DOUGLAS INTEREMDIATE / ELEMENTARY SCHOOL MASSACHUSETTS SCHOOL BUILDING AUTHORITY FINAL DESIGN PROGRAM / ADVANCED SCHEMATIC DESIGN SUBMISSION

Size: px
Start display at page:

Download "DOUGLAS INTEREMDIATE / ELEMENTARY SCHOOL MASSACHUSETTS SCHOOL BUILDING AUTHORITY FINAL DESIGN PROGRAM / ADVANCED SCHEMATIC DESIGN SUBMISSION"

Transcription

1 DOUGLAS INTEREMDIATE / ELEMENTARY SCHOOL MASSACHUSETTS SCHOOL BUILDING AUTHORITY FINAL DESIGN PROGRAM / ADVANCED SCHEMATIC DESIGN SUBMISSION SECTION SIX: PROGRAM DESIGN Security and Visual Access Requirements Instructional Technology Room Data Sheets Preliminary Summary of Ineligible Spaces Massachusetts School Building Authority Project Nº: February 2011 Schematic Design Submission Douglas Intermediate Elementary School 6.0

2 SECURITY AND VISUAL ACCESS REQUIREMENTS The New requires a careful balance between public access, emergency egress and security control. There are four main public entries; three on the first floor and a fourth on the second floor located at the gymnasium lobby. In addition, two emergency exits are located from the gym and a service/emergency exit at the first floor kitchen receiving area. Access Control The location of the New occupies the center of the campus plan and allows for vehicular and pedestrian access to the north, south and west side of the New Elementary School. Buses are dedicated for drop off and pick up from the southern access drive and parent drop-off and pick-up from Gleason Court. Access to the building will be from the two main entrances adjacent to the Administration Wing, supervised by staff personnel. The lower level entry below the gym lobby on the first floor is for emergency egress only and will be locked at all times during school hours. The upper level gym lobby entry will be for staff entry/egress only, emergency egress and off-hour community use. Staff entry will be equipped with electronic locks and proximity readers, whereby users can be tracked, and if need be, deleted via a computerized database. Classroom doors are lockable from the inside during lockdown mode. Visual Security A video monitoring system will be installed at entrances/exits in addition to cameras at the building/site exteriors. The camera system will be monitored at the main secretaryʼs desk and will include a DVR. In addition, the video monitoring signal is also available for real time viewing at the Douglas Police Department. In addition to the video system, the main office will have a physical view of all public entrances and other administrative spaces will have a view of the teacher/gym entrance. Massachusetts School Building Authority Project Nº: February 2011 Schematic Design Submission Douglas Intermediate Elementary School 6.1

3 INSTRUCTIONAL TECHNOLOGY The mission of the Douglas Public Schools Instructional Technology Department is to support the educational environment through the development, implementation, training, and maintenance of high quality instructional technology resources that foster student-centered instruction in order to meet the needs of all learners within the school district. The Douglas Public Schools is committed to the effective integration of technology to support, enrich, and extend teaching and learning. Through integrated learning experiences, students will develop the technology literacy needed to acquire and manage knowledge, to succeed in school, and to thrive in an ever changing world. All members of our school community will use technology to excel as learners and develop as leaders as they skillfully use technology to access, retrieve, and use information school-wide, community-wide, nationally, and internationally. Classrooms, labs, special program, and school wide technology applications will be designed for smart use and equipped with the appropriate levels of audio/visual capabilities, and each subject area will utilize appropriate technologies to support the specific curriculum objectives. Multiple use and accessible technologies such as SMART boards, plug-and-play capabilities, broadcasting, communication tools, web-based applications, virtual instruction, and specialized software programs will allow to meet individual student needs and interests, as well as enhance the delivery of curriculum, communication, and community connections as students learn in a flexible and efficient manner. Our goal is that technology integration will remain flexible and allow for multiple-use purposes and applications as we continue to meet the changing demands of the community. The students develop capabilities as learners in a multi-media learning environment. Massachusetts School Building Authority Project Nº: February 2011 Schematic Design Submission Douglas Intermediate Elementary School 6.2

4 DOUGLAS INTEREMDIATE / ELEMENTARY SCHOOL MASSACHUSETTS SCHOOL BUILDING AUTHORITY FINAL DESIGN PROGRAM / ADVNACED SCHEMATIC DESIGN SUBMISSION PART SIX: PROGRAM DESIGN Room Data Sheets Massachusetts School Building Authority Project Nº: February 2011 Schematic Design Submission Douglas Intermediate Elementary School 6.3

5 Typical Classroom Grades 2nd thru 5th ADJACENT CLASSROOM 5'-0" SMART- WALL MTD PROJECTOR SMART BD COMPUTER DESK STORAGE CUBBIES BUILT-IN STORAGE BELOW/ BEHIND SLIDING MB WALL WINDOW COMPUTER WORKSTATION (2) (1) BASE AND WALL CABINETS AND SINK Description: Second through Fifth Grade Classrooms Net Area: 950 SF Occupancy: 1 teacher, 24 students Quantity: 24 Telephone: Wall phone Data: WI-FI and wall-mounted data outlets (computers - F&E) A/V: 5'-0" Smartboard, wall-mounted projector w/sound amplification system Teacher's desk, teacher's chair, teacher's storage, wardrobe, student desks, round work tables, student work chairs, computer desks, computer chairs, computers, singleloaded bookshelves, supply storage wardrobes, marker boards, tack boards, computer counter. Lighting: Indirect fluorescent lighting HVAC: Central Plumbing: Sink in each room Acoustics: Sound-absorptive ceiling tiles Handicap Access: Yes Finish Quality: Typical classroom Ceiling: Suspended ceiling tiles Users: Teachers, students Adjacency: Other same-grade classrooms, respective project areas Views: North, South & East facing

6 Self-Contained SPED Life Skills Classroom BASE AND WALL CABINETS AND SINK D.W. COMPUTER WORKSTATION BUILT-IN STORAGE BEHIND SLIDING MARKER WALL REGRIGERATOR & RANGE KITCHENETTE TOILET STORAGE CUBBIES WALL MTD PROJECTOR 5'-0" SMART- Description: Special needs life skill classroom Net Area: 950 SF Classroom! 48 SF Toilet Occupancy: 2 teachers, 16 students Quantity: 1 Telephone: Wall phone Data: WI-FI and wall-mounted data outlets (computers - F&E) A/V: 5'-0" Smartboard, wall-mounted projector w/sound amplification system Teacher desks, teacher chairs, teacher storage wardrobes, reading/drawing tables, student desks, student chairs, storage cabinets and bins, bookcases, kitchenette, marker boards, tack boards, computer counter. Lighting: Indirect fluorescent lighting HVAC: Central Plumbing: Sink in each room, toilet Acoustics: Sound-absorptive ceiling tiles Finish Quality: Typical classroom Users: Teachers, students Adjacency: Central corridor Views: South facing

7 Typical SPED Learning Center BOOK CASES & STORAGE BINS S 5'-0" SMART- TEACHER'S STATION COMPUTER WORKSTATION Description: Moderate special needs half-size classroom, reading area, and resource room Net Area: 500 SF Occupancy: 1 teacher, 8 students Quantity: 2 Telephone: Wall phone Data: WI-FI and wall-mounted data outlets (computers - F&E) A/V: 5'-0" Smartboard, wall-mounted projector w/sound amplification system Teacher desk, teacher chair, teacher storage wardrobe, reading/drawing tables, student desks, student chairs, storage cabinets and bins, bookcases, marker board, tack board, computer counter Lighting: Indirect fluorescent lighting HVAC: Central Acoustics: Sound-absorptive ceiling tiles Finish Quality: Typical classroom Users: Teachers, students Adjacency: Central corridor Views: North facing

8 SPED Learning Center COMPUTER WORK STATION 5'-0" SMART- S WALL MOUNTED PROJECTOR TEACHER'S STATION BOOK CASES & STORAGE BINS Description: Moderate special needs half-size classroom, reading area, and resource room Net Area: 420 SF Occupancy: 1 teacher, 8 students Quantity: 2 Telephone: Wall phone Data: WI-FI and wall-mounted data outlets (computers - F&E) A/V: 5'-0" Smartboard, wall-mounted projector w/sound amplification system Teacher desk, teacher chair, teacher storage wardrobe, reading/drawing tables, student desks, student chairs, storage cabinets and bins, bookcases, marker board, tack board, computer counter. Lighting: Indirect fluorescent lighting HVAC: Central Acoustics: Sound-absorptive ceiling tiles Finish Quality: Typical classroom Users: Teachers, students Adjacency: Central corridor Views: South facing

9 Speech/Reading/Math Support Room BOOK CASES & STORAGE BINS READING BOOK CASES & STORAGE BINS SPEECH MATH Description: Moderate special needs classroom, reading area, and resource room Net Area: 130 SF EA. Occupancy: 1 teacher, 4 students Quantity: 3 Telephone: Wall phone Data: WI-FI and wall-mounted data outlets (computers - F&E) Teacher desk, teacher chair, reading/drawing tables, student desks, student chairs, storage cabinets and bins, bookcases Lighting: Indirect fluorescent lighting HVAC: Central Acoustics: Sound-absorptive ceiling tiles Finish Quality: Typical classroom Users: Teachers, students Adjacency: Central corridor Views: North & West facing

