Operating Instructions for the STS ICP Metal Etcher

Size: px
Start display at page:

Download "Operating Instructions for the STS ICP Metal Etcher"

Transcription

1 Operating Instructions for the STS ICP Metal Etcher Tool Owner: Pat Watson, x , cell: Backup: Joe Palmer, x , cell: Introduction The STS is a state of the art inductively coupled plasma etcher (Figure 1). The tool has been configured to enable users to etch Al, Cr, Ti, W, and Nb with a photoresist mask. The tool is plumbed with SF 6, CHF 3, Ar, O 2, Cl 2 and BCl 3 gases. It possesses a He mechanically clamped backside cooled chuck that is temperature controlled with a chilled water circulator. Specimens are loaded into the process chamber by a robot arm through a load lock to minimize contaminants entering the process chamber and to protect users from hazardous etch by-products. SEMI standard 100 mm diameter wafers can be processed in the system. Samples that are smaller than 100 mm in diameter must be mounted on a carrier wafer. There are 2 RF power sources to control the properties of the plasma. The first is a 1000W supply inductively coupled to the gas in the process chamber. It generates a high density of radicals and ions with only a small potential between the plasma and the wafer surface. An additional 500W source induces a potential between the chuck and the plasma just like a traditional RIE system. The advantage of this combination is that the plasma density and the substrate bias can be independently controlled. The system is controlled by a programmable controller mounted on the wall behind the tool. The user interface is a touchscreen mounted on the front of the electronics rack.

2 Electronics Rack Touch Screen Emergency Off Buttons Load Lock Chamber Main Unit Figure 1. The PRISM MNFL STS ICP etcher. The loadlock is in the foreground. The human interface touchscreen is the black screen behind it. Emergency Off buttons are marked. Overview of the System The etcher consists of the: main unit, which houses the turbopump and load lock and process chambers (Fig. 1); Electronics rack; Programmable controller, located on the wall behind the main unit; circulator, process dry pump and load lock dry pump, located behind the main unit in the service chase, J417;

3 Figure 2. The STS computer interface touch screen, displaying the Operator screen. There are 3 screen displays that are regularly used: The Operator screen, where the tool is controlled (Fig 2). The Main screen, where more information is shown while a recipe is running (Fig. 3). The Recipe screen, where the users may select and edit recipes (Fig. 4). Please see the staff before creating or modifying any recipes.

4 Figure 3. The Main screen. The status of the gas flows, RF generators, and other system components may be viewed here. Figure 4. The Recipe screen. Press the gray area to the left of a recipe to select it. Press Load to choose the selected recipe.

5 Start up and Login 1) To operate the etcher, the user must first log in to the tool through the MNFL reservation system. The load lock will not vent unless the user is logged in. 2) Sign in the logbook with user ID and start time. 3) The system should normally be left with the load lock pumped down. To bring the load lock to atmosphere: a. Select the Operator screen if it is not currently displayed on the touchscreen. b. Press Vent Loadlock and wait about 1 minute for the load lock to reach atmospheric pressure. Mounting and Loading a Sample Since the chuck must be protected at all times from the plasma, specimens that are not 100 mm diameter wafers must be bonded to a carrier wafer. 1) If a whole wafer is used, skip to step 3. A small sample (less than a 100mm wafer) must be mounted to a special carrier wafer. A 100 mm Si wafer covered with Kapton tape is typically used as the carrier, but an SiO2 coated wafer or a uncoated Si wafer may also be used. 2) Using a small cleanroom swab, coat the carrier (or the back of the specimen) with a thin layer of thermally conductive silicone grease. Make sure that as little grease is exposed as possible. Press the sample gently on the carrier to ensure good contact. Alternatively, thin strips of Kapton tape may be used to attach the sample to the carrier; however, thermal contact between the sample and the carrier wafer will be poor, possibly leading to uncontrolled etch rate and resist loss. 3) Check the back of the wafer to ensure it is free of any contaminants that could compromise the seal between the carrier and the He backside cooled chuck. 4) Open the load lock chamber door and place the carrier or wafer on the carrousel. Make sure it is properly centered. Up to two wafers may be loaded at a time. 5) Check to make sure that there are no obstructions or particles on the door o-ring and complementary surface, then lower the load lock door.

6 6) Press Pump and Map on the Operator screen to start the load lock pump down process. Etching The user will generally use established etch recipes. Please see the staff before modifying and recipe. Please notify the staff of any major new recipe changes before trying them to prevent hazardous or damaging situations. For instance, long runs using SF6 without some O2 can damage the turbopump. 1) From the Operator screen, press the Select Recipe button on the lower right. 2) Use the arrow keys on the lower right of the Recipe screen to view any recipes off-screen. Select a recipe by pressing on the entry on the left side of the recipe name. 3) Press the Load button on the lower right. 4) Return to the Operator screen by pressing the Close button on the lower left. 5) From the Operator screen, press the run recipe button on the upper left. 6) The user may switch between the operator and main screens throughout the process to view progress. The Operator screen will display Halt and Abort buttons to either halt the recipe at the current step, or cancel the run. Finishing Up 1) When the recipe is complete, the Operator screen will show text identifying that near the center of the screen. 2) From the Operator screen, select Unload 3) When this action is complete, press Vent Loadlock 4) When the load lock is at atmospheric pressure, open the door, remove the wafer(s). 5) Close the loadlock door and press Pump/Map. 6) Fill in the logbook with end time, recipe, type of chemistry, and any comments. 7) Log off the tool from the reservation system.

