1 GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT BUILDING ASSESSMENT REPORT FIRE FOR 75 Fox Street Building OCTOBER 2014
2 Report for Department of Infrastructure Development Fire Services Preliminary Report: 75 Fox Street October 2014 Table of Contents 1. INTRODUCTION Design Criteria and Specifications Scope of the Services Scheme Report PROJECT SUMMARY FIRE SYSTEMS Fire Water System Details Sprinkler System Details Gas Suppression System Details Smoke Ventilation Details Means of Escape Details Structure and Compartmentation Details Recommendation... 9 i P a g e
3 1. INTRODUCTION The 75 Fox Street building is located at cnr. Fox and Sauer Streets, Johannesburg, Gauteng (see Locality Map). Figure 1: Locality Map The project brief, as issued by Gauteng Funding Agency (GFA), was to conduct an initial assessment of the building fire infrastructure and systems of 75 Fox Street building, and to provide recommendations regarding the repairs and renovations of the building. 1.1 Design Criteria and Specifications This project will be implemented in compliance with all the requirements of the National Building Regulations and the new SANS10400, with specific focus on Part T of the regulations. The entire assessment shall be carried out in accordance with relevant SANS codes applicable for the facility: SANS T, The application of the National Building Regulations Part T: Fire Protection SANS D, The application of the National Building Regulations Part D: Public safety. SANS M, The application of the National Building Regulations Part M: Stairways. SANS W, The application of the national building regulations Part W: Fire Installation SANS 543, Fire Hose Reels SANS , Symbolic safety signs Part 1: Standard signs and General requirements SANS , The use and control of fire-fighting equipment Part 1: Portable and wheeled (mobile) fire extinguishers. SANS 1910, Portable refillable fire extinguishers SANS 10287, Automatic sprinkler installations for fire-fighting purposes 1
4 1.2 Scope of the Services Scheme Report This report deals with the fire services to be implemented based on the existing systems and proposed architectural changes to the building, this is photographic assessment only. 2. PROJECT SUMMARY 2.1 Project Description 75 Fox Street is an existing building and is comprised of three (3) basement levels, ground floor with reception, nine (9) upper floors and a roof service level. The 75 Fox Street building is a total of 49, 510m 2. The building is currently occupied and the majority of the Fire systems are active and maintained. 3. FIRE SYSTEMS 3.1 Fire Water System Details The existing fire water system is operational and has been recently serviced. Existing hose reels and hydrants are installed within cupboards with fire extinguishers in all areas of the building, figure 1. Figure 1 - Existing Equipment and Signage Figure 2 Servicing The existing fire extinguishers are hung in positions depending on the risk and are specified according to the fire load, figure 3. They are suitable for use. There is existing statutory signage installed and does meet the SANS requirements for photoluminescence, figure 4. 2
5 Figure 3 Plant Room Hydrant Figure 4 Statutory Signage The fire extinguishers and fire hose reel have been removed from the basement level 1 electrical areas, figure 5. There is an existing combined domestic and fire water tank on the roof. The combined capacity is 54m 3 of which the lower third (18m 3 ) is dedicated fire water storage that is adequate storage capacity for fire hose reel purposes only, figure 6. Figure 5 Removed Hose Reel Figure 6 Existing combined Water Tanks 3.2 Sprinkler System There is an existing sprinkler system in the entire 75 Fox building. The main sprinkler control valves are situated in basement level 1 adjacent to the vehicle ramp into the basements with the booster connections at street level Details Sprinkler control valves are operational, figure 7. The installation is fitted with a small false alarm prevention pump. The sprinkler valves serve the following areas: Valve 1 1 st, 2 nd and 3 rd floors Valve 2 8 th and 9 th floors Valve 3 7 th floor Valve4 4 th, 5 th and 6 th floors Valve 5 basements 1, 2, 3 and ground floor Valve 6 1 st to 9 th floor lift lobbies The sprinkler system was recently serviced in 2014, figure 8. 3
6 Figure 7 - Sprinkler ICVs Figure 8 - Sprinkler Servicing Some sprinkler spares are still in the spares cabinet but are old, figure 9. It is recommended that a sample of all sprinkler heads be tested to confirm they are still operational. The heads used for testing must be replaced with new sprinkler heads. This will apply to all types of sprinkler heads used within the building. The existing sprinkler system on the office floors is reticulated within the floor voids with vertical droppers through the slabs to the sprinkler heads, figure 10. Currently the majority of the sprinkler heads are positioned within regulation but will require repositioning should partition changes be made within the building to meet statutory requirements. If this is required the existing slab opening will require closing and the coring of new penetrations through the slabs Figure 9 - Sprinkler Spares Figure 10 Underfloor Sprinkler Range Pipes Sprinklers are positioned centrally within coffers within the coffer slab areas with some droppers being extended to accommodate false ceilings, figure 11. The basement sprinkler heads are of fusible link type, figure 12. It is recommended that all these heads be replaced with suitable new sprinkler heads to ensure suitable operation. The current sprinkler installation is supplied by the municipal water connection. A water flow test will need to be conducted to test whether the existing water supply is adequate for the sprinkler system for a nine (9) storey building such as this. Should the supply not be adequate, a new pump and water tank supply will need to be installed to meet statutory requirements. 4