10 Self-Contained SPED/Autism Classroom COMPUTER WORKSTATION BASE AND WALL CABINETS AND SINK (1) (2) TOILET BUILT-IN STORAGE BELOW/BEHIND SLIDING MB WALL STORAGE CUBBIES SMART BD COMPUTER DESK WALL MTD PROJECTOR 5'-0" SMART- ADJACENT CLASSROOM Description: Autistic classroom Net Area: 950 SF Classroom! 48 SF Toilet Occupancy: 2 teachers, 16 students Quantity: 2 Telephone: Wall phone Data: WI-FI and wall-mounted data outlets (computers - F&E) A/V: 5'-0" Smartboard, wall-mounted projector w/sound amplification system Teacher desks, teacher chairs, teacher storage wardrobes, reading/drawing tables, student desks, student chairs, storage cabinets and bins, bookcases, marker boards, tack boards, computer counter. Lighting: Indirect fluorescent lighting HVAC: Central Plumbing: Sink in classroom, toilet Acoustics: Sound-absorptive ceiling tiles Finish Quality: Typical classroom Users: Teachers, students Adjacency: Central corridor, Gymnasium, Elevator Views: West facing

11 Occupational Therapy / Physical Therapy Room BOOK CASES & STORAGE CABINETS COMPUTER WITH DESK LOBBY STORAGE CABINET PHYSICAL THERAPY S OCCUPATIONAL THERAPY COMPUTERS WITH DESKS S BOOK CASES & STORAGE CABINETS BOOK CASES Description: Therapy room Net Area: 340 SF Physical Therapy! 200 SF Occupational Therapy Occupancy: 1 Teacher & 4 Students (PT)! 1 Teacher & 6 Students (OT) Quantity: 1 EA Telephone: Wall phone Data: WI-FI and wall-mounted data outlets (computer - F&E) Teacher's desk, teacher's chair, teacher's storage wardrobe, reading/drawing table, student chairs, tables, storage cabinets and bins, bookcases, floor mats and cushions, ceiling-suspended swing, marker boards, tack boards Lighting: Indirect fluorescent lighting HVAC: Central Acoustics: Normal Finish Quality: Durable Flooring: Floor mats, linoleum Users: Teachers, community (PT) Adjacency: Central corridor, gymnasium, elevator Views: South facing

12 Music Classroom EGRESS TO EXTERIOR 12'-0" SINK & BASE CABINET WINDOW STORAGE CABINET PROJECTOR INSTRUMENT STORAGE CLERESTORY DOTTED 5'-0" SMART- Description: Music instruction and practice classroom Net Area: 1,237 SF! 97 SF Music Practice Occupancy: 1 teacher, 45 students (band-size) Quantity: 1 Telephone: Wall phone Data: WI-FI and wall-mounted data outlets (computers - F&E) A/V: Local sound system, 5'-0" Smartboard, wall-mounted projector w/sound amplification system Teacher's desk, teacher's chair, teacher's storage wardrobe, student music chairs, music stands, upright piano, bookshelves, assorted instrument storage units, tack & marker boards, student desks. Lighting: Indirect fluorescent lighting HVAC: Central Plumbing: Sink Acoustics: Absorptive/reflective ceiling tiles, fabric-wrapped acoustic panels on upper walls, acoustic wall separation from adjacent rooms and corridor Finish Quality: Typical classroom Ceiling: See Acoustics Users: School and community use Adjacency: Platform, Cafetorium, central corridor Views: North & West facing

13 Gymnasium EGRESS TO EXTERIOR 100'-0" (CLERESTORY ABOVE) (CLERESTORY ABOVE) RETRACTABLE WOOD BLEACHERS PARTITION CURTAIN GYM STORAGE BLDG STORAGE WALL PADS 60'-0" WALL PADS CEILING- MOUNTED RETRACTABLE BASKETBALL HOOP AND BACK, TYPICAL EGRESS TO EXTERIOR (CLERESTORY ABOVE) Description: Gymnasium for basketball with spectator seating for 100; multi-use for assemblies and community events Net Area: 6,000 SF Occupancy: - Sporting events: 100 spectators! - Assemblies: 550 persons Quantity: 1 Telephone: Emergency wall phone Data: WI-FI and wall-mounted data outlets A/V: Local sound system, wired for CCTV Folding/stackable chairs for assemblies, retractable bleachers, fixed & retractable basketball hoops Lighting: High-intensity fluorescent lighting, dimmable HVAC: Independent ventilation system Security: Secured for after-hours use and motion detectors Acoustics: Sound-absorptive ceiling and wall materials Finish Quality: Very durable Ceilings: Acoustic metal deck, painted Walls/Partitions: CMU with GWF, painted acoustic wood fiber panels, wood trim, partition curtain Flooring: Sprung wood gym floor Users: School and community use Adjacency: Parking, playfield, community access, PE office, gym storage, central corridor, PT, Autistic classrooms Views: North, South & West facing

14 Gym Storeroom GYMNASIUM GYM STORAGE METAL STORAGE SHELF UNIT, TYP. Description: Storage closet for gymnasium equipment and assembly chairs Net Area: 150 SF Occupancy: N/A Quantity: 1 Telephone: N/A Data: N/A Clock/Speaker: N/A Metal shelving units Power: N/A Lighting: Fluorescent lighting HVAC: Ventilation Security: N/A Acoustics: N/A Finish Quality: Very durable Ceiling: Painted Flooring: Painted concrete Users: Faculty, students, community Adjacency: Gymnasium Views: N/A

15 PE Office BOOK CASE FILE CABINET MARKER TACK WINDOW Description: PE teacher office Net Area: 110 SF Occupancy: 1 teacher Quantity: 1 Telephone: Wall phone Data: WI-FI and wall-mounted data outlets Teacher desk, teacher chair, file cabinet, side chairs, marker board, tack board Lighting: Fluorescent lighting HVAC: Central Acoustics: Normal Finish Quality: Durable Users: Teacher Adjacency: Gymnasium Views: South facing

16 Cafetorium/Platform STORAGE PLATFORM ACCESSIBLE RAMP STEPS STORAGE KITCHEN MARKER GLASS COLUMNS WOOD BENCH 180 SEATS WOOD BENCH EGRESS TO EXTERIOR Description: Cafetorium for student dining, performances, and assemblies Net Area: - Cafetorium: 4,140 SF! - Platform: 1,000 SF Occupancy: - Dining: 184 students! - Assembly: 350 persons Quantity: 1 Telephone: Emergency wall phone Data: WI-FI and wall-mounted data outlets A/V: Local sound system, wired for CCTV Round folding dining tables with moveable chairs, cash register table, coat rack / lost and found bin, stacking chairs w/dolly, marker board, tack board Lighting: Indirect fluorescent lighting with dimmer switch, track lighting system for stage HVAC: Independent HVAC system Security: Secured for after-hours use, motion detectors, and electronic door locks Acoustics: Sound-absorptive ceiling tiles and wall materials Finish Quality: Durable Ceilings: Suspended acoustic ceiling tiles Walls/Partitions: CMU and GWB, ceramic tile wainscot Flooring: - Cafeteria: Linoleum!- Platform: Wood Users: School and community use Adjacency: Parking, deliveries, kitchen, storage, central corridor, exterior Views: South facing

17 Cafetorium Storage STORAGE STORAGE CAFETORIUM Description: Storage room for chairs, tables, and other cafetorium furniture Net Area: 244 SF! 90 SF Quantity: 1 EA. Telephone: N/A Data: N/A Clock/Speaker: N/A Chair stacking carts Power: N/A Lighting: Fluorescent lighting HVAC: Ventilation Security: Lockable from outside Acoustics: N/A Finish Quality: Durable Ceilings: Suspended acoustic ceiling tiles Users: Staff, community Adjacency: Cafetorium Views: N/A

18 CLERESTORY ABOVE TACK Art Classroom MARKER MARKER COLUMN EGRESS TO EXTERIOR STORAGE ROOM 5'-0" SMART PROJECTOR 12'-0" COMPUTER WORK STATIONS MARKER HALF WALL STORAGE CABINET BOOKCASE SINKS, BASE AND WALL CABINETS AND FULL HGHT STORAGE CABINETS Description: Art classroom Net Area: - Art classroom: 1,200 SF! - Storage room: 120 SF Occupancy: 1 teacher, 24 students Quantity: 1 Telephone: Wall phone Data: WI-FI and wall-mounted data outlets A/V: 5'-0" Smartboard, ceiling-mounted projector w/sound amplification system Teacher's desk, teacher's chair, teacher's storage cabinet, epoxy-top student tables, student chairs, computer desks, computer chairs, bookcases, epoxy-top work and storage tables, flat file drawers, storage shelves, sinks, tack boards, marker boards. Lighting: Indirect fluorescent lighting HVAC: Central Plumbing: (2) Sinks Acoustics: Sound-absorptive ceiling tiles Finish Quality: Typical classroom Users: Teachers, students, community Adjacency: Central corridor Views: North facing

