Purchase Qualification Requirement (PQR)

Size: px
Start display at page:

Download "Purchase Qualification Requirement (PQR)"

Transcription

1 Purchase Qualification Requirement (PQR) The vendor is required to meet the provenness criteria of critical equipment, auxiliaries, systems and bought out items for a 660MW rating TG sets as per criteria stipulated below: Provenness Criteria for equipment(s): 1. Vendor should have previously designed (either by itself or under collaboration / licensing agreement), manufactured / got manufactured, supplied, erected/ supervised erection and commissioned/ supervised commissioning of the type and minimum equipment rating of Air Cooled Condenser as stipulated below such that the ACC are in successful operation in at least one (1) plant for a period not less than one (1) year as on date of submission of PQR bid. Slno Name of Equipment Type of Equipment Equipment Rating 1 Air Cooled Condenser(ACC) Direct Air Cooled Forced Cooling ACC of a 500MW or higher size rating 1 (a) Condenser Air Evacuation system Liquid Ring type for steam generator sets Free dry Air Capacity 30 SCFM at 1 Hg(abs) at 21.1 deg C 1 (b) Condensate Extraction Pumps(CEP) Vertical, canister with double suction first stage impeller for steam generator sets Capacity not less than 900 Ton/ hr and total developed Head not less than 30 Kg/cm2 However, offer with Horizontal Pump may be considered subject to approval/ acceptance on later date. Vendor shall offer and supply only the type of the above equipment(s) for which it, itself or the manufacturer proposed by the vendor for the above equipment(s) at 1(a) and 1(b) is qualified. In case, vendor is not manufacturer of equipment(s) at 1(a) and 1(b), then vendor shall source the equipment(s) from such manufacturer(s) who meets the qualification/ provenness criteria of the respective equipment(s) specified above. The proposed sub-vendor(s) for 1(a) and 1(b) should have designed (either by itself or under collaboration / licensing agreement), manufactured / got manufactured the respective equipment(s) of the type and minimum equipment rating as stipulated above such that the respective equipment(s) are in successful operation in at least one (1) plant for a period not less than one (1) year as on date of submission of PQR bid. 2. In case vendor is not manufacturer of proven equipment(s) as per clause 1, but is a manufacturer for such equipment(s) for at least 1 no. 200 MW rating (for equipment at slno.1 of clause 1) which has been successfully running since last 1 year, and the vendor can manufacture such equipment(s) for 660MW supercritical units also, provided it has collaboration or valid licensing agreement for Design, Engineering, Manufacturing, and Supply of such equipment in India from a

2 manufacturer who meet the requirements stipulated at clause 1above for the respective equipment. 3. A JV / Subsidiary Company formed for manufacturing and supply of equipment in India can also manufacture such equipment, provided that it has a valid collaboration or licensing agreement for design, engineering, manufacturing of such equipment(s) in India with a qualified equipment manufacturer who meets the requirements stipulated at clause 1 above (or the technology provider of the qualified equipment manufacturer). Further, in such a case, such qualified equipment manufacturers should have, directly or indirectly through its holding company/ subsidiary company, at least 26% equity participation in the Indian Joint Venture Company/ Subsidiary Company, which shall be maintained for a lock-in period of seven (7) years from the date of incorporation of such Joint Venture/ Subsidiary or upto the end of defect liability period of the contract, whichever is later. In addition, the sub-vendor along with the Indian Joint Venture Company/ Subsidiary Company, qualified equipment manufacturers and its holding/ subsidiary Company, as applicable, shall furnish DJU(Deed of Joint Undertaking) in which executants of the DJU shall be jointly and severally liable for the successful performance of the equipment. Format of the DJU to be provided later. The DJU shall be submitted prior to the placement of order on the approved sub-vendor for particular equipment. In case of award, each executants of the DJU be required to furnish an on demand bank guarantee for INR 1.5 Million (Rupees One and Half Million) for each equipment. 4. Before taking up the manufacturing of such equipment(s) as per point 2 and 3 above, the vendor / its sub vendor(s) must create (or should have created) manufacturing and testing facilities at its works as per Collaborator / licenser s design, manufacturing and quality control system for such equipment duly certified by the Collaborator / licensor. Further, the Collaborator / Licenser shall provide (or should have provided) all design, design calculation, manufacturing drawings and must provide (or should have provided) technical and quality surveillance assistance and supervision during manufacturing, erection, testing, commissioning of equipment. The BHEL reserve the right to fully satisfy himself regarding capability and capacity of vendor / its sub-vendors and proposed arrangement and may prescribe additional requirement before allowing manufacture of the equipment. The vendors should confirm their acceptance for submission of all documents / information required for registration with BHEL and approval of NTPC. Bidder has to provide documents/ details required for proven criteria mentioned in clause 1, 2, 3 and 4 above of PQR as per Annexure-1.

3 Data required from Vendor: 1. Supporting documents / Details as per annexure-1 for proven criteria as mentioned in clause no 1, 2, 3 and 4 stipulated above. 2. The scope of supplies and services shall be tentatively as per annexure The board technical requirement (not limited to) shall be as per annexure Following preliminary data regarding General Arrangement / Design of Air Cooled Condenser for 660MW rating based on tentative Design Data as per annexure-4 to be provided: Minimum elevation of steam duct at LP Exhaust connection. Cross-sectional view, sizing (including height), routing & layout of Steam exhaust duct from LP turbine to ACC Size, Elevation and layout of vacuum pump, condensate extraction pump, condensate storage tank, drain pot, drain pump, elevators, stairs, walkways, number of modules, piping,lp exhaust line, rupture disc, control room etc. Location of ACC columns, its tentative size is required & clear distance between ACC columns. Minimum Distance between TG building column and first column of ACC. Cross-sectional view showing clear height available below ACC Suggestive location for nozzles (like TDBFP exhaust, LP bypass dump line, LPHs vent, F/T vents/drains, GSC recirculation etc.) which shall be mounted upon steam exhaust duct from LPT, accordingly provision shall be kept. Vendor to furnish the data sheet of equipment(s) as per attached annexure-5. Vendor to furnish the auxiliary power consumption as per attached annexure Details such as technical features, experience details, product catalogue, reference list or any other relevant information. 6. Documents required for all Categories as per clause no. 1, 2, 3 and 4 of PQR are as below: a. Reference list. b. List of equipments manufactured in-house. c. List of Bought Out items along with vendors list of each equipments with experience details with respect to size rating and years of operation. d. List of equipments sourced from outside along with vendors list of each equipments with experience details with respect to size rating and years of operation. e. Experience details satisfying the tentative scope of supplies and deliveries clearly mentioning the exclusions if any as per Annexure-2.

4 ANNEXURE-1 Documents/Details required for proven criteria mentioned in clause 1, 2, 3 and 4 of PQR For Clause 1 of PQR: 1. In case of OEM: i. Copy of purchase Order (un-priced) for items stipulated in the clause 1 of PQR as per equipment rating specified at a plant. - Required at EOI stage. ii. Certificate of successful operation for at least 1 year of the equipment supplied at the plant mentioned in point (i) above duly certified from end user to be provided or confirmation that it will be provided at the time of enquiry. 2. In case of Vender under Collaboration/ Licensing Agreement: i. Copy of purchase Order (un-priced) for items stipulated in the clause 1 of PQR as per equipment rating specified at a plant. - Required at EOI stage. ii. Certificate of successful operation for at least 1 year of the equipment supplied at the plant mentioned in point (i) above duly certified from end user to be provided or confirmation that it will be provided at the time of enquiry. iii. MOU/ certificate of collaboration/ licensing agreement satisfying clause 1 of PQR to be provided or confirmation that it will be provided at the time of enquiry. For Clause 2 & 3 of PQR: i. Copy of purchase Order (un-priced) for items stipulated in the clause 1 of PQR as per equipment rating specified at a plant. -Required at EOI stage ii. Certificate of successful operation for at least 1 year of the equipment supplied at the plant mentioned in point (i) above duly certified from end user to be provided or confirmation that it will be provided at the time of enquiry. iii. MOU/ certificate of collaboration/ licensing agreement satisfying clause 2 and 4 of PQR to be provided or confirmation that it will be provided at the time of enquiry. iv. Details of establishment for manufacturing and testing facilities at its works as per Collaborator / licenser s design, manufacturing and quality control system for such equipment duly certified by the Collaborator / licensor to be provided or confirmation that it will be provided at the time of enquiry.

5 ANNEXURE-2 Scope of Supply& Services The scope of work for the equipment, material and system to be furnished in accordance specification shall include design, engineering, manufacture, fabrication, assembly, preshipment testing at manufacturer's works, proper packing for transportation, delivery at plant site, unloading, storage, installation, interconnection with related plant and equipment, calibration, performance testing, commissioning and putting the ACC together with all accessories, auxiliaries and associated equipment. SL. SYSTEM/EQUIPMENT REMARKS From the bottom exhaust of LP Turbine to the discharge of CEP Including CEP recirculation valve such as vacuum breaker valve, transition piece, 1 main steam duct with bellow, distribution manifold, rupture disc, risers, fin tube bundles, fans, motors, all supporting structure, condensate tank, drain pot, interfaces for all connections etc.. 2 Bottom steam exhaust of LP turbine shall be welded connection with ACC. 3 Control System(DCS/PLC) and Control Panel (of ACC) 4 Drain pot (Hot-Well), Condensate tank. 5 Piping, Instruments, valves within battery limits of ACC. 6 Connecting pipeline from Condensate storage tank to Condensate tank. 7 Control system of DM water make-up Valve & Valve and control system of Condensate level in Condensate tank Including piping. 8 One no elevator. Terminal pt shall be 2M from A- Row of TG column towards ACC except Steam exhaust connection. In case DCS by BHEL, bidder to provide necessary inputs like Drive list, I/O list, Control logics, Cable schedule & interconnection. Battery limits shall be 2M from A- Row of TG column towards ACC. Control System shall be realized in DCS. 9 2X 100% Drain pump for each unit along with all accessories, drives, associated piping and valves, Instrumentation and control etc. 10 3X50% capacity motor driven condensate extraction pumps for each unit along with all accessories, drives, suction strainers, associated piping and valves, instrumentation and control etc. 11 Recirculation valve and piping of CEP 12 Air Cooled Condenser Air Evacuation system complete with 2X100% vacuum pumps, associated motors, all accessories, associated piping, valves and fittings, specialties, duplex filters, instrumentation and control etc along with 1X100% hogging pump Control System shall be realized in DCS. Bidder to provide necessary inputs like Drive list, I/O list, Control logics, Cable schedule & interconnection PLC based control system

