Air System Sizing Summary for Lobby System Project Name: Existing Lobby 04/04/2005 Prepared by: psuae

Size: px
Start display at page:

Download "Air System Sizing Summary for Lobby System Project Name: Existing Lobby 04/04/2005 Prepared by: psuae"

Transcription

1 APPENDIX C

2 Air System Sizing Summary for Lobby System Project Name: Existing Lobby 04/04/ :56PM Air System Information Air System Name Equipment Class Air System Type Lobby System CW AHU SZCAV Number of zones 1 Floor Area ft² Location Columbus, Ohio Sizing Calculation Information Zone and Space Sizing Method: Zone CFM Sum of space airflow rates Space CFM Individual peak space loads Calculation Months Sizing Data Jan to Dec Calculated Central Cooling Coil Sizing Data Total coil load 61.4 Tons Total coil load MBH Sensible coil load MBH Coil CFM at Jun CFM Max block CFM CFM Sum of peak zone CFM CFM Sensible heat ratio ft²/ton 40.4 BTU/(hr-ft²) Water 10.0 F rise gpm Load occurs at Jun 1400 OA DB / WB 86.4 / 71.8 F Entering DB / WB / 67.8 F Leaving DB / WB 51.5 / 48.4 F Coil ADP 45.8 F Bypass Factor Resulting RH 33 % Design supply temp F Zone T-stat Check 1 of 1 OK Max zone temperature deviation 0.0 F Central Heating Coil Sizing Data No central heating coil loads occurred during this calculation. Preheat Coil Sizing Data Max coil load MBH Coil CFM at Des Htg CFM Max coil CFM CFM Water 20.0 F drop gpm Load occurs at Des Htg Ent. DB / Lvg DB 70.0 / F Supply Fan Sizing Data Actual max CFM CFM Standard CFM CFM Actual max CFM/ft² 5.41 CFM/ft² Fan motor BHP BHP Fan motor kw kw Fan static 6.10 in wg Outdoor Ventilation Air Data Design airflow CFM 0 CFM CFM/ft² 0.00 CFM/ft² CFM/person 0.00 CFM/person

3 Air System Design Load Summary for Lobby System Project Name: Existing Lobby 04/04/ :56PM DESIGN COOLING DESIGN HEATING COOLING DATA AT Jun 1400 HEATING DATA AT DES HTG COOLING OA DB / WB 86.4 F / 71.8 F HEATING OA DB / WB 1.0 F / -0.6 F Sensible Latent Sensible Latent ZONE LOADS Details (BTU/hr) (BTU/hr) Details (BTU/hr) (BTU/hr) Window & Skylight Solar Loads 2880 ft² ft² - - Wall Transmission 0 ft² 0-0 ft² 0 - Roof Transmission 0 ft² 0-0 ft² 0 - Window Transmission 0 ft² 0-0 ft² 0 - Skylight Transmission 2880 ft² ft² Door Loads 0 ft² 0-0 ft² 0 - Floor Transmission 2480 ft² ft² 0 - Partitions 0 ft² 0-0 ft² 0 - Ceiling 0 ft² 0-0 ft² 0 - Overhead Lighting 2812 W Task Lighting 0 W Electric Equipment 2480 W People Infiltration Miscellaneous Safety Factor 0% / 0% 0 0 0% 0 0 >> Total Zone Loads Zone Conditioning Plenum Wall Load 0% Plenum Roof Load 0% Plenum Lighting Load 0% Return Fan Load CFM CFM 0 - Ventilation Load 0 CFM CFM 0 0 Supply Fan Load CFM CFM Space Fan Coil Fans Duct Heat Gain / Loss 0% 0-0% 0 - >> Total System Loads Central Cooling Coil Central Heating Coil Preheat Coil >> Total Conditioning Key: Positive values are clg loads Positive values are htg loads Negative values are htg loads Negative values are clg loads

4 Air System Sizing Summary for Lobby System Project Name: Redesign Lobby 04/04/ :03PM Air System Information Air System Name Equipment Class Air System Type Lobby System CW AHU SZCAV Number of zones 1 Floor Area ft² Location Columbus, Ohio Sizing Calculation Information Zone and Space Sizing Method: Zone CFM Sum of space airflow rates Space CFM Individual peak space loads Calculation Months Sizing Data Jan to Dec Calculated Central Cooling Coil Sizing Data Total coil load 54.2 Tons Total coil load MBH Sensible coil load MBH Coil CFM at Jul CFM Max block CFM CFM Sum of peak zone CFM CFM Sensible heat ratio ft²/ton 45.7 BTU/(hr-ft²) Water 10.0 F rise gpm Load occurs at Jul 1300 OA DB / WB 87.9 / 73.4 F Entering DB / WB / 70.3 F Leaving DB / WB 57.6 / 54.6 F Coil ADP 52.5 F Bypass Factor Resulting RH 44 % Design supply temp F Zone T-stat Check 1 of 1 OK Max zone temperature deviation 0.0 F Central Heating Coil Sizing Data No central heating coil loads occurred during this calculation. Preheat Coil Sizing Data Max coil load MBH Coil CFM at Des Htg CFM Max coil CFM CFM Water 20.0 F drop gpm Load occurs at Des Htg Ent. DB / Lvg DB 70.0 / F Supply Fan Sizing Data Actual max CFM CFM Standard CFM CFM Actual max CFM/ft² 5.41 CFM/ft² Fan motor BHP BHP Fan motor kw kw Fan static 6.10 in wg Outdoor Ventilation Air Data Design airflow CFM 0 CFM CFM/ft² 0.00 CFM/ft² CFM/person 0.00 CFM/person

