Safer Inspection of Medium Voltage Electrical Panels on Navy Ships

Size: px
Start display at page:

Download "Safer Inspection of Medium Voltage Electrical Panels on Navy Ships"

Transcription

1 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. 1 FY15 NSRP ETP Panel Project Safer Inspection of Medium Voltage Electrical Panels on Navy Ships NSRP ETP Panel Meeting All Panel Meeting, Charleston, SC March 12, 2015 Penn State Electro-Optics Center The Navy Manufacturing Technology Center of Excellence for Electro-Optics 222 Northpointe Blvd. Freeport, PA Jeff Callen Research and Development Engineer Electrical Engineering and Systems Engineering , ext jcallen@eoc.psu.edu Matthew E. DiGioia Engineering Project Manager Assistant to ManTech Program Operations , ext mdigioia@eoc.psu.edu

2 Presentation Outline 1. Project Background Issue & Approach Participants & Stakeholders Goals & Objectives 2. Issues & Status Technical Approach & Deliverables Project Assumptions & Requirements Milestones 3. Summary Quad / End 4. Backups Programmatics Technical Tasks Details NFPA 70E Assumptions & Requirements Talking Points (From Kickoff Meeting) Concerns & Risks Meeting & Reviews Master Integrated Schedule Other Solution Concepts (IR Fibers for Blackbody Radiation & Embedded Temp Sensor) Results of 2014 Trade Study 2

3 Safer Inspection of Medium Voltage Electrical Panels on Navy Ships Background Even under best practices, installation of shipboard switchboards results in loose connections and wiring mistakes that lead to arc faults and other electrical maladies Average of 8 arc faults per year throughout the navy fleet - all occurred in Switchboards and Load Centers - cost Navy millions of dollars in downtime and repairs [NAVSEA, Gulf Coast] Newer ships have electrical systems considered medium to high voltage LHD, LHA, DDG-51, DDG-1000 = Medium, 4160 volt systems (CVN = High, 13,000 volt systems) Switchboard Inspections: during construction, builder s trial, during sea trials, and again at regular maintenance intervals Current inspection methods: typically utilize Thermal IR imagers to investigate cabinets and comparatively identify hotspots ; other investigation modes require close proximity interrogation Shore Power Switchboard 3

4 Safer Inspection of Medium Voltage Electrical Panels on Navy Ships Lighting Distribution Box Gear / Motor Controller 4

5 Safer Inspection of Medium Voltage Electrical Panels on Navy Ships Issue Current Inspection Practices: secure the area, personnel don full coverage Personal Protective Equipment (PPE) to image inside active panels, preferably while drawing a high load such as during sea trials Necessitates a new paradigm in switchboard inspection to comply with OSHA regulations and avoid Technical Warrant Holder (TWH) waiver requests Approach EOC s initial analysis identified preliminary requirements and potential solutions for both temporary installations acceptable before and during sea trials as well as permanent solutions which must be compliant with Mil-Specs for shipboard operations Leading candidate solution: temporary or permanent installation of panel covers with IR transparent windows enabling safe IR inspection without exposing personnel to active electrical components This would allow inspectors in the room to operate at any time before/during acceptance/sea trials without PPE, while utilizing the same cameras and practices currently used but without the cumbersome and costly need to secure the area and deactivate and reactivate electrical switchboards. Besides IR windows, potential solutions with pros and cons of each were identified including a standalone gantry for remote imaging, temperature sensitive paint, and RF interrogation of embedded temperature sensors Candidate solutions were vetted through NSRP Electrical Technologies Panel (ETP) presentations and subsequent stakeholder interactions. With the support of this community, the approach was refined such that this project focuses on demonstration of temporary (or permanent) installation of panel covers with IR transparent windows enabling safe IR inspection without exposing personnel to energized electrical components 5

6 Active Project Participants Lead Investigators Jeff Callen Matthew E. DiGioia Sponsoring Shipyard Jason Farmer Penn State Electro-Optics Center Research and Development Engineer, Electrical Engineering and Systems Engineering Penn State Electro-Optics Center Engineering Project Manager, ManTech Sensors, Robotics, and Automation Ingalls Shipbuilding (Pascagoula) Project Lead / Electrical Engineer IV jcallen@eoc.psu.edu mdigioia@eoc.psu.edu jason.farmer@hii-ingalls.com Government Stakeholder Clay Smith Project Technical Representative Richard Deleo SUPSHIP Gulf Coast Engineering Newport News Shipbuilding Engineering Manager - Submarine Electrical david.smith@supshipgc.navy.mil r.deleo@hii-nns.com 6

7 Integrated Project Team (IPT): Advisors and Other Stakeholders Government Stakeholders Humberto Lopez Dave Mako Naval Sea Systems Command NAVSEA 05Z32 Electrical Distribution Systems, Office of the Technical Warrant Holder, The Naval Systems Engineering Directorate (SEA05) Naval Surface Warfare Center - Carderock Ship Systems Engr Station, NSWCCD-SSES C937 Humberto.Lopez@navy.mil Charles.mako@navy.mil Industry Advisors Dennis Neitzel Gary Weiss AVO Training Institute, Inc. OSHA Authorized Maritime Trainer Principal Committee Member, NFPA 70E DRS Power & Control Technologies, Inc. Business Development Manager for Power Distribution and Power Conversion Dennis.Neitzel@avotraining.com garypweiss@drs.com Other Interested Parties Greg Stevens Bath Iron Works Electrical Engineering Gregory.Stevens@gdbiw.com 7

8 Safer Inspection of Medium Voltage Electrical Panels on Navy Ships Project Goals and Objectives The suitability and the safety impact of using IR windows in electrical panels for thermographic inspection of electrical connections on Navy ships will be determined 1. Develop safer, cost effective solutions with IR transparent viewports in electrical panel covers to reduce risk for government and shipbuilder inspection of onboard medium/high voltage electrical infrastructures Facilitate comprehensive inspections accomplished with less risk and reduced labor Eliminate or reduce the need for secured locations, personal protective equipment (PPE), and waiver requests wrt OSHA standards 2. Develop and demonstrate a proof of concept solution that meets temporary (or permanent) installation requirements for the shipbuilder/government implementers Utilize principal methods and practices currently employed but without the cumbersome and costly need to secure the area and deactivate and reactivate electrical switchboards Inspections made with closed panels avoiding dangerous proximity to energized circuits Allow inspectors in the room to operate at any time before/during acceptance/sea trials 3. Establish the business / safety case and path to implementation for government and shipbuilder applications Develop the business case and risk reduction benefits for shipbuilder construction and government applications where inspection of electric switchboards, load centers, and transformers is necessary Pursue industry support and buy-in with identification of vendors which can provide products that meet temporary installation requirements Explore the criteria and viability for permanent installations within MIL-DTL (RevA pending) 8

9 Technical Approach Process and Means to Accomplishing Goals and Objectives (from SOW) 1. Review Shipbuilder/Government/Industry Requirements for IR Panel Inspection and Current Inspection Practices [HII, SSGC & Penn State EOC] 2. Determine Camera(s) and Window(s) to be Used [Penn State EOC Led] 3. Laboratory Tests of Cameras and Windows [Penn State EOC Led] 4. Devise Practical Implementation [Penn State EOC, HII & SSGC] 5. Plan and Prepare for Final Demonstration [Penn State EOC, HII & SSGC] 6. Develop Technology Transition Path Including Safety/Business Case [All] 9

10 Deliverables 6.1 Proof of Concept Demonstration (Targeting LHA-7 Sea Trial) A proof of concept demonstration will take place at the end of the project to show an IR thermographic inspection through a window on a closed cover of a representative electrical panel. Venue and test conditions to be determined during project in conjunction with stakeholders HII and SSGC. The demonstration is not meant to be comprehensive, i.e. will not cover all panel types and all geometries, but will be representative to the agreement of the stakeholders. Relevant demonstration data will be recorded and analyzed for inclusion and discussion in the final report. 6.2 Quarterly Reports: April, July, and October Reflect the Sample Status Report found in the NSRP Panel Project Guide and shall include the following sections: (1) Project Overview, (2) Technical Status, (3) Schedule, (4) Business Status, (5) Issues, (6) Near-Term Plans 6.3 Final Project Report Final report content shall summarize research done, test methodology, test results, demonstration results, and technology transition path forward 10

