JAMES R. HAUG. Representative projects that Mr. Haug has been involved with are as follows:

Size: px
Start display at page:

Download "JAMES R. HAUG. Representative projects that Mr. Haug has been involved with are as follows:"

Transcription

1 EDUCATION Bachelor of Science - Electrical Engineering University of Wisconsin - Milwaukee, 1986 EXPERIENCE Mr. Haug offers extensive engineering and management experience, assuring success in our client s engineering challenges. He provides leadership in the design of building electrical systems from the conceptual design through system construction and continually provides work direction to the design team. These efforts often include cost estimating, field survey, and site inspections. His experience includes the preparation of studies and reports dealing with building electric systems to assist clients in establishing design criteria and appropriate work scope. He remains knowledgeable of current technical developments applicable to Electrical Engineering projects and promotes these applications within Leedy & Petzold. A specific area of interest includes the design and specification of electric service and power distribution facilities, as well as standby and emergency power generation facilities. Representative projects that Mr. Haug has been involved with are as follows: Project Manager for electrical consulting engineering of Johnson Controls Glendale, WI Campus Expansion and construction administration thru Hunzinger Construction Company. The Corporate Headquarters expansion at Johnson Controls 33-acre campus in Glendale is designed as LEED Platinum. The project includes both renewable energy and energy efficiency in the following: 141,000 sq. ft. new Corporate Headquarters Office Building from renovation of Corporate Buildings No. 2 and ,599 sq. ft. Power Solutions Headquarters 35,000 sq. ft. Amenities Building with a cafeteria, meeting rooms, and a fitness center. Eight-Level Parking Structure. Battery Tech Center Renovation. Battery Formation and Test Center LED Parking and Roadway Lighting 380KW Photovoltaic System. 24,9KV Primary Substation with 4,160V underground distribution to building transformers. Provided electrical engineering services for 130,000 square foot, 7-story, Brengel Technology Center in Milwaukee. This project features include: energy efficient lighting sources, indirect lighting, Metasys control of Lighting System including daylight control, time clock control, security control, and phone control, 13.2KV, 1500KVA substation, 2000A. 480Y/277V. main distribution switchboard, vertical riser busway distribution, 125KW standby emergency generator, 80KVA uninterruptible power system, flexible underfloor raceway and cable management design, Category 7 telecommunications wiring system, Addressable Automatic Fire Alarm System, and Personal Environment Responsive workstations. Project received a bronze level award from the U.S. Green Buildings Council for Energy Efficiency as well as a Best of 2000 Midwest Construction award. Construction Administration thru M. A. Mortenson Company. Provided electrical engineering services for 920,000 square foot renovation of CUNA Mutual Insurance Group Corporate Offices in Madison, Wisconsin. Project involved multi-phase renovation (18 phases) of CUNA s three-building complex consisting primarily of open office space and public areas utilizing - 1 -

2 energy efficient indirect lighting. The existing building distribution systems were reused, modified and extended to facilitate the increase in electronic loads within the powered open office furniture systems. Sound masking, ADA compliant Fire Alarm and Voice/Data wiring systems were provided to meet the needs of a modern office facility. Provided Airfield Electrical Master Plan of General Mitchell International Airport to allow successful implementation of proposed improvements. Report detailed recommendations with clear justifications on proposed courses of action, a detailed map indicating conceptual facilities, and a budget showing cost for each recommended improvement. General Mitchell International Airport: Airfield Lighting Facility, New Regulatory Vault, Phase II Airfield Lighting Cabling Reconfiguration, Phase III E Concourse Apron Expansion Terminal Road Lighting Study and Cost Estimate Re-Light Front Ticket Drive Air Cargo Way Road, Replace Roadway Lighting Relocate Taxiway C and Perimeter Road Tug Tunnel Canopy(s) Chilled and Hot Water Piping Revisions Sky Cap Booths Power and Heating Cargo Apron Expansion Parking Structure, Electrical Power System One-Line Diagram Relocate Parking Structure Emergency Electrical Equipment Air Cargo Simulator Primary Electrical Service/Distribution Improvements Study In-Line Baggage, Lightning Protection for Temporary Tents Electrical Engineer for new eight-story, 26,000 sq. ft. addition to Ambassador Hotel in Milwaukee, WI. Addition includes lounge, meeting rooms, offices, pre-function and banquet facilities. Responsible for full electrical engineering design including power, lighting, and specialty systems for the following hotels: Fairfield Inn and Suites, Weston, WI Hampton Inn and Suites, La Vista, NE Hilton Garden Inn, Middleton, WI Provided Electrical Consulting Services for Design/Build Performance Specifications for the following hotels: Country Inn and Suites, Rogers, AR Courtyard Inn, Middleton, WI Hampton Inn and Suites, Oklahoma City, OK Homewood Suites Hotel, Rogers, AR - 2 -

3 Coordinated design and specifications for modernizing and upgrading the primary power system for Saint Luke s Medical Center in Milwaukee, WI. Design included a complete new primary head end system to interface with (16) substations throughout the complex. Specific equipment includes a complete new 2-Line 26.4 KV service switchgear line-up with auto-source transfer control system. Designed installation of a third 7,500 KVA small power transformer including re-engineering the secondary 3810 volt distribution system. A comprehensive cutover procedure was documented as part of the design for removing existing equipment and replacing with new to minimize service interruption. A new powerhouse was built to accommodate (30) bays of switchgear with a basement designed for cable routing on trays along with (6) new underground duct packages. Provided electrical engineering services for the following office facilities: Advanced Healthcare Corporate Center (design), Germantown, WI American Cancer Society, Riverwood Corporate Center, Pewaukee, WI CUNA Mutual Group, Office Building Addition (design), Waverly, IA Greenway Office Building, 4-Story Vertical Expansion, Middleton, WI Greenway Office Building, 6 th & 7 th Floor Submetering, Middleton, WI Prairie Preserve Corporate Center, Pewaukee, WI Purity Delafield Office Building, Delafield, WI Raven Office Facilities, Middleton, WI Provided electrical engineering services for Delphi Automotive Systems Tech 2000 Project, Oak Creek, Wisconsin. Designed retrofit of 60,000 square foot space inside existing factory. Lighting and power systems were retrofitted to accommodate needs of new production and enhance energy efficiency. Existing T12HO fluorescent lighting was removed and replaced with energy efficient 320W pulse start metal halide. Light levels were improved and energy needs reduced. Emergency lighting was added. New power distribution busway was added to accommodate new loads as well as stepdown transformers and associated 208Y120V panelboards. Provided electrical engineering services for addition to manufacturing plant for Waukesha Electric Systems Corporation, Waukesha, Wisconsin. The addition was approximately 100,000 square feet and included manufacturing, assembly, machining, welding, painting, product testing and shipping and receiving. Interior lighting consists of 1000W HID high bay fixtures mounted on channel wire distribution system. Fluorescent emergency lighting. Power system expands upon existing dual line utility service with extension of primary loop to three new 1000KVA substations, and primary feeder to new 3000HP motor. Power distribution for equipment within the building is provided by new 480V distribution busways, stepdown transformers and 120V panelboards. Emergency power is provided from a new 125KW emergency generator. A building grounding mat, underground duct package and manholes were also designed. Responsible for lighting, power, and special systems renovations and additions at many area hospitals and medical clinics: Advanced Healthcare Clinic, Addition, Brookfield, WI Advanced Healthcare Clinic, Germantown, WI Bader Center, Geriatric Clinic, Milwaukee, WI Capitol Drive Medical Clinic, Brookfield, WI Community Memorial Hospital, Menomonee Falls, WI - 3 -