5 Air System Design Load Summary for Lobby System Project Name: Redesign Lobby 04/04/ :03PM DESIGN COOLING DESIGN HEATING COOLING DATA AT Jul 1300 HEATING DATA AT DES HTG COOLING OA DB / WB 87.9 F / 73.4 F HEATING OA DB / WB 1.0 F / -0.6 F Sensible Latent Sensible Latent ZONE LOADS Details (BTU/hr) (BTU/hr) Details (BTU/hr) (BTU/hr) Window & Skylight Solar Loads 2880 ft² ft² - - Wall Transmission 0 ft² 0-0 ft² 0 - Roof Transmission 0 ft² 0-0 ft² 0 - Window Transmission 0 ft² 0-0 ft² 0 - Skylight Transmission 2880 ft² ft² Door Loads 0 ft² 0-0 ft² 0 - Floor Transmission 2480 ft² ft² 0 - Partitions 0 ft² 0-0 ft² 0 - Ceiling 0 ft² 0-0 ft² 0 - Overhead Lighting 2812 W Task Lighting 0 W Electric Equipment 2480 W People Infiltration Miscellaneous Safety Factor 0% / 0% 0 0 0% 0 0 >> Total Zone Loads Zone Conditioning Plenum Wall Load 0% Plenum Roof Load 0% Plenum Lighting Load 0% Return Fan Load CFM CFM 0 - Ventilation Load 0 CFM CFM 0 0 Supply Fan Load CFM CFM Space Fan Coil Fans Duct Heat Gain / Loss 0% 0-0% 0 - >> Total System Loads Central Cooling Coil Central Heating Coil Preheat Coil >> Total Conditioning Key: Positive values are clg loads Positive values are htg loads Negative values are htg loads Negative values are clg loads

Air System Sizing Summary for AHU/CU-1 Project Name: Wilton Manors Fire Station#16 06/26/2016 Prepared by: L.N.I.

Air System Sizing Summary for AHU/CU-1 Project Name: Wilton Manors Fire Station#16 06/26/2016 Prepared by: L.N.I. Air System Sizing Summary for AHU/CU-1 AHU/CU-1 Floor Area 1678.0 ft² Central Cooling Coil Total coil load 4.8 Tons Total coil load 57.8 MBH Sensible coil load 41.8 MBH Coil CFM at Jul 1500 1909 CFM Max

More information

MECHANICAL INFRASTRUCTURE ASSESSMENT FOR VICTOR VALLEY COLLEGE

MECHANICAL INFRASTRUCTURE ASSESSMENT FOR VICTOR VALLEY COLLEGE MECHANICAL INFRASTRUCTURE ASSESSMENT FOR VICTOR VALLEY COLLEGE 18422 Bear Valley Road Victorville, CA 92395 Date 25 September 2012 dha Job No. 12155 TABLE OF CONTENTS I. Purpose.... Page 1 II. Existing

More information

COOLING LOAD CALCULATION SHEET

COOLING LOAD CALCULATION SHEET 7 8 7 5 3 & 7 6 8 7 2 & 3 8 3 & 7 6 5 3 & 4 2 COOLING LOAD CALCULATION SHEET Project Name :...... Prepare by :.... Revision :... Location :.... Approved by :....... Sheet No. :....... CHAP REF ITEM TABLE

More information

Technical Development Program

Technical Development Program Technical Development Program PRESENTED BY: James Parker Insert your logo here AIR HANDLERS Coils: Direct Expansion Chilled Water and Heating Menu Section 1 Introduction Section 2 Typical Coil Applications

More information

90% Design Submittal Mechnical Equipment Calculations Parking Garage CDRL

90% Design Submittal Mechnical Equipment Calculations Parking Garage CDRL NORTH METRO RAIL LINE PROJECT Thornton Crossroads at 14 th Avenue Station 9% Design Submittal Mechnical Equipment Calculations Parking Garage CDRL 3-37.11.6 June 2, 217 Prepared by: Regional Rail Partners

More information

ApacheHVAC User Guide Part F: Loads Analysis and Reporting Tools

ApacheHVAC User Guide Part F: Loads Analysis and Reporting Tools ApacheHVAC User Guide Part F: Loads Analysis and Reporting Tools IES Virtual Environment Copyright 2017 Integrated Environmental Solutions Limited. All rights reserved. No part of the manual is to be copied

More information

Company Acme HVAC Inc. Customer James Allen Preparer J White Address 3652 Shady LaneAnywhere, Earth Phone

Company Acme HVAC Inc. Customer James Allen Preparer J White Address 3652 Shady LaneAnywhere, Earth Phone Company Acme HVAC Inc. Customer James Allen Preparer J White Address 3652 Shady LaneAnywhere, Earth Phone 252-555-7493 Phone 555-576-3764 Date 12/9/10 This HVAC load calculation has been performed using

More information

Mechanical System Redesign. Dedicated Outdoor Air System. Design Criteria

Mechanical System Redesign. Dedicated Outdoor Air System. Design Criteria Mechanical System Redesign Dedicated Outdoor Air System Design Criteria The outdoor air conditions used were for Philadelphia, Pennsylvania IAP at a 0.4% occurrence. The supply air conditions were developed

More information

MANUAL J/S Summary One summary sheet for each system

MANUAL J/S Summary One summary sheet for each system MANUAL J/S Summary One summary sheet for each system NOTE: The load calculation must be calculated on a room basis. Room loads are a mandatory requirement for making Manual D duct sizing calculations.

More information

Building Systems: HVAC

Building Systems: HVAC Building Systems: HVAC Committee on Microbiomes of the Built Environment June 21, 2016 Washington DC Dennis Stanke (dstanke47@gmail.com) Retired rane (IR) Outline Ventilation Systems Moisture sources Low

More information

Standards and Guidelines. Presented by: Aric Murray December 12, 2014

Standards and Guidelines. Presented by: Aric Murray December 12, 2014 TDSHS Ventilation Standards and Guidelines Presented by: Aric Murray December 12, 2014 Agenda 1. What are the TDSHS ventilation 1. What are the TDSHS ventilation requirements? 2. Pressure relationships.