7 Figure 11 Coffer Slab Sprinkler Heads Figure 12 Basement Sprinkler Heads 3.3 Gas Suppression System There is an existing FM200 gas suppression system in the server rooms of the 75 Fox building. The system has a stand-alone smoke detection system that initiates the system in event of fire Details The data centre on 6 th floor is protected with FM200 gas suppression, cylinders are piped into the floor voids and room space, figure 13. Each room within the data centre is similarly protected. The system was last serviced in 2011, figure 14. Figure 13 FM200 Cylinders Figure 14 FM200 Servicing The gas suppression cylinders are within operational pressure levels, figure 15. The gas cylinders were filled in 2001, figure 16. 5
8 Figure 15 FM200 Pressure Figure 16 FM200 Manufacturing Data The dividing walls between the data centre rooms are fire rated and extend from slab to slab to ensure independent gas suppression compartments as per regulations. 3.4 Smoke Ventilation Details There is an existing basement smoke ventilation system installed. HVAC engineer to comment and ensure operation, figure 17. The office levels are ventilated through openable windows. Figure 17 Basement Level Ventilation Figure 18 Staircase Pressurization Emergency escape routes are fitted with stairwell pressurization systems at the top of the stairs, figure 18, 19. The mechanical engineer must confirm that the system is operational and meets the requirements of the standards for smoke ventilation. 6
9 Figure 19 - Staircase Ventilation Figure 20 - Atrium All levels of the building are connected with a central atrium, figure 20. Smoke ventilation from this atrium was not found, the atrium requires either mechanical smoke extraction or natural ventilation at the highest points in the area. 3.5 Means of Escape The 75 Fox Street building is currently served by five main fire escapes that link all floors of the building Details The final exit door to street level from the western staircase has a security gate installed stopping its use, figure 21. This is illegal and blocks the escape route from the building. This must be removed. Temporary evacuations signs have been put up in the western staircase that conflict with the existing fire signage, figure 22, and direct escape into the parking basement and not to outside the building. These must be removed and escape must be directed to the final escape door to street level, figure 21. Figure 21 Northern Escape Door Gate Figure 22 Internal Western Staircase 7
10 Existing emergency directional signage is installed and is suitable for use, figure 23. Hand railings are on a single side of the stairs only, figure 24, current regulations require handrails on both sides. Figure 23 Ground Floor Escape Door Figure 24 Eastern Internal Staircase The second eastern fire escape is an external staircase within a courtyard that exits on ground level, figure 25. It must be ensured that discharge from this stair is directly to outside the building. The escape doors into the staircase are fitted with redlam bolt type locking devices, figure 26. These are suitable for emergency use. Figure 25 - Eastern External Staircase Figure 26 Escape Door Redlam Bolt The number of escape routes are adequate for a population of a standard office building based on the time of construction. 3.6 Structure and Compartmentation The 75 Fox building is of concrete structure with brick internal structure. There are numerous vertical shafts and service penetrations between floors Details Fire sealing of services through firewalls is of good quality, figure 27. Should further services be pulled through these openings they will need to be resealed. Fire sealing of services in vertical service shafts is of good quality, figure 28. Should further services be pulled through these openings they will need to be resealed. 8
11 Figure 27 Basement Fire Sealing Figure 28 - Vertical Slab Penetration Seals Smoke baffles have been installed in the floor voids as per regulation, figure 29. All services that pass through the baffles have been smoke sealed, should further services be pulled through these openings they will need to be resealed. Figure 29 Underfloor Smoke Baffles and Cable Seals 4 Recommendation The critical remedial work required to meet the minimum national fire standard is recommended and a high level budgetary cost for the remedial work is presented. Complete ground floor fire hose reel, fire hydrant and fire extinguishers installation as per SANS T/W. Test portion of sprinkler heads for compliance. Replace all heads if no longer suitable for application. Reinstate sprinkler spares cabinet and replace missing spares. Revise sprinkler layouts to suit any proposed changes to partitioning. Test domestic water supply for suitability for sprinkler system. Install new pump and tank system if required. Ensure basement and staircase smoke ventilation systems are operational Address atrium ventilation, install smoke extraction or actuated natural ventilation at roof level. Remove all security gates in escape routes. Install second hand rail within all stairwells as per SANS S. Ensure final escape from staircases is directly to outside the building. All vertical penetrations to be fire sealed Service all gas suppression equipment. 9
GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT
GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT BUILDING ASSESSMENT REPORT FIRE FOR LIBRARY HOTEL OCTOBER 2014 Report for Department of Infrastructure Development Fire Services Preliminary Report: Library
More informationGAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT
GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT BUILDING ASSESSMENT REPORT FIRE FOR 69 PRESIDENT SEPTEMBER 2014 Report for Department of Infrastructure Development Fire Services Preliminary Report: 69
More informationGAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT
GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT BUILDING ASSESSMENT REPORT VERTICAL TRANSPORT FOR ABSA BUILDING OCTOBER 2014 Report for Gauteng Department of Infrastructure Development Vertical Transport
More informationTHE REGULATORY REFORM (FIRE SAFETY) ORDER 2005 FIRE RISK ASSESSMENT NO 68 (ENGLISH AND PHILOSOPHY)
FIRE RISK ASSESSMENT NO 68 (ENGLISH AND PHILOSOPHY) BUILDING SUMMARY The building was constructed in Victorian times and is constructed of brick with knapped flint in fill on some outer walls. The building
More informationTHE REGULATORY REFORM (FIRE SAFETY) ORDER 2005 FIRE RISK ASSESSMENT NEW BUILDINGS
FIRE RISK ASSESSMENT NEW BUILDINGS BUILDING SUMMARY The building is utilised for classroom teaching for Modern Languages. 1. Identification of the hazards 1.1 Identification of sources of fuel. Timber
More informationSCHEDULE. Essential Safety Measures taken from Schedule 9 of the Building Regulations PART 1 BUILDING FIRE INTEGRITY
SCHEDULE Essential s taken from Schedule 9 of the Building Regulations 2006 43 PART 1 BUILDING FIRE INTEGRITY 1 Building elements required to satisfy prescribed fire-resistance levels 2 Materials and assemblies
More informationTHE REGULATORY REFORM (FIRE SAFETY) ORDER 2005 FIRE RISK ASSESSMENT SPORTS CENTRE
FIRE RISK ASSESSMENT SPORTS CENTRE BUILDING SUMMARY The building is used as a Sports Centre and contains a large sports hall with changing rooms, an office for staff and a fitness area. 1. Identification
More informationTHE REGULATORY REFORM (FIRE SAFETY) ORDER 2005 FIRE RISK ASSESSMENT HORSEFAIR HOUSE
FIRE RISK ASSESSMENT HORSEFAIR HOUSE BUILDING SUMMARY The building is utilised for the teaching of Science and contains Laboratories and Chemical storage. 1. Identification of the hazards 1.1 Identification
More informationUCL PRINCIPAL CONTRACTOR SITE FIRE SAFETY RISK REVIEW & MITIGATION MEASURES
Mandatory Fire Safety Instruction UCL PRINCIPAL CONTRACTOR SITE FIRE SAFETY RISK REVIEW & MITIGATION MEASURES Principal Contractor fire safety considerations in shared occupancy project or refurbishments
More informationCertification Assessment Instrument and Guidelines
Certification Instrument Full compliance with BCA 96 will ensure passing 19 for Section 1 Do not need 100 to pass 1 SECTION 1 SAFETY (25 POINTS) Residential Fire Sprinkler System Not required to pass Section
More informationMAINTENANCE OF ESSENTIAL SAFETY MEASURES EXPLAINED (Building Regulations 2006)
MAINTENANCE OF ESSENTIAL SAFETY MEASURES EXPLAINED (Building Regulations 2006) 1. INTRODUCTION 1.1 Essential Safety Measures Defined Essential Safety Measures (previously called essential services) are
More informationFIRE RISK ASSESSMENT NOT KNOWN 15/10/ SOMERTON COURT BROADMOSS DRIVE SIMON ROFFEY
UPRN Date of inspection Address 1 (flat numbers) Address 2 (street) Address 3 (area) Fire Risk Assessor Checked by Approved by Postcode Does the building have common areas? Was access available to the
More informationBUILDING ASSESSMENT REPORT ELECTRICAL SERVICES FOR 75 FOX STREET BUILDING
GAUTENG DEPARTMENT OF INFRASTRUCTURE DEVELOPMENT BUILDING ASSESSMENT REPORT ELECTRICAL SERVICES FOR 75 FOX STREET BUILDING September 2014 Contents 1. INTRODUCTION... 3 1.1. Design Criteria and Specification...
More informationSURREY FIRE SERVICE. Construction Fire Safety Plan Bulletin
SURREY FIRE SERVICE Construction Fire Safety Plan Bulletin The B.C. Fire Code requires building owners/contractors to comply with the requirements of the BC Fire Code 5.6 Construction and Demolition Sites
More information- CONSTRUCTION FIRE SAFETY STANDARDS
SGG15 - CONSTRUCTION FIRE SAFETY STANDARDS 1) Construction Planning All construction sites shall plan and sequence their construction activities to ensure the early installation and operation of permanent
More informationFire Risk Assessment
Fire Risk Assessment Maritime Studios Pendennis Rise Falmouth TR11 4FB Carried out by: Date: October 2015 Review Date: October 2016 Les Carter CMIOSH Health & Safety Consultant Mobile 07831 636751, Email
More informationFIRE SAFETY INSPECTION REPORT
FIRE SAFETY INSPECTION REPORT DANNY'S KNITWEAR LTD. ACCORD ID: 12228 SURABARI, GAZIPUR, SADAR, GAZIPUR Other Factories: ne October 17, 2015 Page 2 Fire Safety Inspection Report Introduction manufacturing
More informationBUILDING FIRE STRATEGY (Operational & Fire Engineering Information)
Safety Services Fire Safety Fire Strategy for: 132 Hampstead Road (317) UNIVERSITY COLLEGE LONDON BUILDING FIRE STRATEGY (Operational & Fire Engineering Information) Regulatory Reform (Fire Safety) Order
More informationEnclosure 4- RISK ASSESSMENT
Enclosure 4- RISK ASSESSMENT RISK ASSESSMENT Risk is a potential that a chosen action or activity will lead to a loss of human or property. Risk assessment is a step for Risk Management. Risk assessment
More informationSAFETY. USE OF SAFETY CHECK LISTS A safety check for compliance with current regulations should be performed yearly.