4 Coordination Study for Electrical Service Expansion - Northwest Addition Davis Duehr Dean Eye Clinic, Pewaukee, WI DePaul Health Center, Bridgeton, MO Medical Office Building Ambulatory Surgery Center Froedtert Memorial Lutheran Hospital, Wauwatosa, WI Essential Electrical System Assessment Grants Pass Clinic, Grants Pass, OR Hartford Memorial Hospital, Hartford, WI Emergency Generator and Distribution System Kenosha Memorial Hospital, Kenosha, WI Cardiac Cath Lab Renovation Lakeshore Medical Office Building, Milwaukee, WI Lindengrove Nursing Home, New Berlin, WI Milwaukee Medical Clinic Addition, Port Washington, WI Milwaukee Medical Clinic Renovation - Mayfair, Wauwatosa, WI Penrad MRI Facility Addition, Colorado Springs, CO Saint Agnes Hospital, Fond du Lac, WI Cardiac Cath Lab Saint Clare Hospital, Baraboo, WI Power Service and Distribution System Renovation Saint Francis Hospital, St. Francis, WI Electrical Power System Documentation Saint Joseph Hospital, Milwaukee, WI Chiller Plant Upgrade Study Chiller Plant Upgrade Cooling Tower 8 West - Acute Care Bone Marrow Transplant Unit Remodeling Emergency Department Remodeling ICU Phase I Renovation Women s and Children s Center - South Tower Addition and Associated Renovations Obstetric and Gynecology Clinic Lactation Clinic NICU LDR Suite, Antepartum Unit, Postpartum Unit OR Suites (3 OR s) Saint Joseph Hospital, Marshfield, WI Load Analysis on Generator Study Power Factor Analysis and Correction Waupun Memorial Hospital, Waupun, WI Electrical Service Replacement - 4 -

5 Furnished design configuration for Bechtel National Corporation - Sprint Spectrum Personal Communication Systems. Site adapted designs include water tower, monopole and lattice tower antenna installations with base transmission systems inside existing structures, new buildings or mounted directly on grade in fenced-in enclosures. LPA assembled bid drawings utilizing Bechtel standard detail templates and Sprint Site Review and Material Requisition data. Drawing content included electrical equipment layout for grounding ring, electrical service and distribution, coaxial cable routing and antenna mounting, equipment ground connections, bill of materials and associated details. Designed and developed documents for the electrical facilities for Rawson Elementary School in South Milwaukee, WI. This building was approximately 100,000 sq. ft. with facilities for Kindergarten thru 5th Grade, art, music, special education, an outdoor playground, gymnasium, library computer lab and performing stage. Electrical challenges included energy efficient lighting design using state of the art lamps and ballast combinations as well as occupancy controls, emergency power system with natural gas generator, stage and gymnasium dimming systems, fire alarm system, rescue assistance audio visual system for the handicapped, classroom paging/intercom, gymnasium audio, flexible raceway system design for current and future communication and data system needs. Exterior lighting and control including parking area and drive lighting as well as building security and flood lighting. Also designed softball and football field lighting systems for South Milwaukee Schools. Provided power system design and construction administration services for Welded Tube Company of America New Tube Mill in Portland, Oregon. Project included development of new 12.47KV electric service and associated distribution. Distribution included (3) 12.47KV pad mounted distribution switchgear units, underground duct and manhole system, (7) Y/277V transformers, and (4) 4000A. main distribution switchboards. Other services included design of power and raceway system to serve Owner machine layout, assistance in bidding, construction review and Owner purchase of materials. Coordinated electrical engineering design and construction follow-up efforts for multi-state Vehicle Emission Inspection Program. These efforts included more than 150 buildings consisting of new and remodeled facilities in Colorado, Connecticut, Ohio, Pennsylvania and Wisconsin. These buildings entailed power system designs - addressing harmonics, sensitive electronics and power quality - to insure proper and reliable future power system operation. Provides ongoing electrical engineering design services for Johnson Controls, Inc. at their various facilities. Activities included participation in various remodeling projects, varying from research and manufacturing areas to computer/data processing areas and general office areas. Additional tasks include large scale surveying, studying and documenting the power system, identifying deficiencies and correcting problems. Installation and use of energy efficient lighting and control was extensive throughout these projects. Supplied electrical engineering services for the Universal Medical Buildings. Work consisted of design and specification of multi-story Medical Office Buildings and Ambulatory Care Facilities across the United States. His efforts encompassed as many as twenty of these facilities. Several locations included primary power service and specialty design for surgi-centers with O.R. X-Ray, Magnetic Imaging, and MRI facilities

6 Contributed to the design for modernizing and upgrading headend power system at St. Clare Hospital in Baraboo, Wisconsin. Design included a specification of a new 12,470 volt, dual line electric power service with auto-source transfer characteristics, four new substations with main-tie-main arrangements and separation of existing emergency power system to meet NEC and NFPA essential electrical system requirements - including a specification of a new 300KW diesel standby generator. Furnished the design of electrical facilities associated with the building addition for a structural tube manufacturing process for Welded Tube Company, Chicago, Illinois. Installation entailed double ended substation with transformation from 13.2 KV to 480Y/277V, including modification and expansion of service switchgear and primary feeders to the substations. Designed and developed documents for the electrical facilities for State of Wisconsin Taycheedah Correctional Institution Food Service Building. Project involved expansion of existing underground 4160 volt manhole system, 500 KVA substation with 208Y/120V secondary distribution facilities, emergency generator, lighting, power, telephone, fire alarm, paging, and security systems. Developed construction documents for electrical facilities for Chrysler Motors, Kenosha, involving a 4.0 Engine block line and cam/crank area. Project area was 120,000 square feet and consisted of industrial lighting and 4000 ampere busduct extension to feed the various process machines. Busduct layout included extensive survey work and isometric drawing outlining all required tees, offsets, transitions and benchmarks required for proper installation and ordering of materials. Correlated the design and specification of the 13.8kv medium voltage power line extension at Waukesha County Technical College to serve the fire training area as well as any future buildings. This effort included underground ductbanks, manholes, padmounted switchgear, pad mounted transformer and box pads, and metal enclosed switchgear. Documents included a profile of the duct package to show depths and slopes as well as possible interferences. Designed new 15KV substation to serve Plate and Weld Shop operations for Bucyrus Erie in South Milwaukee, WI. Work involved new outdoor walk-in substation with metal clad power circuit breakers. Rework of primary system for redundant line to substation. Removal of a PCB transformer, retrofitting electro mechanical trip units on existing circuit breakers, and detailing of secondary ties to existing distribution system. Coordinated design efforts for a new 40,000 square foot dry-cleaning facility for Absorbtech, LLC in South Bend, IN. Work involved industrial lighting and power distribution. Specialty process areas required explosion-proof design. Designed the 160,000 sq. ft. electrical facilities for the Serigraph, Inc. Corporate Office and Auto Graphics Printing Plant. Project design included exterior roadway and parking area lighting and control systems, building equopotential ground grid, energy efficient office area lighting, production area HID lighting system design, hazardous location power and lighting, plant paging system, communication/data raceway and cable tray system, underground conduit system layout, power distribution system design including new pad-mount transformer, indoor primary substation and respective panelboard, motor control centers busway and distribution schemes, computer room grounding and EPO system design

