Lead-Based Paint XRF Test Cover Sheet

Size: px
Start display at page:

Download "Lead-Based Paint XRF Test Cover Sheet"

Transcription

1 Lead Safe Testing, LLC E. Girard Ave. Bldg. A, Suite 412 Denver, CO Lead-Based Paint XRF Test Cover Sheet Job Name: Glenwood Springs Decommissioned Wastewater Treatment Facility Test Location: 101 W. 7 th St., Glenwood Springs, CO Date of Test: 6/19/ :00 a.m. Inspector license number: Comments / Results: Pre-demo site inspection of Garage Building and Water tanks at/near Garage Building, Old Lab building, Admin and Clarifier building and adjacent Water tanks. Positive readings for Lead-Based Paint (LBP) above the EPA/HUD action level of 1.0 mg/cm 2 are notated below. From the job description given to Lead Safe Testing, LLC this project is to be a complete demolition project and it will be the responsibility of the demolition contractor to dispose of materials containing Lead-Based Paint in accordance with Local, State, and Federal Laws. The purpose of this report is to identify those building components containing LBP above the action level. Other components on the site tested for the presence of LBP but were not above the EPA/HUD action level and can be found in the results spreadsheet. POSITIVE READINGS-- #595 Interior Garage/Mezzanine Metal Support Column #597 Interior Garage/Mezzanine Metal Support Column #613 Interior Hallway Landing Railing #617 Interior Hallway Stair Railing West Stairwell #618 Interior Hallway Stair Stringer West Stairwell #620 Interior Horizontal Metal Pipes connected to North Water Tank Retain these records for a minimum of 3 years or as required by law. Lead Safe Testing, LLC E. Girard Ave. Building A, Suite 412 Denver, CO Page 1

2 #622 Interior Horizontal Metal Valves connected to North Water Tank #629 Interior Garage/Mezzanine Metal Support Beam #655 Interior Mezzanine Metal Support Beam on the 2 nd floor #684 Exterior Roof Access Metal Stair Rail on Side D (East) #685 Exterior Roof Access Metal Stair Stringer on Side D (East) #693 Exterior Catwalk Metal Stair Rail connecting the Garage to the West Tank #778 Interior Metal Beam Hoist support in Room 4 of the Old Lab Building #782 Interior Metal Beam Hoist support in Room 4 of the Old Lab Building #798 Exterior Metal Stair Stringer on Tank 1 #799 Exterior Metal Stair Column on Tank 1 #800 Exterior Metal Stair Rail on Tank 1 #806 Exterior Metal Stair Rail on Tank 2 #807 Exterior Metal Stair Stringer on Tank 2 #812 Exterior Metal Crank Housing on Tank 3 #895 Exterior Metal Lintel on Side A (South) of the Admin Building Locker Room While every effort was made to inspect all components, the possibility exists that other components not inspected could be present behind walls, ceilings, or other components that were not accessible. This inspection report is only valid for components listed herein. Retain these records for a minimum of 3 years or as required by law. Lead Safe Testing, LLC E. Girard Ave. Building A, Suite 412 Denver, CO Page 2

3 XRF Analysis The instrument used for this Lead Paint Inspection was an X-ray fluorescence unit (XRF) manufactured by the Heuresis Corporation serial number HOW TO INTERPRET XRF READINGS: There are fourteen columns in the XRF table. The interpretation of each column is as follows: Column 1 Reading Number (#): This is the reading number on the instrument. Column 2 Units: The way the instrument correlates the data. Most often mg/cm 2 Column 3 Results: The result of the assay Column 4 Date/Time: This is the time and date the reading was taken. Column 5 User: The certificate number of the inspector performing the lead test. Column 6 Job: The physical address of the job site. Column 7 Location: Interior, Exterior, or Calibration. This column simply states if the assay was take on the interior or the exterior of the site. Additionally, this column can list Calibration. The XRF must be calibrated before inspection and at the end of the inspection. The XRF also needs to be calibrated every 4 hours if the inspection time exceeds 4 hours. Column 8 Room: This column identifies the room where assay was taken. This column may be represented by a - - if the reading was taken on the exterior of a building and the room was unspecified. Column 9 Component: This column identifies the surface that was tested. Some examples are door, door trim, wall, ceiling, window, etc. Retain these records for a minimum of 3 years or as required by law. Lead Safe Testing, LLC E. Girard Ave. Building A, Suite 412 Denver, CO Page 3

4 Column 10 Description: This column identifies an associated part of the components, e.g. sash to describe the sash of a window. This column may be represented by an -- if the reading was taken on a specific component, e.g. a wall will not have an associated part. Column 11 Substrate: This column defines what material the paint was applied to. Substrates are most commonly plaster, drywall or wood but could be other material such as metal, vinyl, or stucco. Column 12 Side: This column determines where the component being tested is located in the room. Side A is usually the street side of the building. Then, going in a clockwise direction, the adjacent sides are labeled B, C and D. Sides A, B, C and D are identified on the Floor Plan where applicable. For example, if you were standing in a bedroom that had two windows on different walls these windows would be identified by the side location such as Window Side A and Window Side B. Column 13 Floor: This simply corresponds to the floor of the building. Column 14 Condition: This column identifies the condition of the paint on the surface being tested. The terms intact, poor, peeling, chalking, cracking are used to describe the paint condition for HUD funded projects. Retain these records for a minimum of 3 years or as required by law. Lead Safe Testing, LLC E. Girard Ave. Building A, Suite 412 Denver, CO Page 4

5 EFFECTIVE DATE: December 1, 2015 MANUFACTURER AND MODEL: Performance Characteristic Sheet Make: Models: Source: Heuresis Model Pb200i 57 Co, 5 mci (nominal new source) FIELD OPERATION GUIDANCE OPERATING PARAMETERS: Action Level mode XRF CALIBRATION CHECK LIMITS: 0.8 to 1.2 mg/cm 2 (inclusive) SUBSTRATE CORRECTION: Not applicable INCONCLUSIVE RANGE OR THRESHOLD: ACTION LEVEL MODE READING DESCRIPTION Results not corrected for substrate bias on any substrate SUBSTRATE THRESHOLD (mg/cm 2 ) Brick 1.0 Concrete 1.0 Drywall 1.0 Metal 1.0 Plaster 1.0 Wood 1.0 BACKGROUND INFORMATION EVALUATION DATA SOURCE AND DATE: This sheet is supplemental information to be used in conjunction with Chapter 7 of the HUD Guidelines for the Evaluation and Control of Lead-Based Paint Hazards in Housing ("HUD Guidelines"). Performance parameters shown on this sheet are calculated using test results on building components in the HUD archive. Testing was conducted on 146 test samples in November 2015, with two separate instruments running software version in Action Level test mode. The actual source strength of each instrument on the day of testing was approximately 2.0 mci; source ages were approximately one year. OPERATING PARAMETERS

6 Performance parameters shown in this sheet are applicable only when properly operating the instrument using the manufacturer's instructions and procedures described in Chapter 7 of the HUD Guidelines. XRF CALIBRATION CHECK: The calibration of the XRF instrument should be checked using the paint film nearest 1.0 mg/cm 2 in the NIST Standard Reference Material (SRM) used (e.g., for NIST SRM 2579, use the 1.02 mg/cm 2 film). If the average (rounded to 1 decimal place) of three readings is outside the acceptable calibration check range, follow the manufacturer's instructions to bring the instrument into control before XRF testing proceeds. SUBSTRATE CORRECTION VALUE COMPUTATION: Chapter 7 of the HUD Guidelines provides guidance on correcting XRF results for substrate bias. Supplemental guidance for using the paint film nearest 1.0 mg/cm 2 for substrate correction is provided: XRF results are corrected for substrate bias by subtracting from each XRF result a correction value determined separately in each house for single-family housing or in each development for multifamily housing, for each substrate. The correction value is an average of XRF readings taken over the NIST SRM paint film nearest to 1.0 mg/cm 2 at test locations that have been scraped bare of their paint covering. Compute the correction values as follows: Using the same XRF instrument, take three readings on a bare substrate area covered with the NIST SRM paint film nearest 1 mg/cm 2. Repeat this procedure by taking three more readings on a second bare substrate area of the same substrate covered with the NIST SRM. Compute the correction value for each substrate type where XRF readings indicate substrate correction is needed by computing the average of all six readings as shown below. For each substrate type (the 1.02 mg/cm 2 NIST SRM is shown in this example; use the actual lead loading of the NIST SRM used for substrate correction): Correction value = (1st + 2nd + 3rd + 4th + 5th + 6th Reading)/ mg/cm 2 Repeat this procedure for each substrate requiring substrate correction in the house or housing development. EVALUATING THE QUALITY OF XRF TESTING: Randomly select ten testing combinations for retesting from each house or from two randomly selected units in multifamily housing. Conduct XRF re-testing at the ten testing combinations selected for retesting. Determine if the XRF testing in the units or house passed or failed the test by applying the steps below. Compute the Retest Tolerance Limit by the following steps: Determine XRF results for the original and retest XRF readings. Do not correct the original or retest results for substrate bias. In single-family and multi-family housing, a result is defined as a single reading. Therefore, there will be ten original and ten retest XRF results for each house or for the two selected units. Calculate the average of the original XRF result and the retest XRF result for each testing combination. Square the average for each testing combination. Add the ten squared averages together. Call this quantity C. Multiply the number C by Call this quantity D. Add the number to D. Call this quantity E.

7 Take the square root of E. Call this quantity F. Multiply F by The result is the Retest Tolerance Limit. Compute the average of all ten original XRF readings. Compute the average of all ten re-test XRF readings. Find the absolute difference of the two averages. If the difference is less than the Retest Tolerance Limit, the inspection has passed the retest. If the difference of the overall averages equals or exceeds the Retest Tolerance Limit, this procedure should be repeated with ten new testing combinations. If the difference of the overall averages is equal to or greater than the Retest Tolerance Limit a second time, then the inspection should be considered deficient. Use of this procedure is estimated to produce a spurious result approximately 1% of the time. That is, results of this procedure will call for further examination when no examination is warranted in approximately 1 out of 100 dwelling units tested. TESTING TIMES: In the Action Level paint test mode, the instrument takes the longest time to complete readings close to the Federal standard of 1.0 mg/cm 2. The table below shows the mean and standard deviation of actual reading times by reading level for paint samples during the November 2015 archive testing. The tested instruments reported readings to one decimal place. No significant differences in reading times by substrate were observed. These times apply only to instruments with the same source strength as those tested (2.0 mci). Instruments with stronger sources will have shorter reading times and those with weaker sources, longer reading times, than those in the table. Mean and Standard Deviation of Reading Times in Action Level Mode by Reading Level Reading (mg/cm 2 ) Mean Reading Time (seconds) Standard Deviation (seconds) < > CLASSIFICATION OF RESULTS: XRF results are classified as positive if they are greater than or equal to the stated threshold for the instrument (1.0 mg/cm 2 ), and negative if they are less than the threshold. DOCUMENTATION: A report titled Methodology for XRF Performance Characteristic Sheets (EPA 747-R ) provides an explanation of the statistical methodology used to construct the data in the sheets, and provides empirical results from using the recommended inconclusive ranges or thresholds for specific XRF instruments. The report may be downloaded at This XRF Performance Characteristic Sheet (PCS) was developed by QuanTech, Inc., under a contract with the XRF manufacturer.

