Technical information Installation instructions. Uno-3 ( ) Oil/gas boiler. These instructions apply to the following types:

Size: px
Start display at page:

Download "Technical information Installation instructions. Uno-3 ( ) Oil/gas boiler. These instructions apply to the following types:"

Transcription

1 Technical information Installation instructions Uno-3 ( ) Oil/gas boiler These instructions apply to the following types: 41-Uno-3 (130, 160, 190, 220, 250, 280) Hoval products must be installed and commissioned only by appropriately qualified experts. These instructions are intended exclusively for the specialist. Electrical installations may only be carried out by a qualified electrician. Uno-3 ( ) boilers are suitable and licensed for use as heat generators for hot water heating systems with a permissible flow temperature of up to 100 C 1). They are designed for closed-circuit systems, but can also be installed in open systems as per EN ) See technical data Subject to modifi cations / 00-07/15 EN

2 TABLE OF CONTENTS 1. Important information 1.1 Other instructions Safety instructions Regulations, official approvals Warranty Assembly 2.1 Installation position Setting up levelling Fitting the heat insulation Fitting the casing Installation of boiler controller Boiler controller TopTronic E Boiler controller T0.2 / T Technical information 3.1 Description of the boiler The Uno-3 ( ) complies with the following directives + standards Technical data Uno-3 ( ) Dimensions without heat insulation and casing (transport dimensions) Installation 4.1 Boiler room requirements Connection of the flue gas system and flue duct dimensions Fitting the burner Sound insulation Fuel Electrical connection Flue gas regulator set Recommended cable cross sections: Safety measures relating to EMC assembly Flue gas regulator set Flue gas and performance diagrams Flow mixing loop / minimum limitation of the boiler return temperature Setting the temperature regulators Safety valves Charging pump (boiler with free-standing calorifier) Heating pump Commissioning 5.1 Water quality Filling the heating system Filling the calorifier (if present) Initial commissioning Oil/gas burner Handover to the operator / storage Maintenance 6.1 Information for fire inspector / chimney sweep regarding emission monitor key Cleaning Preparatory work Cleaning (dry or wet method) Putting into operation again Safety temperature limiter - Reset / 00

3 IMPORTANT INFORMATION 1. Important information 1.1 Other instructions All instructions relevant to your system can be found in the Hoval system manual! In exceptional cases, the instructions can be found in the documentation for the components! Further sources of information: Hoval catalogue standards, regulations 1.2 Safety instructions The installation may only be put into operation if all relevant standards and safety regulations have been complied with. However, for trial operation, the following are the minimum conditions requiring fulfilment: 1. A safety valve has been installed (closed-circuit installation) 2. Controls in operation (connected to the power supply) 3. The sensor for the safety temperature limiter is located in the immersion sleeve. 4. The system is filled with water 5. An expansion vessel is attached 6. Flue gas outlets connected to the flue gas conduit at the chimney 7. The burner is preset. 1.3 Regulations, official approvals For installation and operation of the system, the following regulations are to be observed: Germany DIN EN Heating systems in buildings - procedure for calculating the standard heating load. DIN EN Heating systems in buildings - design of hot water systems. DIN EN Flue gas systems - heat and flow calculation methods. DIN 4755 Oil-fired combustion systems. Technical regulations for oil-fired installations (TRÖ) DIN 4756 Gas-fired combustion systems: design, construction and safety engineering requirements, design and construction (for operation with gas burners). DIN House chimneys, requirements, design and execution. PED (Pressure Equipment Directive). TRD 721 Safety equipment to safeguard against excess pressures / safety valves / for group II steam boilers. DVGW-TRGI - Technical regulations for gas installations - DVGW process sheet G600. VDI 2035 Prevention of damage by corrosion and the formation of scale in hot water systems. DIN / VDI 0116 Electrical equipment in combustion systems (VDE regulations). Austria ÖNorm B 8130 Open hot water systems, safety installations. ÖNorm B 8131 Closed hot water systems, safety, construction and testing regulations. ÖNorm B 8133 Water heating systems, safety engineering requirements. ÖNorm B 8136 Heating systems, space requirements and other building requirements. ÖNorm M 7515 Calculations of dimensions of chimneys; terminology, calculation procedure. ÖNorm H 5170 Heating installations, building and technical fire-protection regulations ÖVGW TR-gas (Austrian Gas and Water Confederation - Technical Guidelines) Switzerland VKF - Association of Cantonal Fire Insurers Fire prevention authority regulations SVGW Switzerland. Gas and water association. SNV Supply and extract air handling in the boiler room. SWKI 97-1 Water treatment for heating, steam and air conditioning plants SWKI 80-2 Safety engineering regulations for heating systems KRW Corrosion caused by halogen compounds KRW/VSO/FKR Ready-to-connect electrical connections on heating boilers and burners Technical tank regulations TTV and further regulations and standards prescribed by the CEN, CEN ELEC, DIN, VDE, DVGW, TRD and by law. The regulations of the local building authorities, insurers and chimney inspectors must also be taken into account. When gas is used as a fuel, the regulations of the local gasworks must be observed and official authorisation may also be required / 00 3

4 IMPORTANT INFORMATION 1.4 Warranty Fault-free operation can only only be guaranteed if these instructions are followed and if the boiler is regularly serviced by a licensed specialist (maintenance contract). The rectification of faults and damage as a result of contaminated operating materials (gas, water, combustion air), unsuitable chemical additives to the heating water, improper handling, faulty installation, unauthorised modifications and damage due to the use of force do not fall under our guarantee obligations; this also applies to corrosion due to halogen compounds, e.g. from spray cans, paints adhesives, halogenised refrigerants, solvents and cleansing agents / 00

5 ASSEMBLY 2. Assembly 2.1 Installation position Where limited space is available, the Uno-3 can be transported standing on the door. Hex nuts are mounted behind the door as supports for this purpose. After transport, they can simply be screwed back to the bracket. Release and screw back 6 transport counter nuts before commissioning. Counter nut There must be enough space to swing open the boiler door, incl. the burner. Boiler door pivotable to the left It is possible to change the attachment of the boiler door so that it opens towards the left. This can be of advantage when installing the boiler in a corner. Proceed as follows: NOTE Close the boiler door and lock it in position before changing the attachment of the door fig Setting up levelling A special foundation plate for the boiler is not an essential, but it is recommended. Space requirement for fitting the heat insulation and casing panelling: at least 40 cm each on the left and right side of the boiler. controller side min. 70 cm. If the space between the boiler and the wall is less than 50 cm, all heat insulation and casing must be fitted before the boiler can be pushed into its final position. Do not connect lines until the heat insulation and casing have been fitted to the boiler! NOTE There must always be enough space between the back of the boiler and the wall to allow easy access to the cleaning aperture in the flue gas collector. 2 fig Remove special screw (1). 2. Swing the arm (2) to the opposite side. 3. Refit the special screw (1) on the other side. 4. Fit the burner plug on the other side (see also point 4.5.1). NOTE The cable must not touch any hot parts! Levelling Using a spirit level, align the upper edge of the boiler water jacket (longitudinal axis of the boiler) until it is precisely horizontal or sloping very slightly upwards towards the rear by inserting the plinth rails correspondingly, to allow the boiler to vent properly. Before fitting the burner, first fit the double door (Pos. 8a, fig. 05) (door casing) / 00 5

6 ASSEMBLY 2.3 Fitting the heat insulation 1. Using M8 hex screws, nuts and washers, fit the front retaining bracket (1, fig. 04) to the front of the boiler in horizontally aligned position. - - Attach C-clips. 2. Using M8 hex screws, nuts and washers, fit the rear retaining bracket (2, fig. 04) in horizontally aligned position. - - Attach C-clips. 3. Place insulation mat (3) (on Uno-3 (250 / 280) = 2 mats) around the boiler body (with the joint at the top, black side facing outward). 4. Attach the insulation mat (3) using 2 (or 3) plastic straps (4) and strap fasteners (4a): - - There are also tension springs (4b) for additional attachment - - Do not overtighten the straps (reduced insulating value) 5. Attach the insulation mats (5/5a/5b/5c) to the pins provided on the rear wall of the boiler and secure with retaining discs (ø 38). For your information: The insulation mats protrude 80 mm on the left and right. Wrap the insulation mats (5d) around the connection fittings and secure with tension springs. 6. Attach insulation panels (6/6a/6b/6c/6d) to the pins welded onto the flue gas collector and secure with the retaining discs (ø 38) provided. 7. Attach insulation panels (7/7a/7b/7c/7d) to the pins welded onto the front wall of the boiler and secure with the retaining discs (ø 38) provided. - - Insulation mat 7c (or 7d with boiler door pivotable to the right) can be cut for easier fitting. For your information: - - The insulation panels protrude 50 mm on the left and right. The remaining 2 insulation mats (17) are fitted after mounting the casing. fig / 00

7 ASSEMBLY 7 7a 7b 7c 7d 3 4a fig. 04 4b 4 6 6b 1 C-Clips 6d 5a 5 6c 5b 6a 5c 5d 2 C-Clips / 00 7

8 ASSEMBLY 2.4 Fitting the casing 8. Fit hexagon bolts with U-washers and hexagon nuts (8, fig. 07). Insert thermal insulation into the boiler door (8a). Attach the door casing to the boiler door using hexagon cap nut. The boiler controller can be mounted on the right or left side panel (11a, fig. 06). 9. Place support (9) on the door hinge (Figure 6a). 10. Attach 4 special screws (9a) with counter nuts to each side section (9b/9c). Fit burner plug (9d) into the front left (or right) side section and route the burner cable (9e) (possibly over the boiler) to the opening for the controller (cable routing as shown in fig. 06). NOTE The cable must not touch any hot parts 11. Place right and left side sections (9b/9c, fig. 06) over the supports (9, fig. 05) and attach to the front brackets (1, fig. 04) with self-tapping screws ø 4.8 x Hook lower right and left side wall (10) into the side sections (9b/9c) and attach to the rear retaining brackets (2, fig. 09) with self-tapping screws ø 4.8 x Hook in the upper left and right side wall (11, 11a, fig. 06) and attach to the rear retaining brackets (2, fig. 09) with self-tapping screws ø 4.8 x Insert 2 insulation mats (12) (to prevent vertical circulation of air) longitudinally on the left and right. 15. Attach bottom and top rear wall (14,14a, fig. 06) to the angled edges of the side walls (10,11,11a, fig. 06) with self-tapping screws ø 3.5 x 9.5 and C-clips. Fit cover plate (14b, fig. 06) with self-tapping screws ø 3.5 x If necessary, remove controller box cover plate (19, fig. 06) / 00