19 Kitchen STAFF LOCKERS DRY STORAGE ROOM FREEZER COOLER JAN SINK TOILET TOILET KITCHEN EQUIPMENT, TYPICAL CAFETORIUM RECEIVING CUSTODIAL OFFICE KITCHEN OFFICE WINDOW Description: Kitchen for school lunch preparation and lunch lines Net Area: 1,810 SF Occupancy: Food Service Staff Quantity: 1 Telephone: Wall phone in kitchen, desk phone in office Data: 3 data drops in office (computers - F&E) Data drops for cash registers (cash registers - F&E) A/V: Masterclock and intercom systems Office desk, office chair, storage wardrobe, assorted loose kitchenwares Lighting: Fluorescent lighting HVAC: Independent HVAC system / chemical fire suppression Plumbing: Sinks, equipment service, floor drains Security: Door locks Acoustics: Normal Finish Quality: Very durable Ceilings: Washable ceiling tiles Walls/Partitions: Epoxy painted Flooring: Quarry tile Users: Authorized kitchen personal, students for lunch line Adjacency: Parking, deliveries, cafetorium Views: South facing

20 Media Center (IMC) WINDOW SEAT STORY TELLING SOFT SEATING STRG COLUMN SOFT SEATING BOOK SECURITY TACK BOOK CASES TACK CIRCULATION DESK TACK BOOK SECURITY OFFICE WORKROOM SMALL GROUP 5'-0" SMART- PROJECTOR Description: Library with teaching, studying, and story-telling areas Net Area: 3,606 SF Occupancy: 2 Teachers, 48 Students, 1 class in Small Group,! 1 Librarian Quantity: 1 Telephone: Desk phones at circulation desk, small group, office & workroom Data: WI-FI and wall-mounted data outlets (computers - F&E) A/V: 5'-0" Smartboard, wall-mounted projector w/sound amplification system Freestanding bookcases and shelves, reference catalogs, assorted group study/reading tables, study/reading chairs, assorted library seating, upholstered armchairs, coffee table, computer carrels, computer chairs, library staff chairs, library staff desks, book dollies, file cabinets, book security units Lighting: Indirect fluorescent lighting HVAC: Independent HVAC system Acoustics: Sound-absorptive ceiling tiles, acoustic wall separation from adjacent rooms and corridor Finish Quality: Library Flooring: Sheetgood Linoleum Users: Staff, students, community Adjacency: Central corridor Views: North facing

21 Teachers' Lunch Room/Mail Room KITCHENETTE VENDING MACHINE BASE AND WALL CABINETS AND SINK BUILT-IN MAIL BOXES REFRIG. Description: Faculty lunch & mail room Net Area: 214 SF Lunch Room! 100 SF Mail Room Occupancy: Up to 12 teachers Quantity: 1 Telephone: Wall phone Data: WI-FI and wall-mounted data outlets Table & chairs, lounge seating, kitchenette, (refrigerator, range, microwaves, vending machine), mailboxes Lighting: Indirect fluorescent lighting HVAC: Central Plumbing: Sink, disposal Acoustics: Normal Finish Quality: Durable Users: Faculty use Adjacency: Administration corridor Views: North facing

22 Conference Room ADMINISTRATION SIDELIGHT SIDELIGHT Description: Faculty and parent-teacher conference room Net Area: 243 SF Occupancy: Up to 10 adults Quantity: 1 Telephone: Wall phone Data: WI-FI and wall-mounted data outlets Conference table, conference chairs, bookcase, marker board, tack board Lighting: Fluorescent lighting HVAC: Central Acoustics: Normal Finish Quality: Durable Flooring: LInoleum Users: Faculty use Adjacency: Central & administration corridor Views: N/A

23 AV/Storage/Telecom/Network EMERG. ELEC. TELECOM/NETWORK ROOM ELEC. Description: Telecommunications/Network hub room Net Area: 230 SF Occupancy: N/A Quantity: 1 Telephone: Wall phone Data: See below Clock/Speaker: Intercom system No furnishings. Backboards and cable tray (in construction contract) Equipment racks and cabinets for voice/data/video (in construction contract) Power: Per equipment requirements Lighting: Fluorescent lighting HVAC: Air conditioned via dedicated split system Acoustics: N/A Finish Quality: Durable Ceiling: Painted structure Walls: Painted Users: Building management Adjacency: Central corridor Views: N/A

24 COPY MACHINES Main Office/Copy Room/ Storage Room/Waiting Area BASE & WALL CABINETS COPY ROOM STORAGE FILE CABINETS 5'-0" BOOK CASES LOBBY ADMINISTRATION GENERAL OFFICE FILE CABINETS SECURITY PULL-DOWN METAL GRATE WAITING 5'-0" Description: Administration office and front desk for information, visitor sign-in, and other administrative tasks Net Area: 447 SF Main Office/Waiting! 110 SF Copy Room! 54 SF Storage Room Occupancy: 4 administrative personnel Quantity: 1 Telephone: Desk phones, counter phones Data: WI-FI and wall-mounted data outlets, copy machines (computers - F&E) Workstations, desk chairs, bookcases, lateral & vertical files, tack board, base & wall cabinets Lighting: Indirect fluorescent lighting HVAC: Independent HVAC system (connected to other administrative areas) Security: After-hours pull-down grate Acoustics: Normal Finish Quality: Durable Users: Faculty, front lobby, and visitor access Adjacency: Lobby, central corridor, other administration spaces Views: N/A

25 Teachers' Work Room WORK COUNTER & OPEN BASE CABINET COPIERS SIEDLIGHT Description: Faculty work room Net Area: 100 SF/EA Occupancy: Up to 4 teachers Quantity: 2 Telephone: Wall phone Data: WI-FI and wall-mounted data outlets Work counter with base cabinet, printer station, tack board Lighting: Indirect fluorescent lighting HVAC: Central Acoustics: Normal Finish Quality: Durable Users: Faculty Adjacency: Classroom spaces Views: N/A

26 Teachers' Workroom LOBBY SIDELIGHT BASE AND WALL CABINETS AND SINK Description: Faculty work room Net Area: 270 SF Occupancy: Up to 4 teachers Quantity: 1 Telephone: Wall phone Data: WI-FI and wall-mounted data outlets, copy stations Work tables, stacking chairs, printer station, counter with base cabinet, sink, tack board, marker board Lighting: Indirect fluorescent lighting HVAC: Central Plumbing: Sink Acoustics: Normal Finish Quality: Durable Users: Faculty use Adjacency: Central corridor, classroom spaces Views: N/A

27 Principal's Office/Conference STORAGE CABINET BOOKCASES ADMINISTRATION Description: School principal's office and conference space Net Area: 244 SF Occupancy: 1 principal, 4 students / faculty / parents Quantity: 1 Telephone: Desk phone Data: WI-FI and wall-mounted data outlets Principal's desk, principal's chair, conference table, conference chairs, side chairs, bookcases, credenza, storage wardrobe, tack board, marker board Lighting: Fluorescent lighting HVAC: Independent HVAC system (connected to other administrative areas) Security: After-hours pull-down grate Acoustics: Sound-absorptive ceiling tiles Finish Quality: Durable Users: Principal; students, faculty, and parents by admit Adjacency: Other administrative spaces Views: East facing

28 Records Room/Guidance Storage GUIDANCE OFFICE STORAGE RECORDS ROOM FILE CABINETS Description: Official records and Guidance storage Net Area: 40 SF / 35 SF Occupancy: N/A Quantity: 1 ea. Telephone: Wall telephone Data: N/A Clock/Speaker: N/A Assorted vertical and lateral file cabinets Lighting: Fluorescent lighting HVAC: Central (w/admin) Security: N/A Acoustics: Normal Finish Quality: Durable Users: Faculty Adjacency: Other administrative spaces Views: N/A

29 HIGH Title 1 Offices/Spare Office HIGH FILE CABINETS TITLE 1 OFFICE ADMINISTRATION SPARE OFFICE WINDOW Description: Title 1 offices Net Area: 250 SF Title 1! 157 SF Spare Occupancy: 3 counselor, 3 students! 1 counselor, 4 students Quantity: 1 ea. Telephone: Desk phones Data: WI-FI and wall-mounted data outlets (computer - F&E) Counselor desk, counselor chairs, storage wardrobe, bookcase, vertical & lateral file, group table, side chairs, tack board, marker board Lighting: Fluorescent lighting HVAC: Independent HVAC system (connected to other administrative areas) Security: After-hours pull-down grate Acoustics: Normal Finish Quality: Durable Users: Students, faculty, parents Adjacency: Other administrative spaces Views: North/East facing

30 Guidance Office ADMINISTRATION Description: Guidance counselor office, private group discussion Net Area: 133 SF Occupancy: 1 counselor, 2 students Quantity: 2 Telephone: Desk phone Data: WI-FI and wall-mounted data outlets (computer - F&E) Counselor desk, counselor chair, storage wardrobe, bookcase, lateral file, side chairs, tack board Lighting: Fluorescent lighting HVAC: Independent HVAC system (connected to other administrative areas) Security: After-hours pull-down grate Acoustics: Normal Finish Quality: Durable Users: Students, faculty, parents Adjacency: Other administrative spaces Views: East facing

