The meeting convened at 7:30 p.m. in the City of San Mateo Council Chambers and was called to order by Chair Moran, who led the Pledge of Allegiance.

Size: px
Start display at page:

Download "The meeting convened at 7:30 p.m. in the City of San Mateo Council Chambers and was called to order by Chair Moran, who led the Pledge of Allegiance."

Transcription

1 CITY OF SAN MATEO PLANNING COMMISSION MINUTES OF THE REGULAR MEETING JANUARY 25, 2011 The meeting convened at 7:30 p.m. in the City of San Mateo Council Chambers and was called to order by Chair Moran, who led the Pledge of Allegiance. Those present were Chair Moran, Vice-Chair Freschet, Commissioners Feinman, Massey and Whitaker. A motion was made by Commissioner Massey, seconded by Commissioner Feinman to approve the minutes of the Study Session meeting of January 11, 2011 as revised. Vote Passed Abstention *** PUBLIC COMMENT Chair Moran opened the public comment period. The following people spoke: (street name, city only) Alan Talansky, West Poplar, San Mateo Their comments included the following: Wanted to thank the Planning Commission for their service and all their hard work on our project. Appreciate the work that you and the staff have done and the conclusion of the process. (No other persons wishing to speak, the Chair closed the public comment period.) ITEM 1 + STUDY SESSION PA , MI RANCHO MARKET PRE-APPLICATION. Preliminary review for the development of a new market; 80 North B Street, (APN # , 150, 160, 310). The project site is located in the northern portion of downtown San Mateo, north of the downtown Caltrain Station, and is bounded by North B Street to the west, a public alley to the north, the railroad to the east, and San Mateo Creek to the south. The project site is zoned C1-2/R5 (Neighborhood Commercial/High Density Residential Overlay).

2 Page 2 PROJECT PLANNER: APPLICANT: PROPERTY OWNER: Julia Yeh, Associate Planner City of San Mateo, Planning Division 330 W. 20 th Avenue San Mateo, CA Ph: (650) jyeh@cityofsanmateo.org Galen Grant, AIA Flynn Craig + Grant Architects 301 Hartz Ave, Suite 213 Danville, CA North B Street, LLC C/O Laura Watanuki 1007 East Fifth Ave San Mateo, CA Julia Yeh gave the staff presentation, which included a power point presentation. The Planning Commission had the following questions for staff: Walk us through the access from the parking lot to the pedestrian bridge. What parts of the lot will be fenced off and what parts will be open to the public? Is it the applicant s desire to open up the access to the pedestrian bridge or is this the city s requirement? Staff: The applicant will incorporate a response into their presentation. There is reference to the parking deficit and payment into the CPID. Where the closest city parking facility? Staff: The downtown Caltrain station and parking facility is located south of the project site. The site is located within the downtown parking district, the CPID. Parking in the CPID facilities is shared, there are no physical spaces assigned to the project. Payment of the parking in-lieu fee allows the applicant to meet parking requirement without providing physical spaces on-site. Commissioner: Where would employees park? Staff: There is a standard condition of approval for downtown projects that require employees to park in the long-term parking areas. These parking facilities are the furthest away from the retail core. The alley to the north is that city property? I saw 9 cars parked there. Staff: The alley is part of Railroad Ave and there is no official parking on the street. The main issue with parking there is whether the fire trucks can get through. If this project proceeds, the street would need to be signed for no parking. What is the area to the rear of the project site? Is it the pavement drive-able? Staff: It is a City owned parcel and the Joint Powers Board owns the transit center land adjacent to that parcel. There is no information on the pavement. It would need to be up to the same standard as Railroad Avenue.

3 Page 3 Minerva Guido gave the applicant presentation along with Galen Grant, project architect. The Planning Commission had the following questions for the applicant: I know that the Peninsula Italian Social Club uses the alley (segment of Railroad Ave) to access the back parking lot. Can you confirm where the back loading zone is? Architect: We are not impacting that in any way. There is a possibility that the city may terminate the alley for parking. If that is the case, we have been advised that our informal loading overhead door could not be used. Our trucks will load in the parking lot on site and product will be brought in through the other overhead door. Is there going to be enough room for pedestrian safety once cars start coming through the site? Staff: That is something that needs to be looked at further during the formal Planning Application review. Could CPID funds be used to help fix up the parcel of land to the rear of the project site? Staff: No. Funds collected for the CPID are used for public parking facilities, and cannot be used for other properties. Commissioner: That area does not look really safe as it is. I see this project as an opportunity to do something really nice and make this area more pedestrian friendly. Architect: Yes, it is good opportunity. Would the parking be available to everyone or only for Mi Rancho? Architect: The applicant wants to keep the spaces designated for Mi Rancho s use. The driveway that goes through the parking lot and around the back of the building is being open to general auto traffic? It is not just pedestrian access? Understands need for EVA. Staff: Large trucks would have a hard time backing up onto B Street. Architect: We tried to avoid dead-end parking lots. In our experience, they do not function well. You get cars jammed up. Commissioner: You are asking the city to open the City owned parcel to vehicular traffic? Architect: Yes. Commissioner: This is a concern given pedestrian activity in the area. Staff: There will be discussions internally about use of the City s parcel for vehicular exiting for a business and relationship with pedestrian access. Further review is necessary. I commend the art-deco design. It is kind of bold. It would enhance the neighborhood. Are there two loading docks? Applicant: Yes. Commissioner: In the staff presentation I heard one. Architect: If you were talking about loading areas and this lane (segment of Railroad Ave to the north of the site) were allowed for our use, the trucks could load and unload off of this alley using an overhead door that we are proposing. The larger trucks would park on-site in the parking lot and use the other loading door. What I see is a massive wall along the north side of the building. Is there any way to get windows to get light into the building? Architect: We could add color to this elevation. Functionally we don t need windows on that side of the building but esthetically we could. Are there any thoughts to underground the 2 utility poles? Architect: No. How wide is the sidewalk to the curb of the building face? Staff: 11 feet. There is a lot of parking proposed on-site. Architect: Architect: Thirty spaces are required and we are providing 3 less spaces. It is demand driven. Right now there is no

4 Page 4 parking for existing customers to the store. Some customers get dropped off & get picked up 15 minutes later. Commissioner: Most projects come forward with less parking. Architect: The design is based on 1.9 spaces per 1,000 sq ft. Typical is 4 spaces per 1,000 sq ft. Commissioner: Typical is not TOD? Architect: No. Why orient the building away from N. B St? Architect: We want to encourage business by turning the entry diagonally to the street approach, engage viewers. The entry faces the street and parking lot. You also elected to not have a driveway to parking in the back. Seems a lot of effort to create separate driveway instead of utilizing alley (Railroad Ave) as driveway to a stet parking lot or a parking lot on the alley side, then there would be no need for a new driveway. Architect: It s a good idea. It is another solution but they do not own the rear parcel. Staff: With an abandonment of the alley north of site, half of the alley would go to the two adjacent property owners, the Peninsula Social Club and this site. How would you manage the Storm Water runoff? None of the water should go into the creek. Engineer: We will be working closely with Public Works. The intention is to do filtration. No water will drain to the creek. All the storm water would be captured into a storm drain system. We would be doing some type of filter system. Are filters legal under our current permit? Staff: Mechanical filters are no longer acceptable for our current permit. A bio-treatment system can be engineered to meet our current permit. Commissioner: Still looking at 4% of land as necessary for filtration. Most of the projects we have seen use mostly planter boxes. Staff: Yes. I can t remember seeing a public parking meter in a parking lot that belonged to a private entity before. Is there any? Staff: Yes, there are a couple of spaces in Walgreen s parking lot. There are some public parking meters at Draeger s. Staff: Yes, they are on Ellsworth. What is the impact of the trash location near creek? Engineer: The trash enclosure would be enclosed with four walls, there is a drain box and then drains to the sanitary sewer and not to the storm drain system. There is a screen wall. Cardboards are bundled and shipped off. Commissioner: Is roofing required for these kinds of facilities? Staff: Yes, to keep additional water from getting in. Chair Moran opened the public comment period for this item. The following people spoke: (street name, city only) Steve Tragousis, Warwick Street, Redwood City Their comments included the following: I m concerned about the driveway to Tilton Ave. I don t know if fire trucks can make it thru there. The project is going to have semi trucks going through the lot to Railroad Ave and exiting onto Tilton. Not sure if that s possible. Need to at the end of the road. (No other persons wishing to speak, the Chair closed the public comment period.)

