Sink faucet Kohler 2007 X 5:

Size: px
Start display at page:

Download "Sink faucet Kohler 2007 X 5:"

Transcription

1 Page _1_of _5 CLIENT INFORMANTION Name: Lansingburgh Central School District Date of Sampling: 10/18/2016 Address: 576 Fifth Ave Troy NY Samples Taken By: Tim LeVan Client Rep: Bob Schongar Samples Taken By: Craig Hansen SCHOOL/PROJECT INFORMATION BLDG NO./NAME: Lansingburgh HighSchool BLDG ADDRESS: 320 Seventh Ave Troy NY CONTACT NAME & NUMBERS: Bob Schongar (1) Yr. Built (2) Yr 1st Add: (3) Yr 2nd Add: (4) Yr 1st Mod: (5) Yr. 2nd Mod: SAMPLE DATA Sample Description ID (ID must match container label) Lab Sample # Outlet Information BOCES Sample # Location Outlet Description Outlet Make & Model Construct. Date First Draw Time of Collection (24hr) Lead Copper 82 LHS-GF-SC-P-82 Pump room Service connection : Remediati on 83 LHS-GF-KS1-P-83 Kitchen Sink Faucet 2015 X 4: LHS-GF-KS2-P-84 Kitchen Sink faucet 2015 X 4: LHS-GF-KS3-P-85 Kitchen Sink faucet 2015 X 4: LHS-GF-KS4-P-86 Kitchen Sink faucet 2015 X 4: LHS-GF-KS5-P-87 Kitchen Sink faucet 2015 X 4: LHS-GF-KS6-P-88 Kitchen Sink faucet 2015 X 4: LHS-GF-KS7-P-89 Kitchen Sink faucet 2015 X 4: LHS-GF-DW-P-90 Cafeteria Water fountain Elkay 2015 X 5: LHS-GF-CF-P-91 Cafeteria Sink faucet Delta 2015 X 5: LHS-GF-BF-P-92 Boys room Sink Faucet Chicago 1965 X 5: LHS-GF-BF-P-93 Girls room Sink faucet Chicago 1965 X 5: LHS-GF-CF-P-94 Auto shop Sink faucet Speakman 1965 X 5: LHS-GF-CF-P-95 Wood shop Sink faucet 1965 X 5: LHS-GF-DW-P-96 Corridor by locker rooms Water fountain Halsey Taylor 1965 X 5: Shut off 97 LHS-GF-BF-P-97 Girls PE coach office Sink faucet Kohler 2007 X 5:

2 98 LHS-GF-GIM-P-98 Girls PE coach office Ice Machine Marvel Scientific 2007 X No result 99 LHS-GF-BF-P-99 Girls locker room Sink faucet Chicago 2007 X 5: LHS-GF-DW-P-100 Girls locker room Water fountain 2007 X 5: LHS-GF-BF-P-101 Boys PE coach office Sink faucet Kohler 2007 X 5: CHAIN OF CUSTODY Relinquished By: Received By: Time: Date: INSTRUCTIONS TO THE LABORATORY - Analize all samples for both lead and copper (Pb and Cu) Lab: Pace Analytical Contact: Comments: Provide Laboratory Data Report (LDR) and Chain of Custody

3 Page _2_of _5 CLIENT INFORMANTION Name: Lansingburgh Central School District Date of Sampling: 10/18/2016 Address: 576 Fifth Ave Troy Ny Samples Taken By: Tim LeVan Client Rep: Bob Schongar Samples Taken By: Craig Hansen SCHOOL/PROJECT INFORMATION BLDG NO./NAME: Lansingburgh High School BLDG ADDRESS: 320 Seventh Ave Troy NY CONTACT NAME & NUMBERS: Bob Schongar (1) Yr. Built (2) Yr 1st Add: (3) Yr 2nd Add: (4) Yr 1st Mod: (5) Yr. 2nd Mod: SAMPLE DATA Sample Description ID (ID must match container label) Lab Sample # BOCES Sample # Location Outlet Description Outlet Information Outlet Make & Model Construct. Date First Draw Time of Collection (24hr) Lead Copper Remediaito n 102 LHS-GF-BIM-P-102 Boys PE coach office Ice Machine Marvel Scientific 2007 X 5: LHS-GF-BF-P-103 Boys locker room Sink faucet Chicago 2007 X 5: LHS-GF-DW-P-104 Weight room Water fountain Elkay 2007 X 5: LHS-GF-HC-P-105 Outdoors of weight room Hose connection 2007 X 5: LHS-GF-KF-P-106 Outside concession stand Sink Faucet 2007 X 5: Shut off LHS-GF-DW1-P- ADA water 107 Gym lobby Elkay 2007 X 5: fountain LHS-GF-DW2-P- 108 Gym Lobby Water fountain Elkay 2007 X 5: LHS-GF-KF-P-109 Inside concession stand Sink faucet Moan 2007 X 5: LHS-GF-BF-P-110 Girls room Sink faucet Chicago 2007 X 5: LHS-GF-BF-P-111 Boys room Sink faucet Chicago 2007 X 5: LHS-GF-BF1-P-112 Girls room off gym Sink faucet 1 Chicago 2007 X 5: LHS-GF-BF2-P-113 Girls room off gym Sink faucet 2 Chicago 2007 X 5: LHS-GF-BF1-P-114 Boys room off gym Sink faucet 1 Chicago 2007 X 5: LHS-GF-BF2-P-115 Boys room off gym Sink faucet 2 Chicago 2007 X 5: LHS-GF-HC-P-116 Outdoors of boys room Hose connection 2007 X 5: LHS-GF-BF-P-117 Athletic director office Sink faucet Chicago 2007 X 5:

4 118 LHS-GF-IM-P-118 Athletic director office Ice machine Manitowoc 2007 X 5: < LHS-GF-HC-P-119 Outdoors Northeast end of gym Hose connection : LHS-01-BF-P-120 Music wing faculty ladies room Sink faucet X 5: LHS-01-BF-P-121 Music wing faculty ladies room Sink faucet : LHS-01-BF-P-122 Music wing boys room Sink faucet X 5: All containers are pre-cleaned/pre-certified 250ml plastic bottles and will be preserved w/hno3@ ph by lab CHAIN OF CUSTODY Relinquished By: Received By: Time: Date: INSTRUCTIONS TO THE LABORATORY - Analize all samples for both lead and copper (Pb and Cu) Lab: Pace Analytical Contact: Comments: Provide Laboratory Data Report (LDR) and Chain of Custody