31 Nurse's Office/Waiting Resting/Exam Room Toilet ADMINISTRATION REFRIGERATOR WAITING TACK S PRIVACY CURTAIN, TYPICAL EXAM COTS BASE AND WALL CABINETS AND SINK EXAM TABLE HIGH NURSE'S OFFICE TOILET ROOM WINDOW LOCKABLE MEDICAL AND SUPPLIES CABINETS Description: Nurse's office and resting/exam room Net Area: - Resting/Exam: 300 SF!- Nurse/waiting room: 317 SF!- Toilet room: 64 SF Occupancy: 1 nurse, 3 students in cots Quantity: 1 Telephone: Wall phone in waiting area and desk phone in nurse's office Data: Wall-mounted data outlets (computer - F&E) Nurse's desk, nurse's chair, storage wardrobe, exam tables, resting cots, waiting chairs, privacy curtains, sink base & wall cabinets, refrigerator, tack board, supply cabinets (lockable) Lighting: Fluorescent lighting HVAC: Central Plumbing: Sinks, Toilet Acoustics: Normal Finish Quality: Durable Users: Faculty and student use Adjacency: Central corridor Views: South/East facing

32 Custodian's Office/Workroom, and Storage LOCKABLE STORAGE MTL SHELVING WORK TABLES STORAGE / WORKROOM OFFICE TACK TACK Description: Custodian and building management office, storage, and workroom Net Area: - Office: 59 SF! - Storage/Workroom: 586 SF Occupancy: 2 custodial/building management staff Quantity: 1 ea. Lighting: Fluorescent lighting HVAC: Central Telephone: Wall phones in office and workroom Data: WI-FI and wall-mounted data outlets (computers - F&E) Desks, chairs, vertical file cabinets, storage wardrobe, bookcase, metal shelving units, work tables, storage cabinets, tack boards Acoustics: N/A Finish Quality: Very durable Ceiling: Painted structure Flooring: Concrete sealed on Storage Room, Linoleum on Office Users: Custodial and building management Adjacency: Central corridor, receiving Views: N/A

33 Receiving Area KITCHEN TRASH RECEIVING RECEIVING AREA WATER PUMP CUSTODIAN'S OFFICE EGRESS TO EXTERIOR Functional Description: Receiving and sorting supply deliveries, storing supplies. Net Area: 240 SF Occupancy: N/A Quantity: 1 Telephone: Wall phone Data: N/A Clock/Speaker: Masterclock and intercom system N/A Lighting: Fluorescent lighting HVAC: Ventilation Plumbing: Floor drain Acoustics: N/A Finish Quality: Very durable Ceiling: Painted structure Walls: Painted Flooring: Painted concrete Users: Custodial staff and building management Adjacency: Truck loading area Views: South facing

34 Recycling & Trash Room MTL SHELVING TRASH CART, TYP Description: Temporary recycling and trash holding area for pickup Net Area: 408 SF Occupancy: N/A Quantity: 1 Telephone: N/A Data: N/A Clock/Speaker: Intercom system Metal or plastic waste and recycling carts, metal shelving Lighting: Fluorescent HVAC: Ventilation Plumbing: Hose bib, floor drain (Trash and recyclables to be taken outside by maintenance personnel only) Acoustics: N/A Finish Quality: Very durable Ceiling: Painted structure Walls: Painted Flooring: Painted concrete Users: Custodial staff, building management Adjacency: Truck loading area Views: N/A

35 Typical Boys and Girls Toilet Rooms BOYS GIRLS WATER FOUNTAIN Description: Gender-specific student toilet rooms Net Area: 250 SF each Occupancy: Girls (90), Boys (150) Quantity: 4 Girls' and 4 Boys' (1 each per floor, except on second!(2) on floor) Telephone: N/A Data: N/A Clock/Speaker: Intercom N/A Lighting: Fluorescent lighting HVAC: Ventilation Plumbing: All toilets, fixtures, floor drains, water fountains Security: N/A Acoustics: N/A Finish Quality: Very durable Walls/Partitions: Ceramic tile wainscot, paint / FRP partitions Flooring: Tile Users: Students; can also be used as public toilets for community events Adjacency: Central corridor Views: N/A

36 PRELIMINARY SUMMARY OF INELIGIBLE SPACES DOUGLAS NEW ELEMENTARY SCHOOL To the best of our understanding all spaces associated with the New Douglas Elementary School project are eligible for reimbursement. DOUGLAS MIDDLE SCHOOL The preliminary ineligible spaces at the Middle School include the District Offices / Superintendentʼs Office with a NFA of 2,162 SF. All other spaces associated with the Douglas Middle School project are eligible for reimbursement. Massachusetts School Building Authority Project Nº: February 2011 Schematic Design Submission Douglas Intermediate Elementary School 6.4

Room Data Sheets. Typical Classroom Grades 2nd thru 5th. 4. Technical Criteria. 1. Functional Criteria. 2. Technological Criteria

Room Data Sheets. Typical Classroom Grades 2nd thru 5th. 4. Technical Criteria. 1. Functional Criteria. 2. Technological Criteria Typical lassroom Grades 2nd thru 5th ADJAENT LASSROOM 16'-0" MARKER LOK 8'-0" TAK ORRIDOR MTD PROJETOR OMPUTER TABLE WINDOWS WITH SHADES TAK UBBIES DATA OUTLETS WINDOWS WITH SHADES BUILT-IN BELOW AND BEHIND

More information

EDUCATIONAL SPECIFICATIONS NEW CONSTRUCTION TO: Oxford Middle School Location to be determined November 4, 2016 Approved by BOE on November 29, 2016

EDUCATIONAL SPECIFICATIONS NEW CONSTRUCTION TO: Oxford Middle School Location to be determined November 4, 2016 Approved by BOE on November 29, 2016 EDUCATIONAL SPECIFICATIONS NEW CONSTRUCTION TO: Oxford Middle School Location to be determined November 4, 2016 Approved by BOE on November 29, 2016 Educational Specifications Page 1 Project Overview:

More information

Columns REF, RESPONSIBLE and COMPL TD are provided for your numbering, assignments and control. REF ISSUE RESPONSIBLE COMPL TD

Columns REF, RESPONSIBLE and COMPL TD are provided for your numbering, assignments and control. REF ISSUE RESPONSIBLE COMPL TD PREPARING FOR THE DESIGN OF YOUR SCHOOL CAPITAL PROJECT A Checklist of Issues March 2014, v.1 This document can be used in preparing the stakeholder team for decision-making and for documenting the input

More information

3. 21st Century Learning A. Districtwide Flexible Learning - Allowance for Flexible Furniture $600,000 Subtotal $600,000

3. 21st Century Learning A. Districtwide Flexible Learning - Allowance for Flexible Furniture $600,000 Subtotal $600,000 1. Safety and Security A. Additional Cameras District Wide $382,000 B. Interior Locks Upgrades Allowance $300,000 C. Tilden Entrance Upgrades D. Door and Glass Improvements Allowance $500,000 E. Alert

More information

Allisonville Elementary School Facilities Highlights Built: 1960 Last Major Renovation: 28 years ago Capacity: 650 Current Enrollment: 767

Allisonville Elementary School Facilities Highlights Built: 1960 Last Major Renovation: 28 years ago Capacity: 650 Current Enrollment: 767 Allisonville Elementary School Built: 1960 Last Major Renovation: 28 years ago Capacity: 650 Current Enrollment: 767 ADA improvements are Fire alarms need to be updated Playground equipment needs to be

More information

2014 Bond Project Guide

2014 Bond Project Guide 2014 Bond Project Guide Bush Elementary School Page 1 Instructional Technology Computers, Projectors, Mobile Carts, Document Cameras and Printers Wireless Connectivity New Construction New Tech Center

More information

Maplewood Memorial Library Building Program

Maplewood Memorial Library Building Program Maplewood Memorial Library Building Program 2015 1 The Maplewood Memorial Library builds community and enriches the quality of life throughout Maplewood by bringing together diverse people, information

More information

H107 Video Conference Room

H107 Video Conference Room Capacity: 20 persons White Board (1) Document Camera (1) Door (1) Network connections possible Layout: Seminar style with chairs and tables (moveable) Podium (1) Media Cart (1) Windows (4) Meets all ADA

More information

FOOD SERVICE May 6, 2016

FOOD SERVICE May 6, 2016 FOOD SERVICE May 6, 2016 I. PROGRAM REQUIREMENTS Refer to the project-specific Schedule of Spaces for student stations, square footage, and for any requirements that may differ from the prototype requirements

More information

EDUCATIONAL SPECIFICATION

EDUCATIONAL SPECIFICATION EDUCATIONAL SPECIFICATION FOR HIGH SCHOOL (1,600 Capacity: 9th, 10th, 11th and 12th Grades) Arlington Public Schools Arlington, Virginia December 2004 i EDUCATIONAL SPECIFICATIONS 1,600 Capacity High School

More information

CAPITAL OUTLAY REQUEST - IDENTIFIED AND EMERGING PROJECTS - RANKED 3-Jun-14

CAPITAL OUTLAY REQUEST - IDENTIFIED AND EMERGING PROJECTS - RANKED 3-Jun-14 2014-2015 CAPITAL OUTLAY REQUEST - IDENTIFIED AND EMERGING PROJECTS - RANKED 3-Jun-14 School Item Amount a. Classroom A/R (Increase CR capacity to 804, add l Resource and tutoring spaces needed. Teacher

