1 Board of Education Park Ridge Niles School District 64 Committee-of-the-Whole: Facilities Monday, September 8, 207 7:00 p.m. Jefferson School Multipurpose Room 8200 N. Greendale Avenue Niles, IL 6074 AGENDA APPENDIX. Call to Order and Roll Call 2. Overview of District 64 Master Facilities Plan A- 3. Review of Adopted Financial Framework for Facilities Projects 4. Wrap-Up of Summer 207 Projects and Discussion of Proposed Summer 208 Projects 5. Public Comments 6. Adjournment

2 To: From: Date: Subject: Board of Education Dr. Laurie Heinz, Superintendent Luann Kolstad, Chief School Business Official Ron DeGeorge, Director of Facility Management September 8, 207 Overview of District 64 Master Facilities Plan Review of Adopted Financing Framework Wrap-Up of Summer 207 Projects Discussion of Proposed Summer 208 Projects Appendix Background on Master Facilities Plan Over the past several years, the Board and administration have devoted enormous effort to identify the critical infrastructure needs of the District. Here is a recap of the major milestones in this work in recent years: From , the Board and administration relied on a Maintenance Plan created by architects Fanning Howey and presented to the Board of Education in December 20. This plan did not include a 0-year Life Safety Survey, but did identify five top priority projects; those projects were completed in summer 205 with the Field School phase 2 work. During the school year, the District undertook a competitive selection process for new architects of record. Through this process, FGM Architects were selected to prepare the comprehensive 0-year Health Life Safety (HLS) Survey as required by the Illinois State Board of Education (ISBE) and to create a Master Facilities Plan that would include HLS and other critical infrastructure work. The draft plan was completed in late spring 205. It was the first time a comprehensive, Master Facilities Plan was developed for the District s nine buildings and sites. In 205-6, the Board and administration worked to understand the complexity of the challenges, in terms of the myriad of projects identified for each building and the overall financial impact of addressing the needs of each facility. Numerous hours were devoted to this complex work. FGM, construction manager Nicholas and Associates, engineering specialists, financial consultant Elizabeth Hennessy of Raymond James Public Finance (formerly from William Blair), security consultant Paul Timm from RETA Security, local Park Ridge First Responders, our safety planning partners from the Northeastern Illinois Public Safety Training Academy (NIPSTA), and other contributors brought expertise to the proposals and the Board s many hours of discussions and analysis across a multitude of meetings. In 206-7, District 64 added Studio GC to prioritize and begin more closely estimating total project costs to create a balanced, 5-year plan that would coincide with the timing of the District Vision Strategic Plan. The Financial Framework to implement the plan also was finalized, as discussed separately below. The Board officially adopted the final version of the 0-Year Health Life Safety Survey on April 24, 207 for submission to ISBE (see Attachment ).

3 Master Facilities Plan - 5 Year Overview The District manages buildings with a replacement cost of between $25M - $50M plus site and Furniture, Fixtures & Equipment (FFE). The Master Facilities Plan is a comprehensive look at code requirements, physical condition and educational needs. Every school district has limited resources and no school district can do all the work that needs or wants to be done. The plan is intended to point out the District s facility needs and assist in prioritizing expenditures to maintain safe buildings, to support learning in the buildings, and to protect the community s investment in the existing buildings moving forward. Intended to coincide with the 2020 Vision Strategic Plan, the five-year plan includes a total estimated expenditure of approximately $27.2 million in facilities projects. Attachment 2 provides an overview of the updated 5-year Master Facilities Plan. The proposed projects have been evaluated in the context of extending the life of a building or its systems based on individual building needs and overall needs across the District, and to meet the educational goals for student learning in a safe environment. The plan also reflects the capacity of each building, how space is utilized, the relationship of educational areas within a building, how technology is incorporated, and the focus on flexible learning environments as educational needs have evolved. The plan is divided into categories of work to be completed each year: GREEN = HLS category B projects (required) ORANGE = Critical Infrastructure category 2 (highly recommended) BLUE = Critical Infrastructure category (important) YELLOW = additional priority capital projects It is critical to note that estimates for 209, 2020 and 202 are being updated by Studio GC as the scope of work is more clearly detailed for each project. Therefore, these figures remain preliminary estimates and are useful for general planning and budgetary purposes. In addition to those items identified in the plan, the District also is considering how to address the following concerns: Flooring - Flooring remains a priority, because the majority of flooring in all schools, except Emerson, is over 30 years old and well beyond its useful life, with only limited replacements and/or patching having occurred in recent years. Based on Board discussion at the February 6, 207 meeting, administration will address flooring as funds become available, but also as we complete significant work within a building. When we have asbestos and flooring contractors in a building, we believe it is prudent to take advantage of economies of scale and efficiency. K-5 auditorium renovations - It is interesting to note that it is rare to have dedicated auditoriums with fixed seating in an elementary school. The facility usage study confirmed that these areas are chronically underutilized. Instead, they could be transformed into open, flexible learning spaces and/or even an additional classroom. The space could then be easily 2

4 converted from large group assemblies and events to smaller set-ups for classes to meet for learning focused on collaboration, problem-solving, creativity and communication. Energy-saving initiatives - These include LED lighting and occupancy sensors, which would lower energy costs. PA/Clock Systems - This includes replacement of old PA/clock systems that are critically essential to the safe and efficient running of the schools, along with the necessary wiring for the upgraded systems. Future-ready classrooms - Furniture, fixtures and equipment for future-ready classrooms and common spaces also are as the District continues to focus on the 4 C s. Jefferson School - The ultimate use of Jefferson also needs to be clarified. Therefore, work on all but the most critical portions of the building are not addressed at this time. As the District completes further demographic analysis and a full-day kindergarten feasibility study, the future of this facility will be decided. It may be possible to include some of the above work not currently in the plan within the District s annual Operations and Maintenance budget and/or to move forward with items individually whenever actual bids for authorized projects come in lower than estimated. In such cases, additional projects would be brought to the Board for approval. Review of Summer 207 Projects Further details about the summer 207 projects are included on Attachment 3. The total project cost for the completed work was $4,523,307, which included asbestos abatement, architect/engineering fees, and construction management fees. This is considerably below the original proposed slate of work and estimated costs of $6,20,998. Recommendations for Summer 208 Projects Looking forward to 208, Studio GC has completed its updating of initial estimates provided by FGM Architects when the HLS survey and MFP were first developed. Attachment 4 details the projects being recommended for the Board s consideration at this time. These include investments totalling $8,477,076 which include: HLS Category B = $635,52 Critical infrastructure 2 = $5,390,945 Critical infrastructure 3 = $98,80 Other capital projects = $2,352,438 A list of additional projects for summer 208 that also could be considered is included as Attachment 5. These total an additional $4,534, 563. In selecting the final projects for summer 208, the goal would be to utilize funds the District has already obtained from the issuance of the Debt Certificates in spring 207, as discussed further below. 3

5 Background on Financing Framework Similarly, the District s $30 million financing framework also was the conclusion of a parallel multi-year effort by the Board and administration. The adopted funding framework takes the widest view possible of all available resources at the District s disposal. Attachment 6 is the plan put forward on February 6, 207 by investment adviser Elizabeth Hennessy (formerly of William Blair), and which was adopted by the Board at the February 2, 207 meeting. The framework was designed to identify funding sources in order to complete: 00% of HLS category B projects (required) 00% of Critical Infrastructure category 2 (highly recommended) Critical Infrastructure category 3, and additional priority capital projects. It accesses funds through a combination of sources, while leaving flexibility for future boards to tap additional funding, as. The $30M framework consists of: Cash from Operating Fund balance $0M ( no impact on taxpayers ) Completed in two transfers $5.5M in fiscal year and $4.5M in fiscal year Debt Certificates $9.25M ( no impact on taxpayers ) Issued spring 207 (repaid $800K over 5 years from Operating Fund revenues; first repayment in the budget) Working Cash Fund bonds - Board authority to issue up to $20.75M to complete Master Facilities Plan The authorization process for the Board to issue Working Cash Fund bonds was completed at the April 24, 207 meeting and is good through April When bonds are issued within the next 3 years, repayment will impact the Debt Service portion of the tax levy on local property taxes. The Board will vote specifically on each issuance of the bonds. Here are several important features of the framework: The framework acknowledges the commitment to the community made at the 2007 referendum -- and carried forward by all Boards of Education who have served since that time -- to not return to the community for further rate relief for at least 0 years (207). The Board annually discusses whether to continue extending this commitment into the future; the most recent past Board had targeted an extension to This discussion typically coincides with a review of the District s long-range financial projections and assumptions used to generate that forecast. The framework invests the savings from the Collective Bargaining Agreements (CBAs) for with the District s two largest employee groups (teachers and teaching assistants) into facilities work. 4

6 It utilizes cash on hand from the District s Operating Funds balance, which reduced the balance in a planned manner with no additional burden to taxpayers. It introduced a new form of financing for District Debt Certificates -- that are being paid back within the District s operating funds tax levy with no additional burden to taxpayers. This commitment is a further sign of the District s commitment to fiscal discipline. The limited bonds that may be issued in 208 through 2020 would make use of an accumulated $2 million in the Bond and Interest Fund to pay debt service. The limited bonds also would fill in only a portion of the debt service levy that has dropped as the District has paid off the 997 Emerson Middle School bonds. The Board has implemented only the first two steps in the Framework thus far. Proposed summer 208 projects would be financed through the remaining funds available by the issuance of the Debt Certificates this spring, which is about $8.265M. Administration is hopeful that bids will come in lower than estimates or at that time a decision can be made to either hold back on a project or use Operating Funds for the small balance. It is anticipated that bonds would be issued to fund the remainder of the work in future years, beginning in the summer of 209. Administration will invite Elizabeth Hennessy to speak to the Board at an upcoming meeting about the Financial Framework, bonding authority and process. Next Steps Administration will review the projects recommended for consideration in summer 208 with the Board at the September 8, 207 COW meeting. Based on the Board s direction, administration would return with specific action items to seek the Board s approval at the September and October Board meetings to prepare specifications and bid documents for individual summer 208 projects. It is to the District s advantage to go out to bid as early as possible to lock in the most competitive pricing and timeline for work that must be completed during the extremely limited summer construction period available to schools. Board members are encouraged to contact Dr. Heinz, Mr. DeGeorge and Mrs. Kolstad their questions in advance, so we may prepare information and materials in a timely manner to share with the full Board to facilitate discussion. 5

7 Attachment PARK RIDGE - NILES SCHOOL DISTRICT 64 HLS Report - 0 year survey Illinois State Board of Education April 3rd, 207

8 EMERSON MIDDLE SCHOOL

9 3/20/207 Violation / Work Item Listing. COUNTY CODE 06, Cook Item I.D. Location(s) (Room No) 3 General 4 Stage 5 5 Roof above Gym Storage 6 General 7 8 Stair A0, Book 08, Stair B05,Workroom 25, Book 208A, Book 205A Band 54, Multipurpose 50, Corridor 09 9 Corridor 09 0 Conf 29, Asst. Principal 3, Speech 224 Ind. Arts 8 3 HC Public Lavatories 4 Nurse's Room Violation / Work Item Listing Rule Description of Violated the violation Rubber stair treads damaged Current ramp not ADA compliant Unsafe conditions around HVAC equipment PA system outdated Missing smoke detector Missing fire alarm pull station Missing horn/strobe signaling device Missing visual signaling device Receptacles unsafe No insulation wrap for exposed piping Eye wash fixture needs to be separate 2. DISTRICT CODE/NAME 0640, Park Ridge CCSD 64 Recommendation to correct violation Action I.D. Priority Code Specification(s) 3. FACILITY CODE/NAME EMERSON MIDDLE SCHOOL Units Of Labor Estimated Quantity Measure Code Cost Estimated ISBE Funding Completion Adjustment Type Date Replace rubber stair treads f c. Replace rubber stair treads EA 75 $57, //207 O Remove existing ramp and handrails. Construct new concrete ramp and landings and provide new ADA compliant handrails. Provide a portable guard rail system that can be moved to areas where equipment is being serviced or relocate the HVAC equipment away from the edge of the roof. Remove existing ramp and handrails. Construct new concrete ramp and landings and provide new ADA compliant handrails. Provide a portable guard rail system that can be moved to areas where equipment is being serviced or relocate the HVAC equipment away from the edge of the roof. LS 2 $30,4.00 8//2020 O EA $6, //2020 O Replace complete PA system Replace complete PA system LS 2 $78, //2020 O Add additional fire alarm smoke detector Add additional fire alarm smoke detector EA 6 $6, //2020 F Add fire alarm pull station Add fire alarm pull station EA 3 2 $3, //2020 F Add fire alarm horn/strobe signaling device Add fire alarm horn/strobe signaling device EA 2 2 $2, //2020 F Add fire alarm visual signaling device Add fire alarm visual signaling device EA 3 2 $3, //2020 F Replace receptacles with "GFCI" type within Replace receptacles with "GFCI" type. By District EA $82.00 O Provide insulation wrap kit for exposed piping under lavatory f c. Provide insulation wrap kit for exposed piping under lavatory Provide separate eye wash fixture with thermostatic Provide separate eye wash fixture with thermostatic mixing valve. Remove existing faucet mounted eye wash mixing valve. Remove existing faucet mounted eye wash EA 7 $, //2020 O EA 2 $5, //2020 O Work to be Completed by District: $82 Outstanding Work: - Priority Codes B s Total: $237,04 - Priority Codes C s Total: $58,88 /