5 Page _3_of _5 CLIENT INFORMANTION Name: Lansingburgh Central School District Date of Sampling: 10/18/2016 Address: 576 Fifth Ave Troy Ny Samples Taken By: Tim LeVan Client Rep: Bob Schongar Samples Taken By: Craig Hansen SCHOOL/PROJECT INFORMATION BLDG NO./NAME: Lansingburgh High School BLDG ADDRESS: 320 Seventh Ave Troy NY CONTACT NAME & NUMBERS: Bob Schongar (1) Yr. Built (2) Yr 1st Add: (3) Yr 2nd Add: (4) Yr 1st Mod: (5) Yr. 2nd Mod: SAMPLE DATA Sample Description ID (ID must match container label) Lab Sample # Outlet Information BOCES Sample # Location Outlet Description Outlet Make & Model Construct. Date First Draw Time of Collection (24hr) Lead Copper Remediati on 123 LHS-01-BF-P-123 Music wing boys room Sink faucet 2 Kohler 1965 X 5: LHS-01-BF1-P-124 Girls room near 156 Sink faucet 1 Chicago 1965 X 5: LHS-01-BF2-P-125 Girls room near 156 Sink faucet 2 Chicago 1965 X 5: LHS-01-BF1-P-126 Boys room near 156 Sink faucet 1 Chicago 1965 X 5: LHS-01-BF2-P-127 Boys room near 156 Sink faucet 2 Chicago 1965 X 5: LHS-01-DW-P-128 Corridor across from 152 Water fountain Haley Taylor 1965 X 5: Shut off 129 LHS-01-CF1-P Sink faucet X 5: Shut off 130 LHS-01-CF2-P Sink faucet X 5: LHS-01-CF1-P Sink faucet 1 T&S 1965 X 5: LHS-01-CF2-P Sink faucet X 5: LHS-01-CF3-P Sink faucet 3 T&S 1965 X 5: LHS-01-DW-P-134 Corridor across from 147 Water fountain Elkay 1965 X 5:40 < LHS-01-CF1-P Sink faucet 1 Chicago 1965 X 5: LHS-01-CF2-P Sink faucet 2 Chicago 1965 X 5: LHS-01-CF3-P Sink faucet 3 Chicago 1965 X 5: LHS-01-BF1-P-138 Boys room Sink faucet X 5: LHS-01-BF2-P-139 Boys room Sink faucet X 5:

6 140 LHS-01-BF1-P-140 Girls room Sink faucet X 5: LHS-01-BF2-P-141 Girls room Sink faucet X 5: LHS-01-BF3-P-142 Girls room Sink faucet X 5: LHS-01-BF4-P-143 Girls room Sink faucet X 5: All containers are pre-cleaned/pre-certified 250ml plastic bottles and will be preserved w/hno3@ ph by lab CHAIN OF CUSTODY Relinquished By: Received By: Time: Date: INSTRUCTIONS TO THE LABORATORY - Analize all samples for both lead and copper (Pb and Cu) Lab: Pace Analytical Contact: Comments: Provide Laboratory Data Report (LDR) and Chain of Custody

7 Page _4_of _5_ CLIENT INFORMANTION Name: Lansingburgh Central School District Date of Sampling: 10/18/2016 Address: 576 Fifth Ave Troy Ny Samples Taken By: Tim LeVan Client Rep: Bob Schongar Samples Taken By: Craig Hansen SCHOOL/PROJECT INFORMATION BLDG NO./NAME: Lansingburgh High School BLDG ADDRESS: 320 Seventh Ave Troy NY CONTACT NAME & NUMBERS: Bob Schongar (1) Yr. Built (2) Yr 1st Add: (3) Yr 2nd Add: (4) Yr 1st Mod: (5) Yr. 2nd Mod: SAMPLE DATA Sample Description ID (ID must match container label) Lab Sample # BOCES Sample # Location Outlet Description Outlet Information Outlet Make & Model Construct. Date First Draw Time of Collection (24hr) Lead Copper Remediaiton 144 LHS-01-CF-P Sink faucet Chicago 1965 X 5: LHS-01-CF-P Sink faucet Chicago 1965 X 5: LHS-01-CF1-P Sink faucet 1 Chicago 1965 X 5: LHS-01-CF2-P Sink faucet 2 Chicago 1965 X 5: LHS-01-CF3-P Sink faucet 3 Chicago 1965 X 5: LHS-01-DW-P-149 Corridor outside 142 Water fountain Halsey Taylor 1965 X 5: Shut off 150 LHS-01-CF1-P Sink faucet 1 Chicago 1965 X 5: LHS-01-CF2-P Sink faucet 2 Chicago 1965 X 5: LHS-01-CF3-P Sink faucet 3 Chicago 1965 X 5: LHS-01-HC-P-153 Courtyard media center side Hose connection 1965 X 5: Capped off 154 LHS-01-HC-P-154 Outside southeast corner of Cafeteria Hose connection 1965 X 5: Shut off/capped 155 LHS-01-BF-P-155 Media center Sink faucet Chicago X 5: LHS-01-SF-P-156 Media center office Sink faucet X 5: LHS-01-DW-P LHS-02-DW-P-158 Corridor across from 1st floor media center Corridor across from 2nd floor media center Water fountain Elkay X 5: Water fountain Elkay X 5:

8 159 LHS-02-BF-P-159 Media center 2nd floor Sink faucet Chicago X 5: LHS-02-BF1-P-160 Boys room across from 248 Sink faucet X 5: LHS-02-BF2-P-161 Boys room across from 248 Sink faucet X 5: LHS-02-BF3-P-162 Boys room across from 248 Sink faucet X 5: LHS-02-BF-P-163 Faculty men s room Sink faucet 1965 X 5: All containers are pre-cleaned/pre-certified 250ml plastic bottles and will be preserved w/hno3@ ph by lab CHAIN OF CUSTODY Relinquished By: Received By: Time: Date: INSTRUCTIONS TO THE LABORATORY - Analize all samples for both lead and copper (Pb and Cu) Lab: Pace Analytical Contact: Comments: Provide Laboratory Data Report (LDR) and Chain of Custody