5 Page 5 The Planning Commission made the following comments: If we are looking for more parking spaces there, is there thought about boxing up that heritage oak tree and moving it. You would get four or five more spaces out of that lot. I want to know what is going to happen to the existing market across the street. Applicant: I am the owner of that property. I am planning to lease it out but not for a market. There is a lot of interest for insurance to go there that can speak Spanish. I like the design, agree with architect that there is no theme on N. B Street. I think the overall design approach is fine to pick up on design on other streets in downtown. No issues with trash/recycling near creek but need to address impact issues. I don t have a problem with orientation of the building or parking lot. I do have to question the loading and unloading plans, needs work. The intersection with Tilton Ave is very tight. Overall, I like the project. Architectural style is something to encourage. The existing blue & white laundry building has remnants of an art-deco style; this is not introducing something new. I am concerned with the elevation on the north side, visible from public view, needs more detail. Need to look at rear sign, illumination effect on residential uses east of the railroad tracks. Have concerns but applicant can provide details during formal application. I do have concerns with the trash by the creek. The parking layout and circulation, the one area that does concern me is the pinch point on the south east corner of the building where the driveway is making a curve. Existing is asphalt; I would like to see a sidewalk there for pedestrians. Design brings energy, colors. I like the more sophisticated approach of the building design. I want to make sure there is pedestrian safety in the rear of the building. I am concerned with trash/recycling next to creek. Have you looked at alternatives for trash enclosures? Architect: We have limited options. In more traditional setting, trash/recycling would be near the building but they are trying to encourage pedestrian use next to the building with the walkway. Redevelopment of this site is a priority. I think the City s overall interest is well-served. I am supportive of the design style. Also, support comments about articulation on the northern side. The General Plan Conservation Element has policies regarding the creek/channels, look at 2.1 through 2.5. Staff: The formal planning application will include an environmental review and we will look at conformance to General Plan, Downtown Area Plan, and other applicable codes and policies. Creek setbacks have conservation value. Does not consider parking lot as a setback. I m not convinced that 27 parking spaces are necessary here; maybe look at paying the inlieu fee instead. Look at one-way driveway, reduce parking, provide setback. Do not think it s possible to make findings to support the project. Look at parking. Look at trash, could be a compliance problem for the city. I m worried about the trash so close to the creek. Consult an arborist regarding what can be done within the drip line of the oak tree, trimming of trees. Moving large oak tree is not possible. Regarding bicycle parking, am asking applicants to provide the upside down U rack in the sidewalk on N.

6 Page 6 B Street and for employees, to provide simple metal frame inside, the dimensions are similar to a closet. I think we are unanimous on the design approach. It would be in the interest of the applicant team to see an arborist soon. Like outdoor dining, like keeping all heritage trees. This area of South B Street suffers from a lack of trees. Want to compliment the design team for incorporating the outdoor dining design around the oak tree. Staff report mentions one of the parcels is in the flood zone AE. Staff: The southeast corner is within the 100 yr flood are. The proposed building location appears to be outside the flood area. I m looking at the commercial data form for proposed verses allowed, the building height and the floor ratio is considerably lower than what is allowed. Staff: If the applicant had their choice they would rather maximize. A lot of this had to do with the requirements of the fire department. Due to site constraints and need for fire access, may not be possible to maximize development of site. The previous project by Sares Regis, given the small size of parcel, cost of underground parking garage, the developer found out that it was not supportable even from a larger building. Would envision that the city would have to be involved in designing the layout for access to and egress from the site. Current proposal requires partnership with city to create a driveway on city-owned land behind the parcel. Recommend examination of an alternative layout using the alley to the north to create access and a parking lot on that side instead of on creek side. This could entail a land swap or partnership on a parking lot that could be mutually beneficial to the city and the project sponsor. This being a study session no motion was made. ITEM 2 + STUDY SESSION PA , 2090 S. DELAWARE STREET PRE-APPLICATION. Preliminary review of a proposal to demolish the existing commercial buildings and to construct a three-story residential development consisting of 83 residential units. A mixture of townhomes (53 units) and flats (30 units) are proposed. At grade parking is provided for the units in private individual garages S. Delaware Street (APN ). The project site is approximately 2.37 acres. It is located at the northwest corner of the intersection of South Delaware Street and Pacific Boulevard. The project site is zoned Transit Oriented Development (TOD). PROJECT PLANNER: Christy Usher, AICP Associate Planner City of San Mateo, Planning Division 330 W. 20 th Avenue

7 Page 7 San Mateo, CA Ph: (650) cusher@cityofsanmateo.org PROPERTY OWNER: John Reischl Olson Company 3010 Old Ranch Parkway, Suite 100 Seal Beach, CA, Ph: (562) jreischl@theolsonco.com Christy Usher gave the staff presentation, which included a power point presentation. The Planning Commission had the following questions for staff: Requested background information about of the prior development that had been approved on this site and subsequent litigation. Staff: The previously approved project, also known as Delaware Place, proposed 111 units. Planning Commission approved 104 units. Project was appealed to City Council who approved the original 111 units. The settlement agreement required the 111 units be built within the footprint of 104 units. Is there a parking restriction on the majority of Pacific? Staff: Confirmed parking is restricted on Pacific Boulevard, several spaces in from Delaware Street. What are the long-term plans for the Corporation Yard? Staff: To relocate the Yard, potentially to the site of the Waste Water Treatment Plant. How many people attended the neighborhood meeting? Staff: Approximately 12 persons mostly from the Ironwood Development. John Reischl gave the applicant presentation along with the project architect. The Planning Commission had the following questions for the applicant: I was surprised how close the buildings are to Ironwood. Applicant: It s due to the constraints of this site. It was really important to us to have 2 car units for 2 bedrooms and above. It surprised me that it was a townhouse development. Could you explain why you chose townhouses in a place with this density? Applicant: The reason we proposed a townhouse development is the lack of viability of a podium type of development of a condo over subterranean parking in today s market. We feel it will be several years, probably five years or closer to ten years before that type of development is going to be viable again. It is not financially feasible in today s market. We are experiencing that the townhome market is used more extensively in this area. We are also providing the units that we feel will be in high demand.

