Rockwell/Johnson School Renovations Project. Existing Conditions September, 2016

Size: px
Start display at page:

Download "Rockwell/Johnson School Renovations Project. Existing Conditions September, 2016"

Transcription

1 Rockwell/Johnson School Renovations Project Existing Conditions September, 2016

2 Rockwell School Conditions

3 RS - Custodial Closet Shared w/ Book Room.

4 RS - Aging Telephone Switch Gear/No Growth for Additional Phones/Communication

5 RS -Age of School/Settling Cracked Floors Throughout

6 RS Lack of Storage/Electrical Switch Room Used as Storage, Fire Violation

7 RS -Two of Four Air Handlers Operational/Two Un-repairable

8 RS -Nurse's Room Limited Abilities/ Treatment Area Cramped, Not Private.

9 RS -Main Stairwell ADA Issues w/ Railings & Supports

10 RS -Media Center Shelves Not Age Appropriate, Upper Shelf Unusable/Unsafe

11 RS - Media Center is too small.

12 RS -Only mechanical ventilation available. Lower blue unit/upper air conditioner unit has limited abilities. Struggles to keep the temp. from overheating in the computer lab.

13 RS -Additional electrical circuits are needed but are not available due to the age of the building abilities.

14 RS - Not enough outlets to support technology needs.

15 RS - Class size can be students along with all the furniture.

16 RS -One undersize exhaust fan serves the entire second floor hallway. Resulting in inadequately exhausting heat and humidity throughout the day.

17 RS -Restrooms not grade appropriate for the size of the students using them.

18 RS -Restrooms not grade appropriate for the size of the students using them.

19 RS -Current electrical panels have no growth potential.

20 RS - Elevator does not meet ADA and NFAP fire codes. Stretchers and wheelchairs are unable to maneuver.

21 RS - Paved walkways around the perimeter of the school require extensive grading to remove previous years of patching.

22 RS - 4 Specialist have to share space - up to 4 groups running at the same time.

23 RS - School Psychologist Office - No room to meet with students.

24 RS - Playground Equipment - Outdated and broken pieces.

25 RS - Playground - Cracked and sealed pavement.

26 RS - Only one Conference Room - Too small, no ventilation, and often double booked.

27 Johnson School Conditions

28 JS-Gym shower restroom spaces forced to be used for school storage.

29 JS-Gym toilets not suitable for current ADA requirements.

30 JS-Cafeteria air handlers lack ability to exhaust /heat the space as needed due to size and age of the equipment.

31 JS-Bus drop off area & parent drop offs lanes need to be separated with plastic barricades due to design issues.

32 JS-Service road that goes behind the building is not adequate for emergency vehicles.

33 JS-Stage cramped and has limited abilities for use.

34 JS-Guidance Office lobby cramped with space concerns.

35 JS-STEM classroom crammed, with space concerns.

36 JS-STEM classroom crammed, with space concerns.

37 JS-Student restrooms not grade appropriate fixtures for size of students.

38 JS-Paved walkways around perimeter of school require extensive grading to remove previous years of patching.

39 JS-Several classroom windows have broken thermal seals resulting in foggy condensation forming within the window.

40 JS-Several doorways throughout the building have locking bars in the middle of the travel path of the doors causing exiting issues and injuries.

41 JS-Old cabinet heaters have become difficult to keep in operation due to age and condition of equipment.

42 JS- Pavement & concrete surfaces w/patched over mounds, broken & raised sections, w/potholes & cracks.

43 JS - Band room does not have storage and not large enough to hold ensemble.

44 JS - Shared classrooms - multiple groups going on at the same time.

45 JS - Lack of Space - ELL Instruction occurs in small office.

46 JS - Chorus room not large enough to hold 75+ students.

47 JS - School Counseling Office too small & poor ventilation.

48 JS - Conference room too small for parent meetings and poor ventilation.

Allisonville Elementary School Facilities Highlights Built: 1960 Last Major Renovation: 28 years ago Capacity: 650 Current Enrollment: 767

Allisonville Elementary School Facilities Highlights Built: 1960 Last Major Renovation: 28 years ago Capacity: 650 Current Enrollment: 767 Allisonville Elementary School Built: 1960 Last Major Renovation: 28 years ago Capacity: 650 Current Enrollment: 767 ADA improvements are Fire alarms need to be updated Playground equipment needs to be

More information

New High School Concept

New High School Concept Approved Bond Projects for Alamance-Burlington Schools In November 2018, Alamance County citizens approved a $150 million bond project proposal. Bond funds will pay to construct a new high school and provide

More information

VOTER BOND REFERENDUM 2018 SUMMARY OF WORK PROPOSED

VOTER BOND REFERENDUM 2018 SUMMARY OF WORK PROPOSED Ashton Elementary School 1 Masonry Repair $ 42,781.50 2 Replace HVAC $ 375,000.00 3 Replace SAT @ Various Locations $ 92,364.00 3 Recoat & Resurface Exterior Paved Play Area $ 135,978.30 3 Various Technological

More information

3. 21st Century Learning A. Districtwide Flexible Learning - Allowance for Flexible Furniture $600,000 Subtotal $600,000