10 EUGENE FIELD ELEMENTARY SCHOOL

11 3/2/207 Violation / Work Item Listing. COUNTY CODE 06, Cook Item I.D. Location(s) (Room No) Rule Description of the Violated violation 2. DISTRICT CODE/NAME 0640, Park Ridge CCSD 64 Recommendation to correct violation Action I.D. Priority Code Specification(s) 3. FACILITY CODE/NAME EUGENE FIELD ELEM SCHOOL Units Of Measure Labor Estimated Quantity Code Cost Estimated ISBE Funding Completion Adjustment Type Date 9 Exterior Windows need to Replace windows with new thermally-broken anodized Replace windows with new thermally-broken anodized be replaced aluminum frames and insulated glazing units aluminum frames and insulated glazing units EA $979, //207 O 0 North Attic Replace () door, frame and hardware with new fire rated Replace () door, frame and hardware with new fire rated Need fire rated assembly. Infill opening above with fire rated wall assembly. Infill opening above with fire rated wall assembly construction construction LS 2 $ //2020 F Auditorium Need new Remove stage thrust extension. Reconstruct stage thrust Remove stage thrust extension. Reconstruct stage thrust structural support extension with appropriate structural support. extension with appropriate structural support. LS 2 $82, //202 O 2 North Exit Stair Gate Add gate at stair f c. Add gate at stair LS 2 $3,9.00 8//2022 O 3 Janitor Closet Exhaust system 06, 28A Provide an exhaust system for this room Provide an exhaust system for this room EA 2 2 $20, //202 O 4 Custodian Ventilation Provide a mechanical ventilation system that will deliver Provide a mechanical ventilation system that will deliver Office - Lower system conditioned outside air conditioned outside air Level EA 2 $5, //202 O 6 Equipment 06, 36C 7 Entire School Closet 29A, Sprinkler 3A Public Lavatories and Sinks HC Public Lavatories Faculty Room Nurse's Room 25 Exterior Exhaust fans need to be replaced PA system needs to be replaced Smoke detector Thermostatic mixing valve Insulation wrap Backflow preventer Separate eye wash fixture Light fixtures need to be replaced Provide replacement exhaust fans Provide replacement exhaust fans EA 2 2 $23, //202 O Replace PA system head end complete with all speakers and call buttons f c. Replace PA system head end complete with all speakers and call buttons LS 2 $50, //2020 O Add additional fire alarm smoke detector f c. Add additional fire alarm smoke detector EA $2, //202 O Provide thermostatic mixing valve to prevent water temperature from exceeding 0 degrees Provide insulation wrap kit for exposed piping under lavatory Provide thermostatic mixing valve to prevent water temperature from exceeding 0 degrees Provide insulation wrap kit for exposed piping under lavatory EA 36 2 $22, //202 O EA 2 $ //202 O Provide dual check backflow preventer Provide dual check backflow preventer EA 2 $ //202 O Provide separate eye wash fixture with thermostatic mixing valve. Remove existing faucet mounted eye wash Provide separate eye wash fixture with thermostatic mixing valve. Remove existing faucet mounted eye wash EA 2 $5, //202 O Provide new energy efficient LED light fixtures Provide new energy efficient LED light fixtures. By District LS 2 $39, O 30 Toilet Rooms Need aerator Provide aerator on faucet Provide aerator on faucet. By District LS $2, O Work to be Completed by District: $42,00 Outstanding Work: - Priority Codes B s Total: $,50,47 - Priority Codes C s Total: $56,35 /

12 FRANKLIN ELEMENTARY SCHOOL

13 3/22/207 Violation / Work Item Listing. COUNTY CODE 06, Cook Item I.D. Location(s) (Room No) 3 Mechanical 87 4 Mechanical 87 5 Gymnasium 6 Kitchen 89 7 Technologist 20B 8 Office 20C 9 ELL Office 26 0 Social Work 28 3 Janitor Closet 05 Classroom 02, 06 4 Toilet Rooms 5 Elec 99A, Storage 70A, Workroom 20B 6 General 7 Public Lavatories and Sinks 8 Toilet Rooms 9 Building Exterior 20 Janitor's Closet 2 Nurse's Room 22 Mechanical Room Rule Description of Violated the violation Fire rated door Missing required hardware Exit signs need protection New device New device New device New device New device Exhaust system Receptacles need to be replaced Fire alarm visual Smoke detector Drinking fountains required Thermostatic mixing valve Hand wash fixture Wall hydrant New faucet Eye wash fixture Backflow preventer 2. DISTRICT CODE/NAME 0640, Park Ridge CCSD 64 Recommendation to correct violation Replace door, frame and hardware with new fire rated assembly Action I.D. Priority Code Specification(s) 3. FACILITY CODE/NAME FRANKLIN ELEMENTARY SCHOOL Replace door, frame and hardware with new fire rated assembly Units Of Labor Estimated Quantity Measure Code Cost Estimated ISBE Funding Completion Adjustment Type Date EA 2 $6, //209 F Provide required hardware Provide required hardware. By District EA $,50.00 O Replace exit sign. Provide wire ball guards at all exit signs for future protection f c. Replace exit sign. Provide wire ball guards at all exit signs for future protection. By District EA 3 2 $3, F Provide new device Provide new device EA 2 $2, //209 F Provide new device Provide new device EA $2, //209 F Provide new device Provide new device EA $2, //209 F Provide new device Provide new device EA $2, //209 F Provide new device Provide new device EA $2, //209 F Provide an exhaust system for this room Provide an exhaust system for this room EA 2 $9, //209 O Replace receptacles with "GFCI" type within Replace receptacles with "GFCI" type. By District EA 2 $ O Add fire alarm visual signaling device f c. Add fire alarm visual signaling device EA 9 2 $, //209 O Add additional fire alarm smoke detector Add additional fire alarm smoke detector EA 3 $3, //209 F Install new side-by-side drinking fountains to meet required quantity. Modify plumbing as required. Patch and paint modified walls to match original condition Provide thermostatic mixing valve to prevent water temperature from exceeding 0 degrees Install new side-by-side drinking fountains to meet required quantity. Modify plumbing as required. Patch and paint modified walls to match original condition Provide thermostatic mixing valve to prevent water temperature from exceeding 0 degrees EA 2 2 $6, //209 O EA 35 2 $20, //209 O Provide approved hand washing fixture f c. Provide approved hand washing fixture EA 2 $5, //207 O Provide new wall hydrant with integral vacuum breaker Provide new wall hydrant with integral vacuum breaker EA 3 2 $4, //207 O Provide faucet with vacuum breaker Provide faucet with vacuum breaker EA 2 $, //207 O Provide separate eye wash fixture with thermostatic mixing valve. Remove existing faucet mounted eye wash Provide separate eye wash fixture with thermostatic mixing valve. Remove existing faucet mounted eye wash EA 2 $5, //209 O Provide reduced pressure zone backflow preventer Provide reduced pressure zone backflow preventer EA 2 $8, //209 O Work to be Completed by District: $5,506 Outstanding Work: - Priority Codes B s Total: $97,27 - Priority Codes C s Total: $6,734 /

14 GEORGE B CARPENTER ELEMENTARY SCHOOL

15 3/22/207 Violation / Work Item Listing. COUNTY CODE 06, Cook Item I.D. Location(s) (Room No) 2. DISTRICT CODE/NAME 0640, Park Ridge CCSD 64 Rule Violated Description of the violation Recommendation to correct violation Action Priority Specification(s) I.D. Code 3. FACILITY CODE/NAME GEORGE B CARPENTER ELEM SCHOOL Units Of Labor Estimated Quantity Measure Code Cost Estimated ISBE Funding Completion Adjustment Type Date b. 8 Janitor 04 Replace closer Replace closer Replace closer. By District EA 2 $,50.00 O 9 Janitor 05 Replace closer Replace closer Replace closer. By District EA 2 $,50.00 O 0 Kitchen 08 Fire rated assembly Replace () 3'-0"x7'-0" door, frame and hardware Replace () 3'-0"x7'-0" door, frame and hardware with new fire rated assembly. with new fire rated assembly. EA 2 $6, //2020 O Kitchen 7 Fire rated assembly Replace (2) 3'-0"x7'-0"doors, frame and hardware Replace (2) 3'-0"x7'-0"doors, frame and hardware EA with new fire rated assembly. with new fire rated assembly. 2 $0, //2020 O 2 Storage 73 Fire rated assembly Replace (2) 3'-0"x7'-0"doors, frame and hardware Replace (2) 3'-0"x7'-0"doors, frame and hardware EA with new fire rated assembly. with new fire rated assembly. 2 $0, //2020 O 3 Janitor 75 Fire rated assembly Replace () 3'-0"x7'-0" door, frame and hardware Replace () 3'-0"x7'-0" door, frame and hardware e b. with new fire rated assembly. with new fire rated assembly. EA 2 $6, //2020 O 4 Office 77 Fire rated assembly Replace () 3'-0"x7'-0" door, frame and hardware Replace () 3'-0"x7'-0" door, frame and hardware with new fire rated assembly. with new fire rated assembly. EA 2 $6, //2020 O 5 General Ceilings need to be repaired Repair ceilings to maintain continuity and restore Repair ceilings to maintain continuity and restore c b. LS required fire rating. required fire rating. 2 $238, //2020 O 6 Boiler Room 00 Fire stop Fire stop penetrations with UL listed systems. Fire stop penetrations with UL listed systems. LS 2 $2, //2020 F 7 Electrical 002 Fire stop Fire stop penetrations with UL listed systems. Fire stop penetrations with UL listed systems. LS 2 $2, //2020 F 8 Storage 03, 3A Exhaust Provide exhaust systems for these rooms. Provide exhaust systems for these rooms. EA 2 2 $20, //2020 O 9 Toilet Rooms 3, 7 Exhaust Provide exhaust systems for these rooms. Provide exhaust systems for these rooms. EA 2 2 $20, //2020 O 20 Toilet Room 32A Exhaust Provide exhaust systems for these rooms. Provide exhaust systems for these rooms. EA 2 $0, //2020 O 2 Kiln 42 Exhaust needs to be replaced Replace exhaust fan. f c. Replace exhaust fan. By District EA 2 $4, O 22 Entire School PA system needs to be Replace P.A. system head end complete with all Replace P.A. system head end complete with all LS replaced speakers and call buttons speakers and call buttons 2 $35, //2020 O 23 North Vestibule Fire alarm Add fire alarm pull station. Add fire alarm pull station. EA 2 $, //2020 O Toilet Rooms 02A, 24 00A, 04A, 06B, 05B, Visual device Add fire alarm visual signaling device. Add fire alarm visual signaling device. EA 7 2 $8, //2020 O 50, 6A 25 Vestibule 50 Signaling device Add fire alarm horn/strobe signaling device. Add fire alarm horn/strobe signaling device. EA 2 $, //2020 O 26 Storage 0A Smoke detector Add additional fire alarm smoke detector. Add additional fire alarm smoke detector. EA $, //2020 F Provide thermostatic mixing valve to prevent 27 water temperature from exceeding 0 degrees. EA 36 2 $22, //2020 O Public Lavatories and Sinks Thermostatic mixing valve Provide thermostatic mixing valve to prevent water temperature from exceeding 0 degrees. 28 Sprinkler Room Backflow preventer 30 Nurse's Room Hand wash fixture 3 Exterior Hydrant 32 Nurse's Room Eye wash 33 Storage 65 Heater needs to be connected Provide reduced pressure zone backflow preventer. Provide approved hand washing fixture within Toilet Room. Provide new wall hydrant with integral vacuum breaker. Provide separate eye wash fixture with thermostatic mixing valve. Remove existing faucet mounted eye wash. Connect existing unit heater to heating water system and verify proper operation. e c. Provide reduced pressure zone backflow preventer. Provide approved hand washing fixture within Toilet Room. Provide new wall hydrant with integral vacuum breaker. By District Provide separate eye wash fixture with thermostatic mixing valve. Remove existing faucet mounted eye wash. Connect existing unit heater to heating water system and verify proper operation. EA 2 2 $00, //2020 O EA 2 $5, //209 O EA 2 $,20.00 O EA 2 $5, //2020 O EA 2 $4, //2020 O Work to be Completed by District: $7,866 Outstanding Work - Priority Codes B s Total: $64,723 - Priority Codes C s Total: $5,443 /