9 ASSEMBLY 9 fig a a 9c 14b 8a 11a a 9d 16 9b 13 9e 12 9a fig e 12d fig. 07 T0.2 / T2.2 fig / 00 9

10 ASSEMBLY 2.5 Installation of boiler controller Boiler controller TopTronic E 17. Mount the special screws with nuts (12a, fig. 09) on the side panel. Then hook the boiler controller (12, fig. 06) into the side wall with the recesses for the special screws and secure it with 2 self-tapping screws ø3.5 x 6.5 and serrated washers (12b, fig. 09) Boiler controller T0.2 / T2.2 12a 12 12a 12c 12b 12b 13a 12d fig a Mount the special screws with nuts (12a, fig. 10) on the side panel. Then hook the boiler control (12, fig. 10) onto the special screws and secure using selftapping screws ø 3.5 x 6.5 and serrated lock washers (12b, fig. 10). 21. Pull the capillaries with the immersion sensors (15, Figure 18) through the opening (13a, fig. 09) in the side panel, insert them into the immersion sleeve (16, fig. 06) as far as the stop and fix in position with retaining spring (9e, fig. 06). fig Pull the capillaries with the immersion sensors (13, fig. 11) through the opening (13a, fig. 06) in the side panel, insert them into the immersion sleeve (15a, fig. 11) as far as the stop and fix in position with retaining spring (15c, fig. 06). NOTICE The capillaries must not be folded or kinked 19. Close the boiler controller and screw on (12c, fig. 09), continue with pint 23 NOTICE The capillaries must not be folded or kinked 22. Attach cover plate to the boiler controller (12d, fig. 10) with self-tapping screws ø 3.5 x 6.5 and serrated lock washers. 23. Place casing cover (18/18a) in position and attach on the left and right sides with self-tapping screws ø 3.5 x Affix labels and where applicable, mount manual holder on the side. 25. Remove transport lock, see point b 13c 13 fig / 00

11 TECHNICAL INFORMATION 3. Technical information 3.1 Description of the boiler The Max-3 or Max-3 plus boiler is constructed in 3-compartment form. The flue gases flow from the cylindrical combustion chamber into the water cooled reversing elbows and through the 2nd compartment into the front reversing chamber. The 3rd compartment comprises a specially formed beading pipe through which the flue gases are conducted to the flue gas collector. fig The Uno-3 ( ) complies with the following directives + standards We hereby declare that the product described, as an individual appliance, complies with the standards, guidelines and technical specifications laid down. Directives: 90/396/EG «Gas appliance directive» 73/23/EWG «Low voltage directive» 89/336/EWG «Electromagnetic compatibility directive» 97/23/EG «Pressure equipment directive» (PED) at maximum boiler temperature 90 C Regulations: Stability pren14394:2001 Constructional requirements EN303-1, EN303-2, EN303-3 Low voltage DIN VDE 0722 / Ed EMV EN Part 1 / Ed / 00 11

12 TECHNICAL INFORMATION 3.2 Technical data Uno-3 ( ) Type (130) 1 (160) (190) (220) (250) (280) Nominal heat output at 80/60 C 1 kw Heat output range (heating oil EL, Variant 2) kw Maximum heat input kw 139,8 173,1 206,0 236,6 269,1 302 Maximum boiler operating temperature 2 C Safety temperature limiter setting (water side) 2 C Operating/test pressure at max. operating temperature bar 4,0/5,2 4,0/5,2 5,0/6,5 5,0/6,5 5,0/6,5 5,0/6,5 90 C 2 Maximum boiler operating temperature 3 C Safety temperature limiter setting (water side) 3 C Operating pressure at max. operating temperature 105 C 3 bar 3,0 3,0 4,0 4,0 4,0 4,0 Minimum boiler operating temperature C see table of operating conditions (below) Minimum boiler return temperature C see table of operating conditions (below) Minimum flue gas temperature at boiler C see table of operating conditions (below) Regulator set for 160 C flue gas temperature 9R3/290 6R5/290 6R5+ 6R2/290 9R5/290 6R5+ 3R3/290 6R5+ 6R2/290 Boiler efficiency at full load at 80/60 C % 92,8/87,6 92,5/87,3 92,2/87,0 92,6/87,6 92,8/87,6 92,6/87,4 (related to net/ gross calorific value, heating oil EL) Boiler efficiency at partial load 30% at return 37 C % 94,9/89,5 94,9/89,5 94,8/89,4 95,2/89,8 95,4/90,0 95,3/89,9 (according to EN 303) (Relative to net/gross calorific value heating oil EL) Normal degree of efficiency (DIN 4702 Part 8) (related to net/ gross calorific value, heating oil EL) % 96,1/90,7 96,1/90,7 96,2/90,8 96,0/90,6 96,3/90,4 95,9/90,5 Standby losses qb at 70 C Watt Resistance on the heating gas side at nominal output mbar 0,86 1,50 1,40 1,7 1,6 2,8 160 C flue gas temperature, 12.5% CO 2, 500 m above sea level (tolerance ± 20%) Flue gas mass flow at nominal output 12.5% CO 2 heating oil kg/h Flow resistance boiler 4 z-value 0,2 0,2 0,1 0,1 0,1 0,1 Hydraulic resistance at 10 K mbar 24,80 37,60 26,50 35,55 46,00 57,60 Hydraulic resistance at 20 K mbar 6,20 9,40 6,60 8,90 11,50 14,40 Water flow rate at 10 K m 3 /h 11,10 13,70 16,30 18,90 21,40 24,00 Water flow rate at 20 K m 3 /h 5,60 6,90 8,10 9,40 10,70 12,00 Boiler water content litres Boiler gas content m³ 0,236 0,236 0,322 0,322 0,428 0,428 Insulation thickness of boiler body mm Weight (incl. casing) kg Combustion chamber dimensions Ø-inside x length mm ø 440x974 ø 440x974 ø 490x974 ø 490x974 ø 488x1434 ø 488x1434 Combustion chamber volume m³ 0,148 0,148 0,184 0,184 0,268 0,268 Dimensions see dimensional drawing Maximum negative pressure in the flue pipe system (at the Pa boiler connection) At nominal output, the pollutant limit values and flue gas losses as per regulation LRV (92) are complied with. 2 Boiler controller E13.4 TopTronic E und T2.2 3 Boiler controllere13.5 TopTronic E und T0.2 4 Flow resistance boiler in mbar = flow rate (m 3 /h)2 x z 5 For Switzerland only Possible operating conditions Fuel Heating oil EL Natural gas H Heating oil L Variant 1 Variant 2 Variant 3 Variant 1 Variant 2 Variant 3 min. flue gas temperature C min. boiler temperature C min. return temperature C No lower limit No lower limit Return temperature controls yes yes no yes yes no yes yes Boiler start-up protection 1 no no yes no no yes no no 1 Boiler minimum temperature limit effective on group actuators / 00

13 TECHNICAL INFORMATION fig Flow type DN 50, PN 6 DN 65, PN 6 2 Return Typ DN 50, PN 6 DN 65, PN 6 3 Safety flow R 1 1/2 R 1 1/2 4 Flow for calorifier R 1 1/4 R 1 1/4 5 Return for calorifier R 1 1/4 R 1 1/4 6 Drain R 1 1/2 R 1 1/2 7 Flue gas outlet 8 Cleaning opening 9 Boiler controller, optionally left or right 10 Socket Width 50 mm 11 Boiler door attached on the right (Optional left) 12 Flue gas collector cleaning connection R 1 R 1 13 possible anti-vibration elements Width 80 mm, Height 50 mm 14 Burner absorber hood Uno-3 l b h a c d e f g i k m n o p q* r s t u v Ø / *q = flue gas outlet external diameter. Plate thickness 3 mm; adapter set for Uno-3 ( ): D qø 199, A qø 200 (with tape) / 00 13

14 TECHNICAL INFORMATION 3.3 Dimensions without heat insulation and casing (transport dimensions) fig. 13 Uno-3 Width Length Height Weight Type B with connections+ flue gas collector L1 without connections + flue gas collector L H kg Required minimum width of door and corridor for bringing in the boiler The following values are the calculated minimum values K = B T L T = Door width K = Corridor width B = Boiler width T = B T L L = Maximum boiler length Example calculation for the required corridor width K Door width T = 800 L B < 150 Uno-3 ( ) Uno-3 ( ) 680 K = 800 x 1515 = Door width K = 800 x 1535 = Door width 1439 fig. 14 T Uno-3 ( ) 750 K = 800 x 2015 = Door width / 00