11 Project Assumptions (as of 2/19/17): V panel from LHA7 examined at HII on 2/11/15 will be considered as representative of the inspection to be solved. This type of panel will be used for the project demonstration. 2. Target conditions for final demonstration will be to take thermal images on one energized LHA7 panel in situ on the ship. Intentional faults will be excluded for safety reasons. Scheduling and logistical concerns may preclude this scenario and if so, alternative conditions will be developed and agreed upon by the IPT. 3. While all electrical connections within the cabinet are important for inspection, SUPSHIPS is most interested in the connections made at the shipyard to the cabinet. Specifically, this includes the feed cables at the bottom level of the cabinet and at the middle level of the cabinet. The connections to the fuses at middle and top and the transformers behind the fuses will be considered but with lower priority than the feed cables. 4. Broadband windows will be required such that IR and visible inspection can be completed through the same viewing port. 5. IR windows used will have metal covers over them to secure the integrity of the panel cover when window is not in use. 6. HII and GCSS will be able to loan IR cameras for thermal inspection to Penn State EOC subject to scheduling constraints. 7. Depending on viewing angle and cabinet construction, multiple smaller windows may be desirable rather than fewer large windows. 8. Windows and other materials used in the testing and demonstration will need to meet MIL-STD 901D Grade B shock and vibration, or that a path forward to attain this standard can be developed. 9. Field of View and off angle viewing will permit much more area within the cabinet to be viewed by the camera than the space directly behind the window. 11

12 Project Requirements (as of 2/19/17): 1. Relevant delta temperature values for pass/fail inspection of 4160V panels or guidelines as to what temperature delta will make a relevant demonstration. 2. Dimensional drawings of the target demonstration panel, so realistic laboratory tests can be developed. 3. Samples or part numbers of dust cover boots used in the target 4160 panel. If not available, then representative material. 4. Samples of cables with lugs that are used for connecting to the target 4160 panel. 5. List of IR thermography cameras currently used or planned to be used for inspections (Fluke TI-32, FLIR EX320) 6. If possible, supply of an actual panel cover for the target 4160V cabinet that can be modified for installation of IR windows to use in the demonstration. 12

13 Safer Inspection of Medium Voltage Electrical Panels on Navy Ships Summary Milestones 1/19/15: Contract awarded to EOC 2/11/15: Kickoff Meeting HII 1. 4/10/15: Quarterly Report #1 2. 4/16/15 (Thur): 1st Telecon (review requirements & camera selections, Quarterly Report #1) 3. ~6/18/15: Technology Interchange Meeting (Concurrent with Summer ETP Meeting) Discuss the results of initial research into suitable IR inspection window(s) and camera(s) Identify a candidate system for testing and demonstration with preliminary test plans conveyed The outcome of this meeting will be agreement to proceed with procuring equipment & materials 4. Jul 2015: Quarterly Report #2 5. Aug 2015: 2nd Telecon (review finalized lab experiments & plans) 6. Oct 2015: Quarterly Report #3 7. Oct 2015: Technology Interchange EOC (was 3rd Telecon ) Review lab results and discuss practical implementation plans 8. Dec 2015: 4th Telecon (review plans for final demo) 9. Jan 2016: Draft of Final Report Delivered (1 Week before Final Review) 10. Jan 2016: Final Review Meeting & Handoff Concept Design (@ SUPSHIP GC) [Deliverable] 11. Jan 2016: Update & Deliver Final Report with Transition Path Developed [Deliverable] 12. 1/20/16: End of EOC Period of Performance 13

14 Safer Inspection of Medium Voltage Electrical Panels on Navy Ships Sponsor: The National Shipbuilding Research Program 2014 Electrical Technologies Panel Project Average of 8 arc faults per year throughout the navy fleet - all occurred in Switchboards and Load Centers - cost Navy millions of dollars in downtime and repairs. Current Inspection Practices: secure the area, personnel don full coverage Personal Protective Equipment to image inside active panels, preferably while drawing a high load such as during sea trials. Tasks/Achievements: Review Shipbuilder/Government/Industry Requirements for IR Panel Inspection and Current Inspection Practices Leverage the current state of the art in industry and the recently revised NFPA 70E criteria (National Electrical Code, Standard for Electrical Safety in the Workplace ); emphasizes substantial risk reduction for workplace injuries and fatalities due to shock, electrocution, arc flash, and arc blast Laboratory Experimentation with Cameras and Windows Plan and Execute Final Demonstration of Practical / Representative scenario on a Navy ship Develop Technology Transition Path Including Safety/Business Case Deliverables: Proof of Concept Demonstration: representative IR thermographic inspection using an IR window in closed electrical panel cover of a Quarterly Reports: April, July, and October Final Project Report: Jan-16 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. Objective: Develop safer, cost effective solution within existing thermographic inspection practices for onboard medium/high voltage electrical infrastructures: utilize IR transparent viewports in electrical panel covers to reduce risk for government and shipbuilders Performing Activities: Jan 2015 Jan 2016, $150K Penn State Electro-Optics Center Ingalls Shipbuilding SUPSHIP Gulf Coast Newport News Shipbuilding Integrated Product Team Includes: NAVSEA (TWH Office), Naval Surface Warfare Center Carderock, OSHA Safety Trainer, Industry Product Supplier Implementation: System: Medium & High Voltage Electrical Infrastructures on Navy Platforms (LHD, LHA, CVN ) Site: LHA-7 SUPSHIP-GC (Proof of Concept Demo) Schedule: Jan 2016 = Demo Results with Transition Plan for Temporary Installations Status: Intend future Insertion / adoption Benefits / Payoff: Reduced safety risk to personnel: enables safer practices within existing inspection methods and procedures Potential to provide inspection process cost savings Applicable across multiple military domains & platforms with Information shareable across shipbuilder industry 14 RevA Nov14

15 BACKUPS (From Kickoff Meeting) 15

16 Technical Tasks Process and Means to Accomplishing Goals and Objectives 1. Review Shipbuilder/Government/Industry Requirements for IR Panel Inspection and Current Inspection Practices [HII, SSGC & Penn State EOC - SOW 5.2] Leverage the current state of the art in industry and the revised NFPA 70E criteria (National Electrical Code, Standard for Electrical Safety in the Workplace ) Review and convey the current practices for electrical panel inspection with IR thermography, including equipment used, procedures, techniques, and numerical expectations for pass/fail [HII, SSGC] Review techniques and procedures with perspective of NFPA 70E Standard for Electrical Safety in the Workplace against industry/government requirements for panel inspection [Penn State EOC led with IPT support] Review and verify that the planned path forward will allow panel inspections without PPE and OSHA waivers [Penn State EOC led with IPT support] (Continued on Next Slide) 16

17 Technical Tasks (Continued) 2. Determine Camera(s) and Window(s) to be Used [Penn State EOC Led - SOW 5.3] Borrow hardware from HII and SSGC; provide IR camera/systems and panel covers which are representative of electrical inspection practices Seek rentals, loaners, in-kind equipment from industry (cameras and elec. cabinet suppliers) ($4K budgeted) Purchase sample material/windows and miscellaneous supplies for test and demo ($4K budgeted) 3. Laboratory Tests of Cameras and Windows [Penn State EOC Led - SOW 5.4] Execute IPT approved test plans for laboratory experiments using temperature sources and fabricated fixturing to simulate both good and faulty electrical connections Evaluate various configurations IR imaging, window, panel, configurations 4. Devise Practical Implementation [Penn State EOC, HII & SSGC - SOW 5.5] Review representative panel types and parameters existing in current inspections including: sensitivity to camera position/angle, temporary/permanent requirements, practical and operational considerations Determine implementation plan, including number and placement of IR window(s), camera positions and potential obstacles for representative electrical panels (Continued on Next Slide) 17

18 Technical Tasks (Continued) 5. Plan and Prepare for Final Demonstration [Penn State EOC, HII & SSGC - SOW 5.6] Determine the final demonstration scenario, expected to occur at SSGC A representative electrical panel will be modified and used to first mimic an actual inspection in the lab Execute procedures for demonstration, including number of tests, camera position and angles, visible inspection and verification of results. 6. Develop Technology Transition Path Including Safety/Business Case [All - SOW 5.7] Compare of the demonstrated solution against the existing process (including manhours, cost to file a waiver / use PPE, etc.) Identify and vet the path for transition and implementation (temporary / permanent) Vendors and suppliers will be identified to support production as appropriate 18

19 NFPA 70E, Standard for Electrical Safety in the Workplace, 2015 Edition Main question: Does NFPA 70E support the premise that performing Infrared Thermography on an energized panel through a window in a closed door or cover eliminate the need for PPE and OSHA waivers? Table 130.7(C)(15)(A)(a) pg. 36 states that performing infrared thermography outside the restricted approach boundary does not require PPE, but that this activity does not include opening doors or covers. This implies that IR thermography through a window in a closed door does not require PPE. Need to determine if this is in fact, the case. In Table 130.7(C)(15)(A)(a) for all other tasks, generally speaking, if doors and covers are in place, no PPE is required. Does this apply to windows in doors? 2015 edition of standard places an emphasis on risk assessment. Imaging through a window in a door involves significantly less risk than through an open door. Is this sufficient to remove the hazard of arc flash? Standard states in multiple places (pg. 4, pg. 37) that where an arc flash is not likely to occur or there is no arc flash hazard, PPE is not required. Does this imply that if a window protects from arc flash, no PPE is required? 19

