WELCOME! PUBLIC EVENT SERIES #3. Niagara GO Hub and Transit Stations Study OPEN HOUSE. 5:30pm - 7:30pm TOWN OF GRIMSBY

Size: px
Start display at page:

Download "WELCOME! PUBLIC EVENT SERIES #3. Niagara GO Hub and Transit Stations Study OPEN HOUSE. 5:30pm - 7:30pm TOWN OF GRIMSBY"

Transcription

1 WELCOME! Niagara GO Hub and Transit Stations Study PUBLIC EVENT SERIES # OPEN HOUSE 5:0pm - 7:0pm TOWN OF GRIMSBY

2 PROJECT BACKGROUND In 0, GO Transit/Metrolinx completed an Environmental Study Report (ESR) called the Niagara Rail Service Expansion. The ESR recommended new or expanded commuter rail service to address increasing congestion levels along the corridor between Niagara-Hamilton and the western GTA. The ESR studied multiple station locations and recommended preferred station locations in Grimsby, St. Catharines, and Niagara Falls, with a longer-term recommended future station identified in Lincoln (Beamsville). This study builds on the GO Transit/Metrolinx work done to date and provides more detailed planning and design for areas around the transit stations. Niagara Region, in partnership with the Town of Grimsby, Town of Lincoln, City of St. Catharines and City of Niagara Falls, are embarking on a planning process for four future GO Transit station areas. Today s event is the third in a series of public events for the Station Area. Previous public information centres were hosted in June 06, and June 07. We invite you to engage with the Project Team and contribute your ideas. Recommended future station Recommended Future GO Rail Station Beamsville

3 PROJECT PURPOSE Tonight s event is your opportunity to: JO IN E MAILIN H T LIS T RM FO SUB M I OMMEN C A T T G G W IT H T E H U AM TE DIAL O. Learn about the study, planning process and project steps;. Learn about the draft Secondary Plan for the lands around the GO Transit Station; and. Contribute your comments/feedback on the draft Secondary Plan elements. E For each of the four stations, the project team has prepared: A draft Secondary Plan for the lands around the station area; Opportunities and constraints mapping to inform discussions with Metrolinx on Preliminary Design Plans (non-statutory plans); Transportation analysis including traffic management planning; and Market analysis to better understand development potential around each station. Tonight s Event WE ARE HERE

4 SECONDARY PLANS What is a Secondary Plan? Key Elements of a Secondary Plan The Official Plan is the road map that guides long range land use and development for a town or city. Secondary Plans are part of the Official Plan, and provide more detailed guidance on specific areas. These plans provide more detail on things like land use, public spaces, building heights, environmental protection, roads, trails and parks. Secondary Plans contain a number of important components: Transit stations and the surrounding lands serve an important function within the regional transportation system and in the long term development of a municipality. Vision and principles for the area; A comprehensive set of policies (on topics including environmental protection, public space, buildings, roads, trails, etc.); Land use, building heights, public realm improvement, transportation and active transportation plans; Design guidelines; and Implementation guidance to move the Plan forward. A Secondary Plan Does Not... Provide the detailed design for the GO station (separate processes address these elements) Commit Council to specific capital costs (separate process for funding capital improvements) Identify the specific design for major Beamsville GO Station Secondary Plan infrastructure improvements, such as Schedule : Maximum Building Heights improvements to the road network Stipulate detailed building requirements (zoning by law will contain specific regulations which implement secondary Niagara Falls GO Station Secondary Plan plan policies) Schedule 6: Planned Active Transportation Network North Service Road Ontario Street North LEGEND Max. Storeys Leader Lane r Ter ace Av en NIAGARA RIVER ue ic e ad Ro Transit Station Area Hickson Avenue rv Se Secondary Plan Limits Dyson Avenue Max. 0 Storeys So uth Broughton Avenue Max. 6 Storeys Martin Avenue Muir Avenue Max. 4 Storeys Queen Elizabeth Way eet Elgin Str LEGEND Buttrey Street Urban Area Boundary River Road Christie Drive idge rd St Clair Avenue St Lawrence Avenue Juniper Court G a rdens C rescen t Drake Avenue Iv y Green Meadow Weltman Cataract Avenue Zimmerman Avenue Erie Avenue Ellis Street Simcoe Street Way Alexandra Avenue Armoury Street G a te Te rrace va Willmott Street rd en ie s u le ent Morrison Street ntral an Ce Michig Bridge y Railwa Ga Fr Bo Cresc Homestead Drive Cameron Avenue en gate Queen Street Huron Street Bartlett Road Carriage Road Ontario Street Cedarbrook Lane Lincoln Avenue d v ar ule Bo Hickory Lane North Park Street Ontario Avenue Crysler Avenue Delta Way Lincoln Avenue Greenlane Buckley Avenue ad Bartlett Road Ro Maple Street Bridge Street Victoria Avenue Second Avenue ion Un First Avenue Br Whirlpool NORTH MAP PREPARED BY: ZMJ DILLON CONSULTING CHECKED BY: PJK DILLON CONSULTING Scale PROJECT: 6-95 STATUS: DRAFT DATE: /0/07 Scale

5 PLANNING AROUND TRANSIT What is Transit Oriented Development? Transit Oriented Development (TOD) is a planning approach that envisions the long-term growth of an area around transit stations and major transportation routes. The focus is on improving quality of life by creating sustainable and livable pedestrianoriented, mixed-use communities that respect the character of an area while also providing for more compact growth. Across the Greater Golden Horseshoe, a number of municipalities are leveraging transit investment to drive growth. Provincial investment in GO Train service in Niagara represents a unique opportunity to proactively plan land use, transportation networks (all modes) and infrastructure around the station areas. STREET ORIENTED, MIXED-USE DEVELOPMENT DENSITY/COMPACT GROWTH SEAMLESS INTEGRATION OF THE STATION HIGH QUALITY PUBLIC SPACES Why Planning Matters The Province s Growth Plan directs municipalities to plan for intensification around GO stations. Recent updates to the Growth Plan have also provided density targets. Proactively planning the uses, activities and infrastructure around these locations will have a profound impact on their performance. Successful transit stations are ones where there has been an intentional approach to planning for growth around the station, elevating walkability and access and improving the public realm to create spaces that are vibrant and active. Having more people living and working in close proximity to the station is an important factor in its success. 5

6 ROUTES TO THE STATION CONSULTATION SUMMARY Feedback Channels Online surveys hosted on the Project website Other comments received through the Project website feedback received as well as a mailing list to provide updates to subscribers Feedback received at Public Information Centres through workshop sessions and comment forms What We Heard: Key Themes ACCESS TO GTA DIVERSITY OF USES GROWTH & INVESTMENT STREETSCAPE IMPROVEMENTS GATEWAY TO THE U.S.A TRAFFIC FLOW PARKING TRANSIT INTEGRATION TRAIN SERVICE & FREQUENCY 6

7 Plan VISION FOR THE AREA Specifically to gateway locations, public spaces, prominent streets and adding bikeway/multi-use trails r Ter ace Av Hickson Avenue Comprehensively improve the public realm en ue t e e r Elgin St Buttrey Street Concentrate mixed use intensification on sites in proximity to the Station ge Brid l o o p l r i h W St Clair Avenue tral n e C n a g i h c Mi ge d i r B y a w l i a R Strengthen residential neighbourhoods And provide for a network to address land use compatibility along Buttrey Street and Erie Avenue Huron Street Ontario Avenue Queen Street oa R r e Riv Park Street Cataract Avenue d Zimmerman Avenue Bridge Street 4 Support tourist uses along River Road The riverfront will be redeveloped to include medium density tourist commercial uses such as plazas, open spaces, and public realm improvements to ensure public accessibility and enjoyment of the riverfront Ellis Street NORTH 5 Celebrate, conserve and enhance the historic and cultural assets of the Downtown 7

