1 1 (32) ENGINEERING SPECIFICATION ES16 Fire & Safety - Detection, Prevention & Protection

2 2 (32) Index 1 GENERAL Abbreviations Application Safe location Vent to safe location Operation for emergency equipment at safe location (API521) Fresh air to buildings or furnaces at safe location EMERGENCY ALARM, FIRE AND GAS DETECTION SYSTEMS Buildings Process and offsite areas Site emergency alarm General: Fire detection system: Flammable gas detection Toxic gas detection Atmospheric Tanks Pressurised Tanks ISOLATION AND DEPRESSURING OF PROCESS EQUIPMENT Isolation of process vessels at emergencies General Emptying of liquid inventory Depressuring of process vessels Isolation of vessels by Remote Operated Emergency Isolation Valves General: EIV on vessel not directly connected to a pump or compressor EIV on pump system EIV on compressor system Isolation for maintenance FIRE WATER SYSTEM General Fire safety assessment...12

3 3 (32) Material used for fire water systems above ground (pipes, monitors, spray systems): Fire water demand calculation Fire water supply, storage and pumping Fire water ring main (NFPA 24) Fire hydrants (NFPA 24) Water spray systems (NFPA 15) Monitors (NFPA 24) Portable extinguishers (NFPA 10 and EN 3) Steam lances Steam rings Dry risers FIRE PROTECTION OF SPECIFIC EQUIPMENT Buildings (BBR20, AFS 2009:2) LPG containing vessels (NFPA 15) Pumps (NFPA 15) Compressors (NFPA 15) Heaters (NFPA 86) Tanks and bunds (NFPA 11 / EN 13565) Tank bunds Jetties Fire Water main (NFPA 24) Fire Pumps (NFPA 20) Fire Hydrants (NFPA 24 / 307) Monitors Master Streams (NFPA 24) PASSIVE PROTECTION - FIRE PROOFING Steel structures Electrical-& instrument cables References REVISIONS Audit Appendix 1 Plant layout and spacing Application Basic design intentions...22

4 4 (32) 10.3 Overall Plant Layout On site - Process Units Process hazards Intra-Unit Spacing Offsite - Tank Farms Atmospheric Storage Tanks Pressurized and Refrigerated Storage Tanks Spheres and spheroids: Drums and bullets: Refrigerated dome roof tanks: Utilities Control Rooms Services Loading and Unloading Table 1 - minimum inter-unit spacing Table 2 general recommendations for spacing aboveground storage tanks Table 3 - general recommendations for spacing aboveground storage tanks Revision of plant layout and spacing Audit of plant layout and spacing...32

5 5 (32) 1 GENERAL 1.1 Abbreviations NFPA codes National Fire Protection Agency EN standards European standards RP&G Recommended Practices and Guides ES Engineering specification RP Recommended Practice BP Best Practice ALARP As Low As Reasonably Practicable API American Petroleum Institute ATEX ATmosphères EXplosibles (2014/34/EU) PPE Personal Protective Equipment LEL Lower Explosive Limit QRA Quantitative Risk Assessment HVAC Heating, ventilation and air conditioning GHAB Göteborgs Hamn AB LPG Liquid Petroleum Gas LOPC Loss Of Primary Containment EIV Emergency Isolation Valve DCS distributed control system GRP Glass-fiber Reinforced Plastic BBR Boverkets byggregler (Swedish legislation) AFS Arbetsmiljöverkets författningssamling (Swedish legislation) 1.2 Application This NFPA Codes, EN Standards, Recommended Practices and Guides (latest revision) shall be applied when installing new process units or new process equipment at Preemraff. ES lists exceptions and clarifications of these standards and codes and specific requirements that shall be applied for Preemraff. It also serves as a guideline for improving safety at existing units as further defined in Preemraffs long-term plan. When conflicting information s in regulations, codes, standards, RP, BP and ES the most strict demand shall be used. When liquid volumes are mentioned it refers to normal operating level if not stated otherwise. For distillation towers the volumes shall incorporate the liquid on distillation trays above the draw-off tray/outlet pipe to the equipment in question. For all paragraphs in this ES specification the following apply: Proposed systems and solutions shall be discussed and final approved by Preemraff.

6 6 (32) If exceptions from this ES is required, exceptions is regulated in NO201 Tekniska specifikationer, if not specified in specific paragraph. In cases where this standard use the word shall the equipment mentioned is compulsory. Risks shall be reduced to ALARP (As Low As Reasonably Practicable) when applicable. Note that general specifications is described in section 1-4. Section 5 describes specific equipment and products. That means that section 5 shall always be studied and the highest demand applies. 1.3 Safe location There are three different types of safe location Vent to safe location Outlet from compressor vent, other vents, relief valve or similar: Shall be at a place where there are no ignition sources and not possible to expose personnel for a fire exceeding 6.31 kw/m 2. Outlet shall be included in ATEX classification document, for more information see SA405 Uppfyllande av ATEX-direktivet Operation for emergency equipment at safe location (API521) Where safe location is mentioned it is to be seen as a place that not will be exposed to thermal radiation levels over 4.73 kw/m 2 according to fire safety assessment. If the equipment is meant to be activate by fire responder with full PPE the maximum level shall be 6.31 kw/m Fresh air to buildings or furnaces at safe location Fresh air intake to buildings and furnace shall be located above or otherwise outside ATEX classified area (see also gas detection in fresh air intake in this document). 2 EMERGENCY ALARM, FIRE AND GAS DETECTION SYSTEMS 2.1 Buildings All buildings shall have fire detection systems connected to Preemraff fire detection system and, when applicable, local evacuation alarms. For temporary buildings a risk assessment can allow lower demands. For normally unmanned rooms where critical instrument, electrical, battery and/or computer equipment is situated high sensitive smoke detection shall be evaluated.

7 7 (32) If flammable/toxic/inert gas is handled or anticipated inside buildings a gas detection system shall be installed (e.g. LEL/toxic/O 2 ). System alarms shall be connected to and integrated with the process control/alarm system for the process unit concerned and, when applicable, local evacuation alarms. In addition flammable and toxic (H 2 S) gas detectors shall be installed in the fresh air intake of control room and electric / instrument substations air conditioning. The need for smoke detectors shall also be evaluated. For other manned buildings flammable/toxic (H 2 S)/smoke detectors shall be evaluated, the site QRA can be used as guidance. Mechanical ventilation (HVAC or similar) shall automatically stop upon alarm. 2.2 Process and offsite areas Site emergency alarm An alarm system shall be installed which can be heard and/or visible throughout the risk area (including manned buildings) in case of an emergency. For new units or modification of existing units it must be evaluated if existing system is sufficient or extension of existing system is required. The system shall be possible to activate from a manned control room and in accordance to ES11-40 Instrumentation and Control. Exception is harbor areas with other responsible authority e.g. GHAB General: Common for all systems described below is that, alarms shall be connected to the fire and gas detection system. For details see ES Instrumentation and Control. It shall also be possible to activate remote/automatic systems (e.g. deluge and/or evacuation alarm) from activated alarm. To be able to optimize the number analyzers/detectors and where to position them in site a study over the area shall be performed in large projects and should be considered in all other projects (preferably a software simulation program shall be used). The aim is to detect a flammable or toxic gas cloud and a fire flame within acceptable limits. The following can be used for guidance of required capability of the detector systems used: Fire detections: A pool fire (N-heptane) with 100 kw radiant heat output. Flammable gas: A cloud size (sphere) of 10 m in diameter. Toxic gas (H2S): A cloud size (sphere) of 8 m in diameter Fire detection system: Fire detection system shall be installed in field in the following areas:

8 8 (32) Hydrocarbon and hydrogen centrifugal compressors areas. Pumps handling Hydrocarbons operating at temperature above auto ignition or 250 o C. Pumps handling LPG. For other fire hazardous areas (e.g. heat exchangers, process heaters) or remote pump stations (e.g. gasoline blender, cavern) fire detections shall be evaluated. If indoors local fire alarms is applicable in the same way as for manned buildings, the alarm shall be heard and/or visible from all locations. Even less fire hazardous, but expensive equipment (e.g. single sophisticated pumps) or pumps having serious consequence to plant operations, shall be evaluated Flammable gas detection Flammable gas detection system shall cover the process and offsite area where it is not unlikely that a leakage of flammable gas can occur (e.g. vessels, heat exchangers, pumps handling hydrocarbons at elevated temperature or pressure). In addition flammable gas detection shall be installed in the following areas: Hydrocarbon or hydrogen gas compressors areas. Pumps handling LPG. To achieve enough risk reduction it is often necessary to combine different types of gas detectors (e.g. Line of Sight, point and sonic detectors) Toxic gas detection Toxic gas detection system shall be installed strategically in the process units, where the toxic gas can be present. Guideline regarding H 2 S detectors at potential leak points: Process streams containing H 2 S in concentrations ppm H 2 S detectors shall be evaluated. Process streams containing H 2 S in concentrations over ppm H 2 S detectors shall be installed Atmospheric Tanks Open floating roof tanks shall have fire detection system in the seal area type Protectowire or similar. Tanks with internal floating roof shall have UV-fire detection system (or similar) in the space between roofs.

9 9 (32) Tanks containing hydrocarbons with design storage temperature higher than 5 C below flashpoint shall have flammable gas detection system in the tank bunds. The need for fire detections in all tank bunds shall be evaluated Pressurised Tanks Pressurised tanks to have fire and gas detection system covering tank equipment e.g. safety valves, tank connections and manway. 3 ISOLATION AND DEPRESSURING OF PROCESS EQUIPMENT 3.1 Isolation of process vessels at emergencies General In case of leakage (LOPC) or other emergencies, it shall be possible to isolate, empty and depressurise process vessels containing hydrocarbons. (Process vessels include towers, reactors, heaters, heat exchangers etc.). The purpose is to minimise the leakage or to avoid loss of containment. The process design of each individual process vessel shall take this requirement into consideration. The resulting strategy and operating instructions shall be documented as part of the operating manual. Isolation can be done either for an individual piece of equipment or a system of several items e.g. heat exchangers. 3.2 Emptying of liquid inventory Emptying of liquid in process vessels must be possible by pumps or by the operating pressure. 3.3 Depressuring of process vessels Depressurisation can be initiated manually by the operator or automatically. Events that may lead to severe consequences in a relatively short timeframe require remote high rate emergency depressuring. Examples on applications: LPG vessels above 4 m 3 liquid volume, large volumes of flammable gas and high pressure and also reactor circuits with possible runaway reactions. High rate emergency depressuring typically meets the following criteria: depressure the equipment to 7 barg or 50 % of design pressure, whichever is lower, within 15 min. Alternative high rate emergency depressuring criteria (more stringent or more liberal) shall be supported by analysis. The above criteria do not imply that the depressuring stops after 15 min.

