1 Kamloops March 12, 2002 Pilot 2 Design and Installation of Embedded Culverts Part 2: Design 1
2 2 Part 2: Design 6 Main Topics 1. Evaluation of site suitability 2. Detailed streambed profile 3. Sizing the pipe 4. Design embedment 5. Embedment material 6. Design drawings
3 Culvert Terminology 3 Slope/Gradient Barrel Perching Invert Weir Jump/Rest Pool
4 4 1. Evaluation of Site Suitability Should consider the following: Fish stream Stable stream channel Stream gradient <6% Stream channel width <2.5m Depth of excavatable fill Suitable for both stream and road geometry Evaluate diversion options
5 5 2. Detailed Streambed Profile Use precise instruments Establish elevation benchmarks
6 Detailed Streambed Profile 6 Field Survey Reference Control Elevational benchmarks Spike BM in blazed tree Horizontal reference stakes
7 Detailed Streambed Profile 7 Profile Length Extended distance upstream and downstream (~50m minimum) note potential influences such as log/debris jams, bedrock, nick points
8 Detailed Streambed Profile 8 Elevation (m) Proposed Stream Bed Slope and Elevation (at low points) Existing Stream Bed Profile Length (m)
9 9 3. Sizing the Pipe Stream Channel Width Edges of rooted vegetation Definite change in vegetation and sediment texture Culvert diameter / span must span SCW at point of embedment
10 Sizing the Pipe 10 Diameter/Span Determination of Stream Channel Width with field measurements Use systematic approach to avoid skewing the results (FSCG - 6 equally spaced intervals along 100 m length)
11 Sizing the Pipe 11 Depth of Embedment Round pipes - 40% of diameter or 0.6m, whichever is greater Pipe-arch - 20% of vertical rise of the arch
12 Sizing the Pipe 12 Round Pipes Pipe Dia > Stream channel width 40% of diameter or 0.6m, whichever is greater Span the stream channel width (SCW) at embedment depth present water level 40% embeddment
13 Sizing the Pipe 13 Arch Pipes Arch Span > Stream channel width Pipe-arch 20% of vertical rise of the arch Span the stream channel width (SCW) at embedment depth Present water level 20% embedment
14 Sizing the Pipe 14 Check Q100 Check that Q100 will embedment depth Non-embedded pipe Culvert Cross Sectional Area ~ 3 x Visible Highwater Area Round pipe at 40% embedment => loss of 37% of area Arch pipe at 20% embedment => loss of 17% of area
15 Sizing the Pipe 15 Check Q100 Round pipe at 40% embedment -> loss of 37% of area Arch pipe at 20% embedment -> loss of 17% of area Round Culvert X-sectional Area Required ~ 1.37 x (3 x visible high water area) Arch Culvert X-sectional Area Required ~ 1.2 x (3 x visible high water area)
16 Sizing the Pipe 16 FPC Forest Road Regulations Require P.Eng. For : >2000mm or >6 m 3 /s
17 Sizing the Pipe 17 Factors Influencing Culvert Length Depth of fill and fill slopes Road surface width Culvert gradient Skew angle of culvert to road
18 Sizing the Pipe 18 Factors Influencing Culvert Length Include: R/W width 1 1 depth of fill gradient
19 Sizing the Pipe 19 Factors Influencing Culvert Length Include: amount of skew to road r/w C/L
20 20 4. Design Embedment Depth of Embedment Round pipes - 40% of diameter or 0.6m, whichever is greater Pipe-arch - 20% of vertical rise of the arch
21 Design Embedment 21 Elevation (m) Proposed Stream Bed Slope and Elevation (at low points) Existing Stream Bed Profile Length (m) 40% or 20 % Embedment Estimated Culvert Invert Elevation & Slope
22 22 5. Embedment Materials Objective is to emulate/simulate natural streambed Fish passage is related to Hydraulic Roughness (HR) HR related to size of bed materials Bed materials, in turn, are related to water velocities and water depth in culvert which influence fish passage
23 Velocity (m/s) Embedment Materials 23 Material Size Influence on Velocity Depth of Flow (m) Material Size 5 cm 15 cm 30 cm 60 cm
24 Embedment Materials 24 Velocity Refuge (Shadows) Roughness reduces velocity and creates shadows
25 Embedment Materials 25 Embedded pipes -modeling/simulating the natural streambed
26 Embedment Materials 26 Rule of Thumb Size similar to that found in adjacent natural streambed Natural Stream Channel Embedment Material
27 Embedment Materials 27 Range of Material Size Design should specify composition and distribution sizes of material to be used
28 Embedment Materials 28 Range of Material Size A range of substrate sizes (gradation) should be specified in the design Materials must be well graded to seal the streambed Ensure sufficient fines (sands & gravels) to seal the streambed Supplement with larger D90 material to help retain substrate D90 or greater particularly important on stream between 3 and 6% Defn. D90 is the size of which 90% of the material will be smaller than
29 Embedment Materials 29 Range of Material Size 25% 35% 25% 15% Cobble Gravel Fine Boulder Rule of thumb - aka George Robison General Size Distribution of Embedded Material
