The following narrative outlines a conceptual electrical Scope of Work for converting the Phase 2 TRW Building to an Exhibition Hall.

Size: px
Start display at page:

Download "The following narrative outlines a conceptual electrical Scope of Work for converting the Phase 2 TRW Building to an Exhibition Hall."

Transcription

1 The following narrative outlines a conceptual electrical Scope of Work for converting the Phase 2 TRW Building to an Exhibition Hall. Demolition: The area of work shall be a complete gut ; removing all electrical lights, wiring devices, and gear. Remove all branch circuit conduit and wire in its entirety. Remove electrical panelboards, unless noted otherwise. Remove cabling serving panels, disconnects and other gear back to main electrical room; capping and marking horizontal conduit in place up at structure. Maintain power in existing mechanical/electrical rooms and along south perimeter. The center restroom area is to remain; remodeled as noted under this Work. The support rooms and abandoned kitchen area along the south perimeter are not included in this phase; except as noted. The restrooms in the south area are being remodeled under this Work. A panel for a future food vendor is included as noted below. See Arch Narrative regarding salvage rights. Electrical Service: The existing gear in the lower level main electrical room will be used to serve the Exhibition Hall. The main switchboard is a 4000A, 480/277V, 3ph Square D, fuseddisconnect switchboard. A 500kVA dry-type transformer powers the 1600A, 120/208V switchboard in the main electrical room. An 800A motor control center is located in the boiler room, just outside the main electrical room. Re-fuse and/or replace existing OCDP disconnect switch units within each switchboard as required to serve the loads indicated. Reuse existing feeder conduit wherever possible. Electrical Distribution: Provide power feeders to mechanical equipment see description below. Provide feeders to serve 125A, 120/208V 3ph Panelboards located along the perimeter walls of the Ex Hall. Provide 60A, 277/480V 3ph feeders to serve ceiling mounted j-boxes (power drops) located in a nominal 30ft by 80ft on-center pattern through-out the Ex Hall to serve 10 x10 vendor booths. Each drop shall consist of a NEMA 1 j-box at the ceiling; with a 1

2 60A hard-service SOOW black cord with kellum grips; nominal 40-foot long, with a 60A 4-pin connector on the end. Each drop shall include a portable cord drop cradle; allowing the actual drop location to be moved within the radius served by each celing j- box. Power drops shall serve mobile power carts to provide vendor booth power. Include a 45kVA, dry-type, aluminum winding, 150deg-rated transformer for each 208V panel noted. Mount xfmr s directly above panelboards in the Ex Hall, near structure, using wall mounting brackets with isolation pads. Contractor has the option to power the perimeter 208V panels directly from the 208V distr switchboard MDP and eliminate the associated transformer, if cost effective. Include up to six (6) 120V, 20A cord drops along the main entrance; locations to be determined. Include 20A circuits to control panels, DDC and other misc loads. Power Carts: Provide field-assembled power carts to provide 120/208V event power in the open areas of the Ex Hall. Each power cart shall consist of the following: Metal frame cart, 4 caster wheels One 45kVA dry-type transformer One 60A, four pin, pin & sleeve recep One 125A, 120/208V 42-pole Panel (sec) One 60A, 480V fused main disc switch Each power cart shall include receptacles flush-mounted in two NEMA 1 enclosures mounted either side of the serving panelboard. Recep shall include: Two (2) 50A, 125/208V, 1ph Four (4) 20A, 3ph twist-lock Four Quad 20A, 1ph (for local booths) <Panelboard <Recep Enclosures <Disc Sw (opp-side) <Dry-type Xfmr <Mobile Cart Label each recep with assoc circuit no(s) using typed label maker. Include one power cart for each 100A power drop location. Include four (4) hard-service cords, 20-foot long, with a quad receptacle on the end for hard-wiring to power cart panelboard breakers to serve vendor booths either side of cart. Include one (1) spare power cart and four (4) spare cord/quad receptacle assemblies. Equip four (4) of the power carts required with a 200/3 disconnect. The disconnect shall be fused at 125A; and feed from the on-board transformer secondary; with instruction 2

3 plaques that denote the main breaker on the panelboard must be in the OFF position before energizing the 208V disconnect. Panelboards: Perimeter wall Panels: These panels shall have one (1) 50/2 breaker serving a 50A outlet located directly under each panel; and a nominal twenty (20) 20/1 breakers to provide a dedicated 20A, 120V circuit to local quad receptacles located 10-feet on-center along associated perimeter wall(s). Provide a minimum of one panel per perimeter wall. See Plans. Power Cart Panels: Provide 200A, 120/208V 3ph, 42-circuit panelboards with the following breakers (see attached typical Power Cart Panel Schedule): Two (2) 50A, 2-pole Four (4) 20A, 3-pole Twelve (12) 20A, 1-pole Food Service Panel: Provide a 200A, 120/208V 3ph, 42-circuit panelboard for an outside food service vendor to connect their equipment. Food service is proposed to be located in the abandoned Kitchen area. Panel shall include a mix of 20/1, 20/2, 30/2 and 20/3 breakers with all 42 pole-positions occupied with breakers. Mechanical Equipment Power: Provide power to three (3) water heaters added at each of three restroom areas. The mechanical AHU connection requirements vary; based on two AHU options. Option 1: Existing AHU s are re-used (maintain power); and supplemented with Evap Coolers. A smoke exhaust fan is added near the center core restroom area. An RTU-1 (VAV) unit is added to serve the Admin Area. Provide a 200A, 480V panelboard at center mezzanine mechanical room to serve the added 480V equipment. See scope narrative and attached panel schedule. Option 2: Existing AHU s are abandoned; and six (6) new 50-ton RTU s serve the Ex Hall. An RTU-1 (VAV) unit is added to serve the Admin Area. Wiring and Conduit: Conduit shall be EMT with compression or set-screw fittings; 1/2 C minimum. No floor cuts or underground conduit work is anticipated. All overhead conduit shall be installed tight to structure. 3

4 Conductors shall be copper, 90 degrees C, #12 AWG min., Type THHN/THWN for dry locations, Type XHHW for wet locations. Conductor insulation shall be color coded to match existing scheme used in the building. Feeders and branch circuits shall be sized for a total voltage drop not to exceed 5 percent. Grounding: Include a green ground conductor within all branch circuit and feeder conduits. Provide a #4AWG ground from the main switchboard to the main comm headend. Provide a ground from each dry-type transformer back to the main ground bus. (Due to concrete T building construction.) Assume the service grounding electrode is in good condition. Wiring Devices: Wiring devices shall be grey; with galvanized metal coverplates. Provide quad 20A, 120V receptacles along outside perimeter walls of the Ex Hall; with a dedicated 20A, 120V circuit to each outlet from a local panelboard. Identification: Provide typed self-adhesive labels to label wiring devices and boxes. Label each receptacle with a typed label denoting the Panel ID and circuit no. serving it. Label each light switch using nomenclature that clearly describes lights controlled. Interior Lighting: Lighting shall be provided to meet IECC 2009 Energy Code W/SF requirements. Lighting shall be 277V, program-start ballasts, 35k lamps/80+cri fluor lamps. Light Fixture Types are anticipated to be the following: Exhibit Hall T5HO High-Bay Fluor; Columbia LHEW or equal Two ballasts for inboard/outboard 3-level switching Corridor Recess Fluorescent Troffer Toilets Recess Fluorescent Troffer Vestibules Recess Fluorescent Troffer or Down Lights Mechanical Existing to Remain Storage Industrial Fluorescent or recessed 1x4 Troffers South Perimeter Existing to remain (NIC, except Restroom remodel) 4

