Explain in writing if the address of the building is different than the address on this form:

Size: px
Start display at page:

Download "Explain in writing if the address of the building is different than the address on this form:"

Transcription

1 ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO SCHOOL DIST Emmett Till Math & Science Chicago, IL, 6637 DATE LAST THREE YEAR REINSPECTION WAS COMPLETED 3/11/213 If the address on this form is different than the address of the building, submit a written explanation. SECTION II (Please type or print) PLEASE COMPLETE THE FOLING FOR YOUR THREE YEAR REINSPECTION: DATE REINSPECTION COMPLETED: 4/26/216 IDPH INSPECTOR LICENSE NUMBER: IDPH LICENSED INSPECTOR NAME (Please Print): John Feely IDPH MP LICENSE NUMBER: IDPH LICENSED MANAGEMENT PLANNER NAME (Please Print): DESIGNATED PERSON (Please Print): Robert Christlieb ENROLLMENT 333 Todd Huffer PHONE: (773) /26/216 Signature of Designated Person Date SECTION III PLEASE COMPLETE THE FOLING INFORMATION FOR ANY CHANGES WITHIN THE SCHOOL DISTRICT. School building has been sold. Date of Sale: School has been closed. Date closed: School building has been demolished. School building is asbestos free since last reinspection: Please explain in writing why the school building is now asbestos free and include the supporting documentation. If a new school building has been added to the district, submit either and exclusionary statement or a management plan and inspection report. Include the complete name, address and city of school building. Explain in writing if the address of the building is different than the address on this form: IL Revised 1.3

2 THREE YEAR REINSPECTION CHICAGO SCHOOL DIST 299 Emmett Till Math & Science Chicago, IL, 6637 Unit: Building ID: 474 IDPH ID Number: REPORT DATE: Tuesday, April 26, 216 Prepared for: 125 S. Clark Street Chicago, IL 663 Prepared by: 6 West Van Buren St., Ste 5 Phone (312) Fax (312) DO NOT REMOVE FROM SCHOOL REQUIRED BY FEDERAL LAW

3 March 9, 216 Mr. R. Kent Cook Asbestos Program Illinois Department of Public Health 525 West Jefferson Street Springfield, Illinois Re: Three-Year Reinspections Dear Mr. Cook:, Managing Environmental Consultant (MEC), conducted the ThreeYear Reinspections and performed management plan updates for the (CPS) facilities in Region 3,4,5 Elementary Schools. Please update your records with the following information. School District: 299 Unit: School: Emmett Till Math & Science Region: 5 IDPH ID: Building ID: 474 Address: Chicago, IL, 6637 Building Contact: Miranda, Juan Contact Phone: Current Building Owners: Review 4/26/216 Inspector: John Feely Management Planner: Todd Huffer Inspector IDPH License: Management Planner IDPH License: If you have any questions or comments, please contact us at (312) Sincerely, Todd Huffer 1-987

4 Environmental tification to Occupants To: Faculty, Staff and Parents From: March 9, 216 RE: Emmett Till Math & Science, Unit Chicago, IL, 6637 Dear Faculty, Staff and Parents, This letter is to notify you that the 216 asbestos three year re-inspection has been completed at Emmett Till Math & Science, following the Federal Asbestos Hazard Emergency Response Act (AHERA), 4 CFR Part 763, Subpart E and is available for your review at the main office of the school. Although asbestos-containing materials have been identified at Emmett Till Math & Science, there is no reason to believe that any threat to the health of students or staff exists at this time. CPS will continue to carefully monitor the condition of asbestos-containing materials and if conditions warrant, all appropriate steps will be taken to maintain the health and safety of all building occupants. If you have any questions regarding this matter or require additional information, please feel free to contact Robert Christlieb, the designated Local Education Authority's Designated Person at (773)

5 Table of Contents I. School and Inspection Information II. Executive Summary III. Methodology IV. Abatement History V. Reassessments and Recommendations VI. Conclusions Table I: Inspector's Reinspection Findings Table II: Management Planner's Review APPENDICES: Appendix A: Assessment Sheets, Drawings and Photos Appendix B: Inspector and Management Planner Licenses Appendix C: Laboratory Accreditations Appendix D: Laboratory Results Appendix E: Chain of Custody Forms

6 SCHOOL AND INSPECTION INFORMATION 1. School Information School: Address: IDPH ID: Contact: 2. Emmett Till Math & Science Miranda, Juan Unit: Chicago, IL, 6637 Building ID: 474 Phone: Description of Facility Original Construction: 1954 Total Square Footage: Current Occupancy: Additional Construction: of Floors: 2 LEA Designated Person Contact: Robert Christlieb Address: 125 South Clark Street, 17th Floor Chicago, IL Fax: (312) Inspector Inspector Name: John Feely Signature: 3/9/216 Inspector IDPH license # Phone: (773) Managing Environmental Consultant MEC: Contact: Dan Juneau Address 6 West Van Buren St., Ste 5 Phone: (312) Region: 5 Management Planner Management Planner Name: Todd Huffer Management Planner IDPH license # Review 4/26/ LEA Designated Person's Acknowledgement Signature: 4/26/216 The reinspection report and recommendations have been received by me and appropriate action will be taken by the School District. Signature: 4/26/216 Name: Robert Christlieb Unit : Emmett Till Math & Science Building: 474

7 II. EXECUTIVE SUMMARY was retained by the (CPS) to perform a three-year asbestos reinspection of the Emmett Till Math & Science. This inspection was conducted in accordance with the United States Environmental Protection Agency (USEPA) Asbestos Hazard Emergency Response Act (AHERA) part (b), and the ongoing Operations and Maintenance Program (O&M) originally designed in the School's Asbestos Management Plan. The purpose of this three-year reinspection is to record any condition changes in the asbestos-containing building material (ACBM) in the school since the previous three-year reinspection and the six-month periodic surveillance, to identify, assess, and include any Homogeneous Areas (HA) not identified in the Management Plan, and to recommend an appropriate response action to manage asbestos. The inspector conducted a three-year reinspection of this facility under Illinois Department of Public Health (IDPH) school reinspection requirements and AHERA, sections and The main building and each addition to the main building, if constructed at different dates, were inspected separately. Laboratory accreditations are included in Appendix C, laboratory results are included in Appendix D, and chain of custody forms are included in Appendix E. te: During previous inspections, some of the HA(s) were identified together as 9" x 9" floor tile (FT), mastics assoc. with 9" x 9" FT, 12" x 12" FT, mastics assoc. with 12" x 12" FT, pipe insulation, etc. Some of these HA(s) have been re-identified by areas that are uniform in color, texture, construction date, application date, and general appearance. The inspector has determined the following: A. The following HAs have changed assessment categories for Building 474: Unit: 1 Brown linoleum mastic 35 12x12 med. brown floor tile 48 12x12 off white floor tile mastic 64 2x4 acoustical tile J fittings on fiberglass pipe insulation K paperwrap pipe insulation L fittings on paperwrap pipe insulation M fittings on fiberglass pipe insulation N aircell pipe insulation Emmett Till Math & Science Building: 474

8 Unit: O fittings on aircell pipe insulation P paperwrap pipe insulation Q fittings on paperwrap pipe insulation Emmett Till Math & Science Building: 474

9 B. The following new homogenous areas have been identified for Building 474: Unit: Emmett Till Math & Science Building: 474

10 C. This reinspection covered only physically accessible and visible areas and materials that were identified in the LEA's management plan. The following materials were concealed and/or contained in areas that were inaccessible for sampling and have been classified as Assumed: A F Unit: 12x12 lt. Beige floor tile 1895 bldg. Brown linoleum mastic hard coat plaster hard coat plaster hard coat plaster 12x12 tan floor tile 12x12 dark beige floor tile 12x12 dark beige floor tile 12x12 yellow floor tile 12x12 yellow floor tile mastic 12x12 lt/ grey floor tile 12x12 med. brown floor tile McCosh Annex Modular Unit (Fieldhouse) 12x12 lt. brown floor tile 12x12 brown floor tile 12x12 pink floor tile 12x12 pink floor tile mastic 12x12 grey floor tile 12x12 grey floor tile mastic brown carpet mastic drywall drywall compound baseboard baseboard mastic acoustical tile acoustical tile mastic 2x4 acoustical tile chalk boards chalk boards 12x12 grey floor tile 12x12 white floor tile over wood tile 12"x12" Yellow Floor Tile 12"x12" Yellow Floor Tile Mastic 12"x12" Green Floor Tile 12"x12" Green Floor Tile Mastic Ceramic Floor Tile Grout Ceramic Floor Tile Adhesive 12"x12" White w/blue Specks Floor tile 12"x12" White w/blue Specks Floor Tile Adhesive Terrazzo Carpet Adhesive 12"x12" Blue Mix Floor Tile Emmett Till Math & Science Building: 474

11 8 J K M P R S T 12"x12" Blue Mix Floor Tile Adhesive fittings on fiberglass pipe insulation paperwrap pipe insulation fittings on fiberglass pipe insulation paperwrap pipe insulation fittings on fiberglass pipe insulation boiler gasket incinerator insulation The following areas were deemed to be inaccessible: 37F McCosh Annex Modular Unit (Fieldhouse) acoustical tile acoustical tile mastic 12"x12" Yellow Floor Tile Mastic 12"x12" Green Floor Tile Mastic Ceramic Floor Tile Adhesive 12"x12" White w/blue Specks Floor Tile Adhesive Carpet Adhesive 12"x12" Blue Mix Floor Tile Adhesive Materials were also listed as "assumed" if they were in good condition and sampling was not conducted to avoid damage. This reinspection was conducted by John Feely, IDPH License # The Management Plan was updated by Todd Huffer, IDPH License # Inspector and Management Planner Licenses are included in Appendix B. Unit: Emmett Till Math & Science Building: 474

12 III. METHODOLOGY Tasks performed on-site included the following: IV. 1. Review current management plan, identify HA(s) and extract appropriate information. 2. Examine and verify abatement records. 3. Touch and visually and physically reinspect and reassess the condition of all friable known or assumed ACBM. 4. Touch and visually and physically reinspect all non-friable known or assumed ACBM to determine whether these materials have become friable since the last inspection or periodic surveillance. 5. Identify any condition changes that may affect Hazard Ranking of known ACBM or Assumed ACBM, as well as any HA(s) that have become friable since the last reinspection. 6. Collect bulk samples from each newly discovered friable HA or previously assumed and submit for laboratory analysis. 7. Tabulate reinspection findings and submit for management planner review and recommendations with appropriate response actions based on the AHERA Damage Category of the ACBM. 8. Submit reinspection findings and management planner recommendations to the LEA within thirty (3) days for inclusion into the management plan. ABATEMENT HISTORY The information collected from the existing management plan and inspection report(s) and from interviews with the school official revealed that the following asbestos abatement was conducted at the school since the previous Three year Reinspection. Abatement Dates: V. REASSESSMENTS AND RECOMMENDATIONS The reassessments and recommendations are summarized in Tables I and II on the following pages. Detailed Hazard Assessment Sheets and Drawings and Photos (if applicable) are included in Appendix A. VI. CONCLUSIONS The Emmett Till Math & Science Building 474 Three-Year reinspection has been completed and response actions have been recommended for both friable and non-friable materials. A timely execution of the response actions recommended will enable the LEA and the Designated Person(s) to effectively manage the existing ACBM. This three-year reinspection report should be inspected in the current Management plan at the CPS Central Office, and one (1) copy should be kept at the school for use when planning any renovation and/or demolition activities in areas where ACBM has been identified. Also, periodic surveillance documentation and any summary reports from any response actions that are executed at the school should be used to update the Management Plan. Unit: Emmett Till Math & Science Building: 474

