1 Facility Master Plan for COSUMNES RIVER COLLEGE Los Rios Community College District March, 2004

2 TABLE OF CONTENTS I. Facility Master Plan Process of Development 1. Background Statement 2. Facility Master Plan Process for Development 2.1 Step One 2.2 Step Two 2.3 Step Three 2.4 Step Four 2.5 Step Five 2.6 Step Six 2.7 Step Seven 2.8 Step Eight 3. Site Analysis Sketch II. Facility Master Plan 1. Site Plan Overview 2. Projects in Detail 3. Schedule of Projects 4. Schedule of Project Budgets III. Design Guidelines 1. Introduction 2. Purpose 3. Design Review 4. Growth Projections 5. Setting

3 6. Site Design Guidelines 6.1 Parking Guidelines 6.2 Parking Expansion 6.3 Vehicle Traffic Circulation 6.4 Regional Transit 6.5 Pedestrian Circulation 6.6 Building Placement 6.7 Open Space 7. Architectural Guidelines 7.1 General Guidelines 7.2 Building Additions 7.3 New Buildings 7.4 Building Materials 7.5 Mechanical Equipment 7.6 Fire Sprinklers 8. Landscape Guidelines 8.1 General Concept 8.2 Future Character 8.3 Plant Materials 8.4 Irrigation 8.5 Landscape Furniture 9. Lighting Guidelines 9.1 General Concept 9.2 Parking Lot Lighting 9.3 Campus Lighting 10. Sign Guidelines 10.1 Purpose 10.2 Directional Signage 10.3 Building Identification Signage

4 I. FACILITY MASTER PLAN Process of Development

5 I. FACILITY MASTER PLAN PROCESS FOR DEVELOPMENT 1. Background After passage of a local general obligation bond and more recently a state bond measure, Cosumnes River College will be allocated approximately $103,000,000 over the next 15 years to fund facility projects. These projects will include modernization of existing facilities as well as construction of new facilities, including the construction of a new center in the area of Elk Grove. To facilitate the effective use of these funds, Cosumnes River College undertook the task of developing a Facilities Master plan. Development of the Facilities Master Plan was accomplished though a series of collaborative workshops, campus wide forums, meetings and other forms of communication between the CRC Health and Facilities Committee, the architectural firm of Murray & Downs AIA, the CRC managers and their respective faculty and staff, as well as the facilities planning unit from the District Office. The Facilities Master Plan is intended to be a living document, which will provide a flexible framework to guide planning of the college construction projects until the year It s important to differentiate between a Facility Master Plan, a Detailed Facilities Plan, and actual building designs. The primary goal of the Facilities Master Plan is to identify where future buildings should be sited, which current facilities should be modernized, which should be demolished, and the placement of future roadways, parking lots, and pedestrian walkways. The Facilities Master Plan should also provide the sequencing and timelines for projects as well as the general architectural standards that should be incorporated in all projects. The primary goal of a Detailed Facilities Plan is to identify specifically which departments will be housed within new construction and what secondary effects will follow the primary moves. The primary goal of the building designs is to ensure the program needs of future occupants are met and that the aesthetic goals of the campus are maintained. The Facilities Master Plan is driven by things such as instructional growth projections, general growth needs of the non-instructional departments, campus utility layouts, capacity/load ratios, and other parameters provided by the facilities planning unit at the State Chancellors Office as well as our own District office. As such, the Facilities Master Plan does not specifically address program requirements within each project. It is expected that this aspect of facility planning will occur at the detailed programming phase associated with each individual project. The primary goals of the Facilities Master Plan are: Identify long term facility needs Identify future projects to address the program needs, including modernization and expansion projects

6 Identify projects to address vehicular and pedestrian needs Identify future project locations Prioritize identified projects and provide a schedule for construction Identify design guidelines for future projects 2. Process The following is intended to identify the process used by Cosumnes River College to gather the input that was used to guide and inform the Facility Master Plan. The basic premise used in the master planning process was to facilitate as much communication, input, and review as possible and to ensure the best possible master plan as possible as well as ensure buy-in from all college constituents. 2.1 Step One The Health and Facilities Planning Committee sent a memo to the entire campus that outlined the Facility Master Planning process and timelines as developed. The memo requested that all faculty, staff and administrators provide input to the Health and Facilities Planning Committee with regard to facility needs and interests relative to their programs and services. The memo was also provided to student groups to ensure their input was also incorporated. The goal of this part of the process was to ensure a wide spread education of the college community with regard to the planning process and to ensure a vehicle for the broadest possible input. 2.2 Step Two A campus-wide forum was conducted at a campus flex day to discuss and share information about the Facility Master Planning process as well as input that had been received by Health and Facilities Planning Committee. The goal of this portion of the process was to ensure all constituents continued to be well informed, engaged in the process and to provide a further vehicle for input Step Three Presentations were made to the Academic Senate, the Classified Senate, and the management council with regard to the progress that was being made on various interests and proposals that were being put forward to the planning committee. The goal of these presentations was to provide a further venue for input and review into the progress being made on the Facilities Master Plan. The presentations were well received and provided input that the planning process was moving in an appropriate manner with proper direction Step Four Input that was gathered from the various forums, presentations and other meetings was reviewed by the Health and Facilities Committee and incorporated into the planning process. The goal of this part of the process was to ensure that the input that came from all presentations, forums and meetings was reviewed and incorporated into the planning considerations.

7 2.5 Step Five In a series of meetings between the architects, the district facility planning director, and the college vice presidents, the identified projects in the Facilities Master Plan were prioritized. This process was informed by campus needs, capacity/load ratios, potential secondary effects, and project feasibility criteria. Another primary driver of the project prioritization process was the fundability of each project. While some projects are eligible to receive state funding, others will be supplemented or entirely funded from local bond measures. One goal of this portion of the process was to ensure that the college maximized its leverage of projects with respect to receiving as much state funding as possible. The college site was then analyzed to determine possible future project locations and a facility analysis was conducted to identify future modernization projects. The prioritized project list was then superimposed on the site plan to generate a comprehensive master plan. A full color rendering of the campus site is provide in the Facilities Master Plan to graphically show all projects that will occur over the period covered by this plan. In conjunction with the master planning process, the architects developed design guidelines to set a standard for future projects and to ensure continuity in design, architectural expression and site planning that maintains the character of the existing campus. As part of the design guidelines, various building sites on the campus were analyzed and rejected or found to be acceptable as possible future building sites. A hierarchy of open space based on its importance to the overall character to the existing campus was established in order to clearly identify boundaries and setbacks for future projects. 2.6 Step Six After many iterations and changes, a draft of the Facilities Master Plan was reviewed by the Health and Facilities Planning Committee. The committee was asked for final changes and input before finalization was complete. The goal of this part of the process was to take one final look at the master plan before a final rollout to the campus community. 2.7 Step Seven A campus wide forum was held to provide for further discussion and input to the master plan prior to finalization. The draft Facilities Master Plan was presented at this forum, where the entire campus was invited to attend. 2.8 Step Nine The Health and Facilities Planning Committee provided the college president with a recommendation regarding the final master plan. The campus president subsequently approved the recommendation.

8 3. Site Analysis Sketch

9 II. FACILITY MASTER PLAN

10

11 2. Projects in Detail Project 1: Child Development Center (complete in 2002) (11,348 ASF) Goals and Objectives: The goal of this project was to meet the growing need for increased capacity of childcare slots on the campus for student parents. A secondary goal was to provide an improved site that could handle increased enrollment in the Early Childhood Education program. This facility would provide increased practicum placements in the child care center. Additional faculty offices colocated in the center would also better serve the ECE students. Description: The new facility for the Child Development Center was completed in March 2002 and increased the college capacity to 108 children. The project provided for 11,348 assignable square footage of childcare and instructional space that has greatly improved the offerings of the college. Project 2: Faculty Office Building (complete in 2003) (8,000 ASF) Goals and Objectives: The primary goal of this project was to provide for more faculty offices at the college. Prior to this project, there were faculty being housed and co-located in less than desirable locations. Without this building, even the less than desirable locations would have been in short supply. This project has allowed to college to provide its faculty with a modern, bright, professional environment in which to work. Description: The new faculty office building, named the Southeast Office Complex, was completed in the December of The building provides 48 faculty offices, administrative offices for two deans as well as support staff. Also included in the building is a faculty workroom and a much needed conference room.

12 Project 3: Bookstore/Cafeteria Addition Phase 1 (2005) (2,800 ASF) Goals and Objectives: The primary goal of this project is to address the issue of a bookstore that was too small. Given the size of the current bookstore, during peak periods, students actually have to line up outside to wait their turn to buy their books. The other goal of the expansion would be to enable the bookstore to expand the offerings to things other than just books. The ability to buy college clothing and other items is something that the students have been asking for and will certainly enjoy. Description: The expansion of the bookstore will provide an additional 2,800 square feet of retail space in the bookstore. This will essentially double the current bookstore. With very high ceilings and huge skylights, this project will provide a modern retail feel on the inside while preserving the academic feel of the current architecture on the exterior of the building. Project 4: Learning Resources Center (2005) (30,635 ASF) Goals and Objectives: The primary objectives of this project are to provide additional instructional space as well as to improve the space provided for many of our instructional services. This project will provide a new Reading/Writing Center, a Tutorial Center, a Math Center, an Assessment and Testing Center, a Journalism Lab, an Anthropology Lab, two large theatre style seating classrooms, a number or instructional classrooms, and faculty offices. Some of the aforementioned operations will move from the current Library building into this new facility, resulting in vacated space in the Library building. As a secondary effect of this project, the newly vacated space in the Library building will be used to consolidate programs in the Library building to provide them with better access. Description: This project will be a two-story building sited directly east of the Library building. It will be approximately 30,635 square feet and will provide a huge increase in instructional space for the campus. This will be the third multi-story building constructed at the college.