More information

Fundamentals of Psychrometrics. By James L. Murphy, Colorado Building Environments Sales Engineer

Fundamentals of Psychrometrics. By James L. Murphy, Colorado Building Environments Sales Engineer Fundamentals of Psychrometrics By James L. Murphy, Colorado Building Environments Sales Engineer Let s s Start with Air Air is Made up of Two Main Gases Nitrogen (77%) Oxygen (23%) If that is all there

More information

Introduction to HVAC. American Standard Inc Air Conditioning Clinic TRG-TRC018-EN

Introduction to HVAC. American Standard Inc Air Conditioning Clinic TRG-TRC018-EN Introduction to HVAC Agenda Psychrometrics Human Comfort Heat Transfer Refrigeration Cycle HVAC Terminology HVAC Systems Introduction to HVAC Psychrometrics 2000 TRG-TRC002-EN Properties of Air Dry-bulb

More information

PhEn-602 Pharmaceutical Facility Design. Notes #7 J. Manfredi

PhEn-602 Pharmaceutical Facility Design. Notes #7 J. Manfredi PhEn-602 Pharmaceutical Facility Design Notes #7 J. Manfredi 1 HVAC Design and the Psychrometric Chart 2 HVAC Considerations Pharmaceutical Facility Design Process 1. SPACE REQUIREMENTS Temperature Humidity

More information

Appendices. Included in this section are

Appendices. Included in this section are Appendices Included in this section are Appendix A Building Overview Appendix B Alternative Mechanical Designs Appendix C Integration of Structural System and Constructability 68 Appendix A Building Overview

More information

7. MECHANICAL SYSTEM DESIGN

7. MECHANICAL SYSTEM DESIGN 7. MECHANICAL SYSTEM DESIGN The second primary topic of this thesis is to investigate the application of a dedicated outdoor air system (DOAS) to the SLCC. The stated goals for this thesis of improved

More information

ELECTRICAL QUANTITY WEIGHT (LB)

ELECTRICAL QUANTITY WEIGHT (LB) VRF SYSTEM INDOOR UNIT ENTERING AIR TEMPERATURES ( F) CAPACITIES (kbtuh) Max SOUND ELECTRICAL WEIGHT TOSHIBA-CARRIER COOLING HEATING Airflow PRESSURE, MARK NO. TYPE ROOM TOTAL SENSIBLE HEATING V / Ø /

More information

SUBMITTAL DATA SHEET FEATURES. SPLIT-SYSTEM EVAPORATOR BLOWERS 7.5, 10, 15 & 20 TONS MODELS: NH-07 thru -20, 2-PIPE NJ-10 thru -20, 4-PIPE

SUBMITTAL DATA SHEET FEATURES. SPLIT-SYSTEM EVAPORATOR BLOWERS 7.5, 10, 15 & 20 TONS MODELS: NH-07 thru -20, 2-PIPE NJ-10 thru -20, 4-PIPE SUBMITTAL DATA SHEET SPLIT-SYSTEM EVAPORATOR BLOWERS 7.5, 10, 15 & 20 TONS MODELS: NH-07 thru -20, 2-PIPE NJ-10 thru -20, 4-PIPE JOB NAME: LOCATION: PURCHASER: ORDER NO: ENGINEER: SUBMITTED TO: FOR: REF:

More information

Andrea Borowski The Pennsylvania State University University Park, PA November 11, 2002 Consultant: Dr. Bahnfleth Technical Assignment M-3

Andrea Borowski The Pennsylvania State University University Park, PA November 11, 2002 Consultant: Dr. Bahnfleth Technical Assignment M-3 Existing System Evaluation Executive Summary The MBNA Career Services Center is a 44,000 square foot, 4-story office type building at Penn State University, University Park Campus. The building is located

More information

HVAC Myths and Realities Trane Engineers Newsletter Live Series

HVAC Myths and Realities Trane Engineers Newsletter Live Series HVAC Myths and Realities Trane Engineers Newsletter Live Series AGENDA Low delta T is unavoidable 55 F supply air temperature is adequate for today s loads ASHRAE Standard 15 has to be updated before new

More information

ASHRAE Region VI CRC Track III: Session 3 Ventilation Energy Recovery. Steven T. Taylor, PE Principal Taylor Engineering

ASHRAE Region VI CRC Track III: Session 3 Ventilation Energy Recovery. Steven T. Taylor, PE Principal Taylor Engineering ASHRAE Region VI CRC Track III: Session 3 Ventilation Energy Recovery Steven T. Taylor, PE Principal Taylor Engineering This program is registered with the AIA/CES for continuing professional education.

More information

Dehumidification: Energy Efficiency Comparisons

Dehumidification: Energy Efficiency Comparisons Fourth Annual Energy Management Workshop Cocoa, Florida February 10-11, 2003 Dehumidification: Energy Efficiency Comparisons Michael K. West, Ph.D., P.E. Building Systems Scientist Advantek Consulting,

More information

The Ed Roberts Campus Berkeley, CA

The Ed Roberts Campus Berkeley, CA The Ed Roberts Campus Berkeley, CA Anderson Clemenceau Mechanical Option Penn State A.E. Senior Thesis April 14, 2015 Leddy Maytum Stacy Architects, Photo by Tim Griffith ASHRAE Climate Zone 3C 99.6% Heating

More information

Design Considerations For Dedicated OA Systems BY HUGH CROWTHER, P.ENG, MEMBER ASHRAE; YI TENG MA, ASSOCIATE MEMBER ASHRAE

Design Considerations For Dedicated OA Systems BY HUGH CROWTHER, P.ENG, MEMBER ASHRAE; YI TENG MA, ASSOCIATE MEMBER ASHRAE ASHRAE www.ashrae.org. Used with permission from ASHRAE Journal. This article may not be copied nor distributed in either paper or digital form without ASHRAE s permission. For more information about ASHRAE,

More information

50HS018, 024, 030, 036, 042, 048 & 060 STANDARD-EFFICIENCY COMBINATION HEAT PUMP UNITS W/OPTIONAL ELECTRIC HEAT

50HS018, 024, 030, 036, 042, 048 & 060 STANDARD-EFFICIENCY COMBINATION HEAT PUMP UNITS W/OPTIONAL ELECTRIC HEAT -1SB 018, 024, 030, 036, 042, 048 & 060 STANDARD-EFFICIENCY COMBINATION HEAT PUMP S W/OPTIONAL ELECTRIC HEAT PERFORMANCE DATA CERTIFIED DIMENSION PRINT CERTIFIED ROOF CURB DIMENSION PRINT 1997 Carrier

More information

Technical Report #3 Mechanical Systems Existing Conditions Evaluation

Technical Report #3 Mechanical Systems Existing Conditions Evaluation Mechanical Option Technical Report #3 Technical Report #3 Mechanical Systems Existing Conditions Evaluation Instructor: Dr. Bahnfleth 11.15.04 Building Sponsor: CCG Facilities Integration Table of Contents

More information

RHEEM Split Systems Condensers All submitted condensers meet the 15 SEER minimum All submitted condensers meet the 208/230V specification All submitted condensers contain enhanced mufflers to help dissipate

More information

C13-Series Engineering Guide

C13-Series Engineering Guide Engineering Guide Effective January 2018 Horizontal Air-Cooled, Water-Cooled, Chilled Water and Heat Pump Contents Product Features............................... 3 Product Options................................

