1 Design and analysis of the piping systems Over all schematic diagram of the total system along with equipment and connecting piping is shown in Fig.. Different piping systems are described as follows:. Steam Ducting: This duct connects from Steam Turbine Exhaust to Air Cooled Condenser (ACC) bundles. The provisional / proposed isometric schematic is as shown in Drg No: RD Operational Parameters of Medium (Steam): Pressure: 0.8 Kg/cm 2 (abs) Temperature/Quality: Flow at turbine exhaust: 2, 47,000 Kg/hr i) Preparation of P&ID in consultation with BHEL i Mechanical design of Ducting. Providing suitable expansion bellows at appropriate locations. Location of rupture disks. v) Location and design of supports. vi) Design of insulation and cladding for thermal and acoustics. v Seismic and Flexibility Analysis using CAESAR or equivalent software and rerouting / modification if necessary. 2. Condensate piping: This piping is envisaged to collect condensed water from ACC bundles and route to Condensate Storage Tank (CST). Condensate is pumped to feed water heaters with the help of 2 x 00% standby Condensate Extraction Pump (CEP). Provisional / proposed isometric schematic is as shown in Drg. No: RD Operational Parameters of medium (Water): Pressure: 0.8 kg/cm 2 (abs) Temperature: 57 0 c Flow to the condensate Tank: 2,47,000 kg/hr

2 Mechanical Design. i Design and location of Supports and hangers from the nearest column / walking platforms. 3. Air-Steam mixture piping: This Piping System is connected from Air Cooled Condenser bundles to vacuum pumps meant for evacuating air-steam mixture in normal operation and creating vacuum during start-up of the plant. There are two vacuum pumps operating one at a time the other pump is for standby situation. The provisional / proposed isometric schematic is as shown in Drg. No: RD Operating parameters of air-steam mixture: Air-Steam mixture pressure: 0.8 kg/cm 2 (abs) Air temperature: 53 0 c Air-steam mixture flow rate: 60 kg/hr (air) + 20 kg/hr (steam) Mechanical design. i Design and location of supports and Hangers from nearest ACC bundle / Walking Platform / Column. 4. Drain Transfer piping: This piping system is meant for transferring / conveying drain water from Hot Well Tank to condensate storage tank. There are two pumps operating one at a time and one is for standby condition. The provisional / proposed isometric schematic is as shown in Drg. No: RD Operating parameters of Drain Water piping: Suction Pressure before pump: 0.8 kg/cm 2 (abs) Delivery pressure after pump: 6.00 kg/cm 2 (abs)

3 Flow: 30,000 kg/hr i Mechanical design. Design and location of supports and Hangers from nearest Walking Platform / Column. 5. Common scope: In all the above works the following work has to be carried out All the above piping system to be designed for vacuum conditions considering seismic Zone III (moderate) factors: i Preparation of 3D drawings using PDMS or Equivalent software. Preparation of 3D models v) Generation of 2D Auto CAD drawings including BOM and part drawings from the 3D model Drawings. vi) Integration of all the systems with ACC bundles and support structures 6. Deliverables: i) Complete documentation along with design methodology in soft and hard copies i Detailed Technical Report in soft and hard copies Complete set of 3D & 2D drawings in PDMS or Equivalent, AutoCAD and PDF formats

4 7. General Terms & Conditions i) Vendor should submit the proof of having experience with list of completed jobs along with their customer references. i Vendor should submit the detailed technical methodology for the execution of the job with milestones and activities. ASME B3., API 66 standards for power piping, Air cooled heat Exchangers for general service and HEI standard for Air Cooled Condensers as applicable should be followed for the work. Non-Disclosure Agreement (NDA) to be signed v) The work to be carried out as developmental job and the product developed will be the property of BHEL. Required inputs for executing the job will be provided by BHEL.

5 To atmosphere ST ~ 2 ACC Bundles 7 VP Generator 3 Drain from FWH & ST Hot Well 2 DTP 9 8 DTP CONDENSATE STORAGE TANK (CST) 6 CEP 4 To FWHs 5 CEP Legend: Abbreviations. Turbine Exhaust 7. Air Evacuation Pipe from ACC Bundles DTP-Drain Transfer Pump 2. Steam Duct 8. Air Evacuation Pipe from CST to vacuum pump CEP-Condensate Extraction Pump 3. Condensate to CST 9. Drain from Hot Well to Drain Transfer pumps (&2) FWH-Feed Water Heater 4. Condensate to CEP Suction 0. Drain transfer pipe line to CST ACC-Air Cooled Condenser 5. Condensate to Feed Water Heaters. Terminal point CST-Condensate Storage Tank 6. CEP Recirculation line to CST VP Vacuum Pump ST- Steam Turbine Fig. No: Schematic of Air Cooled Condenser System

TITLE: SPECIFICATION NO. PE-MSE-VD-ACC VOLUME:

TITLE: SPECIFICATION NO. PE-MSE-VD-ACC VOLUME: (For Vendor Registration Purpose) SHEET 1 of 6 1.00.00 GENERAL INFORMATION 1.01.00 The general guidelines as illustrated in the subsequent clauses of this section shall be applicable for air cooled condenser

More information

LIQUID RING PUMPS FOR THE POWER INDUSTRY

LIQUID RING PUMPS FOR THE POWER INDUSTRY LIQUID RING PUMPS FOR THE POWER INDUSTRY VACUUM SOLUTIONS FOR THE POWER PLANT for The Power Industry 334 Shop online at shop.edwardsvacuum.com Contact our customer service team for the Power Industry 333.