8

9

10

11 Reading # mg/cm 2 Result DateTime User Job Positive 6/19/201710: GSWTF Positive 6/19/201710: GSWTF Positive 6/19/201710: GSWTF Negative 6/19/201710: GSWTF-WTB Negative 6/19/201710: GSWTF-WTB Negative 6/19/201710: GSWTF-WTB Negative 6/19/201710: GSWTF-WTB Negative 6/19/201710: GSWTF-WTB Negative 6/19/201710: GSWTF-WTB Negative 6/19/201710: GSWTF-WTB Negative 6/19/201710: GSWTF-WTB Positive 6/19/201710: GSWTF-WTB Negative 6/19/201710: GSWTF-WTB Positive 6/19/201710: GSWTF-WTB Negative 6/19/201710: GSWTF-WTB Negative 6/19/201710: GSWTF-WTB Negative 6/19/201710: GSWTF-WTB Negative 6/19/201710: GSWTF-WTB Negative 6/19/201710: GSWTF-WTB Negative 6/19/201710: GSWTF-WTB Negative 6/19/201710: GSWTF-WTB Negative 6/19/201710: GSWTF-WTB Negative 6/19/201710: GSWTF-WTB Negative 6/19/201710: GSWTF-WTB Negative 6/19/201710: GSWTF-WTB Negative 6/19/201710: GSWTF-WTB Negative 6/19/201710: GSWTF-WTB Negative 6/19/201710: GSWTF-WTB Negative 6/19/201710: GSWTF-WTB Positive 6/19/201710: GSWTF-WTB Negative 6/19/201710: GSWTF-WTB Negative 6/19/201710: GSWTF-WTB Negative 6/19/201710: GSWTF-WTB Positive 6/19/201710: GSWTF-WTB Positive 6/19/201710: GSWTF-WTB Negative 6/19/201710: GSWTF-WTB Positive 6/19/201710: GSWTF-WTB Negative 6/19/201710: GSWTF-WTB Positive 6/19/201710: GSWTF-WTB Negative 6/19/201710: GSWTF-WTB GSWTF Report Page 1

12 Negative 6/19/201711: GSWTF-WTB Negative 6/19/201711: GSWTF-WTB Negative 6/19/201711: GSWTF-WTB Negative 6/19/201711: GSWTF-WTB Negative 6/19/201711: GSWTF-WTB Positive 6/19/201711: GSWTF-WTB Negative 6/19/201711: GSWTF-WTB Negative 6/19/201711: GSWTF-WTB Negative 6/19/201711: GSWTF-WTB Negative 6/19/201711: GSWTF-WTB Negative 6/19/201711: GSWTF-WTB Negative 6/19/201711: GSWTF-WTB Negative 6/19/201711: GSWTF-WTB Negative 6/19/201711: GSWTF-WTB Negative 6/19/201711: GSWTF-WTB Negative 6/19/201711: GSWTF-WTB Negative 6/19/201711: GSWTF-WTB Negative 6/19/201711: GSWTF-WTB Negative 6/19/201711: GSWTF-WTB Negative 6/19/201711: GSWTF-WTB Negative 6/19/201711: GSWTF-WTB Negative 6/19/201711: GSWTF-WTB Negative 6/19/201711: GSWTF-WTB Negative 6/19/201711: GSWTF-WTB Negative 6/19/201711: GSWTF-WTB Negative 6/19/201711: GSWTF-WTB Negative 6/19/201711: GSWTF-WTB Negative 6/19/201711: GSWTF-WTB Negative 6/19/201711: GSWTF-WTB Negative 6/19/201711: GSWTF-WTB Negative 6/19/201711: GSWTF-WTB Positive 6/19/201711: GSWTF-WTB Negative 6/19/201711: GSWTF-WTB Negative 6/19/201711: GSWTF-WTB Negative 6/19/201711: GSWTF-WTB Negative 6/19/201711: GSWTF-WTB Negative 6/19/201711: GSWTF-WTB Negative 6/19/201711: GSWTF-WTB Negative 6/19/201711: GSWTF-WTB Negative 6/19/201711: GSWTF-WTB Negative 6/19/201711: GSWTF-WTB GSWTF Report Page 2

13 Negative 6/19/201711: GSWTF-WTB Negative 6/19/201711: GSWTF-WTB Negative 6/19/201711: GSWTF-WTB Negative 6/19/201711: GSWTF-WTB Negative 6/19/201711: GSWTF-WTB Negative 6/19/201711: GSWTF-WTB Negative 6/19/201711: GSWTF-WTB Negative 6/19/201711: GSWTF-WTB Negative 6/19/201711: GSWTF-WTB Negative 6/19/201711: GSWTF-WTB Negative 6/19/201711: GSWTF-WTB Negative 6/19/201711: GSWTF-WTB Negative 6/19/201711: GSWTF-WTB Negative 6/19/201711: GSWTF-WTB Negative 6/19/201711: GSWTF-WTB Negative 6/19/201711: GSWTF-WTB Negative 6/19/201711: GSWTF-WTB Negative 6/19/201711: GSWTF-WTB Negative 6/19/201711: GSWTF-WTB Positive 6/19/201711: GSWTF-WTB Positive 6/19/201711: GSWTF-WTB Negative 6/19/201711: GSWTF-WTB Negative 6/19/201712: GSWTF-WTB Negative 6/19/201712: GSWTF-WTB Negative 6/19/201712: GSWTF-WTB Negative 6/19/201712: GSWTF-WTB Negative 6/19/201712: GSWTF-WTB Negative 6/19/201712: GSWTF-WTB Positive 6/19/201712: GSWTF-WTB Negative 6/19/201712: GSWTF-WTB Negative 6/19/201712: GSWTF-WTB Negative 6/19/201712: GSWTF-WTB Negative 6/19/201712: GSWTF-WTB Negative 6/19/201712: GSWTF-WTB Negative 6/19/201712: GSWTF-WTB Negative 6/19/201712: GSWTF-WTB Negative 6/19/201712: GSWTF-WTB Negative 6/19/201712: GSWTF-WTB Negative 6/19/201712: GSWTF-WTB Negative 6/19/201713: GSWTF-WTB Negative 6/19/201713: GSWTF-WTB GSWTF Report Page 3

14 Negative 6/19/201713: GSWTF-WTB Negative 6/19/201713: GSWTF-WTB Negative 6/19/201713: GSWTF-WTB Negative 6/19/201713: GSWTF-WTB Negative 6/19/201713: GSWTF-WTB Negative 6/19/201713: GSWTF Negative 6/19/201713: GSWTF Negative 6/19/201713: GSWTF Negative 6/19/201713: GSWTF Old Lab Negative 6/19/201713: GSWTF Old Lab Negative 6/19/201713: GSWTF Old Lab Negative 6/19/201713: GSWTF Old Lab Negative 6/19/201713: GSWTF Old Lab Negative 6/19/201713: GSWTF Old Lab Negative 6/19/201713: GSWTF Old Lab Negative 6/19/201713: GSWTF Old Lab Negative 6/19/201713: GSWTF Old Lab Negative 6/19/201713: GSWTF Old Lab Negative 6/19/201713: GSWTF Old Lab Negative 6/19/201713: GSWTF Old Lab Negative 6/19/201713: GSWTF Old Lab Negative 6/19/201713: GSWTF Old Lab Negative 6/19/201713: GSWTF Old Lab Negative 6/19/201713: GSWTF Old Lab Negative 6/19/201713: GSWTF Old Lab Negative 6/19/201713: GSWTF Old Lab Negative 6/19/201713: GSWTF Old Lab Negative 6/19/201713: GSWTF Old Lab Negative 6/19/201713: GSWTF Old Lab Negative 6/19/201713: GSWTF Old Lab Negative 6/19/201713: GSWTF Old Lab Negative 6/19/201713: GSWTF Old Lab Negative 6/19/201713: GSWTF Old Lab Negative 6/19/201713: GSWTF Old Lab Negative 6/19/201713: GSWTF Old Lab Negative 6/19/201713: GSWTF Old Lab Negative 6/19/201713: GSWTF Old Lab Negative 6/19/201713: GSWTF Old Lab Negative 6/19/201713: GSWTF Old Lab Negative 6/19/201713: GSWTF Old Lab Negative 6/19/201713: GSWTF Old Lab GSWTF Report Page 4

15 Negative 6/19/201713: GSWTF Old Lab Negative 6/19/201713: GSWTF Old Lab Negative 6/19/201713: GSWTF Old Lab Negative 6/19/201713: GSWTF Old Lab Negative 6/19/201713: GSWTF Old Lab Negative 6/19/201713: GSWTF Old Lab Negative 6/19/201713: GSWTF Old Lab Negative 6/19/201713: GSWTF Old Lab Negative 6/19/201713: GSWTF Old Lab Negative 6/19/201713: GSWTF Old Lab Negative 6/19/201713: GSWTF Old Lab Negative 6/19/201713: GSWTF Old Lab Negative 6/19/201713: GSWTF Old Lab Negative 6/19/201713: GSWTF Old Lab Negative 6/19/201713: GSWTF Old Lab Negative 6/19/201713: GSWTF Old Lab Negative 6/19/201713: GSWTF Old Lab Negative 6/19/201713: GSWTF Old Lab Negative 6/19/201713: GSWTF Old Lab Negative 6/19/201713: GSWTF Old Lab Negative 6/19/201713: GSWTF Old Lab Negative 6/19/201713: GSWTF Old Lab Negative 6/19/201713: GSWTF Old Lab Negative 6/19/201713: GSWTF Old Lab Negative 6/19/201713: GSWTF Old Lab Negative 6/19/201713: GSWTF Old Lab Negative 6/19/201713: GSWTF Old Lab Negative 6/19/201713: GSWTF Old Lab Negative 6/19/201713: GSWTF Old Lab Negative 6/19/201713: GSWTF Old Lab Negative 6/19/201713: GSWTF Old Lab Positive 6/19/201713: GSWTF Old Lab Negative 6/19/201713: GSWTF Old Lab NULL 6/19/201713: GSWTF Old Lab Negative 6/19/201713: GSWTF Old Lab Positive 6/19/201713: GSWTF Old Lab Negative 6/19/201713: GSWTF Old Lab Negative 6/19/201713: GSWTF Old Lab Negative 6/19/201713: GSWTF Old Lab Negative 6/19/201713: GSWTF Old Lab Negative 6/19/201713: GSWTF Old Lab GSWTF Report Page 5