7 Designed and coordinated electrical facilities for General Mitchell International Airport s Regulator Building which is used to power and control the airfield s lighting systems. This project involved twoline utility service to new power operated 24.9 kv indoor pad-mounted switchgear, two 750/100 kva indoor dry-type transformers, and a double ended 480Y/277V metal enclosed switchgear lineup with draw out circuit breakers and auto source transfer capabilities. Design also included general building lighting and power, grounding, underground duct packages, busways, lighting regulators, cable racks, sleeves and supports, fuse cutouts, fire alarm, TVSS, and a 600 kw, 480Y/277V diesel generator for standby power. Coordinated the design of uninterruptible power system (UPS) facilities for data processing centers at the following organizations: Milwaukee Area Technical College: Two-module parallel (N+1) 160 kva UPS, including a 400 kw diesel generator, automatic transfer switches, power distribution units (PDUs), and distribution panelboards. Johnson Controls, Inc. Data Center: Redundant (2N) 400 kva/360 kw UPS, including (2) 600 kw diesel generators, automatic transfer switches, power distribution units (PDUs), transformers, and distribution panels. Rockwell Automation Data Center: Redundant (2N) 650 kva/500 kw UPS, including primary (13,200 volts) substation and feeder connections, static automatic transfer switches, power distribution units (PDUs), and distribution panels. Johnson Controls, Inc Pewaukee Data Center: 225KVA UPS, including a 500KW diesel generator, automatic transfer switches, power distribution units (PDU s), and distribution panelboards. Van Kampen Funds, Oakbrook Terrace Il: Redundant (2N) 225KVA UPS, including a 600KW diesel generator, automatic transfer switches, power distribution units (PDU s), static transfer switches, and distribution panels. Community Care: Redundant 30KVA/24KW UPS, including a 300KW diesel generator, automatic transfer switches, transformers, TVSS, and distribution cabinets. CUNA Mutual Group: Replace 2N 500KVA UPS, system control cabinets, battery disconnects, and battery strings. University of Wisconsin Whitewater. Substation Transformer and Switchgear Replacement. Project included demolition of existing outdoor 25 kv and 5kV substation equipment including transformers, circuit breaker switchgear, capacitor banks, and related cable connections supplying electrical service to the campus. New equipment includes a four-bay lineup of 600A 24.9KV metal-enclosed, medium voltage, air interrupter switchgear, two 7500 KVA pad-mounted transformers, and two seven-bay 1200A 4.16KV lineups of metal-clad, circuit breaker distribution switchgear installed in a sheltered aisle weatherproof house. New substation grounding, pad mount switchgear, underground ductbanks, manholes, and feeder loops were also built as part of the project. The existing substation service was maintained until the new switchgear is installed and ready for switchover. CUNA Mutual Group, Waverly, Iowa. Power System Upgrade to provide 1.5MW standby generator system, to back up two 1200A 480Y/277V utility service feeds to two office buildings. Scope included modifications to existing switchboards, underground ductbanks, and closed transition automatic transfer switches. LPA provided complete design, commissioning, and project management for a working system

8 Milwaukee Public Museum. Electrical Substation Replacement. Developed design to replace existing 13.2KV primary service circuit breaker switchgear, 750KVA lighting substation, and 1000KVA power substation. New design provided replacement of the existing outdated equipment with new state of the art equipment in the same electrical room by means of a step by step procedure which will allow the Museum to continue operations without extensive power interruptions. New equipment included 10 bay lineup of common bus fusible interrupter switchgear with two incoming utility lines and auto transfer scheme to feed new transformers and distribution switchboards. The new system will be more reliable with additional capacity and sectionalizing capability to enhance overall reliability and allow for future growth. CONTINUING EDUCATION Powersmith s Power Quality Seminar; Summer 2001 Generac Parallel Power Generation Seminar; Summer 2003 Leviton Healthcare Technical Conference, Fall 2003 Cummins Power Generator Seminar, Spring 2004 Danaher/Current Technology TVSS Seminar, Spring 2004 Eaton Power Quality Seminar, Summer 2005 Lighting for People Seminar, Peerless Lighting, Fall 2005 Optical Design Choices and Application for Exterior Lighting, Gardco, Spring 2006 Lightfair International Conference and Exposition, Spring 2006 Metal Halide vs. Fluorescent Lighting for High Ceiling Applications, Holophane, Summer 2006 Lighting Control for Sustainable Design and LEED Certification, Lutron, Fall 2006 Dangers of Arc Flash, Power Quality Needs, Danaher, Spring 2007 Fundamentals of Metal Halide, Venture, Spring 2007 Weatherproof Products and Professional Lighting, Intermatic, Summer 2007 Square D Selective Coordination Seminar, Fall 2007 IEEE/PES Transmission and Distribution Conference & Exposition, Spring 2008 Generator UL Listing and NFPA Standards, Spring 2008 Square D Healthcare Technical Conference, Spring 2008 Lightfair International Conference and Exposition, Spring 2014 PROFESSIONAL REGISTRATION Registered Professional Engineer, Wisconsin, 1990, Colorado, 1993, Pennsylvania, 1994, Oregon, 1996, Michigan, 2000, Alabama, 2002, Georgia, 2003, Wyoming, 2003, South Carolina, 2006, Illinois, 2007, Arizona, 2008, Iowa 2011, Kansas 2011, Kentucky 2013, Florida 2013 and Tennessee PROFESSIONAL ORGANIZATION MEMBERSHIPS Electrical League of Milwaukee National Society of Professional Engineers Institute of Electrical and Electronics Engineers - 8 -

Resume ALLISON M. BLAU

Resume ALLISON M. BLAU EDUCATION Bachelor of Science - Architectural Engineering Major in Building Electrical Power Systems Design Milwaukee School of Engineering, 2009 EXPERIENCE Ms. Blau joined Leedy & Petzold as a Project

More information

Brown University Revised June 29, 2012 Facilities Design & Construction Standards SECTION ELECTRICAL DESIGN CRITERIA

Brown University Revised June 29, 2012 Facilities Design & Construction Standards SECTION ELECTRICAL DESIGN CRITERIA PART 1 - GENERAL 1.1 Background SECTION 26 00 10- ELECTRICAL DESIGN CRITERIA A. Brown University maintains it own campus electrical distribution system which serves the majority of the buildings and facilities

More information

Electrical Design Guidelines Table of Contents

Electrical Design Guidelines Table of Contents C: Compliant Rev. 3 Dated June 13 11 NC: Non-Compliant NA: Not Applicable Page1 16.1 General 16.2 Single Line Diagrams 16.3 Electric Motor Equipment and Controls 16.4 Lighting 16.5 Emergency Lighting 16.6

More information

DESIGN AND CONSTRUCTION STANDARDS GENERAL DESIGN GUIDELINES

DESIGN AND CONSTRUCTION STANDARDS GENERAL DESIGN GUIDELINES 2.07 ELECTRICAL GENERAL DESIGN AND CONSTRUCTION STANDARDS GENERAL DESIGN GUIDELINES - 2.07 It is expected that the electrical design professional will conform to accepted good engineering design practices.

More information

Introduction Consultant shall incorporate the material in the DSS into the project specifications.

Introduction Consultant shall incorporate the material in the DSS into the project specifications. DIVISION 16 - ELECTRICAL Section 16000 - General Discussion Introduction Consultant shall incorporate the material in the DSS into the project specifications. Refer any questions, clarifications regarding

More information

ELECTRICAL POWER SYSTEMS

ELECTRICAL POWER SYSTEMS Scope The various Codes applicable to the University's electrical power system are mainly based upon a model of a single utility service, connected to a single premise. The University s electrical system,

More information

Executive Summary. CNBC Global Headquarters Christine Cajilig

Executive Summary. CNBC Global Headquarters Christine Cajilig Executive Summary This report contains an analysis and description of the existing electrical distribution of the including the distribution type, emergency power, uninterruptible power system, over current

More information

ELECTRICAL Seminar. B A L A Consulting Engineers, Inc. Edward J. Lynch, PE Vice President, Electrical Department Manager.