15 TECHNICAL INFORMATION Minimum overall unit dimensions Boiler upright Boiler upright with swivel flange at bottom, transport on trolley or rollers provided by the client. Example calculation for the required corridor width Door width T = 800 Uno-3 ( ) 680 K = 800 x 1180 = Corridor width 1003 Uno-3 ( ) 750 K = 800 x 1335 = Corridor width 1252 fig. 15 fig Transport board (by client) 3 Boiler door (can be removed) 2 Pipe as roller (by client) 4 Threaded rod Uno-3 Type including connectors and flue gas collector Boiler height without connection b. Flue gas collector H2 Width B Length L Uno-3 Type available ground clearance max. Width doorwith boiler without boiler door for trolley a b c ( ) ( ) ( ) ( ) ( ) / 00 15

16 INSTALLATION 4. Installation 4.1 Boiler room requirements Regarding the building specifications for boiler rooms and their supply and extract air handling, the current building supervisory office regulations specific to the state or country are to be observed. In Germany, the firing ordinances of the individual federal states must be observed. Ensure that there is an adequate supply of fresh air to the boiler room, so that the amount of combustion air required for operation of all the burners installed there can be continuously replenished without hindrance and that, for the protection of operating personnel, there is no shortage of oxygen. Binding values for the size of supply air openings are not generally specified in the relevant regulations; it is merely required that no partial vacuum in excess of 3 N/m 2 occurs. An opening or line leading into the open air of at least 150 cm 2. For every kw in excess of 50 kw, a further 2 cm 2 must be calculated. In rectangular openings, the ratio of the sides should not exceed 1.5:1; if a grid is fitted, an appropriate allowance must be added so that the free cross-section area reaches the amount given above. In Austria, ÖNorm H 5171 also requires an extract air opening. Up to a nominal heat output of 100 kw, this opening must have a minimum cross-section of 180 cm 2. For every further kw, the cross-section must be increased by 1 cm 2. NOTE The flue gas system must be watertight, acid-proof and approved for the corresponding flue gas temperatures. Existing flue gas systems may require upgrading or adjustment of the flue duct crosssection as indicated by a chimney engineer. The correct functioning of the flue duct, i.e. the generation of the required delivery pressure depends on: a) type (materials and characteristics) of the flue duct (thermal insulation, internal surface roughness, leaktightness etc.) b) connection of the boiler to the flue gas system accor ding to applicable regulations and standards d) correct dimensioning of the flue duct crosssection. re: a) Schornsteine gemäss EN 13384, Teil 2, Ausführungsart I und II entsprechen modernen Feuerungsanlagen (Beratung durch den Schornsteinfachmann ist erforderlich). re: b) The flue gas pipe connecting the boiler to the flue gas system must be as short as possible and placed at an angle of Carefully seal the flue gas pipe against the flue gas system. The insertion of the flue gas pipe into the flue gas system (a) must be carried out in such a way that no condensation water can flow from the flue gas system into the flue gas pipe and into the boiler. fig. 18 As a general rule, only one heat generator should be connected to the chimney! When using two heat generators, the corresponding regulations must be observed. a 4.2 Connection of the flue gas system and flue duct dimensions Boiler and flue gas system must be mutually compatible and operate as a single functional unit in order to guarantee trouble-free and economical operation. Moisture-resistant and acid-proof flue gas systems must be used in new installations. fig. 18 Where possible, avoid 90 bends in the flue gas system! Flue gas pipes over 1 m in length must be insulated / 00

17 INSTALLATION NOTE As a general rule, only one heat generator may be connected to the chimney! Flue gas pipes over 1m in length must be insulated. If an adapter (reducer) from the flue gas outlet of the boiler to the entry point into the flue gas system is required, it must take the form of a slim cone. vom from the Kessel boiler to zum the chimney Schornstein re: c) Dimensioning of the flue duct cross-section. The crosssections must be calculated for boilers without delivery pressure requirement in accordance with EN (Please also observe DIN 18160, Part 1 «Domestic chimneys»). Take into consideration location-specific factors (hillside location of the building, chimney position, slope of the roof, chimney stack exit shape, etc.)! In Switzerland, SIA recommendation 384/4 must be observed! In Austria, calculation is performed as prescribed by ÖNorm M Non-binding guide values for dimensioning of the flue duct for boiler types Uno-3 ( ). Inside diameter of flue duct in mm Boiler type Uno-3 kw * ~ ~ ~ ~ ~ ~ 250 * kw = maximum boiler output Chimney height m Based on: flue gas conduit 5 m long, two 90 bends and one 45 bend, outside air 15 C, height above sea level max. 800 m, flue gas conduit of same ø as flue gas outlet on the boiler. However, it is always advisable to consult the chimney engineer in the planning stages! / 00 17

18 INSTALLATION 4.3 Fitting the burner fig. 19 Uno-3 A B C D E F G H L max M N O Ø Ø Ø Ø / Depending on the size of the burner flange, an intermediate flange may be required to attach the burner. To allow the burner to be swung out 90 to the left or right, the connections must be flexible and routed to the burner in sufficiently large loops. The cavity between burner pipe and boiler flange must be insulated with the fireproof fibre provided Sound insulation Gas pipes must be mounted in such a way that no vibrations are transferred to the building. The burner can be equipped with a sound-absorbing hood. We recommend that you install silencers downstream of the boiler in the flue gas pipe. fig / 00

19 INSTALLATION 4.4 Fuel NOTE The boiler may only be operated with the fuel designated on the boiler rating plate. Uno-3 boilers are suitable for the combustion of the following fuels: Heating oil EL in accordance with DIN / SN /2 / ÖNorm C 1109 Heating oil L in accordance with ÖNorm C 1108 all fuel gases as defined by DVGW process sheet G Electrical connection Electrical connections must be established by a licensed and qualified electrician. The connection diagram is located in the terminal box of the heat generator; the circuit diagram is supplied separately. Refer to this for the conductor cross section required for the mains supply. WARNING The heat generator can be deprived of only separating it from the mains voltage (eg multipole switch). WARNING All electric power supply circuits must be switched off before accessing the terminals. For Switzerland, the following applies: For the electrical connection, the circuit diagram specific to the plant must be observed! For Austria only: The diagram folder is located in the switch control box. Please affix the correct connection diagram to the inside of the terminal cover. An electrical circuit diagram is supplied with the boiler controls. An all-phase main switch with a minimum contact spacing of 3 mm must be fitted in the power supply line. Applies only for Germany: The diagram folder is located in the switch control box. An electrical circuit diagram is supplied with the boiler controls. An all-phase main switch with a minimum contact spacing of 3 mm must be fitted in the power supply line Flue gas regulator set The flue gas regulators fitted in each case are listed on a label on the boiler casing. The installer can change the flue gas regulator set fitted and thus vary the flue gas temperature within a specific range Recommended cable cross sections: Cable type Cross-section Length Power supply of the heat generator (230V) Power supply of the heat generator (400V) Mains voltage cables of actuators Low-voltage cables (sensors) Data bus lines (shielded cable) min 2,5 mm 2 with 16A Protection min 1,0 mm 2 with 10A Protection min 1,0 mm 2 min 0,5 mm 2 unlimited m unlimited m unlimited m max. 50 m 2 x 2 x 0,6 mm 2 max. 100 m Safety measures relating to EMC assembly 1. In the case of control units with their own mains supply, it is imperative that cables carrying mains voltage are routed separately from sensor or data bus cables. If using cable ducts, these must be equipped with separator strips. 2. The mains connection for the heating system (boiler control panel regulator unit) must be designed as an independent electrical circuit. Neither fluorescent lamps nor other sources of interference for the relevant machinery may be connected or capable of connection. Fuse Boiler room emergency switch Heat Generator Boiler room lighting and power sockets must be in a separate circuit fig The fresh air sensor must not be fitted in the vicinity of transmitters and receivers (on garage walls near receivers for garage door openers, amateur radio antennae, radio alarm installations or in the immediate vicinity of large transmitters etc.) / 00 19

20 INSTALLATION 4.6 Flue gas regulator set The flue gas regulators fitted in each case are listed on a label on the boiler casing (side section Figure 6, Pos. 9b/9c). The installer can change the flue gas regulator set fitted and thus vary the flue gas temperature within a specific range. NOTE Even in partial load operation, the flue gas temperature must not fall below 100 C. Regulators Inspection hole fig / 00

21 INSTALLATION Flue gas and performance diagrams Uno-3 (130) or Switzerland only C kw 9R5/290 Uno-3 (160) C kw 6R5/290 Uno-3 (190) C kw 6R5 + 6R2/290 Uno-3 (220) C kw 9R5/ / 00 21

22 INSTALLATION Uno-3 (250) kw C C 6R5 + 3R3/290 Uno-3 (280) kw C 6R5 + 6R2/290 The curves shown here represent an average value based on measurements taken with burners from various manufacturers. Deviations of ± 10% are normal. kw = heat output C = flue gas temperature with heating oil EL, boiler flow 80 C return flow 60 C. CO 2 = 13% During the combustion of natural gas or heating oil L, the flue gas temperature is approx. 15 C higher. Flue gas temperature under other operating conditions Influence of the boiler water temperature on the flue gas temperature A change in the boiler water temperature of ± 10 K results in a change of approximately ± 6K in the flue gas temperature. Influence of the CO 2 content in the flue gases A change in the CO 2 content of ± 1% changes the flue gas temperature by approx. ± 8 C. Key to regulator designation No. of regulators Regulator height (example: 5 units) 6R5/290 Length of the regulators / 00