More information

2x58 MW Coal Fired Power Plant at Mauritius

2x58 MW Coal Fired Power Plant at Mauritius 2x58 MW Coal Fired Power Plant at Mauritius The coal-fired power plant produces electricity by the burning of coal and air in a Circulating Fluidized Bed Combustion Boiler (CFBC), where it heats water

More information

ALZ GmbH. air cooled systems and air heaters. Competent Partners

ALZ GmbH. air cooled systems and air heaters. Competent Partners ALZ GmbH air cooled systems and air heaters Competent Partners Company overview We would like to introduce ourselves as your competent partner in heat transfer. Since 1990 the ALZ GmbH designs and manufactures

More information

TECHNICAL SPECIFICATIONS

TECHNICAL SPECIFICATIONS . MOL Group TECHNICAL SPECIFICATIONS MECHANICAL List of booklets MGS - M - REF M LI Rev 1.00.00 This document is property of MOL Group. The use is only allowed with the written permission of MOL Group.

More information

Purchase Qualification Requirement (PQR)

Purchase Qualification Requirement (PQR) Purchase Qualification Requirement (PQR) The vendor is required to meet the provenness criteria of critical equipment, auxiliaries, systems and bought out items for a 660MW rating TG sets as per criteria

More information

STANDARD TECHNICAL SPECIFICATION FOR PRESSURE SWITCH, DIFFERENTIAL PRESSURE SWITCH VOLUME - IIB. SPECIFICATION No: PES

STANDARD TECHNICAL SPECIFICATION FOR PRESSURE SWITCH, DIFFERENTIAL PRESSURE SWITCH VOLUME - IIB. SPECIFICATION No: PES STANDARD TECHNICAL SPECIFICATION FOR PRESSURE SWITCH, DIFFERENTIAL PRESSURE SWITCH VOLUME - IIB SPECIFICATION No: PES-145-031 BHARAT HEAVY ELECTRICALS LIMITED POWER SECTOR PROJECT ENGINEERING MANAGEMENT

More information

MILL IN SERVICE FIRST COAL FIRES AT MEDUPI

MILL IN SERVICE FIRST COAL FIRES AT MEDUPI Smoke from Chimney Tuesday 2 nd December 2014 MILL IN SERVICE FIRST COAL FIRES AT MEDUPI First Coal Fires On Thursday 27 th November the team at Medupi successfully brought the first mill into service

More information

Secondary Systems: Condensate/Feedwater Cycle

Secondary Systems: Condensate/Feedwater Cycle Secondary Systems: Condensate/Feedwater Cycle K.S. Rajan Professor, School of Chemical & Biotechnology SASTRA University Joint Initiative of IITs and IISc Funded by MHRD Page 1 of 8 Table of Contents 1

More information

Emergency Ventilation System Design - Preliminary Report Shishir Gupta

Emergency Ventilation System Design - Preliminary Report Shishir Gupta Emergency Ventilation System Design - Preliminary Report Shishir Gupta (shishir@mechartes.com), Abstract The existing stations and tunnels of Metro Railway, Kolkata are not equipped with effective emergency

More information

Off Design Operation of Hybrid Noncondensable Gas Removal Systems for Flash Steam Cycle Geothermal Power Plants

Off Design Operation of Hybrid Noncondensable Gas Removal Systems for Flash Steam Cycle Geothermal Power Plants GRC Transactions, Vol. 40, 2016 Off Design Operation of Hybrid Noncondensable Gas Removal Systems for Flash Steam Cycle Geothermal Power Plants Jason Project Engineer, Vooner FloGard Corporation, Charlotte

More information

Improved safety system in a nitric acid plant

Improved safety system in a nitric acid plant NITR IC ACI D ALAR ARM AND SAFE FETY SYSTEM Improved safety system in a nitric acid plant The existing alarm and safety system in a nitric acid plant in Croatia was replaced by a new microprocessor-based

More information

Speransa 2008: Round table: Nuclear and sustainable development Universitad Politecnica de Valencia \UPV - Passive safety systems -

Speransa 2008: Round table: Nuclear and sustainable development Universitad Politecnica de Valencia \UPV - Passive safety systems - Universitad Politecnica de Valencia \UPV - Passive safety systems - complete+annex.doc 1 1.1 Definition of Passive Safety Systems...3 2. Passive safety systems for core decay heat removal....4 2.1 Pre-Pressurized

More information

Thermax Consultancy Services

Thermax Consultancy Services Welcome to Thermax Consultancy Services Engineering the system for better tomorrow Thermax Consultancy. How can we add Value? Consultancy for. Greenfield Project! Re-Engineering the existing plant! Present

More information

SECTION FIRE DETECTION AND ALARM

SECTION FIRE DETECTION AND ALARM PART 1 - GENERAL 1.1 RELATED SECTIONS: Refer to Section 15300 for requirements regarding fire protection systems. 1.2 SCOPE OF SECTION: This section contains the requirements for equipment and installation

More information

Brown Hills College of Engineering & Technology

Brown Hills College of Engineering & Technology UNIT 6 Steam Condensers Elements of a condensing plant, Types of condensers, Comparison of jet and surface condensers, Condenser vacuum, Sources of air leakage & its disadvantages, Vacuum efficiency, Condenser

More information

TECHNICAL SPECIFICATIONS SWIVEL ARM GRINDING MACHINE

TECHNICAL SPECIFICATIONS SWIVEL ARM GRINDING MACHINE TECHNICAL SPECIFICATIONS SWIVEL ARM GRINDING MACHINE 1. PURPOSE : The Grinding machine is required for taper grinding of the Root and Shroud of the Turbine blades within close tolerances during assembly

More information

Scope of Work and Other Terms & Conditions

Scope of Work and Other Terms & Conditions Annexture-II Scope of Work and Other Terms Conditions Sl. 1. Removal Disconnection (i) Removal of existing heating elements, insulation brickwork of the side walls, roof, the doors and the bogie hearth.