6 13 Steam exhaust duct from LPT exhaust to ACC tube bundle(outside TG Hall). Including expansion bellows, spring hangers, rupture discs and supporting structures. 14 Semi-automatic Fin cleaning system Independent for each side along the length of ACC Complete with Water storage tank, Fin cleaning pumps, piping, valves, Instruments, fittings, cleaning nozzle sets, motorized ladders, flexible hoses etc. 15 Monorail and hoist arrangement for handling fan and motor, vacuum pump etc 16 Cable rack Including walkways between STG building and ACC with supporting structures. 17 Design and supply of erection drawings for Civil structure, foundation and loading drawings. NOTE:-Geo-Technical data as received from NTPC is attached herewith. BHEL shall carry detailed geo- Technical investigation during contract stage & same shall be provided to the bidder. However, no extra amount shall be payable to bidder on account of variance in soil data. A.) ACC on Steel super Structure: All Steel Structure to be supplied & erected by bidder. Civil foundation shall be designed by bidder and constructed by BHEL. BOQ of civil foundations shall be furnished by bidder at proposal stage. B.) ACC on RCC columns: All Steel structure to be supplied & erected by bidder. RCC columns & Civil foundation shall be designed by bidder and constructed by BHEL. BOQ of civil foundation & column shall be furnished by bidder at proposal stage. 18 Erection, commissioning and performance testing. Other than concrete work. 19 Air Conditioned room for ACC control system/panels and MCC room for ACC outside TG hall. (Size of Room and load of AC) 20 Instrument air supply for vacuum pump system valves (Quantity: Negligible, Pressure :at 5-10 kg/cm2 ) 21 ACW supply for vacuum pump heat exchanger (Vacuum pump is located in ACC area) 22 Supply of transformer for ACC MCC BHEL scope 23 Supply of bus duct from transformer to ACC MCC BHEL scope 24 Supply of power cables upto transformer BHEL scope 25 Supply of ACC MCC 26 Supply of power and control cables from ACC MCC and Control Panel to ACC loads/ field instruments. 27 UPS for ACC control system. 28 Supply of cable trays and cable tray accessories upto Air Cooled condenser MCC and to ACC loads and field equipment. Erection and material supply for Control Room and MCC room shall be done by BHEL based on required design inputs by vendor Terminal pt shall be 2M from A- Row from TG column towards ACC Terminal pt shall be 2M from A- Row from TG column towards ACC

7 29 Support for exhaust Pipe from Turbine Execution by BHEL based on required inputs from Vendor. 30 Lighting for ACC area. Supply by BHEL, design by vendor 31 Above ground earthing for ACC area. Supply by BHEL, design by vendor 32 Lightening protection for ACC area. Supply by BHEL, design by vendor 33 3 D modeling of ACC alongwith all components for Layout The scope of supply is not limited as specified. Activities required for completeness of the package shall be in scope of supply. If there is any deviation regarding scope of supply. Vendor to indicate the same. BHEL reserves the right to accept or reject the same.

8 Technical Requirements ANNEXURE-3 Air Cooled Condenser TYPE: Direct air cooled, forced cooling type. Air cooled condenser and associated system shall be designed as per HEI for Air cooled condensers. The exhaust steam from the turbine shall be cooled using an Air Cooled Condenser with forced convection air as a cooling medium. Expanded steam from the Steam Turbine is condensing through the condenser tubes. Cooling air is drawn over the condenser tubes by motor fans to produce condensate. The condensate is collected in a common condensate tank and returned to the feed water tank / deaerator via the condensate pumps. The Air cooled condenser shall be direct air cooled condenser with fined tubes and A- frames with all associated auxiliaries, integral piping and elevator. DESIGN AND CONSTRUCTION REQUIREMENTS ACC Performance ASME PTC 30.1/VGB 131 Me should be followed for reporting thermal performance characteristics of mechanical draft air-cooled steam condensers (ACC) operating under vacuum conditions. Under all the operating conditions, while passing the required steam flows as per the relevant heat balances, the condenser should be able to accept the entire steam without increasing the exhaust hood temperature and condenser pressure beyond the maximum permissible value. The ACC shall be capable of condensing the steam flows under the following, but not limited to conditions: The whole of the steam from the steam turbine under Turbine VWO + 3% makeupandallnormaloperatingconditions,andatspecifieddesignambientair temperature. Attemperated steam flow from the steam by pass systems under transient operation(start-up, shut down, unit trip)(bypasscapacityis60% more of main steam flow at VWO 3%MU). Maximum oxygen content of condensate leaving the condensate collection tank shallbe0.015cc/litreover50-100% load range. Condensate temperature at all loads shall not be less than the saturation temperature corresponding to condenser pressure. The condenser vacuum shall be measured with a vacuum grid utilizing ASME basket tips. The grid is fitted at 300 mm downstream of LP turbine exhaust connection.

9 Vibration of the cooling system structure shall not exceed the recommendations given in standards as applicable. Mechanical vibration measured at gear box and motor bearing housing, shall be assessed in accordance with relevant standards and shall not exceed the limits of the acceptable assessment level of generally accepted technical standards under normal operating conditions. Each fan shall be free from harmful surge or pulse effects arising from gustso f wind or from parallel operation with other fans. The acceptable sound pressure level, while all the fans are working shall not exceed 85 dba measured at a height of 1.5 m above floor level in elevation and at a distance of one 1.0 metre horizontally from the nearest surface of any equipment / machine. The procedure for determining noise level shall be in accordance with ISO standard. ACC Design The Air Cooled Condenser (ACC) shall be of Direct air cooled forced cooling type. TheAircooledcondenser(ACC)shallbebuilttoastandardandprovendesignand complying with the requirements of the Heat Exchange Institute (HEI), ISO and ASME VIII as applicable For the purposes of sizing and establishing the rated capacity of the condensate collection tank, condensate transfer pumps (including suction strainers) the condensate system shall be shall be sized as per HEI for five (5) minutes storage capacity (between normal and low-low level) of total design flow with the turbine operating at VWO+ 3%make-up, and design condenser pressure, but not limited to,the following conditions. The low-low level of condensate tank shall be at least 200 mm above the bottom of the tank. Operation of the steam from the Steam Turbine under Turbine VWO + 3% Make-up and all normal operating conditions plus; all drains plus; a suitable margin as per ACC Supplier s design philosophy. Or the highest condensate flow resulting from the parallel operation of the turbine by pass system and the steam turbine. All drains shallincludethedrainsfromtheflashtanks, drains from LP Heatersandglandsteamcondenser pluspumpglandsealreturn waterandthemaximumspecifiedmake-up waterflow. Design of air removal section to cool the air and vapor mixture to at least 4.17 deg.c below saturation temperature corresponding to guaranteed condenser pressure.connections to air evacuation pumps shall be made at this section. Thecondensatecollectiontankshallbedesignedandarrangedtoensurethatthere should be

10 zero air leakage directly into the condensate below the condensate level in the tank. Stand pipes with necessary connections for instruments, with water level gauges and isolation valves. ACC shall include:- i. Condenser modules, finned heat exchanger tube bundles, steam and condensate collection header. ii. iii. iv. Complete air moving system incl. fans, speed reducer, couplings, electric motors, fan support bridges and equipment required for safe operation. Steam distributing system from steam turbine outlet to the ACC unit including main steam duct, steam distribution manifold, steam header. Condensate tank including connections for makeup water with condensate strainer, standpipe, manholes, nozzles connection, hand railing etc. v. ACondensatedrainpotshallbeprovidedforreceivingdrainswaterfromthe ACC steam duct, Steam Turbine internal drains including L P Heaters drains, flash tanks and gland steam drains and be complete with suction strainers, suction isolation, discharge control &isolation valves, Minimum recirculation valve. vi. vii. viii. ix. Steam duct shall be welded to turbine exhaust. Connections for Steam turbine HP-LP bypass connections. Selection of fans and speed reducer shall be as per HEI. Fin tube cleaning system of semi automatic type as per HEI is to be provided. The fintube bundles shall be cleaned using high pressure water. Cooling fins shall bedesigned to withstand the cooling water jet pressure. x. Necessary vacuum breaker valves and provision of rupture devices as per HEI. xi. xii. xiii. Provisions for accommodating expansion and contraction with changes in thermal load. Steam duct connecting turbine exhaust flange to steam distribution manifold shall include expansion joints, rupture discs, inspection ports, drain pots and necessary vent and drain connections. All necessary structures for bundles, fans, motor, gearboxes, piping, cable rack, lighting, etc., with inspection platforms, stairways, ladders for access to all instruments, drives, valves, and to operation, maintenance and inspection locations e.g. duct manholes). At least one staircase and one caged ladder to be provided to get access to the ACC main platform.

