1 Design and Construction Report #2 30 of DRRCGPR OVERVIEW OF PROPOSED WORK ACTIVITIES 1.1. Proposed Wors An overview of the proposed wors described in this DCR is provided below. DCR #2 includes the construction of 21 structures and 3 stream realignments. Structures include both bridges and culverts located in Segments A1, A3, A4, A5 and B1. Stream realignments include a tributary of East Duffins Cree in Segment A1, a tributary of West Oshawa Cree in Segment A4, and a tributary of Lynde Cree in Segment B1. The locations of the proposed structural and stream realignment wors in this DCR are shown in Figure 11. The proposed structures and stream realignments will be constructed in advance of the roadwor construction, which will be presented in future DCRs, and are part of the overall construction staging implementation strategy for the. The purpose of this approach is to provide efficiencies with regard to the required earth grading and haulage operations for the. Drawings of the proposed wors are provided in Appendix A Structures The proposed bridges and culverts in this DCR are presented by segment. Segment A1 Sideline 14 Bridge (Structure M11), which carries Sideline 14 over the East Phase 1 mainline, located approximately 1 m west of Westney Road and lies west of Spring Cree. East Duffins Cree Tributary Culvert (Structure M14) to allow for the crossing of the mainline over the tributary of East Duffins Cree, located approximately 350 m west of Westney Road. East Duffins Tributary Culvert (Structure M15) to allow for the Westney Road crossing over the tributary of East Duffins Cree. Westney Road Bridge (Structure M16), which carries Westney Road over the Highway 407 mainline. Salem Road Bridge (Structure M19), which carries Salem Road over the mainline.
2 Design and Construction Report #2 31 of DRRCGPR Segment A3 Cochrane Street Bridge (Structure M38) which carries Cochrane Street over the mainline. Baldwin Street Bridge (Structure M42) which carries Baldwin Street over the Highway 407 mainline. Lynde Cree Tributary B Culvert (Structure M44) to allow for the Phase 1 mainline crossing over Lynde Cree Tributary B, located approximately 890 m east of Baldwin Street. Thicson Road Bridge (Structure M46) which carries Thicson Road over the Highway 407 mainline. Segment A4 Pringle Cree Tributary Culvert (Structure M47) to allow for the East Phase 1 mainline crossing over the tributary of Pringle Cree, located approximately 420 m east of Thicson Road. Winchester Road Bridge (Structure M50), which carries the mainline over Winchester Road. Oshawa Cree West Tributary A Culvert (Structure M51) to allow for the mainline and Simcoe Street interchange ramp crossings over Tributary A of Oshawa Cree West. Oshawa Cree Tributary B Culvert (Structure M52) to allow for the Simcoe Street crossing over Tributary B of Oshawa Cree West. Simcoe Street Bridge (Structure M53), which carries Simcoe Street over the Highway 407 mainline. Segment A5 Oshawa Cree East Tributary Culvert (Structure M54) to allow for the East Phase 1 crossing over the tributary of Oshawa Cree East, located 900 m east of Simcoe Street. Oshawa Cree East Tributary Culvert (Structure M56) to allow for the East Phase 1 crossing over Tributary C of Oshawa Cree East, located 300 m east of Ritson Road.
3 Design and Construction Report #2 32 of DRRCGPR Segment B1 Highway 401 Bridge (Structure W6), which carries Highway 401 over Lynde Cree Tributary A, located within the of WDL/Highway 401 interchange. Highway 401 West WDL North Ramp Bridge (Structure W7) to allow for the Highway 401 West WDL North Ramp crossing over Lynde Cree Tributary A and Highway 401. WDL North Highway 401 East Ramp Bridge (Structure W9) over Highway 401. Highway 401 Bridge (Structure W10), to allow for the Highway 401 crossing over Lynde Cree Main Branch, located approximately 900 m east of the WDL. The WDL/Dundas Street West Bridge (Structure W12), which carries Dundas Street West over the WDL Stream Realignments The following stream realignments are proposed, using natural channel design principles to restore and enhance fish habitat; m realignment of tributary of East Duffins Cree from Westney Road in a southerly direction crossing the mainline, associated with Structures M14 and M15; m realignment of Tributary A / B of Oshawa Cree West from approximately 100 m east of Simcoe Street in a westerly direction under Simcoe Street and then south under the mainline, associated with Structures M51 and M52; and m realignment of Lynde Cree Tributary A within the WDL/Highway 401 interchange, associated with Structures W6 and W Other Related wors Other related wors to support the proposed construction of the structures and stream realignments include: Installation of erosion and sediment control measures according to the Erosion and Sediment Control Plan for the proposed wor elements and as identified as a condition of the ESA Permits (AUC01211, AUC00512, AUC00111, AUC00211) for the ; Construction of temporary access routes from municipal roads to structure locations within the highway ROW, as required; Placement of fill material for road approaches to bridges;
4 Design and Construction Report #2 33 of DRRCGPR Localized site preparation to allow for material and equipment storage and laydown areas within the highway ROW to facilitate construction; Relocation of local utilities at Sideline 14, Westney Road, Salem Road, Baldwin Street Thicson Road, Winchester Road, Thornton Road, Simcoe Street, Baldwin Street and Dundas Street to the accommodate structural wors; Construction of temporary drainage wors, including ditches and culverts, to address localized drainage conditions within the ROW at the structure and stream realignment sites; and Excavation of permanent stormwater management ponds to function as temporary settling ponds for treatment of any sedimentladen runoff. Although listed sequentially, the construction of the stream realignments and structural wors described in this DCR may be undertaen simultaneously in an effort to minimize the duration of construction. The following sections of this DCR are organized as follows: Section 2 and Appendices B and C outline input received from public, agency, and staeholder consultation and First Nations engagement; Section 3 details the specific wors associated with this DCR; Section 4 presents the identified impacts and mitigation measures and commitments associated with the wors; and Section 5 summarizes overall project environmental monitoring. The Detail Design for the remaining components of the will be addressed in future DCRs.