3. 21st Century Learning A. Districtwide Flexible Learning - Allowance for Flexible Furniture $600,000 Subtotal $600,000 1. Safety and Security A. Additional Cameras District Wide $382,000 B. Interior Locks Upgrades Allowance $300,000 C. Tilden Entrance Upgrades D. Door and Glass Improvements Allowance $500,000 E. Alert

More information

Briar Crest Elementary

Briar Crest Elementary Promises Kept This document includes partial lists of major projects completed at Pattonville Schools since 1986 as part of past bond issues approved by the Pattonville community. Briar Crest Elementary

More information

IEQ SCHOOL DATA BASE. School Name: Reservoir High School Principal: Patrick Saunderson DATE: 1/23/2017. WORK ORDER NUMBER of POTENTIAL IEQ

IEQ SCHOOL DATA BASE. School Name: Reservoir High School Principal: Patrick Saunderson DATE: 1/23/2017. WORK ORDER NUMBER of POTENTIAL IEQ LOOK-FORS ROOM/LOCATION COMMENTS ADMIN FACILITIES WORK ORDER NUMBER of POTENTIAL IEQ DATE ASSIGNED COMPLETION DATE 30 DAY REVISIT CLOSED 1. No unusual or offensive odors, or temperature discomfort 316,

More information

Food needs to be in sealed containers 03. FOOD: Unsealed, left in

Food needs to be in sealed containers 03. FOOD: Unsealed, left in 01A. ODOR: Unusual or 6/14/2017 14:15offensive Boys room Urine smell 01A. ODOR: Unusual or 6/14/2017 15:16offensive Office Odor and poor air flow x 01B. TEMPERATURE: 6/14/2017 13:42Uncomfortable 202 Warm

More information

CAPITAL OUTLAY REQUEST - IDENTIFIED AND EMERGING PROJECTS - RANKED 3-Jun-14

CAPITAL OUTLAY REQUEST - IDENTIFIED AND EMERGING PROJECTS - RANKED 3-Jun-14 2014-2015 CAPITAL OUTLAY REQUEST - IDENTIFIED AND EMERGING PROJECTS - RANKED 3-Jun-14 School Item Amount a. Classroom A/R (Increase CR capacity to 804, add l Resource and tutoring spaces needed. Teacher

More information

Master Facility Planning Update School Board Meeting May 26, 2016

Master Facility Planning Update School Board Meeting May 26, 2016 Master Facility Planning Update School Board Meeting May 26, 2016 Master Facilities Committee Overview Reflection of Committee Work Review of District Wide Facility Issues Identified District Wide Facility

More information

PLATTEVILLE MIDDLE SCHOOL

PLATTEVILLE MIDDLE SCHOOL Architectural The building has aluminum clad wood awning windows in combination with aluminum fixed glass units. They appear to be exterior glazed with insulated glazing. See photo 2. Platteville Middle

More information

30% Design Community Meeting

30% Design Community Meeting Monday, September 17, 2018 30% Design Community Meeting Site 85-E-W-4 Please sign in on your mobile device: http//communitymeeting.ocps.net/ Site 85-E-W-4 Meeting Agenda September 17, 2018, 6:45PM Welcome

More information

2014 Bond Project Guide

2014 Bond Project Guide 2014 Bond Project Guide Bush Elementary School Page 1 Instructional Technology Computers, Projectors, Mobile Carts, Document Cameras and Printers Wireless Connectivity New Construction New Tech Center

More information

Greenwood Elementary School 5550 South Holly Street Greenwood Village, Colorado 80111

Greenwood Elementary School 5550 South Holly Street Greenwood Village, Colorado 80111 Greenwood Elementary School 5550 South Holly Street Greenwood Village, Colorado 80111 Year Opened 1958 Current Square Footage 50,504 Site Acreage 8.53 greenwood.cherrycreekschools.org $220,720 Electrical

More information

Emergency Management Resource Guide. Appendix A: Crime Prevention Through Environmental Design CPTED Principles Checklist for Kentucky Public Schools

Emergency Management Resource Guide. Appendix A: Crime Prevention Through Environmental Design CPTED Principles Checklist for Kentucky Public Schools Appendix A: Crime Prevention Through Environmental Design CPTED Principles Checklist for Kentucky Public Schools 143 Crime Prevention Through Environmental Design CPTED Principles Checklist for Kentucky

More information

Number of persons with a disability that live with a disability in your community?

Number of persons with a disability that live with a disability in your community? Building name: re Dame Location: Owen Sound Assessment by: Cathy Smart Date: August 25, 2003 Total number of students: 378 Number of students living with a disability? Deaf/Hard of hearing Blind/Low vision

More information

EMMS IEQ Walkthrough Summary Spring Room Observations (Responses)

EMMS IEQ Walkthrough Summary Spring Room Observations (Responses) 01A. ODOR: Unusual or 5/15/2017 9:55:18 offensive 111 Stained floor, metal shelves with chemicals rusty WOID31122 5/15/17 01B. TEMPERATURE: 5/15/2017 9:24:45 Uncomfortable 2 Inconsistent temperature WOID31121

More information

Sagebrush Elementary School East Temple Place Aurora, Colorado 80015

Sagebrush Elementary School East Temple Place Aurora, Colorado 80015 Sagebrush Elementary School 14700 East Temple Place Aurora, Colorado 80015 Year Opened 1977 Current Square Footage 57,100 Site Acreage 7.66 sagebrush.cherrycreekschools.org Asphalt and concrete work; electrical