30 Embedment Materials 30 Substrate Volume Determination Round pipe embedded 40% ~ 37% of area Area (Round) = p(dia/2) 2 Arch pipe embedded 20% ~ 17% of area Area (Arch) from manufacturer info
31 Design Drawings 31 Purpose Tools to design culvert to fit site Document proposed works and final product Provides material and construction specifications Provide construction referencing
32 Design Drawings 32 Site Plan / Profiles - Plan/profiles developed for the crossing - design drawings developed from site plan / profiles - used for design and documentation purposes
33 Design Drawings 33 Site Plan - contour map of the site
34 Design Drawings 34 Fit Crossing to Site - The selected crossing structure should be suited to both the stream and road - consider road drainage to minimize potential sediment delivery to the stream - avoid vertical dips, provide for roadway drainage
35 Design Drawings 35 Culvert Profile
36 Design Drawings 36 Road profile
37 Design Drawings Plan Drawing 37
38 Design Drawings Riprap Specifications 38
39 Design Drawings Installation Measures 39
40 Design Drawings Installation Referencing 40
41 Design Drawings 41 Other Details ie. Weir Design channel widths stream bank stream bank well graded boulders, cobbles and fines leaving no gaps in matrix A downstream weir may required as part of the design to be installed within channel widths downstream of culvert outlet Assists in maintaining adequate low flow depth Helps retain substrate Prevents formation of plunge pool Particularly important where stream gradient is > 3%
42 Design Drawings 42 Weir Design Weir Plan View Flow Longitudinal View Weir
43 Design Drawings Weir Design 43
44 Design Drawings Summary 44 Design should include: Stream data Plan Profile Construction referencing (vertical / horizontal) Materials specifications Installation specifications other details (riprap, weir, etc.)
Department of Agriculture. Conservation Service. United States. Natural Resources REVISED 8/26/16
GENERAL NOTES: SYMBOL LEGEND 1. All work shall comply with the constriction specifications, drawings, project-specific quality assurance plan and other contract requirements. 2. All notes on the drawings
More informationSTREAM BANK STABILIZATION THORPS MORTIMER RECREATION AREA Grandfather Ranger District SITE LOCATION & DRAINAGE AREA
STREAM BANK STABILIZATION THORPS CREEK @ MORTIMER RECREATION AREA SITE LOCATION & DRAINAGE AREA SITE LOCATION Drainage Area = 1.14 sq. miles STREAM BANK STABILIZATION THORPS CREEK @ MORTIMER RECREATION
More informationAlternate Green Stream Bank Stabilization Methods
U.S. Army Corps of Engineers Philadelphia/Baltimore Districts Alternate Green Stream Bank Stabilization Methods Wissahickon Creek, Tannery Run and Rose Valley Creek Bo-Rit Asbestos Site Ambler, Pennsylvania
More informationLow Gradient Velocity Control Short Term Steep Gradient [1] Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent
Grass Linings DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient [1] Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] May be used on short, steep
More informationSILT FENCE MACHINE SLICED ERO-1A STEEL FENCE POST (T-POST), MINIMUM 5' LONG, 6' MAXIMUM SPACING.
STEEL FENCE POST (T-POST), MINIMUM 5' LONG, 6' MAXIMUM SPACING. ATTACH FABRIC TO POSTS WITH MINIMUM 3 ZIP TIES (50 LB. TENSILE) PER POST IN TOP 8" OF FABRIC. MONOFILAMENT GEOTEXTILE FABRIC PER MNDOT TABLE
More informationPost Construction BMPs
Post Construction BMPs Why are Post Construction BMPs important? With increased development brings the increase of impervious cover Parking lots, rooftops, driveways Storm water runoff volume increases
More informationSTREAM ALTERATION PRACTICES
STREAM ALTERATION PRACTICES Stream Diversion Channel SDC DEFINITION A temporary channel constructed to convey stream flow around in-stream construction. PURPOSE Stream diversion channels are used to allow
More informationThe use of low head weirs to. perennial streams with their floodplains:
The use of low head weirs to reconnect severely entrenched perennial streams with their floodplains: An Anne Arundel County TMDL Watershed Implementation Plan Strategy presented by Hala Flores, P.E Mid
More informationPLAN SUBMITTER'S CHECKLIST
Page 1 of 8 PLAN SUBMITTER'S CHECKLIST FOR EROSION AND SEDIMENT CONTROL PLANS Please fill in all blanks and reference the plan sheets/pages where the information may be found, where appropriate, or write
More informationNorth Branch of Cypress Creek Ecological Restoration: A Comprehensive Approach to Stream Restoration
North Branch of Cypress Creek Ecological Restoration: A Comprehensive Approach to Stream Restoration Rocky Powell Clear Creeks Consulting, LLC Keith D. Tate, P.E. BayLand Consultants & Designers, Inc.
