamongna - Implement Master

More information

Pedestrian and Bike Bridge LOGO

Pedestrian and Bike Bridge LOGO 6.2.2 Pedestrian and Bike Bridge The proposed pedestrian and bike crossing re-envisions the existing bridge at Pismo Creek on Cypress Street. The bridge is currently underutilized by vehicular through

More information

ARROYO PROJECTS ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET

ARROYO PROJECTS ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET A RROYO P ROJECTS ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET FISCAL YEARS 214-218 HAHAMONGNA Priority Description 1 Hahamongna Watershed Park - Implement Master Plan 211,6 211,6 (77565) 2 Hahamongna -

More information

BROOKHILL NEIGHBORHOOD MODEL ZONING MAP AMENDMENT PREFACE TO APPLICATION

BROOKHILL NEIGHBORHOOD MODEL ZONING MAP AMENDMENT PREFACE TO APPLICATION BROOKHILL NEIGHBORHOOD MODEL ZONING MAP AMENDMENT PREFACE TO APPLICATION June 15, 2015 Revised: August 1, 2016 I. VISION Brookhill is a proposed community based upon the principles of Albemarle County

More information

AESTHETIC APPEARANCE. Design Guidelines for Grade-Separated Pedestrian, Cyclist and Equestrian Structures

AESTHETIC APPEARANCE. Design Guidelines for Grade-Separated Pedestrian, Cyclist and Equestrian Structures III. AESTHETIC APPEARANCE The aesthetic qualities of a grade-separated structure are as important as the specific design criteria. For example, a structure may be constructed to the exact criteria set

More information

Potential Green Infrastructure Strategies May 6, 2015 Workshop

Potential Green Infrastructure Strategies May 6, 2015 Workshop Potential Green Infrastructure Strategies May 6, 2015 Workshop Background The City of Cortland is developing the Tioughnioga Urban Headwaters Green Infrastructure Action Plan with funding from the National

More information

COMPLETE GREEN STREET CHECKLIST

COMPLETE GREEN STREET CHECKLIST COMPLETE GREEN STREET CHECKLIST This document was developed to dissect the structure of an urban street and explore opportunities to make our streets more complete while also integrating green street strategies.

More information

Figure 3-1: Public Realm Plan

Figure 3-1: Public Realm Plan 3 Public Realm Figure 3-1: Public Realm Plan 3.1 Public Realm Concept The public realm concept for the Little Mountain site integrates a clear and accessible movement network with public spaces for social

More information

Corridor Identity. Section 9. Introduction. Corridor Guiding Principles

Corridor Identity. Section 9. Introduction. Corridor Guiding Principles Corridor Identity An attractive and healthy community is a critical element of a quality place, and the design of quality places is a balance between environmental, economic, and social considerations.

More information

City of Nogales General Plan

City of Nogales General Plan Open Space, Parks, Recreation and Trails City of Nogales General Plan Residents of Nogales place a high priority in the development of a comprehensive system of open space, parks, recreation and trails

More information

CHAPTER FIVE COMMUNITY DESIGN

CHAPTER FIVE COMMUNITY DESIGN CHAPTER FIVE COMMUNITY DESIGN CHAPTER FIVE - COMMUNITY DESIGN Assumptions Frazier Park and Lebec have historically developed according to different patterns of spatial form. While both communities are

More information

Yadkin River Greenway Feasibility Study Fact Sheet Village of Clemmons, Town of Lewisville, Town of Bermuda Run

Yadkin River Greenway Feasibility Study Fact Sheet Village of Clemmons, Town of Lewisville, Town of Bermuda Run Fact Sheet Village of Clemmons, Town of Lewisville, Town of Bermuda Run Project Background The Yadkin River Greenway Feasibility Study is a joint project with the Village of Clemmons, the Town of Bermuda

More information

Community Design Plan

Community Design Plan Gardena General Plan 2006 Authority While the is not a required element of a General Plan, it is included because improving the community appearance and image is paramount to the overall quality of life

More information

The transportation system in a community is an

The transportation system in a community is an 7 TRANSPORTATION The transportation system in a community is an important factor contributing to the quality of life of the residents. Without a sound transportation system to bring both goods and patrons

More information

Eastcreek Farm. Planned Development Standards September, 2014

Eastcreek Farm. Planned Development Standards September, 2014 Eastcreek Farm Planned Development Standards September, 2014 ekfarm Contents 01. General Standards 02. Residential Development Standards 03. Architectural Design Standards 04. Landscape Design Standards

