1 Sent Via erims November 13, 2013 Sonic Automotive, Inc Colwick Road Charlotte, North Carolina Attention: Mr. Doug Siska Re: Asbestos Survey Murray BMW of Denver 900 S Colorado Blvd and 4320 E Kentucky Ave Glendale, Colorado H&H Job No. SAI-090 Dear Doug: 1.0 Introduction Hart & Hickman, PC (H&H) has completed a survey of suspect asbestos-containing materials (ACMs) at the Murray BMW of Denver dealership located at 900 S Colorado Blvd (showroom) and 4320 E. Kentucky Ave (pre-owned sales & service) in Glendale, Glendale County, Colorado (Figure 1). The dealership is comprised of the following buildings: 900 S. Colorado Blvd. - 5,609 square ft building (new automobile sales showroom and offices) built in 2000/2001; and 4320 E. Kentucky Ave. 34,420 square ft (pre-owned automobile showroom, offices, parts storage, maintenance areas) built in 1984 with construction of an addition in The asbestos survey was conducted prior to future renovation and/or demolition of the two buildings. This report presents the methods and results of the asbestos survey.

2 Mr. Doug Siska November 13, 2013 Page Asbestos Survey Activities H&H conducted the asbestos survey in general accordance with Asbestos Hazard Emergency Response Act (AHERA) guidelines for asbestos building inspections. The objective of the asbestos survey was to: identify and assess the condition of suspect ACMs, either friable or non-friable, on the interior and exterior of the facility; collect samples from a representative number of random locations in accordance with the AHERA guidelines; and prepare a written report detailing findings of the inspection. Mr. Jimmy Carr, an AHERA trained and Colorado certified asbestos inspector (20677), conducted the asbestos survey on October 7 and 8, During the survey, Mr. Carr collected a representative number of samples from each readily accessible homogeneous area in a random manner representative of the homogeneous suspect materials sampled. In accordance with United States Environmental Protection Agency (EPA) Regulation 40 CFR (a) (3-4), H&H conducted the following activities during our asbestos survey: visually inspected the site building to identify the locations of suspected ACMs; touched the ACMs to determine the friability of the material; identified homogeneous areas of friable and non-friable ACMs; and collected and submitted bulk samples of potential ACMs to a laboratory for analysis. AHERA guidelines indicate that the following number of bulk samples be collected from each homogeneous area: S:\AAA-Master Projects\Sonic Automotive - SAI\SAI-090 BMW of Denver VI and Asbestos (Former Murray)\Asbestos\BMW Asbestos Report.doc

3 Mr. Doug Siska November 13, 2013 Page 3 three, five, and seven bulk samples are to be collected from interior and exterior surfacing materials with volumes totaling 1,000 square ft, 1,000 to 5,000 square ft, and greater than 5,000 square feet, respectively; three bulk samples are to be collected from each material identified as thermal system insulation (TSI). TSI that was identified by the inspector as fiberglass or as a non-suspect material was not sampled; and two bulk samples are to be collected from TSI that is patched, cemented pipe elbow material commonly found on TSI joints, and miscellaneous and non-friable materials (including floor tile, ceiling tile, and exterior siding). For each homogeneous area, H&H directed the laboratory to stop analysis on that material in the event of a positive asbestos detection. H&H collected samples of the following suspect ACMs identified during our survey: exterior surfacing materials interior surfacing materials ceiling tiles (two homogeneous areas) drywall, tape, and joint compound (three homogeneous areas) vinyl backing with black mastic attached to fiberglass insulation (two homogeneous areas) shoe molding (two homogeneous areas) vinyl floor covering roof sealant on metal roofing (three homogeneous areas) felt layer below cement shingle roof The exterior of the BMW pre-owned and service building is constructed primarily of glass and metal per BMW company specifications. The BMW new vehicle showroom is constructed with exterior stucco surfacing, interior slate floor, wood ceiling, and cement roof tiles. S:\AAA-Master Projects\Sonic Automotive - SAI\SAI-090 BMW of Denver VI and Asbestos (Former Murray)\Asbestos\BMW Asbestos Report.doc

4 Mr. Doug Siska November 13, 2013 Page Asbestos Detections Samples collected from the suspect ACMs were submitted to Carolina Environmental Inc. (CEI) s of Cary, NC. CEI is a National Voluntary oratory Accreditation Program (NVLAP) certified laboratory. Based on the AHERA guidelines, 46 samples were analyzed by the laboratory from 16 homogenous areas associated with the two buildings. The analytical data indicate that none of the homogeneous materials sampled contain asbestos at concentrations >1% and by definition are the sampled suspect materials are not ACMs. The complete asbestos analytical results are included as Appendix A. 4.0 Recommendations and Limitations Prior to the scheduled demolition activities, H&H recommends providing a copy of the asbestos survey to the contractor. This report is an inspection report only and must not be taken as a project design plan. Also, there is the potential that other ACMs are present at the site which are not readily accessible (i.e., wall or column interiors, etc.). If other suspect ACMs are identified during demolition activities, they should be sampled to determine asbestos content and properly managed. We appreciate the opportunity to assist you with this project. If you have any questions concerning this report, please do not hesitate to contact us. Sincerely, Hart & Hickman, PC Jimmy Carr Environmental Scientist Colorado Asbestos Inspector Attachments Matt Ingalls Project Manager S:\AAA-Master Projects\Sonic Automotive - SAI\SAI-090 BMW of Denver VI and Asbestos (Former Murray)\Asbestos\BMW Asbestos Report.doc

5 SITE N APPROXIMATE SCALE IN FEET U.S.G.S. QUADRANGLE MAP ENGLEWOOD, COLORADO (1997) TITLE PROJECT SITE LOCATION MAP BMW SHOWROOM & SERVICE FACILITIES 900 S COLORADO BLVD & 4320 E KENTUCKY AVE GLENDALE, COLORADO 2923 S. Tryon Street, Suite 100 Charlotte, NC (p) (f) QUADRANGLE 7.5 MINUTE SERIES (TOPOGRAPHIC) DATE: JOB NO: 11/1/13 REVISION NO: 0 SAI-090 FIGURE: 1

6 Appendix A Asbestos Analytical Results

7 ASBESTOS LABORATORY REPORT Prepared for Hart & Hickman, P. C. PROJECT: SAI-090; S Col. Blvd., Glendale, CO CEI LAB CODE: A DATE ANALYZED: 10/14/13 DATE REPORTED: 10/15/13 TOTAL SAMPLES ANALYZED: 18 # SAMPLES >1% ASBESTOS: TEL:

8 Asbestos Report Summary By: POLARIZING LIGHT MICROSCOPY PROJECT: SAI-090; S Col. Blvd., Glendale, CO CEI LAB CODE: A METHOD: EPA 600 / R93 / 116 and EPA 600 / M4-82 / 020 Client ID Layer ID Color Sample Description 001A 001B 002A 002B 002C 002D 002E 002F 002G 003A 003B 004A 004B 004C 004D 004E 004F 004G ASBESTOS % A White Drywall/tape & Spackle A White Drywall/tape & Spackle A A A A A A A A Black Felt A Black Felt A A A A A A A Page 1 of 1