More informationGloucester County PLAN SUBMITTER'S CHECKLIST
Page 1 of 9 Gloucester County PLAN SUBMITTER'S CHECKLIST FOR EROSION AND SEDIMENT CONTROL PLANS Please fill in all blanks and please reference the plan sheets/pages where the information may be found,
More informationRIVER TRAINING STRUCTURES
RIVER TRAINING STRUCTURES SPUR DIKES Spur dikes, deflectors or groins are transverse structures that extend into the stream from the bank and reduce erosion by deflecting flows away from the bank. Transverse
More informationHILCORP ALASKA, LLC HAPPY VALLEY MIDDLE NATURAL GAS EXPLORATION PROJECT DEEP CREEK UNIT BOUNDARY PROPOSED ACCESS ROAD T02S T03S R14W
, LLC STERLING HWY. M.P. 142.8 28 33 TIM AVE. DEEP CREEK UNIT BOUNDARY 27 26 25 TIM AVE. CULVERT REPLACEMENT PROPOSED ACCESS ROAD 34 35 36 T2S T3S 31 NINILCHIK, ALASKA 5 4 3 2 BEGIN ROAD CONSTRUCTION 1
More information511 - RIP RAP - OPSS 511 ROCK PROTECTION - OPSS 511 GRAVEL SHEETING - OPSS 511 GEOTEXTILE - OPSS 511
511 - - OPSS 511 ROCK PROTECTION - OPSS 511 GRAVEL SHEETING - OPSS 511 GEOTEXTILE - OPSS 511 511.1 GENERAL 511.1.1 Rip Rap 511.1.2 Rock Protection Excavation for placing Rip Rap, Rock Protection and Gravel
More informationConstruction Progress Report
Report Date: 4/8/2017 Subject: Construction Week 2 70% Complete Project: Sunset Pond EWP Stream Reclamation, Fourmile Creek, Boulder County, CO Report By: TJ Burr, Civil Engineer/Stream Restoration Specialist,
More informationCity of Stoughton Erosion Control Permit Application (effective 2/6/2018)
City of Stoughton Erosion Control Permit Application (effective 2/6/2018) Incomplete applications will not be accepted Project Name: Address of subject property: Landowner Name(s): Applicant Name: Landowner
More informationARIZONA WATER COMPANY
ARIZONA WATER COMPANY East Sedona Water Storage Facility February 21, 2018 Community Meeting STORMWATER RUNOFF Issue: Runoff sometimes flows out of the wash at bottlenecks in front of several homes on
More informationErosion & Sediment Control Plan Application Form & Checklist
Erosion & Sediment Control Plan Application Form & Checklist GENERAL INFORMATION Application Date: Project Address: Tax Map / Parcel Number(s): PROPERTY OWNER / DEVELOPER Firm Name: Contact Person: Title:
More informationProject: Developer/Designer: Reviewer: I. Narrative: 1. Project Description: Describes the nature and purpose of the land disturbing activity.
City of Charlottesville, Virginia Erosion and Sediment Control Plan Review Checklist 610 East Market Street, Charlottesville, VA 22902 Telephone 434-970-3182; Fax 434-970-3359 Project: Developer/Designer:
More informationYour town s subdivision or land use ordinance standards should reference the following street standards, for example:
Your town s subdivision or land use ordinance standards should reference the following street standards, for example: Streets shall be designed to move traffic safely and in a way that minimizes environmental
More informationWQ-23 MOUNTAINOUS AND STEEP SLOPE SITES
Greenville County Technical Specification for: WQ-23 MOUNTAINOUS AND STEEP SLOPE SITES 1.0 Mountainous and Steep Slope Sites 1.1 Description The geographic locations of portions of Greenville County are
More informationSTANDARD SPECIFICATIONS SECTION TEMPORARY EROSION AND SEDIMENT CONTROL
STANDARD SPECIFICATIONS SECTION 01570 TEMPORARY EROSION AND SEDIMENT CONTROL PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements, procedures, and methods related to responsibilities for providing
More informationHYDRAULIC DESIGN involves several basic
Chapter 6 Tools for Hydr draulic and Road Design HYDRAULIC DESIGN involves several basic concepts that must be considered to build successful projects with a minimum risk of failure (Photo 6.1). Use of
More informationB511 - RIP-RAP, ROCK PROTECTION AND GRANULAR SHEETING - OPSS 511
B511 - - OPSS 511 511.1 GENERAL 511.1.1 Rip-Rap Excavation for placing rip-rap, rock protection, and granular sheeting is part of each individual tender item. Rip-rap is a special application of rock protection.