16 GEORGE WASHINGTON ELEMENTARY SCHOOL

17 3/30/207 Violation / Work Item Listing. COUNTY CODE 06, Cook Item I.D. Location(s) (Room No) 3 Exterior 4 5 Perimeter of 95 and 953 Building Perimeter of 989 and 993 Building 6 Kitchen 05 7 Auditorium 8 Auditorium 9 P.E. Office 09 0 Auditorium Storage Attic 3 4 Jan. Closets 05C, 40, 28 Restrooms near Activity Room 9 5 Toilet Elevator Machine Room 03 Women's Restroom near Activity Room 8 Girls 25 9 Phone 20B Description Rule of the Violated violation Paving requires replacement 2. DISTRICT CODE/NAME 0640, Park Ridge CCSD 64 Recommendation to correct violation Replace Caged asphalt paving. Replace concrete paving as required. Masonry Tuckpoint Masonry Walls and Remove and Replace Sealants walls require and Caulk tuckpointing Masonry Tuckpoint Masonry Walls and Remove and Replace Sealants walls require and Caulk tuckpointing Door requires replacement Replace () 3'-0"x7'-0" door, frame, hardware and sidelight assembly with new fire rated assembly. Action I.D. e b. c c. c c. e b. Priority Code 3. FACILITY CODE/NAME GEORGE WASHINGTON ELEM SCHOOL Specification(s) Replace Caged asphalt paving. Replace concrete paving as required. Tuckpoint Masonry Walls and Remove and Replace Sealants and Caulk Tuckpoint Masonry Walls and Remove and Replace Sealants and Caulk Replace () 3'-0"x7'-0" door, frame, hardware and sidelight assembly with new fire rated assembly. Units Of Labor Estimated Quantity Measure Code Cost Estimated ISBE Funding Completion Adjustment Type Date LS 2 $4, //2020 O EA 2 $303, //209 O EA 2 $87, //208 O EA 2 $6, //202 O Provide () new 3'-0"x7'-0" fire rated exit door, frame and hardware assembly from seating area into the North/South Provide () new 3'-0"x7'-0" fire rated exit door, frame and hardware assembly from seating area into the North/South New doors corridor. Provide new fire rated corridor separation assembly corridor. Provide new fire rated corridor separation required consisting of (2) 3'-0"x7'-0" doors, frame, sidelights, transom assembly consisting of (2) 3'-0"x7'-0" doors, frame, LS 2 $9, //202 O and magnetic hold-opens, as required to separate North/South corridor from East/West corridor. sidelights, transom and magnetic hold-opens, as required to separate North/South corridor from East/West corridor. Install new assembly with (2) 3'-0"x7'-0" doors, frame, hardware Install new assembly with (2) 3'-0"x7'-0" doors, frame, New doors from auditorium and move and replace hallway doors with new hardware from auditorium and move and replace hallway required doors, frames, hardware and sidelights. (hallway door in line doors with new doors, frames, hardware and sidelights. EA 2 $, //202 O above) (hallway door in line above) Device required Provide device Provide device EA 2 $2, //202 F Ceiling Repair ceilings to maintain continuity and restore required fire Repair ceilings to maintain continuity and restore required requires c b. rating. fire rating. repair SF $46, //202 O Portal requires Replace portal with new fire rated assembly. e b. Replace portal with new fire rated assembly. EA 2 $4, //202 O replacement Panel requires Replace with fire rated ceiling access panels. e b. Replace with fire rated ceiling access panels. EA 3 2 $2, //202 O replacement Exhaust system Provide exhaust systems for these rooms. Provide exhaust systems for these rooms. EA 3 2 $34, //202 O required Door grilles require Replace door grilles. e c. Replace door grilles. EA 2 2 $, //2020 O replacement Exhaust system Provide exhaust systems for this room. Provide exhaust systems for this room. EA 2 $, //202 O required Exhaust system Provide exhaust systems for this room. Provide exhaust systems for this room. EA 2 $, //202 O required Convector requires Replace convector. e b. Replace convector. EA 2 $ //202 O replacement Exhaust grille requires Repair exhaust grille. c b. Repair exhaust grille. EA 2 $ //202 O repair Supply grille requires Repair supply grille c b. Repair supply grille EA 2 $ //202 O repair /2

18 3/30/207 Violation / Work Item Listing Item I.D Location(s) (Room No) Basement Corr, Vest Corr, Corr 05, Office 2, Coat Rm 0B & 02B, Stair 2 Vest, Corr 235 Coat Rm Clst 02B, Work Rm Clst 04A & 08A & 4A & 22A, Trans 23, Storage 4 Public Lavatories and Classroom Hand Sinks Handicap Accessible Public Lavatories at Accessible Toilet Rooms District Central Supply Music Mechanical 20 Description Rule of the Violated violation Fire alarm required Devices required New valve required Pipe insulation required New valve required New doors required Doors require replacement Recommendation to correct violation Action I.D. Priority Code Specification(s) Units Of Labor Estimated Quantity Measure Code Cost Estimated ISBE Funding Completion Adjustment Type Date Add fire alarm horn/strobe signaling device. Add fire alarm horn/strobe signaling device. EA 0 2 $2, //202 F Add additional fire alarm smoke detector Add additional fire alarm smoke detector EA 7 2 $8, //202 F Provide thermostatic mixing valve to prevent water temperature from exceeding 0 degrees. Provide insulation wrap kit for exposed piping under lavatory. Provide thermostatic mixing valve to prevent water temperature from exceeding 0 degrees. Provide insulation wrap kit for exposed piping under lavatory. EA 33 2 $5, //206 O EA 2 $9.00 8//207 O Provide reduced pressure zone backflow preventer. Provide reduced pressure zone backflow preventer. EA 2 $66, //207 O Remove existing doors and frames. Construct dedicated egress corridor through northwest corner of room, in conjunction with egress corridor line item, above. Install (2) new fire rated door/frame/hardware assemblies. Remove (2) 3'-0"x7'-0" doors, frame and hardware. Replace with new frame and out-swinging doors. e b. e b. Remove existing doors and frames. Construct dedicated egress corridor through northwest corner of room, in conjunction with egress corridor line item, above. Install (2) new fire rated door/frame/hardware assemblies. Remove (2) 3'-0"x7'-0" doors, frame and hardware. Replace with new frame and out-swinging doors. LS 2 $8, //202 O EA 2 2 $20, //202 O Work to be Completed by District: $0 Outstanding Work - Priority Codes B's Total: 420,23 $ - Priority Codes C's Total: 393,429 $ 2/2

19 JEFFERSON SCHOOL

20 3/22/207 Violation / Work Item Listing. COUNTY CODE 06, Cook Item I.D. Location(s) (Room No) 2 Janitor 04 3 Storage Janitor Office 3 Toilet Rooms Rule Description of Violated the violation 6 General 7 General 8 General 9 Janitor 04 0 Storage 06 Storage 50 2 Corridor Fire rated construction Fire rated construction Fire rated construction Emergency lighting Devices are required Fire rated assemblies Fire stopping Fire stop Fire stop Fire stop Fire separation Recommendation to correct violation 2. DISTRICT CODE/NAME 0640, Park Ridge CCSD 64 Action I.D. Priority Code Specification(s) 3. FACILITY CODE/NAME JEFFERSON SCHOOL Units Of Labor Estimated Quantity Measure Code Cost Estimated ISBE Funding Completion Adjustment Type Date Remove ceiling and replace with fire rated construction. Remove ceiling and replace with fire rated construction. SF 48 2 $6, //2020 O Remove ceiling and replace with fire rated construction. Remove ceiling and replace with fire rated construction. SF 48 2 $6, //2020 O Close openings with fire rated construction. Close openings with fire rated construction. SF 20 2 $2, //2020 O Provide emergency lighting in windowless rooms. f c. Provide emergency lighting in windowless rooms. By District EA 5 2 $3,63.00 O Test devices to determine if volume is sufficient. Add devices as required. Test devices to determine if volume is sufficient. Add devices as required. LS 2 $2, //2020 O Replace with fire rated assemblies. f c. Replace with fire rated assemblies. EA 4 2 $6, //2020 F Provide UL listed top of wall fire stopping assemblies. Provide UL listed top of wall fire stopping assemblies. LF $2, //2020 F Fire stop penetrations with UL listed systems. Fire stop penetrations with UL listed systems. LS 2 $2, //2020 F Fire stop penetrations with UL listed systems. Fire stop penetrations with UL listed systems. LS 2 $, //2020 F Fire stop penetrations with UL listed systems. e b. Fire stop penetrations with UL listed systems. LS 2 $, //2020 F Modify existing south walls of Classrooms 38 and 39 as required to provide a 2-hour fire rated separation between occupancies. Fire stop top of wall and penetrations as required. Modify existing south walls of Classrooms 38 and 39 as required to provide a 2-hour fire rated separation between occupancies. Fire stop top of wall and penetrations as required. LS 2 $3, //2020 F Auditorium 22 Auditorium 22 Admin Office 5 6 Janitor Toilet Rooms Vestibule 007 & 46 Vestibule 009, 46, Admin 5 Public Lavatories and Sinks HC Public Lavatories 22 Toilet Room 23 Building Exterior Stage needs new structural support Ductwork needs replacement Reconnect ductwork Exhaust system Fire alarm visual Smoke detectors Firm alarm Thermostatic mixing valve Insulation wrap Hand wash fixture Wall hydrant Remove stage thrust extension. Reconstruct stage thrust extension with appropriate structural support. Remove stage thrust extension. Reconstruct stage thrust extension with appropriate structural support. LS 2 $82, //2020 O Repair ductwork in attic. c b. Repair ductwork in attic. EA 2 $7, //2020 O Reconnect ductwork serving room to ventilation source (AHU). c b. Reconnect ductwork serving room to ventilation source (AHU). EA 2 $23, //2020 O Provide an exhaust system for this room. Provide an exhaust system for this room. EA 2 $0, //2020 O Add fire alarm visual signaling device. Add fire alarm visual signaling device. EA 2 $3, //2020 O Provide smoke detectors interlocked w with magnetic hold open devices to close doors upon the presence of smoke. Provide smoke detectors interlocked w with magnetic hold open devices to close doors upon the presence of smoke. EA 3 2 $3, //2020 F Add fire alarm horn/strobe signaling device. Add fire alarm horn/strobe signaling device. EA 3 2 $3, //2020 F Provide thermostatic mixing valve to prevent water temperature from exceeding 0 degrees. Provide thermostatic mixing valve to prevent water temperature from exceeding 0 degrees. EA 29 2 $7, //2020 O Provide insulation wrap kit for exposed piping under lavatory. Provide insulation wrap kit for exposed piping under lavatory. EA 2 $ //2020 O Provide approved hand washing fixture within Toilet Room. Provide approved hand washing fixture within Toilet Room. EA 2 $6, //2020 O Provide new wall hydrant with integral vacuum breaker. Provide new wall hydrant with integral vacuum breaker. By District EA 3 2 $3, O /2

21 3/22/207 Violation / Work Item Listing Item I.D Location(s) (Room No) Nurse's Room Abandoned Plumbing Fixtures Rule Description of Violated the violation Eye wash fixture Abandoned fixtures to be removed Recommendation to correct violation Provide separate eye wash fixture with thermostatic mixing valve. Remove existing faucet mounted eye wash. Remove abandoned fixture and remove unused sections of piping back to mains. Action I.D. f a. b b. Priority Code Specification(s) Provide separate eye wash fixture with thermostatic mixing valve. Remove existing faucet mounted eye wash. Remove abandoned fixture and remove unused sections of piping back to mains. Units Of Labor Estimated Quantity Measure Code Cost Estimated ISBE Funding Completion Adjustment Type Date EA 2 $5, //2020 O EA 9 2 $3, //207 O Violation / Work Item Listing Work to be Completed by District: $7,243 Outstanding Work: - Priority Codes B's Total: $245,748 - Priority Codes C's Total: $6, /2

