LEVEE VEGETATION MANAGEMENT - Strategy Overview

Size: px
Start display at page:

Download "LEVEE VEGETATION MANAGEMENT - Strategy Overview"

Transcription

1 LEVEE VEGETATION MANAGEMENT - Strategy Overview The levee vegetation management strategy represents our local preferred approach to levee vegetation management that balances the needs of flood risk reduction with the habitat needs of salmonids and other aquatic species found within our river systems. Currently three of these species are listed as threatened under the Endangered Species Act. The strategy acknowledges the agreement established by Court decree (Case No. C79-269T) entered into between Pierce County and the Puyallup Tribe of Indians relating to vegetation management along the Puyallup River System (Puyallup River Vegetation Management Program, PRVMP). The strategy works within the constraints of that court ordered agreement and the Corps Interim Guidance Policy (Corps, 2014). The levee vegetation strategy is driven by Pierce County s desire to ensure all PL levees within the County s river system meet the Corps inspection criteria to retain PL program eligibility. The strategy provides basic guidelines to establish an appropriate balance between maintaining flood risk reduction structures and habitat considerations. The vegetation management strategy will be implemented annually and monitored for effectiveness and potential negative impacts to fish and wildlife. The program will be adaptively managed to make adjustments as identified through routine annual monitoring. The vegetation management strategy will be performance driven, centered by three main performance considerations: Risk - Flood Risk Reduction Habitat Retain Functional Habitat Maintenance - Maintenance Efficiency Goal: The goal of this vegetation management strategy echoes the goal stated in the PRVMP, to provide for the riparian vegetation habitat requirements of the fish and wildlife resources in conjunction with the basic requirements entrusted to Pierce County of revetment (and levee) integrity and inspection, emergency revetment repairs, river channel capacity, and County road maintenance along tributary streams. (PRVMP, 1985) Objectives: Risk Vegetation management will be performed in a manner to minimize risk to both habitat and flood risk reduction structures. Habitat -Vegetation management will be performed in a manner that avoids or minimizes impacts upon fish and wildlife habitat. Maintenance A vegetation management strategy will be developed that is cost-effective and practical to implement. Pierce County Public Works 1

2 Levee Vegetation Management Strategy - Deliverables The following products (deliverables) are incorporated into the levee vegetation management strategy: Riparian Vegetation Communities Mapping Mapping of the current vegetation communities has been conducted using the County Geographic Information System, and field verified by crews. The mapping was used to inform the development of a vegetation management strategy. ( See Appendix X.x) Risk Analysis - The levee vegetation management strategy considers the level of risk to levee structural integrity posed by the river as well as characteristics of the river. The risk analysis will considers ( See Appendix X.x): Flood Risk Reduction Structures River hydraulics Previous damages Hazard trees Potential Benefits of Vegetation (erosion control, root structure, flood calming) Levee Structure Schematics Five typical levee structure scenario s that are encountered along the river system are listed below (See Section X.x.): Schematic A River Channel Adjacent to Levee Schematic B Silt Bench or Gravel Bar upon Levee Schematic C Concrete Panel Levee with Silt Bench and Unpaved Road Schematic D Concrete Panel Levee with Extended Silt Bench and Paved Trail Schematic E - Levee Setback with Floodplain Bench Vegetation Maintenance Inspection Standards Maintenance specifications standard operating procedures will be developed as an action item for each levee structure type to help direct field personnel in the performance of levee vegetation maintenance. (See Chapter X Action Plan) Vegetation Risk Matrix - Protocols and methodology to manage vegetation that threatens the structural integrity of flood risk reduction structures, i.e. hazard trees. (See Section X.x.) Planting Plan Standards, specifications and protocols for replanting vegetation removed associated with levee repairs. (See Section X.x.) Invasive Species Management Plan A plan will be developed as an action item addressing protocols and a strategy for managing specified invasive species. (See Chapter X Action Plan) Standard Operating Procedures Develop a set of Standard operating procedures to ensure the consistent implementation of the Levee Vegetation Management Strategy, including: Vegetation maintenance, invasive species control, plantings/enhancement, and hazard tree removal. Pierce County Public Works 2

3 General Guidelines A Vegetation Management Zone is provided across the levee structure prism, extending from the upland side of the levee down to the structural toe of the levee. This represents the area of vegetation management influence addressed in this strategy that aligns with the following documents: PRVMP: The provisions of the Inter-Governmental Agreement between Pierce County and the Puyallup Tribe of Indians, regarding the Puyallup River Vegetation Management Program (PRVMP) are incorporated within this interim vegetation management strategy. USACE PL Program: This interim strategy is provided in response to the United States Levee Rehabilitation Program, PL Program Interim Policy for Establishing Eligibility Status for Flood Risk Management Projects. It is understood that the vegetation management strategy developed may need to be revised as necessary to comply with the PL program levee maintenance standards once the Corps releases a new Engineer Technical Letter on Vegetation Management (ETL ). Current understanding is that vegetation management strategies developed through the once approved will be honored through the lifetime of the plan necessary to implement. USACE PL84-99 Interim Policy : The Corps has released an Interim Policy for determining eligibility Status of Flood Risk Management Projects for the Rehabilitation Program Pursuant to Public Law 84-99, dated March 21, The purpose of the interim policy is to allow eligibility determinations in the Rehabilitation Program to continue to be implemented while the new policy is developed, and to do so in a manner that avoids potentially incentivizing public sponsors to take actions that may negatively impact natural resources or tribal rights. Under this new Interim Policy, vegetation on levees is no longer directly a criterion for determining Program eligibility. Indirectly, vegetation may impact the ability to properly visually inspect the levee, provide adequate vehicular access, or may pose a hazard to the structural integrity or operation of the flood control structure facility. Photo Illustration XX.x Levee riparian vegetation along the Puyallup River, near City of Puyallup Pierce County Public Works 3

4 General Vegetation Management Strategies The following strategies are applied as the basic protocols for all vegetation management applied across the levee prism: Vegetation Management Zones: A Vegetation Management Zone will be provided across the levee prism, extending from the upland side of the levee down to the structural toe of the levee. This represents the area of vegetation management influence addressed in this strategy. Levee vegetation management subzones will be established to reflect the various components of the levee structure relative to the adjacent river habitat. Levee Structure Schematics: Levee vegetation management strategies are applied to various levee structure types, each that represent a unique consideration of levee construction and orientation to the adjacent river and habitat. Vegetation Removal: Vegetation will be managed to meet the minimum requirements of the USACE for levee inspections and access. This includes specifications for levee vegetation management allowing visual and physical access onto the levee for inspection purposes. o o o Levee vegetation understory will be thinned to provide visibility and physical access for inspections, retaining clusters of native shrubs and saplings approximately feet in diameter, for recruitment of future understory native vegetation and overstory trees. The cleared area around the native shrubs will be approximately feet between clusters, depending on site conditions and character of vegetation. (See Illustration X.x) Woody riparian vegetation will be preserved as feasible on the riverside levee slope in order to provide moderate riparian functions including bank stability, roughness, cover, shade, wood and nutrient contribution, water quality filtering and moderation of water temperature. Vegetation that provides for shading of adjacent waters will be retained to the fullest extent feasible. Generally, trees over 6 inches in diameter will be retained, unless the tree interferes with minimum inspection, access standards, or considered a hazard tree. The retention of mature trees is a priority and these trees will not be removed unless the tree presents an unacceptable hazard to the levee structural integrity, public infrastructure or adjacent private property. Vegetation maintenance work should be conducted in a way that does not kill or weaken the remaining trees, and retains saplings for continued growth of desirable species. Efforts will be made to identify and retain sapling trees within cluster areas to provide for long term successional growth of trees. Vegetation on silt benches formed upon levee structures will be preserved as feasible, unless site conditions indicate underlying structural concerns necessitate removal. Major vegetation clearing to allow for levee repairs will follow the standards of the Puyallup Tribal Vegetation Management Program. At all times, precautions will be taken to protect trees that might be retained as feasible. This may include flagging trees for retention, protective construction fencing, and working from the riverside in the dry when site conditions allow retention of the larger trees on the upper portion of the levee structure. Areas where vegetation is cleared for repairs or to remove undesirable vegetation (hazard trees or invasive species) will be replanted with native vegetation per plan details Figure XX.x. Pierce County Public Works 4