5 Lighting Control: Switchology shall be used to control Ex Hall lighting. Switches shall be located at the east main entrance by the Admin Area/Ticket Office. Ex Hall switches shall allow each of four (4) quadrants to be turned on independently; and shall include 3-level switching within each of the four quadrants. Provide mech-held lighting contactors and momentary switches where cost effective. Provide a separate switch for lights at main entry adjacent to Admin Offices. Restrooms shall be key-switched. Staff areas and offices shall be local toggle switches or occupancy switches to meet IECC requirements. Exterior Lighting: Provide a HID wall pack to replace each existing wall pack on all perimeter walls of the Ex Hall/south building; including the loading dock area on the west side; and any wall packs within the interior courtyard directly east of the loading docks. Verify photocell/time clock/contactor operation and adjust/repair/replace as required. Emergency Lighting: Provide LED exit lights with battery as required by Code; Dual-Lite LXUGWE or equal. Provide unit emergency lights, 10W-MR16, to illuminate egress pathways in Ex Hall. Provide 5W-MR16, unit emergency lights for egress lighting in support/office areas. Provide exterior emergency lamps to provide exterior egress lighting at each exit. Fire Alarm System: Provide a fire alarm detection/notification and voice alarm system per IFC The FACP will be housed in a fire control room near the main entrance near Admin. Provide a Simplex 4100U FACP with voice/alarm comm systems. Include tone/pre-recorded messaging and a mic for manual/live voice messages. Provide duct detectors per Code for AHU s; with wall mounted indication/test switches. Provide an alpha/numeric annunciator at the main entrance. Provide dual-action manual pull stations at each exit from the building. Provide visual alarm/speaker notification devices, mounted back-to-back on columns and on perimeter walls within the Ex Hall; and wall-mounted in all support and admin area rooms per Code. Provide notification devices in the ex kitchen/eatery area; and other south perimeter rooms (noted NIC) as required by AHJ. Include NAC panel(s) as required to power devices located remote from FACP. Include battery back-up for the fire alarm system per Code. Include a telephone connection for auto-dial notification to a monitoring service. 5

6 Sound System: Provide a basic public announcement system to serve the Ex Hall. Include basic horn positioned on columns/walls to provide uniform db coverage of the Ex Hall and ceiling speakers for restrooms and other areas with a lay-in ceiling. Locate the microphone/headend panel in the Admin Office/Ticket Booth area. Option: Use FA speakers in lieu of a stand-alone speaker system; per IFC Voice/Data System: Coordinate with utilities to provide copper lines & fiber for voice/data/ip service. Provide for a telephone headend; with digital handsets as directed by the Owner. Phone system shall support IP and wireless communications. Provide a Cat 6 structured cabling system to all wall outlets within the ticket booth, admin offices and select support spaces as defined by the Owner (up to 10 locations). Provide a free-standing data rack; with required gigabit data headend equipment to provide wireless internet services throughout the Ex Hall and wired voice/data drops in admin and ticket booth areas. Provide broad-band Wi-Max wireless antenna with superior response located to provide service to the Ex Hall and Admin Office areas. Include all ancillary components for a turn-key complete system. Security System: Provide a central security system headend control panel with auto-dial. Provide motion detection to monitor all entry points into the facility. Provide an exterior horn to sound upon a general alarm. Include a telephone connection for auto-dial notification to a monitoring service. Include a panic button in the ticket booth/admin office area, located per Owner. Supplemental Info: Sample Panel Schedules Concept Electrical Drawings 6

7 PANEL SCHEDULE PANEL: PC* LOCATION: POWER CART VOLTS: 120 / PH 4 W NO. POLES: 42 MAIN LUG ONLY BUS RATING: 125A xx KA INTERRUPTING CAP. MOUNTING: METAL FRAME ON CART FEATURES: DESCRIPTION NOTES VA TYPE BRKR P CKT PH CKT P BRKR TYPE VA DESCRIPTION NOTES QUAD - POWER CART 1800 R A R 1800 QUAD - POWER CART QUAD - POWER CART 1800 R B R 1800 QUAD - POWER CART SPARE C SPARE VENDOR BOOTH QUAD 1800 R A R 1800 VENDOR BOOTH QUAD VENDOR BOOTH QUAD 1800 R 9 B 10 R 1800 VENDOR BOOTH QUAD VENDOR BOOTH QUAD 1800 R 11 C 12 R 1800 VENDOR BOOTH QUAD VENDOR BOOTH QUAD 1800 R A R 1800 VENDOR BOOTH QUAD VENDOR BOOTH QUAD 1800 R 15 B 16 R 1800 VENDOR BOOTH QUAD VENDOR BOOTH QUAD 1800 R 17 C 18 R 1800 VENDOR BOOTH QUAD SPARE A SPARE SPARE B SPARE SPARE C SPARE SPECIAL VENDOR RECEP 3900 A A A 3900 SPECIAL VENDOR RECEP " 3900 A 27 B A 3900 " 29 C A B C A B C 42 LOAD SUMMARY: DEMAND CONNECTED LOAD TYPE CONN. pf FACTOR DEMAND PHASE LOADING P=PANELS PHASE A: 18.6 EST. MAX. DEMAND: L=LIGHTING PHASE B: 18.6 MIN. FEEDER AMPACITY: R=RECEPTACLES % OF > 10k 19.4 PHASE C: 7.2 A= APPLIANCES [LARGEST MOTO Kw] M=MOTORS NOTES: 3M=3PH MOTORS TYPICAL POWER CART PANELBOARD. H=HEATERS =SPARE TOTAL 44.4 kva kva 29.1 kva 86.3 A

8 PANEL SCHEDULE PANEL: MECH LOCATION: CENTER CORE VOLTS: 277 / PH 4 W NO. POLES: 42 MAIN LUG ONLY BUS RATING: 225A xx KA INTERRUPTING CAP. MOUNTING: SURFACE FEATURES: DESCRIPTION NOTES VA TYPE BRKR P CKT PH CKT P BRKR TYPE VA DESCRIPTION NOTES EVAP COOLER M A M 3047 EVAP COOLER " M 3 B 4 3M 3047 " " M 5 C 6 3M 3047 " EVAP COOLER M A M 3047 EVAP COOLER " M 9 B 10 3M 3047 " " M 11 C 12 3M 3047 " EVAP COOLER M A M 3047 EVAP COOLER " M 15 B 16 3M 3047 " " M 17 C 18 3M 3047 " EVAP COOLER M A M 3047 EVAP COOLER " M 21 B 22 3M 3047 " " M 23 C 24 3M 3047 " EVAP COOLER M A M 3047 EVAP COOLER " M 27 B 28 3M 3047 " " M 29 C 30 3M 3047 " RTU M A 32 " M 33 B 34 " M 35 C A B C 42 LOAD SUMMARY: DEMAND CONNECTED LOAD TYPE CONN. pf FACTOR DEMAND PHASE LOADING P=PANELS PHASE A: 33.5 EST. MAX. DEMAND: L=LIGHTING PHASE B: 33.5 MIN. FEEDER AMPACITY: R=RECEPTACLES % OF > 10k PHASE C: 33.5 A= APPLIANCES [LARGEST MOTO 9.1 Kw] M=MOTORS NOTES: 3M=3PH MOTORS FOR MECH OPTION NO. 1. SEE DWGS/NARRATIVES FOR OPTION NO. 2. H=HEATERS =SPARE TOTAL kva kva kva A

FIRE ALARM: BY OTHERS, IF REQUIRED.