7 Appendix A: Chlorine Chemistry Etching The etch chamber is normally kept in a state ready for F chemistry etching. To use Cl2 and BCl3, it is prudent to prepare the chamber by loading a blank wafer and running the recipe Cl2 Prep. The preparation takes about 60 minutes. When complete, run the Cl2 recipe of interest with the same blank wafer. The chamber should now be ready. When etching is complete, load a blank wafer and pump down the load lock. From the Operator screen, press Start Purge to clear the Cl2 and BCl3 mass flow controllers. When this process is completed, load the blank wafer, then select and run the recipe F Prep. This recipe should take about 60 minutes to complete. Let other users know in that the chamber has been returned to the F chemistry state by noting it in the log book. Appendix B: STS Metal Etcher Short Operation Instructions 1) Log in with reservation system, write entry into log book, 2) Press vent loadlock on operator screen. 3) Load sample into loadlock and press pump/map 4) Press Load Wx to load appropriate sample into chamber 5) Press Select Recipe to access recipe page. Select recipe, load it and exit page. 6) Press Run from operator page 7) When etch is complete, press Unload sample 8) Vent load lock and remove sample, then press Pump/Map to evacuate load lock 9) Fill out rest of logbook and close reservation. Revised gpw 04/23/2012

Operating Instructions for the SAMCO RIE800iPB

Operating Instructions for the SAMCO RIE800iPB Operating Instructions for the SAMCO RIE800iPB Tool Owner: Pat Watson x8-4626, cell: 732 996 2713 Backup: Bert Harrop, cell 848 459 2542 Introduction The SAMCO International RIE800iPB is a state of the

More information

Plasma-Therm 790 RIE (Reactive Ion Etcher) Basic Operation Guide

Plasma-Therm 790 RIE (Reactive Ion Etcher) Basic Operation Guide Plasma-Therm 790 RIE (Reactive Ion Etcher) Basic Operation Guide Description: The Plasma-Therm 790 is configured for RIE (Reactive Ion Etching) processing of Silicon substrates. Substrates up to 8 inches

More information

OXFORD PLASMALAB 100 PECVD

OXFORD PLASMALAB 100 PECVD Arizona State University NanoFab OXFORD PLASMALAB 100 PECVD Rev D Table of Contents Contents Table of Contents... 1 1. Purpose / Scope... 2 2. Reference Documents... 2 3. Equipment / Supplies / Material...

More information

Arizona State University Center for Solid State Electronic Research Title: Oxford Plasmalab 100 PECVD Page 1 of 7

Arizona State University Center for Solid State Electronic Research Title: Oxford Plasmalab 100 PECVD Page 1 of 7 Title: Oxford Plasmalab 100 PECVD Page 1 of 7 Table of Contents 1.0 Purpose/Scope... 2 2.0 Reference Documents... 2 3.0 Equipment/Supplies/Material... 2 4.0 Safety... 2 5.0 Set Up Procedures... 2 6.0 Procedure...

More information

Standard Operating Procedure: Sputter

Standard Operating Procedure: Sputter Contents Hardware Description and Principle of Operation... 1 Procedure... 1 Check Targets... 1 Load Sample... 1 Sample Stage Transfer... 3 Recipe Creation... 4 Deposition Running a Recipe... 7 Deposition

More information

University of Minnesota Nano Fabrication Center Standard Operating Procedure

University of Minnesota Nano Fabrication Center Standard Operating Procedure Equipment Name: ALD Coral Name: ald Revision Number: 8 Model: Savannah Revisionist: T. Whipple Location: Bay 1 Date: 3/14/2017 1 Description The ALD, Atomic Layer Deposition system is a Savannah series

More information

NANO-MASTER Single Wafer/Mask Cleaning Systems

NANO-MASTER Single Wafer/Mask Cleaning Systems Damage-Free Megasonic and Cleaning Technology The latest developments in Megasonic and Cleaning Technology have opened up new horizons to achieve the cleanest wafers and masks used in MEMS and Semiconductor

More information

UV-Ozone Technology and Applications

UV-Ozone Technology and Applications UV-Ozone Technology and Applications Introducing SAMCO Your Global Partner in Progress Over the last 30 Years SAMCO has provided Over 3,200 Thin Film Solutions to our Global Partners in 23 Countries The

More information

University of Minnesota Nano Fabrication Center Standard Operating Procedure

University of Minnesota Nano Fabrication Center Standard Operating Procedure Equipment Name: Ion Mill Coral Name: ionmill Revision Number: 4 Model: Intlvac Revisionist: K. Roberts Location: Bay 3 Date: 09/17/2013 1 Description The Intlvac Ion Mill is used for non-chemical etching

More information

NRF PDMS Processing SOP 2/12/18 Rev 2 Page 1 of 9. NRF PDMS Processing SOP

NRF PDMS Processing SOP 2/12/18 Rev 2 Page 1 of 9. NRF PDMS Processing SOP Rev 2 Page 1 of 9 NRF PDMS Processing SOP Table of Contents 1. PDMS Processing Tools available at the NRF 2. Fabrication of Master Molds 3. Mixing and Preparing the PDMS 4. PDMS Master Surface Preparation

More information

Brandon Barrel Asher. Standard Operating Procedure

Brandon Barrel Asher. Standard Operating Procedure Brandon Barrel Asher Standard Operating Procedure The barrel asher is designed to give isotropic (non-directional) etches. There is no DC bias, so the cloud of plasma chemically etches uniformly across

More information

YES-3DR HMDS OVEN USERS GUIDE

YES-3DR HMDS OVEN USERS GUIDE YES-3DR HMDS OVEN USERS GUIDE HMDS(Hexamethyldisilazane, [(CH3)3Si]2NH) is widely used in the semiconductor industry to improve photoresist adhesion to oxides. The HMDS reacts with the oxide surface in

More information

Standard Operating Manual

Standard Operating Manual Standard Operating Manual SOLITEC 5110-C/PD Manual Single-Head Coater Page 1 of 14 Contents 1 Picture and Location 2 Process Capabilities 2.1 Cleanliness Standard 2.2 Recipes 2.3 Performance of SOLITEC