SAFETY GENERAL Buildings must be designed according to building and fire safety codes and other regulatory standards at the time of construction. However, such codes and standards are continuously changing.
More informationFIRE INSPECTORS GUIDELINES FOR PLAN REVIEWS AND INSPECTIONS OF NEW CONSTRUCTION / ADDITIONS AND CHANGE OF OCCUPANCY
FIRE INSPECTORS GUIDELINES FOR PLAN REVIEWS AND INSPECTIONS OF NEW CONSTRUCTION / ADDITIONS AND CHANGE OF OCCUPANCY PLAN REVIEWS SITE PLANS: 1) Access to buildings (Volume V NC Building Code sections 602.6.1
More informationFIRE SAFETY INSPECTION REPORT
FIRE SAFETY INSPECTION REPORT MAHID APPAREL LTD ACCORD ID: 11956 NOWPARA, MADHABDI, NARSINGDI, DHAKA-1604 OTHER FACTORIES: NONE February 20, 2015 Page 2 SUMMARY was surveyed for fire safety on 2/20/2015
More informationSome Important Aspects of Fire Safety Regulations about High Rise Buildings
Some Important Aspects of Fire Safety Regulations about High Rise Buildings Tokyo University of Science Prof. Kyoichi Kobayashi (Dr. of Engineering) Many high rise buildings are being built with awful
More informationINITIAL FIRE SAFETY ASSESSMENT
INITIAL FIRE SAFETY ASSESSMENT Factory Plot No -246-249, Adamjee EPZ, Siddhirganj, Narayanganj Narayanganj 17 Jul 2016 The Alliance for Bangladesh Worker Safety Page 1/17 Factory 17 Jul 2016 Introduction
More information8.1. Fire and Heritage. The maintenance series. Information sheet. Guidelines on Fire Safety in Heritage Buildings
The maintenance series Information sheet 8.1 Fire and Heritage Destruction of the Prince of Wales Theatre by fire on 3 October 1860. It was situated at the corner of King and Castlereagh Streets, Sydney.
More informationTYPE 1 FIRE RISK ASSESSMENT REVIEW (NO DESTRUCTIVE AUDIT)
TYPE 1 FIRE RISK ASSESSMENT REVIEW (NO DESTRUCTIVE AUDIT) BRECON TOWERS BLACKBERRY LANE STOCKPORT SK5 8JW Date of this risk assessment review: 4th July 2017 Date of last risk assessment review: 8th May
More informationDesign Guidelines Fire Safety in New and Refurbished Buildings
Design Guidelines Fire Safety in New and Refurbished Buildings Introduction All major new or refurbishment projects must comply with the Technical Standards (Scotland) Regulations as a matter of course.
More informationINITIAL FIRE SAFETY ASSESSMENT
INITIAL FIRE SAFETY ASSESSMENT Factory Assessor: 180, Baizid Bostami Road Nasirabad I/A Area-1, Building -1, Chittagong Chittagong Chittagong Bangladesh Emkay Enterprises 31 Jan 2015 The Alliance for Bangladesh
More informationElement C3.5 Means of Escape
.5 Means of Escape RRFSO Article 14 Legal Factors Responsible person must ensure routes to emergency exits and exits themselves are kept clear at all times Exits must directly lead to place of safety Safe
More informationINITIAL FIRE ASSESSMENT REPORT (FAR)
INITIAL FIRE ASSESSMENT REPORT (FAR) Factory SQ Station, Plot # 221-223, Jamirdia, Valuka, Mymensingh Mymensingh 17 Jun 2014 The Alliance for Bangladesh Worker Safety Page 1/17 Factory 17 Jun 2014 Introduction
More informationUnit 2 Fire Safety (Zone 1)
IFE Level 3 Diploma in Fire Safety and Fire Science Unit 2 Fire Safety (Zone 1) Examiner Report March 2018 Introduction 42% of candidates attained a Pass. Half of the candidates that attained a Pass secured
More informationFIRE RISK ASSESSMENT
FIRE RISK ASSESSMENT Full Property Name: St Augustine s Catholic Voluntary Academy Full Property Address: Opposite 93 PE9 1SR Date of Fire Risk Assessment: 6 th June 2017 Name of Fire Risk Assessor: Peter
More information- CONSTRUCTION FIRE SAFETY STANDARDS
SGG15 - CONSTRUCTION FIRE SAFETY STANDARDS 1) Hot Work Permits All construction sites shall implement a system of Hot Work Permits for all work activities that generate heat, sparks or flames. All of the
More informationFire precautions in dwellings
NORWICH City Council Fire precautions in dwellings Private sector housing Providing homes building communities Version 2 Published by Norwich City Council June 2010 Contents Page Introduction 1 2 Types
More informationFIRE RISK ASSESSMENT
FIRE RISK ASSESSMENT Fire Precautions (Workplace) Regulations Before beginning the risk assessment, check to see if your workplace has a Fire Certificate. If the workplace does have a Fire Certificate,
More informationINITIAL FIRE SAFETY ASSESSMENT - EXPANSION
INITIAL FIRE SAFETY ASSESSMENT - EXPANSION Factory Plot 47-52 & 68-73, KEPZ North Patenga Chittagong Chittagong 06 Mar 2017 The Alliance for Bangladesh Worker Safety Page 1/23 06 Mar 2017 Introduction
More informationSteven Craft, PhD, P.Eng. FIRE SAFETY DURING THE COURSE OF CONSTRUCTION
Steven Craft, PhD, P.Eng. FIRE SAFETY DURING THE COURSE OF CONSTRUCTION Mid-Rise Workshop, Coast Plaza Inn, Calgary, Feb. 4 th, 2016 Outline Overview of risks Regulations Changes to 2015 NFC for mid-rise