8 Page 8 I was wondering where the children will play since there are some 3 bedroom townhomes? How large is the open space? Applicant: The townhomes do not have backyards. The townhouses will have front stoops. How much Transit Oriented Development has been built to date? Staff: Peninsula Station is near the TOD, although technically it is not zoned TOD. Why does the Corridor Plan allow a minimum density of 35 units per acre? Staff: The Plan took into account multiple factors in considering the density ranges of dwelling units per acre. These factors included accommodating future projected growth promoting pedestrian, bicycle and transit use, and encouraging development of support services. Chair Moran opened the public comment period for this item. The following people spoke: (street name, city only) Ryan Vanderbroeck, S. Delaware St., San Mateo Pernille Gutschick, S. Delaware St., San Mateo Their comments included the following: The back of our unit faces directly into the proposed units. The bottom floor of our unit gets one source of natural light which will be blocked by the proposed units. The front of the house doesn t have any windows that open up to get natural light. We have a major concern that there is going to be a three story building right behind us. We bought our home primarily because of the quality of life here in San Mateo. We would like to see our quality of life and property values maintained. We support development on the site that will enhance our community. Moved to Ironwood in San Mateo for the weather including sunshine. Presented a letter of consent signed by the members of the Ironwood community asking the Planning Commission and the city to re-evaluate the 2005 Rail Corridor Plan to allow for lower building density to address the serious impact of Shade and Shadow effect, privacy and quality of life. The proposed project would reduce the property values in the Ironwood community which has been part of the San Mateo community since Submitted a couple of pictures which were taken last week from my balcony. The Shade and Shadow Study for the proposed project indicates that Ironwood will be severely impacted. The elements of the Transit Oriented Development are Density, Directness and Design. The Ironwood community is a 28 unit complex and you have 20+ people here today. Ironwood has held its value higher that the general market in all of San Mateo for the kind of building structure it is. Resale values have remained high in Ironwood. The proposed project, with three buildings with the stack flats, will reduce the property value permanently of Ironwood. We do not want to be legal adversaries. We want to keep the shade and the smell away from our property. We want to share the great quality of San Mateo with our neighbors. (No other persons wishing to speak, the Chair closed the public comment period.)

9 Page 9 The Planning Commission requested clarification on the following issues: The Corridor Plan provides a height accommodation along Delaware Street. I was surprised that there wasn t a reduction in height in the Plan for Ironwood. Could staff comment on why that is? Staff: Those setbacks or reduced heights are along public right-of-way. They are also right across the street from single-family neighborhoods. Is the only residential neighborhood within the TOD zones Ironwood? Staff: Ironwood was developed in the early 1990s when the live-work loft concept was first introduced so at the time Ironwood was a unique development in its own right. The Planning Commission made the following comments: I have a concern with the building scale and shade impacts on the adjacent Ironwood community. Nine visitor parking spaces for 83 units are somewhat limited. Are paid parking meters an option at this site? Staff: We would not look at this issue in isolation. Instead, with the next stage of this project, we would look at comprehensive on-site parking, street parking and residential parking. I am glad you will be addressing the walkways because I know that was one of the concerns was how wide the pedestrian walkways were. Daylight Plane does not apply to this parcel? Staff: That is correct. Generally I like how the townhouse buildings are presented. I don t like how the stacked flats are expressed on the elevations. I am wondering if we could step back these three buildings. The project is in a perfect location for a Transit Oriented District development. I think underground parking would solve a number of issues with respect to building scale, shade and shadow impacts, and compatibility with adjacent Ironwood. I think the shades and shadows impacts to Ironwood are significant and need to be addressed. Rear elevations, with rows of garage doors, need work. Not sure why all the townhouses are 3 bedrooms. Has a traffic impact study been done on this property? Staff: When they submit their formal application. We would be doing an analysis based on the specifics of this project. I would like to understand, if I were a resident of this development, what my path of travel to the train station would be. I think it is well designed with the Spanish influence and the red tile roofs. The stacked buildings as they sit are unacceptable. I think the scale of the flat buildings is too massive. I also find the townhouse buildings flat. I think if you could reduce the size of those buildings fronting the Ironwood Development maybe this could be made to work. That s the direction you need to go in. The trash 5 feet from the property line is unacceptable. Density of 35 units per acre is right. You will have to come up with a development that does not have tall walls adjacent to Ironwood.

10 Page 10 I don t see that we are making a decision between density and quality of life. I think we can have it all. I hear you say we can finance a townhouse development but you don t know if you can finance the townhouses that achieve that density and give that kind of design. The townhouses look better than the stacked flats. I agree with what I have heard about the interior elevations of the project needing more work to break up the rows of garage doors. Give some thought to the pedestrian circulation in this area. People will be walking to the train station and to the store. The sewer pump station is going to be an issue. It smells in the summer. I agree with the comment that the amount of proposed visitor parking does not seem adequate. The project also includes too much pavement and not enough open-space. It sounds like we will need another study session before a decision can be made. This being a study session no motion was made. COMMUNICATIONS/ANNOUNCEMENTS 1. Communications from Staff a. February 7 is a City Council Study Session on SB375. The City Council will also hear the Yang-Hung Appeal that was not approved by the Planning Commission. b. February 8 is the Planning Commission Meeting for Nazareth Terrace Public Hearing, will also review Planning Commission bylaws. c. February 12 the Planning Commission Field Trip is planned 2. Communications from the Commissioners a. February 23 there is a workshop at 6 pm at the library for Poplar/101 (note: in subsequent discussions with Public Works, this workshop will not take place on February 23 and will instead be rescheduled.) ADJOURNMENT There being no further items before the Planning Commission, Chair Moran adjourned at 10:40 p.m. on Tuesday, January 25, 2011.

The meeting convened at 7:30 p.m. in the City of San Mateo Council Chambers and was called to order by Chair Massey, who led the Pledge of Allegiance.

The meeting convened at 7:30 p.m. in the City of San Mateo Council Chambers and was called to order by Chair Massey, who led the Pledge of Allegiance. CITY OF SAN MATEO PLANNING COMMISSION MINUTES OF THE REGULAR MEETING MAY 25, 2010 The meeting convened at 7:30 p.m. in the City of San Mateo Council Chambers and was called to order by Chair Massey, who

More information

Project phasing plan (if applicable) 12 copies of site plan

Project phasing plan (if applicable) 12 copies of site plan SITE PLAN REVIEW PERMIT APPLICATION City of Grand Haven, 11 N. Sixth Street, Grand Haven, MI 49417 Phone: (616) 847-3490 Fax: (616) 844-2051 Website: www.grandhaven.org 1. Project Information Address/location

More information

September 30, 2014 Ms. Lorraine Weiss Department of Community Development City of San Mateo 330 West 20th Avenue San Mateo, CA

September 30, 2014 Ms. Lorraine Weiss Department of Community Development City of San Mateo 330 West 20th Avenue San Mateo, CA ARCHITECTURE PLANNING URBAN DESIGN September 30, 2014 Ms. Lorraine Weiss Department of Community Development City of San Mateo 330 West 20th Avenue San Mateo, CA 94403-1388 RE: Station Park Green Dear

More information

SITE PLAN REVIEW PROCESS

SITE PLAN REVIEW PROCESS BOWNE TOWNSHIP PO Box 35, 8240 Alden Nash Road, Alto, Michigan 49302 Ph. 616-868-6846 Fax 616-868-0110 http://www.bownetwp.org SITE PLAN REVIEW PROCESS 1. Application Form and Fee Schedule Site Plan Review

More information

Approved: CITY OF ARDEN HILLS, MINNESOTA PLANNING COMMISSION WEDNESDAY, AUGUST 5, :30 P.M. - ARDEN HILLS CITY HALL

Approved: CITY OF ARDEN HILLS, MINNESOTA PLANNING COMMISSION WEDNESDAY, AUGUST 5, :30 P.M. - ARDEN HILLS CITY HALL Approved: CITY OF ARDEN HILLS, MINNESOTA PLANNING COMMISSION WEDNESDAY, AUGUST 5, 2015 6:30 P.M. - ARDEN HILLS CITY HALL PLANNING CASES A. Planning Case 15-016; Final Planned Unit Development Arden Plaza;

More information

Bloor St. W. Rezoning - Preliminary Report

Bloor St. W. Rezoning - Preliminary Report STAFF REPORT ACTION REQUIRED 1638-1644 Bloor St. W. Rezoning - Preliminary Report Date: April 1, 2008 To: From: Wards: Reference Number: Toronto and East York Community Council Acting Director, Community

More information

Planning Commission Staff Report June 5, 2008

Planning Commission Staff Report June 5, 2008 Owner/Applicant Taylor Village Sacramento Investments Partners, LP c/o Kim Whitney 1792 Tribute Road #270 Sacramento, CA 95815 Staff Recommendation Planning Commission Staff Report Project: File: Request:

More information

MEMORANDUM. I2 District Downtown Parking Overlay District 24,000 square feet /.55 acres. Industrial Employment District North Loop Small Area Plan

MEMORANDUM. I2 District Downtown Parking Overlay District 24,000 square feet /.55 acres. Industrial Employment District North Loop Small Area Plan Department of Community Planning & Economic Development 50 South 4th Street, Room 300 Minneapolis, MN 5545-385 MEMORANDUM To: City Planning Commission, Committee of the Whole Prepared By: Peter Crandall,

More information

General Location Courtyard at LMH Final Development Plan and Final Plat

General Location Courtyard at LMH Final Development Plan and Final Plat R-1 LEYDEN RIDGE LOMA RIDGE LOBDELL R-3 MILLER PARKWAY LAUSSAC Subject Property R-3 LOCHENSHIRE LESMER R General Location Courtyard at LMH Final Development Plan and Final Plat ¹ 230 115 0 230 Feet Airport

More information

Developer s Program. The Station at East 54

Developer s Program. The Station at East 54 Developer s Program The Station at East 54 Existing Conditions The Station at East 54 is proposed for a 1.12 acre site at the northeast corner of Hamilton Road and Prestwick Road, tucked between the East

More information

D1 September 11, 2013 Public Hearing APPLICANT:

D1 September 11, 2013 Public Hearing APPLICANT: D1 September 11, 2013 Public Hearing APPLICANT: BEACH MUNICIPAL FEDERAL CREDIT UNION PROPERTY OWNER: SISTERS II, LLC STAFF PLANNER: Karen Prochilo REQUEST: Conditional Change of Zoning (AG-2 Agriculture

More information

CITY OF NORWALK ZONING COMMITTEE. November 13, 2012

CITY OF NORWALK ZONING COMMITTEE. November 13, 2012 PRESENT: STAFF: OTHERS: CITY OF NORWALK ZONING COMMITTEE Adam Blank, Chair; Emily Wilson; Jill Jacobson; Harry Rilling; James White; Michael Mushak; Joseph Santo (arrived at 8:25 p.m.) Michael Greene;

More information

M E M O R A N D U M SITE DATA

M E M O R A N D U M SITE DATA Department of Community Planning & Economic Development 250 South 4 th Street, Room 300 Minneapolis, MN 55415-1385 M E M O R A N D U M TO: City Planning Commission, Committee of the Whole FROM: Lisa Steiner,

More information

The petition proposes the development of five townhomes on a vacant parcel between Charlotte Latin School and Providence Presbyterian Church.

The petition proposes the development of five townhomes on a vacant parcel between Charlotte Latin School and Providence Presbyterian Church. Rezoning Petition 2017-202 Final Staff Analysis June 18, 2018 REQUEST LOCATION Current Zoning: R-3 (single family residential) Proposed Zoning: UR-2(CD) (urban residential, conditional) with five-year

More information

PLAN ELEMENTS WORKSHOP. April 5, 2016

PLAN ELEMENTS WORKSHOP. April 5, 2016 PLAN ELEMENTS WORKSHOP April 5, 2016 needs more housing. But there is no one-size fits-all solution. Every neighborhood has its own character. In some places, density is not only appropriate it is badly

More information

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: May 18, 2017

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: May 18, 2017 & PUD-0000102-2017 PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: May 18, 2017 NAME SUBDIVISION NAME Dauphin Creek Estates Subdivision Dauphin Creek Estates Subdivision LOCATION CITY COUNCIL

More information

599 Kennedy Road - Official Plan Amendment and Zoning Amendment Application - Preliminary Report

599 Kennedy Road - Official Plan Amendment and Zoning Amendment Application - Preliminary Report STAFF REPORT ACTION REQUIRED 599 Kennedy Road - Official Plan Amendment and Zoning Amendment Application - Preliminary Report Date: March 7, 2017 To: From: Wards: Reference Number: Scarborough Community

More information

Public may provide comments on the GDP within the next two weeks (December 24)

Public may provide comments on the GDP within the next two weeks (December 24) 25/70 General Development Plan (GDP) Public Meeting Wednesday, December 10, 2014 6:00 8:00 P.M. District 1 Police Station Community Room 1311 W 46th Ave, Denver, CO 80211 Council Woman Montero: This particular

More information

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of February 23, 2019

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of February 23, 2019 ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of February 23, 2019 DATE: February 15, 2019 SUBJECT: Amendment to the Master Transportation Plan (MTP) Map to add a new section of North Kansas

More information

646 Kingston Road - Official Plan Amendment and Zoning Amendment Applications - Preliminary Report

646 Kingston Road - Official Plan Amendment and Zoning Amendment Applications - Preliminary Report STAFF REPORT ACTION REQUIRED 646 Kingston Road - Official Plan Amendment and Zoning Amendment Applications - Preliminary Report Date: December 8, 2014 To: From: Wards: Reference Number: Toronto and East

More information

1071 King Street West Zoning Amendment Application - Preliminary Report

1071 King Street West Zoning Amendment Application - Preliminary Report STAFF REPORT ACTION REQUIRED 1071 King Street West Zoning Amendment Application - Preliminary Report Date: August 9, 2012 To: From: Wards: Reference Number: Toronto and East York Community Council Director,

More information

September 25th, 2018 $2000 fee pd CC

September 25th, 2018 $2000 fee pd CC 2.7267 acres 2018I-00075 September 25th, 2018 $2000 fee pd CC Rezoning Review Criteria Analysis - Map Amendment Application Number: 2018I-00075 805 W. 38 th Avenue October 19, 2018 (amd.) September 17,

More information

Description. Summary. MCPB Item No. Date: 01/17/13. Bethesda Crescent, Limited Site Plan Amendment, A, A

Description. Summary. MCPB Item No. Date: 01/17/13. Bethesda Crescent, Limited Site Plan Amendment, A, A THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION MCPB Item No. Date: 01/17/13 Bethesda Crescent, Limited Site Plan Amendment, 81984005A, 81984003A Parag Agrawal, Senior Planner, parag.agrawal@montgomeryplanning.org,

More information

Beachside Redevelopment Committee

Beachside Redevelopment Committee Beachside Redevelopment Committee DRAFT FINAL RECOMMENDATIONS MARCH 22, 2018 This is a new slide 2 This is a new slide Table of Contents I. Introduction and Overview II. III. Community Improvements and

More information

PLANNED DEVELOPMENT (MASTER PLAN & UNIT PLAN)

PLANNED DEVELOPMENT (MASTER PLAN & UNIT PLAN) Central Permit Center 555 Santa Clara Street Vallejo CA 94590 Business License Building Fire Prevention Planning Public Works 707.648.4310 707.648.4374 707.648.4565 707.648.4326 707.651.7151 PLANNED DEVELOPMENT

More information

8 Oak Street - Official Plan and Zoning By-law Amendment Application - Preliminary Report

8 Oak Street - Official Plan and Zoning By-law Amendment Application - Preliminary Report STAFF REPORT ACTION REQUIRED 8 Oak Street - Official Plan and Zoning By-law Amendment Application - Preliminary Report Date: March 17, 2014 To: From: Wards: Reference Number: Planning and Growth Management

More information

City Council Special Meeting AGENDA ITEM NO. C.