More information

SPACE NEEDS PROGRAM. Leicester Fire Department. Leicester Fire Station. July 27, 2009

SPACE NEEDS PROGRAM. Leicester Fire Department. Leicester Fire Station. July 27, 2009 Leicester Fire Department July 27, 2009 33 Commercial Street, Suite 1 TABLE OF CONTENTS TABLE OF CONTENTS STAFFING AND PARKING I-1 SPACE ALLOCATION I-2 APPARATUS AND SUPPORT APPARATUS ROOM I-4 HAZMAT AND

More information

LINCOLN HIGH SCHOOL MODERNIZATION BEX IV COMMUNITY MEETING JUNE 23, 2016

LINCOLN HIGH SCHOOL MODERNIZATION BEX IV COMMUNITY MEETING JUNE 23, 2016 LINCOLN HIGH SCHOOL MODERNIZATION BEX IV COMMUNITY MEETING JUNE 23, 2016 PROJECT OVERVIEW PROJECT OVERVIEW + PRE-DESIGN BEGAN IN FALL OF 2015 + EXISTING CONDITIONS ANALYSIS + PROJECTED GROWTH IN HIGH SCHOOL

More information

WILLIAM & MARY CUSTODIAL TASK & FREQUENCY LIST. PUBLIC SPACE: ENTRANCES, LOBBIES, AND CORRIDORS Daily Weekly Monthly Quarterly Yearly

WILLIAM & MARY CUSTODIAL TASK & FREQUENCY LIST. PUBLIC SPACE: ENTRANCES, LOBBIES, AND CORRIDORS Daily Weekly Monthly Quarterly Yearly WILLIAM & MARY CUSTODIAL TASK & FREQUENCY LIST PUBLIC SPACE: ENTRANCES, LOBBIES, AND CORRIDORS Daily Weekly Monthly Quarterly Yearly Collect & properly dispose of recycling as needed Dust, or wipe all

More information

University of Delaware

University of Delaware KEY STATION Campus must have a key station minimum 20 x 16 1 Computer hook up for time and attendance Furniture Seating for 20 Employee mailbox 3 Key Boxes (2 boxes should hold 30 keys; 1 box should hold

More information

2015 Building Condition Survey Summary Mosaic Associates Architects 02/19/16

2015 Building Condition Survey Summary Mosaic Associates Architects 02/19/16 1. General: This summary is offered as a supplement to the 2015 Building Condition Survey being filed with SED on behalf of the District. All cost estimates are preliminary, and should be re-evaluated

More information

FOOD SERVICE May 6, 2016

FOOD SERVICE May 6, 2016 FOOD SERVICE May 6, 2016 I. PROGRAM REQUIREMENTS Refer to the project-specific Schedule of Spaces for student stations, square footage, and any requirements that may differ from the prototype requirements

More information

VOTER BOND REFERENDUM 2018 SUMMARY OF WORK PROPOSED

VOTER BOND REFERENDUM 2018 SUMMARY OF WORK PROPOSED Ashton Elementary School 1 Masonry Repair $ 42,781.50 2 Replace HVAC $ 375,000.00 3 Replace SAT @ Various Locations $ 92,364.00 3 Recoat & Resurface Exterior Paved Play Area $ 135,978.30 3 Various Technological

More information

Food needs to be in sealed containers 03. FOOD: Unsealed, left in

Food needs to be in sealed containers 03. FOOD: Unsealed, left in 01A. ODOR: Unusual or 6/14/2017 14:15offensive Boys room Urine smell 01A. ODOR: Unusual or 6/14/2017 15:16offensive Office Odor and poor air flow x 01B. TEMPERATURE: 6/14/2017 13:42Uncomfortable 202 Warm

More information

Ichabod Crane Central School District 2018 Capital Project Preliminary Estimate

Ichabod Crane Central School District 2018 Capital Project Preliminary Estimate Health & Safety 1,399,000 Academics & Program 17,140,800 Physical Education & Athletics 5,922,000 Building Infrastructure 3,103,800 Site Infrastructure 1,049,600 TOTAL SCOPE OF WORK 28,615,200 PROPOSED

More information

3 rd Floor Programming Date: April 24, 2011

3 rd Floor Programming Date: April 24, 2011 3 rd Programming Date: April 24, 2011 Classroom/Bauer III 3 rd Room Specifications This document provides space allocations, functions and detail room specification for the supplemental fifth floor for

More information

Chariho Regional School District Five-Year Capital Facilities Improvement Plan (2/10/15)

Chariho Regional School District Five-Year Capital Facilities Improvement Plan (2/10/15) Chariho Regional School District Five-Year Capital Facilities Improvement Plan (2/10/15) School/Department FY 16 FY 17 FY18 FY19 FY20 Chariho Regional High School FY 16 FY 17 FY18 FY19 FY20 *Repair Bleachers

More information

Compilation of Spaces

Compilation of Spaces Compilation of Spaces Suggested Spaces Existing Space Space Requirements Teaching Stations Total S.F. Total S.F. Proposed Program Sq Ft per Student High School Learning Area 7 8,000 # Students Total SF

More information

AGENDA. 1. Call to Order. 2. Approval of Minutes. 3. Approval of Invoices and Commitments. 4. Review Updated Site Analysis and Permitting

AGENDA. 1. Call to Order. 2. Approval of Minutes. 3. Approval of Invoices and Commitments. 4. Review Updated Site Analysis and Permitting PROJECT MANAGEMENT AGENDA Project: George Keverian School Feasibility Study Project No.: 16049 Re: School Building Committee Meeting Meeting Date: 3/22/2017 Meeting Location: Mayor s Conference Room, City

More information

GENERAL ASSIGNMENT CLASSROOM DESIGN STANDARDS

GENERAL ASSIGNMENT CLASSROOM DESIGN STANDARDS University of Iowa FSG - Design & Construction Services Design Reference Manual 2 Design Standards 2.02 Classroom Design Standards Classroom Design Standards GENERAL ASSIGNMENT CLASSROOM DESIGN STANDARDS

More information

Library stacks and records storage 150 LB/SF live load

Library stacks and records storage 150 LB/SF live load SPACE TYPE: LIBRARY Construction Criteria The unit costs for Library space types are based on the construction quality and design features in the following table. This information has been generally organized

More information

Beaufort County Community College. Maintenance and House Keeping Plan

Beaufort County Community College. Maintenance and House Keeping Plan Beaufort County Community College Maintenance and House Keeping Plan Summary: The College s facility management is handled by the Maintenance Department. The Director of Plant and Maintenance Operations

More information

CCES IEQ Walkthrough Summary Spring Room Observations (Responses)

CCES IEQ Walkthrough Summary Spring Room Observations (Responses) 6/5/2017 10:45:07 6/5/2017 10:50:05 6/5/2017 11:01:09 6/5/2017 11:56:25 6/5/2017 10:44:05 6/5/2017 11:08:12 6/5/2017 11:11:14 6/5/2017 11:15:35 6/5/2017 11:16:11 6/5/2017 11:16:38 6/5/2017 11:33:34 6/5/2017

More information

MEDIA CENTER September 30, 2010

MEDIA CENTER September 30, 2010 MEDIA CENTER September 30, 2010 I. PROGRAM REQUIREMENTS Refer to the project-specific Schedule of Spaces for student stations, square footage, and for any requirements that may differ from the prototype

More information

2 Main Office Building BLDG-955A Building Purpose Building Area Administration offices. Training room 7,610 SF Inspection Date August 16, 2016 Inspect

2 Main Office Building BLDG-955A Building Purpose Building Area Administration offices. Training room 7,610 SF Inspection Date August 16, 2016 Inspect 1 Site Summary Address 7200 Bluff Springs Road Austin, TX 78744 Number of Permanent Campus Facilities 2 Original Year of Construction 2014 Total Campus Building Area (combined) 25,314 SF Introduction The

More information

SPACE TYPE: JUDICIAL CHAMBER

SPACE TYPE: JUDICIAL CHAMBER SPACE TYPE: JUDICIAL CHAMBER Construction Criteria The unit costs for Judicial Chamber space types are based on the construction quality and design features in the following table. This information has

More information

C.U.S.D. Elementary Education Specifications. Facility Services. Dr. Janet Young, Ed.D. District Superintendent

C.U.S.D. Elementary Education Specifications. Facility Services. Dr. Janet Young, Ed.D. District Superintendent C.U.S.D. Dr. Janet Young, Ed.D. District Superintendent Elementary Education Specifications Dr. Don Ulrich, Ed.D. Assistant Superintendent Facility Services Kevin Peterson Administrator Facility Services

More information

ALLEGHANY COUNTY PUBLIC SCHOOLS Maintenance Work Request Completion Analysis

ALLEGHANY COUNTY PUBLIC SCHOOLS Maintenance Work Request Completion Analysis ALLEGHANY COUNTY PUBLIC SCHOOLS Maintenance Work Request Completion Analysis 204-205 YEAR-TO-DATE Custodial Supplies 88.00 9.50 $,643. $26,39.60 $27,782.7 Preventive Maintenance 67.00,74.00 $20,372.68