More information

OPERATION MANUAL Model 800 Nanoimprint Controller

OPERATION MANUAL Model 800 Nanoimprint Controller OPERATION MANUAL Model 800 Nanoimprint Controller 685 RIVER OAKS PARKWAY SAN JOSE, CA 95134 www.oainet.com sales@oainet.com 408/232-0600 0420-757-01, Rev. B 02/17/09 OAI Model 800 Nanolithosolution Nanoimprint

More information

Standard Operating Procedure: Spinner

Standard Operating Procedure: Spinner Contents Hardware Description and Principle of Operation... 2 Material Requirements... 2 Procedure... 2 Emergency Stop... 3 Allowed Activities... 4 Disallowed Activities... 4 What to watch out for during

More information

Experiment #6 Photolithography: Microprocessing Technology Fabrication of the microstructures with SPR photoresist

Experiment #6 Photolithography: Microprocessing Technology Fabrication of the microstructures with SPR photoresist Experiment #6 Photolithography: Microprocessing Technology Fabrication of the microstructures with SPR photoresist The Steps involved in Fabrication: Students will fabricate microstructures on the surface

More information

Standard Operating Manual

Standard Operating Manual Standard Operating Manual RTP-600S Rapid Thermal Processing System Version 1.2 Page 1 of 11 Contents 1. Picture and Location 2. Process Capabilities 2.1 Cleanliness Standard 2.2 Process Temperatures, Time

More information

University of Minnesota Nano Fabrication Center

University of Minnesota Nano Fabrication Center Equipment name: Spray/Puddle Developer Badger name: develop spinner CEE-4 Model: 200X Location: Bay 2 Revisionist: Paul Kimani Revision #: 1 Date: April 26, 2013 Description The develop spinner CEE-4 spinner

More information

Title: CHA E-Beam Evaporator Semiconductor & Microsystems Fabrication Laboratory Revision: C Rev Date: 01/13/2011

Title: CHA E-Beam Evaporator Semiconductor & Microsystems Fabrication Laboratory Revision: C Rev Date: 01/13/2011 Approved by: Process Engineer / / / / Equipment Engineer 1 SCOPE The purpose of this document is to detail the use of the CHA E-Beam Evaporator. All users are expected to have read and understood this

More information

Standard Operating Manual

Standard Operating Manual Standard Operating Manual EVG 101 Spray Coater Version 1.1 Page 1 of 24 Contents 1. Picture and Location 2. Process Capabilities 2.1 Cleanliness Standard 2.2 Substrate Size 2.3 Spin speed 2.4 Spin ramp

More information

Fischione Model 1020 Plasma Cleaner

Fischione Model 1020 Plasma Cleaner Fischione Model 1020 Plasma Cleaner Standard Operating Procedure Revision: 1.0 Last Updated: Mar. 20/2015, Revised by Xin Zhang Overview This document will provide a detailed operation procedure of the

More information

CHA ELECTRON BEAM EVAPORATOR SYSTEM OPERATING MANUAL Version: 1.0 Jan 2012

CHA ELECTRON BEAM EVAPORATOR SYSTEM OPERATING MANUAL Version: 1.0 Jan 2012 CHA ELECTRON BEAM EVAPORATOR SYSTEM OPERATING MANUAL Version: 1.0 Jan 2012 UNIVERSITY OF TEXAS AT ARLINGTON Nanofabrication Research and Teaching Facility TABLE OF CONTENTS 1.0 DESCRIPTION.... 3 2.0 SAFETY.......

More information

Oerlikon Ebeam Evaporator SOP short. UNT Cleanroom

Oerlikon Ebeam Evaporator SOP short. UNT Cleanroom Oerlikon Ebeam Evaporator SOP short UNT Cleanroom 1. Transfer sample holder into process chambers: Log in FOM to access the software Go to the software and log in with user1 and password user1 Go to transport

More information

PicoTrack PCT-200CRS Standard Operating Procedure

PicoTrack PCT-200CRS Standard Operating Procedure PicoTrack PCT-200CRS Standard Operating Procedure CORAL Name: ptrack Model: PicoTrack PCT-200CRS Coat-Develop Track Location: ICL Photo Room Purpose: Coat and Develop Photoresist Author: K. Payer, November

More information

VACUUM CHAMBER PM TECHNIQUE LAM 9600 Metal ETCH WET-Strip Procedure

VACUUM CHAMBER PM TECHNIQUE LAM 9600 Metal ETCH WET-Strip Procedure VACUUM CHAMBER PM TECHNIQUE LAM 9600 Metal ETCH WET-Strip Procedure OBJECTIVE: TO PM THE LAM 9600 METAL ETCH CHAMBER IN AN EFFECTIVE AND TIMELY MANNER WHILE IMPROVING PARTICLE PERFORMANCE, TOOL RECOVERY

More information

Guide for Thin Film Evaporation Edited 7/22/13 by Stephen Albright, BJAM & Steven Palefsky

Guide for Thin Film Evaporation Edited 7/22/13 by Stephen Albright, BJAM & Steven Palefsky Guide for Thin Film Evaporation Edited 7/22/13 by Stephen Albright, BJAM & Steven Palefsky N.B. This guide is written largely for use with the Thin-Film Tunneling with Superconductors instructional lab.

