1 Larry Teixeira Selma Unified School District 3036 Thompson Avenue Selma, CA Subject: Feasibility Study for New Library Building Project Number A C Dear Mr. Teixeira: At your request, we are providing a Feasibility Report for the construction of a new Library Building on the James Campus. This report will analyze the scope discussed in our previous meetings. As you are aware, the addition of a new building to the campus will trigger other upgrades to the existing campus to meet current Building Code, DSA and ADA requirements. These items are included within this report. Please note that we have classified the scope of work as Minimum for budgeting purposes. The Minimum classification indicates the basic level of work to accommodate the Code required minimums. The finished product will appear patched within the existing context. BUILDING LOCATION / SITEWORK: There are (2) proposed locations for the new building as indicated on the attached Site Plan (North and South Option). Upon review of the site conditions and existing building, we are recommending that the new building be placed at least 30 feet away from the existing building for either. If the buildings were any closer, a minimum 2- hour fire rated construction (Fire Barrier) would be required within the new building. We understand there would be no requirement for Fire Sprinklers, however, the final terms of the fire-rated construction would be dependent on project specific determinations by DSA. In regards to the Sitework for either of the locations, both Options would be very similar in scope and cost. Both would require similar amounts of earthwork, and trenching for the electrical utility connection. The North Option would require the relocation of playground equipment and possibly a new fire hydrant (pending the Local Fire Authority); the South Option would require additional paving for the adjacent Fire Lane.

2 Selma Unified School District Library Building Feasibility Study Page 2 ARCHITECTURAL SCOPE OF WORK: The main scope included within this project is a 30 x36, Slab-on Grade, Modular Building, similar to the Meehleis Modular Buildings located on your other campuses. The building will be basic in nature and accommodate the following: o Single, open room layout o Casework/shelving for reading materials, o Reading area o Check-out area o Capacity and area for multiple computer stations Additional work required to the existing campus includes the following: Boys, Girls Restrooms: o Replace (2) toilets with (1) new fully accessible toilet compartment. o Replace (1) toilet with (1) semi-ambulatory toilet compartment. o Modify existing piping and wall framing for (2) new toilets. o Provide new toilet partition and toilet accessories for (2) new toilets. o Patch existing floor and wall finishes. o Replace sink and hardware. Patch wall finish Staff Restrooms: o Minimum: Modify sink/door location of Women s Staff restroom for proper ADA clearances. Patch wall/floor finishes as required. Drinking Fountain: o Provide accessible Hi-Lo Drinking Fountain with guardrails. Accessible Parking: o Re-stripe and provide new signage for existing parking stall at the south side of the campus. Path-of-Travel : It is required to upgrade the accessible Path-of-Travel to connect from the new building to the Main Office, the Accessible parking, and Public Right-of-way. o Modify stair/ramp handrails for proper extensions at top and bottom of landings. Add handrails to stairs which do not have any handrails. This pertains to both existing ramps and all stairways. o If the new building is placed at the North Location, a new ramp will be required at the west side of the existing building. o Modify Door landings for level landing and threshold by removing and replacing concrete. o Add door and way-finding signage.

3 Selma Unified School District Library Building Feasibility Study Page 3 ELECTRICAL SCOPE OF WORK: POWER: The campus is supplied from an existing 120/208-Volt, 3-Phase, 4-Wire, 2000-Amp main switchboard located in the central courtyard of the campus. Based on the way the campus electrical distribution is currently structured, it would be the most practical to supply the new modular building directly from the main switchboard. The main switchboard appears to have been recently upgraded and in good repair, and from preliminary evaluation it appears to have sufficient electrical capacity and physical space to supply power to the new building. The overall feeder length required would be marginally shorter for the proposed South location than for the proposed North location, and slightly less saw-cutting and patching of the existing courtyard would be required. Directional boring can be explored as a conduit installation method if saw-cutting of the existing courtyard is undesirable. SIGNAL AND COMMUNICATION: The existing signal headend equipment, including the Main Distribution Frame (MDF) and Intercommunication System headend equipment, is located in a closet at the northeast side of the main building adjacent to the library. The campus master clock is located in the library itself. This equipment appears to be in good repair and should be able to accommodate installation of additional equipment to support the new building. New conduit for fiber optic and/or copper communication cabling, intercommunication system cabling and clock system cabling can be routed within the attic space of the existing building, then routed to the building exterior and down to below grade at a visually out-of-the-way location for both proposed locations of the new building. FIRE ALARM: The existing campus Fire Alarm Control Panel (FACP) is a Pyrotronics System 3 conventional type FACP. The existing initiation devices within the main building do not constitute a full coverage automatic Fire Alarm system as required by CA SB575 and current code. Installation of a new FACP with a current CSFM listing will be required. This panel can be installed at any convenient location within the main building. New, full-coverage initiation devices consisting of smoke detectors on ceilings and heat detectors in attic spaces will be required for the new building and the restroom spaces being modernized in the main building. The new FACP can be provided with a conventional zone interface module to communicate with the existing FACP and its monitor its existing conventional initiation device zones. The new FACP should additionally have sufficient capacity to eventually supply the