More information

Medupi Unit 6 ACC hot cleaning: Method and results

Medupi Unit 6 ACC hot cleaning: Method and results Medupi Unit 6 ACC hot cleaning: Method and results Johannes Pretorius and Pieter Rosslee China International ACC user s group meeting 13-16 October 2015 Overview Background Medupi ACC hot cleaning - general

More information

POWERENERGY

POWERENERGY ASME 2016 POWER CONFERENCE JUNE 26 JUNE 30, 2016 CHARLOTTE, NORTH CAROLINA, USA POWERENERGY2016-59067 EVACUATION SYSTEMS FOR STEAM SURFACE CONDENSERS: VACUUM PUMPS OR STEAM JET AIR EJECTORS? Ranga Nadig,

More information

Study of Hot-air Recirculation around Off-road Tier-4 Diesel Engine Unit Using CFD Abbreviations Keywords Abstract Introduction and Background

Study of Hot-air Recirculation around Off-road Tier-4 Diesel Engine Unit Using CFD Abbreviations Keywords Abstract Introduction and Background Study of Hot-air Recirculation around Off-road Tier-4 Diesel Engine Unit Using CFD Siddharth Jain, Yogesh Deshpande, Atul Bokane, Arun Kumar Santharam, and Deepak Babar, Halliburton Abbreviations: Computational

More information

ISO INTERNATIONAL STANDARD

ISO INTERNATIONAL STANDARD INTERNATIONAL STANDARD ISO 10438-1 Second edition 2007-12-15 Petroleum, petrochemical and natural gas industries Lubrication, shaft-sealing and control-oil systems and auxiliaries Part 1: General requirements

More information

Riverside County Fire Department Office of the Fire Marshal Market St., Ste. 150, Riverside, CA Ph. (951) Fax (951)

Riverside County Fire Department Office of the Fire Marshal Market St., Ste. 150, Riverside, CA Ph. (951) Fax (951) Riverside County Fire Department Office of the Fire Marshal 2300 Market St., Ste. 150, Riverside, CA 92501 Ph. (951) 955-4777 Fax (951) 955-4886 Technical Policy Title: Plant Processing and Extraction

More information

Vacuum Booster for Distillation Process

Vacuum Booster for Distillation Process Vacuum Booster for 1.00 Introduction: Distillation at reduced pressures is a widely used process in the chemical industry, specially used in extraction / purification of essential oils, deodorisation of

More information

ClearFire Economizer Model ECF Integral or External. Addendum to manuals CFH and CFV

ClearFire Economizer Model ECF Integral or External. Addendum to manuals CFH and CFV ClearFire Economizer Model ECF Integral or External Addendum to manuals 750-295 CFH and 750-269 CFV CB-8466 08/2011 1-GENERAL The Model ECF economizer is a stainless steel coil tube arrangement using

More information

International Journal of Advance Engineering and Research Development

International Journal of Advance Engineering and Research Development Scientific Journal of Impact Factor (SJIF): 4.72 International Journal of Advance Engineering and Research Development Volume 5, Issue 01, January -2018 e-issn (O): 2348-4470 p-issn (P): 2348-6406 APPLICATION

More information

Efficiency of Application the Condensing Heat Utilizers in the Existing Boiler's Unit in Heat Power Station

Efficiency of Application the Condensing Heat Utilizers in the Existing Boiler's Unit in Heat Power Station Efficiency of Application the Condensing Heat Utilizers in the Existing Boiler's Unit in Heat Power Station Normuminov J.A. Assistant, Dean of Heat Power Engineering, Tashkent State Technical University,

More information

ENGINEERING SPECIFICATION ASU TYPE NITROGEN GENERATION UNIT FOR DIESEL HYDROTREATER UNIT FOR HINDUSTAN PETROLEUM CORPORATION LTD.

ENGINEERING SPECIFICATION ASU TYPE NITROGEN GENERATION UNIT FOR DIESEL HYDROTREATER UNIT FOR HINDUSTAN PETROLEUM CORPORATION LTD. ENGINEERING SPECIFICATION FOR DIESEL HYDROTREATER UNIT FOR HINDUSTAN PETROLEUM CORPORATION LTD. VISAKH REFINERY DHT PROJECT TEIL JOB NO. : 6261 DOCUMENT NO: 6261- A - 95-48 -051 A 16-March-09 For Client

More information

Procedure for the Approval of New Fire Detection and Alarm Technologies

Procedure for the Approval of New Fire Detection and Alarm Technologies VdS Guidelines for Automatic Fire Detection and Fire Alarm Systems VdS 3469en Procedure for the Approval of New Fire Detection and Alarm Technologies VdS 3469en : 2016-01 (01) Publisher and publishing

More information

HEAT EXCHANGE INSTITUTE, INC.

HEAT EXCHANGE INSTITUTE, INC. HEAT EXCHANGE INSTITUTE, INC. STANDARDS for STEAM SURFACE CONDENSERS ELEVENTH EDITION Copyright October 2012 by Heat Exchange Institute 1300 Sumner Avenue Cleveland, Ohio 44115-2851 Reproduction of any

More information

Products for. Nuclear Power Applications

Products for. Nuclear Power Applications Products for Nuclear Power Applications Caloritech electric heaters, heating elements and heating accessories are well-known in the industry for their quality, reliability, performance and versatility.