22 LINCOLN MIDDLE SCHOOL

23 3/22/207 Violation / Work Item Listing. COUNTY CODE 06, Cook Item I.D Location(s) (Room No) Perimeter of 928, 93 and 956 Perimeter 928 Computer Lab 00 Description Rule of the Violated violation 7 Storage 002B 8 TV Studio Storage 02 0 Mechanical 029 Storage Storage Third Floor Corridor Third Floor Corridor Tuckpointing 2. DISTRICT CODE/NAME 0640, Park Ridge CCSD 64 Recommendation to correct violation Tuckpoint Masonry Walls and Remove and Replace Sealants and Caulk Action I.D. c c. Tuckpointing Tuckpoint Masonry Walls and Remove and Replace Sealants and Caulk c c. Fire rated Replace () 3'-0"x7'-0" door, frame and hardware with new fire assembly rated assembly. Fire rated Replace () 3'-0"x7'-0" door, frame and hardware with new fire assembly rated assembly. Fire rated Replace () 3'-0"x7'-0" door, frame and hardware with new fire rated assembly. f c. Fire rated Replace () 3'-0"x7'-0" door, frame and hardware with new fire rated assembly. Fire rated Replace (2) 3'-0"x7'-0" doors, frame and hardware with new fire rated assembly. Fire rated Replace (2) 3'-0"x7'-0" doors, frame and hardware with new fire rated assembly. Fire rated Remove existing overhead coiling door at corridor. Provide (2) new assembly f fire rated 3'-0"x7'-0" doors, frame and hardware. b. Doors should Doors in open position reduce corridor width below the required not be 8'-0" clear. opened Corridor separation At rooms 3, 32, 33, 33A and 337A, remove existing corridor separation walls and associated doors, casework, devices and display boards. Reconstruct walls in new locations as required to meet required 8'-0". Reinstall existing casework. Reconstruct ceilings as required by wall relocation. Priority Code Specification(s) 3. FACILITY CODE/NAME LINCOLN MIDDLE SCHOOL Tuckpoint Masonry Walls and Remove and Replace Sealants and Caulk Tuckpoint Masonry Walls and Remove and Replace Sealants and Caulk Replace () 3'-0"x7'-0" door, frame and hardware with new fire rated assembly. Replace () 3'-0"x7'-0" door, frame and hardware with new fire rated assembly. Units Of Labor Estimated Quantity Measure Code Cost Estimated ISBE Funding Completion Adjustment Type Date EA 2 $405, //209 O EA 2 $263, //209 O EA 2 $5, //207 O EA 2 $5, //207 O Replace () 3'-0"x7'-0" door, frame and hardware with new fire rated assembly. EA 2 $5, //207 O Replace () 3'-0"x7'-0" door, frame and hardware with new fire rated assembly. EA 2 $5, //207 O Replace (2) 3'-0"x7'-0" doors, frame and hardware with new fire EA rated assembly. 2 $8, //207 O Replace (2) 3'-0"x7'-0" doors, frame and hardware with new fire EA rated assembly. 2 $5, //207 O Remove existing overhead coiling door at corridor. Provide (2) new fire rated 3'-0"x7'-0" doors, frame and hardware. Doors in open position reduce corridor width below the required 8'-0" clear. At rooms 3, 32, 33, 33A and 337A, remove existing corridor separation walls and associated doors, casework, devices and display boards. Reconstruct walls in new locations as required to meet required 8'-0". Reinstall existing casework. Reconstruct ceilings as required by wall relocation. EA 2 $8, //207 O e 3 2 $ //207 O LS 2 $69, //207 O Third Floor Corridor Industrial Arts 304 Woodshop 306 Art Storage 32A 9 Office Storage 002B Mechanical 003 Elevator Machine 005 Fire rated Fire rated wall Fire wall Closer needs to be replaced Closer needs to be replaced Fire stop penetrations with UL listed systems. Fire stop penetrations with UL listed systems. Fire stop penetrations with UL listed systems. Replace (2) 3'-0"x7'-0" doors, frame, hardware and sidelight assemblies with new fire rated assemblies. Remove walls extending through exit corridor. Provide new fire rated wall separating room from corridor. Provide (2) new fire rated 3'-0"x7'0" doors, frames and hardware. Remove walls extending through exit corridor. Provide new fire rated wall separating room from corridor. Provide (2) new fire rated 3'-0"x7'0" doors, frames and hardware. Replace (2) 3'-0"x7'-0" doors, frame, hardware and sidelight assemblies with new fire rated assemblies. EA 4 2 $33, //207 O Remove walls extending through exit corridor. Provide new fire rated wall separating room from corridor. Provide (2) new fire LS 2 $57, //207 O rated 3'-0"x7'0" doors, frames and hardware. Remove walls extending through exit corridor. Provide new fire rated wall separating room from corridor. Provide (2) new fire LS 2 $57, //207 O rated 3'-0"x7'0" doors, frames and hardware. Adjust/replace closer as required. c b. Adjust/replace closer as required. By District EA 2 $,50.00 O Adjust/replace closer as required. Adjust/replace closer as required. By District EA 2 $,50.00 O Fire stop penetrations with UL listed systems. Fire stop penetrations with UL listed systems. LS 2 $, //202 O Fire stop penetrations with UL listed systems. Fire stop penetrations with UL listed systems. LS 2 $, //202 O Fire stop penetrations with UL listed systems. Fire stop penetrations with UL listed systems. LS 2 $, //202 O /3

24 3/22/207 Violation / Work Item Listing Item I.D Location(s) (Room No) Custodian Office 04 First Floor Corridor Storage 009, 02, 08, Electrical 00, 0, Boiler 06 Meter Room 020 Meter Room 020 Description Rule of the Violated violation 36 Storage Fitness Center Office 20A 39 Dark Room 209A Fire rated Fire rated First stop Infill 40 Attic 4 Attic Garage 0, Storage 25A Garage 30A, 0 Garage 30A, Janitor 0 Conference Room 00 Janitor 2F, 26A, 02C Janitor 200C & 20 Classroom 35 Wood Finishing 306A 50 Janitor 337A 5 Entire School 52 Gangs 0, Faculty Lounge, Storg 32 Recommendation to correct violation Action I.D. Priority Code Specification(s) Units Of Labor Estimated Quantity Measure Code Cost Estimated ISBE Funding Completion Adjustment Type Date Provide (2) 3'-0"x7'-0" fire rated doors, frame and hardware. Provide (2) 3'-0"x7'-0" fire rated doors, frame and hardware. EA 2 $39, //202 O Replace (2) 3'-0"x7'-0" doors, frame, hardware and sidelight assemblies with new fire rated assemblies. Replace (2) 3'-0"x7'-0" doors, frame, hardware and sidelight assemblies with new fire rated assemblies. EA 3 2 $39, //202 O Fire stop penetrations with UL listed systems. Fire stop penetrations with UL listed systems. LS 6 2 $8, //202 O Install closer Install closer Install closer. By District EA 2 $,50.00 O Fire stop penetrations with UL Fire stop penetrations with UL listed systems. Fire stop penetrations with UL listed systems. LS 2 $, //202 O listed systems. Provide new smoke rated Provide new smoke rated portal. Provide new smoke rated portal. EA 2 $2, //202 O portal. Remove existing operable partition. Infill opening with new fire Remove existing operable partition. Infill opening with new fire f c. rated construction. rated construction. EA 2 $38, //202 O Provide new device. Provide new device. Provide new device. EA 2 $2, //202 O Provide new device. Provide new device. Provide new device. EA 2 $2, //202 O Fire rated doors Ceilings need to be removed for fire separation Exhaust system CO2 system Exhaust Ventilation Exhaust Exhaust Ventilator Exhaust Exhaust PA system needs to be replaced Smoke Detector Provide 2-hour fire rated separation walls required to compartmentalize attic into 5,000 SF areas. Provide fire-rated access doors to connect areas. Remove existing third floor lay-in ceilings. Provide new horizontal fire separation above ceiling to separate the attic and third floor. Provide new lay-in ceiling system throughout the third floor. Reinstall Provide 2-hour fire rated separation walls required to compartmentalize attic into 5,000 SF areas. Provide fire-rated access doors to connect areas. Remove existing third floor lay-in ceilings. Provide new horizontal fire separation above ceiling to separate the attic and third floor. Provide new lay-in ceiling system throughout the third floor. Reinstall LS 2 $85, //202 O SF $92, //209 O Provide an exhaust system for this room. Provide an exhaust system for this room. EA 2 2 $20, //202 O Provide CO2 monitoring system. Provide CO2 monitoring system. EA 2 2 $9, //202 O Provide an exhaust system for these rooms. Provide an exhaust system for these rooms. EA 2 2 $23, //202 O Provide ventilation into new room from Conference Room 00 Provide ventilation into new room from Conference Room 00 EA 2 $27, //202 O Provide an exhaust system for these rooms. f c. Provide an exhaust system for these rooms. EA 2 $34, //202 O Provide an exhaust system for these rooms. Provide an exhaust system for these rooms. EA 2 2 $23, //202 O Provide new unit ventilator for this room. Provide new unit ventilator for this room. EA 2 $49, //202 O Provide an exhaust system for these rooms. Provide an exhaust system for these rooms. EA 2 $, //202 O Provide an exhaust system for these rooms. Provide an exhaust system for these rooms. EA 2 $0, //202 O P.A. system is old and antiquated nearing end of useful life. P.A. system is old and antiquated nearing end of useful life. LS 2 $78, //202 O Add additional fire alarm smoke detector Add additional fire alarm smoke detector EA 5 $5, //202 F 2/3

25 3/22/207 Violation / Work Item Listing Item I.D Location(s) (Room No) Public Lavatories and Sinks Receiving 3 Description Rule of the Violated violation 55 Toilet Room 56 Kitchen and Nurse's Room 57 General 58 Boiler Room Recommendation to correct violation Thermostatic Provide thermostatic mixing valve to prevent water temperature mixing valve from exceeding 0 degrees. Zone backflow Hand wash fixture Eye wash fixture Piping needs to be removed RPZ needs to be relocated Action I.D. Priority Code Specification(s) Provide thermostatic mixing valve to prevent water temperature from exceeding 0 degrees. Units Of Labor Estimated Quantity Measure Code Cost Estimated ISBE Funding Completion Adjustment Type Date EA 9 2 $4, //207 O Provide reduce pressure zone backflow preventer. Provide reduce pressure zone backflow preventer. EA 2 $66, //207 O Provide approved hand washing fixture within Toilet Room. Provide approved hand washing fixture within Toilet Room. EA 2 $6, //207 O Provide separate eye wash fixture with thermostatic mixing valve. Remove existing faucet mounted eye wash Remove abandoned fixture and remove unused sections of piping back to mains. b b. Provide separate eye wash fixture with thermostatic mixing valve. Remove existing faucet mounted eye wash Remove abandoned fixture and remove unused sections of piping back to mains. EA 6 2 $9, //207 O EA 8 2 $8, //207 O Relocate RPZ to within 5'-0" of A.F.F. d b. Relocate RPZ to within 5'-0" of A.F.F. EA 2 $, //207 O Work to be Completed by District: $3,450 Outstanding Work: - Priority Codes B's Total: $,830,402 - Priority Codes C's Total: $747, /3

26 THEODORE ROOSEVELT ELEMENTARY SCHOOL

27 3/22/207 Violation / Work Item Listing. COUNTY CODE 06, Cook Item I.D. Location(s) (Room No) Rule Description of the Violated violation 2. DISTRICT CODE/NAME 0640, Park Ridge CCSD 64 Recommendation to correct violation Action I.D. Priority Code 3. FACILITY CODE/NAME THEODORE ROOSEVELT ELEM SCHOOL Specification(s) Units Of Labor Estimated Quantity Measure Code Cost Estimated ISBE Funding Completion Adjustment Type Date 3 Exterior Stairs not to code Remove concrete stairs and landing. Install new stairs Remove concrete stairs and landing. Install new stairs that are compliant with code required dimensions. that are compliant with code required dimensions. LS 2 $8, //208 O 4 Lounge 002 Fire rated doors Replace () 3'-0"x7'-0" door, frame and hardware with Replace () 3'-0"x7'-0" door, frame and hardware with new fire rated assembly. new fire rated assembly. EA 2 $6, //208 O 5 Janitor 04 Fire rated door Replace () 3'-0"x7'-0" door, frame and hardware with Replace () 3'-0"x7'-0" door, frame and hardware with new fire rated assembly. new fire rated assembly. EA 2 $3, //208 O 6 LRC 4 Fire rated door Replace (2) 3'-0"x7'-0" door, frame and hardware with Replace (2) 3'-0"x7'-0" door, frame and hardware with new fire rated assembly. new fire rated assembly. EA 2 $9, //208 O 7 Auditorium 9 Egress hardware Install egress hardware. Install egress hardware. EA 2 2 $6, //208 O 8 Auditorium 9 Fire rated door Replace (2) 3'-0"x7'-0" door, frame and hardware with Replace (2) 3'-0"x7'-0" door, frame and hardware with new fire rated assembly. new fire rated assembly. EA 2 $8, //208 O 9 Boiler Room 00 Fire stop Fire stop penetrations with UL listed systems. Fire stop penetrations with UL listed systems. LS 2 $2,0.00 8//208 O 0 Lounge 002 Construct fire rated corridor walls within District Science Construct fire rated corridor walls within District Need fire rated Storage 003. Provide new fire rated 3'-0"x7'-0" door, e b. Science Storage 003. Provide new fire rated 3'-0"x7'-0" doors frame and hardware. door, frame and hardware. LS 2 $4, //208 O Storage 005, Elevator Machine 006 Need new device Provide new device. Provide new device. EA 2 2 $4, //208 O 2 Attic Access 9B Rated wall Extend 2-hour rated wall to underside of the roof deck. Extend 2-hour rated wall to underside of the roof deck. SF $0, //208 O 3 Attic Access 3A Fire rated Provide fire rated ceiling construction, with fire rated attic Provide fire rated ceiling construction, with fire rated access panel. attic access panel. SF 65 2 $7, //208 O 4 Gymnasium 00 Windows need to Replace windows with new thermally broken anodized Replace windows with new thermally broken anodized f c. be replaced aluminum frames with aluminum frames. By District EA 27 2 $27, //207 O 5 Admin Office 9 Stage structure Remove stage thrust extension. Reconstruct stage Remove stage thrust extension. Reconstruct stage needs to be e b. thrust extension with appropriate structural support. thrust extension with appropriate structural support. reconstructed LS 2 $74, //208 O 6 Janitor 2 Exhaust Provide an exhaust system for the room. Provide an exhaust system for the room. EA 2 $9, //208 O 7 Mechanical 00D Belt guard Provide belt guard. Provide belt guard. By District EA 2 $,2.00 8//208 O 8 Entire School PA system needs Replace P.A. system head end complete with all Replace P.A. system head end complete with all to be replaced speakers and call buttons. speakers and call buttons. LS 2 $55, //208 O 9 4A, Basement Corridor, 02A, 2 Flr. Stiars, 35A, 308 Smoke detector Add additional fire alarm smoke detector Add additional fire alarm smoke detector EA 6 2 $6, //208 F 20 Corridor Exit signs Provide exit signs pointing to proper exit egress. Provide exit signs pointing to proper exit egress. EA 2 $ //208 O 2 LRC 4 Exit sign Add exit sign. Add exit sign. EA 2 $ //208 O Thermostatic Public Lavatories and Provide thermostatic mixing valve to prevent water Provide thermostatic mixing valve to prevent water 22 mixing valve EA 44 2 $24, //208 O Sinks temperature from exceeding 0 degrees. temperature from exceeding 0 degrees. 23 HC Public Lavatories 24 Classrooms 25 Boiler Room Insulation wrap Bubbler needs to be removed RPZ needs to be relocated Provide insulation wrap kit for exposed piping under lavatory. Provide insulation wrap kit for exposed piping under lavatory. EA 2 $2.00 8//208 O Remove bubbler from classroom sink b b. Remove bubbler from classroom sink EA 2 $ //208 O Relocate RPZ to within 5'-0" of A.F.F. d b. Relocate RPZ to within 5'-0" of A.F.F. EA 2 $, //208 O Work to be Completed by District: $28,89 Outstanding Work: - Priority Codes B's Total: $374,307 - Priority Codes C's Total: $0 /