13 Table I Inspector's Reinspection Findings

14 School Emmett Till Math & Science Unit Building ID 474 Address Region 5 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report HA Material Description 2 12x12 lt. Beige floor tile 1895 bldg. 3 9x9 Tan floor tile 8 12x12 Beige floor tile mastic 9 9x9 tan floor tile mastic 1,54 1 Brown linoleum mastic x12 beige floor tile 5, x12 beige floor tile mastic 5, x9 Brown floor tile 15 9x9 Brown floor tile mastic 16 9x9 black floor tile 17 9x9 black floor tile mastic 18 hard coat plaster 61,45 19 hard coat plaster 14,67 2 hard coat plaster 41, x9 brown floor tile 24 9x9 brown floor tile mastic 25 9x9 black floor tile 26 9x9 black floor tile mastic Material Quantity Material Units Material Location Asbestos Type Material Category Friable Damage Type Damage Quantity Damage Units Change in Assessment Category 4 N NONE 1st & 2nd floor stairwell landing Lunchroom & Playroom, 1895 bldg. 1st & 2nd floor stairwell 1895 bldg. Lunchroom & Playroom, 1895 bldg 3rd floor classroom, 194 bldg Corridors throughout hallways, 1895 bldg. Corridors throughout hallways, 1895 bldg. Corridor throughout 193, bldg. Corridord throughout 193, bldg. 1st, 2nd, & 3rd floor corridor, 193 bldg. 1st, 2nd, & 3rd floor corridor, 193 bldg. throughout 1895 bldg. ASSUMED 1,54 CHR N DIST 45 ABATED CHR N NONE ASSUMED N NONE CHR N CHR N NONE ABATED ABATED ABATED ABATED ASSUMED SURFACE Y NONE throughout 193 bldg. ASSUMED SURFACE Y throughout 194 bldg. ASSUMED SURFACE Y 1st & 2nd & 3rd floor corridor, 194 bldg. 1st & 2nd & 3rd floor corridor, 194 bldg. corridors throughout 194 bldg. corridors throughout ABATED ABATED ABATED ne ABATED ne Damage Category ACBM with the potential for damage ACBM with the potential for damage Damage Reason Disturbance Potential 3 MODERATE ne ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage NONE NONE Any remaining friable ACBM or friable suspect ACBM Any remaining friable ACBM or friable suspect ACBM Any remaining friable ACBM or friable suspect ACBM Yes

15 School Emmett Till Math & Science Unit Building ID 474 Address Region 5 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report HA Material Description 26A 12x12 tan floor tile 27 Material Quantity Material Units 77 12x12 dark beige floor tile x12 dark beige floor tile x12 yellow floor tile x12 yellow floor tile mastic x12 lt/ grey floor tile x12 lt. grey floor tile mastic x12 lt. brown floor tile x12 lt. brown floor tile mastic x12 med. brown floor tile x12 med. brown floor tile mastic x12 brown floor tile 3,2 37F McCosh Annex Modular Unit (Fieldhouse) 1, x12 brown floor tile mastic 3, x12 dark brown floor tile x12 dark brown floor tile mastic x12 lt. brown floor tile 78 Material Location 194 bldg. Room 15 (45) installed over existing entrance to room 11 &112, 1895 bldg. entrance to room 11 &112, 1895 bldg. Lunchroom/kitchen, 1895 bldg. Lunchroom/kitchen, 1895 bldg. corridors throughout 1895 bldg. throughout corridors, 1895 bldg. lunchroom, store room & corridors throughout 1895 bldg. lunchroom, store room & corridors throughout 1895 bldg. lunchroom, janitors washroom, main office lunchroom, janitors washroom, main office lunchroom, room 21, 1895 bldg. Throughout lunchroom, room 21, 1895 bldg. lunchroom, 1895 bldg. lunchroom, 1895 bldg. teachers lunch room, 193 bldg. Asbestos Type Material Category Friable Damage Type ASSUMED N NONE ASSUMED N ASSUMED ASSUMED Damage Quantity Damage Units Change in Assessment Category Damage Category Damage Reason Disturbance Potential ACBM with the potential for damage NONE ACBM with the potential for damage N NONE ACBM with the potential for damage N NONE ASSUMED N NONE ASSUMED N NONE CHR N NONE CHR N NONE ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage CHR N NONE ACBM with the potential for damage ASSUMED N LOC 15 Yes ACBM with the potential for damage CHR N NONE ACBM with the potential for damage CHR N NONE N NONE CHR N NONE CHR N NONE CHR N NONE ASSUMED N NONE ACBM with the potential for damage ACBM with potential for significant damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ASSUMED 3

16 School Emmett Till Math & Science Unit Building ID 474 Address Region 5 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report HA Material Description 42 12x12 lt. brown floor tile mastic 43 12x12 brown floor tile 44 12x12 brown floor tile mastic 3, x12 black floor tile 3, x12 black floor tile mastic 3, x12 off white floor tile 1, x12 off white floor tile mastic 1, x12 pink floor tile x12 pink floor tile mastic x12 grey floor tile x12 grey floor tile mastic x12 black floor tile 54 12x12 black floor tile mastic 55 grey carpet mastic 56 brown carpet mastic 57 carpet mastic 58 drywall baseboard mastic 62 acoustical tile 63 acoustical tile mastic 3,63 Material Quantity Material Units Material Location Asbestos Type Material Category Friable Damage Type 78 CHR N NONE 3,63 teachers lunch room, 193 bldg. assembly hall, 193 bldg. assembly hall, 193 bldg. assembly hall, 193 bldg. assembly hall, 193 bldg. room 14, 194 bldg. room 14, 194 bldg. kindergarten, 194 bldg. kindergarten, 194 bldg. 3rd floor corridor 194 bldg. 3rd floor corridor 194 bldg. 3rd floor corridor 194 bldg. 3rd floor corridor 194 bldg. room 27, 1895 bldg. room 26, 1895 bldg. kindergarten 194 bldg. main office, 1895 bldg. main office, 1895 bldg. main office, 1895 bldg. main office, 1895 bldg. assembly hall, 193 bldg. Change in Assessment Category ASSUMED N NONE CHR N NONE CHR N NONE CHR N NONE CHR N ne CHR N NONE Yes ASSUMED N NONE ASSUMED N NONE ASSUMED N NONE ASSUMED N NONE ABATED ABATED ABATED ASSUMED N NONE ABATED ASSUMED N NONE ASSUMED N ASSUMED N ASSUMED ASSUMED assembly hall, 193 ASSUMED 81 1 drywall compound 5 baseboard 4 4 3,63 Damage Quantity Damage Units Damage Category Damage Reason Disturbance Potential ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage NONE NONE N NONE Y NONE Y NONE ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage Any remaining friable ACBM or friable suspect ACBM Any remaining friable

17 School Emmett Till Math & Science Unit Building ID 474 Address Region 5 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report HA Material Description 64 2x4 acoustical tile 1,74 65 chalk boards 2,11 66 chalk boards 67 12x12 grey floor tile Material Quantity Material Units Material Location Asbestos Type Material Category Friable Damage Type Damage Quantity Damage Units Change in Assessment Category ASSUMED Y NONE Yes ASSUMED N NONE ASSUMED N NONE ASSUMED N NONE ASSUMED N NONE ASSUMED N NONE bldg. Damage Category ACBM or friable suspect ACBM Any remaining friable ACBM or friable suspect ACBM ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage Damage Reason Disturbance Potential 9 1, 12x12 white floor tile over wood tile 3 12"x12" Yellow Floor Tile 42 main office, rooms 29 & 39, 1895 bldg. throughout 1895 bldg. throughout 194 bldg. 194 bldg - Room bldg - Room 34A Rooom "x12" Yellow Floor Tile Mastic 42 Room 16 ASSUMED N NONE 71 12"x12" Green Floor Tile 42 Room 16 ASSUMED N NONE 72 12"x12" Green Floor Tile Mastic 42 Room 16 ASSUMED N NONE 73 Ceramic Floor Tile Grout 6 ASSUMED N NONE 74 Ceramic Floor Tile Adhesive 6 ASSUMED N NONE 75 12"x12" White w/blue Specks Floor tile 3 ASSUMED N NONE 76 12"x12" White w/blue Specks Floor Tile Adhesive Terrazzo 3 ASSUMED N NONE 77 8 ASSUMED N NONE 78 Carpet Adhesive 8 Girl's and Boy's Washrooms Girl's and Boy's Washrooms Engineer's Washroom Engineer's Washroom Corridors of 193 Building Principal's Office ASSUMED N NONE 79 12"x12" Blue Mix Floor Tile 17,5 ASSUMED N NONE 8 12"x12" Blue Mix Floor Tile Adhesive 17,5 ASSUMED N NONE ACBM with the potential for damage C aircell pipe insulation 37 LF CHR TSI Y NONE fittings on aircell pipe insulation CHR TSI Y NONE ACBM with the potential for damage Any remaining friable ACBM or friable suspect ACBM D 1st, 2nd & 3rd Floor Corridors of 193 and 194 Buildings 1st, 2nd & 3rd Floor Corridors of 193 and 194 Buildings basement & roo 21, 1895 bldg. basement & room 21, 1895 bldg. 37 Fittings

18 School Emmett Till Math & Science Unit Building ID 474 Address Region 5 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report HA Material Description F joints on paperwrap pipe insulation H aircell pi[pe insulation I joints on aircell pipe insulation J fittings on fiberglass pipe insulation K paperwrap pipe insulation L Material Quantity Material Units Material Location Asbestos Type Material Category Friable Damage Type Damage Quantity Damage Units 15 Each CHR TSI N NONE 2 LF basement boiler room, 1895 bldg. basement corridor, 193 bldg. basement corridor 193 bldg Change in Assessment Category CHR TSI Y NONE CHR TSI Y NONE Basement, room 11, room 21, room 31 basement corridor, 193 bldg. ASSUMED TSI Y NONE Yes ASSUMED TSI Y NONE Yes Damage Category Damage Reason Disturbance Potential ACBM with the potential for damage ACBM with the potential for damage Any remaining friable ACBM or friable suspect ACBM Any remaining friable ACBM or friable suspect ACBM Any remaining friable ACBM or friable suspect ACBM Any remaining friable ACBM or friable suspect ACBM Any remaining friable ACBM or friable suspect ACBM Any remaining friable ACBM or friable suspect ACBM Any remaining friable ACBM or friable suspect ACBM Any remaining friable ACBM or friable suspect ACBM 3 Each 265 Each 2 Each fittings on paperwrap pipe insulation 2 Each basement corridor, 193 bldg. CHR TSI Y NONE Yes M fittings on fiberglass pipe insulation 4 Each basement corridor 193 bldg. ASSUMED TSI Y NONE Yes N aircell pipe insulation LF basement corridor, 194 bldg. CHR TSI Y NONE Yes O fittings on aircell pipe insulation Fittings basement corridor, 194 bldg. CHR TSI Y NONE Yes P paperwrap pipe insulation LF ASSUMED TSI Y NONE Yes Q fittings on paperwrap pipe insulation 3 Each CHR TSI Y NONE Yes Any remaining friable ACBM or friable suspect ACBM R fittings on fiberglass pipe insulation 44 Each basement corridor, 1st & 2nd floor washroom pipe chase. basement corridor, 1st & 2nd floor washroom pipe chase. fan and engine room, 194 bldg. ASSUMED TSI Y NONE S boiler gasket 3 LF boiler room, 1895 bldg. ASSUMED TSI Y NONE Any remaining friable ACBM or friable suspect ACBM Any remaining friable ACBM or friable suspect ACBM T incinerator insulation boiler room removed ASSUMED TSI

19 School Emmett Till Math & Science Unit Building ID 474 Address Region 5 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report Reinspection Date 3/9/216 Inspector Name Inspector's Comments John Feely /15/216 Inspector's IDPH License Number / Expiration Date HA Number: A Inspector Comments: Damage located in lunchroom and playroom. Has been repaired not observed 216 not observed 216 not observed 216 not observed 216 not observed 216