20 Assumptions & Requirements (From Kickoff) Information desired before proceeding 1. Is there a published procedure for IR inspection? 2. Besides FLIR E-50 (Ingalls) & FLIR EX320 (SUPSHIP): What other cameras are used for IR inspection? 3. What is the standoff distance from camera to circuit? 4. What observed temperature difference constitutes a pass or fail condition? 5. Is IR thermography sensitive to off angle viewing? If so by how much? 6. What cameras are available for borrowing and for what time frame? 7. Is a visible camera image for comparison a requirement? 8. What options are available for getting an actual panel cover? 9. Can we get dimensions/drawings/information for typical panels/inspection scenarios so as to set realistic laboratory conditions? 10. What are obstacles/safety concerns in performing a demonstration as envisioned (energized panel, IR through window in door)? Any logistical concerns? 11. Consensus that scope of demo will include only 4,160V panels. Will not attempt to cover 13,800V panels in this phase. 12. Any others? 20

21 Safer Inspection of Medium Voltage Electrical Panels on Navy Ships Concerns and Risks Technical» Will IR transmissivity through window significantly affect measurements?» If required, can visual inspection be performed through same window?» Will the geometry of some panels make imaging through windows impractical?» Will windows be considered enough arc flash protection to preclude needing PPE? Programmatic» Logistical/cost issues with borrowing/purchasing cameras and shipping panel components» Safety, logistical, or timing issues that may make the demonstration impractical» Scope creep 21

22 Meetings and Reviews [Penn State EOC Led - SOW 5.1] Kickoff Meeting A kick-off meeting will be held with key players to (1) review project plans, (2) confirm availability of equipment and testing site and (3) make any revisions to project plans based on IPT input and guidance. This meeting occurred at HII Pascagoula Bi-Monthly Teleconferences Four (4) teleconferences will be conducted to facilitate team communication and updates pertaining to progress and status. These teleconferences are scheduled in correlation with project milestones and meetings to assure the integrated project team is engaged in formal communications at least every 2 months throughout project execution Technical Interchange Meeting to Review Initial Research At this meeting, the results of initial research into IR inspection windows suitable for the camera(s) to be used will be discussed, a candidate system for testing and demonstration will be identified, and preliminary test plans will be conveyed. The outcome of this meeting will be agreement to proceed with procuring equipment and materials. This meeting is likely to occur at Penn State EOC. Timeline To occur upon completion of initial research phase, specifically upon conclusion of task 5.3, Determine Camera(s) and Window(s) to be Used Final Review Meeting and Demonstration Hold a Final Project meeting to review project success. Present proof of concept demonstration in relevant setting. Final project results and implications will be presented. This meeting likely to occur at SSGC Pascagoula, but venue to be determined during the course of the project. Timeline Before conclusion of the project which occurs 12 months after project funding is received by all parties. 22

23 Master Integrated Schedule (v.2/13/15) 23

24 Other Solution Concepts IR Fibers for Blackbody Radiation [NNS via Deleo] IR Fibers for Blackbody Radiation 1. One potential avenue is to use IR fibers to transmit blackbody radiation to a high density FO connector on the face of the panel. 2. Connector can then be read by a variety of methods. Can even develop a special tool to automate scanning. 3. This allows a high level of flexibility with regard to mapping the inside of a panel and monitoring areas without a direct line of sight. 4. You can also easily accommodate a large number of measurements without a significant impact to the panel face (just a connector and dust cap). Pro s: 1. Non-conductive materials eliminate short circuit potential 2. No EMI concerns 3. Not a tactical concern (failure or loss doesn t degrade performance of equipment) 4. Flexible and can be added easily to a design with minimal risk to military qualifications 5. Field installable 6. Lends itself to automation in the future 7. Simple installation. Fibers are not required to carry data so precision installation not an issue. Large light loss acceptable. You only need enough to measure radiation frequency to determine temperature. 8. High quality FO conductors exist 9. High quality (and Mil Spec) connectors exist (Mil-DTl-38999) at high densities (e.g. 64 conductors in small footprint) Con s: 1. Not consistent with current inspection practices 2. Expensive / impractical retrofit? 24

25 Other Solution Concepts Embedded Temperature Sensor & Camera [via Mako & Smith] FLIR AX8TM Combining thermal and visual cameras in a small, affordable package, the AX8 provides continuous temperature monitoring and alarming for uninterrupted condition monitoring of critical electrical and mechanical equipment. 1. The AX8 provides early detection of temperature-related issues in electrical and mechanical equipment, making it the ideal temperature sensor for continuous condition monitoring and hot spot detection for electrical cabinets, process and manufacturing settings, data centers, mass transit facilities, energy generation plants, and storage facilities. 2. Easy to install in electrical cabinets or other confined areas, the AX8 provides uninterrupted condition monitoring of critical electrical and mechanical equipment to help reduce unplanned downtime and prevent safety hazards. 3. Learn more about this powerful thermal sensor and camera, and its many practical applications: Pro s: 1. Continuous condition monitoring 24/7 2. Excellent solution for new construction (pending cost/safety benefit) Con s 1. Not consistent with current inspection practices 2. Expensive / impractical retrofit? Pending Further Investigation 25

26 Results of Initial Trade Study EOC s initial analysis identified preliminary requirements and potential solutions for both temporary installations acceptable before and during sea trials as well as permanent solutions which must be compliant with Mil-Specs for shipboard operations Leading candidate solution: temporary or permanent installation of panel covers with IR transparent windows enabling safe IR inspection without exposing personnel to active electrical components This would allow inspectors in the room to operate at any time before/during acceptance/sea trials without PPE, while utilizing the same cameras and practices currently used but without the cumbersome and costly need to secure the area and deactivate and reactivate electrical switchboards. Besides IR windows, potential solutions with pros and cons of each were identified including: Curtain RF interrogation of embedded temperature sensors A standalone gantry for remote imaging temperature sensitive paint Candidate solutions were vetted through NSRP Electrical Technologies Panel (ETP) presentations and subsequent stakeholder interactions With the support of this community, the approach was refined such that this project focuses on demonstration of temporary (or permanent) installation of panel covers with IR transparent windows enabling safe IR inspection without exposing personnel to energized electrical components 26

27 Initial Trade Study Solution Concepts Panel with IR Transparent Windows (Temporary or Permanent) Replace panel with a temporary panel that has IR transparent windows in it. 1. Windows would be small to keep costs down. 2. Multiple windows would supply the required angles and fields of view. 3. Small panels, some of each with windows, can be modular. 4. An entire panel might consist of 9 subpanels, of which 3 or 4 would have windows. 5. The subpanels would be reconfigured to match the best viewing angles for the switchboard that is being inspected. 6. Some of the windows could be in angled conical mounts so as to direct the FOV somewhat off of normal. 7. Rotating conical mounts like this would allow this angle to be aimed in any direction. 8. The power would be shut off while the regular panel is removed and this temporary panel takes its place. Power restored then inspection takes place same as the old inspection. 9. Temporary panel removed and taken to next switch panel. 10. Temporary panel can be reconfigured if necessary. Pro s: 1. Allows inspectors in room, permitting inspection at any time, including underway 2. Inspection can be done with same cameras and techniques used now. Con s: 1. Requires temporary shutdown of panel while temporary panel installed or removed. 2. Geometry dependent. Even with modular subpanels, might be difficult to get the best location and best angles for meaningful test. 3. Unclear whether one size will fit all. May need more than one set, or some adaptor to make it fit on different size panels. Other Issues / Determinations: 1. Wide array of LWIR transparent windows materials: ideal would be one that has high visible (~ 80%) and IR (>60%) transmission, large/standard size, and durability to withstand a flash event (not be blown out or melt). Cost implications 2. Could use separate IR/Vis windows unless it is possible to take the vis pictures after the inspection is over and the panel is shutdown for removal of our temporary panel 27

28 Initial Trade Study Solution Concepts Curtains - Subset of Panel with IR Transparent Windows Curtains (subset of Panel with IR Transparent Windows): Instead of panel with conical camera ports, create a curtain with a port in the middle. 1. Curtain would resist spark and flame, like welding curtains. 2. Can make it from same material as the flash protection suits. 3. Curtain could be sewn so as to form pyramidal or conical general shape. 4. Curtain flexible enough to allow camera to be moved around to exact position and angle desired. If looking through camera lens, no window in curtain will be needed, just a hole to poke the camera through. 5. Camera may need lights for the visible pictures. Pro s: 1. Simpler than panel 2. More flexible in positioning camera 3. No IR window needed 4. Not very expensive Con s: 1. Not sure welding curtain type cloth will be acceptable. (flash protection suit material should be acceptable) 2. May be unwieldy to move camera surrounded by thick curtain 28