28 DISTRICT Work Completed: $05,238 Outstanding Work: - Priority Codes B s Total: $4,969,95 - Priority Codes C s Total: $,395,70

29 Attachment 2 5 Year Plan September 8, 207 Park Ridge School District 64 5 Year Annual Budget * Total Project Costs includes abatement, construction contingency and A/E/CM fee $8,477,076 HLS B's Category Required $5,59,834 $4,523,307 $4,4,308 $3,890,839 $6,202,03 Critical Infrastructure 2's Critical Infrastructure 3's $,58,373 $448, Budget Year Capital Projects Grand Total: $0,035,498 $27,234, Completed 2020 Previous Survey Estimates Priority Code Total Project Cost $4,523,307 Priority Code School Item Total Project Cost $3,890,839 B $937,264 B Carpenter Plumbing $59,742 2 $,004,225 B Carpenter Mechanical $60,228 3 $350,658 B Carpenter Fire $9,933 Capital $2,23,60 B Carpenter Ceiling $286,33 B Carpenter Doors $49, Proposed B Carpenter Electrical $62,343 Priority Code School Item Total Project Cost $8,477,076 B Emerson Plumbing $7,042 B Roosevelt Plumbing $32,02 B Emerson Roof $6,77 B Roosevelt Mechanical $2,270 B Emerson Fire $9,366 B Roosevelt Fire $54,503 B Emerson Accessibility $36,37 B Roosevelt Stage Thrust $89,759 B Emerson Electrical $24,568 B Roosevelt Doors $52,843 B Jefferson Ceiling $8,273 B Roosevelt Electrical $86,424 B Jefferson Plumbing $48,276 B Roosevelt Site $22,692 B Jefferson Mechanical $49,09 B Administration/ESC Entry ADA Accessi $85,000 B Jefferson Fire $94,049 Total $635,52 B Jefferson Stage Thrust $98,959 2 Roosevelt Water Piping $463,976 Total $,329,623 2 Emerson & Site Detention, $2,93,036 2 Carpenter Water Piping $447,669 Jefferson Campus Asphalt, Drain. 2 Jefferson Water Piping $489,73 2 Emerson Shingle Roof $858,480 2 Emerson Flat Roof $377,775 Total $936,842 2 Franklin Roofing $,436,640 2 Washington Asphalt $6,038 Total $5,390,945 Total $0 3 Lincoln Tuckpointing $50,000 Capital Jefferson SV $787,20 3 Franklin Tuckpointing $48,80 Capital Emerson SV $787,63 Total $98,80 Capital Emerson LRC * Capital Roosevelt Classroom & Main $,502,438 Capital District wide Tuckpointing Mn $50,000 Capital Roosevelt LRC $250,000 Total $,624,373 Capital Carpenter LRC $5,000 Capital Lincoln Mech. Equipmt. $485, Previous Survey Estimates Total $2,352,438 Priority Code School Item Total Project Cost $6,202,03 B Field Plumbing $35,20 B Field Mechanical $70, Previous Survey Estimates B Field Stage Thrust $98,959 Priority Code School Item Total Project Cost $4,4,308 B Washington Mechanical $72,273 B Franklin Plumbing $80,368 B Washington Fire $03,35 B Franklin Mechanical $,472 B Washington Doors $8,339 B Franklin Fire $6,943 B Washington Accessibility $22,973 B Franklin Doors $7,942 B Lincoln Mechanical $25,03 B Lincoln Fire Separation $,05,845 B Lincoln Fire $360,904 B Lincoln Doors $269,22 B Lincoln Electrical $93,883 B Washington Plumbing $80,27 Total $,7,380 Total $,572,054 2 Field Water Piping $333,569 2 Franklin Water Piping $79,992 2 Washington Water Piping $674,38 2 Lincoln Asphalt $768,4 2 Lincoln Asphalt $768,4 Total $948,33 2 Field Asphalt $235,200 2 Washington Asphalt $867,80 Total $2,878,228 Total $0 Capital Carpenter SV $659,29 Capital Franklin SV $9,83 Total $0 Capital Washington LRC * Capital Field SV $2,56,405 Capital District wide Tuckpointing Mnt $50,000 Capital District wide Tuckpointing Mn $50,000 Total $,62,22 Total $2,206,405

30 Attachment Completed Projects September 8, Priority Code School Item Projected /28/206 Actual Notes B Field Windows $,75,467 $882,049 B Franklin Plumbing $7,24 Project postponed B Lincoln Doors $35,22 $46,000 Remaining doors as part of future phase B Lincoln Plumbing $29,743 $9,25 Est. $20,528 to be completed as part of future Capital phase B Washington Plumbing $80,27 Project postponed Subtotal Proposed $,707,87 Subtotal Actual $937,264 2 Roosevelt Roof # 5 $,276,958 $543,996 2 Lincoln Roof Area #6 $39,860 $60,444 2 Lincoln Water Piping $399,785 $399,785 Est. $20,528 to be completed as part of future phase Subtotal Proposed $,86,603 Subtotal Actual $,004,225 3 Lincoln Tuckpointing $350,658 Project added Subtotal Proposed $0 Subtotal Actual $350,658 Capital Lincoln Secure Vestibule $,08,080 $625,448 $46,000 of bid amount allocated above for Doors Capital Lincoln Learning Resource Center $636,000 $873,950 Capital Franklin Auditorium $960,498 Project postponed Capital Field Learning Resource Center $39,02 Project added Capital Franklin Learning Resource Center $76,925 Project added Capital Lincoln Corridor Floors $366,688 Project added Capital Multi Kitchen Remodeling $49,27 Project added Subtotal Proposed $2,677,578 Subtotal Actual $2,23,60 TOTAL PROPOSED $6,20,998 TOTAL ACTUAL $4,523,307 * Total Project Costs include abatement, construction contingency, and A/E/CM fees

31 Attachment Proposed Projects September 8, Priority Code School Item Total Project Cost $8,477,076 B Roosevelt Plumbing $32,02 B Roosevelt Mechanical $2,270 B Roosevelt Fire $54,503 B Roosevelt Stage Thrust $89,759 B Roosevelt Doors $52,843 B Roosevelt Electrical $86,424 B Roosevelt Site $22,692 B Administration/ESC Entry ADA Accessibility $85,000 ** Total $635,52 2 Roosevelt Water Piping $463,976 2 Emerson & Jefferson Campus Site Detention, Drainage, & Asphalt $2,93,036 *** 2 Emerson Shingle Roof $858,480 2 Emerson Flat Roof $377,775 2 Franklin Roofing $,436,640 **** 2 Washington Asphalt $6,038 Total $5,390,945 3 Lincoln Tuckpointing $50,000 3 Franklin Tuckpointing $48,80 Total $98,80 Capital Roosevelt Classroom and Main Office $,502,438 Relocation Capital Roosevelt Learning Resource Center $250,000 Capital Carpenter Learning Resource Center $5,000 Capital Lincoln Mechanical Equipment $485,000 ***** Total $2,352,438 Total Project Cost $8,477,076 * Total Project Costs for all projects include abatement, construction contingency and A/E/CM fees ** Admin Entry ADA Accessibility project will require review from Illinois State Historical Society (building was surveyed without determination in 975) *** $240,000 included in cost for estimated site detention requirements to be determined with Village of Niles **** Existing metal roof area (2,500SF) in good condition and to remain ***** Scope includes replacement of inefficient walk in cooler/freezer and water cooled unit ventilators

32 Attachment 5 Proposed Additional 208 Work Administration Building/ESC Task Total Project Cost Remodel Open Office $293,792 Remodel Kitchens $4,400 Total $308,92 Emerson Task Total Project Cost Secure Vestibule $420,000 Total $420,000 Roosevelt Task Total Project Cost Corridor Flooring $427,889 First Floor Classroom Flooring $97,24 Replace Classroom Doors & Hardware $8,800 Total $643,929 Field Task Total Project Cost Finish Remodel of LRC Remodel of Teachers Lounge/ Workspace $50,000 $300,000 Total $350,000 Lincoln Task Total Project Cost First & Second Floor Classroom Flooring $475,576 Asphalt $768,4 Total $,243,77 Franklin (remaining HLS items) Task Total Project Cost Plumbing Mechanical $80,368 $,472 Fire $6,943 Doors $7,942 Total $6,725 District Wide Task Total Project Cost Interior door & hardware replacement (includes 550 $2,200 each; frames to remain) $,452,000 Total $,452,000 Additional Project Cost $4,534,563

33 Attachment 6 Community Consolidated School District 64 (Park Ridge- Niles), Cook County, Illinois Funding Five Year Capital Plan February 6, 207 Elizabeth M. Hennessy, Managing Director

34 Market Update

35 Historical AAA MMD Interest Rates AAA Municipal Market Data ( MMD ) During the Past Five Years (%) Yr AAA MMD % 2.33% Yr AAA MMD.0 Jan-2 Mar-2 May-2 Jul-2 Sep-2 Nov-2 Jan-3 Mar-3 May-3 Jul-3 Sep-3 Nov-3 Jan-4 Mar-4 May-4 Jul-4 Sep-4 Nov-4 Jan-5 Mar-5 May-5 Jul-5 Sep-5 Nov-5 Jan-6 Mar-6 May-6 Jul-6 Sep-6 Nov-6 Jan-7 Note: ReWlects market conditions as of January 27, 207 Source: Thomson Financial

36 Municipal Yield Curve Comparison AAA MMD Curves During the Past Seven Years (%) MMD Yield Curve 0/27/7 0/27/6 0/27/5 0/27/4 0/27/2 0/27/ Note: ReWlects market conditions as of January 27, 207 Source: Thomson Financial 2

37 Outstanding Debt

38 Outstanding Debt Service Dated Issue Series Original Par Earliest Call Maturity March 3, 204 TAXABLE REFUNDING SCHOOL BONDS 204B $800,000 NON-CALLABLE December, March 3, 204 G.O. LIMITED TAX SCHOOL BONDS 204A $7,900,000 NON-CALLABLE December, December, 2008 G.O. REFUNDING SCHOOL BONDS 2008 $2,555,000 NON-CALLABLE December, November, 200 G.O. SCHOOL BONDS 200 $7,065,000 NON-CALLABLE December, Credit Ratings (Moody/S&P/Fitch) Fiscal Year Ending June 30, Amount Coupon Interest Debt Service Amount Coupon Amount Coupon Interest Debt Service Amount Coupon Interest Debt Service Amount Refunded Coupon Interest Debt Service Aa2 Aa2 AA Aaa FSA Insured (A Underlying) 207 0,400 0, , , , % 8,00 43,00 2,300, , % 63,250 2,363, , % 5, ,200,720, % 268,200,988, ,830, % 97,200 2,027, ,945, % 2,700 2,066, ,065, %,000, % 46,500 2,, , % 5,00 345,00 Total 800,000 26, ,000 6,900,000,000,000,243,900 9,43, ,000 32, ,000 4,485, , ,838 4,734,838 Callable $0 $0 $0 $0 Non-Callable $800,000 $7,900,000 $405,000 $2,300,000 Total Outstanding $800,000 $7,900,000 $405,000 $2,300,000 Purpose/ Notes REFUNDING OF SERIES 200 BONDS WORKING CASH BONDS REFUNDING OF SERIES 997 BONDS REFUNDING OF SERIES 997 REFERENDUM BONDS Underwriter Bond Counsel William Blair & Company Chapman and Cutler William Blair & Company Chapman and Cutler William Blair & Company Chapman and Cutler William Blair & Company Chapman and Cutler 3

39 Debt Limit Community Consolidated School District Number 64 (Park Ridge - Niles), Cook County, Illinois Statutory Debt Limit Equalized Assessed Valuation 205 $,37,795,37 (Times) Statutory Debt Limit 6.9% 94,653,864 (Less) Outstanding Bond Principal (,405,000) Net Debt Limit $83,248,864 4

40 Working Cash Fund Bond Limit Community Consolidated School District Number 64 (Park Ridge - Niles), Cook County, Illinois Working Cash Fund Bond Limit Equalized Assessed Valuation 205 $,37,795,37 Maximum Education Fund Extension 3.50 Subtotal 48,02,830 Times 85% 40,80,905 Less: Greater of: (7,900,000) Outstanding working cash bonds - or Working Cash Fund Balance 4,265,287 Net Working Cash Fund Debt Limit 32,90,905 5