More informationFIRE PROTECTION SYSTEMS IN BURJ KHALIFA. By NAFFCO Fire Protection
FIRE PROTECTION SYSTEMS IN BURJ KHALIFA By NAFFCO Fire Protection 8 September 2015 Company Introduction NAFFCO ( National Fire Fighting Manufacturing FZCO ) an ISO 9001:2008 certified company with its
More informationFIRE SAFETY INSPECTION REPORT
FIRE SAFETY INSPECTION REPORT PORTLAND TEXTILE LTD. ACCORD ID: 11873 PLOT NO. 14-15, SECTOR 6, CHITTAGONG EXPORT PROCESSING ZONE, CHITTAGONG OTHER FACTORIES: NONE November 3, 2015 Page 2 SUMMARY was surveyed
More informationFIRE SAFETY INSPECTION REPORT
FIRE SAFETY INSPECTION REPORT BEQ KNIT LTD. ZIRABO, ASHULIA, SAVAR, DHAKA Other Factories: Beq Sweaters Ltd., Tammam Design Ltd. April 22, 2014 Page 2 Fire Safety Inspection Report Introduction manufacturing
More informationfire risk assessment For use by landlords of small premises Premises Address
fire risk assessment For use by landlords of small premises Premises Address FIRE RISK ASSESSMENT for use by landlords of small premises Person having control of the premises: Name of landlord (if different):
More informationWhere EXCESSIVE reduce the number of ignition sources such as: ACTIONS TAKEN/TO BE TAKEN:-*
Snowtraxx International General Hotel Risk Assessments 2015/16 Version Date: Hotel: Resort: Staff Name: Fire Prevention Where EXCESSIVE reduce the number of ignition sources such as: by the outbreak of
More informationSTATE OF MARYLAND DEPARTMENT OF STATE POLICE OFFICE OF THE STATE FIRE MARSHAL
STATE OF MARYLAND DEPARTMENT OF STATE POLICE OFFICE OF THE STATE FIRE MARSHAL Larry Hogan Governor Boyd K. Rutherford Lt. Governor 1201 Reisterstown Road Pikesville, MD 21208 410-653-8980 Fax 410-653-8988
More informationEQUIVALENT INITIAL FIRE SAFETY ASSESSMENT
EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT Factory Name: 4 YOU CLOTHING LTD 367/1 Senpara Parbata, Mirpur-10, Dhaka Dhaka Dhaka Bangladesh 27 May 2014 The Alliance for Bangladesh Worker Safety Page 1/20
More informationFollowing are the systems proposed as per NBC & Local Fire Authority:
1. OBJECTIVES AND STRATEGIES OF THE FIRE PROTECTION DESIGN This report describes the design parameters, system requirements of fire protection system for mixed occupancy (Assembly + Business) building
More informationFire Risk Assessment 2017
Fire Risk Assessment 2017 Westmorland House Windermere School Author Paul Brownless Date 11 April 2017 Revised Revised by 04/12/2017 Richard Hennah Reference FRA_WSWH_11042017 1 AUTHOR CLIENT Paul Brownless
More informationProcedure DESCRIPTION/OVERVIEW
Applies To: UNMH Responsible Department: Life Safety Revised: 07.08.16 Procedure Patient Age Group: (X ) N/A ( ) All Ages ( ) Newborns ( ) Pediatric ( ) Adult DESCRIPTION/OVERVIEW To assure the safety
More informationKensington Aldridge Academy, London W10
Kensington Aldridge Academy, London W10 Fire Safety Review Job Number: 1103 June 2018 FIRE SAFETY REVIEW CONTENTS EXECUTIVE SUMMARY 1.0 INTRODUCTION 2.0 FIRE SAFETY REQUIREMENTS 3.0 EXTERNAL WALL SPECIFICATION
More informationWelcome to the AccessibilityOnline Webinar Series. Listening to the Webinar. Listening to the Webinar, continued
Welcome to the Webinar Series A collaborative program between the ADA National Network and the U.S. Access Board The Session is Scheduled to begin at 2:30pm Eastern Time We will be testing sound quality
More informationCase Study 1 Underground Car Park
Case Study 1 Underground Car Park Dorota Brzezińska 1, Janusz Paliszek 2, Piotr Smardz 2, Renata Ollesz 1, Karol Kaczor 2 1 Lodz University of Technology, GRID - Lodz, 2 INBEPO Wroclaw, Poland Building
More informationINITIAL FIRE SAFETY ASSESSMENT
INITIAL FIRE SAFETY ASSESSMENT Factory Name: Assessor: Anzir Apparels Limited, Unit-1 Karim supermarket, Baipal, Baipal, Savar Savar Dhaka Bangladesh Emkay Enterprises 30 Apr 2014 The Alliance for Bangladesh
More informationINITIAL FIRE SAFETY ASSESSMENT
INITIAL FIRE SAFETY ASSESSMENT Factory Assessor: Plot no. A102, BSCIC Industrial Estate, Tongi, Gazipur Tongi, Gazipur Emkay Enterprises 06 Jul 2014 The Alliance for Bangladesh Worker Safety Page 1/22
More informationCURTIN UNIVERSITY PROJECT DELIVERY GUIDELINES
CURTIN UNIVERSITY PROJECT DELIVERY GUIDELINES EMERGENCY MANAGEMENT DESIGN GUIDELINES 000331 Details of revisions Level Details Date Initial 1 Document created from 20150513NewBuildsAndRedevelopments.docx
More informationCHAPTER 7 ALTERATIONS LEVEL
CHAPTER 7 ALTERATIONS LEVEL 2 SECTION 701 GENERAL 701.1 Scope. Level 2 alterations as described in Section 404 shall comply with the requirements of this chapter. Exception: Buildings in which the reconfiguration