More information

WILLIAM & MARY CUSTODIAL TASK & FREQUENCY LIST. PUBLIC SPACE: ENTRANCES, LOBBIES, AND CORRIDORS Daily Weekly Monthly Quarterly Yearly

WILLIAM & MARY CUSTODIAL TASK & FREQUENCY LIST. PUBLIC SPACE: ENTRANCES, LOBBIES, AND CORRIDORS Daily Weekly Monthly Quarterly Yearly WILLIAM & MARY CUSTODIAL TASK & FREQUENCY LIST PUBLIC SPACE: ENTRANCES, LOBBIES, AND CORRIDORS Daily Weekly Monthly Quarterly Yearly Collect & properly dispose of recycling as needed Dust, or wipe all

More information

HOLUM EDUCATION CENTER. Architectural. January 13, 2014 DeForest Area School District

HOLUM EDUCATION CENTER. Architectural. January 13, 2014 DeForest Area School District HOLUM EDUCATION CENTER Architectural The existing building has approximately 41,823 square feet and sets on a lot about 4.14 acres in size. Parking lots are located along the east and west sides of the

More information

Forest Hills Facilities Plan

Forest Hills Facilities Plan Forest Hills Facilities Plan Extensive updates to 8 of our 9 schools Replace Wilson Elementary Enhance learning environments across the district Build additional classrooms to accommodate gradual implementation

More information

Facility Improvements

Facility Improvements AP-SI-03 BICYCLE RACK ADDITION AP-SI-05 EXTERIOR BENCH ADDITIONS Installation of bike rack will allow for designated and secure storage of bicycles. Installation of exterior benches will provide an outdoor

More information

Safety Checklist for Science Instruction, Preparation and Storage Area

Safety Checklist for Science Instruction, Preparation and Storage Area Safety Checklist for Science Instruction, Preparation and Storage Area School: Date: Teacher(s): Room or Area: The Science Center of the Boston Public Schools would like to acknowledge both the Science

More information

MOUNT PLEASANT MIDDLE SCHOOL HVAC. M-01 Heating Plant: M-02 Heating & Ventilating Systems: Livingston School District Mount Pleasant Middle School

MOUNT PLEASANT MIDDLE SCHOOL HVAC. M-01 Heating Plant: M-02 Heating & Ventilating Systems: Livingston School District Mount Pleasant Middle School MOUNT PLEASANT MIDDLE SCHOOL HVAC M-01 Heating Plant: The existing boilers have recently been upgraded. (3) steam boilers (8660 mbh each) manufactured by Weil- McLain have been installed. Newer hot water

More information

NYC Department of Education

NYC Department of Education Asset: NEW UTRECHT AF - BROOKLYN, 1601 80 STREET, New York, 11214 Inspection Id Inspection Type Time In Last Edited SA : Architectural - Senior 2017-10-31 4:06 PM 2018-06-13 10:51 AM AA : Architectural

More information

NYC Department of Education

NYC Department of Education Architectural Inspection Building Assessment Survey 2017-2018 Asset: LEHMAN AF - BRONX, 3000 EAST TREMONT AVENUE, New York, 10461 Inspection Id Inspection Type Time In Last Edited SA : Architectural -

More information

Beaufort County Community College. Maintenance and House Keeping Plan

Beaufort County Community College. Maintenance and House Keeping Plan Beaufort County Community College Maintenance and House Keeping Plan Summary: The College s facility management is handled by the Maintenance Department. The Director of Plant and Maintenance Operations

More information

Electrical Inspection Special Electrical

Electrical Inspection Special Electrical 0941 Fire Alarm System Devices, panels, wiring, conduit, etc. The present fire alarm system manufactured by Gamewell was installed with the 1982 renovation. It is a non addressable, zoned system. It includes

More information

F. GENERAL REQUIREMENTS Electrical Design Criteria 2006 Edition 4/3/06 School District Palm Beach County Page-1 of 15

F. GENERAL REQUIREMENTS Electrical Design Criteria 2006 Edition 4/3/06 School District Palm Beach County Page-1 of 15 ELECTRICAL DESIGN CRITERIA TABLE OF CONTENTS I GENERAL...2 II CRITERIA...2 A. POWER DISTRIBUTION SYSTEMS...2 1. NORMAL POWER:...2 2. EMERGENCY POWER...3 B. LIGHTING...4 1. GENERAL...4 2. AVERAGE MAINTAINED

More information

NEIGHBORS SOUTHWEST NEIGHBORHOOD MEETING December 17, 2014 BEAVERTON SCHOOL DISTRICT SOUTH COOPER MOUNTAIN HIGH SCHOOL

NEIGHBORS SOUTHWEST NEIGHBORHOOD MEETING December 17, 2014 BEAVERTON SCHOOL DISTRICT SOUTH COOPER MOUNTAIN HIGH SCHOOL NEIGHBORS SOUTHWEST NEIGHBORHOOD MEETING December 17, 2014 AGENDA NEIGHBORHOOD MEETING Design Criteria Review 3 Concepts Discussion Q&A DESIGN CRITERIA NEIGHBORHOOD MEETING IMAGE & IDENTITY CIVIC PRESENCE