11 xiv. xv. xvi. xvii. xviii. xix. xx. xxi. xxii. xxiii. xxiv. All structures for supporting ACC as defined elsewhere in the specification. Painting of all exposed parts of ACC and structure shall be as specified elsewhere in the specification. The thermal, hydraulic and mechanical design calculation for checking the equipment capability. Provision of air evacuation pumps. Condenser to be designed for minimum air leakage and under normal operating conditions, the air leakage in the condenser not to exceed more than 50% of design value taken for sizing of vacuum pumps. The same shall be demonstrated at site under actual operating condition failing which bidder shall carryout necessary modifications. Provision for leakage testing of ACC and associated system along with blanking arrangement. The design of the ACC shall be based on proven design practices and the supplier shall indicate the provision made for wind effects on the performance of ACC. ACC shall be design taking into account the environmental conditions and the seismic condition. Corrosion allowance shall be as per HEI. The inlets to each fan shall be protected with a screen capable of preventing objects/foreign material. Leakage testing shall be done as per HEI. Fouling factors on steam side and air side shall be considered as per HEI. Complete fan assemblies comprised of blades, hub and seal disks to provide optimum efficiencies over the expected range of ambient temperature. Suitable arrangement shall be provided to improve the entering airflow characteristics upstream of the fan. Fans shall be designed as per HEI. Fan blade (material) shall be as per standard practice. Fan blade systems shall be designed such that there are no natural frequencies set up between the intended operations of the fans and the ACC structure. Steam dumping device to accept the steam from HP-LP bypass with necessary spray water including abnormal conditions like HP heaters out of service etc. Design for exhaust steam from steam turbine, BFP drive turbine, HP-LP bypass system,

12 heater drains and vents, boiler separator drains during start up, low load and abnormal conditions and other miscellaneous drains. The gearbox shall be designed as per AGMA and design life of the gearbox shall be hours. Gear box shall be designed for continuous operation. All the bearings in the gearbox shall be designed for a life of 100,000 hours. Gear box shall have self contained lubrication arrangement of sump oil / oil pump type as per standard practice of the bidder. All couplings shall be as per standard practice. ACC Structures (a) The ACC shall be supported by a structural steel framework / RCC columns at a height sufficient to allow proper air distribution to each fan. (b) Each individual delta form section or cell shall be complete with a fan assembly, remote temperature instrumentation for both steam and condensate, walkway, dividing wall sand access doors. (c) The ACC sections shall be constructed to ensure they remain tight under all pressures and stresses to which they may be subjected during operation, transportandhandling.specialprecautionsshallbetakentoensurethatthe completedsectionsarefreefromdistortionduetoweldingoranyothercause. (d)allstructuralboltsshallbesuitableforthecorrosiveatmosphereandshallbe providedwithsuitablelocknutstopreventlooseningduetovibration.where necessarythestructureshallbeweldedformaximumdurabilityandparticular attention paid to achieving the specified performance of the anti-corrosion finishes on all surfaces. (e)thedesignshallincludefeaturestominimizewindinterferenceontheaccor operation. fan (f) Permanent lifting beams shall be installed inside each delta form section to enable the drive motor to be removed from the gearbox or fan assembly without disturbing the gearbox or fan assembly. (g) The inlets to each fan shall be protected with a screen capable of preventing objects/foreign materials (h)a suitable handling facility shall be provided to lift and lower the fully bladed fan assembly and gear box after removal of the drive motor. The Bidder shall provide a method statement on how a complete fan assembly is raised and lowered during maintenance activities. (i) Suitable electric hoist shall be provided raising and lowering materials from ground level to the fan level.

13 (j) TheACCstructureshallbecompletewithallthenecessarywalkways,access stairs and handrails to ensure safe access and working conditions at this elevated height. (k) One number passenger cum good elevator for ACC(for each unit)to access ACC fan deck level from ground level. Condenser Air Evacuation System i) Each unit shall consist of 2x100% vacuum pumps for holding operation with all accessories and instrumentation for condenser air evacuation with PLC based control system shall be provided consisting of Control desk, PLC panels, I/O racks, along with its power supply arrangement etc. for the control of each pump. (a) Pumps shall be sized as per latest HEI requirements. Capacity of each pump in free dry air at standard condition with condenser operating at design pressure of 1 inch (25.4 mm) of Hg (abs) and sub cooled to 4.17 degc below temperature corresponding to absolute suction pressure shall not be less than 30 scfm (51 M3 per hour under standard condition i.e 760 mm of Hg (abs) and 21.1 deg. C). (b) The capacity of each pump during hogging shall not be less than 800 scfm (1360 m3/per hour) under standard conditions i.e. 760 mm of Hg. (abs) and 21.1 deg. C) at 10inch (254 mm) of Hg (abs). ii) One (01) start up hogging vacuum pump per unit with capacity not be less than 800scfm (1360 m3 per hour) under standard conditions i.e. 760 mm of Hg. (abs) and21.1 deg. C) at 10 inch (254 mm) of Hg (abs) shall be provided. All three pumps running together should be able to bring condenser pressure from atmospheric pressure to 10 inch of Hg (abs) in 30 minutes. PLC based control system shall be provided for Vacuum pumps as follows- Independent PLC based control system consisting of Control desk, PLC panels, I/O racks, along with its power supply arrangement etc. for the control of each Vacuum pump. Condensate Extraction pump 3 x 50% capacity motor driven condensate extraction pumps for each unit along with all accessories, drives, suction strainers, associated piping, and valves, flow elements with flow transmitter and indicators, instrumentation and control etc. including one number canister drainage pump per station shall be provided i) Pump sizing a) Design Capacity: Combined flow of 2x50% condensate extraction pumps to be based on 15%

14 margin over highest Condensate flow envisaged during unit operation (excluding HP/LP by pass operation). Design Head: Corresponding to above considering 10% margin over deaerator pressure. b) Best efficiency point; Combined flow of 2x50% CEPs shall be based on TG unit EMCR and corresponding head. Best efficiency point of the selected pump shall be preferably corresponding to above point. c) Maximum Capability; One pump capable of handling the flow and head corresponding to 65% unit load. d) Other Capability; - 2 pumps shall be capable of handling the flow corresponding to Unit EMCR, all HPH out, 3% m.u and worst condenser pressure at 47.5 Hz. - 2 pumps shall be capable of handling the flow corresponding to HP/LP by pass operation with turbine under tripped condition as well as turbine on house load. ii) Motor Rating; Motor rating at 50 deg.c ambient temperature not less than the maximum load demand of its driven equipment in its entire operation at frequency variations from 47.5Hz to 51.5Hz and motor not to be overloaded during any mode of operations of driven equipment. Control system is to be realised in plant DCS, bidder to provide necessary inputs like Drive list, I/O list, Control logics, Cable schedule & interconnection. LV SWITCHGEARS AND LV CABLES The scope of work includes the following for feeding all the LV Loads of the ACC. The major LT Switchgear shall include the following: 415 Volt Switchgears 415 Volt Motor Control Centers 415 Volt AC Distribution Boards 220 V DC/110 V DC/48 V DC Distribution Boards 415 Volt AC Fuse Boards 220 Volt DC/110 V DC Fuse Boards Local Motor Starters, Local Push Button Stations, Telescopic Trolley/ Welding / Lighting LV Cables

15 Preparation of control cable interconnection schedules, supply and termination of control cables for the following. a. LV Switchgear / MCC panel (motor outgoing) and Motor auxiliary / space heater terminal box / Emergency Stop Push Button b. Any other interlock envisaged during detailed engineering All switchgear, Motor Control Centers (MCCs) & AC/DC distribution boards, etc. shall have at least 20% or minimum two (whichever is higher) fully equipped switch-fuse modules of each rating as spares, uniformly distributed over different vertical sections. In addition, all switchgears, MCCs, AC/DC boards, etc., shall have as spares at least twenty (20%) percent of starter modules/mccb module or at least one module (whichever is higher) of each physical size, equipped for the rating of the largest auxiliary fed from that size of module. Contractor shall provide power supply distribution panels/cabinets/boxes for sub-distribution of DC/Main UPS//utility feeders on as required basis. The power supply distribution box shall included change over circuitry, switch fuse units, MCB s, terminal blocks etc suitable for application. MOTORS Motors along with couplings and coupling guards for all rotating auxiliaries covered under this package. For the purpose of design of equipment/systems, an ambient temperature of 50 deg. Centigrade and relative humidity of 95% (at 40 deg C) shall be considered. The equipment shall operate in a highly polluted environment. All equipment shall be suitable for rated frequency of 50 Hz with a variation of +3% &-5%, and 10% combined variation of voltage and frequency unless specifically brought out in the specification, fully compatible electrical system, equipment, accessories and services. Paint shade shall be as per RAL 5012 (Blue) for indoor and outdoor equipment. Degree of Protection Degree of protection for various enclosures as per IS:4691, IEC shall be as follows :- i) Indoor motors - IP 54 ii) Outdoor motors - IP 55 iii) Cable box-indoor area - IP 54 iv) Cable box-outdoor area - IP 55 CODES AND STANDARDS 1) Three phase induction motors : IS:325, IEC: ) Single phase AC motors : IS:996, IEC: ) Crane duty motors : IS:3177, IEC: ) DC motors/generators : IS:4722 5) Energy Efficient motors : IS 12615, IEC:

16 Earthing and Lightning Protection Aboveground earthing mat /Grounding and lightning protection for the complete ACC, switchyard and equipment. Station Lighting Station lighting system for the ACC, buildings and equipment. Lighting fixtures complete with lamps & accessories, Lighting Panels, Receptacles, Switch boxes. Conduits. Lighting Wires, Ceiling fans with regulators, Lighting poles. Lighting masts, Earth wires and rods, Junction boxes, Battery operated automatic self contained lighting fixture, Maintenance ladders as required are to be included. CONTROL AND INSTRUMENTATION A stand- alone common system / provision of control system to be realised in plant DCS shall be provided for control and monitoring of ACC units with separate control room and control panels (in case of stand lone system). Control & Instrumentation system for control, monitoring and operation of entire ACC including all the systems, equipments etc covered under specification( like Fans,Motors etc, Electrical sections for /MCC/SWGR/ Transformer etc.), in all regimes of operation in safe and most efficient manner. In case of control system is realised in plant DCS, bidder to provide necessary inputs like Drive list, I/O list, Control logics, Cable schedule & interconnection. The scope of work for the equipment, material and system to be furnished in accordance with this specification shall include design, engineering, manufacture, fabrication, assembly, pre-shipment testing at manufacturer's works, proper packing for transportation, delivery at plant site, unloading, storage, installation, interconnection with related plant and equipment, calibration, testing, commissioning and putting the Control and Instrumentation System together with all accessories, auxiliaries and associated equipment control system shall comply to the requirement of combustion control implosion protection as stipulated in NFPA-85. Automatic unit start-up and shutdown controls under various regimes of operation shall also be implemented. INSTRUMENTATION All the primary Instruments like thermocouples & RTDs, transducers, Ultrasonic / Guided Radar type level transmitters, Pressure/Diff. Pressure/Temperature/Flow/Level transmitters & Gauges, Vibration sensor, etc. shall be provided on as required basis meeting functional redundancy, available and reliability requirements of the specification sufficient quantities to enable the functioning in all regimes of operation. INSTRUMENTATIONCABLES, CONTROL & POWER SUPPLY CABLES & CABLES SUB-TRAYS All instrumentation cables twisted & shielded, PVC insulated & sheathed with FRLS properties, including thermocouple extension cables (PVC / extruded FEP insulated &

17 sheathed) and prefabricated cables (with plug-in connectors), Power Supply distribution cables, optical fibre cables as applicable for interconnection of all equipment/system/devices Fans/Motors/PLC/MCC/LT SWGR//Etc. shall be supplied, terminated and laid on as required basis.