5 Phase 1 Deferred Interchange Phase 1 Deferred Ramp Roads 6 Lane Section Watercourses 4 Lane Section Waterbody Broc Street Rossland Road East Lynde Cree Site 51 / 51A / 51C W6 Highway 401 GO Transit / CN Rail Dundas Street East Scott Street Ash Street Dundas Street West King Street East King Street West STA TIO STATION Salem Road Kingston Road East AJAX W12 Harwood Avenue South a Cr e e OSHAWA W7 W9 W10 Ü Structures Railway Harmony Road North Thornton Road North Conlin Road M54 Osh aw M47 le C re e M50 Winchester Road East REGION OF DURHAM Rossland Road N 14 Harwood Avenue North ROSSLAND ROAD CP Rail Line HWY 401 / WEST DURHAM LINK SEGMENT B2 STATION SEGMENT B1 ( Simcoe Street North M44 Legend Phase 1 Interchange M53 M51 Prin g Garden Street ree ec Ly nd M46 WHITBY STATION STATION STATION STATION Coronation Road Halls Road North Lae Ridge Road Kinsale Road Westney Road Concession Road 5 M56 M52 s Site t O 33 es W Oshawa Cree Site 32 Oshawa Cree Thicson Road North PICKERING M42 TAUNTON ROAD SEGMENT B3 East D uffin s Cree WEST DURHAM LINK Church Street North sto Winchester Road West Highway 7 ree West Oshawa Cree g Kin oad nr M19 ac Taunton Road West Kingston Road West Finch Avenue STATION Paddoc Road Sideline 16 Road Broc Road Cr ee M38 w ha Columbus Road East Goodman Cree go n Columbus Road West e Cre e ia HARMONY ROAD wa Ga na ts SIMCOE STREET N Corbett Cree Concession Road 3 BALDWIN STREET a Osh Concession Road 4 STATION / WEST DURHAM LINK t We s e Cre Whitevale Road Concession Road 6 SEGMENT A5 Cre e e Urf re e M14 Site 10 East Duffins Cree SEGMENT A4 e Lynd am C Site 10A East Duffins Cree M15 M16 Spring Cree Brou gh M11 Salem Road Concession Road 7 SEGMENT A3 e Lynde Cre STATION WESTNEY / SALEM SEGMENT A2 Country Lane SEGMENT A1 STATION HIGHWAY 407 EAST PHASE Structures and Stream Realignments 2 m Date: 2013/02/04 Figure: 11 File Number: 0000 Rev.: Sub Code: 0000
Highway 407 East Phase 1 DESIGN AND CONSTRUCTION REPORT # D-RR-CGP-R002_01
DESIGN AND CONSTRUCTION REPORT #2 610706-00-6D-RR-CGP-R002_01 March 2013 Name Design and Construction Report #2 1 of 129 610706-00-6D-RR-CGP-R002 01 Public Record Viewing Locations (MOE file number EA-02-07)
More informationHighway 407 East Phase 1 DESIGN AND CONSTRUCTION REPORT #6
DESIGN AND CONSTRUCTION REPORT #6 All Segments Community Value Plan, Landscaping and Ecological Restoration, and Illumination Segment B2 Culvert and Stream Realignment Segment A1 Maintenance Facility Segments
More informationTOWN OF WHITBY REPORT RECOMMENDATION REPORT
TOWN OF WHITBY REPORT RECOMMENDATION REPORT REPORT TO: Council REPORT NO: PL 95-09 DATE OF MEETING: October 13, 2009 PREPARED BY: Planning/Public Works Joint Report FILE NO(S): N/A LOCATION: N/A REPORT
More informationENBRIDGE GAS DISTRIBUTION INC. Proposed Relocation for Ninth Line, Markham and Whitchurch-Stouffville. Environmental Screening Report
Page 1 of 18 ENBRIDGE GAS DISTRIBUTION INC. Proposed Relocation for Ninth Line, Markham and Whitchurch-Stouffville Environmental Screening Report July 2011 Page 2 of 18 Table of Contents 1.0 INTRODUCTION
More informationServices Department B September 10, 2007
Report To: Development Services Committee Item: Date of Report: DS-07-246 September 5, 2007 From: Commissioner, Development File: Date of Meeting: Services Department B7200-0001 September 10, 2007 Subject:
More informationSummary of Changes for the Comprehensive Draft Proposed Official Plan Amendment
Summary of Changes for the Comprehensive Draft Proposed Official Plan Amendment Note: Due to the broad scope of the Official Plan Review, this list is not exhaustive of the extent of changes in the comprehensive
More informationBetter Cycling. The City will update the cycling master plan (London ON Bikes) based on the approved BRT network.