4 Selma Unified School District Library Building Feasibility Study Page 4 entire campus as spaces are modernized within the main building, the existing conventional devices can be removed and replaced with a full coverage automatic system connected to the new FACP. The 2013 CA Electrical code contains a new requirement for voice evacuation-type fire alarm notification systems in school buildings. The new FACP should be fully voice-evacuation capable to meet this requirement for the new building. For the spaces in the existing building being modernized, upgrading to a voice evacuation system depends on the application of several exceptions within the new portion of the code. DSA guidance on the application of these exceptions is still in progress, so they have advised contacting them on a case-by-case basis to determine whether upgrade to voice evacuation in an existing building is required. However, we have received word that the Building Standards Commission intends to rescind one of the relevant exceptions as of July 1, DSA CLOSEOUT (PREVIOUS PROJECTS): As of January 2014, DSA requires that all previous projects completed on a campus, be Closed and Certified, prior to any DSA approval of any new projects. DSA records indicate that there is one (1) project that has not been Closed and Certified: DSA Application 49096; Alterations to Classroom/Administration/Multi- Purpose Building (see attached letter). The District must certify this project prior to the approval of the new Library Building. If you have any questions or would like to discuss this further, please do not hesitate to contact us. Sincerely, TETER, LLP Bart Treis Architect Attachments: (1) page Site Plan (1) page Opinion of Probable Cost (1) page DSA Closeout for 49096

5 Client: TETER Project Number: Project: Updated: Selma Unified School District Garfield Elem. Library Bldg. Quantity Unit Unit Cost Estimated Construction Cost Alternate Scope for consideration NEW BUILDING Misc Site Demolition 1 ls $10,000 $10,000 *Site Prep 1200 sf $10 $12,000 *30x32 Slab-on-Grade Modular Building 960 sf $225 $216,000 *Std. Portable Classroom Bldg. w/ Site Prep 1 ls $50,000 $50,000 Casework (estimated) 100 lf $300 $30,000 Data/Communications 1 ls $10,000 $10,000 Fire Alarm Control Panel and Connection 1 ls $15,000 $15,000 Fire Alarm Devices 960 sf $10 $9,600 EXISTING BUILDING **Student Toilet Room upgrade (Basic) 1200 sf $30 $36,000 **Student Toilet Room upgrade (Complete) 1200 sf $250 $300,000 Staff Toilet Room Upgrade 50 sf $150 $7,500 Drinking Fountain (w/ finishes) 1 ls $4,000 $4,000 ***Fire Alarm (Toilet Rooms Only) 1200 sf $10 $12,000 ***Fire Alarm (Entire Building) sf $10 $210,000 SITEWORK New Ramp (for North Location) 1 ls $10,000 $10,000 Perimeter Sitework around new building 1500 sf $8 $12,000 Electrical Service to new building 1 ls $26,000 $26,000 Handrail Upgrades to (E) Stairs and Ramps 1 ls $7,000 $7,000 ****Fire Hydrant 1 ls $15,000 $15,000 Subtotal $407,100 Contractor O&P (5%) $20,355 Contractor Insurance (2%) $8,142 Contingency (20%) $87,119 Sub Total $522,716 Soft Costs (20%) $104,543 Estimated Total Project Cost $627,260 *The Portable Classroom Option is included as a cost-reducing option, however, not as durable or permanent as the Modular Bldg. If this option is selected, omit the sitework and Modular Bldg line items. **The"Complete" Option for the restroom modernization includes all new floor, wall finishes, new plumbing fixtures and toilet compartments. Omit the "Basic" costs if the "Complete"option is selected. ***Two options for the Fire Alarm are included, depending on the extent of the DSA requirements. ****Fire Hydrant cost is included pending and Local Fire Authority requirement at the North location. In providing Opinion of Probable Costs, the Client understands that the consultant has no control over the cost or availability of labor, equipment or materials, or over market conditions or the Contractor's method of pricing, and that the Consultant's Opinion of Probable Costs are made on the on the basis of the Consultant's professional judgment and experience and historical costs and data as the basis of pricing. The Consultant makes no warranty, express or implied than the bids or the negotiated cost of the work will not vary from the Consultant's Opinion of Probable Cost.

6

Master Project List Report

Master Project List Report Blue Hills Elementary School 01-8215 Site Utilities Replacement $52,835 01-8502 Modernization $3,135,933 01-8525 Exterior Painting $181,478 01-8552 Kindergarden Fencing $13,180 Install new backflow preventer.

More information

H BUTCH BROWNING FIRE MARSHAL BUILDING REHABILITATION

H BUTCH BROWNING FIRE MARSHAL BUILDING REHABILITATION STATE OF LOUISIANA Department of Public Safety and Corrections Office of State Fire Marshal Code Enforcement and Building Safety 8181 Independence Boulevard Baton Rouge, Louisiana 70806 225-925-4920 H

More information

Richard Henry Lee Elementary School

Richard Henry Lee Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Encumbered Balance (E-D) Branham HVAC Implementation Complete 100% 03/04/19 07/19/19 $765, $635, $635, $130, $0.

Encumbered Balance (E-D) Branham HVAC Implementation Complete 100% 03/04/19 07/19/19 $765, $635, $635, $130, $0. Branham High School Budget Remaining 1 906030 Branham HVAC Implementation Complete 100% 03/04/19 07/19/19 $765,473.00 $635,342.00 $635,342.00 $130,131.00 $0.00 2 970205 Branham Interim Housing - 12 Portable

More information

Facility Condition Assessment Summary Report. British Columbia Institute of Technology NE6 - Plumbing and Pipefit Building

Facility Condition Assessment Summary Report. British Columbia Institute of Technology NE6 - Plumbing and Pipefit Building Facility Condition Assessment Summary Report British Columbia Institute of Technology NE6 - Plumbing and Pipefit Building Submitted by: VFA Canada Corp. Burnaby Centre 4211 Kingsway Burnaby, BC V5H 1Z6

More information

Electronic Safety and Security

Electronic Safety and Security 28 Electronic Safety and Security NOTE: This is a new section, which includes content from previous sections of the KU Design Standards, along with appropriate revisions and updates. Significant revisions

More information

Concluding Improvement Recommendations and Opinions of Probable Cost (calculated in may 2010 construction rates).

