Operating Instructions only for authorised experts RENDAMAX 30. doc /2007 Art. No

Size: px
Start display at page:

Download "Operating Instructions only for authorised experts RENDAMAX 30. doc /2007 Art. No"

Transcription

1 Operating Instructions only for authorised experts RENDAMAX 30 doc /2007 Art. No

2 Table of contents Table of contents...2 General information...3 Conditions...3 Warranty conditions...3 Hot water quality...4 Product description Components...5 Function description...5 Extent of delivery...5 Circuit diagram...6 Compact gas fitting...6 Technical data...7 Dimensions...8 Information about system integration Chimney Exhaust...9 Condensation pipes...9 Assembly Preparations for the assembly...10 Air / exhaust system...11 Design variations...12 Exhaust systems, ambient air dependent...13 Example: exhaust system...13 Installing the burner...14 Dismantling / assembling the cover...14 Burner connection, filling the system...15 Electrical installation...16 Set up Control measures...17 Circulating pump...17 Control measures...18 Gas fitting settings...19 Switch field with operating field KM Display in operating field KM Maintenance and service Removing device covers...22 Dismantling of the burner and gas fitting...23 Cleaning...23 Maintenance instructions...24 List of error messages...25 Notes

3 General information Conditions Warranty conditions General information Installation, set up, electrical connection and first operation are tasks for an expert. He is responsible for the correct implementation. Information for the operator The safety and function of the burner are reliable if the unit is regularly serviced by a heating expert. In order to guarantee regular implementation, it is recommended that a service contract be concluded. Before installation of the burner, the consent of the gas supply company and the district master chimney sweep must be obtained. Notes on our warranty conditions We exclude our guarantee for damage resulting from the following: - Unsuitable or incorrect use or operation - Incorrect assembly ot set up by the purchaser or third parties - Connection of parts of other origin - Operation of the unit with excess pressure or outside the work s performance details - Use of incorrect fuel - Non-compliance with the information in the operating instructions and the labels attached to the burner. Conditions Observe the following standards for a safe, environmentally friendly and energy-saving operation: DIN Drinking water systems in properties, technical conditions for construction and operation DIN EN Chimney TRGI (DVGW G600) - Technical regulations, gas installation ATV A Feeding condensation from furnaces into public wastewater systems State building regulations TRF - Technical regulations, liquid gas DVGW G688 - Burner technology EN Regole per il calcolo del fabbisogno di calore degli edifici EN Technical safety equipment for heating units with lead temperatures of up to 95 o C - EnEV - FeuVO In Austria, the following also applies: - ÖVGW TR Gas (G1) - ÖVGW TR Liquid gas (G2) - ÖNORM H 5152 Furnaces, planning aids - ÖNORM M 7443 Gas devices with atmospheric burners Part 1, 3, 5, 7 - ÖNORM M 7457 Gas devices with mechanically supported pre-mix burners - ÖNORM H 5195 Hot water norm - ÖVGW Guidelines G1 - Technical guideline for the erection of low pressure gas systems G2 - Technical guideline for the erection of liquid gas systems G41 - Gas furnaces, erection and connection G4 - Heating room guideline - The device is licensed according to Article 15a B-CG and according to the Furnace Directive VO (FAV 97) - The local building regulations must be observed In Switzerland, the following also applies: - PROCAL Heating materials supplier association - SVGW gas guidelines G1: Gas installations Swiss gas and water association - EKAS Form, 1942: Liquid gas guideline, part 2 - BUWAL Federal Ministry for the Environment, Forest and Landscape - VKF Union of cantonal fire insurance companies - Water treatments Observe the guidelines of SWKI No Water treatments for heating systems In addition, the country-specific directives and standards must be observed. 3

4 Hot water quality Hot water quality The composition and quality of the system water directly affect the performance of the overall system and the life of the boiler. Normally, mains water with a ph value of 7-8 can be used for the first filling and subsequent top-ups, provided that the water is not strongly corrosive (chlorine content > 150 mg/l) or is very hard (>14odH; hardness range IV). A drinking water analysis can be requested from the appropriate water supply company. If the specific system volume is greater than 20 litres / kw of heat output (e.g. through the installation of a hot water buffer tank), the maximum permitted chalk deposit must be determined by the filling and top-up water corresponding to the computation of VDI guideline If necessary, the water must be softened. No chemical anticorrosion substances must be used. Unknown water quality and replacement systems Frequently, substances and additives are in hot water which impact on the function and life of the burner. Therefore, either or heat the old system and then fully empty before replacing, carefully rinse the heating system after replacing. Ideally, the system should be rinsed directly after the first heating. Underfloor heating For old systems, underfloor heating systems and if there is problematic filling water, ELCO recommends fitting a heat exchanger from the accessories. In Austria, ÖNORM H also applies. In Switzerland, SWKI No also applies. Criterion Permissible value Effect of deviation ph value 7-8 Danger of corrosion of boiler components and heating system Hardness < 14 dh - Increased chalk deposits - Limited life of boiler Chlorine content < 150 mg/l Corrosion of alloyed materials 4

5 Product description Components Function description Extent of delivery Smoke gas exhaust connection 2 Air infeed 3 Smoke gas temperature sensor 4 Heat exchanger 5 Ignition transformer 6 Blower 7 Regulator 8 On / off switch 9 Automatic ventilator 10 Noise insulation (types 65 and 85) 11 Gas valve 12 Venturi tube 13 Boiler pump (outside the boiler on types 100 and 120) Product description The burner RENDAMAX 30 is certified with CE-0063BO3192 and therefore corresponds to the following standards and guidelines: - DIN EN EN EN /2-90/396/EWG - 89/336/EWG - 73/23/EWG - 92/42/EWG - DIN EN DIN EN DIN EN The NOx limits required by 1 st BlmSchV Section 7 (2) are met. The burner RENDAMAX 30 is a system with a closed combustion chamber which is independent of ambient air. The combustion air enters the device through an air infeed system. The burner is used for closed hot water heating systems. The boiler output is modulated to the current heating requirements by the integrated regulator. Heat exchanger The stainless steel heat exchanger is made from flat spirals and ensures a transfer of the exhaust gas s heat to the boiler water. The condensation takes place in the upper section of the heat exchanger. The condensation is fed down in the rear section of the heat exchanger. The control and regulator unit assumes the function of the automatic firing device and regulator of the modulating operation of the boiler and the hot water preparation. A display shows the operating status of the boiler. The automatic firing device controls and monitors the safety function process. Extent of the delivery Burner with circuit diagram Documentation Accessories VISTRON tank Flue systems Neutralisation unit / condensation treatment Pump group 5

6 Product description Circuit diagram Compact gas fitting Operating type i Standby q Automatic operation F Summer operation j Chimney sweep operation 2 Operating type selector 3 Fault display E 4 Lead temperature 5 Fault code (blinking) 6 Heating circuit status C Night operation B Day operation (Blinking) Burner on 7 Service status ji Service status minimum burner output jii Service status maximum burner output Circuit diagram The circuit diagram is integrated in the burner with all the above operating elements. The system electronics KM628 offers: - Management for modulating boiler regulator - Hot water preparation Compact gas fitting The compact gas fitting works as a gas safety close valve and as regulator. The regulator functions as a pneumatic gas / air difference pressure regulator. On the gas side, it controls the gas pressure P O in the function of the combustion air pressure P L. If no air pressure is built up (P L = 0), the gas valve remains closed. The gas/ air pressure ratio and thus also the gas air volume ratio can be set and then/ remain almost constant over the set load range. Technical data Safety close valve Mains power Type Type 120 Power consumption Type Type 120 Gas fitting incl. gas filter 2, class B/C AC 24 V AC 230 V 0,42 A 0,09 A 6

7 Product description Technical data RENDAMAX Nominal heat output at 75 o / 60 o Max/Min kw 58,8/8,3 77,5/15,5 87,2/17,4 108,9/21,8 Nominal heat output at 40 o / 30 o C kw 65,1/9,2 85,8/17,2 96,5/19,3 120,5/24,1 Nominal heat load kw 60,7/8,6 80,0/16,0 90,0/18,0 112,4/22,5 Standard efficiency 75 o / 60 o C % 106,3 106,3 106,3 106,3 Standard efficiency 40 o / 30 o C % 110,1 110,1 110,1 110,1 Operability losses T K = 70 o C % < 0,3 < 0,3 < 0,3 < 0,3 Max. blower pressure Pa Water content l 6,6 8,4 10,3 12,0 Max. permissible water pressure bar Max. permissible lead temperature C Condensation volume at 40 o C / 30 o C ca. l/h 9,7 12,8 14,4 18,0 Gas connection value Min. gas flow pressure Natural gas E/H* (Hi=10.9 kwh/m 3 ) m 3 /h 5,6 7,3 8,2 10,3 Natural gas LL (Hi=8.1 kwh/m 3 ) m 3 /h 7,5 9,9 11,1 13,9 Liquid gas propane / butane (Hi=12.8 kwh/kg) Natural gas Liquid gas kg/h 4,7 6,3 7,1 8,8 mbar mbar Exhaust gas mass flow for natural gas g/s Exhaust gas temperature net, T V /T R 75/60 C Exhaust gas temperature net, T V /T R 40/30 C < 55 < 55 < 55 < 55 Gas category II2ELL3P / II2H3P Exhaust gas value group G61 G61 G61 G61 Construction type - Exhaust gas systems (B23; C13; C33; C43; C53; C63; C83) All All All All Ionisation flow min. 15,0 15,0 15,0 15,0 Connections: Air/exhaust gas pipe (concentric) DN 80/ / / /150 Air/exhaust gas pipe (parallel) DN 80/80 100/ / /100 Heating lead / heating reflux (inner / outer) DN 25/32 25/32 25/32 25/32 Gas connection DN Condensation pipe connection mm ph value condensation ph 3,0 3,0 3,0 3,0 Electric connection / power consumption 230 V / VAC (*types 100 and 120 without boiler circuit pump) W * 215* CE ID number 0063BO3192 Weight, approx. kg Nominal heat output at 80 o /60 o C kw 59,2 77,8 88,2 109,0 Efficiency at nominal output at 100%, 80 o /60 o C % 97,5 97, ,7 Efficiency at partial load 30%, 40 o /30 o C % 108,1 108,1 108,1 108,1 Operability losses at 70 o C average K temp. % < 0,3 < 0,3 < 0,3 < 0,3 Auxiliary energy + integrated boiler circuit pump (*types 100 and 120 without boiler circuit pump) W * 137* 7