23 INSTALLATION 4.7 Flow mixing loop / minimum limitation of the boiler return temperature Hydraulic and control measures must be provided to ensure that the temperatures do not fall below the permissible minimum boiler flow and return temperature under any operating conditions. 4.8 Setting the temperature regulators without heating regulator: Set the boiler temperature in accordance with the outside temperature. with heating regulator: The heating regulator automatically sets the correct boiler temperature. The boiler temperature varies between the minimum and maximum boiler temperatures entered. If a calorifier is connected, the priority circuit disables the boiler temperature regulator until the temperature is reached. The boiler temperature can rise to approx. 85 C. 4.9 Safety valves The heating system and hot water supply must each be protected with one safety valve against impermissibly high pressures. The discharge capacity of the heating system safety valve must correspond to the boiler s maximum nominal heat output. The valve is installed in the safety flow. In Germany, only safety valves with the code letter «H» in the approval mark may be connected, and they must always be connected at the boiler safety flow. Water shortage protection in accordance with EN Part 2 Section 9 is mandatory Charging pump (boiler with free-standing calorifier) Speed of rotation and output regulation must correspond to the requirements of the free-standing calorifier. Setting carried out by the heating installation engineer Heating pump Speed of rotation and output regulation must correspond to the requirements of the system. They are to be set by the heating installation engineer / 00 23

24 COMMISSIONING 5. Commissioning 5.1 Water quality Heating Water The European Standard EN and the directive VDI 2035 must be observed. Parts of the boiler which have con tact with water are made of ferrous materials. On account of the danger of stress cracking corrosion the chloride, nitrate and sulfate con tents of the heating water must not exceed 200 mg/l in total. The ph value of the heating water should lie between 8.3 and 9.5 after 6-12 weeks of heating operation. In particular, attention must be paid to the following stipulations: Hoval boilers and calorifi ers are designed for heating plants without signifi cant oxygen intake (plant type I according to EN 14868). Plants with - continuous oxygen intake (e.g. underfloor heating systems without diffusion proof plastic piping) or - intermittent oxygen intake (e.g. where frequent refilling is necessary) must be equipped with separate circuits. Treated fi lling and replacement water must be tested at least 1x yearly. According to the inhibitor manufacturer s instructions, more frequent testing may be necessary. A refi lling is not necessary if the quality of the heating water in existing installations (e.g. exchange of boiler) conforms to VDI The Directive VDI 2035 applies equally to the replacement water. New and if applicable existing installations need to be adequately cleaned and fl ushed befor being fi lled. The boiler may only be fi lled after the heating system has been fl ushed! Filling and replacement water For a plant using Hoval boilers untreated drinking water is generally best suited as heating medium, i.e. as fi lling and replacement water. However, as not all drinking water is suitable for use as fi lling and replacement water the water quality must fulfi l the standard set in VDI Should the mains water available not be suited for use then it must be desalinated and/or be treated with inhibitors. The stipulations of EN must be observed. In order to maintain a high level of boiler effi ciency and to avoid overheating of the heating surfaces the values given in the table should not be exceeded (dependent on boiler performance ratings - for multi-boiler plants rating of smallest boiler applies - and on the water content of the plant). The total amount of fi lling and replacement water which is used throughout the total service life of the boiler must not exceed three times the water capacity of the plant. Maximum filling capacity based on VDI 2035 Total hardness of the filling water up to... [mol/m 3 ] 1 <0,1 0,5 1 1,5 2 2,5 3 >3,0 f H < >30 d H <0,56 2,8 5,6 8,4 11,2 14,0 16,8 >16,8 e H <0,71 3,6 7,1 10,7 14,2 17,8 21,3 >21,3 ~mg/l <10 50,0 100,0 150,0 200,0 250,0 300,0 >300 Conductance 2 <20 100,0 200,0 300,0 400,0 500,0 600,0 >600 Boiler size of the individual boiler maximum filling quantity without desalination 50 to 200 kw NO REQUI- 50 l/kw 20 l/kw 20 l/kw 200 to 600 kw RE- 50 l/kw 50 l/kw 20 l/kw always desalinate over 600 kw MENT 1 Sum of alkaline earths 2 If the conductance in µs/cm exceeds the tabular value an analysis of the water is necessary / 00

25 COMMISSIONING 5.2 Filling the heating system Filling of the heating system must be carried out by trained personnel. The filling and replacement water must comply with the quality requirements in the relevant state or country (VDI 2035 or SWKI 88-4 or ÖNORM H 5195). 5.3 Filling the calorifier (if present) The heating boiler may be put into operation even when the calorifier is not filled. 5.4 Initial commissioning Important: On first commissioning, check that all safety and control devices are functioning properly (in accordance with the operating manual). The operation and maintenance of the system must be explained to the user in detail. In some areas, gas or dual-fuel systems may only be commissioned by an engineer from the local gasworks. Check with the local gasworks to make sure. 5.5 Oil/gas burner Setting the burner must also be carried out by a specialist, and the setting must correspond to the heat demand of the system. Please see the technical information / assembly instructions supplied with the burner. 5.6 Handover to the operator / storage Have the operator confirm in writing that the operating and maintenance procedures have been explained and that he or she has received a copy of the relevant operating manuals. (see sample on page 30). The system manufacturer is responsible for providing operating instructions for the whole plant. This technical information / these installation instructions must not be destroyed after completing the commissioning procedures, but should be permanently stored with the unit / 00 25

26 MAINTENANCE 6. Maintenance 6.1 Information for fire inspector / chimney sweep regarding emission monitor key This chapter is exclusively intended to describe the function of emissions and manual operation settings for the fi ring monitoring technician / chimney sweep. All operating elements are described in the operating instructions.! CAUTION Danger of scalding with hot water, since the hot water temperature can exceed the target setpoint temperature. NOTICE In order to protect underfl oor heating systems against impermissible superheating during emissions measurement / manual operation, it is necessary to implement appropriate safety measures (e.g. pump switch-off with maximum thermostat). The output and duration of the emission measurement can be set in the "Emission" main menu, and reactivated if required. Emission metering Setting at: Home screen > Main menu (page 1) > Emission. For detailed information see operating instructions, "Emission" chapter. Power limitation with 2-stage burner: 0 to 50% = 1st stage 51 to 100% = 2nd stage REACTION to emission metering Go back after expiry of the time unit/time specifi cation of return to the main menu Setpoint temperature = Maximum temperature limit Forced energy is used in an attempt to keep the corresponding heat generator temperature to 60 C Regulate heating circuits and the calorifi ers to their maximum temperature (in the direct heating circuit only if the hot water basic program is set to parallel operation) Manual mode Settings under: Home screen > Main menu (page 2) > Manual operation. For detailed information see operating instructions, "Emission" chapter. REACTION for manual operation Setting the required setpoint temperature using the selected heating or hot water circuit All heating pumps ON Note the maximum permissible temperature of surface heating! / 00

27 MAINTENANCE 6.2 Cleaning Cleaning should be performed at least twice per year. Cleaning at intermediate intervals is necessary if the flue gas temperature rises Preparatory work Switch boiler off (controller: set switch to «O,» pull the burner plug) Interrupt the fuel supply Open the boiler door Remove regulators (fig. 20) Remove flue gas collector cleaning cover (back) 6.3 Safety temperature limiter - Reset If the boiler temperature rises too high (>100 C), the system is switched off by the safety temperature limiter (STL) by means of a mechanical lockout. The malfunction must first be unlocked on the safety temperature limiter, then on the control panel. -- TB-reset Cleaning (dry or wet method) Clean combustion chamber, 2-pass (cylindrical tubes), 3-pass (ribbed heating surface) thoroughly with a brush or spray and then remove any combustion residue or sprayed liquid from the flue gas collector and from the combustion chamber. For wet cleaning: Treat seals with graphite before carrying out wet cleaning. Dispose of the cleaning fluid (scrubbing liquid) in accordance with regulations. 1. Open the switch control box 2. Unscrew the protective cap 3. Reset the STL Reset on the control panel fig Putting into operation again Insert the regulators Fit cleaning cover Close boiler door and reconnect burner plug. NOTE Do not overtighten boiler door screws. Reconnect the fuel supply Where applicable, refit front cover Reset boiler switch to «I» Reset key fig. 24 Press the reset key on the control (first remove the cover): the boiler is ready for operation again once the boiler water temperature is less than 80 C / 00 27

28 / 00

29 / 00 29

30 COPY FOR PLANT USER Confirmation The user (owner) of the system herewith confi rms that he has received adequate instruction in the operating and maintenance of the installation, received and taken note of the operating and maintenance instructions and, where applicable other documents concerning the heat generator and any further components. and is consequently suffi ciently familiar with the installation. Installation address: Type: Serial number: Year of manufacture: Place, Date: System installer: System user: COPY OF SYSTEM INSTALLER Confirmation The user (owner) of the system herewith confi rms that he has received adequate instruction in the operating and maintenance of the installation, received and taken note of the operating and maintenance instructions and, where applicable other documents concerning the heat generator and any further components. and is consequently suffi ciently familiar with the installation. Installation address: Type: Serial number: Year of manufacture: Place, Date: System installer: System user:

Technical information Installation instructions

Technical information Installation instructions EN Technical information Installation instructions Oil/gas boiler Uno-3 (130-280) Hoval products must be installed and commissioned only by appropriately qualifi ed experts. These instructions are intended

More information

Technical information Assembly instructions. Uno-3 (320, 360) Oil/gas boilers

Technical information Assembly instructions. Uno-3 (320, 360) Oil/gas boilers Technical information Assembly instructions Uno-3 (320, 360) Oil/gas boilers These instructions are applicable to the following types: 7-Uno-3 (320, 360) 7-Uno-3 b-i * (320, 360) * = Burner integrated

More information

Technical information Installation instructions. Modul-plus (F21-52) High performance calorifiers

Technical information Installation instructions. Modul-plus (F21-52) High performance calorifiers Technical information Installation instructions Modul-plus (F21-52) High performance calorifiers These instructions apply to the following types: 5/6-Modul-plus F (21) 5/6-Modul-plus F (31) 5/6-Modul-plus

