1 STATEMENT OF WORK INSTALLATION SERVICES and ACQUISITION OF EMC AVAMAR SOLUTION LOS ANGELES COUNTY DEPARTMENT OF HEALTH SERVICES RFB_IS_ February 2014
2 INTRODUCTION This document defines the requirements, deliverables, tasks, and scope of the work to be delivered by CONTRACTOR to the DEPARTMENT OF HEALTH SERVICES (DHS). CONTRACTOR shall provide the services necessary to accomplish all of the tasks and subtasks in this Statement of Work (SOW) and to successfully install, configure, test, and implement all of the components listed in EXHIBIT A (Component Listing) including, but not limited to, all associated software and/or firmware, patches/fixes, and interfaces, post implementation support, technical and end-user training. CONTRACTOR is responsible for all acts, and services required to provide DHS with a fully functional System in accordance with the Manufacturer s Specifications, whether or not the acts or services required to do so are specifically identified as a task, subtask, or deliverable in this Statement of Work, and unless otherwise expressly stated, all work described in this Statement of Work shall be performed by CONTRACTOR. EXHIBIT A (Component Listing) to this Statement of Work identifies all of the hardware, software, and their corresponding manufacturer part numbers that shall be installed by CONTRACTOR. Software and or other bundled items not listed in EXHIBIT A that are deemed as bundled items by the Manufacturer shall be installed and implemented in accordance with Manufacturer s Specifications, whether or not they are specifically listed in EXHIBIT A. DHS is responsible for procuring and taking delivery of these components prior to commencement of installation and engineering services. TASK 1 Installation and Engineering Services CONTRACTOR shall be responsible for unpacking, installing, installation testing and integrating of all components listed in EXHIBIT A including integration into existing DHS Data Center. CONTRACTOR shall be responsible, at its expense, for obtaining any and all governmental licenses or permits that may be required for carrying out the installation at DHS Facilities. CONTRACTOR shall deliver and transfer any and all Documentation and licenses for software, firmware, utility programs, and any and all other software provided by the manufacturer as well as warranties for all of the components listed in EXHIBIT A. All configuration and integration work must be completed by CONTRACTOR with the following credentials: 1. EMC Velocity Premier Level certification 2. EMC Velocity BRS Specialty 3. VMware Enterprise Level certification with Infrastructure Virtualization Specialty 4. Minimum 3 yr. experience (preferably in healthcare IT) with similar project scope and size
3 In the event technical support or other services are required during or after the end of the project due to problems resulting from this project, one of CONTRACTOR s EMC BRS certified Avamar Specialist (EMCIE) (must be able to respond on site within four hours for diagnosis and problem resolution or escalation. All equipment must be supplied in brand new, unused, condition. All equipment must come from the manufacturer or an authorized EMC Reseller with full USA manufacturer warranty and USA manufacturer technical support. Equipment shall not be gray market. Subtask 1.1 Install, and Configure all components CONTRACTOR shall unpack, install, configure, connect, power-up, and test, in accordance with Manufacturer s Specifications all components listed in EXHIBIT A. Upon completion of installation, CONTRACTOR shall submit to DHS the documents listed below. These documents are to be known as the Post Installation Documents. A listing of all components that were installed including equipment type, model number, serial number, location, name, version number, and license number. The manufacturer's valid USA warranties. Certification that all components are installed and operating properly according to Manufacturer s specifications. All reference and operating manuals and all other Documentation pertaining to the operation of the equipment. Any and all manufacturer maintenance and technical support availability and telephone numbers. Satisfactorily prove that all provided equipment is not black market or gray market. Subtask 1.2 Provide Installation/Configuration Services for EMC AVAMAR Solution CONTRACTOR shall provide all engineering services related to configuration and implementation of the new EMC AVAMAR SOLUTION to properly function with DHS s existing EMC AVAMAR backup grid, EMC storage arrays, fibre channel switches, Cisco network, and attached x86 servers currently installed in the DHS Network Data Center and integrate them with all required components listed in EXHIBIT A. Any disruptive work that affects access to the production servers will be scheduled for weekend hours. Activities under this subtask shall include, but not be limited to, the following services: Attend weekly meeting between the time the order is delivered and installed at