8 Product description Dimensions Type R30/65 R30/85 R30/100 R30/120 B1 mm D mm D1 mm G R 3 / 4 " R 3 / 4 " R 3 / 4 " R 3 / 4 " L mm L1 mm W R 1 1 / 4 " / Rp 1" R 1 1 / 4 " / Rp 1" R 1 1 / 4 " / Rp 1" R 1 1 / 4 " / Rp 1" 8

9 Information about system integration Chimney Exhaust Condensation pipes Burner technology In the burner technology, the residual heat is removed from the exhaust gas trough cooling and condensation and is fed to the heating system. In this way, a higher degree of efficiency is achieved with low energy consumption. Information for the chimney Exhaust systems must be installed in a shaft corresponding to DIN / Part 1. Check the exhaust gas pipes before assembling the burner Dimensions only apply to the use of the exhaust gas system made from polypropylene (PP) DN 110/150. The low exhaust gas temperatures required usual exhaust gas pipes specifically for burners. Examples: - Chimneys resistant to moisture - Condensation-sealed inner dish - Diameter of the connections (sleeves) must be considered for the minimum shaft cross-sections. Roof heating central Dependent on ambient air, max. pipe length 4 m Exhaust gas is extracted - via a DIBT (D) or VKF (CH) ÖTZ (A) authorised and tested exhaust pipe - into the chimney Pipes and pipe sections - outside shafts, must be freely accessible and checkable and must be protected against frost - inside shafts, must be rear ventilated. Exhaust pipes must be - moisture resistant - suitable for exhaust temperatures below 40 o C, and - secure against over-pressure. Recommendation: Accessories, exhaust pipe set Condensation pipes must not be securely installed. The condensation is trapped in a funnel and fed into the sewage system. Recommendation: Accessories, neutralisation device Note worksheet ATV A 251. Exhaust pipes Infeed / exhaust system The applicable local provisions for the design of the exhaust system must be observed. The burner can only be operated with approved exhaust systems. On site exhaust systems must be resistant to moisture, corrosion and sealed against condensation, and satisfy static and operating requirements. Unhindered escape of the exhaust gases must be guaranteed at the chimney opening (chimneypot is not recommended). The connection between chimney and burner must be fitted with a drop (3%) so that the condensation escaping through the exhaust system can flow back from the exhaust pipe. This connection should have as few bends as possible. Inspection openings must be planned in the exhaust pipe in accordance with official requirements. It is possible to use an exhaust system not dependent on ambient air. Exhaust pipes Horizontal pipes must be avoided in order to prevent the development of condensation. It must be ensured that the various components are connected to each other with proper seals. 45 o bends should be used for the assembly. The vertical parts must be fixed with straps. Installation example of separate condensation pipe from the exhaust gas pipe. Condensation The connection of the condensation pipe (under boiler) must lead to the exhaust pipe with drop. It must also be guaranteed that there is no risk of frost. 9

10 Assembly Preparations for the assembly Minimum distances Installation and distances Unrestricted access for operation and maintenance is only possible if the minimum distances are observed. Place of installation Do not install the unit in rooms with aggressive vapours (e.g. hairspray, perchloroethylene, tetrachlorocarbon), large occurrences of dust or high humidity (e.g. laundry rooms). The place of assembly must be secure against frost. If these requirements are not fulfilled, the warranty for damage shall lapse. When assembling the device, please ensure that no foreign parts (e.g. drill dust) enter the gas burner. Use covers. As different requirements apply in different Bundesländer, consulting the appropriate authorities and the appropriate district master chimney sweep is recommended before installation. Gas connection The laying of gas pipes and the gas connection are exclusively the tasks of the licensed gasfitter. Clean deposits from the heating network and gas pipes before connecting the gas burner, especially order systems. Please ensure that the gas pipes are laid free from tension. Before setting up, check the pipes and gas connections. The gas fittings on the burner can be pressurised to a maximum of 150 mbar. 10

11 Assembly Air / exhaust system Design variations Ambient air dependent B23 Exhaust connection to exhaust system Multiple configuration (underpressure / overpressure) Cellar installation Air supply via installation room Exhaust system via roof Minimum shaft cross-section Shaft rear ventilation according to DIN for design B23 (ambient air dependent) Exhaust pipe ø 110 mm > Ambient air dependent, PPS / Alu white C33x Air exhaust system via roof in the same pressure area Cellar installation Exhaust-ventilation system to the exhaust chimney Air-exhaust system via roof Installation in exhaust chimney not sensitive to moisture Air exhaust system via roof in the same pressure area Floor, roof installation Exhaust, ventilation system via sloping roof or flat roof C43x Connection to AZ / LAS (2-speed) multiple configuration on site C53x Air infeed and exhaust to outside in different pressure areas on site C63x Air, exhaust connection on separately tested and supplied air/exhaust pipes Cellar, floor installation Exhaust, air infeed system through the external wall. Exhaust trough heat-insulated exhaust pipe or AZ-AW Exhaust pipe (standing air layer) at the external wall C83x Exhaust connection exhaust systems, multiple configuration (underpressure), combustion air infeed via separate air pipe on site 11

12 Assembly Air / exhaust system Design variations The local applicable provisions must be observed for the design of the exhaust system. Connection to gas / exhaust system Only original accessories and parts, including the offered lubricants for PPS exhaust systems, must be used for the concentric air/exhaust gas system. Gas burners with an air/gas design via a roof can only be installed in the attic or in rooms where the ceiling also forms the roof or there is only the roof construction over the ceiling. The air/gas design must not pass through other rooms. If a fire-resistance period is demanded for the ceiling, the pipes for the combustion air and exhaust system in the area between the upper edge of the ceiling and the roof skin must have a cladding which also has this fire-resistance period and comprises non-flammable materials. If no fire-resistance period is demanded for the ceiling, the pipes for the combustion air and exhaust system from the upper edge of the ceiling to the roof skin must be in a shaft of non-flammable, robust materials or in a metal protective pipe (mechanical protection). It must be possible to check exhaust pipes for free cross-sections. At least one corresponding revision and / or test opening must be fitted in the installation room must have in accordance with the appropriate district master chimney sweep. Exhaust connections are produced between the sleeve and seal. Sleeves must always be positioned against the direction of condensation flow. The air/gas system must be installed with a 3 o slope to the burner. Upon installation, the length to be calculated of the air and gas system through the roof must not exceed 4m. The calculated length of the air and gas system comprises the straight pipes and the length of the curved pipes. A 90 o bend is treated as 1m and a 45 o bend as 0.8m. In order to prevent mutual impacts on the air and gas systems through the roof, we recommend a minimum distance between the air and gas systems of 2.5m. Connection to air and exhaust chimney not sensitive to moisture (AZ), exhaust chimney or exhaust system Chimneys and exhaust systems must be approved under building regulations for furnaces (DIBT approval for D, VKF for CH and ÖTZ for A ). The size is calculated using the calculation tables according to the exhaust gas values. There must not be more than three 90 o bends. For chimneys, 0 Pa must be assumed when calculating the feed pressure. Connection to air and exhaust chimney not sensitive to moisture C43x (AZ) The straight air and exhaust pipes must not be longer than 1.4m when installing the air and exhaust chimney. There must not be more than three 90 o bends. The air and exhaust chimney AZ must be tested by the DIBT (German Institute for Building Technology); the VKF (Association of Cantonal Fire Insurance Companies), the ÖTZ and be approved for burners. Connection to exhaust chimney not sensitive to moisture or exhaust system B23 for ambient air dependent operation The straight air and exhaust pipes must not be longer 2m when installing an exhaust chimney. There must not be more than three 90 o bends. The exhaust chimney must be tested by the DIBT; the VKF, the ÖTZ and be approved for burners. Connection to a combustion air and exhaust system C63x without a tested gas furnace The straight air and exhaust pipes must not be longer 2m when installing a combustion air and exhaust system. There must not be more than three 90 o bends. The exhaust system must be tested by the DIBT; the VKF, the ÖTZ and be approved for burners. If the combustion air is taken from the shaft, it must be free from impurities. Multiple configuration of exhaust systems (not included in the delivery) The proof of the calculation, design and function from the manufacturer of the boiler system must be taken into consideration in the event of multiple configurations of the exhaust system. Temperature [ o C] Volume flow [m 3 /h] Mass flow [g/s] Feed pressure [Pa] RENDAMAX 30 max. / min. max. / min. max. / min. max. / min / / / / / / / / / / / / / / / / 15 12