10 10 (32) Special considerations to prevent spurious trips are required. The depressuring system shall be operable during fire conditions. 3.4 Isolation of vessels by Remote Operated Emergency Isolation Valves General: All EIV valves shall be equipped to allow full or partial stroke test during operation. Systems containing particles or high viscous material (increased risk for valve not able to give a tight shut off) systems allowing full stroke test is preferred. If a vessel not falls within the limits below evaluations shall be done to verify if the volume in systems upstream the vessel (e.g. pipe, exchangers, distillation tower) can be considered to be large enough to justify an EIV. All EIV shall have three ways of controlling the EIV. One local, one at safe location and one in the DCS system. Maneuver points at safe location shall preferably be grouped together. If a system is exposed to unusually many planned changes in pressure and/or temperature (compared to normal operation which means operating for 1-6 years without any major changes) or systems where process flanges are opened (e.g. filters, dryers or other systems which is operated/changed on a regular bases) special attentions can be needed. These systems can in some cases be seen as hazardous enough to have an EIV even if the volume or material criteria below are not met. Where the text below calls for evaluation of an EIV the hazop meeting report shall have a note clearly stating the recommendation from the hazop team regarding EIV or not. If the hazop meeting comes to the conclusion that a system (that falls within the criteria below) don`t need an EIV this shall be clearly noted in the hazop report with an explanation of the facts that the group based its decision on. The decision should be confirmed by Preemraff. For fired heaters se also ES 09. Normally EIV shall have a fail close action. If there is a need for other fail action this shall be verified by the hazop team and clearly noted in the hazop protocol. If the hazop meeting comes to the conclusion that the EIV is expected to be operable during a fire scenario (and not direct go to a fail-safe position) EIV and power (electric and air) supply shall be fire proofed.

11 11 (32) If the EIV is positioned in locations where high thermal radiations are expected during a fire scenario the valve shall be fire safe EIV on vessel not directly connected to a pump or compressor EIV shall be provided on process vessel with a liquid volume of 25 m 3 or more handling: LPG (or lighter) Liquid at temperature above auto ignition temperature or above 250 o C Hydrocarbons handled at temperature above flash point and operating system pressure above 17 barg. Systems handling acute toxic material (e.g. H 2 S, see also 2.2.5) shall be evaluated if EIV shall be used regardless of the volume. If there is a remote operated control valve in the above systems which is positioned in a suitable place the hazop meeting shall decide if it can be used instead of an EIV. If so, this shall be clearly noted in the hazop protocol EIV on pump system EIV shall be provided on process vessel with a liquid volume of 4 m 3 or more handling: LPG (or lighter) Liquid at temperature above auto ignition temperature or above 250 o C EIV shall be provided on process vessel with a liquid volume of 15 m 3 or more handling: Hydrocarbons handled at temperature above flash point and operating system pressure above 17 barg. Systems handling acute toxic material (e.g. H 2 S, see also 2.2.5) shall be evaluated if EIV shall be used regardless of the volume. EIV shall be provided on process vessel with a liquid volume of 30 m 3 or more handling: Other hydrocarbon (than mentioned above) EIV (as mentioned above) shall always be on suction side of the pump. Normally the EIV is positioned as close to the suction vessel as possible. On pump systems (if there are two or more pumps) handling liquid containing particles or have a high viscosity (increased risk for valve not able to give a tight shut off), evaluation shall be done if the EIV shall be placed on the separate suction line to each pump to be able to do a full stroke test on the EIV. If there are filters on the suction side of the pump evaluation shall be done to verify if the EIV should be placed upstream filters.

12 12 (32) The discharge side of the pump shall always have checkvalve/s. If the pumped liquid contains particles or have a high viscosity (increased risk for valve not able to give a tight shut off), evaluation shall be done if the system shall have an EIV. This will be of special interest if the delta pressure over the pump (when stopped) is high EIV on compressor system The discharge side of the compressor shall always have checkvalve/s. On all centrifugal compressor system handling flammable hydrocarbon or hydrogen rich gases evaluations shall be made if EIV shall be installed on the suction and discharge side of the compressor. Systems handling acute toxic material (e.g. H 2 S, see also 2.2.5) shall be evaluated if EIV shall be used regardless of the volume. 3.5 Isolation for maintenance. For details regarding valves and blinds in process equipment, see ES FIRE WATER SYSTEM 4.1 General Fire safety assessment Definition of a fire area: Fire area is normally a process unit (or parts of it) including minimum 15 m of open area to the closest process equipment of the adjacent areas. Used for dimensioning of passive fire protection, for more information see ES19. Pool fire area: Pool fire area at Preemraff normally defined as 250 m 2 (sources mention areas between 232 m 2, sqft, and 300 m 2 ). Used for relief valve calculations, flare calculation and water sprinkler systems Material used for fire water systems above ground (pipes, monitors, spray systems): Firewater pipelines likely to handle salt water the preferred material is glass-fiber reinforced plastic (GRP). Hot dipped galvanized steel could be an alternative. Firewater pipelines unlikely to handle salt water (process areas normally connected to permanent sprinkler or monitor) the preferred material is hot dipped galvanized steel or

13 13 (32) stainless steel (316L or better). Where risk of clogging equipment (e.g. spray nozzle) a strainer shall be mounted and it shall withstand full system differential pressure. Spray system nozzle to be stainless steel (316L or better) or brass. Spray system and monitors shall be possible to flush, test and drain in a proper way Fire water demand calculation As a base for requirement of active fire protection systems there shall be a fire safety assessment based on a 50 mm circular hole in equipment. The quantity of water required for control and extinguish one major fire shall be based on the largest credible fire scenario occurring through the Process, Storage and Jetty areas. Normally only one fire scenario at a time shall be considered. Fire safety assessment shall consider to include more than one simultaneously fire case for large expansions with project costs exceeding 300 MSEK Fire water supply, storage and pumping Fire water shall be stored in a dedicated water storage tank for firefighting purposes. The level in the tank shall always be high enough to give a minimum of two hour at maximum flow rate without any refilling. The position of the tank shall be minimum 50 m away from fire area. To be able to do maintenance on the fire water tank alternative supply to fire water mains shall be available. The main fire water pumps shall be able to pump the maximum flow (as stated above). A minimum of one standby pump shall be available (with the same capacity, or higher, as the highest capacity main pump) One of the main pumps shall be driven by an electric motor while the other ones of the main pumps and stand by pump shall be diesel driven. Another alternative is that the standby diesel can handle the maximum case if all main pumps are electric. (When diesel driven pumps are used there shall be a system for fire detection and fire extinguishing for these pump system). Fire water pumps shall be installed in a location which is considered to be safe from the effects of fire and clouds of flammable vapor, and from collision damage by vehicles. The pumps should be located as close as possible to the fire water storage or alternative water source. The fire water pumps rated pressure shall be based on a minimum pressure of 10 barg at the most remote end of fire main with the highest water flow demand. If the required pump capacity exceeds m3/h, two or more smaller pumps shall be installed.

14 14 (32) One out of suggested alternatives below shall be used as a minimum: Electric 1 Electric 2 Diesel 1 Diesel 2 Alternative 1 100% 100% 100% Alternative 2 60% 60% 60% 60% Alternative 3 60% 60% 100% Two fire water jockey pumps, electric motor driven, one in normal operation one in standby, shall be provided to keep system pressure against leakage and allow automatic starting of fire water pumps in sequence in case of fire water demand higher than the normal pumps capacity. Alternatives to jockey pump is controlled/regulated main pumps in normal operation. The jockey/main in normal operation shall have typical capacity to compensate for leakage plus plant service water specified by Preemraff. The pumps shall maintain a minimum pressure of 3-4 barg in the fire water distribution system. The pumps and accessories shall be designed according to NFPA 20 requirements Fire water ring main (NFPA 24) Firewater ring main shall be a 12 (minimum) underground system. Laterals normally also shall be 12, smaller size can be accepted depending of number of hydrants and/or sprinkling systems connected. The main ring shall be designed in order to have a minimum pressure of 10 barg at all areas and at farthest outlet point under the fire water demand required by the relevant fire scenario, with the maximum flow velocity in the system not exceeding specifications in ES08. A surge analysis of the firewater distribution system shall be performed and, where required, surge protection devices shall be provided. The fire water piping shall be installed as a "looped" system, with strategically located, isolation valves. Isolation valves to be full bore valves and it shall be possible to verify valve position (open or closed). The installation of these valves is based on the following criteria: When fire water pipes serving hydrants, monitors, or wall hose reels are taken out of service for maintenance alternative ways to supply water by hoses shall be available. Hose length shall not be more than 100 m. The remaining part of the local fire water ring shall be able to supply design flow rates at the design pressure at all times. No more than 4 equipment of hydrants and monitors shall be out of service at any time as a result of maintenance on the firewater mains.