More informationA. Regional Detention Requirements
I. GENERAL DESIGN GUIDELINES A. Full-spectrum detention is provided for all new development, redevelopment or expansion of a site to provide for water quality and flood control detention. B. Detention
More informationChapter 1 GENERAL SOUTH DAKOTA DRAINAGE MANUAL
Chapter 1 GENERAL SOUTH DAKOTA DRAINAGE MANUAL October 2011 Table of Contents Section Page 1.1 INTRODUCTION...1-1 1.2 BASIC APPROACH...1-2 1.3 FUNCTIONAL RESPONSIBILITIES...1-3 1.3.1 Office of Road Design...1-3
More informationSTORM SEWER OUTFALLS AND CONNECTING OUTFALL CHANNELS. General Submission Requirements
COMPLETE APPLICATION CHECKLIST Jan 2016 STORM SEWER OUTFALLS AND CONNECTING OUTFALL CHANNELS The following checklist has been compiled to assist the applicant in preparing their application for approval
More informationUrban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT
NOT WELL 800 - Urban Stormwater Wetlands A constructed system of shallow pools that create growing conditions for wetland plants to lessen the impacts of stormwater quality and quantity in urban areas.
More informationTENNESSEE GAS PIPELINE COMPANY, L.L.C.
TENNESSEE GAS PIPELINE COMPANY, L.L.C. HYDROLOGIC AND HYDRAULIC CALCULATIONS FOR ACCESS ROADS ALONG THE CONNECTICUT PIPELINE EXPANSION PROJECT CONNECTICUT LOOP Submitted by: Tennessee Gas Pipeline Company,
More informationTable 4.7.1: Swales Potential Application and Storm Water Regulation
4.7. Swales A swale is a vegetated open channel, planted with a combination of grasses and other herbaceous plants, shrubs, or trees. A traditional swale reduces peak flow at the discharge point by increasing
More informationBiotechnical streambank stabilization
Traditional streambank stabilization Biotechnical streambank stabilization Channelization alters: shape pattern slope bed morphology cover Ecological effects: loss of riparian habitat loss of fish habitat
More informationIs a Riparian Restoration Still Viable After 100-year Storm Events Alter the Original Design?
Is a Riparian Restoration Still Viable After 100-year Storm Events Alter the Original Design? Sarah Spear Cooke, Ph.D. Seattle, Washington Presentation Outline Introduction The site pre-restoration Restoration
More informationCase Study 6. Fitzpatrick Creek Cable Concrete Block Mat Ford
Case Study. Fitzpatrick Creek Cable Concrete Block Mat Ford Location Southwest Oregon. Bureau of Land Management Coos Bay District. Fitzpatrick Creek. BLM road 23-8-11.0. This ford was constructed in 2000
More informationDraft Rhode Island Stormwater Design and Installation Standards Manual
Draft Rhode Island Stormwater Design and Installation Standards Manual Summary The May 2009 Public Review Draft version of the RI Stormwater Design and Installation Standards Manual consists of approximately
More informationGuidelines for Streambank Protection
PDHonline Course C187 (3 PDH) Guidelines for Streambank Protection Instructor: John Poullain, PE 2012 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA 22030-6658 Phone & Fax: 703-988-0088 www.pdhonline.org
More informationURBANIZED STREAM CORRIDOR: COMMUNITY APPROACH TO ADDRESS EROSION
URBANIZED STREAM CORRIDOR: COMMUNITY APPROACH TO ADDRESS EROSION Stephen Crawford, P.E., CFM Romin Khavari, P.E., CFM NCTCOG Public Works Roundup MAY 23, 2018 Today s Agenda Urbanized Stream Erosion Solving
More informationProject Name: Project Address or Location: Principal Designer Name and Company: Principal Designer Phone Number:
SECTION 1: GENERAL INFORMATION Plan Submission Date: Total Disturbed Acreage: _ Project Name: Project Address or Location: Principal Designer Name and Company: Principal Designer Phone Number: email: SECTION
More informationTentatively Selected Plan within Harlem River, East River and Western Long Island Sound Planning Region. First Level Costs. Federal Non-Federal Total