9 Page _5_of _5 CLIENT INFORMANTION Name: Lansingburgh Central School District Date of Sampling: 10/18/2016 Address: 576 Fifth Ave Troy Ny Samples Taken By: Tim LeVan Client Rep: Bob Schongar Samples Taken By: Craig Hansen SCHOOL/PROJECT INFORMATION BLDG NO./NAME: Lansingburgh High School BLDG ADDRESS: 320 Seventh Ave Troy NY CONTACT NAME & NUMBERS: Bob Schongar (1) Yr. Built (2) Yr 1st Add: (3) Yr 2nd Add: (4) Yr 1st Mod: (5) Yr. 2nd Mod: SAMPLE DATA Sample Description ID (ID must match container label) Lab Sample # BOCES Sample # Location Outlet Description Outlet Information Outlet Make & Model Construct. Date First Draw Time of Collection (24hr) Lead Copper 164 LHS-02-BF-P-164 Faculty women s room Sink faucet 1965 X 5: Remediati on 165 LHS-02-CF-P Faculty room Sink faucet Delta 1965 X 5: LHS-02-DW-P-166 Corridor outside 242 Water fountain Halsey Taylor 1965 X 5: Shut off 167 LHS-02-DW-P-167 Corridor outside 250 Water fountain Elkay 1965 X 5: LHS-02-DW-P-168 Corridor outside 251 Water fountain Halsey Taylor 1965 X 5: Shut off 169 LHS-02-CF1-P Sink faucet 1 Kohler 1965 X 6: LHS-02-CF2-P Sink faucet 2 Kohler 1965 X 6: LHS-02-BF-P-171 Boys room across from 260 Sink faucet Chicago 1965 X 6: LHS-02-BF-P-172 aculty across from 260 Sink faucet Chicago 1965 X 6: LHS-02-BF1-P-173 Girls room next to stairwell Sink faucet X 6: LHS-02-BF1-P-174 Girls room next to stairwell Sink faucet X 6: LHS-02-BF1-P-175 Girls room next to stairwell Sink faucet X 6: A LHS-GF-KS8-P-89A Kithchen Kitchen Steam X 4: B LHS-GF-KS9-P-89B Kitchen Kitchen Steam X 4: A LHS-01-DW-P-123A Corridor near 185 X 5:

10 All containers are pre-cleaned/pre-certified 250ml plastic bottles and will be preserved ph by lab CHAIN OF CUSTODY Relinquished By: Received By: Time: Date: INSTRUCTIONS TO THE LABORATORY - Analize all samples for both lead and copper (Pb and Cu) Lab: Pace Analytical Contact: Comments: Provide Laboratory Data Report (LDR) and Chain of Custody

ENGINEERING REPORT - MECHANICAL / ELECTRICAL / PLUMBING

ENGINEERING REPORT - MECHANICAL / ELECTRICAL / PLUMBING Mechanical Systems Information The mechanical system at Reed Middle School is comprised of seventy six Trane DX/Gas rooftop units (RTUs). The recommended useful life for DX equipment is 15 years. Seventy

More information

The school s metal push-out windows were assessed and nothing of concern was noted.

The school s metal push-out windows were assessed and nothing of concern was noted. February 15, 2017 Courtney Wilton Portland Public Schools 501 North Dixon Portland, OR 97227 Via email: Regarding: cwilton@pps.net Lead Paint Condition Assessment Faubion at Tubman 2231 N Flint Avenue

More information

3. 21st Century Learning A. Districtwide Flexible Learning - Allowance for Flexible Furniture $600,000 Subtotal $600,000

3. 21st Century Learning A. Districtwide Flexible Learning - Allowance for Flexible Furniture $600,000 Subtotal $600,000 1. Safety and Security A. Additional Cameras District Wide $382,000 B. Interior Locks Upgrades Allowance $300,000 C. Tilden Entrance Upgrades D. Door and Glass Improvements Allowance $500,000 E. Alert

More information

HAVE A SAMPLING AND ANALYSIS PLAN (SAP)

HAVE A SAMPLING AND ANALYSIS PLAN (SAP) THE HOW TO OF SAMPLING, TRANSPORTING, AND DELIVERY HAVE A SAMPLING AND ANALYSIS PLAN (SAP) INCLUDE SAMPLING LOCATIONS NUMBERS AND TYPES OF SAMPLES TO BE COLLECTED QUALITY CONTROL REQUIREMENTS OF THE PROJECT

More information

FORT ERIE SECONDARY SCHOOL FACILITY INFORMATION. Lake Erie Corridor Secondary Schools Accommodation Review

FORT ERIE SECONDARY SCHOOL FACILITY INFORMATION. Lake Erie Corridor Secondary Schools Accommodation Review FORT ERIE SECONDARY SCHOOL FACILITY INFORMATION Lake Erie Corridor Secondary Schools Accommodation Review November 2012 LAKE ERIE CORRIDOR SECONDARY SCHOOLS ACCOMMODATION REVIEW Fort Erie Secondary School

More information

NYC Department of Education

NYC Department of Education Asset: P.S. 183 - QUEENS, 2-45 B 79 STREET, New York, 11693 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-03-02 8:32 AM 2018-05-16 1:44 PM Asset Data Are there fuel tanks? Total

More information

Lead in Priority Area Sampling Report Naval Air Station Patuxent River

Lead in Priority Area Sampling Report Naval Air Station Patuxent River Lead in Priority Area Sampling Report Naval Air Station Patuxent River Contract Number N40080-14-D-0453 TASK ORDER# 0003 Lead in Priority Areas (LIPA) Sampling at Activities (Schools, CDC & YC) within

More information

TALLEY STREET ELEMENTARY SCHOOL CITY SCHOOLS OF DECATUR COMMUNITY PRESENTATION DECEMBER 6, 2017

TALLEY STREET ELEMENTARY SCHOOL CITY SCHOOLS OF DECATUR COMMUNITY PRESENTATION DECEMBER 6, 2017 TALLEY STREET ELEMENTARY SCHOOL CITY SCHOOLS OF DECATUR COMMUNITY PRESENTATION DECEMBER 6, 2017 AGENDA INTRODUCTIONS RECAP OF CONSTITUENT INPUT WHAT WE HEARD SITE PLAN PRECEDENT IDEAS WHERE WE ARE 06.23.17

More information

WATER QUALITY TESTING FOR SCHAUMBURG COMMUNITY CONSOLIDATED SCHOOL DISTRICT 54 HOOVER SCHAUMBURG, ILLINOIS OCTOBER 3, 2017 PROJECT NUMBER:

WATER QUALITY TESTING FOR SCHAUMBURG COMMUNITY CONSOLIDATED SCHOOL DISTRICT 54 HOOVER SCHAUMBURG, ILLINOIS OCTOBER 3, 2017 PROJECT NUMBER: WATER QUALITY TESTING FOR SCHAUMBURG COMMUNITY CONSOLIDATED SCHOOL DISTRICT 54 HOOVER SCHAUMBURG, ILLINOIS OCTOBER 3, 2017 PROJECT NUMBER: 17-18350 1550 Hubbard Ave., Batavia, IL 60510, 630-879-3006 Schaumburg