Concluding Improvement Recommendations and Opinions of Probable Cost (calculated in may 2010 construction rates). Pelican Bay Community Improvement Plan Traffic,JI Concluding Improvement Recommendations and Opinions of Probable Cost (calculated in may 2010 construction rates). D1 -A: Provide consistent signing, marking

More information

Michigan State University Barrier-Free/Accessibility Project Status Summary March 2017

Michigan State University Barrier-Free/Accessibility Project Status Summary March 2017 Projects Completed FY14, FY15 and FY16 (arranged alphabetically) Abrams Planetarium Install automatic door opener on main doors of the Planetarium. Completed: Summer 2016 Cost: $13,000 Akers Hall Renovations

More information

Agustin Lara Elementary Academy

Agustin Lara Elementary Academy Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

For additional information regarding R-3.1 residential care facilities please contact (951)

For additional information regarding R-3.1 residential care facilities please contact (951) Riverside County Fire Department Fire/Life Safety Inspection Division Riverside Office: 2300 Market St., Ste. 150, Riverside, CA 92501 Ph. (951) 955-4823 Fax (951) 955-4886 Palm Desert Office: 77-933 Las

More information

Edward Jenner Elementary Academy of the Arts

Edward Jenner Elementary Academy of the Arts Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

CORRALES INTERNATIONAL SCHOOL TENANT IMPROVEMENT 5500 WILSHIRE AVE NE ALBUQUERQUE, NM 87113

CORRALES INTERNATIONAL SCHOOL TENANT IMPROVEMENT 5500 WILSHIRE AVE NE ALBUQUERQUE, NM 87113 CORRALES INTERNATIONAL SCHOOL TENANT IMPROVEMENT DRAWING INDEX COVER SHEET G-101 FIRST FLOOR CODE ANALYSIS G-102 SECOND FLOOR CODE ANALYSIS G-103 CAFETERIA CODE ANALYSIS D-101 FIRST FLOOR DEMOLITION PLAN

More information

3. 21st Century Learning A. Districtwide Flexible Learning - Allowance for Flexible Furniture $600,000 Subtotal $600,000

3. 21st Century Learning A. Districtwide Flexible Learning - Allowance for Flexible Furniture $600,000 Subtotal $600,000 1. Safety and Security A. Additional Cameras District Wide $382,000 B. Interior Locks Upgrades Allowance $300,000 C. Tilden Entrance Upgrades D. Door and Glass Improvements Allowance $500,000 E. Alert

More information

Calmeca Academy of Fine Arts and Dual Language

Calmeca Academy of Fine Arts and Dual Language Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Josefa Ortiz De Dominguez Elementary School

Josefa Ortiz De Dominguez Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Princeton Joint Unified School District Invitation for Bid Installation of District-Wide Lighting Occupancy Sensors

Princeton Joint Unified School District Invitation for Bid Installation of District-Wide Lighting Occupancy Sensors Princeton Joint Unified School District Invitation for Bid Installation of District-Wide Lighting Occupancy Sensors 1. SUMMARY AND BACKGROUND: Princeton Joint Unified School District located in Princeton

More information

HOLUM EDUCATION CENTER. Architectural. January 13, 2014 DeForest Area School District

HOLUM EDUCATION CENTER. Architectural. January 13, 2014 DeForest Area School District HOLUM EDUCATION CENTER Architectural The existing building has approximately 41,823 square feet and sets on a lot about 4.14 acres in size. Parking lots are located along the east and west sides of the

More information

REPORT CARD TO THE COMMUNITY MAY 15, 2018

REPORT CARD TO THE COMMUNITY MAY 15, 2018 REPORT CARD TO THE COMMUNITY MAY 15, 2018 O On May 10, 2014 voters in Greenville ISD approved a $72,275,000 bond election. BOND PROPOSAL PROJECT BOND AMOUNT CONSTRUCT A NEW BOWIE ELEMENTARY SCHOOL $17,600,000

More information

Garden Grove Unified School District Board of Education. April 16, 2013

Garden Grove Unified School District Board of Education. April 16, 2013 Garden Grove Unified School District Board of Education April 16, 2013 Presenters: Rick Nakano, Asst. Sup. Business Services Sal Sanchez, Director, M.O.T. and Facilities Margie Brown, Consultant, Bond

More information

Joseph Brennemann Elementary School

Joseph Brennemann Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Unit # 1038 ± 900 SF Width ± 15' Depth ± 60'

Unit # 1038 ± 900 SF Width ± 15' Depth ± 60' ±60' Lease Line Lease Outline Drawing Needles Towne Center 1004 E. Broadway St.,, Needles, CA 92363 ± 900 SF Width ± 15' Depth ± 60' Plans produced by: ID Plans 6/16/2017 (813) 657-2545 C 2017 Site map

More information

PLATTEVILLE MIDDLE SCHOOL

PLATTEVILLE MIDDLE SCHOOL Architectural The building has aluminum clad wood awning windows in combination with aluminum fixed glass units. They appear to be exterior glazed with insulated glazing. See photo 2. Platteville Middle

More information

Residential-based Care Facility R-4 Guideline

Residential-based Care Facility R-4 Guideline Moreno Valley Fire Department Fire Prevention Bureau Residential-based Care Facility R-4 Guideline Approved and Authorized By: Adria Reinertson, Fire Marshal Issued: April 7, 2017 Residential-based Care

More information

PROCTOR TERRACE ELEMENTARY SCHOOL

PROCTOR TERRACE ELEMENTARY SCHOOL SCHL DAA Address: Bryden Lane Santa Rosa, CA 95404 Established: 50 Permanent Classrooms: 3 Portable Classrooms: 9 Building Area: Site Area: 40, sq ft 5 acres Students in 5: 484 Students in (Projected):