FIRE ALARM: BY OTHERS, IF REQUIRED. x x x x x x OS LIGHTING S FLUORESCENT LIGHT FIXTURE, SEE LIGHT FIXTURE SCHEDULE FOR SIZE AND MOUNTING. FLUORESCENT STRIP LIGHT FIXTURE, SEE LIGHT FIXTURE SCHEDULE FOR SIZE AND MOUNTING. WALL BRACKET FLUORESCENT

More information

FIRE ALARM: BY OTHERS, IF REQUIRED.

FIRE ALARM: BY OTHERS, IF REQUIRED. x x x x x x OS LIGHTING S FLUORESCENT LIGHT FIXTURE, SEE LIGHT FIXTURE SCHEDULE FOR SIZE AND MOUNTING. CAPITAL LETTER DENOTES TYPE, LOWER CASE LETTER DENOTES SWITCH LEG. FLUORESCENT STRIP LIGHT FIXTURE,

More information

M001. Revenue Services ISSUED FOR CONSTRUCTION SEPTEMBER. 2, East State Parkway Schaumburg, Illinois Do Not Scale Drawings

M001. Revenue Services ISSUED FOR CONSTRUCTION SEPTEMBER. 2, East State Parkway Schaumburg, Illinois Do Not Scale Drawings 1 T Consultant: NOTES, SYMBOLS & ABBREVIATIONS - MECHANICAL Number Description M001 Vestibule 117 LAN/IT Coffee 115 116 Mail Room 118 114 113 112 Scanning 119 Open Office 101 FIRST FLOOR PLAN - MECHANICAL

More information

Appendix B. Facilities Assessment Report

Appendix B. Facilities Assessment Report Mile Lane Army Reserve Center Redevelopment Plan September 2008 Appendix B Facilities Assessment Report RKG Associates, Inc. Mile Lane Army Reserve Base Middletown, CT MEP System Evaluation For RKG Associates

More information

.4 Do complete installation in accordance with latest Electrical Bulletins of the local inspection authority.

.4 Do complete installation in accordance with latest Electrical Bulletins of the local inspection authority. Fitness Facility Addition Page 1 1.1 CODES AND STANDARDS.1 Do complete installation in accordance with the latest edition of the CSA C22.1 as amended by the latest editions of the National Building Code

More information

PLATTEVILLE MIDDLE SCHOOL

PLATTEVILLE MIDDLE SCHOOL Architectural The building has aluminum clad wood awning windows in combination with aluminum fixed glass units. They appear to be exterior glazed with insulated glazing. See photo 2. Platteville Middle

More information

Electrical Design Guidelines Table of Contents

Electrical Design Guidelines Table of Contents C: Compliant Rev. 3 Dated June 13 11 NC: Non-Compliant NA: Not Applicable Page1 16.1 General 16.2 Single Line Diagrams 16.3 Electric Motor Equipment and Controls 16.4 Lighting 16.5 Emergency Lighting 16.6

More information

ELECTRICAL SYSTEMS ASSESSMENT Hanover High School

ELECTRICAL SYSTEMS ASSESSMENT Hanover High School ELECTRICAL SYSTEMS ASSESSMENT Hanover High School ELECTRICAL DISTRIBUTION SYSTEM:?? The existing electrical service consists of an underground primary service originating at a utility pole on Cedar Street,

More information

Lindsay Frederick. Lighting + Electrical. Ron Dodson Faculty Advisor. Native American Cultural Center Arizona. Technical Report 2

Lindsay Frederick. Lighting + Electrical. Ron Dodson Faculty Advisor. Native American Cultural Center Arizona. Technical Report 2 Lindsay Frederick Lighting + Electrical Ron Dodson Faculty Advisor Native American Cultural Center Arizona Technical Report 2 Native American Cultural Center Technical Report 2 p. 2 Executive Summary The

More information

Florence High School / Middle School Page 1 of 3 Florence, WI

Florence High School / Middle School Page 1 of 3 Florence, WI Florence High School / Middle School Page 1 of 3 Florence, WI Plumbing Systems Review: The following report is the result of a site visit by Tim Kehoe of Muermann Engineering, LLC that occurred on October

More information

LIGHT LEVEL REQUIREMENTS MINIMUM ACCEPTABLE FOOT CANDLES

LIGHT LEVEL REQUIREMENTS MINIMUM ACCEPTABLE FOOT CANDLES LIGHT LEVEL REQUIREMENTS LOCATION Classrooms and instrumental areas- Study Halls, Lecture Rooms, Art Rooms, Offices, Libraries, Conference Rooms, Work Rooms, Shops, Laboratories and Secondary School Cafeterias.

More information

Brown University Revised June 29, 2012 Facilities Design & Construction Standards SECTION ELECTRICAL DESIGN CRITERIA

Brown University Revised June 29, 2012 Facilities Design & Construction Standards SECTION ELECTRICAL DESIGN CRITERIA PART 1 - GENERAL 1.1 Background SECTION 26 00 10- ELECTRICAL DESIGN CRITERIA A. Brown University maintains it own campus electrical distribution system which serves the majority of the buildings and facilities

More information

GARCIA GALUSKA DESOUSA Consulting Engineers

GARCIA GALUSKA DESOUSA Consulting Engineers L#57297 /Page 1/July 21, 2017 ELECTRICAL SYSTEMS NARRATIVE REPORT The following is the Electrical Systems narrative, which defines the scope of work and capacities of the Power and Lighting systems, as

More information

Renovate MCRC Facilities Great Lakes, IL

Renovate MCRC Facilities Great Lakes, IL 6. ENGINEERING SYSTEMS REQUIREMENTS D50 ELECTRICAL SYSTEM DESCRIPTION The electrical repair work includes the design and construction of the electrical distribution system for the B3200 Marine Corps Reserve

More information

Technical II Report Electrical Systems

Technical II Report Electrical Systems Technical II Report Electrical Systems Kelly Chan Consultant: Prof T. Dannerth, P.E. Part A Drawings Drawings needed for single-line diagram EE1.01 title sheet (electrical drawings) EE2.09 penthouse/roof