City Council Special Meeting AGENDA ITEM NO. C. City Council Special Meeting AGENDA ITEM NO. C. DATE: 01/04/2019 TO: Honorable Mayor and City Council Members SUBJECT: Transit Villages Specific Plan project Study Session (Development Services Director

More information

4 January 11, 2012 Public Hearing APPLICANT:

4 January 11, 2012 Public Hearing APPLICANT: . 4 January 11, 2012 Public Hearing APPLICANT: MID-ATLANTIC AUTO PROPERTY OWNER: DZR, LLC STAFF PLANNER: Leslie Bonilla REQUEST: Conditional Use Permit (truck rental, automobile service, and automotive/bulk

More information

DESIGN REVIEW COMMISSION AGENDA COEUR D ALENE PUBLIC LIBRARY LOWER LEVEL, COMMUNITY ROOM 702 E. MULLAN THURSDAY JANUARY 25, :00 pm

DESIGN REVIEW COMMISSION AGENDA COEUR D ALENE PUBLIC LIBRARY LOWER LEVEL, COMMUNITY ROOM 702 E. MULLAN THURSDAY JANUARY 25, :00 pm DESIGN REVIEW COMMISSION AGENDA COEUR D ALENE PUBLIC LIBRARY LOWER LEVEL, COMMUNITY ROOM 702 E. MULLAN THURSDAY JANUARY 25, 2018 12:00 pm 12:00 P.M. CALL TO ORDER: ROLL CALL: Ives, Ingalls, Lemmon, Messina,

More information

ADMINISTRATION RECOMMENDATION(S) 2018 January 25. That Calgary Planning Commission recommend APPROVAL of the proposed Land Use Amendment.

ADMINISTRATION RECOMMENDATION(S) 2018 January 25. That Calgary Planning Commission recommend APPROVAL of the proposed Land Use Amendment. Page 1 of 9 EXECUTIVE SUMMARY This land use amendment proposes to redesignate a parcel from DC Direct Control District to Multi-Residential Contextual Grade-Oriented (M-CG) District to allow for multi-residential

More information

CITY CLERK. Consolidated Clause in North York Community Council Report 8, which was considered by City Council on October 26, 27 and 28, 2004.

CITY CLERK. Consolidated Clause in North York Community Council Report 8, which was considered by City Council on October 26, 27 and 28, 2004. CITY CLERK Consolidated Clause in Report 8, which was considered by City Council on October 26, 27 and 28, 2004. 28 Request for Direction Report - Site Plan Approval Application 03 200020 NNY 24 SA - Marek

More information

WASHINGTON/KIRKWOOD SPECIAL GLUP STUDY PLUS MAY 1, 2017 OPEN HOUSE

WASHINGTON/KIRKWOOD SPECIAL GLUP STUDY PLUS MAY 1, 2017 OPEN HOUSE 1. Results of Scenario Rating Scorecard (as of May 10, 2017) WASHINGTON/KIRKWOOD SPECIAL GLUP STUDY PLUS MAY 1, 2017 OPEN HOUSE 1. Results of Scenario Rating Scorecard (as of May 10, 2017) Scenario 2 -

More information

DESIGN REVIEW COMMITTEE AGENDA ITEM

DESIGN REVIEW COMMITTEE AGENDA ITEM DESIGN REVIEW COMMITTEE AGENDA ITEM AGENDA DATE: AUGUST 2, 2017 TO: THRU: FROM: SUBJECT: Chair Imboden and Members of the Design Review Committee Anna Pehoushek, Assistant Community Development Director

More information

MEMORANDUM. DATE: March 15, Chairman and Members Community Redevelopment Agency. Leif J. Ahnell, C.P.A., C.G.F.O. Executive Director

MEMORANDUM. DATE: March 15, Chairman and Members Community Redevelopment Agency. Leif J. Ahnell, C.P.A., C.G.F.O. Executive Director MEMORANDUM DATE: March 15, 2019 TO: FROM: Chairman and Members Community Redevelopment Agency Leif J. Ahnell, C.P.A., C.G.F.O. Executive Director SUBJECT: Camino Square, IDA No. CRP-16-02, located at 171

More information

COLERAIN TOWNSHIP ZONING COMMISSION Regular Meeting Tuesday, October 18, :00 p.m.

COLERAIN TOWNSHIP ZONING COMMISSION Regular Meeting Tuesday, October 18, :00 p.m. COLERAIN TOWNSHIP ZONING COMMISSION Regular Meeting Tuesday, October 18, 2016-6:00 p.m. Colerain Township Government Complex 4200 Springdale Road - Cincinnati, OH 45251 1. Meeting called to order. Pledge

More information

4780 Eglinton Avenue West - Zoning By-law Amendment and Draft Plan of Subdivision Applications - Preliminary Report

4780 Eglinton Avenue West - Zoning By-law Amendment and Draft Plan of Subdivision Applications - Preliminary Report STAFF REPORT ACTION REQUIRED 4780 Eglinton Avenue West - Zoning By-law Amendment and Draft Plan of Subdivision Applications - Preliminary Report Date: May 29, 2014 To: From: Wards: Reference Number: Etobicoke

More information

WHEREAS, after consideration of the evidence presented at the public hearing on January 14, 2010, the Prince George's County Planning Board finds:

WHEREAS, after consideration of the evidence presented at the public hearing on January 14, 2010, the Prince George's County Planning Board finds: R E S O L U T I O N WHEREAS, the Prince George s County Planning Board has reviewed DDS-600 requesting a departure for the location of two loading spaces without driveway access along Toledo Terrace in

More information

FLORIN ROAD CORRIDOR Site Plan and Design Review Guidelines Checklist

FLORIN ROAD CORRIDOR Site Plan and Design Review Guidelines Checklist FLORIN ROAD CORRIDOR Site Plan and Design Review Guidelines Checklist Applicant s Name: Project Address: Phone: Email: Applicant shall fill out the design guidelines checklist for all guidelines applicable

More information

From: Director, Community Planning, Scarborough District. Ward 40 Scarborough-Agincourt

From: Director, Community Planning, Scarborough District. Ward 40 Scarborough-Agincourt STAFF REPORT ACTION REQUIRED 2967 Sheppard Ave E - Zoning Amendment Application - Preliminary Report Date: July 18, 2014 To: Scarborough Community Council From: Director, Community Planning, Scarborough

More information

CITY PLANNING COMMISSION AGENDA. ITEM NO: 6.a 6.b STAFF: LONNA THELEN

CITY PLANNING COMMISSION AGENDA. ITEM NO: 6.a 6.b STAFF: LONNA THELEN Page 156 CITY PLANNING COMMISSION AGENDA ITEM NO: 6.a 6.b STAFF: LONNA THELEN FILE NO(S): A. - CPC ZC 08-00069 QUASI-JUDICIAL B. - CPC CU 08-00070 QUASI-JUDICIAL PROJECT: APPLICANT: OWNER: PHIL LONG VALUCAR

More information

Rezoning Petition Pre-Hearing Staff Analysis March 19, 2018

Rezoning Petition Pre-Hearing Staff Analysis March 19, 2018 Rezoning Petition 2017-171 Pre-Hearing Staff Analysis March 19, 2018 REQUEST Current Zoning: R-3 (single family residential) Proposed Zoning: MX-2 (INNOV) (mixed used, innovative) with five-year vested

More information

Pedestrian and Bike Bridge LOGO

Pedestrian and Bike Bridge LOGO 6.2.2 Pedestrian and Bike Bridge The proposed pedestrian and bike crossing re-envisions the existing bridge at Pismo Creek on Cypress Street. The bridge is currently underutilized by vehicular through

More information

Rezoning Petition Pre-Hearing Staff Analysis May 21, 2018

Rezoning Petition Pre-Hearing Staff Analysis May 21, 2018 Rezoning Petition 2018-018 Pre-Hearing Staff Analysis May 21, 2018 REQUEST Current Zoning: R-5 (single family residential), R-5 HD-O (single family residential, historic district overlay) and B-2(CD) HD-O

More information

City of Yelm. Tahoma Terra Final Master Plan Development Guidelines. Table of Contents

City of Yelm. Tahoma Terra Final Master Plan Development Guidelines. Table of Contents City of Yelm Tahoma Terra Final Master Plan Development Guidelines Table of Contents Table of Contents... 1 Purpose... 2 Low Density Residential (R4-6)... 3 Moderate Density Residential (R6-10)... 5 Neighborhood