4 DHS data center. Recommend optimum configuration settings based on DHS s existing environment as well as anticipated future needs. Install the latest firmware levels on EMC AVAMAR SOLUTION, as well as verify and/or install the most current levels of firmware/software required on associated equipment (switches, servers, Management Appliance, HBA/FCA cards, etc) Install and configure EMC AVAMAR SOLUTION at DHS data center Provide up to 80 hours of expert onsite technical resource to DHS with EMC AVAMAR certification credentials (EMCIE) Discuss, demonstrate, and implement these procedures under the supervision of DHS staff Before project begins, CONTRACTOR should become or already be familiar with DHS Active Directory setup and components. Additional Information Location of installation and configuration: DHS HAS Data center Hours of installation: TBD. Site preparation can be completed 8-5 Monday-Friday with scheduling approval from DHS staff. Any disruptive work that affects access to the SAN or attached production servers will be scheduled for weekend hours. Expected Completion Date: April 2014
5 EXHIBIT A Manufacture Part # Description Qty AVM6CBLEXT 6 NODE LONG CABLE BUNDLE FOR EXTERNAL ROUTING 2 AVM19CBINTG4S AVAMAR G4S INTERNAL 19 CABLE BUNDLE 2 AVMCOMKITG4S AVAMAR G4S COM INSTALL KIT 1 AVMCOMG4S AVAMAR G4S INTERNAL COMM MODULE 2 AVM2400MG4S AVAMAR G4S M2400 STG NODE (MFG INST) 4 AVMMAFG4S AVAMAR G4S MEDIA ACCESS (FLD INST) WW 1 AVMUTILMG4S AVAMAR G4S UTILITY NODE (MFG INST) 1 C13 PWR 12 2 C13 PWRCORDS W/ NEMA V 10A AVAMAR 1 TB INCR CAPACITY LICENSE DATA PROTECTION ADVISOR AVAMAR 1TB CAP AVAMAR EXTENDED RETENTION BACKUP AND RECOVERY MANAGER AVAMAR 1 M PRESWL 002 PREMIUM SOFTWARE SUPPORT 1 PREMIUM HARDWARE SUPPORT WARR UPG(ANDL) WU PREHWB 00 1 WU PREHWB 00 PREMIUM HARDWARE SUPPORT WARR UPG(ANDL) 1 PS CUS IMP CUSTOM PROFESSIONAL SERVICES PER SOW 1
Appendix 1 LACCD Districtwide Security Performance Requirements
Appendix 1 LACCD Districtwide Security Performance Requirements SECTION LISTING 28 01 10 Overview 28 13 00 Access Control System 28 13 01 Access Control System Installation 28 13 26 Access Control Remote
More informationWorkflow Performance Assurance
HONEYWELL REPAIR SERVICES Workflow Performance Assurance With Honeywell Repair Services, it s easy to get the level of repair coverage and protection that makes the most sense for your business. Honeywell
More informationSECTION SECURITY TESTING AND COMMISSIONING
SECTION 280800 - SECURITY TESTING AND COMMISSIONING PART 1 - GENERAL 1.1 WORK INCLUDES A. General Description: This specification section covers the provision of preliminary testing, acceptance testing,
More informationModel 4880 Status Output Display Module Manual
Model 4880 Status Output Display Module Manual 1-2 150912 Section 1 Introduction The 4880 provides 16 switched outputs, 4 form C relay contacts, and an X10 module interface. See Table 2-1 for electrical
More informationVeritas Appliance Hardware Service Procedure
Veritas Appliance Hardware Service Procedure Power Supply Replacement: NetBackup 0 Appliance Document Number: 77 Version:.0 (7/0/6) Purpose This document describes the process for replacing a power supply
More informationHealthEast Care System
healthcare HealthEast Care System CASE STUDY HealthEast Leverages OnGuard Open Platform to Manage Enterprise-Wide Security Operations As the largest health care provider in the Twin Cities East Metro area,
More informationBlackBerry AtHoc Networked Crisis Communication Siemens Indoor Fire Panel Installation and Configuration Guide Release Version 7.
BlackBerry AtHoc Networked Crisis Communication Siemens Indoor Fire Panel Installation and Configuration Guide Release Version 7.3, October 2017 Copyright 2017 BlackBerry Limited. All Rights Reserved.