16 Negative 6/19/201713: GSWTF Old Lab Negative 6/19/201713: GSWTF Old Lab Negative 6/19/201713: GSWTF Old Lab Negative 6/19/201713: GSWTF Old Lab Negative 6/19/201713: GSWTF Old Lab Negative 6/19/201713: GSWTF Old Lab Negative 6/19/201713: GSWTF Old Lab Negative 6/19/201713: GSWTF Old Lab Negative 6/19/201713: GSWTF Negative 6/19/201713: GSWTF Positive 6/19/201713: GSWTF Positive 6/19/201713: GSWTF Positive 6/19/201713: GSWTF Negative 6/19/201713: GSWTF Negative 6/19/201713: GSWTF Negative 6/19/201714: GSWTF Negative 6/19/201714: GSWTF Negative 6/19/201714: GSWTF Positive 6/19/201714: GSWTF Positive 6/19/201714: GSWTF Negative 6/19/201714: GSWTF Negative 6/19/201714: GSWTF Negative 6/19/201714: GSWTF Negative 6/19/201714: GSWTF Positive 6/19/201714: GSWTF Negative 6/19/201714: GSWTF Negative 6/19/201714: GSWTF Negative 6/19/201714: GSWTF Negative 6/19/201714: GSWTF Negative 6/19/201714: GSWTF Negative 6/19/201714: GSWTF Negative 6/19/201714: GSWTF Negative 6/19/201714: GSWTF Negative 6/19/201714: GSWTF Negative 6/19/201714: GSWTF Negative 6/19/201714: GSWTF RBC Negative 6/19/201714: GSWTF RBC Negative 6/19/201714: GSWTF RBC Negative 6/19/201714: GSWTF RBC Negative 6/19/201714: GSWTF RBC Negative 6/19/201714: GSWTF RBC GSWTF Report Page 6

17 Negative 6/19/201714: GSWTF RBC Negative 6/19/201714: GSWTF RBC Negative 6/19/201714: GSWTF RBC Negative 6/19/201714: GSWTF RBC Negative 6/19/201714: GSWTF RBC Negative 6/19/201714: GSWTF RBC Negative 6/19/201714: GSWTF RBC Negative 6/19/201714: GSWTF RBC Negative 6/19/201714: GSWTF RBC Negative 6/19/201714: GSWTF RBC Negative 6/19/201714: GSWTF RBC Negative 6/19/201714: GSWTF RBC Negative 6/19/201714: GSWTF RBC Negative 6/19/201714: GSWTF RBC Negative 6/19/201714: GSWTF RBC Negative 6/19/201714: GSWTF RBC Negative 6/19/201714: GSWTF RBC Negative 6/19/201714: GSWTF RBC Negative 6/19/201714: GSWTF RBC Negative 6/19/201714: GSWTF RBC Negative 6/19/201714: GSWTF RBC Negative 6/19/201714: GSWTF RBC Negative 6/19/201714: GSWTF RBC Negative 6/19/201714: GSWTF RBC Negative 6/19/201714: GSWTF RBC Negative 6/19/201714: GSWTF RBC Negative 6/19/201714: GSWTF RBC Negative 6/19/201714: GSWTF RBC Negative 6/19/201714: GSWTF RBC Negative 6/19/201714: GSWTF RBC Negative 6/19/201714: GSWTF RBC Negative 6/19/201714: GSWTF RBC Negative 6/19/201714: GSWTF RBC Negative 6/19/201714: GSWTF RBC Negative 6/19/201714: GSWTF RBC Negative 6/19/201714: GSWTF RBC Negative 6/19/201714: GSWTF RBC Negative 6/19/201714: GSWTF RBC Negative 6/19/201714: GSWTF RBC Negative 6/19/201714: GSWTF RBC Negative 6/19/201714: GSWTF RBC GSWTF Report Page 7

18 Negative 6/19/201714: GSWTF RBC Negative 6/19/201714: GSWTF RBC Negative 6/19/201714: GSWTF RBC Negative 6/19/201714: GSWTF RBC Negative 6/19/201714: GSWTF RBC Negative 6/19/201714: GSWTF RBC Negative 6/19/201714: GSWTF RBC Negative 6/19/201714: GSWTF RBC Negative 6/19/201714: GSWTF RBC Negative 6/19/201714: GSWTF RBC Negative 6/19/201714: GSWTF RBC Negative 6/19/201714: GSWTF RBC Negative 6/19/201714: GSWTF RBC Negative 6/19/201714: GSWTF RBC Negative 6/19/201714: GSWTF RBC Negative 6/19/201714: GSWTF RBC Negative 6/19/201714: GSWTF RBC Negative 6/19/201714: GSWTF RBC Negative 6/19/201714: GSWTF RBC Negative 6/19/201714: GSWTF RBC Negative 6/19/201715: GSWTF RBC Negative 6/19/201715: GSWTF RBC Negative 6/19/201715: GSWTF RBC Negative 6/19/201715: GSWTF RBC Negative 6/19/201715: GSWTF RBC Positive 6/19/201715: GSWTF RBC Negative 6/19/201715: GSWTF RBC Negative 6/19/201715: GSWTF RBC Negative 6/19/201715: GSWTF RBC Negative 6/19/201715: GSWTF RBC Negative 6/19/201715: GSWTF RBC Negative 6/19/201715: GSWTF RBC Negative 6/19/201715: GSWTF RBC Negative 6/19/201715: GSWTF RBC Negative 6/19/201715: GSWTF RBC Negative 6/19/201715: GSWTF RBC Negative 6/19/201715: GSWTF RBC Negative 6/19/201715: GSWTF RBC Negative 6/19/201715: GSWTF RBC Negative 6/19/201715: GSWTF RBC Negative 6/19/201715: GSWTF RBC GSWTF Report Page 8

19 Negative 6/19/201715: GSWTF RBC Negative 6/19/201715: GSWTF Positive 6/19/201715: GSWTF Positive 6/19/201715: GSWTF GSWTF Report Page 9

20 Location Room Component Description Substrate Side Floor Condition Calibration Calibration Calibration Interior Garage Window -- Metal B First Intact Interior Garage Window -- Metal D First Intact Interior Garage Door -- Metal A First Intact Interior Garage Door -- Metal A First Intact Interior Garage Door Jamb Metal A First Intact Interior Garage Wall -- Concrete C First Intact Interior Garage Wall -- Concrete B First Intact Interior Garage Wall -- Concrete B First Intact Interior Garage Column -- Metal B First Intact Interior Garage Column -- Metal B First Intact Interior Garage Column -- Metal B First Intact Interior Garage Pipe Horizontal PVC B First Intact Interior Garage Pipe Horizontal Metal B First Intact Interior Garage Pipe Horizontal Metal B First Intact Interior Garage Pipe Horizontal Metal B First Intact Interior Garage Pipe Vertical PVC B First Intact Interior Garage Pipe Horizontal PVC B First Intact Interior Garage Door -- Metal C First Intact Interior Garage Door Jamb Metal C First Intact Interior Hallway Door Jamb Metal C First Intact Interior Hallway Door -- Metal C First Intact Interior Hallway Floor -- Concrete C First Intact Interior Hallway Wall -- Concrete A First Intact Interior Hallway Wall -- Concrete B First Intact Interior Hallway Wall -- Concrete C First Intact Interior Hallway Wall -- Concrete D First Intact Interior Hallway Landing Rail Metal A First Intact Interior Hallway Boiler -- Metal A First Intact Interior Hallway Boiler -- Metal A First Intact Interior Hallway Stair Rail Metal B First Intact Interior Hallway Stair Rail Metal B First Intact Interior Hallway Stair Stringer Metal B First Intact Interior Hallway Stair Tread Metal B First Intact Interior Hallway Pipe Horizontal Metal C First Intact Interior Hallway Pipe Horizontal Metal C First Intact Interior Hallway Valve Horizontal Metal C First Intact Interior Hallway Pipe Horizontal Metal C First Intact GSWTF Report Page 10

21 Interior Hallway Pipe Horizontal Metal C First Intact Interior Hallway Pipe Vertical PVC C First Intact Interior Garage Pipe Horizontal PVC D First Intact Interior Garage Truss Horizontal Metal D First Intact Interior Garage Decking Horizontal Metal D First Intact Interior Garage Beam -- Metal D First Intact Interior Hallway Pipe Horizontal Metal D First Intact Interior Hallway Pipe Horizontal Metal D First Intact Interior Hallway Pipe Horizontal Metal D First Intact Interior Hallway Pipe Horizontal Metal D First Intact Interior Hallway Pipe Horizontal Metal D First Intact Interior Hallway Pipe Horizontal Metal D First Intact Interior Hallway Pipe Horizontal Metal D First Intact Interior Hallway Pipe Horizontal Metal D First Intact Interior Hallway Pipe Horizontal Metal C First Intact Interior Hallway Pipe Horizontal Metal C First Intact Interior Hallway Pipe Horizontal Metal C First Intact Interior Hallway Pipe Horizontal Metal C First Intact Interior Hallway Pipe Horizontal Metal A First Intact Interior Hallway Pipe Horizontal Metal A First Intact Interior Hallway Pipe Horizontal Metal A First Intact Interior Mezzanine Pipe Horizontal Metal C Second Intact Interior Mezzanine Pipe Horizontal Metal C Second Intact Interior Mezzanine Pipe Horizontal Metal C Second Intact Interior Mezzanine Pipe Horizontal Metal C Second Intact Interior Mezzanine Pipe Horizontal Metal C Second Intact Interior Mezzanine Pipe Horizontal Metal C Second Intact Interior Mezzanine Pipe Horizontal Metal C Second Intact Interior Mezzanine Pipe Horizontal Metal C Second Intact Interior Mezzanine Pipe Horizontal Metal C Second Intact Interior Mezzanine Pipe Horizontal Metal C Second Intact Interior Mezzanine Beam -- Metal A Second Intact Interior Mezzanine Beam -- Metal A Second Intact Interior Mezzanine Pipe Vertical Metal C Second Intact Interior Mezzanine Pipe Vertical Metal C Second Intact Interior Mezzanine Pipe Vertical Metal C Second Intact Interior Mezzanine Pipe Horizontal Metal C Second Intact Interior Mezzanine Wall -- Concrete A Second Intact Interior Mezzanine Wall -- Concrete C Second Intact Interior Mezzanine Window -- Metal B Second Intact Interior Mezzanine Window -- Metal B Second Intact GSWTF Report Page 11