ELECTRICAL Seminar. B A L A Consulting Engineers, Inc. Edward J. Lynch, PE Vice President, Electrical Department Manager. B A L A Consulting Engineers, Inc. PECO Line 13.2kV Incoming Service No. 1 Utility/Generator Medium Voltage Switchgear PECO Line 13.2kV Incoming Service No. 2 Unit Substation ELECTRICAL Seminar HVAC Equip.

More information

Element D Services Electrical

Element D Services Electrical PART 1 - GENERAL 1.01 OVERVIEW A. This Section includes design standards and requirements for electrical service and distribution. This is a design standard and is not intended to be used as a Specification.

More information

ELECTRICAL SYSTEMS ASSESSMENT Hanover High School

ELECTRICAL SYSTEMS ASSESSMENT Hanover High School ELECTRICAL SYSTEMS ASSESSMENT Hanover High School ELECTRICAL DISTRIBUTION SYSTEM:?? The existing electrical service consists of an underground primary service originating at a utility pole on Cedar Street,

More information

Electrical Inspection Service & Distribution

Electrical Inspection Service & Distribution 0911 Distribution Panels & Switchgear Equipment, conduit, feeders, and grounding 480 Volt Switchboard: This switchboard contains the utility meter and two main, service, circuit breakers. One circuit breaker

More information

Corbin Building. Technical Assignment 2. Matthew Trethaway Lighting/ Electrical AE 481W 10/26/2011 Advisor: Ted Dannerth

Corbin Building. Technical Assignment 2. Matthew Trethaway Lighting/ Electrical AE 481W 10/26/2011 Advisor: Ted Dannerth Corbin Building Technical Assignment 2 Matthew Trethaway Lighting/ Electrical AE 481W 10/26/2011 Advisor: Ted Dannerth 10/26/2011 Technical Report II 1 Executive Summary The following report is an overview

More information

Assessing Your Airfield Electrical Distribution System

Assessing Your Airfield Electrical Distribution System Assessing Your Airfield Electrical Distribution System PRESENTED AT The 2017 Airports Conference March 30, 2017 Hershey, PA PRESENTED BY Samuel Mullen, III - Burns Engineering, Inc. 1 Presentation Objective

More information

FORCON INTERNATIONAL WILLIAM J. SHORT, P.E. SUMMARY

FORCON INTERNATIONAL   WILLIAM J. SHORT, P.E. SUMMARY WILLIAM J. SHORT, P.E. SUMMARY Mr. Short has twenty-five plus years of experience in design, construction and project management of multi-million dollar, multidiscipline, pharmaceutical plants, 24x7 facilities,

More information

Division 26 ELECTRICAL TABLE OF CONTENTS

Division 26 ELECTRICAL TABLE OF CONTENTS Division 26 ELECTRICAL TABLE OF CONTENTS 26 1000 GENERAL... 33 A. CODE... 3 B. RELATED SECTIONS... 3 C. ABBREVIATIONS... 3 D. DEFINITIONS... 3 E. DRAWING REQUIREMENTS... 3 F. EQUIPMENT SERVICE ACCESS AND

More information

GARCIA GALUSKA DESOUSA Consulting Engineers

GARCIA GALUSKA DESOUSA Consulting Engineers L#57297 /Page 1/July 21, 2017 ELECTRICAL SYSTEMS NARRATIVE REPORT The following is the Electrical Systems narrative, which defines the scope of work and capacities of the Power and Lighting systems, as

More information

CHAPTER 8 ELECTRICAL

CHAPTER 8 ELECTRICAL CHAPTER 8 ELECTRICAL 8.1 GENERAL... 3 8.2 REQUEST FOR PROPOSAL DEVELOPMENT... 3 8.3 DESIGN DEVELOPMENT... 3 8.3.1 CONCEPT (30%) DESIGN SUBMITTAL REQUIREMENTS... 3 8.3.1.1 Concept Design Analysis... 3 8.3.1.1.1

More information

Page 1 of General

Page 1 of General Page 1 of 8 16.1 General 1. This section covers items common to sections of CSI s Master Format - Division 16. 2. Dalhousie University is certified by IBEW for new construction and all electrical contractors

More information

Technical Report 2: Electrical Systems Criteria and Existing Conditions

Technical Report 2: Electrical Systems Criteria and Existing Conditions Technical Report 2: Electrical Systems Criteria and Existing Conditions Princeton Theological Seminary Library Princeton, NJ Stephanie Deckard Lighting Electrical Faculty Advisor Dr. Kevin Houser 10/12/2012

More information

ELECTRIC SERVICE EVALUATIONS ELECTRICAL / BOILER REPLACEMENTS. Clarkstown Central School District. June Arch Proj. #

ELECTRIC SERVICE EVALUATIONS ELECTRICAL / BOILER REPLACEMENTS. Clarkstown Central School District. June Arch Proj. # ELECTRICAL ELECTRIC SERVICE EVALUATIONS / BOILER REPLACEMENTS Clarkstown Central School District June 2015 CSArch Arch Proj. # 151-1501.00 151 Table of Contents SECTION 1 Executive Summary... 1 SECTION

More information

STATEWIDE CAREER/TECHNICAL EDUCATION COURSE ARTICULATION REVIEW MINUTES

STATEWIDE CAREER/TECHNICAL EDUCATION COURSE ARTICULATION REVIEW MINUTES STATEWIDE CAREER/TECHNICAL EDUCATION COURSE ARTICULATION REVIEW MINUTES Articulation Agreement Identifier: ELT 118 (2005-1) Identifier is the postsecondary course prefix followed by Plan-of-Instruction

More information

Building Electrical System Overview

Building Electrical System Overview Philip Mackey L/E Dr. Mistrick Holy Cross Hospital North Addition Silver Spring, MD 0/3/05 Building Electrical System Overview Executive Summary: The following report describes the existing emergency power

More information

CHAPTER 8 ELECTRICAL

CHAPTER 8 ELECTRICAL CHAPTER 8 0 8.1 GENERAL... 3 8.2 REQUEST FOR PROPOSAL DEVELOPMENT... 3 8.3 DESIGN DEVELOPMENT... 3 8.3.1 CONCEPT (30%) DESIGN SUBMITTAL REQUIREMENTS... 3 8.3.1.1 Concept Design Analysis... 3 8.3.1.1.1

More information

Chandler City Hall Chandler, Arizona

Chandler City Hall Chandler, Arizona Chandler City Hall Chandler, Arizona AE481W: Architectural Engineering Senior Thesis Wednesday October 27 th, 2010 Stephanie Romanias Lighting/Electrical Faculty Consultant Dr. Kevin Houser/Professor Dannerth

More information

Please refer to the drawing and notes for each particular plan view. Site Plan S1-1 Site Drawing. Electrical E1-1 Main Electrical Drawing

Please refer to the drawing and notes for each particular plan view. Site Plan S1-1 Site Drawing. Electrical E1-1 Main Electrical Drawing The property that I discuss is an actual property that I helped to build. My position was as the Facility/Project Manager while the building was under construction. I worked very closely with the Senior

More information

Michigan State University DESIGN GUIDELINES. ELECTRICAL DESIGN Page 1 TABLE OF CONTENTS 1