More informationCourse Catalogue. An evolution of excellence. Welcome to the UTC Fire and Security EMEA Lenel OnGuard Training Catalogue for Value Added Resellers
Course Catalogue Welcome to the UTC Fire and Security EMEA Lenel OnGuard Training Catalogue for Value Added Resellers An evolution of excellence Contact information: UTC Fire & Security Kouterveldstraat
More informationPROJ. NO SECTION PAGING, SPEAKERS AND HARD-WIRED CLOCK SYSTEMS
SECTION 26 92 50 PAGING, SPEAKERS AND HARD-WIRED CLOCK SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions
More informationWASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY SAMPLE TASK WORK STATEMENT Fire Life Safety Upgrade Alexandria Facilities
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY SAMPLE TASK WORK STATEMENT Fire Life Safety Upgrade Alexandria Facilities 1. BACKGROUND The Washington Metropolitan Area Transit Authority (Metro) was created
More informationLSM MANUAL PRINCIPLES OF LSM
Page 1 1.0 PRINCIPLES OF LSM 1.1. SYSTEM REQUIREMENTS: LSM 3.1 SP1 OR HIGHER (SUBJECT TO CHANGE) GENERAL Local administrator rights for installation Communication: TCP/IP (NetBios active), LAN (recommended:
More informationB. After installation, the Owner shall be able to perform hardware configuration changes as desired without the services of the Integrator.
SECTION 281300 - ACCESS CONTROL SYSTEM PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Minimum standards for Access Control Systems. B. Related Requirements: 1. Section 087100 Door Hardware. 1.2 REFERENCES
More informationCONSULTANT PROCEDURES & DESIGN GUIDELINES ACCESS CONTROL SYSTEM
GENERAL: To provide minimum standards for Access Control Systems. PART 1 Common Work Results for Access Control System 1.1 Owner will provide server and software for connecting control panels through the
More informationSupervisor Standard Edition
Supervisor Standard Edition Installation Manual Heat-Tracing Controller Configuration and Monitoring Software INSTALL-119 (Europe) 1 / 18 Contents Section 1 Introduction...3 1.1 Welcome...3 1.2 Vital Information...3
More information"This is only the scope of work for the project. For more information, interested parties should contact Procurement at
"This is only the scope of work for the project. For more information, interested parties should contact Procurement at purchasing@stpgov.org to ensure receipt of a full bid package, to be listed as a
More informationIntelligent Keys. A smart solution for recurring revenue
Intelligent Keys A smart solution for recurring revenue Cloud-Based Services Benefits of the Cloud: For your customers: Ensures that a facility s database is always accessible, secure and up-to-date Enables
More informationTyco Security Products Acquires Innometriks Deal strengthens TSP s Solutions in the Government Market
MEDIA CONTACT Manisha Kumari +91 80 4052 7000 Info-tspindia@tycoint.com Tyco Security Products Acquires Innometriks Deal strengthens TSP s Solutions in the Government Market WESTFORD, Mass. May 16, 2016
More informationREQUEST FOR PROPOSALS CLEANING SERVICES
REQUEST FOR PROPOSALS CLEANING SERVICES Jeffrey Gray City Manager City of Jonesville 265 E. Chicago Street Jonesville, MI 49250 manager@jonesville.org (517) 849-2104 Overview The City of Jonesville is
More informationCOMMISSION ORDER. IT IS FURTHER ORDERED that the Request for Bid and Notice to Bidders be displayed on the Franklin County website.
4.e STATE OF MISSOURI County of Franklin ss. COMMISSION ORDER Commission Order No. 2016-316 Third Quarter Term 2016 Tuesday,August,09,2016 Bid Notice IN THE MATTER OF ADVERTISING FOR SEALED BIDS FOR SMOKE
More informationAPPLICATION DATA SHEET
APPLICATION DATA SHEET Control Systems Transmitters Sensors Accessories Wall, 19 Rack or Panel Mounting Units 110/230V 50/60Hz AC operation 250 Addressable devices as: Relays, 4-20 Inputs or Gas Detectors
More informationDell and Lenel Grow Globally, Together
technology Dell and Lenel Grow Globally, Together CASE STUDY OnGuard Delivers Flexible Capabilities and Ability to Handle Eventualities That We Couldn t Even Yet Predict. At age 19, Michael Dell founded
More information1 NetNumen U31 R Double Blade Servers
1 NetNumen U31 R50 1.1 Double Blade Servers 1.1.1 Disk Array FUJITSU DX60 iscsi Disk Array/AC Power Supplies/3yr 7*24 Support(China):Controller:PN:ET06L22AU/Dual Controller;Host Port:4*1GB iscsi ports;cache:2*1gb
More informationComplete solutions for commercial security. Verex delivers leading intrusion, access and video products to protect today s companies
Complete solutions for commercial security Verex delivers leading intrusion, access and video products to protect today s companies Scalable, cost-effective security designed for today s businesses Designed
More informationPodView Level Indicator LI40 Series Manual
PodView Level Indicator LI40 Series Manual Flowline Inc. 10500 Humbolt Street Los Alamitos, CA 90720 Tel: (562) 598 3015 Fax: (562) 431 8507 www.flowline.com Rev A MN204260 1 of 16 INTRODUCTION / TABLE
More informationC. The system shall be capable of turning luminaires on/off (where supported by the luminaire) as well as full range dimming.