5 Targeted Invasive Species Removal: Specified non-native Invasive species will be controlled through a programmatic approach of working with resource agencies, tribal biologists, and private property owners. Mature Tree Preservation: Mature Trees may exist in sections of the levee where the general maintenance schematics would suggest their removal. Often these trees are integral to the structural integrity of the levee. These special situations will be evaluated on a case-by-case basis using a Site Specific Levee Vegetation Risk Matrix (See appendix XX.X). Recognizing the importance of retaining large trees within the riparian zone, Mature Trees will be retained to the furthest extent feasible. Hazardous Trees: Trees that pose a threat to levee structural integrity, nearby structures, public infrastructure and/or pose an elevated danger to the safety of maintenance personnel will be surveyed and monitored for degree of hazard based on level of risk (High, Medium, and Low). High Risk Hazard trees will be removed. Medium and Low Risk Hazard Trees will be monitored. Strategies for assessing and addressing potential hazard trees and reducing the impacts of vegetation removal will be developed. (See Appendix XX.X) Habitat Protection/Enhancement: Riparian vegetation along the levees will be maintained and enhanced with native plantings and removal of invasive plants to support habitat functions critical to fish and wildlife resources. Riparian Plantings will be provided to offset the removal of hazardous trees and removal of vegetation necessary to perform levee repairs. (See Chapter XX.x) Long Term Tree Preservation/Conservation: Long term riparian tree preservation will be directed to the area beyond the upland side of the levee, with a focus upon the first 200 feet of properties contained within the riverine shoreline environment. Efforts should be directed to retaining the largest mature trees that provide benefit to thermal cooling, as well as other benefits to habitat. Since approximately only 20 percent of the riparian corridor associated with the system of PL levees is under the control of Pierce County, it will be necessary to work closely with owners of private holdings to provide for additional long term preservation. As opportunities are made available, land may be set aside in conservation easements where existing native trees will be preserved and the area enhanced with appropriate conifer trees. Photo Illustration XX.x Levee vegetation along Ford Setback Levee near City of Orting Pierce County Public Works 5

6 Proposed Levee Vegetation Maintenance Schematics A Vegetation Management Zone is provided across the levee prism, extending from the upland side of the levee down to the structural toe of the levee. This represents the area of vegetation management influence addressed in this strategy. The Vegetation Management Zone is divided into five (5) subzones to guide vegetation removal to five commonly encountered levee structure scenarios. The subzones are described as follows: - Riparian Management Zone This zone is defined as the waterward slope measured from the waterward edge of the crown extending to the levee toe, but never extending waterward of the ordinary high water mark. The width of this zone is variable depending upon the presence of a gravel bar, silt bench, paved trail or levee height. - Clear Zone This zone is defined as the crown of the levee. The Clear Zone will be maintained to insure adequate vehicular access for a minimum width of 15 feet. - Backslope Zone This area is defined as the landward slope measured from the landward edge of the crown extending down to the levee toe. - Upland Zone This zone is defined as the area landward of the landward of the levee toe. - Inspection Zone This zone is defined as the area extending 8-10 feet above the ground between the landward toe and the waterward extent of the Riparian Zone. Figure X.x Levee Vegetation Management Sub Zones: The following Levee Maintenance Schematics (Schematics A-E) depict how vegetation would be maintained on typical levee structure prisms, for each management zone, relative to level of risk and habitat considerations. Pierce County Public Works 6

7 Levee Maintenance Schematic A River Channel Adjacent to Levee (w/o silt bench) This levee x-section depicts levees immediately adjacent to the river without a silt bench or floodplain bench area at the riverward toe of the levee. Type A levees have very limited space for balancing levee stability and safety risks, while maintaining some level of riparian vegetation function. Typically Type A levees are situated on a steep river bank that functions as the levee embankment. The maintenance approach for Type A levee sections allows for the growth of native trees and shrubs in the riparian management zone adjacent to the river. Woody riparian vegetation is preserved as feasible on the riverside levee slope in order to provide moderate riparian functions including bank stability, roughness, cover, shade, wood and nutrient contribution, water quality filtering and moderation Figure X.x of water temperature. Vegetation will be managed to provide for visual inspection of the levee on a rotational basis based on degree of risk exhibited on that portion of the levee segment. (See Levee Visual Inspection Standards - TBD) Mature vegetation ( Mature Trees ) situated upon the levee area,that are not identified as a hazard tree of high risk, nor interferes directly with vehicular access requirements, will be preserved to the greatest extent feasible. A Clear Zone is provided across the crest of the levee to remain clear of woody vegetation for vehicle access for purposes of maintenance work and in times of emergency. The Clear Zone will extend 5-15ft downslope of the Riparian and Backslope Zone as necessary to control growth of invasive plants and branches through routine mowing and limbing of tree branches that may crowd the clear zone. The backslope will be managed to provide visibility for inspection of possible seepage and structural integrity issues. An Upland Zone is provided beyond the landward toe as available for long-term enhancement and conservation protection. Pierce County Public Works 7

8 Levee Maintenance Schematic B Levee with Silt Bench (on levee structure) This levee x-section represents levees immediately adjacent to the river, with a silt bench on the riverward face of the levee. Type B levees also have limited space for balancing levee stability and safety risks, while maintaining some level of riparian function. The maintenance approach for Type B levee sections preserves native trees and shrubs on the silt bench zone of the levee adjacent to the river. The silt benches are typically found in the middle to downstream reaches of the Puyallup River System and have built up over time due to long term sediment accretion along the river bank. Typically the silt benches result in oversteepened river banks that lie above the levee structural prism Figure XX.x embankment. The silt bench is an area where native trees and shrubs have become established on silt deposits along the riverward slope of the levee. The silt provides a rooting zone on top of any riprap which may be present, which better protects the lower levee from potential tree impacts from uprooting. The vegetated silt bench along the levee may provide for further protection of the levee prism during high flow events. Levees with silt benches will be mapped for longer term protection. Woody riparian vegetation on the silt bench (below the levee prism) will be preserved in order to provide moderate riparian functions including bank stability, roughness, cover, shade, wood and nutrient contribution, water quality filtering and moderation of water temperature. Vegetation on the levee above the silt bench will be managed to provide for visual inspection of the levee on a rotational basis based on degree of risk exhibited on that portion of the levee segment (see Levee Visual Inspection Standards). Mature vegetation ( Mature Trees ) situated upon the levee area, above the silt bench, that are not identified as a hazard tree of high risk, nor interferes directly with vehicular access requirements, will be preserved to the greatest extent feasible. A Clear Zone is provided across the crest of the levee to remain clear of woody vegetation for vehicle access for purposes of maintenance work and in times of emergency. The Clear Zone will extend 5-15ft downslope of the Riparian and Backslope Zone as necessary to control growth of invasive plants and branches through routine mowing and limbing of tree branches that may crowd the clear zone. The backslope will be managed to provide visibility for inspection of possible seepage and structural integrity issues. An Upland Zone is provided beyond the landward toe as available for long-term enhancement and conservation protection. Pierce County Public Works 8

9 Levee Maintenance Schematic C - Concrete Panel Levee w Silt Bench/Access Road This levee x-section represents levees that were constructed along the lower reaches of the Puyallup River constructed of local riverine gravel soil mix and armored with concrete panels extending down below OHW with a silt bench formed on top of brush mats lying in front of the levee concrete panels adjacent to the river. The silt bench provides a medium where riverine vegetation grows. A maintenance access road has been established on portions of the levee silt bench. The maintenance approach for Type C levee sections preserves native trees and shrubs on the silt bench zone of the levee adjacent to the river, while allowing for visual inspection of the upper portions of the levee concrete panels above the silt bench. The silt benches are typically found in the lower reaches of the Puyallup River System and have built up over time due to long term sediment accretion along the river bank. The silt bench is an area Figure X.x where native trees and shrubs have become established on silt deposits along the riverward slope of the levee. The vegetation silt bench along the levee may provide for further protection of the levee concrete panels and levee prism during high flow events. Woody riparian vegetation on the silt bench (below the levee prism) will be preserved as feasible in order to provide moderate riparian functions including bank stability, roughness, cover, shade, wood and nutrient contribution, water quality filtering and moderation of water temperature. Vegetation on the levee above the silt bench will be managed to provide for vehicular access and visual inspection of the levee concrete panels. Mature vegetation ( Mature Trees ) situated upon the levee silt bench area, that are not identified as a hazard tree of high risk, nor interferes directly with vehicular access requirements, will be preserved to the greatest extent feasible. A Clear Zone is provided across the crest of the levee down to the lower silt bench access road, to remain clear of woody vegetation for purposes of vehicular access for maintenance work a d in times of emergency. The Clear Zone will extend 5-15ft downslope across the Riparian and Backslope Zone as necessary to control growth of invasive plants and branches through routine mowing and limbing of tree branches that may crowd the clear zone. The backslope will be managed to provide visibility for inspection of possible seepage and structural integrity issues. An Upland Zone is provided beyond the landward toe as available for long-term enhancement and conservation protection. Pierce County Public Works 9