More information

NYC Department of Education

NYC Department of Education Asset: NEW UTRECHT AF - BROOKLYN, 1601 80 STREET, New York, 11214 Inspection Id Inspection Type Time In Last Edited SA : Architectural - Senior 2017-10-31 4:06 PM 2018-06-13 10:51 AM AA : Architectural

More information

BURLEIGH MANOR MIDDLE SCHOOL HOWARD COUNTY PUBLIC SCHOOL SYSTEM

BURLEIGH MANOR MIDDLE SCHOOL HOWARD COUNTY PUBLIC SCHOOL SYSTEM BURLEIGH MANOR MIDDLE SCHOOL HOWARD COUNTY PUBLIC SCHOOL SYSTEM Built in 1992 108, 407 Square Feet 771 Student Population 91 Staff Population 2 Building Supervisors, 3 Custodians 102, 663 Square Feet of

More information

dusty. Room shakes and Student restrooms across All vents need cleaning

dusty. Room shakes and Student restrooms across All vents need cleaning Timestamp Observation: 01B. TEMPERATURE: Room Number or Location/Name: Comments for this room: ADMINISTRATION CUSTODIAL 6/1/2017 15:08:34 Uncomfortable 01B. TEMPERATURE: 310 Etremely warm 6/1/2017 15:11:42

More information

TALLEY STREET ELEMENTARY SCHOOL CITY SCHOOLS OF DECATUR COMMUNITY PRESENTATION DECEMBER 6, 2017

TALLEY STREET ELEMENTARY SCHOOL CITY SCHOOLS OF DECATUR COMMUNITY PRESENTATION DECEMBER 6, 2017 TALLEY STREET ELEMENTARY SCHOOL CITY SCHOOLS OF DECATUR COMMUNITY PRESENTATION DECEMBER 6, 2017 AGENDA INTRODUCTIONS RECAP OF CONSTITUENT INPUT WHAT WE HEARD SITE PLAN PRECEDENT IDEAS WHERE WE ARE 06.23.17

More information

Briar Crest Elementary

Briar Crest Elementary Promises Kept This document includes partial lists of major projects completed at Pattonville Schools since 1986 as part of past bond issues approved by the Pattonville community. Briar Crest Elementary

More information

TIFT COUNTY SCHOOLS E-SPLOST HISTORY

TIFT COUNTY SCHOOLS E-SPLOST HISTORY TIFT COUNTY SCHOOLS E-SPLOST HISTORY July 1, 1997 June 30, 2002 $28,766,187.16 collected July 1, 2002 June 30, 2007 $39,025,830.10 collected July 1, 2007 June 30, 2012 $41,886,155.46 collected July 1,

More information

NYC Department of Education

NYC Department of Education Asset: COLUMBUS AF - BRONX, 925 ASTOR AVENUE, New York, 10469 Inspection Id Inspection Type Time In Last Edited SA : Architectural - Senior 2017-10-31 9:21 AM 2017-11-29 8:45 AM AA : Architectural - Associate

More information

SPACE TYPE: CHILD CARE

SPACE TYPE: CHILD CARE SPACE TYPE: CHILD CARE Construction Criteria The unit costs for Child Care Center space types are based on the construction quality and design features in the following table. This information has been

More information

Master Facility Planning Update School Board Meeting May 26, 2016

Master Facility Planning Update School Board Meeting May 26, 2016 Master Facility Planning Update School Board Meeting May 26, 2016 Master Facilities Committee Overview Reflection of Committee Work Review of District Wide Facility Issues Identified District Wide Facility

More information

CENTRAL KITSAP SCHOOL DISTRICT BOARD PROCEDURE

CENTRAL KITSAP SCHOOL DISTRICT BOARD PROCEDURE MANAGEMENT SUPPORT SERVICES Utilities Management Introduction In support of Central Kitsap School District (CKSD) Utilities Conservation Policy, the following procedure is set forth to establish operating

More information

NEIGHBORS SOUTHWEST NEIGHBORHOOD MEETING December 17, 2014 BEAVERTON SCHOOL DISTRICT SOUTH COOPER MOUNTAIN HIGH SCHOOL

NEIGHBORS SOUTHWEST NEIGHBORHOOD MEETING December 17, 2014 BEAVERTON SCHOOL DISTRICT SOUTH COOPER MOUNTAIN HIGH SCHOOL NEIGHBORS SOUTHWEST NEIGHBORHOOD MEETING December 17, 2014 AGENDA NEIGHBORHOOD MEETING Design Criteria Review 3 Concepts Discussion Q&A DESIGN CRITERIA NEIGHBORHOOD MEETING IMAGE & IDENTITY CIVIC PRESENCE

More information

New High School Concept

New High School Concept Approved Bond Projects for Alamance-Burlington Schools In November 2018, Alamance County citizens approved a $150 million bond project proposal. Bond funds will pay to construct a new high school and provide

More information

03. FOOD: Unsealed, left in room, dirty lunch. 03. FOOD: Unsealed, left in room, dirty lunch. 03. FOOD: Unsealed, left in room, dirty lunch

03. FOOD: Unsealed, left in room, dirty lunch. 03. FOOD: Unsealed, left in room, dirty lunch. 03. FOOD: Unsealed, left in room, dirty lunch 6/2/2017 10:58:002. AIR FRESHENERS D27 03. FOOD: Unsealed, left in room, dirty lunch 6/2/2017 10:54:0boxes A59 Need contained 03. FOOD: Unsealed, left in room, dirty lunch 6/2/2017 11:00:3boxes D28 03.

More information

F. GENERAL REQUIREMENTS Electrical Design Criteria 2006 Edition 4/3/06 School District Palm Beach County Page-1 of 15

F. GENERAL REQUIREMENTS Electrical Design Criteria 2006 Edition 4/3/06 School District Palm Beach County Page-1 of 15 ELECTRICAL DESIGN CRITERIA TABLE OF CONTENTS I GENERAL...2 II CRITERIA...2 A. POWER DISTRIBUTION SYSTEMS...2 1. NORMAL POWER:...2 2. EMERGENCY POWER...3 B. LIGHTING...4 1. GENERAL...4 2. AVERAGE MAINTAINED

More information

784 Classroom design capacity=

784 Classroom design capacity= A Program of Requirements is a management tool that is subject to change during development of Schematic & Detailed Design. It may be modified and/or amended in response to changes in project scope and/or

More information

White Bear Lake Area Schools District 624 ENERGY GUIDELINES

White Bear Lake Area Schools District 624 ENERGY GUIDELINES White Bear Lake Area Schools District 624 ENERGY GUIDELINES Developed by: White Bear Lake Area Schools Energy Steering Committee as part of the Schools for Energy Efficiency (SEE) Program ISD 624 Energy

More information

PENNSYLVANIA. Downloaded

PENNSYLVANIA. Downloaded Housekeeping/Laundry/Maintenance 205.26. Laundry. PENNSYLVANIA Downloaded 01.15.11 (a) A laundry room shall be provided in a facility where commercial laundry service is not used for the washing of soiled

More information

REPORT CARD TO THE COMMUNITY MAY 15, 2018

REPORT CARD TO THE COMMUNITY MAY 15, 2018 REPORT CARD TO THE COMMUNITY MAY 15, 2018 O On May 10, 2014 voters in Greenville ISD approved a $72,275,000 bond election. BOND PROPOSAL PROJECT BOND AMOUNT CONSTRUCT A NEW BOWIE ELEMENTARY SCHOOL $17,600,000

More information

30% Design Community Meeting

30% Design Community Meeting Monday, September 17, 2018 30% Design Community Meeting Site 85-E-W-4 Please sign in on your mobile device: http//communitymeeting.ocps.net/ Site 85-E-W-4 Meeting Agenda September 17, 2018, 6:45PM Welcome

More information

Facilities Management State-Funded and Billable Services

Facilities Management State-Funded and Billable Services Facilities Management State-Funded and Billable Services Facilities Management receives funding to provide maintenance in eligible state-supported areas only, per UCOP guidelines. State-supported areas,

More information

Attending: Representing:

Attending: Representing: WTW Project No. 71-4012 Page 1 of 9 Attending: Representing: Email: Dr. Michael Panza West Jefferson Hills School District (WJHSD) mpanza@wjhsd.net Ryan Snodgrass West Jefferson Hills School District rsnodgrass@wjhsd.net

More information

Cleaning Service Levels

Cleaning Service Levels Restrooms Empty waste receptacles and change liner, as needed. Restock dispensers: soap, paper towel and toilet tissue. Clean mirrors; clean and disinfect urinals, toilets, and sinks. Polish stainless

More information

bold/italic items are revisions to the previous program notes

bold/italic items are revisions to the previous program notes bold/italic items are revisions to the previous program notes Future Meetings: - Dr. Caldwell - Students - Industry Partners (Mike Betts? Sam Geil? Kevin Harmon? TBD by SCCCD) A. Specific Room Requirements

More information

4.0 SERVICES AND SCHEDULE

4.0 SERVICES AND SCHEDULE 4.0 SERVICES AND SCHEDULE 4.1 GENERAL INFORMATION The janitorial services listed below are required at the designated facilities shown in Section 4.3 on the basis of the commencement cleaning times indicated.