Michigan State University DESIGN GUIDELINES. ELECTRICAL DESIGN Page 1 TABLE OF CONTENTS 1 Page 1 TABLE OF CONTENTS 1 ELECTRICAL 2 Summary Sustainability Electrical Distribution Lighting Detection and Alarm Communication Systems Lightning Protection Clock Systems Access Control Housekeeping

More information

Related Sections: TBD. Effective Date: January 1, 2016

Related Sections: TBD. Effective Date: January 1, 2016 Description: The purpose of the section is to highlight the current applicable UMCP Design Standards for the design, selection and, installation of lighting fixtures within buildings. Related Sections:

More information

F. GENERAL REQUIREMENTS Electrical Design Criteria 2006 Edition 4/3/06 School District Palm Beach County Page-1 of 15

F. GENERAL REQUIREMENTS Electrical Design Criteria 2006 Edition 4/3/06 School District Palm Beach County Page-1 of 15 ELECTRICAL DESIGN CRITERIA TABLE OF CONTENTS I GENERAL...2 II CRITERIA...2 A. POWER DISTRIBUTION SYSTEMS...2 1. NORMAL POWER:...2 2. EMERGENCY POWER...3 B. LIGHTING...4 1. GENERAL...4 2. AVERAGE MAINTAINED

More information

SECTION : CAMPUS CENTRAL METERING SYSTEM DESIGN

SECTION : CAMPUS CENTRAL METERING SYSTEM DESIGN Brown University Department of Facilities Management Design & Construction Standards 26 09 01 Campus Central Metering System Design SECTION 26 09 01: CAMPUS CENTRAL METERING SYSTEM DESIGN 1. GENERAL A.

More information

FIRE ALARM: BY OTHERS, IF REQUIRED.

FIRE ALARM: BY OTHERS, IF REQUIRED. x x x x x x OS LIGHTING S FLUORESCENT LIGHT FIXTURE, SEE LIGHT FIXTURE SCHEDULE FOR SIZE AND MOUNTING. FLUORESCENT STRIP LIGHT FIXTURE, SEE LIGHT FIXTURE SCHEDULE FOR SIZE AND MOUNTING. WALL BRACKET FLUORESCENT

More information

COMPANY PROFILE Electrical & Instrumentation Contractor

COMPANY PROFILE Electrical & Instrumentation Contractor COMPANY PROFILE Electrical & Instrumentation Contractor Engineering I Supply I Installation I Testing I Commissioning Maintenance I Fabrication I Ship Repairing ABOUT US The year was 2003, where there

More information

FIRE ALARM: BY OTHERS, IF REQUIRED.

FIRE ALARM: BY OTHERS, IF REQUIRED. x x x x x x OS LIGHTING S FLUORESCENT LIGHT FIXTURE, SEE LIGHT FIXTURE SCHEDULE FOR SIZE AND MOUNTING. CAPITAL LETTER DENOTES TYPE, LOWER CASE LETTER DENOTES SWITCH LEG. FLUORESCENT STRIP LIGHT FIXTURE,

More information

NORTH CENTRAL MICHIGAN COLLEGE PETOSKEY CAMPUS. Facilities Conditions Assessment Mechanical And Electrical Petoskey, Michigan

NORTH CENTRAL MICHIGAN COLLEGE PETOSKEY CAMPUS. Facilities Conditions Assessment Mechanical And Electrical Petoskey, Michigan NORTH CENTRAL MICHIGAN COLLEGE PETOSKEY CAMPUS Facilities Conditions Assessment Mechanical And Electrical Petoskey, Michigan PBA Project No. 2014.0137.00 Prepared By: Wayne Kerbelis Terry Cleis September

More information

F. GENERAL REQUIREMENTS Electrical Design Criteria 2009 Edition 11/23/2009 School District Palm Beach County Page-1 of 17

F. GENERAL REQUIREMENTS Electrical Design Criteria 2009 Edition 11/23/2009 School District Palm Beach County Page-1 of 17 ELECTRICAL DESIGN CRITERIA TABLE OF CONTENTS I GENERAL...2 II CRITERIA...2 A. POWER DISTRIBUTION SYSTEMS...2 1. NORMAL POWER:... 2 2. EMERGENCY POWER... 3 B. LIGHTING...4 1. GENERAL... 4 2. AVERAGE MAINTAINED

More information

MEETING NOTICE BOARD OF REGENTS OF THE UNIVERSITY OF WISCONSIN SYSTEM EXECUTIVE COMMITTEE

MEETING NOTICE BOARD OF REGENTS OF THE UNIVERSITY OF WISCONSIN SYSTEM EXECUTIVE COMMITTEE MEETING NOTICE BOARD OF REGENTS OF THE UNIVERSITY OF WISCONSIN SYSTEM EXECUTIVE COMMITTEE Friday, July 27, 2018 8:00 a.m. To be held by telephone conference 1511 Van Hise Hall 1220 Linden Drive Madison,

More information

PLATTEVILLE MIDDLE SCHOOL

PLATTEVILLE MIDDLE SCHOOL Architectural The building has aluminum clad wood awning windows in combination with aluminum fixed glass units. They appear to be exterior glazed with insulated glazing. See photo 2. Platteville Middle

More information

13. ELECTRICAL - TECHNICAL

13. ELECTRICAL - TECHNICAL 13. ELECTRICAL - TECHNICAL 13.1 GENERAL REQUIREMENTS 1. Base the electrical design on providing the following features at the most economical cost, considering both investment and operating expenditures:

More information

State College Area School District High School South Building EXISTING CONDITIONS ASSESSMENT

State College Area School District High School South Building EXISTING CONDITIONS ASSESSMENT State College Area School District High School South Building Prepared by CenterPoint Engineering 08 February 2013 FACILITY ASSESSMENT SUMMARY PHYSICAL PLANT General HVAC This report is a snapshot of the

More information

Technical Assignment #2 Electrical Systems Existing Conditions & Building Load Summary

Technical Assignment #2 Electrical Systems Existing Conditions & Building Load Summary Technical Assignment #2 Electrical Systems Existing Conditions & Building Load Summary William H. Gates Hall Seattle, WA Katherine Jenkins Lighting/Electrical Option October 27, 2006 Faculty Advisor: Ted

More information

Lindsay Frederick. Lighting + Electrical. Ron Dodson Faculty Advisor. Native American Cultural Center Arizona. Technical Report 2

Lindsay Frederick. Lighting + Electrical. Ron Dodson Faculty Advisor. Native American Cultural Center Arizona. Technical Report 2 Lindsay Frederick Lighting + Electrical Ron Dodson Faculty Advisor Native American Cultural Center Arizona Technical Report 2 Native American Cultural Center Technical Report 2 p. 2 Executive Summary The

More information

General RATIONALE services. dedicated. utility. that do not. sized. The. over the selection of the. equipment. Voltage.

General RATIONALE services. dedicated. utility. that do not. sized. The. over the selection of the. equipment. Voltage. Section 10 9 6 14 12 1 2 3 4 5 6 8 9 0 11 14 15 16 17 18 19 10 11 12 23 24 25 26 25 20 21 22 23 24 31 37 38 39 340 341 342 38 347 348 49 40 41 42 43 44 45 48 49 40 Section 10.9 General 10.9.0. This section

More information

TABLE OF CONTENTS CHAPTER 1 GENERAL RULES CHAPTER 2 WIRING AND PROTECTION... 51

TABLE OF CONTENTS CHAPTER 1 GENERAL RULES CHAPTER 2 WIRING AND PROTECTION... 51 TABLE OF CONTENTS About This Textbook...xi How to Use the National Electrical Code... 1 Article 90 Introduction to the National Electrical Code... 7 90.1 Purpose of the NEC... 7 90.2 Scope of the NEC...