41 Five Year Capital Plan and Funding Options

42 Five Year Capital Plan Summer 207 Summer 208 Summer 209 Summer 2020 Summer 202 Total Construction Projects: Priority: B,707,87 450,52,25,447,329,623,7,380 5,820,779 2,86,603 2,534,5 2,499,838 3,696,402 2,0,048 2,558, , ,234 Capital SV,08,080,08,080 Capital LRC 636, ,000 Capital SV R 2,93,746 2,93,746 Capital SV C 659,29 659,29 Capital SV E 787,63 787,63 Capital SV F 9,83 2,56,405 3,068,236 Capital SV J 787,20 787,20 Flooring,50,000,50,000,50,000,50,000 4,600,000 Total 5,24,500 6,328,769 7,238,64 7,750,398 6,434,833 32,994,4 Cumulative Total 5,24,500,570,269 8,808,90 26,559,308 32,994,4 6

43 Five Year Capital Plan with Funding Options Funding Sources: Summer 207 Summer 208 Summer 209 Summer 2020 Summer 202 Total Cash 3,500,000 3,500,000 Debt Certificates 9,250,000-9,250,000 Limited Bonds (DSEB) 9,700,000 0,544,4 20,244,4 Total 9,250,000 3,500,000 9,700,000 0,544,4-32,994,4 Cumulative Total 9,250,000 2,750,000 22,450,000 32,994,4 32,994,4 Construction Projects: Priority: B,707,87 450,52,25,447,329,623,7,380 5,820,779 2,86,603 2,534,5 2,499,838 3,696,402 2,0,048 2,558, , ,234 Capital SV,08,080,08,080 Capital LRC 636, ,000 Capital SV R 2,93,746 2,93,746 Capital SV C 659,29 659,29 Capital SV E 787,63 787,63 Capital SV F 9,83 2,56,405 3,068,236 Capital SV J 787,20 787,20 Flooring,50,000,50,000,50,000,50,000 4,600,000 Total 5,24,500 6,328,769 7,238,64 7,750,398 6,434,833 32,994,4 Cumulative Total 5,24,500,570,269 8,808,90 26,559,308 32,994,4 4,008,500,79,73 3,64,090 6,434,833-7

44 Funding Plan The District has $3.5M left over from the $0M working cash designated for capital projects Because we are in a rising interest rate environment we recommend issuing debt certiwicates to fund projects Wirst, using the cash second and limited bonds third All debt is issued as bank qualiwied (less than $0M in a calendar year) due to the.05% to.5% savings on the interest rates for bank qualiwied debt Debt CertiWicates are repaid in 5 years and limited bonds are repaid within 0 years or less to keep interest costs low and to allow future Boards Wlexibility to issue additional debt if Debt Certi8icates: Debt certiwicates are paid from the operating funds-there is no separate tax levy for these bonds The District will realize operational savings from retirements and cost containment resulting in an estimated annual savings in the operating funds pledging $800,000 to repayment of debt certiwicates over 5 years Limited Bonds Paid from Debt Service Extension Base (DSEB): The limited bonds are issued in 209 and 2020 They make use of the $2M accumulated fund balance in the bond and interest fund to pay debt service on currently outstanding bonds in excess of the DSEB and a large amount of the new bonds issued in 2020; Accumulated debt service fund balances can ONLY be used to pay debt service 8

45 Series 207 Debt CertiWicates 5 Year Payback Fiscal Series 207 Year Debt Certificates 06/30/8 799, /30/9 800, /30/20 799, /30/2 798, /30/22 796, /30/23 798, /30/24 798, /30/25 797, /30/26 795, /30/27 797, /30/28 797, /30/29 796, /30/30 798, /30/3 799, /30/32 798,000.00,97, Proceeds from Debt Certificates $9,250,000 All In True Interest Cost 3.36% 9

46 Current Situation Outstanding Bonds ## Community Consolidated School District Number 64 (Park Ridge - Niles), Cook County, Illinois Summary of Outstanding Debt Service Tax Rate Equalized Debt (CPI) Non-Referendum Referendum Current Current Remaining Tax Assessed % Service DSEB % DSEB () ULT (2) Debt Service Debt Service DSEB Year Valuation** Change Ext. Base ** Change Debt Service Levy Debt Service Levy Levies Tax Rate Capacity 205,37,795, %,967, % 302,600 2,858,00 3,60, ,665, ,577,564, %,98, % 2,022,600 80,400 2,833, (40,95) 207,577,564, % 2,023, % 2,063,800 2,063, (40,500) 208,577,564, % 2,053,649.50% 2,05,600 2,05, (5,95) 209,577,564, % 2,084,454.50% 2,47,800 2,47, (63,346) 2020,577,564, % 2,5,72.50% 350, , ,765,52 202,577,564, % 2,47,457.50% ,47, ,577,564, % 2,79,669.50% ,79, ,577,564, % 2,22,364.50% ,22, ,577,564, % 2,245,549.50% ,245, ,577,564, % 2,279,232.50% ,279, ,577,564, % 2,33,42.50% ,33, ,577,564, % 2,348,22.50% ,348, ,577,564, % 2,383,344.50% ,383, ,577,564, % 2,49,094.50% ,49, ,577,564, % 2,455,380.50% ,455, ,577,564, % 2,492,2.50% ,492,2 2032,577,564, % 2,529,594.50% ,529, ,577,564, % 2,567,538.50% ,567, ,577,564, % 2,606,05.50% ,606,05 Total $ 8,690,000 $ 80,400 $ 9,500,400 () Represents the debt service from the Series 204A Non-Referendum Bonds (2) Represents the debt service from Referendum Bonds issued to fund Emerson and the Bonds that refunded portions of that debt: 997, 200, 2008, 204B **Uses District EAV and CPI Assumptions as of February

47 Current Situation

48 Limited Bonds (DSEB): $9.7M Series 209 and $0.5M Series 2020 Community Consolidated School District Number 64 (Park Ridge - Niles), Cook County, Illinois Option I: Debt Certificates + LTGO Bonds 209 Financing 2020 Financing PLUS LESS PLUS LESS Debt (CPI) Current 209 DSEB Funds 2020 DSEB Funds Projected Remaining Projected Tax Service DSEB % Non-Ref New Money on New Money on DSEB DSEB Referendum Projected Debt Service Year Ext. Base ** Change Debt Service Debt Service* Hand in DS Debt Service* Hand in DS Debt Service Capacity Debt Service Debt Service Tax Rate 205,967, % $ 302,600 $ 302,600 $,665,309 $ 2,858,00 3,60, ,98, % 2,022,600 2,022,600 (40,95) 80,400 2,833, ,023, % 2,063,800 2,063,800 (40,500) - 2,063, ,053,649.50% 2,05, ,25 (322,25) 2,05,600 (5,95) - 2,05, ,084,454.50% 2,47, ,500 (429,500),244,500 (,248,375) 2,43,925 (59,47) - 2,43, ,5,72.50% 350, ,500,33,750 2,,450 4,27-2,, ,47,457.50% -,329,500 85,50 2,44,650 2,807-2,44, ,79,669.50% -,329, ,750 2,77,250 2,49-2,77, ,22,364.50% -,327, ,500 2,20,750,64-2,20, ,245,549.50% -,327,750 56,250,844,000 40,549 -,844, ,279,232.50% -,330, ,000,876, ,482 -,876, ,33,42.50% -,33, ,750,909, ,67 -,909, ,348,22.50% -,328,500 69,250,947, ,372 -,947, ,383,344.50% -,328, ,000,980, ,094 -,980, ,49,094.50% - 2,07,250 2,07,250 40,844-2,07, ,455,380.50% - 2,053,250 2,053, ,30-2,053, ,492,2.50% -,3,000,3,000,379,2 -,3, ,529,594.50% - - 2,529, ,567,538.50% - - 2,567, ,606,05.50% - - 2,606, ,645,42.50% - - 2,645, ,684,89.50% - - 2,684, ,725,09.50% - - 2,725, Total $ 8,690,000 $,83,625 $ (75,625) $ 3,28,400 $ (,248,375) $ 3,722,025 $ 80,400 $ 32,532,425 Bond Proceeds $9,750,000 $0,544,4 (2,000,000) All -In True Interest Cost as of February 3, % 3.33% **Uses District EAV and CPI Assumptions as of February

49 Limited Bonds (DSEB): $9.7M Series 209 and $0.5M Series

Master Facility Planning Update School Board Meeting May 26, 2016

Master Facility Planning Update School Board Meeting May 26, 2016 Master Facility Planning Update School Board Meeting May 26, 2016 Master Facilities Committee Overview Reflection of Committee Work Review of District Wide Facility Issues Identified District Wide Facility

More information

VOTER BOND REFERENDUM 2018 SUMMARY OF WORK PROPOSED

VOTER BOND REFERENDUM 2018 SUMMARY OF WORK PROPOSED Ashton Elementary School 1 Masonry Repair $ 42,781.50 2 Replace HVAC $ 375,000.00 3 Replace SAT @ Various Locations $ 92,364.00 3 Recoat & Resurface Exterior Paved Play Area $ 135,978.30 3 Various Technological

More information

PLATTEVILLE MIDDLE SCHOOL

PLATTEVILLE MIDDLE SCHOOL Architectural The building has aluminum clad wood awning windows in combination with aluminum fixed glass units. They appear to be exterior glazed with insulated glazing. See photo 2. Platteville Middle

More information

Garfield Elementary School Feasibility Study for New Library Building Project Number A C

Garfield Elementary School Feasibility Study for New Library Building Project Number A C Larry Teixeira Selma Unified School District 3036 Thompson Avenue Selma, CA 93662 Subject: Feasibility Study for New Library Building Project Number A 12-8581.00 C Dear Mr. Teixeira: At your request, we

More information

Master Project List Report

Master Project List Report Blue Hills Elementary School 01-8215 Site Utilities Replacement $52,835 01-8502 Modernization $3,135,933 01-8525 Exterior Painting $181,478 01-8552 Kindergarden Fencing $13,180 Install new backflow preventer.

More information

REPORT CARD TO THE COMMUNITY MAY 15, 2018

REPORT CARD TO THE COMMUNITY MAY 15, 2018 REPORT CARD TO THE COMMUNITY MAY 15, 2018 O On May 10, 2014 voters in Greenville ISD approved a $72,275,000 bond election. BOND PROPOSAL PROJECT BOND AMOUNT CONSTRUCT A NEW BOWIE ELEMENTARY SCHOOL $17,600,000

More information

LINCOLN HIGH SCHOOL MODERNIZATION BEX IV COMMUNITY MEETING JUNE 23, 2016

LINCOLN HIGH SCHOOL MODERNIZATION BEX IV COMMUNITY MEETING JUNE 23, 2016 LINCOLN HIGH SCHOOL MODERNIZATION BEX IV COMMUNITY MEETING JUNE 23, 2016 PROJECT OVERVIEW PROJECT OVERVIEW + PRE-DESIGN BEGAN IN FALL OF 2015 + EXISTING CONDITIONS ANALYSIS + PROJECTED GROWTH IN HIGH SCHOOL

More information

New High School Concept

New High School Concept Approved Bond Projects for Alamance-Burlington Schools In November 2018, Alamance County citizens approved a $150 million bond project proposal. Bond funds will pay to construct a new high school and provide

More information

AGENDA. 1. Call to Order. 2. Approval of Minutes. 3. Approval of Invoices and Commitments. 4. Review Updated Site Analysis and Permitting

AGENDA. 1. Call to Order. 2. Approval of Minutes. 3. Approval of Invoices and Commitments. 4. Review Updated Site Analysis and Permitting PROJECT MANAGEMENT AGENDA Project: George Keverian School Feasibility Study Project No.: 16049 Re: School Building Committee Meeting Meeting Date: 3/22/2017 Meeting Location: Mayor s Conference Room, City

More information

Design Presentation. Chief Operations Officer Willie Burroughs

Design Presentation. Chief Operations Officer Willie Burroughs Design Presentation Chief Operations Officer Willie Burroughs Agenda Introduction Community Feedback Project updates 2 Feedback Citizens Advisory Committee meetings Growth and Development meetings Community

More information

3. 21st Century Learning A. Districtwide Flexible Learning - Allowance for Flexible Furniture $600,000 Subtotal $600,000

3. 21st Century Learning A. Districtwide Flexible Learning - Allowance for Flexible Furniture $600,000 Subtotal $600,000 1. Safety and Security A. Additional Cameras District Wide $382,000 B. Interior Locks Upgrades Allowance $300,000 C. Tilden Entrance Upgrades D. Door and Glass Improvements Allowance $500,000 E. Alert

More information

Massachusetts School Building Authority

Massachusetts School Building Authority Massachusetts School Building Authority School District Revere District Contact Paul Dakin TEL: (781) 286-8226 Name of School Submission Date 3/6/2007 The following Priorities have been included in the

More information

Kerrville ISD has called for a bond election in the amount of $88,960,000 for November 6, 2018

Kerrville ISD has called for a bond election in the amount of $88,960,000 for November 6, 2018 Kerrville ISD has called for a bond election in the amount of $88,960,000 for November 6, 2018 WHAT IS A BOND ELECTION? Provide communities an opportunity to vote to give the Board of Trustees authority

