DULANEY HIGH SCHOOL FEASIBILITY STUDY

Size: px
Start display at page:

Download "DULANEY HIGH SCHOOL FEASIBILITY STUDY"

Transcription

1 DULANEY HIGH SCHOOL FEASIBILITY STUDY APPENDIX A: SITE PLAN Baltimore County Public Schools Site Plan-Appendix A Office of Engineering and Construction February 18, 2016 Dulaney High School Feasibility Study

2

3 DULANEY HIGH SCHOOL FEASIBILITY STUDY APPENDIX B: EXISTING UTILIZATION PLAN Baltimore County Public Schools Existing Utilization Plan-Appendix B Office of Engineering and Construction February 18, 2016 Dulaney High School Feasibility Study

4

5

6 WOODLAWN HIGH SCHOOL FEASIBILITY STUDY APPENDIX C: EDUCATIONAL ENHANCEMENT PLAN Baltimore County Public Schools Educational Enhancement Plan-Appendix C Office of Engineering and Construction February 18, 2016 Woodlawn High School Feasibility Study

7

8

9 DULANEY HIGH SCHOOL FEASIBILITY STUDY APPENDIX D: STRUCTURAL ISSUES PLAN Baltimore County Public Schools Structural Issues Plan-Appendix D Office of Engineering and Construction February 18, 2016 Dulaney High School Feasibility Study

10

11

12 DULANEY HIGH SCHOOL FEASIBILITY STUDY APPENDIX E: Food Service Memo Baltimore County Public Schools Food Service Memo-Appendix E Office of Engineering and Construction February 18, 2016 Dulaney High School Feasibility Study

13 DULANEY HIGH SCHOOL FEASIBILITY STUDY APPENDIX E: FOOD SERVICE MEMO A. GENERAL DESCRIPTION: Dulaney High School kitchen operates as a full-service/production facility equipped to produce meals for the students and staff of Dulaney High as well as three feeder elementary schools. Dulaney High School opened in 1964, which is when the two of the three existing serving lines were installed. Much of the equipment, although well maintained, is old, outdated, insufficient, non-compliant with current codes and has seen its useful life. The kitchen had a minor renovation in 2001 which included the addition of a four-compartment pot washing sink, the installation of a walk-in freezer and the replacement of the kitchen hood. B. EXISTING CONDITIONS: 1. FINISHES Floors. Kitchen and main serving area are thick-set quarry tile. The floor has been maintained; however, due to smooth surfaces, tiles can be very slippery when wet or laden with grease. Walls. The walls in the serving line area and kitchen are covered by a 4 x6 ceramic tile and appear to be well maintained. There are six individual doors leading from the cafeteria into the serving area. A row of large ribbon windows extends above the tiling on this wall. Ceilings. High, painted ceilings extend through the serving are and kitchen. Lighting. Lighting in the serving area is 2 x4 recessed fluorescence. Most of the kitchen has 1 x4 surface mounted lights; however, a portion has 1 x4 recessed lights. Overall, the lighting levels are poor. 2. AREAS Dry Storage. Dry Storage is a small room with items stored on perimeter shelving; however, the room does not appear to be over packed. The ceilings are painted drywall. The walls are the covered with the same ceramic tiles as the kitchen and serving area and the floor is quarry tile. Walk-in Coolers and Freezer Storage. The freezer was installed in 2001, has a diamond plated floor and appears to be in good condition. There is adequate space in the freezer. The cooler, acquired in 1993 is small, crowded and needs attention, including the concrete floor which needs to be repainted. The refrigeration system for the cooler was replaced in Baltimore County Public Schools Food Service Memo-Appendix E Page 1 Office of Engineering and Construction February 18, 2016 Dulaney High School Feasibility Study

14 Kitchen. The kitchen is an interior space, which lacks windows and air conditioning and gets hot during the warmer months. A new HVAC system should be installed to control the temperatures in the winter and provide air conditioning in the summer to temper the space to avoid overheating the area. The cooking equipment in the kitchen does not match the menu and should be reevaluated to include the proper equipment. Serving. The serving line area consists of three serving lines. These serving lines are original. Two of these lines are single construction units. Several of the components of this equipment has failed and is no longer functional, included the ice cream coolers and milk coolers. In 1996, these lines were modified to add two drop-in-cold wells for milk. The third line is thrown together to form a make-shift serving line. This area should be redesigned to provide U-shaped serving lines with individual pieces of equipment, matching BCPS current standards. This would provide better service and less wasted space by components which no longer function. Dishwashing. BCPS uses all-disposable dinnerware. Area contains a four-compartment pot washing sink and shelving to store pots and pans. Janitor Closet. The kitchen has two rooms, on opposite sides of the kitchen. There is a narrow room which holds the mops, buckets and a shelf. The second room is small and has a wall mounted custodial sink and should be replaced by a floor mounted mop sink. Receiving. A double door with screen leads out the back of the kitchen to a hallway accessible by both staff and students. Workers must pass turn the corner to reach a receiving room. This area has a large coiling metal door which is manually operated and exits to the loading dock. Also in this area, is a paper storage room which holds cups, napkins and lunch trays. Baltimore County Public Schools Food Service Memo-Appendix E Page 2 Office of Engineering and Construction February 18, 2016 Dulaney High School Feasibility Study

15 3. EQUIPMENT Exhaust Hood. This is the original exhaust hood from 1961 and should to be replaced. Current Cooking Equipment. 1) (2) Double-Deck Convection Oven (1996 & 2010) 2) (2) Steam Kettle (2001) 3) (1) Double-Deck Steamer (1972) The 1972 steamer should be replaced and one of the steam kettles should be removed and replaced with an additional double-deck steamer. Serving Counters. The serving equipment is original and is single construction. Several components are non-functioning; however cannot be removed as they are all integrated together. This equipment should be replaced. Worktables, Prep Sinks, Pot Sinks. Many of the worktables and prep tables are the original equipment and should be replaced. C. CONCLUSION: Although large in space, rooms are scattered throughout the kitchen making it labor-intensive to perform the work required. Also, despite that some systems have been updated, the kitchen would greatly benefit from a renovation to reorganize the available space to bring order to the kitchen. Additionally, the serving line equipment should be redesigned to provide a better functioning area to better serve the students and the employees that serve the food. Baltimore County Public Schools Food Service Memo-Appendix E Page 3 Office of Engineering and Construction February 18, 2016 Dulaney High School Feasibility Study

16 DULANEY HIGH SCHOOL FEASIBILITY STUDY APPENDIX F: COST ESTIMATE Baltimore County Public Schools Cost Estimate-Appendix F Office of Engineering and Construction February 18, 2016 Dulaney High School Feasibility Study

17 02/05/16 LEWICKI ESTIMATING SERVICES, INC. DULANEY HIGH SCHOOL RENOVATION PRECONSTRUCTION SERVICES BALTIMORE COUNTY SCHOOLS FEASIBILITY STUDY COST ESTIMATE ARCHITECT: RUBELING & ASSOCIATES EQUIPMENT/ NO. DESCRIPTION LABOR MATERIAL SUBCONTRACT TOTAL COMMENTS 01 GENERAL REQUIREMENTS $0 $0 $3,090,000 $3,090, EXISTING CONDITIONS $0 $0 $1,136,103 $1,136, CONCRETE $0 $0 $177,950 $177, MASONRY $0 $0 $40,000 $40, METALS $0 $0 $302,500 $302, WOOD & PLASTICS $0 $0 $102,300 $102, THERMAL & MOISTURE PROTECTION $0 $0 $2,095,000 $2,095, OPENNINGS $0 $0 $2,042,050 $2,042, FINISHES $0 $0 $2,783,648 $2,783, SPECIALTIES $0 $0 $316,250 $316, EQUIPMENT $0 $0 $640,800 $640, FURNISHINGS $0 $0 $632,700 $632, SPECIAL CONSTRUCTION $0 $0 $0 $0 14 CONVEYING SYSTEMS $0 $0 $60,000 $60, FIRE SUPPRESSION $0 $0 $649,285 $649, PLUMBING $0 $0 $1,303,888 $1,303, HVAC $0 $0 $4,686,872 $4,686, INTEGRATED AUTOMATION $0 $0 $0 $0 Incl. w/ Div ELECTRICAL $0 $0 $2,030,466 $2,030, COMMUNICATIONS $0 $0 $172,524 $172, ELECTRONIC SAFETY & SECURITY $0 $0 $649,285 $649, EARTHWORK $0 $0 $0 $0 32 EXTERIOR IMPROVEMENTS $0 $0 $114,750 $114, UTILITIES $0 $0 $90,000 $90,000 SUBTOTAL $23,116,371 PREVAILING WAGE SCALE PREMIUM 6% $1,386,982 CONTRACTOR OH / P 5% $1,225,168 P & P BOND / INSURANCE1.5% $385,928 DESIGN / ESTIMATING CONTINGENCY 15% $3,917,167 INFLATION 8% $2,402,529 Q construction start TOTAL $32,434,146 Dulaney HS FS 1

18 02/05/16 DULANEY HIGH SCHOOL RENOVATION BALTIMORE COUNTY SCHOOLS LEWICKI ESTIMATING SERVICES,INC. PRECONSTRUCTION SERVICES FEASIBILITY STUDY COST ESTIMATE ARCHITECT: RUBELING & ASSOCIATES UNIT EQUIPMENT/ TRADE NO. DESCRIPTION UNIT QUANTITY COST LABOR MATERIAL SUBCONTRACT AMOUNT SUBTOTAL COMMENTS 01 GENERAL CONDITIONS: General Conditions Mo 30 $55,000 $1,650,000 $1,650,000 Temporary trailers Ea 8 $130,000 $1,040,000 $1,040,000 Temporary trailers - Double wide Ea 2 $175,000 $350,000 $350,000 Packing & storage Allow 1 $50, $50,000 $50,000 $3,090,000 Total General Conditions 02 EXISTING CONDITIONS: Demo at classroom entrances Loc 60 $ $15,000 $15,000 Rmv doors & frames Ea 205 $50.00 $10,250 $10,250 Demo at public restrooms Sf 2,725 $7.50 $20,438 $20,438 Rmv glazed clearstory Lf 5,800 $8.75 $50,750 $50,750 Rmv chalk boards Rms 60 $ $21,000 $21,000 Rmv auditorium seating Ea 1,204 $15.00 $18,060 $18,060 Rmv VCT floor & base Sf 120,510 $0.50 $60,255 $60,255 Rmv lockers Hr 1,100 $35.00 $38,500 $38,500 Misc demo Hr 500 $35.00 $17,500 $17,500 Tools & equipment Ea 1 $15, $15,000 $15,000 Haulaway Lds 125 $ $75,000 $75,000 Hazmat Abatement - Floor tile & mastic Sf 72,600 $3.00 $217,800 $217,800 Rmv terrazzo Floor Sf 500 $16.00 $8,000 $8,000 Weatherproof membrane - HVAC Sf 100 $5.00 $500 $500 Vibration isolators - HVAC Ea 6 $50.00 $300 $300 Boiler Room gaskets Ea 60 $ $6,000 $6,000 Mudded pipe fittings -HVAC Ea 500 $20.00 $10,000 $10,000 Mudded pipe fittings -Plumbing Ea 400 $20.00 $8,000 $8,000 Piping insulation - Plumbing Lf 800 $20.00 $16,000 $16,000 Sink mastic Ea 20 $50.00 $1,000 $1,000 Window caulking Wndw 840 $ $252,000 $252,000 Transite board Sf 2,400 $5.00 $12,000 $12,000 Fire doors Ea 210 $75.00 $15,750 $15,750 Chalk / tackboard mastic Sf 11,800 $5.00 $59,000 $59,000 Ceramic wall grout Sf 3,000 $7.00 $21,000 $21,000 Auditorium ceiling Sf 500 $20.00 $10,000 $10,000 Testing & monitoring Ea 1 $157, $157,000 $157,000 $1,136,103 Total Existing Conditions Dulaney HS FS 2