HARLEM RIVER, EAST RIVER AND WESTERN LONG ISLAND SOUND PLANNING REGION Flushing Bay and Creek Ecosystem Restoration Source Feasibility Study Background Study Resolution (1994), Reconnaissance Report (1996),
More informationPresentation to Parks and Open Space Advisory. Committee September 22, 2016
Flood Planning & Preliminary Design Services for South St. Vrain Creek Restoration at Hall Ranch Presentation to Parks and Open Space Advisory Prepared for: Boulder County, Colorado Committee September
More informationPollutant Removal Benefits
Bioswales Bioswales Similar to biocells, but have a slight, but positive grade toward an outlet Designed to convey the WQv event at very low velocities Promote filtration through native vegetation, infiltration
More information2.1.4 Roof Downspout Rain Gardens
2008 SWMM, 2010 Revision City of Tacoma 2.1.4 Roof Downspout Rain Gardens Purpose and Definition Bioretention areas are shallow stormwater retention facilities designed to mimic forested systems by controlling
More informationAppendix E Preliminary Location Hydraulic Study
Appendix E Prepared for: State of Alaska Department of Transportation and Public Facilities Prepared by: HDR Alaska, Inc. 2525 C Street, Suite 305 Anchorage, Alaska 99503 February 2014 This page intentionally
More informationChapter 14. Stormwater Quality Introduction
14.0 Introduction This chapter addresses requirements and design criteria related to post-construction stormwater best management practices (requirements for construction erosion and sediment control are
More informationACTIVITY: Geotextiles ES 12
Targeted Constituents Significant Benefit Partial Benefit Low or Unknown Benefit Sediment Heavy Metals Floatable Materials Oxygen Demanding Substances Nutrients Toxic Materials Oil & Grease Bacteria &
More informationSECTION 5: REACH RECOMMENDATIONS/MAPS
SECTION 5: REACH RECOMMENDATIONS/MAPS This section describes areas of concern and provides specific recommendations for each project reach. Locations of stormwater drains were from GIS coverage supplied
More informationVA DCR STORMWATER DESIGN SPECIFICATION NO. 11 WET SWALE. VERSION 2.0 January 1, 2013 SECTION 1: DESCRIPTION
VIRGINIA DCR STORMWATER DESIGN SPECIFICATION No. 11 VERSION 2.0 January 1, 2013 SECTION 1: DESCRIPTION Wet swales can provide runoff filtering and treatment within a conveyance system and are a cross between
More informationPROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM
PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM Project ID Number: 25-5 Problem: Stormwater collected from the neighborhood upstream is released at 9 Muirfield Lane and flows west toward
More information2014 HDR 2014 Architecture, HDR, Inc., all all rights reserved. reserved.
2014 HDR 2014 Architecture, HDR, Inc., all all rights reserved. reserved. Uplift of a Wet Weather Stream: Satisfying Regulatory Requirements Agawela Drive Stream Project Chattanooga, TN 2014 HDR, Inc.,
More informationPlan Review Checklist
Plan Review Checklist FOR EROSION AND SEDIMENT CONTROL PLANS _ Minimum Standards - All applicable Minimum Standards must be addressed. All minimum Standards must be adhered to during the entire project
More informationCity of Richmond. Engineering Design Specifications
City of Richmond Design Specifications June 2008 CITY OF RICHMOND ENGINEERING DESIGN SPECIFICATIONS JUNE 2008 THIS DOCUMENT DETAILS THE MINIMUM STANDARDS TO BE USED FOR THE DESIGN OF ENGINEERING PROJECTS
More informationDesign Considerations for Open Channel and Detention Pond Design. Howard Redfearn, City of Mansfield
Design Considerations for Open Channel and Detention Pond Design Howard Redfearn, City of Mansfield Previous Experience/Criteria/Maintenance Issues New Criteria Discussion Overview Where is Mansfield?
More informationMap of erosion control sites is attached to this document.