22 Exterior Mezzanine Window Lintel Metal B Second Intact Exterior Mezzanine Window Lintel Metal C Second Intact Exterior Mezzanine Window Lintel Metal C Second Intact Exterior Bathroom 1 Wall -- Drywall D Second Intact Exterior Bathroom 1 Wall -- Drywall C Second Intact Exterior Bathroom 1 Door Jamb Drywall C Second Intact Exterior Bathroom 1 Door -- Drywall C Second Intact Interior Bathroom 1 Door -- Drywall C Second Intact Interior Bathroom 1 Door Jamb Drywall C Second Intact Interior Bathroom 1 Wall -- Drywall B Second Intact Interior Bathroom 1 Wall -- Drywall C Second Intact Interior Bathroom 1 Ceiling -- Drywall C Second Intact Interior Mezzanine Door -- Metal D Second Intact Interior Mezzanine Door Jamb Metal D Second Intact Interior Mezzanine Truss -- Metal D Second Intact Interior Mezzanine Decking -- Metal D Second Intact Exterior Mezzanine Door Jamb Metal D Second Intact Exterior Mezzanine Door -- Metal D Second Intact Exterior Roof Access Stair Rail Metal D Second Intact Exterior Roof Access Stair Rail Metal D Second Intact Exterior Roof Access Stair Stringer Metal D Second Intact Exterior South Tank Hatch -- Metal -- Second Intact Exterior South Tank Tank Lid -- Metal -- Second Intact Exterior South Tank Tank Latch -- Metal -- Second Intact Exterior South Tank Guard Rail -- Metal -- Second Intact Exterior Garage Fascia -- Wood A Second Poor Exterior Garage Fascia -- Wood D Second Poor Exterior Garage Fascia -- Wood B Second Poor Exterior Catwalk Stair Rail Metal B Second Intact Exterior Catwalk Hatch Landing Metal B Second Intact Exterior West Tank Tank Lid -- Metal B Second Intact Exterior West Tank Tank Latch -- Metal B Second Intact Exterior West Tank Guard Rail -- Metal B Second Intact Exterior West Tank Hatch -- Metal B Second Intact Exterior North Tank Tank Lid -- Metal B Second Intact Exterior North Tank Tank Latch -- Metal B Second Intact Exterior North Tank Guard Rail -- Metal B Second Intact Exterior North Tank Wall -- Concrete B First Intact Exterior West Tank Wall -- Concrete B First Intact Exterior Garage Window Lintel Metal D First Intact Exterior Garage Door Jamb Metal D First Intact GSWTF Report Page 12

23 Exterior Garage Door -- Metal D First Intact Exterior Garage Door -- Metal D First Intact Exterior Garage Door -- Metal D First Intact Exterior Garage Door Jamb Metal D First Intact Exterior Garage Window Lintel Metal B First Intact Calibration Calibration Calibration Interior Room 1 Wall -- Concrete A First Intact Interior Room 1 Wall -- Concrete B First Intact Interior Room 1 Wall -- Concrete C First Intact Interior Room 1 Wall -- Concrete D First Intact Interior Room 1 Ceiling -- Concrete D First Intact Interior Room 1 Window Jamb Wood D First Intact Interior Room 1 Pipe Horizontal PVC D First Intact Interior Room 1 Pipe Horizontal PVC D First Intact Interior Room 1 Door -- Metal D First Intact Interior Room 1 Door Jamb Metal D First Intact Interior Room 2 Door Jamb Metal D First Intact Interior Room 2 Door -- Metal D First Intact Interior Room 2 Wall -- Concrete A First Intact Interior Room 2 Wall -- Concrete B First Intact Interior Room 2 Wall -- Concrete C First Intact Interior Room 2 Wall -- Concrete D First Intact Interior Room 2 Ceiling -- Concrete D First Intact Interior Room 2 Wall -- Drywall B First Intact Interior Room 2 Wall -- Drywall A First Intact Interior Room 2 Door Trim Wood A First Intact Interior Room 2 Door -- Wood A First Intact Interior Room 2 Door Jamb Wood A First Intact Interior Stairwell Door Trim Wood C First Intact Interior Stairwell Door -- Wood C First Intact Interior Stairwell Wall -- Concrete A First Intact Interior Stairwell Wall -- Concrete B First Intact Interior Stairwell Wall -- Drywall C First Intact Interior Stairwell Wall -- Drywall D First Intact Interior Stairwell Wall -- Concrete A Basemen Intact Interior Stairwell Wall -- Concrete B Basemen Intact Interior Mechanical Room Wall -- Concrete C Basemen Intact Interior Mechanical Room Wall -- Concrete D Basemen Intact Interior Mechanical Room Pipe Horizontal Metal A Basemen Intact GSWTF Report Page 13

24 Interior Mechanical Room Pipe Horizontal Metal A Basemen Intact Interior Mechanical Room Pipe Horizontal Metal A Basemen Intact Interior Mechanical Room Pipe Horizontal Metal A Basemen Intact Interior Mechanical Room Pipe Horizontal Metal A Basemen Intact Interior Mechanical Room Pipe Horizontal Metal A Basemen Intact Interior Mechanical Room Pipe Horizontal Metal A Basemen Intact Interior Mechanical Room Pipe Horizontal Metal A Basemen Intact Interior Mechanical Room Pipe Horizontal Metal A Basemen Intact Interior Mechanical Room Pipe Horizontal Metal A Basemen Intact Interior Mechanical Room Vent -- Metal A Basemen Intact Interior Mechanical Room Stair Rail Metal A Basemen Intact Interior Mechanical Room Stair Tread Metal A Basemen Intact Interior Mechanical Room Stair Post Metal A Basemen Intact Interior Mechanical Room Stair Baluster Metal A Basemen Intact Interior Mechanical Room Pipe Vertical Metal A Basemen Intact Interior Room 3 Wall -- Drywall A First Intact Interior Room 3 Wall -- Drywall B First Intact Interior Room 3 Wall -- Drywall C First Intact Interior Room 3 Wall -- Drywall D First Intact Interior Room 3 Ceiling Drywall D First Intact Interior Room 3 Door Trim Wood A First Intact Interior Room 3 Door Jamb Wood A First Intact Interior Room 3 Baseboard -- Wood A First Intact Interior Room 3 Baseboard -- Wood B First Intact Interior Room 3 Baseboard -- Wood C First Intact Interior Room 3 Baseboard -- Wood D First Intact Interior Room 4 Wall -- Concrete C First Intact Interior Room 4 Wall -- Concrete D First Intact Interior Room 4 Wall -- Concrete B First Intact Interior Room 4 Ceiling -- Concrete B First Intact Interior Room 4 Wall -- Concrete A First Intact Interior Room 4 Beam -- Metal A First Intact Interior Room 4 Beam -- Metal A First Intact Interior Room 4 Door Lintel Metal D First Intact Interior Room 4 Door Lintel Metal D First Intact Interior Room 4 Beam -- Metal D First Intact Interior Room 4 Door -- Metal D First Intact Interior Room 4 Door Jamb Metal D First Intact Exterior Room 4 Floor - Concrete D First Intact Interior Room 1 Floor - Concrete D First Intact Interior Room 2 Floor - Concrete D First Intact GSWTF Report Page 14

25 Exterior Door -- Metal C First Intact Exterior Door Jamb Metal C First Intact Exterior Door Jamb Metal D First Intact Exterior Door -- Metal D First Intact Exterior Wall -- Concrete A First Intact Exterior Wall -- Concrete B First Intact Exterior Wall -- Concrete C First Intact Exterior Wall -- Concrete D First Intact Exterior Tank 1 Stair Rail Metal D First Intact Exterior Tank 1 Stair Tread Metal D First Intact Exterior Tank 1 Stair Stringer Metal D First Intact Exterior Tank 1 Stair Column Metal D First Intact Exterior Tank 1 Stair Rail Metal D First Intact Exterior Tank 1 Stair Landing Metal D First Intact Exterior Tank 1 Catwalk Rail Metal D First Intact Exterior Tank 1 Catwalk Landing Metal D First Intact Exterior Tank 1 Wall -- Concrete D First Intact Exterior Tank 2 Wall -- Concrete D First Intact Exterior Tank 2 Stair Rail Metal D First Intact Exterior Tank 2 Stair Stringer Metal D First Intact Exterior Tank 2 Stair Landing Metal D First Intact Exterior Tank 2 Catwalk Rail Metal D First Intact Exterior Tank 2 Catwalk Landing Metal D First Intact Exterior Tank 2 Crank Housing -- Metal D First Intact Exterior Tank 3 Crank Housing -- Metal D First Intact Exterior Tank 3 Stair Rail Metal D First Intact Exterior Tank 3 Stair Stringer Metal D First Intact Exterior Tank 3 Stair Landing Metal D First Intact Exterior Tank 3 Catwalk Rail Metal D First Intact Exterior Tank 3 Catwalk Landing Concrete D First Intact Exterior Tank 4 Wall -- Concrete D First Intact Exterior Tank 4 Stair Rail Metal D First Intact Exterior Tank 4 Stair Landing Metal D First Intact Exterior Tank 4 Catwalk Rail Metal D First Intact Exterior Tank 4 Catwalk Landing Metal D First Intact Interior Bathroom 1 Wall -- Concrete A First Intact Interior Bathroom 1 Wall -- Drywall B First Intact Interior Bathroom 1 Wall -- Concrete B First Intact Interior Bathroom 1 Wall -- Concrete C First Intact Interior Bathroom 1 Door Jamb Metal C First Intact Interior Bathroom 1 Door -- Wood C First Intact GSWTF Report Page 15

26 Interior Hallway Door -- Wood A First Intact Interior Hallway Door Jamb Metal A First Intact Interior Hallway Wall -- Concrete A First Intact Interior Hallway Wall -- Drywall B First Intact Interior Hallway Wall -- Drywall C First Intact Interior Hallway Door -- Metal C First Intact Interior Hallway Door Jamb Metal C First Intact Interior Hallway Door Jamb Wood B First Intact Interior Hallway Door Jamb Wood C First Intact Interior Office Wall -- Drywall A First Intact Interior Office Wall -- Drywall B First Intact Interior Office Wall -- Drywall C First Intact Interior Office Window Jamb Metal D First Intact Interior Office Window Jamb Wood D First Intact Interior Office Window Jamb Wood B First Intact Interior Office Door -- Wood C First Intact Interior Office Door Jamb Metal C First Intact Interior Office 2 Door Jamb Metal A First Intact Interior Office 2 Door -- Wood A First Intact Interior Office 2 Door Jamb Metal B First Intact Interior Office 2 Wall -- Drywall A First Intact Interior Office 2 Wall -- Drywall B First Intact Interior Lab Wall -- Drywall A First Intact Interior Lab Wall -- Drywall D First Intact Interior Lab Door Jamb Metal A First Intact Interior Lab Door Jamb Metal C First Intact Interior Lab Door -- Metal C First Intact Interior Lab Door -- Metal A First Intact Interior Lab Truss -- Metal A First Intact Interior Lab Decking -- Metal A First Intact Interior Lab Floor - Concrete A First Intact Interior Breakroom Wall -- Concrete A First Intact Interior Breakroom Wall -- Drywall B First Intact Interior Breakroom Wall -- Drywall C First Intact Interior Breakroom Wall -- Drywall D First Intact Interior Breakroom Door Jamb Metal D First Intact Interior Breakroom Door Jamb Metal C First Intact Interior Breakroom Door Jamb Metal B First Intact Interior Breakroom Door Jamb Metal A First Intact Interior Breakroom Door -- Wood A First Intact Interior Breakroom Door -- Metal B First Intact GSWTF Report Page 16