29 Initial Trade Study Solution Concepts Temp Sensor w/rfid Interrogation Temp Sensor w/rfid Interrogation 1. Researched commercially available: see below, - Temp Sensor w/rfid Interrogation 2. Use a contact temperature sensor with RFID-like (wireless) interrogation. Pro s: 1. No change to existing panels 2. No camera required to inspect documentation with auto logging of sensor serial #/location 3. Gather data when convenient. Panels operated normally no open panels, no personnel safety issues. 4. Geometry independent camera same angles as with present inspection Con s 1. Requires additional steps to add and remove sensors and create database of sensor locations 2. Unknowns/Issues: 3. EMI interference with panel closed when trying to read? Unlikely but Need more research 4. Cost? 5. Perhaps make a permanent installation? 6. Variation: has a product called Delta T Alert, which is a wireless device you put on the door and it monitors temperature inside the cabinet vs. outside, and logs data at regular intervals. Can set up a network of these. Only measures entire cabinet temperature, but one testimonial credited it with alerting him to a phase unbalance in one of his cabinets. Perhaps part of the long term solution. 29

30 Initial Trade Study Solution Concepts Remote Operated Camera Gantry System Standalone Gantry with PTU 1. Build a man-high frame with a motorized X-Y gantry on it. On the gantry, mount the camera on a PTU. 2. Shut down the switchgear, remove the panels, set up the frame where a person would stand to do the inspection. 3. Gantry and PTU permit the camera to be placed anywhere a person would place it. Control everything remotely. 4. When inspection finished, shut down power remotely, replace panels and move on. Pro s: 1. Can get all of the viewing angles that are currently available. 2. Probably simplest to implement (X-Y and PTU do not need to be of any great precision) 3. Costs are low, depending on the camera Con: 1. Need a camera that can be operated remotely 2. Probably will be wired, so will need to see what safety issues there are running cables out of the room. 3. Bulkiest of the potential solutions. 4. Requires people to be out of room, so would be difficult to implement while underway. Subset (Gantry with PTU inside panel box) 1. Reproduce the XY gantry with PTU in a box that hangs on the switchgear in place of the regular front panel. Shut down panel, remove front, replace with this box, re-energize and do inspection. Pro: 1. Panel is closed so inspection can be done with people in room and done at any time. 2. Fairly low cost XY gantry and PTU do not need to be of great precision Con s: 1. Of necessity will have camera fairly close to panel. FOV and focus might be problematic that close Camera might be bulky 2. Difficult if panels are significantly different in size 3. Projection from panel might be an issue. 4. Need remotely operated camera 30

31 Initial Trade Study Solution Concepts Temperature Sensitive Paint Temperature Sensitive Paint There are paints that change color depending on their temperature (thermochromic). There are both irreversible (which stay at the color they changed to at their highest temperature) and reversible (which change back to their original color when the temperature returns). In the case of irreversible, it is often a change in density of the same color, so the color darkens. They could be incorporated in the following manner: Subset (Irreversible Thermochromic Paint) The paint can be applied on assembly or prior to inspection to the potential hotspots (terminals on cables, studs on panels). If desirable not to introduce paint to the components, pads can be constructed with the thermochromic paint on the top and an adhesive backing. Prior to inspection, these pads can be applied to the potential hotspots. After the panel is powered up, then shut down, the cabinet doors are opened and the colors on the pads examined. Those that were hotter will have darker or different color than their neighbors in the same circuit. Comparison color charts can be made up that can be held against the pad in the panel to judge a maximum temperature reached. Photos can be taken with visible light color camera. Pro s: 1. No change to existing panels 2. No camera required to inspect documentation with a visible camera only 3. Panels operated normally no open panels, no personnel safety issues. 4. Geometry independent camera same angles as with present inspection Con: 1. Will change color only when absolute temperature exceeds threshold. A bad connection may not indicate at less than full current (lower temp). 2. Requires additional steps to add and remove pads 3. Temperature sensitivity may not have fine enough resolution to tell difference between a few C. (ACTION) Need more research. 4. Need to have the pads made up. 5. If paint applied directly, then would need to pass approval to be permanently installed inside the cabinet. Also, would need to be stripped off and reapplied for each retest. 6. Requires shutdown of panel both before (to install the pads) and after (to read the results) Subset (Reversible Thermochromic Paint) The paint can be applied on assembly or prior to inspection to the potential hotspots, either directly, or via the pads described above. Panel replaced with temporary panel containing visible transmission windows. Inspection done while panel energized and color change is noted by comparing color of different phases of the same circuit. Done with visible camera for inspection or just documentation. Pro s: 1. No camera required to inspect documentation with a visible camera only 2. Much more flexibility in obtaining appropriate visible windows than IR windows. 3. Transmission much higher through visible windows (closer to 100 %). 4. Less geometry dependent visible windows can be larger to cover more angles than IR Con s: 1. Will change color only when absolute temperature exceeds threshold. A bad connection may not indicate at less than full current (lower temp). 2. Requires additional steps to add and remove pads 3. Temperature sensitivity may not have fine enough resolution to tell difference between a few C. Need more research. 4. Requires temporary shutdown of panel while temporary panel installed or removed. May not be able to open panel quickly enough to catch change 31

32 Initial Trade Study Solution Concepts Other Ideas Considered but Not Explored in Initial Trade Study Flexible Camera Head Through Louvers (borescope) 1. IR camera with imaging head on gooseneck, probably (non-conductive) fiber optic. 2. Insert camera head through louvers in existing panel while switchpanel is energized. 3. Move camera head around via gooseneck, or attached to insulating rod or other manipulating device. 4. Move to different louvers to get best view. Pro s: 1. No change in existing panels 2. No requirement to shut panels off while equipment is installed or removed. 3. Test can be done at any time, including while ship is underway Con s: 1. Highly geometry dependent. Doubtful that all relevant views can be obtained through louvers. Unclear if required manipulation can be done through louvers. 2. Requires penetration of plane of panel Potential safety issue, even if camera head is isolated Embedded Camera Ports (Subset to Temporary Panel/Curtain) 1. Instead of IR windows, have subpanels with camera ports, probably conical to the outside of the panel. 2. Camera goes at peak of cone, but has ability to be angled in pan and tilt. Inside of cone has mechanical shutter. 3. Panel is installed in place of regular panel. All shutters are closed. 4. Camera is installed in one port, and then shutter is opened. 5. Camera angled for best view and test performed. Shutter closed and camera moved to next port. Pro s: 1. Less expensive than multiple IR windows Con s: 1. May not get all the angles needed with camera fixed at end of cone 2. Possible mechanical challenge to allow PT at port while still protecting from HV discharge within 32

Safer Inspection of Medium Voltage Electrical Panels on Navy Ships

Safer Inspection of Medium Voltage Electrical Panels on Navy Ships DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. 1 FY15 NSRP ETP Panel Project Safer Inspection of Medium Voltage Electrical Panels on Navy Ships NSRP ETP Panel Meeting

More information

DISTRIBUTION STATEMENT

DISTRIBUTION STATEMENT NSRP National Shipbuilding Research Program Distributed Temperature Sensing for Inspection of Electrical Panels on Navy Ships Jeff Callen Penn State Electro-Optics Center March 7-9, 2017 Charleston, SC

More information

DISTRIBUTION STATEMENT

DISTRIBUTION STATEMENT NSRP National Shipbuilding Research Program Distributed Temperature Sensing for Inspection of Electrical Panels on Navy Ships Jeff Callen Penn State Electro-Optics Center June 20-21, 2017 Portland, ME

More information

DISTRIBUTION STATEMENT

DISTRIBUTION STATEMENT NSRP National Shipbuilding Research Program Distributed Temperature Sensing for Inspection of Electrical Panels on Navy Ships Jeff Callen Penn State Electro-Optics Center November 7-8, 2017 San Diego,

More information

A Powerful Case for Infrared Windows

A Powerful Case for Infrared Windows ROI A Powerful Case for Infrared Windows By Martin Robinson, CMRP Level III Thermographer CEO, IRISS, Inc. Overview: A regional Facility had been tasked by their insurance carrier to perform regular preventive

More information

Case Study. A Geothermal Energy Generation Facility Embraces Infrared. Polymer Window Inspections. Overview: iriss.com

Case Study. A Geothermal Energy Generation Facility Embraces Infrared. Polymer Window Inspections. Overview: iriss.com A Geothermal Energy Generation Facility Embraces Infrared Polymer Window Inspections By Dominique Capili, Spectrum Scientific Corporation (An IRISS Distributor) Overview: A prominent geothermal energy