9 ASBESTOS BULK ANALYSIS By: POLARIZING LIGHT MICROSCOPY Client: Hart & Hickman, P. C S. Tryon Street, Suite 100 Charlotte, NC Project: SAI-090; S Col. Blvd., Glendale, CO ASBESTOS BULK PLM, EPA 600 METHOD Client ID ID Description Attributes NON-ASBESTOS COMPONENTS Non- ASBESTOS % 001A A Drywall/tape & Spackle White 70% Gypsum 001B A Drywall/tape & Spackle White 70% Gypsum 002A A Synthetic Fiber 60% 30% Binder 002B A Synthetic Fiber 60% 30% Binder 002C A Synthetic Fiber 60% 30% Binder 002D A Synthetic Fiber 60% 30% Binder 002E A Synthetic Fiber 60% 30% Binder Page 1 of 4

10 ASBESTOS BULK ANALYSIS By: POLARIZING LIGHT MICROSCOPY Client: Hart & Hickman, P. C S. Tryon Street, Suite 100 Charlotte, NC Project: SAI-090; S Col. Blvd., Glendale, CO ASBESTOS BULK PLM, EPA 600 METHOD Client ID ID Description Attributes NON-ASBESTOS COMPONENTS Non- ASBESTOS % 002F A Synthetic Fiber 60% 30% Binder 002G A Synthetic Fiber 60% 30% Binder 003A A Felt Black Fiberglass 80% Tar 003B A Felt Black Fiberglass 80% Tar 004A A B A C A Page 2 of 4

11 ASBESTOS BULK ANALYSIS By: POLARIZING LIGHT MICROSCOPY Client: Hart & Hickman, P. C S. Tryon Street, Suite 100 Charlotte, NC Project: SAI-090; S Col. Blvd., Glendale, CO ASBESTOS BULK PLM, EPA 600 METHOD Client ID ID Description Attributes NON-ASBESTOS COMPONENTS Non- ASBESTOS % 004D A E A F A G A Page 3 of 4

12 LEGEND: Non-Anth = Non-Asbestiform Anthophylite Non-Trem = Non-Asbestiform Tremolite = Calcium Carbonate METHOD: EPA 600 / R93 / 116 and EPA 600 / M4-82 / 020 The detection limit for the method is by visual estimation and 0.2 by 400 point counts or 0.1% by 1,000 point counts. Due to the limitations of the EPA 600 Method, nonfriable organically bound materials (NOBs) such as vinyl floor tiles can be difficult to analyze via polarizing light microscopy (PLM). EPA recommends that all NOBs analyzed by PLM, and found not to contain asbestos, be further analyzed by Transmission Electron Microscopy (TEM). Please note that PLM analysis of dust and soil samples for asbestos is not covered under NVLAP accreditation. This report may not be reproduced, except in full, without written approval by CEI LABS. CEI LABS makes no warranty representation regarding the accuracy of client submitted information in preparing and presenting analytical results. This report may not be used by the client to claim product endorsement by NVLAP or any other agency of the U. S. Government. ANALYST: Daniel Liguori APPROVED BY: Tianbao Bai, Ph.D. oratory Director CEI s, 107 New Edition Court, Cary, NC 27511, Phone: (866) Page 4 of 4

13

14

15 ASBESTOS LABORATORY REPORT Prepared for Hart & Hickman, P. C. PROJECT: SAI-090; BMW Eky Ave., Glendale, CO CEI LAB CODE: A DATE ANALYZED: 10/14/13 DATE REPORTED: 10/15/13 TOTAL SAMPLES ANALYZED: 28 # SAMPLES >1% ASBESTOS: TEL:

16 Asbestos Report Summary By: POLARIZING LIGHT MICROSCOPY PROJECT: SAI-090; BMW Eky Ave., Glendale, CO CEI LAB CODE: A METHOD: EPA 600 / R93 / 116 and EPA 600 / M4-82 / 020 Client ID Layer ID Color Sample Description 001A 001B 001C 002A 002B 003A 003B 004A 004B 004C 005A 005B 006A 006B 007A 007B 007C 008A 008B 009A 009B 009C 010A 010B 011A ASBESTOS % A White,Tan Insulation Backing A White,Tan Insulation Backing A White,Tan Insulation Backing A White, Ceiling Tile A White, Ceiling Tile A A Coping Vinyl A B Tan Mastic A A Coping Vinyl A B Tan Mastic A ,Off-white Drywall/ Tape & Spackle A ,Off-white Drywall/ Tape & Spackle A ,Off-white Drywall/ Tape & Spackle A A Black Stair Tread A B Tan Mastic A A Black Stair Tread A B Tan Mastic A ,White Ceiling Tile A ,White Ceiling Tile A ,Off-white Drywall/ Tape & Spackle A ,Off-white Drywall/ Tape & Spackle A ,Off-white Drywall/ Tape & Spackle A A Coping Vinyl A B Tan Mastic A A Coping Vinyl A B Tan Mastic A White,Tan Insulation Backing A White,Tan Insulation Backing A White,Tan Insulation Backing A White Roof Patch A White Roof Patch A Roof Patch Page 1 of 2

17 Asbestos Report Summary By: POLARIZING LIGHT MICROSCOPY PROJECT: SAI-090; BMW Eky Ave., Glendale, CO CEI LAB CODE: A METHOD: EPA 600 / R93 / 116 and EPA 600 / M4-82 / 020 Client ID Layer ID Color Sample Description ASBESTOS % 011B 012A 012B A Roof Patch A Black Roof Patch A Black Roof Patch Page 2 of 2

18 ASBESTOS BULK ANALYSIS By: POLARIZING LIGHT MICROSCOPY Client: Hart & Hickman, P. C S. Tryon Street, Suite 100 Charlotte, NC Project: SAI-090; BMW Eky Ave., Glendale, CO ASBESTOS BULK PLM, EPA 600 METHOD Client ID ID Description Attributes NON-ASBESTOS COMPONENTS Non- ASBESTOS % 001A A Insulation Backing White,Tan 70% Fiberglass Vinyl Mastic 001B A Insulation Backing White,Tan 70% Fiberglass Vinyl Mastic 001C A Insulation Backing White,Tan 70% Fiberglass Vinyl Mastic 002A A Ceiling Tile White, 80% Perlite Binder 002B A Ceiling Tile White, 80% Perlite Binder 003A A A Coping Vinyl 100% Vinyl A B Mastic 100% Mastic Tan Page 1 of 6