15 15 (32) The fire water piping on minimum two sides of process units shall remain in service at all times. 4.2 Fire hydrants (NFPA 24) Fire hydrants shall be constructed in accordance to Std HB BP01 in process area and BP03 in off plot areas (deviations to be approved by Preemraff) and connected to firemain or lateral headers in accordance to Std HB (LYR) or Std HB xxxx-xx (GOR). Where water spray protection of process equipment from fire hydrant is needed (according to the fire safety assessment) water monitor shall be fitted. If foam protection of process equipment from fire hydrant is needed (according to the fire safety assessment), appropriate foam monitor system shall be fitted. Fire hydrants shall be located along roadside maximum 50 meters apart on site and some parts of off-site (e.g. LPG storage, jettys, pump stations, blending stations). For the rest of offsite 100 m shall apply. For occupied buildings BBR applies. In the offsite area (mainly around tanks) provision of big hydrants shall be evaluated. These are to be used in connection with a major tank fire for cooling and extinguishing purpose. Hydrants shall be readily accessible from roads and be located in such a way that possible damage by road traffic will be minimised. They shall be provided with a guard post. The location should not be less than 1.5 m from the curb of the road, and at least 10 m from road crossings, sharp road curves, and buildings or other structures. Each hydrant shall be provided with a hard-paved grade or grating. All hydrants in and around a process plant shall be of the type suitable to mount stationary monitors, see standard drawing. This shall also be considered for other specific locations as directed by the fire safety assessment. 4.3 Water spray systems (NFPA 15) All process equipment (e.g. vessel, towers, pumps, pipes) that not can be sufficiently protected by a permanent water monitor shall be evaluated if there are needs for a permanent water spray system up to a height of 11 m above ground (or 11 m above any platforms that can contain a poolfire). For passive fire protection on process equipment and supporting structures, see ES19. Water spray systems shall be in accordance to Std HB

16 16 (32) Systems shall be possible to operate from three separate places: Manually at valve pit, local remote control at safe location and in DCS system. System to be fail open in case of malfunction of air or electrical signals to the system. As general rule equipment likely to be exposed to a heat radiation level between 12 kw/m 2 and 32 kw/m 2 can be covered by permanent monitors or mobile monitors. Heat radiation level above 32 kw/m 2 normally will need a permanent water spray system to be effective. Design fire water rates for general cooling of structure and pipe racks are to be a minimum of 2 l/m 2 /min. If process equipment (e.g. vessels, towers) are effected the minimum rate will be 10 l/m 2 /min. If the fire safety assessment gives higher rates that will apply. 4.4 Monitors (NFPA 24) Water monitors shall have a capacity of minimum litres /min at 7 barg. Foam and/or water monitors either shall be detachable or firmly mounted monitors. For detailed information se Std HB sheet 2. Where monitors at grade (on top of hydrants) can`t sufficiently cover the fire area, elevated monitors or monitors inside process areas at optimized positions shall be evaluated. The aim for critical equipment is two separate monitors to cover the equipment. The elevated monitors shall be possible to control (elevation, rotation and nozzle setting) at elevated position. Feed valve to the elevated monitor shall be operable from grade (at hydrant, at safe location and from control room) and pipe to monitor shall be able to drain free of water after use or test. Design fire water rates for general cooling of structure and pipe racks are to be a minimum of 2 l/m 2 /min. If process equipment (e.g. vessels, towers) are effected the minimum rate will be 10 l/m 2 /min. If the fire safety assessment gives higher flowrates those will apply. For all monitors an assessment to be done if foam injection, non-aspirating, shall be possible, this also applies for truck/rail loading stations. 4.5 Portable extinguishers (NFPA 10 and EN 3) Portable extinguishers type 233 BC (hydrocarbon fire) shall be positioned close to equipment where risk for fire exists, 12 kg to be selected (exceptions to be approved by Preem). Generally a maximum distance between extinguishers shall not exceed 25 meters. For visibility and ease of handling preferred location is alongside foundation of pipe rack superstructures. On elevated structures extinguisher shall be positioned at entrance/ leaving points (eg. at stairs). Signs indicating extinguisher position and extinguisher shall be weather protected.

17 17 (32) Larger portable pressurized (e.g.50 kg powder) extinguishers with a minimum hose length of 5 meters and having similar efficiency of the powder as type mentioned above, shall be positioned in the centre line of a process finger. Distance between extinguishers depends upon risk present and does normally not exceed 50 meters. Signs indicating extinguisher position and extinguisher shall be weather protected. 4.6 Steam lances Steam lances are used for extinguishing fires as well as preventing fires to occur. To feed steam lances utility stations according to Preemraff ES-08 shall be arranged on site. 4.7 Steam rings Heavy flanges in high-pressure/high-temperature service (e.g. reactors, heat exchangers) shall be evaluated for installation of fixed steam rings. Systems containing hydrogen with a flange size 6 and larger shall be specially checked. Supply of steam shall be arranged by a stationary installation. Operation of shut off valves for steam rings shall be local from a safe distance (minimum 15 m away) or calculated safe location. 4.8 Dry risers Dry risers are not a part of firefighting systems. They are primarily used for maintenance activities but can be used supplying firewater for protection during hot work. Dry risers shall be installed on superstructures with higher elevation than 8 meters. Typical arrangement of dry riser is shown in dwg. HC-25195/0-Z08 sheet FIRE PROTECTION OF SPECIFIC EQUIPMENT 5.1 Buildings (BBR20, AFS 2009:2) Fire extinguishing equipment and escape philosofy shall follow regulations in BBR and AFS. Computer/instrumental and switchgear/electrical rooms shall be evaluated for automatic extinguishing system, e.g. CO 2, Argonite or water. 5.2 LPG containing vessels (NFPA 15) LPG vessels (within fire areas) with a normal operating volume exceeding 4 m 3 shall be protected either by fixed water spray system or by passive fire protection. Typical service include storage vessels, feed surge drums, overhead drums, and similar.

18 18 (32) Water spray capacity shall be not less than 10 l/min/m 2 of vessel surface. The system shall be connected to underground fire water mains in accordance to Preemraff STD HB Systems shall be possible to operate from three separate places: Manually at valve pit, local remote control at safe location and in DCS system. System to be fail open in case of malfunction of air or electrical signals to the system. 5.3 Pumps (NFPA 15) Pumps handling LPG (or lighter) shall have permanent water spray system. Pump handling product above auto ignition temperature or operating temperature above 250 o C shall have a permanent water spray system. Systems shall be possible to operate from three separate places: Manually at valve pit, local remote control at safe location and in DCS system. System to be fail open in case of malfunction of air or electrical signals to the system. A maximum of four pumps to be protected by a single spray system. Water spray capacity shall be minimum 20 l/min/m 2. For pumps an assessment to be done if foam injection, non-aspirating, shall be possible. When foam installed the system shall be designed for at least 15 minutes operation. 5.4 Compressors (NFPA 15) Centrifugal compressors handling hydrocarbon and hydrogen rich gas shall have a fixed water spray system. Systems shall be possible to operate from three separate places: Manually at valve pit, local remote control at safe location and in DCS system. System to be fail open in case of malfunction of air or electrical signals to the system. If the compressor have a separate seal and lube oil system it will be evaluated if water spray system shall incorporate that equipment as well. Water spray density shall be minimum 20 l/min/m Heaters (NFPA 86) Demands on snuffing steam is described in ES09 Fired heaters. If heaters use fuel oil for firing, medium foam pouring systems on ground in the burner area shall be evaluated.

19 19 (32) General protection of a heater area shall be by means of fixed foam or water monitors depending upon heater media. 5.6 Tanks and bunds (NFPA 11 / EN 13565) When differences in the standards above the strictest value applies. When tank is nitrogen blanketed all notes below can be challenged. Semifixed extinguishing foam systems shall be installed on all tanks and be designed to extinguish full tank fire. The fixed piping installation for such systems shall be grouped together to a common connecting point for tanks in the group or existing tank installations. The connection point shall be at safe location in case of a tank fire. For floating roof and tanks with high viscosity and/or temperature foam injection at top shall be installed also consult EN13565/NFPA11 for type of extinguishing system. To be able to cool adjacent tanks during a tank fire an adequate cooling system shall be readily available. It can be by fixed or portable monitors or permanent fixed water spray system. Special care should be taken if tank spacing is closer than recommended in applicable codes. In general 2 l/min/m 2 are required for cooling of the adjacent tank, 40% of tank roof and 25% of tank mantle Tank bunds The water mains round tank bunds shall be designed to supply sufficient amount of water for extinguish the fire. The hydrants in this area shall be of sufficient number to give the amount of water needed and shall be positioned in a way that they can be used in case of fire. Except above paragraphs no fixed foam or water spray system are installed for tank bunds. The equipment for extinguishing the fire can be mobile or permanent units. 5.7 Jetties Fire Water main (NFPA 24) Firewater main supply line shall be 12 (minimum) traced and insulated where installed aboveground. The main supply line shall be designed in order to have a minimum pressure of 10 barg at all areas and at farthest outlet point under the fire water demand required by the relevant fire scenario, with the maximum flow velocity in the system not exceeding specifications

20 20 (32) in ES08. A surge analysis of the firewater distribution system shall be performed and, where required, surge protection devices shall be provided. The firewater system shall be filled with water during normal operation (standby). Connection point to firewater main supply for each jetty from tug shall be supplied in accordance to Preemraff specifications Fire Pumps (NFPA 20) Fire pumps, one in normal operating and one in standby, each one to have pressure and capacity to serve fire-extinguishing equipment installed on a jetty / jetty deck. A third backup system (pump or from process) is required, for more information see section The main fire water pump shall be able to pump the maximum flow (as stated in 4.1.3) Fire Hydrants (NFPA 24 / 307) Fire hydrants shall be constructed in accordance to Std HB BP03 and supplied with main valve and drain valve upstream the hydrant. Two hydrants shall be installed on each jetty deck, see also Monitors Master Streams (NFPA 24) Each jetty deck shall be covered by minimum two monitors mounted on jetty deck or on separate towers. All parts of the jetty deck and all equipment shall be protected by at least one monitor, fire study shall verify if vessel (or part of vessel) also shall be protected by Preemraff system. Monitors shall be electric remote controlled foam/ water monitors with a minimum capacity of l/min each, fire study shall determine number, capacity, type and position, see also Remote control system to be approved by Preemraff. Each monitor shall have a fire protection to be able to operate when engulfed in fire, this in accordance with ES19, ES11 and ES12. Remote locations and loading arms can be covered with fixed sprinkler system instead of monitor coverage. 6 PASSIVE PROTECTION - FIRE PROOFING 6.1 Steel structures For reference, see ES-19, Fire proofing. 6.2 Electrical-& instrument cables See ES 11 and ES References BBR20