10 Levee Maintenance Schematic D - Concrete Panel Levee w/ Silt Bench and Trail This levee x-section represents levees that were constructed along the lower - mid reaches of the Puyallup River constructed of local riverine gravel soil mix with a silt bench formed in front of the levee structure. In some locations, additional bank erosion controls have been provided along the silt bench, primarily around culvert/pipe discharge pipe outfalls. The silt bench provides a medium where riverine vegetation grows; including large deciduous trees. A levee trail and maintenance access road has been established on portions of the levee silt bench. The maintenance approach for Type D levee sections preserves native trees and shrubs on the silt bench zone of the levee adjacent to the river, while allowing for visual inspection of the levee prism above the silt bench. The silt benches are typically found in the lower mid reaches of the Puyallup River System and have built up over time due to long term sediment accretion along the river bank. The silt bench is an area where native trees and shrubs have become Illustration X.x established on silt deposits along the riverward slope of the levee. Large, Mature Trees are typically found growing upon the wellestablished silt bench. The vegetated silt bench along the levee may provide for further protection of the levee prism during high flow events. Woody riparian vegetation on the silt bench (below the levee prism) will be preserved as feasible in order to provide moderate riparian functions including bank stability, roughness, cover, shade, wood and nutrient contribution, water quality filtering and moderation of water temperature. Vegetation upon the silt bench will be managed for maintenance access and pedestrian safety purposes. Vegetation on the levee structure above the silt bench will be managed to provide for vehicular access and visual inspection of the levee prism. Mature trees situated upon the levee silt bench area and upon the levee prism, that are not identified as a hazard tree of high risk, nor interferes directly with vehicular access requirements, will be preserved to the greatest extent feasible. A Clear Zone is provided across the crest of the levee down to the lower silt bench access road, to remain clear of woody vegetation for purposes of vehicular access for maintenance work and in times of emergency. The clear zone will extend 5-15ft downslope across the Riparian and Backslope Zone as necessary to control growth of invasive plants and branches through routine mowing and limbing of tree branches that may crowd the clear zone. The backslope will be managed to provide visibility for Pierce County Public Works 10

11 inspection of possible seepage and structural integrity issues. An Upland Zone is provided beyond the landward toe as available for long-term enhancement and conservation protection. Levee Maintenance Schematic E Setback Levee with Floodplain Bench This levee x-section depicts levees (known as setback levees) that are 50 feet or more back from the active river channel, with a floodplain bench at the riverward toe of the levee that is at least 50 feet wide. If the floodplain bench (vegetated bar) is less than 50 feet wide, Levee Maintenance Schematic A or B applies. Typically, these floodplain benches are associated with constructed setback levees, and reflect the furthest extent that levees can be constructed under current land use constraints. Upon these vegetated bars (floodplain bench), all woody vegetation, trees and native shrubs are preserved and provide riparian functions including bank stability, roughness, cover, shade, wood recruitment, nutrient contribution, water quality filtering and moderation of water temperature. The levee prism will be maintained in grass for routine maintenance and inspection purposes. This approach recognizes that levees located 50 feet or more from the active channel provide for a greater level of riparian function compared to the other schematics, and can therefore be maintained in grass with less ecological impact. However, over time the river may migrate towards the levee and be less than 50 feet away, and vegetation maintenance may Illustration X.x need to change accordingly. If the river migrates to within 50 feet of the levee toe, the maintenance practices switch to Section A or B methods. If the river migrates further than 50 feet away from the Type A or Type B levee embankment, maintenance practices switch to those for Type E. The levee is maintained for ease of levee maintenance and for inspection purposes. A Clear Zone is provided across the crest of the levee to remain clear of woody vegetation for vehicle access for purposes of maintenance work and in times of emergency. The Clear Zone will extend to the toe of the slope or as necessary down the slope to control growth of invasive plants and branches through routine mowing and limbing of tree branches that may crowd the clear zone and for maintenance efficiency. The backslope will be managed to provide visibility for inspection of possible seepage and structural integrity issues. An Upland Zone is provided beyond the landward toe as available for long-term enhancement and conservation protection. Pierce County Public Works 11

12 Levee Vegetation Management Plan View Details The following illustration reflects the concept of how vegetation will be retained while providing for visual and physical access onto the levee for the purpose of levee inspection, maintenance and flood fighting. Woody riparian vegetation will be preserved as feasible on the riverside levee slope in order to provide moderate riparian functions including bank stability, roughness, cover, shade, wood and nutrient contribution, water quality filtering and moderation of water temperature. Vegetation that provides for shading of adjacent waters will be retained to the fullest extent feasible. Mature trees that provide for significant shade value will be retained as feasible. Additionally, all vegetation that provides shading by hanging over the water will be retained. Vegetation maintenance work should be conducted in a way that does not kill or weaken the remaining trees, and retains saplings for continued growth of desirable species. Vegetation on silt benches formed upon levee structures will be preserved as feasible, unless site conditions indicate underlying structural concerns necessitate removal. Levee vegetation understory within the riparian management zone will be thinned to provide visibility and physical access for inspections, retaining clusters of native shrubs and saplings approximately feet in diameter, for recruitment of future understory native vegetation and overstory trees. The cleared area around the native shrubs will be approximately 8-25 feet between clusters, depending on site conditions and character of vegetation. Backslope zone will retain clusters of understory vegetation around existing mature trees. A continuous buffer will be retained extending from below ordinary high water mark to a minimum 5 feet upland along the levee face. The buffer understory that does not overhang beyond OHW may be Figure X.x Pierce County Public Works 12

13 limbed up to a maximum height of 4 feet above the ground to provide for visual inspection of the levee toe in areas of higher risk to provide for visual inspection of the levee toe. Hazardous Trees The integrity of levees, floodwalls, embankment dams, and appurtenant structures is paramount to the public health, safety, and welfare. The presence of undesirable vegetation can undermine that integrity and lead to failure if not corrected. Trees and other woody vegetation, such as shrubs and vines, can create both structural and seepage instabilities, prevent adequate inspection, and create obstacles to maintenance and flood-fighting/flood-control activities. (ref.: ETL , Apr 30, 2014) It is recognized that vegetation on levees can impede inspection and introduce uncertainty for levee performance. Trees that become unstable can damage levees if they fall over and remove part of the levee prism as the tree rootball is overturn. Once a tree on a levee falls, the pit created by the rootball is susceptible to erosion and will likely result in damage to the levee if it is not stabilized. Cutting the tree before it falls will reduce the need for a future repair project. Mature vegetation ( Mature Trees ) situated upon the levee area, that are not identified as a hazard tree of high risk, nor interferes directly with vehicular access requirements, will be preserved to the greatest extent feasible. Strategies for assessing and addressing potential hazard trees and reducing the impacts of vegetation removal will be incorporated into standard operating procedures for levee condition assessment and vegetation work. Personnel will be trained to utilize a standard form for identifying potential trees that may pose a hazard to the operations and performance of the levee system Trees that pose a threat to levee structural integrity, nearby structures, public infrastructure and/or pose an elevated danger to the safety of maintenance personnel will be surveyed and monitored for degree of hazard based on level of risk (High, Medium, and Low). High Risk Hazard trees will be removed. Medium and Low Risk Hazard Trees will be monitored. Trees that may pose a threat to the structural integrity of the levee structure will be reviewed by an engineer to determine the level of risk to the levee structure. Trees that pose a high risk will be removed. Trees that appears to pose a moderate threat to neighboring properties, general public or nearby structures will be reviewed by a trained arborist to determine if the tree is healthy and stable or should be removed due to the health of the tree and risk imposed to neighboring properties. (See Vegetation Risk Matrix, Table XX.X) Hazard trees removed will be documented, indicating tree species, height, diameter, and orientation to the river. Trees removed will be offset with trees to be planted on the upper 1/3 of the levee riparian management zone, back slope zone, or the upland side of the levee upon County controlled land for long term preservation. Pierce County Public Works 13

14 Photos of common concerns of impacts posed by hazard trees upon levees. Trees can topple, damaging bank levee armoring Tree roots can penetrate levee embankment causing seepage and instability problems. Trees can direct river flows to induce scour. Tree rotation can damage levee slopes (Source, Charles Ifft, USACE Seattle District) Pierce County Public Works 14

15 Vegetation Risk Matrix The following protocol has been developed to establish a methodology to manage vegetation that threatens the structural integrity of flood risk reduction structures, i.e. hazard trees. Pierce County Public Works 15

16 Levee Plantings Planting native vegetation upon the levee system has been a component of the levee maintenance program for several decades. With the Puyallup Tribal Vegetation Management Agreement in 1989, replanting of the levees with willow plants became the standard practice following a levee repair project. Planting typically occurs during the winter months when plants are in a dormant period. Initially, rip rap levees were prepared with soil then willow livestakes were placed between the rocks. Once the plant roots establish and find their way between the rip rap then there is assurance the plant will survive long term. In most cases this program resulted in a productive riparian vegetated corridor. The program evolved to most recently supplementing the soil with mulch material to better retain moisture necessary for the plants to thrive in the harsh setting of planting amongst rip rap material. Levee vegetation is established on the system of levees by natural propagation as well as through the levee vegetation planting program following a levee repair. Native bare root plants are now preferred since the plants have a jump start on their root structure necessary to carry them through the first summer. Nisqually Levee prepared with soil for planting following repair work, 2013 Nisqually Levee native plants (red osier dogwood, willow, ninebark, snow berry, etc) installed, 2013 Pierce County Public Works 16

17 Planting Plan The following establishes the standards, specifications and protocols for replanting vegetation removed associated with levee repairs. Planting plans will be designed to allow inspection of levee structures and sufficient access for performing levee maintenance work and flood fighting operations, when needed. Access and inspection requirements will be incorporated into the planting plan following specifications for clustering and long term tree retention illustrated in Figure X.x. Plantings shall be installed to complement existing vegetation communities, and to promote a functional vegetation riparian zone over time. Plantings of native vegetation is integrated into levee repair work using two different techniques: 1) bioengineered brush layering; and 2) planting over topsoil-covered rock rip-rap. Technique 1: Bioengineered Brush Layering One example of the bioengineered brush layering is shown in figure XX.x. This technique occurs at the top of rock revetments, and includes lifts of topsoil (which may or may not be wrapped in a biodegradable geotextile fabric), and then placing live dormant branches in layers between these topsoil lifts. Photo illustration X.x Technique 1: Bioengineered brush layering Pierce County Public Works 17