More information

Electrical System (N) PANELBOARD "L1" VOLTAGE: 208/120 A, 3P :MAIN C/B PHASE: 3 A :BUSSING WIRE: 4 :MOUNTING

Electrical System (N) PANELBOARD L1 VOLTAGE: 208/120 A, 3P :MAIN C/B PHASE: 3 A :BUSSING WIRE: 4 :MOUNTING Electrical System After re-designing the lighting system for the children s computer, circulation and storytelling areas, the electrical system had to be redesigned as well. These are the new panel board

More information

Division 26 ELECTRICAL TABLE OF CONTENTS

Division 26 ELECTRICAL TABLE OF CONTENTS Division 26 ELECTRICAL TABLE OF CONTENTS 26 1000 GENERAL... 33 A. CODE... 3 B. RELATED SECTIONS... 3 C. ABBREVIATIONS... 3 D. DEFINITIONS... 3 E. DRAWING REQUIREMENTS... 3 F. EQUIPMENT SERVICE ACCESS AND

More information

HOLUM EDUCATION CENTER. Architectural. January 13, 2014 DeForest Area School District

HOLUM EDUCATION CENTER. Architectural. January 13, 2014 DeForest Area School District HOLUM EDUCATION CENTER Architectural The existing building has approximately 41,823 square feet and sets on a lot about 4.14 acres in size. Parking lots are located along the east and west sides of the

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 26 0519 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

TABLE LIGHTING POWER DENSITIES FOR BUILDING EXTERIORS ASHRAE Uncovered Parking Areas. Building Grounds. Walkways 10 feet wide or greater

TABLE LIGHTING POWER DENSITIES FOR BUILDING EXTERIORS ASHRAE Uncovered Parking Areas. Building Grounds. Walkways 10 feet wide or greater TABLE 9.4.5 LIGHTING POWER DENSITIES FOR BUILDING EXTERIORS ASHRAE 90.1 Uncovered Parking Areas Parking Lots and drives Building Grounds Walkways less that 10 feet wide Walkways 10 feet wide or greater

More information

ELECTRIC SERVICE EVALUATIONS ELECTRICAL / BOILER REPLACEMENTS. Clarkstown Central School District. June Arch Proj. #

ELECTRIC SERVICE EVALUATIONS ELECTRICAL / BOILER REPLACEMENTS. Clarkstown Central School District. June Arch Proj. # ELECTRICAL ELECTRIC SERVICE EVALUATIONS / BOILER REPLACEMENTS Clarkstown Central School District June 2015 CSArch Arch Proj. # 151-1501.00 151 Table of Contents SECTION 1 Executive Summary... 1 SECTION

More information

Currently, all electrical upgrades would be voluntary, but there are situations in which upgrades would be required.

Currently, all electrical upgrades would be voluntary, but there are situations in which upgrades would be required. Executive Summary The current electrical system is functional but requires some understanding in order to avoid overloading circuits. Certain outlets can be used for space heaters while others cannot and

More information

2 Main Office Building BLDG-955A Building Purpose Building Area Administration offices. Training room 7,610 SF Inspection Date August 16, 2016 Inspect

2 Main Office Building BLDG-955A Building Purpose Building Area Administration offices. Training room 7,610 SF Inspection Date August 16, 2016 Inspect 1 Site Summary Address 7200 Bluff Springs Road Austin, TX 78744 Number of Permanent Campus Facilities 2 Original Year of Construction 2014 Total Campus Building Area (combined) 25,314 SF Introduction The

More information

DESIGN AND CONSTRUCTION STANDARDS GENERAL DESIGN GUIDELINES

DESIGN AND CONSTRUCTION STANDARDS GENERAL DESIGN GUIDELINES 2.07 ELECTRICAL GENERAL DESIGN AND CONSTRUCTION STANDARDS GENERAL DESIGN GUIDELINES - 2.07 It is expected that the electrical design professional will conform to accepted good engineering design practices.

More information

TABLE OF CONTENTS CHAPTER 1 GENERAL RULES CHAPTER 2 WIRING AND PROTECTION... 51

TABLE OF CONTENTS CHAPTER 1 GENERAL RULES CHAPTER 2 WIRING AND PROTECTION... 51 TABLE OF CONTENTS About This Textbook...xi How to Use the National Electrical Code... 1 Article 90 Introduction to the National Electrical Code... 7 90.1 Purpose of the NEC... 7 90.2 Scope of the NEC...

More information

Element D Services Electrical

Element D Services Electrical PART 1 - GENERAL 1.01 OVERVIEW A. This Section includes design standards and requirements for electrical service and distribution. This is a design standard and is not intended to be used as a Specification.

More information

Facility Condition Assessment Summary Report. British Columbia Institute of Technology NE6 - Plumbing and Pipefit Building

Facility Condition Assessment Summary Report. British Columbia Institute of Technology NE6 - Plumbing and Pipefit Building Facility Condition Assessment Summary Report British Columbia Institute of Technology NE6 - Plumbing and Pipefit Building Submitted by: VFA Canada Corp. Burnaby Centre 4211 Kingsway Burnaby, BC V5H 1Z6

More information

Chang Liu Lighting + Electrical M.A.E./B.A.E. Integrated Degree. Technical Assignment 2 October 12, 2012 Faculty Consultants: Ron Dodson

Chang Liu Lighting + Electrical M.A.E./B.A.E. Integrated Degree. Technical Assignment 2 October 12, 2012 Faculty Consultants: Ron Dodson M.A.E./B.A.E. Integrated Degree Technical Assignment 2 October 12, 2012 Faculty Consultants: Ron Dodson Renzo Museum of American Art Executive Summary This report provides an analysis of the electrical

More information

MOUNT PLEASANT MIDDLE SCHOOL HVAC. M-01 Heating Plant: M-02 Heating & Ventilating Systems: Livingston School District Mount Pleasant Middle School

MOUNT PLEASANT MIDDLE SCHOOL HVAC. M-01 Heating Plant: M-02 Heating & Ventilating Systems: Livingston School District Mount Pleasant Middle School MOUNT PLEASANT MIDDLE SCHOOL HVAC M-01 Heating Plant: The existing boilers have recently been upgraded. (3) steam boilers (8660 mbh each) manufactured by Weil- McLain have been installed. Newer hot water

More information

COMMON WORK RESULTS FOR ELECTRICAL: Basic Electrical Materials Methods

COMMON WORK RESULTS FOR ELECTRICAL: Basic Electrical Materials Methods 1. BASIC ELECTRICAL MATERIALS 1. All conduit and raceway must be 3/4" or larger. Exposed raceway in finished areas shall be in 700 or larger wiremold. Exception: runs to individual devices 10 or less,

More information

ELECTRICAL EXISTING CONDITIONS AND DESIGN ANALYSIS

ELECTRICAL EXISTING CONDITIONS AND DESIGN ANALYSIS Executive Summary ELECTRICAL EXISTING CONDITIONS AND DESIGN ANALYSIS Sara Lappano Ltg./Elec. Corron Cultural Center Middletown, VA Faculty Advisor: Dr. Moeck 11.4.2002 As in the prior lighting technical