More informationEQUIVALENT INITIAL FIRE SAFETY ASSESSMENT
EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT Factory Plot # 33-36 Sector # 07, Chittagong Chittagong Chittagong 08 Jun 2014 The Alliance for Worker Safety Page 1/18 08 Jun 2014 Introduction to the Report
More informationFire Risk Management in Sheltered Housing
Fire Risk Management in Sheltered Housing Paul Lane 22 March 2017 making the difference Fire Risk Management in Sheltered Housing Paul Lane 22 March 2017 making the difference Agenda What is Sheltered
More information150 Elgin - Office Tower and Grant House Renovations
APPLICATION OF THE ONTARIO BUILDING CODE 150 Elgin - Office Tower and Grant House Renovations 150 Elgin Street Ottawa, Ontario Presented to: Mr. Brandon Donnelly Morguard Investments Limited c/o Mr. Harry
More informationAPPLICATION FOR FIRE CERTIFICATE / FIRE CLEARANCE UNDER THE MAURITIUS FIRE AND RESCUE SERVICE ACT 2013 OFFICE USE ONLY
Mauritius Fire and Rescue Service 14, Deschartres Street, Port Louis. Tel No: 2113580; Fax: 2113258 Email: mfrs_headoffice@govmu.org FSD Form 1 File No. Date received: Received by: Signature: APPLICATION
More informationTechnical write-up on Fire safety services
1. General: Technical write-up on Fire safety services Nitesh Santa Clara, proposed development is a residential apartment with multiple blocks. Document briefs on fire safety systems envisaged for the
More informationREGULATORY REFORM (FIRE SAFETY) ORDER 2005 FIRE RISK ASSESSMENT
OVERALL COLOUR ACTION CODE RISK AMBER STATUTORY INSTRUMENT 2005:1541 REGULATORY REFORM (FIRE SAFETY) ORDER 2005 FIRE RISK ASSESSMENT Address of Premises: Thuurock CCG, Civic Offices New Road Grays Responsible
More information1970s building housing main school reception and support offices. Well managed buildings with no significant risk of a fire occurring.
Record of significant findings Risk assessment for : Assessment undertaken by : 71a The Close Nigel Billing CMIOSH Date: 21/3/17 Overview of Premises: 1970s building housing main school reception and support
More informationLYHA Fire Safety Policy
LYHA Fire Safety Policy Introduction This Fire Safety Policy shows our approach to Fire Safety in the work place and in our homes. It identifies our approach to Fire Safety in: The workplace Flats with
More informationWelcome to the AccessibilityOnline Webinar Series. Listening to the Webinar
Welcome to the Webinar Series A collaborative program between the ADA National Network and the U.S. Access Board The Session is Scheduled to begin at 2:30pm Eastern Time We will be testing sound quality
More informationFIRE SAFETY INSPECTION REPORT
FIRE SAFETY INSPECTION REPORT MULTIFABS LTD KASHIMPUR, NAYAPARA Other Factories: ne April 9, 2014 Page 2 Fire Safety Inspection Report Introduction manufacturing complex was surveyed for fire safety on
More informationTechnical Seminar on the Code of Practice for Fire Safety in Buildings 2011
Technical Seminar on the Code of Practice for Fire Safety in Buildings 2011 The Code of Practice for Fire Safety in Buildings 2011 The FS Code comprises 7 parts and 1 annex: Part A Introduction Part B
More informationReviewed: DD Month Emergency Evacuation of People with a Disability Options Matrix for Developing a PEEP
Safety Office Reviewed: 17 July 2012 Reviewed: DD Month Emergency Evacuation of People with a Disability Options Matrix for Developing a PEEP The following matrix includes most disability types and recommends
More informationINITIAL FIRE SAFETY ASSESSMENT
INITIAL FIRE SAFETY ASSESSMENT Dhanpur, Chapapur, Kotwali, Comilla COMILLA Chittagong The Alliance for Worker Safety Page 1/16 Introduction to the Report The following report contains a site profile and
More informationCHAPTER 8: RISK ASSESSMENT & EMERGENCY PREPAREDNESS PLAN
CHAPTER 8: RISK ASSESSMENT & EMERGENCY PREPAREDNESS PLAN RISK ASSESSMENT The phases of an emergency includes: 1. Risk assessment 2. Mitigation 3. Preparedness 4. Response 5. Recovery Areas of Risk includes:
More informationFIRE SAFETY UPGRADING CONSIDERATIONS for EXISTING SENIOR CITIZEN LODGES
FIRE SAFETY UPGRADING CONSIDERATIONS for EXISTING SENIOR CITIZEN LODGES 1. The major objective is to provide an acceptable degree of life safety from fire in existing senior citizen lodges. This document
More informationFirefighting operations on multi-tiered vehicle stacking buildings F5-13 GD
DESIGNER S GUIDE Firefighting operations on multi-tiered vehicle stacking buildings F5-13 GD Introduction When to use Scope Use this chapter to provide a consistent Fire and Emergency New Zealand position
More informationWell managed building mean risk is normal. Fire action notices should be displayed by all alarm break glass call points.