18 Cottonwood poles can also be used for similar applications fitted between rip rap near the OHWM. The siting of the planting units to maximize plant-able area above the ordinary high water mark (OHWM) will help insure the success of plantings. Technique 2: Planting over Topsoil-covered Rock Riprap The second technique, an example of which is shown in photo 2, has had less success in long-term plant establishment and overall stability, but does include a more diverse plant species mix. This technique occurs after the rock riprap armor layer has been placed over the repaired levee. Topsoil is then placed on top of the rock riprap and plants are installed. Plants may be container grown or bareroot, depending on the time of year planting occurs. The main limiting factors for plant success with this technique over time are: soil depth and soil stability. Soil instability appears to be due to three potential causes. The first observed cause, as shown in the photo below, is instability of the toe from high water (flood events) that leads to unraveling of the topsoil mass. Photo 2 shows a distinct thinning and absence of vigorous vegetation of the lower portion of the soil/mulched area, as well as small scarps where the topsoil is less stable, indicative of the first cause of instability. The second cause is soil piping through the gaps within the underlying rock riprap due to void spaces. A third cause could be inconsistent and insufficient soil depths due to the irregularity of the underlying rock surface. All three of these causes increase the likelihood of installed plants mortality after a few growing seasons when soil depths can t accommodate the growing root systems and the plant s water and nutrient needs. Photo illustration X.x: Technique 2 Planting over topsoilcovered rock riprap Pierce County Public Works 18

19 The loss of topsoil depth can be addressed through the use of a stabilized toe, and the placement of a filter layer between the rock riprap and topsoil. Figure XX.x illustrates how these materials would be placed conceptually. The figure indicates that a 2-foot terrace in the rock riprap is needed in conjunction with a coir log or wood log to stabilize the toe as a lip to protect the topsoil from high water events. Figure XX.x - Rock placement and planting toe Anchoring of coir logs or wood logs over rock will require securing them to the underlying rock riprap using anchor bolts and chain or cable. Other options for the lip feature include a wider rock terrace, and/or additional rock extending above the terrace. The filter layer shall be comprised of clean quarry pit run material, with the intent of filling the voids between the rip rap rock and providing drainage for the upper planting medium. Riparian Plant Selection To improve upon the ecological services provided by riparian buffers, Pierce County will manage the growth of vegetation, promoting both a functional riparian buffer contributing to the benefit of fish and wildlife, while also insuring structural integrity through proper plant selection and adaptive management. Vegetation positively affects the mass stability of slopes through root reinforcement of the soil, helping to offset the scour effects of the rivers by calming river flow and lessening the effects upon the levee structure. Pierce County Public Works 19

20 Plantings will be comprised of a mix of native vegetation typically found within a northwest riparian environment (see Figure XX.x). The Lower 2/3 rd of the levee face will be typically planted with a mix of willow including Hookers Willow (Salix hookeriana), Pacific Willow (Salix lucida), Scouler s Willow (Salix scouleriana ), and Sitka Willow (Salix sitchensis). Additional native plant shrubs will be incorporated into the plantings to provide greater diversity, food source, and habitat. Compost material will be placed around the plantings to provide for moisture retention and erosion control. See Figure XX.x for list of plants. Willow Plant Species (typ.) Hookers Willow (Salix hookeriana) Pacific Willow (Salix lucida) Scouler s Willow (Salix scouleriana ) Sitka Willow (Salix sitchensis) Pierce County Public Works 20

21 The upper 1/3 rd of the levee will be planted in a mix of native shrubs, willows, and taller growing trees, such as big leaf maple and conifer trees. The upper portion of the levee is typically above the high flows of the river, insuring higher probability of planting success. Additionally, soil medium will be prepared to allow for natural tree regeneration from seed broadcast from adjacent sources where available. Observation has found that vegetation growth from natural propagation tends to have a higher level of success. Emphasis will be placed upon planting taller growing trees in the upper 1/3 rd or back side of levee where the tree can provide maximum benefit for shading sun exposure (typically on the south side of an eastwest oriented river reach). Trees planted on the levee face that promote a root structure that is beneficial to levee structural integrity will be chosen. Installing shade-tolerant conifer plantings within the initial bioengineered installation area will increase the biodiversity of the site, adding species that will grow much larger than the willows. Over the long term, the conifers will provide year-round shading and potentially greater over-hanging vegetation, and large wood contribution benefits. In addition, planting conifers after the initial establishment of the willows, or other commonly used deciduous species, will diversify the plant palette. The willows will provide shade to conifer species that might have been too exposed to sun if they had been installed as small container plants initially. These species could include Big Leaf Maple (Acer macrophyllum), Grand Fir (Abies grandis), Western red cedar (Thuja plicata), and Western hemlock (Tsuga heterophylla). Native tree species such as pacific alder and black cottonwood that grow from natural propagation will be accommodated in the planting area. These saplings grow at a fast rate and will provide additional shading of the understory planted shrubs and shading of the river banks in short time; while also providing increased diversity and nutrients to the riparian planting area. Volunteer tree saplings will be thinned overtime to conform to the levee planting plan view details depicted in figure XX.x. Pierce County Public Works 21

22 Native Tree Species List (typ.) Figure XX.x Pierce County Public Works 22

23 Native Shrub Species List (typ.) Species Bareroot Plant Specification Figure XX.x Red Osier Dogwood Cornus sericea (C. stolonifera) -, Red 18-36" Osier Dogwood Pacific Ninebark - Physocarpus capitatus " Pacific Willow - Salix lucida 36"+ Sitka Willow - Salix sitchensis 36 + Rubus spectabilis - Salmonberry 6-12" Nootka Rose - Rosa nutkana 18-36" Snow Berry - Symphoricarpos albus- Snow Berry 12-18" Pierce County Public Works 23

24 Further reading: King County, 2016 King County Interim System Wide Improvement Framework. King County website. Adams, Ashley N Determining the effects of vegetation on levee structural integrity on the Green River in King county, Washington. University of Washington. Battelle Memorial Institute (2008), Revised Final Independent Peer Review Report for U.S. Army Corps of Engineers Vegetation Policy for Local Flood Damage Reduction Systems, Columbia, OH. California Department of Water Resources (2011), Effects of U.S. Army Corps of Engineers Policy on Levee Vegetation in California, a useful web site. Hanak, E., J. Lund, A. Dinar, B. Gray, R. Howitt, J. Mount, P. Moyle, and B. Thompson, Managing California s Water: From Conflict to Reconciliation, Public Policy Institute of California, San Francisco, CA, 500 pp., February Haselsteiner, R. (2010): Woody Vegetation on Small Embankments. 8th ICOLD European Club Symposium, From research to design in European practice, 22th 23th September 2010 in Innsbruck, Austria (and a nice ppt presentation) Kelley, R Battling the Inland Sea. Berkeley: University of California Press. MBK Engineers (2010), Natomas Levee Improvement Program, Phase 3 Project, Appendix B Levee Vegetation Management, for Sacramento Area Flood Control Agency, Sacramento, CA. TAW (1999), Grass Cover as a Dike Revetment, Technical Advisory Committee for Flood Defence in The Netherlands. USACE (2009), Guidelines for Landscape Planting and Vegetation Management at Levees, Floodwalls, Embankment Dams, and Appurtenant Structures, ETL , US Army Corps of Engineers. USACE (2007), Treatment of Vegetation within Local Flood Damage Reduction Systems USACE (n.d.), Issues Regarding Vegetation Management On Levee Embankments, REMR Technical Note Ei-M-1,4, US Army Corps of Engineers, Waterways Experiment Station, Vicksburg, MS. USACE (n.d.), Vegetation and the Structural Integrity of Levees: Results Of Field Investigations, REMR Technical Note Ei-M-1,3, US Army Corps of Engineers, Waterways Experiment Station, Vicksburg, MS. USACE (n.d.), Questions and Answers on Variance from Vegetation Standards for Levees and Floodwalls Policy: Guidance Letter. USACE (2009), Temporary extension of P.L Rehabilitation Eligibility for Non-Federal Sponsors. Implementing System-wide Improvements, Memorandum from Steven Stockton, USACE Director of Civil Works, April 9, Pierce County Public Works 24

D RAFT MEMORANDUM CURRENT PLANTING TECHNIQUES. Technique 1: Bioengineered Brush Layering. To: Date: January 20, 2016

D RAFT MEMORANDUM CURRENT PLANTING TECHNIQUES. Technique 1: Bioengineered Brush Layering. To: Date: January 20, 2016 720 Olive Way, Suite 1900 Seattle, Washington 98101 Phone 206.287.9130 Fax 206.287.9131 www.anchorqea.com D RAFT MEMORANDUM To: Rob Wenman, Pierce County Public Works and Utilities Date: From: Betsy Severtsen,

More information

Stormwater Standards. Clackamas County Service District No. 1. Planting Guide for Buffers

Stormwater Standards. Clackamas County Service District No. 1. Planting Guide for Buffers Stormwater Standards Clackamas County Service District No. 1 APPENDIX B Planting Guide for Buffers Table of Contents Appendix B - Planting Guide for Buffers... Page B.1 General... 1 B.1.1 Introduction...