13 Assembly Exhaust systems, ambient air dependent Example: exhaust system 1 Boiler connection 2 T connector with lid 87.5 o 3 Pipe with sleeve 4 Support track 5 Support bend 6 Pipe with sleeve 7 Spacer 8 Furnace shaft cover 10 Revision piece 11 Bend 30 o 13

14 Assembly Installing the burner Dismantling / assembling the cover Removing the boiler covers Loosen 2 screws (1) on the front cover (2) Slide the front cover up and remove Loosen the tension fasteners (3) on the side cover (4) Fold the side cover to the right and left and lift from the clips (5) Open the snap fastener (6) on the front cover plate (7) Remove the cover plate 14

15 Assembly Burner connection, filling the system The connection is only performed by an authorised expert. 1 2 Siphon and condensation trap Dismantle the siphon (1), fill and reassemble Connect the condensation trap or neutralisation equipment (accessory) with the siphon Note The condensation pipe (2) must not be securely connected to the wastewater pipe. The condensation must be able to be drip freely into a funnel. 3 Filling the system Connect the water pipe to the KFE tap (in the building) Open all radiator valves Fill cold system to 1 bar Check water quality Vent pump (if necessary, loosen blade wheel with screwdriver) Fill condensation siphon with water (approx. 05. l) Run pump several times After complete venting, fill system to the final operating pressure Close venting screw and remove filler pipe Replacement system Carefully rinse system Check seal at connection points Carefully vent system Siphon 2 Condensation connection 3 Cable insert, external cabling 4 Gas connection ¾ 5 Lead connection 6 Reflux connection Connect the gas pipe Check seal of pipes Connect required exhaust closing plate (concentric / parallel) Insert boiler connector (concentric or parallel) from above into the respective opening and press into the socket. To do this, use the lubricant suitable for PPS exhaust pipes Connect exhaust collector to the exhaust system Assemble supports 15

16 Assembly Electrical installation General information Electrical installation and connection work must only be performed by an electrician. The VDE/ÖVE/Sev and EVU provisions and conditions must be observed. Mains connection and connection from building wires The device is designed for permanent connection and connection wires NYM 3 x 1.5 mm 2 or H05W-F 3 x 1 mm 2. Burner and switch field are wired. The mains connection is with a clamp (3) on the device via a power circuit envisaged and secured for this. It must be possible to separate the burner from the network by suitable means. Allpolar switches with a contact opening width > 3 mm or power protector switch can be used for this. Mains voltage: Mains connection fuse: Power consumption: 230 V, 50 Hz 10 A max. 420 W Wastewater pump power consumption Max. switched current KM628 1A / relay Max. 2.5 A total The switch field (1) can be folded up after the securing screw (2) has been removed

17 Set up Control measures Circulating pump Water throughflow speed and pump data R30 Type t 20K Pump data Nominal throughflow Boiler resistance Pump type WILO Pump setting Feed amount at Q Residual feed amount at Q Max. power consumption* m 3 /h kpa kpa kpa W R30/65 2,57 20 RS 25/7 PWM 3/C max R30/85 3,38 25 RS 25/7 PWM 3/C max R30/100 3,78 28 TOP-S 30/7 *** R30/120 4,70 30 TOP-S 30/7 *** The boiler is fitted with a pump switch as standard. The pump is activated when the boiler is switched on. The pump continues to operate for a few minutes after the burner switches off. This period can be adjusted. The standard period is 2 minutes. *) Maximum pump power consumption stated in pump position 3 ***) Pump optional 17

18 Set up Control measures The first set up must be performed by an authorised expert. Before set up, the following checks must generally be performed: Check power supply Check pressure in the heating system Check pressure at the gas connection Check gas pipe seal Check perfect assembly of the exhaust accessories Check condensation pipe seal Minimum circulation quantity / flow monitoring It must be guaranteed that the device has a hydraulic throughflow when feeding heat. The device is fitted with a flow safety which monitors the throughflow. In order to maintain the minimum throughflow, it is recommended that points or a plate heat exchanger be fitted (both available as accessories) or the RENDAMAX 30 is connected to an open distributor. Before installation, please note the following: The size of the expansion tank must be sufficient, see notes on the water quality, if necessary fill with softened water. The system should be set up directly after filling in order to rule our standing air cushions as a corrosion ovens. Chalk deposits in the heating boiler are avoided by setting up the device at low system temperatures and maximum throughflow. During revision work, a complete exchange of the system water should be avoided. This can be achieved through partial dams or reuse of the trapped and filtered system water. 18

19 Set up Gas fitting settings Setting the combustion quality Connect the device to the water, gas and electricity Because of the different ignition behaviours of natural gas LL and natural gas E, the gas-air compound must be adjusted. After successful ignition, the prescribed CO 2 value at full load can be set by turning the control screw (2) on the gas valve. Set the CO 2 value for low load by turning the control screw (1) on the gas fitting Natural gas settings Natural gas L / H RENDAMAX 30 Gas connection pressure mbar 20 CO 2 max. 65/85/120 % 8,8 0,2 CO 2 max. 100 % 9,4 0,2 CO 2 min. 65/85/120 % 8,2 0,2 CO 2 min. 100 % 8,8 0,2 Min. And max. CO 2 values must always have a difference of 0.3%. 2 Natural gas liquid gas conversion The following diaphragms must be used for conversion to operation with liquid gas (included with the delivery as a set): R30 65: 6,0 mm R30 85: 6,0 mm R30 100: 6,8 mm R30 120: 8,0 mm Liquid gas settings Liquid gas RENDAMAX 30 Gas connection pressure mbar 50 1 CO 2 max. 65/85/120 % 9,8 0,2 CO 2 max. 100 % 10,4 0,2 CO 2 min. 65/85/120 % 9,0 0,2 CO 2 min. 100 % 9,6 0,2 Min. And max. CO 2 values must always have a difference of 0.3%. 19

20 Set up Switch field with operating field KM628 1 Operating type i Standby q Automatic operation F Summer operation j Chimney sweep operation 2 Operating type selector 3 Fault display E 4 Lead temperature 5 Fault code (blinking) 6 Heating circuit status C Night operation B Day operation (Blinking) Burner on 7 Service status ji Service status minimum burner output jii Service status maximum burner output Operating functions (flap closed) When the flap is closed, the desired operating status can be selected by turning the knob (2) left or right. i Standby Boiler not in use, frost protection active q Automatic operation Boiler in use for heating and hot water user F Summer operation Boiler in summer operation (only hot water use) ji Chimney sweep operation, minimum load Boiler in use, minimum load jii Chimney sweep operation, maximum load Boiler in use, maximum load 20

21 Set up Display in operating field KM Parameter display P1 Current/set lead temperature P2 Current/set hot water temperature *P3 Desired lead temperature P5 Current outside temperature P6 Current exhaust temperature P9 Current burner output P10 Password 2 Optical interface 3 Reset / program button 4 Alarm LED 5 Parameter selector 6 Operating status outputs 7 Corresponding current measurement 8 Fault / parameter display 9 Operating status inputs *) P3 desired load (for KKM cascade manager) Information functions (flap open) Information menu When the flap is open, turning the knob (5) displays information. There are ten menus. Using the knob, a selection can be made. An arrow in the lower section of the LCD display indicates which parameter has been selected. No. P1 P2 P3 P5 P6 P9 P10 Parameter display Current / set lead temperature Current / set hot water temperature Desired hot water temperature (desired load for KKM cascade manager) Current outside temperature Current exhaust temperature Current burner output Only for trained engineers Overview of the symbols Input symbols H RT Bus Flame ionisation in operation Boiler released by external regulator Data bus in operation Output symbols Main gas valve voltage on Z F Ignition transformer voltage on Release of boiler ventilator Boiler pump voltage on Hot water load voltage on Setting the desired lead temperature for heating operation Only applicable without weather effect of 0-5 V signal Open flap (the arrow on the lower side of the LCD display indicates Parameter 1) Press reset / program button (3), Alarm LED lights up, turn the knob (5) left or right until the desired lead temperature appears in the display Press reset / program button (3), Alarm LED turns off Close flap Setting the desired hot water temperature for hot water use Only applicable when using the boiler s hot water function Open flap) Turn the knob to the right until the arrow on the lower side of the LCD display indicates Parameter 2 Press reset / program button (3), Alarm LED lights up, turn the knob (5) left or right until the desired hot water temperature appears in the display Press reset / program button (3), Alarm LED turns off Close flap 21

22 Maintenance and service Removing device covers Maintenance and cleaning work is only performed by the authorised expert. He is responsible for correct maintenance. Before the maintenance work, remove the device from the mains electricity and close the feed and reflux. The maintenance work should be carried out annually. The heat exchanger does not have to be cleaned if there is a small amount of dirt, but must be cleaned at least every two years Removing the boiler covers Loosen 2 screws (1) on the front cover (2) Slide the front cover up and remove Loosen the tension fasteners (3) on the side cover (4) Fold the side cover to the right and left and lift from the clips (5) Open the snap fastener (6) on the front cover plate (7) Remove the cover plate 22