More information

Document Code: 1 (5) Issuing date: Status:

Document Code: 1 (5) Issuing date: Status: Document Code: 1 (5) Project : MULTI FUEL CFB BOILER SIMULATOR Author: Approved: Language: JJA Document title: SYSTEM DESCRIPTION MAIN CONDENSATE PUMPING Submitted for: Customer reference: Other information:

More information

SOUTH AFRICAN NATIONAL STANDARD

SOUTH AFRICAN NATIONAL STANDARD ISBN 978-0-626-21896-6 Edition 1 SOUTH AFRICAN NATIONAL STANDARD Medical gas pipeline systems Part 1: Pipeline systems for compressed medical gases and vacuum This national standard is a modified adoption

More information

Plant Processing and Extraction Facilities

Plant Processing and Extraction Facilities Orange County Fire Authority Community Risk Reduction 1 Fire Authority Road, Building A, Irvine, CA. 92602 www.ocfa.org 714-573-6180 Plant Processing and Extraction Facilities Guideline G-16 Serving the

More information

MCF 500 CENTRIFUGAL FAN FOR AIR, FOR BIOGAS, LANDFILL AND NATURAL GAS

MCF 500 CENTRIFUGAL FAN FOR AIR, FOR BIOGAS, LANDFILL AND NATURAL GAS MCF 00 CENTRIFUGAL FAN FOR AIR, FOR BIOGAS, LANDFILL AND NATURAL GAS MCF 00 CENTRIFUGAL FAN FOR COMBUSTIBLE GASES MCF 00 centrifugal fan for biogas, natural gas or combustible gases, in conformity to the

More information

SECTION GAS-FIRED RADIANT HEATERS

SECTION GAS-FIRED RADIANT HEATERS SECTION 23 55 23 PART 1 - GENERAL 1.1 DESCRIPTION SPEC WRITER NOTES: 1. Use this section only for NCA projects. 2. Delete between // // if not applicable to project. Also delete any other item or paragraph

More information

The Condensate Water Systems

The Condensate Water Systems The Condensate Water Systems Condenser: A closed vessel in which steam is condensed by abstracting the heat and where the pressure is maintained below atmospheric pressure is known as a condenser. The

More information

PURPOSE OF THE PROCEDURE

PURPOSE OF THE PROCEDURE Title: Procedures for Ozone Depleting Substances Effective Date: November 2005 Issuing Authority: Responsible Officer: VP, Capital Projects & Facilities Director Environmental Health and Safety PURPOSE

More information

COMMERCIAL KITCHEN SUPPRESSION SYSTEMS INFORMATION PACKET

COMMERCIAL KITCHEN SUPPRESSION SYSTEMS INFORMATION PACKET COMMERCIAL KITCHEN SUPPRESSION SYSTEMS INFORMATION PACKET Colorado Springs Fire Department Division of the Fire Marshal October 2013 Table of Contents PURPOSE... 3 SCOPE... 3 DEFINITIONS... 3 GUIDELINES...

More information

CONTENTS. B. System Design and Performance Requirements

CONTENTS. B. System Design and Performance Requirements 15625 Water Chillers This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications or in notes

More information

POWER Selecting Shell Side Design Temperature for Feedwater Heaters

POWER Selecting Shell Side Design Temperature for Feedwater Heaters Proceedings of the ASME 2014 Power Conference POWER2014 July 28-31, 2014, Baltimore, Maryland, USA Selecting Shell Side Design Temperature for Feedwater Heaters POWER2014-32275 Kellen J. Muldoon American

More information

Signs + or - The desired duty point lies for fans with preceding + sign, outside its optimum using area. It is recommended to use a bigger fan size.

Signs + or - The desired duty point lies for fans with preceding + sign, outside its optimum using area. It is recommended to use a bigger fan size. Signs + or - The desired duty point lies for fans with preceding + sign, outside its optimum using area. It is recommended to use a bigger fan size. The desired duty point lies for fans with preceding

More information

Liberty Township Fire Department Fire Prevention Bureau. Clean Agent Fire Protection Plan Submittal Checklist

Liberty Township Fire Department Fire Prevention Bureau. Clean Agent Fire Protection Plan Submittal Checklist Liberty Township Fire Department Fire Prevention Bureau Clean Agent Fire Protection Plan Submittal Checklist Project Name: Date: Project Address: Designers Name: Company Name: Phone Number: Email: Fax:

More information

ENERGY OPTIMIZATION IN THE MAA GAS PROCESSING FACILITIES

ENERGY OPTIMIZATION IN THE MAA GAS PROCESSING FACILITIES ENERGY OPTIMIZATION IN THE MAA GAS PROCESSING FACILITIES ABDULLAH AJMI, K.S.SABAPATHI, MUSAALAM AL MOWAIZRI, SHAIMA AL AMEEN PROCESS ENGINEERING MINA AL-AHMADI REFINERY, KNPC Kuwait Oil & Gas Summit and

More information

Week 13 Chapter 10 Vapor & Combined Power Cycles

Week 13 Chapter 10 Vapor & Combined Power Cycles MECH341: Thermodynamics of Engineering System Week 13 Chapter 10 Vapor & Combined Power Cycles The Carnot vapor cycle The Carnot cycle is the most efficient cycle operating between two specified temperature