13 Project 5: Science Building Modernization (2006) (18,971 ASF) Modernization Goals and Objectives: This project will improve the college s ability to serve students by improving the safety and enhancing the working environment for students and staff. This is due to the anticipated improvement in the ventilation system in the building, the improvement in the number and quality of the hoods in the labs and the installation of electronic gas shut-off valves. The project will also enhance the overall learning environment in the labs. This is due to the anticipated replacement of existing lab stations and cabinets and the creation of improved storage capabilities in the rooms and the stockrooms. The project will also aid with improving the departments ability to meet the needs of wheelchair bound students and staff in our science programs. This is due to the creation of accessible lab stations for both students and staff. Also improved, will be the ability to integrate technology into science lectures and labs. This is due to the addition and improvement of the technology infrastructure to the labs and lecture spaces, storage space, as well as the ability to upgrade current computer systems. Improving the quality of several programs (MESA, Biology, Natural Science, Geology, Geography) will be another benefit of this project. This is due to the anticipated construction of secure storage space in a way that increases student and instructor access to materials and improves the functionality of the existing space. Description: This project will involve the modernization of mechanical, electrical, heating and ventilating systems, and a host of other internal building systems to bring it up to the level it should be. The project will also address aesthetic as well as other operational needs that will provide for an improved teaching and learning environment. Project 6: Transportation, Access and Parking Phase 1 (2005) (144) Parking Stalls Goals and Objectives: The primary goal of this project will be to improve vehicular access and egress to and from the campus. Currently there are two main entrances onto the campus: off Center Parkway and off Bruceville Road. Both of these entrances can be quite congested at times due to not having traffic signals. The project will add a third entrance that will help ease the congestion on the other two.

14 Description: This project will add a third entrance off Calvine Road (south of campus) that will be a mirror image of the other two that currently exist. If budget permits, this project will also include the development of further parking to the west of the new entrance to accommodate the ever-increasing growth at the college. Project 7 Police / Printing / Nurse Office Modernization (2006) (7,813 ASF) Modernization Goals and Objectives: The primary goal of this project will be to provide adequate facilities for the Police, Printing, and Nurses office. All three of these operations are currently housed in very old portable buildings that do not fully meet their needs. This will also aid in the goal of removing portable structures that tend to be high in maintenance and aesthetically inferior. Description This project will involve the elimination of portable structures, which will then be replaced by a new building that will house all three of these operations. The new structure will be located very near to their current location, which will be directly north of the new Learning Resources Center. Project 8 Science Building Addition (2008) (15,801 ASF) Goals and Objectives This expansion will improve the college s ability to serve students by increasing access to science classes. This is due to the fact that the expansion project will provide for an increase in the number of science lab sections that are offered by over 125%. It will also provide greater flexibility for scheduling. This will help meet the current and anticipated demand for science classes some of which currently close within days of the start of registration. This project will improve the quality of instruction in many of the science classes due to the fact that the college will be able to move existing lab sections to rooms that are constructed explicitly for that instructional purpose, are in close proximity to the supporting stockrooms and have storage and cabinets that provide security and quick access to instructional

15 materials. The project will also have the benefit of increasing the size of stockrooms, which will enhance the instructional resources available. This project will help facilitate student access to faculty offices hours and tutoring support due to the fact that the expansion will increase the number of office spaces that are in close proximity to the laboratories and instructional materials. The project will also increase the size of the division office and workroom, which will greatly aid the efficient running of the division. Description: The project will provide for an additional 15,801 square feet, which will almost double the size of the current facility. The expansion will take place on all sides of the current structure while still maintaining an appropriate set back for open space. Project 9 Community and Athletic Center Phase 2 (2007) (9,588 ASF) Goals and Objectives This project will complete second floor of the Community and Athletic Center. The project will provide for an appropriate Fitness and Conditioning Center. The project will allow for spectator capacity to reach approximately It will complete the concessions area to provide for fund raising opportunities. It will complete the equipment and laundry room. The project will also allow for the housing of all full time faculty and head coaches in their own office space. It will complete the ticket office for major events. It will provide for an elevator so that access to the second level will be available. It will also provide for campus meeting space that is in short supply. All of the above will expand the physical education program, accommodate a highly competitive athletic program, allow for the expansion of summer programs and increase the quality of community events hosted in the facility. Description: This phase of construction will open up the second floor of this facility and provide for an additional 9,588 square feet of instructional and office space.

16 Project 10 Elk Grove Center Phase 1 (2009) (15,200 ASF) Goals and Objectives: The Elk Grove Center is intended to serve the growing community toward the south of the college as a site where general education / transfer courses and some selected occupational courses that do not require specialized facilities can be completed, with the student moving to the main college site to complete programs that require more specialized facilities. The first phase of this development will create a learning environment where students will have both classroom and lab space (9000 ASF) and appropriate learning support areas in a learning resource center that will serve the initial implementation of the center (2000 ASF). With specific educational planning for the Center at its early stages, the lab space is designed to be as flexible as possible so that it can be used to support a variety of instructional purposes as the Center responds to the educational needs of the community. Description: This project would provide for a newly created off campus center. The exact location that this facility will be located has not yet been fully determined, but it is expected to be south of the college, somewhere in the vicinity of Elk Grove. This project will be the first of three phases that will complete the center. This phase will provide for 15,200 square feet of instructional and support space. Project 11 Bookstore / Cafeteria Addition Phase 2 (2010) (5,960 ASF) Goals and Objectives: The primary goal of this project will to increase the size of the cafeteria so that it can accommodate the student population. In addition this, the project will provide for public meeting space, and increase in the lab space dedicated to the Culinary Arts Program, as well as providing space to remodel the servery area of the cafeteria itself. Description: This project will expand the current College Center to the west of the current structure to provide for an additional 5,960 square feet of useable space for the college. The expansion will ensure consistency with the current architecture of the building and ensure it ties into the current theme of the building and campus.

17 Project 12 New Instructional Building Phase 1 (2008) (20,370 ASF) Goals and Objectives: The initial phase of the New Instructional Building will serve CRC students by increasing the capacity of the college to serve both transfer students and some important occupational programs. Despite the current downturn in demand for computer classes, the long-term outlook for this area is strong enough to warrant an increase in laboratory space for that program (2400 sq. ft.); however, if growth in this area does not meet expectations, the flexible nature of the CIS laboratory space will allow it to be converted easily to serve other kinds of programs. This flexibility is also true of the lab space dedicated to other kinds of labs (7000 sq. ft.); the non-specialized nature of this space will allow it to be adapted to meet growth in areas that do not require wet lab support. The increase to the photography laboratory space (2000 sq. ft.) will address the strict limitations on growth imposed by the current limited laboratory space. The increase (970 sq. ft.) in math/statistics laboratory space will allow more effective support for instruction in this important area, and the increase in lecture space (4000 sq. ft. will support increases in general education and transfer areas like the social sciences, English and mathematics. Description: This project, which will be located northeast of the Learning Resources Center, will provide for an additional 20,370 square feet of instructional and support space. This structure. This will likely be a single story structure and will be designed in such a way as to tie into the architecture of the surrounding buildings and campus. Project 13 North East Campus Modernization (2009) (4,650 ASF) New and (26,732 ASF) Modernized Goals and Objectives: This will be a very large and diverse project with the primary goal of modernizing the many of the facilities located in the northeast area of the campus. This area, currently houses many operational departments such as receiving, warehouse, custodial services, and campus maintenance. It also houses many areas such as the Ford Center, the Welding program, the Veterinary Program, the Agriculture program, and the Construction program. With the exception of the Veterinary program, the other programs listed need their facilities modernized to enable them to maximize their ability to deliver

18 quality programs and services. A secondary goal of this project, in addition to project 14, would be to bring this section of the campus into the main fold. Currently this part of campus is called the back 40, which is a reference to the remoteness of the area. This project and project 14 are expected to develop this area of campus such that it becomes viewed as part of the main campus. Description: This project will involve the modernization of both the Ford Center and the Welding facility. The facilities used by the Agriculture program, the Construction program, custodial services, campus maintenance, and receiving, will be torn down and replaced with new structures. This project will add 4,650 ASF of new space and will modernize 26,732 ASF of existing space. Project 14 Transportation, Access and Parking Phase 2 (2007) (262) Parking Stalls Goals and Objectives: The primary goal of this project will be to develop more of the planned parking spaces that will be needed by students, as well as providing vehicular and pedestrian access to the northeast section of the campus. The project will provide additional parking stalls for both students and staff along the south end of campus as well as the northeast side of campus. This project will greatly improve the parking associated with the northeast section of campus, that primarily has gravel parking at the current time. Description: The project will involve the paving and lighting of a section of undeveloped parking along the south side of the campus as well as the northeast side of campus. The project will also provide an access road and sidewalk for vehicular and pedestrian traffic between the main area of campus and the northeast area of campus.

19 Project 15 Portables 42 through 48 Modernization (2010) (4,700 ASF) Modernization Goals and Objectives: As one of it s overarching goals, the campus is trying to eliminate portable structures whenever possible. Some of these structures are over twenty years old, well past their expected lifecycles. This project would improve the aesthetics of the campus as well as move programs into appropriate structures more suited to their operations. Description: This project would involve the elimination of numerous portable structures and replace them with permanent ones. This project would involve a combined 4,700 ASF of modernization. Project 16 New Instructional Building Phase 2 (2011) (5,900 ASF) Goals and Objectives: The primary goal of this project would be to provide additional instructional space for the Allied Health program, the EMT program, and general lecture space. With an ever-increasing demand for graduates from these programs, the increased space is necessary to provide an appropriate educational experience for students. Description: This project would be an addition to the construction of project number twelve, earlier referenced. It would provide for 3,000 ASF of lab space, 1,200 ASF of lecture space, and 1,400 ASF of faculty office space. Project 17 Elk Grove Center Phase 2 (2012) (15,140 ASF) Goals and Objectives: As stated above, the Elk Grove Center is intended to serve the growing community toward the south of the college as a site where general education / transfer courses and some selected career / occupational courses that do not require specialized facilities can be completed close to where the students live. The

20 second phase of this development will create an enhancement to the first phase in lecture space (1,280 ASF) and lab space (7,800 ASF) and in learning support areas (4,600 ASF including offices). Consistent with the current design guidelines of the center, the lab space, as in the first phase, is designed to be as flexible as possible so that it can be used to support a variety of instructional purposes as the Center responds to the educational needs of the community. This flexibility will allow growth in the transfer / general education and career / occupational classes that this center will feature. Description: This project will be the second phase of the Elk Grove Center and will be an addition to the phase one construction project. The project will provide for an additional 15,140 of instructional and support space to further the mission of the center operation. Project 18 Automotive Technology Expansion (2013) (6,950 ASF) Goals and Objectives: The primary goal of this project will be to provide increased laboratory space to the current facility to meet ever-increasing student demand. This project will provide increased lab space as well as appropriate storage to support the rapidly growing automotive program. A large new tool room, with an office for the automotive technician, will be located between the automotive laboratories. The former tool room will be converted to component storage. Description: This project will be an addition to the current automotive building. It will provide for an additional 5,000 ASF in laboratory space, 750 ASF in lecture space, 600 ASF in office space, and 600 ASF in operational space. Project 19 Transportation, Access and Parking Phase 3 (2012) (139) Parking Stalls Goals and Objectives: The primary goal of this project will be to develop more of the planned parking spaces that will be needed by students. The project will provide additional parking stalls for both students and staff along the south end of campus.