More information

VERTICAL AHU ENGINEERING SPECIFICATIONS BULLETIN

VERTICAL AHU ENGINEERING SPECIFICATIONS BULLETIN VERTICAL AHU ENGINEERING SPECIFICATIONS BULLETIN 20-019 TABLE OF CONTENTS DESIGN & SPECIFICATIONS...3 APPLICATIONS... 3 CABINET CONSTRUCTION... 3 FEATURES AND CONTROLS... 3 DIMENSIONAL DATA... 5 SPECIFICATIONS...

More information

ISERIES VERTICAL AHU ENGINEERING SPECIFICATIONS

ISERIES VERTICAL AHU ENGINEERING SPECIFICATIONS ISERIES VERTICAL AHU ENGINEERING SPECIFICATIONS BULLETIN 20-131.001 Page 1 Copyright 2017 Unico Inc. TABLE OF CONTENTS APPLICATIONS... 3 CABINET CONSTRUCTION... 3 FEATURES AND CONTROLS... 3 DIMENSIONAL

More information

We are pleased to submit the following equipment for your approval on the above project:

We are pleased to submit the following equipment for your approval on the above project: Sigler Southern California 205 S. Puente St. Brea, CA 92821 PH: 714-578-5100 Salesman: Tim Dres SUBMITTAL DATA PROJECT: LAUSD South Region High School 15 MECHANICAL CONTRACTOR: Mechanical Technology Systems

More information

ASHRAE WILL GIVE YOU THE WORLD. This ASHRAE Distinguished Lecturer is brought to you by the Society Chapter Technology Transfer Committee

ASHRAE WILL GIVE YOU THE WORLD. This ASHRAE Distinguished Lecturer is brought to you by the Society Chapter Technology Transfer Committee ASHRAE WILL GIVE YOU THE WORLD This ASHRAE Distinguished Lecturer is brought to you by the Society Chapter Technology Transfer Committee Complete the Distinguished Lecturer Event Summary Critique CTTC

More information

Technical Assignment 3 11/15/04. Executive Summary

Technical Assignment 3 11/15/04. Executive Summary Executive Summary This report is an analysis of the existing systems within the Outreach Innovation Building in University Park, PA. One significant design criteria was a lower than average noise criteria

More information

SPLIT SYSTEMS SELECTION & OPTIMIZATION GUIDE

SPLIT SYSTEMS SELECTION & OPTIMIZATION GUIDE SPLIT SYSTEMS SELECTION & OPTIMIZATION GUIDE www.addison-hvac.com Creating a New Project 1. Open the ACE Interface within the web browser. ACE performs best using the Google Chrome browser. Do not use

More information

UNDERSTANDING AND USING THE HVAC DESIGN REVIEW FORM

UNDERSTANDING AND USING THE HVAC DESIGN REVIEW FORM Page 1 UNDERSTANDING AND USING THE HVAC DESIGN REVIEW FORM Each of the 38 points of requested information is discussed, and references to the supporting manual are given to substantiate the requirement.

More information

K*ES120 DESCRIPTION TECHNICAL GUIDE SPLIT-SYSTEM EVAPORATOR BLOWERS 10 NOMINAL TONS EER 8.5 ACCESSORIES FIELD INSTALLED TABLE 1: ARI RATINGS*

K*ES120 DESCRIPTION TECHNICAL GUIDE SPLIT-SYSTEM EVAPORATOR BLOWERS 10 NOMINAL TONS EER 8.5 ACCESSORIES FIELD INSTALLED TABLE 1: ARI RATINGS* TECHNICAL GUIDE SPLIT-SYSTEM EVAPORATOR BLOWERS K*ES120 10 NOMINAL TONS EER 8.5 DESCRIPTION These completely assembled dual circuit evaporator blower units include a well-insulated cabinet, a DX cooling

More information

Chilled beam technology overview John Woollett 1, Jonas Åkesson 2 Swegon AB 1,2

Chilled beam technology overview John Woollett 1, Jonas Åkesson 2 Swegon AB 1,2 Chilled beam technology overview John Woollett 1, Jonas Åkesson 2 Swegon AB 1,2 john.woollett@swegon.se, jonas.akesson@swegon.se SUMMARY The main focus of the paper will be on active beam technology regarding

More information

VertiCool Aurora Engineering Guide

VertiCool Aurora Engineering Guide Engineering Guide Effective August 2016 Air-Cooled, Water-Cooled and Water Source Heat Pump Contents Product Features... 3 Options... 4 Physical Data...5-6 Air-Cooled Performance Data (a) (b) (c)...7-8

More information

December 6, 2018 Optimizing Solutions through Superior Dehumidification Technology SM

December 6, 2018 Optimizing Solutions through Superior Dehumidification Technology SM Humidity Control and Heating and Cooling Applications December 6, 2018 Optimizing Solutions through Superior Dehumidification Technology SM Today s Discussion Discussion of cooling, heating and dehumidification

More information

Pharmaceutical Facility Design

Pharmaceutical Facility Design PhEn-602 Pharmaceutical Facility Design J. Manfredi Notes 9A PhEn-602 J. Manfredi 1 Primary & Secondary HVAC units Primary Primary air handling unit arrangement: One unit is responsible for all of the

More information

Air Conditioning Clinic

Air Conditioning Clinic Air Conditioning Clinic Psychrometry One of the Fundamental Series D C B A C B D A July 2012 TRG-TRC001-EN Psychrometry One of the Fundamental Series A publication of Trane Preface Psychrometry A Trane

More information

ASHRAE Standard 62 Ventilation Report Technical Assignment #1. Calvert Memorial Hospital Prince Frederick, MD

ASHRAE Standard 62 Ventilation Report Technical Assignment #1. Calvert Memorial Hospital Prince Frederick, MD ASHRAE Standard 62 Ventilation Report Technical Assignment #1 Prepared By: Holly Mawritz October 6, 2004 Table Of Contents: Executive Summary 2 Assumptions 3 Procedure 4 Sample Calculations 5 System and

More information

UNIT 1 AIR CONDITIONING 1. Write the various psychometric processes? Explain any four processes with neat sketches?