More information

Food needs to be in sealed containers 03. FOOD: Unsealed, left in

Food needs to be in sealed containers 03. FOOD: Unsealed, left in 01A. ODOR: Unusual or 6/14/2017 14:15offensive Boys room Urine smell 01A. ODOR: Unusual or 6/14/2017 15:16offensive Office Odor and poor air flow x 01B. TEMPERATURE: 6/14/2017 13:42Uncomfortable 202 Warm

More information

LINCOLN HIGH SCHOOL MODERNIZATION BEX IV COMMUNITY MEETING JUNE 23, 2016

LINCOLN HIGH SCHOOL MODERNIZATION BEX IV COMMUNITY MEETING JUNE 23, 2016 LINCOLN HIGH SCHOOL MODERNIZATION BEX IV COMMUNITY MEETING JUNE 23, 2016 PROJECT OVERVIEW PROJECT OVERVIEW + PRE-DESIGN BEGAN IN FALL OF 2015 + EXISTING CONDITIONS ANALYSIS + PROJECTED GROWTH IN HIGH SCHOOL

More information

VOTER BOND REFERENDUM 2018 SUMMARY OF WORK PROPOSED

VOTER BOND REFERENDUM 2018 SUMMARY OF WORK PROPOSED Ashton Elementary School 1 Masonry Repair $ 42,781.50 2 Replace HVAC $ 375,000.00 3 Replace SAT @ Various Locations $ 92,364.00 3 Recoat & Resurface Exterior Paved Play Area $ 135,978.30 3 Various Technological

More information

EMSL Analytical, Inc.

EMSL Analytical, Inc. Phone: (856) 303-2500 Fax: (856) 858-4571 Email: 9/1/2016 The following analytical report covers the analysis performed on samples submitted to EMSL Analytical, Inc. on 8/31/2016. The results are tabulated

More information

NYC Department of Education

NYC Department of Education Asset: JEFFERSON AF - BROOKLYN, 125-08 FLATLANDS AVENUE, New York, 11208 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-05-07 8:39 AM 2018-05-08 2:04 PM Asset Data Are there fuel

More information

DUKE UNIVERSITY CONSTRUCTION STANDARDS

DUKE UNIVERSITY CONSTRUCTION STANDARDS 1 22 40 00 Plumbing Fixtures 1. General A. Definitions 1. Section includes a. Water closets and urinals b. Lavatories, sinks, and service sinks c. Electric water coolers, drinking fountains, d. Showers

More information

Ichabod Crane Central School District 2018 Capital Project Preliminary Estimate

Ichabod Crane Central School District 2018 Capital Project Preliminary Estimate Health & Safety 1,399,000 Academics & Program 17,140,800 Physical Education & Athletics 5,922,000 Building Infrastructure 3,103,800 Site Infrastructure 1,049,600 TOTAL SCOPE OF WORK 28,615,200 PROPOSED

More information

PBS did not observe any paint chips on soil at the school, and no areas of major concern were observed.

PBS did not observe any paint chips on soil at the school, and no areas of major concern were observed. January 6, 2017 Courtney Wilton Portland Public Schools 501 North Dixon Portland, OR 97227 Via email: Regarding: cwilton@pps.net Lead Paint Condition Assessment Cleveland High School 3400 SE 26th Avenue

More information

NEIGHBORS SOUTHWEST NEIGHBORHOOD MEETING December 17, 2014 BEAVERTON SCHOOL DISTRICT SOUTH COOPER MOUNTAIN HIGH SCHOOL

NEIGHBORS SOUTHWEST NEIGHBORHOOD MEETING December 17, 2014 BEAVERTON SCHOOL DISTRICT SOUTH COOPER MOUNTAIN HIGH SCHOOL NEIGHBORS SOUTHWEST NEIGHBORHOOD MEETING December 17, 2014 AGENDA NEIGHBORHOOD MEETING Design Criteria Review 3 Concepts Discussion Q&A DESIGN CRITERIA NEIGHBORHOOD MEETING IMAGE & IDENTITY CIVIC PRESENCE

More information

IEQ SCHOOL DATA BASE. School Name: Reservoir High School Principal: Patrick Saunderson DATE: 1/23/2017. WORK ORDER NUMBER of POTENTIAL IEQ

IEQ SCHOOL DATA BASE. School Name: Reservoir High School Principal: Patrick Saunderson DATE: 1/23/2017. WORK ORDER NUMBER of POTENTIAL IEQ LOOK-FORS ROOM/LOCATION COMMENTS ADMIN FACILITIES WORK ORDER NUMBER of POTENTIAL IEQ DATE ASSIGNED COMPLETION DATE 30 DAY REVISIT CLOSED 1. No unusual or offensive odors, or temperature discomfort 316,

More information

NYC Department of Education

NYC Department of Education Asset: P.S. 198 - BRONX, 1180 TINTON AVENUE, New York, 10456 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-01-24 8:14 AM 2018-01-24 9:32 PM Asset Data Are there fuel tanks? Total

More information

NYC Department of Education

NYC Department of Education Asset: NEW UTRECHT AF - BROOKLYN, 1601 80 STREET, New York, 11214 Inspection Id Inspection Type Time In Last Edited SA : Architectural - Senior 2017-10-31 4:06 PM 2018-06-13 10:51 AM AA : Architectural

More information

UNIVERSITY OF WISCONSIN-PLATTEVILLE REQUEST FOR ARCHITECTURE & ENGINEERING PRE-PLANNING & DESIGN SERVICES. for. Williams Fieldhouse - Phase I

UNIVERSITY OF WISCONSIN-PLATTEVILLE REQUEST FOR ARCHITECTURE & ENGINEERING PRE-PLANNING & DESIGN SERVICES. for. Williams Fieldhouse - Phase I UNIVERSITY OF WISCONSIN-PLATTEVILLE REQUEST FOR ARCHITECTURE & ENGINEERING PRE-PLANNING & DESIGN SERVICES for Williams Fieldhouse - Phase I 2007-2009 August 2007 DSF # 07E2H TABLE OF CONTENTS Scope of

More information

Master Facility Planning Update School Board Meeting May 26, 2016

Master Facility Planning Update School Board Meeting May 26, 2016 Master Facility Planning Update School Board Meeting May 26, 2016 Master Facilities Committee Overview Reflection of Committee Work Review of District Wide Facility Issues Identified District Wide Facility

More information

CUSTODIAL CUSTOMER SERVICE GUIDE

CUSTODIAL CUSTOMER SERVICE GUIDE CUSTODIAL CUSTOMER SERVICE GUIDE INSIDE what we clean & how often we clean it 2. Classrooms & Teaching Labs 3. Research Labs & Halls & Lobbies 4. Offices & Restrooms 5. Stairwells & Conference Rooms 6.