Engineers Without Borders Erosion Control Projects Communities of Malingua Pamba, Tunguiche, and Guantugloma Cotopaxi Province, Ecuador Ecuador Group, Denver Professional Chapter June 2017 Monitoring Update
More informationGuidelines for Installing Rolled Erosion Control Products in Slope, Channel and Shoreline Applications Laurie Honnigford
Guidelines for Installing Rolled Erosion Control Products in Slope, Channel and Shoreline Applications Laurie Honnigford Soil erosion is evident in so many situations and the environmental impact can be
More informationST. MARY S SOIL CONSERVATION DISTRICT (SMSCD) AND DPW&T CONCEPT EROSION AND SEDIMENT CONTROL AND STORMWATER MANAGEMENT GUIDELINES AND CHECKLIST
St. Mary s Soil Conservation District 26737 Radio Station Way, Suite B Leonardtown, MD 20650 Phone: 301-475-8402 ext. 3 Fax: 301-475-8391 www.stmarysscd.com St. Mary s County Government Department of Public
More informationGuiding Landowners in Stream Restoration. The Science, Practice & Art of Restoring Native Ecosystems 2015
Guiding Landowners in Stream Restoration The Science, Practice & Art of Restoring Native Ecosystems 2015 January 24, 2015 Guiding Landowners in Stream Restoration January 24, 2015 Agenda 1Watershed Planning
More informationColorado Watershed Protection Fund - Project Grant Application Fountain Creek Restoration Shryver Park Reach Including Shryver Pond
Fountain Creek - Manitou Springs, CO Shryver Park Reach and Pond Restoration Project Submitted by: The Fountain Creek Restoration Committee & The Pikes Peak Community Foundation April 28, 2008 FCRC Page
More informationCHECKLIST FOR PHASE II DRAINAGE REPORT
I. COVER SHEET CHECKLIST FOR PHASE II DRAINAGE REPORT A. Name of Project B. Address C. Owner D. Developer E. Engineer F. Submittal date and revision dates as applicable II. GENERAL LOCATION AND DESCRIPTION
More informationThe Napa River Flood Protection Project
The Napa River Flood Protection Project Creating Flood Protection and Restoring Geomorphic and Biological Processes Jeremy Sarrow, Napa County Flood Control & Water Conservation District June 2, 2014.
More informationChapters 6 and 8 revised May 2013
A cooperative effort between the North Carolina Sedimentation Control Commission, the North Carolina Department of Environment and Natural Resources, and the North Carolina Agricultural Extension Service.
More informationAppendix I. Checklists
Appendix I Checklists Town of Greenwich Drainage Manual Department of Public Works - Engineering Division Town Hall - 101 Field Point Road, Greenwich, CT 06836-2540 Phone 203-622-7767 - Fax 203-622-7747
More informationAttention: Ray Tardiff,
D B 1A 1750 S.Quinn Prince George, B.C. V2N 1X3 PHONE: (250) 562-5541 FAX: (250) 562-5561 E-MAIL: dwbpg@mag-net.com August 30, 2007 PC: MOF-05-001 Ray Tardiff, Regional Roads Specialist Ministry of Forest,
More informationCHAPTER 4. SPECIAL CONDITION EROSION CONTROL MEASURES
CHAPTER 4. SPECIAL CONDITION EROSION CONTROL MEASURES 4.1 INFILTRATION BASIN AND TRENCH Figure 4.1. Infiltration basin and trench (Source: Department of Civil, Construction, and Environmental Engineering,
More informationPERMANENT SEEDING. Overview of Sedimentation and Erosion Control Practices. Practice no. 6.11
Overview of Sedimentation and Erosion Control Practices Practice no. 6.11 PERMANENT SEEDING Permanent vegetation controls erosion by physically protecting a bare soil surface from raindrop impact, flowing
More informationSECTION 6. Routine Maintenance Activity Details
SECTION 6 Routine Maintenance Activity Details 80. DEBRIS REMOVAL When Deadfall, and other objects, such as shopping carts, tires, appliances, and mattresses have accumulated in the drain. Why To prevent
More informationThe checklist can be used for a single filter strip or groups of filter strips with the same characteristics.
Objectives This checklist can be used by the organisation approving the drainage scheme (drainage approving body) to help assess submissions for drainage approval. This checklist is aimed at providing
More informationLandfill Closure, Intermediate Cover & Post-Closure Care. Municipal League Meeting
Landfill Closure, Intermediate Cover & Post-Closure Care Municipal League Meeting 9-7-17 Gated and Closed Landfill Gated means no longer accepting waste. Closed means gated and final cover has been installed
More informationREFERENCE DRAWINGS FOR 332 W. MAIN STREET ROCK HILL, SOUTH CAROLINA
REFERENCE DRAWINGS FOR REET ROCK HILL, SOUTH CAROLINA COVER SHEET 1 OF 6 GENERAL NOTES 2 OF 6 REMOVE WIRE AND NYLON TWINE FROM BALL AND CANOPY. SOAK ROOT BALL AND PLANT PIT IMMEDIATELY AFTER INSTALLATION.
More informationStream Restoration: Working with Nature?