More information

Room Number or CUSTODIAL FACILITIES WORK ORDERS ADMINISTRATION IEQ WORK ORDERS ASSIGNED DATE COMPLETION DATE 30-DAY REVISIT CLOSED

Room Number or CUSTODIAL FACILITIES WORK ORDERS ADMINISTRATION IEQ WORK ORDERS ASSIGNED DATE COMPLETION DATE 30-DAY REVISIT CLOSED 5/17/2017 11:03:18 02. AIR FRESHENERS 3 Spray 5/17/2017 10:06:34 5/17/2017 10:20:09 5/17/2017 10:11:42 5/17/2017 10:45:45 5/17/2017 9:58:45 5/17/2017 10:02:26 5/17/2017 10:14:46 5/17/2017 10:15:30 5/17/2017

More information

University of Delaware

University of Delaware KEY STATION Campus must have a key station minimum 20 x 16 1 Computer hook up for time and attendance Furniture Seating for 20 Employee mailbox 3 Key Boxes (2 boxes should hold 30 keys; 1 box should hold

More information

NYC Department of Education

NYC Department of Education Asset: COLUMBUS AF - BRONX, 925 ASTOR AVENUE, New York, 10469 Inspection Id Inspection Type Time In Last Edited SA : Architectural - Senior 2017-10-31 9:21 AM 2017-11-29 8:45 AM AA : Architectural - Associate

More information

Chabot College: Plan Kickoff and Visioning Session with Student Senate

Chabot College: Plan Kickoff and Visioning Session with Student Senate Facilities Master Plan 2017 Chabot College: Plan Kickoff and Visioning Session with Student Senate February 05, 2018 Key issues, challenges and opportunities: Need more information on the projects that

More information

School District of Milton 5- Year Capital Maintenance and Improvement Plan

School District of Milton 5- Year Capital Maintenance and Improvement Plan Updated - 02/21/17 School District of Milton 5- Year Capital Maintenance and Improvement Plan 101 East Elementary 1 Parking Lot/Traffic Flow Project 615,175 Includes Construction and Engineering 2 Bathroom

More information

PROCTOR TERRACE ELEMENTARY SCHOOL

PROCTOR TERRACE ELEMENTARY SCHOOL SCHL DAA Address: Bryden Lane Santa Rosa, CA 95404 Established: 50 Permanent Classrooms: 3 Portable Classrooms: 9 Building Area: Site Area: 40, sq ft 5 acres Students in 5: 484 Students in (Projected):

More information

H107 Video Conference Room

H107 Video Conference Room Capacity: 20 persons White Board (1) Document Camera (1) Door (1) Network connections possible Layout: Seminar style with chairs and tables (moveable) Podium (1) Media Cart (1) Windows (4) Meets all ADA

More information

REPORT CARD TO THE COMMUNITY MAY 15, 2018

REPORT CARD TO THE COMMUNITY MAY 15, 2018 REPORT CARD TO THE COMMUNITY MAY 15, 2018 O On May 10, 2014 voters in Greenville ISD approved a $72,275,000 bond election. BOND PROPOSAL PROJECT BOND AMOUNT CONSTRUCT A NEW BOWIE ELEMENTARY SCHOOL $17,600,000

More information

Meadow Point Elementary School East Grand Avenue Aurora, Colorado 80015

Meadow Point Elementary School East Grand Avenue Aurora, Colorado 80015 Meadow Point Elementary School 17901 East Grand Avenue Aurora, Colorado 80015 Year Opened 1982 Current Square Footage 53,100 Site Acreage 7.48 meadowpoint.cherrycreekschools.org $2,081,600 Electrical system,

More information

MCB/DDS Partnership Orientation & Mobility/Low Vision Services

MCB/DDS Partnership Orientation & Mobility/Low Vision Services MCB/DDS Partnership Orientation & Mobility/Low Vision Services www.mass.gov/dds/visionloss Creating Safe Environments For People with Vision Loss: the Basics! Color and High Contrast Use of highly contrasting

More information

January 11, New benches installed. Paving of parking lot adjacent to piers and the canoe put-in. Near complete with clean up remaining.

January 11, New benches installed. Paving of parking lot adjacent to piers and the canoe put-in. Near complete with clean up remaining. Project Updates January 11, 2018 CENTERVILLE CHESAPEAKE ARBORETUM BELLS MILL CITY CREEKWOOD SOUTH DEEP CREEK LOCK WORK TO BE PERFORMED/UPDATES Improvements to the parking lot include installation of a

More information

CUSTODIAL SERVICES CUSTOMER SERVICE GUIDE

CUSTODIAL SERVICES CUSTOMER SERVICE GUIDE CUSTODIAL SERVICES CUSTOMER SERVICE GUIDE WHAT WE CLEAN AND HOW OFTEN WE CLEAN IT As part of an ongoing effort to improve custodial customer service, we developed the Custodial Services Customer Service

More information

TIFT COUNTY SCHOOLS E-SPLOST HISTORY

TIFT COUNTY SCHOOLS E-SPLOST HISTORY TIFT COUNTY SCHOOLS E-SPLOST HISTORY July 1, 1997 June 30, 2002 $28,766,187.16 collected July 1, 2002 June 30, 2007 $39,025,830.10 collected July 1, 2007 June 30, 2012 $41,886,155.46 collected July 1,