More information

MOUNT PLEASANT MIDDLE SCHOOL HVAC. M-01 Heating Plant: M-02 Heating & Ventilating Systems: Livingston School District Mount Pleasant Middle School

MOUNT PLEASANT MIDDLE SCHOOL HVAC. M-01 Heating Plant: M-02 Heating & Ventilating Systems: Livingston School District Mount Pleasant Middle School MOUNT PLEASANT MIDDLE SCHOOL HVAC M-01 Heating Plant: The existing boilers have recently been upgraded. (3) steam boilers (8660 mbh each) manufactured by Weil- McLain have been installed. Newer hot water

More information

Attachment F. Campus Capital Needs Sales Surtax Funded Detail Report

Attachment F. Campus Capital Needs Sales Surtax Funded Detail Report Facility Attachment F Campus Capital Needs Sales Surtax Funded Detail Report Facilities Services 2700 Judge Fran Jamieson Way Viera, Florida 32940-6601 Condition Code Estimate Longleaf Elementary 1.78

More information

Plot # R019A ± 74' ± 74' ± 65' Plot # R019A LEASE OUTLINE DRAWING GROSS LEASABLE AREA ± 4,631 S.F. DEMISING FRONT WIDTH DEPTH ± 13' ± 32' Lease Line

Plot # R019A ± 74' ± 74' ± 65' Plot # R019A LEASE OUTLINE DRAWING GROSS LEASABLE AREA ± 4,631 S.F. DEMISING FRONT WIDTH DEPTH ± 13' ± 32' Lease Line ± 4' ± 13' ± 72' Lease Line ± 6' ± 7' Plot # R019A ± 18' Lease Line Site N o : Site N ame: Lo catio n: Submitted B y: D rawn by D ate: 991 Santee Trolley Square Santee, CA ID Plans 11/10/2016 This drawing

More information

PLAN REVIEW SUBMITTAL GUIDE

PLAN REVIEW SUBMITTAL GUIDE PLAN REVIEW SUBMITTAL GUIDE Plans, specifications and other construction documentation for the initial plan review should be as complete as possible at the time of submittal. Use this convenient guide

More information

Washington Irving Elementary School

Washington Irving Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Oscar DePriest Elementary School

Oscar DePriest Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

John Palmer Elementary School

John Palmer Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Alessandro Volta Elementary School

Alessandro Volta Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Residential Based Care Facility Guidelines

Residential Based Care Facility Guidelines Moreno Valley Fire Department Fire Prevention Bureau Residential Based Care Facility Guidelines Approved and Authorized By: Randall Metz, Fire Marshal Issued: January 1, 2011 Residential Based Care Facilities

More information

ALLISON ELEMENTARY SCHOOL 4315 Don Julio Blvd., North Highlands, CA 95660

ALLISON ELEMENTARY SCHOOL 4315 Don Julio Blvd., North Highlands, CA 95660 ALLISON ELEMENTARY SCHOOL 4315 Don Julio Blvd., North Highlands, CA 95660 Year Built 1960 // Age 58 years Building Area 31,688 Square Feet Student Capacity 389 Current Enrollment (2017-2018) 466 Priority

More information

MARY CRAPO CENTER Miller Road, Swartz Creek, Michigan

MARY CRAPO CENTER Miller Road, Swartz Creek, Michigan MARY CRAPO CENTER 8197 Miller Road, Swartz Creek, Michigan MARY CRAPO CENTER 8197 Miller Road, Swartz Creek General Information: - Instructional, Child Care Development Center (West Wing) o (2) Infant/Toddler

More information

BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM

BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM Date of Meeting: September 2, 2015 # 9 SUBJECT: ELECTION DISTRICT: Identification of Funds for the Traffic Signal at the Intersection of Northstar Boulevard

More information

ADDENDUM NO. 1 BID-CONTRACT DOCUMENTS FOR. RFP No Professional Design Services for CCC Le-Jao Student Resource Center

ADDENDUM NO. 1 BID-CONTRACT DOCUMENTS FOR. RFP No Professional Design Services for CCC Le-Jao Student Resource Center ADDENDUM NO. 1 BID-CONTRACT DOCUMENTS FOR RFP No. 2030 Professional Design Services for CCC Le-Jao Student Resource Center COAST COMMUNITY COLLEGE DISTRICT COSTA MESA, CALIFORNIA COUNTY OF ORANGE COAST

More information

DRAFT. CITY OF ESCONDIDO 11th Avenue Park WORKSHOP SUMMARY December 17, 2008

DRAFT. CITY OF ESCONDIDO 11th Avenue Park WORKSHOP SUMMARY December 17, 2008 DRAFT RJM DESIGN GROUP, INC. CITY OF ESCONDIDO 11th Avenue Park WORKSHOP SUMMARY December 17, 2008 INTRODUCTION This report summarizes the results of the planning process that was conducted as a part of

More information

Genevieve Melody Elementary School

Genevieve Melody Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Riverside County Fire Department Office of the Fire Marshal Market St., Ste. 150, Riverside, CA Ph. (951) Fax (951)

Riverside County Fire Department Office of the Fire Marshal Market St., Ste. 150, Riverside, CA Ph. (951) Fax (951) Riverside County Fire Department Office of the Fire Marshal 2300 Market St., Ste. 150, Riverside, CA 92501 Ph. (951) 955-4777 Fax (951) 955-4886 Guideline Title: Residentially Based Care Facilities Group

More information

Attendees/Absentees. Derek Gallagher DG. Delano Secondary School Additions and Renovations June 6, 2016 Technology User Group Meeting Minutes

Attendees/Absentees. Derek Gallagher DG. Delano Secondary School Additions and Renovations June 6, 2016 Technology User Group Meeting Minutes MEMORANDUM To: From: Attendees/Absentees Derek Gallagher DG Date: June 14, 2016 Comm. No: 152235 Subject: Independent School District #879 Delano Secondary School Additions and Renovations June 6, 2016

More information

Ashland School District Facility & Capacity Assessment Report 2005

Ashland School District Facility & Capacity Assessment Report 2005 Ashland School District Facility & Capacity Assessment Report 2005 Briscoe Elementary School (Closed Facility) Address: 265 N Main Street Area: 33,980 square feet Buildings: Original Building 1948 Music

More information

Arlington Public Schools Purchasing Office

Arlington Public Schools Purchasing Office Arlington Public Schools Purchasing Office NOTICE OF ADDENDUM NO. 1 Issued on March 30, 2018 TITLE: ITB NO.: YORKTOWN HIGH SCHOOL INTERIOR MODIFICATIONS PROJECT 57FY18 ITB CLOSING DATE PRIOR TO 2:00 P.