20 School Emmett Till Math & Science Unit Building ID 474 Address Region 5 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report HA Number: F Inspector Comments: Damage located in lunchroom not observed 216 not observed 216 not observed 216 not observed 216

21 School Emmett Till Math & Science Unit Building ID 474 Address Region 5 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report HA Number: C D F H I J K L Inspector Comments:

22 School Emmett Till Math & Science Unit Building ID 474 Address Region 5 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report HA Number: M N O P Q R S T Inspector Comments: not observed 216

23 Table II Management Planner's Review

24 School Emmett Till Math & Science Address Unit Building ID Chicago, IL, Region 5 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Management Planner's Comments Summarized at the End of the Report HA Num Material Description Material Quantity Material Units Material Location Asbestos Type Material Category Friable Damage Quantity Damage Units Damage Category Response x12 lt. Beige floor tile 1895 bldg. 9x9 Tan floor tile 12x12 Beige floor tile mastic 9x9 tan floor tile mastic Brown linoleum mastic 12x12 beige floor tile 4 1,54 45 Assumed Chrysotile Abated Chrysotile Assumed Chrysotile 1, , x12 beige floor tile mastic 5,79 Chrysotile x9 Brown floor tile 9x9 Brown floor tile mastic 9x9 black floor tile 9x9 black floor tile mastic hard coat plaster 61,45 1st & 2nd floor stairwell landing Lunchroom & Playroom, 1895 bldg. 1st & 2nd floor stairwell 1895 bldg. Lunchroom & Playroom, 1895 bldg 3rd floor classroom, 194 bldg Corridors throughout hallways, 1895 bldg. Corridors throughout hallways, 1895 bldg. Corridor throughout 193, bldg. Corridord throughout 193, bldg. 1st, 2nd, & 3rd floor corridor, 193 bldg. 1st, 2nd, & 3rd floor corridor, 193 bldg. throughout 1895 bldg. Abated Abated Abated Abated Assumed SURFACE Yes 19 hard coat plaster 14,67 throughout 193 bldg. Assumed SURFACE Yes 2 hard coat plaster 41,52 throughout 194 bldg. Assumed SURFACE Yes 7 Any remaining friable ACBM or friable suspect ACBM 7 Any remaining friable ACBM or friable suspect ACBM 7 Any remaining friable ACBM or friable suspect ACBM 23 9x9 brown floor tile Abated 24 9x9 brown floor tile mastic Abated A x9 black floor tile 9x9 black floor tile mastic 12x12 tan floor tile 12x12 dark beige floor tile 12x12 dark beige floor tile 12x12 yellow floor tile 12x12 yellow floor tile mastic 12x12 lt/ grey floor tile 12x12 lt. grey floor tile mastic 12x12 lt. brown floor tile 1st & 2nd & 3rd floor corridor, 194 bldg. 1st & 2nd & 3rd floor corridor, 194 bldg. corridors throughout 194 bldg. corridors throughout 194 bldg. Room 15 (45) installed over existing entrance to room 11 &112, 1895 bldg. entrance to room 11 &112, 1895 bldg. Lunchroom/kitchen, 1895 bldg. Lunchroom/kitchen, 1895 bldg. corridors throughout 1895 bldg. throughout corridors, 1895 bldg. lunchroom, store room & corridors throughout 1895 bldg. Abated Abated Assumed Assumed Assumed Assumed Assumed Assumed Chrysotile Chrysotile

25 School Emmett Till Math & Science Address Unit Building ID Chicago, IL, Region 5 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Management Planner's Comments Summarized at the End of the Report HA Num Material Description Material Quantity Material Units Material Location Asbestos Type Material Category Friable Damage Quantity Damage Units Damage Category Response 34 12x12 lt. brown floor tile mastic 3 Chrysotile 35 12x12 med. brown floor tile 85 Assumed x12 med. brown floor tile mastic 85 Chrysotile 37 37F 12x12 brown floor tile McCosh Annex Modular Unit (Fieldhouse) 3,2 1,2 lunchroom, store room & corridors throughout 1895 bldg. lunchroom, janitors washroom, main office lunchroom, janitors washroom, main office lunchroom, room 21, 1895 bldg. Throughout Chrysotile Assumed x12 brown floor tile mastic 12x12 dark brown floor tile 12x12 dark brown floor tile mastic 12x12 lt. brown floor tile 12x12 lt. brown floor tile mastic 12x12 brown floor tile 12x12 brown floor tile mastic 12x12 black floor tile 12x12 black floor tile mastic 12x12 off white floor tile 12x12 off white floor tile mastic 12x12 pink floor tile 12x12 pink floor tile mastic 12x12 grey floor tile 12x12 grey floor tile mastic 12x12 black floor tile 12x12 black floor tile mastic grey carpet mastic brown carpet mastic carpet mastic drywall drywall compound baseboard baseboard mastic acoustical tile 3, ,63 3,63 3,63 3,63 1,5 1, ,63 Chrysotile Chrysotile Chrysotile Assumed Chrysotile Assumed Chrysotile Chrysotile Chrysotile Chrysotile Chrysotile Assumed Assumed Assumed Assumed Abated Abated Abated Assumed Abated Assumed Assumed Assumed Assumed Assumed 81 lunchroom, room 21, 1895 bldg. lunchroom, 1895 bldg. lunchroom, 1895 bldg. teachers lunch room, 193 bldg. teachers lunch room, 193 bldg. assembly hall, 193 bldg. assembly hall, 193 bldg. assembly hall, 193 bldg. assembly hall, 193 bldg. room 14, 194 bldg. room 14, 194 bldg. kindergarten, 194 bldg. kindergarten, 194 bldg. 3rd floor corridor 194 bldg. 3rd floor corridor 194 bldg. 3rd floor corridor 194 bldg. 3rd floor corridor 194 bldg. room 27, 1895 bldg. room 26, 1895 bldg. kindergarten 194 bldg. main office, 1895 bldg. main office, 1895 bldg. main office, 1895 bldg. main office, 1895 bldg. assembly hall, 193 bldg. 5 ACBM with potential for significant damage Yes 7 Any remaining friable ACBM or friable

26 School Emmett Till Math & Science Address Unit Building ID Chicago, IL, Region 5 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Management Planner's Comments Summarized at the End of the Report HA Num Material Description Material Quantity Material Units Material Location Asbestos Type Material Category Friable Damage Quantity Damage Units Damage Category Response 63 acoustical tile mastic 3,63 assembly hall, 193 bldg. Assumed Yes 64 2x4 acoustical tile 1,74 Assumed Yes chalk boards chalk boards 12x12 grey floor tile 12x12 white floor tile over wood tile 12"x12" Yellow Floor Tile 12"x12" Yellow Floor Tile Mastic 12"x12" Green Floor Tile 12"x12" Green Floor Tile Mastic Ceramic Floor Tile Grout Ceramic Floor Tile Adhesive 12"x12" White w/blue Specks Floor tile 12"x12" White w/blue Specks Floor Tile Adhesive Terrazzo Carpet Adhesive 12"x12" Blue Mix Floor Tile 2,11 9 1, ,5 Assumed Assumed Assumed Assumed Assumed Assumed Assumed Assumed Assumed Assumed Assumed Assumed Assumed Assumed Assumed 8 12"x12" Blue Mix Floor Tile Adhesive 17,5 Assumed C D aircell pipe insulation fittings on aircell pipe insulation LF Fittings main office, rooms 29 & 39, 1895 bldg. throughout 1895 bldg. throughout 194 bldg. 194 bldg - Room bldg - Room 34A Rooom 16 Room 16 Room 16 Room 16 Girl's and Boy's Washrooms Girl's and Boy's Washrooms Engineer's Washroom Engineer's Washroom Corridors of 193 Building Principal's Office 1st, 2nd & 3rd Floor Corridors of 193 and 194 Buildings 1st, 2nd & 3rd Floor Corridors of 193 and 194 Buildings basement & roo 21, 1895 bldg. basement & room 21, 1895 bldg. suspect ACBM 7 Any remaining friable ACBM or friable suspect ACBM 7 Any remaining friable ACBM or friable suspect ACBM Chrysotile Chrysotile TSI TSI Yes Yes LF Fittings F H I joints on paperwrap pipe insulation aircell pi[pe insulation joints on aircell pipe insulation Each LF Each basement boiler room, 1895 bldg. basement corridor, 193 bldg. basement corridor bldg Chrysotile Chrysotile Chrysotile TSI TSI TSI Yes Yes Each LF Each J fittings on fiberglass pipe insulation 265 Each Assumed TSI Yes Each K paperwrap pipe insulation 2 Each Basement, room 11, room 21, room 31 basement corridor, 193 bldg. Assumed TSI Yes Each 7 Any remaining friable ACBM or friable suspect ACBM 7 Any remaining friable ACBM or friable suspect ACBM 7 Any remaining friable ACBM or friable suspect ACBM 7 Any remaining friable ACBM or friable suspect ACBM

27 School Emmett Till Math & Science Address Unit Building ID Chicago, IL, Region 5 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Management Planner's Comments Summarized at the End of the Report HA Num Material Description Material Quantity Material Units Material Location Asbestos Type Material Category Friable Damage Quantity Damage Units Damage Category Response L fittings on paperwrap pipe insulation 2 Each basement corridor, 193 bldg. Chrysotile TSI Yes Each M fittings on fiberglass pipe insulation 4 Each basement corridor 193 bldg. Assumed TSI Yes Each N aircell pipe insulation 22 LF basement corridor, 194 bldg. Chrysotile TSI Yes LF O fittings on aircell pipe insulation 18 Fittings basement corridor, 194 bldg. Chrysotile TSI Yes Fittings P paperwrap pipe insulation 18 LF Assumed TSI Yes LF Q fittings on paperwrap pipe insulation 3 Each Chrysotile TSI Yes Each R fittings on fiberglass pipe insulation 44 Each basement corridor, 1st & 2nd floor washroom pipe chase. basement corridor, 1st & 2nd floor washroom pipe chase. fan and engine room, 194 bldg. Assumed TSI Yes Each S boiler gasket 3 LF boiler room, 1895 bldg. Assumed TSI Yes LF 7 Any remaining friable ACBM or friable suspect ACBM 7 Any remaining friable ACBM or friable suspect ACBM 7 Any remaining friable ACBM or friable suspect ACBM 7 Any remaining friable ACBM or friable suspect ACBM 7 Any remaining friable ACBM or friable suspect ACBM 7 Any remaining friable ACBM or friable suspect ACBM 7 Any remaining friable ACBM or friable suspect ACBM 7 Any remaining friable ACBM or friable suspect ACBM T incinerator insulation boiler room - removed Assumed TSI

28 School Emmett Till Math & Science Address Unit Building ID Chicago, IL, 6637 Region ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Management Planner's Comments Summarized at the End of the Report 4/26/216 Review Date Manager Planner Name Todd Huffer /15/216 Manager IDPH License /Expiration HA Number A Management Comments Remove/Replace damaged material and follow O&M

29 School Emmett Till Math & Science Address Unit Building ID Chicago, IL, 6637 Region ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Management Planner's Comments Summarized at the End of the Report HA Number F Management Comments Replace damaged material and follow O&M

30 School Emmett Till Math & Science Address Unit Building ID Chicago, IL, 6637 Region ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Management Planner's Comments Summarized at the End of the Report HA Number Management Comments material no observed in 216 material no observed in 216 material no observed in 216

31 School Emmett Till Math & Science Address Unit Building ID Chicago, IL, 6637 Region ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 6 West Van Buren St., Ste 5 Phone: (312) Fax: (312) Management Planner's Comments Summarized at the End of the Report HA Number C D F H I J K L M N O P Q R S T Management Comments

32 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 2 12x12 lt. Beige floor tile 1895 bldg. HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 1st & 2nd floor stairwell landing 4 COMMENTS: Inspector's Signature: 3/9/216

33 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ x12 lt. Beige floor tile 1895 bldg. 1st & 2nd floor stairwell landing 4 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