More information

Dates of Construction Construction Start 2/28/1999 Date of Completion 4/2000 Occupancy 5/2000

Dates of Construction Construction Start 2/28/1999 Date of Completion 4/2000 Occupancy 5/2000 Executive Summary The Milton S. Hershey Medical Center Academic Support Building is located on The Pennsylvania State University's campus in Hershey, PA. The building is owned by The Pennsylvania State

More information

Distribution Control Center Operator Training

Distribution Control Center Operator Training Distribution Control Center Operator Training OnlineTraining 15-Hour Course COURSE I BASIC DISTRIBUTION 1. Introduction to Distribution Systems a. Terminology b. Basic electricity and Ohm s Law c. BES

More information

STEPHEN W. COLLINGS, MSEE, PE, Post Office Box CFEI, CVFI, CESCP Franklin, TN Telephone: (615)

STEPHEN W. COLLINGS, MSEE, PE, Post Office Box CFEI, CVFI, CESCP Franklin, TN Telephone: (615) ENGINEER: ELECTRICAL Engineering Design & Testing Corp. STEPHEN W. COLLINGS, MSEE, PE, Post Office Box 682425 CFEI, CVFI, CESCP Franklin, TN 37068-2425 Telephone: (615) 915-5255 scollings@edtengineers.com

More information

MOUNT PLEASANT MIDDLE SCHOOL HVAC. M-01 Heating Plant: M-02 Heating & Ventilating Systems: Livingston School District Mount Pleasant Middle School

MOUNT PLEASANT MIDDLE SCHOOL HVAC. M-01 Heating Plant: M-02 Heating & Ventilating Systems: Livingston School District Mount Pleasant Middle School MOUNT PLEASANT MIDDLE SCHOOL HVAC M-01 Heating Plant: The existing boilers have recently been upgraded. (3) steam boilers (8660 mbh each) manufactured by Weil- McLain have been installed. Newer hot water

More information

Wold Architects and Engineers. 332 Minnesota Street Suite W2000 Saint Paul, MN

Wold Architects and Engineers. 332 Minnesota Street Suite W2000 Saint Paul, MN Wold Architects and Engineers 332 Minnesota Street Suite W2000 Saint Paul, MN 55101 651 227 7773 PLANNERS ARCHITECTS ENGINEERS ISD #15 St. Francis Area Schools East Bethel Elementary School Additions and

More information

Newark, Delaware Architectural Engineering Senior Thesis Portfolio. Electrical Analysis

Newark, Delaware Architectural Engineering Senior Thesis Portfolio. Electrical Analysis Electrical Analysis The AstroPower Headquarters building was constructed a few years ago to act as both a Headquarters and to be a display of what the product they manufacture can accomplish when put to

More information

MID MICHIGAN COMMUNITY COLLEGE HARRISON CAMPUS Harrison, Michigan 2015 MASTER PLAN

MID MICHIGAN COMMUNITY COLLEGE HARRISON CAMPUS Harrison, Michigan 2015 MASTER PLAN MID MICHIGAN COMMUNITY COLLEGE HARRISON CAMPUS Harrison, Michigan 2015 MASTER PLAN September 30, 2015 PBA Project No. 2015.0140.00 PETER BASSO ASSOCIATES INC. CONSULTING ENGINEERS 5145 LIVERNOIS ROAD,

More information

HOLUM EDUCATION CENTER. Architectural. January 13, 2014 DeForest Area School District

HOLUM EDUCATION CENTER. Architectural. January 13, 2014 DeForest Area School District HOLUM EDUCATION CENTER Architectural The existing building has approximately 41,823 square feet and sets on a lot about 4.14 acres in size. Parking lots are located along the east and west sides of the

More information

Attachment F. Campus Capital Needs Sales Surtax Funded Detail Report

Attachment F. Campus Capital Needs Sales Surtax Funded Detail Report Facility Attachment F Campus Capital Needs Sales Surtax Funded Detail Report Facilities Services 2700 Judge Fran Jamieson Way Viera, Florida 32940-6601 Condition Code Estimate Longleaf Elementary 1.78

More information

NYC Department of Education

NYC Department of Education NYC Department of Education Building Assessment Survey 2017-2018 Asset: P.S. 314 - BROOKLYN, 330 59 STREET, New York, 11220 Inspection Id Inspection Type Time In Last Edited EE : Electrical 2018-04-23

More information

LIGHTING CONTROLS

LIGHTING CONTROLS 260923 LIGHTING CONTROLS PART 1: GENERAL 1.01 SUMMARY COMMENTS A. CU has developed this lighting control guideline to direct design professionals toward standard solutions that meet the University s performance

More information

TRACY A. RAPP, P.E., CFEI Electrical Engineer Industrial, Commercial, Residential

TRACY A. RAPP, P.E., CFEI Electrical Engineer Industrial, Commercial, Residential PROFESSIONAL EXPERIENCE TRACY A. RAPP, P.E., CFEI 2015 to Robson Forensic, Inc. present Associate Provide technical investigations, analysis, reports, and testimony for failure analysis toward the resolution

More information

Engineering Design & Testing Corp./EDT Engineers, P.C.

Engineering Design & Testing Corp./EDT Engineers, P.C. ENGINEER: ELECTRICAL ALBERT M. ROSE, P.E. Engineering Design & Testing Corp. Post Office Box 940520 Maitland, Florida 32794 Telephone: (407) 865-9900 amrose@edtengineers.com EDUCATION: 1981 Bachelor of

More information

Facility Condition Assessment Summary Report. British Columbia Institute of Technology NE6 - Plumbing and Pipefit Building

Facility Condition Assessment Summary Report. British Columbia Institute of Technology NE6 - Plumbing and Pipefit Building Facility Condition Assessment Summary Report British Columbia Institute of Technology NE6 - Plumbing and Pipefit Building Submitted by: VFA Canada Corp. Burnaby Centre 4211 Kingsway Burnaby, BC V5H 1Z6

More information

Cook - Wissahickon Elementary School

Cook - Wissahickon Elementary School Cook - Wissahickon Elementary School 201 E. Salaignac St., Philadelphia, PA 19128 HVAC Replacement Project Scope Determination Report May 10, 2018 Prepared by: G.P. Lamina, Jr., P.E., MBA School District

More information

Chapter 1 General... 5

Chapter 1 General... 5 About This Textbook...xi About the National Electrical Code...xv About the Authors and Illustrator...xix About the Team...xxi Article 90 Introduction to the National Electrical Code... 1 90.1 Purpose of

More information

Technical II Report Electrical Systems

Technical II Report Electrical Systems Technical II Report Electrical Systems Kelly Chan Consultant: Prof T. Dannerth, P.E. Part A Drawings Drawings needed for single-line diagram EE1.01 title sheet (electrical drawings) EE2.09 penthouse/roof

More information

Chapter 1 General...9 Article 100 Definitions...11 Article 100 Questions Article 110 Requirements for Electrical Installations...