21 Description: The project will involve the paving and lighting of a section of undeveloped parking along the south side of the campus, west of the new Calvine Road entrance. Project 20 Interior Library Expansion (2013) (2,000 ASF) Goals and Objectives: The expansion of the library Mezzanine floor, given the existing supportive structure, is an efficient and cost-effective way to add growth space to the CRC library. The 2,000 square foot expansion will provide the CRC library with four reservable rooms for group study. Currently there are no study rooms available for student group work. The remaining floor space would be used for needed student seating and an expansion of the book stacks to accommodate the library collection. Description: This project will involve extending the 2 nd floor of the library over an area of mezzanine that resides above book stacks. It is felt that this expansion will not only provide a more aesthetically pleasing environment, it will also help to reduce noise and provide necessary increased library space within the confines of its current envelope. This project will provide an additional 2,000 ASF of instructional support space. Project 21 Elk Grove Center Phase 3 (2014) (13,740 ASF) Goals and Objectives: This third and final phase of the Elk Grove Center is intended to bring the Center to it maximum planned size. The additions to laboratory space (7,800 ASF), lecture space (1,280 SF), learning resource center space and office space (4,660 ASF), and office space (2,660 ASF) will allow the center to reach its maximum planned size. These enhancements will assist students in the area near the Center to complete significant elements of their general education / transfer requirements and some selected career programs before coming to the main site of the college to complete more specialized career/occupational courses or other courses that require specialized facilities.

22 Description: This project will be the third and final phase of the Elk Grove Center and will be an addition to the phase one and two construction projects. The project will provide for an additional 13,740 of instructional and support space to further the mission of the center operation. Project 22 College Center Expansion (2015) (5,000 ASF) Goals and Objectives: The primary goal of this project will be to provide for additional campus office space. By the year 2015 there will be a severe shortage of administrative office space in the college center and this expansion will serve to meet that need. Description: This project will be an expansion of the current facility and will be constructed on the north side of the current building. The project will provide for an additional 4,000 ASF of office space and 1,000 ASF of operational space to meet the needs of the future. Project 23 Bookstore / Cafeteria Addition Phase 3 (2014) (4,560 ASF) Goals and Objectives: The primary goal of this project will be to ensure the college bookstore can keep up with student demand. Given the projected student population at this point in time, the bookstore will need to grow in order to serve its customers. Description: The expansion of the bookstore will provide an additional 4,560 ASF of retail space. This project will be constructed to the east of the current structure and will provide for very necessary expansion at that time.

23 Project 24 Transportation, Access and Parking Phase 4 (2015) (180) Parking Stalls Goals and Objectives: The primary goal of this project will be to develop more of the planned parking spaces that will be needed by students. The project will provide additional parking stalls for both students and staff along the south end of campus. Description: The project will involve the paving and lighting of a section of undeveloped parking along the south side of the campus, east of the new Calvine Road entrance.

24 3. Schedule of Projects Cosumnes River College Master Plan Los Rios Community College District Project / Program New ASF Mod. ASF NO. Lab Lecture LRC Office Other Total Total 1 Child Development Center Child Development Center ,218 Total ASF ,218 11,348 - FPP due: Complete. Estimated const. completion: Complete 2 Faculty Office Building Faculty Office Building ,000 - Total ASF ,000-8,000 - FPP due: Complete. Estimated const. completion: Bookstore/Cafeteria Addition Phase 1 Bookstore/Office 95 2,705 Total ASF ,705 2,800 - FPP due: Complete. Estimated const. completion: New LRC (was Instruc/Library Phase 1) English RWC 2,000 Tutoring and other various LRC 3,895 Math / Math Cen 2, Journalism 850 Antropology 960 Lab Various 7,615 Other Space 4,360 7, Total ASF 11,805 4,360 6,480 7, ,635 - FPP due: Completed Estimated const. completion: 2005

25 Cosumnes River College Master Plan Los Rios Community College District Project / Program New ASF Mod. ASF NO. Lab Lecture LRC Office Other Total Total 5 Science Building Modernization Science - 14,398 Other Space - 4,573 Total ASF - 18,971 FPP due: Completed Estimated const. completion: Trans., Access and Parking Phase 1 Parking, walkways, entries, etc - Total ASF - - FPP due: Estimated const. completion: Police/Printing/Nurse Office Modernization Security Office Modernization 7,813 Total ASF ,813 FPP due: Complete. Estimated const. completion: Science Building Addition Biology 2,500 Chemistry 2,500 Physics 1,250 Various Geo/GIS/Chem/Bio/Phys lab 6,443 Other Space 1,616 1,492 Total ASF 12,693 1,616-1,492-15,801 - FPP due: Completed Estimated const. completion: Community/Athletic Center Phase 2 Athletic and Community Center 2,588 7,000 Total ASF ,588 7,000 9,588 - FPP due: Estimated const. completion: 2007

26 Cosumnes River College Master Plan Los Rios Community College District Project / Program New ASF Mod. ASF NO. Lab Lecture LRC Office Other Total Total 10 Elk Grove Center Phase 1 Interdisiplinary Lab 7,800 Other Space 1,200 2,000 2,800 1,400 Total ASF 7,800 1,200 2,000 2,800 1,400 15,200 - FPP due: Estimated const. completion: Bookstore/Cafeteria Addition Phase 2 Culinary Arts 1,000 Cafeteria 4,000 Meeting Room 400 Other Space 560 Total ASF 1, ,960 5,960 - FPP due: Estimated const. completion: New Instructional Building Phase 1 CIS 2,400 Math / Stat Combo 970 Lab Various 7,000 Photo Lab 2,000 Other Space 4,000 3,000 1,000 Total ASF 12,370 4,000-3,000 1,000 20,370 - FPP due: Estimated const. completion: North East Campus Modernization Ford Center - 7,950 Green Houses - 5,025 Barn (remod. for ConstMgt & Hort.) 3,000 1, ,614 Campus Maintenance - 2,296 Receiving - 1,084 Custodial Total ASF 3,000 1, ,650 26,732 FPP due: Estimated const. completion: 2009

27 Cosumnes River College Master Plan Los Rios Community College District Project / Program New ASF Mod. ASF NO. Lab Lecture LRC Office Other Total Total 14 Trans., Access and Parking Phase 2 Parking, walkways, entries, etc - - Total ASF - - FPP due: Estimated const. completion: Portable Modernization Demolition of portables, construction - - 4,700 Total ASF - 4,700 FPP due: Estimated const. completion: New Instructional Building Phase 2 Allied Health 1,000 EMT 1,000 Lab Various 1,000 Other Space 1,200 1, Total ASF 3,000 1,200-1, ,900 - FPP due: Estimated const. completion: Elk Grove Center Phase 2 Lab 7,800 Other Space 1,280 2,000 2,660 1,400 Total ASF 7,800 1,280 2,000 2,660 1,400 15,140 - FPP due: Estimated const. completion: Auto Tech Expansion (was New Instructional Building 3) Auto Mech Tech 5,000 Other Space Total ASF 5, ,950 - FPP due: Estimated const. completion: 2013

28 Cosumnes River College Master Plan Los Rios Community College District Project / Program New ASF Mod. ASF NO. Lab Lecture LRC Office Other Total Total 19 Trans., Access and Parking Phase 3 Parking, walkways, entries, etc - - Total ASF - - FPP due: Estimated const. completion: Interior Library Expansion Libray 2, Total ASF - - 2, ,000 - FPP due: Estimated const. completion: Elk Grove Center Phase 3 Lab 7,800 Other Space 1,280 2,000 2,660 Total ASF 7,800 1,280 2,000 2,660-13,740 - FPP due: Estimated const. completion: College Center Expansion Other Space 4,000 1,000 Total ASF ,000 1,000 5,000 - FPP due: Estimated const. completion: Bookstore/Cafeteria Addition Phase 3 Bookstore 4,000 Other Space 560 Total ASF ,560 4,560 - FPP due: Estimated const. completion: 2014

29 Cosumnes River College Master Plan Los Rios Community College District Project / Program New ASF Mod. ASF NO. Lab Lecture LRC Office Other Total Total 24 Trans., Access and Parking Phase 4 Parking, walkways, entries, etc - - Total ASF - - FPP due: Estimated const. completion: 2015 Totals 73,168 16,886 14,480 37,090 36, ,642 58,216

30 4. Schedule of Project Budgets Los Rios Community College District - Long Range Capital Needs Plan Status as of March 2004 Proposed Construction and Modernization Projects by Location and Year Proposed New Projects Possible Funding Source Estimated Occupancy New ASF Total Cost Local Bonds State Bonds District/Other Cosumnes River College Child Development Center Complete 11,348 4,046,000-4,046,000 - Faculty Offices Buildings Complete 8,000 1,970, ,970,500 Bookstore and Cafeteria Addition ,800 1,101,000 1,101, New LRC (was Inst/Lib 1) ,635 13,466,000 6,733,000 6,733,000 - Science Building Modernization ,404,000 2,888,000 2,516,000 - Transportation, Access and Parking Improvements , , Police, Printing and Office Buildings Modernizations ,445,000 1,550,250 1,894,750 - Science Building Addition ,801 8,506,000 3,827,700 4,678,300 - Community and Athletic Center Phase , , , Land Acq.and Site Dev. for New Center (Elk Grove/Laguna) ,952,000 2,952, Elk Grove/Laguna Center Phase ,200 6,686,000 3,008,700 3,677,300 - Bookstore and Cafeteria Addition ,960 2,021,000 2,021, New Instructional Building Phase ,370 9,647,000 4,341,150 5,305,850 - North East Campus Modernization (was Ag Mod) ,900,000 3,555,000 4,345,000 - Transportation, Access and Parking Improvements , , Portables Modernization (was DSP&S/CC mod) ,136, , ,800 - New Instructional Building Phase ,900 2,713,000 1,220,850 1,492,150 - Elk Grove/Laguna Center Phase ,140 6,659,000 2,996,550 3,662,450 Automotive Tech Building Expansion ,950 2,754,000 1,239,300 1,514,700 Transportation, Access & Parking Improvements , , Interior Library Building Expansion , , , Elk Grove/Laguna Center Phase ,740 6,471,000 2,911,950 3,559,050 - College Center Expansion ,000 1,655, , ,250 - Bookstore and Cafeteria Addition ,560 1,724,000 1,724, Transportation, Access and Parking Improvements , , Cosumnes River College Total 171,992 94,903,500 47,973,400 44,959,600 1,970,500 LRCCD FM Schedule of Project Budgets.xls, 3/12/2004 Page 1

31 III. DESIGN GUIDELINES

32 III. DESIGN GUIDELINES 1. Introduction The Los Rios Community College District is a two-year public college district serving the greater Sacramento region. The district currently includes American River College, Cosumnes River College, Sacramento City College, and Folsom Lake College. The district also has major centers in Davis, West Sacramento, downtown Sacramento, Natomas and Rancho Cordova. In addition, the district also offers special services for business and industry. This Facility Master Plan is focused exclusively on Cosumnes River College, which has provided quality education since The college is located at 8401 Center Parkway, Sacramento CA Purpose The main purpose of the Facility Master Plan is to coordinate the guide and inform the facilities construction program at the college to ensure the needs of all programs and services are met to the fullest extent possible. The other purpose of the plan is to inform college constituents with respect to facility development so that they can plan accordingly. The Facility Master Plan illustrates the size and types of spaces that are needed along with funding and timing information.