19 ASBESTOS BULK ANALYSIS By: POLARIZING LIGHT MICROSCOPY Client: Hart & Hickman, P. C S. Tryon Street, Suite 100 Charlotte, NC Project: SAI-090; BMW Eky Ave., Glendale, CO ASBESTOS BULK PLM, EPA 600 METHOD Client ID ID Description Attributes NON-ASBESTOS COMPONENTS Non- ASBESTOS % 003B A A Coping Vinyl 100% Vinyl A B Mastic 100% Mastic Tan 004A A Drywall/ Tape & Spackle,Off-white 1 6 Gypsum 004B A Drywall/ Tape & Spackle,Off-white 1 60% Gypsum 004C A Drywall/ Tape & Spackle,Off-white 1 60% Gypsum 005A A A Stair Tread Black 100% Vinyl A B Mastic 100% Mastic Tan Page 2 of 6

20 ASBESTOS BULK ANALYSIS By: POLARIZING LIGHT MICROSCOPY Client: Hart & Hickman, P. C S. Tryon Street, Suite 100 Charlotte, NC Project: SAI-090; BMW Eky Ave., Glendale, CO ASBESTOS BULK PLM, EPA 600 METHOD Client ID ID Description Attributes NON-ASBESTOS COMPONENTS Non- ASBESTOS % 005B A A Stair Tread Black 100% Vinyl A B Mastic 100% Mastic Tan 006A A Ceiling Tile,White 80% Perlite Binder 006B A Ceiling Tile,White 80% Perlite Binder 007A A Drywall/ Tape & Spackle,Off-white Gypsum 007B A Drywall/ Tape & Spackle,Off-white Gypsum 007C A Drywall/ Tape & Spackle,Off-white Gypsum Page 3 of 6

21 ASBESTOS BULK ANALYSIS By: POLARIZING LIGHT MICROSCOPY Client: Hart & Hickman, P. C S. Tryon Street, Suite 100 Charlotte, NC Project: SAI-090; BMW Eky Ave., Glendale, CO ASBESTOS BULK PLM, EPA 600 METHOD Client ID ID Description Attributes NON-ASBESTOS COMPONENTS Non- ASBESTOS % 008A A A Coping Vinyl 100% Vinyl A B Mastic 100% Mastic Tan 008B A A Coping Vinyl 100% Vinyl A B Mastic 100% Mastic Tan 009A A Insulation Backing White,Tan 70% Fiberglass Vinyl Mastic 009B A Insulation Backing White,Tan 70% Fiberglass Vinyl Mastic 009C A Insulation Backing White,Tan 70% Fiberglass Vinyl Mastic Page 4 of 6

22 ASBESTOS BULK ANALYSIS By: POLARIZING LIGHT MICROSCOPY Client: Hart & Hickman, P. C S. Tryon Street, Suite 100 Charlotte, NC Project: SAI-090; BMW Eky Ave., Glendale, CO ASBESTOS BULK PLM, EPA 600 METHOD Client ID ID Description Attributes NON-ASBESTOS COMPONENTS Non- ASBESTOS % 010A A Roof Patch White 100% Binder 010B A Roof Patch White 100% Binder 011A A Roof Patch 8 1 Binder 011B A Roof Patch 8 1 Binder 012A A Roof Patch Black 100% Binder 012B A Roof Patch Black 100% Binder Page 5 of 6

23 LEGEND: Non-Anth = Non-Asbestiform Anthophylite Non-Trem = Non-Asbestiform Tremolite = Calcium Carbonate METHOD: EPA 600 / R93 / 116 and EPA 600 / M4-82 / 020 The detection limit for the method is by visual estimation and 0.2 by 400 point counts or 0.1% by 1,000 point counts. Due to the limitations of the EPA 600 Method, nonfriable organically bound materials (NOBs) such as vinyl floor tiles can be difficult to analyze via polarizing light microscopy (PLM). EPA recommends that all NOBs analyzed by PLM, and found not to contain asbestos, be further analyzed by Transmission Electron Microscopy (TEM). Please note that PLM analysis of dust and soil samples for asbestos is not covered under NVLAP accreditation. This report may not be reproduced, except in full, without written approval by CEI LABS. CEI LABS makes no warranty representation regarding the accuracy of client submitted information in preparing and presenting analytical results. This report may not be used by the client to claim product endorsement by NVLAP or any other agency of the U. S. Government. ANALYST: Candace Olson APPROVED BY: Tianbao Bai, Ph.D. oratory Director CEI s, 107 New Edition Court, Cary, NC 27511, Phone: (866) Page 6 of 6

24

25

26 Appendix B Colorado Asbestos Inspector Certification

27

ASBESTOS ROOF INSPECTION REPORT

ASBESTOS ROOF INSPECTION REPORT ASBESTOS ROOF INSPECTION REPORT OF MARSHALL COURTS ROOF 3300 A&B, 3302 A&B, 3400 A & B, 3402 A & B MARSHALL AVE 800 A & B 35 TH STREET AND 801 A&B 33 RD STREET NEWPORT NEWS, VIRGINIA 23606 MCS JOB #13-031S

More information

ASBESTOS AND LEAD-BASED PAINT SURVEY 696/698 Hawthorne Avenue St. Paul, Minnesota. Prepared for:

ASBESTOS AND LEAD-BASED PAINT SURVEY 696/698 Hawthorne Avenue St. Paul, Minnesota. Prepared for: ASBESTOS AND LEAD-BASED PAINT SURVEY 696/698 Hawthorne Avenue St. Paul, Minnesota Prepared for: City of St. Paul Department of Planning and Economic Development 1100 City Hall Annex 25 West 4 th Street

More information

Turn-Key Environmental Consultants, Inc. 790 Barnhart Rd. 714 Monument Ave. Phone: Troy, OH Dayton, OH Fax:

Turn-Key Environmental Consultants, Inc. 790 Barnhart Rd. 714 Monument Ave. Phone: Troy, OH Dayton, OH Fax: Turn-Key Environmental Consultants, Inc. 790 Barnhart Rd. 714 Monument Ave. Phone: 937-335-8807 Troy, OH 45373 Dayton, OH 45402 Fax: 937-339-4882 March 24, 2016 Mr. Dennis Zimmer City of Dayton, Division

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

NARRATIVE REPORT. Underlayment Paper for Linoleum. The Asbestos Bulk Sample Results Table includes asbestos sampling data.

NARRATIVE REPORT. Underlayment Paper for Linoleum. The Asbestos Bulk Sample Results Table includes asbestos sampling data. NARRATIVE REPORT 1.0 BUILDING INFORMATION Engineering and Technology was originally constructed in 1913; although specific information is unavailable, several renovations are evident. Engineering and Technology

More information

Palmyra High School 07/16 Addition and Renovation Palmyra, Nebraska

Palmyra High School 07/16 Addition and Renovation Palmyra, Nebraska Palmyra High School 07/16 Addition and Renovation Palmyra, Nebraska 845-001-14 DOCUMENT 00 31 26 - EXISTING HAZARDOUS MATERIAL INFORMATION 1.1 EXISTING HAZARDOUS MATERIAL INFORMATION A. This Document with

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

If the address on this form is different than the address of the building, submit a written explanation.