More information

NYACK PUBLIC SCHOOLS CAPITAL IMPROVEMENT PLANNING PROCESS

NYACK PUBLIC SCHOOLS CAPITAL IMPROVEMENT PLANNING PROCESS NYACK PUBLIC SCHOOLS CAPITAL IMPROVEMENT PLANNING PROCESS DECEMBER 3, 2013 KEY QUESTIONS 1. What is the time sequence for available funding? (In what years will the funding be available?) 2. What is the

More information

PLATTEVILLE MIDDLE SCHOOL

PLATTEVILLE MIDDLE SCHOOL Architectural The building has aluminum clad wood awning windows in combination with aluminum fixed glass units. They appear to be exterior glazed with insulated glazing. See photo 2. Platteville Middle

More information

Bethlehem University 2008 Projects Summary

Bethlehem University 2008 Projects Summary 2008 Projects Summary 2008 Projects Summary In Addition to following up daily engineering related issues and supervising the Maintenance and Security Departments the University Engineer is involved in

More information

CLEVELAND HEIGHTS UNIVERSITY HEIGHTS CITY SCHOOL DISTRICT MONTICELLO & ROXBORO MIDDLE SCHOOLS INTERIOR DESIGN

CLEVELAND HEIGHTS UNIVERSITY HEIGHTS CITY SCHOOL DISTRICT MONTICELLO & ROXBORO MIDDLE SCHOOLS INTERIOR DESIGN CLEVELAND HEIGHTS UNIVERSITY HEIGHTS CITY SCHOOL DISTRICT MONTICELLO & ROXBORO MIDDLE SCHOOLS INTERIOR DESIGN 04.13.2017 1 MONTICELLO INTERIOR FINISHES PAINT MOULDING WALLS ACCENT DOORS DOOR TRIM/STAIRS

More information

EAST BATON ROUGE PARISH SCHOOL SYSTEM AUCTION LOT LIST November 3, 2018

EAST BATON ROUGE PARISH SCHOOL SYSTEM AUCTION LOT LIST November 3, 2018 1 MONITORS 2 MISC. ELECTRONICS 3 MISC. ELECTRONICS 4 COMPUTERS 5 COMPUTERS 6 MISC. ELECTRONICS 7 TV'S 8 TV'S 9 TV'S 10 TV'S 11 PRINTERS 12 CPU'S 13 CPU'S 14 COMPUTERS 15 MISC. ELECTRONICS 16 COMPUTERS

More information

Conference-Seminar Table & chair Case Study (tiered) Swivel chairs, Continuous Counter Top

Conference-Seminar Table & chair Case Study (tiered) Swivel chairs, Continuous Counter Top III. DESIGN 3.03 Academic Building Interior Space Square Footage Standards A. Plan academic spaces in new buildings and in the major renovation of existing buildings to conform to the following space standards:

More information

EXHIBIT A-1 CITY OF BELLFLOWER JANITORIAL MAINTENANCE SPECIFICATIONS

EXHIBIT A-1 CITY OF BELLFLOWER JANITORIAL MAINTENANCE SPECIFICATIONS EXHIBIT A-1 CITY OF BELLFLOWER JANITORIAL MAINTENANCE SPECIFICATIONS Janitorial Service Specifications Services shall include furnishing all labor, equipment, tools, fuel, materials, insurance, supervision,

More information

TUFTS FACILITIES SERVICES BASELINE MAINTENANCE VS. CHARGEABLE SERVICES

TUFTS FACILITIES SERVICES BASELINE MAINTENANCE VS. CHARGEABLE SERVICES TUFTS FACILITIES SERVICES BASELINE MAINTENANCE VS. CHARGEABLE SERVICES Below is a list of services delivered by the University s Facilities Services Department. While all of these services are delivered

More information

DEERFIELD SCHOOL DISTRICT REFERENDUM Committed to Excellence and Equity in Educating Our Students

DEERFIELD SCHOOL DISTRICT REFERENDUM Committed to Excellence and Equity in Educating Our Students DEERFIELD SCHOOL DISTRICT REFERENDUM Committed to Excellence and Equity in Educating Our Students FACILITY NEEDS THE CHALLENGE Deerfield Middle School/High School building has served the community for

More information

Junk Pickup: Accepted Large Items

Junk Pickup: Accepted Large Items Junk Pickup: Accepted Large Items This list may not include all large items. If you have large items not on this list, please call your recycling collection company for more information. Note: Mixed construction

More information

APPROVED: Dayroom: Space for activities that is situated immediately adjacent to the youth sleeping areas and separated from them by a wall.

APPROVED: Dayroom: Space for activities that is situated immediately adjacent to the youth sleeping areas and separated from them by a wall. GEORGIA DEPARTMENT OF JUVENILE JUSTICE Applicability: { } All DJJ Staff { } Administration { } Community Services {x} Secure Facilities (RYDCs & YDCs) Transmittal # 17-4 Chapter 7: PHYSICAL PLANT Effective

More information

Custodial- General Cleaning Duties

Custodial- General Cleaning Duties Custodial- General Cleaning Duties This document is a general list of scheduled custodial routines. All cleaning is scheduled Sunday through Thursday nights with minimal coverage on weekends while classes

More information

Custodial Guide

Custodial Guide Custodial Guide 2018-2019 Table of Contents Page Number 1 General Items to Note 2-3 Maintenance for Office Areas 4-5 Maintenance for Classrooms and Hallways 6 Maintenance for Lounge Areas 7 Maintenance

More information

Reed, Wells, Benson & Company Consulting Engineeers Firm Registration F-2176 #: COIT CENTRAL TOWER SUITE 1100 12001 NORTH CENTRAL EXPWY DALLAS, TEXAS 75243 RWB PHONE: (972 788-4222 FAX: (972) 788-0002

More information

HOLUM EDUCATION CENTER. Architectural. January 13, 2014 DeForest Area School District

HOLUM EDUCATION CENTER. Architectural. January 13, 2014 DeForest Area School District HOLUM EDUCATION CENTER Architectural The existing building has approximately 41,823 square feet and sets on a lot about 4.14 acres in size. Parking lots are located along the east and west sides of the

More information

3.2.4 OFFICE FACILITIES

3.2.4 OFFICE FACILITIES 3.2.4 OFFICE FACILITIES 3.2.4.1 General The guidelines in this section address offices and office support spaces. Office and office support space standards are used to provide the Project Team with design

More information

NP MASTER LIST OF ASSETS Do NOT Edit

NP MASTER LIST OF ASSETS Do NOT Edit 1 MODEL & MFG. OR NAME AND DESCRIPTION QTY. ID # SERIAL NO. TRADE NAME KITCHEN K2 27-169327 Hobart Under-the-Counter Dishwasher 1 NOTES GONE K4 43-419917 Hobart Convection Oven 1 K6 Wyatt Range - 2 plate

More information

MARY CRAPO CENTER Miller Road, Swartz Creek, Michigan

MARY CRAPO CENTER Miller Road, Swartz Creek, Michigan MARY CRAPO CENTER 8197 Miller Road, Swartz Creek, Michigan MARY CRAPO CENTER 8197 Miller Road, Swartz Creek General Information: - Instructional, Child Care Development Center (West Wing) o (2) Infant/Toddler

More information

Attendees/Absentees. Derek Gallagher DG. Delano Secondary School Additions and Renovations June 6, 2016 Technology User Group Meeting Minutes

Attendees/Absentees. Derek Gallagher DG. Delano Secondary School Additions and Renovations June 6, 2016 Technology User Group Meeting Minutes MEMORANDUM To: From: Attendees/Absentees Derek Gallagher DG Date: June 14, 2016 Comm. No: 152235 Subject: Independent School District #879 Delano Secondary School Additions and Renovations June 6, 2016

More information

NYC Department of Education

NYC Department of Education NYC Department of Education Building Assessment Survey 2017-2018 Asset: P.S. 16 - BROOKLYN, 157 WILSON STREET, New York, 11211 Inspection Id Inspection Type Time In Last Edited EE : Electrical 2017-11-30

More information

Edith Wolford Elementary School Site Improvement Committee

Edith Wolford Elementary School Site Improvement Committee Edith Wolford Elementary School Site Improvement Committee School Site Improvement Committee Members Bob Wedel Principal Robin Lowery Assistant Principal Toby Williams Building Manager Amalia De Ramon

More information

INTERIORS. serving all your interiors needs

INTERIORS. serving all your interiors needs INTERIORS serving all your interiors needs E&I COOPERATIVE SERVICES E&I is the member-owned, not-for-profit sourcing cooperative delivering expertise, solutions and services to higher education and related

More information

TRUCKING CO. OFFICE AND MAINTENANCE FACILITY

TRUCKING CO. OFFICE AND MAINTENANCE FACILITY TRUCKING CO. OFFICE AND MAINTENANCE FACILITY 13 ACRE (566,280 SQ FT.) LOT WITH A 30,000 SQ FT. BUILDING DIVIDED INTO 20,000 SQ. FT. SHOP AND 10,000 SQ. FT. OF OFFICE 1151 West Thompson Road Indianapolis

More information

Educate Challenge. LONG RANGE FACILITIES PLAN Long Range Facilities Plan Committee. June 11, :30 pm 7:30 pm