More information

Mechanical Inspection Plumbing

Mechanical Inspection Plumbing 0811 Fixtures Sinks, drinking fountains, water closets, showers, etc. Classroom Sinks. Classroom sinks (19) are enameled cast iron self rimming side ledge with gooseneck faucet trim with index handles,

More information

Charles W Earle Elementary School

Charles W Earle Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Briar Crest Elementary

Briar Crest Elementary Promises Kept This document includes partial lists of major projects completed at Pattonville Schools since 1986 as part of past bond issues approved by the Pattonville community. Briar Crest Elementary

More information

Josefa Ortiz De Dominguez Elementary School

Josefa Ortiz De Dominguez Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

2015 Building Condition Survey Summary Mosaic Associates Architects 02/19/16

2015 Building Condition Survey Summary Mosaic Associates Architects 02/19/16 1. General: This summary is offered as a supplement to the 2015 Building Condition Survey being filed with SED on behalf of the District. All cost estimates are preliminary, and should be re-evaluated

More information

Joseph Brennemann Elementary School

Joseph Brennemann Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Richard Henry Lee Elementary School

Richard Henry Lee Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Design Review of Facility Improvement Projects

Design Review of Facility Improvement Projects Design Review of Facility Improvement Projects Agenda Board Meeting Schedule Scope of Work Summary Overall Building Plans and Scope Summary Update on Areas of Design Development Programming and Space planning

More information

Edward Jenner Elementary Academy of the Arts

Edward Jenner Elementary Academy of the Arts Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Washington Irving Elementary School

Washington Irving Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Agustin Lara Elementary Academy

Agustin Lara Elementary Academy Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Tighe&Bond. Groton Heights School Mechanical Evaluation. 1 Existing Conditions. 1.1 Water Service Entrance

Tighe&Bond. Groton Heights School Mechanical Evaluation. 1 Existing Conditions. 1.1 Water Service Entrance Groton Heights School Mechanical Evaluation TO: FROM: Amy Vaillancourt, Project Manager Harley Langford, Project Manger Jason Curtis, P.E. DATE: February 24, 2016; Revised May 31, 2016 On Monday, December

More information

School District of New London. Community Listening Session & Referendum Consideration

School District of New London. Community Listening Session & Referendum Consideration School District of New London Community Listening Session & Referendum Consideration 1 Why? Significant facility, maintenance, safety, energy efficiency needs Independent Facility Study identified millions

More information

MARY CRAPO CENTER Miller Road, Swartz Creek, Michigan

MARY CRAPO CENTER Miller Road, Swartz Creek, Michigan MARY CRAPO CENTER 8197 Miller Road, Swartz Creek, Michigan MARY CRAPO CENTER 8197 Miller Road, Swartz Creek General Information: - Instructional, Child Care Development Center (West Wing) o (2) Infant/Toddler

More information

Forest Hills Facilities Plan

Forest Hills Facilities Plan Forest Hills Facilities Plan Extensive updates to 8 of our 9 schools Replace Wilson Elementary Enhance learning environments across the district Build additional classrooms to accommodate gradual implementation

More information

MUKWONAGO AREA SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY

MUKWONAGO AREA SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY ARCHITECTURE ROLLING HILLS ELEMENTARY SCHOOL Rolling Hills Elementary was built in 1999 and is the newest addition to the Mukwonago Area School District. The building contains approximately 64,900 gross

More information

Renovation Project Presentation Public Meetings

Renovation Project Presentation Public Meetings Renovation Project Presentation Public Meetings SWBR Architects and Tappé Associates made a formal presentation to both the Board and Public in early February of a conceptual design of a proposed renovation

More information

2014 Bond Project Guide

2014 Bond Project Guide 2014 Bond Project Guide Bush Elementary School Page 1 Instructional Technology Computers, Projectors, Mobile Carts, Document Cameras and Printers Wireless Connectivity New Construction New Tech Center

More information

MOUNT PLEASANT MIDDLE SCHOOL HVAC. M-01 Heating Plant: M-02 Heating & Ventilating Systems: Livingston School District Mount Pleasant Middle School

MOUNT PLEASANT MIDDLE SCHOOL HVAC. M-01 Heating Plant: M-02 Heating & Ventilating Systems: Livingston School District Mount Pleasant Middle School MOUNT PLEASANT MIDDLE SCHOOL HVAC M-01 Heating Plant: The existing boilers have recently been upgraded. (3) steam boilers (8660 mbh each) manufactured by Weil- McLain have been installed. Newer hot water

More information

HOLUM EDUCATION CENTER. Architectural. January 13, 2014 DeForest Area School District

HOLUM EDUCATION CENTER. Architectural. January 13, 2014 DeForest Area School District HOLUM EDUCATION CENTER Architectural The existing building has approximately 41,823 square feet and sets on a lot about 4.14 acres in size. Parking lots are located along the east and west sides of the

More information

Genevieve Melody Elementary School

Genevieve Melody Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

DEERFIELD SCHOOL DISTRICT REFERENDUM Committed to Excellence and Equity in Educating Our Students

DEERFIELD SCHOOL DISTRICT REFERENDUM Committed to Excellence and Equity in Educating Our Students DEERFIELD SCHOOL DISTRICT REFERENDUM Committed to Excellence and Equity in Educating Our Students FACILITY NEEDS THE CHALLENGE Deerfield Middle School/High School building has served the community for

More information

SCO # 1 & 2 PUNCLH LIST Project Name: VANCLEAVE UPPER ELEMENTARY CLA#: 13003

SCO # 1 & 2 PUNCLH LIST Project Name: VANCLEAVE UPPER ELEMENTARY CLA#: 13003 SCO # 1 & 2 PUNCLH LIST Project Name: VANCLEAVE UPPER ELEMENTARY CLA#: 13003 No. Discipline Sent to Name Item Date Noted Date Resolved How item was resolved SCO # 1Punch listed items were noted below on

More information

Calmeca Academy of Fine Arts and Dual Language

Calmeca Academy of Fine Arts and Dual Language Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

PLAN REVIEW SUBMITTAL GUIDE

PLAN REVIEW SUBMITTAL GUIDE PLAN REVIEW SUBMITTAL GUIDE Plans, specifications and other construction documentation for the initial plan review should be as complete as possible at the time of submittal. Use this convenient guide

More information

Cherry Hill Public Schools BUILDING A SOLID FUTURE

Cherry Hill Public Schools BUILDING A SOLID FUTURE Cherry Hill Public Schools BUILDING A SOLID FUTURE Who We Are The Cherry Hill School District is the 12 th largest in the state, serving 11,500 students 19 Locations 2 High Schools, 3 Middle Schools, 12

More information

Greenwood Elementary School 5550 South Holly Street Greenwood Village, Colorado 80111

Greenwood Elementary School 5550 South Holly Street Greenwood Village, Colorado 80111 Greenwood Elementary School 5550 South Holly Street Greenwood Village, Colorado 80111 Year Opened 1958 Current Square Footage 50,504 Site Acreage 8.53 greenwood.cherrycreekschools.org $220,720 Electrical

More information

Ichabod Crane Central School District 2018 Capital Project Preliminary Estimate

Ichabod Crane Central School District 2018 Capital Project Preliminary Estimate Health & Safety 1,399,000 Academics & Program 17,140,800 Physical Education & Athletics 5,922,000 Building Infrastructure 3,103,800 Site Infrastructure 1,049,600 TOTAL SCOPE OF WORK 28,615,200 PROPOSED

More information

NEW WATER CONNECTION PROCEDURES FOR HOPE AND EDENVILLE TOWNSHIP RESIDENTS

NEW WATER CONNECTION PROCEDURES FOR HOPE AND EDENVILLE TOWNSHIP RESIDENTS NEW WATER CONNECTION PROCEDURES FOR HOPE AND EDENVILLE TOWNSHIP RESIDENTS WATER DISTRICT NO. 1 of MIDLAND COUNTY Office Location: 246 E. Price Rd. Midland, MI 48642 Mailing Address: PO Box 320 Sanford,

More information

Attachment F. Campus Capital Needs Sales Surtax Funded Detail Report

Attachment F. Campus Capital Needs Sales Surtax Funded Detail Report Facility Attachment F Campus Capital Needs Sales Surtax Funded Detail Report Facilities Services 2700 Judge Fran Jamieson Way Viera, Florida 32940-6601 Condition Code Estimate Longleaf Elementary 1.78

More information

NYC Department of Education

NYC Department of Education Asset: NEW UTRECHT AF - BROOKLYN, 1601 80 STREET, New York, 11214 Inspection Id Inspection Type Time In Last Edited SA : Architectural - Senior 2017-10-31 4:06 PM 2018-06-13 10:51 AM AA : Architectural

More information

Oscar DePriest Elementary School

Oscar DePriest Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Beaufort County Community College. Maintenance and House Keeping Plan

Beaufort County Community College. Maintenance and House Keeping Plan Beaufort County Community College Maintenance and House Keeping Plan Summary: The College s facility management is handled by the Maintenance Department. The Director of Plant and Maintenance Operations

More information

H BUTCH BROWNING FIRE MARSHAL BUILDING REHABILITATION

H BUTCH BROWNING FIRE MARSHAL BUILDING REHABILITATION STATE OF LOUISIANA Department of Public Safety and Corrections Office of State Fire Marshal Code Enforcement and Building Safety 8181 Independence Boulevard Baton Rouge, Louisiana 70806 225-925-4920 H

More information

Francis M McKay Elementary School

Francis M McKay Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

State College Area School District High School North Building EXISTING CONDITIONS ASSESSMENT

State College Area School District High School North Building EXISTING CONDITIONS ASSESSMENT State College Area School District High School North Building Prepared by CenterPoint Engineering 08 February 2013 FACILITY ASSESSMENT SUMMARY PHYSICAL PLANT General HVAC This report is a snapshot of the

More information

CHAPTER 7 ALTERATIONS LEVEL

CHAPTER 7 ALTERATIONS LEVEL CHAPTER 7 ALTERATIONS LEVEL 2 SECTION 701 GENERAL 701.1 Scope. Level 2 alterations as described in Section 404 shall comply with the requirements of this chapter. Exception: Buildings in which the reconfiguration

More information

Florence High School / Middle School Page 1 of 3 Florence, WI

Florence High School / Middle School Page 1 of 3 Florence, WI Florence High School / Middle School Page 1 of 3 Florence, WI Plumbing Systems Review: The following report is the result of a site visit by Tim Kehoe of Muermann Engineering, LLC that occurred on October

More information

Alessandro Volta Elementary School

Alessandro Volta Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

NYACK PUBLIC SCHOOLS CAPITAL IMPROVEMENT PLANNING PROCESS

NYACK PUBLIC SCHOOLS CAPITAL IMPROVEMENT PLANNING PROCESS NYACK PUBLIC SCHOOLS CAPITAL IMPROVEMENT PLANNING PROCESS DECEMBER 3, 2013 KEY QUESTIONS 1. What is the time sequence for available funding? (In what years will the funding be available?) 2. What is the

More information

S AGE E NGINEERING A SSOCIATES, LLP

S AGE E NGINEERING A SSOCIATES, LLP S AGE E NGINEERING A SSOCIATES, LLP 1211 Western Avenue Albany, NY (518) 453 6091 F (518) 453 6092 Kingston Library Mechanical and Electrical Systems Field Report Date of Visits: Mechanical - September

More information

Appendix B. Facilities Assessment Report

Appendix B. Facilities Assessment Report Mile Lane Army Reserve Center Redevelopment Plan September 2008 Appendix B Facilities Assessment Report RKG Associates, Inc. Mile Lane Army Reserve Base Middletown, CT MEP System Evaluation For RKG Associates

More information

SAFETY. USE OF SAFETY CHECK LISTS A safety check for compliance with current regulations should be performed yearly.

SAFETY. USE OF SAFETY CHECK LISTS A safety check for compliance with current regulations should be performed yearly. SAFETY GENERAL Buildings must be designed according to building and fire safety codes and other regulatory standards at the time of construction. However, such codes and standards are continuously changing.