More information

PUMPS & PUMPING SYSTEMS FOR THE CHEMICAL PROCESSING & HEATING & AIR CONDITIONING INDUSTRY

PUMPS & PUMPING SYSTEMS FOR THE CHEMICAL PROCESSING & HEATING & AIR CONDITIONING INDUSTRY PUMPS & PUMPING SYSTEMS FOR THE CHEMICAL PROCESSING & HEATING & AIR CONDITIONING INDUSTRY THE ROTH SOLUTION PROVIDES: Lowest NPSHr - Lower Motor Speeds Lower Tank Heights - Reduced Maintenance ROTH PUMP

More information

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD INTERNATIONAL STANDARD ISO 12039 First edition 2001-06-15 Stationary source emissions Determination of carbon monoxide, carbon dioxide and oxygen Performance characteristics and calibration of automated

More information

A Cost Effective Multi-Spectral Scanner for Natural Gas Detection

A Cost Effective Multi-Spectral Scanner for Natural Gas Detection A Cost Effective Multi-Spectral Scanner for Natural Gas Detection Semi-Annual Progress Report No. 1 Reporting Period Start Date: October 1, 2003 Reporting Period End Date: March 31, 2004 Principal Authors:

More information

NEW PROJECTS DOCUMENTATION FOR OCCUPATION - REGULATION 38 FIRE STRATEGIES, DRAWINGS & INFORMATION EMPLOYER S REQUIREMENTS

NEW PROJECTS DOCUMENTATION FOR OCCUPATION - REGULATION 38 FIRE STRATEGIES, DRAWINGS & INFORMATION EMPLOYER S REQUIREMENTS Mandatory Fire Safety Instruction NEW PROJECTS DOCUMENTATION FOR OCCUPATION - REGULATION 38 FIRE STRATEGIES, DRAWINGS & INFORMATION EMPLOYER S REQUIREMENTS Reference A: Reference B: Approved Document B

More information

Four ways of performance improvement. 4 ways to improve perf

Four ways of performance improvement. 4 ways to improve perf ACC TEAM The ACC team is an engineering Company specialized in Air cooled Condensers and Process Coolers activities are: Maintenance, fans, drives, bundles Cleaning and cleaning equipment Performance improvements

More information

Cabinet Type Washing and Drying Machine

Cabinet Type Washing and Drying Machine Cabinet Type Washing and Drying Machine K. V. Jadhav (1), A. N. Jadhav (2), S. R. Gundale (3), A. H. Hingane (4) S. T. Dudhabhate (5), Department of Mechanical Engineering, Savitribai Phule Pune University,

More information

BIDDER S OFFICE FACILITIES

BIDDER S OFFICE FACILITIES PT. SULUH ARDHI ENGINEERING PROJECT NO: BIDDER S OFFICE FACILITIES 0 12/02/2016 Issue for Bid LK YW RS Rev. Date Description BY CHK D APP D CONTRACTOR 1. BIDDER S OFFICE FACILITIES 1.1 Building Location

More information

Installation Summary - Dairy Plant

Installation Summary - Dairy Plant Installation Summary - Dairy Plant Project Summary: Logicon provided an combined automation system for re-automation of 2 Large Milk dryers, replacing existing obsolete systems. Each system was built using

More information

PD AutoCAD Plant 3D Piping Specification Writing Workflows

PD AutoCAD Plant 3D Piping Specification Writing Workflows PD5957 - AutoCAD Plant 3D Piping Specification Writing Workflows Bruce Trevena Cadgroup Australia LEARNING OBJECTIVES At the end of this class, you will be able to: Understand the potential of customized

More information

SECTION STEAM AND STEAM CONDENSATE SPECIALTIES

SECTION STEAM AND STEAM CONDENSATE SPECIALTIES SECTION 23 22 18 STEAM AND STEAM CONDENSATE SPECIALTIES PART 1 - GENERAL 1.1 SECTION INCLUDES A. Steam Traps. B. Flash Tanks. C. Condensate Return Units. D. Pressure Reducing Valves. E. Safety Valves.

More information

Basic Electrical Tools List Of Manual

Basic Electrical Tools List Of Manual Basic Electrical Tools List Of Manual If looking for a book Basic electrical tools list of manual in pdf form, in that case you come on to correct site. We presented the utter variation of this ebook in

More information

Points to be Considered when Purchasing a Steam Jet Vacuum Pump

Points to be Considered when Purchasing a Steam Jet Vacuum Pump Steam Jet Vacuum Pump 1. Suctin flow determination 2. Required suction pressure 3. Direct contact versus surface type condenser 4. Installations 4.1 Barometric 4.2 Semi-barometric 4.3 Non-barometric 5.

More information

By: Prof K. M. Joshi,

By: Prof K. M. Joshi, Condensers The condenser is a two-phase flow heat exchanger (HEX) where the heat (generally latent heat) is removed by conversion of vapor into liquid with the help of coolant. By: Prof K. M. Joshi, Assi.

More information

STANDARD TECHNICAL SPECIFICATION FOR LEVEL SWITCH (FLOAT/DISPALCER TYPE) VOLUME - IIB. SPECIFICATION No: PES

STANDARD TECHNICAL SPECIFICATION FOR LEVEL SWITCH (FLOAT/DISPALCER TYPE) VOLUME - IIB. SPECIFICATION No: PES STANDARD TECHNICAL SPECIFICATION FOR LEVEL SWITCH (FLOAT/DISPALCER TYPE) - IIB SPECIFICATION No: PES-145-033 BHARAT HEAVY ELECTRICALS LIMITED POWER SECTOR PROJECT ENGINEERING MANAGEMENT DIVISION NOIDA,

More information

PV Newsletter Monthly Publication from CoDesign Engineering Skills Academy

PV Newsletter Monthly Publication from CoDesign Engineering Skills Academy February 15, 2013 PV Newsletter Monthly Publication from CoDesign Engineering Skills Academy www.codesignengg.com Classification of Shell-and-Tube Heat Exchangers Shell-and-tube heat exchangers can be

More information

Figure 1. Ejector cross-sectional drawing. Figure 2. Precondenser to left of vacuum flasher. pressure.