More information

Home Safety Checklist From Adaptive Remodeling Solutions, LLC Monona, WI

Home Safety Checklist From Adaptive Remodeling Solutions, LLC Monona, WI Home Safety Checklist From Adaptive Remodeling Solutions, LLC 608-234-7440 Monona, WI Are you able to use every part of your home efficiently and safely? Take a good look at the rooms in your home and

More information

Cleaning Service Levels

Cleaning Service Levels Restrooms Empty waste receptacles and change liner, as needed. Restock dispensers: soap, paper towel and toilet tissue. Clean mirrors; clean and disinfect urinals, toilets, and sinks. Polish stainless

More information

Tillamook High School Bond Projects

Tillamook High School Bond Projects Tillamook High School Bond Projects School Project Description All Buildings Upgrade fire alarm H&S All Buildings Add door lock capability from inside rooms Security All Buildings Install card lock entry

More information

Wold Architects and Engineers. 332 Minnesota Street Suite W2000 Saint Paul, MN

Wold Architects and Engineers. 332 Minnesota Street Suite W2000 Saint Paul, MN Wold Architects and Engineers 332 Minnesota Street Suite W2000 Saint Paul, MN 55101 651 227 7773 PLANNERS ARCHITECTS ENGINEERS ISD #15 St. Francis Area Schools East Bethel Elementary School Additions and

More information

Building Self-Inspection Program

Building Self-Inspection Program Building Self-Inspection Program www.tridentinsurance.net Lines of Business: Property, General Liability, Worker s Compensation, Public Official Liability Risk Control Strategy/Key Issues: Reduce physical

More information

dusty. Room shakes and Student restrooms across All vents need cleaning

dusty. Room shakes and Student restrooms across All vents need cleaning Timestamp Observation: 01B. TEMPERATURE: Room Number or Location/Name: Comments for this room: ADMINISTRATION CUSTODIAL 6/1/2017 15:08:34 Uncomfortable 01B. TEMPERATURE: 310 Etremely warm 6/1/2017 15:11:42

More information

If there are emergency situations they should be reported to Maintenance Department immediately.

If there are emergency situations they should be reported to Maintenance Department immediately. To: From: Re: Mercer County Schools Principals Mercer County Schools Safety Committee Required Safety Reports Date: October 30, 2010 In order to work toward safer schools, two reports are required to be

More information

Workplace Safety Observation Tour Notes

Workplace Safety Observation Tour Notes Workplace Safety Observation Tour Notes The following summary report highlights key observation findings noted during the 2012 COR Safety Audit. The intent of this document is to share the 2012 observation

More information

CENTRAL GEORGIA TECHNICAL COLLEGE. Maintenance, Custodial & Operation Plan Facilities & Equipment

CENTRAL GEORGIA TECHNICAL COLLEGE. Maintenance, Custodial & Operation Plan Facilities & Equipment CENTRAL GEORGIA TECHNICAL COLLEGE Maintenance, Custodial & Operation Plan Facilities & Equipment Central Georgia Technical College Maintenance, Custodial and Operation Plan In order that Central Georgia

More information

Bethlehem University 2008 Projects Summary

Bethlehem University 2008 Projects Summary 2008 Projects Summary 2008 Projects Summary In Addition to following up daily engineering related issues and supervising the Maintenance and Security Departments the University Engineer is involved in

More information

Greater Albany Public Schools May 2017 Ballot Measure for School Repairs, Crowding and Job Training

Greater Albany Public Schools May 2017 Ballot Measure for School Repairs, Crowding and Job Training PUBLIC SCHOOLS Greater Albany Public s for Repairs, Crowding and Job Training CRITICAL FACILITY UPGRADES ADA Improvements: Architectural Improvements: Envelope Improvements Including Roofs: Exterior Improvements:

More information

MASTER PLAN DIAGRAMS DISTRICT CAMPUS OVERVIEW

MASTER PLAN DIAGRAMS DISTRICT CAMPUS OVERVIEW DISTRICT CAMPUS OVERVIEW Classrooms, CR Special Education Computer Lab INTERSTATE 5 FW - Faculty Work, FL - Faculty Physical Education / Athletics Support Spaces S - Storage, T - Toilets, U - Utility,

More information

LINCOLN HIGH SCHOOL MODERNIZATION BEX IV COMMUNITY MEETING JUNE 23, 2016

LINCOLN HIGH SCHOOL MODERNIZATION BEX IV COMMUNITY MEETING JUNE 23, 2016 LINCOLN HIGH SCHOOL MODERNIZATION BEX IV COMMUNITY MEETING JUNE 23, 2016 PROJECT OVERVIEW PROJECT OVERVIEW + PRE-DESIGN BEGAN IN FALL OF 2015 + EXISTING CONDITIONS ANALYSIS + PROJECTED GROWTH IN HIGH SCHOOL

More information

EMERGENCY RESPONSE PLAN MANUAL. Nursing

EMERGENCY RESPONSE PLAN MANUAL. Nursing EMERGENCY RESPONSE PLAN MANUAL INDIANA STATE UNIVERSITY Nursing PAGE 2 TABLE OF CONTENTS BUILDING COORDINATOR 3 RESPONSE TEAM MEMBERS 3 NOTIFICATION 3 EVACUATION 4 ASSEMBLY POINTS 5 DISABLED SAFE AREAS