UNIT 1 AIR CONDITIONING 1. Write the various psychometric processes? Explain any four processes with neat sketches? SIDDHARTH INSTITUTE OF ENGINEERING & TECHNOLOGY :: PUTTUR (AUTONOMOUS) (Approved by AICTE, New Delhi & Affiliated to JNTUA, Anantapuramu) (Accredited by NBA & Accredited by NAAC with A Grade) (An ISO 9001:2008

More information

TDSHS Air Change Requirements and the Basics of Psychrometrics. Presented by: Aric Murray December 06, 2013

TDSHS Air Change Requirements and the Basics of Psychrometrics. Presented by: Aric Murray December 06, 2013 TDSHS Air Change Requirements and the Basics of Psychrometrics Presented by: Aric Murray December 06, 2013 Agenda 1. What are the air change requirements and how do you calculate them? 2. Why are air change

More information

MHCCW Chilled Water Ceiling Concealed With 5kW Electric Heat 2-Pipe Heat / Cool Fan Coil 30,000 BTUH

MHCCW Chilled Water Ceiling Concealed With 5kW Electric Heat 2-Pipe Heat / Cool Fan Coil 30,000 BTUH MHCCW-10-05 Chilled Water Ceiling Concealed With 5kW Electric Heat 2-Pipe Heat / Cool Fan Coil 30,000 BTUH Rev. 1.21 HVAC Guide Specifications Chilled Water Fan Coil with Electric Heat 2-Pipe Nominal Size:

More information

DIRECT DRIVE BLOWER COILS

DIRECT DRIVE BLOWER COILS DIRECT DRIVE BLOWER COILS Horizontal HDY Vertical VDY Upgrade to IEC s Direct Drive Blower Coils Energy Efficient Energy Efficient Easy Easy to Installation Install Extended Service Life Engineered to

More information

TECHNICAL GUIDE. Description SPLIT-SYSTEM AIR-COOLED CONDENSING UNITS YD360, 480 & THRU 50 NOMINAL TONS YTG-B-0811

TECHNICAL GUIDE. Description SPLIT-SYSTEM AIR-COOLED CONDENSING UNITS YD360, 480 & THRU 50 NOMINAL TONS YTG-B-0811 Description These units are completely assembled, piped and wired at the factory to provide one-piece shipment and rigging. Each unit is pressurized with a holding charge of Refrigerant R-410A for storage

More information

MHCCW Chilled Water Ceiling Concealed Without Electric Heat 2-Pipe Heat / Cool Fan Coil 18,000 BTUH

MHCCW Chilled Water Ceiling Concealed Without Electric Heat 2-Pipe Heat / Cool Fan Coil 18,000 BTUH MHCCW-06-00 Chilled Water Ceiling Concealed Without Electric Heat 2-Pipe Heat / Cool Fan Coil 18,000 BTUH Rev. 1.21 HVAC Guide Specifications Chilled or Hot Water Fan Coil 2-Pipe Nominal Size: 18,000 BTUH

More information

ENERGY COST AND FEATURE REPORT

ENERGY COST AND FEATURE REPORT ENERGY COST AND FEATURE REPORT Building Name: Rating Org.: GREEN DREAM GROUP, LLC ANNUAL ENERGY COSTS Heating $ 565 Cooling $ 0 Water Heating $ 0 Lights & Appliances $ 1402 Photovoltaics $ -189 Service

More information

CARRIER edesign SUITE NEWS. Interpreting High (Low) Peak Design Airflow Sizing Results for HVAC. Equipment Selection.

CARRIER edesign SUITE NEWS. Interpreting High (Low) Peak Design Airflow Sizing Results for HVAC. Equipment Selection. Volume 5, Issue 1 CARRIER edesign SUITE NEWS Interpreting High (Low) Peak Design Airflow Sizing Results for HVAC Equipment Selection A design challenge sometimes occurs when computing design loads using

More information

MASS AND HEAT RECOVERY SYSTEM SALAH MAHMOUD HINDAWI DIRECTOR HINDAWI FOR ENGINEERING SERVICES & CONTRACTING NEW DAMIETTA, EGYPT

MASS AND HEAT RECOVERY SYSTEM SALAH MAHMOUD HINDAWI DIRECTOR HINDAWI FOR ENGINEERING SERVICES & CONTRACTING NEW DAMIETTA, EGYPT ESL-IC-10-10-56 MASS AND HEAT RECOVERY SYSTEM SALAH MAHMOUD HINDAWI DIRECTOR HINDAWI FOR ENGINEERING SERVICES & CONTRACTING NEW DAMIETTA, EGYPT ABSTRACT : In the last few years heat recovery was under

More information

ENGINEERING BULLETIN. Overview of Chilled Beam Technology. Purpose. Summary. Theory

ENGINEERING BULLETIN. Overview of Chilled Beam Technology. Purpose. Summary. Theory Overview of Chilled Beam Technology Purpose Chilled beam technology is new to the United States but has been used in Europe since the 1950 s. Chilled beams can reduce energy costs, improve indoor air quality,

More information

Radiant Exchange in Stratified Environments: Considerations and Challenges for Hourly Energy Simulation of UFAD, DV, and Radiant Cooling Systems

Radiant Exchange in Stratified Environments: Considerations and Challenges for Hourly Energy Simulation of UFAD, DV, and Radiant Cooling Systems Radiant Exchange in Stratified Environments: Considerations and Challenges for Hourly Energy Simulation of UFAD, DV, and Radiant Cooling Systems CBE Timothy Moore CENTER FOR THE BUILT ENVIRONMENT SimBuild

More information

Architecture - Engineering - Planning

Architecture - Engineering - Planning Architecture - Engineering - Planning www.mkcinc.com Mansfield, Ohio New Philadelphia, Ohio Powell, Ohio 9-55-0 - phone 0-6-887 - phone 70-657-0 - phone 9-55-8 - fax 0--075 - fax 70-657-77 - fax SHOP DRAWING

More information

Underfloor Air Distribution:

Underfloor Air Distribution: Underfloor Air Distribution: An underfloor air distribution system utilizes a plenum space between the structural slab and the underside of a raised floor to distribute the conditioned air to the room.