Figure 1. Ejector cross-sectional drawing. Figure 2. Precondenser to left of vacuum flasher. pressure. LESSONS FROM THE FIELD - EJECTOR SYSTEMS James R. Lines, Graham Corporation, USA, presents the problems associated with ejector system performance and subsequent solutions. Figure 1. Ejector cross-sectional

More information

CLEACOM Engineered System Solutions. Established 24/7 technology for the separation of dust and fume during compounding processes

CLEACOM Engineered System Solutions. Established 24/7 technology for the separation of dust and fume during compounding processes CLEACOM Engineered System Solutions Established 24/7 technology for the separation of dust and fume during compounding processes Reduced consumption of resources with dry separation. Wet separation with

More information

Sheet Formers "Rapid Koethen" System

Sheet Formers Rapid Koethen System 1/6 Sheet Formers "Rapid Koethen" System Type BB Sheet Former for Manual Operation The low-cost alternative with 1 to 4 Vacuum Dryer units. Provides manual control of the sheet forming and drying processes

More information

J. LINES, Graham Corp., Batavia, New York

J. LINES, Graham Corp., Batavia, New York Originally appeared in: January 2017, pgs 77-81. Used with permission. Process Engineering J. LINES, Graham Corp., Batavia, New York Key design considerations for vacuum process condensers The crude oil

More information

ASME A17.1/CSA B44 Handbook

ASME A17.1/CSA B44 Handbook 2016 Edition ASME A17.1/CSA B44 Handbook ASME A17.1-2016, Safety Code for Elevators and Escalators CSA B44-16, Safety Code for Elevators Kevin L. Brinkman, PE 2016 Edition ASME A17.1/CSA B44 Handbook ASME

More information

CHAPTER 7 PERFORMANCE ANALYSIS OF VAPOUR COMPRESSION REFRIGERATION SYSTEM IN HYBRID REFRIGERATION SYSTEM

CHAPTER 7 PERFORMANCE ANALYSIS OF VAPOUR COMPRESSION REFRIGERATION SYSTEM IN HYBRID REFRIGERATION SYSTEM 111 CHAPTER 7 PERFORMANCE ANALYSIS OF VAPOUR COMPRESSION REFRIGERATION SYSTEM IN HYBRID REFRIGERATION SYSTEM 7.1 INTRODUCTION Energy is the primary component to run any system in the world. According to

More information

Request for Proposals Design Services for Kitchen Remodel and Second Floor Layout

Request for Proposals Design Services for Kitchen Remodel and Second Floor Layout Request for Proposals Design Services for Kitchen Remodel and Second Floor Layout I. About the Agency StopWaste helps Alameda County s businesses, residents and schools waste less, recycle more and use

More information

10 th Annual ACC User Group Meeting

10 th Annual ACC User Group Meeting 10 th Annual ACC User Group Meeting Colorado Springs, CO Oct 8-11, A Vacuum Leak Odyssey Presented by Don Wright 2018 Exelon Generation Company, LLC. All rights reserved. Combined Cycle Plant Configuration

More information

Boiler Draft Equipment

Boiler Draft Equipment Boiler Draft Equipment Learning Outcome When you complete this module you will be able to: Discuss, sketch and describe the basic equipment used to supply combustion air to a boiler furnace. Learning Objectives

More information

COMPACT IRONERS INDEX

COMPACT IRONERS INDEX COMPACT IRONERS COMPACT IRONERS INDEX 1.- Product range - Overview 2.- Classification 3.- Main features 4.- Accessories and Options 5.- Technical data 6.- Sales arguments and marketing tools 1. PRODUCT

More information

Technical Manual Binair Monobloc Heat Pump

Technical Manual Binair Monobloc Heat Pump Technical Manual Binair Monobloc Heat Pump MODEL BINAIR12 Introduction Disassembly of the machine must be carried out by any professional or any special agency assigned by us. All operation and maintenance

More information

Castle. Model 233HC Vacuum and Gravity Steam Sterilizer for Healthcare Applications. data and specifications

Castle. Model 233HC Vacuum and Gravity Steam Sterilizer for Healthcare Applications. data and specifications Castle Model 233HC Vacuum and Gravity Steam Sterilizer for Healthcare Applications data and specifications PRODUCT A microcomputer-controlled automatic steam sterilizer with six preprogrammed cycles that

More information

OPERATING INSTRUCTIONS

OPERATING INSTRUCTIONS OPERATING INSTRUCTIONS MODEL LV20 LARGE CAPACITY REFRIGERANT RECOVERY UNIT NATIONAL REFRIGERATION PRODUCTS 985 WHEELER WAY LANGHORNE, PA 19047 (215) 638-8909 FAX (215) 638-9270 R01101 LV20.DOC NRP-OM-LV20

More information

Chapter 10 VAPOR AND COMBINED POWER CYCLES

Chapter 10 VAPOR AND COMBINED POWER CYCLES Thermodynamics: An Engineering Approach Seventh Edition Yunus A. Cengel, Michael A. Boles McGraw-Hill, 2011 Chapter 10 VAPOR AND COMBINED POWER CYCLES Copyright The McGraw-Hill Companies, Inc. Permission