More information

State College Area School District High School South Building EXISTING CONDITIONS ASSESSMENT

State College Area School District High School South Building EXISTING CONDITIONS ASSESSMENT State College Area School District High School South Building Prepared by CenterPoint Engineering 08 February 2013 FACILITY ASSESSMENT SUMMARY PHYSICAL PLANT General HVAC This report is a snapshot of the

More information

Charles W Earle Elementary School

Charles W Earle Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Allisonville Elementary School Facilities Highlights Built: 1960 Last Major Renovation: 28 years ago Capacity: 650 Current Enrollment: 767

Allisonville Elementary School Facilities Highlights Built: 1960 Last Major Renovation: 28 years ago Capacity: 650 Current Enrollment: 767 Allisonville Elementary School Built: 1960 Last Major Renovation: 28 years ago Capacity: 650 Current Enrollment: 767 ADA improvements are Fire alarms need to be updated Playground equipment needs to be

More information

Board of Education Park Ridge Niles School District 64

Board of Education Park Ridge Niles School District 64 Board of Education Park Ridge Niles School District 64 Committee-of-the-Whole: Facilities Monday, September 8, 207 7:00 p.m. Jefferson School Multipurpose Room 8200 N. Greendale Avenue Niles, IL 6074 AGENDA

More information

Francis M McKay Elementary School

Francis M McKay Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

SPACE TYPE: JUDICIAL CHAMBER

SPACE TYPE: JUDICIAL CHAMBER SPACE TYPE: JUDICIAL CHAMBER Construction Criteria The unit costs for Judicial Chamber space types are based on the construction quality and design features in the following table. This information has

More information

Measure W Review. East Nicolaus High School District March 9, 2017

Measure W Review. East Nicolaus High School District March 9, 2017 Measure W Review East Nicolaus High School District March 9, 2017 To improve the quality of education with funding that cannot be taken by the State; repair or replace leaky roofs; modernize outdated classrooms,

More information

CDB Life Safety Upgrades Facility Wide Choate Mental Health and Development Center Anna, Union County, Illinois

CDB Life Safety Upgrades Facility Wide Choate Mental Health and Development Center Anna, Union County, Illinois BIDDING & CONTRACT REQUIREMENTS DATE: June 27, 2014 State of Illinois CAPITAL DEVELOPMENT BOARD Architechniques, Ltd. Mark Feldhake, AIA, LEED AP 817 S. Park Ave. Herrin, Illinois 62948 TO: PROSPECTIVE

More information

MADISON ELEMENTARY SCHOOL

MADISON ELEMENTARY SCHOOL TWIN RIVERS UNIFIED SCHOOL DISTRICT MADISON ELEMENTARY SCHOOL 54 HARRISON STREET NORTH HIGHLANDS, CALIFORNIA 95660 ORIGINAL BUILDING COMPLETED: 96, 67 BUILDING AREA: 45,69 SITE ACREAGE: 0 BUILDING CAPACITY:

More information

Appendix E: Photo Documentation

Appendix E: Photo Documentation Appendix E: Photo Documentation Brown County Library Central Branch Building Assessment Appendix E: Photo Documentation Architectural and Structural Brown County Library Central Branch Building Assessment

More information

Unit # E ± 1,200 SF Width ± 20' Depth ± 60'

Unit # E ± 1,200 SF Width ± 20' Depth ± 60' Lease Outline Drawing ±60' Lease Line Sunnymead Plaza 24907 Sunnymead Blvd., Unit # E, Moreno Valley, CA 92553 Unit # E ± 1,200 SF Width ± 20' Depth ± 60' Plans produced by: ID Plans 6/13/2017 (813) 657-2545

More information

Library stacks and records storage 150 LB/SF live load

Library stacks and records storage 150 LB/SF live load SPACE TYPE: LIBRARY Construction Criteria The unit costs for Library space types are based on the construction quality and design features in the following table. This information has been generally organized

More information

Date: February 22, 2005 Kimbalton DUSEL, Pre-S-2 Submittal CNA0402 PRELIMINARY CODE REVIEW. International Plumbing Code Edition

Date: February 22, 2005 Kimbalton DUSEL, Pre-S-2 Submittal CNA0402 PRELIMINARY CODE REVIEW. International Plumbing Code Edition Kimbalton DUSEL Preliminary Code Study CNA0402 Date: Project: February 22, 2005 Kimbalton DUSEL, Pre-S-2 Submittal CNA0402 Note: Shaded Sections not complete. PRELIMINARY CODE REVIEW Building Code: International

More information

DeWitt Clinton Elementary School

DeWitt Clinton Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

VOTER BOND REFERENDUM 2018 SUMMARY OF WORK PROPOSED

VOTER BOND REFERENDUM 2018 SUMMARY OF WORK PROPOSED Ashton Elementary School 1 Masonry Repair $ 42,781.50 2 Replace HVAC $ 375,000.00 3 Replace SAT @ Various Locations $ 92,364.00 3 Recoat & Resurface Exterior Paved Play Area $ 135,978.30 3 Various Technological