More information

City of Lafayette Staff Report Design Review Commission

City of Lafayette Staff Report Design Review Commission City of Lafayette Staff Report Design Review Commission Meeting Date: February 13, 2017 Staff: Subject: Niroop K. Srivatsa DR13-14DDII Lennar Homes (Applicant), C-Zoning: Request for: (1) Review of Phase

More information

WINDSOR GLEN DESIGN GUIDELINES

WINDSOR GLEN DESIGN GUIDELINES WINDSOR GLEN DESIGN GUIDELINES Adopted by Council, 2006 WINDSOR GLEN REDEVELOPMENT DESIGN GUIDELINES August 2006 1.0 Master Plan Organization For this area of the Coquitlam Town Centre, a mix of high,

More information

30 and 44 Zorra Street - Zoning By-law Amendment Application - Preliminary Report

30 and 44 Zorra Street - Zoning By-law Amendment Application - Preliminary Report STAFF REPORT ACTION REQUIRED 30 and 44 Zorra Street - Zoning By-law Amendment Application - Preliminary Report Date: March 14, 2016 To: From: Wards: Reference Number: Etobicoke York Community Council Director,

More information

Site Plan Review Committee June 5, 2007

Site Plan Review Committee June 5, 2007 CITY OF ANDOVER SITE PLAN REVIEW COMMITTEE June 5, 2007 MINUTES The Site Plan Review Committee met for a regular meeting on Tuesday, June 5, 2007 at the Andover Central Park Lodge located at 1607 E. Central,

More information

Land Use Amendment in Southwood (Ward 11) at and Elbow Drive SW, LOC

Land Use Amendment in Southwood (Ward 11) at and Elbow Drive SW, LOC 2018 November 15 Page 1 of 10 EXECUTIVE SUMMARY This land use amendment application was submitted by Rick Balbi Architect on 2017 August 31 on behalf of Sable Developments Ltd, and with authorization from

More information

Request Change in Nonconformity. Staff Recommendation Approval. Staff Planner Jonathan Sanders

Request Change in Nonconformity. Staff Recommendation Approval. Staff Planner Jonathan Sanders Applicant & Owner Public Hearing April 11, 2018 City Council Election District Beach Agenda Item 5 Request Change in Nonconformity Staff Recommendation Approval Staff Planner Jonathan Sanders Location

More information

8 & 10 Donalda Crescent Official Plan & Rezoning Application Final Report

8 & 10 Donalda Crescent Official Plan & Rezoning Application Final Report STAFF REPORT ACTION REQUIRED 8 & 10 Donalda Crescent Official Plan & Rezoning Application Final Report Date: July 26, 2010 To: From: Wards: Reference Number: Scarborough Community Council Director, Community

More information

Urban Planning and Land Use

Urban Planning and Land Use Urban Planning and Land Use 701 North 7 th Street, Room 423 Phone: (913) 573-5750 Kansas City, Kansas 66101 Fax: (913) 573-5796 Email: planninginfo@wycokck.org www.wycokck.org/planning To: From: City Planning

More information

Development Services Staff Report for Design Review Committee

Development Services Staff Report for Design Review Committee Development Services Staff Report for Design Review Committee To: Design Review Committee From: DS Staff: Erika Akin Subject: Proposed Addition to J s Car Wash File: DSRFY2016-1 Date: January 19, 2016

More information

Public Consultation Summary: Lakeview Place Making Workshop January 30, 2008.

Public Consultation Summary: Lakeview Place Making Workshop January 30, 2008. Page 1 of 11 Public Consultation Summary: Lakeview Place Making Workshop January 30, 2008. 1.0 Introduction: On January 30, 2008 the City of Mississauga, in conjunction with the consulting team of Brook

More information

New Street Proposed Redevelopment Architecture & Urban Design Brief

New Street Proposed Redevelopment Architecture & Urban Design Brief 2130 2136 New Street Proposed Redevelopment Architecture & Urban Design Brief Prepared By: Cynthia Zahoruk Architect Inc. 3077 New Street, Burlington, ON, L7N 1M6 TABLE OF CONTENTS Background and Objective

More information

BUILDING SCALE AND SETBACKS 5 ELEMENTS:... 5 FAÇADES (COMMERCIAL/RESIDENTIAL) 5

BUILDING SCALE AND SETBACKS 5 ELEMENTS:... 5 FAÇADES (COMMERCIAL/RESIDENTIAL) 5 VISION STATEMENT 3 UTILIZATION OF THE GUIDELINES 3 IMPLEMENTATION 3 PROCEDURES FOR DESIGN REVIEW 3 LAND USE AND ZONING 4 LAND USE 4 ELEMENTS:... 4 ZONING 4 ELEMENTS:... 4 BUILDING SCALE AND SETBACKS 5

More information

CITY COUNCIL STUDY SESSION MEMORANDUM

CITY COUNCIL STUDY SESSION MEMORANDUM City and County of Broomfield, Colorado CITY COUNCIL STUDY SESSION MEMORANDUM To: From: Prepared by: Mayor and City Council Charles Ozaki, City and County Manager Kevin Standbridge, Deputy City and County

More information

4.1.3 LAND USE CATEGORIES

4.1.3 LAND USE CATEGORIES 4.1.3 LAND USE CATEGORIES a. City Center District The City Center District incorporates the existing character and mix of uses in downtown Belmont to encourage redevelopment and new development in keeping

More information

Mayor Dave Netterstrom and Members of the City Commission. Anthony Caravella, AICP, Director of Development Services

Mayor Dave Netterstrom and Members of the City Commission. Anthony Caravella, AICP, Director of Development Services CITY COMMISSION BRIEFING & DOWNTOWN COCOA BEACH COMMUNITY REDEVELOPMENT AGENCY Planning Board and Landscape Committee Report For Meeting Scheduled for February 7, 2013 Minutemen Causeway Low Impact Design

More information

Section 9 NEIGHBORHOOD DESIGN

Section 9 NEIGHBORHOOD DESIGN Section 9 NEIGHBORHOOD DESIGN City of Lancaster Comprehensive Plan D u n k i n, S e f k o & A s s o c i a t e s, I n c. NEIGHBORHOOD DESIGN INTRODUCTION There are many ways in which a neighborhood can

More information

TOWN OF ATHERTON CIVIC CENTER MASTER PLAN

TOWN OF ATHERTON CIVIC CENTER MASTER PLAN TOWN OF ATHERTON CIVIC CENTER MASTER PLAN ///////////////////////////// NOVEMBER 6, 2013// CITY COUNCIL & CCAC PRESENTATION CITY COUNCIL & CCAC PRESENTATION OVERVIEW & PROJECT STATUS OVERVIEW OF PROCESS

More information

280 Manse Road - Official Plan Amendment, Zoning Amendment, Draft Plan of Subdivision Applications - Preliminary Report

280 Manse Road - Official Plan Amendment, Zoning Amendment, Draft Plan of Subdivision Applications - Preliminary Report STAFF REPORT ACTION REQUIRED 280 Manse Road - Official Plan Amendment, Zoning Amendment, Draft Plan of Subdivision Applications - Preliminary Report Date: March 11, 2014 To: From: Wards: Reference Number:

More information

1296 Kennedy Road - Zoning Amendment Application - Preliminary Report

1296 Kennedy Road - Zoning Amendment Application - Preliminary Report STAFF REPORT ACTION REQUIRED 1296 Kennedy Road - Zoning Amendment Application - Preliminary Report Date: January 15, 2016 To: From: Wards: Reference Number: Scarborough Community Council Acting Director,

More information

Preliminary Design Review. Poudre Garage Mixed Use December 14, 2015

Preliminary Design Review. Poudre Garage Mixed Use December 14, 2015 Preliminary Design Review December 14, 2015 1 Development Review Guide STEP 2 of 8 PRELIMINARY DESIGN REVIEW: APPLICATION General Information Preliminary design review is an opportunity for an applicant