SECTION 260943 SPECIFICATIONS - Wireless Network Lighting Controls. PART 1 - GENERAL 1.1 RELATED DOCUMENTS 1.2 SUMMARY AND KEY SYSTEM DIFFERENTIATORS A. The lighting control system specified herein shall
More informationIntegrated Security and Building Automation Technology Solutions and Services. SDI Security Center of Excellence Charleston, SC
Integrated Security and Building Automation Technology Solutions and Services SDI Security Center of Excellence Charleston, SC SDI 7445 Cross County Road, Suite 10 North Charleston, SC 29418 843.554.7622
More informationSECTION : CAMPUS CENTRAL METERING SYSTEM DESIGN
Brown University Department of Facilities Management Design & Construction Standards 26 09 01 Campus Central Metering System Design SECTION 26 09 01: CAMPUS CENTRAL METERING SYSTEM DESIGN 1. GENERAL A.
More informationACTIVE INFRARED BARRIER
Although PROTECH provides high security indoor intrusion sensors for the military and government markets, our specialty is outdoor protection. Since we first introduced our PIRAMID outdoor dual technology
More informationWorking in Partnership with our Customers.
02 03 Introduction Working in Partnership with our Customers. At McElwaine Security our commitment to our customer is simple; we will provide an unrivalled end to end electronic security service and solutions,
More information"This is only the scope of work for the project. For more information, interested parties should contact Procurement at
"This is only the scope of work for the project. For more information, interested parties should contact Procurement at purchasing@stpgov.org to ensure receipt of a full bid package, to be listed as a
More informationGreentrol Automation, Inc.
Model GA-100 Technical Manual GreenAlert 100 Series Greentrol Automation, Inc. Installation, Operation and Maintenance Technical Manual GA-100 Document Name: TM_GA-100_R1C TM_GA-100_R1C Part Number: 960--0000
More informationSubstation Monitoring System
Substation Monitoring System SF6 Gas Density Monitoring System Description Introduction As a result of recent European legislation on the control of greenhouse gasses, utilities and manufacturers alike
More informationDIRECTIVE NO: D-B
DIRECTIVE NO: D-B6 100604 1 LOW PRESSURE THERMAL FLUID PLANT AUTOMATED CONTROL SYSTEMS Date of Issue: June 4, 2010 General Details This directive is being issued to owners, licensed contractors, consulting
More informationMARINE GYRO COMPASS STANDARD FOR CERTIFICATION. DET NORSKE VERITAS Veritasveien 1, N-1322 Høvik, Norway Tel.: Fax:
STANDARD FOR CERTIFICATION No. 2.9 MARINE GYRO COMPASS JANUARY 2003 Veritasveien 1, N-1322 Høvik, Norway Tel.: +47 67 57 99 00 Fax: +47 67 57 99 11 FOREWORD is an autonomous and independent Foundation
More informationPERMACONN PM1030 Includes DI300. Installation Manual
PERMACONN PM1030 Includes DI300 Installation Manual Radio Data Comms Unit 5/20-30 Stubbs Street Silverwater NSW 2128 Telephone: 02 9352 1777 Facsimile: 02 9352 1700 Introduction The PERMACONN system provides
More informationVERIFICATION OF FIRE ALARM SYSTEMS
DEVELOPMENT, BUILDINGS AND LICENSING Chief Building Official (CBO) and Building Code and Policy Building Policy Branch The intent of this bulletin is to clarify requirements of verification of the fire
More informationRequest for Proposals
Request for Proposals Charlestown Navy Yard Infrastructure Assessment Engineering Services The Boston Redevelopment Authority ( BRA )/Economic Development Industrial Corporation ( EDIC ) is issuing a Request
More informationComplexity made simple
Complexity made simple ICTProtegeGX : Faster, smarter, stronger. Introducing ProtegeGX At ICT we believe the key to great software is doing all the hard thinking up-front so you don t have to. There s
More information/ XPS Interconnection Diagrams
4100-5153/4100-5154 XPS Interconnection Diagrams Introduction This publication provides interconnection diagrams for 4100-5153 (120 VAC) and 4100-5154 (220/240 VAC) 13 A Expansion Power Supplies (XPS).