More information

Tray ST5. Tray Type Deaerator Pressurized.005 cc/liter. industrialsteam.com

Tray ST5. Tray Type Deaerator Pressurized.005 cc/liter. industrialsteam.com Tray ST5 Pressurized and Atmospheric Deaerators Tray Type Deaerator Pressurized.005 cc/liter COUNTER FLOW TRAY design provides guaranteed removal of all dissolved oxygen in excess of.005 cc/liter from

More information

AUTOMATION OF BOILERS USING LABVIEW

AUTOMATION OF BOILERS USING LABVIEW I J L S C M 4(1), 2012, pp. 49-53 AUTOMATION OF BOILERS USING LABVIEW A. MICHAEL SIDDHARTHA AND S. NAVEEN KUMAR Under Graduate Student, Department of Electronics and Communication Engineering Thiagarajar

More information

Derating of 75 MWe Pulverised Coal Fired Power Plant without HP Heaters in Service A Case Study

Derating of 75 MWe Pulverised Coal Fired Power Plant without HP Heaters in Service A Case Study International Journal of Innovative Research in Engineering & Management (IJIREM) ISSN: 2350-0557, Volume- 4, Issue-4, July 2017 DOI: 10.21276/ijirem.2017.4.4.7 Derating of 75 MWe Pulverised Coal Fired

More information

SWIMMING POOL SWIMMING POOL DEHUMIDIFICATION

SWIMMING POOL SWIMMING POOL DEHUMIDIFICATION SWIMMING POOL DEHUMIDIFICATION SWIMMING POOL Dehumidification systems for private indoor swimming pools, Dehumidification for swimming pools, hotels, spas or therapeutic clinics spas and therapeutic clinics

More information

INDUSTRIAL RANGE ACCESSORIES AND COMPONENTS

INDUSTRIAL RANGE ACCESSORIES AND COMPONENTS AND COMPONENTS 199 INDUSTRIAL AUTOMATIC PURGING SYSTEMO FOR BX RANGE GENERATORS The automatic bottom blow down unit prevents unnecessary purging duplication or verifiable omission with the manual system.

More information

NATIONAL INSTITUTES of HEALTH FUME HOOD TESTING PROTOCOL. For CONSTANT VOLUME FUME HOODS

NATIONAL INSTITUTES of HEALTH FUME HOOD TESTING PROTOCOL. For CONSTANT VOLUME FUME HOODS NATIONAL INSTITUTES of HEALTH FUME HOOD TESTING PROTOCOL For CONSTANT VOLUME FUME HOODS PART I. GENERAL Test identified below was created by Farhad Memarzadeh of the National Institutes of Health in 1997

More information

EKK Anlagentechnik. Plastics and Environmental Technology. Update 01/2018. certified acc. to ISO 9001 ISO 14001

EKK Anlagentechnik. Plastics and Environmental Technology. Update 01/2018. certified acc. to ISO 9001 ISO 14001 EKK Anlagentechnik Plastics and Environmental Technology Contents Company portrait company sites manufacturing Scope of services planning production installation service / maintenance quality management

More information

Bharat Heavy Electricals Limited (High Pressure Boiler Plant) Tiruchirapalli , TAMIL NADU, INDIA MATERIALS MANAGEMENT / CAPITAL EQUIPMENT

Bharat Heavy Electricals Limited (High Pressure Boiler Plant) Tiruchirapalli , TAMIL NADU, INDIA MATERIALS MANAGEMENT / CAPITAL EQUIPMENT An ISO 9001 Company Bharat Heavy Electricals Limited (High Pressure Boiler Plant) Tiruchirapalli 620014, TAMIL NADU, INDIA MATERIALS MANAGEMENT / CAPITAL EQUIPMENT ENQUIRY NOTICE INVITING TENDER Phone:

More information

WHA 3000V Hot Air Station

WHA 3000V Hot Air Station WHA 3000V Hot Air Station Operating Instructions Version 1.1 Page 1 of 14 Table of contents 1. Description 5 Technical data 5 2. Commissioning 6 2.1 Manual operating mode 6 2.2 Automatic operating mode

More information

SERVICE MANUAL PORTABLE AIR CONDITIONER PAC-10000DB NEW WIDETECH V 50Hz

SERVICE MANUAL PORTABLE AIR CONDITIONER PAC-10000DB NEW WIDETECH V 50Hz IDETECH R NE IDETECH SERVICE MANUAL PORTABLE AIR CONDITIONER PAC-0000DB Important points on service, and flow chart for inspecting and repairing the unit... Appearance(out ward)... Troubleshooting... 3

More information

Ratio Architects, Inc. Section Refrigerant Piping

Ratio Architects, Inc. Section Refrigerant Piping SECTION 232300 - REFRIGERANT PIPING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Refrigerant pipes and fittings. 2. Refrigerant piping valves and specialties. 3. Refrigerants. 1.2 ACTION SUBMITTALS

More information

Metal hydride storage system for MICE experiment at Rutherford Appleton Laboratory. Technical specification.

Metal hydride storage system for MICE experiment at Rutherford Appleton Laboratory. Technical specification. DRAFT Metal hydride storage system for MICE experiment at Rutherford Appleton Laboratory. Technical specification. MICE Collaboration Contact persons: Dr Thomas Bradshaw Head of Cryogenics Section Tel:

More information

1.1 DESCRIPTION A. The purpose of this section is to specify Division 23 responsibilities in the commissioning (Cx) process.