18 ANNEXURE-4 DESIGN DATA The tentative design data for typical 660MW rating Air Cooled Condenser and its associated components are as below:- Case-1 Case-2 Case-3 Case4 Case-5 1. Steam Flow from LP Exhaust (T/Hr) : Condenser Back Pressure (ata) : Ambient Air Temperature(Deg C) : Worst Ambient Air Temperature(Deg C) : Steam Dryness Fraction : Steam Enthalpy at LP exhaust(kcal/kg) : Drains & vents Flow to ACC(T/Hr) : Avg. enthalpy of Drains & vents (kcal/kg) : Site Elevation from MSL(m) : Design Temperature : As per HEI Condensate Flow at outlet of ACC (T/Hr) : Heat Load (calculated)(kcal/hr) : X X X X X Distance of TG centerline to TG column : Towards ACC (m) 14. CW Inlet temperature for Heat Exchanger of : Vacuum Pump (Deg C) 15. Seismic acceleration : g horizontal Noise limit (db) : Basic Wind Speed : m/sec Note:-1. 5% margin on area to be considered for each case. Fouling resistance to be considered as per HEI. 2. Bidder to furnish the achieved back pressure corresponding to worst ambient air temperature considering designed ambient temperature as specified above.

19 ANNEXURE-5 1. Condenser Direct air cooled, forced circulation type Design, manufacture and testing code... ii) Heat load considered for design (with reference of corresponding heat balance diagram)... iii) Design air flow quantity with inlet temp. of 38 de. C and 42 Deg C... iv)vacuum in the condenser with ambient air temp. of 38 deg. C and 42 Deg. C. mmhg (abs)... v) Tube outside diameter and thickness mmxmm... vi)tube material... vii) No. of cells (Fin-tube assemblies)... viii) Steam duct material from turbine exhaust to ACC... ix) Air cooled condenser (ACC) design pressure Kg/cm2 (gauge)... x) Air cooled condenser (ACC) test pressure Kg/cm2... xi) ACC header material thickness mm... xii) Corrosion allowance mm... xiii) Header material... xiv) No. of rows / streets nos.... xv) Corrosion allowance mm... xvi) Tube plate thickness mm... xvii) Corrosion allowance for tube plate mm... xviii) Tube plate material... xix) Design velocity through tubes m/sec... xx) Pressure drop across tube /cells of condenser on steam side mwc... (Furnish back-up calculations& data on provenness) xxi) Total heat transfer surfacearea sq.m... xxii) Overall heat transfer coefficient Kcal/hr/ m2/deg C... xxiii) Number of tubes/ panels / cells which can be plugged without affecting condenser performance... xxiv) Rated ITD a) Design value deg C... b) 42 deg. C deg C... xxv) Weight of ACC... a) Empty Tonnes... b) Operating condition Tonnes... xxvi) Method of supporting ACC... xxvii) Type of steam duct to LP turbine casing joint... xxviii) Material of expansion joints used in the steam duct... xxix) Provision for compensating thermal expansion of condenser... xxx) Type of exhaust steam duct Removable / Non-removable... xxxi) Maximum oxygen content in the condensate leaving the condensate tank (Furnish write-up on how deaeration of make up water is done)... a) under normal condition... b) under abnormal condition... xxxii) Condensate tank storage capacity cu. m between the normal water leveland low water level... xxxiii) Condenser pressure during bypass Kg/cm2(abs) operation...

20 xxxiv) Steam throw off device a) Capacity T/hr... b) Number of nozzles... c) Total no. of devices (per condenser) Condenser Air evacuation system(vacuum pumps) for Main Drive turbine Condenser a) Make & Model... b) Number offered... c) Number working... d) Size and type... e) Design code... f) Capacity in free air delivered at scfm standard conditions with pump operating at saturated inletcondition of 25.4 mm Hg (abs) & at design condenser pressure & sub-cooled by 4.17 deg. C below temperature corresponding to the absolute suction pressure scfm i)... (at 25.4 mm Hg (abs)) ii)... (at Design condenser pressure) g) Capacity of each pump during scfm hogging operation at 10" (254 mm) Hg (abs) suction pressure... h) Suction Pressure mm Hg (abs)... i) Suction temperature at... i) 25.4 mm Hg (abs) suction pressure deg C... ii) 196 mm Hg (abs) suction pressure deg C... j) Suction line pressure drop mm Hg... k) Power required at pump... i) 25.4 mm Hg cond. pressure kw... ii) Condenser design pressure kw... l) Sealing water for vacuum pump and Cu.m/hr Cooling water required for sealant heat exchanger... m) Design ITD (Saturation temperature deg. C cooling water inlet temp.)... n) Design TTD of heat exchanger deg C... o) Volume of condenser and turbine cu.m steam spaces to be evacuated as a basis of pump design... p) Time to evacuate the above volume minutes under standard conditions (21.1 deg C & (abs)... q) Whether air ejector is provided Yes/no... r) Number of stages... s) Compression ratio of each stage... t) Cooling water pressure at inlet to heat exchanger... u) Blank off suction pressure(at 36 mmhg deg. C cooling water inlet temp.)... v) Motor i) Make... ii) Rating kw... iii) Rated voltage kv... w) Weight of each pump motor unit Tonnes...

21 x) Material of pump i) Casing... ii) Shaft... iii) Impeller... iv) Shaft Sleeves... v) Cooler tubes... y) Characteristic/Performance curves (without air ejector and with air ejector, if applicable) : i) Inlet air capacity in free dry air vs. suction pressure for ITD values of 10 deg. C, 11 deg C, 13 deg C, 15 deg. C & 16 deg. C... ii) Power consumption vs. suction pressure... iii) Suction pressure vs. sealant temp./itd showing air ejector cutting in and cutting off (if applicable)... iv) Pump performance with and without air ejector (if applicable) for different back pressures andcondenser heat loads... v) Air evacuation time(hogging time) vs. pump suction pressure with one pump in operation and two pumps in operation.... vi) Design Air leakage into thecond. considered for sizing the condenser air evacuation system CONDENSATE EXTRACTION PUMPS(PER UNIT) 1.00 Design flow rate (kg/hr) Design inlet condition Inlet temp. (deg.c) Specific gravity NPSH required at impeller centre line... a) 3% head breakdown m... b) 1% head breakdown m... c) 0% head breakdown m... d) 40,000 hrs. erosion life of first stage impeller m Design discharge conditions 3.01 Discharge pressure ata TDH m Shut off head m Pump speed rpm Power Consumption at design Condition Power input to motor at 50 Hz/47.5 Hz kw Loss in motor at 50 Hz/47.5 Hz kw Power input to pump at 50 Hz/47.5 Hz kw Efficiency of pump alone, % Overall efficiency of pump set % Suction Specific speed for first stage indicating the flow at which US Units the same is considered Cannister losses mwc Seal water requirement(flow/pressure/temp.)cu.m/hr./ata/oc Minimum flow for continuous stable

22 operation cu.m/hr On set recirculation flow cu.m/hr Peripheral speed at the eye of first stage impeller, m/sec Maximum thrust, up/down Kgs Manufacturer Model Number and No. of pumps Number of stages Type of first stage impeller Impeller outer diameter, mm Suction specific speeds US units Design pressure of bowl and discharge components, ata Outer casing (can) : Minimum wall thickness, mm Design pressure ata Depth below pump mounting flange mm Suction connection: Size/schedule Type of connection with piping Depth of centerline below pump mounting flange mm Discharge connection: Size/schedule Type of connection with piping Height of centerline above pump mounting flange mm Critical speeds: First critical speed in water rpm Second critical speed in water rpm GD2 of rotor including coupling kg-m Impeller shaft: Length mm Dia mm Span between bearings, mm Intermediate shafts: Length mm Dia mm Span between bearings (max.) mm Method of coupling with adjacent shafting Radial bearings Type & Number Size mm Thrust bearing Located in pump/motor Type & number Design load, kg Max. load kg Bearing lubrication type: Radial bearing Thrust bearing Recommended hole size of suction strainer First stage details (Bidder shall necessarily fill up this data) Impeller eye diameter mm Hub diameter mm Inlet angle degrees Inlet area between vanes normal to average Meridional velocity sq.mm Eye, peripheral velocity M/sec.

23 30.06 Axial fluid velocity, in eye M/sec Discharge angle Degrees Discharge area between vanes normal to average meridional velocity sq.mm Width of impeller water way at discharge sq.mm Impeller eye area sq.mm Impeller/diffuser width ratio Number of impeller vanes Clearance between impeller tip and diffuser % Pressure pulsation data (peak-to-peak) At sunction and discharge nozzle : - design, flow metres - b.e.p. metres - 60% flow metres - 40% flow metres - Minimum flow metres Maximm allowable metres 4. DRIP PUMPS(PER UNIT) 1.00 Design flow rate (kg/hr) Design inlet condition Inlet temp. (deg.c) Specific gravity NPSH required at impeller centre line... a) 3% head breakdown m... b) 1% head breakdown m... c) 0% head breakdown m... d) 40,000 hrs. erosion life of first stage impeller m Design discharge conditions 3.01 Discharge pressure ata TDH m Shut off head m Pump speed rpm Power Consumption at design Condition Power input to motor at 50 Hz/47.5 Hz kw Loss in motor at 50 Hz/47.5 Hz kw Power input to pump at 50 Hz/47.5 Hz kw Efficiency of pump alone, % Overall efficiency of pump set % Suction Specific speed for first stage indicating the flow at which US Units the same is considered Cannister losses mwc Seal water requirement(flow/pressure/temp.) cu.m/hr./ata/oc Minimum flow for continuous stable operation cu.m/hr On set recirculation flow cu.m/hr Peripheral speed at the eye of first stage impeller, m/sec Maximum thrust, up/down Kgs Manufacturer Model Number and No. of pumps Number of stages Type of first stage impeller Impeller outer diameter, mm Suction specific speeds US units Design pressure of bowl and discharge components, ata...