More information

Technical information Assembly instructions. UltraOil ( ) Oil condensing boiler

Technical information Assembly instructions. UltraOil ( ) Oil condensing boiler Technical information Assembly instructions UltraOil (110-200) Oil condensing boiler These instructions apply to the following types: 30-UltraOil (110) 30-UltraOil (130) 30-UltraOil (160) 30-UltraOil (200)

More information

Max-3 plus. Output range 420 to 2700 kw TopTronic E control. Steel Shell Boiler. Responsibility for energy and environment

Max-3 plus. Output range 420 to 2700 kw TopTronic E control. Steel Shell Boiler. Responsibility for energy and environment Max-3 plus Steel Shell Boiler Responsibility for energy and environment Output range 420 to 2700 kw Now with new TopTronic E control 1 Why choose Max-3 plus? The Hoval Max-3 plus boiler delivers market-leading

More information

Technical information Installation instructions. UltraOil (16-35) Oil condensing boiler. These instructions are applicable to the following

Technical information Installation instructions. UltraOil (16-35) Oil condensing boiler. These instructions are applicable to the following Technical information Installation instructions UltraOil (16-35) Oil condensing boiler These instructions are applicable to the following types: Rated output levels at 40/30ºC 32-UltraOil (16) 32-UltraOil

More information

Technical information Installation instructions

Technical information Installation instructions Technical information Installation instructions UltraGas (15-50) Condensing gas heating boilers for natural gas and liquid gas for modulating operation These instructions apply to the following types:

More information

VIESMANN. Installation instructions VITOCELL 300-B. for contractors. Vitocell 300-B Type EVBA-A. Dual mode DHW cylinder, 300 and 500 l

VIESMANN. Installation instructions VITOCELL 300-B. for contractors. Vitocell 300-B Type EVBA-A. Dual mode DHW cylinder, 300 and 500 l Installation instructions for contractors VIESMANN Vitocell 300-B Type EVBA-A Dual mode DHW cylinder, 300 and 500 l VITOCELL 300-B 1/2017 Dispose after installation. Safety instructions Please follow these

More information

Steel Shell Boilers. Max-3 plus kw. Max-3 E & Max-3 condens E kw. CompactGas kw. SR-plus and SR-H plus kw

Steel Shell Boilers. Max-3 plus kw. Max-3 E & Max-3 condens E kw. CompactGas kw. SR-plus and SR-H plus kw Steel Shell Boilers Max-3 plus 420-2700 kw Description 194 Technical Data and Dimensions 198 Typical Hydraulic Schematic 204 Engineering 205 Max-3 E & Max-3 condens E 3000-6839 kw Description 207 Technical

More information

Installation and maintenance instructions

Installation and maintenance instructions 6304 4995 0/004 GB For installer Installation and maintenance instructions Flue gas heat exchanger WT50/60 Please read thoroughly prior to installation and maintenance. Summary About this manual This equipment

More information

VIESMANN. Installation instructions VITOCROSSAL 200. for contractors. Vitocrossal 200 Type CM2 Gas fired condensing boiler with MatriX radiant burner

VIESMANN. Installation instructions VITOCROSSAL 200. for contractors. Vitocrossal 200 Type CM2 Gas fired condensing boiler with MatriX radiant burner Installation instructions for contractors VIESMANN Vitocrossal 200 Type CM2 Gas fired condensing boiler with MatriX radiant burner VITOCROSSAL 200 2/2007 Dispose after installation. Safety instructions

More information

and Installation Instructions The installation instructions for the Unit pressure jet oil burner is included in the pressure jet oil burner pack.

and Installation Instructions The installation instructions for the Unit pressure jet oil burner is included in the pressure jet oil burner pack. Technical Guide and Installation Instructions MKS / MUS Steel boiler 70-550 kw The installation instructions for the Unit pressure jet oil burner is included in the pressure jet oil burner pack. The control

More information

Technical information. Remeha P 500. Pressurized boiler. Heat output: kw

Technical information. Remeha P 500. Pressurized boiler. Heat output: kw Technical information Remeha P 500 R e m e h a P 5 0 0 Pressurized boiler Heat output: 635-1900 kw Remeha P 500 TABLE OF CONTENT Preface 3 1 Description of the unit 3 1.1 General 3 1.2 Burners 3 2 Construction

More information

VIESMANN. Installation instructions VITOCROSSAL 300. for contractors. Vitocrossal 300 Type CM3 Gas condensing boiler with MatriX radiant burner

VIESMANN. Installation instructions VITOCROSSAL 300. for contractors. Vitocrossal 300 Type CM3 Gas condensing boiler with MatriX radiant burner Installation instructions for contractors VIESMANN Vitocrossal 300 Type CM3 Gas condensing boiler with MatriX radiant burner VITOCROSSAL 300 2/2013 Dispose after installation. Safety instructions Please

More information

VIESMANN. Installation instructions VITORONDENS 200-T. for contractors. Vitorondens 200-T Type BR2A, 20.2 to 53.7 kw Oil Unit condensing boiler

VIESMANN. Installation instructions VITORONDENS 200-T. for contractors. Vitorondens 200-T Type BR2A, 20.2 to 53.7 kw Oil Unit condensing boiler Installation instructions for contractors VIESMANN Vitorondens 200-T Type BR2A, 20.2 to 53.7 kw Oil Unit condensing boiler VITORONDENS 200-T 5/2013 Dispose after installation. Safety instructions Please

More information

VIESMANN. Installation instructions VITOMAX 200-HW. for contractors

VIESMANN. Installation instructions VITOMAX 200-HW. for contractors Installation instructions for contractors VIESMANN Vitomax 200-HW Type M238 Oil/gas fired high pressure hot water boiler Combustion output 4.0 to 18.2 MW VITOMAX 200-HW 6/2007 Dispose after installation.

More information

Hoval Uno-3 ( ) Low temperature oil/gas boiler

Hoval Uno-3 ( ) Low temperature oil/gas boiler Low temperature oil/gas boiler Description Hoval Low temperature oil/gas boiler Boiler 3-pass steel boiler according to EN 303 part 1 and 2 and EN 304 for firing of diesel oil, oil L and gas. Secondary

More information

Remeha. Fuel oil/gas boilers P 520. Installation and Service Manual A

Remeha. Fuel oil/gas boilers P 520. Installation and Service Manual A Remeha Fuel oil/gas boilers EN Installation and Service Manual 300016859-001-A 63115 Declaration of conformity The appliance complies with the standard model described in declaration of compliance. It

More information

Installation and maintenance manual

Installation and maintenance manual Installation and maintenance manual Warm air heater WS/WO (Copy of the original version) Wolf GmbH D-84048 Mainburg Postfach 1380 Telefon +498751/74-0 Telefax +498751/741600 Internet: www.wolf-heiztechnik.de

More information

Hoval SR-plus heating boilers Outputs from 350 to 4000kW Working pressures to 8 bar

Hoval SR-plus heating boilers Outputs from 350 to 4000kW Working pressures to 8 bar Hoval SR-plus heating boilers Outputs from 30 to 4000kW Working pressures to 8 bar ...built in the UK where high quality and reliability have been a way of life for generations. Hoval SR-plus Simplicity

More information

VIESMANN. Installation instructions VITOCELL 300-V/W. for contractors. Vitocell 300-V/W Type EVIA-A

VIESMANN. Installation instructions VITOCELL 300-V/W. for contractors. Vitocell 300-V/W Type EVIA-A Installation instructions for contractors VIESMNN Vitocell 300-V/W Type EVI- DHW cylinder with internal indirect coil 160 to 500 l VITOCELL 300-V/W 3/2017 Dispose after installation. Safety instructions

More information

Technical information Assembly instructions

Technical information Assembly instructions EN Technical information Assembly instructions Hoval CompactGas (1000-2800) for natural gas and liquid gas Hoval products must be installed and commissioned only by appropriately qualifi ed experts. These

More information

Technical information Installation instructions

Technical information Installation instructions Technical information Installation instructions UltraGas (125-1000) Condensing gas heating boilers for natural gas and liquid gas for modulating operation Rated output levels at 40/30ºC and for natural

More information

VIESMANN. Service instructions VITOLADENS 300-T. for contractors. Vitoladens 300-T Type VW3B Inox-Radial heat exchanger for oil fired condensing Unit

VIESMANN. Service instructions VITOLADENS 300-T. for contractors. Vitoladens 300-T Type VW3B Inox-Radial heat exchanger for oil fired condensing Unit Service instructions for contractors VIESMANN Vitoladens 300-T Type VW3B Inox-Radial heat exchanger for oil fired condensing Unit VITOLADENS 300-T 1/2007 Please keep safe. Safety instructions Safety instructions

More information

IDE 20 / IDE 30 / IDE 50 IDE 60 / IDE 80

IDE 20 / IDE 30 / IDE 50 IDE 60 / IDE 80 IDE 20 / IDE 30 / IDE 50 IDE 60 / IDE 80 EN OPERATING MANUAL OIL HEATER TRT-BA-IDE20-30-50-60-80-TC-001-EN Table of contents Information on the use of this manual... 1 Scope of delivery... 1 General safety...