More informationUSD 380 Centralia, Frankfort & Vermillion
PROJECT MANUAL District Wide Security Upgrade Project Software and Hardware Specifications Covering Locking Hardware Access Control Software & Hardware Video Software & Hardware January 30, 2018 USD 380
More informationRFP Addendum 2 March 31, 2016
RFP Addendum 2 March 31, 2016 For Best Value Procurement Option Three Security Upgrades Ph 1 UT Health Science Center SBC No. 540/013-04-2015 This Addendum forms a part of the Request for Proposals (RFP)
More informationSynergis Master Controller 2.2 Integration Guide for Assa Abloy IP Locks
Synergis Master Controller 2.2 Integration Guide for Assa Abloy IP Locks This guide supplements the Synergis Master Controller Configuration Guide and explains how to configure Assa Abloy IP locks (PoE
More informationNetwork Display Unit Installation Instructions
Network Display Unit Installation Instructions Introduction This publication describes the installation procedures for the optional Network Display Units (NDUs). This product is compatible with both the
More informationAPPLICATION DATA SHEET
APPLICATION DATA SHEET Wed : www.saenchotesei.com WWW.-..UK Control Systems Transmitters Sensors Accessories TOCSIN 920 - Wall, 19 Rack or Panel Mounting Units - 110/230V 50/60Hz AC operation - 250 Addressable
More informationCOST-EFFECTIVE SCADA SYSTEMS
COST-EFFECTIVE SCADA SYSTEMS Presented by: Tritech Group Ltd. PAUL MCRAE Summary Background Defining Cost-effectiveness Tech trends and IT/SCADA synergies Small system challenges Case studies and lessons
More informationVideo Surveillance Systems Infrastructure
DIVISION 28 ELECTRONIC SAFETY AND SECURITY JVC Professional Products Company Division of JVC AMERICAS CORP. 1700 Valley Road Wayne, New Jersey 07470 (800) 582-5825 www.jvc.com/pro This product specification
More informationCan You Hear Me Now?
Fire Alarm Notebook by Dean K. Wilson. P.E. Page 1 Can You Hear Me Now? by Dean K. Wilson, P.E. I am the lead fire alarm system technician at our very extensive multi-building public warehouse complex
More informationEnhanced FOUNDATION Fieldbus Physical Layer Diagnostics with the DeltaV System
November 2006 Page 1 Enhanced FOUNDATION Fieldbus Physical Layer Diagnostics This document provides possible solutions that allow enhanced Ff (FOUNDATION fieldbus) physical layer diagnostics using the
More informationCan You Hear Me Now?
Fire Alarm Notebook Can You Hear Me Now? By Dean K. Wilson, P.E., FSFPE, C.F.P.S. I am the lead fire alarm system technician at our very extensive multi-building public warehouse complex over 2.5 million
More informationControllers. Centralization of Access Control Devices Made Easy. Installer Guide
Controllers Centralization of Access Control Devices Made Easy Installer Guide CONTENTS 1 INTRODUCTION 3 The Overview of Hardware 5 The Overview of Installation & Communications 7 Installations with door
More informationCARD ACCESS CONTROL SYSTEM
SECTION 13851 CARD ACCESS CONTROL SYSTEM PART 1 GENERAL 1.01 SUMMARY A. Section Includes: A complete, operable, tested, integrated proximity access control system, to operate on a proximity principle where
More informationSuccessful Applications Using ISA100 Wireless Technology
Successful Applications Using ISA100 Wireless Technology Standards Certification Education & Training Publishing Conferences & Exhibits Phil Ng Honeywell Sr. Product Manager Wireless May 22, 2013 Presenter
More informationGATEWAY BUILDING ELEVATOR AND ESCALATOR SERVICES
29 One Gateway Plaza Los Angeles, CA 90012-2952 213.922.2000 Tel metro.net SYSTEM SAFETY AND OPERATIONS COMMITTEE JANUARY 16, 2014 SUBJECT: ACTION: GATEWAY BUILDING ELEVATOR AND ESCALATOR SERVICES APPROVE
More informationQuick Alert Remote (QA216R)
Quick Alert Remote (QA216R) Description The QA 216 Remote is used by AT&T to monitor tower lights and turned down facilities. It is a 16-bit alarm unit used to transport discrete alarms from a remote location
More informationTESTING, ADJUSTING AND BALANCING
PART 1 GENERAL 1.01 DESCRIPTION A. Work Included: After completion of the work of installation, owner is responsible for procuring an air balancing and testing agency to test and regulate all components
More informationRosenberger Intergrated Operation and Maintenance Center for all repeaters(2g/3g/lte) following CMCC and TMN specification.