24 20.00 Outer casing (can) : Minimum wall thickness, mm Design pressure ata Depth below pump mounting flange mm Suction connection: Size/schedule Type of connection with piping Depth of centerline below pump mounting flange mm Discharge connection: Size/schedule Type of connection with piping Height of centerline above pump mounting flange mm Critical speeds First critical speed in water rpm Second critical speed in water rpm GD2 of rotor including coupling kg-m Impeller shaft Length mm Dia mm Span between bearings, mm Intermediate shafts Length mm Dia mm Span between bearings (max.) mm Method of coupling with adjacent shafting Radial bearings Type & Number Size mm Thrust bearing Located in pump/motor Type & number Design load, kg Max. load kg Bearing lubrication type Radial bearing Thrust bearing Recommended hole sizeof suction strainer First stage details (Bidder shall necessarily fill up this data) Impeller eye diameter mm Hub diameter mm Inlet angle degrees Inlet area between vanes normal to average Meridional velocity sq.mm Eye, peripheral velocity M/sec Axial fluid velocity, in eye M/sec Discharge angle Degrees Discharge area between vanes normal to average meridional velocity sq.mm Width of impeller water way at discharge sq.mm Impeller eye area sq.mm Impeller/diffuser width ratio Number of impeller vanes Clearance between impeller tip and diffuser % Pressure pulsation data (peak-to-peak) At sunction and discharge nozzle : - design, flow metres

25 - b.e.p. metres - 60% flow metres - 40% flow metres - Minimum flow metres Maximm allowable metre

26 AUXILIARY POWER CONSUMPTION ANNEXURE-6 Sl. No. Name of the Equipment No. off per set No. off in run Rated Power (KW) Total Power consumption (KW) Remark Condenser and Heat Exchangers ACC(below mentioned) 1 Fan& Motor 2 CEP (including recirculation pump) 3 x 50% 3 Drain pump 2x100% 4 Vacuum Pump (2X100% ) 5 Hogging Pump (1X100%) 6 Other Equipments Page No.1 of 1

TITLE: SPECIFICATION NO. PE-MSE-VD-ACC VOLUME:

TITLE: SPECIFICATION NO. PE-MSE-VD-ACC VOLUME: (For Vendor Registration Purpose) SHEET 1 of 6 1.00.00 GENERAL INFORMATION 1.01.00 The general guidelines as illustrated in the subsequent clauses of this section shall be applicable for air cooled condenser

More information

2x58 MW Coal Fired Power Plant at Mauritius

2x58 MW Coal Fired Power Plant at Mauritius 2x58 MW Coal Fired Power Plant at Mauritius The coal-fired power plant produces electricity by the burning of coal and air in a Circulating Fluidized Bed Combustion Boiler (CFBC), where it heats water

More information

Indian National Trust for Art and Cultural Heritage (INTACH, 71, KK Birla Lane, Lodhi Estate, New Delhi , Ph. No.

Indian National Trust for Art and Cultural Heritage (INTACH, 71, KK Birla Lane, Lodhi Estate, New Delhi , Ph. No. Indian National Trust for Art and Cultural Heritage (INTACH, 71, KK Birla Lane, Lodhi Estate, New Delhi -110003, Ph. No. 011-49854100 TENDER NOTICE Sealed tender in two separate bids a) Technical bids,

More information

Design and analysis of the piping systems

Design and analysis of the piping systems Design and analysis of the piping systems Over all schematic diagram of the total system along with equipment and connecting piping is shown in Fig.. Different piping systems are described as follows:.

More information

Bharat Heavy Electricals Limited (High Pressure Boiler Plant) Tiruchirapalli , TAMIL NADU, INDIA MATERIALS MANAGEMENT / CAPITAL EQUIPMENT

Bharat Heavy Electricals Limited (High Pressure Boiler Plant) Tiruchirapalli , TAMIL NADU, INDIA MATERIALS MANAGEMENT / CAPITAL EQUIPMENT An ISO 9001 Company Bharat Heavy Electricals Limited (High Pressure Boiler Plant) Tiruchirapalli 620014, TAMIL NADU, INDIA MATERIALS MANAGEMENT / CAPITAL EQUIPMENT ENQUIRY NOTICE INVITING TENDER Phone:

More information

BuildingName The Description of the Project P DOCUMENTS

BuildingName The Description of the Project P DOCUMENTS ARCHITECTURE, ENGINEERING AND CONSTRUCTION P00000000 0000 DOCUMENTS ARCHITECTURE & ENGINEERING 326 East Hoover, Mail Stop B Ann Arbor, MI 48109-1002 Phone: 734-764-3414 Fax: 734-936-3334 SPECIFICATION

More information

CRU-S Series Stainless Steel Condensate Recovery Unit

CRU-S Series Stainless Steel Condensate Recovery Unit IM-UK-CRU-S UK Issue 1 CRU-S Series Stainless Steel Condensate Recovery Unit 1. Safety information 2. General product information 3. Installation 4. Commissioning 5. Storage, shutdown and equipment protection

More information

CONTENTS. B. System Design and Performance Requirements

CONTENTS. B. System Design and Performance Requirements 15625 Water Chillers This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications or in notes

More information

DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION PUMPS

DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION PUMPS PART 0 A/E INSTRUCTIONS 0.01 Design Requirements A. Pumping system design 1. A primary-secondary pumping system is preferred. Redundant pipes are required for chillers and boilers. 2. Select pumps to operate

More information

C. ASME Compliance: Fabricate and label water chiller heat exchangers to comply with ASME Boiler and Pressure Vessel Code: Section VIII, Division 1.

C. ASME Compliance: Fabricate and label water chiller heat exchangers to comply with ASME Boiler and Pressure Vessel Code: Section VIII, Division 1. SECTION 236426 - ROTARY-SCREW WATER CHILLERS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes packaged, water cooled or air cooled as scheduled, electric-motor-driven, rotary-screw water chillers

More information

C. ASSE 1013: Performance Requirements for Reduced Pressure Principle Backflow Preventers.

C. ASSE 1013: Performance Requirements for Reduced Pressure Principle Backflow Preventers. SECTION 22 10 00 PLUMBING PIPING AND PUMPS PART 1 - GENERAL 1.1 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design.

More information

0.4 In the preparation of this standard, assistance has been derived from the following standards:

0.4 In the preparation of this standard, assistance has been derived from the following standards: FOREWORD 0.1 Formal clauses will be added later. 0.2 The committee identified IS 10617(Pt 1), IS 10617(Pt 2) and IS 10617(Pt 3) for the first revision in the light of CFC free/hfc refrigerants and need

More information

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: HVAC Standards

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: HVAC Standards Date Description of Change Pages / Sections Modified ID 6/15/16 Entire document - mgl44 PART 1 - INTRODUCTION 1.1 PURPOSE A. This section is intended to define the general installation and minimum product

More information

1.1 This section applies to air handling units for HVAC Systems.

1.1 This section applies to air handling units for HVAC Systems. AIR HANDLING UNITS GENERAL INFORMATION 1.1 This section applies to air handling units for HVAC Systems. DESIGN REQUIREMENTS 2.1 Design Criteria a. The decision to use modular central station air handling

More information

LIQUID RING PUMPS FOR THE POWER INDUSTRY

LIQUID RING PUMPS FOR THE POWER INDUSTRY LIQUID RING PUMPS FOR THE POWER INDUSTRY VACUUM SOLUTIONS FOR THE POWER PLANT for The Power Industry 334 Shop online at shop.edwardsvacuum.com Contact our customer service team for the Power Industry 333.

More information

UPZ PUMP POWER FOR TOP PERFORMANCE UNDER

UPZ PUMP POWER FOR TOP PERFORMANCE UNDER Submersible borehole pump People at KSB we make your world flow round! UPZ PUMP POWER FOR TOP PERFORMANCE UNDER THE TOUGHEST CONDITIONS UPZ is top choice wherever submersible borehole pumps have to satisfy

More information

Copy Right By: Thomas T.S. Wan

Copy Right By: Thomas T.S. Wan Chapter 23 Motor and Starter Copy Right By: Thomas T.S. Wan 温到祥著 Sept. 3, 2008 All rights reserved Electric Motors All the motors are to be designed and constructed in accordance with NEMA code. Electric

More information

SECTION DOMESTIC WATER PRESSURE BOOSTING SYSTEMS (VFD) PART 1 - GENERAL 1.1 SUMMARY

SECTION DOMESTIC WATER PRESSURE BOOSTING SYSTEMS (VFD) PART 1 - GENERAL 1.1 SUMMARY SECTION 22 11 23.13 DOMESTIC WATER PRESSURE BOOSTING PART 1 - GENERAL 1.1 SUMMARY A. Where utility water pressure cannot adequately meet the pressure requirements of the domestic water systems and where

More information

TENDER DOCUMENT FOR SUPPLY OF EPOXY MIXING & POURING PLANT

TENDER DOCUMENT FOR SUPPLY OF EPOXY MIXING & POURING PLANT BHARAT HEAVY ELECTRICALS LTD., CORPORATE R&D DIVISION VIKAS NAGAR, HYDERABAD-500093 (INDIA) Enquiry : Date : PURCHASE SECTION TECHNICAL SECTION SPEC.NO. 91 40 2377 8474 PHONE 91 40 2377 4494 Ext.7326 ST:ICH:08:001

More information

NATIONAL TRAINING BOARD (ELECTRICIAN) REGULATIONS 2008 BR 54/2008 NATIONAL OCCUPATIONAL CERTIFICATION ACT :38

NATIONAL TRAINING BOARD (ELECTRICIAN) REGULATIONS 2008 BR 54/2008 NATIONAL OCCUPATIONAL CERTIFICATION ACT :38 BR 54/ NATIONAL OCCUPATIONAL CERTIFICATION ACT 2004 2004 :38 The National Training Board, with the approval of the Minister responsible for the National Training Board, in exercise of the powers conferred

More information

SAMPLE SPECIFICATION FOR RIELLO ARRAY MODULATING BOILER

SAMPLE SPECIFICATION FOR RIELLO ARRAY MODULATING BOILER SAMPLE SPECIFICATION FOR RIELLO ARRAY MODULATING BOILER PART 1 GENERAL 1.01 RELATED DOCUMENTS A. ANSI Z21.13 American National Standard for Gas-Fired Low Pressure Steam and Hot Water Boilers B. ASME Section

More information

Brown University Revised August 3, 2012 Facilities Design & Construction Standards SECTION AIR HANDLING UNITS

Brown University Revised August 3, 2012 Facilities Design & Construction Standards SECTION AIR HANDLING UNITS SECTION 23 70 00 AIR HANDLING UNITS PART 1. GENERAL 1.1 Section includes air-handling units to 15,000 cfm and accessories. 1.2 Related Sections 1 : A. Division 01 - Brown University Standard for Narragansett

More information

Call us today! (800)