Better Cycling Dedicated bike facilities will be constructed along BRT corridors where space is available. Nearby bike routes will also be upgraded to ensure a complete network is available for cyclists.
More informationIntroduction. Public Information Package. Project website. Overview. Class Environmental Assessment Process
1 Introduction Public Information Package Baseline Road Extension between Lambs Road and Bennett Road, Bowmanville Schedule B Municipal Class Environmental Assessment November 6, 2017 Overview The purpose
More informationChecklists. Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Applicant: Contact Name: Phone Number:
Applicant: Contact Name: Phone Number: Email: Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Concept Plan Requirements: I. General Project Information 1. Address or parcel number
More informationServices Department F May 28, 2007
Report To: Development Services Committee Item: Date of Report: From: DS-07-144 May 23, 2007 Commissioner, Development File: Date of Meeting: Services Department F-7000-0013 May 28, 2007 Subject: Gibb
More information¾À 401 TOWN OF AJAX TOWN OF WHITBY. Lake Ontario. Background Urban Planning Studies forwest West Whitby
Thickson Rd Conlin Rd Country Ln Taunton Rd E Garrard Road Reservoir Expansion 2013-2021 (2016-2025) ") #* Canadian Pacific Rail Pressure Zone 2 Pressure Zone 1 Anderson St Rossland Rd E AJAX Zone 1 Feedmain
More informationWELCOME TO OPEN HOUSE TWO November 28, 2018
Langstaff Road Weston Road to Highway 7 Class Environmental Assessment Study WELCOME TO OPEN HOUSE TWO November 28, 2018 Please sign in and join our mailing list Study Overview York Region is conducting
More informationSouthwest Transitway Extension Baseline Road to Norice Street. Environmental Assessment Minor Modification Report
Southwest Transitway Extension Baseline Road to Norice Street Environmental Assessment Minor Modification Report September 2009 Environmental Assessment Minor Modification Report Southwest Transitway
More informationTOWN OF AJAX OFFICIAL PLAN OFFICE CONSOLIDATION
TOWN OF AJAX OFFICIAL PLAN OFFICE CONSOLIDATION This document presents a consolidation of the Town of Ajax Official Plan and subsequent amendments, as approved and/or modified by the Regional Municipality
More informationTOWN OF AJAX OFFICIAL PLAN OFFICE CONSOLIDATION
TOWN OF AJAX OFFICIAL PLAN OFFICE CONSOLIDATION This document presents a consolidation of the Town of Ajax Official Plan and subsequent amendments, as approved and/or modified by the Regional Municipality
More information7.0 SOCIAL, ECONOMIC, AND ENVIRONMENTAL ISSUES
7.0 SOCIAL, ECONOMIC, AND ENVIRONMENTAL ISSUES The following list of social, economic, and environmental issues have been identified based on a preliminary inventory of resources in the project area, an
More informationMASTER DEVELOPMENT DRAINAGE PLAN FOR MONUMENT HEIGHTS
MASTER DEVELOPMENT DRAINAGE PLAN FOR MONUMENT HEIGHTS DRAINAGE REPORT STATEMENT ENGINEER'S STATEMENT: The attached drainage plan and report were prepared under my direction and supervision and are correct
More informationINFRASTRUCTURE EXISTING INFRASTRUCTURE A. Circulation B. Signals C. Drainage D. Utilities
7.01. EXISTING INFRASTRUCTURE A. Circulation B. Signals C. Drainage D. Utilities 7.02. PROPOSED INFRASTRUCTURE A. Overall Concept B. Circulation C. Signals D. Drainage 7.03. INFRASTRUCTURE MAP A. Key Infrastructure
More informationNorthern Branch Corridor SDEIS March 2017
14. Water Quality 14.1. Chapter Overview 14.1.1. Introduction This section discusses changes to the potential for activities associated with the development and operation of the Preferred Alternative to
More informationLevel 1 Downstream Analysis
Level 1 Downstream Analysis Newcastle Way Apartments Newcastle, Washington King County April 14, 2014 Revised July 10, 2014 Prepared by: Dean A. Furr, P.E. Reviewed by: Donald Scarberry, P.E. Coffman Engineering,
More informationTown of Vershire Road Erosion Inventory Report
Town of Vershire Road Erosion Inventory Report Taylor Valley Road. Photo taken by TRORC staff. Prepared by: 128 King Farm Road Woodstock, VT 05091 Inventory and report funded by the Vermont Agency of Transportation
More informationBLACK/HARMONY/FAREWELL CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 5 IMPERVIOUS SURFACES
BLACK/HARMONY/FAREWELL CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 5 IMPERVIOUS SURFACES Draft November 2009 TABLE OF CONTENTS 1.0 INTRODUCTION... 3 2.0 STUDY AREA AND SCOPE... 4 3.0 METHODOLOGY...