Chapter 1 General...9 Article 100 Definitions...11 Article 100 Questions Article 110 Requirements for Electrical Installations... Article 90 Introduction...1 90.1 Purpose of the NEC...1 90.2 Scope of the NEC...2 90.3 Code Arrangement...4 90.4 Enforcement...5 90.5 Mandatory Requirements and Explanatory Material...6 90.6 Formal Interpretations...6

More information

Briar Crest Elementary

Briar Crest Elementary Promises Kept This document includes partial lists of major projects completed at Pattonville Schools since 1986 as part of past bond issues approved by the Pattonville community. Briar Crest Elementary

More information

NYC Department of Education

NYC Department of Education NYC Department of Education Building Assessment Survey 2017-2018 Asset: P.S. 135 - QUEENS, 207-11 89TH AVENUE, New York, 11427 Inspection Id Inspection Type Time In Last Edited EE : Electrical 2018-03-20

More information

Design Presentation. Chief Operations Officer Willie Burroughs

Design Presentation. Chief Operations Officer Willie Burroughs Design Presentation Chief Operations Officer Willie Burroughs Agenda Introduction Community Feedback Project updates 2 Feedback Citizens Advisory Committee meetings Growth and Development meetings Community

More information

ELECTRICAL CURRICULA OUTLINE CORE CURRICULUM 2015

ELECTRICAL CURRICULA OUTLINE CORE CURRICULUM 2015 ELECTRICAL CURRICULA OUTLINE CORE CURRICULUM 2015 Basic Safety (Construction Site Safety Orientation) (12.5 Hours) (Module ID 00101-15) Presents basic jobsite safety information to prepare workers for

More information

Element Z General Design Requirements Existing Facilities Information

Element Z General Design Requirements Existing Facilities Information PART 1 - INTRODUCTION 1.01 OVERVIEW A. This Section provides general information for building systems and components. B. Refer to the Owner s Design Guideline Elements A though G and Element Z for technical

More information

NATIONAL ELECTRICAL CODE (NEC) & NFPA 70E ARC FLASH ELECTRICAL SAFETY

NATIONAL ELECTRICAL CODE (NEC) & NFPA 70E ARC FLASH ELECTRICAL SAFETY A new twist on the National Electrical Code - a practical application workshop. If you sign up in this class, prepare to work! Day 1: Fundamentals of OSHA requirements for performing electrical work -

More information

ENGINE GENERATORS AND ACCESSORIES

ENGINE GENERATORS AND ACCESSORIES ENGINE GENERATORS AND ACCESSORIES GENERAL INFORMATION 1.1 This section applies to engine generators and accessories. DESIGN REQUIREMENTS 2.1 The Engineer of Record will consult with the University s Engineering

More information

Electrical Systems Existing Conditions and Building Load Summary Report

Electrical Systems Existing Conditions and Building Load Summary Report The building was constructed a few years ago to act as both a Headquarters and to be a display of what the product they manufacture can accomplish when put to work. The building features both office and

More information

NATIONAL TRAINING BOARD (ELECTRICIAN) REGULATIONS 2008 BR 54/2008 NATIONAL OCCUPATIONAL CERTIFICATION ACT :38

NATIONAL TRAINING BOARD (ELECTRICIAN) REGULATIONS 2008 BR 54/2008 NATIONAL OCCUPATIONAL CERTIFICATION ACT :38 BR 54/ NATIONAL OCCUPATIONAL CERTIFICATION ACT 2004 2004 :38 The National Training Board, with the approval of the Minister responsible for the National Training Board, in exercise of the powers conferred

More information

Tennessee (Memphis) Service Center

Tennessee (Memphis) Service Center Tennessee (Memphis) Service Center Tony Bishop, P.E. Forensic Engineer 901-375-4062 EDUCATION: University of Memphis Bachelor of Science Electrical Engineering EMPLOYMENT: Unified Investigations & Sciences,

More information

M001. Revenue Services ISSUED FOR CONSTRUCTION SEPTEMBER. 2, East State Parkway Schaumburg, Illinois Do Not Scale Drawings

M001. Revenue Services ISSUED FOR CONSTRUCTION SEPTEMBER. 2, East State Parkway Schaumburg, Illinois Do Not Scale Drawings 1 T Consultant: NOTES, SYMBOLS & ABBREVIATIONS - MECHANICAL Number Description M001 Vestibule 117 LAN/IT Coffee 115 116 Mail Room 118 114 113 112 Scanning 119 Open Office 101 FIRST FLOOR PLAN - MECHANICAL

More information

Technical Report Two

Technical Report Two Technical Report Two Yale Sculpture Building Advisors: Ted Dannerth Richard Mistrick Date: October 31, 2006 Electrical Systems Existing Conditions and Building Load Summary Report Executive Summary: This

More information

Florence High School / Middle School Page 1 of 3 Florence, WI

Florence High School / Middle School Page 1 of 3 Florence, WI Florence High School / Middle School Page 1 of 3 Florence, WI Plumbing Systems Review: The following report is the result of a site visit by Tim Kehoe of Muermann Engineering, LLC that occurred on October

More information

COMMON WORK RESULTS FOR ELECTRICAL: Basic Electrical Materials Methods

COMMON WORK RESULTS FOR ELECTRICAL: Basic Electrical Materials Methods 1. BASIC ELECTRICAL MATERIALS 1. All conduit and raceway must be 3/4" or larger. Exposed raceway in finished areas shall be in 700 or larger wiremold. Exception: runs to individual devices 10 or less,

More information

SCHOOL DISTRICT PALM BEACH COUNTY BUILDING DEPARTMENT PLAN REVIEW CHECK LIST -- ELECTRICAL

SCHOOL DISTRICT PALM BEACH COUNTY BUILDING DEPARTMENT PLAN REVIEW CHECK LIST -- ELECTRICAL SCHOOL DISTRICT PALM BEACH COUNTY BUILDING DEPARTMENT PLAN REVIEW CHECK LIST -- ELECTRICAL 3300 SUMMIT BOULEVARD WEST PALM BEACH, FLORIDA 33406 TEL (561) 688-7687 FAX (561) 688-7654 http://www.palmbeach.k12.fl.us/fm/bd/index.htm

More information

NYC Department of Education

NYC Department of Education NYC Department of Education Building Assessment Survey 2017-2018 Asset: I.S. 364 - BROOKLYN, 1426 FREEPORT LOOP, New York, 11239 Inspection Id Inspection Type Time In Last Edited EE : Electrical 2017-11-16

More information

A. Furnish and install wiring devices and plates as specified herein and as shown on the Drawings.

A. Furnish and install wiring devices and plates as specified herein and as shown on the Drawings. DIVISION 26 ELECTRICAL SECTION 26 27 26 PART 1 GENERAL 1.01 DESCRIPTION A. Furnish and install wiring devices and plates as specified herein and as shown on the Drawings. B. Specialty switches and outlets

More information

State College Area School District High School North Building EXISTING CONDITIONS ASSESSMENT

State College Area School District High School North Building EXISTING CONDITIONS ASSESSMENT State College Area School District High School North Building Prepared by CenterPoint Engineering 08 February 2013 FACILITY ASSESSMENT SUMMARY PHYSICAL PLANT General HVAC This report is a snapshot of the

More information

IDENTIFICATION FOR ELECTRICAL SYSTEMS July Electrical Systems

IDENTIFICATION FOR ELECTRICAL SYSTEMS July Electrical Systems SECTION 26 05 54 IDENTIFICATION FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Nameplates. 2. Labels. 3. Wire markers. 4. Conduit markers. 5. Permanent Marking. 6. Underground

More information

UltraLITE Model ELU Centralized Emergency Lighting Inverter 4.2 KW- 5 KW

UltraLITE Model ELU Centralized Emergency Lighting Inverter 4.2 KW- 5 KW 12/23/16 Rev 9 UltraLITE Model ELU General Specification 4.2 KW to 5 KW UltraLITE Model ELU Centralized Emergency Lighting Inverter 4.2 KW- 5 KW 1.0 General General Specification This specification describes

More information

Franklin Square Hospital Center

Franklin Square Hospital Center Franklin Square Hospital Center Baltimore, MD Thesis Proposal Cassandra Watson + Electrical Electrical Advisor Professor Dannerth Advisor Dr. Mistrick 16 December 2009 Table of Contents Executive Summary...