More information

bold/italic items are revisions to the previous program notes

bold/italic items are revisions to the previous program notes bold/italic items are revisions to the previous program notes Future Meetings: - Dr. Caldwell - Students - Industry Partners (Mike Betts? Sam Geil? Kevin Harmon? TBD by SCCCD) A. Specific Room Requirements

More information

Briar Crest Elementary

Briar Crest Elementary Promises Kept This document includes partial lists of major projects completed at Pattonville Schools since 1986 as part of past bond issues approved by the Pattonville community. Briar Crest Elementary

More information

New School Construction: Safe School Opening. OAR and IOR Joint Training February 17, 2005

New School Construction: Safe School Opening. OAR and IOR Joint Training February 17, 2005 New School Construction: Safe School Opening OAR and IOR Joint Training February 17, 2005 1 Purpose Provide information on process moving from construction to occupancy and opening schools 2 School Opening

More information

Old Jail HVAC Replacement Feasibility Report

Old Jail HVAC Replacement Feasibility Report Old Jail HVAC Replacement Feasibility Report Madera, CA Prepared by Kitchell for the County of Madera, California Job No. 6168A3 Executive Summary On October 21, 2016, Kitchell conducted a Feasibility

More information

COMMERCIAL PERMIT APPLICATION AND CHECKLIST. Depending on the scope of your project, the following submittal requirements will apply:

COMMERCIAL PERMIT APPLICATION AND CHECKLIST. Depending on the scope of your project, the following submittal requirements will apply: Planning/Building Department 115 Ramsdell Street Fircrest WA 98466 (253) 564-8902 COMMERCIAL PERMIT APPLICATION AND CHECKLIST Depending on the scope of your project, the following submittal requirements

More information

RE: Clark East Tower Renovations DATE: November 16, 2015 Ypsilanti, Michigan

RE: Clark East Tower Renovations DATE: November 16, 2015 Ypsilanti, Michigan ADDENDUM NO. 2 RE: Clark East Tower Renovations DATE: November 16, 2015 Ypsilanti, Michigan TO: All Bidders Gentlemen: You are hereby directed to make the following changes in the Project Manual and/or

More information

Project Scenario Summary Report http://fusion.deltacollege.edu/code/planning/project/editfpu/scenariorpt.asp?id=2629&ce... Page 1 of 1 11/7/2017 California Community Colleges Project Scenario Summary 2019

More information

Chariho Regional School District Five-Year Capital Facilities Improvement Plan (2/10/15)

Chariho Regional School District Five-Year Capital Facilities Improvement Plan (2/10/15) Chariho Regional School District Five-Year Capital Facilities Improvement Plan (2/10/15) School/Department FY 16 FY 17 FY18 FY19 FY20 Chariho Regional High School FY 16 FY 17 FY18 FY19 FY20 *Repair Bleachers

More information

Unit # H ± 2,000 SF Width ± 25' Depth ± 80'

Unit # H ± 2,000 SF Width ± 25' Depth ± 80' ±80' Lease Line Lease Outline Drawing Sunnymead Plaza 24907 Sunnymead Blvd., Unit # H, Moreno Valley, CA 92553 Unit # H ± 2,000 SF Width ± 25' Depth ± 80' Unit # H Plans produced by: ID Plans 6/13/2017

More information

LOS ANGELES UNIFIED SCHOOL DISTRICT OFFICE OF ENVIRONMENTAL HEALTH AND SAFETY PROCEDURE

LOS ANGELES UNIFIED SCHOOL DISTRICT OFFICE OF ENVIRONMENTAL HEALTH AND SAFETY PROCEDURE TITLE: ISSUER: Occupancy Inspections for New Schools and Modernization Projects John Sterritt, Director Office of Environmental Health and Safety ROUTING Office of Environmental Health & Safety Staff DATE:

More information

Level I Chapter 1 Worksheet

Level I Chapter 1 Worksheet Chapter 1 Worksheet 1. For applicability requirements of the Plumbing Code, refer to: a. Building Code b. Administration and Enforcement Code c. Plumbing Code d. Residential Code 2. The provisions of the

More information

Springpoint Architects, pc SECTION Childcare Center Architect s Project No TABLE OF CONTENTS Monroe County Comm. Sch. Corp.

Springpoint Architects, pc SECTION Childcare Center Architect s Project No TABLE OF CONTENTS Monroe County Comm. Sch. Corp. Volume 1 Bidding Requirements, Contract Forms, Conditions of the Contract, Division 1, Architectural and Site Specifications 000107 Certification Page 000110 Table of Contents DIV00 PROCUREMENT AND CONTRACTING

More information

PALO ALTO HIGH SCHOOL. Palo Alto Unified School District SCHEMATIC DESIGN TO DESIGN DEVELOPMENT TRANSITION MEETING. 21 January 2010, 12:30pm-2:00pm

PALO ALTO HIGH SCHOOL. Palo Alto Unified School District SCHEMATIC DESIGN TO DESIGN DEVELOPMENT TRANSITION MEETING. 21 January 2010, 12:30pm-2:00pm PALO ALTO HIGH SCHOOL SCHEMATIC DESIGN TO DESIGN DEVELOPMENT TRANSITION MEETING DATE: SUBJECT: 21 January 2010, 12:30pm-2:00pm Math/Social Sciences Department ATTENDEES: Radu Toma, Paly Math IS Aimee Lopez,

More information

Unit HH Gregg. ± 30,000 SF Width ±26' Lakeland Retail Center. Lease Outline Drawing. Unit HH Gregg. Depth ± 145' HVAC Units & Information