More information

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST FIRE ALARM SYSTEM INSTALLATION

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST FIRE ALARM SYSTEM INSTALLATION July 1, 2010 SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST FIRE ALARM SYSTEM INSTALLATION Address: Permit #: Inspector: Date: Status: Inspector: Date: Status: A-Approved; AC-Approved

More information

I.C. Thomasson Associates, Inc. CONSULTING ENGINEERS 2950 KRAFT DRIVE, SUITE 500 NASHVILLE, TN. 37204 PHONE (615) 346-3400 FAX (615) 346-3550 www.icthomasson.com ICT PROJECT # 170647 HODGSON DOUGLAS landscape

More information

A. Section includes distribution panelboards and lighting and appliance branch-circuit panelboards.

A. Section includes distribution panelboards and lighting and appliance branch-circuit panelboards. SECTION 262416 - PANELBOARDS PART 1 - GENERAL 1.1 SUMMARY A. Section includes distribution panelboards and lighting and appliance branch-circuit panelboards. 1.2 PERFORMANCE REQUIREMENTS A. Seismic Performance:

More information

Student Services & Classroom Addition. A. Section includes distribution panelboards and lighting and appliance branch-circuit panelboards.

Student Services & Classroom Addition. A. Section includes distribution panelboards and lighting and appliance branch-circuit panelboards. SECTION 262416 - PANELBOARDS PART 1 - GENERAL 1.1 SUMMARY A. Section includes distribution panelboards and lighting and appliance branch-circuit panelboards. 1.2 PERFORMANCE REQUIREMENTS A. Seismic Performance:

More information

APPENDIX - L INTERNATIONAL RESIDENTIAL CODE ELECTRICAL

APPENDIX - L INTERNATIONAL RESIDENTIAL CODE ELECTRICAL This Appendix (2000 IRC Appendix-L) is produced, copyrighted, and maintained by the National Fire Protection Association Association, all rights reserved. Use of this Appendix is pursuant to license with

More information

S AGE E NGINEERING A SSOCIATES, LLP

S AGE E NGINEERING A SSOCIATES, LLP S AGE E NGINEERING A SSOCIATES, LLP 1211 Western Avenue Albany, NY (518) 453 6091 F (518) 453 6092 Kingston Library Mechanical and Electrical Systems Field Report Date of Visits: Mechanical - September

More information

SECTION LOW VOLTAGE LIGHTING CONTROLS

SECTION LOW VOLTAGE LIGHTING CONTROLS SECTION 26 09 26 LOW VOLTAGE LIGHTING CONTROLS PART 1 - GENERAL 1.01 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section

More information

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards Change History Date Description of Change Pages / Sections Modified Change Approver Initials 8/1/17 Updated section on Manufacturers 3 1. 6/15/16 Updated division section from 16120 to 26 05 00, - mgl44

More information

Michigan State University DESIGN GUIDELINES. ELECTRICAL DESIGN Page 1 TABLE OF CONTENTS 1

Michigan State University DESIGN GUIDELINES. ELECTRICAL DESIGN Page 1 TABLE OF CONTENTS 1 Page 1 TABLE OF CONTENTS 1 ELECTRICAL 2 Summary Sustainability Electrical Distribution Lighting Detection and Alarm Communication Systems Lightning Protection Clock Systems Access Control Housekeeping

More information

State College Area School District High School South Building EXISTING CONDITIONS ASSESSMENT

State College Area School District High School South Building EXISTING CONDITIONS ASSESSMENT State College Area School District High School South Building Prepared by CenterPoint Engineering 08 February 2013 FACILITY ASSESSMENT SUMMARY PHYSICAL PLANT General HVAC This report is a snapshot of the

More information

Building Electrical System Overview

Building Electrical System Overview Philip Mackey L/E Dr. Mistrick Holy Cross Hospital North Addition Silver Spring, MD 0/3/05 Building Electrical System Overview Executive Summary: The following report describes the existing emergency power

More information

Sprinkler: The building does not have a fire protection system installed. MECHANICAL / PLUMBING / SPRINKLER SYSTEMS RECOMMENDATIONS

Sprinkler: The building does not have a fire protection system installed. MECHANICAL / PLUMBING / SPRINKLER SYSTEMS RECOMMENDATIONS EXISTING MECHANICAL CONDITIONS SUMMARY The items listed below are based on our site visit on Nov 10, 2016. Our review is based on current conditions and anticipated future use of these building. In the

More information

F. GENERAL REQUIREMENTS Electrical Design Criteria 2006 Edition 4/3/06 School District Palm Beach County Page-1 of 15

F. GENERAL REQUIREMENTS Electrical Design Criteria 2006 Edition 4/3/06 School District Palm Beach County Page-1 of 15 ELECTRICAL DESIGN CRITERIA TABLE OF CONTENTS I GENERAL...2 II CRITERIA...2 A. POWER DISTRIBUTION SYSTEMS...2 1. NORMAL POWER:...2 2. EMERGENCY POWER...3 B. LIGHTING...4 1. GENERAL...4 2. AVERAGE MAINTAINED

More information

Lord Stirling Community School Electrical Systems Existing Conditions & Building Load Summary Technical Assingment#2 Due October 26, 2004

Lord Stirling Community School Electrical Systems Existing Conditions & Building Load Summary Technical Assingment#2 Due October 26, 2004 Electrical Systems Existing Conditions & Building Load Summary Technical Assingment#2 Due October 26, 2004 Table of Content: Page 1 ~ Single Line Diagram 1 2 ~ Electrical System Narrative 2-3 3 ~ Lamp

More information

SINGLE CONVENIENCE OUTLET, WALL MOUNTED RECESSED +18" AFF

SINGLE CONVENIENCE OUTLET, WALL MOUNTED RECESSED +18 AFF LUORESCENT STRIP SURACE/PENDANT MOUNTED ' X ' LUORESCENT RECESS MOUNTED LUORESCENT STRIP RECESS MOUNTED LUORESCENT STRIP WALL MOUNTED LUORESCENT STRIP RECESS MOUNTED LUORESCENT EMERGENCY STRIP SURACE/PENDANT

More information

DIVISION 28 ELECTRONIC SAFETY AND SECURITY

DIVISION 28 ELECTRONIC SAFETY AND SECURITY 281300 - ACCESS CONTROL A. General DIVISION 28 ELECTRONIC SAFETY AND SECURITY At the beginning of the project, schedule a meeting with the Facilities Access/Maintenance Coordinator with questions and concerns.