Stream Restoration: Working with Nature? Greg Jennings, PhD, PE jenningsenv@gmail.com Ecosystem Restoration activities that initiate or accelerate the recovery of ecosystem health, integrity, and sustainability
More informationStream Restoration: Working with Nature? Greg Jennings, PhD, PE
Stream Restoration: Working with Nature? Greg Jennings, PhD, PE jenningsenv@gmail.com Ecosystem Restoration activities that initiate or accelerate the recovery of ecosystem health, integrity, and sustainability
More informationStormwater Management Techniques WMPF LAND USE TRAINING INSTITUTE MARCH 14, 2018
Stormwater Management Techniques WMPF LAND USE TRAINING INSTITUTE MARCH 14, 2018 Potential Impacts of New Development Urban development can significantly increase stormwater runoff Water quality considerations
More informationLow Density Projects. Design Objective
E-1. Low Density Projects Design Objective Low density projects are not required to be equipped with Stormwater Control Measures (SCMs) in exchange for limiting their built-upon area, maximizing dispersed
More informationVEGETATED SLOPE STABILIZATION DESCRIPTION APPLICABILITY. Advantages
4.2-d VEGETATED SLOPE STABILIZATION Alternative Names: Willow Wattles, Live Bundles, Fascines, Live Staking, Joint Planting, Branch Packing, Brush Layering, and Brush Matting DESCRIPTION Vegetated slope
More informationRestoring Floodplain Capacity and Hyporheic Function in an Urban Setting Thornton Confluence and Kingfisher Projects Mike (Rocky) Hrachovec, P.E.
Restoring Floodplain Capacity and Hyporheic Function in an Urban Setting Thornton Confluence and Kingfisher Projects Mike (Rocky) Hrachovec, P.E. Project Locations: Historic Map of Thornton Creek orth
More informationAppendix K. Stormwater Management Plan
Regional Municipality of Halton - Steeles Avenue (Regional Road 8) Class EA - Industrial Drive to Regional Road 25/Martin Street Appendix K Stormwater Management Plan PR226401.001 Rev. 2 PR.DOT, 00/01
More informationDITCH BANK STABILIZATION TECHNIQUES
onstructed Ditch Drainage anagement Guide - No. 0 in series Order No. 5.0- December 00 DITH BANK STABILIZATION TEHNIQUES It is important to maintain ditches using practices that ensure ditch banks remain
More information2008 SWMM, 2010 Revision City of Tacoma
2008 SWMM, 2010 Revision City of Tacoma 2.2.3.1 BMP L630 Rain Gardens Purpose and Definition Bioretention areas are shallow stormwater retention facilities designed to mimic forested systems by controlling
More informationLake Shoreline Stabilization Techniques
Environment and Sustainable Resource Development Lake Shoreline Stabilization Techniques Compliance Assurance / Operations Central Region Suite #1, 250 Diamond Avenue Box 4240 Spruce Grove, Alberta T7X
More informationMANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS
MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS May 2007 SECTION 1 Responsibility of Applicant TABLE OF CONTENTS A. Stormwater Management Plan Required Information
More informationBioengineering Shoreline Protection
Insert Company Logo Here (first slide only) Bioengineering Shoreline Protection Agrecol LLC Evansville WI rob.walker@agrecol.com A little about Agrecol 1,100 acres in production in SC WI Produce 3.5 million
More informationKearney Post-Construction Stormwater Program
Kearney Post-Construction Stormwater Program Stormwater Treatment Facilities (STFs) Kearney Public Works Office August 10 and 17, 2017 Stormwater Treatment Facility (STF) Session Goals Understand STF Function
More information4. Contractor (and subcontractors if applicable) certification statement(s)
CHEMUNG COUNTY STORMWATER COALITION STORMWATER POLLUTION PREVENTION PLAN (SWPPP) SUBMITTAL CHECKLIST GENERAL INFORMATION: 1. Owner/Operator name, legal address, phone number 2. Copy of signed Notice of
More informationPhiladelphia Creek Trash Assessment (PCTA) Methodology Mill Run Creek Test Case
Philadelphia Creek Trash Assessment (PCTA) Methodology Mill Run Creek Test Case Mill Run Creek emerges from a covered creek in Philadelphia to an open creek in Cheltenham. The Creek has extensive trash
More informationSoil bioengineering and ecological
Soil bioengineering and ecological systems Techniques Click to proceed... Copyright 2001 Maccaferri Inc. All rights reserved. All reproduction, including photocopy, film and microfilm, is forbidden. Release
More informationWalkover Assessment. River Wear Frosterley Angling Club. July 2014
Walkover Assessment River Wear Frosterley Angling Club July 2014 Contents 1.0 Introduction... 3 2.0 Upper Section... 4 3.0 Middle Section... 6 4.0 Lower Section... 10 5.0 Recommendations... 16 6.0 Summary
More informationMontana Stream Permitting
Montana Stream Permitting A Guide for Conservation District Supervisors and Others Conservation Districts Bureau Montana Department of Natural Resources and Conservation June 2001 CONTRIBUTORS Committee
More information4.6. Low Impact and Retentive Grading
4.6. Low Impact and Retentive Grading Low Impact Grading techniques focus on utilizing existing topography during Site layout to minimize cost. Proposing structures, roads, and other impervious surfaces
More informationCEE:3371 Principles of Hydraulics and Hydrology Project #2 Flow Measurement with a Weir
CEE:3371 Principles of Hydraulics and Hydrology Project #2 Flow Measurement with a Weir Problem Statement The Iowa DNR plans to monitor a proposed prairie restoration project in eastern Iowa as an experiment.