23 Maintenance Cleaning Dismantling the burner and gas fitting Loosen the electric plug connection Loosen 4 screws (1) on the blower (2) Loosen securing screws (3) on the burner (4) Remove the entire burner unit from the heat exchanger mm 5-10 mm Cleaning burner and blower Visually check the burner (4) and the blower (2). Dust deposits are usually blown away and burnt by the draft from the burner during normal operation. If there is additional dirt such as building dust, a careful cleaning of the metal material (5) must be undertaken using a vacuum cleaner. Check seals (6) surrounding the burner plate and the ceramic fibre seal (7) for damage and replace if necessary. Check adjustment of electrodes (8) 9 Cleaning the heat exchanger Rinse the heat exchanger (9) with clean water (remove persistent dirt with a thin plastic brush and then rinse) 23

24 Maintenance instructions RENDAMAX 30 Burner Maintenance and cleaning work is only performed by the authorised expert. He is are responsible for correct maintenance. The maintenance work should be carried out annually. The heat exchanger does not have to be cleaned if there is a small amount of dirt, but must be cleaned at least every two years. Measure and record the set emission values Switch off the main heating switch and secure against reactivation, or separate the device from the allpolar mains Close the gas tap Remove the device covers Dismantle the blower, gas valve and burner unit Remove ignition cable. Check ignition plug for breaks, damp (damp / wet ignition plugs cause error messages replace ignition plug) Check the burner (if necessary clean with paintbrush / nylon brush or vacuum cleaner) Check blower (if necessary clean with paintbrush / nylon brush or vacuum cleaner) Remove furnace chamber insulation Rinse heat exchanger with clean water (remove persistent dirt with a thin plastic brush and then rinse) Clean siphon and refill with water before reassembly Check seal of all connections to condensation-carrying parts. Remove any escaped condensation or other moisture Check securing screws, replace if necessary Check system pressure, expansion tank and safety valve. Dismantled seals for gas and water-carrying parts must be replaced for new ones when reassembling. This is the case, in particular, for O-rings on the gas valve and all burner seals Reassemble device ready for use Open gas pipe and check seal Switch on main heating switch Carry out function control with emission measurements If necessary, readjust values according to factory requirements. 24

25 List of error messages Error messages displayed on KM 628 Error messages The E symbol and an error code are displayed in the event of an error. Before correcting the error, the cause of the error must be found and remedied. The operating signal fails if an error occurs twice within six minutes (error code is shown on the display, with 3 above) or if there is an error which is active for longer than six minutes. 1. Maximum thermostat (STB) has reacted The lead temperature has exceeded its set value. Wait until the lead temperature is below the set value for at least one minute, then unlock the safety function by pressing the reset button. 2/3. Blocking entrance has been interrupted An external safety, connected to the clamps (ST ) has reacted. Check and test this safety. 4. Flame disruption When starting combustion, no flame was detected during the set safety period. If the corresponding programming has been undertaken, a new start is possible. 5. Flames reduce during operation While the burner is in use, the respective ionisation flow was below 1 µa. Check and unlock this safety function by pressing the reset button. 6. Maximum temperature monitor (STW) has reacted The lead temperature has exceeded the value set for it or the water flow is too weak. 7. Maximum smoke gas thermostat has activated The smoke gas temperature has exceeded 100 o C. Remedy the fault and activate Reset. 11. Wrong flame signal An ionisation flow exceeding 1 µa has been measured while the burner is in use. Remedy the fault and activate Reset. 12. Defective lead temperature sensor The measured resistance of the temperature sensor is outside the range between -10 and +126 o C. Remedy the fault and press Reset. 13. Defective smoke gas temperature sensor / locked entrance has been interrupted The measured resistance of the smoke gas sensor is outside the range between -10 and +126 o C. Remedy the fault and press Reset. An external retainer, connected to the clamps (1 3) has reacted. Check and repair this retainer. 14. Defective water sensor The measured resistance of the water sensor is outside the range between -39 and +110 o C. Remedy the fault and press Reset. 15. Defective external sensor The measured resistance of the external sensor is outside the range between -39 and +110 o C. Remedy the fault and press Reset. 20/21. Error in the gas valve control After the burner has been switched off, no ionisation flow bas been measured for 5 seconds, which was greater than 1 µa. Remedy the fault and press Reset. 24. Wrong minimum blower speed When rinsing, a specific minimum bower speed is not achieved. Remedy the fault and press Reset. 25. Defective maximum blower speed A specific maximum blower speed has not been undercut for the ignition. Remedy the fault and press Reset. 26. Defective blower speed at stop When the blower is switched off, the selected speed is too high (300 revolutions / minute). Remedy the fault and press Reset. 30. CRC error in the control parameters An Eeprom error has occurred in the stored control parameters. Check and change this parameter set. 31. CRC error in the safety-relevant parameters An Eeprom error has occurred in the stored safety-relevant parameters. Check and change this parameter set. 32. Faults in the low voltage power supply The low voltage power supply is too small or the fuse is defective. Remedy the fault and press Reset. x.y. internal error An internal error has been detected in the electronics. Check and remedy this error. 25

26 Notes 26

27 Notes 27

28 Service: ELCO GmbH D Mörfelden-Walldorf ELCO Austria GmbH A Leobersdorf ELCOTHERM AG CH Vilters ELCO-Rendamax B.V. NL AB Naarden ELCO Belgium n.v./s.a. B Zellik

WOLF GAS CONDENSING BOILERS COMFORTLINE

WOLF GAS CONDENSING BOILERS COMFORTLINE WOLF GAS CONDENSING BOILERS COMFORTLINE CGB-35/50 / CGB-75/100 30m 3 /h THE EXTENSIVE EQUIPMENT RANGE from system supplier WOLF offers the ideal solution for commercial and industrial buildings, new build

More information

The competent brand for energy saving systems NEW. Gas-combi boiler CGG-1K-24/28

The competent brand for energy saving systems NEW. Gas-combi boiler CGG-1K-24/28 The competent brand for energy saving systems NEW Gas-combi boiler CGG-1K-24/28 Gas-combi boiler CGG-1K Technical data room sealed fannned flue model gas combi boiler for low temperature heating and d.h.w.

More information

VIESMANN. Service instructions VITOLADENS 300-T. for contractors. Vitoladens 300-T Type VW3B Inox-Radial heat exchanger for oil fired condensing Unit

VIESMANN. Service instructions VITOLADENS 300-T. for contractors. Vitoladens 300-T Type VW3B Inox-Radial heat exchanger for oil fired condensing Unit Service instructions for contractors VIESMANN Vitoladens 300-T Type VW3B Inox-Radial heat exchanger for oil fired condensing Unit VITOLADENS 300-T 1/2007 Please keep safe. Safety instructions Safety instructions

More information

WHE 2.24 / WHE 2.24 FF

WHE 2.24 / WHE 2.24 FF EN Wall-hung gas boilers WHE 2.24 WHE 2.24 FF User Guide 300011777-001-C . Contents 1 Introduction.............................................................................3 1.1 Symbols used...........................................................................................3

More information

ProCon Streamline Gas Condensing Boiler. Installation and Operating Manual.

ProCon Streamline Gas Condensing Boiler. Installation and Operating Manual. 1 MHG Heating Ltd ProCon Streamline Gas Condensing Boiler. Installation and Operating Manual. Unit 4 Epsom Downs Metro Centre, Waterfield, Tadworth, Surrey, KT20 5LR Telephone 08456 448802 Fax 08456 448803

More information

VIESMANN. Service instructions VITORONDENS 200-T. for contractors. Vitorondens 200-T Type BR2A, 20.2 to 53.7 kw Oil Unit condensing boiler

VIESMANN. Service instructions VITORONDENS 200-T. for contractors. Vitorondens 200-T Type BR2A, 20.2 to 53.7 kw Oil Unit condensing boiler Service instructions for contractors VIESMANN Vitorondens 200-T Type BR2A, 20.2 to 53.7 kw Oil Unit condensing boiler For applicability, see the last page VITORONDENS 200-T 6/2011 Please keep safe. Safety

More information

1 VICTRIX ZEUS Superior kw I features

1 VICTRIX ZEUS Superior kw I features Wall-hung condensing VICTRIX ZEUS Superior kw I is the new range of wall-hung condensing boilers with 54 litre stainless steel storage tank available in two versions with nominal heat output of 26 kw and

More information

ECONOFLAME R6000 GAS FIRED CONDENSING HOT WATER HEATER SUPPLEMENT

ECONOFLAME R6000 GAS FIRED CONDENSING HOT WATER HEATER SUPPLEMENT ECONOFLAME R6000 GAS FIRED CONDENSING HOT WATER HEATER SUPPLEMENT DOC1066 GB STOKVIS ENERGY SYSTEMS 96R WALTON ROAD EAST MOLESEY SURREY KT8 0DL TEL: 08707 707 747 FAX: 08707 707 767 E-MAIL:info@stokvisboilers.com

More information

VICTRIX 90 VICTRIX 115 Wall-hung condensing boilers for high power

VICTRIX 90 VICTRIX 115 Wall-hung condensing boilers for high power VICTRIX 90 VICTRIX 115 Wall-hung condensing boilers for high power VICTRIX 90 is the new wall-hung condensing boiler for room heating only, set-up for independent functioning and for that in cascade mode

More information

IDE 20 / IDE 30 / IDE 50 IDE 60 / IDE 80

IDE 20 / IDE 30 / IDE 50 IDE 60 / IDE 80 IDE 20 / IDE 30 / IDE 50 IDE 60 / IDE 80 EN OPERATING MANUAL OIL HEATER TRT-BA-IDE20-30-50-60-80-TC-001-EN Table of contents Information on the use of this manual... 1 Scope of delivery... 1 General safety...