More information

Juneau Watershed Partnership

Juneau Watershed Partnership Juneau Watershed Partnership Native Plant Resource Center Final Report A Partners for Fish and Wildlife Project Prepared for: U.S. Fish and Wildlife Service For Grant #F11C00552 Prepared by: The Juneau

More information

Guidelines for Streambank Protection

Guidelines for Streambank Protection PDHonline Course C187 (3 PDH) Guidelines for Streambank Protection Instructor: John Poullain, PE 2012 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA 22030-6658 Phone & Fax: 703-988-0088 www.pdhonline.org

More information

STILL CREEK CD-1 GUIDELINES (BY-LAW NO. 6654) Adopted by City Council April 24, 1990

STILL CREEK CD-1 GUIDELINES (BY-LAW NO. 6654) Adopted by City Council April 24, 1990 $2 City of Vancouver Land Use and Development Policies and Guidelines Community Services, 453 W. 12th Ave Vancouver, BC V5Y 1V4 F 604.873.7344 fax 873.7060 planning@city.vancouver.bc.ca STILL CREEK CD-1

More information

STREAM ALTERATION PRACTICES

STREAM ALTERATION PRACTICES STREAM ALTERATION PRACTICES Stream Diversion Channel SDC DEFINITION A temporary channel constructed to convey stream flow around in-stream construction. PURPOSE Stream diversion channels are used to allow

More information

Guiding Landowners in Stream Restoration. The Science, Practice & Art of Restoring Native Ecosystems 2015

Guiding Landowners in Stream Restoration. The Science, Practice & Art of Restoring Native Ecosystems 2015 Guiding Landowners in Stream Restoration The Science, Practice & Art of Restoring Native Ecosystems 2015 January 24, 2015 Guiding Landowners in Stream Restoration January 24, 2015 Agenda 1Watershed Planning

More information

5.0 Storm Water Landscape Guidance Introduction

5.0 Storm Water Landscape Guidance Introduction 5.0 Storm Water Landscape Guidance Introduction Landscaping is a critical element to improve both the function and appearance of storm water management practices. Integrated storm water landscapes can

More information

Joint Public Notice. Public Notice Date: February 9, 2015 Expiration Date: March 11, 2015

Joint Public Notice. Public Notice Date: February 9, 2015 Expiration Date: March 11, 2015 US Army Corps of Engineers Seattle District Joint Public Notice Application for a Department of the Army Permit and a Washington Department of Ecology Water Quality Certification and/or Coastal Zone Management

More information

STREAM BUFFERS

STREAM BUFFERS 88-415 STREAM BUFFERS 88-415-01 PURPOSE In the Kansas City region and throughout the nation, vegetated stream buffers have been clearly shown to protect stream stability and related infrastructure, improve

More information

DEPARTMENT OF THE ARMY ETL U.S. Army Corps Engineers CECW-CE Washington, DC Technical Letter No April 2009

DEPARTMENT OF THE ARMY ETL U.S. Army Corps Engineers CECW-CE Washington, DC Technical Letter No April 2009 DEPARTMENT OF THE ARMY ETL 1110-2-571 U.S. Army Corps Engineers CECW-CE Washington, DC 20314-1000 Technical Letter No. 1110-2-571 10 April 2009 EXPIRES 10 April 2014 Engineering and Design GUIDELINES FOR

More information

Veranda Park Planting Plan Draft 10/08/10

Veranda Park Planting Plan Draft 10/08/10 Planting Plan Native Plant Selection Trees and Shrubs Plants were selected based on what species were indentified onsite, information from the Medford Riparian Ordinance, and typical native riparian species

More information

Department of Agriculture. Conservation Service. United States. Natural Resources REVISED 8/26/16

Department of Agriculture. Conservation Service. United States. Natural Resources REVISED 8/26/16 GENERAL NOTES: SYMBOL LEGEND 1. All work shall comply with the constriction specifications, drawings, project-specific quality assurance plan and other contract requirements. 2. All notes on the drawings

More information

Is a Riparian Restoration Still Viable After 100-year Storm Events Alter the Original Design?

Is a Riparian Restoration Still Viable After 100-year Storm Events Alter the Original Design? Is a Riparian Restoration Still Viable After 100-year Storm Events Alter the Original Design? Sarah Spear Cooke, Ph.D. Seattle, Washington Presentation Outline Introduction The site pre-restoration Restoration

More information

FirstLight Power Shoreline Management Manual Sustainable Shoreline Designs: From Long Island to Lake Erie Webinar Series

FirstLight Power Shoreline Management Manual Sustainable Shoreline Designs: From Long Island to Lake Erie Webinar Series FirstLight Power Shoreline Management Manual Sustainable Shoreline Designs: From Long Island to Lake Erie Webinar Series Presented by Jason Williams, PLA, NCI February 19, 2017 Introduction Lakes (impoundments)

More information

GUIDELINES FOR LANDSCAPE PLANTING AND VEGETATION MANAGEMENT AT LEVEES, FLOODWALLS, EMBANKMENT DAMS, AND APPURTENANT STRUCTURES

GUIDELINES FOR LANDSCAPE PLANTING AND VEGETATION MANAGEMENT AT LEVEES, FLOODWALLS, EMBANKMENT DAMS, AND APPURTENANT STRUCTURES 30 April 2014 US Army Corps of Engineers ENGINEERING AND DESIGN GUIDELINES FOR LANDSCAPE PLANTING AND VEGETATION MANAGEMENT AT LEVEES, FLOODWALLS, EMBANKMENT DAMS, AND APPURTENANT STRUCTURES THIS PAGE

More information

Wisconsin NRCS Direct Volume Method Bank Recession Rate Categorizations

Wisconsin NRCS Direct Volume Method Bank Recession Rate Categorizations 2 Executive Summary The City of Ramsey contracted the Anoka Conservation District to complete an inventory of riverbank condition along the entire 5.8 miles of City that border the Mississippi River. The

More information

Buffer Zone (BZ) Stream Protection. The width and plant composition of a buffer zone will determine its effectiveness.

Buffer Zone (BZ) Stream Protection. The width and plant composition of a buffer zone will determine its effectiveness. Buffer Zone (BZ) Figure BZ-1 Buffer Zone in Agricultural Area Practice Description A buffer zone is a strip of plants adjacent to land-disturbing sites or bordering streams, lakes, and wetlands that provides

More information

Lake Nokomis Shoreline Enhancement Project

Lake Nokomis Shoreline Enhancement Project Lake Nokomis Shoreline Enhancement Project Community Meeting 2 February 13, 2018 Agenda Current Problems Project Goals Project Status Existing Conditions Community Input Draft Schematic Design Long-term

More information

Bio-Engineering Techniques to Revegetate Streambanks

Bio-Engineering Techniques to Revegetate Streambanks Bio-Engineering Techniques to Revegetate Streambanks DORMANT CUTTINGS Dormant cuttings are harvested from living woody plants. The cuttings are prepared from branches of woody plants when the plant is

More information

Section 3 Non-Structural BMPs

Section 3 Non-Structural BMPs 3.1 Stream Buffers A stream buffer or stream setback is a designated area around a stream, lake, or wetland left in a natural, densely vegetated state so as to protect the receiving water quality and provide

More information

Stream Bank Erosion: Soil Bioengineering Solutions

Stream Bank Erosion: Soil Bioengineering Solutions Stream Bank Erosion: Soil Bioengineering Solutions The principal causes of streambank erosion can be classed as geologic, climatic, vegetative, and hydraulic. These causes may act independently, but normally

More information

The Impact of Woody Vegetation on Levees Research Experiences from Austria

The Impact of Woody Vegetation on Levees Research Experiences from Austria EGU 2012 LEVEE VEGETATION RESEARCH SYMPOSIUM 2012 Sacramento, California, August 28 30, 2012 The Impact of Woody Vegetation on Levees Research Experiences from Austria Walter LAMMERANNER Institute of Soil

More information

PERMANENT SEEDING. Overview of Sedimentation and Erosion Control Practices. Practice no. 6.11

PERMANENT SEEDING. Overview of Sedimentation and Erosion Control Practices. Practice no. 6.11 Overview of Sedimentation and Erosion Control Practices Practice no. 6.11 PERMANENT SEEDING Permanent vegetation controls erosion by physically protecting a bare soil surface from raindrop impact, flowing

More information

Grave Creek Riparian Revegetation 2011 Implementation Report

Grave Creek Riparian Revegetation 2011 Implementation Report Task Order #1008 Grave Creek Riparian Revegetation 2011 Implementation Report Prepared for: Kootenai River Network P.O. Box 491 Libby, MT 59923 Prepared by: Geum Environmental Consulting, Inc. 307 State