33 3. Design Review All proposed projects should be reviewed for conformance with the parameters established in this master plan document. Variances from such shall be documented and if found acceptable they shall be added to this document as an addendum. Any deviation from the design guidelines as established in this document shall be accompanied by a graphic and/or written explanation as to the justification for this deviation for future reference. It is important that the college codify all major deviations so that there exists a dynamic history of progression.

34 DISTRICT BREAKDOWN 4. Growth Projections LOS RIOS COMMUNITY COLLEGE DISTRICT FM - ENGINEERING AND PLANNING ENROLLMENT AND WSCH FORECAST - DISTRICT BREAKDOWN SCO 1/28/03 Enrollment Forecast DISTRIBUTIONS OF FORECAST TO CAMPUS VIA POPULATION PROJECTIONS AND PERCENTAGES: WSCH YEAR ARC CRC EDC SCC FLC TOTAL % 194, % 79, % 17, % 177, % 17, % 487, % 203, % 82, % 18, % 179, % 18, % 502, % 220, % 87, % 19, % 182, % 19, % 528, % 232, % 92, % 20, % 185, % 20, % 552, % 240, % 97, % 22, % 189, % 22, % 572, % 258, % 103, % 21, % 208, % 31, % 623,438 actual % 219, % 109, % 25, % 206, % 83, % 645,142 forecast % 218, % 116, % 26, % 208, % 92, % 662, % 223, % 120, % 27, % 220, % 96, % 687, % 228, % 124, % 27, % 217, % 114, % 713, % 236, % 129, % 28, % 214, % 130, % 739, % 241, % 137, % 28, % 218, % 140, % 766, % 247, % 148, % 28, % 212, % 149, % 785, % 247, % 151, % 27, % 215, % 155, % 797, % 251, % 155, % 28, % 223, % 159, % 817, % 258, % 160, % 28, % 232, % 165, % 846, % 266, % 171, % 28, % 235, % 171, % 874, % 271, % 176, % 28, % 247, % 177, % 902, % 277, % 186, % 28, % 252, % 186, % 932, % 280, % 192, % 28, % 259, % 192, % 953,234 DistrictBreakDown.xls Page 1 3/12/2004

35 DISTRICT BREAKDOWN LOS RIOS COMMUNITY COLLEGE DISTRICT FM - ENGINEERING AND PLANNING ENROLLMENT AND WSCH FORECAST - DISTRICT BREAKDOWN SCO 1/28/03 Enrollment Forecast DISTRIBUTIONS OF FORECAST TO CAMPUS VIA POPULATION PROJECTIONS AND PERCENTAGES: ENROLLMENT YEAR ARC CRC ELD SCC FLC TOTAL % 21, % 8, % 1, % 19, % 1, % 54, % 22, % 9, % 2, % 20, % 2, % 56, % 25, % 10, % 2, % 20, % 2, % 60, % 27, % 10, % 2, % 21, % 2, % 64, % 28, % 11, % 2, % 22, % 2, % 66, % 29, % 11, % 2, % 24, % 3, % 71,755 actual % 25, % 12, % 2, % 23, % 9, % 74,253 forecast % 25, % 13, % 3, % 24, % 10, % 76, % 25, % 13, % 3, % 25, % 11, % 79, % 26, % 14, % 3, % 25, % 13, % 82, % 27, % 14, % 3, % 24, % 15, % 85, % 27, % 15, % 3, % 25, % 16, % 88, % 28, % 17, % 3, % 24, % 17, % 90, % 28, % 17, % 3, % 24, % 17, % 91, % 28, % 17, % 3, % 25, % 18, % 94, % 29, % 18, % 3, % 26, % 19, % 97, % 30, % 19, % 3, % 27, % 19, % 100, % 31, % 20, % 3, % 28, % 20, % 103, % 31, % 21, % 3, % 29, % 21, % 107, % 32, % 22, % 3, % 29, % 22, % 109,713 DistrictBreakDown.xls Page 2 3/12/2004

36 5. Setting The Cosumnes River College campus covers approximately 156 acres in the area between Cosumnes River Boulevard to the north, Calvine Road to the south, Bruceville Road to the east and Center Parkway to the west. The campus is surrounded on three sides by student and staff parking located at the same elevation as the surrounding streets; the actual campus (building pads and pedestrian circulation) are on an elevated plane separating it from the neighborhood and clearly stating the higher purpose of the facilities. This upper level containing the majority of buildings and pedestrian circulation is referred to as the Upper Deck for the purpose of this document. The Upper deck is organized in a grid pattern with four major circulation elements terminating at the center of the campus at the Library building. With its plane elevated even higher than the upper deck, this building can be seen from almost any point within the campus and serves as reference point for way finding. A large open green space with a water feature to the immediate south of the Library building helps to define the structure and is used as open air gathering space for students and faculty and staff. 6. Site Design Guidelines 6.1 Parking Guidelines The purpose of the Circulation and Parking Guidelines is to provide for safety and efficiency in the on-site circulation and parking areas. The guidelines address pedestrian, service and emergency vehicles as well as student and staff vehicles. 6.2 Parking Expansion The street level parking areas on three sides of the current campus allow for some expansion. Growth projections indicate a need for 1,650 new parking stalls in the fifteen year time period covered under this master plan. The existing parking lots currently provide 2,318 parking stalls with enough room to add approx. 1,013 parking stalls in future expansions. The area of the current Community Bowl could potentially yield additional on-site parking once the large berms around the

37 playfield are exported or moved. Future parking expansions should maintain the same layout pattern as established by the original architect. The small five foot berm that separates the college parking lots from street traffic is an important treatment to continue as it provides for a much more picturesque view of the campus for vehicular traffic driving past the college. Careful consideration shall be given to the potential conflicts of vehicle and pedestrian traffic. 6.3 Vehicle Traffic Circulation Vehicle access is provided from entrance roads off Center Parkway and Bruceville Road. An additional entrance is planned on the south side of the campus off Calvine road. The new entrance will greatly improve the access to the campus. On-site vehicle circulation appears to be sufficiently sized and routed for current traffic loads with the exception of service access around the Community and Athletic Center and the access to playing fields, and the northeast area of the college. 6.4 Regional Transit Regional Transit is currently in the process of planning a light rail station along Bruceville Road that will terminate at the college entrance. If this occurs, it will necessitate a major pedestrian circulation element from that station to the college. Such a circulation element should be free of conflict with any vehicle traffic and should be constructed large enough to handle the projected pedestrian flow.

38 6.4 Pedestrian Circulation The grid patterned circulation concept allows for efficient pedestrian circulation between buildings. Deviations from the grid pattern for pedestrian circulation are acceptable and encouraged. With the exception of the northeast section of the campus, all buildings are well interconnected without adding further hardscape. Increased vehicular and pedestrian access should be added to incorporate the northeast section of the college with the main campus. The main circulation elements (axis) originating in the parking lots and terminating at the library in the center of the campus are of adequate width in their paving section as well as their associated green space (open space). (Figure E). 6.5 Open Space The campus layout currently presents a beautiful park-like feel that contributes considerably to the atmosphere. In order to preserve this important feature, it is necessary to spend adequate time in the study of the space between buildings.

39 6.5.1 Primary Open Space Primary open space is defined as large open areas that need to preserved and free of building construction. The student gathering area adjacent to the Library Building is considered to be primary open space. (Figure B) Secondary Open Space Secondary open space is defined as space that needs to be preserved to maintain certain vistas for general way-finding on campus and to preserve the open atmosphere on campus. The three main axis leading from the parking lots to the Library building are considered to be secondary open space and should be preserved and free from building construction. Total building setback from the centerline of the main pedestrian circulation element should be 45' at a minimum.

40

41 6.5.3 Other Open Space Other open space is defined as open space that can t be categorized as primary or secondary open space. The space between buildings is equally important to the architectural expression as the actual building. The preservation of open space is the key to the maintenance of the open feel on the current campus and the quality of such open space becomes vitally important as the campus grows and open space is lost. This guideline seeks to establish minimal building separations based on the height of any two structures as they relate to each other. Building separations should be as follows: One Story Buildings 40'-0" Min. Two Story Buildings 60'-0" Min. Three + Story Buildings 80'-0" Min. 7. Architectural Guidelines 7.1 General Guidelines The upper deck appears large enough to meet building additions and new buildings as projected for the time period covered by this plan. Building additions as well as new buildings should be sited to maintain the open feel of the campus. Space between buildings should be viewed as important as actual building mass.