More informationONLINE PUBLIC INFORMATION CENTRE
ONLINE PUBLIC INFORMATION CENTRE County Road 17 Bridge Replacements Detail Design and Environmental Assessment GWP 4203-15-00 The Ministry of Transportation Ontario (MTO) has retained CH2M Hill and Dillon
More informationCHECKLIST FOR PHASE II DRAINAGE REPORT
I. COVER SHEET CHECKLIST FOR PHASE II DRAINAGE REPORT A. Name of Project B. Address C. Owner D. Developer E. Engineer F. Submittal date and revision dates as applicable II. GENERAL LOCATION AND DESCRIPTION
More informationCity of Surrey PLANNING & DEVELOPMENT REPORT File: Development Permit in order to redevelop portions of this industrial site.
City of Surrey PLANNING & DEVELOPMENT REPORT File: 7910-0181-00 Planning Report Date: December 13, 2010 PROPOSAL: Development Permit in order to redevelop portions of this industrial site. LOCATION: OWNER:
More informationSCARBOROUGH RAPID TRANSIT ENVIRONMENTAL PROJECT REPORT CHAPTER 2 PROJECT DESCRIPTION. Table 2-4: North Segment Alignment Analysis 2-21
Table 2-4: North Segment Alignment Analysis 2-21 SCARBOROUGH RAPID TRANSIT Based on the above analysis (detailed analysis is contained in Appendix A-4), North Alignment 3 is preferred because it: Has the
More informationChapter 4 - Preparation of Stormwater Site Plans
Chapter 4 - Preparation of Stormwater Site Plans The Stormwater Site Plan is the comprehensive report containing all of the technical information and analysis necessary for the City to evaluate a proposed
More informationSorensen Gravely Lowes Planning Associates Inc.
Planning Associates Inc. 509 Davenport Road Toronto, Ontario M4V 1B8 Telephone (416) 923-6630 Facsimile (416) 923-6916 Principals: Warren Sorensen, P.Eng, MCIP, RPP Catherine Gravely, MES, MCIP, RPP Paul
More information15. Wetlands Chapter Overview Introduction
15. Wetlands 15.1. Chapter Overview 15.1.1. Introduction Pursuant to Presidential Executive Order 11990 entitled Protection of Wetlands, the United States Department of Transportation (USDOT) developed
More informationARGENTA TRAIL (CSAH 28/63) REALIGNMENT SOUTH PROJECT (CP 63-25)
ARGENTA TRAIL (CSAH 28/63) REALIGNMENT SOUTH PROJECT (CP 63-25) Preliminary Design Report February 2015 Prepared For: City of Inver Grove Heights Dakota County Prepared By: Kimley-Horn and Associates,
More informationFY 2005 TRANSPORTATION CAPITAL PROGRAM
Camden County Civic Center Access Study, Pennsauken 03340 This project will address operational and access improvements on Routes 30, 73 and 90 related to the Crossroads redevelopment project around the
More informationLeduc Industrial Outline Plan SE W4
Leduc Industrial Outline Plan SE 1-50-25-W4 Within the North Leduc Industrial ASP Prepared for: Leduc Energy Park Ltd. Prepared by: Stantec Consulting Ltd. File No. 1161 104655 V5 Table of Contents 1.0
More informationTORONTO TRANSIT COMMISSION AND THE REGIONAL MUNICIPALITY OF YORK
TORONTO TRANSIT COMMISSION AND THE REGIONAL MUNICIPALITY OF YORK NOTICE OF PREPARATION OF AN ADDENDUM REPORT TO THE HIGHWAY 7 CORRIDOR AND VAUGHAN NORTH-SOUTH LINK ENVIRONMENTAL ASSESSMENT & RESPONSE TO
More informationC. WATER. 1. Surface Water Runoff. See Section C.3, Flood Hazard/Mudflow Hazard, page Ground Water
C. WATER 1. Surface Water Runoff See Section C.3, Flood Hazard/Mudflow Hazard, page 67. 2. Ground Water Determined not significant by the October 1984 and January 1999 Initial Studies conducted by the
More informationExecutive Committee Meeting Addendum. #7/15 July 3, :30 A.M. HEAD OFFICE, 101 EXCHANGE AVENUE, VAUGHAN Members:
Executive Committee Meeting Addendum #7/15 July 3, 2015 9:30 A.M. HEAD OFFICE, 101 EXCHANGE AVENUE, VAUGHAN Members: Maria Augimeri Michael Di Biase David Barrow Ronald Chopowick Vincent Crisanti Glenn
More informationReconnecting New Haven: Downtown Crossing
Reconnecting New Haven: Downtown Crossing Phase 2 Update Introduction to Phase 3 November 16, 2017 City of New Haven, Connecticut Toni N. Harp, Mayor Reconnecting New Haven Introduction Project Overview
More informationSt. Clair Avenue West Area Transportation Master Plan
1 (Between Keele Street and Old Weston Road) Public Information Centre 1 December 2, 2015 2 Welcome Welcome to the first Public Information Centre for the St. Clair Avenue West Area. The panels will present