More information

Appendix B JPPSS Emergency Management Plan Template for Schools (Please type all information)

Appendix B JPPSS Emergency Management Plan Template for Schools (Please type all information) Appendix B JPPSS Emergency Management Plan Template for Schools (Please type all information) Directions for the Site Administrator/Principal This Emergency Management Plan must be completed at the beginning

More information

NYACK PUBLIC SCHOOLS CAPITAL IMPROVEMENT PLANNING PROCESS

NYACK PUBLIC SCHOOLS CAPITAL IMPROVEMENT PLANNING PROCESS NYACK PUBLIC SCHOOLS CAPITAL IMPROVEMENT PLANNING PROCESS DECEMBER 3, 2013 KEY QUESTIONS 1. What is the time sequence for available funding? (In what years will the funding be available?) 2. What is the

More information

RADON PLAN. Eugene School District 4J Facilities Management 715 West Fourth Avenue Eugene, OR

RADON PLAN. Eugene School District 4J Facilities Management 715 West Fourth Avenue Eugene, OR RADON PLAN The 2015 Legislature passed House Bill (HB) 2931 so that if elevated radon levels in Oregon schools existed they would be known. House Bill 2931 later became Oregon Revised Statute (ORS) 332.166-167.

More information

Proposed Bond Construction Projects

Proposed Bond Construction Projects Proposed Bond Construction Projects The Facility Planning Process * September, 2006: - Board of Education established the Facilities and Asset Review Committee with the responsibility to evaluate all district

More information

ALLISON ELEMENTARY SCHOOL 4315 Don Julio Blvd., North Highlands, CA 95660

ALLISON ELEMENTARY SCHOOL 4315 Don Julio Blvd., North Highlands, CA 95660 ALLISON ELEMENTARY SCHOOL 4315 Don Julio Blvd., North Highlands, CA 95660 Year Built 1960 // Age 58 years Building Area 31,688 Square Feet Student Capacity 389 Current Enrollment (2017-2018) 466 Priority

More information

IEQ SCHOOL DATA BASE

IEQ SCHOOL DATA BASE LOOK-FORS ROOM/LOCATION COMMENTS ADMIN FACILITIES WORK ORDER NUMBER of POTENTIAL IEQ ASSIGNED COMPLETION 30 DAY REVISIT CLOSED 1. No unusual or offensive odors, or temperature discomfort 15-21 - 8-2 -

More information

FACILITIES CONDITION ASSESSMENT WAGNER RANCH NATURE AREA. Orinda Union School District Facilities Master Plan

FACILITIES CONDITION ASSESSMENT WAGNER RANCH NATURE AREA. Orinda Union School District Facilities Master Plan FACILITIES CNDITIN ASSESSMENT WAGNE ANCH NATE AEA 0 30 60 0 AT MAE CL SCI SP INT 4 IT 3 3 BASC BASC INCLSIN SPECIALIST M FW FL IT ADMIN C MP IT Property line shown is estimated. CE Core Curriculum (Language

More information

SPLOST I, II, III,IV

SPLOST I, II, III,IV ACWORTH ES (OLD) ACWORTH INTERMEDIATE Construction projects not done due to school replacement Land Acquisition, 61 IU Replacement Elementary School Access Controls, Temperature monitors for walk in coolers

More information

Design Review of Facility Improvement Projects

Design Review of Facility Improvement Projects Design Review of Facility Improvement Projects Agenda Board Meeting Schedule Scope of Work Summary Overall Building Plans and Scope Summary Update on Areas of Design Development Programming and Space planning

More information

MAINE. Downloaded g. Maintain an effective pest control program so that the facility is free of pests and rodents;

MAINE. Downloaded g. Maintain an effective pest control program so that the facility is free of pests and rodents; Housekeeping/Laundry/Maintenance Each licensed facility shall: MAINE Downloaded 01.15.11 g. Maintain an effective pest control program so that the facility is free of pests and rodents; 20.J.2. Soiled

More information

Chariho Regional School District Five-Year Capital Facilities Improvement Plan (2/10/15)

Chariho Regional School District Five-Year Capital Facilities Improvement Plan (2/10/15) Chariho Regional School District Five-Year Capital Facilities Improvement Plan (2/10/15) School/Department FY 16 FY 17 FY18 FY19 FY20 Chariho Regional High School FY 16 FY 17 FY18 FY19 FY20 *Repair Bleachers

More information

MEDIA CENTER September 30, 2010

MEDIA CENTER September 30, 2010 MEDIA CENTER September 30, 2010 I. PROGRAM REQUIREMENTS Refer to the project-specific Schedule of Spaces for student stations, square footage, and for any requirements that may differ from the prototype

More information

ENGINEERING REPORT - MECHANICAL / ELECTRICAL / PLUMBING

ENGINEERING REPORT - MECHANICAL / ELECTRICAL / PLUMBING Mechanical Systems Information The mechanical system at Reed Middle School is comprised of seventy six Trane DX/Gas rooftop units (RTUs). The recommended useful life for DX equipment is 15 years. Seventy