19 02/05/16 DULANEY HIGH SCHOOL RENOVATION BALTIMORE COUNTY SCHOOLS LEWICKI ESTIMATING SERVICES,INC. PRECONSTRUCTION SERVICES FEASIBILITY STUDY COST ESTIMATE ARCHITECT: RUBELING & ASSOCIATES UNIT EQUIPMENT/ TRADE NO. DESCRIPTION UNIT QUANTITY COST LABOR MATERIAL SUBCONTRACT AMOUNT SUBTOTAL COMMENTS 03 CONCRETE: Concrete repairs after plumbing work Ea 1 $25, $25,000 $25,000 Ramp replacement - Tech wing Ea 1 $20, $20,000 $20,000 Flash patch floors Ls 1 $30, $30,000 $30,000 Exterior concrete spalling repairs slab Allow 1 $35, $35,000 $35,000 Concrete column repairs Allow 1 $20, $20,000 $20,000 New addtion slab repairs Ea 1 $10, $10,000 $10,000 Infill pit at Library Sf 530 $15.00 $7,950 $7,950 Misc concrete repairs Allow 1 $25, $25,000 $25,000 Equipment pads Ls 1 $5, $5,000 $5,000 $177,950 Total Concrete 04 MASONRY: Exterior brick replacement Allow 1 $10, $10,000 $10,000 Limited tuckpointing Allow 1 $30, $30,000 $30,000 $40,000 Total Masonry 05 METALS: Structural upgrades for HVAC equipment Loc 3 $15, $45,000 $45,000 DOAS Structural upgrades for HVAC equipment Loc 13 $15, $195,000 $195,000 RTU Rmv & replace misc stair railings Ea 6 $2, $15,000 $15,000 Replace misc. ramp & stair railings Ls 1 $10, $10,000 $10,000 Misc. metals Ea 1 $35, $35,000 $35,000 Shop drawings Ea 1 $2, $2,500 $2,500 $302,500 Total Metals 06 WOOD & PLASTICS: Roof blocking Sf 167,200 $0.25 $41,800 $41,800 Finish carpentry Hr 1,100 $55.00 $60,500 $60,500 $102,300 Total Wood & Plastics 07 THERMAL & MOISTURE PROTECTION: Rmv & replace existing roof & sht. Metal Sf 167,200 $12.50 $2,090,000 $2,090,000 Caulking Ea 1 $5, $5,000 $5,000 $2,095,000 Total Thermal & Moist. Protec. Dulaney HS FS 3

20 02/05/16 DULANEY HIGH SCHOOL RENOVATION BALTIMORE COUNTY SCHOOLS LEWICKI ESTIMATING SERVICES,INC. PRECONSTRUCTION SERVICES FEASIBILITY STUDY COST ESTIMATE ARCHITECT: RUBELING & ASSOCIATES UNIT EQUIPMENT/ TRADE NO. DESCRIPTION UNIT QUANTITY COST LABOR MATERIAL SUBCONTRACT AMOUNT SUBTOTAL COMMENTS 08 OPENNINGS: Corridor doors, fames, hardware Ea 175 $1, $218,750 $218,750 Enclose exterior breezeway Sf 900 $55.00 $49,500 $49,500 Security Vestibule Ls 1 $30, $30,000 $30,000 Rmv & replace exterior windows Sf 28,230 $60.00 $1,693,800 $1,693,800 Rmv & reinstall sun screens Ls 1 $50, $50,000 $50,000 $2,042,050 Total Opennings 09 FINISHES: Classroom entry drywall & ceramic tile Loc 60 $1, $90,000 $90,000 2 x 4 ACT ceilings Sf 185,000 $2.55 $471,750 $471,750 VCT flooring & base Sf 120,510 $3.75 $451,913 $451,913 Infill glazed clearstory Lf 5,800 $30.00 $174,000 $174,000 Clean & repair terrazzo floors Sf 38,000 $1.50 $57,000 $57,000 Interior painting of school Sf 185,000 $1.50 $277,500 $277,500 Repaint canopy soffit Ea 1 $2, $2,500 $2,500 Program Area Renovations - Renovate Library / Media Center Sf 5,190 $30.00 $155,700 $155,700 Renovate Art classrooms Sf 4,410 $35.00 $154,350 $154,350 Relocate Health Suite Sf 1,500 $30.00 $45,000 $45,000 Renovate Technology classrooms Sf 7,080 $20.00 $141,600 $141,600 Renovate restrooms Sf 2,725 $75.00 $204,375 $204,375 Renocate Child Care Sf 1,407 $30.00 $42,210 $42,210 Renovate Locker Rooms Sf 5,400 $50.00 $270,000 $270,000 RenovateAdmin & Guidance area Sf 5,800 $35.00 $203,000 $203,000 Renovate Food / Nutrition Sf 1,425 $30.00 $42,750 $42,750 $2,783,648 Total Finishes 10 SPECIALTIES: White board & tackboards Rms 60 $4, $270,000 $270,000 ADA Signage Ea 1 $20, $20,000 $20,000 Locker room lockers Ea 50 $ $11,250 $11,250 Mis. Specialties Ls 1 $15, $15,000 $15,000 $316,250 Total Specialties Dulaney HS FS 4

21 02/05/16 DULANEY HIGH SCHOOL RENOVATION BALTIMORE COUNTY SCHOOLS LEWICKI ESTIMATING SERVICES,INC. PRECONSTRUCTION SERVICES FEASIBILITY STUDY COST ESTIMATE ARCHITECT: RUBELING & ASSOCIATES UNIT EQUIPMENT/ TRADE NO. DESCRIPTION UNIT QUANTITY COST LABOR MATERIAL SUBCONTRACT AMOUNT SUBTOTAL COMMENTS 11 EQUIPMENT: Kitchen equipment Ea 1 $630, $630,000 $630,000 Residential appliances at Food & Nutrition - Range Ea 6 $ $2,700 $2,700 Exhaust hood Ea 6 $ $900 $900 Dishwasher Ea 6 $ $2,400 $2,400 Refrigerator Ea 6 $ $4,800 $4,800 $640,800 Total Equipment 12 FURNISHINGS: Auditorium seating Ea 1,204 $ $361,200 $361,200 Classroom casework Rms 60 $4, $270,000 $270,000 Entrance mats Ea 1 $1, $1,500 $1,500 $632,700 Total Furnishings 14 CONVEYING SYSTEMS: Elevator controls upgrade Ea 1 $30, $30,000 $30,000 Chair lift Ea 2 $15, $30,000 $30,000 $60,000 Total Conveying Systems 21 FIRE SUPRESSION: Wet Sprinkler System SF 185,510 $3.50 $1.50 $2.00 $0.00 $649,285 Fire Pump EA 0 $42, $2, $40, $0.00 $0 None included $649,285 Total Fire Suppression 22 PLUMBING: Demolition SF 185,510 $0.60 $0.50 $0.10 $0.00 $111,306 Plumbing Fixtures SF 185,510 $1.60 $0.35 $1.25 $0.00 $296,816 Drains, Carriers & Specialties SF 185,510 $0.75 $0.20 $0.55 $0.00 $139,133 Kitchen Plumbing LS 1 $35, $20, $15, $0.00 $35,000 Condensate Drain SF 185,510 $0.33 $0.11 $0.22 $0.00 $61,218 Storm Water Piping SF 185,510 $0.46 $0.12 $0.34 $0.00 $85,335 Waste & Vent Piping SF 185,510 $0.55 $0.15 $0.40 $0.00 $102,031 Insulated Domestic Water Piping SF 185,510 $2.35 $0.85 $1.50 $0.00 $435,949 Start-Up & Test SF 185,510 $0.20 $0.18 $0.02 $0.00 $37,102 $1,303,888 Total Plumbing Dulaney HS FS 5

22 02/05/16 DULANEY HIGH SCHOOL RENOVATION BALTIMORE COUNTY SCHOOLS LEWICKI ESTIMATING SERVICES,INC. PRECONSTRUCTION SERVICES FEASIBILITY STUDY COST ESTIMATE ARCHITECT: RUBELING & ASSOCIATES UNIT EQUIPMENT/ TRADE NO. DESCRIPTION UNIT QUANTITY COST LABOR MATERIAL SUBCONTRACT AMOUNT SUBTOTAL COMMENTS 23 HVAC Demolish HVAC System SF 185,510 $1.75 $1.50 $0.25 $0.00 $324,643 Air Cooled Chiller Assembly- 350 Ton EA 1 $255, $20, $235, $0.00 $255,000 Chilled Water Pump EA 4 $19, $5, $14, $0.00 $79,600 Heating Water Pump EA 4 $16, $4, $12, $0.00 $65,600 Roof Top Unit CFM 150,600 $6.50 $1.00 $5.50 $0.00 $978,900 Dedicated OA System CFM 19,266 $9.00 $1.25 $7.75 $0.00 $173,394 Kitchen Exhaust & Makeup Air EA 1 $45, $25, $20, $0.00 $45,000 Hydronic Specialties SF 185,510 $0.77 $0.22 $0.55 $0.00 $142,843 Split systems at computer classrooms LS 1 $35, $15, $20, $0.00 $35,000 Fan Coil Unit SF 185,510 $1.75 $0.25 $1.50 $0.00 $324,643 Split system at IDF & MDF rooms LS 1 $25, $10, $15, $0.00 $25,000 Insulated Hydronic Piping SF 185,510 $2.65 $1.20 $1.45 $0.00 $491,602 Miscellaneous Terminal Unit SF 185,510 $0.25 $0.05 $0.20 $0.00 $46,378 Sheet Metal Ductwork SF 185,510 $3.15 $2.10 $1.05 $0.00 $584,357 Ductwork Insulation SF 185,510 $0.55 $0.35 $0.20 $0.00 $102,031 Chemical Treatment SF 185,510 $0.13 $0.04 $0.09 $0.00 $24,116 Automatic Temperature Control SF 185,510 $4.40 $0.00 $4.40 $0.00 $816,244 Start-Up, Test, & Balance SF 185,510 $0.53 $0.45 $0.08 $0.00 $98,320 Commissioning SF 185,510 $0.40 $0.34 $0.06 $0.00 $74,204 $4,686,872 Total HVAC 26 ELECTRICAL: Service & Distribution Base Building Demolition SF 185,510 $0.60 $0.55 $0.05 $0.00 $111,306 Modify Existing Switchboard EA 1 $50, $30, $20, $0.00 $50,000 Concrete Pad, Grounding Grid & Duct Bank EA 1 $10, $1, $8, $0.00 $10,350 Panelboard Upgrade SF 185,510 $0.85 $0.20 $0.65 $0.00 $157,684 Motor Starter/Disconnect SF 185,510 $0.65 $0.25 $0.40 $0.00 $120,582 Motor Feeder Conduit & Wire SF 185,510 $0.95 $0.30 $0.65 $0.00 $176,235 Power Feeder Conduit & Wire SF 185,510 $0.39 $0.14 $0.25 $0.00 $72,349 Grounding SF 185,510 $0.09 $0.05 $0.04 $0.00 $16,696 Start-Up & Independent Testing SF 185,510 $0.50 $0.36 $0.14 $0.00 $92,755 Commissioning SF 185,510 $0.40 $0.30 $0.10 $0.00 $74,204 Lighting & Power Base Building Interior Lighting SF 185,510 $4.65 $1.20 $3.45 $0.00 $862,622 Lighting Control System SF 185,510 $1.00 $0.25 $0.75 $0.00 $185,510 Branch Circuit Conduit & Wire SF 185,510 $0.54 $0.24 $0.30 $0.00 $100,175 $2,030,466 Total Electric Dulaney HS FS 6