8 Dyson Avenue Muir Avenue PLAN FOR LAND USE Leader Lane 4a Martin Avenue Broughton Avenue Buttrey Street Hickson Avenue Terrace Avenue Elgin Street NIAGARA RIVER LEGEND Low Density Residential Medium Density Residential High Density Residential Mixed Use (Downtown) Mixed Use 4b River Road Employment/Mixed Use Tourist Commercial Utility Recreation and Open Space Whirlpool Bridge Environmental Protection Area Environmental Conservation Area Second Avenue Maple Street First Avenue Victoria Avenue Buckley Avenue Crysler Avenue Park Street Queen Street Huron Street Bridge Street Ontario Avenue Erie Avenue Zimmerman Avenue Cataract Avenue Michigan Central Railway Bridge Special Policy Area (SPA) Transit Station Area may be refined during the detailed design of the Station. Secondary Plan Limits Urban Area Boundary Willmott Street St Lawrence Avenue Morrison Street St Clair Avenue Ellis Street NORTH Simcoe Street Armoury Street Scale FEEDBACK Key Highlights of the Plan HOW WAS INTEGRATED? Long-term vision for future redevelopment of industrial sites Focusing higher density in the main downtown area in the vicinity of the GO Transit Station Transitioning from higher to lower densities across the area to protect the character of residential neighbourhoods Targeting the riverfront north of Bridge Street for tourist commercial development Alignment with the Niagara Falls Official Plan and strategic direction for the City General agreement on the land uses proposed Suggestions for future long-term redevelopment of some industrial sites, which was incorporated into guidance for Special Policy Areas Comments on need for integration of diverse community and commercial uses in mixed-use areas, integrated into the policy guidance

9 Dyson Avenue Muir Avenue PLAN FOR BUILDING HEIGHT Leader Lane 4a Martin Avenue Broughton Avenue Buttrey Street Hickson Avenue Terrace Avenue Elgin Street NIAGARA RIVER LEGEND Max. Storeys Max. 4 Storeys Max. 6 Storeys Max. 8 Storeys 4b Max. 0 Storeys Max. 4 Storeys Max. 0 Storeys River Road Special Policy Area (SPA) Second Avenue Maple Street First Avenue Victoria Avenue Buckley Avenue Crysler Avenue Park Street Queen Street Huron Street Bridge Street Ontario Avenue Erie Avenue Zimmerman Avenue Cataract Avenue Whirlpool Bridge Michigan Central Railway Bridge Secondary Plan Limits Transit Station Area may be refined during the detailed design of the Station. Urban Area Boundary Willmott Street St Lawrence Avenue Morrison Street St Clair Avenue Ellis Street NORTH Simcoe Street Armoury Street Scale FEEDBACK Key Highlights of the Plan HOW WAS INTEGRATED? Additional transitions in height from higher to lower to protect sightlines and views as well as residential neighbourhoods and heritage areas Policies in the plan to provide setbacks and building stepbacks (podium-style, as shown on Panel #) to reduce effects of taller buildings for pedestrians Height limits recognize existing development and character of the area Alignment with the Niagara Falls Official Plan and strategic direction for the City Support for the general arrangement of building heights and transitions across the Plan area Suggestions for protection of heritage properties integrated with further intermediate heights between taller and shorter building height permissions Concern over how building height permissions would result in more traffic addressed through road improvements (see Panel #)

10 Dyson Avenue PLAN FOR THE PUBLIC REALM LEGEND Muir Avenue Leader Lane Martin Avenue Broughton Avenue Hickson Avenue Environmental Protection Area Terrace Avenue Elgin Street NIAGARA RIVER Parks and Open Space Major Streetscape Improvement Minor Streetscape Improvement Existing Active Transportation Connection Buttrey Street Planned Active Transportation Connection Potential Street Grid Refinement Major Gateway River Road Minor Gateway Second Avenue Maple Street First Avenue Victoria Avenue Buckley Avenue Bridge Street Crysler Avenue Park Street Queen Street Huron Street Ontario Avenue Erie Avenue Zimmerman Avenue Cataract Avenue Whirlpool Bridge Michigan Central Railway Bridge Potential GO Station Location Potential Public Space Improvement Potential New Public Space Transit Station Area may be refined during the detailed design of the Station. Secondary Plan Limits Urban Area Boundary Willmott Street St Lawrence Avenue Morrison Street St Clair Avenue Ellis Street NORTH Simcoe Street Armoury Street Scale Key Highlights of the Plan Streetscape Improvements that include sidewalk widening, lighting, street furnitute Parks and public open spaces identified that provide venues for community gathering Victoria Street and Bridge Street intersection identified as a Major Gateway area, promoting investment in public art and high quality design to provide a sense of arrival to the area Minor Gateway areas identified as potential locations for public art HOW WAS FEEDBACK Community feedback on need for INTEGRATED? m gathering spaces integrated into the Plan Connections between public spaces and active transportation connections recognized in the design of the Plan Streetscape improvements and wayfinding suggestions integrated into the Plan and Urban Design Guidelines (see Panel #) 0

11 First Avenue Victoria Avenue Dyson Avenue Dyson Avenue PLAN FOR MOBILITY Muir Avenue Leader Lane Broughton Avenue Martin Avenue Buttrey Street Hickson Avenue Terrace Avenue Elgin Street River Road NIAGARA RIVER Potential Thorold Stone Road extension Muir Avenue Leader Lane Signalization of Victoria Avenue at Buttrey Street or reconfiguration of Buttrey Street needed to improve sight lines Martin Avenue Broughton Avenue Buttrey Street Hickson Avenue Terrace Avenue Elgin Street Whirlpool Bridge Second Avenue Maple Street Willmott Street Buckley Avenue St Lawrence Avenue Simcoe Street Bridge Street Crysler Avenue Morrison Street Park Street Queen Street Huron Street St Clair Avenue Ellis Street Ontario Avenue Erie Avenue Zimmerman Avenue Cataract Avenue NORTH Michigan Central Railway Bridge Second Avenue Maple Street First Avenue Willmott Street Victoria Avenue Existing Bike Route/Lane (On-Road) Victoria Avenue improvements Buckley Avenue St Lawrence Avenue Crysler Avenue Morrison Street St Clair Avenue Park Street Queen Street Huron Street Bridge Street Ellis Street Location of Improvement Ontario Avenue Erie Avenue Armoury Street Planned Bike Route/Lane (On-Road) Existing Multi-Use Trail (Off-Road) Armoury Street Planned Multi-Use Trail (Off-Road) Urban Area Boundary Simcoe Street Road Network Secondary Plan Limits Transit Station Area may be refined during the detailed design of the Station. Key Highlights of the Plan Active transportation connections proposed to fill out the existing network and provide connections to the riverfront and through the downtown Road widths align with the Niagara Falls Official Plan and strategic direction for the City Three main improvements suggested to provide better traffic flow and access to the GO Transit Station Transportation policies include guidance on traffic calming and managing volumes through the area Design guidelines for roads include direction on incorporating active transportation and promoting safety for cyclists and pedestrians (see Panel #) HOW WAS ² m FEEDBACK Strong support for greater connetivity and priority for INTEGRATED? pedestrians and cyclists, reflected in the policies for protected cycling lanes and wider sidewalks Desire for connections to the riverfront, integrated into the selected routes for proposed cycling lanes Need for active transportation links that provide access to the GO Transit Station, integrated through north and south access routes