More information

MUKWONAGO SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY

MUKWONAGO SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY MUKWONAGO SCHOOL DISTRICT ARCHITECTURE PARK VIEW MIDDLE SCHOOL The original school building was dedicated in 1954 as the High School, with an addition in 1959, a library addition in 1970, and an addition/renovation

More information

Emergency Evacuation Plan

Emergency Evacuation Plan Emergency Evacuation Plan Oceanside Campus - Library & Information Hub Building 1200 Revised February 2011 Evacuation Plan - Building 1200 Overview Evacuation Plan - Building 1200 Campus Emergency and

More information

G W C C GREENMOUNT WEST COMMUNITY CENTER GWCA - COMMUNITY CENTER. design recommendations

G W C C GREENMOUNT WEST COMMUNITY CENTER GWCA - COMMUNITY CENTER. design recommendations G W C C GREENMOUNT WEST COMMUNITY CENTER design recommendations GWCA - COMMUNITY CENTER PROGRAM SIDEWALK 1... ENTRANCE/EXIT A... MECHANICAL 2... LOBBY B... ELECTRICAL 1 3... RECEPTION C... MEN S TOILET

More information

HELENA PUBLIC SCHOOLS FRONT STREET LEARNING CENTER CLEANING OUTCOMES ASSESSMENT. May 2013

HELENA PUBLIC SCHOOLS FRONT STREET LEARNING CENTER CLEANING OUTCOMES ASSESSMENT. May 2013 HELENA PUBLIC SCHOOLS FRONT STREET LEARNING CENTER CLEANING OUTCOMES ASSESSMENT May 2013 HPS FRONT STREET LEARNING CENTER CLEANING OUTCOMES ASSESSMENT PURPOSE During the week of May 20th, 2013 BRUCO INC.

More information

PASS Security Plan Checklist

PASS Security Plan Checklist [School District Name] PASS Security Plan Checklist SCHOOL DISTRICT INFORMATION Address: Telephone Number: Fax Number: Number of Employees: Number of Students: School Resource Officer: TIER CONTINUUM:

More information

DEERFIELD SCHOOL DISTRICT REFERENDUM Committed to Excellence and Equity in Educating Our Students

DEERFIELD SCHOOL DISTRICT REFERENDUM Committed to Excellence and Equity in Educating Our Students DEERFIELD SCHOOL DISTRICT REFERENDUM Committed to Excellence and Equity in Educating Our Students FACILITY NEEDS THE CHALLENGE Deerfield Middle School/High School building has served the community for

More information

EDUCATIONAL SPECIFICATIONS NEW CONSTRUCTION TO: Oxford Middle School Location to be determined November 4, 2016 Approved by BOE on November 29, 2016

EDUCATIONAL SPECIFICATIONS NEW CONSTRUCTION TO: Oxford Middle School Location to be determined November 4, 2016 Approved by BOE on November 29, 2016 EDUCATIONAL SPECIFICATIONS NEW CONSTRUCTION TO: Oxford Middle School Location to be determined November 4, 2016 Approved by BOE on November 29, 2016 Educational Specifications Page 1 Project Overview:

More information

Green-Sea. Attendance Area

Green-Sea. Attendance Area Green-Sea Attendance Area Green Sea Floyds Elementary Asset Summary and History Report Hierarchy Green Sea Floyds Elementary Inspection Date N/A Asset 23 Green Sea Floyds Elementary Deficiencies Count

More information

August 2012 CRISIS MANAGEMENT PLAN

August 2012 CRISIS MANAGEMENT PLAN August 2012 CRISIS MANAGEMENT PLAN 1 Table of Contents 1. DUTIES AND RESPONSIBILITIES OF CRISIS TEAM MEMBERS 2. FIRE ALARM PROCEDURES/ FALSE ALARM PROCEDURE 3. TORNADO / SEVERE STORMS / OTHER WEATHER 4.

More information

Facilities Procedure for Accessibility or Compliance Related Requests:

Facilities Procedure for Accessibility or Compliance Related Requests: Facilities Procedure for Accessibility or Compliance Related Requests: All doorways, entry ways, equipment height, etc. will be checked to ensure compliance with the Americans with Disabilities Act (ADA)

More information

Aging-in-Place Safety Checklist

Aging-in-Place Safety Checklist Aging-in-Place Safety Checklist Use the checklist to find the hazardous conditions or safety risks for every room/area in your home: Entrance to Front Door and Front Yard: 1. Lack of railing or unstable

More information

CUSTODIAL CUSTOMER SERVICE GUIDE

CUSTODIAL CUSTOMER SERVICE GUIDE CUSTODIAL CUSTOMER SERVICE GUIDE INSIDE what we clean & how often we clean it 2. Classrooms & Teaching Labs 3. Research Labs & Halls & Lobbies 4. Offices & Restrooms 5. Stairwells & Conference Rooms 6.