Call us today! (800) 500 TON AIR-COOLED CHILLER PA-ACCTR-500 Call us today! (800)341-4297 The 500-Ton portable chiller package features a Trane RTAC chiller unit. Trane leads the industry in providing some of the most reliable,

More information

SECTION HEATING BOILER FEEDWATER EQUIPMENT

SECTION HEATING BOILER FEEDWATER EQUIPMENT SECTION 23 53 00 HEATING BOILER FEEDWATER EQUIPMENT PART 1 - GENERAL 1.1 SUMMARY A. Section includes boiler feedwater pumps, de-aerators, accessories, controls and tanks. 1.2 REFERENCES A. ASME (American

More information

Update In Progress. Division 23 Heating, Ventilation, and Air Conditioning Page Section FLUID SYSTEMS EQUIPMENT PART 1 GENERAL

Update In Progress. Division 23 Heating, Ventilation, and Air Conditioning Page Section FLUID SYSTEMS EQUIPMENT PART 1 GENERAL Section 23 20 00 FLUID SYSTEMS EQUIPMENT PART 1 GENERAL 1. CHILLERS Page 23 20 00-1 A. Provide chiller packages with centrifugal compressors, or screw compressors, and water cooled condensers. B. Design

More information

2 X 1996 Wartsila 18V mw Each 50hz HFO Generator Sets

2 X 1996 Wartsila 18V mw Each 50hz HFO Generator Sets 2 X 1996 Wartsila 18V26 5.125mw Each 50hz HFO Generator Sets The responsibility for any and all additional charges is the purchasers. 2 x WARTSILA 5 MW Power plant 2 Units of Wartsila 18V26 @ 5 MW each,

More information

Multistage Centrifugal Blowers

Multistage Centrifugal Blowers Multistage Centrifugal Blowers Multistage Centrifugal Blowers In order to meet all the requirements for air and gas applications, Ingersoll Rand provides a new generation of Hibon Multistage Centrifugal

More information

Scope of Work and Other Terms & Conditions

Scope of Work and Other Terms & Conditions Annexture-II Scope of Work and Other Terms Conditions Sl. 1. Removal Disconnection (i) Removal of existing heating elements, insulation brickwork of the side walls, roof, the doors and the bogie hearth.

More information

Annexure - 1. Detectors: Fire Alarm Control Panel :

Annexure - 1. Detectors: Fire Alarm Control Panel : Item 1. Supply Part This Specification includes Supply, Warranty, Installation, Testing and Commissioning and integration of the Fire Alarm System mainly consisting of the Fire Alarm Control Panel (FACP),

More information

SECTION STEAM CONDENSATE PUMPS

SECTION STEAM CONDENSATE PUMPS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 23 22 23 STEAM CONDENSATE PUMPS SPEC WRITER NOTES: 1. Delete between // ---- // if not applicable to project. Also delete any other item or paragraph not applicable

More information

Annex A-8 CONCENTRATED SOLAR POWER UNITS INDEX TO SYSTEM/COMPONENT CAUSE CODES

Annex A-8 CONCENTRATED SOLAR POWER UNITS INDEX TO SYSTEM/COMPONENT CAUSE CODES Annex A-8 CONCENTRATED SOLAR POWER UNITS INDEX TO SYSTEM/COMPONENT CAUSE CODES SOLAR ENERGY GATHERING EQUIPMENT Solar Field 6500-6559 Thermal Storage 6570-6589 Operational Problems 6590-6599 STEAM TURBINE

More information

University of Houston Master Construction Specifications Insert Project Name SECTION DRY-PIPE FIRE SPRINKLER SYSTEM PART 1 - GENERAL

University of Houston Master Construction Specifications Insert Project Name SECTION DRY-PIPE FIRE SPRINKLER SYSTEM PART 1 - GENERAL SECTION 21 13 16 DRY-PIPE FIRE SPRINKLER SYSTEM PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section

More information

POWERENERGY

POWERENERGY ASME 2016 POWER CONFERENCE JUNE 26 JUNE 30, 2016 CHARLOTTE, NORTH CAROLINA, USA POWERENERGY2016-59067 EVACUATION SYSTEMS FOR STEAM SURFACE CONDENSERS: VACUUM PUMPS OR STEAM JET AIR EJECTORS? Ranga Nadig,

More information

TECHNICAL GUIDE DESCRIPTION SPLIT-SYSTEM AIR-COOLED CONDENSING UNITS MODELS: HF-07 FEATURES B-0703

TECHNICAL GUIDE DESCRIPTION SPLIT-SYSTEM AIR-COOLED CONDENSING UNITS MODELS: HF-07 FEATURES B-0703 TECHNICAL GUIDE SPLIT-SYSTEM AIR-COOLED CONDENSING UNITS MODELS: HF-07 DESCRIPTION These Sunline 2000 units are completely assembled, piped and wired at the factory to provide one-piece shipment and rigging.

More information

SECTION HEATING BOILERS

SECTION HEATING BOILERS SECTION 23 52 00 HEATING BOILERS PART 1 - GENERAL 1.1 SUMMARY A. Section includes boilers, controls and boiler trim, steam and condensate connections, hot water connections, fuel burning system and connections,

More information

SECTION REFRIGERATION. 1. Reciprocating Compressors (Hermetic). 2. Reciprocating Compressors (Open Drive). 3. Water Cooled Condensing Units.

SECTION REFRIGERATION. 1. Reciprocating Compressors (Hermetic). 2. Reciprocating Compressors (Open Drive). 3. Water Cooled Condensing Units. SECTION 15650 REFRIGERATION PART 1 - GENERAL 1.01 SUMMARY A. Section Includes: 1. Reciprocating Compressors (Hermetic). 2. Reciprocating Compressors (Open Drive). 3. Water Cooled Condensing Units. 4. Air

More information

SECTION COOLING TOWERS

SECTION COOLING TOWERS SECTION 23 65 00 COOLING TOWERS PART 1 - GENERAL 1.1 DESCRIPTION A. Packaged, induced draft open circuit cooling tower complete with fill, fan, inlet louvers and associated accessories and equipment. 1.2

More information

Four ways of performance improvement. 4 ways to improve perf

Four ways of performance improvement. 4 ways to improve perf ACC TEAM The ACC team is an engineering Company specialized in Air cooled Condensers and Process Coolers activities are: Maintenance, fans, drives, bundles Cleaning and cleaning equipment Performance improvements

More information

A. Hydraulic calculations shall be prepared in accordance with Chapter 23 of NFPA 13 with the following exceptions:

A. Hydraulic calculations shall be prepared in accordance with Chapter 23 of NFPA 13 with the following exceptions: SECTION 21 13 13 WET-PIPE FIRE SPRINKLER SYSTEM PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section

More information

Call us today! (800)

Call us today! (800) PA-ACCTR-200 Call us today! (800)341-4297 The 200-Ton portable chiller package features a Trane RTAC chiller unit. Trane leads the industry in providing some of the most reliable, efficient and quiet chiller

More information

Experience In Motion. WXH and WXM Utility-Grade Multistage Ring Section Pumps

Experience In Motion. WXH and WXM Utility-Grade Multistage Ring Section Pumps Experience In Motion WXH and WXM Utility-Grade Multistage Ring Section Pumps High reliability and performance in rapid-cycling applications The WXH and WXM multistage ring section pumps are specifically

More information

Multistage Centrifugal Blowers

Multistage Centrifugal Blowers Multistage Centrifugal Blowers Multistage Centrifugal Blowers In order to meet all the requirements for air and gas applications, Ingersoll Rand provides a new generation of Hibon Multistage Centrifugal

More information

PHYSICAL FACILITIES Consultant s Handbook Specifications Division 21 Fire Suppression 3000 Fire Pumps

PHYSICAL FACILITIES Consultant s Handbook Specifications Division 21 Fire Suppression 3000 Fire Pumps Note: The A/E must choose all design values in brackets below before using in project specifications 1 General 1.1 Provide UL listed and FM approved fire pump complete with pump, driver, controller and

More information

MINIMUM TANK GAP. Greater of 3 or one-sixth of sum of adjacent tank diameters. one-half of sum of adjacent tank diameters 20

MINIMUM TANK GAP. Greater of 3 or one-sixth of sum of adjacent tank diameters. one-half of sum of adjacent tank diameters 20 Piping Layout Design Introduction The performance requirements of the equipment are developed by design teams which normally include members from the different departments such as process, engineering,

More information

Goulds 3600 Between-Bearing, Axially-Split, Multi-Stage Pumps. Goulds Pumps

Goulds 3600 Between-Bearing, Axially-Split, Multi-Stage Pumps. Goulds Pumps Between-Bearing, Axially-Split, Multi-Stage Pumps Goulds Pumps A Leader in API Engineered Pump Package Solutions Proven API Leadership ITT Goulds Pumps is a proven leader in API Pumps Over 18,000 units

More information

INSTRUMENTATION AND CONTROL TECHNICIAN TRADE REGULATION

INSTRUMENTATION AND CONTROL TECHNICIAN TRADE REGULATION Province of Alberta APPRENTICESHIP AND INDUSTRY TRAINING ACT INSTRUMENTATION AND CONTROL TECHNICIAN TRADE REGULATION Alberta Regulation 283/2000 With amendments up to and including Alberta Regulation 90/2017

More information

N N O V A T I O N E F F I C I E N C Y Q U A L I T Y LS BARGE PUMP. Vertical high-flow pump

N N O V A T I O N E F F I C I E N C Y Q U A L I T Y LS BARGE PUMP. Vertical high-flow pump N N O V A T I O N E F F I C I E N C Y Q U A L I T Y LS BARGE PUMP LS BARGE For more than 60 years the name Ruhrpumpen has been synonymous worldwide with innovation and reliability for pumping technology

More information

LN series STERLING PUMPS. Horizontal Split Case Pumps. Double Volute. Single Stage.