23 02/05/16 DULANEY HIGH SCHOOL RENOVATION BALTIMORE COUNTY SCHOOLS LEWICKI ESTIMATING SERVICES,INC. PRECONSTRUCTION SERVICES FEASIBILITY STUDY COST ESTIMATE ARCHITECT: RUBELING & ASSOCIATES UNIT EQUIPMENT/ TRADE NO. DESCRIPTION UNIT QUANTITY COST LABOR MATERIAL SUBCONTRACT AMOUNT SUBTOTAL COMMENTS 27 COMMUNICATIONS: PA / Intercom SF 185,510 $0.93 $0.33 $0.60 $0.00 $172,524 $172,524 Total Communications 28 ELECTRONIC SAFETY & SECURITY: Fire Alarm System Modifications SF 185,510 $0.75 $0.25 $0.50 $0.00 $139,133 Security System Upgrades SF 185,510 $2.75 $1.25 $1.50 $0.00 $510,153 $649,285 Total Electronic Safety & Security 32 EXTERIOR IMPROVEMENTS: Brick & block chiller enclosure Lf 80 $ $40,000 $40,000 Chiller pads Ea 1 $3, $3,500 $3,500 Replace exterior Tech wing Ea 1 $30, $30,000 $30,000 Replace main entry Sf 3,500 $7.50 $26,250 $26,250 Site repairs Ls 1 $15, $15,000 $15,000 $114,750 Total Site Improvements 33 UTILITIES: Water service - fire Ea 1 $90, $90,000 $90,000 $90,000 Total Utilities Dulaney HS FS 7

24 02/05/16 DULANEY HIGH SCHOOL RENOVATION BALTIMORE COUNTY SCHOOLS LEWICKI ESTIMATING SERVICES,INC. PRECONSTRUCTION SERVICES ALTERNATES ARCHITECT: RUBELING & ASSOCIATES UNIT EQUIPMENT/ TRADE NO. DESCRIPTION UNIT QUANTITY COST LABOR MATERIAL SUBCONTRACT AMOUNT SUBTOTAL COMMENTS ALT A SWITCHGEAR UPGRADE Alter Existing Switchboard EA -1 $50, $30, $20, $0.00 ($50,000) Demolish Existing Switchboard SF 1 $6, $4, $ $1, $6,400 New Switchgear 4000A EA 1 $158, $46, $112, $0.00 $158,000 Roll Up Generator Connection Assembly EA 1 $10, $1, $9, $0.00 $10,400 New Ductbank LF 100 $ $88.00 $ $0.00 $21,000 Wire Trough & Splicing EA 1 $9, $3, $5, $0.00 $9,000 Grounding EA 1 $2, $ $1, $0.00 $2,000 Start-Up & Independent Testing EA 1 $4, $0.00 $0.00 $4, $4,400 Commissioning EA 1 $6, $0.00 $0.00 $6, $6,400 $167,600 $67,040 Markups $234,640 Total Construction Add $20,000 BG & E Fee- Allow $254,640 Total Add ALT 2 EMERGENCY GENERATOR New Emergency Generator 250 KW EA 1 $142, $7, $135, $0.00 $142,900 Automatic Transfer Switch EA 2 $21, $2, $18, $0.00 $42,000 Emergency Branch Panelboard EA 6 $5, $1, $4, $0.00 $34,200 Emergency Distribution Panels EA 1 $15, $2, $12, $0.00 $15,050 Concrete Pad, Grounding Grid & Duct Bank EA 1 $14, $2, $12, $0.00 $14,200 Power Feeder Conduit & Wire LF 800 $32.50 $14.50 $18.00 $0.00 $26,000 Start-Up & Independent Testing EA 1 $4, $0.00 $0.00 $4, $4,500 Commissioning EA 1 $7, $0.00 $0.00 $7, $7,800 $286,650 $114,660 Markups $401,310 Total Add ALT 3 DOOR REPLACEMENT Rmv existing doors & hardware Ea 244 $50.00 $12,200 $12,200 Haul away Lds 20 $ $12,000 $12,000 Interior Doors & hardware Ea 244 $1, $256,200 $256,200 $280,400 $112,160 Markups $392,560 Total Add Dulaney HS FS 8

25 02/05/16 DULANEY HIGH SCHOOL RENOVATION BALTIMORE COUNTY SCHOOLS LEWICKI ESTIMATING SERVICES,INC. PRECONSTRUCTION SERVICES ALTERNATES ARCHITECT: RUBELING & ASSOCIATES UNIT EQUIPMENT/ TRADE NO. DESCRIPTION UNIT QUANTITY COST LABOR MATERIAL SUBCONTRACT AMOUNT SUBTOTAL COMMENTS ALT 4 ALT 5 ELECTRICAL PANEL UPGRADE Demolition SF 185,510 $0.08 $0.08 $0.00 $0.00 $14,841 Panelboard Upgrade SF 185,510 $0.85 $0.20 $0.65 $0.00 $157,684 Power Feeder Conduit & Wire SF 185,510 $0.39 $0.14 $0.25 $0.00 $72,349 Branch Circuit Device SF 185,510 $0.32 $0.22 $0.10 $0.00 $59,363 Branch Circuit Conduit & Wire SF 185,510 $0.36 $0.16 $0.20 $0.00 $66,784 Start-Up & Independent Testing EA 1 $8, $0.00 $0.00 $8, $8,800 Commissioning EA 1 $11, $0.00 $0.00 $11, $11,750 TECHNOLOGY UPGRADE Teaching wall Lf 1,500 $45.00 $67,500 $67,500 Data/Comupgrade SF 185,510 $3.30 $1.40 $1.90 $0.00 $612,183 Fire Protection-Preaction MDF LS 1 $27, $3, $24, $0.00 $27,800 Start-Up & Independent Testing EA 1 $9, $0.00 $0.00 $9, $9,400 Commissioning EA 1 $12, $0.00 $0.00 $12, $12,200 $391,570 $156,628 Markups $548,198 Total Add $729,083 $291,633 Markups $1,020,716 Total Add ALT 6 CLEAN & SEAL PRECAST CONCRETE SPANDRELS Precast spandrels Sf 16,050 $2.75 $44,138 $44,138 $44,138 $17,655 Markups $61,793 Total Add Dulaney HS FS 9

26 02/05/16 DULANEY HIGH SCHOOL RENOVATION BALTIMORE COUNTY SCHOOLS LEWICKI ESTIMATING SERVICES,INC. PRECONSTRUCTION SERVICES LIMITED RENOVATIONS ARCHITECT: RUBELING & ASSOCIATES UNIT EQUIPMENT/ TRADE NO. DESCRIPTION UNIT QUANTITY COST LABOR MATERIAL SUBCONTRACT AMOUNT SUBTOTAL COMMENTS AC SYSTEMS General Conditions Mo 30 $55,000 $1,650,000 $1,650,000 Temporary trailers Ea 8 $130,000 $1,040,000 $1,040,000 Temporary trailers - Double wide Ea 2 $175,000 $350,000 $350,000 Packing & storage Allow 1 $50, $50,000 $50,000 Rmv VCT floor & base Sf 120,510 $0.50 $60,255 $60,255 Misc demo Hr 500 $35.00 $17,500 $17,500 Tools & equipment Ea 1 $15, $15,000 $15,000 Haulaway Lds 125 $ $75,000 $75,000 Hazmat Abatement - Floor tile & mastic Sf 72,600 $3.00 $217,800 $217,800 Rmv terrazzo Floor Sf 500 $16.00 $8,000 $8,000 Weatherproof membrane - HVAC Sf 100 $5.00 $500 $500 Vibration isolators - HVAC Ea 6 $50.00 $300 $300 Boiler Room gaskets Ea 60 $ $6,000 $6,000 Mudded pipe fittings -HVAC Ea 500 $20.00 $10,000 $10,000 Mudded pipe fittings -Plumbing Ea 400 $20.00 $8,000 $8,000 Piping insulation - Plumbing Lf 800 $20.00 $16,000 $16,000 Sink mastic Ea 20 $50.00 $1,000 $1,000 Window caulking Wndw 840 $ $252,000 $252,000 Transite board Sf 2,400 $5.00 $12,000 $12,000 Ceramic wall grout Sf 3,000 $7.00 $21,000 $21,000 Auditorium ceiling Sf 500 $20.00 $10,000 $10,000 Testing & monitoring Ea 1 $157, $157,000 $157,000 Concrete repairs after plumbing work Ea 1 $25, $25,000 $25,000 Flash patch floors Ls 1 $30, $30,000 $30,000 Equipment pads Ls 1 $5, $5,000 $5,000 Structural upgrades for HVAC equipment Loc 3 $15, $45,000 $45,000 DOAS Structural upgrades for HVAC equipment Loc 13 $15, $195,000 $195,000 RTU Misc. metals Ea 1 $35, $35,000 $35,000 Shop drawings Ea 1 $2, $2,500 $2,500 Finish carpentry Hr 1,100 $55.00 $60,500 $60,500 Enclose exterior breezeway Sf 900 $55.00 $49,500 $49,500 Security Vestibule Ls 1 $30, $30,000 $30,000 Rmv & replace exterior windows Sf 28,230 $60.00 $1,693,800 $1,693,800 Rmv & reinstall sun screens Ls 1 $50, $50,000 $50,000 Classroom casework Rms 60 $4, $270,000 $270,000 2 x 4 ACT ceilings Sf 185,000 $2.55 $471,750 $471,750 VCT flooring & base Sf 120,510 $3.75 $451,913 $451,913 $7,392,318 Subtotal Dulaney HS FS 10