More information

INSTRUCTION MANUAL & SERVICE MANUAL ORLIGNO 400

INSTRUCTION MANUAL & SERVICE MANUAL ORLIGNO 400 INSTRUCTION MANUAL & SERVICE MANUAL ORLIGNO 400 Content 1. Delivery......................................................................... 3 2. Installation and assembly.........................................................

More information

and Installation Instructions The installation instructions for the Unit pressure jet oil burner is included in the pressure jet oil burner pack.

and Installation Instructions The installation instructions for the Unit pressure jet oil burner is included in the pressure jet oil burner pack. Technical Guide and Installation Instructions MKS / MUS Steel boiler 70-550 kw The installation instructions for the Unit pressure jet oil burner is included in the pressure jet oil burner pack. The control

More information

ELRO Cooking Island Range 600

ELRO Cooking Island Range 600 Installation and Initial Operating Instructions ELRO Cooking Island Range 600 Date 10.07.2015 Replaces 03.06.2013 Author PM Responsible Doc. No. VAE Sig VAE X101703E Revised 1 Pages 24 Subject to modification

More information

ENERGY TOP. Condensing boiler solutions

ENERGY TOP. Condensing boiler solutions ENERGY TOP Condensing boiler solutions 1 ENERGY TOP > ENERGY TOP RANGE A wide array of flexible solutions both for centralised residential application and big commercial plants The increasing need for

More information

Quickheat 30 weather compensated boiler control

Quickheat 30 weather compensated boiler control Quickheat 0 weather compensated boiler control A compact and sophisticated heating controller The compact KM controller is designed for the control of fan assisted boilers with modulating burners. The

More information

VICTRIX Superior kw Export VICTRIX Superior kw X Export

VICTRIX Superior kw Export VICTRIX Superior kw X Export Wall-hung condensing VICTRIX Superior kw is the instantaneous sealed chamber wallhung boiler with power of 32 kw which, thanks to condensation technology, is characterised for its high efficiency and guarantees

More information

Technical documentation. ComfortLine gas condensing boilers CGB-2(K) CGW-2 CGS-2 CSZ-2 NEW

Technical documentation. ComfortLine gas condensing boilers CGB-2(K) CGW-2 CGS-2 CSZ-2 NEW Technical documentation ComfortLine gas condensing boilers CGB-2(K) CGW-2 CGS-2 CSZ-2 NEW ComfortLine gas condensing boilers Benefits of the WOLF gas condensing boilers up to 24 kw CGB-2(K) / CGW-2 / CGS-2

More information

Operating Instructions

Operating Instructions Operating Instructions P4 Pellet 8-60 Read and follow the operating instructions and safety information. Subject to technical change. July 2009 Fröling Heizkessel- und Behälterbau Ges.m.b.H, Industriestrasse

More information

Installation and Operation Guide EURON 2 4 / 3 0 H G EURON 30 HSG. Manual Ref: L of 49

Installation and Operation Guide EURON 2 4 / 3 0 H G EURON 30 HSG. Manual Ref: L of 49 Installation and Operation Guide EURON 2 4 / 3 0 H G EURON 30 HSG Manual Ref: L307 1 of 49 Contents Contents... 2 General Information... 3 Regulations... 3 Conditions of warranty... 3 Quality of heating

More information

Sirius FS. Working towards a cleaner future

Sirius FS. Working towards a cleaner future Sirius FS Floor Standing Stainless Steel Condensing Boilers Single Boiler Applications: 50 to 160kW Modular Boiler Applications: up to 640kW Working towards a cleaner future heating specialists 1. Product

More information

ECONOFLAME R30 GAS FIRED WALL MOUNTED CONDENSING BOILERS

ECONOFLAME R30 GAS FIRED WALL MOUNTED CONDENSING BOILERS ECONOFLAME R30 GAS FIRED WALL MOUNTED CONDENSING BOILERS INSTALLATION, OPERATION & MAINTENANCE DOCUMENTATION STOKVIS ENERGY SYSTEMS 96R WALTON ROAD EAST MOLESEY SURREY KT8 0DL TEL: 020 8783 3050 / 08707

More information

INSTALLATION AND OPERATING INSTRUCTIONS General operating instructions for sample gas conditioner Model: MAK 6

INSTALLATION AND OPERATING INSTRUCTIONS General operating instructions for sample gas conditioner Model: MAK 6 List of contents 1.0 Uses 2.0 Technical data 2.1 Operating data 2.2 Construction and installation 2.3 Climatic load 2.4 Power supply 3.0 Function and design 3.1 General comments 3.2 Design 3.3 Performance

More information

Superior. A Compact Floor Standing Gas Fired, High Efficiency Condensing Hot Water Boiler. Outputs 120, 160, 200, 240, 280 kw

Superior. A Compact Floor Standing Gas Fired, High Efficiency Condensing Hot Water Boiler. Outputs 120, 160, 200, 240, 280 kw Superior A Compact Floor Standing Gas Fired, High Efficiency Condensing Hot Water Boiler Outputs 120, 160, 200, 240, 280 kw 1 The Superior is a, pre-assembled floor standing, gas fired high efficiency

More information

Euron. Compact Wall Mounted Gas Fired Condensing Boilers and Combis with Outputs 24kW - 30kW BOILERS

Euron. Compact Wall Mounted Gas Fired Condensing Boilers and Combis with Outputs 24kW - 30kW BOILERS Euron Compact Wall Mounted as Fired Condensing Boilers and Combis with Outputs 24kW - 30kW BOILERS Compact, Efficient & Easy to Install & Maintain The Euron range of wall mounted gas fired condensing boilers

More information

Aqua Balance. AquaBalance TM CONTROL MODULE QUICK START GUIDE LEGEND

Aqua Balance. AquaBalance TM CONTROL MODULE QUICK START GUIDE LEGEND Aqua Balance AquaBalance TM CONTROL MODULE QUICK START GUIDE 10 1 Domestic Hot Water temperature setpoint decreasing button 2 Domestic Hot Water temperature setpoint increasing button 3 Central Heating

More information

Heating, Air Conditioning, Ventilation. Отопление-Кондиционеры-Вентиляция. MTM 8-30 kw UNIVERSAL OIL HEATER OPERATING MANUAL

Heating, Air Conditioning, Ventilation. Отопление-Кондиционеры-Вентиляция. MTM 8-30 kw UNIVERSAL OIL HEATER OPERATING MANUAL Heating, Air Conditioning, Ventilation Отопление-Кондиционеры-Вентиляция MTM 8-30 kw UNIVERSAL OIL HEATER OPERATING MANUAL 1. Usage MTM 8-30 universal oil heater is designed for heating commercial rooms

More information

Hoval TopGas (12, 16, 22)

Hoval TopGas (12, 16, 22) Hoval TopGas (2, 6, 22) Wall gas condensing boiler with or without calorifier TopVal Description Hoval TopGas Boiler Wall mounted gas condensing boiler Heat-exchanger out of corrosion resistance aluminium

More information

80-140 80-180 95-260 70-360 65-400 65-500 Installation User and Service Manual TM your installer TM Warning Read this manual carefully before first using the water heater. Failure to read this manual and

More information

Operating Instructions

Operating Instructions Operating Instructions S3 Turbo Be sure to read and comply with the operating instructions and safety information Subject to technical change. Fröling Heizkessel- und Behälterbau Ges.m.b.H, Industriestrasse

More information

ECONOFLAME R6000 GAS FIRED CONDENSING BOILERS (KM628 CONTROLLER)

ECONOFLAME R6000 GAS FIRED CONDENSING BOILERS (KM628 CONTROLLER) ECONOFLAME R6000 GAS FIRED CONDENSING BOILERS (KM628 CONTROLLER) INSTALLATION, OPERATION & MAINTENANCE DOCUMENTATION STOKVIS ENERGY SYSTEMS 96R WALTON ROAD EAST MOLESEY SURREY KT8 0DL TEL: 020 8783 3050

More information

Servicing manual. Wall-mounted condensing gas boiler 600 Series - 11S / 19S / 24S / 24C /2002 GB(EN) For trade use

Servicing manual. Wall-mounted condensing gas boiler 600 Series - 11S / 19S / 24S / 24C /2002 GB(EN) For trade use GB122 7210 1300-12/2002 GB(EN) For trade use Servicing manual Wall-mounted condensing gas boiler 600 Series - 11S / 19S / 24S / 24C Please read thoroughly before attempting to diagnose fault List of contents

More information

Stokvis R600 LMS IP Water Heater Gas-Fired Floor Standing Condensing

Stokvis R600 LMS IP Water Heater Gas-Fired Floor Standing Condensing Stokvis R600 LMS IP Water Heater Gas-Fired Floor Standing Condensing Water Heater Supplement STOKVIS ENERGY SYSTEMS 96R Walton Road East Molesey Surrey KT8 0DL Tel: 020 8783 3050 / 0870 7707747 Fax: 020