27 Interior Breakroom Door -- Metal C First Intact Interior Laundry Wall -- Concrete A First Intact Interior Laundry Wall -- Concrete B First Intact Interior Laundry Wall -- Concrete C First Intact Interior Laundry Wall -- Concrete D First Intact Interior Laundry Door Jamb Metal B First Intact Interior Locker Room Wall -- Concrete B First Intact Interior Locker Room Wall -- Concrete C First Intact Interior Locker Room Wall -- Concrete D First Intact Interior Locker Room Wall -- Concrete D First Intact Interior Clarifier Room Column - Concrete A First Intact Interior Clarifier Room Beam - Concrete A First Intact Interior Clarifier Room Pipe Horizontal PVC A First Intact Interior Clarifier Room Pipe Vertical Metal A First Intact Interior Clarifier Room Pipe Horizontal Metal A First Intact Interior Clarifier Room Column -- Metal A First Intact Interior Clarifier Room Beam -- Metal A First Intact Interior Clarifier Room Door -- Wood B First Intact Interior Clarifier Room Door Jamb Metal B First Intact Interior Clarifier Room Beam -- Metal C First Intact Interior Clarifier Room Column -- Metal C First Intact Interior Clarifier Room Support Bracket -- Metal C First Intact Interior Clarifier Room Door -- Metal C First Intact Interior Clarifier Room Door Jamb Metal C First Intact Exterior Locker Room Window Lintel Metal D First Intact Exterior Locker Room Window Lintel Metal A First Intact Exterior Locker Room Door -- Metal A First Intact Exterior Locker Room Door Jamb Metal A First Intact Exterior Clarifier Room Window Lintel Metal A First Intact Exterior Clarifier Room Downspout -- Metal A First Intact Exterior Clarifier Room Pipe Horizontal PVC A First Intact Exterior Clarifier Room Door -- Wood B First Intact Exterior Clarifier Room Window Lintel Metal B First Intact Exterior Clarifier Room Downspout -- Metal C First Intact Exterior Clarifier Room Window Lintel Metal C First Intact Exterior Office Window Lintel Metal B First Intact Exterior Office Window Lintel Metal C First Intact Exterior Office Door -- Metal C First Intact Exterior Office Door Jamb Metal C First Intact Exterior Clarifier Room Door Jamb Metal C First Intact Exterior Clarifier Room Door -- Metal C First Intact GSWTF Report Page 17

28 Exterior Office Downspout -- Metal C First Intact Calibration Calibration Calibration GSWTF Report Page 18

ASBESTOS AND LEAD-BASED PAINT SURVEY 696/698 Hawthorne Avenue St. Paul, Minnesota. Prepared for:

ASBESTOS AND LEAD-BASED PAINT SURVEY 696/698 Hawthorne Avenue St. Paul, Minnesota. Prepared for: ASBESTOS AND LEAD-BASED PAINT SURVEY 696/698 Hawthorne Avenue St. Paul, Minnesota Prepared for: City of St. Paul Department of Planning and Economic Development 1100 City Hall Annex 25 West 4 th Street

More information

Inspection Dates: March 21 March 22, 2016 Report Date: March 31, 2016

Inspection Dates: March 21 March 22, 2016 Report Date: March 31, 2016 Lead-Based Paint Inspection Broadway Terrace Apartments 1504-1508 Broadway Street Ann Arbor, Michigan Ann Arbor Housing Commission Inspection Dates: March 21 March 22, 2016 Report Date: March 31, 2016

More information

Montgomery County Land Bank 130 West 2nd Street, Suite 1425 Dayton, OH PRE SALE INSPECTION REPORT

Montgomery County Land Bank 130 West 2nd Street, Suite 1425 Dayton, OH PRE SALE INSPECTION REPORT Montgomery County Land Bank 130 West 2nd Street, Suite 1425 Dayton, OH 45402 Address: 4020 Old Riverside Pre-Sale Number: City: Dayton Location: Inspector: Sue Pratt Phone Number: PRE SALE INSPECTION REPORT

More information

Montgomery County Land Bank PRE SALE INSPECTION REPORT

Montgomery County Land Bank PRE SALE INSPECTION REPORT Montgomery County Land Bank 130 West 2nd Street, Suite 1425 Dayton, OH 45402 Address: 1517 PRINCETON Pre-Sale Number: City: DAYTON Location: Inspector: Sue Pratt Phone Number: PRE SALE INSPECTION REPORT

More information

Montgomery County Land Bank 130 West 2nd Street, Suite 1425 Dayton, OH PRE SALE INSPECTION REPORT

Montgomery County Land Bank 130 West 2nd Street, Suite 1425 Dayton, OH PRE SALE INSPECTION REPORT Montgomery County Land Bank 130 West 2nd Street, Suite 1425 Dayton, OH 45402 Address: 2921 Grace Pre-Sale Number: City: Dayton Location: Inspector: Sue Pratt Phone Number: PRE SALE INSPECTION REPORT On

More information

Montgomery County Land Bank 130 West 2nd Street, Suite 1425 Dayton, OH PRE SALE INSPECTION REPORT

Montgomery County Land Bank 130 West 2nd Street, Suite 1425 Dayton, OH PRE SALE INSPECTION REPORT Montgomery County Land Bank 130 West 2nd Street, Suite 1425 Dayton, OH 45402 Address: 304 Waneta Pre-Sale Number: City: Riverside Location: Inspector: Sue Pratt Phone Number: PRE SALE INSPECTION REPORT

More information

MWL Consulting Company

MWL Consulting Company MWL Consulting Company NFPA Member since1990 Fire Service Section Fire Marshal (retired) Newport Fire Department Michael W. Leber 17 Whitwell Avenue Newport, RI 02840 Mobile Phone 401-439-5322 mlebernpt@aol.com

More information

Lead Remediation/Abatement at Forest Blvd., Hugo, MN

Lead Remediation/Abatement at Forest Blvd., Hugo, MN Request for Bids for Lead Remediation/Abatement at 14383 Forest Blvd., Hugo, MN This Request for Bids ( RFB ) is for the services of a qualified and licensed contractor to provide remediation/abatement

More information

Montgomery County Land Bank 130 West 2nd Street, Suite 1425 Dayton, OH PRE SALE INSPECTION REPORT

Montgomery County Land Bank 130 West 2nd Street, Suite 1425 Dayton, OH PRE SALE INSPECTION REPORT Montgomery County Land Bank 130 West 2nd Street, Suite 1425 Dayton, OH 45402 Address: 2018 Fauver Pre-Sale Number: City: Dayton Location: Inspector: Sue Pratt Phone Number: PRE SALE INSPECTION REPORT On

More information

Certificate of Inspection CHECKLIST

Certificate of Inspection CHECKLIST Neptune Township Code Enforcement 25 Neptune Boulevard Neptune, NJ 07753 732-988-5200 X211 Inspections@neptunetownship.org Rev. 05/23/18 Certificate of Inspection CHECKLIST For Residential & Commercial

More information

The school s metal push-out windows were assessed and nothing of concern was noted.

The school s metal push-out windows were assessed and nothing of concern was noted. February 15, 2017 Courtney Wilton Portland Public Schools 501 North Dixon Portland, OR 97227 Via email: Regarding: cwilton@pps.net Lead Paint Condition Assessment Faubion at Tubman 2231 N Flint Avenue

More information

Inside Out Home Inspections

Inside Out Home Inspections Cover Page Inside Out Home Inspections Property Inspection Report Inspection prepared for: John Doe & Jane Doe Date of Inspection: 5/10/2014 Inspector: Lucas Sargent PO Box 514, Tioga, PA 16946 Phone:

More information

FAIRA TRANSPARENCY REPORTS S 236th St, 10-5, Kent, WA 98032

FAIRA TRANSPARENCY REPORTS S 236th St, 10-5, Kent, WA 98032 608 State St. South Kirkland, WA 98033 www.faira.com hello@faira.com +1.800.571.FAIR FAIRA TRANSPARENCY REPORTS 5427 S 236th St, 10-5, Kent, WA 98032 Thank you for your interest in this Faira Certified

More information

Bayshore House Inspections LLC

Bayshore House Inspections LLC Cover Page Bayshore House Inspections LLC Property Inspection Report 32963 Inspection prepared for: Ron Rosenthal Date of Inspection: 3/23/2017 Time: 10:30am Age of Home: 1950 Size: 3284 Weather: Clear

More information

Axiom Property Inspections

Axiom Property Inspections Cover Page Axiom Property Inspections Property Inspection Report 868 Wally Avenue, Henderson NV, 89178 Inspection prepared for: John Doe Agent: David Lawson - Axiom Inspection Date: 8/12/2010 Time: 2:30

More information

FAIRA TRANSPARENCY REPORTS. November 21, 2016

FAIRA TRANSPARENCY REPORTS. November 21, 2016 608 State St. South Kirkland, WA 98033 www.faira.com hello@faira.com +1.800.571.FAIR Thank you for your interest in this Faira Certified home. FAIRA TRANSPARENCY REPORTS 7307 22 nd Ave NW, Seattle, WA

More information

SUMMARY th Ave SW, Minot ND Cory Gibbons August 17, 2018

SUMMARY th Ave SW, Minot ND Cory Gibbons August 17, 2018 SUMMARY 1300 34th Ave SW, Minot ND 58701 Cory Gibbons August 17, 2018 Shane Hillman InterNACHI Certified... Magic City Inspections, LLC 701.720.9260 shane@minotinspections.com 4.4.1 Doorbell DOORBELL (INOPERABLE)

More information

Section 8 Housing Choice Voucher Program. Housing Quality Standards (HQS) Inspection Checklist

Section 8 Housing Choice Voucher Program. Housing Quality Standards (HQS) Inspection Checklist Section 8 Housing Choice Voucher Program Housing Quality Standards (HQS) Inspection Checklist SECTION 8 PROGRAM RESIDENT AND OWNER'S HQS GUIDE THE HOUSING QUALITY STANDARDS INSPECTION The unit must pass

More information

The Home Inspector Alaska LLC Donna Ranson Certified Inspector Cell:

The Home Inspector Alaska LLC Donna Ranson Certified Inspector Cell: INSPECTION REPORT CLIENT INFORMATION TIME: 10:30 am Duane s Antique Market 349-7078 WEATHER: sunny,74 deg akauction@gci.net INSPECTOR PERSONS PRESENT Donna Ranson Owner OL# HINI37 ASHI# 207853 EXTERIOR

More information

FAIRA TRANSPARENCY REPORTS th Ave NE B-3, Kenmore, WA March 28 th, 2017

FAIRA TRANSPARENCY REPORTS th Ave NE B-3, Kenmore, WA March 28 th, 2017 608 State St. South Kirkland, WA 98033 www.faira.com hello@faira.com +1.800.571.FAIR Thank you for your interest in this Faira Certified home. FAIRA TRANSPARENCY REPORTS 17817 80th Ave NE B-3, Kenmore,

More information

Egress Window. Requirements for Building Permit Application

Egress Window. Requirements for Building Permit Application Egress Window Requirements for Building Permit Application 1. Completed Building Permit application form with signature. 2. Submit two (2) copies of plans showing proposed designs and materials; plans

More information

AZTEC HOME SERVICES HOME MAINTENANCE MANUAL

AZTEC HOME SERVICES HOME MAINTENANCE MANUAL A well maintained home is a happy home. They inspect better, sell better and present better. AZTEC HOME SERVICES HOME MAINTENANCE MANUAL Keep this manual in a quick and easy access location. Maintaining

More information

AC & E HOME INSPECTION CORP.