27 02/05/16 DULANEY HIGH SCHOOL RENOVATION BALTIMORE COUNTY SCHOOLS LEWICKI ESTIMATING SERVICES,INC. PRECONSTRUCTION SERVICES LIMITED RENOVATIONS ARCHITECT: RUBELING & ASSOCIATES UNIT EQUIPMENT/ TRADE NO. DESCRIPTION UNIT QUANTITY COST LABOR MATERIAL SUBCONTRACT AMOUNT SUBTOTAL COMMENTS AC SYSTEMS HVAC - Demolish HVAC System SF 185,510 $1.75 $1.50 $0.25 $0.00 $324,643 Air Cooled Chiller Assembly- 350 Ton EA 1 $255, $20, $235, $0.00 $255,000 Chilled Water Pump EA 4 $19, $5, $14, $0.00 $79,600 Heating Water Pump EA 4 $16, $4, $12, $0.00 $65,600 Roof Top Unit CFM 150,600 $6.50 $1.00 $5.50 $0.00 $978,900 Dedicated OA System CFM 19,266 $9.00 $1.25 $7.75 $0.00 $173,394 Hydronic Specialties SF 185,510 $0.77 $0.22 $0.55 $0.00 $142,843 Split systems at computer classrooms LS 1 $35, $15, $20, $0.00 $35,000 Fan Coil Unit SF 185,510 $1.75 $0.25 $1.50 $0.00 $324,643 Split system at IDF & MDF rooms LS 1 $25, $10, $15, $0.00 $25,000 Insulated Hydronic Piping SF 185,510 $2.65 $1.20 $1.45 $0.00 $491,602 Miscellaneous Terminal Unit SF 185,510 $0.25 $0.05 $0.20 $0.00 $46,378 Sheet Metal Ductwork SF 185,510 $3.15 $2.10 $1.05 $0.00 $584,357 Ductwork Insulation SF 185,510 $0.55 $0.35 $0.20 $0.00 $102,031 Chemical Treatment SF 185,510 $0.13 $0.04 $0.09 $0.00 $24,116 Automatic Temperature Control SF 185,510 $4.40 $0.00 $4.40 $0.00 $816,244 Start-Up, Test, & Balance SF 185,510 $0.53 $0.45 $0.08 $0.00 $98,320 Commissioning SF 185,510 $0.40 $0.34 $0.06 $0.00 $74,204 Electrical - Demolition SF 185,510 $0.60 $0.55 $0.05 $0.00 $111,306 Motor Starter/Disconnect SF 185,510 $0.65 $0.25 $0.40 $0.00 $120,582 Motor Feeder Conduit & Wire SF 185,510 $0.95 $0.30 $0.65 $0.00 $176,235 Interior Lighting SF 185,510 $4.65 $1.20 $3.45 $0.00 $862,622 Lighting Control System SF 185,510 $1.00 $0.25 $0.75 $0.00 $185,510 Branch Circuit Conduit & Wire SF 185,510 $0.54 $0.24 $0.30 $0.00 $100,175 Brick & block chiller enclosure Lf 80 $ $40,000 $40,000 Chiller pads Ea 1 $3, $3,500 $3,500 $13,634,119 Subtotal $5,572,814 Markups $19,206,932 Total AC Systems SITE IMPROVEMENTS Replace exterior Tech wing Ea 1 $20, $20,000 $20,000 Replace main entry Sf 3,500 $7.50 $26,250 $26,250 Site repairs Ls 1 $15, $15,000 $15,000 $61,250 Subtotal $25,113 Markups $86,363 Total Site Improvements $19,293,295 PAGE SUBTOTAL Dulaney HS FS 11

28 02/05/16 DULANEY HIGH SCHOOL RENOVATION BALTIMORE COUNTY SCHOOLS LEWICKI ESTIMATING SERVICES,INC. PRECONSTRUCTION SERVICES LIMITED RENOVATIONS ARCHITECT: RUBELING & ASSOCIATES UNIT EQUIPMENT/ TRADE NO. DESCRIPTION UNIT QUANTITY COST LABOR MATERIAL SUBCONTRACT AMOUNT SUBTOTAL COMMENTS STRUCTURAL SYSTEMS - EXTERIOR Exterior concrete spalling repairs slab Allow 1 $35, $35,000 $35,000 Concrete column repairs Allow 1 $20, $20,000 $20,000 Exterior brick replacement Allow 1 $10, $10,000 $10,000 Limited tuckpointing Allow 1 $30, $30,000 $30,000 NEW ROOF Roof blocking Sf 167,200 $0.25 $41,800 $41,800 Rmv & replace existing roof & sht. Metal Sf 167,200 $12.50 $2,090,000 $2,090,000 Caulking Ea 1 $5, $5,000 $5,000 ARCH. & STRUCTURAL SYSTEMS - INTERIOR New addtion slab repairs Ea 1 $10, $10,000 $10,000 Infill pit at Library Sf 530 $15.00 $7,950 $7,950 Misc concrete repairs Allow 1 $25, $25,000 $25,000 $95,000 Subtotal $38,950 Markups $133,950 Total Structural Systems Exterior $2,136,800 Subtotal $876,088 Markups $3,012,888 Total New Roof $42,950 Subtotal $17,610 Markups $60,560 Total Structural Systems Interior MECHANICAL SYSTEMS - BEYOND AC Kitchen Exhaust & Makeup Air EA 1 $45, $25, $20, $0.00 $45,000 $45,000 Subtotal $18,450 Markups $63,450 Total HVAC Beyonf AC PLUMBING SYSTEMS Demolition SF 185,510 $0.60 $0.50 $0.10 $0.00 $111,306 Kitchen Plumbing LS 1 $35, $20, $15, $0.00 $35,000 Condensate Drain SF 185,510 $0.33 $0.11 $0.22 $0.00 $61,218 Storm Water Piping SF 185,510 $0.46 $0.12 $0.34 $0.00 $85,335 Waste & Vent Piping SF 185,510 $0.55 $0.15 $0.40 $0.00 $102,031 Insulated Domestic Water Piping SF 185,510 $2.35 $0.85 $1.50 $0.00 $435,949 Start-Up & Test SF 185,510 $0.20 $0.18 $0.02 $0.00 $37,102 $867,940 Subtotal $355,855 Markups $1,223,795 Total Plumbing Systems $4,494,643 PAGE SUBTOTAL Dulaney HS FS 12

29 02/05/16 DULANEY HIGH SCHOOL RENOVATION BALTIMORE COUNTY SCHOOLS LEWICKI ESTIMATING SERVICES,INC. PRECONSTRUCTION SERVICES LIMITED RENOVATIONS ARCHITECT: RUBELING & ASSOCIATES UNIT EQUIPMENT/ TRADE NO. DESCRIPTION UNIT QUANTITY COST LABOR MATERIAL SUBCONTRACT AMOUNT SUBTOTAL COMMENTS ELECTRICAL SYSTEMS Modify Existing Switchboard EA 1 $50, $30, $20, $0.00 $50,000 Concrete Pad, Grounding Grid & Duct Bank EA 1 $10, $1, $8, $0.00 $10,350 Panelboard Upgrade SF 185,510 $0.85 $0.20 $0.65 $0.00 $157,684 Power Feeder Conduit & Wire SF 185,510 $0.39 $0.14 $0.25 $0.00 $72,349 Grounding SF 185,510 $0.09 $0.05 $0.04 $0.00 $16,696 Start-Up & Independent Testing SF 185,510 $0.50 $0.36 $0.14 $0.00 $92,755 Commissioning SF 185,510 $0.40 $0.30 $0.10 $0.00 $74,204 PA / Intercom SF 185,510 $0.93 $0.33 $0.60 $0.00 $172,524 $646,562 Subtotal $265,090 Markups $911,652 Total Electrical Systems SECURITY SYSTEMS Security System Modifications SF 185,510 $2.75 $1.25 $1.50 $0.00 $510,153 $510,153 Subtotal $209,163 Markups $719,315 Total Security Systems FIRE SAFETY SPRINKLER & FIRE ALARM Wet Sprinkler System SF 185,510 $3.50 $1.50 $2.00 $0.00 $649,285 Fire Alarm System Modifications SF 185,510 $0.75 $0.25 $0.50 $0.00 $139,133 Water service - fire Ea 1 $90, $90,000 $90,000 ADA Demo at classroom entrances Loc 60 $ $15,000 $15,000 Haz mat fire door removal Ea 210 $75.00 $15,750 $15,750 Rmv doors & frames Ea 205 $50.00 $10,250 $10,250 Demo at public restrooms Sf 2,725 $7.50 $20,438 $20,438 Ramp replacement - Tech wing Ea 1 $20, $20,000 $20,000 Rmv & replace misc stair railings Ea 6 $2, $15,000 $15,000 Replace misc. ramp & stair railings Ls 1 $10, $10,000 $10,000 Classroom entry drywall & ceramic tile Loc 60 $1, $90,000 $90,000 Plumbing Fixtures SF 185,510 $1.60 $0.35 $1.25 $0.00 $296,816 Drains, Carriers & Specialties SF 185,510 $0.75 $0.20 $0.55 $0.00 $139,133 Corridor doors, fames, hardware Ea 175 $1, $218,750 $218,750 Renovate restrooms Sf 2,725 $75.00 $204,375 $204,375 Elevator controls upgrade Ea 1 $30, $30,000 $30,000 Chair lift Ea 2 $15, $30,000 $30,000 ADA Signage Ea 1 $20, $20,000 $20,000 $878,418 Subtotal $360,151 Markups $1,238,569 Total Fire Safety $1,135,511 Subtotal $465,560 Markups $1,601,071 Total ADA $28,258,544 TOTAL LIMITED RENOVATIONS Dulaney HS FS 13

30 02/05/16 DULANEY HIGH SCHOOL RENOVATION BALTIMORE COUNTY SCHOOLS LEWICKI ESTIMATING SERVICES,INC. PRECONSTRUCTION SERVICES INTERIOR AESTHETIC ISSUES ARCHITECT: RUBELING & ASSOCIATES UNIT EQUIPMENT/ TRADE NO. DESCRIPTION UNIT QUANTITY COST LABOR MATERIAL SUBCONTRACT AMOUNT SUBTOTAL COMMENTS Rmv glazed clearstory Lf 5,800 $8.75 $50,750 $50,750 Rmv lockers Hr 1,100 $35.00 $38,500 $38,500 Rmv auditorium seating Ea 1,204 $15.00 $18,060 $18,060 Mis. Specialties Ls 1 $15, $15,000 $15,000 Infill glazed transoms Lf 5,800 $30.00 $174,000 $174,000 Clean & repair terrazzo floors Sf 38,000 $1.50 $57,000 $57,000 Interior painting of school Sf 185,000 $1.50 $277,500 $277,500 Repaint canopy soffit Ea 1 $2, $2,500 $2,500 Auditorium seating Ea 1,204 $ $361,200 $361,200 Entrance mats Ea 1 $1, $1,500 $1,500 $996,010 Subtotal Interior Aesthetics Issues $408,364 Markups $1,404,374 Total Interior Aesthetics Issues Dulaney HS FS 14