Rosenberger Intergrated Operation and Maintenance Center for all repeaters(2g/3g/lte) following CMCC and TMN specification. Main Features The topology relationship of all repeater is shown by the domain
More informationOne call protects it all.
One call protects it all. 2 // Tyco Integrated Fire & Security Two industry leaders. One great resource. Driven by our shared passion for protecting the employees and operations of businesses and institutions
More informationOptical Preemption & Priority Control Systems
Optical Preemption & Priority Control Systems Table of Contents STROBECOM II 4140 Coded OSP Card and Card Cage... 4-5 OSPOCx Coded OSP Card and Card Cage... 6-7 4080 Coded OSP Card and Card Cage... 8-9
More informationFire Smoke Damper Actuator Replacements SECTION COMMISSIONING OF HVAC
PART 1 GENERAL 1.01 SUMMARY SECTION 23 08 00 COMMISSIONING OF HVAC A. This section covers the Contractor's and Commissioning Authority (CA) responsibilities for commissioning; each subcontractor or installer
More informationManage Alarms. Before You Begin CHAPTER
CHAPTER 8 Manage Alarms This chapter contains the procedures for viewing and managing the alarms and conditions on a Cisco ONS 15454. Cisco Transport Controller (CTC) detects and reports alarms generated
More informationGMS GRAPHICAL MANAGEMENT SYSTEM
GMS GRAPHICAL MANAGEMENT SYSTEM 1 GMS Security management system for multi-site organizations. PACOM Graphical Management System (GMS) is the modular client-server application that integrates all of PACOM
More informationOF AIRPORT COMMISSIONERS
OY i -401 0*11 oir". 4Los Angeles World Airports REPORT TO THE BOARD. OF AIRPORT COMMISSIONERS Meeting Date: Gvt A. Approved by: Aura Moor Chief In ormation Officer c -A/ / v Reviewed by: Samson Mengistu,
More informationFact File 48 Guide to BS EN 54-13:2017 Fire Detection and alarm systems:
Fact File 48 Guide to BS EN 54-13:2017 Fire Detection and alarm systems: Compatibility and connectivity assessment of system components Guide to BS EN 54-13:2017 Fire Detection and alarm systems: Compatibility
More informationLos Angeles Trade Technical College Student Employment Center PLUMBING. Part Time
Plumber Job Number: 578 Hours/Days: Part/ Full Time Salary:$10.00- $17.00 Per hr Approximate Location: Garden Grove, CA Requirements: Commercial Plumbing, Copper Pipe, Flexible Hoses, PVC Pipe, Sanitary
More informationEMERGENCY COMMUNICATIONS SYSTEMS SUPPLEMENTARY RECORD OF INSPECTION AND TESTING
SUPPLEMENTARY RECORD OF INSPECTION AND TESTING This form is a supplement to the System Record of and ing. It includes systems and components specific to emergency communication systems. This form is to
More informationExhibit 3.1: Service Level Matrix VA UC
Exhibit 3.1 Service Level Matrix VA-180815-UC COMMONWEALTH OF VIRGINIA VIRGINIA INFORMATION TECHNOLOGIES AGENCY (VITA) SUPPLY CHAIN MANAGEMENT DIVISION 11751 MEADOWVILLE LANE CHESTER, VIRGINIA 23836 INTRODUCTION
More informationSECTION ph/orp Sensors
SECTION 40 75 13 ph/orp Sensors PART 1 General 1.01 SUMMARY A. Requirements for a ph/orp sensor for in-process measurement. The sensor will incorporate Memosens digital technology for maximum process and
More informationCity of Milpitas. We invite applications for the position of: Fire Prevention Inspector
Annual Salary Range: $ 118,831 - $143,804 Post Date: August 29, 2017 Close Date: September 12, 2017, 5:00 p.m. Why Milpitas? Located at the southern tip of the San Francisco Bay, the City of Milpitas is
More informationSection PERIMETER SECURITY SYSTEMS
Section 28 16 43 PERIMETER SECURITY SYSTEMS PART 1 GENERAL 1.1 SUMMARY A. Provide and install a perimeter security system as herein specified for the purpose of detecting entry into a designated security
More informationSECTION INDUCTIVE CONDUCTIVITY ANALYZERS
SECTION 40 75 16 INDUCTIVE CONDUCTIVITY ANALYZERS PART 1 General 1.01 SUMMARY A. Requirements for a digital inductive conductivity sensor for standard, hazardous and hightemperature applications. The sensor
More informationUsing ANM Mobile CHAPTER
CHAPTER 19 Date: 3/22/13 This chapter describes Cisco ANM Mobile, which allows you to access your ANM server or ANM Virtual Appliance and manage your devices using a mobile device such as an iphone or
More informationFire control panel for modernization