LN series STERLING PUMPS. Horizontal Split Case Pumps. Double Volute. Single Stage. LN series Horizontal Split Case Pumps Double Volute. Single Stage www.sterlingpumps.com.au LN series Sizes: 6 to 42 Capacity to 12,500 m³/h Heads to 190 metres A rugged, single stage, double volute horizontal

More information

Bharat Heavy Electricals Limited (High Pressure Boiler Plant) Tiruchirappalli , TAMIL NADU, INDIA MATERIALS MANAGEMENT / CAPITAL EQUIPMENT

Bharat Heavy Electricals Limited (High Pressure Boiler Plant) Tiruchirappalli , TAMIL NADU, INDIA MATERIALS MANAGEMENT / CAPITAL EQUIPMENT An ISO 9001 Company Bharat Heavy Electricals Limited (High Pressure Boiler Plant) Tiruchirappalli 620014, TAMIL NADU, INDIA MATERIALS MANAGEMENT / CAPITAL EQUIPMENT ENQUIRY Phone: +91 431 257 70 49 Fax

More information

CENTRIFUGAL PUMPS. STATE the purposes of the following centrifugal pump components:

CENTRIFUGAL PUMPS. STATE the purposes of the following centrifugal pump components: Pumps DOE-HDBK-1018/1-93 CENTRIFUGAL PUMPS CENTRIFUGAL PUMPS Centrifugal pumps are the most common type of pumps found in DOE facilities. Centrifugal pumps enjoy widespread application partly due to their

More information

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Union County Vocational - Technical Schools Scotch Plains, New Jersey SECTION 230593 - TESTING, ADJUSTING, AND BALANCING FOR HVAC PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Balancing Air Systems: a. Constant-volume air systems. b. Variable-air-volume systems. 2.

More information

SECTION PACKAGED HEAT TRANSFER SYSTEM

SECTION PACKAGED HEAT TRANSFER SYSTEM PACKAGED HEAT TRANSFER SYSTEM Page 1 of 6 SECTION PACKAGED HEAT TRANSFER SYSTEM 1 GENERAL 1.1 SUMMARY A. Packaged steam-to-water heat transfer system 1.2 REFERENCES A. ASHRAE American Society of Heating,

More information

Standard Specifications for Rice University Traction and Hydraulic Elevator(s) Revision 04/28/2017

Standard Specifications for Rice University Traction and Hydraulic Elevator(s) Revision 04/28/2017 Summary: 14 20 00 Standard Specifications for Rice University Traction and Hydraulic Elevator(s) Revision 04/28/2017 Work for this section includes providing equipment, incidental material and labor required

More information

DS series STERLING PUMPS. Industrial End Suction Pumps ISO/DP

DS series STERLING PUMPS. Industrial End Suction Pumps ISO/DP DS series Industrial End Suction Pumps ISO/DP 5199 www.sterlingpumps.com.au DS series Capacities from: Heads from: 340 to 5,680 m3/h (1,500 to 25,000 USPGM) 21 to 106 metres (70 to 350 feet) Power range

More information

Electrical Design Guidelines Table of Contents

Electrical Design Guidelines Table of Contents C: Compliant Rev. 3 Dated June 13 11 NC: Non-Compliant NA: Not Applicable Page1 16.1 General 16.2 Single Line Diagrams 16.3 Electric Motor Equipment and Controls 16.4 Lighting 16.5 Emergency Lighting 16.6

More information

SYSTEM DESIGN REQUIREMENTS

SYSTEM DESIGN REQUIREMENTS P a g e 1 SYSTEM DESIGN REQUIREMENTS WFC-S SERIES WATER-FIRED SINGLE-EFFECT ABSORPTION CHILLERS / CHILLER-HEATERS Yazaki WFC-S Series water-fired chillers and chiller-heaters are available with nominal

More information

A. Product Data: Include rated capacities, furnished specialties and accessories.

A. Product Data: Include rated capacities, furnished specialties and accessories. BASE BID: SECTION 15542 FUEL-FIRED RADIANT HEATERS PART 1 - GENERAL 1.1 SUMMARY A. Furnish and install a Co-Ray-Vac Low Intensity Vented Infrared Radiant Vacuum Gas Heating System. System must be certified

More information

SECTION STEAM CONDENSATE PUMPS

SECTION STEAM CONDENSATE PUMPS SECTION 23 22 23 - STEAM CONDENSATE PUMPS PART I - GENERAL 1.1 SECTION INCLUDES A. Steam Condensate Return Units, Gravity Return Type 1. Receiver 2. Pumps 3. Control Panel 4. Accessories Note to PSC: Although

More information

MCF 500 CENTRIFUGAL FAN FOR AIR, FOR BIOGAS, LANDFILL AND NATURAL GAS

MCF 500 CENTRIFUGAL FAN FOR AIR, FOR BIOGAS, LANDFILL AND NATURAL GAS MCF 00 CENTRIFUGAL FAN FOR AIR, FOR BIOGAS, LANDFILL AND NATURAL GAS MCF 00 CENTRIFUGAL FAN FOR COMBUSTIBLE GASES MCF 00 centrifugal fan for biogas, natural gas or combustible gases, in conformity to the

More information

1.1 REFERENCES.1 American National Standards Institute/National Fire Protection Association (ANSI/NFPA).1 ANSI/NFPA 20, Centrifugal Fire Pumps.

1.1 REFERENCES.1 American National Standards Institute/National Fire Protection Association (ANSI/NFPA).1 ANSI/NFPA 20, Centrifugal Fire Pumps. Issued 2006/08/01 Section 13920 Packaged Fire Pumps and Controllers Page 1 of 7 PART 1 GENERAL 1.1 REFERENCES.1 American National Standards Institute/National Fire Protection Association (ANSI/NFPA).1

More information

Call us today! (800)

Call us today! (800) 150 TON AIR-COOLED CHILLER PA-ACCTR-150 Call us today! (800)341-4297 The 150-Ton portable chiller package features a Trane RTAC chiller unit. Trane leads the industry in providing some of the most reliable,

More information

SECTION PACKAGED ROOFTOP AIR CONDITIONING UNITS

SECTION PACKAGED ROOFTOP AIR CONDITIONING UNITS SECTION 15732 - PACKAGED ROOFTOP AIR CONDITIONING UNITS PART 1 - GENERAL 1.1 SECTION INCLUDES A. Package roof top unit. B. Heat exchanger. C. Refrigeration components. D. Unit operating controls. E. Roof

More information

LABORATORY AIR COMPRESSORS AND VACUUM PUMPING SYSTEMS

LABORATORY AIR COMPRESSORS AND VACUUM PUMPING SYSTEMS SECTION 22 20 00 LABORATORY AIR COMPRESSORS AND VACUUM PUMPING SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements",

More information

SECTION PLUMBING EQUIPMENT

SECTION PLUMBING EQUIPMENT PART 1 GENERAL 1.1 SECTION INCLUDES A. Water heaters B. Packaged water heating systems C. Water storage tanks D. Water softeners E. Pumps F. Circulators 1.2 REFERENCES SECTION 22 30 00 PLUMBING EQUIPMENT

More information

The last date of submission of responses has been extended up to 14: 00 hrs on 20/07/2018.

The last date of submission of responses has been extended up to 14: 00 hrs on 20/07/2018. TCIL/S&TC/2017-18/AIPS Dated: 17.07.2018 Corrigendum No. 11 Sub: Amendment for Pre-bid Tie-Up for selection of OEM / Master Integrator for the design, supply, installation, commissioning & CAMC of perimeter

More information

HEAT GENERATION 1.01 RELATED CORNELL DESIGN AND CONSTRUCTION STANDARDS. B. Section HVAC Basic Materials and Methods

HEAT GENERATION 1.01 RELATED CORNELL DESIGN AND CONSTRUCTION STANDARDS. B. Section HVAC Basic Materials and Methods 230520 HEAT GENERATION Cornell s Design and Construction Standards provide mandatory design constraints and acceptable or required products for all construction at Cornell University. These standards are

More information

PUMPS FOR INDUSTRY. The Vertical Pump Specialists CONTENTS: Introduction & User List. Product Overview. Vertical Process Pumps...

PUMPS FOR INDUSTRY. The Vertical Pump Specialists CONTENTS: Introduction & User List. Product Overview. Vertical Process Pumps... PUMPS FOR INDUSTRY CONTENTS: The Vertical Pump Specialists Introduction & User List Product Overview Vertical Process Pumps... Series 600 Vertical Sewage Pumps... Series 700 Vertical Sump Pumps... Series

More information

Medupi Unit 6 ACC hot cleaning: Method and results

Medupi Unit 6 ACC hot cleaning: Method and results Medupi Unit 6 ACC hot cleaning: Method and results Johannes Pretorius and Pieter Rosslee China International ACC user s group meeting 13-16 October 2015 Overview Background Medupi ACC hot cleaning - general

More information

PURCHASING SECTION th Street, Surrey, B.C. V3S 3C7 Tel: Fax: ADDENDUM NO.

PURCHASING SECTION th Street, Surrey, B.C. V3S 3C7 Tel: Fax: ADDENDUM NO. PURCHASING SECTION 6645 148 th Street, Surrey, B.C. V3S 3C7 Tel: 604-590-7274 Fax: 604-599-0956 E-mail: purchasing@surrey.ca ADDENDUM NO. 2 REQUEST FOR QUOTATIONS (RFQ) NO.: 1220-040-2014-001 TITLE: DISTRICT

More information

B. HI Compliance: Design, manufacture, and install pumps in accordance with HI "Hydraulic Institute Standards."

B. HI Compliance: Design, manufacture, and install pumps in accordance with HI Hydraulic Institute Standards. PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

Goulds 3600 Between-Bearing, Axially-Split, Multistage Pumps

Goulds 3600 Between-Bearing, Axially-Split, Multistage Pumps Goulds Pumps Goulds 3600 Between-Bearing, Axially-Split, Multistage Pumps motralec 4 rue Lavoisier. ZA Lavoisier. 95223 HERBLAY CEDEX Tel. : 01.39.97.65.10 / Fax. : 01.39.97.68.48 Demande de prix / e-mail

More information

we make air move Double Inlet Centrifugal Fans (Forward Curved) FBD Series (Square Outlet Metric Size)

we make air move Double Inlet Centrifugal Fans (Forward Curved) FBD Series (Square Outlet Metric Size) we make air move Double Inlet Centrifugal Fans (Forward Curved) FBD Series (Square Outlet Metric Size) www.blowtech.in we make air move Blowtech Air Devices Pvt. Ltd. was founded in 1988 and quickly established

More information

NFZP Variable Refrigerant Flow Guide Specification

NFZP Variable Refrigerant Flow Guide Specification PART 1 - GENERAL 1.01 SECTION INCLUDES SECTION 23 81 29 VARIABLE REFRIGERANT FLOW HVAC SYSTEM A. (VRF) HVAC system includes: 1. Outdoor/Condensing unit(s): a. Size Range: 14 Tons Nominal b. YANMAR VRF

More information

UNIVERSITY OF ROCHESTER DESIGN STANDARDS NOVEMBER 1, 2013

UNIVERSITY OF ROCHESTER DESIGN STANDARDS NOVEMBER 1, 2013 SECTION 15800 - AIR HANDLING EQUIPMENT 1.1 GENERAL A. All air handlers installed shall conform to the University of Rochester specification Guideline for Semi-Custom and Pre-Engineered Air Handling Units.