More information

Mechanical Building Services Report For BHP Mitsubishi Alliance

Mechanical Building Services Report For BHP Mitsubishi Alliance 1 GOONYELLA RIVERSIDE MINE ADMINISTRATION BUILDING Mechanical Building Services Report For BHP Mitsubishi Alliance Prepared by: A/C DESIGN SERVICES (QLD) Pty Ltd 95-97 RASMUSSEN AVE HAY POINT MACKAY QLD

More information

EADQUARTERS. Technical Report One. Stephanie Kunkel Mechanical Option

EADQUARTERS. Technical Report One. Stephanie Kunkel   Mechanical Option EADQUARTERS 707 N. Calvert St. Technical Report One ASHRAE Standard 62.1 Ventilation ASHRAE Standard 90.1 Energy Design Stephanie Kunkel www.engr.psu.edu/ae/thesis/portfolios/2011/slk5061 Mechanical Option

More information

SELF-CONTAINED VERTICAL AIR COOLED PACKAGE AIR-CONDITIONERS

SELF-CONTAINED VERTICAL AIR COOLED PACKAGE AIR-CONDITIONERS SELF-CONTAINED VERTICAL AIR COOLED PACKAGE AIR-CONDITIONERS Cooling Capacity from 115,000 to 670,000 Btu/hr Btu/hr Smartwise Innovations... Towards Green, Quality & Reliability Solutions SERIES INTRODUCTION

More information

Technical Development Program. COMMERCIAL HVAC PACKAGED EQUIPMENT Split Systems PRESENTED BY: Ray Chow Sigler

Technical Development Program. COMMERCIAL HVAC PACKAGED EQUIPMENT Split Systems PRESENTED BY: Ray Chow Sigler Technical Development Program COMMERCIAL HVAC PACKAGED EQUIPMENT Split Systems PRESENTED BY: Ray Chow Sigler Menu Section 1 Section 2 Section 3 Section 4 Section 5 Section 6 Section 7 Introduction System

More information

S H R E V E P O R T, L O U I S I A N A File: ARCHIVE MAIN STORAGE 102 09 / 18 / 2018 REVISIONS BY SCHEMATIC DESIGN SET DESIGN DEVELOPMENT SET CONSTRUCTION DOCUMENT SET CLIENT REVIEW SET AS-BUILT DOCUMENT

More information

Product Specifications NEW OPTION AVAILABLE: AUTOSPEED 24V CONTROL PACKAGE

Product Specifications NEW OPTION AVAILABLE: AUTOSPEED 24V CONTROL PACKAGE NOW AVAILABLE WITH AUTOSPEED V CONTROL Product Specifications MB Series MBE Series W Series Vertical / Horizontal Direct Drive Hydronic Fan Coils 00 0 CFM NEW OPTION AVAILABLE: AUTOSPEED V CONTROL PACKAGE

More information

Designing Energy Efficient Outdoor Air Systems

Designing Energy Efficient Outdoor Air Systems Designing Energy Efficient Outdoor Air Systems Joseph Thorndal Applied Products Sales Manager Greenheck, Schofield, Wisconsin 1 Joseph Thorndal BS Industrial Engineering North Dakota State University Work

More information

A.H.U / Fan Room (p1 of 2) (approx. sizing using rules of thumb)

A.H.U / Fan Room (p1 of 2) (approx. sizing using rules of thumb) A.H.U / Fan Room (p1 of 2) M1 STEP 1 Determine air flow req'd for each space, for total size of fan unit(s) in tons. Equation: Area (program) / (sf/ton) = tons req'd for space Classroom 8100sf / 350sf/ton

More information

Humidity Control Design Tips. R. Mark Nunnelly, PE, CxA, LEED AP President

Humidity Control Design Tips. R. Mark Nunnelly, PE, CxA, LEED AP President Humidity Control Design Tips R. Mark Nunnelly, PE, CxA, LEED AP President AIA Quality Assurance The Building Commissioning Association is a Registered Provider with The American Institute of Architects

More information

303 Garibaldi Ave, Roseto, PA Phone: Fax: Web: License: PA007413

303 Garibaldi Ave, Roseto, PA Phone: Fax: Web:   License: PA007413 Load Short Form Entyre house Outside db ( F) Inside db ( F) Design TD ( F) Inside humidity (%) oisture difference (gr/lb) Htg 4 70 67-30 28 Clg 89 75 14 50 29 Shielding / stories Pressure / AVF 3 (partial)

More information

TAG: RTU-2B 3B 4B 5B 6B 7B 1E MODEL: QTY. (7) 48TCED14A3A5-0B0A0 PACKAGED GAS/ELECTRIC ROOF TOP UNITS

TAG: RTU-2B 3B 4B 5B 6B 7B 1E MODEL: QTY. (7) 48TCED14A3A5-0B0A0 PACKAGED GAS/ELECTRIC ROOF TOP UNITS SUBMITTAL ***FOR APPROVAL*** TAG: RTU-2B 3B 4B 5B 6B 7B 1E MODEL: QTY. (7) 48TCED14A3A5-0B0A0 PACKAGED GAS/ELECTRIC ROOF TOP UNITS Project 66 Orland Square Dr. Landlord Renovations Location Orland Park,

More information

CARRIER edesign SUITE NEWS. Modeling 100% OA Constant Volume Air Systems. Volume 6, Issue 1. Page 1 Modeling 100% OA Constant Volume Air Systems

CARRIER edesign SUITE NEWS. Modeling 100% OA Constant Volume Air Systems. Volume 6, Issue 1. Page 1 Modeling 100% OA Constant Volume Air Systems Volume 6, Issue 1 CARRIER edesign SUITE NEWS Modeling 100% OA Constant Volume Air Systems This article provides an overview of how to model a stand-alone constant air volume (CAV) 100% OA system in HAP.