42 The existing buildings are humanly scaled with horizontal bands of concrete and vertical support elements of brick or brick veneer. Large glazing areas provide relief to the long horizontal elevations. Newer additions have replaced some of the brick elements of the original buildings with cement plaster and substituted the horizontal concrete bands with metal fascia panels. The brick wing walls in some of the newer designs have been replaced with round concrete columns (Sono tubes). Future building proportions as well as other design elements should be in conformance with existing architectural expression. All buildings or building additions should appear as an integrated part of an overall design concept. 7.2 Building Additions A number of buildings at Cosumnes River College are designed with a system of open corridors that connect building elements under the same roof. This layout can make it challenging to add square footage in an efficient and cost effective manner. If additional square footage in a specific facility is needed, careful consideration shall be given to the consolidation of educational programs and building mass. 7.3 New Buildings Future expansions of Cosumnes River College should be consolidated as much as possible to avoid the loss of open space and to maintain the park-like atmosphere on campus. 7.4 Building Materials To ensure continuity of design at Cosumnes River College, there should be a unit of allowable basic building materials. Allowable basic materials should be limited to the following: Glass Poured-in-place concrete or pre-cast concrete Brick / Brick Veneer Pre-finished metal panel Cement Plaster

43 7.5 Mechanical Equipment Mechanical equipment shall be housed in designated mechanical rooms. Roof mounted mechanical equipment shall be avoided wherever possible. If mechanical equipment must be roof mounted, it shall be adequately screened from view. Mechanical screens may consist of any architecturally suitable material conforming to the design of the building. 7.6 Fire Sprinklers Fire sprinkler riser shall be located inside exterior walls 8. Landscape Guidelines 8.1 General Concept The existing campus possesses a park-like character, with the landscaped grounds creating a spacious setting for the buildings and pathways. The existing landscaping is kept simple with large grassy areas, trees and few planters. The campus is pedestrian oriented with a system of walkways and open spaces integrating the academic core. Landscaping at Cosumnes River College serves a number of key purposes that help to establish the character of the campus. Climate Control The placement of appropriate trees and groundcover can help to moderate the extremes of temperature that are characteristic the Sacramento Valley Screening Trees may be used to screen the less attractive, utilitarian features of the individual buildings. Setting and Visual Amenity Landscaping provides a setting for the buildings and helps to establish the parklike atmosphere of the campus

44 Common and Visual Elements The use of uniform trees and other landscape materials on campus provides an identity and continuity that establishes a sense of place and order for the entire campus. Outdoor Space Landscaping may provide a setting for outdoor activities such as lunch breaks, recreation, informal meetings and relaxation Establish Orientation Landscaping may be effectively used to guide motorists and pedestrians through a project site. Signage is obviously the primary method of providing direction, but the location, size, color and spacing of landscaping can also provide subtle direction to individuals. On-Site Drainage On-site drainage may be integrally designed with the landscaping to provide a visually aesthetic and potentially less costly alternative to conventional underground drainage systems. Positive drainage shall be provided throughout the entire system 8.2 Future Character The future character or "built" environment of the campus relies on several key planning assumptions: Campus view corridors will be maintained, developed and enhanced. Cosumnes River College's park-like character will be preserved and a strong "unique" place will be created. The open feeling of the campus and the lush feel of the present campus core will be maintained while increasing the density of development. A pedestrian oriented environment will be maintained / enhanced and vehicular traffic through campus will continue to be minimized. 8.3 Plant Materials In order to ensure a consistent landscape character plant material shall be selected to match the existing landscape material. All planting is encouraged to be installed using appropriate soil amendment and subsurface drainage to ensure an adequate growing environment.

45 8.4 Irrigation All landscape areas shall be fully irrigated with an automatically controlled underground irrigation system. The system shall be valved separately to allow irrigation of turf, trees, shrubs and groundcover etc. per their particular water requirements. The irrigation system shall be designed to prevent overflow into pedestrian walks and vehicle driveways or parking areas and drip irrigations systems are encouraged. No irrigation nozzles shall be installed on risers next to walks, street and or pavement. Irrigation heads in these locations shall be high-pop models only installed less than 1" above finish grade Landscape Furniture Landscape furniture on the campus currently consists of trash receptacles, ashtrays and a variety of benches and tables.

46 Landscape furniture shall continue to be subordinate in appearance and size to all other elements such as landscaping and other design elements. Landscape furniture shall be selected for its durability and its fit into the overall design scheme of the existing campus. 9.0 Lighting Design Guidelines 9.1 General Concept The purpose of the Lighting Guidelines is to provide for safe, functional, visually attractive and coordinated lighting system. The guidelines apply to the two areas of illumination: parking lots and campus lighting. Lighting standard and fixture standardization is encouraged to help establish design continuity. Lights are not to cause glare or excessive light spillage. All light are to be concealed source fixtures except for pedestrian-oriented accent lights. Fixtures should be selected on the basis of their compatibility with existing fixtures and materials. 9.2 Parking Lot Lighting All parking lot and driveway lighting levels are to meet Uniform Building Code standards. Parking lot and entry driveway fixtures shall be cut-off type, metal halide or highpressure sodium, aluminum, extrusion luminaries, twenty foot mounting height, single or double luminaire configuration on square pole with round concrete base. Luminaire and pole shall have an anodized finish to match existing parking lot fixtures.

47 9.2 Campus Lighting Pedestrian areas such as courtyards, patios and entryways shall articulate the building design scheme and achieve lighting levels to meet the uniform building code. Lighting fixtures are to cut-off type overhead or bollard and metal halide or mercury vapor variety. Point-to-point lighting within pedestrian walkway areas is acceptable with no specific illumination levels required. The main emphasis in this zone should be to clearly identify the pedestrian walkway and direction of travel. Walkway and outdoor use area light fixtures should be a maximum of twelve feet high and shall be located at exterior steps, along walkways, walk endings and sitting areas. Bollard style lighting may also be used in close proximity to buildings. 10. Sign Guidelines 10.1 Purpose The purpose of the sign guidelines is to establish prescriptive and performance guidelines for a coordinated graphic system within the Cosumnes River College campus that provides for building identification and information communication in a distinctive and cohesive manner. The signage guidelines apply to four separate categories of signage: 1. Identification Signage 2. Information / Directory Signage 3. Vehicular Control Signage 4. Temporary Signage

48 10.2 Directional Signage Directional signage at the parking lot level guiding the pedestrian to the various facilities shall match the existing signage found on campus. If the college does move to another style at some point in the future, all signs should be changed to ensure consistency. It should be a metal sign of black typography and white background. The use of reflective material for typography and directional arrows is recommended Building Identification Signage Building identification signage shall be a metal sign of white typography and blue background. The college will be repainting the blue background on all these signs to more properly match the school colors. The larger typography shall identify the facility, the smaller typography shall identify the room numbers and possibly the departments housed in the facility.

18 May 2016 CAMPUS MASTER PLAN UPATE

18 May 2016 CAMPUS MASTER PLAN UPATE 18 May 2016 CAMPUS MASTER PLAN UPATE Council of the Deans ( Over view) AGENDA Engagement & What We Heard Focus Elements: 1. Development Framework Plan 2. Campus Mobility 3. Campus Guidelines 4. Wayfinding

More information

SCCCD District Wide Facilities Master Plan

SCCCD District Wide Facilities Master Plan Draft Board Update March 2012 1 2 3 4 5 Completion of the Educational Master Plans Fresno City College Reedley College North Centers Review of Educational Master Plans with the Authors Analysis of the

More information

Winston-Salem State University Campus Master Plan 2016 Update

Winston-Salem State University Campus Master Plan 2016 Update Winston-Salem State University Campus Master Plan 2016 Update Request for Qualifications Page 1 of 6 Overview Winston-Salem State University (WSSU) is requesting qualifications from planning firms specializing

More information

District Facilities Master Plan

District Facilities Master Plan W o r k s h o p B o a r d District Facilities Master Plan February 29, 2012 BACKGROUND + CONTEXT ANALYSIS OPTIONS RECOMMENDATIONS NEXT STEPS DFMP AGENDA BACKGROUND + CONTEXT ANALYSIS OPTIONS RECOMMENDATIONS

More information

implementation r expression in landscape

implementation r expression in landscape 6 ubc okanagan implementation campus plan r expression in landscape 68 6 implementation campus plan sections The Campus Plan supports the academic mission, values and commitments of the University by providing

More information

11.0 TRANSPORTATION ELEMENT

11.0 TRANSPORTATION ELEMENT 11.0 TRANSPORTATION ELEMENT Transit, Circulation and Parking Sub-Element: For all campuses, FIU's goal is to increase multimodal access. In combination with other measures - such as the development of

More information

Chapter Master Planned Communities (MPC) District

Chapter Master Planned Communities (MPC) District Sections 14.53.010 Purpose and Intent 14.53.020 Applicability 14.53.030 Procedure 14.53.040 MPC Standards 14.53.050 Required Findings 14.53.010 Purpose and Intent Chapter 14.53 Master Planned Communities

More information

Campus Sign Plan. Adopted by the Campus Planning Committee Adopted: June 26, 2006 Revised: April 14, 2016

Campus Sign Plan. Adopted by the Campus Planning Committee Adopted: June 26, 2006 Revised: April 14, 2016 Campus Sign Plan Adopted by the Campus Planning Committee Adopted: June 26, 2006 Revised: April 14, 2016 INTRODUCTION Oregon State University requires an effective system of visual communication that projects

More information

NECC Strategic Plan Goal Team 1: Develop a Comprehensive Campus in Downtown Lawrence

NECC Strategic Plan Goal Team 1: Develop a Comprehensive Campus in Downtown Lawrence NECC Strategic Plan Goal Team 1: Develop a Comprehensive Campus in Downtown Lawrence Meeting Minutes April 9, 2014 Lawrence Campus Backfill Subcommittee Updates Martha Leavitt/Dick Goulet Revised goal

More information

SCCCD District Wide Facilities Master Plan FRESNO CITY COLLEGE TOWN HALL MEETING MAY2012

SCCCD District Wide Facilities Master Plan FRESNO CITY COLLEGE TOWN HALL MEETING MAY2012 FRESNO CITY COLLEGE TOWN HALL MEETING MAY2012 1 Facilities Master Planning Committees Structure The planning process for the SCCCD Facilities Master Plan was highly participatory, engaging the many constituencies

More information

EXISTING CONDITIONS 41. Existing Conditions

EXISTING CONDITIONS 41. Existing Conditions EXISTING CONDITIONS 41 Existing Conditions The Existing Analysis phase of the planning process involved a study of the existing conditions on the campus in order to identify key planning issues to be addressed

More information

Goal 1: To Encourage the Orderly, Harmonious and Judicious Use of University Resources in the Development of University Land.