Educate Challenge. LONG RANGE FACILITIES PLAN Long Range Facilities Plan Committee. June 11, :30 pm 7:30 pm 1 LPA LONG RANGE FACILITIES PLAN Long Range Facilities Plan Committee June 11, 2013 5:30 pm 7:30 pm Educate Challenge Inspire Agenda Campus Observations Update Overview of Demographics High School Program

More information

Service Description Service Shop Customer Charge Comments. Electronic Shop. Electric Shop Yes additional circuits for equipment

Service Description Service Shop Customer Charge Comments. Electronic Shop. Electric Shop Yes additional circuits for equipment Fire alarm repairs Electronic Shop Fire alarm sound level testing Electronic Shop Fire system inspections Electronic Shop Installation of additional fire detection/alarm/supression devices Electronic Shop

More information

FORT ERIE SECONDARY SCHOOL FACILITY INFORMATION. Lake Erie Corridor Secondary Schools Accommodation Review

FORT ERIE SECONDARY SCHOOL FACILITY INFORMATION. Lake Erie Corridor Secondary Schools Accommodation Review FORT ERIE SECONDARY SCHOOL FACILITY INFORMATION Lake Erie Corridor Secondary Schools Accommodation Review November 2012 LAKE ERIE CORRIDOR SECONDARY SCHOOLS ACCOMMODATION REVIEW Fort Erie Secondary School

More information

room data sheet TAMURA HOUSE 396 POWELL STREET, VANCOUVER, BC 1/8 RESIDENTIAL ROOM RM DIVISION ELEMENT REQUIREMENT

room data sheet TAMURA HOUSE 396 POWELL STREET, VANCOUVER, BC 1/8 RESIDENTIAL ROOM RM DIVISION ELEMENT REQUIREMENT RESIDENTIAL ROOM Window Provide an operable window New pressed metal door, 20 min. FPR, in new metal buck or existing wood frame, made good Proximity access control technology door hardware, closer in

More information

F. GENERAL REQUIREMENTS Electrical Design Criteria 2009 Edition 11/23/2009 School District Palm Beach County Page-1 of 17

F. GENERAL REQUIREMENTS Electrical Design Criteria 2009 Edition 11/23/2009 School District Palm Beach County Page-1 of 17 ELECTRICAL DESIGN CRITERIA TABLE OF CONTENTS I GENERAL...2 II CRITERIA...2 A. POWER DISTRIBUTION SYSTEMS...2 1. NORMAL POWER:... 2 2. EMERGENCY POWER... 3 B. LIGHTING...4 1. GENERAL... 4 2. AVERAGE MAINTAINED

More information

CDLC Rehab. Karen E. Conway Conway Creations. As inspired by your logo, hues of blues and yellows enliven durable commercial flooring and hardworking

CDLC Rehab. Karen E. Conway Conway Creations. As inspired by your logo, hues of blues and yellows enliven durable commercial flooring and hardworking CDLC Rehab Karen E. Conway Conway Creations As inspired by your logo, hues of blues and yellows enliven durable commercial flooring and hardworking surfaces. A cohesive mix of light wood tones and steel

More information

ROSLINDALE BRANCH, BPL COMMUNITY PRESENTATION #2 MARTIN J. WALSH, MAYOR CITY OF BOSTON PUBLIC FACILITIES DEPARTMENT 02/07/2018

ROSLINDALE BRANCH, BPL COMMUNITY PRESENTATION #2 MARTIN J. WALSH, MAYOR CITY OF BOSTON PUBLIC FACILITIES DEPARTMENT 02/07/2018 ROSLINDALE BRANCH, BPL COMMUNITY PRESENTATION #2 MARTIN J. WALSH, MAYOR CITY OF BOSTON PUBLIC FACILITIES DEPARTMENT 02/07/2018 MEETING AGENDA TEAM & GOALS ENTRY DESIGN PROGRESS INTERIOR PLAN DESIGN PROGRESS

More information

WPUMC Capital Report Existing Facilities February 19, Maintenance Coordinator George Smit

WPUMC Capital Report Existing Facilities February 19, Maintenance Coordinator George Smit WPUMC Capital Report Existing Facilities February 19, 2017 Maintenance Coordinator George Smit Facility Overview Buildings Sanctuary Building (SB) Sanctuary, Narthex, Lobby Choir Room. Dr. Lee s Office,

More information

IEQ SCHOOL DATA BASE. School Name: Reservoir High School Principal: Patrick Saunderson DATE: 1/23/2017. WORK ORDER NUMBER of POTENTIAL IEQ

IEQ SCHOOL DATA BASE. School Name: Reservoir High School Principal: Patrick Saunderson DATE: 1/23/2017. WORK ORDER NUMBER of POTENTIAL IEQ LOOK-FORS ROOM/LOCATION COMMENTS ADMIN FACILITIES WORK ORDER NUMBER of POTENTIAL IEQ DATE ASSIGNED COMPLETION DATE 30 DAY REVISIT CLOSED 1. No unusual or offensive odors, or temperature discomfort 316,

More information

Norwood Public Library Rendering

Norwood Public Library Rendering The new Norwood Public Library is based on a lot that is a few blocks south of Highway 145 (Main Street) in Norwood, Colorado at the intersection of Pine Street and San Miguel Street. It is owned by the

More information

UNIVERSITY OF OKLAHOMA INSTITUTIONAL FURNITURE CONTRACT #R PRICING SCHEDULE July 1, June 30, 2018

UNIVERSITY OF OKLAHOMA INSTITUTIONAL FURNITURE CONTRACT #R PRICING SCHEDULE July 1, June 30, 2018 Alumni 50 45 Classroom Furniture, Science Tables, Lift Lid Desk, I-Rock Chair Amtab Arconas Best Rite Bretford E&I Contract Carpet For Kids 20 15 Computer Tables, Training Tables, Activity Tables, Cocktail

More information

Mechanical Inspection Plumbing

Mechanical Inspection Plumbing 0811 Fixtures Sinks, drinking fountains, water closets, showers, etc. Classroom Sinks. Classroom sinks (19) are enameled cast iron self rimming side ledge with gooseneck faucet trim with index handles,

More information

DUFFERIN-PEEL CATHOLIC DISTRICT SCHOOL BOARD

DUFFERIN-PEEL CATHOLIC DISTRICT SCHOOL BOARD DUFFERIN-PEEL CATHOLIC DISTRICT SCHOOL BOARD LIGHTING FIXTURES AND CIRCUITRY & SWITCHING SECONDARY SCHOOLS 1. GENERAL 1.1.1. Consultants MUST prepare a Summary of Fixtures which will include catalogue

More information

PROCTOR TERRACE ELEMENTARY SCHOOL

PROCTOR TERRACE ELEMENTARY SCHOOL SCHL DAA Address: Bryden Lane Santa Rosa, CA 95404 Established: 50 Permanent Classrooms: 3 Portable Classrooms: 9 Building Area: Site Area: 40, sq ft 5 acres Students in 5: 484 Students in (Projected):

More information

SCO # 1 & 2 PUNCLH LIST Project Name: VANCLEAVE UPPER ELEMENTARY CLA#: 13003

SCO # 1 & 2 PUNCLH LIST Project Name: VANCLEAVE UPPER ELEMENTARY CLA#: 13003 SCO # 1 & 2 PUNCLH LIST Project Name: VANCLEAVE UPPER ELEMENTARY CLA#: 13003 No. Discipline Sent to Name Item Date Noted Date Resolved How item was resolved SCO # 1Punch listed items were noted below on

More information

Chapter 6: Plumbing Elements and Facilities. 603 Toilet and Bathing Rooms Wheelchair Accessible Compartment

Chapter 6: Plumbing Elements and Facilities. 603 Toilet and Bathing Rooms Wheelchair Accessible Compartment Practical Applications of the 2010 Standards for New Construction -- Part 1I James A. Bostrom Deputy Chief Disability Rights Section U. S. Department of Justice 1 Chapter 6: Plumbing Elements and Facilities

More information

Tillamook High School Bond Projects

Tillamook High School Bond Projects Tillamook High School Bond Projects School Project Description All Buildings Upgrade fire alarm H&S All Buildings Add door lock capability from inside rooms Security All Buildings Install card lock entry

More information

NAZARETH AREA SCHOOL DISTRICT MAINTENANCE DEPARTMENT 357 Tatamy Road, Nazareth, PA FAX

NAZARETH AREA SCHOOL DISTRICT MAINTENANCE DEPARTMENT 357 Tatamy Road, Nazareth, PA FAX NAZARETH AREA SCHOOL DISTRICT MAINTENANCE DEPARTMENT 357 Tatamy Road, Nazareth, PA 18064 610-759-1367 FAX 610-759-7028 TO: FROM: Dr. Riker, Superintendent of Schools Board of School Directors Lewis F.

More information

NYC Department of Education

NYC Department of Education Architectural Inspection Building Assessment Survey 2017-2018 Asset: LEHMAN AF - BRONX, 3000 EAST TREMONT AVENUE, New York, 10461 Inspection Id Inspection Type Time In Last Edited SA : Architectural -

More information

Visual Resources Collection: Description of Facilities and Collections

Visual Resources Collection: Description of Facilities and Collections Visual Resources Collection: Description of Facilities and Collections Main Room 300 (public area) Brief description: public space housing the circulating analog slide collection, architectural drawings

More information