More information

Economy Standard Comfort. Heat loss (W/K) Heat loss (kwh/24h) (3)

Economy Standard Comfort. Heat loss (W/K) Heat loss (kwh/24h) (3) 4 Technical Data The following tables and drawings provide an overview of the most important dimensions and properties of Solvis- Max Gas and SolvisMax Gas Pur. 4.1 Volumes and heat loss SX-356 SX-456

More information

REMKO CLK Mobile automatic heater

REMKO CLK Mobile automatic heater REMKO CLK Mobile automatic heater Operation Technology Spare Parts Edition GB M04 REMKO - powerful like a bear. Operating Instructions Read these instructions carefully before setting up/operating the

More information

Servicing manual. 600 Series - 11S / 19S / 24S / 24C. Wall-mounted condensing gas boiler. For trade use

Servicing manual. 600 Series - 11S / 19S / 24S / 24C. Wall-mounted condensing gas boiler. For trade use GB122 Servicing manual Wall-mounted condensing gas boiler 600 Series - 11S / 19S / 24S / 24C For trade use Please read thoroughly before attemting to diagnose fault 7217 4900 (03/2010) GB/IE List of contents

More information

ProCon 16, 31, 47, 75, 77 & HT. RVA 46. Zone Controller Commissioning Data.

ProCon 16, 31, 47, 75, 77 & HT. RVA 46. Zone Controller Commissioning Data. ProCon 16, 31, 47, 75, 77 & HT. RVA 46. Zone Controller Commissioning Data. The RVA 46 Zone Controller can only be used in conjunction with a RVA47 controlled boiler installation. The RVA46 controller

More information

WALL HUNG GAS BOILER FOR C.H. AND PREDISPOSTION FOR INSTANTANEOUS D.H.W. PRODUCTION (with optional kit) MODELS 34,8 kw (depotenziata) 50 C

WALL HUNG GAS BOILER FOR C.H. AND PREDISPOSTION FOR INSTANTANEOUS D.H.W. PRODUCTION (with optional kit) MODELS 34,8 kw (depotenziata) 50 C ALKON 50 C ALKON 70 C WALL HUNG GAS BOILER FOR C.H. AND PREDISPOSTION FOR INSTANTANEOUS D.H.W. PRODUCTION (with optional kit) OUTPUT RANGE from 50 to 560 kw (in battery) WORKING TEMPERATURE no limit on

More information

Settings and Maintenance of the CombinAir

Settings and Maintenance of the CombinAir Atmos CombinAir Settings and Maintenance of the CombinAir Issue 13.8.10 Operation and commissioning: The control unit on the front of the CombinAir is used to adjust the settings during commissioning.

More information

manual Installation and operating instructions

manual Installation and operating instructions manual Installation and operating instructions Condensing boilers Weishaupt Thermo Condens WTC 45-A / WTC 60-A 83240702-1/2008 Conformity Certification to ISO/IEC Guide 22 Manufacturer: Max Weishaupt GmbH

More information

INSTRUCTIONS FOR USE OF COMBINED BOILER INTENDED FOR COMBUSTION OF BOTH PELLETS AND SOLID FUEL ABC COMBO

INSTRUCTIONS FOR USE OF COMBINED BOILER INTENDED FOR COMBUSTION OF BOTH PELLETS AND SOLID FUEL ABC COMBO INSTRUCTIONS FOR USE OF COMBINED BOILER INTENDED FOR COMBUSTION OF BOTH PELLETS AND SOLID FUEL ABC COMBO .Technical specifications Boiler power DESCRIPTION Water content in a boiler Required draft Supply

More information

VIESMANN. Installation instructions VITORONDENS 200-T. for contractors. Vitorondens 200-T Type BR2A, 20.2 to 53.7 kw Oil Unit condensing boiler

VIESMANN. Installation instructions VITORONDENS 200-T. for contractors. Vitorondens 200-T Type BR2A, 20.2 to 53.7 kw Oil Unit condensing boiler Installation instructions for contractors VIESMANN Vitorondens 200-T Type BR2A, 20.2 to 53.7 kw Oil Unit condensing boiler VITORONDENS 200-T 5/2013 Dispose after installation. Safety instructions Please

More information

User Guide Compact-7 series

User Guide Compact-7 series User Guide Compact-7 series Boiler-CH Calorifier Combi Introductory remarks Congratulations on the purchase of your Kabola Compact 7. Kabola has been a manufacturer of oil-fired heating systems since 1947.

More information

VIESMANN VITOCROSSAL 300 Gas condensing boiler 187 to 635 kw

VIESMANN VITOCROSSAL 300 Gas condensing boiler 187 to 635 kw VIESMANN VITOCROSSAL 300 Gas condensing boiler 187 to 635 kw Datasheet Part no. and prices: see pricelist VITOCROSSAL 300 Type CT3B Gas condensing boiler for natural gas E, LL and LPG With modulating MatriX

More information

AVIO kw Export 1 FEATURES. Wall-mounted with storage tank

AVIO kw Export 1 FEATURES. Wall-mounted with storage tank 1 FEATURES Wall-mounted with storage tank Compact wall-mounted open chamber boiler with conventional flue and 45 litre stainless steel storage tank and nominal heat output of 23.7 kw (20,382 kcal/h). AVIO

More information

Installation and operating instructions. DK energy storage and DK energy buffer

Installation and operating instructions. DK energy storage and DK energy buffer Installation and operating instructions DK energy storage and DK energy buffer Edition: 08-2015 1 Preliminary note With this DK energy storage / DK energy buffer you purchased a DK quality product. The

More information

80-140 80-180 95-260 70-360 65-400 Installation User and Service Manual TM your installer TM Warning Read this manual carefully before first using the water heater. Failure to read this manual and to follow

More information

VIESMANN VITOLADENS 300-C Oil condensing boiler 12.9 to 28.9 kw

VIESMANN VITOLADENS 300-C Oil condensing boiler 12.9 to 28.9 kw VIESMANN VITOLADENS 300-C Oil condensing boiler 12.9 to 28.9 kw Datasheet Part no. and prices: see pricelist VITOLADENS 300-C Type BC3 Oil condensing boiler, with two- Compact blue flame burner (12.9 to

More information

AirUnit. Installation instructions. mfh systems modern floor heating. Decentralised domestic ventilation

AirUnit. Installation instructions. mfh systems modern floor heating. Decentralised domestic ventilation mfh systems modern floor heating AirUnit Decentralised domestic ventilation Installation instructions List of contents, Installation instructions Page 1. General information... 03 2. Function / planning

More information

VIESMANN. Installation and service instructions VITODENS 111-W. for contractors

VIESMANN. Installation and service instructions VITODENS 111-W. for contractors Installation and service instructions for contractors VIESMANN Vitodens 111-W Type B1LA, 6.5 to 35.0 kw Gas condensing storage combi boiler Natural gas and LPG version Gas Council no.: 47-819-23; 47-819-24;

More information

Air Comfort. Installation instructions (English) A

Air Comfort. Installation instructions (English) A Air Comfort Installation instructions (English) WWW.BRINKAIRFORLIFE.NL 614788-A This appliance may be used by children as of 8 years of age, persons of reduced mental or physical capacities and those of

More information

INSTALLATION AND OPERATING INSTRUCTIONS BIOCLASS HM

INSTALLATION AND OPERATING INSTRUCTIONS BIOCLASS HM INSTALLATION AND OPERATING INSTRUCTIONS BIOCLASS HM Thank you for choosing a DOMUSA TEKNIK heating boiler. Within the product range offered by DOMUSA TEKNIK you have chosen BioClass HM model. With a suitable

More information

TS RD 7761 RD, 7761 RD

TS RD 7761 RD, 7761 RD 1/2 HERZ Calis TS RD three way valve HERZ Calis TS RD 100% three-way valve for heating and cooling Datasheet for 1 7761 RD, Issue 0716 Dimensions in mm Order number Dimension R A B C kvs dp (bar) maximum

More information

AGUAdens TM 100% residential condensing D.H.W. wall-mounted water heaters ( litres) AISI 316 D.H.W. WORKING PRESSURE TITANIUM CONDENSING

AGUAdens TM 100% residential condensing D.H.W. wall-mounted water heaters ( litres) AISI 316 D.H.W. WORKING PRESSURE TITANIUM CONDENSING MADE IN ITALY residential condensing D.H.W. up to 10 bar WORKING PRESSURE AISI 316 Ti TITANIUM D.H.W. 100% CONDENSING AGUAdens TM wall-mounted water heaters (16-22 -37 litres) AGUAdensTM INSTANTANEOUS

More information

Planner Documentation THISION L

Planner Documentation THISION L Planner Documentation THISION L 03/2011 DOC2079 / 12103209 Contents Gas condensing boiler THISION L Models and output... 4 Application possibilities... 4 Value propositions... 4 Description... 4 Technical

More information

Operating Guide. Termix Solar A+/B+ 1.0 Table of Contents. 1.0 Table of Contents

Operating Guide. Termix Solar A+/B+ 1.0 Table of Contents. 1.0 Table of Contents 1.0 Table of Contents 1.0 Table of Contents... 1........................................................................ 2 2.0 Functional description... 3 3.0 Safety notes... 4 3.1 Safety Notes general............................................