Sinteso Fire control panel for modernization FC2030 Modular, pre-assembled fire control panel with integrated, user-friendly operating unit for gradual migration to Sinteso. Fire control panel for a maximum
More informationSAFETY ON A BROADER SCALE Safety and security for people, processes, plants, communities and environment
Phil Jarrell, Director Integrated Protective Solutions June, 2016 SAFETY ON A BROADER SCALE Safety and security for people, processes, plants, communities and environment 1 INTEGRATED PROTECTIVE SOLUTIONS
More informationCOUNTY OF ROCKLAND Department of General Services Purchasing Division
Department of General Services Purchasing Division Title: Contract Period: Fire Extinguishers and Suppression Systems-Inspection, Testing, Maintenance, Repair and Recharging 3/1/18 through 2/28/19 with
More informationCLARK COUNTY FIRE DEPARTMENT Fire Prevention Bureau
CLARK COUNTY FIRE DEPARTMENT Fire Prevention Bureau 575 E. Flamingo Road, Las Vegas, NV 89119 (702) 455-7316 FAX (702) 455-7347 Permit Type: 105.6.54 Control Number: A.0 Effective Date: TITLE: PROPRIETARY
More informationARCHITECTURAL AND ENGINEERING SPECIFICATION
ARCHITECTURAL AND ENGINEERING SPECIFICATION Access Control System ACTpro Vanderbilt Industries, Clonshaugh Business and Technology Park, Dublin, D17 KV84, Ireland TABLE OF CONTENTS PART 1 GENERAL 1.1 System
More informationVnc Viewer Plus 1.0 User Guide Pdf
Vnc Viewer Plus 1.0 User Guide Pdf VNC Viewer for ios Viewer for Android Viewer for Chrome Viewer Plus deskhop VNC Viewer is a free Google Chrome app that enables you to access and control Terms and conditions
More informationLineGuard 2300 Program User Manual (FloBoss 107)
Form A6251 Part Number D301346X012 November 2012 LineGuard 2300 Program User Manual (FloBoss 107) Remote Automation Solutions Revision Tracking Sheet November 2012 This manual may be revised periodically
More information7.3 Design and Development Design and development planning Design and development inputs Design and development outputs 7.3.
Rev. 1 03/05/2015 ANNEX A to the Yokogawa Corporation of America Quality Assurance Manual For Additional Requirements selectively applied to ATEX and IECEx certified products CONTENTS 1. Scope 2. Purpose
More informationPART 3-O REQUIREMENTS FOR SPRINKLER SYSTEMS MAINTENANCE AND SUPERVISION. 3-O Introduction O.1 Scope of Maintenance and Supervision...
CONTENTS Schedule of amendments for this part of the scheme document Page 1 of 14 3-O Introduction...3 3-O.1 Scope of Maintenance and Supervision...3 3-O.2 Certification conditions...5 3-O.3 LPS 1233 Service
More informationNORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017
SECTION 21 0800 - COMMISSIONING OF FIRE SUPPRESSION SYSTEMS GENERAL 1.1 SUMMARY General 1. Work under this contract shall meet the requirements of Division 01, General Requirements, Conditions of Contract,
More informationPolicy for safe working on Fire Alarm Systems at Loughborough University and Loughborough University in London
Policy for safe working on Fire Alarm Systems at Loughborough University and Loughborough University in London Scope of document General This document sets out the procedure for the management and control
More informationFacility Commander Wnx
Facility Commander Wnx Integrated security management platform for Windows Seamless. Effective. Efficient. Integrate security applications on one versatile platform It s easy and efficient to seamlessly
More informationREQUEST FOR PROPOSAL. Grounds Maintenance
REQUEST FOR PROPOSAL Grounds Maintenance March 1, 2019 Invitation Syracuse City invites contractors to submit a bid to perform grounds maintenance of Syracuse City Hall, Police Station, and Museum. Bid
More informationQUALITY ASSURANCE SURVEILLANCE PLAN (QASP) INTRODUCTION
EXHIBIT 1 PLAN (QASP) CONTRACT No. G S - 01 P - 16 - BW - D - 7004 INTRODUCTION This Quality Assurance Surveillance Plan (QASP) is designed to provide the General Services Administration (GSA) with an
More informationDi-440 The Modular Analyser
Di-440 The Modular Analyser Instrument Concept Single tool for a range of service, maintenance and inspection applications: Condition assessment tool highlights state of machinery today NOT for Predictive
More informationSECTION Fluorescent Dissolved Oxygen Measuring System
SECTION 40 75 43 Fluorescent Dissolved Oxygen Measuring System PART 1 General 1.01 SUMMARY A. Requirements for a high-performance, digital fluorescence sensor for measurement of dissolved oxygen in liquid.