More information

ELECTRICAL SYMBOLS AND ABBREVIATIONS NOT ALL SYMBOLS, DEVICES OR ABBREVIATIONS MAY BE USED

ELECTRICAL SYMBOLS AND ABBREVIATIONS NOT ALL SYMBOLS, DEVICES OR ABBREVIATIONS MAY BE USED SYMBOLS AND ABBREVIATIONS ABBREVIATIONS GENERAL NOTES LINE TYPE LEGEND CIRCUITS TELECOMMUNICATION SYSTEM ING EQUIPMENT POWER DEVICES FIRE ALARM SYSTEM NOT ALL SYMBOLS, DEVICES OR ABBREVIATIONS MAY BE USED

More information

Page 1 of General

Page 1 of General Page 1 of 8 16.1 General 1. This section covers items common to sections of CSI s Master Format - Division 16. 2. Dalhousie University is certified by IBEW for new construction and all electrical contractors

More information

DEMOLITION GENERAL NOTES As-built conditions have been determined from Record Drawings (if they exist), field investigations (accessible areas and

DEMOLITION GENERAL NOTES As-built conditions have been determined from Record Drawings (if they exist), field investigations (accessible areas and DEMOLITION GENERAL NOTES As-built conditions have been determined from Record Drawings (if they exist), field investigations (accessible areas and equipment), and discussions with maintenance personnel

More information

PANELBOARDS & BUILDING DISTRIBUTION

PANELBOARDS & BUILDING DISTRIBUTION 262416 PANELBOARDS & BUILDING DISTRIBUTION PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Distribution panelboards 2. Power panelboards B. Related Sections: 1.02 POLICY 1. CU Standard 260500, Basic

More information

State College Area School District High School North Building EXISTING CONDITIONS ASSESSMENT

State College Area School District High School North Building EXISTING CONDITIONS ASSESSMENT State College Area School District High School North Building Prepared by CenterPoint Engineering 08 February 2013 FACILITY ASSESSMENT SUMMARY PHYSICAL PLANT General HVAC This report is a snapshot of the

More information

SECTION PANELBOARDS Painting Wire and Cable Overcurrent Protective Devices.

SECTION PANELBOARDS Painting Wire and Cable Overcurrent Protective Devices. SECTION 16470 PANELBOARDS PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 09900 - Painting. 2. 16120 - Wire and Cable. 3. 16475 - Overcurrent Protective Devices. 1.02 SYSTEM DESCRIPTION A. Performance

More information

RESIDENTIAL ELECTRICAL INSPECTIONS CHECKLISTS

RESIDENTIAL ELECTRICAL INSPECTIONS CHECKLISTS RESIDENTIAL ELECTRICAL INSPECTIONS CHECKLISTS Key Questions for Residential Inspections 1. What wiring methods will be used, and are the wiring methods suitable for the conditions? 2. Will multiwire branch

More information

SECTION IDENTIFICATION FOR ELECTRICAL SYSTEMS

SECTION IDENTIFICATION FOR ELECTRICAL SYSTEMS SECTION 260553 IDENTIFICATION FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 SECTION INCLUDES A. Nameplates and labels B. Wire and cable markers C. Conduit markers 1.2 REFERENCES A. NFPA 70 - National Electrical

More information

TABLE OF CONTENTS CHAPTER 5 SPECIAL OCCUPANCIES CHAPTER 1 GENERAL RULES... 19

TABLE OF CONTENTS CHAPTER 5 SPECIAL OCCUPANCIES CHAPTER 1 GENERAL RULES... 19 TABLE OF CONTENTS About This Textbook...xiii How to Use the National Electrical Code... 1 Article 90 Introduction to the National Electrical Code... 7 90.1 Purpose of the NEC... 7 90.2 Scope of the NEC...

More information

NATIONAL ELECTRICAL CODE (NEC) & NFPA 70E ARC FLASH ELECTRICAL SAFETY

NATIONAL ELECTRICAL CODE (NEC) & NFPA 70E ARC FLASH ELECTRICAL SAFETY A new twist on the National Electrical Code - a practical application workshop. If you sign up in this class, prepare to work! Day 1: Fundamentals of OSHA requirements for performing electrical work -

More information

GOLDFIELDS PRIMARY SCHOOL. TENDER SPECIFICATION For ELECTRICAL SERVICES MECHANICAL ENGINEER:

GOLDFIELDS PRIMARY SCHOOL. TENDER SPECIFICATION For ELECTRICAL SERVICES MECHANICAL ENGINEER: GOLDFIELDS PRIMARY SCHOOL TENDER SPECIFICATION For ELECTRICAL SERVICES PROJECT MANAGER: School Support Dunedin ARCHITECTURAL DESIGNER: Katipo Design ELECTRICAL ENGINEER: Pedersen Read Dunedin MECHANICAL

More information

Corbin Building. Technical Assignment 2. Matthew Trethaway Lighting/ Electrical AE 481W 10/26/2011 Advisor: Ted Dannerth

Corbin Building. Technical Assignment 2. Matthew Trethaway Lighting/ Electrical AE 481W 10/26/2011 Advisor: Ted Dannerth Corbin Building Technical Assignment 2 Matthew Trethaway Lighting/ Electrical AE 481W 10/26/2011 Advisor: Ted Dannerth 10/26/2011 Technical Report II 1 Executive Summary The following report is an overview

More information

MEDIUM, LOW AND CONTROL VOLTAGE CABLES

MEDIUM, LOW AND CONTROL VOLTAGE CABLES Related Sections U-M Design Guideline Sections: 260800 - Electrical Acceptance Tests Products Medium Voltage Primary Cables Primary power distribution cable shall be single conductor stranded copper, with

More information

Construction Management at Risk Services. New North East Branch Library Project. August 3, 2018

Construction Management at Risk Services. New North East Branch Library Project. August 3, 2018 Construction Management at Risk Services New North East Branch Library Project ADDENDUM 01 August 3, 2018 1. The attendance sheets (4 pages) from the Pre-Bid Conference are attached. 2. The proposals may

More information

Building Division 201 SE 3 rd STREET (Second Floor) OCALA, FL Phone: (352) BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS

Building Division 201 SE 3 rd STREET (Second Floor) OCALA, FL Phone: (352) BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS Building Code compliance is the obligation of design professionals and/or contractors. Plan Review and Inspection Guidelines are intended to be used

More information

TABLE OF CONTENTS GENERAL... 2 A. DEFINITIONS DIGITAL, ADDRESSABLE FIRE ALARM SYSTEM... 2

TABLE OF CONTENTS GENERAL... 2 A. DEFINITIONS DIGITAL, ADDRESSABLE FIRE ALARM SYSTEM... 2 Division 28 ELECTRONIC SAFETY AND SECURITY TABLE OF CONTENTS 28 0000 GENERAL... 2 A. DEFINITIONS...2 28 3111 DIGITAL, ADDRESSABLE FIRE ALARM SYSTEM... 2 A. DESIGN REQUIREMENTS...2 B. CONSTRUCTION REQUIREMENTS...2

More information

SCHOOL DISTRICT PALM BEACH COUNTY BUILDING DEPARTMENT PLAN REVIEW CHECK LIST -- ELECTRICAL

SCHOOL DISTRICT PALM BEACH COUNTY BUILDING DEPARTMENT PLAN REVIEW CHECK LIST -- ELECTRICAL SCHOOL DISTRICT PALM BEACH COUNTY BUILDING DEPARTMENT PLAN REVIEW CHECK LIST -- ELECTRICAL 3300 SUMMIT BOULEVARD WEST PALM BEACH, FLORIDA 33406 TEL (561) 688-7687 FAX (561) 688-7654 http://www.palmbeach.k12.fl.us/fm/bd/index.htm