More information

NSRP ETP Project Enhanced Fiber Optic Testing for Cost Reduction

NSRP ETP Project Enhanced Fiber Optic Testing for Cost Reduction NSRP ETP Project Enhanced Fiber Optic Testing for Cost Reduction Presented 12/10/2015 San Diego, CA Dan Morris, Vice President Dave Norman, EXFO Project Scope This project will investigate the potential

More information

Reducing Arc Flash Risks with Electrical Maintenance Safety Devices - Part 2

Reducing Arc Flash Risks with Electrical Maintenance Safety Devices - Part 2 Reducing Arc Flash Risks with Electrical Maintenance Safety Devices - Part 2 By: Martin Robinson, CEO of IRISS Group and Level III Thermographer Abstract Every year thousands electrical workers are injured

More information

Case Study. Custom Solutions for High Arc Flash Incident Energy and. Interlocked Electrical Enclosures. Overview: iriss.com

Case Study. Custom Solutions for High Arc Flash Incident Energy and. Interlocked Electrical Enclosures. Overview: iriss.com Custom Solutions for High Arc Flash Incident Energy and Interlocked Electrical Enclosures By Mark Bowling, Level II Thermographer, IRISS Inc. & Rick Miner, Level III Thermographer, Thermal Techniques Overview:

More information

IEEE Std IEEE Recommended Practice for Electrical Installations on Shipboard Safety Considerations

IEEE Std IEEE Recommended Practice for Electrical Installations on Shipboard Safety Considerations IEEE Std 45.5-2014 IEEE Recommended Practice for Electrical Installations on Shipboard Safety Considerations Presented by Dennis K. Neitzel, CPE, CESCP Director Emeritus Keeping People Safe from Electrical

More information

CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA

CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA Agenda Date: December 16, 2013 Action Required: Adoption of Resolution Presenter: Staff Contacts: Title: James E. Tolbert, AICP, Director of NDS James

More information

4/8/2015 Item #10D Page 1

4/8/2015 Item #10D Page 1 MEETING DATE: April 8, 2015 PREPARED BY: Christy Villa, Associate Civil Engineer DEPT. DIRECTOR: Glenn Pruim DEPARTMENT: Public Works CITY MANAGER: Larry Watt SUBJECT: NORTH COAST HIGHWAY 101 STREETSCAPE

More information

A Cost Effective Multi-Spectral Scanner for Natural Gas Detection

A Cost Effective Multi-Spectral Scanner for Natural Gas Detection A Cost Effective Multi-Spectral Scanner for Natural Gas Detection Semi-Annual Progress Report No. 1 Reporting Period Start Date: October 1, 2003 Reporting Period End Date: March 31, 2004 Principal Authors:

More information

NFPA 70E Elevates Safety. with Heightened Risk Awareness

NFPA 70E Elevates Safety. with Heightened Risk Awareness NFPA 70E 2015 Elevates Safety with Heightened Risk Awareness Next Page NFPA 70E 2015 Elevates Safety with Heightened Risk Awareness: Significant Changes Since 2012 Compel Updated Electrical Safety Training

More information

Medical devices and electromagnetic compatibility. Addressing the requirements of IEC , 4 th Edition

Medical devices and electromagnetic compatibility. Addressing the requirements of IEC , 4 th Edition Medical devices and electromagnetic compatibility Addressing the requirements of IEC 60601-1-2, 4 th Edition Executive Summary Risk of electromagnetic interference and immunity have long been important

More information

White Paper. Maintenance Inspection Windows on Transformers. Maintenance Inspection Windows on Transformers. Abstract: iriss.com

White Paper. Maintenance Inspection Windows on Transformers. Maintenance Inspection Windows on Transformers. Abstract: iriss.com Maintenance Inspection Windows on Transformers By Rudy Wodrich, P.Eng., MBA, CRL, VP Engineering Services, IRISS Inc. Abstract: Everyone knows that Thomas Alva Edison invented the lightbulb but who invented

More information

BUSINESS PLAN CEN/TC 121 WELDING AND ALLIED PROCESSES EXECUTIVE SUMMARY

BUSINESS PLAN CEN/TC 121 WELDING AND ALLIED PROCESSES EXECUTIVE SUMMARY Page: 1 BUSINESS PLAN CEN/TC 121 WELDING AND ALLIED PROCESSES EXECUTIVE SUMMARY Business Environment Standardization of welding by all processes, as well as allied processes; these standards include terminology,

More information

Electrical Safety Compliance: NFPA 70E

Electrical Safety Compliance: NFPA 70E Electrical Safety Compliance: NFPA 70E From Graybar and Schneider Electric Risks associated with shock and electrocution from inadvertent contact with energized parts have long been recognized as a threat

More information

NATIONAL ELECTRICAL CODE (NEC) & NFPA 70E ARC FLASH ELECTRICAL SAFETY

NATIONAL ELECTRICAL CODE (NEC) & NFPA 70E ARC FLASH ELECTRICAL SAFETY A new twist on the National Electrical Code - a practical application workshop. If you sign up in this class, prepare to work! Day 1: Fundamentals of OSHA requirements for performing electrical work -

More information

White Paper. NFPA 70E 2018 Edition Changes and Implications for. Personnel Performing Condition Based Maintenance. Abstract: iriss.

White Paper. NFPA 70E 2018 Edition Changes and Implications for. Personnel Performing Condition Based Maintenance. Abstract: iriss. NFPA 70E 2018 Edition Changes and Implications for Personnel Performing Condition Based Maintenance By Rudy Wodrich, P.Eng., MBA, CRL, L1 Thermographer, VP Engineering Services, IRISS Inc. Abstract: The

More information

White Paper. Reducing Arc Flash Risks with Electrical Maintenance. Safety Devices. Abstract: iriss.com

White Paper. Reducing Arc Flash Risks with Electrical Maintenance. Safety Devices. Abstract: iriss.com Reducing Arc Flash Risks with Electrical Maintenance By Martin Robinson, CMRP Level III Thermographer President, IRISS Inc. Abstract: Electrical accidents, such as arc flashes, happen daily; however, there

More information

Electrical Hazards and NFPA-70E: Protecting Your Employees

Electrical Hazards and NFPA-70E: Protecting Your Employees Electrical Hazards and NFPA-70E: Protecting Your Employees Presented By Mark B. Haskins, MS, CSP Practical Safety Solutions, LLC At the CBIA Safety Health and Wellness Conference May 22, 2014 PRESENTATION

More information

NFPA 70E Edition Update

NFPA 70E Edition Update NFPA 70E- 2018 Edition Update Paul Colangelo- STSC, CHST, CET, CRIS National Director of Compliance Programs ClickSafety 1 ASSE Construction Practice Specialty Quarterly Meeting 11/17/2017 Agenda Overview

More information

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF NOVEMBER 15, 2016

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF NOVEMBER 15, 2016 Item 11, Report No. 38, of the Committee of the Whole, which was adopted without amendment by the Council of the City of Vaughan on November 15, 2016. Regional Councillor Di Biase declared an interest

More information

VILLAGE OF BOLTON HERITAGE CONSERVATION DISTRICT PLAN

VILLAGE OF BOLTON HERITAGE CONSERVATION DISTRICT PLAN Page 1 1. INTRODUCTION AND BACKGROUND 1.1 THE PROJECT VILLAGE OF BOLTON HERITAGE CONSERVATION DISTRICT PLAN TERMS OF REFERENCE The Town of Caledon (Town) is a large, predominantly rural municipality with

More information

c. DTAH Toronto Complete Streets Guidelines

c. DTAH Toronto Complete Streets Guidelines c. DTAH Toronto Complete Streets Guidelines 164 166 C.1 Project Delivery Process 168 C.5 This section provides a summary of the overarching process for delivering street projects in Toronto. The conclusion

More information

WELCOME TO THE CHOUTEAU GREENWAY EQUITY WORKING GROUP!