More information

Operating manual. Wood pellet boiler. PL M 15 and PL M 25

Operating manual. Wood pellet boiler. PL M 15 and PL M 25 Operating manual Wood pellet boiler PL M 15 and PL M 25 November 29, 2007 Important! This operating manual contains important information for the operator. The boiler must be professionally installed and

More information

HEAT RECOVERY AIR HANDLING UNIT

HEAT RECOVERY AIR HANDLING UNIT HEAT RECOVERY AIR HANDLING UNIT OPERATION MANUAL KOMFORT_L v2(2)_en.indd 1 07.08.2015 15:0:44 CONTENTS Introduction General Safety regulations Transportation and storage regulations Manufacturer's warranty

More information

BG2000S PRE-MIX GAS BURNER

BG2000S PRE-MIX GAS BURNER BG000S PRE-MIX GAS BURNER INSTALLATION OPERATION & MAINTENANCE DOCUMENTATION STOKVIS ENERGY SYSTEMS 96R WALTON ROAD EAST MOLESEY SURREY KT8 0DL TEL: 08707 707 77 FAX: 08707 707 767 E-MAIL:info@stokvisboilers.com

More information

Installation and Operating Instructions DÜRR Regeneration Unit for X-ray developers XR 24, XR24 II, XR 24 Nova, XR 24 Pro

Installation and Operating Instructions DÜRR Regeneration Unit for X-ray developers XR 24, XR24 II, XR 24 Nova, XR 24 Pro Installation and Operating Instructions DÜRR Regeneration Unit for X-ray developers XR 24, XR24 II, XR 24 Nova, XR 24 Pro 2006/01 Content Important Information 1. Notes... 3 1.1 CE - Labeling... 3 1.2

More information

SPECIFICATIONS - NIKE

SPECIFICATIONS - NIKE Wall-mounted instant boilers NIKE Mini kw Special is the ideal Immergas solution for modern building and wherever space is limited and has to be made the most of. Simple to use and easy to install, thanks

More information

VIESMANN. Service instructions VITODENS 200-W. for contractors

VIESMANN. Service instructions VITODENS 200-W. for contractors Service instructions for contractors VIESMANN Vitodens 200-W Type WB2B, 4.8 to 35.0 kw Wall mounted gas fired condensing boiler Natural gas and LPG version For applicability, see the last page VITODENS

More information

Installation, operation and care. Pellmax UB. Burner not included Replaces:

Installation, operation and care. Pellmax UB. Burner not included Replaces: Installation, operation and care Burner not included 2011-11-11 ver: Replaces: Contents 11.11 otes...3 General...4 Function...4 Technical data...5 System principle Pellmax with radiator and tank-in-tank

More information

WOLF WALL MOUNTED GAS CONDENSING BOILERS COMFORTLINE

WOLF WALL MOUNTED GAS CONDENSING BOILERS COMFORTLINE WOLF WALL MOUNTED GAS CONDENSING BOILERS COMFORTLINE CGB-2(K) / CGW-2 / CGS-2L / CGS-2R / CSZ-2 30m 3 /h THE EXTENSIVE EQUIPMENT RANGE from system supplier WOLF offers the ideal solution for commercial

More information

PELLET BURNER PV 350

PELLET BURNER PV 350 PELLET BURNER PV 350 INSTRUCTION MANUAL v1.1 1 PRODUCT DESCRIPTION...3 2 SAFETY RULES...3 3 WARNINGS...4 4 INSTALLATION INSTRUCTIONS...5 4.1 BOILER REQUIREMENTS...5 4.2 PELLET CONTAINER...6 4.3 INSTALLATION

More information

Installation & Maintenance Manual

Installation & Maintenance Manual Installation & Maintenance Manual MOL 200 S1L (B30A) Oil Burner 11/12 Tel: +44 (0) 1905 794331 Fax: +44 (0) 1905 794017 Email: info@nu-way.co.uk Web: www.nu-way.co.uk DESCRIPTION COMPONENTS 1. Shrouded

More information

Conversion Instructions Logano G234X. Gas boiler. Please read carefully before installing and servicing. Gas boiler

Conversion Instructions Logano G234X. Gas boiler. Please read carefully before installing and servicing. Gas boiler Gas boiler UPON COMPLETION OF THE INSTALLATION THE INSTALLER MUST INSTRUCT THE OWNER AND OPERATOR ON THE FUNCTIONALITY AND THE PROPER OPERATION OF THE BOILER AND THE HEATING SYSTEM. INSTALLER MUST REVIEW

More information

24/31-28/35-33/40 kw Premix System Condensing - ErP Combi Gas Boilers. Enerwa / EnerwaPlus.

24/31-28/35-33/40 kw Premix System Condensing - ErP Combi Gas Boilers. Enerwa / EnerwaPlus. 24/31-28/35-33/40 kw Premix System Condensing - ErP Combi Gas Boilers Enerwa / EnerwaPlus www.warmhaus.com Condensing-ErP Premix System Boilers 24/31-28/35-33/40 kw Warmhaus wall-hung gas combi boilers

More information

USER MANUAL 9kW LILLY PELLET STOVE

USER MANUAL 9kW LILLY PELLET STOVE USER MANUAL 9kW LILLY PELLET STOVE Table of Contents.Overview of Stove Parts... 2.Technical Characteristics... 3 3.Important Information... 4 4.Pellet Specification...5 5.Technology... 6 6.Installation...

More information

SERVICE FACTS WARNING M801-SF-1C. Gas Furnaces Upflow & Downflow Induced Draft 1 Stage Heat Models: DISCONNECT POWER BEFORE SERVICING M801P040AU24AA

SERVICE FACTS WARNING M801-SF-1C. Gas Furnaces Upflow & Downflow Induced Draft 1 Stage Heat Models: DISCONNECT POWER BEFORE SERVICING M801P040AU24AA SERVICE FACTS Gas Furnaces Upflow & Downflow Induced Draft Stage Heat Models: M80P00AU2AA M80P060AU2AA M80P060AU36AA M80P080BU36AA M80P080BU8AA M80P00BU36AA M80P00CU8AA M80P00CU60AA M80PDU60AA M80P0DU60AA

More information

Forced draught gas burner

Forced draught gas burner Installation, use and maintenance instructions Forced draught gas burner Code Model Type 3751982 GAS 3 519T80 291 (3) - 02/2010 DECLARATION Declaration of conformity in accordance with ISO / IEC 17050-1

More information

VETO CLEANER 500 FLUE GAS CLEANER

VETO CLEANER 500 FLUE GAS CLEANER As of serial number 3100 0001 VETO CLEANER 500 FLUE GAS CLEANER USER MANUAL SPARE PARTS LIST Manufacturer: ALA TALKKARI Veljekset Ala-Talkkari Oy FI-62130 HELLANMAA TEL. +358 6 433 6333 FAX +358 6 437

More information

HIGH POWER. VICTRIX PRO 2 ErP. High power, wall-hung condensation boiler

HIGH POWER. VICTRIX PRO 2 ErP. High power, wall-hung condensation boiler HIGH POWER VICTRIX PRO 2 ErP High power, wall-hung condensation boiler MAIN INDEX INDEX 1 VICTRIX PRO 35-55 2 ErP SPECIFICATIONS...5 2 VICTRIX PRO 80-100-120 2 ErP SPECIFICATIONS...6 3 VICTRIX PRO 35-55

More information

Ciao Green Condensing Wall-Hung Boilers

Ciao Green Condensing Wall-Hung Boilers Ciao Green Condensing Wall-Hung Boilers Residential Heating Ciao Green A cost-consciuos condensing boiler CIAO GREEN is one of the condensing boilers with the best price-quality ratio on the matket. Kitchen

More information

Installation and maintenance manual

Installation and maintenance manual Installation and maintenance manual Warm air heater WS/WO (Copy of the original version) Wolf GmbH D-84048 Mainburg Postfach 1380 Telefon +498751/74-0 Telefax +498751/741600 Internet: www.wolf-heiztechnik.de

More information

Operating manual. Pellet boiler. Orlan Pellet ISO 9001

Operating manual. Pellet boiler. Orlan Pellet ISO 9001 Operating manual Pellet boiler Orlan Pellet ISO 9001 Contens 1. Boiler s use...................................................................... 3 2. Boiler s way of working...........................................................

More information

Exclusive Green E Condensing Wall-Hung Boilers

Exclusive Green E Condensing Wall-Hung Boilers Exclusive Green E Condensing Wall-Hung Boilers BERETTA HIGH-EFFICIENCY Residential Heating compliant XL Exclusive Green E Energy efficiency at its best EXCLUSIVE GREEN E is Beretta top of the range condensing

More information

ARITERM OY. Arimatic 500. User manual

ARITERM OY. Arimatic 500. User manual ARITERM OY Arimatic 500 User manual Table of contents 1. General information... 3 2. Transport, storage and package opening... 3 3. Warranty... 3 4. Installation and commissioning... 4 5. System description...

More information

INDIVIDUAL HEATING. Installation Manual e Skirting Heating Classic. Skirting Heating Delta. HEATING. COOLING. COMFORT.