12 DESIGNING FOR PEOPLE The Secondary Plan provides detailed design guidance on these four key areas, which together shape the character of the Plan Area and influence the experience of being in it. THE HUMAN SCALE Building Spaces for People SITE DESIGN A Strong Neighbourhood Framework Improving the public realm for pedestrians, cyclists and transit users will contribute to livable and animated streets and parks. As properties within the Plan Area redevelop, it will be increasingly important to improve the public realm. Key elements for human-scaled design include boulevard design, landscaping, street furniture and public art, new public open spaces, and Low-Impact Development (LID) to provide for stormwater management and create green buffers from developed areas. Community design includes the location and orientation of buildings. The Design Guidelimes aim to protect and direct views, providing a consistent street wall, and relating buildings to the street and pedestrian activities. Key elements of development addressed through site design policies include Gateway features, parking, access and entrances, storage, servicing and loading areas for industrial sites, front and rear property setbacks from the street as well as transitions between different site uses. BUILDING HEIGHT AND MASSING Getting the Right Fit SUSTAINABILITY Considering the Future Buildings within the Plan Area will be low to midrise, with taller buildings focused in the vicinity of the GO Transit Station and Downtown. The Urban Design Guidelines address height and massing for buildings with policies directed at mid-rise building design, building podiums and stepbacks, and façade design. Buildings account for approximately 40 percent of greenhouse gas (GHG) emissions in North America. Adopting sustainable practices in building design not only decreases the amount of GHG emissions released, but also lowers operating costs. Key considerations for achieving sustainable building design include passive solar design and energy efficiency.

13 IMPLEMENTING THE PLAN How do Secondary Plans SHORT-TERM PRIORITY 5-YEAR TIMEFRAME MID-TERM PRIORITY 0-YEAR TIMEFRAME LONG-TERM PRIORITY 0-YEAR TIMEFRAME get Implemented? Secondary Plans are integrated into the City s Official Plan and get implemented in a manner of ways: NEW CONNECTIONS & ROADWAY IMPROVEMENTS Thorold Stone Road Extension Signalization of Victoria Avenue at Buttrey Street Alternative would be to realign Buttrey Street to connect with Ferguson Street to improve sight lines Victoria Avenue Improvements As private development occurs, the policies of the secondary are applied. From a public sector perspective, the municipal projects, such as road improvements or new public spaces are implemented by the appropriate level of government (Provincial, Regional or Local). For most public sector projects contemplated in the Secondary Plan, additional detailed planning is required, such as an environmental assessment, feasibility study or design exercise. BIKE ROUTE/ LANE (ON-ROAD) MULTI-USE TRAIL STREETSCAPE IMPROVMENTS 4 5 Bridge Street - Between Victoria Avenue and River Road Victoria Avenue - Between Bridge Street and Armoury Street Erie Avenue - Between Bridge Street and Huron Street Hickson Avenue - Between Buttrey Street and Leader Lane Morrison Street - Between Victoria Avenue and River Road Transit Station Trail Connecting Erie Avenue with Hickson Avenue and Hickson Avenue with River Road Olympic Torch Race Legacy Trail Extension Connecting existing Olympic Torch Race Legacy Trail with the Michigan Central Railway Bridge and River Road River Road Major Streetscape Improvements Between Buttrey Street and Simcoe Street Bridge Street Minor Streetscape Improvements Between Victoria Avenue and River Road Buttrey Street Minor Streetscape Improvements Between Victoria Avenue and River Road Generally, funding for infrastructure projects proposed in the Secondary Plan come from a variety of sources, such as development charges or municipal tax base Victoria Avenue Minor Streetscape Improvements Between Buttrey Street and Bridge Street Erie Avenue Major Streetscape Improvements Between Bridge Street and Queen Street Potential Street Grid Refinement Mid block between Park Street and Queen Street connecting St. Lawrence Avenue with River Road Victoria Avenue and Bridge Street Major Gateway GATEWAY FEATURES Erie Avenue and Bridge Street Minor Gateway River Road and Whirlpool Bridge Minor Gateway New Public Space at southwest corner of Erie Avenue and Bridge Street New Public Space adjacent to Transit Station Area PUBLIC SPACE Public Space Improvement south of Bridge Street Mid-block between Crysler Avenue and Erie Avenue 4 Public Space Improvement along River Road Mid-block between Bridge Street and Park Street

14 NEXT STEPS Public review of draft Secondary Plan (ongoing). Finalize the Secondary Plan and present to Regional and Local Councils at Statutory Public Meetings. How you can help Stay involved with the project and be a part of developing the plan for each of the station areas. Here are the ways you can participate:??? Ask questions today Sign up for our contact list by ing GoHubStudy@niagararegion.ca Visit For any questions or comments, please contact: Diana Morreale, MCIP, RPP Planning Lead, GO Implementation Office Niagara Region 85 Sir Isaac Brock Way (Formerly 0 St. David s Rd.) P.O. Box 04, Thorold, ON LV 4T7 T: (905) ext. 67 E: Diana.morreale@niagararegion.ca 4

Beamsville GO Transit Station Background Study. October 2017

Beamsville GO Transit Station Background Study. October 2017 Beamsville GO Transit Station Background Study October 207 Play structures in Hilary Bald Community Park, Lincoln. This document provides the background and draft policy framework to support the development

More information

Niagara GO Hub and Transit Stations Study

Niagara GO Hub and Transit Stations Study Niagara GO Hub and Transit Stations Study Public Open House #2 June 2017 Study Purpose The purpose of this study is to prepare four key deliverables for each station area: 1. Work with Metrolinx to provide

More information

DRAFT: OPA 125, DOWNTOWN NIAGARA FALLS GO TRANSIT SECONDARY PLAN CITY OF NIAGARA FALLS OFFICIAL PLAN

DRAFT: OPA 125, DOWNTOWN NIAGARA FALLS GO TRANSIT SECONDARY PLAN CITY OF NIAGARA FALLS OFFICIAL PLAN DRAFT: OPA 125, DOWNTOWN NIAGARA FALLS GO TRANSIT SECONDARY PLAN CITY OF NIAGARA FALLS OFFICIAL PLAN PART 2 - BODY OF THE AMENDMENT All of this part of the document entitle PART 2 Body of the Amendment,

More information

CITY OF NIAGARA FALLS. By-law No A by-law to provide for the adoption of Amendment No. 125 to the City of Niagara Falls Official Plan.