If the address on this form is different than the address of the building, submit a written explanation. ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

Three Year Asbestos Re-Inspection Report. Macomb Montessori Academy East Nine Mile Road Warren, Michigan 47089

Three Year Asbestos Re-Inspection Report. Macomb Montessori Academy East Nine Mile Road Warren, Michigan 47089 Three Year Re-Inspection Report For 14057 East Nine Mile Road Warren, Michigan 47089 Prepared by: Northern Analytical Services, LLC. 14870 225 th Avenue Big Rapids, Michigan 49307 Dated: Project 160268

More information

Youth Connection - J. Addams Alter HS

Youth Connection - J. Addams Alter HS ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

If the address on this form is different than the address of the building, submit a written explanation.

If the address on this form is different than the address of the building, submit a written explanation. ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

NARRATIVE REPORT. Engineering Administration was originally constructed in 1965; the building has had no major renovations.

NARRATIVE REPORT. Engineering Administration was originally constructed in 1965; the building has had no major renovations. NARRATIVE REPORT 1.0 BUILDING INFORMATION Engineering Administration was originally constructed in 1965; the building has had no major renovations. Engineering Administration is a three-story, 9,579 ft

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

November 20, Sierra House Elementary School Fire Update and Reports

November 20, Sierra House Elementary School Fire Update and Reports November 20, 2018 Sierra House Elementary School Fire Update and Reports As you are aware, a fire broke at Sierra House Elementary School on November 11, 2018 at approximately 10:00 pm. The following is

More information

ASBESTOS POLICY. 2. Authority. 3. Scope. 4. Definitions. 4. Responsibilities. 1. Purpose. Department supervisors

ASBESTOS POLICY. 2. Authority. 3. Scope. 4. Definitions. 4. Responsibilities. 1. Purpose. Department supervisors 1. Purpose ASBESTOS POLICY The purpose of the University of Denver Asbestos Policy is to establish the means to prevent personal asbestos exposures to DU and contractor workers by managing and controlling

More information

EPA/ODEQ DEMOLITION BY FIRE REQUIREMENTS

EPA/ODEQ DEMOLITION BY FIRE REQUIREMENTS EPA/ODEQ DEMOLITION BY FIRE REQUIREMENTS The OKLAHOMA AIR POLLUTION CONTROL RULES, Oklahoma Administrative Code (OAC) 252:100-13, Open Burning, specifically, subpart 5, Open burning prohibited, states:

More information

Vermiculite Containing Materials

Vermiculite Containing Materials Vermiculite Containing Materials Analytical Challenges Copyright EMSL 2013 1 New York Guidance 04/11 Copyright 2013 2 New York Guidance 06/22/12 Copyright 2013 3 1 New York Guidance 07/09/13 Copyright

More information

Lead Based Coatings Flowchart

Lead Based Coatings Flowchart 1926.62 Any Detectable Levels of Lead / Stop No Testing or Compliance Issues Lead Coatings NOT Target Housing or Child Occupied Facility Target Housing Child Occupied Family Georgia Certified Firm & Inspect

More information

Asbestos 3-Year Re-inspection Report and Updated Management Plan. Edith Nourse Rogers School 43 Highland Street Lowell, Massachusetts, 01852

Asbestos 3-Year Re-inspection Report and Updated Management Plan. Edith Nourse Rogers School 43 Highland Street Lowell, Massachusetts, 01852 Asbestos 3-Year Report Edith Nourse Rogers School 43 Highland Street, 01852 Prepared by: Cardno ATC 600 West Cummings Park, Suite 5450 Woburn, Massachusetts 01801 September 24, 2014 Cardno ATC Project

More information

Procedure. Procedure

Procedure. Procedure Procedure 4.1524 Asbestos Procedure A. Scope... 1 B. Applicability... 2 C. Definitions... 2 D. Responsibilities... 3 E. Hazards... 4 F. General Rules... 4 G. Asbestos Inventory... 5 H. Asbestos Identification...

More information

AHERA Asbestos Management Plan

AHERA Asbestos Management Plan Our Services: Asbestos Inspections Asbestos Abatement Design Asbestos Abatement Oversight AHERA Asbestos Management Plan 720 Fairview Drive Carlisle, Ohio 45005 Asbestos Management Planning Phase I Environmental

More information

Radon Measurement Survey Report. Oak Park Elementary School 1200 Front Street Aurora, Illinois Prepared For:

Radon Measurement Survey Report. Oak Park Elementary School 1200 Front Street Aurora, Illinois Prepared For: Radon Measurement Survey Report Site:July 5, 2018 1200 Front Street Aurora, Illinois 60505 Survey Dates: May 9, 2018 thru May 11, 2018 Prepared For: East Aurora School District 131 417 Fifth Street Aurora,

More information

Radon Measurement Survey Report. McKnight School Service Center 417 Fifth Street Aurora, Illinois Prepared For:

Radon Measurement Survey Report. McKnight School Service Center 417 Fifth Street Aurora, Illinois Prepared For: Radon Measurement Survey Report Site: 417 Fifth Street Aurora, Illinois 60505 Survey Dates: May 9, 2018 thru May 11, 2018 Prepared For: East Aurora School District 131 417 Fifth Street Aurora, Illinois

More information

Radon Measurement Survey Report. Krug Elementary School 240 Melrose Avenue Aurora, Illinois Prepared For:

Radon Measurement Survey Report. Krug Elementary School 240 Melrose Avenue Aurora, Illinois Prepared For: Radon Measurement Survey Report Site: 240 Melrose Avenue Aurora, Illinois 60505 Survey Dates: May 1, 2018 thru May 3, 2018 Prepared For: East Aurora School District 131 417 Fifth Street Aurora, Illinois

More information

ASBESTOS AWARENESS New Employee Training March Environmental, Facilities Services Eddie Pena (HazMat & IAQ Coordinator)

ASBESTOS AWARENESS New Employee Training March Environmental, Facilities Services Eddie Pena (HazMat & IAQ Coordinator) ASBESTOS AWARENESS New Employee Training March 2014 Environmental, Facilities Services Eddie Pena (HazMat & IAQ Coordinator) Why Are You Here? You need to know - Where there is (or may be) asbestoscontaining

More information

DULANEY HIGH SCHOOL FEASIBILITY STUDY

DULANEY HIGH SCHOOL FEASIBILITY STUDY DULANEY HIGH SCHOOL FEASIBILITY STUDY APPENDIX A: SITE PLAN Baltimore County Public Schools Site Plan-Appendix A Office of Engineering and Construction February 18, 2016 Dulaney High School Feasibility

More information

Radon Measurement Survey Report. Rollins Elementary School 950 Kane Street Aurora, Illinois Prepared For:

Radon Measurement Survey Report. Rollins Elementary School 950 Kane Street Aurora, Illinois Prepared For: Radon Measurement Survey Report Site: 950 Kane Street Aurora, Illinois 60505 Survey Dates: May 15, 2018 thru May 18, 2018 Prepared For: East Aurora School District 131 417 Fifth Street Aurora, Illinois

More information

Lead-Based Paint XRF Test Cover Sheet

Lead-Based Paint XRF Test Cover Sheet Lead Safe Testing, LLC 303-949-8884 info@leadsafetestingllc.com 10200 E. Girard Ave. Bldg. A, Suite 412 Denver, CO 80231 Lead-Based Paint XRF Test Cover Sheet Job Name: Glenwood Springs Decommissioned

More information

Asbestos Awareness at the University of Toronto

Asbestos Awareness at the University of Toronto Asbestos Awareness at the University of Toronto What is Asbestos? Asbestos is a general term given to a group of naturally occurring mineral silicates that are made up of long thin fibres. These fibrous

More information

Where Asbestos Hazards May Be Found In The Home

Where Asbestos Hazards May Be Found In The Home Consumer Product Safety Commission and Environmental Protection Agency and the American Lung Association (The Christmas Seal People) Asbestos In The Home CPSC Document #453 This booklet will help you understand

More information

WATER QUALITY TESTING FOR SCHAUMBURG COMMUNITY CONSOLIDATED SCHOOL DISTRICT 54 HOOVER SCHAUMBURG, ILLINOIS OCTOBER 3, 2017 PROJECT NUMBER:

WATER QUALITY TESTING FOR SCHAUMBURG COMMUNITY CONSOLIDATED SCHOOL DISTRICT 54 HOOVER SCHAUMBURG, ILLINOIS OCTOBER 3, 2017 PROJECT NUMBER: WATER QUALITY TESTING FOR SCHAUMBURG COMMUNITY CONSOLIDATED SCHOOL DISTRICT 54 HOOVER SCHAUMBURG, ILLINOIS OCTOBER 3, 2017 PROJECT NUMBER: 17-18350 1550 Hubbard Ave., Batavia, IL 60510, 630-879-3006 Schaumburg

More information

Auto Dealership off I-295

Auto Dealership off I-295 Auto Dealership off I-295 42,619± SF ON 9.19± AC; 572 PARKING SPACES Property Features > > Huge sales floor surrounded by private offices, and customer waiting area > > 2nd floor houses all back of house

More information

Radon Measurement Survey Report. Fred Rodgers Magnet Academy 501 College Avenue Aurora, Illinois Prepared For:

Radon Measurement Survey Report. Fred Rodgers Magnet Academy 501 College Avenue Aurora, Illinois Prepared For: Radon Measurement Survey Report Site: 501 College Avenue Aurora, Illinois 60505 Survey Dates: May 16, 2018 thru May 18, 2018 Prepared For: East Aurora School District 131 417 Fifth Street Aurora, Illinois

More information

Indoor Air Quality Testing. Horry County Schools

Indoor Air Quality Testing. Horry County Schools ! Report of: Indoor Air Quality Testing Horry y Schools Conway, SC Palme5o EHS Report No: 2019015 Submi5ed January 29, 2019 Prepared for: Horry y Schools Prepared By: Palme5o EHS, LLC. Suite F, Box 163

More information

Radon Measurement Survey Report. Waldo Middle School 56 Jackson Street Aurora, Illinois Prepared For:

Radon Measurement Survey Report. Waldo Middle School 56 Jackson Street Aurora, Illinois Prepared For: Radon Measurement Survey Report Site: 56 Jackson Street Aurora, Illinois 60505 Survey Dates: May 8, 2018 thru May 10, 2018 Prepared For: East Aurora School District 131 417 Fifth Street Aurora, Illinois

More information

RADON SCREENING SURVEY FOLLOW-UP WHITTIER WOODS CENTER Whittier Boulevard, Bethesda, Maryland 20817

RADON SCREENING SURVEY FOLLOW-UP WHITTIER WOODS CENTER Whittier Boulevard, Bethesda, Maryland 20817 RADON SCREENING SURVEY FOLLOW-UP WHITTIER WOODS CENTER 7100 Whittier Boulevard, Bethesda, Maryland 20817 EXECUTIVE SUMMARY Date of Test Report: 5/12/16 Round of Testing: Initial Follow-up Post Remediation

More information

RENDERED TO Vipco Industries Inc th Avenue SE Calgary, AB T2C 0B3

RENDERED TO Vipco Industries Inc th Avenue SE Calgary, AB T2C 0B3 REPORT NUMBER: 101207560COQ-001b ORIGINAL ISSUE DATE: June 12, 2013 TEST REPORT EVALUATION CENTER Intertek Testing Services NA Ltd. 1500 Brigantine Drive Coquitlam, B.C. V3K 7C1 RENDERED TO Vipco Industries

More information

HAZARDOUS MATERIALS MANAGEMENT SURVEY FIRE HALL # KNIGHT STREET VANCOUVER, BRITISH COLUMBIA

HAZARDOUS MATERIALS MANAGEMENT SURVEY FIRE HALL # KNIGHT STREET VANCOUVER, BRITISH COLUMBIA HAZARDOUS MATERIALS MANAGEMENT SURVEY FIRE HALL #17 7070 KNIGHT STREET VANCOUVER, BRITISH COLUMBIA Prepared for: City of Vancouver - Real Estate and Facilities Management #300 515 West 10 th Avenue Vancouver,

More information

RADON SCREENING SURVEY FOLLOW-UP CONCORD CENTER Hidden Creek Rd, Bethesda, Maryland 20817

RADON SCREENING SURVEY FOLLOW-UP CONCORD CENTER Hidden Creek Rd, Bethesda, Maryland 20817 RADON SCREENING SURVEY FOLLOW-UP CONCORD CENTER 7210 Hidden Creek Rd, Bethesda, Maryland 20817 EXECUTIVE SUMMARY Date of Test Report: 3/31/16 Follow-Up Round of Testing: Initial Follow-up Post Remediation

More information

Woodlin Elementary School Date of Report March 14, 2018

Woodlin Elementary School Date of Report March 14, 2018 MCPS RADON TESTING - EXECUTIVE SUMMARY Site Name Woodlin Elementary School Date of Report March 14, 2018 Round of Testing Initial Follow-up Post Remediation 2 year testing 5 year testing HVAC Upgrade Window

More information

Test Report. Appliance EMF Testing

Test Report. Appliance EMF Testing Project: 11014506A Date: November 6, 2015 Model: 120V_WWF13NW Test Report On Appliance EMF Testing Copyright 2005 UL LLC UL LLC authorizes the above-named company to reproduce this Report provided it is

More information

Comprehensive Short-Term Radon Survey Report

Comprehensive Short-Term Radon Survey Report Environmental Works, LLC 2634 SE Steele St. Portland, OR. 97202 Phone: 503-719-6715 Fax: 503-972-1866 Email: Sebastian@eworksnw.com Comprehensive Short-Term Radon Survey Report Test Performed At: Trillium