More information

VIESMANN. Service instructions VITORONDENS 200-T. for contractors. Vitorondens 200-T Type BR2A, 20.2 to 53.7 kw Oil Unit condensing boiler

VIESMANN. Service instructions VITORONDENS 200-T. for contractors. Vitorondens 200-T Type BR2A, 20.2 to 53.7 kw Oil Unit condensing boiler Service instructions for contractors VIESMANN Vitorondens 200-T Type BR2A, 20.2 to 53.7 kw Oil Unit condensing boiler For applicability, see the last page VITORONDENS 200-T 6/2011 Please keep safe. Safety

More information

Operating Instructions

Operating Instructions Operating Instructions P4 Pellet 8-60 Read and follow the operating instructions and safety information. Subject to technical change. July 2009 Fröling Heizkessel- und Behälterbau Ges.m.b.H, Industriestrasse

More information

VIESMANN. Service instructions VITOCELL 300-B VITOCELL 300-V. for contractors

VIESMANN. Service instructions VITOCELL 300-B VITOCELL 300-V. for contractors Service instructions for contractors VIESMANN Vitocell 300-B Type EVB DHW cylinder, 300 and 500 l Vitocell 300-V Type EVI DHW cylinder, 200 to 500 l For applicability, see the last page VITOCELL 300-B

More information

/2010 US/CA

/2010 US/CA 6 720 646 148-11/2010 US/CA (en) For the user User s Instructions Condensing gas boiler Logamax plus GB162-L.B. 80 kw/100 kw Please read thoroughly before operating This manual is available in the English

More information

VIESMANN VITOROND 100. Datasheet Part numbers and prices: see pricelist VITOROND 100. Cast iron low temperature oil and gas fired boiler.

VIESMANN VITOROND 100. Datasheet Part numbers and prices: see pricelist VITOROND 100. Cast iron low temperature oil and gas fired boiler. VIESMANN VITOROND 100 Cast iron low temperature oil and gas fired boiler 40 to 100 kw Datasheet Part numbers and prices: see pricelist File in: Vitotec folder, register 1 VITOROND 100 Type VR2B Cast iron

More information

VIESMANN. VITOMAX 200-LW Low pressure hot water boiler for permissible flow temperatures up to 120 C Rated heating output 8.0 to 20.0 MW.

VIESMANN. VITOMAX 200-LW Low pressure hot water boiler for permissible flow temperatures up to 120 C Rated heating output 8.0 to 20.0 MW. VIESMANN VITOMAX 200-LW Low pressure hot water boiler for permissible flow temperatures up to 120 C Rated heating output 8.0 to 20.0 MW Datasheet Part no. and prices on request VITOMAX 200-LW Type M64A

More information

Installation and maintenance instructions

Installation and maintenance instructions 6304 4994 03/2006 GB For installer Installation and maintenance instructions Flue gas heat exchanger WT30/40 Please read thoroughly prior to installation and maintenance. Contents Contents Contents 2 1

More information

Temperature Sensor TRG Original Installation Instructions English

Temperature Sensor TRG Original Installation Instructions English Temperature Sensor TRG 5-6.. EN English Original Installation Instructions 818597-05 1 Contents Important notes Page Usage for the intended purpose...4 Function...4 Safety note...4 Directives and standards

More information

VIESMANN. Installation and service instructions VITOCELL 340-M/360-M. for contractors. Vitocell 340-M/360-M Type SVKA Type SVSA

VIESMANN. Installation and service instructions VITOCELL 340-M/360-M. for contractors. Vitocell 340-M/360-M Type SVKA Type SVSA Installation and service instructions for contractors VIESMANN Vitocell 340-M/360-M Type SVKA Type SVSA Combi cylinder 750 and 950 litre capacity VITOCELL 340-M/360-M 4/2009 Please keep safe. Safety instructions

More information

TopGas Cascade Condensing Gas Boilers Technical Information and Assembly Manual Output range 60 to 720 kw /17 Subject to modification

TopGas Cascade Condensing Gas Boilers Technical Information and Assembly Manual Output range 60 to 720 kw /17 Subject to modification TopGas Cascade Condensing Gas Boilers Technical Information and Assembly Manual Output range 60 to 720 kw Subject to modification Contents 1. Important Information 4 1.1. Documentation 4 1.2. Guarantee

More information

AirUnit. Operating manual. mfh systems modern floor heating. Decentralised domestic ventilation

AirUnit. Operating manual. mfh systems modern floor heating. Decentralised domestic ventilation mfh systems modern floor heating AirUnit Decentralised domestic ventilation Operating manual List of contents, Operating manual Page 1. General information... 02 2. Device description... 03 3. Adjustment

More information

Parts Available from

Parts Available from Montage und Bedienungsanleitung Manuel d entretien Installation, use and maintenance instructions Installatie-, gebruiks- en onderhoudsvoorschriften Oδηγίες εγκατάστασης, χρήσης και συντήρησης D F GB NL

More information

VIESMANN. Installation instructions VITORONDENS 200-T. for contractors. Vitorondens 200-T Type BR2A, 20.2 to 53.7 kw Oil Unit condensing boiler

VIESMANN. Installation instructions VITORONDENS 200-T. for contractors. Vitorondens 200-T Type BR2A, 20.2 to 53.7 kw Oil Unit condensing boiler Installation instructions for contractors VIESMANN Vitorondens 200-T Type BR2A, 20.2 to 53.7 kw Oil Unit condensing boiler VITORONDENS 200-T 6/2011 Dispose after installation. Safety instructions Please

More information

INSTALLATION GUIDE Dual Fuel Ranges

INSTALLATION GUIDE Dual Fuel Ranges INSTALLATION GUIDE Dual Fuel Ranges Contents Wolf Dual Fuel Ranges......................... 3 Safety Instructions............................ 4 Dual Fuel Range Specifications.................. 5 Dual Fuel

More information

SOUND-INSULATED FAN. Iso-K OPERATION MANUAL. Iso-K_v.1(2)-EN.indd :20:59

SOUND-INSULATED FAN. Iso-K OPERATION MANUAL. Iso-K_v.1(2)-EN.indd :20:59 SOUND-INSULATED FAN OPERATION MANUAL _v.1(2)-en.indd 1 10.08.2015 15:20:59 CONTENT Introduction 3 General 3 Safety rules 3 Transport and storage requirements 3 Manufacturer's warranty 3 Fan design 4 Delivery

More information

Installation and operating instructions. DK energy storage and DK energy buffer

Installation and operating instructions. DK energy storage and DK energy buffer Installation and operating instructions DK energy storage and DK energy buffer Edition: 08-2015 1 Preliminary note With this DK energy storage / DK energy buffer you purchased a DK quality product. The

More information

AirUnit. Installation instructions. mfh systems modern floor heating. Decentralised domestic ventilation

AirUnit. Installation instructions. mfh systems modern floor heating. Decentralised domestic ventilation mfh systems modern floor heating AirUnit Decentralised domestic ventilation Installation instructions List of contents, Installation instructions Page 1. General information... 03 2. Function / planning

More information

Ca 6s and BCa 6s kw INSTALLATION AND OPERATING INSTRUCTIONS. Page 1 31/07/00

Ca 6s and BCa 6s kw INSTALLATION AND OPERATING INSTRUCTIONS. Page 1 31/07/00 Ca 6s and BCa 6s 33-64 kw INSTALLATION AND OPERATING INSTRUCTIONS Page 1 CONTENTS: General specification Dimensions for Ca6s and BCa6s boilers. Boiler room clearance requirements Boiler block assembly

More information

INSTALLATION AND OPERATING INSTRUCTIONS GN2. HIGH EFFICIENCY CAST IRON BOILER FOR LIQUID and/or GAS FUELS

INSTALLATION AND OPERATING INSTRUCTIONS GN2. HIGH EFFICIENCY CAST IRON BOILER FOR LIQUID and/or GAS FUELS INSTALLATION AND OPERATING INSTRUCTIONS HIGH EFFICIENCY CAST IRON BOILER FOR LIQUID and/or GAS FUELS INDEX 1. Technical information... page 3 2. Dimensional and technical characteristics... page 3 3. Packing

More information

Installation Instructions Use and Care Guide Instructions d installation Mode d emploi et d entretien

Installation Instructions Use and Care Guide Instructions d installation Mode d emploi et d entretien Installation Instructions Use and Care Guide Instructions d installation Mode d emploi et d entretien AMCHD36SS/ AMCHD44SS/ INDEX WARNINGS AND REQUIREMENTS... 3 RECOMMENDATIONS AND SUGGESTIONS... 6 DIMENSIONS

More information

Installation and maintenance instructions

Installation and maintenance instructions Installation and maintenance instructions Cast Iron Sectional oiler for use with Forced Draft urners. Logano GE55 For contractors Read carefully before carrying out installation and maintenance. 6 70 643

More information

VIESMANN VITOCROSSAL 300 Gas condensing boiler 187 to 635 kw

VIESMANN VITOCROSSAL 300 Gas condensing boiler 187 to 635 kw VIESMANN VITOCROSSAL 300 Gas condensing boiler 187 to 635 kw Datasheet Part no. and prices: see pricelist VITOCROSSAL 300 Type CT3B Gas condensing boiler for natural gas E, LL and LPG With modulating MatriX

More information

Supply air unit VEKA Installation & Maintenance

Supply air unit VEKA Installation & Maintenance November 2008 Safety instructions Operating the air treatment unit and accessory components WARNING Before the air treatment unit is taken into service, any free connections must be provided with protective

More information

Uni 3000 F Output range 420 to 1850 kw. Oil/gas boiler. Installation and maintenance instructions for the contractor (2014/10) UK

Uni 3000 F Output range 420 to 1850 kw. Oil/gas boiler. Installation and maintenance instructions for the contractor (2014/10) UK 6 720 806 032-00.2ITL Oil/gas boiler Output range 420 to 850 kw Installation and maintenance instructions for the contractor UK 2 Contents Contents Key to symbols and safety instructions...................