More information

Leviton Combination Switch And Tamper Resistant Outlet Wiring Diagram

Leviton Combination Switch And Tamper Resistant Outlet Wiring Diagram Leviton Combination Switch And Tamper Resistant Outlet Wiring Diagram Leviton SmartLockPro 15 Amp Tamper-Resistant Combination GFCI Duplex Outlet and Switch - White-R02-X7299-00W - The Home Depot. From

More information

Executive Summary. CNBC Global Headquarters Christine Cajilig

Executive Summary. CNBC Global Headquarters Christine Cajilig Executive Summary This report contains an analysis and description of the existing electrical distribution of the including the distribution type, emergency power, uninterruptible power system, over current

More information

Electrical Inspection Lighting & Power

Electrical Inspection Lighting & Power 0921 Light Fixtures & Controls Fixtures, controls, conduit, wiring, etc. Interior classroom and corridor lighting consists of T12 fluorescent lamps with magnetic ballasts. In the classrooms the luminaires

More information

NORTH CENTRAL MICHIGAN COLLEGE PETOSKEY CAMPUS. Facilities Conditions Assessment Mechanical And Electrical Petoskey, Michigan

NORTH CENTRAL MICHIGAN COLLEGE PETOSKEY CAMPUS. Facilities Conditions Assessment Mechanical And Electrical Petoskey, Michigan NORTH CENTRAL MICHIGAN COLLEGE PETOSKEY CAMPUS Facilities Conditions Assessment Mechanical And Electrical Petoskey, Michigan PBA Project No. 2014.0137.00 Prepared By: Wayne Kerbelis Terry Cleis September

More information

SECTION ELECTRICAL IDENTIFICATION

SECTION ELECTRICAL IDENTIFICATION SECTION 16075 - ELECTRICAL IDENTIFICATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

NYC Department of Education

NYC Department of Education NYC Department of Education Building Assessment Survey 2017-2018 Asset: P.S. 135 - QUEENS, 207-11 89TH AVENUE, New York, 11427 Inspection Id Inspection Type Time In Last Edited EE : Electrical 2018-03-20

More information

ALBUQUERQUE PUBLIC SCHOOLS Facility Design & Construction / Maintenance & Operations ELECTRICAL STANDARDS DESIGN CHECKLIST

ALBUQUERQUE PUBLIC SCHOOLS Facility Design & Construction / Maintenance & Operations ELECTRICAL STANDARDS DESIGN CHECKLIST ALBUQUERQUE PUBLIC SCHOOLS Facility Design & Construction / Maintenance & Operations ELECTRICAL STANDARDS DESIGN CHECKLIST February 01, 2006 2 Project Name: Architect: Electrical Engineer: Completed By:

More information

A. Shop Drawing submittals shall include, but not be limited to, the following:

A. Shop Drawing submittals shall include, but not be limited to, the following: SECTION 26 05 53 IDENTIFICATION FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Divisions 0 and 1 and Section 26 00 01, Electrical

More information

maintenance should only be performed by a trained, qualified person. Consumer service is recommended only for filter replacement.

maintenance should only be performed by a trained, qualified person. Consumer service is recommended only for filter replacement. AHF / AHK SERIES AIR HANDLING UNITS INSTALLATION GUIDE GENERAL The AHF / AHK series is designed for horizontal recessed installations in a furred down area, above a suspended ceiling or recessed in the

More information

SECTION LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES (600 VOLTS AND BELOW)

SECTION LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES (600 VOLTS AND BELOW) SECTION 26 05 21 PART 1 - GENERAL 1.1 DESCRIPTION This section specifies the furnishing, installation, and connection of the low voltage power and lighting wiring. 1.2 RELATED WORK A. Excavation and backfill

More information

F. GENERAL REQUIREMENTS Electrical Design Criteria 2009 Edition 11/23/2009 School District Palm Beach County Page-1 of 17

F. GENERAL REQUIREMENTS Electrical Design Criteria 2009 Edition 11/23/2009 School District Palm Beach County Page-1 of 17 ELECTRICAL DESIGN CRITERIA TABLE OF CONTENTS I GENERAL...2 II CRITERIA...2 A. POWER DISTRIBUTION SYSTEMS...2 1. NORMAL POWER:... 2 2. EMERGENCY POWER... 3 B. LIGHTING...4 1. GENERAL... 4 2. AVERAGE MAINTAINED

More information

SECTION LIGHTING CONTROL DEVICES AND CONTROL PANELS

SECTION LIGHTING CONTROL DEVICES AND CONTROL PANELS SECTION 26 09 23 LIGHTING CONTROL DEVICES AND CONTROL PANELS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Remote control lighting relays. 2. Lighting contactors. 3. Switches. 4. Switch plates.

More information

MINOOKA FIRE PROTECTION DISTRICT Fire Prevention Bureau Fire Inspector Rodney Bradberry

MINOOKA FIRE PROTECTION DISTRICT Fire Prevention Bureau Fire Inspector Rodney Bradberry MINOOKA FIRE PROTECTION DISTRICT Fire Prevention Bureau Fire Inspector Rodney Bradberry Fire Alarm Systems Plan Review Checklist Date: Permit Number: Business Name: Address: Fire Alarm System Submittal

More information

Chapter 1 General... 5

Chapter 1 General... 5 About This Textbook...xi About the National Electrical Code...xv About the Authors and Illustrator...xix About the Team...xxi Article 90 Introduction to the National Electrical Code... 1 90.1 Purpose of

More information

FES - Series Portable Electric Heaters. YES - Series Suspended Electric Heaters CONTENTS

FES - Series Portable Electric Heaters. YES - Series Suspended Electric Heaters CONTENTS FOSTORIA INDUSTRIES, INC. A DIVISION OF FES - Series Portable Electric Heaters YES - Series Suspended Electric Heaters (FES-1524-3E shown) IMPORTANT SAFETY INFORMATION INSIDE Serious injury or death possible.

More information

Rocky Mountain Chapter IAEI Annual Meeting Northglenn, CO March 18-19, 2004

Rocky Mountain Chapter IAEI Annual Meeting Northglenn, CO March 18-19, 2004 Rocky Mountain Chapter IAEI Annual Meeting Northglenn, CO March 18-19, 2004 1. A 2 PVC conduit was installed in the ground prior to setting a factory manufactured home on the foundation. The required service

More information

SECTION C. Section Cable Trays for Electrical Systems: Additional identification requirements for cable tray systems.