21 21 (32) AFS 2009:2 API 521 NFPA 10, 11, 15, 20, 24, 86, 307 ES 08, 09, 11, 11-40, 12, 19 EN EN 3 8 REVISIONS Major revision in areas of concern for VGO project Major revision to include all Preemraff. Jonas Åvall, Bo Karlsson, Ann-Louise Kittendorff, Lars Hansson. 9 Audit Date Position Name Safety Specialist GOR Safety Specialist GOR/LYR Fire and Rescue Manager SHM Manager Safety Manager Projects GOR Manager Projects Electrical & Instrumentation LYR Manager Projects Mechanical LYR Jonas Åvall Ann-Louise Kittendorff Lars Hansson Malin Hallin Anna Grunewald-Thoor Thomas Liljeroth Andreas Wising John Erkselius

22 22 (32) 10 Appendix 1 Plant layout and spacing 10.1 Application The specifications and general design intentions shall be applied for all new equipment s and units installed in all Preemraffs facilities. When the design intentions or separation safety distances cannot be applied due to restrictions in existing or new units alternative equally effective safety measures shall be used (e.g. fire proofing, waterspray or blast hardening). All deviations from this document and the final design shall be approved by Preemraff. The information s and specifications in this document is mainly based on international guidelines. The main info in the document and tables comes from GAPS guideline (Global Asset Protection Services), and for areas not covered by GAP information,information from PIP (Process Industries Practices) and CCPS (Center for Chemical Process Safety) has been used. In some cases Swedish regulation SÄIFS 2000:2 has been used. Many of these guidelines use other non metric values and the conversion to metric has mainly been made without rounding the values. The main intent of the information and specifications are to minimize the risk and consequence of explosions and fire. By applying this recommendation and the spacing and separation distances the following benefits will be achieved: Less explosion damage. Overpressure created by an explosion decrease rapidly as the distance from the center of the explosion increases. Less fire exposure. Radiation intensity from a fire decreases as the square of the separation distance. Higher dilution of gas clouds or plumes. Gas concentration decreases as the distance from the emission source increases. Easier access to equipment for maintenance, inspection and firefighting purposes. Easier spill and spill fire control in open areas. Lower concentration of values, resulting in a lower property damage loss estimates should a given incident occur. In addition to this document there are other Preemraff Engineering standards that give detailed information of accessibility for e.g. work environment, operation and maintenance Basic design intentions The following areas / statements of possible concerns shall be addressed when determining the layout and the separation required. A risk identification (Preemraff and design contractor), using the list below as a minimum, shall be made to compare the planed unit/equipment to a general unit. If any of the areas / statements below raise concerns of a higher risk than for general units the minimum separations recommendations mentioned in this document might need to be increased : High hazard operations and units Grouped operations Critical operations Number of personnel at risk Potential environmental damage Concentration of property and business interruption values Importance of facility for continuing operations Equipment replacement and installation time Interdependency of facilities Critical customer or supplier relationships and market share concerns Fire and explosion exposures Sources of ignition

23 23 (32) Corrosive or incompatible materials exposures Vapor cloud explosions - Where large amounts of flammable vapors could be released and a vapor cloud explosion could occur, perform a more detailed hazard analysis and evaluation. If deemed necessary increase the separation distance or design unit and equipment for high loads. Potential to damage of building components and outdoor equipment Maintenance and emergency accessibility Drainage and grade sloping of surrounding land Climatic data with particular attention to prevailing wind directions. Future expansions External exposures including other plants, pipelines and transportation (rail, motor vehicle, aircraft, ship) 10.3 Overall Plant Layout Once a site has been selected,(sometimes with restrictions from actual landscape or other restrictions) arrange layout and spacing to reduce the effect of as many as possible of the following controllable and uncontrollable factors that contribute to the risk: site slope climate, exposure to natural hazards, wind direction and force type of process and process design parameters process equipment design (e.g flammable liquid holdups) ignition sources ( e.g. fired heaters, boilers, flare stacks, or other equipment which may cause ignition) with acceptable separation distance upwind of potential vapor leaks or locating the tank farm downhill of essential units active and passive fire protection design (e.g. fire and safety equipment should be located to maximize accessibility and minimize exposure to fires, explosions, or releases) spill control and proper drainage and separation to control spills and fire spread. E.g. ensuring that flammable vapour generated from one facility will diffuse to a concentration well below the lower explosive level (LEL) before it reaches any other facility or area where source of ignition may exist acceptable thermal radiation levels for pool fires or hydrocarbon fires on adjacent equipment and occupied areas accessibility for normal and foreseeable operations and maintenance activities (e.g lifting operation, vehicle access) safe access for firefighting personnel and emergency shutdown activities safe means of egress for personnel evacuation in the event of an emergency acceptable separations to site boundary and public areas acceptable separations to essential facilities such as fire water, control rooms, emergency power supplies, occupied buildings control logic and automation unloading facilities spare parts supply spare production capacity Use a hazard assessment of each plant operation (the same list as in paragraph 2 can be used) to help establish the layout or orientation of blocks or unit battery limits within the plant. Review the possible loss events and the consequences for each proposal. Select a layout which will minimize the overall risk and consequence for personnel, environment, property damage and related business interruption should an incident occur. Subdivide the overall site into general areas dedicated to process units, utilities, services and offices.

24 24 (32) Since each area or unit block generally has a rectangular shape, keep the maximum unit size to 90 x 180 m for firefighting purposes. Provide access roadways between blocks to allow each section of the plant to be accessible from at least two directions. Size road widths and clearances to handle large moving equipment and emergency vehicles or to a minimum of 8.5 m, whichever is greater. Table 1 provides minimum inter-unit spacing, which should be increased where a hazard analysis shows that larger separation distances are required. Unfavorable conditions, such as inadequate sloping, poor drainage and critical operations, can increase the exposure between units, thus requiring higher separation distances. All distances between units are measured from battery limits. Battery limits as defined for this document is imaginary lines surrounding a unit. This line is typically box shaped and encloses equipment required for the operation of the unit. Cooling towers, maintenance buildings or other structures not integral to the unit are considered to be independent and should not be included in the battery limits. Figure 1 illustrates a good layout based on the prevailing wind 10.4 On site - Process Units The processing units are generally the most hazardous operations in a plant.

25 25 (32) Often, fire protection spacing requirements will exceed maintenance accessibility requirements. The relative location of equipment depends on its probable release of flammable materials, its flammable liquid holdup, and its potential to be a source of ignition. The risk of domino effect loss is not neglectiblewithin process units and shall be held to a minimum by applying these recommendations.. NFPA 30 defines flammable liquids as Class I materials, and combustible liquids as Class II and III materials. The classification depends on the flash point and boiling point of the product. For separation process equipment see table Process hazards Evaluate the process hazards and, depending on the results of such review, classify them in moderate, intermediate, and high hazard groups (the classification is used in some of the separation tables below) Moderate - This category includes processes, operations, or materials having a limited explosion hazard and a moderate fire hazard. This class generally involves endothermic reactions and nonreactive operations, such as distillation, absorption, mixing and blending of flammable liquids. Exothermic reactions with no flammable liquids or gases also fit in this hazard group. Example for refineries : Crude distillation, Visbreaking Intermediate - This category includes processes, operations, or materials having an appreciable explosion hazard and a moderate fire hazard. This class generally involves mildly exothermic reactions. Example for refineries : Alkylation, Hydrogenation, Reforming High - This category includes processes, operations, or materials having a high explosion hazard and moderate to heavy fire hazard. This class involves highly exothermic or potential runaway reactions and high hazard products handling.: Example for refineries :Hydrocracking Hazard Classification of pumps High hazard pumps: AIT pumps - Actual AIT or over 250 C Handle flammable and combustible liquids and operate at pressures above 35 bar LPG and lighter Intermediate hazard pumps: All other pumps handling flammable or combustible liquids Intra-Unit Spacing For proper intra-unit layout, include the following principles: Do not group pumps and compressors handling flammable products in one single area And do not locate them under piperacks, air cooled heat exchangers and vessels Orient pump and driver axes perpendicular to piperacks or other equipment to minimize fire exposure in case of a pump seal failure Separate high-pressure charge pumps from any other major process equipment and other pumps by at least 7.5 m Compressors (flammable gas) - To avoid unnecessary exposure, do not locate lube oil tanks and pumps directly under any compressor. Detach heaters and furnaces from the unit or at least locate them at one corner of the unit. (e.g. locate continuous ignition sources upwind of the process units) If increased spacing for very high hazard equipment susceptible to explosions, such as reactors is deemed necessary but not practically possible, - separate them from other areas by blast resistant walls.

26 26 (32) Keep flammable and combustible liquid products storage to a minimum within the process unit boundaries. Install drums, accumulators or similar vessels with flammable liquid holdups at grade, if possible. The preferred layout of a process unit is a piperack located in the center of the unit with large vessels and reactors located outwards of the central piperack. Place pumps at the outer limits of the process area. Limit the stacking of equipment in process structures to equipment with no fire potential. Slope the ground surface so that liquids drain away from the center of the unit. Do not put drainage trenches under piperacks. Put cables in the ground or at trays in the top tier of the piperacks Offsite - Tank Farms For minimum spacing between tank farms and other unit see table 2. See table 3 for general recommendations for spacing aboveground storage tanks in the oil and chemical industry. The spacing is given as a distance from tank shell to tank shell and is a function of the largest tank diameter. If some adverse conditions cannot be avoided, such as poor fire protection water supply, difficult firefighting, poor accessibility, poor diking or poor drainage, increase the spacing by at least 50%. For proper offsite layout, include the following principles: Provide tanks with proper dikes / tank bunds or drainage to a remote impounding facility. Storage dike / tank bund areas or remote impounding s shall be sized to contain minimum 100% for a single tank and for a group of tanks minimum 75 % of the total volume. To these volumes an extra capacity shall be added to be able to contain the calculated amount of fire water and foam used in case of fire. The sloping inside the dikes / tank bunds or to remote impounding facility shall be of minimum 1 % and take the spill away from the tanks. (Refer to NFPA codes for additional requirements) Do not group or dike /bund different types of tanks and contents (class I-III) together. Locate storage tanks at a lower elevation than other occupancies to prevent liquids or gases from flowing toward equipment or buildings and exposing them. Locate tanks downwind of other areas. Arrange atmospheric storage tanks and pressure vessels in rows not more than two deep and adjacent to a road or accessway for adequate firefighting accessibility. Arrangement of storage tanks shall allow for firefighting from at least two sides. Since piping exposed to ground fires usually fails within 10 or 15 min of initial exposure, locate an absolute minimum amount of piping, valves and flanges within dikes / bunds. Install pumps, valve manifolds, and transfer piping outside dikes / bunds or impounding areas. Where tanks over 80,000 m3 are present, increase minimum distances to 300 m spacing between them. Space tanks so the thermal radiation intensity from an exposing fire is too low to ignite the contents of the adjacent tanks. Tolerances of tanks to thermal radiation can be increased by: - Painting vessels a reflective color (generally white or silver). -Providing a fixed water spray or tank shell cooling system. -Insulating or fireproofing the tank shell.