More information

SPRINGHILL LAKE TRANSIT VILLAGE

SPRINGHILL LAKE TRANSIT VILLAGE Greenbelt Metro Area Sector Plan - Subarea Design Policies and Guidelines - Springhill Lake Transit Village 113 SPRINGHILL LAKE TRANSIT VILLAGE Residential Neighborhood and Village Center CONCEPT Springhill

More information

PLANNING COMMISSION AGENDA REPORT NOVEMBER 15, 2012

PLANNING COMMISSION AGENDA REPORT NOVEMBER 15, 2012 PLANNING COMMISSION AGENDA REPORT NOVEMBER 15, 2012 TO: FROM: Members of the Planning Commission Michael Klein, Associate Planner FILE NO.: 120000890 PROPOSAL: APPLICANT: Request for an Administrative

More information

CHAPTER 8. Mrs. Zimman s Class - Central Elementary

CHAPTER 8. Mrs. Zimman s Class - Central Elementary SUSTAINABILITY CHAPTER 8 Mrs. Zimman s Class - Central Elementary 8.1 OVERVIEW Green infrastructure also known as low impact development (LID) and environmental or sustainable site design is an environmentally

More information

Toronto Complete Streets Guidelines

Toronto Complete Streets Guidelines Toronto Complete Streets Guidelines 108 110 7.1 Green Infrastructure Design Principles 112 7.2 Context-Sensitive Green Streets 114 7.3 Key Green Street Elements Green infrastructure refers to natural and

More information

This page intentionally blank.

This page intentionally blank. This page intentionally blank. Parks, Recreation, and Open Space Chapter Relationship to Vision Vision Parks, Recreation and Open Space Chapter Concepts County Government. County government that is accountable

More information

TRANSPORTATION ELEMENT

TRANSPORTATION ELEMENT TRANSPORTATION ELEMENT GOAL I: To create and maintain a safe, efficient and aesthetic transportation system that encourages multi-modal transportation and promotes the mobility strategies of the Ocala

More information

WASHINGTON COUNTY OREGON

WASHINGTON COUNTY OREGON WASHINGTON COUNTY OREGON July 9, 2009 Revisions to Chapter 2 of the Bethany Community Plan The North Bethany Subarea Plan Exhibit pages 7 and 8 The sections for the Core and Flexible Streets were amended

More information

The Village at Loomis. Long-Envisioned A Wonderful Place to Call Home

The Village at Loomis. Long-Envisioned A Wonderful Place to Call Home at Loomis Long-Envisioned A Wonderful Place to Call Home The Vision Implementing the Town s Plans and Goals Years ago, the Town established the vision for The Village at Loomis in plans and EIRs approved

More information

A Vision for Walnut Creek

A Vision for Walnut Creek A Vision for Walnut Creek Photo: City of Clive Walnut Creek Booklet 8 of 8 Greater Des Moines Water Trails and Greenways 1 Table of Contents Booklet 1: Water Trails Strategies and Policies Booklet 2: Beaver

More information

Parks, Trails, and Open space Element

Parks, Trails, and Open space Element Parks, Trails, and Open space Element Parks, Trails, and Open Space element Parks, Recreation, and Open Space are important components of the quality of life desired by the residents of Elk Grove. This

More information

4. ENVIRONMENTAL IMPACT ANALYSIS 7. LAND USE AND PLANNING

4. ENVIRONMENTAL IMPACT ANALYSIS 7. LAND USE AND PLANNING 4. ENVIRONMENTAL IMPACT ANALYSIS 7. LAND USE AND PLANNING 4.7.1 INTRODUCTION The following analysis discusses the consistency of the Proposed Project with the corresponding land use and zoning designations

More information

Mendota-Lebanon Hills Greenway Master Plan Executive Summary. August draft for more information visit

Mendota-Lebanon Hills Greenway Master Plan Executive Summary. August draft for more information visit Mendota-Lebanon Hills Greenway Master Plan Executive Summary August 2013 draft for more information visit www.hkgi.com/projects/dakota INTRODUCTION The Mendota-Lebanon Hills Greenway Master Plan portrays