SECTION C. Section Cable Trays for Electrical Systems: Additional identification requirements for cable tray systems. SECTION 26 0553 PART 1 GENERAL 1.1 SECTION INCLUDES A. Electrical identification requirements. B. Identification nameplates and labels. C. Wire and cable markers. D. Voltage markers. E. Underground warning

More information

SECTION : FIRE ALARM & DETECTION SYSTEMS

SECTION : FIRE ALARM & DETECTION SYSTEMS SECTION 28 31 10: FIRE ALARM & DETECTION SYSTEMS 1. GENERAL A. This section applies to fire detection/alarm system and carbon monoxide system components and equipment installed during new construction

More information

NEC Requirements for Standby Power Systems. New England Building Officials Education Association Annual Conference October 5, 2015

NEC Requirements for Standby Power Systems. New England Building Officials Education Association Annual Conference October 5, 2015 NEC Requirements for Standby Power Systems New England Building Officials Education Association Annual Conference October 5, 2015 Emergency & Standby Power Systems Alternative power sources are utilized

More information

Chapter 1 General...9 Article 100 Definitions...11 Article 100 Questions Article 110 Requirements for Electrical Installations...

Chapter 1 General...9 Article 100 Definitions...11 Article 100 Questions Article 110 Requirements for Electrical Installations... Article 90 Introduction...1 90.1 Purpose of the NEC...1 90.2 Scope of the NEC...2 90.3 Code Arrangement...4 90.4 Enforcement...5 90.5 Mandatory Requirements and Explanatory Material...6 90.6 Formal Interpretations...6

More information

Please refer to the drawing and notes for each particular plan view. Site Plan S1-1 Site Drawing. Electrical E1-1 Main Electrical Drawing

Please refer to the drawing and notes for each particular plan view. Site Plan S1-1 Site Drawing. Electrical E1-1 Main Electrical Drawing The property that I discuss is an actual property that I helped to build. My position was as the Facility/Project Manager while the building was under construction. I worked very closely with the Senior

More information

SCO # 1 & 2 PUNCLH LIST Project Name: VANCLEAVE UPPER ELEMENTARY CLA#: 13003

SCO # 1 & 2 PUNCLH LIST Project Name: VANCLEAVE UPPER ELEMENTARY CLA#: 13003 SCO # 1 & 2 PUNCLH LIST Project Name: VANCLEAVE UPPER ELEMENTARY CLA#: 13003 No. Discipline Sent to Name Item Date Noted Date Resolved How item was resolved SCO # 1Punch listed items were noted below on

More information

A. Furnish and install wiring devices and plates as specified herein and as shown on the Drawings.

A. Furnish and install wiring devices and plates as specified herein and as shown on the Drawings. DIVISION 26 ELECTRICAL SECTION 26 27 26 PART 1 GENERAL 1.01 DESCRIPTION A. Furnish and install wiring devices and plates as specified herein and as shown on the Drawings. B. Specialty switches and outlets

More information

Informational Bulletin on Mobile office Units Prepared by Mark Hilbert May 17, 2017

Informational Bulletin on Mobile office Units Prepared by Mark Hilbert May 17, 2017 Informational Bulletin on Mobile office Units Prepared by Mark Hilbert May 17, 2017 It has come to the attention of the electrical authorities having jurisdiction (AHJs) at the DOE sites there is inconsistency

More information

PowerWave 2 Busway System

PowerWave 2 Busway System PowerWave 2 Busway System Guide Specifications (Revision 004, 11/17/2017) 1 GENERAL 1.1 Summary This specification covers the electrical characteristics and general requirements for a continuous opening,

More information

Technical Report 2: Electrical Systems Criteria and Existing Conditions

Technical Report 2: Electrical Systems Criteria and Existing Conditions Technical Report 2: Electrical Systems Criteria and Existing Conditions Princeton Theological Seminary Library Princeton, NJ Stephanie Deckard Lighting Electrical Faculty Advisor Dr. Kevin Houser 10/12/2012

More information

3. Provide revised typed circuit directory in panelboards that have circuits removed.

3. Provide revised typed circuit directory in panelboards that have circuits removed. DIVISION 26 - ELECTRICAL 26 0501 MINOR ELECTRICAL DEMOLITION A. Coordinate utility service outages with the UND Electrical Department. B. Verify the abandoned wiring and equipment serve only abandoned

More information

DIVISION 16 - ELECTRICAL

DIVISION 16 - ELECTRICAL DIVISION 16 - ELECTRICAL I. GENERAL A. This division contains the following elements: 1. Electrical Distribution System. 2. Power System. 3. Lighting System. 4. Emergency Power System. 5. Fire Alarm Detection

More information

ENGINE GENERATORS AND ACCESSORIES

ENGINE GENERATORS AND ACCESSORIES ENGINE GENERATORS AND ACCESSORIES GENERAL INFORMATION 1.1 This section applies to engine generators and accessories. DESIGN REQUIREMENTS 2.1 The Engineer of Record will consult with the University s Engineering

More information

NYC Department of Education

NYC Department of Education NYC Department of Education Building Assessment Survey 2017-2018 Asset: P.S. 56 - STATEN ISLAND, 250 KRAMER AVE., New York, 10309 Inspection Id Inspection Type Time In Last Edited EE : Electrical 2017-10-20

More information

SECTION LIGHTING CONTROLS

SECTION LIGHTING CONTROLS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 09 23 LIGHTING CONTROLS SPEC WRITER NOTE: 1. Delete between //----// if not applicable to project. Also, delete any other item or paragraph not applicable to

More information

2. The Group F occupancy has have an a combined occupant load of 500 or more above or below the lowest level of exit discharge.

2. The Group F occupancy has have an a combined occupant load of 500 or more above or below the lowest level of exit discharge. 2. The Group F occupancy has have an a combined occupant load of 500 or more above or below the lowest level of exit discharge. Exception: Manual fire alarm boxes are not required where the building is

More information

ITC 2000 HEATING CONTROL CABINET. Installation & Operation Manual

ITC 2000 HEATING CONTROL CABINET. Installation & Operation Manual ITC 2000 HEATING CONTROL CABINET Installation & Operation Manual VTI, Incorporated 24 McMillan Way Newark, DE 19713 Phone (302) 738 0500 FAX (302) 738 6594 Revision Level 0.03 Manual No. 90003314 June,

More information

STUDY AND TEST MATERIAL FOR THE. FA2 and FA4 ASSESSMENTS. (Fire Alarm On-Site and Business Cert. Holder) June 14, 2017

STUDY AND TEST MATERIAL FOR THE. FA2 and FA4 ASSESSMENTS. (Fire Alarm On-Site and Business Cert. Holder) June 14, 2017 STUDY AND TEST MATERIAL FOR THE FA2 and FA4 ASSESSMENTS (Fire Alarm On-Site and Business Cert. Holder) June 14, 2017 This document contains sample questions to help participants study for the FA2 and FA4

More information

Fire and Life Safety Review Form

Fire and Life Safety Review Form Exits/Egress Fire and Life Safety Review Form 1. Doors shall swing in the direction of egress travel where serving and occupancy load of 50 or more. IFC 1010.1.2.1 2. Egress shall be readily openable from

More information

Functional Performance Test

Functional Performance Test Fire Alarm Control Panel & Fire Alarm Annunciator Panel Notify all building occupants that testing will be conducted. Fire alarm contractor shall have personnel with 2-way radios at the fire alarm control