CITY OF NIAGARA FALLS. By-law No A by-law to provide for the adoption of Amendment No. 125 to the City of Niagara Falls Official Plan. CITY OF NIAGARA FALLS By-law No. 2018- A by-law to provide for the adoption of Amendment No. 125 to the City of Niagara Falls Official Plan. THE COUNCIL OF THE CORPORATION OF THE CITY OF NIAGARA FALLS,

More information

Urban Design Manual PLANNING AROUND RAPID TRANSIT STATIONS (PARTS) Introduction. Station Study Areas

Urban Design Manual PLANNING AROUND RAPID TRANSIT STATIONS (PARTS) Introduction. Station Study Areas 111111 PLANNING AROUND RAPID TRANSIT STATIONS (PARTS) Introduction The ION rapid transit system will link Waterloo, Kitchener and Cambridge through a central transit corridor (CTC). There are a number

More information

DOWNTOWN GEORGETOWN PLANNING STUDY

DOWNTOWN GEORGETOWN PLANNING STUDY DOWNTOWN GEORGETOWN PLANNING STUDY Community Workshop #3 Thursday, May 4, 08 The Planning Partnership OVERVIEW OF STUDY, PROCESS & MILESTONES We are here PURPOSE OF THE STUDY To develop a clear vision

More information

Subject: Official Plan Amendment No.125 (OPA 125) Niagara Falls Transit Station Secondary Plan City of Niagara Falls

Subject: Official Plan Amendment No.125 (OPA 125) Niagara Falls Transit Station Secondary Plan City of Niagara Falls PDS 24-2018 June 6, 2018 Page 1 Subject: Official Plan Amendment No.125 (OPA 125) Niagara Falls Transit Station Secondary Plan City of Niagara Falls Report to: Planning and Economic Development Committee

More information

PUBLIC OPEN HOUSE HURONTARIO-MAIN CORRIDOR SECONDARY PLAN

PUBLIC OPEN HOUSE HURONTARIO-MAIN CORRIDOR SECONDARY PLAN PUBLIC OPEN HOUSE HURONTARIO-MAIN CORRIDOR SECONDARY PLAN Tuesday, February 28, 2012 6pm 9pm 1 st Floor Atrium, City Hall 2 Wellington Street West, Brampton 1 POLICY FRAMEWORK The 2006 Provincial Growth

More information

Town of Cobourg Heritage Master Plan. Statutory Public Meeting

Town of Cobourg Heritage Master Plan. Statutory Public Meeting Town of Cobourg Heritage Master Plan Statutory Public Meeting April 25 th 2016 Presentation Overview 1. Introduction 2. Project background and schedule overview 3. Review of strategic direction content

More information

PART 2 THE AMENDMENT DRAFT

PART 2 THE AMENDMENT DRAFT PART 2 THE AMENDMENT 2.1 PREAMBLE All of this part of the document entitled PART 2 THE AMENDMENT, consisting of the explanatory text and the attached maps identified as Schedules B3 to Schedule B8 constitute

More information

WELCOME and introduction

WELCOME and introduction 1 WELCOME and introduction Mobility Hub Locations within Burlington STUDY OVERVIEW STUDY OBJECTIVES The City of Burlington is developing four Area Specific Plans, one for each of Burlington s Mobility

More information

Welcome. Walk Around. Talk to Us. Write Down Your Comments

Welcome. Walk Around. Talk to Us. Write Down Your Comments Welcome This is an information meeting introducing the applications for proposed redevelopment of the Yorkdale Shopping Centre site at 3401 Dufferin Street and 1 Yorkdale Road over the next 20+ years,

More information

SCARBOROUGH SUBWAY EXTENSION. Scarborough Subway Extension. Final Terms of Reference

SCARBOROUGH SUBWAY EXTENSION. Scarborough Subway Extension. Final Terms of Reference Scarborough Subway Extension Final Terms of Reference 1 1.0 Introduction and Background 1.1 Introduction Toronto City Council recently confirmed support for an extension of the Bloor-Danforth Subway from

More information

SUBJECT: Proposed Downtown Mobility Hub Precinct Plan and Proposed Official Plan Policies

SUBJECT: Proposed Downtown Mobility Hub Precinct Plan and Proposed Official Plan Policies Page 1 of Report PB-81-17 SUBJECT: Proposed Downtown Mobility Hub Precinct Plan and Proposed Official Plan Policies TO: FROM: Committee of the Whole Planning and Building Department Report Number: PB-81-17

More information

Don Mills Crossing Study and Celestica Lands Development Application Community Meeting, Open House, and Breakout Discussions

Don Mills Crossing Study and Celestica Lands Development Application Community Meeting, Open House, and Breakout Discussions Consultation Summary Don Mills Crossing Study and Celestica Lands Development Application Community Meeting, Open House, and Breakout Discussions This report is not intended to provide a verbatim transcript

More information

Port Credit Local Advisory Panel October 20 th Meeting

Port Credit Local Advisory Panel October 20 th Meeting Port Credit Local Advisory Panel October 20 th Meeting Focus Of This Evening s Meeting: 1. Hurontario Main Street Higher Order Transit Study 2. Port Credit Mobility Hub & GO Station Parking Structure Study

More information

This page has been intentionally left blank.

This page has been intentionally left blank. This page has been intentionally left blank. Chapter 3 3-2 3. Employment 3.A Niagara Economic Gateway 3.A.1 General The Niagara Economic Gateway comprises: a) The Gateway Economic Zone which includes all

More information

Clair-Maltby Community visioning

Clair-Maltby Community visioning Clair-Maltby Community visioning workshop #1 Summary April 27th, 2017 Table of Contents INTRODUCTIon 1 PURPOSE 1 CONSULTATION STRUCTURE 2 PARTICIPANT FEEDBACK 3 VISIONING EXERCISE 8 ONLINE SURVEY RESULTS

More information

ELMVALE ACRES SHOPPING CENTRE MASTER PLAN

ELMVALE ACRES SHOPPING CENTRE MASTER PLAN ELMVALE ACRES SHOPPING CENTRE MASTER PLAN Contents 1.0 INTRODUCTION... 2 2.0 LOCATION... 2 3.0 EXISTING CONTEXT... 2 4.0 VISION & GUIDING PRINCIPLES... 2 5.0 LAND USE AND BUILT FORM... 4 5.1 St. Laurent

More information

Workshop 3. City of Burlington Waterfront Hotel Planning Study. September 14, The Planning Partnership

Workshop 3. City of Burlington Waterfront Hotel Planning Study. September 14, The Planning Partnership Workshop 3 City of Burlington Waterfront Hotel Planning Study September 14, 2017 The Planning Partnership The Waterfront Hotel Planning Study 01 The Brant & Lakeshore Planning Study will establish a Strategic

More information

NEW REGIONAL OFFICIAL PLAN HIGH LEVEL PROCESS & FRAMEWORK

NEW REGIONAL OFFICIAL PLAN HIGH LEVEL PROCESS & FRAMEWORK NEW REGIONAL OFFICIAL PLAN HIGH LEVEL PROCESS & FRAMEWORK Why A New Official Plan Originally the role of Regionally Planning and content of Regional Official Plan (1970s) primarily focused on protecting

More information

Mark-up of the effect of the proposed Bronte Village Growth Area OPA No.18 on the text of section 24, Bronte Village, of the Livable Oakville Plan

Mark-up of the effect of the proposed Bronte Village Growth Area OPA No.18 on the text of section 24, Bronte Village, of the Livable Oakville Plan Mark-up of the effect of the proposed Bronte Village Growth Area OPA No.18 on the text of section 24, Bronte Village, of the Livable Oakville Plan Notes: This document is provided for information purposes

More information

Laird in Focus Community Information Session

Laird in Focus Community Information Session Laird in Focus Community Information Session Tuesday, December 5, 2017 St. Anslem Catholic School, 182 Bessborough Drive Session 1: 5:30 pm - Presentation and Question and Answer Period 6:15 pm - Breakout

More information

Report to: Development Services Committee Report Date: April 24, 2017

Report to: Development Services Committee Report Date: April 24, 2017 SUBJECT: Cornell Rouge National Urban Park Gateway - Report on Design Charrette and Next Steps PREPARED BY: Lilli Duoba, MES, MCIP, RPP, Manager, Natural Heritage (ext. 7925) REVIEWED BY: Marg Wouters,