More informationWILLIAM STREET STORM SEWER OUTFALL. PUBLIC INFORMATION CENTRE March 23, 2017
WILLIAM STREET STORM SEWER OUTFALL Municipal Class Environmental Assessment PUBLIC INFORMATION CENTRE March 23, 2017 ACCESSIBILITY Under the Accessibility Standards 2015 for Customer Service Regulation
More informationFY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects
ROUTE/ Project ID No. TIP No. Burlington County Computerized Signal Control, IV D9911 D9911 This ITS project will be a traffic responsive signal system, consisting of 24 intersections--9 on CR 607, 4 on
More informationWELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A
WELCOME! 168 TH STREET IMPROVEMENTS 6:30 Open House 7 8 Presentation & Q&A 8 8:30 Open House WELCOME Todd Pfitzer City of Omaha Engineer Bob Stubbe City of Omaha Public Works Director Jon Meyer Project
More informationExisting Conditions and Environmental Consequences Floodplains
3.9 Environmental Consequences 3.8 3.8.1 WHAT ARE FLOODPLAINS? are low-lying areas adjacent to rivers, streams, and other waterbodies that are susceptible to inundation (flooding) during rain events. These
More information7.4 Maintenance and Storage Facility
Region of Waterloo Rapid Transit Project 7.4 Maintenance and Storage Facility A Maintenance and Storage Facility is required to support the LRT component of the RT system. These facilities typically include
More informationWest Gate Tunnel Project. Incorporated Document May Incorporated document pursuant to section 6(2)(j) of the Planning and Environment Act 1987.
West Gate Tunnel Project Incorporated Document May 2017 Incorporated document pursuant to section 6(2)(j) of the Planning and Environment Act 1987. Drafting Note: The planning control contained in this
More informationUrban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT
NOT WELL 800 - Urban Stormwater Wetlands A constructed system of shallow pools that create growing conditions for wetland plants to lessen the impacts of stormwater quality and quantity in urban areas.
More informationTABLE OF CONTENTS. Introductory Discussion Paper 1 INTRODUCTION 1 2 THE WHITBY OFFICIAL PLAN 1 3 OTHER GOVERNMENT POLICY INITIATIVES 12
Environment Community Heritage Growth Management Employment Housing Revitalization Transportation Arts & Culture Recreation Downtowns Safety Intensification Education Neighbourhoods Development Sustainability
More informationK+P TRAIL EXTENSION FEASIBILITY STUDY PRELIMINARY SITE ANALYSIS PLAN PREPARED FOR THE CITY OF KINGSTON NOT FOR CONSTRUCTION
YY/MM/DD V:\2015\1415605-000 - Kingston K+P Trail Extension Feasibility\Drawings\K+P - Sheet Layout.dwg TITLEBLOCK: 790mm x 534mm OTTAWA LA 2014 PRELIMINARY SITE ANALYSIS PLAN PREPARED FOR THE NOT FOR
More informationTown of Corinth Road Erosion Inventory Report
Town of Corinth Road Erosion Inventory Report Grist Mill Road. Photo taken by TRORC staff. Prepared by: 128 King Farm Road Woodstock, VT 05091 Inventory and report funded by the Vermont Agency of Transportation
More informationTAUNTON ROAD EAST HARMONY ROAD NORTH WALTER AVENUE 767 TAUNTON ROAD EAST, OSHAWA APPROVAL STAMP: SITE STATISTICS
LANDSCAPE AREA HYDRANT TAUNTON ROAD EAST TITLE: CONTEXTUAL SITE PLAN ORIGINAL ADJUSTED 4..4 4.50 0.8. 4.4. 4..6 LEGAL DESCRIPTION: PART OF LOT 5 CONCESSION (GEOGRAPHIC TOWNSHIP OF EAST WHITBY) NOW IN THE
More informationNortheast Anthony Henday Drive Manning Freeway to Whitemud Drive Welcome to this Construction Information Session
Manning Freeway to Whitemud Drive Welcome to this Construction Information Session Purpose To inform interested residents and businesses about the plans accommodation. Background: The Government of Alberta
More information4. Contractor (and subcontractors if applicable) certification statement(s)
CHEMUNG COUNTY STORMWATER COALITION STORMWATER POLLUTION PREVENTION PLAN (SWPPP) SUBMITTAL CHECKLIST GENERAL INFORMATION: 1. Owner/Operator name, legal address, phone number 2. Copy of signed Notice of
More informationNorthern Branch Corridor DEIS December 2011
16 Floodplains 161 Chapter Overview 1611 Introduction The flowing chapter identifies floodplains found within the Northern Branch Corridor in accordance with Executive Order 11988, Floodplain Management
More informationInterested in speaking at the meeting?