More information

NYC Department of Education

NYC Department of Education Asset: COLUMBUS AF - BRONX, 925 ASTOR AVENUE, New York, 10469 Inspection Id Inspection Type Time In Last Edited SA : Architectural - Senior 2017-10-31 9:21 AM 2017-11-29 8:45 AM AA : Architectural - Associate

More information

DESIGN GUIDELINES AND TECHNICAL STANDARDS

DESIGN GUIDELINES AND TECHNICAL STANDARDS DESIGN GUIDELINES AND TECHNICAL STANDARDS Date of Issuance: January 1, 2014 DIVISION 22 PLUMBING SECTION 22 1118 DOMESTIC WATER DISTRIBUTION SYSTEM 1. General: This section outlines general requirements

More information

NYACK PUBLIC SCHOOLS CAPITAL IMPROVEMENT PLANNING PROCESS

NYACK PUBLIC SCHOOLS CAPITAL IMPROVEMENT PLANNING PROCESS NYACK PUBLIC SCHOOLS CAPITAL IMPROVEMENT PLANNING PROCESS DECEMBER 3, 2013 KEY QUESTIONS 1. What is the time sequence for available funding? (In what years will the funding be available?) 2. What is the

More information

NYC Department of Education

NYC Department of Education Asset: P.S. 194 - MANHATTAN, 244 WEST 144 STREET, New York, 10030 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2017-12-12 10:48 AM 2018-01-29 10:54 AM Asset Data Are there fuel tanks?

More information

School District of Milton 5- Year Capital Maintenance and Improvement Plan

School District of Milton 5- Year Capital Maintenance and Improvement Plan Updated - 02/21/17 School District of Milton 5- Year Capital Maintenance and Improvement Plan 101 East Elementary 1 Parking Lot/Traffic Flow Project 615,175 Includes Construction and Engineering 2 Bathroom

More information

NYC Department of Education

NYC Department of Education Asset: P.S. 19 - STATEN ISLAND, 780 POST AVENUE, New York, 10310 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2017-10-26 8:58 AM 2017-11-14 1:37 PM Asset Data Are there fuel tanks?

More information

NYC Department of Education

NYC Department of Education Asset: A. PHILLIP RANDOLPH HS - MANHATTAN, 443 WEST 135 STREET, New York, 10031 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-02-02 8:11 AM 2018-06-14 1:21 PM Asset Data Are there

More information

CAPITAL OUTLAY REQUEST - IDENTIFIED AND EMERGING PROJECTS - RANKED 3-Jun-14

CAPITAL OUTLAY REQUEST - IDENTIFIED AND EMERGING PROJECTS - RANKED 3-Jun-14 2014-2015 CAPITAL OUTLAY REQUEST - IDENTIFIED AND EMERGING PROJECTS - RANKED 3-Jun-14 School Item Amount a. Classroom A/R (Increase CR capacity to 804, add l Resource and tutoring spaces needed. Teacher

More information

Quality and durability. Interchangeability. Bath Shower Valve/Eyewash Laboratory Faucet Water conservation.

Quality and durability. Interchangeability. Bath Shower Valve/Eyewash Laboratory Faucet Water conservation. Schools & Education Schools & Education For decades, T&S Brass has been supplying quality faucets and plumbing products to a wide variety of markets, including schools and education. With more than 60

More information

NYC Department of Education

NYC Department of Education Architectural Inspection Building Assessment Survey 2017-2018 Asset: LEHMAN AF - BRONX, 3000 EAST TREMONT AVENUE, New York, 10461 Inspection Id Inspection Type Time In Last Edited SA : Architectural -

More information

New High School Concept

New High School Concept Approved Bond Projects for Alamance-Burlington Schools In November 2018, Alamance County citizens approved a $150 million bond project proposal. Bond funds will pay to construct a new high school and provide

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

Michigan State University Barrier-Free/Accessibility Project Status Summary March 2017

Michigan State University Barrier-Free/Accessibility Project Status Summary March 2017 Projects Completed FY14, FY15 and FY16 (arranged alphabetically) Abrams Planetarium Install automatic door opener on main doors of the Planetarium. Completed: Summer 2016 Cost: $13,000 Akers Hall Renovations

More information

Updated: 5/6/16. Facility and Property Information Package

Updated: 5/6/16. Facility and Property Information Package Updated: 5/6/16 Facility and Property Information Package Purpose This package is put together to provide general information to District Administration, the School board and the public. The information

More information

NYC Department of Education

NYC Department of Education Asset: P.S. 92 - BROOKLYN, 601 PARKSIDE AVENUE, New York, 11226 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2017-11-13 8:31 AM 2017-11-27 11:43 AM Asset Data Are there fuel tanks?

More information

NYC Department of Education

NYC Department of Education Asset: P.S. 2 - MANHATTAN, 122 HENRY STREET, New York, 10002 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-01-05 9:21 AM 2018-01-16 12:15 PM Asset Data Are there fuel tanks? Total

More information

NYC Department of Education

NYC Department of Education Asset: P.S. 23 - BROOKLYN, 545 WILLOUGHBY AVENUE, New York, 11206 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-05-31 8:47 AM 2018-06-05 3:45 PM Asset Data Are there fuel tanks?

More information

Tillamook High School Bond Projects

Tillamook High School Bond Projects Tillamook High School Bond Projects School Project Description All Buildings Upgrade fire alarm H&S All Buildings Add door lock capability from inside rooms Security All Buildings Install card lock entry

More information

Yale University Design Standards

Yale University Design Standards Change History Date Description of Change Pages / Sections Modified Change Approver Initials 3/26/13 Add text encouraging discussion of innovation in 2 15410, A (Summary) SO newly available products. 3/26/13

More information

NYC Department of Education

NYC Department of Education Asset: P.S. 224 ANNEX - QUEENS, 221-21 CORBETT ROAD, New York, 11361 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-03-28 12:27 PM 2018-04-04 5:15 PM Asset Data Are there fuel tanks?