Goal 1: To Encourage the Orderly, Harmonious and Judicious Use of University Resources in the Development of University Land. 2.0 Future Land Use Goal 1: To Encourage the Orderly, Harmonious and Judicious Use of University Resources in the Development of University Land. Objective 1.1: Make available future building sites that

More information

University of Denver Land Use Plan Update I. Executive Summary

University of Denver Land Use Plan Update I. Executive Summary Executive Summary The task of developing a Land Use Plan for the University of Denver has been an exciting collaborative process that engaged a variety of interested people, including members of the University

More information

ARTICLE 6: Special and Planned Development Districts

ARTICLE 6: Special and Planned Development Districts ARTICLE 6: Special and Planned Development Districts 6-10 Traditional Neighborhood Development (TND) District 6-10.10 Purpose and Intent The Traditional Neighborhood Development (TND) District provides

More information

Technical Appendix L, University Community Plan Town Center

Technical Appendix L, University Community Plan Town Center Technical Appendix L, University Community Plan Town Center Table of Contents L.1 Executive Summary L.2 Merced County University Community Plan, 2004 Findings L.2.1 Visioning L.2.2 UCP Goals, Objectives

More information

ESTABLISH AN EFFICIENT TOWN CENTER

ESTABLISH AN EFFICIENT TOWN CENTER ESTABLISH AN EFFICIENT TOWN CENTER 4 Overview Lisbon residents are proud of the history of Newent and at the same time recognize its current importance as a centralized location for a variety of municipal

More information

Derry Green Corporate Business Park

Derry Green Corporate Business Park Town of Milton Derry Green Corporate Business Park Urban Design Guidelines BMI/Pace - June 2010 Draft 3 Prepared by: Brook McIlroy Planning + Urban Design / Pace Architects Suite 300-51 Camden Street Toronto,

More information

campus master plan VIRGINIA STATE UNIVERSITY

campus master plan VIRGINIA STATE UNIVERSITY campus master plan VIRGINIA STATE UNIVERSITY agenda 01 INTRODUCTION & GENERAL OVERVIEW 02 03 04 LAND USE CONCEPT PROGRAM ACCOMMODATION MAXIMIZE EXISTING INFRASTRUCTURE SUMMARY AND NEXT 05 STEPS agenda

More information

CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA

CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA Agenda Date: December 16, 2013 Action Required: Adoption of Resolution Presenter: Staff Contacts: Title: James E. Tolbert, AICP, Director of NDS James

More information

Angela M. Bollinger. architecture & interior design project management facilities management PORTFOLIO

Angela M. Bollinger. architecture & interior design project management facilities management PORTFOLIO Angela M. Bollinger architecture & interior design project management facilities management PORTFOLIO 2016 Outdoor Recreation Sport Complex Create a new Outdoor Recreation Sports Complex for NIU Campus

More information

CAMPUS MASTER PLAN UPATE

CAMPUS MASTER PLAN UPATE 19 MAY 2016 CAMPUS MASTER PLAN UPATE Metropolitan Planning Organization AGENDA Introductions Planning Scope Observation & Analysis: Mobility Systems Campus Development Plan Mobility Planning Scenarios

More information

UAA School of Engineering Parking Garage Master Plan Amendment. 1. Purpose

UAA School of Engineering Parking Garage Master Plan Amendment. 1. Purpose UAA School of Engineering Parking Garage Master Plan Amendment 1. Purpose Since the UAA campus master plan was drafted in 2003, adopted in 2004, and amended in 2009 a number of significant changes regarding

More information

3. Flexibility of changing use of technology needs should be an integral part of the design of learning spaces. Walls that are easily reconfigured.

3. Flexibility of changing use of technology needs should be an integral part of the design of learning spaces. Walls that are easily reconfigured. I. Enable Learning and Foster Intellectual Inquiry A. Learning can happen anywhere. Each space should be designed to fulfill its potential as a learning environment. Cal Poly s learn-by-doing implies that

More information

City of Farmington. Downtown Plan. Amendment to the 1998 Master Plan Adopted October 11, 2004

City of Farmington. Downtown Plan. Amendment to the 1998 Master Plan Adopted October 11, 2004 City of Farmington Amendment to the 1998 Master Plan Adopted October 11, 2004 Introduction Planning Background 1 Scope and Components of the Plan Amendment 2 Concept Introduction 3 Plan Concepts 3 Conceptual

More information

ORDINANCE WHEREAS, this Ordinance is consistent with the City of Winter Garden Comprehensive Plan; and

ORDINANCE WHEREAS, this Ordinance is consistent with the City of Winter Garden Comprehensive Plan; and ORDINANCE 17-06 AN ORDINANCE OF THE CITY COMMISSION OF THE CITY OF WINTER GARDEN, FLORIDA, CREATING ARTICLE XIV OF CHAPTER 118 OF THE CITY OF WINTER GARDEN CODE OF ORDINANCES PROVIDING FOR THE EAST PLANT

More information

Community Response Buchanan Elementary. December 13, 2016

Community Response Buchanan Elementary. December 13, 2016 Community Response Buchanan Elementary December 13, 2016 SITE EVALUATION FOLLOWING INITIAL COMMUNITY INPUT BUCHANAN ELEMENTARY SCHOOL Design Concepts for the new Buchanan Elementary School have been shared

More information

Conference-Seminar Table & chair Case Study (tiered) Swivel chairs, Continuous Counter Top

Conference-Seminar Table & chair Case Study (tiered) Swivel chairs, Continuous Counter Top III. DESIGN 3.03 Academic Building Interior Space Square Footage Standards A. Plan academic spaces in new buildings and in the major renovation of existing buildings to conform to the following space standards:

More information

Planning Commission Staff Report June 5, 2008

Planning Commission Staff Report June 5, 2008 Owner/Applicant Taylor Village Sacramento Investments Partners, LP c/o Kim Whitney 1792 Tribute Road #270 Sacramento, CA 95815 Staff Recommendation Planning Commission Staff Report Project: File: Request:

More information

MASTER PLAN DIAGRAMS DISTRICT CAMPUS OVERVIEW

MASTER PLAN DIAGRAMS DISTRICT CAMPUS OVERVIEW DISTRICT CAMPUS OVERVIEW Classrooms, CR Special Education Computer Lab INTERSTATE 5 FW - Faculty Work, FL - Faculty Physical Education / Athletics Support Spaces S - Storage, T - Toilets, U - Utility,

More information

Developer s Program. The Station at East 54

Developer s Program. The Station at East 54 Developer s Program The Station at East 54 Existing Conditions The Station at East 54 is proposed for a 1.12 acre site at the northeast corner of Hamilton Road and Prestwick Road, tucked between the East

More information

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan Appendix F Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan Introduction and Purpose of the Plan The Gold Line Bus Rapid Transit facility is an eleven-mile dedicated

More information

TEMPLE MEDICAL & EDUCATION DISTRICT

TEMPLE MEDICAL & EDUCATION DISTRICT City of Temple, Texas TEMPLE MEDICAL & EDUCATION DISTRICT 1 Description. The City of Temple joined in partnership with key public and private entities to jointly promote education and medical activities

More information

2014 Exhibition of School Planning and Architecture. White Hill Middle School Campus Master Plan & Design. Ross Valley School District Fairfax, CA

2014 Exhibition of School Planning and Architecture. White Hill Middle School Campus Master Plan & Design. Ross Valley School District Fairfax, CA 2014 Exhibition of School Planning and Architecture White Hill Middle School Campus Master Plan & Design Ross Valley School District Fairfax, CA Main Exterior Image Main Exterior Image Main Site Diagram

More information

4.0 Future Land Use Element

4.0 Future Land Use Element 4.0 The Florida Agricultural and Mechanical University (FAMU) represents existing and proposed development patterns within the campus boundaries to be coordinated and not conflict with the adjacent areas

More information

Steering Committee Meeting

Steering Committee Meeting Neighborhood Planning Initiative NPI EAST CENTRAL AREA PLAN Steering Committee Meeting November 9, 2017 6:00PM 8:00PM Tears McFarlane House East Central Area Plan Steering Committee Meeting 11/9/17 AGENDA

More information

Public input has been an important part of the plan development process.

Public input has been an important part of the plan development process. Lakewood s Comprehensive Plan recognizes that transportation helps shape the community, and that the way the community provides for the safe and efficient movement of people affects the character of the

More information

2014 Exhibition of School Planning and Architecture. Digital Media Lab Stratford Campus. University of Waterloo Stratford, Ontario, Canada

2014 Exhibition of School Planning and Architecture. Digital Media Lab Stratford Campus. University of Waterloo Stratford, Ontario, Canada 2014 Exhibition of School Planning and Architecture Digital Media Lab Stratford Campus University of Waterloo Stratford, Ontario, Canada Digital Media Lab The first phase of the new Stratford Campus is

More information

McDonald s Restaurant - Purcellville Town of Purcellville Special Use Permit Statement of Justification July 24, 2014

McDonald s Restaurant - Purcellville Town of Purcellville Special Use Permit Statement of Justification July 24, 2014 Introduction / Written Statement McDonald s Restaurant - Purcellville McDonald s Corporation is proposing to redevelop the existing McDonald s eating establishment with a drive-through located at 121 N

More information

BELLEVUE COLLEGE Campus Master Plan February 29, 2016 (Space Needs Updated on 04/13/2016) Bellevue College Campus Master Plan April 13, :08 PM

BELLEVUE COLLEGE Campus Master Plan February 29, 2016 (Space Needs Updated on 04/13/2016) Bellevue College Campus Master Plan April 13, :08 PM BELLEVUE COLLEGE Campus Master Plan February 29, 2016 (Space Needs Updated on 04/13/2016) AGENDA / STEERING COMMITTEE MEETING 15:00 PLANNING PROCESS: 15:05 GUIDING PRINCIPLES: 15:10 SPACE NEEDS: 15:30

More information

6. RECREATION AND OPEN SPACE ELEMENT

6. RECREATION AND OPEN SPACE ELEMENT 6. RECREATION AND OPEN SPACE Introduction This Recreation and Open Space Element includes Goals, Objectives and Policies (GOP) that apply to the main campus in Gainesville and the Lake Wauburg Recreation

More information

4. INDUSTRIAL 53 CASTLE ROCK DESIGN

4. INDUSTRIAL 53 CASTLE ROCK DESIGN 4. INDUSTRIAL 53 CASTLE ROCK DESIGN CASTLE ROCK DESIGN 54 4. INDUSTRIAL Overview Well-designed and attractive industrial centers are the product of blending economic realities with both functional and

More information

FROST CAMPUS MASTER PLAN SIR SANDFORD FLEMING COLLEGE

FROST CAMPUS MASTER PLAN SIR SANDFORD FLEMING COLLEGE FROST CAMPUS MASTER PLAN SIR SANDFORD FLEMING COLLEGE SEPT 2015 TABLE OF CONTENTS 1.0 Introduction 01 1.1 Master Plan Purpose 1.2 About The Campus 2.0 The Campus Master Plan 05 2.1 Vision Statement 2.2

More information

Design Presentation. Chief Operations Officer Willie Burroughs

Design Presentation. Chief Operations Officer Willie Burroughs Design Presentation Chief Operations Officer Willie Burroughs Agenda Introduction Community Feedback Project updates 2 Feedback Citizens Advisory Committee meetings Growth and Development meetings Community

More information

Atlanta BeltLine, Inc. Pathways to Urban Sustainability

Atlanta BeltLine, Inc. Pathways to Urban Sustainability Atlanta BeltLine, Inc. Pathways to Urban Sustainability September 30, 2010 WHAT IS THE ATLANTA BELTLINE? Transit 22-mile loop Parks 1300 + new acres Trails 33 miles Jobs & Economic Development 20 areas,