More information

Servicing manual. 600 Series - 11S / 19S / 24S / 24C. Wall-mounted condensing gas boiler. For trade use

Servicing manual. 600 Series - 11S / 19S / 24S / 24C. Wall-mounted condensing gas boiler. For trade use GB122 Servicing manual Wall-mounted condensing gas boiler 600 Series - 11S / 19S / 24S / 24C For trade use Please read thoroughly before attemting to diagnose fault 7217 4900 (03/2010) GB/IE List of contents

More information

Servicing manual. Wall-mounted condensing gas boiler 600 Series - 11S / 19S / 24S / 24C /2002 GB(EN) For trade use

Servicing manual. Wall-mounted condensing gas boiler 600 Series - 11S / 19S / 24S / 24C /2002 GB(EN) For trade use GB122 7210 1300-12/2002 GB(EN) For trade use Servicing manual Wall-mounted condensing gas boiler 600 Series - 11S / 19S / 24S / 24C Please read thoroughly before attempting to diagnose fault List of contents

More information

DOMINATORPLUS ELECTRIC RANGE APPLIANCES INSTALLATION and SERVICING INSTRUCTIONS

DOMINATORPLUS ELECTRIC RANGE APPLIANCES INSTALLATION and SERVICING INSTRUCTIONS DOMINATORPLUS ELECTRIC RANGE APPLIANCES INSTALLATION and SERVICING INSTRUCTIONS IMPORTANT The installer must ensure that the installation of the appliance is in conformity with these instructions and National

More information

Light oil burners. One stage operation

Light oil burners. One stage operation Installation, use and maintenance instructions Light oil burners One stage operation CODE MODEL TYPE 3505 RDB CF 38 50 T3 350050 RDBR CF 6 50 TR 35050 RDBR CF 33 50 TR 35050 RDBR CF 38 50 T3R 350650 RDBR

More information

Installation and maintenance instructions

Installation and maintenance instructions Technology serving Mankind Installation and maintenance instructions ComfortLine FunctionLine Steel boilers up to 63 kw Wolf GmbH Postfach 1380 84048 Mainburg Tel. +49 8751/74-0 Fax +49 8751/741600 Internet:

More information

s l it l on for Infrared Heaters

s l it l on for Infrared Heaters Installation and Instruction Manual for Infrared Heaters Contents Safety and operating instructions... 3 Scope of supply... Installation instructions... 4 5 Initial operation... 10 Cleaning instructions...

More information

WHE 2.24 / WHE 2.24 FF

WHE 2.24 / WHE 2.24 FF EN Wall-hung gas boilers WHE 2.24 WHE 2.24 FF User Guide 300011777-001-C . Contents 1 Introduction.............................................................................3 1.1 Symbols used...........................................................................................3

More information

UV Flame Supervision System

UV Flame Supervision System 7 783 UV Flame Supervision System DETACTOGYR LFE50 Series 02 ISO 9001 The LFE50 is a self-checking UV flame supervision system designed for use with continuously operating burners or for burners running

More information

Light oil / kerosene burner

Light oil / kerosene burner Installation, use and maintenance instructions Light oil / kerosene burner One stage operation CODE MODEL TYPE 374445 G5 444T50 290238 (5) - 05/20 TECHNICAL DATA Thermal power output 28 60 kw 2.3 5 kg/h

More information

USER S INFORMATION MANUAL

USER S INFORMATION MANUAL USER S INFORMATION MANUAL HOT WATER HEATING BOILERS DOMESTIC WATER HEATERS 150,000-300,000 Btu/hr MODELS EB-EWU-02 IMPORTANT INSTALLER - AFFIX INSTALLATION MANUAL ADJACENT TO THE BOILER CONSUMER - RETAIN

More information

VIESMANN. Service instructions VITORONDENS 200-T. for contractors. Vitorondens 200-T Type BR2A, 20.2 to 53.7 kw Oil Unit condensing boiler

VIESMANN. Service instructions VITORONDENS 200-T. for contractors. Vitorondens 200-T Type BR2A, 20.2 to 53.7 kw Oil Unit condensing boiler Service instructions for contractors VIESMANN Vitorondens 200-T Type BR2A, 20.2 to 53.7 kw Oil Unit condensing boiler For applicability, see the last page VITORONDENS 200-T 2/2013 Please keep safe. Safety

More information

Hoval Cosmo heating boilers, outputs from 100 to 4000kW. Working pressures to 8 bar. Heatpack boilers. to 2900kW.

Hoval Cosmo heating boilers, outputs from 100 to 4000kW. Working pressures to 8 bar. Heatpack boilers. to 2900kW. Hoval Cosmo heating boilers, outputs from 100 to 4000kW. Working pressures to bar. Heatpack boilers to 2900kW. Whether your application is for single, multiple or space saving heatpack boilers, Hoval always

More information

KITCHEN EXHAUST FAN GLEC-6 INSTALLATION AND MAINTENANCE

KITCHEN EXHAUST FAN GLEC-6 INSTALLATION AND MAINTENANCE KITCHEN EXHAUST FAN GLEC-6 INSTALLATION AND MAINTENANCE 2 GLEC-6 - Installation and maintenance CONTENTS 1 Important information... 3 2 Safety notes... 3 3 Technical description...4 4 Transport... 6 5

More information

This appliance has been CE-marked on the basis of compliance with the Low Voltage and EMC Directives for the voltages stated on the data plate.

This appliance has been CE-marked on the basis of compliance with the Low Voltage and EMC Directives for the voltages stated on the data plate. DOMINATORPLUS ELECTRIC RANGE APPLIANCES INSTALLATION and SERVICING INSTRUCTIONS IMPORTANT The installer must ensure that the installation of the appliance is in conformity with these instructions and National

More information

Mikrofill Ethos Condensing combination boiler. Maintenance Instructions 24cc

Mikrofill Ethos Condensing combination boiler. Maintenance Instructions 24cc Mikrofill Ethos Condensing combination boiler Maintenance Instructions 24cc IMPORTANT Benchmark Installation, Commissioning and Service Record Log Book is enclosed in your customer information pack. This

More information

Hoval BioLyt (8-36) Pellet boiler

Hoval BioLyt (8-36) Pellet boiler Pellet boiler Description Hoval BioLyt Boiler Steel boiler for the combustion of wood pellets of Ø 6 mm, max. length 30 mm manually or automatically Pellet metering screw with rotary valve for fuel supply

More information

Technical information. Remeha P200. Pressurized boiler. Heat output: kw

Technical information. Remeha P200. Pressurized boiler. Heat output: kw Technical information Remeha P200 R e m e h a P 2 0 0 Pressurized boiler Heat output: 59-256 kw Remeha P 200 CONTENTS Preface 3 1. Description of the unit 4 1.1 General 4 1.2 Burners 4 2. Construction

More information

CEILING FAN OWNER'S MANUAL

CEILING FAN OWNER'S MANUAL Style that revolves around you. CEILING FAN OWNER'S MANUAL QUATRO 10/09 WARNING: Read and follow these instructions carefully and be mindful of all warnings shown throughout. GENERAL INSTALLATION & OPERATION

More information

Hoval TopGas (12, 16, 22)

Hoval TopGas (12, 16, 22) Hoval TopGas (2, 6, 22) Wall gas condensing boiler with or without calorifier TopVal Description Hoval TopGas Boiler Wall mounted gas condensing boiler Heat-exchanger out of corrosion resistance aluminium

More information

ELECTRIC BOILERS FOR CENTRAL HEATING

ELECTRIC BOILERS FOR CENTRAL HEATING ELECTRIC BOILERS FOR CENTRAL HEATING TermoMax INSTRUCTIONS FOR INSTALLATION INSTRUCTIONS FOR INSTALLATION We reserve the right of alternations WE ARE NOT LIABLE FOR DAMAGES RESULTING FROM NON- OBSERVING

More information

Installation Instructions

Installation Instructions Installation Instructions TX English version of the assembly instructions for technicians. Read and follow the instructions and safety instructions! Subject to technical change. Fröling Heizkessel- und

More information

4FLOOR-STANDING GAS CONDENSING BOILERS

4FLOOR-STANDING GAS CONDENSING BOILERS EASYLIFE PROJECT / SOLNEO / ECODENS RESIDENTIAL DTG (E) 130-15/25 Eco. NOx Plus DTG (E) 1300-15/25 Eco. NOx Plus/B150 DTG (E) 1300-15/25 Eco. NOx Plus/H150 DTG 1300-15/25 Eco. NOx Plus/V130 4FLOOR-STANDING

More information

Installation and Operating Instructions ISH ELECTRIC STEAM SUPERHEATER

Installation and Operating Instructions ISH ELECTRIC STEAM SUPERHEATER Installation and Operating Instructions ISH ELECTRIC STEAM SUPERHEATER 1 Installation and Operating Instructions ISH ELECTRIC STEAM SUPERHEATER FOR YOUR SAFETY This manual supplies information on the application,

More information

Oil burners Brûleurs fioul Stookoliebranders

Oil burners Brûleurs fioul Stookoliebranders Installation, use and maintenance instructions Manuel d entretien Installatie-, gebruiks- en onderhoudsvoorschriften GB F NL Oil burners Brûleurs fioul Stookoliebranders One stage operation Fonctionnement

More information

ELECTRIC COOKTOP INSTALLATION INSTRUCTIONS

ELECTRIC COOKTOP INSTALLATION INSTRUCTIONS INSTALLATION AND SERVICE MUST BE PERFORMED BY A QUALIFIED INSTALLER. IMPORTANT: SAVE FOR LOCAL ELECTRICAL INSPECTOR'S USE. READ AND SAVE THESE INSTRUCTIONS FOR FUTURE REFERENCE. U.S.A. WARNING FOR YOUR

More information

I n s t r u c t i o n m a n u a l f o r b u i l t - i n h o o d. Model code: BORA600

I n s t r u c t i o n m a n u a l f o r b u i l t - i n h o o d. Model code: BORA600 I n s t r u c t i o n m a n u a l f o r b u i l t - i n h o o d Model code: BORA600 Contact Caple on 0844 8003830 or for spare parts www.4caple.co.uk 1 Y O U R A P P L I A N C E Thank you for buying your

More information

Installation and instruction manual SOLAR STATION

Installation and instruction manual SOLAR STATION INSTALLATION AND INSTRUCTION MANUAL SOLAR STATION Installation and instruction manual SOLAR STATION SST 25-1E / SST25-2E EN April 2015 1 Table of contents Usage 3 Warranty 3 Safety instructions and symbol

More information

USER MANUAL 9kW LILLY PELLET STOVE

USER MANUAL 9kW LILLY PELLET STOVE USER MANUAL 9kW LILLY PELLET STOVE Table of Contents.Overview of Stove Parts... 2.Technical Characteristics... 3 3.Important Information... 4 4.Pellet Specification...5 5.Technology... 6 6.Installation...