FIXED PROTECTION FOR OIL AND CHEMICAL PLANTS

FIXED PROTECTION FOR OIL AND CHEMICAL PLANTS GAP.12.2.1.2 A Publication of Global Asset Protection Services LLC FIXED PROTECTION FOR OIL AND CHEMICAL PLANTS INTRODUCTION Fixed water spray, deluge, foam-water and sprinkler systems are essential parts

More information

Explosion Protection Engineering Principles

Explosion Protection Engineering Principles Handbook of Fire and Explosion Protection Engineering Principles for Oil, Gas, Chemical and Related Facilities Second edition Dennis P. Nolan ELSEVIER AMSTERDAM BOSTON HEIDELBERG LONDON NEW YORK OXFORD

More information

Fire protection on chemical manufacturing sites

Fire protection on chemical manufacturing sites CFPA-E No 18:2008 Fire protection on chemical manufacturing sites FOREWORD The European fire protection associations have decided to produce common guidelines in order to achieve similar interpretation

More information

MINIMUM TANK GAP. Greater of 3 or one-sixth of sum of adjacent tank diameters. one-half of sum of adjacent tank diameters 20

MINIMUM TANK GAP. Greater of 3 or one-sixth of sum of adjacent tank diameters. one-half of sum of adjacent tank diameters 20 Piping Layout Design Introduction The performance requirements of the equipment are developed by design teams which normally include members from the different departments such as process, engineering,

More information

Process Hazard Analysis Facility Siting Checklist

Process Hazard Analysis Facility Siting Checklist Process Hazard Analysis Facility Siting Checklist Facility: Date: Team Members: Note: For compliance, OSHA expects specific justification for each individual situation/condition. GENERAL CONSIDERATIONS

More information

POSITION PAPER ON WATER MIST FOR FIRE FIGHTING APPLICATIONS

POSITION PAPER ON WATER MIST FOR FIRE FIGHTING APPLICATIONS FIRE EXTINGUISHING INSTALLATIONS SECTION POSITION PAPER ON WATER MIST FOR FIRE FIGHTING APPLICATIONS Version 1 29-09-04 0 Eurofeu position paper on water mist for fire fighting applications 1 Scope The

More information

The regulatory section first discusses codes and standards and then Federal and State legislative and local requirements.

The regulatory section first discusses codes and standards and then Federal and State legislative and local requirements. 4.7 FIRE PROTECTION AND EMERGENCY RESPONSE This section addresses the fire protection and emergency response resources related to the proposed Project. These resources include the existing services and

More information

International Safety Guide Chapter 30 for Inland Navigation Tank-barges and Terminals. Chapter 30 FIRE-FIGHTING

International Safety Guide Chapter 30 for Inland Navigation Tank-barges and Terminals. Chapter 30 FIRE-FIGHTING Chapter 30 FIRE-FIGHTING This Chapter discusses events which may follow cargo spillage and the procedures which can be adopted to protect life and property in such circumstances. It also describes the

More information

Above Ground Fuel Tank Requirements

Above Ground Fuel Tank Requirements FIRE DEPARTMENT in cooperation with Above Ground Fuel Tank Requirements The purpose of this document is to provide information about general Fire Code requirements for above ground storage within the unincorporated

More information

APPLICATION BULLETIN COMBUSTION TURBINE FACILITIES. Overview

APPLICATION BULLETIN COMBUSTION TURBINE FACILITIES. Overview Overview Modern combustion (or gas) turbine packages typically include an axial compressor, a combustion section and a turbine. Both compressor and turbine sections consist of one or more sets of fixed

More information

Enclosure 4- RISK ASSESSMENT

Enclosure 4- RISK ASSESSMENT Enclosure 4- RISK ASSESSMENT RISK ASSESSMENT Risk is a potential that a chosen action or activity will lead to a loss of human or property. Risk assessment is a step for Risk Management. Risk assessment

More information

ELC International Inc

ELC International Inc (Loss Control through Engineering) Company Profile & Capability Document INTRODUCTION ELC International Inc., an independent consultancy firm established in 2006, specializes in providing engineering solutions

More information

AVOID CATASTROPHIC SITUATIONS: EXPERT FIRE AND GAS CONSULTANCY OPTIMIZES SAFETY

AVOID CATASTROPHIC SITUATIONS: EXPERT FIRE AND GAS CONSULTANCY OPTIMIZES SAFETY AVOID CATASTROPHIC SITUATIONS: EXPERT FIRE AND GAS CONSULTANCY OPTIMIZES SAFETY World-class services help reduce incidents, protect the environment, and keep people and plants safe White Paper PAGE 1 Introduction

More information

Application Bulletin. LNG / LPG Facilities FLAME AND GAS DETECTION FOR LNG FACILITIES

Application Bulletin. LNG / LPG Facilities FLAME AND GAS DETECTION FOR LNG FACILITIES FLAME AND GAS DETECTION FOR LNG FACILITIES Liquefied natural gas (LNG) is a generic name for liquefied hydrocarbon gas composed primarily of methane. When natural gas is cooled to approximately -260 F,

More information

AVOID CATASTROPHIC SITUATIONS: EXPERT FIRE AND GAS CONSULTANCY OPTIMIZES SAFETY

AVOID CATASTROPHIC SITUATIONS: EXPERT FIRE AND GAS CONSULTANCY OPTIMIZES SAFETY AVOID CATASTROPHIC SITUATIONS: EXPERT FIRE AND GAS CONSULTANCY OPTIMIZES SAFETY World-class services help reduce incidents, protect the environment, and keep people and plants safe White Paper PAGE 1 Introduction

More information

Contents. xiii. 4. PHYSICAL PROPERTIES OF HYDROCARBONS General Alkene Series... 28

Contents. xiii. 4. PHYSICAL PROPERTIES OF HYDROCARBONS General Alkene Series... 28 Contents 1. INTRODUCI'ION... 1 Historical Background... 2 Legal Influences... 4 Hazards and Their Prevention... 4 Systems Approach... 5 Fire Protection Engineering Role... 5 Risk Management and Insurance...

More information

Review Paper FIREWATER SYSTEM DESIGN AND SELECTION OF OPTIMIZED LOCATION FOR FIREWATER TANKS AND PUMPS IN GAS OIL SEPARATION FACILITY

Review Paper FIREWATER SYSTEM DESIGN AND SELECTION OF OPTIMIZED LOCATION FOR FIREWATER TANKS AND PUMPS IN GAS OIL SEPARATION FACILITY Raufeek M H, et al., International Journal on Occupational Health & Safety, Fire & Environment Allied Science ISSN 2349-977X Review Paper FIREWATER SYSTEM DESIGN AND SELECTION OF OPTIMIZED LOCATION FOR

More information

ICHEME SYMPOSIUM SERIES NO. 144 A METHODOLOGY FOR ASSESSING AND MINIMISING THE RISKS ASSOCIATED WITH FIREWATER RUN-OFF ON OLDER MANUFACTURING PLANTS

ICHEME SYMPOSIUM SERIES NO. 144 A METHODOLOGY FOR ASSESSING AND MINIMISING THE RISKS ASSOCIATED WITH FIREWATER RUN-OFF ON OLDER MANUFACTURING PLANTS A METHODOLOGY FOR ASSESSING AND MINIMISING THE RISKS ASSOCIATED WITH FIREWATER RUN-OFF ON OLDER MANUFACTURING PLANTS Christopher J, Beale, Ciba Speciality Chemicals Pic, Water Treatments Division, PO Box

More information

Performance and safety features of a 2 x cbm LPG-import terminal built in China

Performance and safety features of a 2 x cbm LPG-import terminal built in China Performance and safety features of a 2 x 50.000 cbm LPG-import terminal built in China Dr. Manfred Kuver Christof Fey Li Qin Yi Executive Vice President Tractebel Gas Engineering GmbH Deputy Engineering

More information

Water Spray Systems: NFPA 15

Water Spray Systems: NFPA 15 Water Spray Systems: NFPA 15 WILLIAM HICKS MSc, CFEI, CFPS, IAAI-CFI, MIFireE, EFO, CFOD, F-IAFI Associate Professor Eastern Kentucky University William.Hicks@eku.edu System Maintenance Objectives Identify

More information

LIST OF OISD STANDARDS (April 2016)

LIST OF OISD STANDARDS (April 2016) LIST OF OISD STANDARDS (April 2016) 1. OISD-STD-105 Work Permit System 2. OISD-STD-106 Pressure Relief & Disposal System 3. OISD-RP-108 Recommended Practices on Oil Storage and Handling 4. OISD-STD-109

More information

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 1 GENERAL

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 1 GENERAL Annex 2, page 2 ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 1 GENERAL Section 1 Application 1 The following new sentence is added to the end of paragraph 1.2:

More information

DIRECTIVE NO: D-B

DIRECTIVE NO: D-B DIRECTIVE NO: D-B6 100604 1 LOW PRESSURE THERMAL FLUID PLANT AUTOMATED CONTROL SYSTEMS Date of Issue: June 4, 2010 General Details This directive is being issued to owners, licensed contractors, consulting

More information

Bowties in process safety auditing

Bowties in process safety auditing Bowties in process safety auditing Mireille Busque - ERM Insert then choose Picture select your picture. Right click your picture and Send to back. Copyright 2015 by ERM Worldwide Limited and/or its affiliates

More information

LIST OF STANDARDS S. NO. STANDARD NO. STANDARD NAME. Recommended Practices on Oil Storage and Handling OISD-STD-109

LIST OF STANDARDS S. NO. STANDARD NO. STANDARD NAME. Recommended Practices on Oil Storage and Handling OISD-STD-109 LIST OF STANDARDS S. NO. STANDARD NO. STANDARD NAME 1. OISD-STD-105 Work Permit System 2. OISD-STD-106 Pressure Relief & Disposal System 3. OISD-RP-108 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17.