More information

ADOPTION OF THE REVISED OPEN SPACE AND CONSERVATION ELEMENT OF THE GENERAL PLAN

ADOPTION OF THE REVISED OPEN SPACE AND CONSERVATION ELEMENT OF THE GENERAL PLAN TO: FROM: SUBJECT: Honorable Mayor and City Council Planning Department ADOPTION OF THE REVISED OPEN SPACE AND CONSERVATION ELEMENT OF THE GENERAL PLAN RECOMMENDATION: It is recommended that the City Council:

More information

A. Background Summary of Existing Challenges and Potential Possibilities. 1. Summary of Existing Assets and Potential Opportunities

A. Background Summary of Existing Challenges and Potential Possibilities. 1. Summary of Existing Assets and Potential Opportunities A. Background 1 A Main Street Master Plan Study was performed and completed in October of 2007. The study was initiated to review current land uses and development patterns along Main Street, from Parrish

More information

APPENDIX C. Architectural and Environmental Design Standards. Environmentally sensitive areas should be protected.

APPENDIX C. Architectural and Environmental Design Standards. Environmentally sensitive areas should be protected. APPENDIX C Architectural and Environmental Design Standards Environmentally Sensitive Areas Goal A. Environmentally sensitive areas should be protected. Development, such as roads, houses, and other structures,

More information

RECREATION AND OPEN SPACE ELEMENT GOALS, OBJECTIVES, AND POLICIES

RECREATION AND OPEN SPACE ELEMENT GOALS, OBJECTIVES, AND POLICIES RECREATION AND OPEN SPACE ELEMENT GOALS, OBJECTIVES, AND POLICIES Goal 7 To provide park facilities, recreation programs, and open space resources that are safe, adequate, and accessible to all City residents,

More information

2.5 Roads. Loading and service areas adjacent to Highway 401 should be screened through architectural walls and/or landscape buffer planting.

2.5 Roads. Loading and service areas adjacent to Highway 401 should be screened through architectural walls and/or landscape buffer planting. N HIGHWAY OFF RAMP 2.5 Roads A legible road network with a clear hierarchy will help create a connected community, both within and surrounding the Milton Heights. The following section outlines the proposed

More information

Applicant Name Phone / Fax / Address City State Zip Code . Property Owner Phone / Fax / Address City State Zip Code

Applicant Name Phone / Fax / Address City State Zip Code  . Property Owner Phone / Fax / Address City State Zip Code Master Development Plan Application Community Development Department City of Redmond 411 SW 9 th Street Redmond, Oregon 97756 541-923-7721 541-548-0706 FAX Master Development Plan Fee $38,862.52 File Number

More information

North Oakville East Parks Facilities Distribution Plan. November, 2009

North Oakville East Parks Facilities Distribution Plan. November, 2009 North Oakville East November, 2009 POLICY CONTEXT 1) Purpose a) The purpose of this document is to be a guide for the location, configuration, design and development of the parks system for the North Oakville

More information

GENERAL LAND USE PLAN ELEMENT

GENERAL LAND USE PLAN ELEMENT CITY OF Prepared by City of Medford Planning Department 200 South Ivy Street Medford, Oregon 97501 plnmed@ci.medford.or.us James E. Huber, AICP, Planning Director COMPREHENSIVE PLANNING SECTION John Adam,

More information

Draft Memorandum #1: Goals and Vision for Revitalization

Draft Memorandum #1: Goals and Vision for Revitalization Keizer Revitalization Plan Draft Memorandum #1: Goals and Vision for Revitalization Submitted to: City of Keizer April 12, 2018 (revised) Prepared By: Angelo Planning Group and Otak, Inc. Project No. 17482.A

More information

SAN RAFAEL GENERAL PLAN 2040 INTRODUCTION AND OVERVIEW

SAN RAFAEL GENERAL PLAN 2040 INTRODUCTION AND OVERVIEW SAN RAFAEL GENERAL PLAN 2040 INTRODUCTION AND OVERVIEW Steering Committee Presentation February 14, 2018 Purpose of General Plan Guide land use and development decisions Coordinate transportation, infrastructure,

More information

GUIDE FOR PROCESSING A SUPPLEMENTAL ZONING CLEARANCE

GUIDE FOR PROCESSING A SUPPLEMENTAL ZONING CLEARANCE GUIDE FOR PROCESSING A SUPPLEMENTAL ZONING CLEARANCE A Supplemental Zoning Clearance ensures that all required fees and any special plan checks and/or conditions of the various departments and agencies

More information

Public input has been an important part of the plan development process.