More information

ADDENDUM TO BIOLOGICAL SCOPING SURVEY REPORT, BOTANICAL SURVEY AND WETLAND DELINEATION

ADDENDUM TO BIOLOGICAL SCOPING SURVEY REPORT, BOTANICAL SURVEY AND WETLAND DELINEATION ADDENDUM TO BIOLOGICAL SCOPING SURVEY REPORT, BOTANICAL SURVEY AND WETLAND DELINEATION FOR AVALON INN (APN 069-241-27 & -04) 1201 & 1211 NORTH MAIN STREET FORT BRAGG, CA MENDOCINO COUNTY prepared for:

More information

FURNEAUX CREEK 5 CHANNEL

FURNEAUX CREEK 5 CHANNEL FURNEAUX CREEK 5 CHANNEL AND TRAIL IMPROVEMENTS TEXAS CHAPTER AMERICAN PUBLIC WORKS ASSOCIATION PROJECT OF THE YEAR CATEGORY: ENVIRONMENT PROJECT OF $2 MILLION BUT LESS THAN $5 MILLION ENGINEERING DEPARTMENT,

More information

Technical Manual for Dam Owners Impact of Plants on Earthen Dams FEMA 534

Technical Manual for Dam Owners Impact of Plants on Earthen Dams FEMA 534 Technical Manual for Dam Owners Impact of Plants on Earthen Dams FEMA 534 Presented by William Bouley, PE Technical Service Center Bureau of Reclamation Who Developed FEMA 534? North Carolina State University

More information

EROSION & SEDIMENT CONTROL

EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL 1 EROSION & SEDIMENT CONTROL Effective Soil & Water Protection Whether you want to prevent soil erosion caused by rain, water and wind, or protect waterways from inevitable build

More information

Zoning Ordinance Article 3

Zoning Ordinance Article 3 Article 3 Natural Resources Protection Section 301 Natural Resources Protection 301.1. Purpose - The following natural resources protection standards are established to protect the public health, safety

More information

When planning stormwater management facilities, the following principles shall be applied where possible.

When planning stormwater management facilities, the following principles shall be applied where possible. 2.0 Principles When planning stormwater management facilities, the following principles shall be applied where possible. 2.0.1 Drainage is a regional phenomenon that does not respect the boundaries between

More information

2011 ASLA Design Awards. Coyote Gulch Honor Award and Land Stewardship Designation Valerian LLC. Environmental Restoration and Reclamation

2011 ASLA Design Awards. Coyote Gulch Honor Award and Land Stewardship Designation Valerian LLC. Environmental Restoration and Reclamation 2011 ASLA Design Awards Honor Award and Land Stewardship Designation Valerian LLC Environmental Restoration and Reclamation Project Name: Category : Project Location: 5 2011 Environmental Restoration and

More information

Banking on Natural Fibers Products made from coir and jute play a key role in stabilizing a restored stream for a commercial stream mitigation bank.

Banking on Natural Fibers Products made from coir and jute play a key role in stabilizing a restored stream for a commercial stream mitigation bank. Banking on Natural Fibers Products made from coir and jute play a key role in stabilizing a restored stream for a commercial stream mitigation bank. By Greg Northcutt When White Creek Mitigation, LLC,

More information

DITCH BANK STABILIZATION TECHNIQUES

DITCH BANK STABILIZATION TECHNIQUES onstructed Ditch Drainage anagement Guide - No. 0 in series Order No. 5.0- December 00 DITH BANK STABILIZATION TEHNIQUES It is important to maintain ditches using practices that ensure ditch banks remain

More information

Alternate Green Stream Bank Stabilization Methods

Alternate Green Stream Bank Stabilization Methods U.S. Army Corps of Engineers Philadelphia/Baltimore Districts Alternate Green Stream Bank Stabilization Methods Wissahickon Creek, Tannery Run and Rose Valley Creek Bo-Rit Asbestos Site Ambler, Pennsylvania

More information

Riparian Restoration Plan for the Quiet Waters Homeowners Association Reach of the Yachats River. Site Overview

Riparian Restoration Plan for the Quiet Waters Homeowners Association Reach of the Yachats River. Site Overview Walama Restoration Project Community Supported Rehabilitation And Native Re-vegetation of our Watersheds PO Box 894 Eugene, OR 97440 541.484.3939 info@walamarestoration.org www.walamarestoration.org Riparian

More information

Shoreline Stabilization Using Wetland Plants and Bioengineering

Shoreline Stabilization Using Wetland Plants and Bioengineering Shoreline Stabilization Using Wetland Plants and Bioengineering by Cathy J. Wendt & Hollis H. Allen PURPOSE This is a case study in which wetland plants and bioengineering treatments were used to protect

More information

Property Owner s Guide to Creek and Shoreline Maintenance

Property Owner s Guide to Creek and Shoreline Maintenance 2014 Property Owner s Guide to Creek and Shoreline Maintenance City of O Fallon This guide for homeowners of creekside property is intended to serve as a reference for helping homeowners understand what

More information

Environmental Protection Ordinances (Performance Zoning) Bedminster Township, Bucks County

Environmental Protection Ordinances (Performance Zoning) Bedminster Township, Bucks County Environmental Protection Ordinances (Performance Zoning) Bedminster Township, Bucks County ARTICLE VI. PERFORMANCE STANDARDS Section 600 Compliance All uses, activities, subdivisions and/or land developments

More information

Natural Shorelines. for Inland Lakes. A Landowner s Guide to using. to STABLIZE SHORELINES, Michigan s inland lakeshore.

Natural Shorelines. for Inland Lakes. A Landowner s Guide to using. to STABLIZE SHORELINES, Michigan s inland lakeshore. Natural Shorelines for Inland Lakes A Landowner s Guide to using NATURAL MATERIALS to STABLIZE SHORELINES, IMPROVE WATER QUALITY and ENHANCE WILDLIFE HABITAT along Michigan s inland lakeshore. Natural

More information

Chapter 5: Natural Resources and Environment

Chapter 5: Natural Resources and Environment NATURAL RESOURCES AND ENVIRONMENT 5-1 5 Chapter 5: Natural Resources and Environment BACKGROUND AND INTENT Urban expansion represents the greatest risk for the future degradation of existing natural areas,

More information

SECTION 6. Routine Maintenance Activity Details

SECTION 6. Routine Maintenance Activity Details SECTION 6 Routine Maintenance Activity Details 80. DEBRIS REMOVAL When Deadfall, and other objects, such as shopping carts, tires, appliances, and mattresses have accumulated in the drain. Why To prevent

More information

Property. Line. Fence. Plantings. Vegetated Buttress. With Sun Tolerant. Vegetated Terrace. Tolerant Plantings Existing

Property. Line. Fence. Plantings. Vegetated Buttress. With Sun Tolerant. Vegetated Terrace. Tolerant Plantings Existing PREFERRED ALTERNATIVE - CROSS SECTIONS 92 Existing Pool Property Line 2 6 10 14 0 4 8 12 16 Existing Armour Stone Wall Existing Proposed 18 22 20 24 26 30 28 32 34 36 38 Property Line 40 44 48 52 56 42

More information

Zoning Ordinance Chapter 10

Zoning Ordinance Chapter 10 CHAPTER 10 - WASHES SECTION 10.0 GENERAL: A. The purpose of this Ordinance is to establish standards for development in or near Major and Minor Washes as defined in Appendix A Glossary of Terms and Definitions

More information

WETLAND SOD u Bare Root Wetland Plants u Deep Rooted Willows u Coir Logs u Native Trees & Shrubs u Habitat Islands u Custom Growing

WETLAND SOD u Bare Root Wetland Plants u Deep Rooted Willows u Coir Logs u Native Trees & Shrubs u Habitat Islands u Custom Growing WETLAND SOD u Bare Root Wetland Plants u Deep Rooted Willows u Coir Logs u Native Trees & Shrubs u Habitat Islands u Custom Growing 2009 PROJECT HIGHLIGHTS The following 10 projects highlight the interesting

More information

Design Considerations for Open Channel and Detention Pond Design. Howard Redfearn, City of Mansfield

Design Considerations for Open Channel and Detention Pond Design. Howard Redfearn, City of Mansfield Design Considerations for Open Channel and Detention Pond Design Howard Redfearn, City of Mansfield Previous Experience/Criteria/Maintenance Issues New Criteria Discussion Overview Where is Mansfield?

More information

Coir Block System (fabric attached coir block) add New Dimension to Streambank Stabilization Projects

Coir Block System (fabric attached coir block) add New Dimension to Streambank Stabilization Projects Coir Block System (fabric attached coir block) add New Dimension to Streambank Stabilization Projects Using geotextiles to confine soil in lifts between layers of live plants has become an increasingly

More information

Improving Communities Through the Arroyo Seco Sustainability Campaign and Watershed Assessment

Improving Communities Through the Arroyo Seco Sustainability Campaign and Watershed Assessment Improving Communities Through the Arroyo Seco Sustainability Campaign and Watershed Assessment Arroyo Seco Headwaters in the San Gabriel Mountains Major tributary to the Los Angeles River 44 square mile

More information

VEGETATED SLOPE STABILIZATION DESCRIPTION APPLICABILITY. Advantages

VEGETATED SLOPE STABILIZATION DESCRIPTION APPLICABILITY. Advantages 4.2-d VEGETATED SLOPE STABILIZATION Alternative Names: Willow Wattles, Live Bundles, Fascines, Live Staking, Joint Planting, Branch Packing, Brush Layering, and Brush Matting DESCRIPTION Vegetated slope

More information

Rule D Wetland and Creek Buffers

Rule D Wetland and Creek Buffers Rule D Wetland and Creek Buffers 1 Policy It is the policy of the Board of Managers to ensure the preservation of the natural resources, recreational, habitat, water treatment and water storage functions

More information

BUFFERS, TREE PROTECTION AND LANDSCAPING. Sec Purpose and Intent.