34 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 3 9x9 Tan floor tile HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: Deterioration DISTURBANCE POTENTIAL: MODERATE Lunchroom & Playroom, 1895 bldg. 154 COMMENTS: Damage located in lunchroom and playroom. Inspector's Signature: 3/9/216

35 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ x9 Tan floor tile Lunchroom & Playroom, 1895 bldg In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Remove/Replace damaged material and follow O&M Management Planner's Signature: 4/26/216

36 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 8 12x12 Beige floor tile mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: 1st & 2nd floor stairwell 1895 bldg. COMMENTS: Inspector's Signature: 3/9/216

37 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ x12 Beige floor tile mastic 1st & 2nd floor stairwell 1895 bldg. 474 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

38 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 9 9x9 tan floor tile mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Lunchroom & Playroom, 1895 bldg 154 COMMENTS: Inspector's Signature: 3/9/216

39 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ x9 tan floor tile mastic Lunchroom & Playroom, 1895 bldg 154 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

40 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 1 Brown linoleum mastic HISTORICAL AHERA DAMAGE CATEGORY 6 HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 3rd floor classroom, 194 bldg 325 COMMENTS: Inspector's Signature: 3/9/216

41 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ Brown linoleum mastic 3rd floor classroom, 194 bldg In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

42 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 12 12x12 beige floor tile HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Corridors throughout hallways, 1895 bldg. 579 COMMENTS: Has been repaired Inspector's Signature: 3/9/216

43 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ x12 beige floor tile Corridors throughout hallways, 1895 bldg In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

44 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 13 12x12 beige floor tile mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Corridors throughout hallways, 1895 bldg. 579 COMMENTS: Inspector's Signature: 3/9/216

45 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ x12 beige floor tile mastic Corridors throughout hallways, 1895 bldg. 579 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

46 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 14 9x9 Brown floor tile HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Corridor throughout 193, bldg. COMMENTS: not observed 216 Inspector's Signature: 3/9/216

47 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ x9 Brown floor tile Corridor throughout 193, bldg. 474 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

48 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 15 9x9 Brown floor tile mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Corridord throughout 193, bldg. COMMENTS: Inspector's Signature: 3/9/216

49 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ x9 Brown floor tile mastic Corridord throughout 193, bldg. 474 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

50 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 16 9x9 black floor tile HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: 1st, 2nd, & 3rd floor corridor, 193 bldg. COMMENTS: Inspector's Signature: 3/9/216

51 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ x9 black floor tile 1st, 2nd, & 3rd floor corridor, 193 bldg. 474 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

52 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 17 9x9 black floor tile mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: 1st, 2nd, & 3rd floor corridor, 193 bldg. COMMENTS: Inspector's Signature: 3/9/216

53 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ x9 black floor tile mastic 1st, 2nd, & 3rd floor corridor, 193 bldg. 474 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

54 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 18 hard coat plaster HISTORICAL AHERA DAMAGE CATEGORY 7 Any remaining friable ACBM or friable suspect ACBM HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: throughout 1895 bldg COMMENTS: Inspector's Signature: 3/9/216

55 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ hard coat plaster throughout 1895 bldg In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

56 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 19 hard coat plaster HISTORICAL AHERA DAMAGE CATEGORY 7 Any remaining friable ACBM or friable suspect ACBM HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: throughout 193 bldg COMMENTS: Inspector's Signature: 3/9/216

57 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ hard coat plaster throughout 193 bldg In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

58 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 2 hard coat plaster HISTORICAL AHERA DAMAGE CATEGORY 7 Any remaining friable ACBM or friable suspect ACBM HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: throughout 194 bldg COMMENTS: Inspector's Signature: 3/9/216

59 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ hard coat plaster throughout 194 bldg In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

60 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 23 9x9 brown floor tile HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: 1st & 2nd & 3rd floor corridor, 194 bldg. COMMENTS: not observed 216 Inspector's Signature: 3/9/216

61 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ x9 brown floor tile 1st & 2nd & 3rd floor corridor, 194 bldg. 474 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

62 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 24 9x9 brown floor tile mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: 1st & 2nd & 3rd floor corridor, 194 bldg. COMMENTS: not observed 216 Inspector's Signature: 3/9/216

63 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ x9 brown floor tile mastic 1st & 2nd & 3rd floor corridor, 194 bldg. 474 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

64 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 25 9x9 black floor tile HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: corridors throughout 194 bldg. COMMENTS: not observed 216 Inspector's Signature: 3/9/216

65 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ x9 black floor tile corridors throughout 194 bldg. 474 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

66 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 26 9x9 black floor tile mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: corridors throughout 194 bldg. COMMENTS: not observed 216 Inspector's Signature: 3/9/216

67 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ x9 black floor tile mastic corridors throughout 194 bldg. 474 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

68 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 26A 12x12 tan floor tile HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Room 15 (45) installed over existing 77 COMMENTS: Inspector's Signature: 3/9/216

69 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ A 12x12 tan floor tile Room 15 (45) installed over existing 77 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

70 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 27 12x12 dark beige floor tile HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: entrance to room 11 &112, 1895 bldg. 1 COMMENTS: Inspector's Signature: 3/9/216

71 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ x12 dark beige floor tile entrance to room 11 &112, 1895 bldg. 1 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

72 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 28 12x12 dark beige floor tile HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: entrance to room 11 &112, 1895 bldg. 1 COMMENTS: Inspector's Signature: 3/9/216

73 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ x12 dark beige floor tile entrance to room 11 &112, 1895 bldg. 1 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

74 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 29 12x12 yellow floor tile HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Lunchroom/kitchen, 1895 bldg. 5 COMMENTS: Inspector's Signature: 3/9/216

75 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ x12 yellow floor tile Lunchroom/kitchen, 1895 bldg. 5 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

76 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 3 12x12 yellow floor tile mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Lunchroom/kitchen, 1895 bldg. 5 COMMENTS: Inspector's Signature: 3/9/216

77 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ x12 yellow floor tile mastic Lunchroom/kitchen, 1895 bldg. 5 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

78 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 31 12x12 lt/ grey floor tile HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: corridors throughout 1895 bldg. 8 COMMENTS: Inspector's Signature: 3/9/216

79 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ x12 lt/ grey floor tile corridors throughout 1895 bldg. 8 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

80 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 32 12x12 lt. grey floor tile mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: throughout corridors, 1895 bldg. 8 COMMENTS: Inspector's Signature: 3/9/216

81 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ x12 lt. grey floor tile mastic throughout corridors, 1895 bldg. 8 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

82 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 33 12x12 lt. brown floor tile HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: lunchroom, store room & corridors throughout 1895 bldg. 3 COMMENTS: Inspector's Signature: 3/9/216

83 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ x12 lt. brown floor tile lunchroom, store room & corridors throughout 1895 bldg. 3 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

84 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 34 12x12 lt. brown floor tile mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: lunchroom, store room & corridors throughout 1895 bldg. 3 COMMENTS: Inspector's Signature: 3/9/216

85 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ x12 lt. brown floor tile mastic lunchroom, store room & corridors throughout 1895 bldg. 3 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

86 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 35 12x12 med. brown floor tile HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: Deterioration DISTURBANCE POTENTIAL: lunchroom, janitors washroom, main office 85 COMMENTS: Damage located in lunchroom Inspector's Signature: 3/9/216

87 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ x12 med. brown floor tile lunchroom, janitors washroom, main office In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Replace damaged material and follow O&M Management Planner's Signature: 4/26/216

88 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 36 12x12 med. brown floor tile mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: lunchroom, janitors washroom, main office 85 COMMENTS: Inspector's Signature: 3/9/216

89 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ x12 med. brown floor tile mastic lunchroom, janitors washroom, main office 85 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

90 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 37 12x12 brown floor tile HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: lunchroom, room 21, 1895 bldg. 32 COMMENTS: Inspector's Signature: 3/9/216

91 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ x12 brown floor tile lunchroom, room 21, 1895 bldg. 32 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

92 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 37F McCosh Annex Modular Unit (Fieldhouse) HISTORICAL AHERA DAMAGE CATEGORY 5 ACBM with potential for significant damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 5. ACBM with potential for significant damage DAMAGE REASON: DISTURBANCE POTENTIAL: Throughout 12 COMMENTS: Inspector's Signature: 3/9/216

93 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ F McCosh Annex Modular Unit (Fieldhouse) Throughout 12 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

94 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 38 12x12 brown floor tile mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: lunchroom, room 21, 1895 bldg. 32 COMMENTS: Inspector's Signature: 3/9/216

95 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ x12 brown floor tile mastic lunchroom, room 21, 1895 bldg. 32 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

96 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 39 12x12 dark brown floor tile HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: lunchroom, 1895 bldg. 8 COMMENTS: Inspector's Signature: 3/9/216

97 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ x12 dark brown floor tile lunchroom, 1895 bldg. 8 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

98 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 4 12x12 dark brown floor tile mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: lunchroom, 1895 bldg. 8 COMMENTS: Inspector's Signature: 3/9/216

99 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ x12 dark brown floor tile mastic lunchroom, 1895 bldg. 8 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

100 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 41 12x12 lt. brown floor tile HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: teachers lunch room, 193 bldg. 78 COMMENTS: Inspector's Signature: 3/9/216

101 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ x12 lt. brown floor tile teachers lunch room, 193 bldg. 78 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

102 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 42 12x12 lt. brown floor tile mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: teachers lunch room, 193 bldg. 78 COMMENTS: Inspector's Signature: 3/9/216

103 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ x12 lt. brown floor tile mastic teachers lunch room, 193 bldg. 78 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

104 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 43 12x12 brown floor tile HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: assembly hall, 193 bldg. 363 COMMENTS: Inspector's Signature: 3/9/216

105 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ x12 brown floor tile assembly hall, 193 bldg. 363 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

106 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 44 12x12 brown floor tile mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: assembly hall, 193 bldg. 363 COMMENTS: Inspector's Signature: 3/9/216

107 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ x12 brown floor tile mastic assembly hall, 193 bldg. 363 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

108 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 45 12x12 black floor tile HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: assembly hall, 193 bldg. 363 COMMENTS: Inspector's Signature: 3/9/216

109 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ x12 black floor tile assembly hall, 193 bldg. 363 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

110 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 46 12x12 black floor tile mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: assembly hall, 193 bldg. 363 COMMENTS: Inspector's Signature: 3/9/216

111 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ x12 black floor tile mastic assembly hall, 193 bldg. 363 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

112 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 47 12x12 off white floor tile HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: room 14, 194 bldg. 15 COMMENTS: Inspector's Signature: 3/9/216

113 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ x12 off white floor tile room 14, 194 bldg. 15 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

114 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 48 12x12 off white floor tile mastic HISTORICAL AHERA DAMAGE CATEGORY 6 HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: room 14, 194 bldg. 15 COMMENTS: Inspector's Signature: 3/9/216

115 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ x12 off white floor tile mastic room 14, 194 bldg. 15 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

116 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 49 12x12 pink floor tile HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: kindergarten, 194 bldg. 52 COMMENTS: Inspector's Signature: 3/9/216

117 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ x12 pink floor tile kindergarten, 194 bldg. 52 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

118 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 5 12x12 pink floor tile mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: kindergarten, 194 bldg. 52 COMMENTS: Inspector's Signature: 3/9/216

119 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ x12 pink floor tile mastic kindergarten, 194 bldg. 52 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

120 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 51 12x12 grey floor tile HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 3rd floor corridor 194 bldg. 3 COMMENTS: Inspector's Signature: 3/9/216

121 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ x12 grey floor tile 3rd floor corridor 194 bldg. 3 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

122 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 52 12x12 grey floor tile mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 3rd floor corridor 194 bldg. 3 COMMENTS: Inspector's Signature: 3/9/216

123 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ x12 grey floor tile mastic 3rd floor corridor 194 bldg. 3 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