AC & E HOME INSPECTION CORP. AC & E HOME INSPECTION CORP. CONCLUSION 12/10/2011 DESCRIPTION OF HOUSE: Two Story APPROXIMATE AGE: 14 years (according to the real estate salesperson) TYPE OF BASIC CONSTRUCTION: Poured concrete foundation

More information

Inspection Report. Cheri Maisonneuve. Property Address: 103 Dogleg Dr Moultrie GA. Welcome Home! Premier Home Inspections of Valdosta, LLC

Inspection Report. Cheri Maisonneuve. Property Address: 103 Dogleg Dr Moultrie GA. Welcome Home! Premier Home Inspections of Valdosta, LLC Inspection Report Cheri Property Address: 103 Dogleg Dr Moultrie GA Welcome Home! Shea Wynn 1709A Gornto Rd, UPS #131 Valdosta, GA 31601 229-292-4694 Table of Contents Cover Page...1 Table of Contents...2

More information

Inspecta-Homes 2469 University Avenue West St. Paul MN Ph#: (651)

Inspecta-Homes 2469 University Avenue West St. Paul MN Ph#: (651) Page 1 Doc #: Inspector: Date: Dwelling Address: Client Name: Client's Agent: Real Estate Company: Please refer to the General Home Inspection Contract. Thank you for using Minnesota and Western Wisconsin's

More information

FAIRA TRANSPARENCY REPORTS Country Club Dr, B-203, Mill Creek, WA April 5 th, 2017

FAIRA TRANSPARENCY REPORTS Country Club Dr, B-203, Mill Creek, WA April 5 th, 2017 608 State St. South Kirkland, WA 98033 www.faira.com hello@faira.com +1.800.571.FAIR FAIRA TRANSPARENCY REPORTS 15433 Country Club Dr, B-203, Mill Creek, WA 98012 Thank you for your interest in this Faira

More information

INDOOR RADON POLICY AND PROCEDURES LAWLER WOOD HOUSING, LLC

INDOOR RADON POLICY AND PROCEDURES LAWLER WOOD HOUSING, LLC INDOOR RADON POLICY AND PROCEDURES LAWLER WOOD HOUSING, LLC Prepared for Lawler-Wood Housing, LLC Riverview Tower, Suite 2000 900 South Gay Street Knoxville, Tennessee Prepared by ORION Orion Environmental

More information

PBS observed paint chips in the garden, which is located approximately six to 10 feet from painted surfaces that were in intact condition.

PBS observed paint chips in the garden, which is located approximately six to 10 feet from painted surfaces that were in intact condition. December 30, 2016 Courtney Wilton Portland Public Schools 501 North Dixon Portland, OR 97227 Via email: Regarding: cwilton@pps.net Lead Paint Condition Assessment Arleta Elementary School 5109 SE 66th

More information

SITE SYSTEMS: FANNIE MAE EXPECTED USEFUL LIFE TABLES (FMEUL)

SITE SYSTEMS: FANNIE MAE EXPECTED USEFUL LIFE TABLES (FMEUL) SITE SYSTEMS: FANNIE MAE EXPECTED USEFUL LIFE TABLES (FMEUL) Basketball Courts 15 25 Built Improvements Playgrounds, Site Furniture, etc. 20 20 Catch Basin 40 40 Cold Water Lines 40 40 Compactors DHW Supply

More information

Extra Mile Inspection, Inc.

Extra Mile Inspection, Inc. Cover Page Property Inspection Report Inspection prepared for: Jerry and Lynne Richardson Real Estate Agent: Polly Richardson - BHKR Lake Forest Date of Inspection: 3/13/2017 Time: 12 pm Age of Home: built

More information

Shown with optional metal roofs, front door with transom, upgraded porch columns, and landscape package. Yardley Model

Shown with optional metal roofs, front door with transom, upgraded porch columns, and landscape package. Yardley Model Shown with optional metal roofs, front door with transom, upgraded porch columns, and landscape package. Yardley Model The Yardley Model First Floor The Yardley Model Second Floor Available Available Lot

More information

FAIRA TRANSPARENCY REPORTS Fairview Ave E, #304, Seattle, WA June 7 th, 2017

FAIRA TRANSPARENCY REPORTS Fairview Ave E, #304, Seattle, WA June 7 th, 2017 608 State St. South Kirkland, WA 98033 www.faira.com hello@faira.com +1.800.571.FAIR Thank you for your interest in this Faira Certified home. FAIRA TRANSPARENCY REPORTS 2301 Fairview Ave E, #304, Seattle,

More information

Canadian Property Inspections

Canadian Property Inspections Cover Page Canadian Property Inspections Home Inspection Report N6J-3A8 Inspection prepared for: Josh Baran Date of Inspection: 3/7/2017 Time: 9am Age of Home: 40 Size: 1500 Weather: Cloudy,cool,light

More information

Summary of Repairs and Deficiencies

Summary of Repairs and Deficiencies Summary of s and Deficiencies Organization Building: Station #1 178 Safety & Compliance Inspections and Certifications Sprinkler System Certifications This building is sprinkled but no inspection/ certification

More information

Inspection Report. 1 Inspection Way Orlando, FL Prepared for: Wanda Figueroa Prepared by: ACF Home Inspections Inc

Inspection Report. 1 Inspection Way Orlando, FL Prepared for: Wanda Figueroa Prepared by: ACF Home Inspections Inc Inspection Report 1 Inspection Way Orlando, FL 32825 Prepared for: Wanda Figueroa Prepared by: Page 1 of 25 Needs Service Summary This summary is not the entire report. The complete report may include

More information

Ohio Department of Health, Bureau of Environmental Health and Radiation Protection, Radon Licensing Program. School Radon Testing Checklist

Ohio Department of Health, Bureau of Environmental Health and Radiation Protection, Radon Licensing Program. School Radon Testing Checklist Ohio Department of Health, Bureau of Environmental Health and Radiation Protection, Radon Licensing Program School Radon Testing Checklist Purpose: This checklist has been prepared to provide school employees

More information

The Villas of Wyldewood

The Villas of Wyldewood The Chalet 1442 Sq. Ft. 2 Bedrooms 2 Full Baths 2 Car Garage 1st Floor Laundry Stain Resistant Carpet Gas Fireplace Central Air Easy Access - No Steps Private Deck Lake & Walking Trail All Dimensions,

More information

El 0. El 0. El El. El El. El 0 TWO FAMILY HOUSING INSPECTINO CHECKLIST

El 0. El 0. El El. El El. El 0 TWO FAMILY HOUSING INSPECTINO CHECKLIST ONE TWO FAMILY HOUSING INSPECTINO CHECKLIST Owner Name Property address Date of Inspection Inspector AREA OF INSPECTION COMPLAINT COMMENTS 1 Fences 2 Dumpsters 3 Trash building materials junk cars branches

More information

Denver Fire Department Fire Prevention Division

Denver Fire Department Fire Prevention Division /A 505.1 505.1 Address: Clearly marked from street, Arabic numbers or alphabetical letters. Numbers shall not be spelled out. Address identification characters shall contrast with their background. Each

More information

CHAPTER 7 ALTERATIONS LEVEL

CHAPTER 7 ALTERATIONS LEVEL CHAPTER 7 ALTERATIONS LEVEL 2 SECTION 701 GENERAL 701.1 Scope. Level 2 alterations as described in Section 404 shall comply with the requirements of this chapter. Exception: Buildings in which the reconfiguration

More information

FAIRA TRANSPARENCY REPORTS. January 27 th, 2017

FAIRA TRANSPARENCY REPORTS. January 27 th, 2017 608 State St. South Kirkland, WA 98033 www.faira.com hello@faira.com +1.800.571.FAIR Thank you for your interest in this Faira Certified home. FAIRA TRANSPARENCY REPORTS 4700 115 th Pl SE, Everett, WA

More information

Excellent Home Inspection Services, LLC

Excellent Home Inspection Services, LLC Property Inspection Report Cover Page 46143 Inspection prepared for: John and Jane Doe Date of Inspection: 4/15/2015 Age of Home: About 12 years Size: 1,600 sq ft Weather: About 60 degrees F The house

More information

SUMMARY 1234 Main St.Severn Buyer Name 07/18/2018 9:00AM

SUMMARY 1234 Main St.Severn Buyer Name 07/18/2018 9:00AM SUMMARY 1234 Main St.Severn 21144 Buyer Name 07/18/2018 9:00AM Henry Toman MD License 32391 1st American Home Inspection, LLC 443-685-4062 henrytoman61@gmail.com The summary is meant to organize the defects

More information

Conversion to Vacation Home Permit Life Safety Survey

Conversion to Vacation Home Permit Life Safety Survey P.O. Box 1190, Fort Collins, Colorado 80522-1190, Planning (970) 498-7683 Building (970) 498-7700, Larimer.org Conversion to Vacation Home Permit Life Safety Survey All dwellings used as short-term rentals

More information

Asurity 1. Property Inspection Report S Gurd Rd., Hastings, MI Inspection prepared for: Beretta Lenos Real Estate Agent: Stan Labinski -

Asurity 1. Property Inspection Report S Gurd Rd., Hastings, MI Inspection prepared for: Beretta Lenos Real Estate Agent: Stan Labinski - Cover Page Property Inspection Report Inspection prepared for: Beretta Lenos Real Estate Agent: Stan Labinski - Date of Inspection: 3/28/2017 Time: 2:00 Age of Home: Built 1999 Size: 2015 Weather: 50 Overcast.