More information

HKIE CPD Training Course (II) 23, 25 June and 7, 9 July 2009

HKIE CPD Training Course (II) 23, 25 June and 7, 9 July 2009 (II) 23, 25 June and 7, 9 July 2009 Organization by Co-organized by the Association of Registered Fire Service Installation contractors of Hong Kong Ltd (FSICA) Gas and Foam Suppression Systems Peter Bressington

More information

Page 1 of 19 Committee Input No. 14-NFPA 33-2013 [ Global Input ] Type your content here... Supplemental Information File Name IndoorDraftforCI.docx Description This committee input would be added to new

More information

BP U.S. Pipelines and Logistics (USPL) Safety Manual Page 1 of 6

BP U.S. Pipelines and Logistics (USPL) Safety Manual Page 1 of 6 BP U.S. Pipelines and Logistics (USPL) Safety Manual Page 1 of 6 1. Purpose This policy sets forth requirements for preventing and detecting fires, sounding an alarm, and suppressing fires. Fire protection

More information

FoamFatale INTRODUCTION OF A NOVEL HIGH END TECHNOLOGY FOR LARGE ATMOSPHERIC STORAGE TANK FIRES. TFEX 1 Ltd.

FoamFatale INTRODUCTION OF A NOVEL HIGH END TECHNOLOGY FOR LARGE ATMOSPHERIC STORAGE TANK FIRES. TFEX 1 Ltd. INTRODUCTION OF A NOVEL HIGH END TECHNOLOGY FOR LARGE ATMOSPHERIC STORAGE TANK FIRES TFEX 1 Ltd. FoamFatale technology makes it possible to make a huge step forward in protecting the environment against

More information

IMO. 4 June 1999 GUIDELINES FOR THE APPROVAL OF ALTERNATIVE FIXED WATER-BASED FIRE-FIGHTING SYSTEMS FOR SPECIAL CATEGORY SPACES

IMO. 4 June 1999 GUIDELINES FOR THE APPROVAL OF ALTERNATIVE FIXED WATER-BASED FIRE-FIGHTING SYSTEMS FOR SPECIAL CATEGORY SPACES INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR Telephone: 0171-735 7611 Fax: 0171-587 3210 Telex: 23588 IMOLDN G Ref. T4/4.01 IMO E MSC/Circ.914 4 June 1999 GUIDELINES FOR THE APPROVAL

More information

FIRE SAFETY DURING CONSTRUCTION, ALTERATION AND DEMOLITION

FIRE SAFETY DURING CONSTRUCTION, ALTERATION AND DEMOLITION CHAPTER 14 FIRE SAFETY DURING CONSTRUCTION, ALTERATION AND DEMOLITION SECTION FC 1401 GENERAL 1401.1 Scope. This chapter shall govern fire safety measures during the construction, alteration, or demolition

More information

2.07 Permit Application Checklist for Diesel Generators, Diesel Fire Pumps, and Fuel Tanks Serving Generators and Fire Pumps (2016)

2.07 Permit Application Checklist for Diesel Generators, Diesel Fire Pumps, and Fuel Tanks Serving Generators and Fire Pumps (2016) 2.07 Permit Application Checklist for Diesel Generators, Diesel Fire Pumps, and Fuel Tanks Serving Generators and Fire Pumps (2016) Reference: Documents referenced for this bulletin are as follows: San

More information

Module 3. Water-Based Suppression Systems (WBSS) Part II: Highlights of Code Requirements

Module 3. Water-Based Suppression Systems (WBSS) Part II: Highlights of Code Requirements Module 3 Water-Based Suppression Systems (WBSS) Part II: Highlights of Code Requirements 1 WATER-BASED SUPPRESSION SYSTEMS-PART TWO This module covers: 1. Ohio Building Code requirements and when and why

More information

Vancouver Airport Fuel Delivery Project. Fire Prevention, Preparedness and Emergency Response

Vancouver Airport Fuel Delivery Project. Fire Prevention, Preparedness and Emergency Response Vancouver Airport Fuel Delivery Project Fire Prevention, Preparedness and Emergency Response 1 FIRE PREVENTION, PREPAREDNESS AND EMERGENCY RESPONSE 1.1 Introduction This document is associated with fire-related

More information

MODULAR INTEGRATION OF PROCESS EQUIPMENT PACKAGES FOR OIL AND GAS FACILITIES

MODULAR INTEGRATION OF PROCESS EQUIPMENT PACKAGES FOR OIL AND GAS FACILITIES MODULAR INTEGRATION OF PROCESS EQUIPMENT PACKAGES FOR OIL AND GAS FACILITIES Copyright Material PCIC Europe Paper No. PCIC Europe LO-70 Allan Bozek EngWorks, Inc. 1620 49 th Avenue, SW Calgary, AB T2T

More information

Firefighting operations on multi-tiered vehicle stacking buildings F5-13 GD

Firefighting operations on multi-tiered vehicle stacking buildings F5-13 GD DESIGNER S GUIDE Firefighting operations on multi-tiered vehicle stacking buildings F5-13 GD Introduction When to use Scope Use this chapter to provide a consistent Fire and Emergency New Zealand position

More information

Fire protection documentation. CFPA-E Guideline No 13:2015 F

Fire protection documentation. CFPA-E Guideline No 13:2015 F Fire protection documentation CFPA-E Guideline No 13:2015 F FOREWORD The European fire protection associations have decided to produce common guidelines in order to achieve similar interpretation in the

More information

Bowties in process safety auditing

Bowties in process safety auditing Bowties in process safety auditing Mireille Busque - ERM Insert then choose Picture select your picture. Right click your picture and Send to back. May 9, 2017 Copyright 2015 by ERM Worldwide Limited and/or

More information

Public Input No. 1-NFPA [ Global Input ] Statement of Problem and Substantiation for Public Input. Related Public Inputs for This Document

Public Input No. 1-NFPA [ Global Input ] Statement of Problem and Substantiation for Public Input. Related Public Inputs for This Document of 79 1/27/2016 2:09 PM Public Input No. 1-NFPA 59-2015 [ Global Input ] Throughout standard remove references to the following and replace with the following: (1) ANSI/API and replace with API. (2) ANSI/UL

More information

International Journal of Advance Engineering and Research Development

International Journal of Advance Engineering and Research Development Scientific Journal of Impact Factor (SJIF): 4.72 International Journal of Advance Engineering and Research Development Volume 5, Issue 01, January -2018 e-issn (O): 2348-4470 p-issn (P): 2348-6406 APPLICATION

More information

PHARMACEUTICAL PLANTS

PHARMACEUTICAL PLANTS GAPS Guidelines GAP.17.2.3 A Publication of Global Asset Protection Services LLC PHARMACEUTICAL PLANTS INTRODUCTION The pharmaceutical industry, a high technology industry with a rapidly growing market

More information

APPENDIX D LOSS PREVENTION CHECKLIST

APPENDIX D LOSS PREVENTION CHECKLIST Dow's Fire & Explosion Index Hazard Classification Guide, Seventh Edition by American Institute of Chemical Engineers Copyright U.S.A. 1994 APPENDIX D LOSS PREVENTION CHECKLIST 1. 2. 3. 4. scope This checklist

More information

4 June This circular supersedes MSC/Circ.914. *** I:\CIRC\MSC\01\1272.doc

4 June This circular supersedes MSC/Circ.914. *** I:\CIRC\MSC\01\1272.doc INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR Telephone: 020 7735 7611 Fax: 020 7587 3210 IMO E Ref.: T4/4.01 MSC.1/Circ.1272 4 June 2008 GUIDELINES FOR THE APPROVAL OF FIXED WATER-BASED

More information

HANDLING FLAMMABLE AND COMBUSTIBLE LIQUIDS ON DOCKS, PIERS AND WHARVES

HANDLING FLAMMABLE AND COMBUSTIBLE LIQUIDS ON DOCKS, PIERS AND WHARVES GAP.9.2.1.2 A Publication of Global Asset Protection Services LLC HANDLING FLAMMABLE AND COMBUSTIBLE LIQUIDS ON DOCKS, PIERS AND WHARVES INTRODUCTION Water transport remains the cheapest method of moving

More information

Emergency shutdown systems. Procedures for bypassing ESD s

Emergency shutdown systems. Procedures for bypassing ESD s HYDROCARBON PROCESS SAFETY 2 - ELEMENT 3 - UNIT IOG1 Emergency shutdown systems Emergency shutdown systems (ESD s) are intended to minimise the consequences of emergency situations, for example, the uncontrolled

More information

OUTLINE FOR FIRE PREVENTION ACTIVITY

OUTLINE FOR FIRE PREVENTION ACTIVITY OUTLINE FOR FIRE PREVENTION ACTIVITY Background Buildings under construction present unique fire exposures that require special attention. Fires can result in major losses and long delays in the completion

More information

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST July 1, 2010 SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST FIRE PUMP REVIEW Address: Permit #: Inspector: Date: Status: Inspector: Date: Status: A-Approved; AC-Approved w/comments;

More information

PIPING SYSTEM EQUIPMENTS

PIPING SYSTEM EQUIPMENTS PIPING SYSTEM EQUIPMENTS Introduction Equipments are devices that provide power, process and store materials. Equipments in piping systems depend on the specific industries using them. Specialized equipment