124 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 53 12x12 black floor tile HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: 3rd floor corridor 194 bldg. COMMENTS: not observed 216 Inspector's Signature: 3/9/216

125 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ x12 black floor tile 3rd floor corridor 194 bldg. 474 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

126 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 54 12x12 black floor tile mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: 3rd floor corridor 194 bldg. COMMENTS: not observed 216 Inspector's Signature: 3/9/216

127 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ x12 black floor tile mastic 3rd floor corridor 194 bldg. 474 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: material no observed in 216 Management Planner's Signature: 4/26/216

128 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 55 grey carpet mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: room 27, 1895 bldg. COMMENTS: not observed 216 Inspector's Signature: 3/9/216

129 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ grey carpet mastic room 27, 1895 bldg. 474 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: material no observed in 216 Management Planner's Signature: 4/26/216

130 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 56 brown carpet mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: room 26, 1895 bldg. 81 COMMENTS: Inspector's Signature: 3/9/216

131 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ brown carpet mastic room 26, 1895 bldg. 81 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

132 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 57 carpet mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: kindergarten 194 bldg. COMMENTS: not observed 216 Inspector's Signature: 3/9/216

133 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ carpet mastic kindergarten 194 bldg. 474 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: material no observed in 216 Management Planner's Signature: 4/26/216

134 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 58 drywall HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: main office, 1895 bldg. 1 COMMENTS: Inspector's Signature: 3/9/216

135 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ drywall main office, 1895 bldg. 1 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

136 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 59 drywall compound HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: main office, 1895 bldg. 5 COMMENTS: Inspector's Signature: 3/9/216

137 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ drywall compound main office, 1895 bldg. 5 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

138 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 6 baseboard HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: main office, 1895 bldg. 4 COMMENTS: Inspector's Signature: 3/9/216

139 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ baseboard main office, 1895 bldg. 4 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

140 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 61 baseboard mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: main office, 1895 bldg. 4 COMMENTS: Inspector's Signature: 3/9/216

141 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ baseboard mastic main office, 1895 bldg. 4 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

142 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 62 acoustical tile HISTORICAL AHERA DAMAGE CATEGORY 7 Any remaining friable ACBM or friable suspect ACBM HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: assembly hall, 193 bldg. 363 COMMENTS: Inspector's Signature: 3/9/216

143 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ acoustical tile assembly hall, 193 bldg. 363 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

144 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 63 acoustical tile mastic HISTORICAL AHERA DAMAGE CATEGORY 7 Any remaining friable ACBM or friable suspect ACBM HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: assembly hall, 193 bldg. 363 COMMENTS: Inspector's Signature: 3/9/216

145 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ acoustical tile mastic assembly hall, 193 bldg. 363 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

146 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 64 2x4 acoustical tile HISTORICAL AHERA DAMAGE CATEGORY 7 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: main office, rooms 29 & 39, 1895 bldg. 174 COMMENTS: Inspector's Signature: 3/9/216

147 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ x4 acoustical tile main office, rooms 29 & 39, 1895 bldg. 174 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

148 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 65 chalk boards HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: throughout 1895 bldg. 211 COMMENTS: Inspector's Signature: 3/9/216

149 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ chalk boards throughout 1895 bldg. 211 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

150 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 66 chalk boards HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: throughout 194 bldg. 9 COMMENTS: Inspector's Signature: 3/9/216

151 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ chalk boards throughout 194 bldg. 9 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

152 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 67 12x12 grey floor tile HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 194 bldg - Room 3 1 COMMENTS: Inspector's Signature: 3/9/216

153 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ x12 grey floor tile 194 bldg - Room 3 1 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

154 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 68 12x12 white floor tile over wood tile HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 194 bldg - Room 34A 3 COMMENTS: Inspector's Signature: 3/9/216

155 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ x12 white floor tile over wood tile 194 bldg - Room 34A 3 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

156 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 69 12"x12" Yellow Floor Tile HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Rooom COMMENTS: Inspector's Signature: 3/9/216

157 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ "x12" Yellow Floor Tile Rooom In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

158 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 7 12"x12" Yellow Floor Tile Mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Room COMMENTS: Inspector's Signature: 3/9/216

159 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ "x12" Yellow Floor Tile Mastic Room In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

160 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 71 12"x12" Green Floor Tile HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Room COMMENTS: Inspector's Signature: 3/9/216

161 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ "x12" Green Floor Tile Room In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

162 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 72 12"x12" Green Floor Tile Mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Room COMMENTS: Inspector's Signature: 3/9/216

163 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ "x12" Green Floor Tile Mastic Room In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

164 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 73 Ceramic Floor Tile Grout HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Girl's and Boy's Washrooms 6 COMMENTS: Inspector's Signature: 3/9/216

165 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ Ceramic Floor Tile Grout Girl's and Boy's Washrooms 6 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

166 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 74 Ceramic Floor Tile Adhesive HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Girl's and Boy's Washrooms 6 COMMENTS: Inspector's Signature: 3/9/216

167 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ Ceramic Floor Tile Adhesive Girl's and Boy's Washrooms 6 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

168 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 75 12"x12" White w/blue Specks Floor tile HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Engineer's Washroom 3 COMMENTS: Inspector's Signature: 3/9/216

169 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ "x12" White w/blue Specks Floor tile Engineer's Washroom 3 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

170 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 76 12"x12" White w/blue Specks Floor Tile Adhesive HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Engineer's Washroom 3 COMMENTS: Inspector's Signature: 3/9/216

171 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ "x12" White w/blue Specks Floor Tile Adhesive Engineer's Washroom 3 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

172 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 77 Terrazzo HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Corridors of 193 Building 8 COMMENTS: Inspector's Signature: 3/9/216

173 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ Terrazzo Corridors of 193 Building 8 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

174 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 78 Carpet Adhesive HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: Principal's Office 8 COMMENTS: Inspector's Signature: 3/9/216

175 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ Carpet Adhesive Principal's Office 8 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

176 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 79 12"x12" Blue Mix Floor Tile HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 1st, 2nd & 3rd Floor Corridors of 193 and 194 Buildings 175 COMMENTS: Inspector's Signature: 3/9/216

177 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ "x12" Blue Mix Floor Tile 1st, 2nd & 3rd Floor Corridors of 193 and 194 Buildings 175 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

178 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION 8 12"x12" Blue Mix Floor Tile Adhesive HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: 1st, 2nd & 3rd Floor Corridors of 193 and 194 Buildings 175 COMMENTS: Inspector's Signature: 3/9/216

179 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ "x12" Blue Mix Floor Tile Adhesive 1st, 2nd & 3rd Floor Corridors of 193 and 194 Buildings 175 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

180 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION C aircell pipe insulation HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: basement & roo 21, 1895 bldg. 37 LF LF COMMENTS: Inspector's Signature: 3/9/216

181 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ C aircell pipe insulation basement & roo 21, 1895 bldg. 37 LF LF In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

182 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION D fittings on aircell pipe insulation HISTORICAL AHERA DAMAGE CATEGORY 7 Any remaining friable ACBM or friable suspect ACBM HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: basement & room 21, 1895 bldg. 37 Fittings Fittings COMMENTS: Inspector's Signature: 3/9/216

183 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ D fittings on aircell pipe insulation basement & room 21, 1895 bldg. 37 Fittings Fittings In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

184 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION F joints on paperwrap pipe insulation HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: basement boiler room, 1895 bldg. 15 Each Each COMMENTS: Inspector's Signature: 3/9/216

185 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ F joints on paperwrap pipe insulation basement boiler room, 1895 bldg. 15 Each Each In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

186 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION H aircell pi[pe insulation HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: basement corridor, 193 bldg. 2 LF LF COMMENTS: Inspector's Signature: 3/9/216

187 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ H aircell pi[pe insulation basement corridor, 193 bldg. 2 LF LF In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

188 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION I joints on aircell pipe insulation HISTORICAL AHERA DAMAGE CATEGORY 7 Any remaining friable ACBM or friable suspect ACBM HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: basement corridor bldg 3 Each Each COMMENTS: Inspector's Signature: 3/9/216

189 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ I joints on aircell pipe insulation basement corridor bldg 3 Each Each In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

190 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION J fittings on fiberglass pipe insulation HISTORICAL AHERA DAMAGE CATEGORY 7 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: Basement, room 11, room 21, room Each Each COMMENTS: Inspector's Signature: 3/9/216

191 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ J fittings on fiberglass pipe insulation Basement, room 11, room 21, room Each Each In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

192 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION K paperwrap pipe insulation HISTORICAL AHERA DAMAGE CATEGORY 7 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: basement corridor, 193 bldg. 2 Each Each COMMENTS: Inspector's Signature: 3/9/216

193 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ K paperwrap pipe insulation basement corridor, 193 bldg. 2 Each Each In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

194 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION L fittings on paperwrap pipe insulation HISTORICAL AHERA DAMAGE CATEGORY 7 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: basement corridor, 193 bldg. 2 Each Each COMMENTS: Inspector's Signature: 3/9/216

195 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ L fittings on paperwrap pipe insulation basement corridor, 193 bldg. 2 Each Each In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

196 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION M fittings on fiberglass pipe insulation HISTORICAL AHERA DAMAGE CATEGORY 7 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: basement corridor 193 bldg. 4 Each Each COMMENTS: Inspector's Signature: 3/9/216

197 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ M fittings on fiberglass pipe insulation basement corridor 193 bldg. 4 Each Each In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

198 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION N aircell pipe insulation HISTORICAL AHERA DAMAGE CATEGORY 7 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: basement corridor, 194 bldg. 22 LF LF COMMENTS: Inspector's Signature: 3/9/216

199 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ N aircell pipe insulation basement corridor, 194 bldg. 22 LF LF In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

200 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION O fittings on aircell pipe insulation HISTORICAL AHERA DAMAGE CATEGORY 7 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: basement corridor, 194 bldg. 18 Fittings Fittings COMMENTS: Inspector's Signature: 3/9/216

201 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ O fittings on aircell pipe insulation basement corridor, 194 bldg. 18 Fittings Fittings In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

202 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION P paperwrap pipe insulation HISTORICAL AHERA DAMAGE CATEGORY 7 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: basement corridor, 1st & 2nd floor washroom pipe chase. 18 LF LF COMMENTS: Inspector's Signature: 3/9/216

203 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ P paperwrap pipe insulation basement corridor, 1st & 2nd floor washroom pipe chase. 18 LF LF In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

204 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION Q fittings on paperwrap pipe insulation HISTORICAL AHERA DAMAGE CATEGORY 7 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: basement corridor, 1st & 2nd floor washroom pipe chase. 3 Each Each COMMENTS: Inspector's Signature: 3/9/216

205 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ Q fittings on paperwrap pipe insulation basement corridor, 1st & 2nd floor washroom pipe chase. 3 Each Each In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

206 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION R fittings on fiberglass pipe insulation HISTORICAL AHERA DAMAGE CATEGORY 7 Any remaining friable ACBM or friable suspect ACBM HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: fan and engine room, 194 bldg. 44 Each Each COMMENTS: Inspector's Signature: 3/9/216

207 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ R fittings on fiberglass pipe insulation fan and engine room, 194 bldg. 44 Each Each In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

208 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION S boiler gasket HISTORICAL AHERA DAMAGE CATEGORY 7 Any remaining friable ACBM or friable suspect ACBM HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: boiler room, 1895 bldg. 3 LF LF COMMENTS: Inspector's Signature: 3/9/216

209 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ S boiler gasket boiler room, 1895 bldg. 3 LF LF In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

210 216 AHERA REINSPECTION Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: John Feely Emmett Till Math & Science INSPECTION DATE: 3/9/ INFORMATION FROM PREVIOUS INSPECTION T incinerator insulation HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: boiler room - removed COMMENTS: not observed 216 Inspector's Signature: 3/9/216

211 216 AHERA REINSPECTION Management Planner Review Form MANAGEMENT PLANNER: Todd Huffer Emmett Till Math & Science REVIEW DATE: 4/26/ T incinerator insulation boiler room - removed 474 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 4/26/216

212 216 AHERA REINSPECTION

213 APPENDIX B Inspector and Management Planner Licenses

214

215

216

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

Youth Connection - J. Addams Alter HS

Youth Connection - J. Addams Alter HS ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

If the address on this form is different than the address of the building, submit a written explanation.