More information

2008 MS Electrical Engineering Vanderbilt University, Nashville, Tennessee

2008 MS Electrical Engineering Vanderbilt University, Nashville, Tennessee ENGINEER: ELECTRICAL STEPHEN W. COLLINGS, MSEE, PE, CFEI Post Office Box 682425 Franklin, TN 37068-2425 Telephone: (615) 915-5255 scollings@edtengineers.com EDUCATION: 2008 MS Electrical Engineering Vanderbilt

More information

Fire, Smoke, and Combination Fire Smoke Dampers

Fire, Smoke, and Combination Fire Smoke Dampers Fire, Smoke, and Combination Fire Smoke Dampers Mark Belke Director Damper Products-Greenheck Chairman of Code Action Review Committee (CARC) California Building Code work group NFPA 80A, 90A, 92B, 101,

More information

CURRICULUM VITAE OF BRIAN R. NETTLETON, P.E. November 2017

CURRICULUM VITAE OF BRIAN R. NETTLETON, P.E. November 2017 CURRICULUM VITAE OF BRIAN R. NETTLETON, P.E. November 2017 I. General Information A. Position: Senior Electrical Engineer Semke Forensic 154 Hughes Lane St. Charles, Telephone: 636-896-9995 II. Professional

More information

NYC Department of Education

NYC Department of Education NYC Department of Education Building Assessment Survey 2017-2018 Asset: P.S. 56 - STATEN ISLAND, 250 KRAMER AVE., New York, 10309 Inspection Id Inspection Type Time In Last Edited EE : Electrical 2017-10-20

More information

Master Project List Report

Master Project List Report Blue Hills Elementary School 01-8215 Site Utilities Replacement $52,835 01-8502 Modernization $3,135,933 01-8525 Exterior Painting $181,478 01-8552 Kindergarden Fencing $13,180 Install new backflow preventer.

More information

Air Flow Diagram. Orange County Sanitation District SP-194 Section 05 Conceptual Design

Air Flow Diagram. Orange County Sanitation District SP-194 Section 05 Conceptual Design Orange County Sanitation District SP-194 Section 05 Conceptual Design Air Flow Diagram Two options are being analyzed for air distribution and temperature control within the building: Conditioned air shall

More information

TAB C-6 KEYLESS ACCESS AND SECURITY SYSTEM GUIDELINE

TAB C-6 KEYLESS ACCESS AND SECURITY SYSTEM GUIDELINE TAB C-6 KEYLESS ACCESS AND SECURITY SYSTEM GUIDELINE The University of Arizona has implemented a Keyless Access and Security System program to provide a cost effective, efficient, and maintainable means

More information

Implementing an Energized Electrical Work Program. SESHA Hill Country Chapter. Brett Jay Davis, PE Zephyr Environmental Corporation

Implementing an Energized Electrical Work Program. SESHA Hill Country Chapter. Brett Jay Davis, PE Zephyr Environmental Corporation Implementing an Energized Electrical Work Program SESHA Hill Country Chapter May 22, 2009 Brett Jay Davis, PE Zephyr Environmental Corporation bdavis@zephyrenv.com, 512 879-6628 Presentation Outline 1.

More information

Electrical Inspection Special Electrical

Electrical Inspection Special Electrical 0941 Fire Alarm System Devices, panels, wiring, conduit, etc. Description of the building system The school is equipped with a hard wired fire alarm control panel, and automatic dialer. The fire alarm

More information

Note: The office/work area is not in the scope of the PER. Existing Condition

Note: The office/work area is not in the scope of the PER. Existing Condition ROBERT G. DASHIELL, JR., P.E., INC. Consulting Engineers 1225 West 26 th Street, Norfolk, Virginia 23508 (757) 623-5012 September 14, 2016 Draft Electrical Portion of the PER Petersburg Main Sanitary Sewage

More information

The following narrative outlines a conceptual electrical Scope of Work for converting the Phase 2 TRW Building to an Exhibition Hall.

The following narrative outlines a conceptual electrical Scope of Work for converting the Phase 2 TRW Building to an Exhibition Hall. The following narrative outlines a conceptual electrical Scope of Work for converting the Phase 2 TRW Building to an Exhibition Hall. Demolition: The area of work shall be a complete gut ; removing all

More information

3. Provide revised typed circuit directory in panelboards that have circuits removed.

3. Provide revised typed circuit directory in panelboards that have circuits removed. DIVISION 26 - ELECTRICAL 26 0501 MINOR ELECTRICAL DEMOLITION A. Coordinate utility service outages with the UND Electrical Department. B. Verify the abandoned wiring and equipment serve only abandoned

More information

10606 Bloomfield Ave Santa Fe Springs, CA USA

10606 Bloomfield Ave Santa Fe Springs, CA USA IAS Accreditation Number FEB-103 Company Name eti Conformity Services Address 10606 Bloomfield Ave Santa Fe Springs, CA 90670 USA Contact Name Sam Daye Telephone (562) 236-9555 Effective Date of Scope

More information

Spectron LSN (Life Safety Network) Suggested Specifications

Spectron LSN (Life Safety Network) Suggested Specifications 1. General 1.1 Scope A Dual-Lite Spectron LSN (Life Safety Network) Series Inverter System shall be furnished to provide a reliable source of power, and shall operate during a utility line deficiency without

More information

CENTRAL STATE HOSPITAL PLAN PLANT OPERATIONS UTILITIES MANAGEMENT PLAN

CENTRAL STATE HOSPITAL PLAN PLANT OPERATIONS UTILITIES MANAGEMENT PLAN Page 1 of 11 CENTRAL STATE HOSPITAL PLAN SUBJECT: PLANT OPERATIONS UTILITIES MANAGEMENT PLAN ANNUAL REVIEW MONTH: RESPONSIBLE FOR REVIEW: March CSH Safety Officer LAST REVISION DATE: November 2003 I. SCOPE:

More information

PANELBOARDS & BUILDING DISTRIBUTION

PANELBOARDS & BUILDING DISTRIBUTION 262416 PANELBOARDS & BUILDING DISTRIBUTION PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Distribution panelboards 2. Power panelboards B. Related Sections: 1.02 POLICY 1. CU Standard 260500, Basic

More information

NYC Department of Education

NYC Department of Education NYC Department of Education Building Assessment Survey 2017-2018 Asset: P.S. 80 AX(PETR COMPL-BLDG E)-S.I., 715 OCEAN TERRACE, New York, 10301 Inspection Id Inspection Type Time In Last Edited EE : Electrical

More information

CHESAPEAKE CHILD DEVELOPMENT CENTER

CHESAPEAKE CHILD DEVELOPMENT CENTER Client: Chesapeake Energy Corporation Completion: May 2011 Scope: 60,000 sq. ft. Cost: Withheld at Owner s Request Awards: Citation Award, AIA Oklahoma; American Architecture Award, Chicago Atheaneum;

More information

NYC Department of Education

NYC Department of Education NYC Department of Education Building Assessment Survey 2017-2018 Asset: P.S. 310 - BRONX, 260 WEST KINGSBRIDGE RD, New York, 10463 Inspection Id Inspection Type Time In Last Edited EE : Electrical 2017-12-07

More information