More information

CITY OF VAUGHAN KIRBY GO TRANSIT HUB SUB-STUDY

CITY OF VAUGHAN KIRBY GO TRANSIT HUB SUB-STUDY WELCOME! Thank you for attending, and welcome to the first of three Public Meetings for the Kirby GO Transit Hub Study. Your feedback is important to us, and will help inform the development of the draft

More information

CDAC. Update: Downtown Dartmouth Update: CDAC July 25 th Motion

CDAC. Update: Downtown Dartmouth Update: CDAC July 25 th Motion CDAC Update: Downtown Dartmouth Update: CDAC July 25 th Motion 2018-10-24 Downtown Dartmouth Plan Open House October 22, 2018 6:00 pm Open House 6:30 pm Presentation + Q&A 7:20 pm Open House 8:30 pm Close

More information

Welcome to the Oakridge Centre Open House

Welcome to the Oakridge Centre Open House Welcome to the Oakridge Centre Open House Why is the City hosting this event? This open house is to inform you of a rezoning application submitted to the City of Vancouver to amend the existing CD-1 (Comprehensive

More information

GO Station Mobility Hubs: Draft Precinct Plans. Committee of the Whole July 12, 2018

GO Station Mobility Hubs: Draft Precinct Plans. Committee of the Whole July 12, 2018 GO Station Mobility Hubs: Draft Precinct Plans Committee of the Whole July 12, 2018 Purpose of this Workshop Present Draft Precinct Plans for the 3 GO Station Mobility Hubs Continue the conversations that

More information

THE CITY OF VAUGHAN BY-LAW BY-LAW NUMBER A By-law to adopt Amendment Number 1 to the Official Plan of the Vaughan Planning Area.

THE CITY OF VAUGHAN BY-LAW BY-LAW NUMBER A By-law to adopt Amendment Number 1 to the Official Plan of the Vaughan Planning Area. THE CITY OF VAUGHAN BY-LAW BY-LAW NUMBER 015-2014 A By-law to adopt Amendment Number 1 to the Official Plan of the Vaughan Planning Area. NOW THEREFORE the Council of the Corporation of the City of Vaughan

More information

URBAN DESIGN BRIEF URBAN DESIGN BRIEF 721 FRANKLIN BLVD, CAMBRIDGE August 2018

URBAN DESIGN BRIEF URBAN DESIGN BRIEF 721 FRANKLIN BLVD, CAMBRIDGE August 2018 URBAN DESIGN BRIEF URBAN DESIGN BRIEF 721 FRANKLIN BLVD, CAMBRIDGE August 2018 DESIGN BRIEF CONTENTS PART A 1.0 INTRODUCTION 2.0 DESCRIPTION & ANALYSIS OF SITE CONTEXT 3.0 DESIGN CONSTRAINTS AND OPPORTUNITIES

More information

The West Vaughan Employment Area Secondary Plan Policies

The West Vaughan Employment Area Secondary Plan Policies Part 2: The West Vaughan Employment Area Secondary Plan Policies 2.1 General Policies It is the policy of Council: 2.1.1. That the West Vaughan Employment Area (the WVEA), identified on Schedule 1, will

More information

What We Heard. Downtown Georgetown Planning Study. April 4, 2018

What We Heard. Downtown Georgetown Planning Study. April 4, 2018 What We Heard Downtown Georgetown Planning Study April 4, 2018 Workshop 2 - July 5, 2017 01 DESIGN SUMMIT The Downtown Georgetown Planning Study will guide growth and development in the downtown over the

More information

SUBJECT: Waterfront Hotel Planning Study Update TO: Planning and Development Committee FROM: Department of City Building. Recommendation: Purpose:

SUBJECT: Waterfront Hotel Planning Study Update TO: Planning and Development Committee FROM: Department of City Building. Recommendation: Purpose: Page 1 of Report PB-23-18 SUBJECT: Waterfront Hotel Planning Study Update TO: Planning and Development Committee FROM: Department of City Building Report Number: PB-23-18 Wards Affected: 2 File Numbers:

More information

Complete Neighbourhood Guidelines Review Tool

Complete Neighbourhood Guidelines Review Tool Complete Neighbourhood Guidelines Review Tool Prepared By: City of Regina Planning Department October 2014 Page 1 of 14 Community Development Review Checklist for Secondary Plans and Concept Plans The

More information

WELCOME. The Yonge-Eglinton area has experienced significant growth and change in the last decade.

WELCOME. The Yonge-Eglinton area has experienced significant growth and change in the last decade. WELCOME DID YOU KNOW? MIDTOWN IS REPRESENTED BY 3 CITY COUNCILLORS: WARD 16 EGLINTON-LAWRENCE WARD 22 ST. PAUL S WARD 25 DON VALLEY WEST Midtown in Focus: Building a Livable Yonge-Eglinton The Yonge-Eglinton

More information

University of Saskatchewan CAMPUS MASTER PLAN. Senate Meeting Preliminary Presentation. April 21, 2018 DIALOG ECS DA WATT

University of Saskatchewan CAMPUS MASTER PLAN. Senate Meeting Preliminary Presentation. April 21, 2018 DIALOG ECS DA WATT University of Saskatchewan CAMPUS MASTER PLAN Senate Meeting Preliminary Presentation April 21, 2018 DIALOG ECS DA WATT project process presentation agenda Stakeholder Engagement Project Control phase1

More information

Figure 1- Site Plan Concept

Figure 1- Site Plan Concept Figure 1- Site Plan Concept Parking will be provided underground on three levels at rate of 1.0 space/ unit; this rate includes all visitors parking. MMM Group has prepared a parking assessment (April,

More information

Official Plan Review: Draft Built Form Policies

Official Plan Review: Draft Built Form Policies PG.30.1 REPORT FOR ACTION Official Plan Review: Draft Built Form Policies Date: May 15, 2018 To: Planning and Growth Management Committee From: Chief Planner and Executive Director, City Planning Division

More information

Key Themes and Responses May 2016

Key Themes and Responses May 2016 King and Victoria Transit Hub and Waterloo Street Pedestrian Access Key Themes and Responses May 2016 The following summarizes what Regional staff heard about the King Victoria Transit Hub and Waterloo

More information

Downtown Whitby Action Plan

Downtown Whitby Action Plan Downtown Whitby Action Plan Final Report October 2016 Table of Contents Introduction 1 Public Consultation 2 Walkability 3 Downtown Whitby Walkability Map 4 Vision 5 Goal & Objectives 6 Objective 1 7 Objective

More information

New-Cast Mixed-use Development Proposal King Street West, Newcastle, Ontario

New-Cast Mixed-use Development Proposal King Street West, Newcastle, Ontario URBAN DESIGN BRIEF New-Cast Mixed-use Development Proposal King Street West, Newcastle, Ontario TABLE OF CONTENTS: 1.0 Executive Summary 2.0 Creating Vibrant and Sustainable Urban Places: Excerpts from

More information

Elfrida Growth Area Study

Elfrida Growth Area Study Elfrida Growth Area Study Public Information Centre #2 December 6, 2017 6:00-8:30 pm PLANNING & ECONOMIC DEVELOPMENT DEPARTMENT Purpose of the Study The Elfrida Area has been identified as the preferred

More information

Building Great Neighbourhoods. Strathcona

Building Great Neighbourhoods. Strathcona Building Great Neighbourhoods Strathcona March 21, 2018 Becky Redford Project Manager, Planning & Design Building Great Neighbourhoods Integrated Infrastructure Services Welcome and Purpose To provide