INDIVIDUAL HEATING. Installation Manual e Skirting Heating Classic. Skirting Heating Delta. HEATING. COOLING. COMFORT. www.variotherm.at INDIVIDUAL HEATING Skirting Heating Classic. Skirting Heating Delta. Installation Delta HEATING. COOLING. COMFORT. Classic Installation Manual e22111 Page 2 Table of Contents INDIVIDUAL

More information

Residential Gas Condensing Boiler Greenstar ZBR16/21/28/35/42-3A... ZWB28/35/42-3A...

Residential Gas Condensing Boiler Greenstar ZBR16/21/28/35/42-3A... ZWB28/35/42-3A... 70 80 99-00-O Residential Gas Condensing Boiler ZBR//8/35/4-3A... ZWB8/35/4-3A... 70 80 993 (03/03) CA/US Operating Instructions Contents Contents Key to symbols and safety instructions............................

More information

INSTRUCTION FOR THE USER THC V E OIL BLU

INSTRUCTION FOR THE USER THC V E OIL BLU INSTRUCTION FOR THE THC V E OIL BLU CONTENTS General safety information 4 Precautions 4 Control panel 5 Mode selection 8 User levels 10 Start-up 12 Temporary shutdown 15 Preparing for extended periods

More information

ProCon 16, 31, 47 & 75. RVA 63 Boiler and Circuit Controller Commissioning Data.

ProCon 16, 31, 47 & 75. RVA 63 Boiler and Circuit Controller Commissioning Data. ProCon 16, 31, 47 & 75. RVA 63 Boiler and Circuit Controller Commissioning Data. The RVA63 controller can be utilized to control the following system configurations via LPB communication. Equipment Required

More information

CHESNEY S. Bio-Ethanol Installation & User Manual. model: EFB1200. Issue 01

CHESNEY S. Bio-Ethanol Installation & User Manual. model: EFB1200. Issue 01 CHESNEY S Bio-Ethanol Installation & User Manual model: EFB1200 Issue 01 1 2 Thank you for choosing this Chesney s Bio-Ethanol fire. Please read this information guide carefully in order to safely install,

More information

CHESNEY S. Bio-Ethanol Installation & User Manual. model: EFB1200 with resevoir. Issue 01

CHESNEY S. Bio-Ethanol Installation & User Manual. model: EFB1200 with resevoir. Issue 01 CHESNEY S Bio-Ethanol Installation & User Manual model: EFB1200 with resevoir Issue 01 1 2 Thank you for choosing this Chesney s Bio-Ethanol fire. Please read this information guide carefully in order

More information

HOT AIR GENERATOR WITH GAS BURNER NA11.45 A GGS. Installation Operation Commissioning Maintenance

HOT AIR GENERATOR WITH GAS BURNER NA11.45 A GGS. Installation Operation Commissioning Maintenance Installation Operation Commissioning Maintenance HOT AIR GENERATOR WITH GAS BURNER GGS NA11.45 A 06-2011 04-2011 CONTENTS 1. DESCRIPTION OF THE UNIT 2. INSTALLATION & CONNECTION 3. COMMISSIONING 4. CARE

More information

Gas Instantaneous Water Heater

Gas Instantaneous Water Heater 6 720 607 823 GB (06.06) SM Installation and Operating Instructions Gas Instantaneous Water Heater WR10..B... WR11..B... With electronic ignition and triple safety system consisting of ionisation detector,

More information

TAHITI CONDENSING KR 55 - KR 85

TAHITI CONDENSING KR 55 - KR 85 IST 03 C 351-01 TAHITI CONDENSING KR 55 - KR 85 GB INSTALLATION USE AND MAINTENANCE Dear Customer, Thank you for choosing and buying one of our boilers. Please read these instructions carefully. They will

More information

Great Britain en. Installation, user and service manual. Control panel HMI Gas 310/610 ECO PRO

Great Britain en. Installation, user and service manual. Control panel HMI Gas 310/610 ECO PRO Great Britain en Installation, user and service manual Control panel HMI Gas 310/610 ECO PRO Dear Customer, Thank you very much for buying this appliance. Please read through the manual carefully before

More information

HIGH OUTPUT. Skin design RANGE

HIGH OUTPUT. Skin design RANGE Light drop design HIGH OUTPUT Skin design RANGE Trim design 1 Product Introduction Product Presence Worlwide 2 Product Presentation Bosch Model Commercial Name: GWHC 27 3 Product Presentation Product Design

More information

VIESMANN. Installation instructions VITOCROSSAL 300. for contractors. Vitocrossal 300 Type CM3 Gas condensing boiler with MatriX radiant burner

VIESMANN. Installation instructions VITOCROSSAL 300. for contractors. Vitocrossal 300 Type CM3 Gas condensing boiler with MatriX radiant burner Installation instructions for contractors VIESMANN Vitocrossal 300 Type CM3 Gas condensing boiler with MatriX radiant burner VITOCROSSAL 300 2/2013 Dispose after installation. Safety instructions Please

More information

Operating instructions

Operating instructions Operating instructions Capriz 2 24c 28c GB, IE Contents Contents 1 Safety... 3 1.1 Action-related warnings... 3 1.2 Intended use... 3 1.3 General safety information... 4 2 Notes on the documentation...

More information

OPERATION MANUAL RK-2006LPP AUGER FITTED SOLID FUEL BOILER TEMPERATURE CONTROLLER. Version DC19

OPERATION MANUAL RK-2006LPP AUGER FITTED SOLID FUEL BOILER TEMPERATURE CONTROLLER. Version DC19 OPERATION MANUAL RK-2006LPP AUGER FITTED SOLID FUEL BOILER TEMPERATURE CONTROLLER Version DC19 1. Application. Controller RK-2006LPP is designed for temperature control of solid fuel fired water boilers

More information

INSTRUCTION MANUAL AIR HEATER TYPE HEAT-X

INSTRUCTION MANUAL AIR HEATER TYPE HEAT-X INSTRUCTION MANUAL AIR HEATER TYPE HEAT-X GB 0g THIS DOCUMENT MUST ABSOLUTELY BE READ BEFORE STARTING THE INSTALLATION. INSTRUCT USER AND LEAVE THIS DOCUMENT WITH THE HEATER FOR REFERENCE. Instruction

More information

wall-mounted boilers, water heaters and pool heaters from 15 kw to 140 kw

wall-mounted boilers, water heaters and pool heaters from 15 kw to 140 kw MADE IN ITALY THE EXPERT of stainless steel condensing heating systems ECO FRIENDLY wallmounted boilers, water heaters and pool heaters from 15 kw to 140 kw floor standing boilers, water heaters and pool

More information

Remeha. Fuel oil/gas boilers P 520. Installation and Service Manual A

Remeha. Fuel oil/gas boilers P 520. Installation and Service Manual A Remeha Fuel oil/gas boilers EN Installation and Service Manual 300016859-001-A 63115 Declaration of conformity The appliance complies with the standard model described in declaration of compliance. It

More information

SAFIRE 1600D, 1800D and 2100D Diesel / fuel oil heaters USAGE, INSTALLATION AND MAINTENANCE

SAFIRE 1600D, 1800D and 2100D Diesel / fuel oil heaters USAGE, INSTALLATION AND MAINTENANCE SAFIRE 1600D, 1800D and 2100D Diesel / fuel oil heaters 1 Heater kit contains : Heater, mounting bracket Fuel hose (3 meters), pump, a fuel tank connection to standard tanks (15, 22, 30 litres) Power supply

More information

Boiler Technical Specifications (2013)

Boiler Technical Specifications (2013) ACT Bioenergy Boiler Dimensions 0.5-0.85 Million Btu/h (150-250kW) Model CP500 CP600 CP750 CP850 Heat Output in MBtu/h (kw) 510 (150) 610 (180) 750 (220) 850 (250) Height ft (mm) 6 1 (1855) 6 1 (1855)

More information

Rinnova Cond X. User manual and installation instructions

Rinnova Cond X. User manual and installation instructions Rinnova Cond X User manual and installation instructions Congratulations on your selection. WARNING Your modulating boiler is electronically adjusted and ignited. highly efficient; sealed chamber. Unlike

More information

ROTEX GasSolarUnit. Operating instructions. Gas condensing boiler with stratified solar storage tank. For the owner. GB Edition 09/2007

ROTEX GasSolarUnit. Operating instructions. Gas condensing boiler with stratified solar storage tank. For the owner. GB Edition 09/2007 For the owner ROTEX GasSolarUnit Gas condensing boiler with stratified solar storage tank Operating instructions 0085 BM 0065 Type Rated thermal output ROTEX GSU 320 3-20 kw modulating ROTEX GSU 520S 3-20

More information

ir-range 8G /03.15 Changes reserved.

ir-range 8G /03.15 Changes reserved. U s e r m a n u a l ic-range is-range ir-range 8G.52.80.00/03.15 Changes reserved. Contents 1. Introduction...3 2. Safety...5 3. Boiler description...6 4. Display and functions...7 4.1 DHW and Heating

More information

PZ35RL BIOTECH THE FUTURE OF HEATING PZ 35 RL

PZ35RL BIOTECH THE FUTURE OF HEATING PZ 35 RL BIOTECH THE FUTURE OF HEATING PZ 35 RL Heating with renewable energies is the future and you will not only contribute to the environment, you also will reduce massively your annual energy cost. The Biotech

More information