More information

ROAD CLOSURE AND LAND USE AMENDMENT SILVER SPRINGS (WARD 1) NORTHEAST OF NOSEHILL DRIVE NW AND SILVER SPRINGS ROAD NW BYLAWS 2C2018 AND 29D2018

ROAD CLOSURE AND LAND USE AMENDMENT SILVER SPRINGS (WARD 1) NORTHEAST OF NOSEHILL DRIVE NW AND SILVER SPRINGS ROAD NW BYLAWS 2C2018 AND 29D2018 Page 1 of 19 EXECUTIVE SUMMARY This application proposes redesignating two parcels in the community of Silver Springs from Special Purpose Future Urban Development (S-FUD) District and undesignated road

More information

12 January 12, 2011 Public Hearing APPLICANT: TAILWIND DEVELOPMENT GROUP,LLC PROPERTY OWNER: CITY OF VIRGINIA BEACH

12 January 12, 2011 Public Hearing APPLICANT: TAILWIND DEVELOPMENT GROUP,LLC PROPERTY OWNER: CITY OF VIRGINIA BEACH 12 January 12, 2011 Public Hearing APPLICANT: TAILWIND DEVELOPMENT GROUP,LLC PROPERTY OWNER: CITY OF VIRGINIA BEACH STAFF PLANNER: Faith Christie REQUEST: Conditional Change of Zoning (from PD-H1 Planned

More information

SPECIFIC PLAN Requirements

SPECIFIC PLAN Requirements CITY OF LANCASTER PLANNING DEPARTMENT 44933 Fern Avenue, Lancaster, California 93534 (661) 723-6100 SPECIFIC PLAN Requirements Purpose The purpose of a specific plan is to provide for the logical development

More information

Carlsbad Village Redevelopment Concept Summary of Features

Carlsbad Village Redevelopment Concept Summary of Features Carlsbad Village Redevelopment Concept Summary of Features Calthorpe Associates November 5, 2003 The Redevelopment Concept illustrates a vision for the future of Carlsbad Village. The overall vision of

More information

CITY OF MAPLE GROVE PLANNING COMMISSION AGENDA SEPTEMBER 12, :00 P.M.

CITY OF MAPLE GROVE PLANNING COMMISSION AGENDA SEPTEMBER 12, :00 P.M. CITY OF MAPLE GROVE PLANNING COMMISSION AGENDA SEPTEMBER 12, 2016 7:00 P.M. 1. OPENING BUSINESS A. Call to Order B. Pledge of Allegiance C. Roll Call 2. ADDITIONS OR DELETIONS TO AGENDA Any Commissioner

More information

Workshop 3. City of Burlington Waterfront Hotel Planning Study. September 14, The Planning Partnership

Workshop 3. City of Burlington Waterfront Hotel Planning Study. September 14, The Planning Partnership Workshop 3 City of Burlington Waterfront Hotel Planning Study September 14, 2017 The Planning Partnership The Waterfront Hotel Planning Study 01 The Brant & Lakeshore Planning Study will establish a Strategic

More information

DATE: PLANNING COMMISSION MEETING OF FEBRUARY 24, 2016

DATE: PLANNING COMMISSION MEETING OF FEBRUARY 24, 2016 DATE: PLANNING COMMISSION MEETING OF FEBRUARY 24, 2016 TO: FROM: SUBJECT: THE PLANNING COMMISSION LISA COSTA SANDERS, TOWN PLANNER REQUEST FOR A SPECIAL STRUCTURES PERMIT FOR A POOL IN THE SIDE YARD AND

More information

2.0 THE PLATINUM TRIANGLE VISION

2.0 THE PLATINUM TRIANGLE VISION 2.0 THE PLATINUM TRIANGLE VISION The envisions an exciting future for the area surrounding Angel Stadium of Anaheim, the Honda Center and The Grove of Anaheim. 2.1 Planning Principles In order to further

More information

Tyvola & Archdale Transit Station Area Plan. June 5, 2008

Tyvola & Archdale Transit Station Area Plan. June 5, 2008 Tyvola & Archdale Transit Station Area Plan Second Public Meeting June 5, 2008 Presentation Outline 1. Purpose and Process 2. Station Area Overview 3. Plan Recommendations 4. Comments Received and Proposed

More information

Olde Towne Vision Plan

Olde Towne Vision Plan Olde Towne Vision Plan Introduction In 2016, the City of Bellevue will complete its move of City offices from Olde Towne Bellevue to its new municipal complex on Wall Street. The City intends to sell its

More information

RESEDA - WEST VAN NUYS COMMUNITY PLAN

RESEDA - WEST VAN NUYS COMMUNITY PLAN RESEDA - WEST VAN NUYS COMMUNITY PLAN Executive Summary As part of the initial outreach effort, the Department of City Planning hosted two workshops for the Reseda-West Van Nuys Community Plan Area during

More information

R E S O L U T I O N. Single-Family Residence/ Church. 2,488 sq. ft. 2,488 sq. ft. Area Parking Required: Church

R E S O L U T I O N. Single-Family Residence/ Church. 2,488 sq. ft. 2,488 sq. ft. Area Parking Required: Church R E S O L U T I O N WHEREAS, the Prince George s County Planning Board is charged with the approval of Detailed Site Plans pursuant to Part 3, Division 9 of the Zoning Ordinance of the Prince George s

More information

November 21, Planning Commission Charter Township of Lyon Grand River Ave. New Hudson, MI 48165

November 21, Planning Commission Charter Township of Lyon Grand River Ave. New Hudson, MI 48165 Planning Commission Charter Township of Lyon 58000 Grand River Ave. New Hudson, MI 48165 Subject: AP-18-68; 11 Mile and Milford Road Park, Site Plan Review #1 Based on site plan dated 11/12/18 Location:

More information

MULTIFAMILY RESIDENTIAL DESIGN PRINCIPLES Site Plan and Design Review Principles Checklist

MULTIFAMILY RESIDENTIAL DESIGN PRINCIPLES Site Plan and Design Review Principles Checklist MULTIFAMILY RESIDENTIAL DESIGN PRINCIPLES Site Plan and Design Review Principles Checklist Applicant s Name: Project Address: Phone: Email: Applicant shall fill out the design guidelines checklist for

More information

MINUTES OF THE TOWN COUNCIL MEETING SEPTEMBER 1, 2016

MINUTES OF THE TOWN COUNCIL MEETING SEPTEMBER 1, 2016 MINUTES OF THE TOWN COUNCIL MEETING SEPTEMBER 1, 2016 Town Council Meeting 09/20/16 Item #1 The Town Council of the Town of Los Gatos conducted a Special Meeting on Thursday, September 1, 2016, at 6:00

More information

5. FINAL DEVELOPMENT PLAN APPROVAL MENORAH MEDICAL CENTER OFFICE BUILDING Vicinity of the southwest corner of 119 th Street and Nall Avenue

5. FINAL DEVELOPMENT PLAN APPROVAL MENORAH MEDICAL CENTER OFFICE BUILDING Vicinity of the southwest corner of 119 th Street and Nall Avenue 5. FINAL DEVELOPMENT PLAN APPROVAL MENORAH MEDICAL CENTER Avenue 1. APPLICANT: Hoefer Wysocki Architects, L.L.C., is the applicant for this request. 2. REQUESTED ACTION: The applicant is requesting final

More information

Rezoning Petition Post-Hearing Staff Analysis February 5, 2019

Rezoning Petition Post-Hearing Staff Analysis February 5, 2019 Rezoning Petition 2018-053 Post-Hearing Staff Analysis February 5, 2019 REQUEST Current Zoning: R-5 (single family), B-1 (neighborhood business), I-1 (light industrial), and I-2 (general industrial) Proposed