More information

NYC Department of Education Building Condition Assessment Survey :49AM :00PM

NYC Department of Education Building Condition Assessment Survey :49AM :00PM School: InspectionId Asset Data Inspection Type Building Assessment Survey 05-06 P.S. 70 - BROOKLYN, 4 EMERSON PLACE, BROOKLYN, NY, 05 Time In Last Edited 476 MECHANICAL 05-- 08:49AM 05-- 03:00PM Have

More information

NYC Department of Education

NYC Department of Education Asset: I.S. 45 - BRONX, 2502 LORILLARD PLACE, New York, 10458 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2017-12-05 9:14 AM 2017-12-20 11:42 AM Asset Data Are there fuel tanks? Total

More information

Updated: 8/16/ Facilities Profile

Updated: 8/16/ Facilities Profile Updated: 8/16/17 2017-2018 Facilities Profile Purpose This package is put together to provide general information to District Administration, the School board and the public. The information contained

More information

GENERAL PLUMBING REQUIREMENTS

GENERAL PLUMBING REQUIREMENTS 22 00 00 GENERAL PLUMBING REQUIRMENTS i. 00 00 07 Design Professional Design Process Requirements ii. 00 00 08 Design Professional Documentation Requirements and Deliverables iii. 01 81 00 Facility Performance

More information

MONROE-WOODBURY C E NTRAL S C HOO L DI S TRICT

MONROE-WOODBURY C E NTRAL S C HOO L DI S TRICT MONROE-WOODBURY C E NTRAL S C HOO L DI S TRICT Monroe-Woodbu,y High S chool T: (845 ) 460-7000 155 Dunderberg Road, Central Valley, New York 10917 F: (845) 460-7098 Matthew Krava tz, Interim Principal

More information

WATER WISE SURV EY. Santa Barbara City College

WATER WISE SURV EY. Santa Barbara City College WATER WISE SURV EY FI N AL REPORT Santa Barbara City College August 21, 2013 Prepared By City of Santa Barbara Water Conservation Program WATER WISE SURVEY OF SANTA BARBARA CITY COLLEGE EXECUTIVE SUMMARY

More information

NYC Department of Education

NYC Department of Education Asset: J. K. ONASSIS HS FOR INT CAREERS-M, 120 WEST 46 STREET, New York, 10036 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2017-12-11 11:37 AM 2017-12-26 12:18 PM Asset Data Are there

More information

LOT # DESCRIPTION QTY

LOT # DESCRIPTION QTY Peak Auctioneering -- Building Material Auction Specialists 1628 W. Ninth St., P.O. Box 014141 Kansas City, MO 64101 Office (816)474-1982; Fax (816)474-4405 www.peakauction.com LOT # DESCRIPTION QTY 5001

More information

If the address on this form is different than the address of the building, submit a written explanation.

If the address on this form is different than the address of the building, submit a written explanation. ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

2). Crane Co. 4). Kohler Co. 5). Universal-Rundle Corp. Revised September 29, 2017 Commercial Plumbing Fixtures

2). Crane Co. 4). Kohler Co. 5). Universal-Rundle Corp. Revised September 29, 2017 Commercial Plumbing Fixtures PART 1: GENERAL A. This Section provides design standards for plumbing fixtures and trim. Certification of compliance with specified ANSI, UL, and ASHRAE Standards will be required, as appropriate, for

More information

WILLIAM & MARY CUSTODIAL TASK & FREQUENCY LIST. PUBLIC SPACE: ENTRANCES, LOBBIES, AND CORRIDORS Daily Weekly Monthly Quarterly Yearly

WILLIAM & MARY CUSTODIAL TASK & FREQUENCY LIST. PUBLIC SPACE: ENTRANCES, LOBBIES, AND CORRIDORS Daily Weekly Monthly Quarterly Yearly WILLIAM & MARY CUSTODIAL TASK & FREQUENCY LIST PUBLIC SPACE: ENTRANCES, LOBBIES, AND CORRIDORS Daily Weekly Monthly Quarterly Yearly Collect & properly dispose of recycling as needed Dust, or wipe all

More information

IEQ SCHOOL DATA BASE

IEQ SCHOOL DATA BASE LOOK-FORS ROOM/LOCATION COMMENTS ADMIN FACILITIES WORK ORDER NUMBER of POTENTIAL IEQ ASSIGNED COMPLETION 30 DAY REVISIT CLOSED 1. No unusual or offensive odors, or temperature discomfort 15-21 - 8-2 -

More information

PBS observed paint chips in the garden, which is located approximately six to 10 feet from painted surfaces that were in intact condition.

PBS observed paint chips in the garden, which is located approximately six to 10 feet from painted surfaces that were in intact condition. December 30, 2016 Courtney Wilton Portland Public Schools 501 North Dixon Portland, OR 97227 Via email: Regarding: cwilton@pps.net Lead Paint Condition Assessment Arleta Elementary School 5109 SE 66th

More information

Inspector: PROPERTY INFORMATION Photo Smoke Detector Notification Control Panel Stand Alone Smoke Detector Dialer SUMMARY ONLY

Inspector: PROPERTY INFORMATION Photo Smoke Detector Notification Control Panel Stand Alone Smoke Detector Dialer SUMMARY ONLY FIRE ALARM INSPECTION AND TESTING SUMMARY PAGE PER 2013 NFPA 72 Inspector: Jim Smith Test Date: 5/22/2014 PROPERTY INFORMATION Name of Property: Windsor Tower Owner of Property: Jim Gibbs Properties Address:

More information

November 29, Courtney Wilton Portland Public Schools 501 North Dixon Portland, OR 97227

November 29, Courtney Wilton Portland Public Schools 501 North Dixon Portland, OR 97227 November 29, 2016 Courtney Wilton Portland Public Schools 501 North Dixon Portland, OR 97227 Via email: Regarding: cwilton@pps.net Lead Paint Condition Assessment Duniway Elementary School 7700 SE Reed

More information

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Plumbing Standards

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Plumbing Standards Date Description of Change Pages / Sections Modified ID 8/5/17 Entire document - mgl PART 1 - INTRODUCTION 1.1 This section applies to Plumbing for campus institutional facilities. A. Purpose: Yale University

More information

Allisonville Elementary School Facilities Highlights Built: 1960 Last Major Renovation: 28 years ago Capacity: 650 Current Enrollment: 767

Allisonville Elementary School Facilities Highlights Built: 1960 Last Major Renovation: 28 years ago Capacity: 650 Current Enrollment: 767 Allisonville Elementary School Built: 1960 Last Major Renovation: 28 years ago Capacity: 650 Current Enrollment: 767 ADA improvements are Fire alarms need to be updated Playground equipment needs to be

More information

GENERAL PLUMBING REQUIREMENTS

GENERAL PLUMBING REQUIREMENTS 22 00 00 GENERAL PLUMBING REQUIRMENTS 1. GENERAL A. Related sections: i. 00 00 07 Design Professional Design Process Requirements ii. 00 00 08 Design Professional Documentation Requirements and Deliverables

More information

dusty. Room shakes and Student restrooms across All vents need cleaning

dusty. Room shakes and Student restrooms across All vents need cleaning Timestamp Observation: 01B. TEMPERATURE: Room Number or Location/Name: Comments for this room: ADMINISTRATION CUSTODIAL 6/1/2017 15:08:34 Uncomfortable 01B. TEMPERATURE: 310 Etremely warm 6/1/2017 15:11:42

More information

NYC Department of Education

NYC Department of Education Asset: P.S. 111 - MANHATTAN, 440 WEST 53 STREET, New York, 10019 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-03-16 8:47 AM 2018-03-21 8:02 AM Asset Data Are there fuel tanks?