More information

Section Plaster Accessories

Section Plaster Accessories Section 09209 Plaster Accessories PART 1 - GENERAL 1.1 SUMMARY A. Related work specified elsewhere includes: 1. Rough carpentry. 2. Finish carpentry and millwork. 3. Metal support systems. 4. Furring and

More information

Short Term Accommodations Fire Code Requirements

Short Term Accommodations Fire Code Requirements Short Term Accommodations Fire Code Requirements 1 Foreward The following is a comprehensive reference to Retrofit 9.3 of Division B of the Ontario Fire Code (OFC). Retrofit provisions were developed to

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

John Sample. Property Address: 123 Main St. Alpharetta GA Inspector: Jason David. Residential Inspector of America, Inc.

John Sample. Property Address: 123 Main St. Alpharetta GA Inspector: Jason David. Residential Inspector of America, Inc. John Sample Property Address: 123 Main St. Alpharetta GA 30022 Inspector: Jason David Residential Inspector of America, Inc. 3276 Buford Drive, Ste. 104-306 Buford, GA 30519 770.476.4963 ICC Certified

More information

SOP SF SOP for LN2 Freezers

SOP SF SOP for LN2 Freezers Page 2 of 9 4. SCOPE 4.1. The SOP applies to personnel operating and maintaining the liquid nitrogen freezers owned or contracted for storage in the SSF. This SOP is applicable to all vapor phase and liquid

More information

Brine Generation Study

Brine Generation Study DOE/WIPP 00-2000 Brine Generation Study April 2000 Waste Isolation Pilot Plant Carlsbad, New Mexico Processing and final preparation of this report was performed by the Waste Isolation Pilot Plant Management

More information

Hearth and Homes Inspections, llc

Hearth and Homes Inspections, llc Cover Page Property Inspection Report 44092 Inspection prepared for: Ember Griffith Real Estate Agent: Samantha Elly - Keller Williams Date of Inspection: 3/4/2017 Time: 10:00 AM Age of Home: 63 Years

More information

September 1, Sincerely, Mike Montgomery Fire Marshal. M.S. Montgomery Fire Marshal

September 1, Sincerely, Mike Montgomery Fire Marshal. M.S. Montgomery Fire Marshal M.S. Montgomery Fire Marshal September 1, 2010 This document describes rules changes affecting the operation and fire safety in foster homes licensed and regulated by the Texas Department of Family and

More information

Inspection Report. Prepared for: Tonia Mann. Property Address: 402 Leslie Court McDonough, GA Date: March 07, 2013

Inspection Report. Prepared for: Tonia Mann. Property Address: 402 Leslie Court McDonough, GA Date: March 07, 2013 Inspection Report Prepared for: Tonia Mann Property Address: 402 Leslie Court McDonough, GA 30253 Date: March 07, 2013 Inspector: Charles Mann Edifice Inspections, Inc. (770) 594-2222 www.edificeinspections.com

More information

FIRE INSPECTION GUIDELINES FOR FOSTER GROUP HOME PARENTS Effective June 1, 2002, Update September 2011

FIRE INSPECTION GUIDELINES FOR FOSTER GROUP HOME PARENTS Effective June 1, 2002, Update September 2011 HCFMO Harris County Fire Marshal M.S. Montgomery Fire Marshal FIRE INSPECTION GUIDELINES FOR FOSTER GROUP HOME PARENTS Effective June 1, 2002, Update September 2011 EFFECTIVE JANUARY 1, 2007 These guidelines

More information

FAIRA TRANSPARENCY REPORTS Spruce Way, Lynnwood, WA August 21, 2017

FAIRA TRANSPARENCY REPORTS Spruce Way, Lynnwood, WA August 21, 2017 608 State St. South Kirkland, WA 98033 www.faira.com hello@faira.com +1.800.571.FAIR Thank you for your interest in this Faira Certified home. FAIRA TRANSPARENCY REPORTS 98037 August 21, 2017 We have coordinated

More information

Bay Wide Commercial and Home Inspection Thackeray Avenue/ Mail address Hayward, Calif TH AVENUE SAN LEANDRO, CALIFORNIA

Bay Wide Commercial and Home Inspection Thackeray Avenue/ Mail address Hayward, Calif TH AVENUE SAN LEANDRO, CALIFORNIA 27966 Thackeray Avenue/ Mail address Hayward, Calif. 94544 2011 150TH AVENUE SAN LEANDRO, CALIFORNIA 21:12 August 07, 2015 Page 1 of 11 Table of Contents Definitions 2 General Information 2 Lots and Grounds

More information

BISHOP HOME INSPECTIONS, LLC. Phone (269) / Fax (269) / Website: bishophomeinspection.

BISHOP HOME INSPECTIONS, LLC. Phone (269) / Fax (269) / Website: bishophomeinspection. BISHOP HOME INSPECTIONS, LLC. Phone (269) 686-6485 / Fax (269) 686-7798 email: bishophomeinspection@charter.net / Website: bishophomeinspection.com Inspection address: 123 rth Street Client name: Gerald

More information

1710 ANYWHERE DRIVE, MONTGOMERY, AL 36109

1710 ANYWHERE DRIVE, MONTGOMERY, AL 36109 1710 ANYWHERE DRIVE, MONTGOMERY, AL 36109 INFRARED VIEW OF HOME Attention: Mr. John Smith SUBJECT PROPERTY The following inspection of a property located at 1710 Anywhere Drive, Montgomery, AL 36109, was

More information

Inspection Report. Rob Renfro. Property Address: 1234 Main St. Auburn WA Coastline Home Inspections

Inspection Report. Rob Renfro. Property Address: 1234 Main St. Auburn WA Coastline Home Inspections Page 1 of 48 Inspection Report Rob Property Address: Auburn WA 98002 Coastline Home Inspections Rob 11014 19th Ave. SE PMB #74 Everett, WA 98208 425-357-0956 Page 2 of 48 Table of Contents Cover Page Table

More information

YOU LL LOVE LIFE IN A NEW PENTREX HOME! $845,075

YOU LL LOVE LIFE IN A NEW PENTREX HOME! $845,075 YOU LL LOVE LIFE IN A NEW PENTREX HOME! $845,075 1000 Nana Lane ~ Des Peres, 63131 5 Bedrooms 4.5 Bathrooms 3-Car Garage 3,073 Sq. Ft. Finished Lower Level w/812 Sq. Ft. Includes 5th Bedroom, Full Bath

More information

Canadian Property Inspections

Canadian Property Inspections Cover Page Canadian Property Inspections Home Inspection Report L9Z-1K4 Inspection prepared for: K.C. Pitman Date of Inspection: 3/6/2017 Time: 3pm Age of Home: 42 Size: 500-1000 Weather: Cloudy, cool.

More information

Freshmen Year Trimester 2

Freshmen Year Trimester 2 Portfolio Requirements Painting & Design Technologies Students choose their own Portfolio assignments; it must be something they felt they did a good job on and meet one of the required State given Competencies

More information

OFFICE USE ONL Y BELOW

OFFICE USE ONL Y BELOW RESIDENTIAL OCCUPANCY INSPECTION APPLICATION FORM Single Family Residential Fee $95.00 Multi Family Residential Fee $75.00 New Rental Fee $95.00: Rental Renewal Fee $75.00 PAID: COLLECT ON SITE: ALL UTILITIES

More information

FAIRA TRANSPARENCY REPORTS. March 14 th, 2017

FAIRA TRANSPARENCY REPORTS. March 14 th, 2017 608 State St. South Kirkland, WA 98033 www.faira.com hello@faira.com +1.800.571.FAIR Thank you for your interest in this Faira Certified home. FAIRA TRANSPARENCY REPORTS 4106 38 th Ave SW, Seattle, WA

More information

Scope Of Work: Single Family, La Mesa, CA

Scope Of Work: Single Family, La Mesa, CA Scope Of Work: Single Family, La Mesa, CA Project Introduction and Overview Description Single family home 1687 sq/ft with 3 bedrooms and 2 baths. The home was built in 1961 on a.09 acre lot. The house

More information

Turn-Key Environmental Consultants, Inc. 790 Barnhart Rd. 714 Monument Ave. Phone: Troy, OH Dayton, OH Fax:

Turn-Key Environmental Consultants, Inc. 790 Barnhart Rd. 714 Monument Ave. Phone: Troy, OH Dayton, OH Fax: Turn-Key Environmental Consultants, Inc. 790 Barnhart Rd. 714 Monument Ave. Phone: 937-335-8807 Troy, OH 45373 Dayton, OH 45402 Fax: 937-339-4882 March 24, 2016 Mr. Dennis Zimmer City of Dayton, Division

More information

1921 River Birch Dr., Shawnee, OK Inspection prepared for: Vicki Jager Date of Inspection: 7/27/2015 Time: 8am Weather: Sunny

1921 River Birch Dr., Shawnee, OK Inspection prepared for: Vicki Jager Date of Inspection: 7/27/2015 Time: 8am Weather: Sunny Cover Page 74804 Inspection prepared for: Vicki Jager Date of Inspection: 7/27/2015 Time: 8am Weather: Sunny Inspector: John Crouch License #70001257 Newalla, OK 74857 Phone: 4054815032 Email: john@goodlivinghomes.com

More information

Scope of Work - Single Family, Escondido, CA

Scope of Work - Single Family, Escondido, CA Scope of Work - Single Family, Escondido, CA Project Introduction and Overview Description 2008 square foot 4 bedroom, 3 bath contemporary styled home built in 1995 in the Emerald Heights neighborhood

More information

FAIRA TRANSPARENCY REPORTS W James St, 8, Kent, WA 98032

FAIRA TRANSPARENCY REPORTS W James St, 8, Kent, WA 98032 608 State St. South Kirkland, WA 98033 www.faira.com hello@faira.com +1.800.571.FAIR FAIRA TRANSPARENCY REPORTS 1313 W James St, 8, Kent, WA 98032 Thank you for your interest in this Faira Certified home.