More information

COMMERCIAL DESIGN REVIEW APPLICATION

COMMERCIAL DESIGN REVIEW APPLICATION CITY OF LACEY Community Development Department 420 College Street Lacey, WA 98503 (360) 491-5642 COMMERCIAL DESIGN REVIEW APPLICATION OFFICIAL USE ONLY Case Number: Date Received: By: Related Case Numbers:

More information

Ohlone College Measure G Project Scope Revisions

Ohlone College Measure G Project Scope Revisions Scope Revisions Current Title Revised Title Current Scope Revised Scope 6101 Relocated Baseball Field Athletic Fields Create new sustainable baseball field with synthetic turf, bleacher seating and batting

More information

Campus Outdoor Lighting Plan

Campus Outdoor Lighting Plan University of Oregon November 2004 Campus Planning Committee and Ad Hoc Committee on Campus Lighting I. Purpose: The purpose of this plan is to interpret and enhance the existing Long Range Campus Development

More information

Phasing and Implementation

Phasing and Implementation Phasing and Implementation Adaptive Reuse and New Construction Opportunities The reuse of existing buildings at UW Tacoma S 21st St S 17th St Tacoma Ave is highly valued for maintaining the history, character,

More information

Phase 1 : Understanding the Campus Context. Phase 2 : APPROACHES - Alternates & Preferred Plan

Phase 1 : Understanding the Campus Context. Phase 2 : APPROACHES - Alternates & Preferred Plan Introduction MASTER PLAN PURPOSE WHY A CAMPUS MASTER PLAN? The purpose of the Master Plan at the University of Illinois at Chicago is to translate UIC s strategic goals and objectives into a compelling

More information

The transportation system in a community is an

The transportation system in a community is an 7 TRANSPORTATION The transportation system in a community is an important factor contributing to the quality of life of the residents. Without a sound transportation system to bring both goods and patrons

More information

CHARLES PUTMAN CHARLES PUTMAN AND ASSOCIATES, INC

CHARLES PUTMAN CHARLES PUTMAN AND ASSOCIATES, INC MEMORANDUM CHARLES PUTMAN & ASSOCIATES, INC. LAND DEVELOPMENT CONSULTANTS PLANNING ZONING PERMITTING 4722 NW Boca Raton Boulevard, Suite C-106 Boca Raton, Florida 33431 Phone: 561/994-6411 FAX: 561/994-0447

More information

Master Planning: Cuba, New York Phase II. Dr. John Anderson President Alfred State College. Alfred New York

Master Planning: Cuba, New York Phase II. Dr. John Anderson President Alfred State College. Alfred New York Master Planning: Cuba, New York Phase II Dr. John Anderson President Alfred State College Alfred, New York 14802 607-587-4211 February 1, 2011 June 30, 2012 March 5, 2012 Craig R Clark, PE Dean, School

More information

Sheridan Boulevard S TAT I O N A R E A P L A N S H E R I D A N B O U L E VA R D S TAT I O N A R E A P L A N

Sheridan Boulevard S TAT I O N A R E A P L A N S H E R I D A N B O U L E VA R D S TAT I O N A R E A P L A N Sheridan Boulevard S TAT I O N A R E A P L A N 1 City of Lakewood Adopted November, 2006 S H E R I D A N B O U L E VA R D S TAT I O N A R E A P L A N The Vision The City of Lakewood s overall vision is

More information

HAMLET OF KINGMAN AREA STRUCTURE PLAN

HAMLET OF KINGMAN AREA STRUCTURE PLAN HAMLET OF KINGMAN AREA STRUCTURE PLAN Prepared by: Austrom Consulting Ltd. Page 1 of 19 Table of Contents TABLE OF CONTENTS... 2 1. BACKGROUND... 3 1.1 PLAN AREA... 3 1.2 PLAN PURPOSE... 3 1.3 LEGISLATIVE

More information

Foreword to the Third + Edition

Foreword to the Third + Edition U n i v e r s i t y of Oregon Campus Plan - Third + Edition, 2017 i Foreword to the Third + Edition Third + Edition (November 2017) This third + edition of the 2005 Campus Plan integrates amendments approved

More information

INTRODUCTION. Strive to achieve excellence in all areas of operational sustainability.

INTRODUCTION. Strive to achieve excellence in all areas of operational sustainability. 1 INTRODUCTION 1 INTRODUCTION A master plan guides the physical development of a campus, presenting long-range strategies for campus growth and transformation. As no single issue can be considered in isolation,

More information

Interior signs are an extension of the exterior sign system and their content and design should take this into consideration.

Interior signs are an extension of the exterior sign system and their content and design should take this into consideration. General Guideline The Interior Sign standard is developed to address the need for a cost effective, functional, flexible and serviceable sign system. The intent is to assure code compliance, consistency

More information

Public Open House. Overview of the Downtown Plan Official Plan Amendment April 23, 2018

Public Open House. Overview of the Downtown Plan Official Plan Amendment April 23, 2018 Public Open House Overview of the Downtown Plan Official Plan Amendment April 23, 2018 1 A 25-Year Plan for Downtown To ensure growth contributes positively to Toronto s Downtown as a great place to live,

More information

University of the District of Columbia Van Ness Campus Master Plan Community Open House 3. December 8, 2010

University of the District of Columbia Van Ness Campus Master Plan Community Open House 3. December 8, 2010 University of the District of Columbia Van Ness Campus Master Plan Open House 3 December 8, 2010 Introductions Sequence of Work: Campus Master Plan BEGIN: INTRODUCE AND START WORK Project Initiation Team

More information

Goal 1 To establish and follow land use patterns for the long-range development of the campus.

Goal 1 To establish and follow land use patterns for the long-range development of the campus. ELEMENT 4 FUTURE LAND USE Goal 1 To establish and follow land use patterns for the long-range development of the campus. Objective 1A Correct existing incompatible campus land uses. Policy 1A-1 Reduce

More information

CHAPTER 1. Ms. Guajardo s Class - Central Elementary CH 1 1

CHAPTER 1. Ms. Guajardo s Class - Central Elementary CH 1 1 INTRODUCTION CHAPTER 1 Ms. Guajardo s Class - Central Elementary CH 1 1 1.1 SETTING South Centre City is a linear corridor south of Downtown Escondido paralleling Centre City Parkway and South Escondido

More information

38 Queen s University Campus Master Plan Part 1

38 Queen s University Campus Master Plan Part 1 38 Queen s University Campus Master Plan Part 1 46 The Campus at the City Scale Chapter 4 The Campus at the City Scale 39 Queen s is an urban University centrally located in Kingston. Decisions made by

More information

TABLE OF CONTENTS 1.0 INTRODUCTION... 3

TABLE OF CONTENTS 1.0 INTRODUCTION... 3 TABLE OF CONTENTS 1.0 INTRODUCTION... 3 1.1. BACKGROUND... 3 1.2. THE PROPOSAL... 5 2.0 EXISTING POLICY FRAMEWORK... 5 2.1. PROVINCIAL POLICY STATEMENT (PPS)... 5 2.2. CITY OF LONDON OFFICIAL PLAN (OP)...

More information

4.1.3 LAND USE CATEGORIES

4.1.3 LAND USE CATEGORIES 4.1.3 LAND USE CATEGORIES a. City Center District The City Center District incorporates the existing character and mix of uses in downtown Belmont to encourage redevelopment and new development in keeping

More information

Loebl Schlossman & Hackl

Loebl Schlossman & Hackl Loebl Schlossman & Hackl in association with PSA-Dewberry Chicago, IL EIU Experience 1999 Plan Eastern Illinois University 1999 and 2002 Campus Master Plans Charleston, IL 2002 Update Highly Participatory

More information

Policies and Code Intent Sections Related to Town Center

Policies and Code Intent Sections Related to Town Center Policies and Code Intent Sections Related to Town Center The Town Center Vision is scattered throughout the Comprehensive Plan, development code and the 1994 Town Center Plan. What follows are sections

More information

Master Facility Planning Update School Board Meeting May 26, 2016

Master Facility Planning Update School Board Meeting May 26, 2016 Master Facility Planning Update School Board Meeting May 26, 2016 Master Facilities Committee Overview Reflection of Committee Work Review of District Wide Facility Issues Identified District Wide Facility

More information

Planning & Zoning Commission Meeting Date: June 18, 2012

Planning & Zoning Commission Meeting Date: June 18, 2012 Meeting Date: June 18, 2012 Request Applicant Owner Zoning Location Attachments Proposed Master Plan for 11.5 acres of undeveloped property in the Tuscan Lakes PUD. The land is platted as one lot, and

More information

LANGAN LANDSCAPE ARCHITECTURE + PLANNING FOR COLLEGES & UNIVERSITIES

LANGAN LANDSCAPE ARCHITECTURE + PLANNING FOR COLLEGES & UNIVERSITIES LANGAN LANDSCAPE ARCHITECTURE + PLANNING FOR COLLEGES & UNIVERSITIES CONTACT Philadelphia Pennsylvania 1818 Market Street Suite 3300 Philadelphia PA 19103 215.845.8900 215.845.8901 ST. JOSEPH'S UNIVERSITY

More information

3 June 10, 2015 Public Hearing

3 June 10, 2015 Public Hearing 3 June 10, 2015 Public Hearing APPLICANT & PROPERTY OWNERS: DAVID S. & TERESSA A. ITALIANO STAFF PLANNER: Kevin Kemp REQUEST: Conditional Use Permit (bulk storage yard) ADDRESS / DESCRIPTION: 1417 London

More information

High School Signature Projects

High School Signature Projects San Juan Unified School District High School Signature Projects Information packet Frank Camarda 1/13/2015 1 Exhibit A - Table of Contents Executive Summary Page 3 Principal Statement Page 4 Bella Vista

More information

DESIGN REVIEW COMMITTEE AGENDA ITEM

DESIGN REVIEW COMMITTEE AGENDA ITEM DESIGN REVIEW COMMITTEE AGENDA ITEM AGENDA DATE: OCTOBER 3, 2012 TO: Chair Woollett and Members of the Design Review Committee THRU: FROM: SUBJECT: Leslie Aranda Roseberry, Planning Manager Daniel Ryan,

More information

Kingsborough Community College

Kingsborough Community College Section Contents College Statement and Statistics Campus Site Map Five-Year Capital Plan Request FY 2014-15 through FY 2018-19 Project Funding Type Five - Year Request Total ( $ 000 s ) Fire Alarm Rehab

More information

NORTH TORONTO COLLEGIATE INSTITUTE. the Journey to a New Urban School + the Partnerships which gave it Life