More information

Orrin. Instruction Manual. Includes our new CoolTouch TM Control System Looks permanent, but goes wherever you go! U.S.

Orrin. Instruction Manual. Includes our new CoolTouch TM Control System Looks permanent, but goes wherever you go! U.S. Includes our new CoolTouch TM Control System Looks permanent, but goes wherever you go! U.S. Patent Pending Orrin A Kichler Select ceiling fan Kichler Lighting 7711 East Pleasant Valley Road P.O. Box 318010

More information

STREBEL S-CB + Cascade Kits

STREBEL S-CB + Cascade Kits STREBEL S-CB + Cascade Kits Models + 60 - + 80 - + 100 - + 120 PX 120 - + 10 - + 180 Installation & Operating Manual 2x60 up to 12x180 Please read and understand before commencing installation and leave

More information

RWC Issue: F. Description: ARISTON WALL CANOPY Model Numbers: ARCH90BIX. Model may vary slightly from images pictured. All measurements are in mm.

RWC Issue: F. Description: ARISTON WALL CANOPY Model Numbers: ARCH90BIX. Model may vary slightly from images pictured. All measurements are in mm. RWC Issue: F Description: ARISTON WALL CANOPY Model Numbers: ARCH90BIX Model may vary slightly from images pictured. All measurements are in mm. 1 Overview Pre-installation Thank you for purchasing a quality

More information

VIESMANN. Operating instructions VITODENS 050-W. for the system user. With constant temperature or weather-compensated control unit

VIESMANN. Operating instructions VITODENS 050-W. for the system user. With constant temperature or weather-compensated control unit Operating instructions for the system user VIESMANN With constant temperature or weather-compensated control unit VITODENS 050-W 9/2014 Please keep safe. Safety instructions For your safety Please follow

More information

ELTSHDC110SG/ Users Guide & Installation Instructions

ELTSHDC110SG/ Users Guide & Installation Instructions ELTSHDC110SG/ Users Guide & Installation Instructions CONTENTS IMPORTANT SAFETY INFORMATION Installation Page 2 Child Safety 2 Maintenance and service 3 YOUR APPLIANCE OPERATING INSTRUCTIONS Cooker Hood

More information

VIESMANN. Operating instructions VITODENS 111-W. for the system user

VIESMANN. Operating instructions VITODENS 111-W. for the system user Operating instructions for the system user VIESMANN Heating system with control unit for constant temperature or weather-compensated mode VITODENS 111-W 4/2012 Please keep safe. Safety instructions For

More information

Residential Gas Condensing Boiler Greenstar ZBR16/21/28/35/42-3A... ZWB28/35/42-3A...

Residential Gas Condensing Boiler Greenstar ZBR16/21/28/35/42-3A... ZWB28/35/42-3A... 70 80 99-00-O Residential Gas Condensing Boiler ZBR//8/35/4-3A... ZWB8/35/4-3A... 70 80 993 (03/03) CA/US Operating Instructions Contents Contents Key to symbols and safety instructions............................

More information

1 VICTRIX ZEUS Superior kw I features

1 VICTRIX ZEUS Superior kw I features Wall-hung condensing VICTRIX ZEUS Superior kw I is the new range of wall-hung condensing boilers with 54 litre stainless steel storage tank available in two versions with nominal heat output of 26 kw and

More information

RIELLO 40 GS/M SERIES

RIELLO 40 GS/M SERIES The Riello 40 GS/M series of two stage progressive or modulating gas burners, is a complete range of products developed to respond to any request of gas burners for hot air generator according to EN 1020.

More information

Technical information for installation and operation

Technical information for installation and operation Technical information for installation and operation PR 24002.65 12-04-2016 Subject to technical modifications LogoFresh 100 & 120 fresh water station Electronically controlled GB Meibes System-Technik

More information

Sanpress Inox G. Instructions for Use. Year built: from 02/2004 en_int

Sanpress Inox G. Instructions for Use. Year built: from 02/2004 en_int Sanpress Inox G Instructions for Use Year built: from 02/2004 en_int Sanpress Inox G 2 from 27 Table of contents Table of contents 1 About these instructions for use 4 1.1 Target groups 4 1.2 Labelling

More information

INSTALLATION AND OPERATION MANUAL FOR 2 STAGE RIELLO BURNER ADDENDUM TO ( Mo 437 manual )

INSTALLATION AND OPERATION MANUAL FOR 2 STAGE RIELLO BURNER ADDENDUM TO ( Mo 437 manual ) INSTALLATION AND OPERATION MANUAL FOR 2 STAGE RIELLO BURNER ADDENDUM TO ( Mo 437 manual ) FOR USE WITH MODEL: OH6FX072DV4 PLEASE READ THESE INSTRUCTIONS PRIOR TO INSTALLATION, INITIAL FIRING, AND BEFORE

More information

COPPER INSERT INSTALLATION INSTRUCTIONS, USE AND CARE GUIDE

COPPER INSERT INSTALLATION INSTRUCTIONS, USE AND CARE GUIDE COPPER INSERT INSTALLATION INSTRUCTIONS, USE AND CARE GUIDE DESIGNER SERIES MODELS Model Width CFM Type of Motor & Blower VSL430 BF 28-3/8" * Remote VSL436 BF 34-3/8" * Remote VSL442 BF 40-3/8" * Remote

More information

Chapter 3 Cooling, heating and ventilation systems

Chapter 3 Cooling, heating and ventilation systems 3 1 Chapter 3 Cooling, heating and ventilation systems Contents Antifreeze mixture..............................see Chapter 1 Cooling fan assembly - testing, removal and refitting.............8 Cooling

More information

Installation instructions PYROMAT ECO. for contractors PYROMAT ECO GB 8/2012 Dispose after installation.

Installation instructions PYROMAT ECO. for contractors PYROMAT ECO GB 8/2012 Dispose after installation. Installation instructions for contractors PYROMAT ECO PYROMAT ECO 8/2012 Dispose after installation. Safety instructions Please follow these safety instructions closely to prevent accidents and material

More information

Installation instructions and how to use and look after your built-in cooker hoods D5625/22/45 and D5855. NEFF (UK) Ltd

Installation instructions and how to use and look after your built-in cooker hoods D5625/22/45 and D5855. NEFF (UK) Ltd Installation instructions and how to use and look after your built-in cooker hoods D5625/22/45 and D5855 NEFF (UK) Ltd Operation Instructions Operating modes Exhaust-air mode: The extractor-hood fan extracts

More information

Operating Instructions

Operating Instructions Operating Instructions Typ TEKA CAREMASTER TEKA Absaug- und Entsorgungstechnologie GmbH Industriestraße 13 D-46342 Velen Postfach 1137 D-46334 Velen Tel.: +49 (0) 2863 9282-0 Fax: +49 (0) 2863 9282-72

More information

VIESMANN VITOCROSSAL 300 Gas condensing boiler 787 to 1400 kw

VIESMANN VITOCROSSAL 300 Gas condensing boiler 787 to 1400 kw VIESMANN VITOCROSSAL 300 Gas condensing boiler 787 to 1400 kw Datasheet Part no. and prices: see pricelist VITOCROSSAL 300 Type CR3B Gas condensing boiler for natural gas E, LL and LPG 9/2011 Benefits

More information

Innes. Instruction Manual A Kichler Decor ceiling fan. Includes our new TM

Innes. Instruction Manual A Kichler Decor ceiling fan. Includes our new TM Innes 300130 A Kichler Decor ceiling fan Includes our new CoolTouch Control System Looks permanent, but goes wherever you go! U.S. Patent Pending Kichler Lighting 7711 East Pleasant Valley Road P.O. Box

More information

Part 2: Installation Instructions cl

Part 2: Installation Instructions cl Contents Page: Part 2: Installation Instructions cl. 381-382 1. Delivery scope............................... 3 2. General and Transportation safety precautions........... 3 3. Stand installation 3.1 Installing

More information

Installation and service instructions for contractors Logano plus SB625. Burner shroud not available in UK and Ireland

Installation and service instructions for contractors Logano plus SB625. Burner shroud not available in UK and Ireland Floor standing condensing boiler 6 720 804 349-00.1ITL Installation and service instructions for contractors Logano plus SB625 6 720 806 339 (2013/07) GB Burner shroud not available in UK and Ireland Read

More information

VERTICAL COOKING PRECISIO/PRECIJET COMBI OVEN PRECISIO/ PRECIJET OVENS S.A.V. MAINTENANCE AND REPAIR

VERTICAL COOKING PRECISIO/PRECIJET COMBI OVEN PRECISIO/ PRECIJET OVENS S.A.V. MAINTENANCE AND REPAIR VERTICAL COOKING S.A.V. PRECISIO/ PRECIJET OVENS MAINTENANCE AND REPAIR 27/03/2012 PPS-3BEFM10PC GENERAL Tools Every time this symbol appears, it is imperative to have the appropriate tool in order to

More information

Notes on installation

Notes on installation Contents Connections on the dryer Installation options Safety instructions... 1 Connections on the dryer... 2... 3 Installation options... 4... 6 Installing more than one dryer... 7 Safety instructions

More information