More informationRule D Wetland and Creek Buffers
Rule D Wetland and Creek Buffers 1 Policy It is the policy of the Board of Managers to ensure the preservation of the natural resources, recreational, habitat, water treatment and water storage functions
More informationHuntington Stormwater Utility
Huntington Stormwater Utility Stormwater Management & Sediment and Erosion Control Requirements for Construction Sites Authorized by Huntington City Code Articles: 971, 970, 930, 935, 955, Revised April
More informationAttachment 2: Permeable Pavement Design Guidelines
Attachment 2: Permeable Pavement Design Guidelines Design of permeable pavement systems is critical if they are to function properly and efficiently. The area and shape are dependent on the site design,
More informationChapter Six: Tree Removal and Erosion Control
Chapter Six: Tree Removal and Erosion Control Through the combination of canopy and roots, trees help protect and stabilize the land. Their removal requires proper planning and adherence to land-based
More informationFigure 1. Bioswale along roadside. Photo courtesy of CalTrans. Figure 2. Diagram of typical bioswale (adapted from UDFCD 1999)
Design Manual: Biological Filtration Canal (Bioswale) Dayna Yocum, Bren School of Environmental Science and Management, University of California, Santa Barbara Figure 1. Bioswale along roadside. Photo
More informationProperty. Line. Fence. Plantings. Vegetated Buttress. With Sun Tolerant. Vegetated Terrace. Tolerant Plantings Existing
PREFERRED ALTERNATIVE - CROSS SECTIONS 92 Existing Pool Property Line 2 6 10 14 0 4 8 12 16 Existing Armour Stone Wall Existing Proposed 18 22 20 24 26 30 28 32 34 36 38 Property Line 40 44 48 52 56 42
More information5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS
5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS Low Impact Development (LID) requires a shift in stormwater management away from conveying runoff to a small number of downstream points through hydraulically
More informationBowling Green, Kentucky Stormwater Best Management Practices (BMPs) Erosion Prevention Practices (EPPs) Activity: Nets and Mats (N and M)
Bowling Green, Kentucky Stormwater Best Management Practices (BMPs) Erosion Prevention Practices (EPPs) Activity: Nets and Mats (N and M) EPP-11 PLANNING CONSIDERATIONS: Design Life: 1 yr Acreage Needed:
More informationOFF RIGHT OF-WAY. WATER MANAGEMENT & Other Impacts
OFF RIGHT OF-WAY WATER MANAGEMENT & Other Impacts TYPES OF OFF-ROW INFLUENCES Driveways Logging Access Farm field access Pipe-lines ATV trails Field Outlets Wet-weather channels Drain tile Other waterways
More informationcc: K. Sandefur B. Greene TO: Mark Hite, P.E. R. Powell Division of Structural Design P. Sanders FROM: Bart Asher, P.E. V.
M E M O R A N D U M (SA-008-2011) cc: K. Sandefur B. Greene TO: Mark Hite, P.E. R. Powell Division of Structural Design J. Moore P. Sanders FROM: Bart Asher, P.E. V. Forsythe TEBM, Geotechnical Branch
More informationSTILL CREEK CD-1 GUIDELINES (BY-LAW NO. 6654) Adopted by City Council April 24, 1990
$2 City of Vancouver Land Use and Development Policies and Guidelines Community Services, 453 W. 12th Ave Vancouver, BC V5Y 1V4 F 604.873.7344 fax 873.7060 planning@city.vancouver.bc.ca STILL CREEK CD-1
More informationLABOR-BASED ROUTINE ROAD MAINTENANCE (LBRRM)
LABOR-BASED ROUTINE ROAD MAINTENANCE (LBRRM) A GUIDE TO THE PRACTICAL TASKS 1 Important Drainage Components Camber 2 THE IMPORTANCE OF DRAINAGE Keep water off the running surface and clear of the road
More informationRequest for an Exception to the Napa County Road and Street Standards
F Request for an Exception to the Napa County Road and Street Standards Shed Creek Winery Use Permit P16-327 and Use Permit Exception to the Conservation Regulations P17-178 Planning Commission Hearing
More information