More informationTAB C-6 KEYLESS ACCESS AND SECURITY SYSTEM GUIDELINE
TAB C-6 KEYLESS ACCESS AND SECURITY SYSTEM GUIDELINE The University of Arizona has implemented a Keyless Access and Security System program to provide a cost effective, efficient, and maintainable means
More informationControl Panel. 1.0 GENERAL SCOPE OF WORK Introduction... 2
Architectural & Engineering Specifications Control Panel 1.0 GENERAL... 2 1.1 SCOPE OF WORK... 2 1.1.1 Introduction... 2 1.2 GENERAL CONDITIONS... 2 1.2.1 After-Sales Support... 2 1.2.2 Quality assurance...
More informationTPS Virtualization and Future Virtual Developments Paul Hodge, Honeywell
TPS Virtualization and Future Virtual Developments Paul Hodge, Honeywell Agenda Just released What s coming up 2 2015 Honeywell International All Rights Reserved Enhanced TPS Node (ETN) now available!
More informationNorthwestern University Scope of BAS Contractor
The purpose of this document is to describe the Enterprise Level Server at Northwestern University, and the separation of roles between the System Integrator and the Building Automation System Contractor.
More informationGROUNDING AVOIDANCE SYSTEM (GAS)
STANDARD FOR CERTIFICATION No. 2.9 GROUNDING AVOIDANCE SYSTEM (GAS) JANUARY 2003 Veritasveien 1, N-1322 Høvik, Norway Tel.: +47 67 57 99 00 Fax: +47 67 57 99 11 FOREWORD is an autonomous and independent
More informationOracle Retail Cloud Services Service Descriptions and Metrics February 9, 2017
Oracle Retail Cloud Services Service Descriptions and Metrics February 9, 2017 Oracle Retail Cloud Service Descriptions 1 Table of Contents Metric Definitions... 5 50K Active SKU-Locations... 5 100M Sales
More informationField Products. Experion LX. Proven DCS for a wide range of industrial applications
Field Products Experion LX Proven DCS for a wide range of industrial applications Tried-and-True Technology. Experion LX is an extension of Honeywell s award-winning Experion Process Knowledge System (PKS)
More informationELECTRICAL SERVICES FORM
Booth Number: EVENT DATES: MAIL OR FAX FORMS WITH PAYMENT TO : ENCORE EVENT TECHNOLOGIES AT CAESARS PALACE LAS VEGAS 5150 So. Decatur Blvd., Las Vegas, Nevada 89118 Ph: (702) 866-1056 Fax: (702) 967-3844
More informationSECTION Free/Available Chlorine Analysis System
SECTION 40 75 21 Free/Available Chlorine Analysis System PART 1 General 1.01 SUMMARY A. Requirements for a digital sensor system for free chlorine measurement for disinfection purposes in drinking water,
More informationCisco CallManager. Management Module Guide. Document 5116
Notice Copyright Notice Copyright 2002-present by Aprisma Management Technologies, Inc. All rights reserved worldwide. Use, duplication, or disclosure by the United States government is subject to the
More informationSECTION TESTING, ADJUSTING, AND BALANCING FOR HVAC INTRODUCTORY INFORMATION
SECTION 15990 TESTING, ADJUSTING, AND BALANCING FOR HVAC INTRODUCTORY INFORMATION The purpose of this guide specification is to assist the Specifier in correctly specifying Mechanical System Testing Adjusting
More informationLonix Access Control Operation & Maintenance Manual
1 (7) Lonix Access Control Operation & Maintenance Manual Lonix Ltd Teollisuuskatu 33 FI-00510 Helsinki Finland www.lonix.com 2 (7) Contents 1 Introduction...3 1.1 Health and Safety...3 1.2 Health and
More informationElectronic Safety and Security
28 Electronic Safety and Security NOTE: This is a new section, which includes content from previous sections of the KU Design Standards, along with appropriate revisions and updates. Significant revisions
More information