If the address on this form is different than the address of the building, submit a written explanation. ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

If the address on this form is different than the address of the building, submit a written explanation.

If the address on this form is different than the address of the building, submit a written explanation. ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

Three Year Asbestos Re-Inspection Report. Macomb Montessori Academy East Nine Mile Road Warren, Michigan 47089

Three Year Asbestos Re-Inspection Report. Macomb Montessori Academy East Nine Mile Road Warren, Michigan 47089 Three Year Re-Inspection Report For 14057 East Nine Mile Road Warren, Michigan 47089 Prepared by: Northern Analytical Services, LLC. 14870 225 th Avenue Big Rapids, Michigan 49307 Dated: Project 160268

More information

Palmyra High School 07/16 Addition and Renovation Palmyra, Nebraska

Palmyra High School 07/16 Addition and Renovation Palmyra, Nebraska Palmyra High School 07/16 Addition and Renovation Palmyra, Nebraska 845-001-14 DOCUMENT 00 31 26 - EXISTING HAZARDOUS MATERIAL INFORMATION 1.1 EXISTING HAZARDOUS MATERIAL INFORMATION A. This Document with

More information

NARRATIVE REPORT. Underlayment Paper for Linoleum. The Asbestos Bulk Sample Results Table includes asbestos sampling data.

NARRATIVE REPORT. Underlayment Paper for Linoleum. The Asbestos Bulk Sample Results Table includes asbestos sampling data. NARRATIVE REPORT 1.0 BUILDING INFORMATION Engineering and Technology was originally constructed in 1913; although specific information is unavailable, several renovations are evident. Engineering and Technology

More information

Asbestos 3-Year Re-inspection Report and Updated Management Plan. Edith Nourse Rogers School 43 Highland Street Lowell, Massachusetts, 01852

Asbestos 3-Year Re-inspection Report and Updated Management Plan. Edith Nourse Rogers School 43 Highland Street Lowell, Massachusetts, 01852 Asbestos 3-Year Report Edith Nourse Rogers School 43 Highland Street, 01852 Prepared by: Cardno ATC 600 West Cummings Park, Suite 5450 Woburn, Massachusetts 01801 September 24, 2014 Cardno ATC Project

More information

NARRATIVE REPORT. Engineering Administration was originally constructed in 1965; the building has had no major renovations.

NARRATIVE REPORT. Engineering Administration was originally constructed in 1965; the building has had no major renovations. NARRATIVE REPORT 1.0 BUILDING INFORMATION Engineering Administration was originally constructed in 1965; the building has had no major renovations. Engineering Administration is a three-story, 9,579 ft

More information

ASBESTOS AND LEAD-BASED PAINT SURVEY 696/698 Hawthorne Avenue St. Paul, Minnesota. Prepared for:

ASBESTOS AND LEAD-BASED PAINT SURVEY 696/698 Hawthorne Avenue St. Paul, Minnesota. Prepared for: ASBESTOS AND LEAD-BASED PAINT SURVEY 696/698 Hawthorne Avenue St. Paul, Minnesota Prepared for: City of St. Paul Department of Planning and Economic Development 1100 City Hall Annex 25 West 4 th Street

More information

DULANEY HIGH SCHOOL FEASIBILITY STUDY

DULANEY HIGH SCHOOL FEASIBILITY STUDY DULANEY HIGH SCHOOL FEASIBILITY STUDY APPENDIX A: SITE PLAN Baltimore County Public Schools Site Plan-Appendix A Office of Engineering and Construction February 18, 2016 Dulaney High School Feasibility

More information

ASBESTOS POLICY. 2. Authority. 3. Scope. 4. Definitions. 4. Responsibilities. 1. Purpose. Department supervisors

ASBESTOS POLICY. 2. Authority. 3. Scope. 4. Definitions. 4. Responsibilities. 1. Purpose. Department supervisors 1. Purpose ASBESTOS POLICY The purpose of the University of Denver Asbestos Policy is to establish the means to prevent personal asbestos exposures to DU and contractor workers by managing and controlling

More information

RECORD OF FRIABLE AND NONFRIABLE ACM Inspection Date(s) July 31, 2013 (FORM B)

RECORD OF FRIABLE AND NONFRIABLE ACM Inspection Date(s) July 31, 2013 (FORM B) Corporation Yard RECORD OF FRIABLE AND NONFRIABLE AC Inspection Date(s) July 31, 2013 (FOR B) THREE-YEAR REINSPECTION CDS CODE 04-61424-0000000 SCHOOL Corporate Yard SCHOOL PHONE NUBER (530) 891-3095 ADDRESS

More information

AHERA Asbestos Management Plan

AHERA Asbestos Management Plan Our Services: Asbestos Inspections Asbestos Abatement Design Asbestos Abatement Oversight AHERA Asbestos Management Plan 720 Fairview Drive Carlisle, Ohio 45005 Asbestos Management Planning Phase I Environmental

More information

900 S. Colorado Blvd. - 5,609 square ft building (new automobile sales showroom and offices) built in 2000/2001; and

900 S. Colorado Blvd. - 5,609 square ft building (new automobile sales showroom and offices) built in 2000/2001; and Sent Via erims November 13, 2013 Sonic Automotive, Inc. 4401 Colwick Road Charlotte, North Carolina 28211 Attention: Mr. Doug Siska Re: Asbestos Survey Murray BMW of Denver 900 S Colorado Blvd and 4320

More information

Turn-Key Environmental Consultants, Inc. 790 Barnhart Rd. 714 Monument Ave. Phone: Troy, OH Dayton, OH Fax:

Turn-Key Environmental Consultants, Inc. 790 Barnhart Rd. 714 Monument Ave. Phone: Troy, OH Dayton, OH Fax: Turn-Key Environmental Consultants, Inc. 790 Barnhart Rd. 714 Monument Ave. Phone: 937-335-8807 Troy, OH 45373 Dayton, OH 45402 Fax: 937-339-4882 March 24, 2016 Mr. Dennis Zimmer City of Dayton, Division

More information

ASBESTOS ROOF INSPECTION REPORT

ASBESTOS ROOF INSPECTION REPORT ASBESTOS ROOF INSPECTION REPORT OF MARSHALL COURTS ROOF 3300 A&B, 3302 A&B, 3400 A & B, 3402 A & B MARSHALL AVE 800 A & B 35 TH STREET AND 801 A&B 33 RD STREET NEWPORT NEWS, VIRGINIA 23606 MCS JOB #13-031S

More information

EPA/ODEQ DEMOLITION BY FIRE REQUIREMENTS

EPA/ODEQ DEMOLITION BY FIRE REQUIREMENTS EPA/ODEQ DEMOLITION BY FIRE REQUIREMENTS The OKLAHOMA AIR POLLUTION CONTROL RULES, Oklahoma Administrative Code (OAC) 252:100-13, Open Burning, specifically, subpart 5, Open burning prohibited, states:

More information

Procedure. Procedure

Procedure. Procedure Procedure 4.1524 Asbestos Procedure A. Scope... 1 B. Applicability... 2 C. Definitions... 2 D. Responsibilities... 3 E. Hazards... 4 F. General Rules... 4 G. Asbestos Inventory... 5 H. Asbestos Identification...

More information

Lead Based Coatings Flowchart

Lead Based Coatings Flowchart 1926.62 Any Detectable Levels of Lead / Stop No Testing or Compliance Issues Lead Coatings NOT Target Housing or Child Occupied Facility Target Housing Child Occupied Family Georgia Certified Firm & Inspect

More information

Radon Measurement Survey Report. Rollins Elementary School 950 Kane Street Aurora, Illinois Prepared For:

Radon Measurement Survey Report. Rollins Elementary School 950 Kane Street Aurora, Illinois Prepared For: Radon Measurement Survey Report Site: 950 Kane Street Aurora, Illinois 60505 Survey Dates: May 15, 2018 thru May 18, 2018 Prepared For: East Aurora School District 131 417 Fifth Street Aurora, Illinois

More information

Radon Measurement Survey Report. Fred Rodgers Magnet Academy 501 College Avenue Aurora, Illinois Prepared For:

Radon Measurement Survey Report. Fred Rodgers Magnet Academy 501 College Avenue Aurora, Illinois Prepared For: Radon Measurement Survey Report Site: 501 College Avenue Aurora, Illinois 60505 Survey Dates: May 16, 2018 thru May 18, 2018 Prepared For: East Aurora School District 131 417 Fifth Street Aurora, Illinois

More information

ASBESTOS AWARENESS New Employee Training March Environmental, Facilities Services Eddie Pena (HazMat & IAQ Coordinator)

ASBESTOS AWARENESS New Employee Training March Environmental, Facilities Services Eddie Pena (HazMat & IAQ Coordinator) ASBESTOS AWARENESS New Employee Training March 2014 Environmental, Facilities Services Eddie Pena (HazMat & IAQ Coordinator) Why Are You Here? You need to know - Where there is (or may be) asbestoscontaining

More information

Radon Measurement Survey Report. Waldo Middle School 56 Jackson Street Aurora, Illinois Prepared For:

Radon Measurement Survey Report. Waldo Middle School 56 Jackson Street Aurora, Illinois Prepared For: Radon Measurement Survey Report Site: 56 Jackson Street Aurora, Illinois 60505 Survey Dates: May 8, 2018 thru May 10, 2018 Prepared For: East Aurora School District 131 417 Fifth Street Aurora, Illinois

More information

WATER QUALITY TESTING FOR SCHAUMBURG COMMUNITY CONSOLIDATED SCHOOL DISTRICT 54 HOOVER SCHAUMBURG, ILLINOIS OCTOBER 3, 2017 PROJECT NUMBER:

WATER QUALITY TESTING FOR SCHAUMBURG COMMUNITY CONSOLIDATED SCHOOL DISTRICT 54 HOOVER SCHAUMBURG, ILLINOIS OCTOBER 3, 2017 PROJECT NUMBER: WATER QUALITY TESTING FOR SCHAUMBURG COMMUNITY CONSOLIDATED SCHOOL DISTRICT 54 HOOVER SCHAUMBURG, ILLINOIS OCTOBER 3, 2017 PROJECT NUMBER: 17-18350 1550 Hubbard Ave., Batavia, IL 60510, 630-879-3006 Schaumburg

More information

Safe Removal of Asbestos. Work Safe Week 2013

Safe Removal of Asbestos. Work Safe Week 2013 Safe Removal of Asbestos Work Safe Week 2013 Work Safe Week 2013 For the respect of others please ensure your mobile phone is switched off or on silent. In the event of an emergency a Convention Centre

More information

22A Belvedere Avenue, Parry Sound Sprinkler System Consulting Review

22A Belvedere Avenue, Parry Sound Sprinkler System Consulting Review Parry Sound District Social Services Administration Board Housing and Community Services October 10, 2018 c/o Andrew Ball, Properties and Capital Projects Coordinator Email:aball@psdssab.org 22A Belvedere

More information

The school s metal push-out windows were assessed and nothing of concern was noted.