More information

IMO INTERPRETATIONS OF FIRE PROTECTION-RELATED PROVISIONS OF THE HSC CODE

IMO INTERPRETATIONS OF FIRE PROTECTION-RELATED PROVISIONS OF THE HSC CODE INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR Telephone: 0171-735 7611 Fax: 0171-587 3210 Telex: 23588 IMOLDN G Ref. T4/4.01 IMO E MSC/Circ.911 4 June 1999 INTERPRETATIONS OF FIRE

More information

Savard Labor & Marine Staffing, Inc. Fire Prevention Program Rev3/14

Savard Labor & Marine Staffing, Inc. Fire Prevention Program Rev3/14 Fire Prevention Program Purpose The Company Fire Safety Plan has been developed to work in conjunction with company emergency plans and other safety programs. This includes reviewing all new building construction

More information

Evaluation and Compliance with Facility Siting Regulations in the US API RP 752 / 753 / 756

Evaluation and Compliance with Facility Siting Regulations in the US API RP 752 / 753 / 756 Evaluation and Compliance with Facility Siting Regulations in the US API RP 752 / 753 / 756 Presented by Gary Fitzgerald Director San Antonio, Texas U.S.A. Overview Safety Moment Introduction to Facility

More information

HAZARDOUS AREA CLASSIFICATION AND SELECTION OF EQUIPMENT FOR SAFE USE THEREIN FROM AN ELECTRICAL VIEWPOINT

HAZARDOUS AREA CLASSIFICATION AND SELECTION OF EQUIPMENT FOR SAFE USE THEREIN FROM AN ELECTRICAL VIEWPOINT HAZARDOUS AREA CLASSIFICATION AND SELECTION OF EQUIPMENT FOR SAFE USE THEREIN FROM AN ELECTRICAL VIEWPOINT Olof Bekker Pr. Eng. BSc. Eng. BML S.MSAIEE, M.NACE Engineering Manager, Electrical COMMITMENT

More information

CHAPTER 8 OCCUPATIONAL HEALTH AND SAFETY

CHAPTER 8 OCCUPATIONAL HEALTH AND SAFETY CHAPTER 8 OCCUPATIONAL HEALTH AND SAFETY 8.1 Health and Safety Aspects Plant operation will involve storage handling and use of fuels and several chemicals. Some of these chemicals may be hazardous in

More information

Facility Safety Rules Hazard Communication Emergency Procedures Fire Safety. Safety Orientation

Facility Safety Rules Hazard Communication Emergency Procedures Fire Safety. Safety Orientation Facility Safety Rules Hazard Communication Emergency Procedures Fire Safety Safety Orientation Facility Safety Rules Report all hazards, unsafe acts, unsafe conditions and unsafe equipment to your Supervisor

More information

August Process Industry Practices Electrical. PIP ELEHA01 Engineering Guide for Determining Electrical Area Classification

August Process Industry Practices Electrical. PIP ELEHA01 Engineering Guide for Determining Electrical Area Classification Electrical Engineering Guide for Determining Electrical Area Classification PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities, this Practice

More information

Cross Reference Table for Area Classification Details

Cross Reference Table for Area Classification Details Cross Reference Table f Area Classification Details Area Focus Drum Filling Station (Outdos Indos in an Adequately Ventilated Building)) Marine Terminal Tank Car Tank Truck Loading and Unloading Via Closed

More information

Fire protection for buildings

Fire protection for buildings Fire protection for buildings HI-FOG high-pressure water mist Ghelamco Group Protecting people, property and business continuity A fire in a building can lead to serious consequences. Even a harmless fire

More information

Smoke detection in hazardous areas:

Smoke detection in hazardous areas: WHITE PAPER Smoke detection in hazardous areas: What you need to know Smoke detection in hazardous areas requires detectors that operate effectively and safely in explosive environments. Having the correct

More information

PROTECTING FIRE SPRINKLER SYSTEM PIPES FROM FREEZING IN CHAPTER FACILITIES

PROTECTING FIRE SPRINKLER SYSTEM PIPES FROM FREEZING IN CHAPTER FACILITIES James R. Favor & Company PROTECTING FIRE SPRINKLER SYSTEM PIPES FROM FREEZING IN CHAPTER FACILITIES A resource for Fraternity and Sorority House Corporation Officers Prevent Your Sprinkler System from

More information

Highly Protected Risks in Power Generation Stewart Kidd outlines the issues to consider when installing active fire suppression in power stations THE

Highly Protected Risks in Power Generation Stewart Kidd outlines the issues to consider when installing active fire suppression in power stations THE Highly Protected Risks in Power Generation Stewart Kidd outlines the issues to consider when installing active fire suppression in power stations THE TERM highly protected risk (HPR) is commonly used in

More information

RESOLUTION MSC.292(87) (adopted on 21 May 2010) ADOPTION OF AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS

RESOLUTION MSC.292(87) (adopted on 21 May 2010) ADOPTION OF AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS RESOLUTION MSC.292(87) THE MARITIME SAFETY COMMITTEE, RECALLING Article 28(b) of the Convention on the International Maritime Organization concerning the functions of the Committee, NOTING resolution MSC.98(73)

More information

RISK ENGINEERING GUIDELINE.

RISK ENGINEERING GUIDELINE. RISK ENGINEERING GUIDELINE. IMPAIRMENT OF FIRE PROTECTION SYSTEMS HDI Risk Consulting Property www.hdi.global An impairment of fire protection systems increases the risk. In order to reduce the risk of

More information

(2) Various fire sections enclosed by various classes of fire divisions; (3) Arrangement of fire detectors and manual fire alarm stations;

(2) Various fire sections enclosed by various classes of fire divisions; (3) Arrangement of fire detectors and manual fire alarm stations; (1979) (Rev.1 1990) (Rev.2 1996) (Rev.3 Jan 2012) Safety features.1 Fire protection and extinction.1.1 General Fire protection arrangements and fire extinguishing systems are to be in accordance with the

More information

Journal of Faculty of Engineering & Technology

Journal of Faculty of Engineering & Technology JFET 21(3) (2014) 62-69 Journal of Faculty of Engineering & Technology Journal homepage: www.pu.edu.pk/journals/index.php/jfet/index Fire and Their Mitigation Efforts in Gas Processing Facilities M.K.

More information

GASEOUS HYDROGEN SYSTEMS

GASEOUS HYDROGEN SYSTEMS CHAPTER 7 GASEOUS HYDROGEN SYSTEMS SECTION 701 GENERAL 701.1 Scope. The installation of gaseous hydrogen systems shall comply with this chapter and Chapters 30 and 35 of the Fire Compressed gases shall

More information

DEHYDRATION AND DESALTING

DEHYDRATION AND DESALTING DEHYDRATION AND DESALTING Wet Crude Oil Crude oil from a GOSP may contain very small droplets of salty water Many of these droplets are held in suspension by a thin film of oil that surrounds them. These

More information

REVISED GUIDELINES FOR THE DESIGN AND APPROVAL OF FIXED WATER-BASED FIRE-FIGHTING SYSTEMS FOR RO-RO SPACES AND SPECIAL CATEGORY SPACES

REVISED GUIDELINES FOR THE DESIGN AND APPROVAL OF FIXED WATER-BASED FIRE-FIGHTING SYSTEMS FOR RO-RO SPACES AND SPECIAL CATEGORY SPACES E 4 ALBERT EMBANKMENT LONDON SE1 7SR Telephone: +44 (0)20 7735 7611 Fax: +44 (0)20 7587 3210 7 December 2018 REVISED GUIDELINES FOR THE DESIGN AND APPROVAL OF FIXED WATER-BASED FIRE-FIGHTING SYSTEMS FOR

More information

Operating instructions

Operating instructions Operating instructions Gas condensing boiler WARNING: If the information in this manual is not followed exactly, a fire or explosion may result causing property damage, personal injury or loss of life.

More information

Public Input No. 52-NFPA [ Section No [Excluding any Sub-Sections] ]

Public Input No. 52-NFPA [ Section No [Excluding any Sub-Sections] ] 8 of 93 11/6/2015 7:41 AM Public Input No. 52-NFPA 30-2015 [ Section No. 21.2 [Excluding any Sub-Sections] ] For the purpose of this chapter, the term in this section shall have the definitions given.

More information

Y. ORMIERES. Fire risk analysis method for nuclear installations

Y. ORMIERES. Fire risk analysis method for nuclear installations Y. ORMIERES Fire risk analysis method for nuclear installations 2 Fire risk analysis method for nuclear installations A position on the management of fire safety analysis in nuclear installations by specifying:

More information

ERRATA TO THE 2000 INTERNATIONAL FIRE CODE. Fourth Printing, January 2002 Updated March 29, 2002

ERRATA TO THE 2000 INTERNATIONAL FIRE CODE. Fourth Printing, January 2002 Updated March 29, 2002 ERRATA TO THE 2000 INTERNATIONAL FIRE CODE Fourth Printing, January 2002 Updated March 29, 2002 Table 2306.2 General Fire Protection and Life Safety Requirements In column 2 (Size of High Piled Storage

More information

Public Input No. 1-NFPA [ Global Input ] Additional Proposed Changes. Statement of Problem and Substantiation for Public Input

Public Input No. 1-NFPA [ Global Input ] Additional Proposed Changes. Statement of Problem and Substantiation for Public Input of 280 2/6/2015 12:06 PM Public Input No. 1-NFPA 58-2013 [ Global Input ] NOTE: This public input originates from Tentative Interim Amendment 58-14-1 (TIA 1079) issued by the Standards Council on August

More information

Kelsow Work Instruction. Buffalo Venture FPSO Fire Protection Systems

Kelsow Work Instruction. Buffalo Venture FPSO Fire Protection Systems Kelsow Work Instruction Buffalo Venture FPSO Fire Protection Systems Table of Contents Abbreviations and Definitions....................................................... 2 Overview............................................................................