More information

1080 Marina Village Parkway, Suite 501 Alameda, CA (510) Fax (510) HVAC DESIGN INTENT

1080 Marina Village Parkway, Suite 501 Alameda, CA (510) Fax (510) HVAC DESIGN INTENT Taylor Engineering 1080 Marina Village Parkway, Suite 501 Alameda, CA 94501-1142 (510) 749-9135 Fax (510) 749-9136 LLC HVAC DESIGN INTENT PART 1 - GENERAL 1.1 Overview A. The project consists of a 3-story

More information

August 15, 2013 Page 1 of 19

August 15, 2013 Page 1 of 19 Section C401 Application Compliance with C402, C403, C404 and C405 AND (either C406.2, C406.3 or C406.4) Compliance with C402, C403, C404 or C405 Section C402 Building Envelope (Climate Zone 5A) Space-Conditioning

More information

Mystery of Sustainable Heat Exchange Material Heat Recovery Ventilator(HRV)

Mystery of Sustainable Heat Exchange Material Heat Recovery Ventilator(HRV) Mystery of Sustainable Heat Exchange Material Heat Recovery Ventilator(HRV) 1 Contents Why Heat Recovery Ventilator(HRV) is required Type of Heat Recovery Ventilator Feature of MITSUBISHI ELECTRIC Lossnay

More information

SPLIT-SYSTEM EVAPORATOR BLOWER DESCRIPTION FEATURES L4EU NOMINAL TONS

SPLIT-SYSTEM EVAPORATOR BLOWER DESCRIPTION FEATURES L4EU NOMINAL TONS 036-21096-001 (0101) SPLIT-SYSTEM EVAPORATOR BLOWER L4EU240 20 NOMINAL TONS DESCRIPTION This 20 ton evaporator blower is designed with two distinct modules to provide maximum application flexibility. The

More information

2009 IECC Commercial Mechanical Requirements

2009 IECC Commercial Mechanical Requirements BUILDING ENERGY CODES UNIVERSITY 2009 IECC Commercial Mechanical Requirements Ken Baker PNNL-SA-66171 Learning(Objec-ves(( ( 1. Find(minimum(equipment(efficiency(requirements( and(recite(at(least(3(common(terms(for(measuring(

More information

A/C Cooling Load calculation and measurement

A/C Cooling Load calculation and measurement Testo Inc. 40 White Lake Rd. Sparta NJ 07871 (800) 227-0729 A/C Cooling Load calculation and measurement When we talk about sizing an air conditioning appliance (tons of cooling, BTU/h or KW), we are specifying

More information

SHOE PALACE HUNTINGTON PARK M.200

SHOE PALACE HUNTINGTON PARK M.200 M.200 SPLIT SYSTEM CONDENSING UNIT SCHEDULE MARK SERVICE MODEL NO. COOLING DIMENSIONS ELECTRICAL REMARKS CAPACITY AMBIENT DB REFRIGERANT LENGTH WIDTH HEIGHT WEIGHT VOLT/PHASE MCA MOP (MBH) (DEG F) (IN)

More information

Submittal Data Performance Data Electrical Data

Submittal Data Performance Data Electrical Data ERMS Series Submittal Data Submittal Data Unit Designation: Job name: Architect: Engineer: Contractor: Performance Data Revision: 07/01/11 Cooling Capacity: EER: Heating Capacity: COP: Ambient Air Temp:

More information

Tech Report III. Technology and Engineering Development (TED) Building. Thomas Jefferson National Accelerator Facility.

Tech Report III. Technology and Engineering Development (TED) Building. Thomas Jefferson National Accelerator Facility. Technology and Engineering Development (TED) Building Thomas Jefferson National Accelerator Facility Newport News, VA Tech Report III Mechanical Systems Existing Conditions Report 11/29/2010 Architectural

More information

HVAC Systems What the Rater Needs to Know in the Field CALCS-PLUS

HVAC Systems What the Rater Needs to Know in the Field CALCS-PLUS HVAC Systems What the Rater Needs to Know in the Field This presentation used CASE* studies from the following *CASE Copy And Steal Everything HVAC Systems - What the Rater Needs to Know in the Field This

More information

Mechanical Technical Report 3. Mechanical Systems Existing Conditions Evaluation

Mechanical Technical Report 3. Mechanical Systems Existing Conditions Evaluation Mechanical Technical Report 3 Lutheran Theological Seminary at Philadelphia The New Learning Center Prepared For: William P. Bahnfleth, Ph.D., P.E. Department of Architectural Engineering Pennsylvania

More information

LGH/LCH WARNING. CAUTION Danger of sharp metallic edges. Can cause injury. Take care when servicing unit to avoid accidental contact with sharp edges.

LGH/LCH WARNING. CAUTION Danger of sharp metallic edges. Can cause injury. Take care when servicing unit to avoid accidental contact with sharp edges. Service Literature The LGH/LCH high and standard efficiency 5, 0, 5 and 50 ton (, 0.7, 58. and 75.9 kw) units, are configure to order units (CTO) with a wide selection of factory installed options. The

More information

Richard Hiles ClimateMaster

Richard Hiles ClimateMaster Minnesota Geothermal Heat Pump Association 2012 Properly Sizing Ground Source Heat Pump Systems Richard Hiles ClimateMaster Objective Properly Size and Select GSHP System for Low Operating Costs And Proper

More information

Best Practices for Applied Rooftop ` Systems, Applications and. Jerry Cohen President Jacco & Assoc. Installation

Best Practices for Applied Rooftop ` Systems, Applications and. Jerry Cohen President Jacco & Assoc. Installation Best Practices for Applied Rooftop ` Systems, Applications and Jerry Cohen President Jacco & Assoc. Installation Established 1968 Hudson, Ohio Columbus, Ohio Toledo, Ohio Focused on the Engineered Environment

More information

Technical Guide DESCRIPTION CHAMPION SPLIT-SYSTEM EVAPORATOR BLOWER L4EU240A 20 NOMINAL TONS (WORLD 50 HZ) FEATURES XTG-A-0307

Technical Guide DESCRIPTION CHAMPION SPLIT-SYSTEM EVAPORATOR BLOWER L4EU240A 20 NOMINAL TONS (WORLD 50 HZ) FEATURES XTG-A-0307 DESCRIPTION Technical Guide CHAMPION SPLIT-SYSTEM EVAPORATOR BLOWER L4EU240A 20 NOMINAL TONS (WORLD 50 HZ) This 20 ton evaporator blower is designed with two distinct modules to provide maximum application

More information

Technical Assignment 3. Mechanical Systems Existing Conditions Evaluation

Technical Assignment 3. Mechanical Systems Existing Conditions Evaluation Technical Assignment 3 Mechanical Systems Existing Conditions Evaluation The Milton Hershey School New Supply Center Prepared for: William P. Bahnfleth, Ph.D., P.E., Professor Department of Architectural

More information

HRV Vertical Unit Ventilators

HRV Vertical Unit Ventilators HRV Vertical Unit Ventilators lassroom Ventilators without Energy Recovery Installation, Operation and Maintenance Instructions Manual apacity: Up to 1,400 cfm Model: HRV450w, HRV1000w 2012 Venmar ES Inc.