More information

Memorandum. Introduction

Memorandum. Introduction 5670 Greenwood Plaza Blvd Suite 540 Greenwood Village, Colorado 80111 PH 720.509.8901 www.geosyntec.com Memorandum Date: November 1, 2017 To: CC: From: Kelly Weidenbach, Natrona County Health Department

More information

Mr. Corrado Maltese, B.Sc., C.R.S.P Senior Manager, Occupational Health and Safety Department

Mr. Corrado Maltese, B.Sc., C.R.S.P Senior Manager, Occupational Health and Safety Department Toronto Catholic District School Board Catholic Education Centre 80 Sheppard Avenue East North York, Ontario M2N 6E8 Attention: Mr. Corrado Maltese, B.Sc., C.R.S.P Senior Manager, Occupational Health and

More information

Sample Report Site Visits Any Capitol, Any State Date

Sample Report Site Visits Any Capitol, Any State Date Sample Report Site Visits Any Capitol, Any State Date Unit #1: Single-family wood-frame home 1 Measures: Attic air sealing and insulation, wall air sealing and insulation, new gas wall furnace, weatherstrip

More information

Ohio Department of Health, Bureau of Environmental Health and Radiation Protection, Radon Licensing Program. School Radon Testing Checklist

Ohio Department of Health, Bureau of Environmental Health and Radiation Protection, Radon Licensing Program. School Radon Testing Checklist Ohio Department of Health, Bureau of Environmental Health and Radiation Protection, Radon Licensing Program School Radon Testing Checklist Purpose: This checklist has been prepared to provide school employees

More information

RECORD OF FRIABLE AND NONFRIABLE ACM Inspection Date(s) July 31, 2013 (FORM B)

RECORD OF FRIABLE AND NONFRIABLE ACM Inspection Date(s) July 31, 2013 (FORM B) Corporation Yard RECORD OF FRIABLE AND NONFRIABLE AC Inspection Date(s) July 31, 2013 (FOR B) THREE-YEAR REINSPECTION CDS CODE 04-61424-0000000 SCHOOL Corporate Yard SCHOOL PHONE NUBER (530) 891-3095 ADDRESS

More information

Springpoint Architects, pc SECTION Childcare Center Architect s Project No TABLE OF CONTENTS Monroe County Comm. Sch. Corp.

Springpoint Architects, pc SECTION Childcare Center Architect s Project No TABLE OF CONTENTS Monroe County Comm. Sch. Corp. Volume 1 Bidding Requirements, Contract Forms, Conditions of the Contract, Division 1, Architectural and Site Specifications 000107 Certification Page 000110 Table of Contents DIV00 PROCUREMENT AND CONTRACTING

More information

Inspection Report. Prepared for: Tonia Mann. Property Address: 402 Leslie Court McDonough, GA Date: March 07, 2013

Inspection Report. Prepared for: Tonia Mann. Property Address: 402 Leslie Court McDonough, GA Date: March 07, 2013 Inspection Report Prepared for: Tonia Mann Property Address: 402 Leslie Court McDonough, GA 30253 Date: March 07, 2013 Inspector: Charles Mann Edifice Inspections, Inc. (770) 594-2222 www.edificeinspections.com

More information

At least 10 calendar days prior to project start date Within the last 30 days of a project that will extend beyond 12 months

At least 10 calendar days prior to project start date Within the last 30 days of a project that will extend beyond 12 months New York State Department of Labor Division of Safety and Health (518) 485-9263 Filing an asbestos project notification Who must provide asbestos project notification If the asbestos removal project is:

More information

RADON SCREENING SURVEY FOLLOW-UP GREAT SENECA CREEK ELEMENTARY SCHOOL Dairymaid Drive, Germantown, Maryland 20874

RADON SCREENING SURVEY FOLLOW-UP GREAT SENECA CREEK ELEMENTARY SCHOOL Dairymaid Drive, Germantown, Maryland 20874 RADON SCREENING SURVEY FOLLOW-UP GREAT SENECA CREEK ELEMENTARY SCHOOL 13010 Dairymaid Drive, Germantown, Maryland 20874 EXECUTIVE SUMMARY Date of Test Report: 3/31/16 Follow-Up Round of Testing: Initial

More information

GUARDIAN FIRE TESTING LABORATORIES, INC.

GUARDIAN FIRE TESTING LABORATORIES, INC. GUARDIAN FIRE TESTING LABORATORIES INC. Testing & Listing Field Labeling Page 1 of 5 Engineering & Product Certification Services Factory Inspections Guardian Fire Testing Laboratories, Inc. Phone: 716

More information

TCDSB Asbestos Containing Material Re-Assessment Form. Friability (F/NF) Asbestos Content

TCDSB Asbestos Containing Material Re-Assessment Form. Friability (F/NF) Asbestos Content TCDSB Containing Material June 3, 07 Page St. Josaphat Catholic School 50373 0/0A/0B/0/ 0A/0B/03/03 A/04/05/06/06B //4/5B/5 C/S0 Below Remnant Mastic - Below Tiles 00 (now 0A) Above Ceiling Pipe fitting

More information

PLNPCM Carl s Jr. Commercial Parking Lot at Redwood Road and 1700 South

PLNPCM Carl s Jr. Commercial Parking Lot at Redwood Road and 1700 South Staff Report PLANNING DIVISION COMMUNITY & NEIGHBORHOODS To: Salt Lake City Planning Commission From: Casey Stewart; 801-535-6260 Date: November 4, 2016 Re: PLNPCM2015-00874 Carl s Jr. Commercial Parking

More information

156 Egret Street, Covington, LA * * MOLD/IAQ SCREENING REPORT

156 Egret Street, Covington, LA * * MOLD/IAQ SCREENING REPORT 156 Egret Street, Covington, LA 70433 * 985 871-7511 * 985 373-2371 MOLD/IAQ SCREENING REPORT 123 ABC Lane Any City, LA November 1, 2012 1 Section 1 MOLD/IAQ SCREENING REPORT General: Subject: Mold Screening

More information

Asbestos in the Community EHPA

Asbestos in the Community EHPA Asbestos in the Community EHPA Darren Watson Inspector WorkSafe Victoria 20 th June 2016 Contents What is asbestos Forms of asbestos containing material (ACM) Health hazard & risk to health Types of ACM

More information

Safe Removal of Asbestos. Work Safe Week 2013

Safe Removal of Asbestos. Work Safe Week 2013 Safe Removal of Asbestos Work Safe Week 2013 Work Safe Week 2013 For the respect of others please ensure your mobile phone is switched off or on silent. In the event of an emergency a Convention Centre

More information

Environmental Resources Group, LLC (ERG) has completed the Radon Testing for the referenced property in Ann Arbor, Michigan.