Unit HH Gregg. ± 30,000 SF Width ±26' Lakeland Retail Center. Lease Outline Drawing. Unit HH Gregg. Depth ± 145' HVAC Units & Information Lease Outline Drawing Lakeland Retail Center 4000 US Hwy. 98, Unit HH Gregg, Lakeland, FL 33809 ±26' ±200' Lease Line Unit HH Gregg ±46' Lease Line ±21' Unit HH Gregg ±145' Lease Line ± 30,000 SF Width

More information

SCO # 1 & 2 PUNCLH LIST Project Name: VANCLEAVE UPPER ELEMENTARY CLA#: 13003

SCO # 1 & 2 PUNCLH LIST Project Name: VANCLEAVE UPPER ELEMENTARY CLA#: 13003 SCO # 1 & 2 PUNCLH LIST Project Name: VANCLEAVE UPPER ELEMENTARY CLA#: 13003 No. Discipline Sent to Name Item Date Noted Date Resolved How item was resolved SCO # 1Punch listed items were noted below on

More information

State College Area School District High School North Building EXISTING CONDITIONS ASSESSMENT

State College Area School District High School North Building EXISTING CONDITIONS ASSESSMENT State College Area School District High School North Building Prepared by CenterPoint Engineering 08 February 2013 FACILITY ASSESSMENT SUMMARY PHYSICAL PLANT General HVAC This report is a snapshot of the

More information

4 August Islington Fire Protection Transpower NZ Limited

4 August Islington Fire Protection Transpower NZ Limited 4 August 2011 Islington Fire Protection Contents 1. Introduction...1 General Approach...2 2. General Notes...3 3. Description of Building Areas...4 Use, Layout, Fire Load, Criticality and Division...4

More information

CHAPTER 7 ALTERATIONS LEVEL

CHAPTER 7 ALTERATIONS LEVEL CHAPTER 7 ALTERATIONS LEVEL 2 SECTION 701 GENERAL 701.1 Scope. Level 2 alterations as described in Section 404 shall comply with the requirements of this chapter. Exception: Buildings in which the reconfiguration

More information

WLAC Facilities Committee Meeting. September 18, 2017

WLAC Facilities Committee Meeting. September 18, 2017 Campus Program Report WLAC Facilities Committee Meeting September 18, 2017 Page 1 DSA approved the plans on May 15, 2017. Notice to Proceed was issued June 8, 2017 and the project remains on schedule for

More information

Oxford Hills School District Capital Renewal Plan Updated March 2017

Oxford Hills School District Capital Renewal Plan Updated March 2017 Color Coding Guide Recently Completed In Progress FY 2017 Budget in FY 2018 Future Budgets/Projects 3/20/17 Capital Renewal Plan Updated March 2017 Capital Renewal Plan - Harrison Elementary Harrison add

More information

Vanilla Box Design Criteria

Vanilla Box Design Criteria Description: 1. Floor: 2. Walls: 3. Ceiling: A. Finished and sealed 4 thick concrete slab on 10 mil poly vapor barrier on 4 of crushed stone throughout, including toilets. A. Interior gypsum board walls

More information

Jeff Brown Inspections

Jeff Brown Inspections Cover Page Jeff Brown Inspections Property Inspection Report Vegas NV, 89145 Inspection prepared for: Jim Shen Agent: Lauren Paris - Resolution Realty Inspection Date: 6/13/2013 Time: 10:00 Age: 26 years

More information

GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT

GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT BUILDING ASSESSMENT REPORT FIRE FOR 75 Fox Street Building OCTOBER 2014 Report for Department of Infrastructure Development Fire Services Preliminary Report:

More information

Florence High School / Middle School Page 1 of 3 Florence, WI

Florence High School / Middle School Page 1 of 3 Florence, WI Florence High School / Middle School Page 1 of 3 Florence, WI Plumbing Systems Review: The following report is the result of a site visit by Tim Kehoe of Muermann Engineering, LLC that occurred on October

More information

MUKWONAGO AREA SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY

MUKWONAGO AREA SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY ARCHITECTURE ROLLING HILLS ELEMENTARY SCHOOL Rolling Hills Elementary was built in 1999 and is the newest addition to the Mukwonago Area School District. The building contains approximately 64,900 gross

More information

Brighton Area Fire Authority

Brighton Area Fire Authority 615 W. Grand River Ave. Brighton, MI 48116 o: 810-229-6640 f: 810-229-1619 January 14, 2019 Fire Alarm Contractors RE: Fire Alarm Credential & Submittal Requirements To Whom It May Concern: The following

More information

Sidney Sawyer Elementary School

Sidney Sawyer Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Paradise Marketplace. Unit # AOP +/- 1,600 SF +/- 12' +/- 11' +/- 8' 11'-7" +/- 85' +/- 74' +/- 20' MAIN FLOOR +/- 20' +/- 85' Width.

Paradise Marketplace. Unit # AOP +/- 1,600 SF +/- 12' +/- 11' +/- 8' 11'-7 +/- 85' +/- 74' +/- 20' MAIN FLOOR +/- 20' +/- 85' Width. Electrical Information Breaker Panel 1: Service Type: Not Listed Panel Type: Not Listed Panel Number: Not Listed Manufacturer: Not Listed Amps: Not Listed Location: Rear of Storage Room Notes: Unlabeled

More information

Oconomowoc Area School District Facility Construction Update August 25, 2017

Oconomowoc Area School District Facility Construction Update August 25, 2017 Oconomowoc Area School District Facility Construction Update August 25, 2017 IXONIA ELEMENTARY SCHOOL Ixonia Elementary is getting ready for the start of the new school year! Interior cleaning and classroom