Public input has been an important part of the plan development process. Lakewood s Comprehensive Plan recognizes that transportation helps shape the community, and that the way the community provides for the safe and efficient movement of people affects the character of the

More information

Route 347. New York State Department of Transportation Region 10, Long Island. THE GREENING of ROUTE 347

Route 347. New York State Department of Transportation Region 10, Long Island. THE GREENING of ROUTE 347 The GREENING of Route 347 The Greening of Route 347 The Greening of Route 347: History 3 The Greening of Route 347 4 The Greening of Route 347 5 The Greening of Route 347 Smith Haven Mall 6 The Greening

More information

Planning Commission Staff Report June 5, 2008

Planning Commission Staff Report June 5, 2008 Owner/Applicant Taylor Village Sacramento Investments Partners, LP c/o Kim Whitney 1792 Tribute Road #270 Sacramento, CA 95815 Staff Recommendation Planning Commission Staff Report Project: File: Request:

More information

SECTION ONE North East Industrial Zone Design Guide Palmerston North City Council June 2004

SECTION ONE North East Industrial Zone Design Guide Palmerston North City Council June 2004 SECTION ONE North East Industrial Zone Design Guide Palmerston North City Council June 2004 young heart easy living 1 Preface Industrial areas are a very important component of the economic well-being

More information

Chapter Master Planned Communities (MPC) District

Chapter Master Planned Communities (MPC) District Sections 14.53.010 Purpose and Intent 14.53.020 Applicability 14.53.030 Procedure 14.53.040 MPC Standards 14.53.050 Required Findings 14.53.010 Purpose and Intent Chapter 14.53 Master Planned Communities

More information

CHAPTER 1. Ms. Guajardo s Class - Central Elementary CH 1 1

CHAPTER 1. Ms. Guajardo s Class - Central Elementary CH 1 1 INTRODUCTION CHAPTER 1 Ms. Guajardo s Class - Central Elementary CH 1 1 1.1 SETTING South Centre City is a linear corridor south of Downtown Escondido paralleling Centre City Parkway and South Escondido

More information

Town Center. Block 5 Existing multifamily residential units are expected to remain.

Town Center. Block 5 Existing multifamily residential units are expected to remain. Area Guidelines Germantown s districts should be developed as distinct communities with unique features that are supported through the guidelines. The guidelines not only help distinguish these districts

More information

2011 ASLA Design Awards. Centennial Park Merit Award Design Concepts CLA, Inc. Design over $500,000 Construction Budget

2011 ASLA Design Awards. Centennial Park Merit Award Design Concepts CLA, Inc. Design over $500,000 Construction Budget 2011 ASLA Design Awards Centennial Park Merit Award Design Concepts CLA, Inc. Design over $500,000 Construction Budget 2011 ASLA Colorado Professional Design Awards Project Name: Category: Location: Const.

More information

V. Vision and Guiding Principles

V. Vision and Guiding Principles V. Vision and Guiding Principles The Master Plan for the Powers Ferry Corridor seeks a foundation in the desires of the community. At times, various elements of the community offered opposing viewpoints,

More information

STREAM BUFFERS

STREAM BUFFERS 88-415 STREAM BUFFERS 88-415-01 PURPOSE In the Kansas City region and throughout the nation, vegetated stream buffers have been clearly shown to protect stream stability and related infrastructure, improve

More information

CHAPTER 3 VISION, GOALS, & PLANNING PRINCIPLES. City of Greensburg Comprehensive Plan. Introduction. Vision Statement. Growth Management Goals.

CHAPTER 3 VISION, GOALS, & PLANNING PRINCIPLES. City of Greensburg Comprehensive Plan. Introduction. Vision Statement. Growth Management Goals. CHAPTER 3 VISION, GOALS, & PLANNING PRINCIPLES Introduction The Greensburg Comprehensive Plan is intended as a working community document. A combination of long and short-term goals, this document is intended

More information

City of Hermosa Beach Administrative Policy #

City of Hermosa Beach Administrative Policy # City of Hermosa Beach Administrative Policy # SUBJECT: Living Streets Policy Date: Approved by: City Council Authority: Public Works Department & Community Development Department Mayor, PURPOSE The City