More information

UNIVEX Experimental systems for thin film coating and Space simulation

UNIVEX Experimental systems for thin film coating and Space simulation UNIVEX Experimental systems for thin film coating and Space simulation 184.04.02 Space simulation Thin fi lm deposition units UNIVEX The UNIVEX system range is well established for experimental coating

More information

CiS Institut für Mikrosensorik ggmbh. Haarbergstraße 61 D Erfurt

CiS Institut für Mikrosensorik ggmbh. Haarbergstraße 61 D Erfurt Haarbergstraße 61 D-99097 Erfurt new 2002: Konrad-Zuse-Straße 14 D-99099 Erfurt Phone: +49 361 / 42051 10 Fax: +49 361 / 42051 13 Email: info@cismst.de Web: http://www.cismst.de page 1 1993 Spin-off 1996

More information

Nanoscale Fabrication & Characterization Facility. Thermionics E-Beam Evaporator Users Guide

Nanoscale Fabrication & Characterization Facility. Thermionics E-Beam Evaporator Users Guide Nanoscale Fabrication & Characterization Facility Thermionics E-Beam Evaporator Users Guide The model VE-180 provides thin film coating of virtually any material quickly, cleanly and efficiently. Our system

More information

Welcome to ChE 384T/323

Welcome to ChE 384T/323 Welcome to ChE 384T/323 Chemical Engineering for Micro/Nano Fabrication Grant Willson http://willson.cm.utexas.edu Course Information Please read the syllabus carefully Class web site is http://willson.cm.utexas.edu

More information

Standard Operating Manual. Semitool Spin Rinser Dryer SRD

Standard Operating Manual. Semitool Spin Rinser Dryer SRD Standard Operating Manual Semitool Spin Rinser Dryer SRD Version 1.1 Page 1 of 8 Contents 1. Picture and Location 2. Process Capabilities 2.1 Cleanliness Standard 2.2 Substrate Size 3. Contact List and

More information

AJA THERMAL EVAPOTOR STANDARD OPERATING PROCEDURE

AJA THERMAL EVAPOTOR STANDARD OPERATING PROCEDURE AJA THERMAL EVAPOTOR STANDARD OPERATING PROCEDURE Version: 2.0 MARCH 2013 UNIVERSITY OF TEXAS AT ARLINGTON Nanotechnology Research and Education Center AJA INTERNATIONAL THERMAL EVAPORATION SYSTEM Standard

More information

0. Table of contents. Author: M.C.Martens

0. Table of contents. Author: M.C.Martens RWV nr. : MarMar-20121023-01V01 Page nr. : 0 Chapter : Table of contents Author: M.C.Martens 0. Table of contents 0. Table of contents... 0 1. Changes compared to previous versions... 1 2. Safety... 2

More information

1.0 Denton Thermal Evaporator

1.0 Denton Thermal Evaporator 1.0 Denton Thermal Evaporator View port shutter knob Touch screen View port Vacuum chamber Thickness monitor EMO Switch 1.1 Introduction Figure 1: Denton Thermal Evaporator. Denton Thermal Evaporator is

More information

Laptop / PC Programming Manual

Laptop / PC Programming Manual Laptop / PC Programming Manual Doc. # Fire PC Program rev B 01.07 This Document is property of Evax Systems, Inc. The Evax Fire Solutions Programmer Components 2 1.0 System Setup 4 1.1 Interface Setup

More information

Handling units for. Technobis Mechatronics has developed and manufactured three mechatronic handling units

Handling units for. Technobis Mechatronics has developed and manufactured three mechatronic handling units Mechatronic design for high-temperature operation Handling units for Technobis Mechatronics has developed and manufactured three mechatronic handling units for harsh environments. These units are part

More information

VACUUM CHAMBER PM TECHNIQUE HITACHI METAL ETCHER

VACUUM CHAMBER PM TECHNIQUE HITACHI METAL ETCHER BEFORE VACUUM CHAMBER PM TECHNIQUE HITACHI METAL ETCHER AFTER OBJECTIVE: TO EFFECTIVELY PM THE HITACHI METAL ETCHER IN A TIMELY MANNER, WHILE IMPROVING TOOL RECOVERY AND PARTICLE PERFORMANCE Vacuum Chamber:

More information

LOCATION MAKE & MODEL EQUIPMENT TYPE OWNER/TRAINER ITEMS REQUIRED FOR TRAINING. TFAB Kulicke & Soffa 4524 Ball Bonder Dennis Bueno Die and package

LOCATION MAKE & MODEL EQUIPMENT TYPE OWNER/TRAINER ITEMS REQUIRED FOR TRAINING. TFAB Kulicke & Soffa 4524 Ball Bonder Dennis Bueno Die and package LOCATION MAKE & MODEL EQUIPMENT TYPE OWNER/TRAINER ITEMS REQUIRED FOR TRAINING TFAB Kulicke & Soffa 4524 Ball Bonder Die and package Bay-2 West Bond 7476 E -79 Wedge Bonder Die and package 101B Zeiss Supra

More information

NRF Lithography Processes SOP 8/3/2015 Rev 17 Page 1 of 24. NRF Lithography Processes SOP

NRF Lithography Processes SOP 8/3/2015 Rev 17 Page 1 of 24. NRF Lithography Processes SOP Rev 17 Page 1 of 24 Operation Instructions Table of Contents NRF Lithography Processes SOP 1.0 HMDS Adhesion Promotion and Dehydration Bake 2.0 AZ9260 / EVG620 / Suss MA6 Process Recommendations 3.0 AZ1512

More information

Control Operating Costs. Gain Process Efficiency.