More information

Q-TEC QC-Series Chilled Water Air Conditioner

Q-TEC QC-Series Chilled Water Air Conditioner Cooling Capacities: 13,3 to 49,3 BTUH (Based on EWT, GPM & CFM) Q-TEC QC-Series Chilled Water Air Conditioner The Q-TEC Series self-contained packaged chilled water air conditioner is designed to be installed

More information

VariCool VAV Engineering Guide

VariCool VAV Engineering Guide Engineering Guide Effective September 2017 Water-Cooled and Chilled Water, Variable Air Volume Contents Product Features... 3 UNIT FEATURES... 3 Product Features... 4 Marvel Plus Microprocessor Control

More information

Product Data. Features/Benefits. 36CBAC,AE,AF,AH,AQ,AN, PB,PD,PS Series Active and Passive Chilled Beams. 11 to 190 cfm

Product Data. Features/Benefits. 36CBAC,AE,AF,AH,AQ,AN, PB,PD,PS Series Active and Passive Chilled Beams. 11 to 190 cfm Product Data 36CBAC,AE,AF,AH,AQ,AN, PB,PD,PS Series Active and Passive Chilled Beams 11 to 190 cfm 36CBAC A36-449.eps Chilled beam units offer: An increase in total airflow Sensible cooling and heating

More information

Commercial load calculator instructions (all measurements are imperial)

Commercial load calculator instructions (all measurements are imperial) Commercial load calculator instructions (all measurements are imperial) Basic Tab 1. Enter the design conditions for your area. This only has to be done once unless your performing a load calculation for

More information

Specifying Air Conditioning Requirements for Commercial Buildings in Ethiopia

Specifying Air Conditioning Requirements for Commercial Buildings in Ethiopia International Journal of Research in Engineering and Science (IJRES) ISSN (Online): 2320-9364, ISSN (Print): 2320-9356 Volume 4 Issue 11 ǁ November. 2016 ǁ PP.87-104 Specifying Air Conditioning Requirements

More information

TECAM S.A. harmony. 5PZA Direct Expansion. Air Conditioning Equipment Manufacturer. R-410A PRECISION UNIT 2 Ton 6 Ton / 60 Hz. Tecnología Ambiental

TECAM S.A. harmony. 5PZA Direct Expansion. Air Conditioning Equipment Manufacturer. R-410A PRECISION UNIT 2 Ton 6 Ton / 60 Hz. Tecnología Ambiental TECAM S.A. Tecnología Ambiental R-410A PRECISION UNIT 2 Ton 6 Ton / 60 Hz harmony 5PZA Direct Expansion Registration No.: SC 4696-1 Registration No.: CO-SC 4696-1 Air Conditioning Equipment Manufacturer

More information

Dehumidifying with Dedicated Outdoor Air

Dehumidifying with Dedicated Outdoor Air Dehumidifying with Dedicated Outdoor Air System Configurations Figure 71. Configurations for dedicated outdoor-air systems A dedicated outdoor-air handler separately filters, cools, dehumidifies, heats,

More information

Energy Recovery with Cooling and Heating

Energy Recovery with Cooling and Heating Energy Recovery with Cooling and Heating VersiVent - Model VER Commercial Institutional 2,000-10,000 cfm 3.0 in. wg external static pressure Configurable September 2008 Page The VersiVent Header Model

More information

UNIVERSITY OF MISSOURI Central Station Air-Handling Units March

UNIVERSITY OF MISSOURI Central Station Air-Handling Units March GENERAL: 1. This section provides criteria for the design and installation of air handling units. DESIGN GUIDELINES: Design General 1. Location 1.1. For new construction, and existing buildings where possible,

More information

TECHNICAL REPORT III Mechanical Systems Existing Conditions

TECHNICAL REPORT III Mechanical Systems Existing Conditions TECHNICAL REPORT III Mechanical Systems Existing Conditions TEMPLE UNIVERSITY TYLER SCHOOL OF ART Pennsylvania State University Architectural Engineering Mechanical Option Faculty Adviser: Dr. Jim Freihaut

More information

SR SERIES WATER SOURCE HEAT PUMP SYSTEM SELECTION AND OPTIMIZATION GUIDE

SR SERIES WATER SOURCE HEAT PUMP SYSTEM SELECTION AND OPTIMIZATION GUIDE SR SERIES WATER SOURCE HEAT PUMP SYSTEM SELECTION AND OPTIMIZATION GUIDE Fresh Access Pro http://freshaccesspro.com/erep/ This guide is intended for use by qualified professionals to assist in properly

More information

Adding More Fan Power Can Be a Good Thing

Adding More Fan Power Can Be a Good Thing This article was published in ASHE Journal, May 14. Copyright 14 ASHE. Posted at www.ashrae.org. This article may not be copied and/or distributed electronically or in paper form without permission of

More information

Air Handler Unit (AHU) Equipment Purchase and Delivery Invitation to Bid

Air Handler Unit (AHU) Equipment Purchase and Delivery Invitation to Bid DATE: February 1, 2018 SUBJECT: Letter of Clarification #2 RE: TO: Air Handler Unit (AHU) Equipment Purchase and Delivery Invitation to Bid All Prospective Bidders Houston First Corporation ( HFC ) issues

More information

Practical and Effective Approaches to Residential Ventilation for Production Builders

Practical and Effective Approaches to Residential Ventilation for Production Builders Practical and Effective Approaches to Residential Ventilation for Production Builders by Armin Rudd USDOE Building America Program for Affordable Comfort Conference 2002 Cincinnati, Ohio 18 April 2002

More information

Energy-Efficient Makeup Air Units BY HUGH CROWTHER, P.ENG., MEMBER ASHRAE

Energy-Efficient Makeup Air Units BY HUGH CROWTHER, P.ENG., MEMBER ASHRAE This article was published in ASHRAE Journal, March 20145 Copyright 2015 ASHRAE. Posted at www.ashrae.org. This article may not be copied and/or distributed electronically or in paper form without permission

More information

HVAC Optimization with Cold Air Distribution

HVAC Optimization with Cold Air Distribution PDHonline Course M186 (2 PDH) HVAC Optimization with Cold Air Distribution Instructor: A. Bhatia, B.E. 2012 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA 22030-6658 Phone & Fax: 703-988-0088

More information