The school s metal push-out windows were assessed and nothing of concern was noted. February 15, 2017 Courtney Wilton Portland Public Schools 501 North Dixon Portland, OR 97227 Via email: Regarding: cwilton@pps.net Lead Paint Condition Assessment Faubion at Tubman 2231 N Flint Avenue

More information

Radon Measurement Survey Report. McKnight School Service Center 417 Fifth Street Aurora, Illinois Prepared For:

Radon Measurement Survey Report. McKnight School Service Center 417 Fifth Street Aurora, Illinois Prepared For: Radon Measurement Survey Report Site: 417 Fifth Street Aurora, Illinois 60505 Survey Dates: May 9, 2018 thru May 11, 2018 Prepared For: East Aurora School District 131 417 Fifth Street Aurora, Illinois

More information

Radon Measurement Survey Report. Krug Elementary School 240 Melrose Avenue Aurora, Illinois Prepared For:

Radon Measurement Survey Report. Krug Elementary School 240 Melrose Avenue Aurora, Illinois Prepared For: Radon Measurement Survey Report Site: 240 Melrose Avenue Aurora, Illinois 60505 Survey Dates: May 1, 2018 thru May 3, 2018 Prepared For: East Aurora School District 131 417 Fifth Street Aurora, Illinois

More information

VOTER BOND REFERENDUM 2018 SUMMARY OF WORK PROPOSED

VOTER BOND REFERENDUM 2018 SUMMARY OF WORK PROPOSED Ashton Elementary School 1 Masonry Repair $ 42,781.50 2 Replace HVAC $ 375,000.00 3 Replace SAT @ Various Locations $ 92,364.00 3 Recoat & Resurface Exterior Paved Play Area $ 135,978.30 3 Various Technological

More information

HAZARDOUS MATERIALS MANAGEMENT SURVEY FIRE HALL # KNIGHT STREET VANCOUVER, BRITISH COLUMBIA

HAZARDOUS MATERIALS MANAGEMENT SURVEY FIRE HALL # KNIGHT STREET VANCOUVER, BRITISH COLUMBIA HAZARDOUS MATERIALS MANAGEMENT SURVEY FIRE HALL #17 7070 KNIGHT STREET VANCOUVER, BRITISH COLUMBIA Prepared for: City of Vancouver - Real Estate and Facilities Management #300 515 West 10 th Avenue Vancouver,

More information

Radon Measurement Survey Report. Oak Park Elementary School 1200 Front Street Aurora, Illinois Prepared For:

Radon Measurement Survey Report. Oak Park Elementary School 1200 Front Street Aurora, Illinois Prepared For: Radon Measurement Survey Report Site:July 5, 2018 1200 Front Street Aurora, Illinois 60505 Survey Dates: May 9, 2018 thru May 11, 2018 Prepared For: East Aurora School District 131 417 Fifth Street Aurora,

More information

TCDSB Asbestos Containing Material Re-Assessment Form. Friability (F/NF) Asbestos Content

TCDSB Asbestos Containing Material Re-Assessment Form. Friability (F/NF) Asbestos Content TCDSB Containing Material June 3, 07 Page St. Josaphat Catholic School 50373 0/0A/0B/0/ 0A/0B/03/03 A/04/05/06/06B //4/5B/5 C/S0 Below Remnant Mastic - Below Tiles 00 (now 0A) Above Ceiling Pipe fitting

More information

PBS observed paint chips in the garden, which is located approximately six to 10 feet from painted surfaces that were in intact condition.

PBS observed paint chips in the garden, which is located approximately six to 10 feet from painted surfaces that were in intact condition. December 30, 2016 Courtney Wilton Portland Public Schools 501 North Dixon Portland, OR 97227 Via email: Regarding: cwilton@pps.net Lead Paint Condition Assessment Arleta Elementary School 5109 SE 66th

More information

Understand what asbestos is and how to avoid exposure

Understand what asbestos is and how to avoid exposure Understand what asbestos is and how to avoid exposure. PINCHIN & AFFILIATES A leader in engineering, environmental health & safety solutions Multi-disciplinary approach by highly qualified, experienced

More information

MATHEMATICAL SCIENCES BUILDING

MATHEMATICAL SCIENCES BUILDING Final Focused Tiered Environmental Impact Report State Clearinghouse No. 2002072048 Prepared By: OFFICE OF RESOURCE MANAGEMENT AND PLANNING University of California One Shields Avenue 376 Mrak Hall Davis,

More information

Allisonville Elementary School Facilities Highlights Built: 1960 Last Major Renovation: 28 years ago Capacity: 650 Current Enrollment: 767

Allisonville Elementary School Facilities Highlights Built: 1960 Last Major Renovation: 28 years ago Capacity: 650 Current Enrollment: 767 Allisonville Elementary School Built: 1960 Last Major Renovation: 28 years ago Capacity: 650 Current Enrollment: 767 ADA improvements are Fire alarms need to be updated Playground equipment needs to be

More information

LONG-TERM OPERATIONS AND MAINTENANCE PLAN

LONG-TERM OPERATIONS AND MAINTENANCE PLAN LONG-TERM OPERATIONS AND MAINTENANCE PLAN May, 2017 BOARD OF EDUCATION Cathe Russe President Jackie Lutz Vice President Sam Ach Member John Heggie Member Natalie Jachtorowycz Member John J. Murphy Member

More information

STATE OF MICHIGAN DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS LANSING

STATE OF MICHIGAN DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS LANSING RICK SNYDER GOVERNOR STATE OF MICHIGAN DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS LANSING SHELLY EDGERTON DIRECTOR March 7, 2017 1093 Wayne Rd RE: License #: AS040378598 1093 Wayne Road Dear : Attached

More information

Riverview West Side Elementary 160 Isabel Avenue East

Riverview West Side Elementary 160 Isabel Avenue East 160 Isabel Avenue East Project Summary: At the center of Hispanic culture in St. Paul is Riverview Elementary - and it s truly the center of the West Side community. Our newly renovated location offers

More information

BID PROPOSAL-REVISED

BID PROPOSAL-REVISED BID PROPOSAL-REVISED PROJECT: B17-13, Bldg 1300 HVAC ( the Work ) CABRILLO COMMUNITY COLLEGE DISTRICT Bidder Name Bidder Representative(s) Bidder Representative(s) Contact Information Bidder Mailing Address

More information

Rezoning. Rezone from C-4 and RA to RF-9C and RF-12C to allow subdivision into approximately 47 small single family lots in East Clayton.

Rezoning. Rezone from C-4 and RA to RF-9C and RF-12C to allow subdivision into approximately 47 small single family lots in East Clayton. City of Surrey PLANNING & DEVELOPMENT REPORT File: 7903-0275-00 Rezoning Proposal: Rezone from C-4 and RA to RF-9C and RF-12C to allow subdivision into approximately 47 small single family lots in East

More information

Phase II: School Safety Report_ _15:42

Phase II: School Safety Report_ _15:42 Phase II: School Safety Report_10112017_15:42 Phase II: School Safety Report Timothy Underwood 2431 W. KY 10 Tollesboro, Kentucky, 41189 United States of America Target Completion Date: 10/12/2017 Last

More information

Ohio Department of Health, Bureau of Environmental Health and Radiation Protection, Radon Licensing Program. School Radon Testing Checklist

Ohio Department of Health, Bureau of Environmental Health and Radiation Protection, Radon Licensing Program. School Radon Testing Checklist Ohio Department of Health, Bureau of Environmental Health and Radiation Protection, Radon Licensing Program School Radon Testing Checklist Purpose: This checklist has been prepared to provide school employees

More information

PRIVATE FIRE SERVICE INSTALLATION PACKET

PRIVATE FIRE SERVICE INSTALLATION PACKET PRIVATE FIRE SERVICE INSTALLATION PACKET The 2017 Edition supersedes all previous versions for Private Fire Service Installation To Whom It May Concern: SUBJECT: PRIVATE FIRE SERVICE INSTALLATION Illinois

More information

ADDENDUM #1: MODIFICATIONS AND ADDITIONS TO CONTRACT DOCUMENTS

ADDENDUM #1: MODIFICATIONS AND ADDITIONS TO CONTRACT DOCUMENTS Annex Laundry and Shower Alterations ADDENDUM #1 March 7, 2019 ADDENDUM #1: MODIFICATIONS AND ADDITIONS TO CONTRACT DOCUMENTS A. Invitation to Bid - Call for Bids has been modified as follows: 1. Notice

More information

LOS ANGELES UNIFIED SCHOOL DISTRICT OFFICE OF ENVIRONMENTAL HEALTH AND SAFETY PROCEDURE

LOS ANGELES UNIFIED SCHOOL DISTRICT OFFICE OF ENVIRONMENTAL HEALTH AND SAFETY PROCEDURE TITLE: ISSUER: Occupancy Inspections for New Schools and Modernization Projects John Sterritt, Director Office of Environmental Health and Safety ROUTING Office of Environmental Health & Safety Staff DATE:

More information

3520 A Energy Conservation Standards

3520 A Energy Conservation Standards 3520 A Energy Conservation Standards Regulation Original Adoption: 04/14/2009 Effective Date: 08/06/2009 Revision Dates: 08/05/2009 I. PURPOSE The purpose of this regulation is to establish the energy

More information

Occupancy Packet & Business License Application

Occupancy Packet & Business License Application YOU ARE HEREBY NOTIFIED THAT A NEW OWNER/TENANT MUST OBTAIN AN OCCUPANCY PERMIT BEFORE OCCUPYING THE PREMISES AT ADDRESS OF PROPERTY In Franklin Park, Illinois 60131. Applications for Occupancy Permits

More information

BUILDING, FIRE, AND LIFE SAFETY CODE ENFORCEMENT AND CERTIFICATION OF INSPECTORS FOR HEALTH FACILITIES LICENSED BY THE STATE OF COLORADO

BUILDING, FIRE, AND LIFE SAFETY CODE ENFORCEMENT AND CERTIFICATION OF INSPECTORS FOR HEALTH FACILITIES LICENSED BY THE STATE OF COLORADO DEPARTMENT OF PUBLIC SAFETY Division of Fire Prevention and Control BUILDING, FIRE, AND LIFE SAFETY CODE ENFORCEMENT AND CERTIFICATION OF INSPECTORS FOR HEALTH FACILITIES LICENSED BY THE STATE OF COLORADO

More information

Safety Policy Manual Policy No. 145

Safety Policy Manual Policy No. 145 Policy: Interim Life Safety (ILS) Program Page 1 of 9 APPLICATION NYU Langone PURPOSE To ensure adequate life safety protection: When a standpipe, sprinkler, or fire alarm system is out-of-service. When

More information

Certificate of Completion

Certificate of Completion Love the Lungs You re With 630-325-4443 800-244-4242 Certificate of Completion Every parent or guardian is notified that this facility has performed radon measurements to ensure the health and safety of

More information

Joseph Brennemann Elementary School

Joseph Brennemann Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Type of Fire Alarm Control Panel: System is: Existing OR New If new, provide Electrical Permit Number:

Type of Fire Alarm Control Panel: System is: Existing OR New If new, provide Electrical Permit Number: DATE OF SUBMISSION TO: Department of Licenses and Inspections Commercial and Industrial Fire Inspection Unit 990 Spring Garden Street, 3 rd Floor, Philadelphia, PA 19123 AP# CITY OF PHILADELPHIA FIRE ALARM

More information

[Docket No. FAA ; Directorate Identifier 2012-NM-176-AD] Airworthiness Directives; DASSAULT AVIATION Airplanes

[Docket No. FAA ; Directorate Identifier 2012-NM-176-AD] Airworthiness Directives; DASSAULT AVIATION Airplanes This document is scheduled to be published in the Federal Register on 05/21/2013 and available online at http://federalregister.gov/a/2013-12077, and on FDsys.gov [4910-13-P] DEPARTMENT OF TRANSPORTATION

More information

PLATTEVILLE MIDDLE SCHOOL

PLATTEVILLE MIDDLE SCHOOL Architectural The building has aluminum clad wood awning windows in combination with aluminum fixed glass units. They appear to be exterior glazed with insulated glazing. See photo 2. Platteville Middle

More information

LIMITED INDOOR MOLD ASSESSMENT

LIMITED INDOOR MOLD ASSESSMENT LIMITED INDOOR MOLD ASSESSMENT RESIDENTIAL PROPERTY 1022 NORTHWEST 27 TH STREET SAN ANTONIO, TEXAS PREPARED FOR: PREPARED BY: LUCAS OLIVA ARGUS ENVIRONMENTAL SAN ANTONIO HOUSING AUTHORITY 10004 WURZBACH

More information

At least 10 calendar days prior to project start date Within the last 30 days of a project that will extend beyond 12 months

At least 10 calendar days prior to project start date Within the last 30 days of a project that will extend beyond 12 months New York State Department of Labor Division of Safety and Health (518) 485-9263 Filing an asbestos project notification Who must provide asbestos project notification If the asbestos removal project is:

More information

September 30, Dear Fire Suppression System Contractor/Designer:

September 30, Dear Fire Suppression System Contractor/Designer: CITY OF BOZEMAN FIRE DEPARTMENT P.O. Box 1230 Bozeman, Montana 59771-1230 Phone (406) 582-2350 CITY OF BOZEMAN BUILDING DEPARTMENT 20 E Olive St, STE 208 Bozeman, Montana 59715-4790 Phone (406) 582-2375

More information

Well managed building mean risk is normal. Fire action notices should be displayed by all alarm break glass call points.