Control Operating Costs. Gain Process Efficiency. S t e a m s t e r i l i z e r s Control Operating Costs. Gain Process Efficiency. Amsco Century Small and Amsco Millennium Steam Sterilizers Amsco Century Small and Amsco Millennium Steam Sterilizers The

More information

FEI Nova 200 Dual Beam system maintenance

FEI Nova 200 Dual Beam system maintenance David Haviland A 1(6) FEI Nova 200 Dual Beam system maintenance 1 General This document describes regular maintenance of the FEI Nova 200 Dual Beam system at Albanova Nanofabrication Facility. All work

More information

(12) Patent Application Publication (10) Pub. No.: US 2016/ A1

(12) Patent Application Publication (10) Pub. No.: US 2016/ A1 (19) United States US 201601 18280A1 (12) Patent Application Publication (10) Pub. No.: US 2016/0118280 A1 Wood et al. (43) Pub. Date: (54) BUFFER STATION FORTHERMAL CONTROL OF SEMCONDUCTOR SUBSTRATES

More information

Nanoscale Fabrication & Characterization Facility. PVD Products PLD 3000 Deposition system User Guide

Nanoscale Fabrication & Characterization Facility. PVD Products PLD 3000 Deposition system User Guide Nanoscale Fabrication & Characterization Facility PVD Products PLD 3000 Deposition system User Guide PVD Products PLD-3000 System with dual wafer loadlock and Class 4 Coherent 110F series COMPex Pro excimer

More information

GLD-30 Gas Leak Detector

GLD-30 Gas Leak Detector GLD-30 Gas Leak Detector Installation, Operation & Maintenance General: The Archer Instruments GLD-30 is an ambient air monitor, used to detect the presence of a target gas (or gases) and to alert operators

More information

PINNACLE MONITOR FOR AUTOMATED ENZYMATIC CLEANING (AEC) PROCESS

PINNACLE MONITOR FOR AUTOMATED ENZYMATIC CLEANING (AEC) PROCESS PINNACLE MONITOR FOR AUTOMATED ENZYMATIC CLEANING (AEC) PROCESS Instructions For Use Overview MKT 15-10AECIFU Rev 4/15 1 PURPOSE OF THE PINNACLE AEC TEST The test is to be used to monitor the effectiveness

More information

Single Wafer Thin Film Processing Systems

Single Wafer Thin Film Processing Systems Single Wafer Thin Film Processing Systems 3019 Alvin Devane Blvd., Suite 300, Austin, Texas 78741 Ph. 512-385-4552; Fax 512-385-4900 main@nanomaster.com; www.nanomaster.com Single Wafer Thin Film Processing

More information

Amerimade RCA Wet Bench SOP Page 1 of 13 Rev /22/2014

Amerimade RCA Wet Bench SOP Page 1 of 13 Rev /22/2014 Amerimade RCA Wet Bench SOP Page 1 of 13 Bench Features: Amerimade RCA Wet Bench SOP Tanks 1, 2 and 4 are dedicated to RCA Process (HF, SC1, SC2) batch/bulk cleans. All SC1/SC2 use of the bench will incur

More information

VACUUM CHAMBER PM TECHNIQUE AMAT 5500 TXZ CHAMBER

VACUUM CHAMBER PM TECHNIQUE AMAT 5500 TXZ CHAMBER VACUUM CHAMBER PM TECHNIQUE AMAT 5500 TXZ CHAMBER OBJECTIVE: TO EFFECTIVELY PM THE AMAT 5500 TxZ IN A TIMELY MANNER, WHILE IMPROVING TOOL RECOVERY AND PARTICLE PERFORMANCE Vacuum Chamber: Vacuum Chamber

More information

Originally prepared by B. Cheek Low Temperature Probe Station (LTPS) Assembly and Disassembly Procedures

Originally prepared by B. Cheek Low Temperature Probe Station (LTPS) Assembly and Disassembly Procedures Low Temperature Probe Station (LTPS) Assembly and Disassembly Procedures I. Introduction This is a new document detailing with pictures the procedure to disassemble, prep and clean, and reassemble the

More information

Manual Physical Vapour Deposition System

Manual Physical Vapour Deposition System Manual Physical Vapour Deposition System Wilhelmus Geerts, Debbie Koeck. 1.0 Content: Manual explaining how to operate the system. Background explaining the deposition technology. Trouble-shooting / FAQ.

More information

Development of the Micro Capillary Pumped Loop for Electronic Cooling

Development of the Micro Capillary Pumped Loop for Electronic Cooling Development of the Micro Capillary Pumped Loop for Electronic Cooling Seok-Hwan Moon, Gunn Hwang Microsystem Team, Electronic and Telecommunications Research Institute, 161 Kajeong-Dong, Yusong-Gu, Daejeon

More information

FABRICATION 3 EXAMPLES. Fabrication Example 1

FABRICATION 3 EXAMPLES. Fabrication Example 1 FABRICATION 3 EXAMPLES Fabrication Example 1 The example shows a 2 D side view of the fabrication steps for the following A single NMOS transistor Metal1 contacts Metal1 layer EEC 116, B. Baas 21 1 Fabrication

More information

Teaching Lab Headway Spinner SOP

Teaching Lab Headway Spinner SOP Teaching Lab Headway Spinner SOP The Headway Photoresist Spinner is designed for manual application of photoresist and spinon products. It accommodates miscellaneous substrates and wafers using an assortment

More information

Glovebox Usage Manual v1.4. When you enter the lab walk straight to the log book. Enter all information including N2 and O2/H2O levels.

Glovebox Usage Manual v1.4. When you enter the lab walk straight to the log book. Enter all information including N2 and O2/H2O levels. Logbook Glovebox Usage Manual v1.4 When you enter the lab walk straight to the log book. Enter all information including N2 and O2/H2O levels. Nitrogen tank Alert Daeri Tenery or Andre Gesquiere if the

More information

Equipment Standard Operating Procedure Greg Allion and Kimberly Appel

Equipment Standard Operating Procedure Greg Allion and Kimberly Appel Date Created: May 3, 2004 Date Modified: ACS 200 Equipment Standard Operating Procedure Greg Allion and Kimberly Appel 1. Purpose 1.1. The ACS 200 is used for automated resist coating and development of

More information

SUBFAB DOC PDOC 0152 ROGER SHILE 7/11/97. SCIENCE MISSION SQUID CARRIER SUBSTRATE (Part# ) FABRICATION 1. Document Revision Record