Record of significant findings Risk assessment for : Assessment undertaken by : Horsefair House Nigel Billing CMIOSH Date: 28/3/17 Overview of Premises: 2 buildings on 3 stories in an L shaped configuration,
More informationFor additional information regarding R-3.1 residential care facilities please contact (951)
Riverside County Fire Department Fire/Life Safety Inspection Division Riverside Office: 2300 Market St., Ste. 150, Riverside, CA 92501 Ph. (951) 955-4823 Fax (951) 955-4886 Palm Desert Office: 77-933 Las
More informationFire Safety in Communal Areas Policy
Fire Safety in Communal Areas Policy Date approved by senior management team 27 th July 2017 Board of Management / Committee name Board of Management Approval date 2 nd October 2017 Implementation date
More informationDesign of Fire safety in Multi Occupancy Residential Accommodation
Design of Fire safety in Multi Occupancy Residential Accommodation Myth vs Reality Myth. Fire is bright Reality. It isn t. Flames are bright Outside fires have bright flames because of the availability
More informationBOABC Level III Exams 7, 8, 9 and 10 Beginning April 1, 2015
Exam ID Examination Code Part BOABC Level III Exams 7, 8, 9 and 10 Beginning April 1, 2015 BC3-7 Level III Exam 7 BCBC Part 3 (Part 3 Buildings Classification & Construction) BC3-8 Level III Exam 8 BCBC
More informationNirmal Chandra Sinha. Supposed to complete(dd/ MM/YYYY) Comments after Physical Inspection
Factory Name Address Fire Safety Follow up INTIMATE APPARELS LTD Karnaphuli EPZ, Plot no. 91-93, rth Patenga Date 05/20/2014 Date Report Received 11-August/15 Date of 1 st Follow-up 08-vember/15 Date of
More informationFIRE AND SECURITY CONSULTING SERVICES
FIRE AND SECURITY CONSULTING SERVICES http://fscs-techtalk.com 17 McKenna Court NOOSAVILLE QUEENSLAND, 4566 AUSTRALIA Phone: +61 (0)7 5455 5148, Mobile: 0409 399 190, Email: rafoster@bigpond.net.au MISCELLANEOUS
More informationFire Safety Policy. Billy Hanafin H & S and Operations Officer. Fife Cultural Trust. Version 1.0 October 2013 Page 1
Billy Hanafin H & S and Operations Officer Version 1.0 October 2013 Page 1 1. General The Trust is a responsible employer that takes its Fire Safety duties seriously. For that reason, this policy has been
More informationBlue Whirl Building. General Fire Safety Checklist. conducted for. Location 1029 McLean Ave, Dallas, TX 75211, USA. Visit 20 Sep :08 PM
General Fire Safety Checklist conducted for Blue Whirl Building Location 1029 McLean Ave, Dallas, TX 75211, USA Visit 20 Sep 2018 03:08 PM Prepared by SafetyCulture Staff Completed on 20 Sep 2018 03:58
More informationINITIAL FIRE ASSESSMENT REPORT (FAR)
INITIAL FIRE ASSESSMENT REPORT (FAR) Factory 94/95 (OLD) 46 NEW (Ground To 5th), BLOCK C TONGI INDUSTRIAL AREA,, TONGI, GAZIPUR, GAZIPUR, 0, BD GAZIPUR Dhaka Bangladesh 11 Apr 2014 The Alliance for Bangladesh
More informationCase Study of Underground Car Park. Team Japan
11th Conference on Performance Based Codes and Fire Safety Design Methods Case Study of Underground Car Park Team Japan We focused on the characteristics of the fire behavior of car fire. Car fire is not
More informationRISK ASSESSMENT & EMERGENCY PREPAREDNESS PLAN
RISK ASSESSMENT & EMERGENCY PREPAREDNESS PLAN RISK ASSESSMENT The phases of an emergency includes: 1. Risk assessment 2. Mitigation 3. Preparedness 4. Response 5. Recovery Areas of Risk includes: Naturally
More informationFire Risk Assessment Guidance
Fire Risk Assessment Guidance This document is a guidance note to accompany the example fire risk assessment template. The example fire risk assessment template has been designed with small to medium domestic
More informationSURVEY ON FIRE SERVICE INSTALLATIONS FOR OFFICE BUILDINGS IN HONG KONG
SURVEY ON FIRE SERVICE INSTALLATIONS FOR OFFICE BUILDINGS IN HONG KONG E.C.L. Pang and W.K. Chow Research Centre for Fire Engineering, Area of Strength: Fire Safety Engineering The Hong Kong Polytechnic
More informationHealth, Safety and Wellbeing Management Arrangements. Core I Consider I Complex. Fire Safety. Health, Safety and Wellbeing Service