31 02/05/16 DULANEY HIGH SCHOOL RENOVATION BALTIMORE COUNTY SCHOOLS LEWICKI ESTIMATING SERVICES,INC. PRECONSTRUCTION SERVICES EDUCATIONAL ENHANCEMENTS ARCHITECT: RUBELING & ASSOCIATES UNIT EQUIPMENT/ TRADE NO. DESCRIPTION UNIT QUANTITY COST LABOR MATERIAL SUBCONTRACT AMOUNT SUBTOTAL COMMENTS Chalk / tackboard mastic-haz Mat Sf 11,800 $5.00 $59,000 $59,000 Rmv chalk boards Rms 60 $ $21,000 $21,000 Renovate Library / Media Center Sf 5,190 $30.00 $155,700 $155,700 Renovate Art classrooms Sf 4,410 $35.00 $154,350 $154,350 Relocate Health Suite Sf 1,500 $30.00 $45,000 $45,000 Renovate Technology classrooms Sf 7,080 $20.00 $141,600 $141,600 Renocate Child Care Sf 1,407 $30.00 $42,210 $42,210 Renovate Locker Rooms Sf 5,400 $50.00 $270,000 $270,000 RenovateAdmin & Guidance area Sf 5,800 $35.00 $203,000 $203,000 Renovate Food / Nutrition Sf 1,425 $30.00 $42,750 $42,750 Range Ea 6 $ $2,700 $2,700 Exhaust hood Ea 6 $ $900 $900 Dishwasher Ea 6 $ $2,400 $2,400 Refrigerator Ea 6 $ $4,800 $4,800 Kitchen equipment Ea 1 $630, $630,000 $630,000 White board & tackboards Rms 60 $4, $270,000 $270,000 $1,965,410 Subtotal Educational Enhancements $805,818 Markups $2,771,228 Total Educational Enhancements SUMMARY LIMITED RENOVATIONS $28,258,544 INTERIOR AESTHETIC ISSUES $1,404,374 EDUCATIONAL ENHANCEMENTS $2,771,228 $32,434,146 Dulaney HS FS 15

32 DULANEY HIGH SCHOOL FEASIBILITY STUDY APPENDIX G: ENVIRONMENTAL REPORT Baltimore County Public Schools Environmental Report-Appendix G Office of Engineering and Construction February 18, 2016 Dulaney High School Feasibility Study

33 TITLE 40 CFR PART 763 ASBESTOS-CONTAINING MATERIALS IN SCHOOLS THREE-YEAR AHERA RE-INSPECTION REPORT Dulaney High School 255 Padonia Road Baltimore, Maryland Prepared for: Baltimore County Public Schools Department of Facilities Environmental Office Assessments Made By: Joe G. Lewis III EPA-accredited Asbestos Inspector Certification #: Report Prepared by: Derek Kwon EPA-accredited Asbestos Management Planner Certification #:

34 TABLE OF CONTENTS I. INTRODUCTION...3 II. INSPECTION...4 A. Scope of Work...4 B. Process of Inspection...4 C. Data Gap Analysis...5 D. Results...6 Table I Observed Asbestos-containing Material...8 Table II Room by Room Inventory...18 III. RECOMMENDATIONS...55 IV COST ESTIMATES...55 APPENECIES APPENDIX A APPENDIX B APPENDIX C APPENDIX D APPENDIX E APPENDIX F APPENDIX G School Inventory Form Accreditation Information Friable Homogeneous Area Assessment Site Drawing Inspector and Management Planner Licenses Re-Inspection Management Plan Summary Summary of Abatement Actions 2

35 I. INTRODUCTION Arc Environmental, Inc performed an Asbestos Hazard Emergency Response Act (AHERA) three-year reinspection for Baltimore County Public Schools (BCPS) at Dulaney High School in compliance with 40 CFR Part 763. The school property is located at 255 Padonia Road in Baltimore, Maryland. The inspection was conducted in accordance with AHERA requirements for asbestos-containing building materials (ACBMs). Mr. Joe G. Lewis III, an EPA-accredited Asbestos Inspector, conducted the re-inspections on July 20 and 21, Prior to the re-inspection, previous reports, abatement records, and sampling data were reviewed. 3

36 II. INSPECTION A. Scope of Work The purpose of the re-inspection was to assess the conditions of previously identified ACBMs and assumed ACBMs within the building interior. The re-inspection was nondestructive and limited to only accessible areas throughout the building. Inaccessible areas were documented and are identified in this report. It should be noted that inaccessible areas include, but are not limited to, wall cavities, pipe chases, and areas above fixed ceiling systems (i.e. plaster, sheetrock, splinted tile). The scope of work performed during the three-year AHERA re-inspections and by the EPA-accredited Asbestos Inspector is summarized below: 1. Visually inspected and assessed the conditions of all known friable and/or assumed ACBMs; 2. Visually inspected and touched materials that were previously considered non-friable ACBM to determine whether it had become friable since the last inspection or re-inspection; 3. Identified all homogeneous areas and materials that had become friable since the previous inspection or re-inspection; 4. Collected bulk samples (as approved by BCPS) for each homogeneous area of newly friable material assumed to be ACBM, and submitted suspect materials for laboratory analysis; and 5. Assessed the condition of newly friable materials in the areas where samples were collected, and in areas where materials are assumed to be ACBM. B. Process of Inspection To determine the various types and locations of ACBMs, Arc Environmental, Inc. reviewed original management plans, abatement records, and re-inspection reports, as well as, any other relevant sampling or survey data for the school building. Information collected during the re-inspection was recorded on asbestos inspection forms, and included room identification, homogeneous area numbers, ACBM description, ACBM AHERA classification, total quantities observed, and sample information from previous re-inspection reports. Previous inspection reports were utilized to reconcile the location of materials that are identified as asbestos-containing and/or are assumed to be asbestos-containing. In instances where new materials were observed, unique homogeneous area numbers and material descriptions were generated by onsite personnel. Based on observations, a total of four (4) additional homogenous areas of suspect materials were identified during the re-inspection. The additional homogeneous area numbers and corresponding material descriptions are provided below: BG1 Boiler Gasket TR1 Transite Sink TR2 Transite Fume Hood VB2 Brown Black Vinyl Baseboard and Mastic 4

37 As part of this inspection, ACBMs were visually assessed to determine their condition. The EPA has formulated a seven (7) category numerical assessment code depending on the type and condition of ACBM as follows: 1. Damaged or significantly damaged thermal system insulation asbestos-containing material (ACM); 2. Damaged friable surfacing ACM; 3. Significantly damaged friable surfacing ACM; 4. Damaged or significantly damaged friable miscellaneous ACM; 5. ACBM with potential for damage; 6. ACBM with potential for significant damage; and 7. Other or any remaining friable ACM or friable suspected ACBM. ACBMs were re-inspected and categorized within one of these assessment codes. Following the assessment and review of assessment data, response actions were developed for each material. With regards to controlling asbestos in buildings, the EPA defines response action as removal, repair, encapsulation, enclosure, and operations and maintenance (O&M) program. The following is a brief description of each response action: Removal removing the ACBM from the building. If performed properly, the hazards associated with disturbance and subsequent exposure from the material is eliminated. Enclosure Airtight, impermeable, permanent barrier constructed around an ACBM; an enclosure is only effective if it remains undamaged. Encapsulation Treatment of an ACBM with a material that surrounds or embeds the material with an adhesive matrix to prevent the release of fibers. The encapsulant creates a membrane over the surface of the material (bridging encapsulant) or penetrates and binds material components together (penetrating encapsulant). Repair returning damaged ACBM to an undamaged condition or an intact state so as to prevent a fiber release; if an ACBM has become damaged, the damage should be repaired immediately. Operations and Maintenance (O&M) Program Work practices developed to maintain ACBM in good condition, ensure the clean-p of asbestos fibers previously released, and to prevent further release by minimizing and controlling ACBM disturbances or damage. The O&M Program must be implemented until all of the asbestos-containing material is removed from the facility. It should be noted that for all response actions, with the exception of removal, the hazardous material remains in the building and must be monitored periodically. Warning labels should be attached immediately adjacent to any friable and non-friable ACBM and suspected ACBM assumed to be ACM located in routine maintenance areas at the school. C. Data Gap Analysis Previous inspection reports, as well as sampling data from demolition surveys and various abatement projects were utilized to reconcile materials that are identified as asbestos-containing and/or are assumed to be asbestos-containing. Through these efforts, a number of materials have been removed from the presumed ACBMs identified in previous reports. 5

38 Surfacing Plaster Ceiling and Wall Finishes In November of 2011, Advanced Air Analysis, Inc. (AAA) conducted a plaster and drywall survey to determine the asbestos content of suspect materials. During the survey, AAA collected bulk samples of various plaster finishes from randomly selected locations throughout the school building. A total of thirtyone (31) bulk samples were collected and submitted for laboratory analysis by Polarized Light Microscopy (PLM) and Transmission Electron Microscopy (TEM). Laboratory analysis indicated that the skim coat layer of acoustical plaster is asbestos-containing. The asbestos-containing acoustical plaster appears to be restricted to ceiling finishes within the auditorium and auditorium lobby. Based on the review of previous inspection reports and available sampling data, the remaining plaster located throughout the school building does not contain asbestos. Miscellaneous Drywall Wall and Joint Compound During the plaster and drywall survey conducted by AAA in November of 2011, total of twelve (12) bulk samples of drywall and joint compound were collected and analyzed by PLM and TEM microscopy. Based on the laboratory analysis, the drywall remaining in the school building does not contain asbestos. Ceiling Tile In March of 2011, AAA performed a survey throughout the building to determine if any asbestos-containing ceiling tiles were present. AAA identified seven (7) types of ceiling tile differentiated by size, color, and texture. A total of twenty-seven (27) bulk samples were collected and submitted for laboratory analysis via PLM and TEM analysis. Laboratory analysis indicated that none of the sampled ceiling tile contained asbestos. Tectum Board In February 2001, KCI Technologies, Inc. (KCI) performed a hazardous materials survey as part of renovation to the science laboratories within the school. During the survey, multiple samples of Tectum board were collected from the ceiling plenum of each renovation space and submitted for laboratory analysis via PLM and TEM. Based on the laboratory analysis, the Tectum board within the school does not contain asbestos. D. Results An effort was made to locate and assess the rooms listed below; however, visual confirmation was not acquired before the issuance of this report. All remaining portions of the building were included in the inspections. The following locations could not be surveyed: 6