More information

VOLUME 2 (BOQ & Price Bid)

VOLUME 2 (BOQ & Price Bid) TENDER DOCUMENT NIT No: PAT/CON/721/01 FOR Tender for Supply, Erection & Commissioning of Refrigeration Plant for chilled water system for Ice-Cream mix section complete for 20 KLPD Ice Cream Plant at

More information

C. All components of the systems described shall meet the requirements as stated herein and shall be approved by the Architect and Consultant.

C. All components of the systems described shall meet the requirements as stated herein and shall be approved by the Architect and Consultant. SECTION 218800 - FIRE PROTECTION 1. GENERAL A. Provisions of Division 1, GENERAL REQUIREMENTS, and Section 230000, MECHANICAL GENERAL CONDITIONS, and Section 230050, SEISMIC PROTECTION are a part of this

More information

E. Baffle Tray Column (or, Termed Shower Deck, No Holes, Caps, or Other Contact Devices)

E. Baffle Tray Column (or, Termed Shower Deck, No Holes, Caps, or Other Contact Devices) 252 Applied Process Design for Chemical and Petrochemical Plants E. Baffle Tray Column (or, Termed Shower Deck, No Holes, Caps, or Other Contact Devices) For counter flow, gas flowing up a column through

More information

SECTION CHILLERS

SECTION CHILLERS SECTION 15650 PART I - GENERAL 1.01 WORK INCLUDED A. Extent of work shall be as indicated on Drawings and provisions of this section, including schedules and equipment lists associated with either Drawings

More information

Design and Construction Standards SECTION PLUMBING EQUIPMENT

Design and Construction Standards SECTION PLUMBING EQUIPMENT SECTION 15450 PLUMBING EQUIPMENT PART 1 GENERAL 1.1 SECTION INCLUDES: A. Water heaters. B. Packaged water heating systems. C. Water storage tanks. D. Water softeners. E. Pumps. F. Circulators. 1.2 REFERENCES

More information

D. NEMA Compliance: Provide electric motors and components which comply with NEMA standards.

D. NEMA Compliance: Provide electric motors and components which comply with NEMA standards. PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

DC POWER DISTRIBUTION BOARD

DC POWER DISTRIBUTION BOARD DC POWER DISTRIBUTION BOARD February 2016 Engineering Department WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED Regd. Office: VidyutBhawan, Block DJ, Sector-II, Bidhannagar, Kolkata 700091.

More information

Direct Fired Heater Model AD Specification

Direct Fired Heater Model AD Specification Direct Fired Heater Model AD Specification Description A Direct-fired gas heating and ventilating unit(s), as indicated on the drawings shall be furnished. Unit(s) shall be tested in accordance with ANSI

More information

STANDARD TECHNICAL SPECIFICATION FOR PRESSURE SWITCH, DIFFERENTIAL PRESSURE SWITCH VOLUME - IIB. SPECIFICATION No: PES

STANDARD TECHNICAL SPECIFICATION FOR PRESSURE SWITCH, DIFFERENTIAL PRESSURE SWITCH VOLUME - IIB. SPECIFICATION No: PES STANDARD TECHNICAL SPECIFICATION FOR PRESSURE SWITCH, DIFFERENTIAL PRESSURE SWITCH VOLUME - IIB SPECIFICATION No: PES-145-031 BHARAT HEAVY ELECTRICALS LIMITED POWER SECTOR PROJECT ENGINEERING MANAGEMENT

More information

Internal ridged board 1" x 1.5 foil face installation shall be installed on roof, walls and base of casing.

Internal ridged board 1 x 1.5 foil face installation shall be installed on roof, walls and base of casing. A-D WITH MPU SPECIFICATION WRITTEN SPECIFICATION Description A Modular Packaged Heating, Cooling and ventilating unit(s), as indicated on the drawings shall be furnished. Direct Fired Gas Unit(s) shall

More information

TQ Series. Electronic Control Pump Instruction Manual. 50Hz. ISO 9001 Certified Walrus Pump Co., Ltd.

TQ Series. Electronic Control Pump Instruction Manual. 50Hz. ISO 9001 Certified Walrus Pump Co., Ltd. TQ Series Electronic Control Pump Instruction Manual 50Hz ISO 9001 Certified Walrus Pump Co., Ltd. EC Declaration of Conformity Manufacturer: Walrus Pump Co., Ltd. Address: No. 83-14, Dapiantou, Sanjhih

More information

WHY SULLAIR? For more information on the IHI-Sullair joint venture, please visit 2,000th IHI-Sullair centrifugal

WHY SULLAIR? For more information on the IHI-Sullair joint venture, please visit   2,000th IHI-Sullair centrifugal WHY SULLAIR? Since 2004 Sullair has been part of IHI-Sullair, a joint venture focused on developing and producing high performance centrifugal compressors. Those compressor models, with more than a decade

More information

SECTION AIR HANDLING UNIT

SECTION AIR HANDLING UNIT SECTION 15800 - AIR HANDLING UNIT PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Basic Requirements: Provisions of Section 15010, BASIC MECHANICAL REQUIREMENTS, and Section 15030, ELECTRICAL REQUIREMENTS FOR

More information

DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION REFRIGERATION

DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION REFRIGERATION PART 0 A/E INSTRUCTIONS 0.01 DESIGN REQUIREMENTS A. General: 1. Design and specify refrigeration systems and equipment in accordance with "Energy Conservation Standards" stipulated in Section 15010, Basic

More information

TECHNICAL. Series 18. Pump Packages

TECHNICAL. Series 18. Pump Packages TECHNICAL S Y S T E M S Series 18 Pump Packages Series 18 Pump Packages Standard Features Close-coupled, end-suction, centrifugal pumps Mounted and wired pump starters Hand-Off-Auto switch for each pump

More information

Rules for Classification and Construction Additional Rules and Guidelines

Rules for Classification and Construction Additional Rules and Guidelines VI Rules for Classification and Construction Additional Rules and Guidelines 7 Guidelines for the Performance of Type Approvals 7 Test Requirements for Statical Converters with Semi-Conductors Edition

More information

CPF PRODUCT DESCRIPTION

CPF PRODUCT DESCRIPTION CPF 175 340 PRODUCT DESCRIPTION The CHICAGO PNEUMATIC CPF 175-340 compressor is a quiet, complete and ready-for-use unit for the production of compressed air in industrial applications. OVERVIEW The CHICAGO

More information

SECTION CENTRIFUGAL WATER CHILLERS

SECTION CENTRIFUGAL WATER CHILLERS PART 1 GENERAL 1.01 SECTION INCLUDES A. Chiller package. B. Charge of refrigerant and oil. C. Controls and control connections. D. Chilled water connections. E. Condenser water connections. F. Variable

More information

INSTRUMENTATION AND CONTROL DEVICES FOR HVAC

INSTRUMENTATION AND CONTROL DEVICES FOR HVAC PART 1 GENERAL 1.01 RELATED REQUIREMENTS SECTION 23 0913 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC A. Section 26 2717 - Equipment Wiring: Electrical characteristics and wiring connections. 1.02 ADMINISTRATIVE

More information

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST July 1, 2010 SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST FIRE PUMP REVIEW Address: Permit #: Inspector: Date: Status: Inspector: Date: Status: A-Approved; AC-Approved w/comments;

More information

Eligibility Criteria for Participation [Qualification Requirement (QR)]

Eligibility Criteria for Participation [Qualification Requirement (QR)] Eligibility Criteria for Participation [Qualification Requirement (QR)] 1. Only Manufacturers are eligible to Quote: a) Original manufacturers of High Voltage Detector in India will be eligible in the

More information

ANNEX A-1 GEOTHERMAL UNITS INDEX TO SYSTEM/COMPONENT CAUSE CODES BOILER BALANCE OF PLANT STEAM TURBINE GENERATOR MISCELLANEOUS - GEOTHERMAL EXTERNAL

ANNEX A-1 GEOTHERMAL UNITS INDEX TO SYSTEM/COMPONENT CAUSE CODES BOILER BALANCE OF PLANT STEAM TURBINE GENERATOR MISCELLANEOUS - GEOTHERMAL EXTERNAL ANNEX A-1 GEOTHERMAL UNITS INDEX TO SYSTEM/COMPONENT CAUSE CODES Boiler Piping System 0500-0620 Condensing System 3110-3199 Circulating Water Systems 3210-3285 Waste Water (zero discharge) 3290-3299 Condensate

More information

10 th Annual ACC User Group Meeting

10 th Annual ACC User Group Meeting 10 th Annual ACC User Group Meeting Colorado Springs, CO Oct 8-11, A Vacuum Leak Odyssey Presented by Don Wright 2018 Exelon Generation Company, LLC. All rights reserved. Combined Cycle Plant Configuration

More information

.2 Section Waste Management and Disposal.

.2 Section Waste Management and Disposal. Issued 2005/06/01 Section 15624 Packaged Rotary Screw Water Chillers Page 1 of 5 PART 1 General 1.1 RELATED SECTIONS.1 Section 01330 Submittal Procedures..2 Section 01355 Waste Management and Disposal..3

More information

TGIF-1. Indirect Fired Heating Systems. Technical Guide for: IF Indoor Installations. IFW Outdoor Installations. Applied Air. Keeps You.

TGIF-1. Indirect Fired Heating Systems. Technical Guide for: IF Indoor Installations. IFW Outdoor Installations. Applied Air. Keeps You. TGIF- Indirect Fired Heating Systems Technical Guide for: IF Indoor Installations IFW Outdoor Installations Applied Air Keeps You Warm Indirect Fired Heating Systems Technical Guide In the business of

More information

DOCUMENT TABLE OF CONTENTS

DOCUMENT TABLE OF CONTENTS DOCUMENT 00003 June 16, 2005 TABLE OF CONTENTS DOCUMENT NO. INTRODUCTORY INFORMATION DOCUMENT 00003 TABLE OF CONTENTS DIVISION 1 GENERAL REQUIREMENTS SECTION 01011 SECTION 01025 SSP21.1-1 SECTION 01026

More information