WELCOME TO THE CHOUTEAU GREENWAY EQUITY WORKING GROUP! WELCOME TO THE CHOUTEAU GREENWAY EQUITY WORKING GROUP! Chouteau Greenway Steering Committee and Working Groups Overview Overview January 9, 2019 Chouteau Greenway will transform St. Louis by connecting

More information

SEL Arc-Flash Solutions

SEL Arc-Flash Solutions SEL Arc-Flash Solutions Arc-Flash Protection at the Speed of Light Protect personnel and equipment Detect arc-flash events and send a trip signal in as little as 2 ms to enhance safety and minimize equipment

More information

HESNI ANNUAL CONFERENCE May 3, 2012 Aramark Conference Center, Downers Grove

HESNI ANNUAL CONFERENCE May 3, 2012 Aramark Conference Center, Downers Grove HESNI ANNUAL CONFERENCE May 3, 2012 Aramark Conference Center, Downers Grove Jim Dungar, P.E. Principal Engineer Schneider Electric Engineering Services Jim.dungar@schneider-electric.com (920-766-8012)

More information

SECTION SECURITY TESTING AND COMMISSIONING

SECTION SECURITY TESTING AND COMMISSIONING SECTION 280800 - SECURITY TESTING AND COMMISSIONING PART 1 - GENERAL 1.1 WORK INCLUDES A. General Description: This specification section covers the provision of preliminary testing, acceptance testing,

More information

NFEC FIRE SAFETY SEMINAR Krish Mysore

NFEC FIRE SAFETY SEMINAR Krish Mysore NFEC FIRE SAFETY SEMINAR 2018 Krish Mysore krish.mysore@schneider-electric.com Agenda 1 Electrical Fire Stats 2 Types of Electrical Fires 3 Electrical Risk Management 4 Electrical Health Check Assessment

More information

Infrared Business Tips & Insight

Infrared Business Tips & Insight Infrared Business Tips & Insight 2010 Infrared Training Center. All rights reserved. Intended for use by Infrared Training Center customers and prospects only Infrared Business Tips & Insight Presenter:

More information

Update and Overview on the NFPA Requirements and Testing for Electronic Safety Equipment

Update and Overview on the NFPA Requirements and Testing for Electronic Safety Equipment Update and Overview on the NFPA Requirements and Testing for Electronic Safety Equipment Bruce H. Varner. Chair NFPA Technical Committee on Electronic Safety Equipment Fire Chief (Retired) Santa Rosa,

More information

INFRARED WINDOW SERIES

INFRARED WINDOW SERIES XDV SERIES IR & VISUAL INSPECTION WINDOW INFRARED WINDOW SERIES TURTLE TOUGH IR WINDOWS RANGE offers you a more EFFICIENT & SAFE PROCESS to perform visual & INFRARED INSPECTIONS Our products: LARGE-FORMAT

More information

US Navy Leading the Way in Switchboard Protection

US Navy Leading the Way in Switchboard Protection US Navy Leading the Way in Switchboard Protection Rick Kurek Naval Sea Systems Command (NAVSEA) 2341 Jefferson Davis Highway Arlington, VA 22202 Ph: 202-781-1274 rick.kurek@navy.mil Abstract According

More information

Are Electrical Switchgear Surveys Still the Low-Hanging Fruit of Infrared Thermography?

Are Electrical Switchgear Surveys Still the Low-Hanging Fruit of Infrared Thermography? Are Electrical Switchgear Surveys Still the Low-Hanging Fruit of Infrared Thermography? Gregory R. Stockton, President Stockton Infrared Thermographic Services, Inc. & United Infrared, Inc. 8472 Adams

More information

Western Pennsylvania Conservancy Clairton & Harrison Community Greening Assessment Projects Request for Proposals July 2018

Western Pennsylvania Conservancy Clairton & Harrison Community Greening Assessment Projects Request for Proposals July 2018 Western Pennsylvania Conservancy Clairton & Harrison Community Greening Assessment Projects Request for Proposals July 2018 Proposal Information The Western Pennsylvania Conservancy (WPC) is seeking proposals

More information

NEW ENERGY IN THE BATTERY INFRASTRUCTURE

NEW ENERGY IN THE BATTERY INFRASTRUCTURE NEW ENERGY IN THE BATTERY INFRASTRUCTURE Maurice H. Johnson Business Development Engineer UL LLC Northbrook, IL Paper Overview Over the past several years, there has been a significant effort to address

More information

SEL Arc-Flash Solutions

SEL Arc-Flash Solutions SEL Arc-Flash Solutions Arc-Flash Protection at the Speed of Light Protect personnel and equipment. Detect arc-flash events and send a trip signal in as little as 2 ms to enhance safety and minimize equipment

More information

Guide to Compliance with the Electrical Workplace Safety Standards in the United States

Guide to Compliance with the Electrical Workplace Safety Standards in the United States Guide to Compliance with the Electrical Workplace Safety Standards in the United States July 2011/1910DB1102 by Joseph H. Weigel, Product Manager Schneider Electric USA, Inc. Make the most of your energy

More information

~!VAUGHAN NOV Z November 21, Mr. Denis Kelly, Regional Clerk The Regional Municipality of York Yonge Street Newmarket, ON L3Y 6Z1

~!VAUGHAN NOV Z November 21, Mr. Denis Kelly, Regional Clerk The Regional Municipality of York Yonge Street Newmarket, ON L3Y 6Z1 ~!VAUGHAN NOV Z 5 2016 November 21, 2016 Mr. Denis Kelly, Regional Clerk The Regional Municipality of York 17250 Yonge Street Newmarket, ON L3Y 6Z1 Dear Mr. Kelly: RE: NEW KIRBY GO STATION IN BLOCK 27

More information

Totally Wireless Video Security

Totally Wireless Video Security Totally Wireless Video Security Traditional Video Surveillance ($50,000+) vs. Event-Based Videofied Solution ($2,500) Executive Summary: Totally Wireless Video Security has been effective but cost and

More information

Slot Home Task Force Meeting #5 Phase 2 June 8, 2017

Slot Home Task Force Meeting #5 Phase 2 June 8, 2017 Slot Home Task Force Meeting #5 Phase 2 June 8, 2017 MEETING OBJECTIVES Review Staff Recommended Strategy for Mixed Use and Main Street districts Confirm the Strategy for the Mixed Use and Main Street

More information

NECA S System Approach to Electrical Safety for NFPA 70E

NECA S System Approach to Electrical Safety for NFPA 70E NECA S System Approach to Electrical Safety for NFPA 70E NECA s Systems Approach to NFPA 70E Easy to understand NFPA 70E employer requirements, Provides Supervisors with key on the job information, De

More information

Fire Sprinklers Working Group Final Report

Fire Sprinklers Working Group Final Report Introduction The Building Act received Royal Assent on March 25, 2015. The Act aims to establish more consistent building requirements across British Columbia and create a more robust and modern building

More information

SUBJECT: Waterfront Hotel Planning Study Update TO: Planning and Development Committee FROM: Department of City Building. Recommendation: Purpose:

SUBJECT: Waterfront Hotel Planning Study Update TO: Planning and Development Committee FROM: Department of City Building. Recommendation: Purpose: Page 1 of Report PB-23-18 SUBJECT: Waterfront Hotel Planning Study Update TO: Planning and Development Committee FROM: Department of City Building Report Number: PB-23-18 Wards Affected: 2 File Numbers:

More information

Surface Acoustic Wave Technology based Temperature Monitoring of High Voltage and High Current Switchgear Boxes

Surface Acoustic Wave Technology based Temperature Monitoring of High Voltage and High Current Switchgear Boxes Surface Acoustic Wave Technology based Temperature Monitoring of High Voltage and High Current Switchgear Boxes Summary Safety is a big concern when it comes to managing power distribution systems. High

More information

Architectural and Engineering Specification for a. Flash / Flare

Architectural and Engineering Specification for a. Flash / Flare Architectural and Engineering Specification for a Flash / Flare June 27, 2014 Page 1 of 12 T1DA0115-001 Rev D This document is intended to provide performance specifications and operational requirements

More information

Scope of Work Urban Design Review Framework Monitoring Program Item #7.1

Scope of Work Urban Design Review Framework Monitoring Program Item #7.1 1.0 Background The Urban Design Review Framework (Framework) project (PUD2017-0601) explored design review protocols and processes, and proposed revisions to achieve better built outcomes. In 2017 July,

More information

General Safety Training

General Safety Training Environmental Health and Safety General Safety Training Revised February 3, 2017 Outline Purpose Chancellor's Policy Statement Safety Responsibilities General Safety Rules Hazard Communication Reducing

More information

Measuring Couch Motion Accuracy with X-ray Beam Fluence

Measuring Couch Motion Accuracy with X-ray Beam Fluence Measuring Couch Motion Accuracy with X-ray Beam Fluence Rudi Labarbe, M.S. and Brett Nelson, M.S. IBA Particle Therapy, Belgium and Logos Systems, Scotts Valley, CA Introduction The accuracy of radiosurgery

More information

Rt 29 Solutions Hydraulic Planning Advisory Panel. September 14, 2017

Rt 29 Solutions Hydraulic Planning Advisory Panel. September 14, 2017 Hydraulic Planning Advisory Panel September 14, 2017 Agenda Item 1: Introductions Hydraulic Planning Advisory Panel members Technical Team members 2 Agenda item 2: Public Interaction and Feedback Live

More information

Threat Warning System

Threat Warning System Threat Warning System Objective Install an effective system to provide security monitoring and detection for borders, pipelines and critical infrastructure. The system must be: Proven Robust State of the