More information

BID INFORMATION LIST Crossroads East N. Scottsdale Road, #105 Scottsdale, AZ Rev

BID INFORMATION LIST Crossroads East N. Scottsdale Road, #105 Scottsdale, AZ Rev BID INFORMATION LIST Crossroads East 18511 N. Scottsdale Road, #105 Scottsdale, AZ 85255 Rev.1 12-20-17 SITE CONTACTS: LANDLORD CONSTRUCTION CONTACT Diversified Partners Kevin Gantner Office - (480) 947-8800

More information

DMTF: Specific Building Recommendations

DMTF: Specific Building Recommendations DMTF: Specific Building Recommendations Asset Name Project Title Total Cost BLOCKER BUILDING 22,503,303 Capital Renewal 7,640,013 DOMESTIC WATER HEATER REPLACEMENT 16,374 EXTERIOR DOOR REPLACEMENT 133,623

More information

City of Kearney Capital Improvement Update October 1, TH STREET AND 17TH AVENUE IMPROVEMENTS

City of Kearney Capital Improvement Update October 1, TH STREET AND 17TH AVENUE IMPROVEMENTS 56TH STREET AND 17TH AVENUE IMPROVEMENTS FUNDING: Bonded ESTIMATED COST: $3,885,000 COMPLETION DATE: Fall 2018 SCOPE OF PROJECT: Widening of 56th Street from 6th Avenue to 19th Avenue, and widening 17th

More information

George B Swift Elementary Specialty School

George B Swift Elementary Specialty School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

AN ORDINANCE TO AMEND CHAPTER 7-BUILDING REGULATIONS, ARTICLE 1-UNIFORM CONSTRUCTION CODE, SECTION 7-2 -FEES TO ESTABLISH A NEW FEE SCHEDULE

AN ORDINANCE TO AMEND CHAPTER 7-BUILDING REGULATIONS, ARTICLE 1-UNIFORM CONSTRUCTION CODE, SECTION 7-2 -FEES TO ESTABLISH A NEW FEE SCHEDULE 1. BUILDING FEES: 1 AN ORDINANCE TO AMEND CHAPTER 7-BUILDING REGULATIONS, ARTICLE 1-UNIFORM CONSTRUCTION CODE, SECTION 7-2 -FEES TO ESTABLISH A NEW FEE SCHEDULE ESTABLISHMENT OF FEES PURSUANT TO N.J.A.C.

More information

HMC ARCHITECTS 2495 Natomas Park Drive, Studio 100 Sacramento, California ADDENDUM NO. 3

HMC ARCHITECTS 2495 Natomas Park Drive, Studio 100 Sacramento, California ADDENDUM NO. 3 HMC ARCHITECTS 2495 Natomas Park Drive, Studio 100 Sacramento, California 95833 September 15, 2016 Woodland Joint Unified School District Spring Lake Area Elementary School HMC No. 3535003.000 DSA Appl.

More information

Mechanical Inspection Plumbing

Mechanical Inspection Plumbing 0811 Fixtures Sinks, drinking fountains, water closets, showers, etc. Classroom Sinks. Classroom sinks (19) are enameled cast iron self rimming side ledge with gooseneck faucet trim with index handles,

More information

Greenwood Elementary School 5550 South Holly Street Greenwood Village, Colorado 80111

Greenwood Elementary School 5550 South Holly Street Greenwood Village, Colorado 80111 Greenwood Elementary School 5550 South Holly Street Greenwood Village, Colorado 80111 Year Opened 1958 Current Square Footage 50,504 Site Acreage 8.53 greenwood.cherrycreekschools.org $220,720 Electrical

More information

TIFT COUNTY SCHOOLS E-SPLOST HISTORY

TIFT COUNTY SCHOOLS E-SPLOST HISTORY TIFT COUNTY SCHOOLS E-SPLOST HISTORY July 1, 1997 June 30, 2002 $28,766,187.16 collected July 1, 2002 June 30, 2007 $39,025,830.10 collected July 1, 2007 June 30, 2012 $41,886,155.46 collected July 1,

More information

SECTION : FIRE PROTECTION SYSTEMS

SECTION : FIRE PROTECTION SYSTEMS SECTION 21 00 10: FIRE PROTECTION SYSTEMS 1. GENERAL A. This section applies to the design and performance information for fire protection and suppression systems. B. All fire protection materials and

More information

Paradise Marketplace REAR FRONT. Unit # AOH +/- 1,700 SF +/- 20' +/- 85' +/- 85' +/- 20' MAIN FLOOR +/- 20' +/- 85' Width. Depth

Paradise Marketplace REAR FRONT. Unit # AOH +/- 1,700 SF +/- 20' +/- 85' +/- 85' +/- 20' MAIN FLOOR +/- 20' +/- 85' Width. Depth Electrical Information Breaker Panel 1: Service Type: 120/208 Panel Type: Type 1 Panel Number: 383-21 Manufacturer: Challenger Amps: 200 Location: Near Exit Door of Main Space Notes: Breaker Panel 2: Service

More information

2 Main Office Building BLDG-955A Building Purpose Building Area Administration offices. Training room 7,610 SF Inspection Date August 16, 2016 Inspect

2 Main Office Building BLDG-955A Building Purpose Building Area Administration offices. Training room 7,610 SF Inspection Date August 16, 2016 Inspect 1 Site Summary Address 7200 Bluff Springs Road Austin, TX 78744 Number of Permanent Campus Facilities 2 Original Year of Construction 2014 Total Campus Building Area (combined) 25,314 SF Introduction The

More information

Facilities Procedure for Accessibility or Compliance Related Requests:

Facilities Procedure for Accessibility or Compliance Related Requests: Facilities Procedure for Accessibility or Compliance Related Requests: All doorways, entry ways, equipment height, etc. will be checked to ensure compliance with the Americans with Disabilities Act (ADA)

More information