39 Following the review of previous inspection reports, abatement records, and sampling data, a total of fiftythree (53) homogenous materials are considered asbestos-containing at Dulaney High School. Thermal System Insulation Four (4) materials were identified and categorized as Thermal System Insulation (TSI) during the reinspection. These materials include mudded pipe fittings, pipe insulation, duct insulation, and breeching insulation. Sample data from previous inspection indicated that the mudded pipe fittings with the school are asbestos-containing, all remaining TSI is assumed to be asbestos-containing. Miscellaneous Floor Tiles and Associated Mastics Both asbestos-containing and assumed asbestos-containing floor tiles were identified within the school building. Floor tiles that have not been sampled are assumed as asbestos-containing materials until negated through bulk sampling and laboratory analysis. Fire Doors, Sink Undercoating, and Vibration Dampener Cloth Fire doors, sink undercoatings, and vibration dampening cloth were identified throughout the school building during the inspection. Due to the destructive nature of sampling, and the potential to negatively impact the integrity and/or function, these materials are assumed to be asbestos-containing. Adhesive and Mastics Various adhesives utilized for hanging materials such as chalkboards were identified throughout the building. The adhesives and mastics utilized within the school are assumed to be asbestos-containing. Transite Panels, Sinks, Window Sills, and Thresholds Transite materials were identified throughout the school building. Sample data from previous hazardous materials surveys indicate that several of these products, including fume hoods, contain Chrysotile asbestos. All transite materials are assumed to be asbestos-containing. Table I below identifies the locations and quantities of ACMs within the building, and summarizes information regarding sample history. 7

40 Table I. Observed Asbestos Containing Materials HA Material Description Material Location Existing Quantity Sample Number Sample Results Duct Mastic Pipe Insulation Sink Insulation Terrazzo Flooring Electrical Data, Custodian 1, Storage by 321, 321 Electrical/Data M1, Storage Room, Former Furnace Room Library Conference Room, Nurse, Offices, 229, 231, 233, 305 Hallway 2, Hallway 3, Hallway , Roof Access, Corridor by S-200, Hallway 11, Hallway 9, Hallway 10, Hallway 12, Hallway 7, Cafeteria, Physical Education Office, Hallway at S-205, Girls Corridor, Auditorium Upstairs Corridor, Corridor by LF - Assumed 66 LF - Assumed 26 EA - Assumed 33,146 SF * <1% Chrysotile Transite Window Sill 312 Faculty Lounge 2 EA - Assumed 8

41 Table I. Observed Asbestos Containing Materials HA Material Description Material Location Existing Quantity 107, 108, 109, 110, 111, Office Adjacent to 107, Office Adjacent to 114, 112, 113, 115, 117, 116, 118, 119, 120, 121, 123, 122, 122 Office, M2, 103, 105, 106, Corridor by Storage Room, 100, 102, Office adjacent to Electrical Data, 213, 212, 215, 215 Prep Room, 214, 217, 216, 219, 218, 200, Satellite Cafeteria, 201, 203, Faculty Room, 209, 210, 211, , Gray Window Caulking 206, 207, 208, 220, 221, 222, Science 10,935 Office, 223, 224,225, 226, 227, LF Library, Room 231, 228, 229, 229B, 232, 230, 233, Cafeteria, Faculty Lunch Room, Boy s Locker Room, Girl s Locker Room, S0205, 234, 235, 300, 302, 303, 304, 305, 307, 306, 208, 309, 310, Corridor by 311, 311, New Wing (314), 312A, 312 Faculty Lounge, 313, 315, 316, 318, 317, 319, 320, Office by 321 Electrical / Data, 322, 323, Auditorium Corridor, Hallway 7, 104, 202, 239 Sample Number Sample Results - Assumed AD-1 Chalkboard Mastic 108, 109, 110, 111, 103, 105, 106, 107, 100, 101, 102, 104, 215, 214, 217, 216, 219, 218, 200, 201, 202, 203, 209, 210, 211, 204, 205, 206, 207, 208, 220, 221, 222, 223, 226, 227, 231, 228, 229, 232, 230, 234, 238, 240, 236, 300, 301, 302, 303, 304, 305, 307, 306, 308, 309, 310, ,175 SF - Assumed 9

42 Table I. Observed Asbestos Containing Materials Existing HA Material Description Material Location Quantity Sample Number Sample Results AD-2 Carpet Mastic Library 324 SF - Assumed AD-3 Stair Tread Mastic Library 110 SF - Assumed AP-1 Acoustical Plaster Ceiling Auditorium Lobby, Auditorium Upstairs Corridor 8,292 SF ^ % Chrysotile BG1 Boiler Gasket Boiler Room 12 EA - Assumed BM-1 Residual Baseboard Mastic Office 3, 114, 115, 117, 116, 118, 119, 121, 123, 122B, 122, Lower Level Auditorium, M1, M4, 107, Office by S- 100, 213, 212, 212 Prep and Storage Room, 215, 215 Prep Room, 214, 214 Prep and Storage, 217, 216, 219, 219 Prep Room, 218, 218 Prep Room, 200, 202, 203, 222 Dark Room, 222 Prep Room, Library, Library Conference Room, Nurse's Office, Nurse Office and Waiting Room, Nurse, Offices, Hallway 9, 229B, 230, Hallway 12, , S-301, 304, 305, 208, 310, 316, 318, 317, 321, 322, Auditorium, Sound Room, Auditorium Upstairs Corridor, Auditorium Corridor 3,977 LF - Assumed BR-1 Breeching Insulation Gym Attic, Boiler Room 696 SF - Assumed CK-1 White Door Caulking Mechanical Room LF - Assumed DA-1 White Seam Mastic on Canvas Wrapped Fiberglass Duct Insulation 239, Mechanical Room 312, 215 Prep Room 445 LF - Assumed 10

43 Table I. Observed Asbestos Containing Materials Existing HA Material Description Material Location Quantity DA-2 Gray Duct Mastic on Bare Metal Duct 124 Boiler Room, Electrical Data, Custodial adjacent to S-203, Science Office Storage, Mechanical Room 312 Sample Number Sample Results 122 LF - Assumed DA-3 Brown Duct Mastic on Foil Duct Insulation 212 Prep and Storage Room, 215 Prep Room, Satellite Cafeteria 200 LF - Assumed DA-4 Red Duct Mastic on Bare Metal Duct Science Office Storage 4 LF - Assumed DI-1 Duct Insulation Gym Attic, Former Furnace Room 648 SF - Assumed FC-1 Fire Curtain Stage 1 EA - Assumed FP-1 Fire Proofing Trash Chute Door Corridor by EA - Assumed FT-1 White with Blue Streaks 12"x12" Vinyl Floor Tile and Associated Mastic 315 A, 315 C / Radio Control Room, 317, Server, 319, 320, Foyer New Wing 3 rd Floor Corridor, 321, 323, 212, 212 Prep and Storage Room, 214, 218, 218 Prep Room, 318, 116, 120 A Men s Changing Room, 120 B Women s Changing Room, 121, 121 A, ,428 SF - Assumed 11

If the address on this form is different than the address of the building, submit a written explanation.

If the address on this form is different than the address of the building, submit a written explanation. ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

If the address on this form is different than the address of the building, submit a written explanation.

If the address on this form is different than the address of the building, submit a written explanation. ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

NARRATIVE REPORT. Underlayment Paper for Linoleum. The Asbestos Bulk Sample Results Table includes asbestos sampling data.

NARRATIVE REPORT. Underlayment Paper for Linoleum. The Asbestos Bulk Sample Results Table includes asbestos sampling data. NARRATIVE REPORT 1.0 BUILDING INFORMATION Engineering and Technology was originally constructed in 1913; although specific information is unavailable, several renovations are evident. Engineering and Technology

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

Youth Connection - J. Addams Alter HS

Youth Connection - J. Addams Alter HS ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

VOTER BOND REFERENDUM 2018 SUMMARY OF WORK PROPOSED

VOTER BOND REFERENDUM 2018 SUMMARY OF WORK PROPOSED Ashton Elementary School 1 Masonry Repair $ 42,781.50 2 Replace HVAC $ 375,000.00 3 Replace SAT @ Various Locations $ 92,364.00 3 Recoat & Resurface Exterior Paved Play Area $ 135,978.30 3 Various Technological

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

Palmyra High School 07/16 Addition and Renovation Palmyra, Nebraska

Palmyra High School 07/16 Addition and Renovation Palmyra, Nebraska Palmyra High School 07/16 Addition and Renovation Palmyra, Nebraska 845-001-14 DOCUMENT 00 31 26 - EXISTING HAZARDOUS MATERIAL INFORMATION 1.1 EXISTING HAZARDOUS MATERIAL INFORMATION A. This Document with

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

MUKWONAGO AREA SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY

MUKWONAGO AREA SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY ARCHITECTURE ROLLING HILLS ELEMENTARY SCHOOL Rolling Hills Elementary was built in 1999 and is the newest addition to the Mukwonago Area School District. The building contains approximately 64,900 gross

More information

NARRATIVE REPORT. Engineering Administration was originally constructed in 1965; the building has had no major renovations.

NARRATIVE REPORT. Engineering Administration was originally constructed in 1965; the building has had no major renovations. NARRATIVE REPORT 1.0 BUILDING INFORMATION Engineering Administration was originally constructed in 1965; the building has had no major renovations. Engineering Administration is a three-story, 9,579 ft

More information

New High School Concept

New High School Concept Approved Bond Projects for Alamance-Burlington Schools In November 2018, Alamance County citizens approved a $150 million bond project proposal. Bond funds will pay to construct a new high school and provide

More information

3. 21st Century Learning A. Districtwide Flexible Learning - Allowance for Flexible Furniture $600,000 Subtotal $600,000

3. 21st Century Learning A. Districtwide Flexible Learning - Allowance for Flexible Furniture $600,000 Subtotal $600,000 1. Safety and Security A. Additional Cameras District Wide $382,000 B. Interior Locks Upgrades Allowance $300,000 C. Tilden Entrance Upgrades D. Door and Glass Improvements Allowance $500,000 E. Alert

More information

MUKWONAGO SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY

MUKWONAGO SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY MUKWONAGO SCHOOL DISTRICT ARCHITECTURE PARK VIEW MIDDLE SCHOOL The original school building was dedicated in 1954 as the High School, with an addition in 1959, a library addition in 1970, and an addition/renovation

More information

Three Year Asbestos Re-Inspection Report. Macomb Montessori Academy East Nine Mile Road Warren, Michigan 47089

Three Year Asbestos Re-Inspection Report. Macomb Montessori Academy East Nine Mile Road Warren, Michigan 47089 Three Year Re-Inspection Report For 14057 East Nine Mile Road Warren, Michigan 47089 Prepared by: Northern Analytical Services, LLC. 14870 225 th Avenue Big Rapids, Michigan 49307 Dated: Project 160268

More information

Garfield Elementary School Feasibility Study for New Library Building Project Number A C

Garfield Elementary School Feasibility Study for New Library Building Project Number A C Larry Teixeira Selma Unified School District 3036 Thompson Avenue Selma, CA 93662 Subject: Feasibility Study for New Library Building Project Number A 12-8581.00 C Dear Mr. Teixeira: At your request, we