More information

FAIRA TRANSPARENCY REPORTS Hazel Loop SE, #D, Auburn, WA 98092

FAIRA TRANSPARENCY REPORTS Hazel Loop SE, #D, Auburn, WA 98092 608 State St. South Kirkland, WA 98033 www.faira.com hello@faira.com +1.800.571.FAIR FAIRA TRANSPARENCY REPORTS 6137 Hazel Loop SE, #D, Auburn, WA 98092 Thank you for your interest in this Faira Certified

More information

FAIRA TRANSPARENCY REPORTS th Ave NE, Arlington, WA 98223

FAIRA TRANSPARENCY REPORTS th Ave NE, Arlington, WA 98223 608 State St. South Kirkland, WA 98033 www.faira.com hello@faira.com +1.800.571.FAIR FAIRA TRANSPARENCY REPORTS 98223 Thank you for your interest in this Faira Certified home. We have coordinated the efforts

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

Ball Corporation 140,000 Square Feet on 27 Acres Birmingham, Alabama

Ball Corporation 140,000 Square Feet on 27 Acres Birmingham, Alabama Ball Corporation 140,000 Square Feet on 27 Acres Birmingham, Alabama PRELIMINARY BALL CORPORATION 124 CARSON ROAD BIRMINGHAM, ALABAMA 35215 SIZE: NUMBER OF BUILDINGS: GROUND: BUILDING DIMENSIONS: Approximately

More information

The Salvation Army Southern Territory OFFICERS QUARTERS PROPERTY INSPECTION FORM

The Salvation Army Southern Territory OFFICERS QUARTERS PROPERTY INSPECTION FORM The Salvation Army Southern Territory OFFICERS QUARTERS PROPERTY INSPECTION FORM Property Address: Age of Quarters: Years Date of Inspection: INSPECTION TEAM: Names: Profession/Position (i.e. Board Member,

More information

BUILDER S PRE-INSPECTION CHECKLIST

BUILDER S PRE-INSPECTION CHECKLIST Warrenton Fire Protection District 606 Fairgrounds Rd. Warrenton, MO 63383 Ph: 636-456-8935 Fax: 636-456-7764 www.warrenton-fire.org BUILDER S PRE-INSPECTION CHECKLIST This checklist is designed as a general

More information

FAIRA TRANSPARENCY REPORTS th Ave, Seattle, WA April 28 th, 2017

FAIRA TRANSPARENCY REPORTS th Ave, Seattle, WA April 28 th, 2017 608 State St. South Kirkland, WA 98033 www.faira.com hello@faira.com +1.800.571.FAIR FAIRA TRANSPARENCY REPORTS 98122 Thank you for your interest in this Faira Certified home. April 28 th, 2017 We have

More information

BEDROOM 1. (27) Margins round the door are they consistent? BEDROOM 2

BEDROOM 1. (27) Margins round the door are they consistent? BEDROOM 2 Page 1 of 10 This is what we look at on an average 200 sq/m house. We are all human and may miss one or two small things sometimes but we believe we give value for money on our inspections. When we do

More information

FAIRA TRANSPARENCY REPORTS NE 116th Pl, Kirkland, WA April 20 th, 2017

FAIRA TRANSPARENCY REPORTS NE 116th Pl, Kirkland, WA April 20 th, 2017 608 State St. South Kirkland, WA 98033 www.faira.com hello@faira.com +1.800.571.FAIR Thank you for your interest in this Faira Certified home. FAIRA TRANSPARENCY REPORTS 98034 April 20 th, 2017 We have

More information

Home Inspection Report

Home Inspection Report Pfeifer Home Inpsection, LLC 8332 Crystal Pointe Lane Indianapolis, Indiana 46236 317-340-1734 Lic #HI01700103 Home Inspection Report Columbus, IN 47201 Page 1 of 20 Table of Contents Definitions 2 General

More information

A GUIDE TO THE ROCK ISLAND HOUSING CODE. Prepared By: The City of Rock Island Inspection Division

A GUIDE TO THE ROCK ISLAND HOUSING CODE. Prepared By: The City of Rock Island Inspection Division A GUIDE TO THE ROCK ISLAND HOUSING CODE Prepared By: The City of Rock Island Inspection Division 2 P a g e THIS QUICK GUIDE TO ROCK ISLAND S PROPERTY MAINTENANCE CODE IS INTENDED FOR THE USE OF ALL RESIDENTS

More information

FOR MORE INFORMATION CALL OR EMAIL: Nancy Bass (757) 681-3573 nbass@williamewood.com Marketed by: Built by: www.mcqbuilders.com Builder Reserves the right to substitute plans, prices, components and specifications

More information

Full Service Central Station Fire Alarm Listing Evaluation

Full Service Central Station Fire Alarm Listing Evaluation Full Service Central Station Fire Alarm Listing Evaluation Listing Evaluation A UL Listing project includes: 1. Evaluating the central station facility for compliance with UL 827, Central-Station Alarm

More information

Cascade Inspection Services, LLC

Cascade Inspection Services, LLC Cover Page Property Inspection Report 97330 Inspection prepared for: John Smith & Sarah Smith Date of Inspection: 6/8/2015 Time: 8:30 A.M. Age of Home: 14 years old Size: 2352 Sq Ft Weather: Sunny Inspector:

More information

Site address. Ventilation Quantity (Determine quantity by using Table N or Equation 11-1) Continuous ventilation

Site address. Ventilation Quantity (Determine quantity by using Table N or Equation 11-1) Continuous ventilation City of Victoria Building Inspections Department 7951 Rose Street P. O. Box 36 Victoria, MN 55386 (952) 443-4210 Ventilation, Makeup and Combustion Air Calculations Instructions and Example These instructions

More information

EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD

EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD STANDARD #F-002 EFFECTIVE 05-27-2009 PURPOSE: To define the requirements for a License. To facilitate the quick application and review of new or changed

More information

THE HEMLOCK 3 BD 2.5 BA 1371 sq ft

THE HEMLOCK 3 BD 2.5 BA 1371 sq ft THE HEMLOCK 3 BD 2.5 BA 1371 sq ft Level 1 Level 2 THE GEYSER 3 BD 2.5 BA 1561 sq ft Level 1 Level 2 THE ALGONQUIN 3 BD 1.5 BA 1524 sq ft WBDO77988 Level 1 Level 2 BUILDING PROCESS The best feature we

More information

RW West Consultants. Property Inspection Report

RW West Consultants. Property Inspection Report Cover Page RW West Consultants Property Inspection Report 98122 Inspection prepared for: Faira Date of Inspection: 4/27/2017 Time: 9:00 AM Age of Home: 1992 Size: 3000 Weather: Cloudy 45 degrees Order

More information

Element C Interiors Interior Construction

Element C Interiors Interior Construction Fittings and Interior PART 1 - GENERAL 1.01 OVERVIEW A. Includes marker and tack boards, lockers, storage shelving, handrails and wall protection, access doors, aquariums, fire extinguishers, and signage.

More information

MHI Services Inc. Property Inspection Report

MHI Services Inc. Property Inspection Report Cover Page MHI Services Inc. Property Inspection Report 333 Some place Ave, Some Place OR, 970245 Inspection prepared for: SAMPLE REPORT & SAMPLE REPORT Inspection Date: 3/29/2009 Time: 8AM Age: 9 YEARS

More information

BUILDER S PRE-INSPECTION CHECKLIST

BUILDER S PRE-INSPECTION CHECKLIST Warrenton Fire Protection District 606 Fairgrounds Rd. Warrenton, MO 63383 Ph: 636-456-8935 Fax: 636-456-7764 www.warrenton-fire.org BUILDER S PRE-INSPECTION CHECKLIST This checklist is designed as a general

More information

COVIDIEN SENECA, SOUTH CAROLINA

COVIDIEN SENECA, SOUTH CAROLINA SENECA, SOUTH CAROLINA 220,250 Square Feet on 73.30 Acres 1448 BLUE RIDGE BOULEVARD SENECA, SOUTH CAROLINA 29672 (OCONEE COUNTY) SIZE: NUMBER OF BUILDINGS: GROUND: Approximately 220,250 square feet One,

More information

900 S. Colorado Blvd. - 5,609 square ft building (new automobile sales showroom and offices) built in 2000/2001; and

900 S. Colorado Blvd. - 5,609 square ft building (new automobile sales showroom and offices) built in 2000/2001; and Sent Via erims November 13, 2013 Sonic Automotive, Inc. 4401 Colwick Road Charlotte, North Carolina 28211 Attention: Mr. Doug Siska Re: Asbestos Survey Murray BMW of Denver 900 S Colorado Blvd and 4320

More information

Pre-Drywall Property Inspection

Pre-Drywall Property Inspection Pre-Drywall Property Inspection Information Date: 1/20/2014 Weather: Clear Sky Time: 8:15 am Buyers: Hans Nirmal Property Address: 2563 Forest Breeze Drive City: Frisco Realty Company: Associate: Mike

More information

DESIGNER KITCHEN WITH PREMIUM APPLIANCES 1407 & 1409 Military Trail Features & Finishes 1. Open concept kitchen with NEFF designer cabinetry and Caesa

DESIGNER KITCHEN WITH PREMIUM APPLIANCES 1407 & 1409 Military Trail Features & Finishes 1. Open concept kitchen with NEFF designer cabinetry and Caesa DESIGNER KITCHEN WITH PREMIUM APPLIANCES 1407 & 1409 Military Trail Features & Finishes 1. Open concept kitchen with NEFF designer cabinetry and Caesarstone countertop. 2. 4 x 16 ceramic tile backsplash.

More information

radon Keeping your home safe from radon

radon Keeping your home safe from radon radon Keeping your home safe from radon What is radon? Radon is a colorless and odorless gas that comes from the soil. The gas can accumulate in the air we breathe. Radon gas decays into fine particles

More information

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU INSPECTION GUIDELINE RESIDENTIAL CARE FACILITIES 2007 CBC/CFC (R-3.1)

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU INSPECTION GUIDELINE RESIDENTIAL CARE FACILITIES 2007 CBC/CFC (R-3.1) July 1, 2010 SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU INSPECTION GUIDELINE RESIDENTIAL CARE FACILITIES Address: Permit #: Inspector: Date: Status: Inspector: Date: Status: This Checklist outlines

More information

Where one call does it all!

Where one call does it all! c AMELOT HOME INSPECTIONS, INC. Where one call does it all! Termites Septic Systems Well Water Radon Mold Asbestos Lead Commercial ASH I Member Member #113333 Erick Miller,Owner Certified Home Inspector

More information

Location and lifestyle meet in this great townhome by Domicile, located on a quiet cul-de-sac just steps from Parkdale Market, the Ottawa River,

Location and lifestyle meet in this great townhome by Domicile, located on a quiet cul-de-sac just steps from Parkdale Market, the Ottawa River, 10 Panorama Private - Wellington Village Welcome to 10 Panorama Private Location and lifestyle meet in this great townhome by Domicile, located on a quiet cul-de-sac just steps from Parkdale Market, the

More information

AUSTIN FIRE DEPARTMENT SIA PROCEDURES FOR ANNUAL TESTING OF BUILDINGS WITH STAIRWELL AND VESTIBULE PRESSURIZATION SYSTEMS

AUSTIN FIRE DEPARTMENT SIA PROCEDURES FOR ANNUAL TESTING OF BUILDINGS WITH STAIRWELL AND VESTIBULE PRESSURIZATION SYSTEMS AUSTIN FIRE DEPARTMENT SIA PROCEDURES FOR ANNUAL TESTING OF BUILDINGS WITH STAIRWELL AND VESTIBULE PRESSURIZATION SYSTEMS Building stairwell and vestibule pressurization systems must be retested and recertified

More information