More information

NYC Department of Education

NYC Department of Education Asset: P.S. 160 - BROOKLYN, 5105 FORT HAMILTON PARKWAY, New York, 11219 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-04-03 8:01 AM 2018-05-18 1:45 PM Asset Data Are there fuel

More information

Alternative Parking Spaces + 80 under building. Bike Path Access. New Toilet Facility. Pre-school. Drop-off. Drop-off. mbta Mass Ave.

Alternative Parking Spaces + 80 under building. Bike Path Access. New Toilet Facility. Pre-school. Drop-off. Drop-off. mbta Mass Ave. Alternative 1 04/04/18 P.S. COMMUNITY P.E P.E.. renovate Fusco & Collomb expand Fusco compact floor plan 225 + 80 parking spaces PERFORMING PARKING UNDER distinct entrances community spaces on same floor

More information

NYC Department of Education

NYC Department of Education Asset: P.S. 161 - MANHATTAN, 499 WEST 133 STREET, New York, 10027 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-03-15 8:26 AM 2018-06-08 1:37 PM Asset Data Are there fuel tanks?

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

NYC Department of Education

NYC Department of Education Asset: P.S. 32 - BRONX, 690 EAST 183 STREET, New York, 10458 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2017-11-13 9:25 AM 2017-11-16 5:46 PM Asset Data Are there fuel tanks? Total

More information

NYC Department of Education

NYC Department of Education Asset: LIBERTY HS - MANHATTAN, 250 WEST 18 STREET, New York, 10011 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-01-29 11:32 AM 2018-02-01 10:16 AM Asset Data Are there fuel tanks?

More information

NYC Department of Education

NYC Department of Education Asset: P.S. 128 - MANHATTAN, 560 WEST 169 STREET, New York, 10032 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2017-12-07 8:50 AM 2018-06-14 1:16 PM Asset Data Are there fuel tanks?

More information

NYC Department of Education

NYC Department of Education Asset: I.S. 131 - BRONX, 885 BOLTON AVENUE, New York, 10473 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2017-10-17 8:54 AM 2017-12-05 5:41 PM Asset Data Are there fuel tanks? Total

More information

NYC Department of Education

NYC Department of Education NYC Department of Education Building Assessment Survey 2017-2018 Asset: P.S. 16 - BROOKLYN, 157 WILSON STREET, New York, 11211 Inspection Id Inspection Type Time In Last Edited EE : Electrical 2017-11-30

More information

DESIGN STANDARDS SECTION Toilet rooms and utility rooms to have floor drains at lowest point.

DESIGN STANDARDS SECTION Toilet rooms and utility rooms to have floor drains at lowest point. PART 1 - GENERAL 1.01 Toilet rooms and utility rooms to have floor drains at lowest point. 1.02 Utilize Exposed Flushometers. 1.03 Utilize wall hung toilet room fixtures. Urinals for handicapped may be

More information

ALLEGHANY COUNTY PUBLIC SCHOOLS Maintenance Work Request Completion Analysis

ALLEGHANY COUNTY PUBLIC SCHOOLS Maintenance Work Request Completion Analysis ALLEGHANY COUNTY PUBLIC SCHOOLS Maintenance Work Request Completion Analysis 204-205 YEAR-TO-DATE Custodial Supplies 88.00 9.50 $,643. $26,39.60 $27,782.7 Preventive Maintenance 67.00,74.00 $20,372.68

More information

CORRALES INTERNATIONAL SCHOOL TENANT IMPROVEMENT 5500 WILSHIRE AVE NE ALBUQUERQUE, NM 87113

CORRALES INTERNATIONAL SCHOOL TENANT IMPROVEMENT 5500 WILSHIRE AVE NE ALBUQUERQUE, NM 87113 CORRALES INTERNATIONAL SCHOOL TENANT IMPROVEMENT DRAWING INDEX COVER SHEET G-101 FIRST FLOOR CODE ANALYSIS G-102 SECOND FLOOR CODE ANALYSIS G-103 CAFETERIA CODE ANALYSIS D-101 FIRST FLOOR DEMOLITION PLAN

More information

DESIGN STANDARDS SECTION PLUMBING FIXTURES AND EQUIPMENT. 1.3 Wall hung toilet room fixtures. Urinals for handicapped may be stall type.

DESIGN STANDARDS SECTION PLUMBING FIXTURES AND EQUIPMENT. 1.3 Wall hung toilet room fixtures. Urinals for handicapped may be stall type. PART 1 - GENERAL 1.1 Toilet rooms and utility rooms to have floor drains at lowest point. 1.2 Utilize Exposed Flushometers. 1.3 Wall hung toilet room fixtures. Urinals for handicapped may be stall type.

More information

MUKWONAGO SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY

MUKWONAGO SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY MUKWONAGO SCHOOL DISTRICT ARCHITECTURE PARK VIEW MIDDLE SCHOOL The original school building was dedicated in 1954 as the High School, with an addition in 1959, a library addition in 1970, and an addition/renovation

More information

Adjustable Back Pressure Flow Controller Instructions

Adjustable Back Pressure Flow Controller Instructions Adjustable Back Pressure Flow Controller Instructions Please Read The Following Important Information Before Starting Mechanical Gauges should be used only for approximate pressure/vacuum readings. The

More information

2014 Bond Project Guide

2014 Bond Project Guide 2014 Bond Project Guide Bush Elementary School Page 1 Instructional Technology Computers, Projectors, Mobile Carts, Document Cameras and Printers Wireless Connectivity New Construction New Tech Center

More information

NYC Department of Education

NYC Department of Education Asset: P.S. 188 - MANHATTAN, 442 EAST HOUSTON STREET, New York, 10002 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-03-08 8:52 AM 2018-06-13 5:06 PM Asset Data Are there fuel tanks?