Health, Safety and Wellbeing Management Arrangements Core I Consider I Complex Fire Safety Health, Safety and Wellbeing Service 1. Success Indicators The following indicators will demonstrate success in
More informationFIRE PREVENTION EXHIBIT GUIDELINES
FIRE PREVENTION EXHIBIT GUIDELINES Exhibit booth construction shall meet all building requirements. All means of entrance and exit must be clear and free from obstruction at all times. No storage of any
More informationFire protection documentation. CFPA-E Guideline No 13:2015 F
Fire protection documentation CFPA-E Guideline No 13:2015 F FOREWORD The European fire protection associations have decided to produce common guidelines in order to achieve similar interpretation in the
More informationINITIAL FIRE SAFETY ASSESSMENT
INITIAL FIRE SAFETY ASSESSMENT Factory Assessor: 107/112 Nazrul Market 1st & 2nd floor, Chawk Bazar, Chittagong Emkay Enterprises 09 Apr 2014 The Alliance for Bangladesh Worker Safety Page 1/28 Factory
More informationLondon Borough of Hammersmith & Fulham
London Borough of Hammersmith & Fulham Assessment Details: Property Assessed Flora Gardens 161-185, FLORA GARDENS, LONDON Assessment Date 16/01/2018 Assessment Valid Until 23/08/2018 Assessor Details Gary
More informationChapter Nursing Homes
Chapter 16.01 Nursing Homes Section 1. Licensing. No nursing, convalescent or old age home, as defined in Section 2 of this ordinance, shall be operated except under a license from the City Council of
More informationFirst Aspen Federal Regulation Set: K LSC 2000 Health Existing
First Aspen Federal Regulation Set: K 01.01 LSC 2000 Health Existing K 0000 Title CFR Type INITIAL COMMENTS Memo K 0011 If the building has a common wall with a nonconforming building, the common wall
More informationA GUIDE FOR CONDUCTING FACILITY PRE-FIRE PLANS
A GUIDE FOR CONDUCTING FACILITY PRE-FIRE PLANS 1. Sketch Each Floor 2. Show Roof access of venting devices 3. Show approaches to the facility 4. Indicate the size of the facility (Length and Width) 5.
More informationFIRE DEPARTMENT - RULES FOR FIRE PROTECTION IN AUSTRIA
93 FIRE DEPARTMENT - RULES FOR FIRE PROTECTION IN AUSTRIA INTRODUCTION 94 Legal requirements for the protection of firefighters Requirements of Building Act Fire Prevention Act Technical Guidelines OIB
More informationFIRE SAFETY INSPECTION REPORT
Page 1 FIRE SAFETY INSPECTION REPORT Impress Fashion Ltd. ACCORD ID: 12245 Dag No. 2224, Matuial, Konapara, Katherpool, Jatrabari, Dhaka-1362 Other Factories: None Date: August 27, 2015 Sl No. Category
More informationElement Z General Design Requirements Existing Facilities Information
PART 1 - INTRODUCTION 1.01 OVERVIEW A. This Section provides general information for building systems and components. B. Refer to the Owner s Design Guideline Elements A though G and Element Z for technical
More informationFIRE SAFETY POLICY LEEDS METHODIST MISSION. Oxford Place Centre
FIRE SAFETY POLICY LEEDS METHODIST MISSION Oxford Place Centre P a g e 2 8 Version Draft 1 Name of responsible (ratifying) committee Leeds Methodist Mission Council Date ratified Document Manager (job
More informationThe Physical Environment Portal: Module 5, LS Leadership
The Physical Environment Portal: Module 5, LS.02.01.10 - Leadership Fire Safety: Background Fire safety impacts both the lives of the occupants and the physical structures. In the early 1900 s many buildings
More informationFire Department Of New York
Fire Department Of New York Joseph Barracato Director Construction, Demolition & Abatement Unit (CDA Unit) Bureau of Fire Prevention,FDNY Joseph Barracato, Director Fire Department, City of New York Construction,
More informationFire Enforcement Report
AGENDA ITEM 4.4 Fire Enforcement Report Executive Lead: Director of Planning Author: Senior Fire Safety Adviser, Capital Planning & Estate Management Contact Details for further information: Frank Barrett,
More informationFire Risk Assessment. Index. Part 1 Introduction Part 2 The Fire Risk Assessment Part 3 The Management Action Plan
Fire Risk Assessment Worksafe Solutions Consultancy Ltd 67 Flitwick Road Maulden Bedfordshire, MK45 2BJ Tel: 01525 406787 email enquiries@worksafesoultions.co.uk Index Part 1 Introduction Part 2 The Fire
More information