SUBFAB DOC PDOC 0152 ROGER SHILE 7/11/97. SCIENCE MISSION SQUID CARRIER SUBSTRATE (Part# ) FABRICATION 1. Document Revision Record SUBFAB 71697.DOC PDOC 0152 ROGER SHILE 7/11/97 SCIENCE MISSION SQUID CARRIER SUBSTRATE (Part# 25019-201) FABRICATION 1 Document Revision Record Rev Date ECO No. Pages Affected Description A 7/11/97 606

More information

Denton Thermal Evaporator SOP. UNT Cleanroom

Denton Thermal Evaporator SOP. UNT Cleanroom Denton Thermal Evaporator SOP UNT Cleanroom Utility Checklist: The PCW water valve is open to the cryo compressor (in chase) N2 and CDA are on Cooling water valves to the tools are on 1. Mounting the substrate

More information

Diamond Detectors Ltd. Fabrication and Packaging Capabilities. Kevin Oliver

Diamond Detectors Ltd. Fabrication and Packaging Capabilities. Kevin Oliver Diamond Detectors Ltd Fabrication and Packaging Capabilities Kevin Oliver Presentation Contents Brief Background. DDL road map to expand our capabilities further Diamond detector application examples.

More information

AXCELIS NV-GSD-HE EQUIPMENT DATASHEET

AXCELIS NV-GSD-HE EQUIPMENT DATASHEET AXCELIS NV-GSD-HE Tool ID M7THE707 OEM/Model AXCELIS NV-GSD-HE Serial Number 900282 Process IMPLANT - HE Vintage August, 2006 Wafer Size 200 mm AG Semiconductor Services sales@agsemiconductor.com www.agsemiconductor.com

More information

PDMS Casting Station Supplies

PDMS Casting Station Supplies PDMS Casting Station Supplies These are provided by the CNF. Please do not use more than you need. Please do not take extra supplies from the lab. Log onto CORAL each time that you use PDMS and the PDMS

More information

Standard Operating Manual

Standard Operating Manual Standard Operating Manual CEE 100CB Spin Coater /Hotplate Version 1.1 Page 1 of 18 Contents 1. Picture and Location 2. Process Capabilities 2.1 Cleanliness Standard 2.2 Substrate Size 2.3 Hotplate Temperature

More information

SINGLE COMPACT DISC METALLIZATION TYPE SINGULUS III / 3

SINGLE COMPACT DISC METALLIZATION TYPE SINGULUS III / 3 Revision Date: 10. March 1999 TECHNICAL SPECIFICATION SINGULUS III / 3 SPECIFICATION NO. 010696 PRODUCTION SYSTEM PREPARED FOR SINGLE COMPACT DISC METALLIZATION TYPE SINGULUS III / 3 SINGULUS TECHNOLOGIES

More information

Australian/New Zealand Standard

Australian/New Zealand Standard AS/NZS 2293.2:1995 Australian/New Zealand Standard Emergency evacuation lighting for buildings AS/NZS 2293.2:1995 This Joint Australian/New Zealand Standard was prepared by Joint Technical Committee LG/7,

More information

Technology for Vacuum Systems. Instructions for use

Technology for Vacuum Systems. Instructions for use page 1 of 8 Technology for Vacuum Systems Instructions for use GKF 1000i Cold trap page 2 of 8 Content Safety information!...3 General information...3 Intended use...3 Setting up and installing the cold

More information

Operation Procedure for SMiF Wet Hoods (Solvent, Spin Coat, Acid, and Develop Hoods)

Operation Procedure for SMiF Wet Hoods (Solvent, Spin Coat, Acid, and Develop Hoods) Operation Procedure for SMiF Wet Hoods (Solvent, Spin Coat, Acid, and Develop Hoods) Safety Users must wear proper personal protective equipment (PPE) for the hoods. o For the Solvent and Acid hoods the

More information

Flexible Heaters. of Silicone Rubber & Kapton

Flexible Heaters. of Silicone Rubber & Kapton Flexible Heaters INTRODUCTION Durex Industries flexible heating elements are providing customers their optimal thermal solution in over twenty different OEM markets. Durex s unique approach to flexible

More information

Leica EM ACE600 Carbon & Iridium Coating System

Leica EM ACE600 Carbon & Iridium Coating System Leica EM ACE600 Carbon & Iridium Coating System Standard Operating Procedure Revision: 1.2 2017-0704 by Michael Paul Overview This document will provide a detailed operation procedure of the Leica EM ACE600

More information

Successful Installation. of PHOTOLUMINESCENT EXIT PATH MARKING SYSTEMS

Successful Installation. of PHOTOLUMINESCENT EXIT PATH MARKING SYSTEMS Successful Installation of PHOTOLUMINESCENT EXIT PATH MARKING SYSTEMS This presentation is protected by US and International copyright laws. Reproduction, distribution, display or use of the presentation

More information

INFN Rome Silicon Microstrip Detector for SBS F. De Persio S. Kiprich - F. Meddi G.M. Urciuoli

INFN Rome Silicon Microstrip Detector for SBS F. De Persio S. Kiprich - F. Meddi G.M. Urciuoli INFN Rome Silicon Microstrip Detector for SBS F. De Persio S. Kiprich - F. Meddi G.M. Urciuoli 1 Summary 1) About us: Presentation of the JLAB12 INFN Roma group. 2) Silicon Detector Advantages on SBS:

More information

AXCELIS NV-GSD-HE EQUIPMENT DATASHEET

AXCELIS NV-GSD-HE EQUIPMENT DATASHEET AXCELIS NV-GSD-HE Tool ID M9IHE101 OEM/Model AXCELIS NV-GSD-HE Serial Number 90009 Process IMPLANT - HE Vintage January, 1995 Wafer Size 200 mm AG Semiconductor Services sales@agsemiconductor.com www.agsemiconductor.com

More information

Instruction Manual. B Issue B. next Pump Accessories

Instruction Manual. B Issue B. next Pump Accessories Instruction Manual B811-00-880 Issue B next Pump Accessories This page has been intentionally left blank. Contents Section Page 1 Introduction... 1 Contents gea/0086/06/10 1.1 Scope and definitions...