More information

SEMICONDUCTOR FABRICATION FACILITIES

SEMICONDUCTOR FABRICATION FACILITIES CHAPTER 18 SEMICONDUCTOR FABRICATION FACILITIES SECTION FC 1801 GENERAL 1801.1 Scope. This chapter shall govern the design, installation, operation and maintenance of semiconductor fabrication facilities

More information

contents iii Drilling Tools 27 Adjustable Choke 27 Automatic Drillers 29 MWD and LWD Tools 30 How They Work 30 Uses 30

contents iii Drilling Tools 27 Adjustable Choke 27 Automatic Drillers 29 MWD and LWD Tools 30 How They Work 30 Uses 30 Figures v Foreword ix Acknowledgments xi Units of Measurement xii Introduction 1 Pipe Handling Equipment 3 Kelly Spinners 3 Maintenance 6 Spring Slips and Power Slips 7 Maintenance 9 Automatic Pipe Handlers

More information

Cast Line Heaters The Benefits of This Space Saving Electric Heater

Cast Line Heaters The Benefits of This Space Saving Electric Heater WHITE PAPER Cast Line Heaters The Benefits of This Space Saving Electric Heater Introduction Cast line heaters, or cast-in heaters, offer an alternative to the more common inline process heaters that have

More information

Boiler Basics. Design and operation

Boiler Basics. Design and operation Boiler Basics Design and operation A boiler is an enclosed vessel that provides a means for combustion heat to be transferred into water until it becomes heated water or steam. The hot water or steam under

More information

WATER MIST FIRE PROTECTION SYSTEMS FOR INDUSTRIAL CABLE TUNNELS AND TURBINE HALLS

WATER MIST FIRE PROTECTION SYSTEMS FOR INDUSTRIAL CABLE TUNNELS AND TURBINE HALLS WATER MIST FIRE PROTECTION SYSTEMS FOR INDUSTRIAL CABLE TUNNELS AND TURBINE HALLS Jukka Vaari 1, Amit Lior 2 1 2 VTT Technical Research Centre of Finland, Espoo, Finland Marioff Corporation Oy, Vantaa,

More information

Todd Jekel, Assistant Director, IRC Feb. 8, Standard Definition. What is a machinery room?

Todd Jekel, Assistant Director, IRC Feb. 8, Standard Definition. What is a machinery room? Machinery Room Requirements & Best Practices Design Todd Jekel, Assistant Director, IRC Feb. 8, 2007 Standard Definition What is a machinery room? ASHRAE 15-2004 3 states: a space, meeting the requirements

More information

Laboratories and Hazardous Materials. Company Overview

Laboratories and Hazardous Materials. Company Overview Laboratories and Hazardous Materials Don E. Contois, P.E. Sam Sinapi Company Overview R.W. Sullivan Engineering (RWS) was established in 1945 and currently has 95 employees. RWS is a full service engineering

More information

NFPA 33 Standard for Spray Applica4on Using Flammable or Combus4ble Materials

NFPA 33 Standard for Spray Applica4on Using Flammable or Combus4ble Materials NFPA 33 Standard for Spray Applica4on Using Flammable or Combus4ble Materials Fire Preven4on Officers Associa4on of Bri4sh Columbia 2013 Annual Seminar Kelowna, Bri4sh Columbia May 9, 2013 NFPA 33 Scope

More information

PRIMATECH WHITE PAPER PROCEDURE FOR DUST HAZARD ANALYSIS (DHA)

PRIMATECH WHITE PAPER PROCEDURE FOR DUST HAZARD ANALYSIS (DHA) PRIMATECH WHITE PAPER PROCEDURE FOR DUST HAZARD ANALYSIS (DHA) Glossary of Terms Combustible dust: A finely divided combustible particulate solid that presents a flash-fire hazard or explosion hazard when

More information

DEPARTMENT OF DEFENSE HANDBOOK COVERED STORAGE 1. THE FOLLOWING PAGES OF MIL-HDBK-1032/2 HAVE BEEN REVISED AND SUPERSEDE THE PAGES LISTED:

DEPARTMENT OF DEFENSE HANDBOOK COVERED STORAGE 1. THE FOLLOWING PAGES OF MIL-HDBK-1032/2 HAVE BEEN REVISED AND SUPERSEDE THE PAGES LISTED: NOTICE OF CHANGE INCH-POUND NOTICE 1 15 May 1999 TO ALL HOLDERS OF : DEPARTMENT OF DEFENSE HANDBOOK COVERED STORAGE 1. THE FOLLOWING PAGES OF HAVE BEEN REVISED AND SUPERSEDE THE PAGES LISTED: NEW PAGE

More information

BLABO. Non-man entry tank cleaning and oil recovery system. Automated tank cleaning and. Designed for large, containing crude oil or heavy fuel oil

BLABO. Non-man entry tank cleaning and oil recovery system. Automated tank cleaning and. Designed for large, containing crude oil or heavy fuel oil BLABO Non-man entry tank cleaning and oil recovery system Automated tank cleaning and aboveground oil storage recovery tanks solutions Designed for large, containing crude oil or heavy fuel oil health,

More information

The development Of the new CEN standard For fire fighting foam systems EN13565 Part 2

The development Of the new CEN standard For fire fighting foam systems EN13565 Part 2 The development Of the new CEN standard For fire fighting foam systems EN13565 Part 2 Presented by: Bob Whiteley Engineering & Standards Manager Tyco Fire & Integrated Solutions Ltd Convenor CEN/TC191/WG2

More information

HYDROCARBONENGINEERING June June 2015

HYDROCARBONENGINEERING June June 2015 www.hydrocarbonengineering.com Controlled Combustion Arthur Groenbos, Yokogawa Europe, discusses tunable diode laser gas analysis for combustion management in fired heaters. While fired heaters are used

More information

Notice on the implementation of the amendments to the FSS Code in resolution MSC.339(91)

Notice on the implementation of the amendments to the FSS Code in resolution MSC.339(91) C C S 通函 Circular China Classification Society (2013) Circ.111 /Total No.397 25/07/2013 (total pages:18) To relevant departments of CCS Headquarters, Shanghai Rules and Research Institute, plan approval

More information

DELUGE SYSTEMS FALSE OPERATIONS

DELUGE SYSTEMS FALSE OPERATIONS DELUGE SYSTEMS FALSE OPERATIONS Deluge Water/Foam Systems: False operations result in significant water/foam damages and might also cause destruction by fire! Deluge Foam Systems: In case of Fire, the

More information

Department of Public Safety

Department of Public Safety Terry E. Branstad Governor Kim Reynolds Lt. Governor Department of Public Safety Roxann M. Ryan Commissioner Liquid Propane Informational guide to submitting plans Plans are to be submitted to: State Fire

More information

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST July 1, 2010 SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST TENANT IMPROVEMENTS Address: Permit #: Inspector: Date: Status: Inspector: Date: Status: A-Approved; AC-Approved w/comments;

More information

Design & Use of Ground Based Pumps Guidance Document

Design & Use of Ground Based Pumps Guidance Document Design & Use of Ground Based Pumps The information and recommendations in this guidance are given in good faith and belief in their accuracy at the time of publication, but do not imply any legal liability

More information

ATEX 1999/92/EC (Borehole Directive 92/91/EEC) PROCESS SAFETY ASPECTS

ATEX 1999/92/EC (Borehole Directive 92/91/EEC) PROCESS SAFETY ASPECTS ATEX 1999/92/EC (Borehole Directive 92/91/EEC) PROCESS SAFETY ASPECTS ATEX 1999/92/EC QUOTE, ARTICLE 3 protection against explosions, following basic principles: - Avoid leaks / avoid mixing with air -

More information

NEBOSH International Technical Certificate in Oil and Gas Operational Safety

NEBOSH International Technical Certificate in Oil and Gas Operational Safety IOG1 - Element 4 - Fire protection and emergency response July 2012 NEBOSH International Technical Certificate in Oil and Gas Operational Safety Licence details RMS Publishing Victoria House, Lower High

More information

FIRE PROTECTION PROGRAM

FIRE PROTECTION PROGRAM Fire Protection Program Page 1 of 13 FIRE PROTECTION PROGRAM 1.0 Objective The objective of this performance assessment is to evaluate the effectiveness of the laboratory's fire protection program as implemented

More information

ISHRAE. Guideline document to ISO Version 1 Feb Indian Society of Heating, Refrigerating and Air Conditioning Engineers

ISHRAE. Guideline document to ISO Version 1 Feb Indian Society of Heating, Refrigerating and Air Conditioning Engineers ISHRAE Guideline document to ISO 5149 Version 1 Feb 2017 Indian Society of Heating, Refrigerating and Air Conditioning Engineers Acknowledgement On behalf of ISHRAE I wish to thank and acknowledge the

More information

Domino Effects and Storage Sites of Propane in the Netherlands

Domino Effects and Storage Sites of Propane in the Netherlands Domino Effects and Storage Sites of Propane in the Netherlands Soedesh Mahesh Workshop Domino Effects in the Process Industry Bologna, Italy April 16-17, 2014 Content 1. Introduction 2. Guidelines to prevent

More information

Description of the European standard EN 378: Refrigerating systems and heat pumps Safety and environmental requirements

Description of the European standard EN 378: Refrigerating systems and heat pumps Safety and environmental requirements : Refrigerating systems and heat pumps Safety and environmental requirements Prof. Dr. Risto Ciconkov, dipl. ing. Faculty of Mechanical Engineering, University Ss. Cyril & Methodius Skopje, R. Macedonia

More information

Liquefied Petroleum Gas Facility Written Fire Safety Analysis

Liquefied Petroleum Gas Facility Written Fire Safety Analysis Liquefied Petroleum Gas Facility Written Fire Safety Analysis For Completed by Facility manager Received by Fire Department/Emergency Response representative Date Date INDEX Page Introduction 2 Conducting

More information

Process Control PIP PCEA001 Fixed Gas Detection Guidelines

Process Control PIP PCEA001 Fixed Gas Detection Guidelines November 2015 Process Control PIP PCEA001 PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities, this Practice has been prepared from the technical

More information

Exploration and extraction can be on land or on offshore platforms. Once extracted, ground transportation is done by means of oil or gas pipelines,

Exploration and extraction can be on land or on offshore platforms. Once extracted, ground transportation is done by means of oil or gas pipelines, Oil & Gas Exploration and extraction can be on land or on offshore platforms. Once extracted, ground transportation is done by means of oil or gas pipelines, FPSO vessels, tankers, LNG carriers, etc. The

More information