BUFFERS, TREE PROTECTION AND LANDSCAPING. Sec Purpose and Intent. ARTICLE 20 BUFFERS, TREE PROTECTION AND LANDSCAPING Sec. 20.1. Purpose and Intent. Trees improve air and water quality, reduce soil erosion, reduce noise and glare, provide habitat for desirable wildlife,

More information

Stream Restoration: Working with Nature?

Stream Restoration: Working with Nature? Stream Restoration: Working with Nature? Greg Jennings, PhD, PE jenningsenv@gmail.com Ecosystem Restoration activities that initiate or accelerate the recovery of ecosystem health, integrity, and sustainability

More information

Stream Restoration: Working with Nature? Greg Jennings, PhD, PE

Stream Restoration: Working with Nature? Greg Jennings, PhD, PE Stream Restoration: Working with Nature? Greg Jennings, PhD, PE jenningsenv@gmail.com Ecosystem Restoration activities that initiate or accelerate the recovery of ecosystem health, integrity, and sustainability

More information

Biotechnical streambank stabilization

Biotechnical streambank stabilization Traditional streambank stabilization Biotechnical streambank stabilization Channelization alters: shape pattern slope bed morphology cover Ecological effects: loss of riparian habitat loss of fish habitat

More information

Presentation to Parks and Open Space Advisory. Committee September 22, 2016

Presentation to Parks and Open Space Advisory. Committee September 22, 2016 Flood Planning & Preliminary Design Services for South St. Vrain Creek Restoration at Hall Ranch Presentation to Parks and Open Space Advisory Prepared for: Boulder County, Colorado Committee September

More information

Water Sensitive Urban Design Site Development Guidelines and Practice Notes. Appendix

Water Sensitive Urban Design Site Development Guidelines and Practice Notes. Appendix Water Sensitive Urban Design Site Development Guidelines and Practice Notes Appendix 108 Appendix A Water sensitive developments involve simple design and management practices that take natural site features

More information

Joe Pool Lake Master Plan Revision Public Information Meeting May 23, 2017

Joe Pool Lake Master Plan Revision Public Information Meeting May 23, 2017 Joe Pool Lake Master Plan Revision Public Information Meeting May 23, 2017 Presented By Jason Owen Lake Manager U.S. Army Corps of Engineers Fort Worth District US Army Corps of Engineers Purpose of this

More information

TRCA Field Staking Protocol December 2016

TRCA Field Staking Protocol December 2016 Page 1 of 6 TRCA Field Staking Protocol December 2016 This Protocol describes TRCA staff s current practice for field staking the physical top of bank, the physical toe of slope, and the limit of existing

More information

OLD BUSINESS NEW BUSINESS A. JIM CONWAY 2016-WTRA B. KENNETH CALISE 2016-WTRA C. SAGIE DORON 2016-WTRA-00060

OLD BUSINESS NEW BUSINESS A. JIM CONWAY 2016-WTRA B. KENNETH CALISE 2016-WTRA C. SAGIE DORON 2016-WTRA-00060 May 12, 2016 TO: Wetlands Board Members FROM: Richard W. Scarper RE: May, 2016 Wetlands Board Applications Attached are the Planning Department's administrative comments for the following wetlands/dunes

More information

Vegetated Filter Strips and Buffers

Vegetated Filter Strips and Buffers 3.15 Sediment Control Description: Buffer strips (existing vegetation) and filter strips (planted vegetation) are sections of vegetated land adjacent to disturbed areas. They are designed with low slopes

More information

Protocol for Sustainable Roadsides

Protocol for Sustainable Roadsides Protocol for Sustainable Roadsides Williamson County October 2010 Final Draft Protocol for Sustainable Roadsides Williamson County October 2010 Final Draft Prepared for: Williamson County, Texas Prepared

More information

Hidden Pointe Landscape Master Plan. June, archi terra

Hidden Pointe Landscape Master Plan. June, archi terra Hidden Pointe Landscape Master Plan June, 2006 t h e archi terra g r o u p 1 Table of Contents Background Purpose and Goals of the Master Plan Master Plan Process Existing Conditions Entrance Hidden Pointe

More information

Soil bioengineering and ecological

Soil bioengineering and ecological Soil bioengineering and ecological systems Techniques Click to proceed... Copyright 2001 Maccaferri Inc. All rights reserved. All reproduction, including photocopy, film and microfilm, is forbidden. Release

More information

Restoration of Riparian Buffer at the Former Smelt Hill Dam Site, Falmouth, Maine

Restoration of Riparian Buffer at the Former Smelt Hill Dam Site, Falmouth, Maine Restoration of Riparian Buffer at the Former Smelt Hill Dam Site, Falmouth, Maine Final Report June 30, 2006 Page 1 of 16 I. Project Title Restoration of Riparian Buffer at the Former Smelt Hill Dam Site,

More information

Low Gradient Velocity Control Short Term Steep Gradient [1] Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent

Low Gradient Velocity Control Short Term Steep Gradient [1] Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent Grass Linings DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient [1] Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] May be used on short, steep

More information

USING PLANTS TO STABILIZE STREAM BANKS

USING PLANTS TO STABILIZE STREAM BANKS USING PLANTS TO STABILIZE STREAM BANKS This handout is intended to provide you with a general orientation to the three most common and practicable soil-bioengineering techniques. In a number of situations,

More information

ANDERSON RIVER PARK SIDE CHANNEL HABITAT RESTORATION PROJECT. Public Outreach Meeting June 5, 2017

ANDERSON RIVER PARK SIDE CHANNEL HABITAT RESTORATION PROJECT. Public Outreach Meeting June 5, 2017 ANDERSON RIVER PARK SIDE CHANNEL HABITAT RESTORATION PROJECT Public Outreach Meeting June 5, 2017 Welcome and Introductions Providing Feedback Anderson River Park is an important part of the community

More information

HYDRAULIC DESIGN involves several basic

HYDRAULIC DESIGN involves several basic Chapter 6 Tools for Hydr draulic and Road Design HYDRAULIC DESIGN involves several basic concepts that must be considered to build successful projects with a minimum risk of failure (Photo 6.1). Use of

More information

Plant Selection: Principles

Plant Selection: Principles Plant Selection, Forms & Sources Warren Gold REN capstone November 7, 2008 This presentation will focus on principles For specific information on species see resources on handout, books, instructors Plant

More information

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT NOT WELL 800 - Urban Stormwater Wetlands A constructed system of shallow pools that create growing conditions for wetland plants to lessen the impacts of stormwater quality and quantity in urban areas.

More information

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS 5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS Low Impact Development (LID) requires a shift in stormwater management away from conveying runoff to a small number of downstream points through hydraulically

More information

PARK CITY MUNICIPAL CODE TABLE OF CONTENTS TITLE 15 LAND MANAGEMENT CODE - CHAPTER 2.21

PARK CITY MUNICIPAL CODE TABLE OF CONTENTS TITLE 15 LAND MANAGEMENT CODE - CHAPTER 2.21 PARK CITY MUNICIPAL CODE TABLE OF CONTENTS TITLE 15 LAND MANAGEMENT CODE - CHAPTER 2.21 TITLE 15 - LAND MANAGEMENT CODE CHAPTER 2.21 - SENSITIVE LAND OVERLAY ZONE (SLO) REGULATIONS 15-2.21-1. PURPOSE...1

More information

APPENDIX C NATURAL RESOURCES MANAGEMENT PLAN: ACTIONS AND PRIORITIES

APPENDIX C NATURAL RESOURCES MANAGEMENT PLAN: ACTIONS AND PRIORITIES APPENDIX C NATURAL RESOURCES MANAGEMENT PLAN: ACTIONS AND PRIORITIES TABLE C-1: Resource Actions and Priorities GOAL NRM-4 Objective 4.1: Restore Natural floodplain functions. Objective 4.2: Define and

More information

Natural Shoreline Landscapes on Michigan Inland Lakes. Introduction. Workshop for Property Owners. Photo by Jane Herbert

Natural Shoreline Landscapes on Michigan Inland Lakes. Introduction. Workshop for Property Owners. Photo by Jane Herbert Natural Shoreline Landscapes on Michigan Inland Lakes Workshop for Property Owners Introduction Photo by Jane Herbert MSU is an affirmative action, equalopportunity employer. Michigan State University

More information

SECTION 5: REACH RECOMMENDATIONS/MAPS

SECTION 5: REACH RECOMMENDATIONS/MAPS SECTION 5: REACH RECOMMENDATIONS/MAPS This section describes areas of concern and provides specific recommendations for each project reach. Locations of stormwater drains were from GIS coverage supplied