More information

The safety refresher are mandatory for ALL users Cleanroom access and instrument usage will be denied for users who:

The safety refresher are mandatory for ALL users Cleanroom access and instrument usage will be denied for users who: Preface The safety refresher are mandatory for ALL users Cleanroom access and instrument usage will be denied for users who: 1. Have not attended a safety refresher 2. Have not satisfactorily completed

More information

Linkam Scientific Instruments USER GUIDE TS1500 TS1200 TS1000. High Temperature Stage

Linkam Scientific Instruments USER GUIDE TS1500 TS1200 TS1000. High Temperature Stage Linkam Scientific Instruments TS1500 TS100 TS1000 High Temperature Stage USER GUIDE Contents Before Setting Up your Equipment... 3 Important Notice... 4 Warranty... 4 Technical Support... 4 Equipment Maintenance...

More information

Ion Gateway Cellular Gateway and Wireless Sensors

Ion Gateway Cellular Gateway and Wireless Sensors Page 1 of 9 Account & Network Setup If this is your first time using the Ion Gateway online system site you will need to create a new account. If you have already created an account you can skip to the

More information

Gaseous detectors. 1

Gaseous detectors.  1 Gaseous detectors Very important class of detectors with many applications charged particle, x- & gamma rays, visible light detection applications in many areas of research, & commercial particle & nuclear

More information

aura-t TP536/GBR ventilation systems

aura-t TP536/GBR ventilation systems EN aura-t TP536/GBR Product Manual HRV controller ventilation systems Warnings, Safety information and Guidance Important Information Read instructions fully before the installing this appliance. 1. This

More information

Saintech Ion Beam Systems - Ion Current Monitor

Saintech Ion Beam Systems - Ion Current Monitor Saintech Ion Beam Systems - Ion Current Monitor The Saintech Ion Current Monitor (ICM) provides REAL TIME Monitoring of Ion Flux throughout Ion-based Deposition Processes The Sensor Head The sensor head

More information

Preliminary. SmarteLight v1.2 Manual. Revision: 1.0 Date: 12/4/2012. Revision: 1.0 Page i OmniSite

Preliminary. SmarteLight v1.2 Manual. Revision: 1.0 Date: 12/4/2012. Revision: 1.0 Page i OmniSite Preliminary Revision: 1.0 Date: 12/4/2012 Revision: 1.0 Page i OmniSite Table of Contents Table of Contents... ii Revision History... iii Notice...iv Warning...iv Limited Warranty...iv Contact Information...iv

More information

Installation Instructions Part No

Installation Instructions Part No Heat Exchanger Cell Kit Cancels: New Installation Instructions Part No. 326600-751 IIK-310A-45-6 6-02 NOTE: Read the entire instruction manual before starting the installation. SAFETY CONSIDERATIONS Installing

More information

TECHNICAL SPECIFICATION

TECHNICAL SPECIFICATION OPERATING INSTRUCTIONS FOR SORB-AC CARTRIDGE PUMPS MK5 Type Prep.: MAP Chk.: GS Appr.: CT Jan 21, 2002 Pag.1/28 SORB-AC Cartridge Pumps MK5 Type are types of vacuum pumps manufactured by SAES GETTERS S.p.A.,

More information

IMB-CNM Presentation. Instituto de Microelectrónica de Barcelona. Centro Nacional de Microelectrónica IMB-CNM (CSIC)

IMB-CNM Presentation. Instituto de Microelectrónica de Barcelona. Centro Nacional de Microelectrónica IMB-CNM (CSIC) Instituto de Microelectrónica de Barcelona. Centro Nacional de Microelectrónica IMB-CNM (CSIC) IMB-CNM Presentation Centro Nacional de Microelectrónica Belongs to CSIC (Spanish Council for Scientific Research)

More information

Semiconductor industry

Semiconductor industry Semiconductor industry Heat transfer solutions for the semiconductor manufacturing industry In the microelectronics industry a semiconductor fabrication plant (commonly called a fab) is a factory where

More information

Fleck 2510 SXT Catalox Installation & Start Up Guide

Fleck 2510 SXT Catalox Installation & Start Up Guide Fleck 2510 SXT Catalox Installation & Start Up Guide For Catalox Filters with PotPerm Bleach Solution Tank Thank you for purchasing a Clean Water System! With proper installation and a little routine maintenance

More information

Standard Operating Manual. Ultra Fab Wet Station C Oxide/ Nitride Etch Station

Standard Operating Manual. Ultra Fab Wet Station C Oxide/ Nitride Etch Station Standard Operating Manual Ultra Fab Wet Station C Oxide/ Nitride Etch Station Version 1.1 Page 1 of 18 Contents 1. Picture and Location 2. Process Capabilities 2.1 Cleanliness Standard 2.2 Substrate Size

More information

Open the Door to Increased Productivity and Cost Efficiency

Open the Door to Increased Productivity and Cost Efficiency S t e a m s t e r i l i z e r s Open the Door to Increased Productivity and Cost Efficiency Amsco Century Medium Steam Sterilizers Amsco Century Medium Steam Sterilizers The Family of Sterilizers Designed

More information

GREASE INTERCEPTORS. Z1192 GREASE RECOVERY APPLIANCE (GRA) INSTALLATION and OPERATION INSTRUCTIONS

GREASE INTERCEPTORS. Z1192 GREASE RECOVERY APPLIANCE (GRA) INSTALLATION and OPERATION INSTRUCTIONS Z1192 GREASE RECOVERY APPLIANCE (GRA) INSTALLATION and OPERATION INSTRUCTIONS Note: Zurn Grease Interceptors with grease recognizing sensors are efficient appliances designed to separate grease from water.