Environmental Resources Group, LLC (ERG) has completed the Radon Testing for the referenced property in Ann Arbor, Michigan. August 8, 2013 Mr. Richard Higgins Norstar Development USA, L.P. 733 Broadway Albany, New York 12207 Re: Radon Testing Green Baxter 1737 Green Road, Ann Arbor, Michigan ERG Project 1127.004 Dear Mr. Higgins,

More information

PART 1 GENERAL 1.01 SUMMARY

PART 1 GENERAL 1.01 SUMMARY Welcome to the SAFTIFIRST TM Guide Specification System prepared as an aid to specifiers in preparing written construction documents. For specification assistance with specific product applications, please

More information

The Louis Berger Group, Inc. 15 January 2016

The Louis Berger Group, Inc. 15 January 2016 15 January 2016 THE Louis Berger Group, INC. 350 Eagleview Boulevard, Suite 250, Exton, Pennsylvania 19341-1178 Tel 610 280-4000 Fax 610 363-5390 www.louisberger.com Ms. Anne J. Wolf Facilities R&A Team

More information

2017 Remodeling Impact Report

2017 Remodeling Impact Report National Association of REALTORS Research Department Hello white space Introduction Homeowners and renters remodel, redesign, and restructure their home for a variety of reasons. This report takes a deep

More information

Changing Carpet Care Forever

Changing Carpet Care Forever Changing Carpet Care Forever Faster, Cleaner, Greener. Pro Series Recycling Extractors Portable, Professional-Grade, Moisture-Controlled Cleaning One Machine Does it All CFR s portable Pro-500 and Pro-750

More information

Winston-Salem State University Campus Master Plan 2016 Update

Winston-Salem State University Campus Master Plan 2016 Update Winston-Salem State University Campus Master Plan 2016 Update Request for Qualifications Page 1 of 6 Overview Winston-Salem State University (WSSU) is requesting qualifications from planning firms specializing

More information

Resolving the Vermiculite Asbestos Conflict

Resolving the Vermiculite Asbestos Conflict Resolving the Vermiculite Asbestos Conflict A New Approach to Detection and Quantitation The Vermiculite Association: Annual Meeting Park City, Utah (September 11-13, 2014) Don Ewert; Industrial Hygienist

More information

LIMITED INDOOR MOLD ASSESSMENT

LIMITED INDOOR MOLD ASSESSMENT LIMITED INDOOR MOLD ASSESSMENT RESIDENTIAL PROPERTY 1022 NORTHWEST 27 TH STREET SAN ANTONIO, TEXAS PREPARED FOR: PREPARED BY: LUCAS OLIVA ARGUS ENVIRONMENTAL SAN ANTONIO HOUSING AUTHORITY 10004 WURZBACH

More information

Bethel School District Radon Testing Plan

Bethel School District Radon Testing Plan The 2015 Oregon Legislature passed House Bill (HB) 2931 so that elevated radon levels in Oregon schools would be known. House Bill 2931 later became Oregon Revised Statute (ORS) 332.166-167. As directed

More information

835 S. Canyon Blvd., John Day, OR 97845 Phone: (541) 575-1349 Fax: (541) 575-3601 Robert Waltenburg-Superintendent waltenburgr@grantesd.k12.or.us Stacie Holmstrom Deputy Clerk holmstroms@grantesd.k12.or.us

More information

Imagine the result. Dear Ms. Vanderlaan:

Imagine the result. Dear Ms. Vanderlaan: Mary Vanderlaan Supervisor, Lansing District Michigan Department of Environmental Quality Water Resources Division 525 W. Allegan (Constitution Hall, 4N) P. O. Box 30242 Lansing, MI 48909-7742 ARCADIS

More information

SECTION CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

SECTION CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL SECTION 01 74 19 - PART 1 - GENERAL 1.1 SUMMARY A. Section includes 1. Recycling nonhazardous construction waste. 2. Disposing of nonhazardous construction waste. 3. Recycling of vinyl composition tile.

More information

AVERAGE COST TO SIDE A HOUSE DOCUMENT

AVERAGE COST TO SIDE A HOUSE DOCUMENT 08 March, 2018 AVERAGE COST TO SIDE A HOUSE DOCUMENT Document Filetype: PDF 214.07 KB 0 AVERAGE COST TO SIDE A HOUSE DOCUMENT Read general aluminum siding installation prices, tips and get free siding

More information

VACUUM VALVES AND HOSES

VACUUM VALVES AND HOSES VACUUM VALVES AND HOSES 5046 Vacuum Valve Two-piece 500 F (260 C) industry standard 5255 Vacuum Valve Three-piece 500 F (260 C) industry standard SS5700 Stainless Steel Vacuum Valve Three-piece 1000 F

More information

Building Codes & Standards for Healthcare. Healthcare Construction Certificate - Level 1

Building Codes & Standards for Healthcare. Healthcare Construction Certificate - Level 1 Building Codes & Standards for Healthcare Building Codes and Standards AHJs Codes Defend in Place Walls Sprinklers Fire Alarm Important Dates for Healthcare Facilities 7/5/16 NFPA Life Safety Code 101

More information

Staff Report. Conditional Use PLANNING DIVISION COMMUNITY & ECONOMIC DEVELOPMENT. Salt Lake City Planning Commission

Staff Report. Conditional Use PLANNING DIVISION COMMUNITY & ECONOMIC DEVELOPMENT. Salt Lake City Planning Commission Staff Report PLANNING DIVISION COMMUNITY & ECONOMIC DEVELOPMENT To: From: Salt Lake City Planning Commission Maryann Pickering, Principal Planner (801) 535-7660 Date: December 10, 2014 Re: Church of Scientology

More information

The Prevention and Control of Electrostatic Discharge (ESD)

The Prevention and Control of Electrostatic Discharge (ESD) The Prevention and Control of Electrostatic Discharge (ESD) Document Revision 1.1 February, 2018 1 of 13 Table of Content 1 INTRODUCTION TO ESD... 3 2 PREVENTION AND CONTROL... 4 2.1 SOURCES OF STATIC

More information

GLENDALE FIRE DEPARTMENT FIRE MARSHAL S OFFICE

GLENDALE FIRE DEPARTMENT FIRE MARSHAL S OFFICE GLENDALE FIRE DEPARTMENT FIRE MARSHAL S OFFICE To: From: Subject: Whom It May Concern Carl Ray Austerman, Fire Marshal Contractor s Guide Welcome to the Glendale Fire Department s Contractors Guide. This

More information

SIZING OF VENTING SYSTEMS SERVING APPLIANCES EQUIPPED WITH DRAFT HOODS, CATEGORY I APPLIANCES, AND APPLIANCES LISTED FOR USE WITH TYPE B VENTS