More information

John Palmer Elementary School

John Palmer Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Maintenance Road Show

Maintenance Road Show Maintenance Road Show What does it take to maintain a campus? What are the costs? Buildings: 267 Campus Sq. Feet: 3,470,408 GSF Roads: 8.28 miles Walkways: 8.81 miles Exterior lights: 1,000 Exterior stairways:

More information

Cook - Wissahickon Elementary School

Cook - Wissahickon Elementary School Cook - Wissahickon Elementary School 201 E. Salaignac St., Philadelphia, PA 19128 HVAC Replacement Project Scope Determination Report May 10, 2018 Prepared by: G.P. Lamina, Jr., P.E., MBA School District

More information

What does it take to maintain a campus? What are the costs? UNIVERSITY OF ALASKA FAIRBANKS

What does it take to maintain a campus? What are the costs? UNIVERSITY OF ALASKA FAIRBANKS Maintenance Road Show What does it take to maintain a campus? What are the costs? Buildings: 267 Campus Sq. Feet: 3,470,408 GSF Roads: 8.28 miles Walkways: 8.81 miles Exterior 1,000 Exterior stairways:

More information

Sprinkler: The building does not have a fire protection system installed. MECHANICAL / PLUMBING / SPRINKLER SYSTEMS RECOMMENDATIONS

Sprinkler: The building does not have a fire protection system installed. MECHANICAL / PLUMBING / SPRINKLER SYSTEMS RECOMMENDATIONS EXISTING MECHANICAL CONDITIONS SUMMARY The items listed below are based on our site visit on Nov 10, 2016. Our review is based on current conditions and anticipated future use of these building. In the

More information

School Fire Safety Checklist

School Fire Safety Checklist Community Risk Reduction The (SFSC) includes many of the most common fire prevention and life safety issues found in schools. The SFSC is not intended to be an all inclusive list, but rather highlights

More information

NEW WATER CONNECTION PROCEDURES

NEW WATER CONNECTION PROCEDURES NEW WATER CONNECTION PROCEDURES For Lincoln, Jerome, Village of Sanford WATER DISTRICT NO. 1 of MIDLAND COUNTY Office Location: 246 E. Price Rd. Midland, MI 48642 Mailing Address: PO Box 320 Sanford, MI

More information

Allisonville Elementary School Facilities Highlights Built: 1960 Last Major Renovation: 28 years ago Capacity: 650 Current Enrollment: 767

Allisonville Elementary School Facilities Highlights Built: 1960 Last Major Renovation: 28 years ago Capacity: 650 Current Enrollment: 767 Allisonville Elementary School Built: 1960 Last Major Renovation: 28 years ago Capacity: 650 Current Enrollment: 767 ADA improvements are Fire alarms need to be updated Playground equipment needs to be

More information

BOABC Level III Exams 7, 8, 9 and 10 Beginning April 1, 2015

BOABC Level III Exams 7, 8, 9 and 10 Beginning April 1, 2015 Exam ID Examination Code Part BOABC Level III Exams 7, 8, 9 and 10 Beginning April 1, 2015 BC3-7 Level III Exam 7 BCBC Part 3 (Part 3 Buildings Classification & Construction) BC3-8 Level III Exam 8 BCBC

More information

BUILDER S PRE-INSPECTION CHECKLIST

BUILDER S PRE-INSPECTION CHECKLIST Warrenton Fire Protection District 606 Fairgrounds Rd. Warrenton, MO 63383 Ph: 636-456-8935 Fax: 636-456-7764 www.warrenton-fire.org BUILDER S PRE-INSPECTION CHECKLIST This checklist is designed as a general

More information

DeWitt Clinton Elementary School

DeWitt Clinton Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Inside Out Home Inspections

Inside Out Home Inspections Cover Page Inside Out Home Inspections Property Inspection Report Inspection prepared for: John Doe & Jane Doe Date of Inspection: 5/10/2014 Inspector: Lucas Sargent PO Box 514, Tioga, PA 16946 Phone:

More information

George B Swift Elementary Specialty School

George B Swift Elementary Specialty School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

implementation r expression in landscape

implementation r expression in landscape 6 ubc okanagan implementation campus plan r expression in landscape 68 6 implementation campus plan sections The Campus Plan supports the academic mission, values and commitments of the University by providing

More information

NYC Department of Education

NYC Department of Education Architectural Inspection Building Assessment Survey 2017-2018 Asset: LEHMAN AF - BRONX, 3000 EAST TREMONT AVENUE, New York, 10461 Inspection Id Inspection Type Time In Last Edited SA : Architectural -

More information

Warren County Schools Plant and Operations

Warren County Schools Plant and Operations Warren County Schools Plant and Operations Buildings/Facilities/Energy Strategic Plan September 28, 2017 (Updated January 18, 2018) Donnie Caldwell; Facilities Director One Team, One Goal, High Levels

More information

Meadow Point Elementary School East Grand Avenue Aurora, Colorado 80015

Meadow Point Elementary School East Grand Avenue Aurora, Colorado 80015 Meadow Point Elementary School 17901 East Grand Avenue Aurora, Colorado 80015 Year Opened 1982 Current Square Footage 53,100 Site Acreage 7.48 meadowpoint.cherrycreekschools.org $2,081,600 Electrical system,

More information

Rockwell/Johnson School Renovations Project. Existing Conditions September, 2016

Rockwell/Johnson School Renovations Project. Existing Conditions September, 2016 Rockwell/Johnson School Renovations Project Existing Conditions September, 2016 Rockwell School Conditions RS - Custodial Closet Shared w/ Book Room. RS - Aging Telephone Switch Gear/No Growth for Additional

More information

Proposed Bond Construction Projects

Proposed Bond Construction Projects Proposed Bond Construction Projects The Facility Planning Process * September, 2006: - Board of Education established the Facilities and Asset Review Committee with the responsibility to evaluate all district

More information

RE: Clark East Tower Renovations DATE: November 16, 2015 Ypsilanti, Michigan

RE: Clark East Tower Renovations DATE: November 16, 2015 Ypsilanti, Michigan ADDENDUM NO. 2 RE: Clark East Tower Renovations DATE: November 16, 2015 Ypsilanti, Michigan TO: All Bidders Gentlemen: You are hereby directed to make the following changes in the Project Manual and/or

More information

School District of Milton 5- Year Capital Maintenance and Improvement Plan

School District of Milton 5- Year Capital Maintenance and Improvement Plan Updated - 02/21/17 School District of Milton 5- Year Capital Maintenance and Improvement Plan 101 East Elementary 1 Parking Lot/Traffic Flow Project 615,175 Includes Construction and Engineering 2 Bathroom

More information

HEALTH/LIFE SAFETY ANNUAL INSPECTION CHECKLIST (ROE)

HEALTH/LIFE SAFETY ANNUAL INSPECTION CHECKLIST (ROE) HEALTH/LIFE SAFETY ANNUAL INSPECTION CHECKLIST (ROE) Administrative and General Building Requirements Safety reference plans (1) Fire alarm audibility (10) Alcohol hand-rub-dispensers (19) School safety

More information

Arlington Public Schools Purchasing Office

Arlington Public Schools Purchasing Office Arlington Public Schools Purchasing Office NOTICE OF ADDENDUM NO. 1 Issued on March 30, 2018 TITLE: ITB NO.: YORKTOWN HIGH SCHOOL INTERIOR MODIFICATIONS PROJECT 57FY18 ITB CLOSING DATE PRIOR TO 2:00 P.

More information

BUILDER S PRE-INSPECTION CHECKLIST

BUILDER S PRE-INSPECTION CHECKLIST Warrenton Fire Protection District 606 Fairgrounds Rd. Warrenton, MO 63383 Ph: 636-456-8935 Fax: 636-456-7764 www.warrenton-fire.org BUILDER S PRE-INSPECTION CHECKLIST This checklist is designed as a general

More information

Sidney Sawyer Elementary School

Sidney Sawyer Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Ashland School District Facility & Capacity Assessment Report 2005

Ashland School District Facility & Capacity Assessment Report 2005 Ashland School District Facility & Capacity Assessment Report 2005 Briscoe Elementary School (Closed Facility) Address: 265 N Main Street Area: 33,980 square feet Buildings: Original Building 1948 Music

More information

Doing Business with Bartlett Cocke General Contractors

Doing Business with Bartlett Cocke General Contractors Doing Business with Bartlett Cocke General Contractors FACTS 59 5 580 $ 700 YEARS OFFICES STATEWIDE EMPLOYEES MILLION IN REVENUE Established in 1959 by Bartlett Cocke, Jr. San Antonio (headquarters) Austin

More information

MUKWONAGO SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY

MUKWONAGO SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY MUKWONAGO SCHOOL DISTRICT ARCHITECTURE PARK VIEW MIDDLE SCHOOL The original school building was dedicated in 1954 as the High School, with an addition in 1959, a library addition in 1970, and an addition/renovation

More information

NYC Department of Education

NYC Department of Education Asset: P.S. 104 - BROOKLYN, 9115 5TH AVENUE, New York, 11209 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-02-21 8:55 AM 2018-02-21 1:09 PM Asset Data Are there fuel tanks? Total

More information

PENNSYLVANIA. Downloaded

PENNSYLVANIA. Downloaded Housekeeping/Laundry/Maintenance 205.26. Laundry. PENNSYLVANIA Downloaded 01.15.11 (a) A laundry room shall be provided in a facility where commercial laundry service is not used for the washing of soiled

More information

CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA

CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA Agenda Date: December 16, 2013 Action Required: Adoption of Resolution Presenter: Staff Contacts: Title: James E. Tolbert, AICP, Director of NDS James

More information

MISSISSIPPI GORGE REGIONAL PARK MASTER PLAN

MISSISSIPPI GORGE REGIONAL PARK MASTER PLAN MISSISSIPPI GORGE REGIONAL PARK MASTER PLAN Minneapolis Park and Recreation Board CAC MEETING #1 APRIL 23, 2018 AGENDA Mississippi Gorge Regional Park Master Plan CAC #1 01 / Welcome and Calling Circle

More information

CENTRAL KITSAP SCHOOL DISTRICT BOARD PROCEDURE

CENTRAL KITSAP SCHOOL DISTRICT BOARD PROCEDURE MANAGEMENT SUPPORT SERVICES Utilities Management Introduction In support of Central Kitsap School District (CKSD) Utilities Conservation Policy, the following procedure is set forth to establish operating

More information

DMTF: Specific Building Recommendations

DMTF: Specific Building Recommendations DMTF: Specific Building Recommendations Asset Name Project Title Total Cost BLOCKER BUILDING 22,503,303 Capital Renewal 7,640,013 DOMESTIC WATER HEATER REPLACEMENT 16,374 EXTERIOR DOOR REPLACEMENT 133,623

More information

Virginia Department of Planning and Budget Project Request Justification

Virginia Department of Planning and Budget Project Request Justification DPB Form CNJ June 2005 Virginia Department of Planning and Budget Project Request Justification 2006-2008 Biennium Date: July 22, 2005 A. General Information 1. Agency name: Virginia Tech 2. Agency code:

More information

2 Main Office Building BLDG-955A Building Purpose Building Area Administration offices. Training room 7,610 SF Inspection Date August 16, 2016 Inspect

2 Main Office Building BLDG-955A Building Purpose Building Area Administration offices. Training room 7,610 SF Inspection Date August 16, 2016 Inspect 1 Site Summary Address 7200 Bluff Springs Road Austin, TX 78744 Number of Permanent Campus Facilities 2 Original Year of Construction 2014 Total Campus Building Area (combined) 25,314 SF Introduction The

More information

NUUC CONGREGATIONAL MEETING

NUUC CONGREGATIONAL MEETING NUUC CONGREGATIONAL MEETING MARCH 10, 2019 1. BUILDING PROPOSAL PRESENTATION INTRODUCTION DEE BURLISON BUDGET REVIEW BUILDING COMMITTEE REQUIREMENTS REVIEW BUILDING COMMITTEE WHAT OPTIONS WERE REVIEWED

More information

ALLISON ELEMENTARY SCHOOL 4315 Don Julio Blvd., North Highlands, CA 95660

ALLISON ELEMENTARY SCHOOL 4315 Don Julio Blvd., North Highlands, CA 95660 ALLISON ELEMENTARY SCHOOL 4315 Don Julio Blvd., North Highlands, CA 95660 Year Built 1960 // Age 58 years Building Area 31,688 Square Feet Student Capacity 389 Current Enrollment (2017-2018) 466 Priority

More information

Exhibit CC BALTIMORE COUNTY PUBLIC SCHOOLS

Exhibit CC BALTIMORE COUNTY PUBLIC SCHOOLS Exhibit CC BALTIMORE COUNTY PUBLIC SCHOOLS DATE: July 10, 2007 TO: FROM: SUBJECT: ORIGINATOR: RESOURCE PERSON(S): BOARD OF EDUCATION Dr. Joe A. Hairston, Superintendent ABBREVIATED FACILITY STATUS REPORT

More information

Electrical Inspection Special Electrical

Electrical Inspection Special Electrical 0941 Fire Alarm System Devices, panels, wiring, conduit, etc. Description of the building system The school is equipped with a hard wired fire alarm control panel, and automatic dialer. The fire alarm

More information

First Revision No NFPA [ Global Input ] Submitter Information Verification. Committee Statement

First Revision No NFPA [ Global Input ] Submitter Information Verification. Committee Statement of 43 10/20/2015 4:02 PM First Revision No. 2035-NFPA 101-2015 [ Global Input ] To 14.3.4.4.1, add an item (4) to read: (4) Carbon monoxide detectors shall be installed centrally located within occupiable

More information

Fire District Dwelling Construction Requirements

Fire District Dwelling Construction Requirements Fire District Dwelling Construction Requirements Includes Sacramento County Fire Marshals Association Standard for Residential Sprinklers City of Rancho Cordova Building & Safety Department 2729 Prospect

More information

Radon Detection Specialists, Inc.

Radon Detection Specialists, Inc. Commercial Survey Report Client: Community Consolidated School District 181 Site Address: Elm School 6010 S Elm St Hinsdale, IL 60521 Survey Date: April 9, 2012 to April 11, 2012 Initial Test RDS-R-002

More information

FIRE SAFETY INSPECTION REPORT

FIRE SAFETY INSPECTION REPORT FIRE SAFETY INSPECTION REPORT PORTLAND TEXTILE LTD. ACCORD ID: 11873 PLOT NO. 14-15, SECTOR 6, CHITTAGONG EXPORT PROCESSING ZONE, CHITTAGONG OTHER FACTORIES: NONE November 3, 2015 Page 2 SUMMARY was surveyed

More information