Planning and Development Committee Meeting Agenda October 17, 2016 7:00 PM Council Chambers Whitby Municipal Building Interested in speaking at the meeting? Individuals who would like to speak to an item
More informationTOWN OF AJAX OFFICIAL PLAN PROLOGUE AJAX CELEBRATES ITS PAST, IS PROUD OF WHAT IT IS TODAY, AND EMBRACES THE FUTURE WITH CONFIDENCE
TOWN OF AJAX OFFICIAL PLAN PROLOGUE AJAX CELEBRATES ITS PAST, IS PROUD OF WHAT IT IS TODAY, AND EMBRACES THE FUTURE WITH CONFIDENCE Historical Context The Town of Ajax is named after a war ship, the H.M.S.
More information3 Development Process 3.1 Stage One page Stage Two page Stage Three page CENTRAL PICKERING DEVELOPMENT PLAN
3 Development Process 3.1 Stage One page 24 3.2 Stage Two page 25 3.3 Stage Three page 28 22 CENTRAL PICKERING DEVELOPMENT PLAN The Central Pickering Development Plan establishes the key elements of new
More informationGREEN SHEET ENVIRONMENTAL COMMITMENTS FOR THE IOWA HIGHWAY 100 EXTENSION
County: Linn County, IA GREEN SHEET Location: IA 100, from its terminus at Edgewood Rd. to US 30 southwest of Cedar Rapids Route: IA 100 Extension Project No.: NHS-100-1(36) 19-57 OLE Project Managers:
More informationHighway 427 Industrial Secondary Plan Area 47 Schedule C Class Environmental Assessment For Arterial Roadways
Welcome to Pubic Information Centre #1 Highway 427 Industrial Secondary Plan Area 47 Schedule C Class Environmental Assessment For Arterial Roadways Welcome to Open House # 1 Tonight, we invite you to.
More informationOTC ENVIRONMENTAL ASSESSMENT WORKSHOP
OTC ENVIRONMENTAL ASSESSMENT WORKSHOP JULY 18, 2018 Black Creek Pioneer Village 1000 Murray Ross Pkwy North York, ON Register online at: www.otc.org/events Ontario Traffic Council 204-47 Colborne St.,
More information2017 Canadian Consulting Engineering Awards
2017 Canadian Consulting Engineering Awards Northeast Anthony Henday Drive DBFO Edmonton, Alberta Four years of detours, traffic snarls, varying speed limits, and stop-and-start driving has come to an
More informationMcKay Road Interchange and Salem / Lockhart Crossing
McKay Road Interchange and Salem / Lockhart Crossing The McKay Road Interchange Class EA has two components: 1. A new MacKay Road Interchange at Highway 400; and 2. A new bridge crossing of Highway 400
More informationInformation for File # MVP MMJ; Elim Care
Information for File # MVP-217-2628-MMJ; Elim Care Applicant: Elim Care of Maple Plain Corps Contact: Melissa Jenny Address: 18 Fifth Street East, Suite 7, St. Paul, MN 5511-168 E-Mail: Melissa.m.jenny@usace.army.mil
More informationYOUR EMERGENCY PREPAREDNESS GUIDE
YOUR EMERGENCY PREPAREDNESS GUIDE LET s GET STARTED. Emergencies can occur quickly and without warning, at any time of day and in any season. The Regional Municipality of Durham and its eight local area
More informationRequest for an Exception to the Napa County Road and Street Standards
F Request for an Exception to the Napa County Road and Street Standards Shed Creek Winery Use Permit P16-327 and Use Permit Exception to the Conservation Regulations P17-178 Planning Commission Hearing
More informationInformation for File # JTF
Information for File # 2013-04665-JTF Applicant Corps Contact Enbridge Energy, Limited Partnership Josh Fitzpatrick Address 1554 Highway 2, Suite 2, Two Harbors, MN 55616 E-Mail joshua.t.fitzpatrick@usace.army.mil
More informationPublic Information Centre. Welcome
Transportation Improvements from the Beaver Creek Bridge to the Entrance of Santa s Village District of Muskoka Municipal Class Environmental Assessment Welcome Please sign in Take a comment sheet Staff
More informationPROJECT BACKGROUND. Preliminary Design Scope and Tasks
PROJECT BACKGROUND Preliminary Design Scope and Tasks The purpose of this Study is the development of preliminary designs for intersection improvements for Trunk Highway (TH) 36 at the intersections of
More informationDraft Rhode Island Stormwater Design and Installation Standards Manual
Draft Rhode Island Stormwater Design and Installation Standards Manual Summary The May 2009 Public Review Draft version of the RI Stormwater Design and Installation Standards Manual consists of approximately
More informationMANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS
MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS May 2007 SECTION 1 Responsibility of Applicant TABLE OF CONTENTS A. Stormwater Management Plan Required Information
More informationTHE MINISTRY OF TRANSPORTATION S SUMBISSION FOR THE
THE MINISTRY OF TRANSPORTATION S SUMBISSION FOR THE 2011 Transportation of Canada Environmental Achievement Awards 407 East Environmental Assessment Stakeholder Consultation Process / Community Value Plan