More information

THE CORPORATION OF THE CITY OF NORTH VANCOUVER

THE CORPORATION OF THE CITY OF NORTH VANCOUVER THE CORPORATION OF THE CITY OF NORTH VANCOUVER Meeting of the Held at City Hall, 141 West 14th Street, North Vancouver, B.C. in Conference Room A on Wednesday, July 20,2005 M I N U T E S Present: Staff:

More information

3.1 community vision. 3.3 required plan elements

3.1 community vision. 3.3 required plan elements Chapter 3 Community Form 3.1 community vision 3.2 Parks & landscaping concepts 3.3 required plan elements D R A F T 20 Community Form Chapter 3 3.0 Community form 3.1 community vision The Specific Plan

More information

PLANNED UNIT DEVELOPMENT STAFF REPORT Date: June 2, 2016

PLANNED UNIT DEVELOPMENT STAFF REPORT Date: June 2, 2016 # 9 ZON2016-01032 PLANNED UNIT DEVELOPMENT STAFF REPORT Date: June 2, 2016 DEVELOPMENT NAME JJT Properties LLC LOCATION 1147 & 1151 East I-65 Service Road South and 1180 Sledge Drive (Southeast corner

More information

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF MAY 27, 2014

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF MAY 27, 2014 CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF MAY 27, 2014 Item 6, Report No. 21, of the Committee of the Whole, which was adopted without amendment by the Council of the City of Vaughan on May

More information

The Village. Chapter 3. Mixed Use Development Plan SPECIFIC PLAN

The Village. Chapter 3. Mixed Use Development Plan SPECIFIC PLAN The Village SPECIFIC PLAN Chapter 3 3.1 INTRODUCTION 3.1.1 Purpose This Chapter describes the development regulations applicable to the Mixed-Use and Transit Center Planning Areas. These form-based regulations

More information

D3 January 14, 2015 Public Hearing

D3 January 14, 2015 Public Hearing D3 January 14, 2015 Public Hearing APPLICANT: DONALD J. BOUCHER, JR. PROPERTY OWNER: D.J.B. SERVICE CENTER, LLC STAFF PLANNER: Kristine Gay REQUEST: A. Conditional Change of Zoning (I-1 to B-2) B. Conditional

More information

EDMOND PLANNING COMMISSION MEETING. Tuesday, January 17, 2006

EDMOND PLANNING COMMISSION MEETING. Tuesday, January 17, 2006 8 EDMOND PLANNING COMMISSION MEETING Tuesday, 5:30 P.M. The Edmond Planning Commission Meeting was called to order by Chairperson Leroy Cartwright at 5:30 p.m., Tuesday,, in the City Council Chambers at

More information

Name (Please Print) Address (Please include Zip code and Apt. number) Edgemont Sketch Plan and Preliminary Plan Applications Community Meeting At Beth

Name (Please Print) Address (Please include Zip code and Apt. number) Edgemont Sketch Plan and Preliminary Plan Applications Community Meeting At Beth Name (Please Print) Address (Please include Zip code and Apt. number) Edgemont Sketch Plan and Preliminary Plan Applications Community Meeting At Bethesda-Chevy Chase Regional Services Center 4805 Edgemoor

More information

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan Appendix F Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan Introduction and Purpose of the Plan The Gold Line Bus Rapid Transit facility is an eleven-mile dedicated

More information

PLANNING COMMISSION Work Session Meeting Agenda

PLANNING COMMISSION Work Session Meeting Agenda PLANNING COMMISSION Work Session Meeting Agenda 5200 85TH AVENUE NORTH BROOKLYN PARK MN 55443 PHONE (763) 424-8000 FAX (763) 493-8391 Wednesday, September 27, 2017-7:00 P.M. Brooklyn Township Room If due

More information

Bourne Downtown Site Planning

Bourne Downtown Site Planning Prepared for: The Town of Bourne, MA In Cooperation with: Bourne Financial Development Corporation Prepared by:, Inc. June 24, 2009 Table of Contents Introduction and Summary... 1 Site Existing Conditions...

More information

APPEARANCE COMMISSION. Thursday, February 21, 2013 Council Chambers, City Hall 505 Butler Place Park Ridge, Illinois M I N U T E S

APPEARANCE COMMISSION. Thursday, February 21, 2013 Council Chambers, City Hall 505 Butler Place Park Ridge, Illinois M I N U T E S CITY OF PARK RIDGE 505 BUTLER PLACE PARK RIDGE, IL 60068 TEL: 847/ 318-5291 FAX: 847/ 318-6411 TDD:847/ 318-5252 URL:http://www.parkridge.us DEPARTMENT OF COMMUNITY PRESERVATION AND DEVELOPMENT APPEARANCE

More information

RESIDENTIAL PLANNED UNIT DEVELOPMENT / SUBDIVISION AND REZONING CONCEPT AND DEVELOPMENT STAGE PLAN SUBMITTAL NARRATIVE

RESIDENTIAL PLANNED UNIT DEVELOPMENT / SUBDIVISION AND REZONING CONCEPT AND DEVELOPMENT STAGE PLAN SUBMITTAL NARRATIVE RESIDENTIAL PLANNED UNIT DEVELOPMENT / SUBDIVISION AND REZONING CONCEPT AND DEVELOPMENT STAGE PLAN SUBMITTAL NARRATIVE DEVELOPMENT TEAM DONEGAL SOUTH Maple Grove, Minnesota March 27, 2017 Applicant/Developer/Builder:

More information

DESIGN REVIEW COMMITTEE AGENDA ITEM

DESIGN REVIEW COMMITTEE AGENDA ITEM DESIGN REVIEW COMMITTEE AGENDA ITEM AGENDA DATE: OCTOBER 3, 2012 TO: Chair Woollett and Members of the Design Review Committee THRU: FROM: SUBJECT: Leslie Aranda Roseberry, Planning Manager Daniel Ryan,

More information

TABLE OF CONTENTS 1.0 INTRODUCTION... 3

TABLE OF CONTENTS 1.0 INTRODUCTION... 3 TABLE OF CONTENTS 1.0 INTRODUCTION... 3 1.1. BACKGROUND... 3 1.2. THE PROPOSAL... 5 2.0 EXISTING POLICY FRAMEWORK... 5 2.1. PROVINCIAL POLICY STATEMENT (PPS)... 5 2.2. CITY OF LONDON OFFICIAL PLAN (OP)...

More information

Page 2 University Park CA R 1/

Page 2 University Park CA R 1/ Page 2 University Park CA-1 0-07R 1/13-9500001 0 Subsequent to City Council approval, a demolition permit was issued to raze the existing structures associated with Monier Tile. In July, 2013, a building

More information

DRAFT DESIGN GUIDELINES

DRAFT DESIGN GUIDELINES IHZ Booklet #7 May 6, 2010 DRAFT DESIGN GUIDELINES CANTERBURY 7 Overview During the recent planning process for the Plan of Conservation and Development community character was identified as an important

More information

OTHERS PRESENT: Approximately 16 interested persons were present.

OTHERS PRESENT: Approximately 16 interested persons were present. CITY OF CARPINTERIA ARCHITECTURAL REVIEW BOARD 5775 Carpinteria Avenue Meeting Date: August 26, 2010 Carpinteria California 93013 ACTION MINUTES The meeting was called to order at 5:30 p.m. by William

More information

REPORT TO THE CHIEF ADMINISTRATIVE OFFICER FROM THE DEVELOPMENT AND ENGINEERING SERVICES DEPARTMENT

REPORT TO THE CHIEF ADMINISTRATIVE OFFICER FROM THE DEVELOPMENT AND ENGINEERING SERVICES DEPARTMENT REPORT TO THE CHIEF ADMINISTRATIVE OFFICER FROM THE DEVELOPMENT AND ENGINEERING SERVICES DEPARTMENT ON DEVELOPMENT PERMIT APPLICATION NO. DPM00592 1393 9TH AVENUE/915 MCMURDO DRIVE OWNER/APPLICANT: 1393