1.1 DESCRIPTION A. The purpose of this section is to specify Division 23 responsibilities in the commissioning (Cx) process. SECTION 239950 MECHANICAL COMMISSIONING SYSTEMS PART 1 - GENERAL 1.1 DESCRIPTION A. The purpose of this section is to specify Division 23 responsibilities in the commissioning (Cx) process. B. Commissioning

More information

Winston-Salem State University Campus Master Plan 2016 Update

Winston-Salem State University Campus Master Plan 2016 Update Winston-Salem State University Campus Master Plan 2016 Update Request for Qualifications Page 1 of 6 Overview Winston-Salem State University (WSSU) is requesting qualifications from planning firms specializing

More information

Part I Extraction Process Equipment

Part I Extraction Process Equipment 745 West Colfax Avenue Denver, CO 80204 p: 720.913.3474 f: 720.913.3596 www.denvergov.org/fire MARIJUANA EXTRACTION GUIDELINE FOR COMMERCIAL / LICENSED FACILITIES The information contained within this

More information

Borosilicate 3.3 Glass Pilot plants / Equipment

Borosilicate 3.3 Glass Pilot plants / Equipment Borosilicate 3.3 Glass Pilot plants / Equipment Pilot Plants / Assemblies are multi purpose units having flexibility of utility. These units have been standardized by incorporating all basic & essential

More information

Tuesday, 18 November Video Links. Oil Blow Through 13 November BLOW THROUGH ON BOILER UNIT 6 BEGINS.

Tuesday, 18 November Video Links. Oil Blow Through 13 November BLOW THROUGH ON BOILER UNIT 6 BEGINS. Oil Blow Through 13 November Video Links Tuesday, 18 November 2014 To view the video click on the links or copy and paste into your browser Blow through http://medupiproject.eskom.co.za/videos/blow_through.mp4

More information

SECTION STEAM CONDENSATE PUMPS

SECTION STEAM CONDENSATE PUMPS SECTION 23 22 23 STEAM CONDENSATE PUMPS PART 1 - GENERAL 1.1 DESCRIPTION SPEC WRITER NOTE: Delete between // // if not applicable to project. Also delete any other item or paragraph not applicable in the

More information

DONALD H. BERG, ARCHITECT

DONALD H. BERG, ARCHITECT DONALD H. BERG, ARCHITECT DVA PROJECT 632-CSI-402 PET/CT ROOM #A0-10 RENOVATION BASEMENT LEVEL, BUILDING 200 ARCHITECT S PROJECT No. 0917-02 ADDENDUM NO. 1 JUNE 25, 2018 Page 1 of 1 ARCHITECTURAL 1. Specifications:

More information

ANNEX V. AP600 & AP1000 Westinghouse Electric, USA

ANNEX V. AP600 & AP1000 Westinghouse Electric, USA ANNEX V. AP600 & AP1000 Westinghouse Electric, USA Reactor System Reactor Type Power (MW th) Passive Safety Systems CORE/PRIMARY: Advanced Passive PWR (AP600) and (AP100) Westinghouse Electric, USA PWR

More information

STATEMENT OF WORK ELECTRICAL REPAIR / MAINTENANCE BUILDING PROJECT FDC RACCOON CREEK STATE PARK (BEAVER COUNTY)

STATEMENT OF WORK ELECTRICAL REPAIR / MAINTENANCE BUILDING PROJECT FDC RACCOON CREEK STATE PARK (BEAVER COUNTY) STATEMENT OF WORK ELECTRICAL REPAIR / MAINTENANCE BUILDING PROJECT FDC-213-100797 RACCOON CREEK STATE PARK (BEAVER COUNTY) I. SCOPE OF WORK: The Commonwealth of Pennsylvania, Department of Conservation

More information

Full Service Central Station Fire Alarm Listing Evaluation

Full Service Central Station Fire Alarm Listing Evaluation Full Service Central Station Fire Alarm Listing Evaluation Listing Evaluation A UL Listing project includes: 1. Evaluating the central station facility for compliance with UL 827, Central-Station Alarm

More information

Egg handling. Picking up and opening bags. Vacuum molding of plastic products. Instrument control for aircraft and vehicles

Egg handling. Picking up and opening bags. Vacuum molding of plastic products. Instrument control for aircraft and vehicles Egg handling With suction cups and a vacuum, eggs and other easily damaged products can be handled without risk, simply and conveniently. Picking up and opening bags Bellows suction cups are ideal for

More information

FINNED WATER-TUBE POOL HEATERS

FINNED WATER-TUBE POOL HEATERS HI DELTA, TYPE P - MODELS 992C-2342C SUGGESTED SPECIFICATIONS Catalog No.: 6000.611 Effective: 10-31-16 Replaces: NEW FINNED WATER-TUBE POOL HEATERS - GENERAL 1.1 SUMMARY A. Section includes gas-fired,

More information

NFZP Variable Refrigerant Flow Guide Specification

NFZP Variable Refrigerant Flow Guide Specification PART 1 - GENERAL 1.01 SECTION INCLUDES SECTION 23 81 29 VARIABLE REFRIGERANT FLOW HVAC SYSTEM A. (VRF) HVAC system includes: 1. Outdoor/Condensing unit(s): a. Size Range: 14 Tons Nominal b. YANMAR VRF

More information

TECHNICAL INFORMATION L / A 1

TECHNICAL INFORMATION L / A 1 1 WORKING MACHINE WITH SOLVENT: HYDROCARBON MACHINE CAPACITY (RATIO 1:20) Lbs 60 BASKET Diameter Depth Volume Wash speed Extract speed Door opening inches 39.4 inches 25.2 132 rpm 12 50 rpm 300 540 inches

More information