More information

Chapter 5: Natural Resources and Environment

Chapter 5: Natural Resources and Environment NATURAL RESOURCES AND ENVIRONMENT 5-1 5 Chapter 5: Natural Resources and Environment BACKGROUND AND INTENT Urban expansion represents the greatest risk for the future degradation of existing natural areas,

More information

Status Update (2006 vs. Now) Citizen s Advisory Committee February Plan for Prosperity

Status Update (2006 vs. Now) Citizen s Advisory Committee February Plan for Prosperity Status Update (2006 vs. Now) Citizen s Advisory Committee February 2018 Plan for Prosperity 2000 2017 2000 2017 Gardnerville Population 6,000 5,760 5746 5,500 5,000 5,067 5,550 5,165 5,394 5,412 5,250

More information

3.0 master plan concept

3.0 master plan concept 3.0 master plan concept 3.1 introduction The purpose of the Huron Church Road Master Plan Concept is to provide an overview of the Master Plan design process, identify preliminary streetscape installations

More information

When planning stormwater management facilities, the following principles shall be applied where possible.

When planning stormwater management facilities, the following principles shall be applied where possible. 2.0 Principles When planning stormwater management facilities, the following principles shall be applied where possible. 2.0.1 Drainage is a regional phenomenon that does not respect the boundaries between

More information

City of Farmington. Downtown Plan. Amendment to the 1998 Master Plan Adopted October 11, 2004

City of Farmington. Downtown Plan. Amendment to the 1998 Master Plan Adopted October 11, 2004 City of Farmington Amendment to the 1998 Master Plan Adopted October 11, 2004 Introduction Planning Background 1 Scope and Components of the Plan Amendment 2 Concept Introduction 3 Plan Concepts 3 Conceptual

More information

An Ambitious Plan: Transforming the blighted South Platte River and surrounding environment into Denver s greatest natural resource.

An Ambitious Plan: Transforming the blighted South Platte River and surrounding environment into Denver s greatest natural resource. CONNECTING THE PEOPLE TO THEIR RIVER SOUTH PLATTE RIVER VISION IMPLEMENTATION PROGRAM: GRANT-FRONTIER PARK TO OVERLAND POND PARK REACH The South Platte River Vision Implementation Program (River Vision)

More information

KASPER. City of Georgetown, Texas PUD Planned Unit Development. December 30, 2015 Revised January 27, 2016

KASPER. City of Georgetown, Texas PUD Planned Unit Development. December 30, 2015 Revised January 27, 2016 KASPER City of Georgetown, Texas PUD Planned Unit Development December 30, 2015 Revised January 27, 2016 Applicant: Sentinel Land Company, LLC 4910 Campus Drive Newport Beach, CA Prepared by: SEC Planning

More information

Route 1 Corridor Study

Route 1 Corridor Study Route 1 Corridor Study Westbrook, Connecticut A Vision for the Connecticut Shoreline Public Informational Meeting July 28, 2015 Lower Connecticut River Valley Council of Governments Fitzgerald & Halliday,

More information

Parks, Trails, and Open Space Element

Parks, Trails, and Open Space Element P arks, Recreation, and Open Space are important components of the quality of life desired by the residents of Elk Grove. This Element of the General Plan addresses the City s goals, policies, and actions

More information

Silverdale Regional Center

Silverdale Regional Center Silverdale Regional Center Vision for Silverdale Regional Center The Silverdale Regional Center Plan (Plan) will guide the evolution of the Silverdale Regional Center from a collection of strip malls and

More information

Los Angeles River-Arroyo Seco Confluence Restoration Vision Plan. Professor Meredith McKenzie, JD Urban & Regional Planning Dept Cal Poly Pomona

Los Angeles River-Arroyo Seco Confluence Restoration Vision Plan. Professor Meredith McKenzie, JD Urban & Regional Planning Dept Cal Poly Pomona Los Angeles River-Arroyo Seco Confluence Restoration Vision Plan Professor Meredith McKenzie, JD Urban & Regional Planning Dept Cal Poly Pomona The Los Angeles River Watershed Arroyo Seco Watershed Map

More information

FLORIN ROAD CORRIDOR Site Plan and Design Review Guidelines Checklist

FLORIN ROAD CORRIDOR Site Plan and Design Review Guidelines Checklist FLORIN ROAD CORRIDOR Site Plan and Design Review Guidelines Checklist Applicant s Name: Project Address: Phone: Email: Applicant shall fill out the design guidelines checklist for all guidelines applicable