More information

ASBESTOS AND LEAD-BASED PAINT SURVEY 696/698 Hawthorne Avenue St. Paul, Minnesota. Prepared for:

ASBESTOS AND LEAD-BASED PAINT SURVEY 696/698 Hawthorne Avenue St. Paul, Minnesota. Prepared for: ASBESTOS AND LEAD-BASED PAINT SURVEY 696/698 Hawthorne Avenue St. Paul, Minnesota Prepared for: City of St. Paul Department of Planning and Economic Development 1100 City Hall Annex 25 West 4 th Street

More information

Edward Jenner Elementary Academy of the Arts

Edward Jenner Elementary Academy of the Arts Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Richard Henry Lee Elementary School

Richard Henry Lee Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Oscar DePriest Elementary School

Oscar DePriest Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Briar Crest Elementary

Briar Crest Elementary Promises Kept This document includes partial lists of major projects completed at Pattonville Schools since 1986 as part of past bond issues approved by the Pattonville community. Briar Crest Elementary

More information

PLATTEVILLE MIDDLE SCHOOL

PLATTEVILLE MIDDLE SCHOOL Architectural The building has aluminum clad wood awning windows in combination with aluminum fixed glass units. They appear to be exterior glazed with insulated glazing. See photo 2. Platteville Middle

More information

Francis M McKay Elementary School

Francis M McKay Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Calmeca Academy of Fine Arts and Dual Language

Calmeca Academy of Fine Arts and Dual Language Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Washington Irving Elementary School

Washington Irving Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Genevieve Melody Elementary School

Genevieve Melody Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

DOCUMENT TABLE OF CONTENTS

DOCUMENT TABLE OF CONTENTS DOCUMENT 00003 June 16, 2005 TABLE OF CONTENTS DOCUMENT NO. INTRODUCTORY INFORMATION DOCUMENT 00003 TABLE OF CONTENTS DIVISION 1 GENERAL REQUIREMENTS SECTION 01011 SECTION 01025 SSP21.1-1 SECTION 01026

More information

Agustin Lara Elementary Academy

Agustin Lara Elementary Academy Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

NYC Department of Education

NYC Department of Education Asset: J. K. ONASSIS HS FOR INT CAREERS-M, 120 WEST 46 STREET, New York, 10036 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2017-12-11 11:37 AM 2017-12-26 12:18 PM Asset Data Are there

More information

Joseph Brennemann Elementary School

Joseph Brennemann Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

NYC Department of Education

NYC Department of Education Asset: W.E.B. DUBOIS HS - BROOKLYN, 402 EASTERN PARKWAY, New York, 11225 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2017-12-04 1:02 PM 2017-12-27 4:16 PM Asset Data Are there fuel

More information

Alessandro Volta Elementary School

Alessandro Volta Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

John Palmer Elementary School

John Palmer Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Master Facility Planning Update School Board Meeting May 26, 2016

Master Facility Planning Update School Board Meeting May 26, 2016 Master Facility Planning Update School Board Meeting May 26, 2016 Master Facilities Committee Overview Reflection of Committee Work Review of District Wide Facility Issues Identified District Wide Facility

More information

All food service facilities must be equipped with the following items for the pre-opening inspection:

All food service facilities must be equipped with the following items for the pre-opening inspection: DEPARTMENT OF HEALTH FOOD SERVICE FACILITY Pre-Opening Checklist This checklist is provided as a guide to prepare for the pre-opening inspection of a newly constructed, remodeled or a change-of-ownership

More information

Josefa Ortiz De Dominguez Elementary School

Josefa Ortiz De Dominguez Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

DeWitt Clinton Elementary School

DeWitt Clinton Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Sidney Sawyer Elementary School

Sidney Sawyer Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

NYC Department of Education

NYC Department of Education Asset: LIBERTY HS - MANHATTAN, 250 WEST 18 STREET, New York, 10011 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-01-29 11:32 AM 2018-02-01 10:16 AM Asset Data Are there fuel tanks?

More information

Springpoint Architects, pc SECTION Childcare Center Architect s Project No TABLE OF CONTENTS Monroe County Comm. Sch. Corp.

Springpoint Architects, pc SECTION Childcare Center Architect s Project No TABLE OF CONTENTS Monroe County Comm. Sch. Corp. Volume 1 Bidding Requirements, Contract Forms, Conditions of the Contract, Division 1, Architectural and Site Specifications 000107 Certification Page 000110 Table of Contents DIV00 PROCUREMENT AND CONTRACTING

More information

Turn-Key Environmental Consultants, Inc. 790 Barnhart Rd. 714 Monument Ave. Phone: Troy, OH Dayton, OH Fax:

Turn-Key Environmental Consultants, Inc. 790 Barnhart Rd. 714 Monument Ave. Phone: Troy, OH Dayton, OH Fax: Turn-Key Environmental Consultants, Inc. 790 Barnhart Rd. 714 Monument Ave. Phone: 937-335-8807 Troy, OH 45373 Dayton, OH 45402 Fax: 937-339-4882 March 24, 2016 Mr. Dennis Zimmer City of Dayton, Division

More information

NYC Department of Education

NYC Department of Education Asset: P.S. 146 - BRONX, 968 CAULDWELL AVENUE, New York, 10456 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2017-12-01 8:57 AM 2018-05-31 2:59 PM Asset Data Are there fuel tanks? Total

More information

CCDC EXPANSION PROJECT

CCDC EXPANSION PROJECT CCDC EXPANSION PROJECT TEMPORARY MOBILE KITCHEN RFP NO. 12-0132-3 Addendum #1 ADDENDUM #1 IS BASED ON THE INFORMATION DISCUSSED AT THE MANDATORY PRE-BID MEETING THAT WAS HELD ON THURSDAY, JANUARY 10, 2013

More information

2014 Bond Project Guide

2014 Bond Project Guide 2014 Bond Project Guide Bush Elementary School Page 1 Instructional Technology Computers, Projectors, Mobile Carts, Document Cameras and Printers Wireless Connectivity New Construction New Tech Center

More information

NYC Department of Education

NYC Department of Education Asset: P.S. 2 - MANHATTAN, 122 HENRY STREET, New York, 10002 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-01-05 9:21 AM 2018-01-16 12:15 PM Asset Data Are there fuel tanks? Total

More information

NYC Department of Education

NYC Department of Education Asset: A. PHILLIP RANDOLPH HS - MANHATTAN, 443 WEST 135 STREET, New York, 10031 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-02-02 8:11 AM 2018-06-14 1:21 PM Asset Data Are there

More information

HOLUM EDUCATION CENTER. Architectural. January 13, 2014 DeForest Area School District

HOLUM EDUCATION CENTER. Architectural. January 13, 2014 DeForest Area School District HOLUM EDUCATION CENTER Architectural The existing building has approximately 41,823 square feet and sets on a lot about 4.14 acres in size. Parking lots are located along the east and west sides of the

More information

NYC Department of Education

NYC Department of Education Asset: P.S. 198 - BRONX, 1180 TINTON AVENUE, New York, 10456 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-01-24 8:14 AM 2018-01-24 9:32 PM Asset Data Are there fuel tanks? Total

More information

FOOD SERVICE May 6, 2016

FOOD SERVICE May 6, 2016 FOOD SERVICE May 6, 2016 I. PROGRAM REQUIREMENTS Refer to the project-specific Schedule of Spaces for student stations, square footage, and for any requirements that may differ from the prototype requirements

More information

SITE SYSTEMS: FANNIE MAE EXPECTED USEFUL LIFE TABLES (FMEUL)

SITE SYSTEMS: FANNIE MAE EXPECTED USEFUL LIFE TABLES (FMEUL) SITE SYSTEMS: FANNIE MAE EXPECTED USEFUL LIFE TABLES (FMEUL) Basketball Courts 15 25 Built Improvements Playgrounds, Site Furniture, etc. 20 20 Catch Basin 40 40 Cold Water Lines 40 40 Compactors DHW Supply

More information

Facilities Management State-Funded and Billable Services

Facilities Management State-Funded and Billable Services Facilities Management State-Funded and Billable Services Facilities Management receives funding to provide maintenance in eligible state-supported areas only, per UCOP guidelines. State-supported areas,

More information

NYC Department of Education

NYC Department of Education Asset: P.S. 111 - MANHATTAN, 440 WEST 53 STREET, New York, 10019 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-03-16 8:47 AM 2018-03-21 8:02 AM Asset Data Are there fuel tanks?

More information

Tighe&Bond. Groton Heights School Mechanical Evaluation. 1 Existing Conditions. 1.1 Water Service Entrance

Tighe&Bond. Groton Heights School Mechanical Evaluation. 1 Existing Conditions. 1.1 Water Service Entrance Groton Heights School Mechanical Evaluation TO: FROM: Amy Vaillancourt, Project Manager Harley Langford, Project Manger Jason Curtis, P.E. DATE: February 24, 2016; Revised May 31, 2016 On Monday, December

More information

CAPITAL OUTLAY REQUEST - IDENTIFIED AND EMERGING PROJECTS - RANKED 3-Jun-14

CAPITAL OUTLAY REQUEST - IDENTIFIED AND EMERGING PROJECTS - RANKED 3-Jun-14 2014-2015 CAPITAL OUTLAY REQUEST - IDENTIFIED AND EMERGING PROJECTS - RANKED 3-Jun-14 School Item Amount a. Classroom A/R (Increase CR capacity to 804, add l Resource and tutoring spaces needed. Teacher

More information

NYC Department of Education

NYC Department of Education Asset: P.S. 128 - MANHATTAN, 560 WEST 169 STREET, New York, 10032 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2017-12-07 8:50 AM 2018-06-14 1:16 PM Asset Data Are there fuel tanks?

More information

NYC Department of Education

NYC Department of Education Asset: P.S. 69 - STATEN ISLAND, 144 KEATING PLACE, New York, 10314 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-01-19 8:39 AM 2018-01-23 4:33 PM Asset Data Are there fuel tanks?

More information

FOOD SERVICE May 6, 2016

FOOD SERVICE May 6, 2016 FOOD SERVICE May 6, 2016 I. PROGRAM REQUIREMENTS Refer to the project-specific Schedule of Spaces for student stations, square footage, and any requirements that may differ from the prototype requirements

More information

NYC Department of Education

NYC Department of Education Asset: P.S. 205B (ECF) - BRONX, 2375 SOUTHERN BLVD, New York, 10460 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-01-12 12:29 PM 2018-01-12 3:14 PM Asset Data Are there fuel tanks?