More informationErosion Control for Home Builders in the. City of Jacksonville
Erosion Control for Home Builders in the City of Jacksonville Eroding construction sites are a leading cause of water quality problems in Jacksonville. For every acre under construction, about a dump truck
More informationHAZARD MITIGATION GOALS AND OBJECTIVES
SEWRPC Community Assistance Planning Report No. 282, 2nd Edition CITY OF MILWAUKEE ALL HAZARDS MITIGATION PLAN UPDATE Chapter IV HAZARD MITIGATION GOALS AND OBJECTIVES [NOTE: Throughout this plan update
More informationDurham Region Risk-Specific Plan. Durham Nuclear Emergency Response Plan (DNERP)
Durham Region Risk-Specific Plan Durham Nuclear Emergency Response Plan (DNERP) Foreword The Durham Nuclear Emergency Response Plan (DNERP) conforms to the Provincial Nuclear Emergency Response Plan, pursuant
More informationSt. Croix County Shoreland Overlay Zoning Districts. Public Hearing Community Development Committee December 19, 2013
St. Croix County Shoreland Overlay Zoning Districts Public Hearing Community Development Committee December 19, 2013 Timeline CDC Review October 17 Public Information Meeting October 29 (6:00-8:00 pm)
More information2.5 Roads. Loading and service areas adjacent to Highway 401 should be screened through architectural walls and/or landscape buffer planting.
N HIGHWAY OFF RAMP 2.5 Roads A legible road network with a clear hierarchy will help create a connected community, both within and surrounding the Milton Heights. The following section outlines the proposed
More informationHighlands Region Stormwater Management Program Guidance
DRAFT Highlands Region Stormwater Management Program Guidance Release Date: January 2016 Abstract This guidance document provides an overview of the Highlands Stormwater Management Program. It is intended
More information5-Year Street Reconstruction Plan ( )
5-Year Street Reconstruction Plan (2006-2010) City of Delano Wenck File #0564-37 Prepared for: CITY OF DELANO 234 2 nd Street West Delano, MN 55328 Prepared by: WENCK ASSOCIATES, INC. 1800 Pioneer Creek
More informationProject Status. Construction is underway for Phase 3. Overall Project Area and Schedule. Schedule of Current Construction Phases.
I-95 Avenue Interchange Project Status Construction is underway for Phase 3. Overall Project Area and Schedule Phase 0: Completed 2010 Section GR0: Completed in Fallin 2010 Phase 2: Completed Section GR2:
More informationProposed FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects
30 130 Collingswood/Pennsauken ( B) 155C Vicinity of Cooper River Bridge at Park Drive to 200 feet north of PATCO Railroad Bridge This project may provide for the construction of a proposed new bridge
More informationNAPA COUNTY PUBLIC WORKS Standards & Specifications
Roadway Design & Construction Manual (Table of Contents) 1. Chapter 1: General Provisions 1.1 Short Title 1.2 Jurisdiction 1.3 Purpose and Effect 1.4 Enactment Authority 1.5 Amendment and Revisions 1.6
More informationTRANSPORTATION COMMITTEE
TRANSPORTATION COMMITTEE CITY OF OTTAWA Ministry of Transportation Detailed Design Assignment G.W.P.# 4058-01-00 Highway 417 (Ottawa Queensway) Widening & Rehabilitation from Maitland Avenue to Island
More informationSH20 Manukau Harbour Crossing Project Notice of Requirement Auckland City Council
19 May 2006 (Updated 28 August 2006) Notice of Requirement Dated 19 May 2006: Updated 28 August 2006 Notice of Requirement Dated 19 May 2006: Updated 28 August 2006 Page i Form 18 Notice of Requirement
More informationChapter 1: General Program Information
Chapter 1: General Program Information 1.1 Introduction The Montgomery County Stormwater Management Resolution (#03-1-5) was adopted by the County Board of Commissioners on January 22, 2003. The purpose
More informationSOIL EROSION AND SEDIMENT CONTROL
SOIL EROSION AND SEDIMENT CONTROL SECTION 1: AUTHORITY, TITLE AND PURPOSE 11. STATUTORY AUTHORIZATION This ordinance is adopted pursuant to the provisions of the Federal Water Pollution Control Act 86
More informationAction Plan for Retrofitting Structural BMPs
Action Plan for Retrofitting Structural BMPs Hawaii State Department of Transportation Highways Division, Oahu District Storm Water Management Program NPDES Permit No. HI S000001 August 2014 Action Plan
More informationBostwick Road. Municipal Class Environmental Assessment. October 13, City of London. Bostwick Road Municipal Class Environmental Assessment
Bostwick Road Municipal Class Environmental Assessment October 13, 2016 Welcome! Welcome to the first Public Information Centre for the Bostwick Road Municipal Class Environmental Assessment. Representatives