Well managed building mean risk is normal. Fire action notices should be displayed by all alarm break glass call points. Record of significant findings Risk assessment for : Assessment undertaken by : Horsefair House Nigel Billing CMIOSH Date: 28/3/17 Overview of Premises: 2 buildings on 3 stories in an L shaped configuration,

More information

NYC Department of Education

NYC Department of Education Asset: P.S. 111 - MANHATTAN, 440 WEST 53 STREET, New York, 10019 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-03-16 8:47 AM 2018-03-21 8:02 AM Asset Data Are there fuel tanks?

More information

NYC Department of Education

NYC Department of Education Asset: P.S. 183 - QUEENS, 2-45 B 79 STREET, New York, 11693 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-03-02 8:32 AM 2018-05-16 1:44 PM Asset Data Are there fuel tanks? Total

More information

Alessandro Volta Elementary School

Alessandro Volta Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

RESIDENTIAL CARE USER GUIDE UPDATES TO MANITOBA BUILDING/FIRE CODE:

RESIDENTIAL CARE USER GUIDE UPDATES TO MANITOBA BUILDING/FIRE CODE: RESIDENTIAL CARE USER GUIDE UPDATES TO MANITOBA BUILDING/FIRE CODE: Manitoba Regulation 221/2015 and Manitoba Regulation 222/2015 DATE: MARCH 17, 2016 1. INTRODUCTION On April 1, 2016, new building and

More information

Lakehead University Asbestos Removals (2014 Audit) Residence:

Lakehead University Asbestos Removals (2014 Audit) Residence: Lakehead University Asbestos Removals (2014 Audit) Residence: Bartley Residence, #6 Location #: 458, Marathon - Meeting Room, Floor: Marathon - 1, Room Number: RM100 Walls NI Drywall and joint cosurface

More information

Richard Henry Lee Elementary School

Richard Henry Lee Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Certificate of Completion

Certificate of Completion Love the Lungs You re With 630-325-4443 800-244-4242 Certificate of Completion Every parent or guardian is notified that this facility has performed radon measurements to ensure the health and safety of

More information

REGULATORY REFORM (FIRE SAFETY) ORDER 2005 PERIODIC REVIEW OF FIRE RISK ASSESSMENT

REGULATORY REFORM (FIRE SAFETY) ORDER 2005 PERIODIC REVIEW OF FIRE RISK ASSESSMENT REGULATORY REFORM (FIRE SAFETY) ORDER 2005 PERIODIC REVIEW OF FIRE RISK ASSESSMENT Responsible person (e.g. employer) or person having control of the premises: Address of premises: Tel: Person(s) consulted:

More information

UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY

UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY Revision No.: 11 Page 1 of 12 I. PURPOSE This procedure establishes a tool to help maintain a safe environment for all patients, visitors and staff by evaluating the loss of a life safety feature during

More information

Asbestos in the Community EHPA

Asbestos in the Community EHPA Asbestos in the Community EHPA Darren Watson Inspector WorkSafe Victoria 20 th June 2016 Contents What is asbestos Forms of asbestos containing material (ACM) Health hazard & risk to health Types of ACM

More information

Title: Fire Sprinkler System Permit Requirements

Title: Fire Sprinkler System Permit Requirements Title: Fire Sprinkler System Permit Requirements Category: Operational Procedure Policy No: OP-03 Classification: Development PURPOSE: 1. To provide clear direction to the fire Sprinkler contractors, general

More information

NFPA Fire Inspector I Study Guide

NFPA Fire Inspector I Study Guide NFPA 1031-2003 Fire Inspector I Study Guide National Certification Program October 2004 This document is provided This document at no cost is provided to the user at no by cost Kansas to the user Fire

More information

Inspection Dates: March 21 March 22, 2016 Report Date: March 31, 2016

Inspection Dates: March 21 March 22, 2016 Report Date: March 31, 2016 Lead-Based Paint Inspection Broadway Terrace Apartments 1504-1508 Broadway Street Ann Arbor, Michigan Ann Arbor Housing Commission Inspection Dates: March 21 March 22, 2016 Report Date: March 31, 2016

More information

NEW YORK CITY FIRE DEPARTMENT. Notice of Public Hearing and Opportunity to Comment on Proposed Rule

NEW YORK CITY FIRE DEPARTMENT. Notice of Public Hearing and Opportunity to Comment on Proposed Rule NEW YORK CITY FIRE DEPARTMENT Notice of Public Hearing and Opportunity to Comment on Proposed Rule What are we proposing? The Fire Department is proposing to amend Section 4601-01 of Title 3 of the Rules

More information

For the sake of this investigation, it is assumed that all paint and varnish at the school contains some concentration of lead.

For the sake of this investigation, it is assumed that all paint and varnish at the school contains some concentration of lead. October 5, 2016 Courtney Wilton Portland Public Schools 501 rth Dixon Portland, OR 97227 Via email: Regarding: cwilton@pps.net Lead Paint Condition Assessment Hayhurst Elementary School 5037 SW Iowa Street

More information

Mechanical Inspection Plumbing

Mechanical Inspection Plumbing 0811 Fixtures Sinks, drinking fountains, water closets, showers, etc. Classroom Sinks. Classroom sinks (19) are enameled cast iron self rimming side ledge with gooseneck faucet trim with index handles,

More information

November 20, Sierra House Elementary School Fire Update and Reports

November 20, Sierra House Elementary School Fire Update and Reports November 20, 2018 Sierra House Elementary School Fire Update and Reports As you are aware, a fire broke at Sierra House Elementary School on November 11, 2018 at approximately 10:00 pm. The following is

More information

Green Flag Level Two Survey: Indoor Air Quality Program

Green Flag Level Two Survey: Indoor Air Quality Program Green Flag Level Two Survey: Indoor Air Quality Program You have chosen to work on the Indoor Air Quality (IAQ) program to earn a Green Flag award. Answering these survey questions will take you on a tour

More information

Laser Safety, Utilization and Credentialing Policy

Laser Safety, Utilization and Credentialing Policy University at Buffalo Policy Laser Safety, Utilization and Credentialing Policy Category: Date Established: to be determined Responsible Area: Clinical Affairs Date Last Revised: 11/21/2013 Responsible

More information

Lead-Based Paint XRF Test Cover Sheet

Lead-Based Paint XRF Test Cover Sheet Lead Safe Testing, LLC 303-949-8884 info@leadsafetestingllc.com 10200 E. Girard Ave. Bldg. A, Suite 412 Denver, CO 80231 Lead-Based Paint XRF Test Cover Sheet Job Name: Glenwood Springs Decommissioned

More information

List of Equipment, Tools, Supplies, and Facilities:

List of Equipment, Tools, Supplies, and Facilities: Unit C: Traits of Soil Lesson 3: Understanding Soil Color Student Learning Objectives: Instruction in this lesson should result in the students achieving the following objectives: 1. Identify physical

More information

John Palmer Elementary School

John Palmer Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

TIFT COUNTY SCHOOLS E-SPLOST HISTORY

TIFT COUNTY SCHOOLS E-SPLOST HISTORY TIFT COUNTY SCHOOLS E-SPLOST HISTORY July 1, 1997 June 30, 2002 $28,766,187.16 collected July 1, 2002 June 30, 2007 $39,025,830.10 collected July 1, 2007 June 30, 2012 $41,886,155.46 collected July 1,

More information

Emergency Evacuation Plans and Exercises. Risk Management Services

Emergency Evacuation Plans and Exercises. Risk Management Services Emergency Evacuation Plans and Exercises Services Table of Contents I. Program Goals and Objectives... 2 II. Scope and Application... 2 III. Responsibilities... 2 IV. Emergency Evacuation Plans and Maps...

More information

Contractors Site Induction

Contractors Site Induction Contractors Site Induction Guy s Campus Directorate of Estates & Facilities - Document No. HS16 V3.2 Dated 13 th May 2013 About King s College London One of the top 25 universities in the world (Times

More information

THE ESTABLISHMENT OF URBAN OPEN SPACES TO MEET USER NEEDS: A COMPARATIVE CASE STUDY OF TWO NEIGHBOURHOOD PARKS IN ABUJA, NIGERIA

THE ESTABLISHMENT OF URBAN OPEN SPACES TO MEET USER NEEDS: A COMPARATIVE CASE STUDY OF TWO NEIGHBOURHOOD PARKS IN ABUJA, NIGERIA THE ESTABLISHMENT OF URBAN OPEN SPACES TO MEET USER NEEDS: A COMPARATIVE CASE STUDY OF TWO NEIGHBOURHOOD PARKS IN ABUJA, NIGERIA A report submitted to the School of Urban and Regional Planning in conformity

More information

Briar Crest Elementary

Briar Crest Elementary Promises Kept This document includes partial lists of major projects completed at Pattonville Schools since 1986 as part of past bond issues approved by the Pattonville community. Briar Crest Elementary

More information

SAN DIEGO COMMUNITY COLLEGE DISTRICT MIRAMAR COLLEGE ASSOCIATE DEGREE COURSE OUTLINE

SAN DIEGO COMMUNITY COLLEGE DISTRICT MIRAMAR COLLEGE ASSOCIATE DEGREE COURSE OUTLINE FIPT 202A CIC Approval: 12/21/2006 BOT APPROVAL: 05/13/1998 STATE APPROVAL: EFFECTIVE TERM: Fall 1998 SECTION I SAN DIEGO COMMUNITY COLLEGE DISTRICT MIRAMAR COLLEGE ASSOCIATE DEGREE COURSE OUTLINE SUBJECT

More information

Procedure DESCRIPTION/OVERVIEW

Procedure DESCRIPTION/OVERVIEW Applies To: UNMH Responsible Department: Life Safety Revised: 07.08.16 Procedure Patient Age Group: (X ) N/A ( ) All Ages ( ) Newborns ( ) Pediatric ( ) Adult DESCRIPTION/OVERVIEW To assure the safety

More information

Occupant Load Calculations For Assembly Occupancies and Licensed Beverage Establishments

Occupant Load Calculations For Assembly Occupancies and Licensed Beverage Establishments FIRE AND RESCUE SERVICES FIRE PREVENTION DIVISION March 15, 2017 Bulletin 2017-002-FI Occupant Load Calculations For Assembly Occupancies and Licensed Beverage Establishments This bulletin provides guidance

More information

CLARK COUNTY FIRE DEPARTMENT Fire Prevention Bureau

CLARK COUNTY FIRE DEPARTMENT Fire Prevention Bureau CLARK COUNTY FIRE DEPARTMENT Fire Prevention Bureau 575 E. Flamingo Road, Las Vegas, NV 89119 (702) 455-7316 FAX (702) 455-7347 Permit Type: 105.6.34 Control Number: A.1 Revision Date: TITLE: SCOPE: PURPOSE:

More information