More information

MAYFIELD WEST SECONDARY PLAN PHASE 2

MAYFIELD WEST SECONDARY PLAN PHASE 2 MAYFIELD WEST SECONDARY PLAN PHASE 2 Public Open House #3 February 25, 2010 Draft Preferred Land Use Scenario TOWN OF CALEDON PLANNING & DEVELOPMENT DEPARTMENT Open House Agenda TOWN OF CALEDON 1. Welcome

More information

Welcome. Community Consultation Meeting November 28, Review and discuss the Bathurst Quay Neighbourhood Plan Framework

Welcome. Community Consultation Meeting November 28, Review and discuss the Bathurst Quay Neighbourhood Plan Framework Welcome Community Consultation Meeting November 28, 2016 Why Are We Here Today? Review and discuss the Bathurst Quay Neighbourhood Plan Framework Review and discuss an Action Plan for Implementation Next

More information

Community Open House March 26 th, 2018

Community Open House March 26 th, 2018 Community Open House March 26 th, 2018 Open House Agenda 1. Overview of Planning Process What we heard 2. Future Land Use Policy 3. Priority Growth Areas 4. Plan Elements Making it happen What is a Comprehensive

More information

3. Urban Design in the Central Area

3. Urban Design in the Central Area 3. Urban Design in the Central Area The Central Area Planning and Design Group assumes the responsibility to promote high quality urban and architectural design in the Central Area, plan and ensure the

More information

CITY OF CAMBRIDGE Growth & Intensification Study Secondary Plan Stakeholder Session September 12th, 2016

CITY OF CAMBRIDGE Growth & Intensification Study Secondary Plan Stakeholder Session September 12th, 2016 CITY OF CAMBRIDGE Growth & Intensification Study Secondary Plan Stakeholder Session September 12th, 2016 Dillon Consulting Limited Watson & Associates Economists Curtis Planning Inc. Tim Welch Consulting

More information

*** DRAFT 2 FOR PUBLIC REVIEW ***

*** DRAFT 2 FOR PUBLIC REVIEW *** 6.7 The area is generally bounded by the Red Hill Valley Parkway to the west, Lake Avenue to the east, the Queen Elizabeth Way (QEW) to the north, and by the properties just south of Queenston Road to

More information

1.0 Purpose of a Secondary Plan for the Masonville Transit Village

1.0 Purpose of a Secondary Plan for the Masonville Transit Village Report to Planning and Environment Committee To: Chair and Members Planning & Environment Committee From: John M. Fleming Managing Director, Planning and City Planner Subject: Masonville Transit Village

More information

Corridor Vision. 1Pursue Minnehaha-Hiawatha Community Works Project. Mission of Hennepin County Community Works Program

Corridor Vision. 1Pursue Minnehaha-Hiawatha Community Works Project. Mission of Hennepin County Community Works Program 1Pursue Minnehaha-Hiawatha Community Works Project Minnehaha-Hiawatha Community Works is a project within the Hennepin Community Works (HCW) program. The mission of the HCW program is to enhance how the

More information

YONGE STEELES CORRIDOR SECONDARY PLAN. Young + Wright / IBI Group Architects Dillon Consulting Ltd. GHK International (Canada) Ltd.

YONGE STEELES CORRIDOR SECONDARY PLAN. Young + Wright / IBI Group Architects Dillon Consulting Ltd. GHK International (Canada) Ltd. PART A: PREAMBLE 1.0 PURPOSE The purpose of this Secondary Plan is to provide a development framework for intensification of the Yonge/ Steeles corridor including the north side of Steeles Avenue West

More information

Sustainable Growth. Sustainable Growth

Sustainable Growth. Sustainable Growth 2 Sustainable Growth Sustainable Growth SUSTAINABLE GROWTH 2.1 COMMUNITY VISION... 2-5 2.2 THE CITY SYSTEM... 2-7 2.2.1 AREAS... 2-7 2.2.2 CITY-WIDE SYSTEMS... 2-8 2.2.3 PROVINCIAL PLAN BOUNDARIES AND

More information

THE CORPORATION OF THE TOWN OF OAKVILLE BY-LAW NUMBER

THE CORPORATION OF THE TOWN OF OAKVILLE BY-LAW NUMBER THE CORPORATION OF THE TOWN OF OAKVILLE BY-LAW NUMBER 2017-120 A by-law to adopt an amendment to the Livable Oakville Plan, Official Plan Amendment Number 20 (Downtown Oakville Growth Area) WHEREAS the

More information

John M. Fleming Managing Director, Planning and City Planner. Old East Village Dundas Street Corridor Secondary Plan Draft Terms of Reference

John M. Fleming Managing Director, Planning and City Planner. Old East Village Dundas Street Corridor Secondary Plan Draft Terms of Reference Report to Planning and Environment Committee To: From: Subject: Chair and Members Planning & Environment Committee John M. Fleming Managing Director, Planning and City Planner Old East Village Dundas Street

More information

Official Plan Review

Official Plan Review Official Plan Review Summary Report - The Built Environment August 2014 Part 1: Introduction Planning for a healthy, prosperous and sustainable community is an important goal for our municipality. From

More information

13 THORNHILL YONGE STREET STUDY IMPLEMENTATION CITY OF VAUGHAN OPA 669 AND TOWN OF MARKHAM OPA 154

13 THORNHILL YONGE STREET STUDY IMPLEMENTATION CITY OF VAUGHAN OPA 669 AND TOWN OF MARKHAM OPA 154 13 THORNHILL YONGE STREET STUDY IMPLEMENTATION CITY OF VAUGHAN OPA 669 AND TOWN OF MARKHAM OPA 154 The Planning and Economic Development Committee recommends the adoption of the recommendations contained

More information

Regency Developments. Urban Design Brief. Holyrood DC2 Rezoning

Regency Developments. Urban Design Brief. Holyrood DC2 Rezoning Regency Developments Urban Design Brief Holyrood DC2 Rezoning Stantec Consulting Ltd. 7-31-2017 1. Overview Regency Developments intends to rezone the lands located at 8510 and 8511 93 Avenue, within the

More information

1120 Haist Street - Pelham Arena Community Co-Design Recommendation Report Haist Street - Pelham Arena Community Co-Design Recommendation Report

1120 Haist Street - Pelham Arena Community Co-Design Recommendation Report Haist Street - Pelham Arena Community Co-Design Recommendation Report 1120 Haist Street - Pelham Arena Community Co-Design Executive Summary: In May, 2017 the Town retained the services of The Planning Partnership to undertake a community design charrette process to determine

More information

Downtown Streetscape Manual & Built Form Standards

Downtown Streetscape Manual & Built Form Standards City of Guelph Downtown Streetscape Manual & Built Form Standards July 2014 Prepared by Brook McIlroy Inc. in association with Unterman McPhail Associates and McCormick Rankin Inc. City of Guelph Downtown

More information

WITNESS STATEMENT Of. Ronald Blake. On behalf of the Intervenor The Corporation of the City of Markham

WITNESS STATEMENT Of. Ronald Blake. On behalf of the Intervenor The Corporation of the City of Markham Filed: 2013-06028 EB-2012-0451 Exhibit L.EGD.COM.2 Page 1 of 7 WITNESS STATEMENT Of Ronald Blake On behalf of the Intervenor The Corporation of the City of Markham In the matter of an application by Enbridge

More information

GOLDEN MILE SECONDARY PLAN. Community Consultation Meeting #3 June 26, 2018

GOLDEN MILE SECONDARY PLAN. Community Consultation Meeting #3 June 26, 2018 GOLDEN MILE SECONDARY PLAN Community Consultation Meeting #3 June 26, 2018 Meeting Overview 1. Introduction 2. Principles + Vision 3. Street + Block Alternatives 4. Parks + Open Space Alternatives 5. Land