SIZING OF VENTING SYSTEMS SERVING APPLIANCES EQUIPPED WITH DRAFT HOODS, CATEGORY I APPLIANCES, AND APPLIANCES LISTED FOR USE WITH TYPE B VENTS (IFGS) SIZING OF VENTING SYSTEMS SERVING APPLIANCES EQUIPPED WITH DRAFT HOODS, CATEGORY I APPLIANCES, AND APPLIANCES LISTED FOR USE WITH TYPE B VENTS (This appendix is informative and is not part of the

More information

Section Plaster Accessories

Section Plaster Accessories Section 09209 Plaster Accessories PART 1 - GENERAL 1.1 SUMMARY A. Related work specified elsewhere includes: 1. Rough carpentry. 2. Finish carpentry and millwork. 3. Metal support systems. 4. Furring and

More information

Understand what asbestos is and how to avoid exposure

Understand what asbestos is and how to avoid exposure Understand what asbestos is and how to avoid exposure. PINCHIN & AFFILIATES A leader in engineering, environmental health & safety solutions Multi-disciplinary approach by highly qualified, experienced

More information

Report No. ECL01I Page 1 of 5. Test Report. Centre Testing International Pinbiao(Shanghai) Co., Ltd. Maritime Industry Division

Report No. ECL01I Page 1 of 5. Test Report. Centre Testing International Pinbiao(Shanghai) Co., Ltd. Maritime Industry Division Report No. ECL01I013900001 Page 1 of 5 Test Report Applicant Address Sample(s) received date Mar. 18, 2016 HEIBEI HENGDA SEALING MATERIALS CO.,LTD SHUCHENG INDUSTRIAL AREA, HEJIAN CITY, HEBEI PROVINCE,CHINA

More information

MCPS RADON TESTING. Executive Summary: Festival Center. Date of Test Report: 4/15/2016 Round of Testing: Initial Follow-up Post Remediation

MCPS RADON TESTING. Executive Summary: Festival Center. Date of Test Report: 4/15/2016 Round of Testing: Initial Follow-up Post Remediation E NGINEERS P LANNERS S CIENTISTS C ONSTRUCTION M ANAGERS 936 RIDGEBROOK ROAD SPARKS, MD 21152 410-316-7800 (FAX) 410-316-7935 MCPS RADON TESTING Executive Summary: Festival Center Date of Test Report:

More information

Interior signs are an extension of the exterior sign system and their content and design should take this into consideration.

Interior signs are an extension of the exterior sign system and their content and design should take this into consideration. General Guideline The Interior Sign standard is developed to address the need for a cost effective, functional, flexible and serviceable sign system. The intent is to assure code compliance, consistency

More information

Brighton Area Fire Authority

Brighton Area Fire Authority 615 W. Grand River Ave. Brighton, MI 48116 o: 810-229-6640 f: 810-229-1619 January 14, 2019 Fire Alarm Contractors RE: Fire Alarm Credential & Submittal Requirements To Whom It May Concern: The following

More information

Do you know what you re getting into?

Do you know what you re getting into? Do you know what you re getting into? Disturbing Asbestos could be fatal. Health and Safety Executive Northern Ireland Stop Think Asbestos! Do I know if asbestos is present? Is it high risk material that

More information

STAFF REPORT ACTION REQUIRED

STAFF REPORT ACTION REQUIRED STAFF REPORT ACTION REQUIRED Residential Demolition Application 595 Vaughan Road Date: December 15, 2011 To: From: Wards: Reference Numbers: North York Community Council Director and Deputy Chief Building

More information

ARCHITECT S SPECIFICATIONS For Commercial Vinyl Wallcoverings

ARCHITECT S SPECIFICATIONS For Commercial Vinyl Wallcoverings 1 1. GENERAL 1.1 Summary Contractor shall furnish, install and finish a vinyl wallcovering as specified in the contract documents. 1.2 Sample Contractor shall submit for the architect s approval a sample

More information

Yash Modular Furniture Private Limited

Yash Modular Furniture Private Limited +91-8048089482 Yash Modular Furniture Private Limited https://www.yashmodularfurniture.com/ We are one of the promising manufacturers and suppliers of an enticing range of Office, Kitchen, Lab, School

More information

FAIRA TRANSPARENCY REPORTS th St SE, Lake Stevens, WA June 14 th, 2017

FAIRA TRANSPARENCY REPORTS th St SE, Lake Stevens, WA June 14 th, 2017 608 State St. South Kirkland, WA 98033 www.faira.com hello@faira.com +1.800.571.FAIR Thank you for your interest in this Faira Certified home. FAIRA TRANSPARENCY REPORTS 98258 June 14 th, 2017 We have

More information

20 & 30 Frank Nighbor Place

20 & 30 Frank Nighbor Place Engineering Land / Site Development Municipal Infrastructure Environmental / Water Resources Traffic / Transportation Structural Recreational Planning Land / Site Development Planning Application Management

More information

PRODUCT PERFORMANCE TEST REPORT. Report No.: D Test Date: May 29, Rendered to: Natural Light Energy Systems Phoenix, Arizona

PRODUCT PERFORMANCE TEST REPORT. Report No.: D Test Date: May 29, Rendered to: Natural Light Energy Systems Phoenix, Arizona Architectural Testing PRODUCT PERFORMANCE TEST REPORT Report No.: D7226.01-121-24 Test Date: May 29, 2014 Rendered to: Natural Light Energy Systems Phoenix, Arizona PRODUCT TYPE: Tubular Daylight Device

More information

RADON PLAN. Eugene School District 4J Facilities Management 715 West Fourth Avenue Eugene, OR

RADON PLAN. Eugene School District 4J Facilities Management 715 West Fourth Avenue Eugene, OR RADON PLAN The 2015 Legislature passed House Bill (HB) 2931 so that if elevated radon levels in Oregon schools existed they would be known. House Bill 2931 later became Oregon Revised Statute (ORS) 332.166-167.

More information

Butler Junior High School

Butler Junior High School 150042 Butler Junior High School Site Plan of Butler Junior High Floor Plan of Butler Junior High 2 150042; Butler Junior High School. This school is located on East North Street, Butler, Pennsylvania

More information

TECHNICAL MANUAL for FIRE TAPE. E-Z TAPING SYSTEM PO BOX GREEN BAY, WI

TECHNICAL MANUAL for FIRE TAPE. E-Z TAPING SYSTEM PO BOX GREEN BAY, WI TECHNICAL MANUAL for FIRE TAPE E-Z TAPING SYSTEM PO BOX 10887 GREEN BAY, WI 54307 800-721-8273 http://www.e-ztape.com Table of Contents Product Description... 3 Fire Tape Manufacturer... 3 Fire Tape Listed

More information

Quality Assurance Plan for Conducting Radon Measurements

Quality Assurance Plan for Conducting Radon Measurements Quality Assurance Plan for Conducting Radon Measurements 921 Pheasant Run Lindsborg, Kansas 67456 (785) 510-0000 info@clarityinspect.com getyourinspection.com page 1 of 18 Table of Contents A.1 Approval

More information