More information

City of Shady Cove Riparian Ordinance Ordinance XXX

City of Shady Cove Riparian Ordinance Ordinance XXX 1 Updated October 8, 2015 City of Shady Cove Riparian Ordinance Ordinance XXX This language is to be located in Chapter 155 of the Shady Cove Code of Ordinances. This will affect property inside city limits,

More information

Surrey Ecosystem Management Study

Surrey Ecosystem Management Study Surrey Ecosystem Management Study Green Infrastructure Network Opportunities Public Open House & Information Session June 24 th, 2010 EMS Process Ecological Inventory Ecological Assessment Management Policy

More information

Town of Essex Small Site Erosion Control Guide

Town of Essex Small Site Erosion Control Guide Town of Essex Small Site Erosion Control Guide Why do we need to protect against erosion? Water Quality: Erosion and the transport of sediment and pollutants impacts the water quality of nearby streams

More information

2.1.4 Roof Downspout Rain Gardens

2.1.4 Roof Downspout Rain Gardens 2008 SWMM, 2010 Revision City of Tacoma 2.1.4 Roof Downspout Rain Gardens Purpose and Definition Bioretention areas are shallow stormwater retention facilities designed to mimic forested systems by controlling

More information

STREAM BANK STABILIZATION THORPS MORTIMER RECREATION AREA Grandfather Ranger District SITE LOCATION & DRAINAGE AREA

STREAM BANK STABILIZATION THORPS MORTIMER RECREATION AREA Grandfather Ranger District SITE LOCATION & DRAINAGE AREA STREAM BANK STABILIZATION THORPS CREEK @ MORTIMER RECREATION AREA SITE LOCATION & DRAINAGE AREA SITE LOCATION Drainage Area = 1.14 sq. miles STREAM BANK STABILIZATION THORPS CREEK @ MORTIMER RECREATION

More information

Staff will be providing an overview of the project need, purpose and intent for consideration as part of the Amendment cycle.

Staff will be providing an overview of the project need, purpose and intent for consideration as part of the Amendment cycle. Agenda Item D-2 City of Tacoma Planning and Development Services To: Planning Commission From: Stephen Atkinson, Planning Services Division Subject: Open Space Corridors Project Meeting Date: March 1,

More information

Habitat Improvements to the Motor Island Shoreline in the Upper Niagara River, NY: A Collaborative Approach

Habitat Improvements to the Motor Island Shoreline in the Upper Niagara River, NY: A Collaborative Approach Habitat Improvements to the Motor Island Shoreline in the Upper Niagara River, NY: A Collaborative Approach Edward Alkiewicz 1, Stephen Schoenwiesner 1, Jeff Gerlach 1, Morris Perot 2, Scott Ault 2, Mark

More information

Lewisville Lake Master Plan Revision Public Information Meeting May 2 & 4, 2017

Lewisville Lake Master Plan Revision Public Information Meeting May 2 & 4, 2017 Lewisville Lake Master Plan Revision Public Information Meeting May 2 & 4, 2017 Presented By Rob Jordan Lake Manager U.S. Army Corps of Engineers Fort Worth District US Army Corps of Engineers Purpose

More information

Working Group Meeting

Working Group Meeting April 4,, 2017 Parks Operations Bldg Working Group Meeting Arts Districts Overview Stormwater/RPA/Stream Considerations First Principles Agenda 7:00pm 7:05pm 7:10pm 7:40pm 8:30pm 9:40pm 9:45pm Welcome

More information

Healthy Living Strategy: Shorelines

Healthy Living Strategy: Shorelines Healthy Living Strategy: Shorelines Shoreline Vegetation in Muskoka The basis of a natural ecosystem is a complex combination of vegetation that forms canopy, understory, and herbaceous layers. It is easier

More information

Native Plant Guide - King County, Washington. Plant list for dry part-shade. Plant list for dry shade

Native Plant Guide - King County, Washington. Plant list for dry part-shade. Plant list for dry shade Native Plant Guide - King County, Washington Page 1 Plant list for dry part-shade Tree Pacific dogwood Cornus nuttallii part shade dry - moist 60 Tree bitter cherry Prunus emarginata sun - part shade dry

More information

Pike River Restoration Adaptive Design: Restoring Structure and Function in an Urban Floodplain - from cabbages to cordgrass

Pike River Restoration Adaptive Design: Restoring Structure and Function in an Urban Floodplain - from cabbages to cordgrass Pike River Restoration Adaptive Design: Restoring Structure and Function in an Urban Floodplain - from cabbages to cordgrass Alice Thompson, PWS & Heather Patti, PWS Pike River Re-imaginedfrom Cabbage

More information

Over 80% of wildlife use the Hedgerows have been in existence for over a thousand years. As they have become woven

Over 80% of wildlife use the Hedgerows have been in existence for over a thousand years. As they have become woven HEDGEROWS LIVING FENCES FOR WESTERN WASHINGTON Introduction Over 80% of wildlife use the Hedgerows have been in existence for over a thousand years. As they have become woven habitat found along streams,

More information

2014 HDR 2014 Architecture, HDR, Inc., all all rights reserved. reserved.

2014 HDR 2014 Architecture, HDR, Inc., all all rights reserved. reserved. 2014 HDR 2014 Architecture, HDR, Inc., all all rights reserved. reserved. Uplift of a Wet Weather Stream: Satisfying Regulatory Requirements Agawela Drive Stream Project Chattanooga, TN 2014 HDR, Inc.,

More information

Northern Branch Corridor DEIS December 2011

Northern Branch Corridor DEIS December 2011 16 Floodplains 161 Chapter Overview 1611 Introduction The flowing chapter identifies floodplains found within the Northern Branch Corridor in accordance with Executive Order 11988, Floodplain Management

More information

BEST MANAGEMENT PRACTICES Spurge Laurel(Daphne laureola) (Family Thymelaeaceae Daphne Family)

BEST MANAGEMENT PRACTICES Spurge Laurel(Daphne laureola) (Family Thymelaeaceae Daphne Family) JEFFERSON COUNTY NOXIOUS WEED CONTROL BOARD 380 Jefferson Street, Port Townsend WA 98368 360 379-5610 Ext. 205 noxiousweeds@co.jefferson.wa.us BEST MANAGEMENT PRACTICES Spurge Laurel(Daphne laureola) (Family

More information

GUIDELINES FOR ECOLOGICAL PERFORMANCE

GUIDELINES FOR ECOLOGICAL PERFORMANCE 3 Landscape........................................... 3.2 Stormwater Management................................... 3.3 Hardscape........................................... 3.4 Streetscape..........................................

More information

BRUSH BOXES BIOENGINEERING TREATMENTS AND ROCK. Brush Boxes along the Rhine River in Germany. Brush Box on the Coeur d Alene River

BRUSH BOXES BIOENGINEERING TREATMENTS AND ROCK. Brush Boxes along the Rhine River in Germany. Brush Box on the Coeur d Alene River BIOENGINEERING TREATMENTS AND ROCK 3 BRUSH BOXES BRUSH BOX BREAKWATER Brush Boxes along the Rhine River in Germany. Brush Box on the Coeur d Alene River Built to protect the Phramities along the shoreline

More information

Stormwater and Your Rain Garden

Stormwater and Your Rain Garden Stormwater and Your Rain Garden When rain falls on natural areas, such as a forest or meadow, it is slowed down, filtered by soil and plants, and allowed to soak back into the ground. When rain falls on

More information

WILLAMETTE FALLS LEGACY PROJECT

WILLAMETTE FALLS LEGACY PROJECT OPPORTUNITIES & CONSTRAINTS There are here three falls on a line of rocks extending across the river, which forms the bed of the upper channel. The water is precipitated through deep abrazed gorges, and

More information

Section General Tree Preservation Requirements for New Nonresidential and Residential Development

Section General Tree Preservation Requirements for New Nonresidential and Residential Development DIVISION 2: TREE PRESERVATION AND PROTECTION Section 5.5.2.1 General Tree Preservation Requirements for New Nonresidential and Residential Development (a) Application. The provisions of this Section apply

More information

Bioengineered designs

Bioengineered designs Bioengineered designs In bioengineered designs, plants are essential for the long-term integrity of the water s edge. Certain hard elements may be included, such as driven wooden piles, but their functions

More information

North Carolina Coastal Federation

North Carolina Coastal Federation North Carolina Coastal Federation Erosion Control: Non-Structural Alternatives A Shorefront Property Owner s Guide Shoreline erosion and landward migration of marshes are natural processes, and are important

More information

COMPLIANCE CHECKLIST HILLSIDE RESIDENTIAL DESIGN GUIDELINES MANUAL

COMPLIANCE CHECKLIST HILLSIDE RESIDENTIAL DESIGN GUIDELINES MANUAL COMPLIANCE CHECKLIST HILLSIDE RESIDENTIAL DESIGN GUIDELINES MANUAL The following checklist summarizes development guidelines and standards. See the appropriate section for a complete explanation of the

More information

Your town s subdivision or land use ordinance standards should reference the following street standards, for example:

Your town s subdivision or land use ordinance standards should reference the following street standards, for example: Your town s subdivision or land use ordinance standards should reference the following street standards, for example: Streets shall be designed to move traffic safely and in a way that minimizes environmental

More information