NORTH TORONTO COLLEGIATE INSTITUTE. the Journey to a New Urban School + the Partnerships which gave it Life NORTH TORONTO COLLEGIATE INSTITUTE the Journey to a New Urban School + the Partnerships which gave it Life NORTH TORONTO COLLEGIATE INSTITUTE the Journey to a New Urban School + the Partnerships which

More information

THE COMMITTEE ON BUILDINGS AND GROUNDS SHALL CONSIDER AND MAKE RECOMMENDATIONS ON ALL MATTERS RELATING TO THE BUILDINGS AND GROUNDS OF THE COLLEGE,

THE COMMITTEE ON BUILDINGS AND GROUNDS SHALL CONSIDER AND MAKE RECOMMENDATIONS ON ALL MATTERS RELATING TO THE BUILDINGS AND GROUNDS OF THE COLLEGE, THE COMMITTEE ON BUILDINGS AND GROUNDS SHALL CONSIDER AND MAKE RECOMMENDATIONS ON ALL MATTERS RELATING TO THE BUILDINGS AND GROUNDS OF THE COLLEGE, INCLUDING THE NAMING OF COLLEGE BUILDINGS, REFERRED TO

More information

ARLINGTON COUNTY, VIRGINIA

ARLINGTON COUNTY, VIRGINIA ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of October 23, 2004 DATE: October 6, 2004 SUBJECT: SP #106-3 Site Plan Amendment for changes to façade, plaza deck, landscaping, number of units,

More information

The West Vaughan Employment Area Secondary Plan Policies

The West Vaughan Employment Area Secondary Plan Policies Part 2: The West Vaughan Employment Area Secondary Plan Policies 2.1 General Policies It is the policy of Council: 2.1.1. That the West Vaughan Employment Area (the WVEA), identified on Schedule 1, will

More information

PLANNING REPORT CITY OF EAGAN. APPLICANT: Cedar Grove Hospitality, LLC HEARING DATE: December 18, 2014

PLANNING REPORT CITY OF EAGAN. APPLICANT: Cedar Grove Hospitality, LLC HEARING DATE: December 18, 2014 PLANNING REPORT CITY OF EAGAN REPORT DATE: December 8, 2014 CASE: 19-PA-11-11-14 APPLICANT: Cedar Grove Hospitality, LLC HEARING DATE: PROPERTY OWNER: The Flats at Cedar APPLICATION DATE: Nov. 21, 2014

More information

Scope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan

Scope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan Scope of Services River Oaks Boulevard (SH 183) Corridor Master Plan PROJECT AREA The project area consists of the River Oaks Boulevard (SH 183) corridor bounded by SH 199 at the northern end and the Trinity

More information

TO: CITY COUNCIL DATE: MARCH 23,2009

TO: CITY COUNCIL DATE: MARCH 23,2009 Report TO: CITY COUNCIL DATE: MARCH 23,2009 FROM: CITY MANAGER SUBJECT: MASTER DEVELOPMENT PLAN AMENDMENT FOR PASADENA CHRISTIAN SCHOOL AT 1515 NORTH LOS ROBLES AVENUE AND GENERAL PLAN AMENDMENT AND ZONE

More information

DESIGN REVIEW COMMITTEE AGENDA ITEM

DESIGN REVIEW COMMITTEE AGENDA ITEM DESIGN REVIEW COMMITTEE AGENDA ITEM AGENDA DATE: OCTOBER 17, 2012 TO: Chair Woollett and Members of the Design Review Committee THRU: FROM: SUBJECT: Leslie Aranda Roseberry, Planning Manager Daniel Ryan,

More information

Laney College 2012 Facilities Master Plan

Laney College 2012 Facilities Master Plan laney college 2012 Facilities Master Plan Purpose of the master plan The purpose of the 2012 Long Range Facilities Master Plan is to create a roadmap for facilities development that addresses the educational

More information

Parks, Trails, and Open space Element

Parks, Trails, and Open space Element Parks, Trails, and Open space Element Parks, Trails, and Open Space element Parks, Recreation, and Open Space are important components of the quality of life desired by the residents of Elk Grove. This

More information

ELK GROVE TOWN CENTER DESIGN GUIDELINES

ELK GROVE TOWN CENTER DESIGN GUIDELINES ......... ELK GROVE TOWN CENTER DESIGN GUIDELINES LAGUNA RIDGE SPECIFIC PLAN... June 2008 ............ DESIGN GUIDELINES Table of Contents Contents Section A: Town Center Overview...1 A.1. Purpose and

More information

No comments related to land use and planning issues were received in response to the Notice of Preparation.

No comments related to land use and planning issues were received in response to the Notice of Preparation. 4.8 LAND USE AND PLANNING This section analyzes the impacts relative to land use and planning that would occur as a result of implementation of the proposed Facilities Master Plan (proposed project). This

More information

Parks Master Plan Implementation: Phase I Waterfront Use and Design REPORT #: September 7, 2016 File #

Parks Master Plan Implementation: Phase I Waterfront Use and Design REPORT #: September 7, 2016 File # 0 'O DI Lan-171-14 1 - THE CORPORATION OF THE TOWN OF COBOURG..,. STAFF REPORT TO: FROM: Mayor and Members of Council Dean A. Hustwick, Director of Recreation and Culture DATE OF MEETING: Committee of

More information

Master Plan Visioning #1 Section 3 Informal amphitheater at Community Development Services Building. Section 3 MP Visioning #1

Master Plan Visioning #1 Section 3 Informal amphitheater at Community Development Services Building. Section 3 MP Visioning #1 Section 3 Informal amphitheater at Community Development Services Building Section 3 MP Visioning #1 THIS PAGE INTENTIONALLY LEFT BLANK. appendix As with the master planning of any government campus, the

More information

Glenborough at Easton Land Use Master Plan

Glenborough at Easton Land Use Master Plan Implementation 114 9.0 IMPLEMENTATION 9.1 OVERVIEW This chapter summarizes the administrative procedures necessary to implement the proposed land use plan, infrastructure improvements, development standards,

More information

FLORIDA ATLANTIC UNIVERSITY. GOALS, OBJECTIVES AND POLICIES 3 Urban Design

FLORIDA ATLANTIC UNIVERSITY. GOALS, OBJECTIVES AND POLICIES 3 Urban Design 3 URBAN DESIGN ELEMENT Goal 1 To establish and follow conceptual principles for the organization of future development, including buildings and open spaces, on the University's campuses. Objective 1A Protect

More information

CAL POLY MASTER PLAN UPDATE, March 2015

CAL POLY MASTER PLAN UPDATE, March 2015 Some Key Themes in the General Guiding Principles Academic Mission The plan must foremost advance the University s academic mission and student success. Foresight and Adaptability The plan should take

More information

Gateway commercial MIXED USE MASTER SITE PLAN. CITILAND AIrDRIE GATEWAY VENTURE INC. airdrie GATEWAY COMMERCE CENTRE. airdrie, ALBERTA FEBRUARY 2012

Gateway commercial MIXED USE MASTER SITE PLAN. CITILAND AIrDRIE GATEWAY VENTURE INC. airdrie GATEWAY COMMERCE CENTRE. airdrie, ALBERTA FEBRUARY 2012 Gateway commercial MIXED USE MASTER SITE PLAN 1914 CENTRE STREET NORTH CALGARY, AB CANADA T2E 2S8 T. 403.264.7177 F. 403.264-7175 WWW.CITILAND.CA CITILAND AIrDRIE GATEWAY VENTURE INC. airdrie GATEWAY COMMERCE

More information

How to Start a Garden Project with Gateway Greening. Orientation for Community Gardens and Youth Gardens

How to Start a Garden Project with Gateway Greening. Orientation for Community Gardens and Youth Gardens How to Start a Garden Project with Gateway Greening Orientation for Community Gardens and Youth Gardens agenda What is a Community Garden? Gateway Greening 101 Essentials of starting a Community Garden

More information

Sewanee Village + Request for Builder/Developer Proposals

Sewanee Village + Request for Builder/Developer Proposals Sewanee Village + Request for Builder/Developer Proposals Contact: Frank X. Gladu Special Assistant to the Vice Chancellor University of the South 735 University Ave Version 3 Sewanee TN 37383 Released:

More information

Glenborough at Easton Land Use Master Plan

Glenborough at Easton Land Use Master Plan Land Use Framework November 30, 2007 2.0 LAND USE FRAME- WORK 2.1 LAND USE HISTORY and Setting Glenborough at Easton is located on property that was used for mining in the 19th and 20th centuries and rocket

More information

ELK GROVE GENERAL PLAN VISION

ELK GROVE GENERAL PLAN VISION 2-1 CHAPTER 2: 2-2 CREATING OUR The Community Vision for Elk Grove, expressed through a Vision Statement and a series of Supporting Principles, is a declaration of the kind of community that Elk Grove

More information

Michigan State University Barrier-Free/Accessibility Project Status Summary March 2017

Michigan State University Barrier-Free/Accessibility Project Status Summary March 2017 Projects Completed FY14, FY15 and FY16 (arranged alphabetically) Abrams Planetarium Install automatic door opener on main doors of the Planetarium. Completed: Summer 2016 Cost: $13,000 Akers Hall Renovations

More information

Parks, Trails, and Open Space Element

Parks, Trails, and Open Space Element P arks, Recreation, and Open Space are important components of the quality of life desired by the residents of Elk Grove. This Element of the General Plan addresses the City s goals, policies, and actions

More information

UNIVERSITY OF MANITOBA PROCEDURE

UNIVERSITY OF MANITOBA PROCEDURE UNIVERSITY OF MANITOBA PROCEDURE Procedure: UNIVERSITY BUILDING ACCESS CONTROL Parent Policy: Effective Date: July 2, 2013 Revised Date: Review Date: July 2, 2023 Approving Body: Authority: Responsible

More information

The principal elements of the NTC Strategic Vision plan are as follows.

The principal elements of the NTC Strategic Vision plan are as follows. The proposed project would improve the NTC site plan, circulation, visitor amenities, and landscaping, and would include construction of two new stadiums to replace the existing Louis Armstrong Stadium

More information

PROJECT SUMMARY. University of California, Irvine Humanities Building. Project No FINAL INITIAL STUDY/MITIGATED NEGATIVE DECLARATION

PROJECT SUMMARY. University of California, Irvine Humanities Building. Project No FINAL INITIAL STUDY/MITIGATED NEGATIVE DECLARATION PROJECT SUMMARY University of California, Irvine Humanities Building Project No. 991077 FINAL INITIAL STUDY/MITIGATED NEGATIVE DECLARATION State Clearinghouse No. 2007011035 March 2007 Humanities Building