More information

School District of Milton 5- Year Capital Maintenance and Improvement Plan

School District of Milton 5- Year Capital Maintenance and Improvement Plan Updated - 02/21/17 School District of Milton 5- Year Capital Maintenance and Improvement Plan 101 East Elementary 1 Parking Lot/Traffic Flow Project 615,175 Includes Construction and Engineering 2 Bathroom

More information

Charles W Earle Elementary School

Charles W Earle Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

SPACE TYPE: JUDICIAL CHAMBER

SPACE TYPE: JUDICIAL CHAMBER SPACE TYPE: JUDICIAL CHAMBER Construction Criteria The unit costs for Judicial Chamber space types are based on the construction quality and design features in the following table. This information has

More information

Asbestos 3-Year Re-inspection Report and Updated Management Plan. Edith Nourse Rogers School 43 Highland Street Lowell, Massachusetts, 01852

Asbestos 3-Year Re-inspection Report and Updated Management Plan. Edith Nourse Rogers School 43 Highland Street Lowell, Massachusetts, 01852 Asbestos 3-Year Report Edith Nourse Rogers School 43 Highland Street, 01852 Prepared by: Cardno ATC 600 West Cummings Park, Suite 5450 Woburn, Massachusetts 01801 September 24, 2014 Cardno ATC Project

More information

NYC Department of Education

NYC Department of Education Asset: P.S. 104 - BROOKLYN, 9115 5TH AVENUE, New York, 11209 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-02-21 8:55 AM 2018-02-21 1:09 PM Asset Data Are there fuel tanks? Total

More information

ASBESTOS ROOF INSPECTION REPORT

ASBESTOS ROOF INSPECTION REPORT ASBESTOS ROOF INSPECTION REPORT OF MARSHALL COURTS ROOF 3300 A&B, 3302 A&B, 3400 A & B, 3402 A & B MARSHALL AVE 800 A & B 35 TH STREET AND 801 A&B 33 RD STREET NEWPORT NEWS, VIRGINIA 23606 MCS JOB #13-031S

More information

NYC Department of Education

NYC Department of Education Asset: P.S. 7 - MANHATTAN, 160 EAST 120 STREET, New York, 10035 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-03-02 8:44 AM 2018-03-12 10:45 AM Asset Data Are there fuel tanks?

More information

George B Swift Elementary Specialty School

George B Swift Elementary Specialty School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Facility Condition Assessment Summary Report. British Columbia Institute of Technology NE6 - Plumbing and Pipefit Building

Facility Condition Assessment Summary Report. British Columbia Institute of Technology NE6 - Plumbing and Pipefit Building Facility Condition Assessment Summary Report British Columbia Institute of Technology NE6 - Plumbing and Pipefit Building Submitted by: VFA Canada Corp. Burnaby Centre 4211 Kingsway Burnaby, BC V5H 1Z6

More information

NYC Department of Education

NYC Department of Education Asset: J.H.S. 216 - QUEENS, 64-20 175 STREET, New York, 11365 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2017-11-06 8:51 AM 2017-11-22 10:04 AM Asset Data Are there fuel tanks? Total

More information

Number of sides for work space where food preparation occurs. Minimum width between food equipment and walls in work space.

Number of sides for work space where food preparation occurs. Minimum width between food equipment and walls in work space. This guide will assist you with providing information required by the Anne Arundel County Department of Health to determine compliance with COMAR 10.15.03 Food Service Facilities. The applicant or owner

More information

Ichabod Crane Central School District 2018 Capital Project Preliminary Estimate

Ichabod Crane Central School District 2018 Capital Project Preliminary Estimate Health & Safety 1,399,000 Academics & Program 17,140,800 Physical Education & Athletics 5,922,000 Building Infrastructure 3,103,800 Site Infrastructure 1,049,600 TOTAL SCOPE OF WORK 28,615,200 PROPOSED

More information

NYC Department of Education

NYC Department of Education Asset: P.S. 86 ANNEX - BRONX, 124 EAMES PLACE, New York, 10468 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-04-05 1:03 PM 2018-04-27 1:35 PM Asset Data Are there fuel tanks? Total

More information

NYC Department of Education

NYC Department of Education Asset: UNIVERSITY NEIGHBORHOOD - M, 200 MONROE STREET, New York, 10002 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-02-05 11:56 AM 2018-03-02 7:14 PM Asset Data Are there fuel

More information

900 S. Colorado Blvd. - 5,609 square ft building (new automobile sales showroom and offices) built in 2000/2001; and

900 S. Colorado Blvd. - 5,609 square ft building (new automobile sales showroom and offices) built in 2000/2001; and Sent Via erims November 13, 2013 Sonic Automotive, Inc. 4401 Colwick Road Charlotte, North Carolina 28211 Attention: Mr. Doug Siska Re: Asbestos Survey Murray BMW of Denver 900 S Colorado Blvd and 4320

More information

NYC Department of Education

NYC Department of Education Asset: P.S. 22 - STATEN ISLAND, 1860 FOREST AVENUE, New York, 10303 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2017-12-08 8:51 AM 2017-12-18 4:14 PM Asset Data Are there fuel tanks?

More information

Mechanical Inspection Plumbing

Mechanical Inspection Plumbing 0811 Fixtures Sinks, drinking fountains, water closets, showers, etc. Classroom Sinks. Classroom sinks (19) are enameled cast iron self rimming side ledge with gooseneck faucet trim with index handles,

More information

Florence High School / Middle School Page 1 of 3 Florence, WI

Florence High School / Middle School Page 1 of 3 Florence, WI Florence High School / Middle School Page 1 of 3 Florence, WI Plumbing Systems Review: The following report is the result of a site visit by Tim Kehoe of Muermann Engineering, LLC that occurred on October

More information

NYC Department of Education

NYC Department of Education Asset: MID MAN ADULT LRNG CTR (81) - M, 212 W 120TH ST, New York, 10027 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-01-17 8:16 AM 2018-01-17 8:17 PM Asset Data Are there fuel

More information

Chariho Regional School District Five-Year Capital Facilities Improvement Plan (2/10/15)

Chariho Regional School District Five-Year Capital Facilities Improvement Plan (2/10/15) Chariho Regional School District Five-Year Capital Facilities Improvement Plan (2/10/15) School/Department FY 16 FY 17 FY18 FY19 FY20 Chariho Regional High School FY 16 FY 17 FY18 FY19 FY20 *Repair Bleachers

More information

NYC Department of Education

NYC Department of Education Asset: I.S. 45 - BRONX, 2502 LORILLARD PLACE, New York, 10458 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2017-12-05 9:14 AM 2017-12-20 11:42 AM Asset Data Are there fuel tanks? Total

More information

NYC Department of Education

NYC Department of Education Asset: I.S. 131 - BRONX, 885 BOLTON AVENUE, New York, 10473 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2017-10-17 8:54 AM 2017-12-05 5:41 PM Asset Data Are there fuel tanks? Total

More information

NYC Department of Education

NYC Department of Education Asset: AUTOMOTIVE TRADES VOC HS - K, 50 BEDFORD AVENUE, New York, 11222 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-05-01 8:09 AM 2018-05-10 2:18 PM Asset Data Are there fuel

More information

MARY CRAPO CENTER Miller Road, Swartz Creek, Michigan

MARY CRAPO CENTER Miller Road, Swartz Creek, Michigan MARY CRAPO CENTER 8197 Miller Road, Swartz Creek, Michigan MARY CRAPO CENTER 8197 Miller Road, Swartz Creek General Information: - Instructional, Child Care Development Center (West Wing) o (2) Infant/Toddler

More information

NYC Department of Education

NYC Department of Education Asset: HS FOR MATH, SCI & ENGINEERING-M, 240 CONVENT AVENUE, New York, 10031 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2017-12-20 12:04 PM 2018-01-05 5:32 PM Asset Data Are there

More information

NYC Department of Education

NYC Department of Education Asset: P.S. 163 - BRONX, 2075 WEBSTER AVENUE, New York, 10457 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-03-22 8:33 AM 2018-03-22 3:13 PM Asset Data Are there fuel tanks? Total

More information

NYC Department of Education

NYC Department of Education Asset: P.S./I.S. 194 - BRONX, 2365 WATERBURY AVENUE, New York, 10462 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-01-24 8:34 AM 2018-02-01 10:02 AM Asset Data Are there fuel tanks?

More information

Estimate Form for Kitchen Design and Installation

Estimate Form for Kitchen Design and Installation Form for Kitchen Design and Installation Name: Home Address: City: State: Phone (Home): Phone (Office): Phone (Office): Phone (Office): Phone (Jobsite): Jobsite Address: City: State: By: Hereafter called

More information

NAZARETH AREA SCHOOL DISTRICT MAINTENANCE DEPARTMENT 357 Tatamy Road, Nazareth, PA FAX

NAZARETH AREA SCHOOL DISTRICT MAINTENANCE DEPARTMENT 357 Tatamy Road, Nazareth, PA FAX NAZARETH AREA SCHOOL DISTRICT MAINTENANCE DEPARTMENT 357 Tatamy Road, Nazareth, PA 18064 610-759-1367 FAX 610-759-7028 TO: FROM: Dr. Riker, Superintendent of Schools Board of School Directors Lewis F.

More information

NYC Department of Education Building Condition Assessment Survey :49AM :00PM

NYC Department of Education Building Condition Assessment Survey :49AM :00PM School: InspectionId Asset Data Inspection Type Building Assessment Survey 05-06 P.S. 70 - BROOKLYN, 4 EMERSON PLACE, BROOKLYN, NY, 05 Time In Last Edited 476 MECHANICAL 05-- 08:49AM 05-- 03:00PM Have

More information

2 Main Office Building BLDG-955A Building Purpose Building Area Administration offices. Training room 7,610 SF Inspection Date August 16, 2016 Inspect

2 Main Office Building BLDG-955A Building Purpose Building Area Administration offices. Training room 7,610 SF Inspection Date August 16, 2016 Inspect 1 Site Summary Address 7200 Bluff Springs Road Austin, TX 78744 Number of Permanent Campus Facilities 2 Original Year of Construction 2014 Total Campus Building Area (combined) 25,314 SF Introduction The

More information

NYC Department of Education

NYC Department of Education Asset: P.S. 161 - MANHATTAN, 499 WEST 133 STREET, New York, 10027 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-03-15 8:26 AM 2018-06-08 1:37 PM Asset Data Are there fuel tanks?

More information

Allisonville Elementary School Facilities Highlights Built: 1960 Last Major Renovation: 28 years ago Capacity: 650 Current Enrollment: 767

Allisonville Elementary School Facilities Highlights Built: 1960 Last Major Renovation: 28 years ago Capacity: 650 Current Enrollment: 767 Allisonville Elementary School Built: 1960 Last Major Renovation: 28 years ago Capacity: 650 Current Enrollment: 767 ADA improvements are Fire alarms need to be updated Playground equipment needs to be

More information

2015 Building Condition Survey Summary Mosaic Associates Architects 02/19/16

2015 Building Condition Survey Summary Mosaic Associates Architects 02/19/16 1. General: This summary is offered as a supplement to the 2015 Building Condition Survey being filed with SED on behalf of the District. All cost estimates are preliminary, and should be re-evaluated

More information

NYC Department of Education

NYC Department of Education Asset: P.S. 19 - STATEN ISLAND, 780 POST AVENUE, New York, 10310 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2017-10-26 8:58 AM 2017-11-14 1:37 PM Asset Data Are there fuel tanks?

More information