More information

Hamilton Pier 7&8 Draft Urban Design Plan

Hamilton Pier 7&8 Draft Urban Design Plan Hamilton Pier 7&8 Draft Urban Design Plan Public Open House October 29, 2015 Contents 1. Study Overview 2. Area Design Goals 3. Urban Structure 4. Public Realm 5. Urban Design Plan Options 6. Next Steps

More information

SUBJECT: GO Station Mobility Hubs Preferred Concepts: Aldershot GO, Burlington GO and Appleby GO. Planning and Development Committee - Public Meeting

SUBJECT: GO Station Mobility Hubs Preferred Concepts: Aldershot GO, Burlington GO and Appleby GO. Planning and Development Committee - Public Meeting Page 1 of Report PB-76-17 SUBJECT: GO Station Mobility Hubs Preferred Concepts: Aldershot GO, Burlington GO and Appleby GO TO: FROM: Planning and Development Committee - Public Meeting Planning and Building

More information

CONTENTS 2.0 A FRAMEWORK FOR SUSTAINABLE GROWTH 2.1 MANAGING SUSTAINABLE GROWTH THE VISION TO GOALS AND OBJECTIVES 2.3 MARKHAM STRUCTURE

CONTENTS 2.0 A FRAMEWORK FOR SUSTAINABLE GROWTH 2.1 MANAGING SUSTAINABLE GROWTH THE VISION TO GOALS AND OBJECTIVES 2.3 MARKHAM STRUCTURE 2 A Framework for Sustainable Growth 2.0 A FRAMEWORK FOR SUSTAINABLE GROWTH CONTENTS 2.1 MANAGING SUSTAINABLE GROWTH THE VISION TO 2031 2.2 GOALS AND OBJECTIVES 2.2.1 Protecting the Natural Environment

More information

SECTION ONE: INTRODUCTION. introduction

SECTION ONE: INTRODUCTION. introduction introduction 1 INTRODUCTION Since it was first established in 1843 as a trading post for the Hudson s Bay Company, Victoria has evolved into a Provincial capital city that is recognized across Canada and

More information

Plan Framework Report. Attachment A

Plan Framework Report. Attachment A Plan Framework Report Attachment A Uptown-Douglas Corridor Plan - Plan Framework Report Contents Introduction... 1 Planning Process... 3 Project Objectives... 4 Vision... 5 Community Values... 6 Structural

More information

Lakeview and Port Credit District Policies Review Public Engagement Process

Lakeview and Port Credit District Policies Review Public Engagement Process Lakeview and Port Credit District Policies Review Public Engagement Process Brook McIlroy Planning + Urban Design/PACE Architects MSAi Architects Poulos and Chung Transportation Engineers December 11,

More information

GUIDELINES EXHIBITION PLACE LOCATION: OBJECTIVES. Structure Plan URBAN DESIGN GUIDELINES

GUIDELINES EXHIBITION PLACE LOCATION: OBJECTIVES. Structure Plan URBAN DESIGN GUIDELINES Development in the Exhibition Place lands will be consistent with the following urban design guidelines. They provide a framework for new development of the lands and are to be read in conjunction with

More information

PORT WHITBY COMMUNITY

PORT WHITBY COMMUNITY PORT WHITBY COMMUNITY SECONDARY PLAN UPDATE COMMUNITY IMPROVEMENT PLAN URBAN DESIGN GUIDELINES September 2015 DRAFT PROPOSED AMENDMENT NUMBER # to the Whitby Official Plan PURPOSE: The intent of this Amendment

More information

Draft Urban Hamilton Official Plan. Amendment No. XX

Draft Urban Hamilton Official Plan. Amendment No. XX 1 of 75 The following text, together with: Draft Appendix A Appendix B Volume 1, Schedule E-1 Urban Land Use Designations Appendix C Volume 1, Appendix A Parks Classification Map Appendix D Volume 1, Appendix

More information

Courtice Main Street Study Community Vision Workshop PLANNING SERVICES DEPARTMENT

Courtice Main Street Study Community Vision Workshop PLANNING SERVICES DEPARTMENT Courtice Main Street Study Community Vision Workshop PLANNING SERVICES DEPARTMENT July 22, 2009 Tonight s Meeting 7:00 pm Introduction David Crome, Director of Planning 7:05 Presentation Stasia Bogdan,

More information

Director, Community Planning, Toronto and East York District

Director, Community Planning, Toronto and East York District Lower Yonge Precinct Plan Update STAFF REPORT ACTION REQUIRED Date: October 16, 2012 To: From: Wards: Reference Number: Toronto and East York Community Council Director, Community Planning, Toronto and

More information

CITY OF VAUGHAN D R A F T YONGE STREET STUDY. June 2008 YOUNG + WRIGHT /IBI GROUP ARCHITECTS DILLON CONSULTING LTD.

CITY OF VAUGHAN D R A F T YONGE STREET STUDY. June 2008 YOUNG + WRIGHT /IBI GROUP ARCHITECTS DILLON CONSULTING LTD. CITY OF VAUGHAN June 2008 YOUNG + WRIGHT /IBI GROUP ARCHITECTS GHK SUSTAINABILITY INTERNATIONAL + LIVABILITY (CANADA) LTD. = COMMUNITY VALUE DILLON CONSULTING LTD. Public Open House Tonight s Meeting WELCOME

More information

St. Clair Avenue West Area Transportation Master Plan

St. Clair Avenue West Area Transportation Master Plan 1 (Between Keele Street and Old Weston Road) Public Information Centre 1 December 2, 2015 2 Welcome Welcome to the first Public Information Centre for the St. Clair Avenue West Area. The panels will present

More information

Midtown Oakville will be a vibrant, transit-supportive, mixed use urban community and employment area.

Midtown Oakville will be a vibrant, transit-supportive, mixed use urban community and employment area. Livable Oakville Part E: Growth Areas, Special Policy Areas and Exceptions 20. MIDTOWN OAKVILLE 20.1 Goal The interchange of Trafalgar Road and the QEW and the Oakville GO Station are major entry points

More information

General Committee Presentation. Paddy Kennedy, MCIP, RPP Dillon Consulting Limited

General Committee Presentation. Paddy Kennedy, MCIP, RPP Dillon Consulting Limited General Committee Presentation Paddy Kennedy, MCIP, RPP Dillon Consulting Limited November 2012 Location of Area 3 Fitch St. Prince Charles Dr. Area 3 First Ave Thorold Rd. Study Purpose At the time that

More information

burlington mobility hubs study Downtown Burlington Mobility Hub

burlington mobility hubs study Downtown Burlington Mobility Hub burlington mobility hubs study Downtown Burlington Mobility Hub Draft Precinct Plan Workbook PIC #3, September 7, 2017 downtown mobility hub objectives City staff and their consultants are proposing an

More information

Report to: Development Services Committee Report Date: September 11, 2017

Report to: Development Services Committee Report Date: September 11, 2017 ~RKHAM Report to: Development Services Committee Report Date: September 11, 2017 SUBJECT: PREPARED BY: Conceptual Master Plan for the Future Urban Area - Community Structure Plan and Key Policy Direction

More information

DRAFT. October Wheaton. Design Guidelines

DRAFT. October Wheaton. Design Guidelines October 2011 DRAFT Wheaton Design Guidelines 2 Draft - Design Guidelines - Wheaton Sector Plan Contents 04 Section 1: Introduction 06 Section 2: Context 08 Section 3: Design Guidelines 09 Goal 1: Create