More information

DESIGN AND CONSTRUCTION STANDARDS GENERAL DESIGN GUIDELINES

DESIGN AND CONSTRUCTION STANDARDS GENERAL DESIGN GUIDELINES 2.05 PLUMBING GENERAL DESIGN AND CONSTRUCTION STANDARDS GENERAL DESIGN GUIDELINES - 2.05 It is expected that the plumbing design professional will conform to accepted good engineering design practices.

More information

Tech Report. September 9,

Tech Report. September 9, Rendering courtesy of the S L A M Collaborative Tech Report I Part I Elizabeth Kimble Lighting/Electrical Option Dr. Houser University Research Building Northeast United States September 9, 2013 Executive

More information

NYC Department of Education

NYC Department of Education Asset: J.H.S. 216 - QUEENS, 64-20 175 STREET, New York, 11365 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2017-11-06 8:51 AM 2017-11-22 10:04 AM Asset Data Are there fuel tanks? Total

More information

NYC Department of Education

NYC Department of Education Mechanical Inspection Asset: P.S. 1 - MANHATTAN, 8 HENRY STREET, New York, 10038 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2017-09-28 8:39 AM 2017-10-12 5:28 PM Asset Data Are there

More information

EXISTING CONDITIONS SUMMARY

EXISTING CONDITIONS SUMMARY SITE Fire alarm system does meet current requirements Accessible path of travel lacking throughout campus Announcer s booth at Football Field booth not ADA compliant Covered and non covered outdoor eating

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

RADON SCREENING SURVEY FOLLOW-UP SPRINGBROOK HIGH SCHOOL

RADON SCREENING SURVEY FOLLOW-UP SPRINGBROOK HIGH SCHOOL RADON SCREENING SURVEY OLLOW-UP SPRINGBROOK HIGH SCHOOL, Silver Spring, Maryland 20904 EXECUTIVE SUMMARY Date of Test Report: 9 ebruary 2016 Round of Testing: Initial ollow-up Post Remediation # rooms

More information

HEALTH/LIFE SAFETY ANNUAL INSPECTION CHECKLIST (ROE)

HEALTH/LIFE SAFETY ANNUAL INSPECTION CHECKLIST (ROE) HEALTH/LIFE SAFETY ANNUAL INSPECTION CHECKLIST (ROE) Administrative and General Building Requirements Safety reference plans (1) Fire alarm audibility (10) Alcohol hand-rub-dispensers (19) School safety

More information

Mechanical Inspection Plumbing

Mechanical Inspection Plumbing 0811 Fixtures Sinks, drinking fountains, water closets, showers, etc. Classroom Sinks. Classroom sinks (19) are enameled cast iron self rimming side ledge with gooseneck faucet trim with index handles,

More information

DESIGN STANDARDS SECTION Toilet rooms and utility rooms to have floor drains at lowest point.

DESIGN STANDARDS SECTION Toilet rooms and utility rooms to have floor drains at lowest point. PART 1 - GENERAL 1.01 Toilet rooms and utility rooms to have floor drains at lowest point. 1.02 Utilize Exposed Flushometers. 1.03 Wall hung toilet room fixtures. Urinals for handicapped may be stall type.

More information

Presented by: Bill Lauzon, PE Lauzon Life Safety Consulting, LLC Web: Lauzon-LSC.com

Presented by: Bill Lauzon, PE Lauzon Life Safety Consulting, LLC Web: Lauzon-LSC.com Presented by: Bill Lauzon, PE Lauzon Life Safety Consulting, LLC 262-945-4567 Lauzon.lsc@gmail.com Web: Lauzon-LSC.com 1 Wis Professional Engineer Experienced Facility Director Experienced AHJ WHEA Code

More information

DOMESTIC WATER PACKAGED BOOSTER PUMPS

DOMESTIC WATER PACKAGED BOOSTER PUMPS DIVISION 22 PLUMBING 22 11 16 DOMESTIC WATER PIPING 22 11 19 DOMESTIC WATER PIPING SPECIALTIES 1. To facilitate landscape and other maintenance operations, exterior hose bibs shall be provided at 150 foot

More information

NYC Department of Education

NYC Department of Education Asset: CLINTON AF - BRONX, 100 W. MOSHOLU PKWY S, New York, 10468 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2017-11-20 8:24 AM 2017-12-31 2:04 PM Asset Data Are there fuel tanks?

More information

Master Planning Committee Meeting #8 Notes

Master Planning Committee Meeting #8 Notes Master Planning Committee Meeting #8 Notes Benson Polytechnic High School January 5, 2017 1 1 2 MEETING DETAILS Meeting Location: Benson Polytechnic High School, 546 NE 12th Ave, Portland, OR 97232 Attendees:

More information

REPORT CARD TO THE COMMUNITY MAY 15, 2018

REPORT CARD TO THE COMMUNITY MAY 15, 2018 REPORT CARD TO THE COMMUNITY MAY 15, 2018 O On May 10, 2014 voters in Greenville ISD approved a $72,275,000 bond election. BOND PROPOSAL PROJECT BOND AMOUNT CONSTRUCT A NEW BOWIE ELEMENTARY SCHOOL $17,600,000

More information

AGENDA. 1. Call to Order. 2. Approval of Minutes. 3. Approval of Invoices and Commitments. 4. Review Updated Site Analysis and Permitting

AGENDA. 1. Call to Order. 2. Approval of Minutes. 3. Approval of Invoices and Commitments. 4. Review Updated Site Analysis and Permitting PROJECT MANAGEMENT AGENDA Project: George Keverian School Feasibility Study Project No.: 16049 Re: School Building Committee Meeting Meeting Date: 3/22/2017 Meeting Location: Mayor s Conference Room, City

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

Plant Operations Cleaning and Sanitation Audits.

Plant Operations Cleaning and Sanitation Audits. Plant Operations Cleaning and Sanitation Audits http://plantoperations.dadeschools.net/ DISTRICT-WIDE SCHOOLS Cleaning & Sanitation Audit (4 years) Overall Scores % Fail % Pass 90% 63% 37% 54% 46% 45%

More information

NYC Department of Education

NYC Department of Education Asset: P.S. 22 - STATEN ISLAND, 1860 FOREST AVENUE, New York, 10303 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2017-12-08 8:51 AM 2017-12-18 4:14 PM Asset Data Are there fuel tanks?

More information