More information

NECA S System Approach to Electrical Safety for NFPA 70E

NECA S System Approach to Electrical Safety for NFPA 70E NECA S System Approach to Electrical Safety for NFPA 70E NECA s Systems Approach to NFPA 70E Easy to understand NFPA 70E employer requirements, Provides Supervisors with key on the job information, De-energize

More information

Rutgers Environmental Health and Safety (REHS)

Rutgers Environmental Health and Safety (REHS) Rutgers Environmental Health and Safety (REHS) Program Name: Laboratory Laser Safety Program Responsible Executive: Executive Director of REHS Adopted: February 20, 2001 Reviewed/Revised: July 10, 2018

More information

How SWIR Imaging contributes to the optimization of automatic quality control in the food industry

How SWIR Imaging contributes to the optimization of automatic quality control in the food industry How SWIR Imaging contributes to the optimization of automatic quality control in the food industry 2013 Overview Xenics in Short New Architecture Products Line Overview Visionlink Infrared Seminar 2013

More information

Standoff CWA/TIC Detection. Innovation with Integrity. Toxic Gas/Vapour Threat Mitigation RAPIDplus CBRNE

Standoff CWA/TIC Detection. Innovation with Integrity. Toxic Gas/Vapour Threat Mitigation RAPIDplus CBRNE Standoff CWA/TIC Detection Toxic Gas/Vapour Threat Mitigation RAPIDplus Innovation with Integrity CBRNE Choose Innovation Choose Bruker Toxic Gas Threat Mitigation: RAPIDplus Bruker is recognised as the

More information

Architectural and Engineering Specification for a Real-Time Locating System Flare

Architectural and Engineering Specification for a Real-Time Locating System Flare Architectural and Engineering Specification for a Flare AE-T1-IN-R3-E-0617 Page 1 of 14 This document is intended to provide performance specifications and operational requirements for the Flare. It is

More information

New requirements for IEC best practice compliance

New requirements for IEC best practice compliance New requirements for IEC 61511 best practice compliance Proof testing and a SIL study may no longer be enough by Sven Grone Schneider Electric Safety Services Practice Leader Executive summary Since its

More information

Fluke IR Windows Easier NFPA 70E compliance without compromising on product performance.

Fluke IR Windows Easier NFPA 70E compliance without compromising on product performance. ndustr Proce Fluke IR Windows Easier NFPA 70E compliance without compromising on product performance. Electric Why open enclosures and expose yourself to arc flash hazards when you don t have to? Infrared

More information

Pilz Safety Lockout System (PSLS)

Pilz Safety Lockout System (PSLS) Pilz Safety Lockout System (PSLS) An alternative isolation method for LOTO By Doug Sten, Safety Consultant, Pilz Automation Safety Objectives Challenges with manual, mechanical isolation disconnects Challenges

More information

SMT Quick-Tips: selecting a reflow oven. Robert Voigt, DDM Novastar

SMT Quick-Tips: selecting a reflow oven. Robert Voigt, DDM Novastar SMT Quick-Tips: selecting a reflow oven Robert Voigt, DDM Novastar Selecting A Reflow Oven There are several different reflow methods to liquefy solder in a controlled way and not all of them can literally

More information

CONSULTING SERVICES FOR THE WHITEBELT VISIONING EXERCISE ADDENDUM TO THE GTA WEST LAND USE STUDY WORK PROGRAM

CONSULTING SERVICES FOR THE WHITEBELT VISIONING EXERCISE ADDENDUM TO THE GTA WEST LAND USE STUDY WORK PROGRAM CONSULTING SERVICES FOR THE WHITEBELT VISIONING EXERCISE ADDENDUM TO THE GTA WEST LAND USE STUDY 1. Introduction WORK PROGRAM The Town of Caledon is a large, local municipality located in the Greater Toronto

More information

Implementing an Energized Electrical Work Program. SESHA Hill Country Chapter. Brett Jay Davis, PE Zephyr Environmental Corporation

Implementing an Energized Electrical Work Program. SESHA Hill Country Chapter. Brett Jay Davis, PE Zephyr Environmental Corporation Implementing an Energized Electrical Work Program SESHA Hill Country Chapter May 22, 2009 Brett Jay Davis, PE Zephyr Environmental Corporation bdavis@zephyrenv.com, 512 879-6628 Presentation Outline 1.

More information

Fluke IR Windows Easier NFPA 70E compliance without compromising on product performance. Fluke-Direct.com

Fluke IR Windows Easier NFPA 70E compliance without compromising on product performance. Fluke-Direct.com ndustr Proce Fluke IR Windows Easier NFPA 70E compliance without compromising on product performance. Electric Outdoor/indoor any voltage, arc-tested Indoor medium voltage Indoor low voltage info@ Available

More information

Rework: IR Technology vs. Convection Air

Rework: IR Technology vs. Convection Air 3651 WALNUT AVENUE, CHINO CA 91710 PHONE (909) 627-2453 APR-Rework.com Rework: IR Technology vs. Convection Air Infrared Radiation (IR) Competitor technology varies, but generally IR Technology refers

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 21 0800 - COMMISSIONING OF FIRE SUPPRESSION SYSTEMS GENERAL 1.1 SUMMARY General 1. Work under this contract shall meet the requirements of Division 01, General Requirements, Conditions of Contract,

More information

1.1. SYSTEM MODELING

1.1. SYSTEM MODELING 1 INTRODUCTION Electro-optical imaging system analysis is a mathematical construct that provides an optimum design through appropriate trade studies. A comprehensive model includes the target, background,

More information

UNICEF SD Technical basis for UNICEF procurement. Immunization refrigerators industry consultation October, 2016 Copenhagen

UNICEF SD Technical basis for UNICEF procurement. Immunization refrigerators industry consultation October, 2016 Copenhagen UNICEF SD Technical basis for UNICEF procurement Immunization refrigerators industry consultation 27 28 October, 2016 Copenhagen OUTLINE Specifications and TPPs Current Vs previous PQS specifications Vs

More information

A. Product Data: Include rated capacities, furnished specialties and accessories.

A. Product Data: Include rated capacities, furnished specialties and accessories. BASE BID: SECTION 15542 FUEL-FIRED RADIANT HEATERS PART 1 - GENERAL 1.1 SUMMARY A. Furnish and install a Co-Ray-Vac Low Intensity Vented Infrared Radiant Vacuum Gas Heating System. System must be certified

More information

Monitoring of Electrical Equipment Failure Indicators and Alarming

Monitoring of Electrical Equipment Failure Indicators and Alarming Past, Present and Future Maintenance Practices: Monitoring of Electrical Equipment Failure Indicators and Alarming Author: Gabe Paoletti, P.E. Eaton Corporation Senior Member, IEEE gabrieljpaoletti@eaton.com

More information

A New Plan For The Calgary Region June calgary.ca call 3-1-1

A New Plan For The Calgary Region June calgary.ca call 3-1-1 A New Plan For The Calgary Region June 2009 calgary.ca call 3-1-1 Introduction Since January 2006, The City of Calgary has been actively participating with the member municipalities of the Calgary Regional

More information

General Safety Training

General Safety Training General Safety Training May 20, 2015 Outline Purpose Chancellor s Policy Statement Safety Responsibilities General Safety Rules Hazard Communication Reducing Hazard Exposure Fires and Fire Extinguishers

More information

NFPA 70B and the Importance of Electrical Predictive Maintenance

NFPA 70B and the Importance of Electrical Predictive Maintenance NFPA 70B and the Importance of Electrical Predictive Maintenance PRESENTED BY Bhanu Srilla Director of Product Marke0ng Grace Engineered Products, Inc. Learning Objectives 1. Review NFPA 70B Maintenance

More information

Certification of Thermographers

Certification of Thermographers CFPA-E No 3:2011 F Certification of Thermographers CFPA-E -GUIDELINES FOREWORD The European fire protection associations have decided to produce common guidelines in order to achieve similar interpretation

More information

CAN/ULC-S1001, INTEGRATED SYSTEMS TEST OF FIRE PROTECTION AND LIFE SAFETY SYSTEMS

CAN/ULC-S1001, INTEGRATED SYSTEMS TEST OF FIRE PROTECTION AND LIFE SAFETY SYSTEMS RANDAL BROWN & ASSOCIATES ENGINEERING LTD. CONSULTING ENGINEERS LIFE SAFETY & FIRE PROTECTION 105 6 LANSING SQUARE TORONTO, ONTARIO CAN/ULC-S1001, INTEGRATED SYSTEMS TEST OF FIRE PROTECTION AND LIFE SAFETY

More information

300C High Temperature Flexible Heaters. Written by: Dave Becker, All Flex

300C High Temperature Flexible Heaters. Written by: Dave Becker, All Flex 300C High Temperature Flexible Heaters Written by: Dave Becker, All Flex Flexible polyimide heaters are adopted in medical instrumentation products to precisely test tissue and blood samples. Aerospace