More information

Revised: January 8, Goal: Deposit, expose, and develop standard positive photoresist films as an etch mask, liftoff mask, or sacrificial layer.

Revised: January 8, Goal: Deposit, expose, and develop standard positive photoresist films as an etch mask, liftoff mask, or sacrificial layer. Standard Lithography Standard Operating Procedure Faculty Supervisor: Prof. Robert White, Mechanical Engineering (x72210) Safety Office: Peter Nowak x73246 (Just dial this directly on any campus phone.)

More information

Fleck 2510 Sediment Filter Installation & Start-Up Guide

Fleck 2510 Sediment Filter Installation & Start-Up Guide Clean Water Made Easy www.cleanwaterstore.com Fleck 2510 Sediment Filter Installation & Start-Up Guide Thank you for purchasing a Clean Water System! With proper installation and a little routine maintenance

More information

Fleck 5600 Carbon Filter Installation & Start Up Guide

Fleck 5600 Carbon Filter Installation & Start Up Guide Clean Water Made Easy www.cleanwaterstore.com Fleck 5600 Carbon Filter Installation & Start Up Guide Thank you for purchasing a Clean Water System! With proper installation and a little routine maintenance

More information

Davis Soil Moisture and Temperature Station Protocol

Davis Soil Moisture and Temperature Station Protocol Davis Soil Moisture and Temperature Station Protocol Purpose To log soil data using a Davis soil moisture and temperature station Overview Soil moisture and temperature sensors are installed at multiple

More information

Topic 2. ME 414/514 HVAC Systems Overview Topic 2. Equipment. Outline

Topic 2. ME 414/514 HVAC Systems Overview Topic 2. Equipment. Outline ME 414/514 HVAC Systems Overview Equipment Outline 2-1 The Complete System 2-2 The Air-Conditioning and Distribution System 2-3 Mechanical Equipment Air-handling Equipment Heating Equipment Boilers Furnaces

More information

VACUUM CHAMBER PM TECHNIQUE LAM 9600 METAL ETCH

VACUUM CHAMBER PM TECHNIQUE LAM 9600 METAL ETCH BEFORE VACUUM CHAMBER PM TECHNIQUE LAM 9600 METAL ETCH AFTER OBJECTIVE: TO PM THE LAM 9600 METAL ETCH IN AN EFFECTIVE AND TIMELY MANNER, WHILE IMPROVING PARTICLE PERFORMANCE, TOOL RECOVERY AND MAXIMIZE

More information

Covidien Articulating Absorba Tack Foil Pouch Leak Tester Owner s Manual IPE SN Rev 1

Covidien Articulating Absorba Tack Foil Pouch Leak Tester Owner s Manual IPE SN Rev 1 Covidien Articulating Absorba Tack Foil Pouch Leak Tester Owner s Manual IPE SN 12497 Rev 1 MANUFACTURER: INNOVATIVE PRODUCTS & EQUIPMENT, INC. 5 PROGRESS AVE TYNGSBORO, MASSACHUSETTS 01879 U.S.A Revision

More information

OWNER S MANUAL. Part Number P RF

OWNER S MANUAL. Part Number P RF OWNER S MANUAL CPE230RF Commercial Programmable Thermostat Wireless Transmitter Part Number P474-2300RF CONTENTS Page GENERAL... 2 CONFIGURATION... 3-12 Transmitter Display... 3 Transmitter Indicator...

More information

Installation Instructions

Installation Instructions Condensing Heat Exchanger Kit Cancels: IIK 8A-- IIK 8A--7 -- Installation Instructions Part No. 171-7 through -7 NOTE: Read the entire instruction before starting the installation. INTRODUCTION This instruction

More information

DCSS (ACB) Data Center Fire Suppression Procedures

DCSS (ACB) Data Center Fire Suppression Procedures February 25th, 2016 DCSS (ACB) Data Center Fire Suppression Procedures Purpose: This document is intended for all individuals who have access to the data center at 1011 West Springfield Avenue, Advanced

More information

Fire Prevention Plan

Fire Prevention Plan Fire Prevention Plan TABLE OF CONTENTS Section Title Page 1.0 Objective. 3 2.0 Background 3 3.0 Assignment of Responsibility.. 4 4.0 Plan Implementation..... 5 5.0 Types of Hazards...... 6 6.0 Training........

More information

DEPARTMENTAL SAFETY ISSUES - SAFETY TECHNOLOGIST / INFECTION CONTROL PRACTITIONER

DEPARTMENTAL SAFETY ISSUES - SAFETY TECHNOLOGIST / INFECTION CONTROL PRACTITIONER Section: Orientation For Technologists Manual Policy # MI\ORIEN\03\03\v01 Page 1 of 2 Subject Title: Departmental Issues - Technologist/Infection Control Practitioner Issued by: LABORATORY MANAGER Original

More information

Apex E Quick Installation Guide

Apex E Quick Installation Guide ELEMENTAL SCIENTIFIC INC. Apex E Quick Installation Guide Apex E Quick Installation Guide ã Elemental Scientific Inc. 2440 Cuming Street Omaha, NE 68131 USA Phone 402.991.7800 Fax 402.991.7799 Table of

More information

Vacuum Systems & Thin Films (Jaeger 6, Campbell 10&12, Ruska 7) Deposition of thin films involves vacuum system Direct Deposition from Source

Vacuum Systems & Thin Films (Jaeger 6, Campbell 10&12, Ruska 7) Deposition of thin films involves vacuum system Direct Deposition from Source Vacuum Systems & Thin Films (Jaeger 6, Campbell 10&12, Ruska 7) Deposition of thin films involves vacuum system Direct Deposition from Source Evaporation Sputter Building up layers Chemical Vapour Deposition

More information