More information

3. Endorse the LRT vision in transforming Surrey into Connected-Complete-Livable communities, and more specifically, the official vision statement:

3. Endorse the LRT vision in transforming Surrey into Connected-Complete-Livable communities, and more specifically, the official vision statement: CORPORATE REPORT NO: R038 COUNCIL DATE: February 20, 2017 REGULAR COUNCIL TO: Mayor & Council DATE: February 16, 2017 FROM: General Manager, Engineering FILE: 8740-01 SUBJECT: Surrey Light Rail Transit

More information

Town Center (part of the Comprehensive Plan)

Town Center (part of the Comprehensive Plan) Town Center (part of the Comprehensive Plan) Mercer Island Town Center Looking North (2014) In 1994, a year-long process culminated in a set of design guidelines and code requirements for the Town Center

More information

Transportation. Strategies for Action

Transportation. Strategies for Action Transportation A major priority for the Overlake Neighborhood is to develop a multimodal transportation system. To achieve this system, a balance has to be found among travel, circulation and access needs;

More information

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan Appendix F Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan Introduction and Purpose of the Plan The Gold Line Bus Rapid Transit facility is an eleven-mile dedicated

More information

38 Queen s University Campus Master Plan Part 1

38 Queen s University Campus Master Plan Part 1 38 Queen s University Campus Master Plan Part 1 46 The Campus at the City Scale Chapter 4 The Campus at the City Scale 39 Queen s is an urban University centrally located in Kingston. Decisions made by

More information

16. KING-SPADINA SECONDARY PLAN

16. KING-SPADINA SECONDARY PLAN 16. KING-SPADINA SECONDARY PLAN 1. INERPREAION 1.1 he lands affected by this Secondary Plan for the King-Spadina Area are shown on Map 16-1. 1.2 Where a building within a Regeneration Areas designation

More information

Transit-supportive development and city-building

Transit-supportive development and city-building Photo: Michael Hiemstra (CC BY 2.0) Transit-supportive development and city-building Brief 3: Tools for building infrastructure and policy conditions Building the policy and infrastructure conditions Municipalities

More information

Lambeth Main Street Streetscape Improvements

Lambeth Main Street Streetscape Improvements Lambeth Main Street Streetscape Improvements Open House October 5th, 2017 Agenda 1. Introduction 2. Project Background 3. Context 4. Project Objectives 5. Design Principles & Approach 6. Streetscape Design

More information

King-Spadina Secondary Plan Community Consultation Meeting. Michelle Knieriem, City Planner October 11, 2017

King-Spadina Secondary Plan Community Consultation Meeting. Michelle Knieriem, City Planner October 11, 2017 King-Spadina Secondary Plan Community Consultation Meeting Michelle Knieriem, City Planner October 11, 2017 Agenda 6:30 Welcome 6:35 Presentation 7:15 Question and Answer Session 8:15 Closing Remarks HOW

More information

DRAFT Northeast Quadrant of Kipling Avenue and Highway 7 DRAFT AUGUST 29, Goals Land Use. The goals of this Plan are to:

DRAFT Northeast Quadrant of Kipling Avenue and Highway 7 DRAFT AUGUST 29, Goals Land Use. The goals of this Plan are to: AUGUST 29, 2017 12.15 Northeast Quadrant of Kipling Avenue and Highway 7 12.15.1 Goals 12.15.2 Land Use The goals of this Plan are to: 12.15.2.1 General Provisions: a) Ensure the development of a compact

More information

PUBLIC MEETING AND OPEN HOUSE: Don Mills Crossing Phase 2 Celestica Development Applications. February 21, 2017

PUBLIC MEETING AND OPEN HOUSE: Don Mills Crossing Phase 2 Celestica Development Applications. February 21, 2017 PUBLIC MEETING AND OPEN HOUSE: Don Mills Crossing Phase 2 Celestica Development Applications February 21, 2017 PURPOSE OF TONIGHT S MEETING Engage the community on the Don Mills Crossing Study and development

More information

SUBJECT: Supplementary Information and Directions Regarding the Proposed Downtown Mobility Hub Precinct Plan and Proposed Official Plan Policies

SUBJECT: Supplementary Information and Directions Regarding the Proposed Downtown Mobility Hub Precinct Plan and Proposed Official Plan Policies Page 1 of Report PB-11-18 SUBJECT: Supplementary Information and Directions Regarding the Proposed Downtown Mobility Hub Precinct Plan and Proposed Official Plan Policies TO: FROM: Planning and Development

More information

appendix and street interface guidelines

appendix and street interface guidelines appendix five: building and street interface guidelines appendix 5 building and street interface guidelines BOULEVARDS Boulevards are generally characterized by higher levels of traffic movement at higher

More information

Coliseum Station Area Area Redevelopment Plan. Public Engagement #1 June 12, 2017

Coliseum Station Area Area Redevelopment Plan. Public Engagement #1 June 12, 2017 Coliseum Station Area Area Redevelopment Plan Public Engagement #1 June 12, 2017 Welcome Engagement Purpose Introduce the project Share information Gather input Project Updates & Newsletter edmonton.ca/coliseumplan

More information

The Cambie Corridor 2015 Fall workshop series. What we heard WORKSHOP OUTLINE

The Cambie Corridor 2015 Fall workshop series. What we heard WORKSHOP OUTLINE The Cambie Corridor 2015 Fall workshop series W 16 AVE Area 5 CAMBIE CORRIDOR Phase 3 What we heard ovember 21, 2015, 9am-noon, 1:30-4:30pm Peretz Centre 89 Participants* WORKSHOP OUTLIE Introductions

More information

Figure 3-1: Public Realm Plan

Figure 3-1: Public Realm Plan 3 Public Realm Figure 3-1: Public Realm Plan 3.1 Public Realm Concept The public realm concept for the Little Mountain site integrates a clear and accessible movement network with public spaces for social

More information

Welcome. Green Line LRT. Beltline Alignment Options. Stay engaged! Follow the Green Line story at calgary.ca/greenline

Welcome. Green Line LRT. Beltline Alignment Options. Stay engaged! Follow the Green Line story at calgary.ca/greenline Welcome Green Line LRT Beltline Alignment Options Stay engaged! Follow the Green Line story at calgary.ca/greenline Green Line LRT Why are we here? Our Challenge Determine the best alignment in the Beltline.

More information

2136 & 2148 Trafalgar Road Town of Oakville Region of Halton

2136 & 2148 Trafalgar Road Town of Oakville Region of Halton PLANNING JUSTIFICATION REPORT 2136 & 2148 Trafalgar Road Town of Oakville Region of Halton Zoning By-Law Amendment Application 2500674 Ontario Inc. November 2016 Table of Contents Page 1.0 Location/Summary

More information

THE GARDEN CITY PLAN. City of St. Catharines Official Plan. City of St. Catharines

THE GARDEN CITY PLAN. City of St. Catharines Official Plan. City of St. Catharines THE GARDEN CITY PLAN City of St. Catharines Official Plan City of St. Catharines August 2010 APPROVAL INFORMATION This Official Plan of the City of St. Catharines Planning Area, known as the Garden City

More information

City of Farmington. Downtown Plan. Amendment to the 1998 Master Plan Adopted October 11, 2004

City of Farmington. Downtown Plan. Amendment to the 1998 Master Plan Adopted October 11, 2004 City of Farmington Amendment to the 1998 Master Plan Adopted October 11, 2004 Introduction Planning Background 1 Scope and Components of the Plan Amendment 2 Concept Introduction 3 Plan Concepts 3 Conceptual

More information