More information

DRAFT NFPA 805 TRANSITION PILOT PLANT OBSERVATION GUIDANCE

DRAFT NFPA 805 TRANSITION PILOT PLANT OBSERVATION GUIDANCE Revision D January 14, 2005 DRAFT NFPA 805 TRANSITION PILOT PLANT OBSERVATION GUIDANCE I. INTRODUCTION The Commission s requirements for fire protection of nuclear power plants allow licensees to voluntarily

More information

Fluorescence is the conversion of one frequency of electromagnetic radiation to another frequency by a material

Fluorescence is the conversion of one frequency of electromagnetic radiation to another frequency by a material Fluorescent Lighting Developed around turn of century Commercially available in 1938 by GE Presented at 1939 Worlds Fair Made efficient lighting possible during WWII in factories and warehouses Fluorescence

More information

Predictive Maintenance Training

Predictive Maintenance Training Predictive Maintenance Training Contact us Today for a FREE quotation to deliver this course at your company?s location. https://www.electricityforum.com/onsite-training-rfq This predictive maintenance

More information

BUSINESS PLAN CEN/TC 250 STRUCTURAL EUROCODES EXECUTIVE SUMMARY

BUSINESS PLAN CEN/TC 250 STRUCTURAL EUROCODES EXECUTIVE SUMMARY Page: 1 BUSINESS PLAN CEN/TC 250 STRUCTURAL EUROCODES EXECUTIVE SUMMARY Scope CEN/TC 250 covers the standardization of structural and geotechnical design rules for building and civil engineering works

More information

Changes to NFPA 70E. - The Role of PdM &Safe PdM Work Practices. Tim Rohrer Exiscan LLC

Changes to NFPA 70E. - The Role of PdM &Safe PdM Work Practices. Tim Rohrer Exiscan LLC Changes to NFPA 70E - The Role of PdM &Safe PdM Work Practices Tim Rohrer Exiscan LLC Tim@Exiscan.com 585-705-7775 Joe Gierlach ABM Joseph.Gierlach@ABM.com 412-394-4678 Preview Electrical Safety Risk Management

More information

T22 - Arc Flash Hazards and Arc Resistant Equipment- Understanding the Standards

T22 - Arc Flash Hazards and Arc Resistant Equipment- Understanding the Standards T22 - Arc Flash Hazards and Arc Resistant Equipment- Understanding the Standards v2-5058-co900h Copyright 2016 Rockwell Automation, Inc. All Rights Reserved. 1 Agenda 1. Background 2. Related Electrical

More information

6/23/ National Electrical Contractors Association and Intec, Inc.

6/23/ National Electrical Contractors Association and Intec, Inc. 2012 National Electrical Contractors Association and Intec, Inc. 1 Palmer Hickman Director of Codes and Standards electrical training ALLIANCE Jim Dollard Safety IBEW 98 Objectives Explain why work should

More information

Questions for Carlsbad City Council Members and Candidates (July 1, 2016)

Questions for Carlsbad City Council Members and Candidates (July 1, 2016) Ponto is Carlsbad s Southern Coastal Gateway Questions for Carlsbad City Council Members and Candidates (July 1, 2016) 1. Are you aware of the 3 proposed developments in Ponto? What are your most important

More information

Electrical Safety Requirements

Electrical Safety Requirements Electrical Safety Requirements Purpose This document defines the minimum required control measures to reduce the risk of injury or illness related to electricity. Scope Applicable to all Coca-Cola system

More information

Thermography Report. For: (Client) at: (location)

Thermography Report. For: (Client) at: (location) Thermography Report A SAMPLE INFRARED REPORT INFRARED BUILDING EVALUATION For: (Client) at: (location) Thermography date: 01-01-2013 Thermographer: Dave Sawyer, ITC Level III TIR Outdoor temperature: (Temp)

More information

Miami Valley Regional Planning Commission Regional Land Use Planning

Miami Valley Regional Planning Commission Regional Land Use Planning Miami Valley Regional Planning Commission Regional Land Use Planning This document provides an overall approach on the region-based land use planning process, outlining the major tasks and work elements

More information

How to reduce exposure to arc flash hazards

How to reduce exposure to arc flash hazards GE Electrical Distribution How to reduce exposure to arc flash hazards Multiple solutions for new and existing facilities imagination at work Multiple Issues Today s power system engineer must not only

More information

Developing UV LED Curing Processes for Converting Applications

Developing UV LED Curing Processes for Converting Applications Developing UV LED Curing Processes for Converting Applications Here are the most common questions we get from process development and design engineers familiar with traditional UV curing technology who

More information

3M Personal Safety Division. Standards Update. NFPA 1981/1982, 2018 Edition. March 30, 2018

3M Personal Safety Division. Standards Update. NFPA 1981/1982, 2018 Edition. March 30, 2018 3M Personal Safety Division Standards Update NFPA 1981/1982, 2018 Edition March 30, 2018 Standards Update NFPA 1981/1982, 2018 Edition The purpose of this presentation is to provide an update on the status

More information

Planning Commission Report

Planning Commission Report Planning Commission Report To: From: Subject: Planning Commission Meeting: January 6, 2016 Agenda Item: 8-B Planning Commission David Martin, Planning & Community Development Director Introduction to the

More information

Introducing the Digital Illumination Interface Alliance

Introducing the Digital Illumination Interface Alliance Introducing the Digital Illumination Interface Alliance The global industry alliance for DALI lighting control March 2019 1 DiiA: The global industry alliance for DALI DiiA the Digital Illumination Interface

More information

ARLINGTON COUNTY PLANNING COMMISSION SITE PLAN REVIEW COMMITTEE SITE PLAN CHAIR GUIDE

ARLINGTON COUNTY PLANNING COMMISSION SITE PLAN REVIEW COMMITTEE SITE PLAN CHAIR GUIDE ARLINGTON COUNTY PLANNING COMMISSION SITE PLAN REVIEW COMMITTEE SITE PLAN CHAIR GUIDE Excerpts from the SPRC Operating Guide, 1/31/04 Revised March 17,2010 1. Site Plan Chair Responsibilities 1 1, The

More information

WELCOME TO THE CHOUTEAU GREENWAY ECONOMIC DEVELOPMENT WORKING GROUP!

WELCOME TO THE CHOUTEAU GREENWAY ECONOMIC DEVELOPMENT WORKING GROUP! WELCOME TO THE CHOUTEAU GREENWAY ECONOMIC DEVELOPMENT WORKING GROUP! Chouteau Greenway Steering Committee and Working Groups Overview Overview January 9, 2019 Chouteau Greenway will transform St. Louis

More information

NFPA 70E Electrical Safety & Arc Flash Training

NFPA 70E Electrical Safety & Arc Flash Training NFPA 70E Electrical Safety & Arc Flash Training OSHA 1910.332(a) Training, 1910.332(a) Scope. The training requirements contained in this section apply to employees who face a risk of electric shock that

More information

Naval Surface Warfare Center. Two Band Imaging System US Patent # 6,969,856. Mini Market Study. August 17, 2011

Naval Surface Warfare Center. Two Band Imaging System US Patent # 6,969,856. Mini Market Study. August 17, 2011 Naval Surface Warfare Center Two Band Imaging System US Patent # 6,969,856 Mini Market Study August 17, 2011 Prepared for: NSWC-Crane Division John Dement, ORTA/Technology Transfer Joe Gaines, Chief Technology

More information

Understanding 2015 Changes to NFPA 70E Safety-related work practices and maintenance requirements mandate more robust electrical safety programs for

Understanding 2015 Changes to NFPA 70E Safety-related work practices and maintenance requirements mandate more robust electrical safety programs for Understanding 2015 Changes to NFPA 70E Safety-related work practices and maintenance requirements mandate more robust electrical safety programs for data centers Executive Summary Every three years, the

More information

CAP Series ,,,,, The Clear Choice. CAP Series Features: Who Says Infrared Windows Have to be Round? Certifications:

CAP Series ,,,,, The Clear Choice. CAP Series Features: Who Says Infrared Windows Have to be Round? Certifications: CAP Series Who Says Infrared Windows Have to be Round? The durability and proven transmission stability o our patented reinforced polymer is the cornerstor of the CAP Series. Traditional round infrared

More information

NFPA 70B and CSA Z463 Standards for Electrical Maintenance Where Does Airborne Ultrasound Fit In?

NFPA 70B and CSA Z463 Standards for Electrical Maintenance Where Does Airborne Ultrasound Fit In? NFPA 70B and CSA Z463 Standards for Electrical Maintenance Where Does Airborne Ultrasound Fit In? Adrian Messer, Manager of US Operations UE Systems, Inc. Ph: 864-224-4517 Cell: 914-282-3504 Web: www.uesystems.com

More information