More informationDEALING WITH STORM WATER MANAGEMENT
December 2012 DEALING WITH STORM WATER MANAGEMENT This fact sheet provides information on the guiding principles of storm water management practices, explains the difference between structural and non-structural
More informationInform you of the purpose and scope of the study for PTH 100 and a proposed future St. Norbert Bypass;
WELCOME The intent of today s Open House is to: Inform you of the purpose and scope of the study for PTH 100 and a proposed future St. Norbert Bypass; Review highway crossing locations, future access closures
More informationPrincess Anne Road. Phase VII (CIP 2-195) Citizens Information Meeting
Citizens Information Meeting Princess Anne Road Phase VII (CIP 2-195) Wednesday, May 5, 2004 4:30 PM to 7:00 PM Red Mill Elementary School 1860 Sandbridge Road Virginia Beach, VA Welcome to the Citizens
More informationACT 167 STORMWATER CONSISTENCY VERIFICATION REPORT FOR CHESTER COUNTY 1.0 INTRODUCTION
ACT 167 STORMWATER CONSISTENCY VERIFICATION REPORT FOR CHESTER COUNTY 1.0 INTRODUCTION Tetra Tech, Inc. (Tt) has prepared this Act 167 Stormwater Consistency Verification Report. The report verifies consistency
More informationA. INTRODUCTION AND SUMMARY OF FINDINGS B. EXISTING CONDITIONS. Table 10-1 Adjacent Storm Drains
Chapter 10: Stormwater Management A. INTRODUCTION AND SUMMARY OF FINDINGS This chapter describes existing and proposed stormwater management on the Site. Potential impacts to stormwater infrastructure
More informationRule D Wetland and Creek Buffers
Rule D Wetland and Creek Buffers 1 Policy It is the policy of the Board of Managers to ensure the preservation of the natural resources, recreational, habitat, water treatment and water storage functions
More informationCapital Projects in and near Odenton Town Center
Capital Projects in and near Odenton Town Center Map ID Anne Arundel County Department of Public Works This project provides for the design, right of way acquisition, and construction of approximately
More informationHEALTH SCIENCES BUILDING REDEVELOPMENT PROJECT
INTRODUCTION In recent years, the University of Cincinnati (University) has demonstrated a commitment to identifying and implementing sustainable goals and objectives throughout University s Uptown Campuses.
More informationClay Street Bridge Replacement Project
Clay Street Bridge Replacement Project Frequently Asked Questions (FAQs) No. 2 April 4, 2018 The project is located in downtown Placerville on Clay Street between US Highway 50 and Main Street and Cedar
More informationStrachan Ave. Overpass Community Design Update. October 26, 2010 Stephen Lipkus Executive Director Georgetown South Project GO Transit
Strachan Ave. Overpass Community Design Update October 26, 2010 Stephen Lipkus Executive Director Georgetown South Project GO Transit Welcome Program Overview 6:30 8:30 p.m.: Storyboard Review Project
More informationPublic Meeting #3 May 9, 2009 MVVA Team
Public Meeting #3 May 9, 2009 MVVA Team Welcome to the third Public Meeting for the Lower Don Lands Municipal Class Environmental Assessment (EA) Infrastructure Master Plan and Keating Channel Precinct
More informationPurpose of Open House #3
Public Meeting #3 May 9, 2009 MVVA Team Purpose of Open House #3 The main purpose of this Open House is to present and seek input on the: Evaluation of transportation and infrastructure design alternatives
More informationConstruction Engineering & Inspection
Construction Engineering & Inspection Serving Florida for 20 Years CEI Engineering Planning Landscape Architecture Urban Design Construction Engineering & Inspection (CEI) I N T R O D U C T I O N Over
More informationShelbyville, KY Stormwater Best Management Practices. Section 2 EROSION PREVENTION AND SEDIMENT CONTROL PLAN
Section 2 EROSION PREVENTION AND SEDIMENT CONTROL PLAN 2.1 Requirements The City of Shelbyville, KY will require an Erosion Prevention and Sediment Control (EPSC) Plan for most types of development construction.
More informationGreen Infrastructure for Municipalities in New York s Lake Champlain Basin
Green Infrastructure for Municipalities in New York s Lake Champlain Basin Rural Roads Manual Download If you haven t already, download the manual: http://www.lcbp.org/2017/05/green-infrastructure-webinarseries/
More informationReconfiguration of The Six Points Interchange. Community Update #2 June 18, 2014
Reconfiguration of The Six Points Interchange Community Update #2 June 18, 2014 Outline 1. Project overview 2. How did we get here? 3. Etobicoke Centre 4. Existing and future road network 5. Design Update