More information

Ivywild On The Creek PRELIMINARY CREEK DISTRICT MASTER PLAN

Ivywild On The Creek PRELIMINARY CREEK DISTRICT MASTER PLAN Ivywild On The Creek PRELIMINARY CREEK DISTRICT MASTER PLAN Introduction: Rejuvenating an extraordinary Creekside neighborhood THE CREEKSIDE DISTRICT The Ivywild On The Creek Neighborhood District Master

More information

3.10 LAND USE SETTING PROJECT SITE EXISTING LAND USE DESIGNATIONS AND ZONING. General Plan Land Use Designations.

3.10 LAND USE SETTING PROJECT SITE EXISTING LAND USE DESIGNATIONS AND ZONING. General Plan Land Use Designations. This section of the Draft EIR addresses the existing land uses on and adjacent to the project site and discusses the potential impacts of the proposed project on existing land uses. Key issues addressed

More information

Honorable Mayor and Members of the City Council. Submitted by: Eric Angstadt, Director, Planning and Development

Honorable Mayor and Members of the City Council. Submitted by: Eric Angstadt, Director, Planning and Development Office of the City Manager ACTION CALENDAR January 29, 2013 To: From: Honorable Mayor and Members of the City Council Christine Daniel, City Manager Submitted by: Eric Angstadt, Director, Planning and

More information

ARLINGTON COUNTY, VIRGINIA

ARLINGTON COUNTY, VIRGINIA ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting October 15, 2005 DATE: September 28, 2005 SUBJECT: Request to Advertise the adoption of the 2005 Clarendon Sector Plan C. M. RECOMMENDATION:

More information

Landscape and Streetscape Design 2.5

Landscape and Streetscape Design 2.5 Landscape and Streetscape Design 2.5 2.5.1 Goals 2.5.2 Planting 2.5.3 Sidewalks and Pavement 2.5.4 Furnishings 2.5.5 Walls 2.5.6 Lighting 2.5.7 Stormwater 2.5.8 Street Cross Sections 2.5 LANDSCAPE AND

More information

Arlington, Virginia is a worldclass

Arlington, Virginia is a worldclass EXECUTIVE S U M M A RY Arlington maintains a rich variety of stable neighborhoods, quality schools and enlightened land use policies, and received the Environmental Protection Agency s highest award for

More information

Table L-1 Summary Action Strategy. Action Item Timing Status Responsible Agency

Table L-1 Summary Action Strategy. Action Item Timing Status Responsible Agency CHAPTER 4: CIRCULATION ELEMENT ISSUE #1: MAJOR THOROUFARES AND TRANSPORTATION ROUTES A balanced transportation system for Fontana is provided that meets the mobility needs of current and future residents

More information

Maplewood Avenue Downtown Complete Street Project

Maplewood Avenue Downtown Complete Street Project Maplewood Avenue Downtown Complete Street Project Second Public Meeting January 24, 2018 Welcome and Introduction of Project Team City Planning and Public Works Staff City of Portsmouth Juliet Walker Planning

More information

COMMUNITY DESIGN. GOAL: Create livable and attractive communities. Intent

COMMUNITY DESIGN. GOAL: Create livable and attractive communities. Intent COMMUNITY DESIGN Intent An attractive, well-designed County will attract quality development, instill civic pride, improve the visual character of the community, and create a strong, positive image for

More information

4.1.3 LAND USE CATEGORIES

4.1.3 LAND USE CATEGORIES 4.1.3 LAND USE CATEGORIES a. City Center District The City Center District incorporates the existing character and mix of uses in downtown Belmont to encourage redevelopment and new development in keeping

More information

Your town s subdivision or land use ordinance standards should reference the following street standards, for example:

Your town s subdivision or land use ordinance standards should reference the following street standards, for example: Your town s subdivision or land use ordinance standards should reference the following street standards, for example: Streets shall be designed to move traffic safely and in a way that minimizes environmental

More information

CHAPTER 7: VISION AND ACTION STATEMENTS. Noble 2025 Vision Statement

CHAPTER 7: VISION AND ACTION STATEMENTS. Noble 2025 Vision Statement CHAPTER 7: VISION AND ACTION STATEMENTS This chapter presents the vision, policy and action statements that transform the comprehensive planning study, an analysis of Noble s past, future trends and community

More information