More information

FACILITIES CONDITION ASSESSMENT WAGNER RANCH ELEMENTARY SCHOOL. Orinda Union School District Facilities Master Plan

FACILITIES CONDITION ASSESSMENT WAGNER RANCH ELEMENTARY SCHOOL. Orinda Union School District Facilities Master Plan FACILITIES CNDITIN ASSESSMENT WAGNE ANCH ELEMENTAY SCHL 0 0 60 0 AT MAE CL SCI SP INT IT BASC BASC LIB INCLUSIN SPECIALIST MU FW FL IT U ADMIN C MP IT Property line shown is estimated. CE Core Curriculum

More information

bold/italic items are revisions to the previous program notes

bold/italic items are revisions to the previous program notes bold/italic items are revisions to the previous program notes Future Meetings: - Dr. Caldwell - Students - Industry Partners (Mike Betts? Sam Geil? Kevin Harmon? TBD by SCCCD) A. Specific Room Requirements

More information

Building and Grounds Self-Inspection Program

Building and Grounds Self-Inspection Program www.alterisus.com Building and Grounds Self-Inspection Program Each building and its accompanying grounds should be inspected at regular intervals, ideally on a monthly or quarterly basis. In this way,

More information

Master Project List Report

Master Project List Report Blue Hills Elementary School 01-8215 Site Utilities Replacement $52,835 01-8502 Modernization $3,135,933 01-8525 Exterior Painting $181,478 01-8552 Kindergarden Fencing $13,180 Install new backflow preventer.

More information

Plant Operations Cleaning and Sanitation Audits.

Plant Operations Cleaning and Sanitation Audits. Plant Operations Cleaning and Sanitation Audits http://plantoperations.dadeschools.net/ DISTRICT-WIDE SCHOOLS Cleaning & Sanitation Audit (4 years) Overall Scores % Fail % Pass 90% 63% 37% 54% 46% 45%

More information

Florence High School / Middle School Page 1 of 3 Florence, WI

Florence High School / Middle School Page 1 of 3 Florence, WI Florence High School / Middle School Page 1 of 3 Florence, WI Plumbing Systems Review: The following report is the result of a site visit by Tim Kehoe of Muermann Engineering, LLC that occurred on October

More information

MARY CRAPO CENTER Miller Road, Swartz Creek, Michigan

MARY CRAPO CENTER Miller Road, Swartz Creek, Michigan MARY CRAPO CENTER 8197 Miller Road, Swartz Creek, Michigan MARY CRAPO CENTER 8197 Miller Road, Swartz Creek General Information: - Instructional, Child Care Development Center (West Wing) o (2) Infant/Toddler

More information

FORT ERIE SECONDARY SCHOOL FACILITY INFORMATION. Lake Erie Corridor Secondary Schools Accommodation Review

FORT ERIE SECONDARY SCHOOL FACILITY INFORMATION. Lake Erie Corridor Secondary Schools Accommodation Review FORT ERIE SECONDARY SCHOOL FACILITY INFORMATION Lake Erie Corridor Secondary Schools Accommodation Review November 2012 LAKE ERIE CORRIDOR SECONDARY SCHOOLS ACCOMMODATION REVIEW Fort Erie Secondary School

More information

Athletic Facilities Needs Assessment

Athletic Facilities Needs Assessment PARKS AND RECREATION DEPARTMENT Athletic Facilities Needs Assessment Fiscal Year 2014 PROPOSED Needs Assessment Index 1. Andrew s Fields located at Margate Middle School pg. 2 2. Firefighters Park pg.

More information

LAMPETER-STRASBURG SCHOOL DISTRICT Lampeter, Pennsylvania 17537

LAMPETER-STRASBURG SCHOOL DISTRICT Lampeter, Pennsylvania 17537 LAMPETER-STRASBURG SCHOOL DISTRICT Lampeter, Pennsylvania 17537 Buildings and Grounds Committee Minutes March 20, 2017 The meeting was called to order at 6:30 p.m. PRESENT: Board Members, Mr. Jeffrey A.

More information

Puyallup School District Emergency Response Procedures Supported by Communities In Schools of Puyallup

Puyallup School District Emergency Response Procedures Supported by Communities In Schools of Puyallup Puyallup School District Emergency Response Procedures Supported by Communities In Schools of Puyallup Approved November 17, 2016 Table of Contents: Page 2: Fire Evacuation Procedure Page 4: Earthquake

More information

Revised 06/07 EMERGENCY GUIDELINES

Revised 06/07 EMERGENCY GUIDELINES Revised 06/07 EMERGENCY GUIDELINES Emergency Information In the event of hazardous weather or other natural emergencies, medical alerts, or campus closings or delays employees should check their university

More information

Existing Facilities Assessment

Existing Facilities Assessment DRAFT Patrick Henry Elementary School 4643 Taney Ave, Alexandria, VA 22304 Existing Facilities Assessment Alexandria City Public Schools Planning, Design & Construction Office 1340 Braddock Place Alexandria,

More information

2015 Building Condition Survey Summary Mosaic Associates Architects 02/19/16

2015 Building Condition Survey Summary Mosaic Associates Architects 02/19/16 1. General: This summary is offered as a supplement to the 2015 Building Condition Survey being filed with SED on behalf of the District. All cost estimates are preliminary, and should be re-evaluated

More information

Commercial Properties

Commercial Properties One of the innovations in community design is how to create regulations and requirements to require that commercial and residential places are designed to discourage crime. Below you can find some of the

More information

SCHEMATIC DESIGN PRESENTATION

SCHEMATIC DESIGN PRESENTATION August 5, 2014 SCHEMATIC DESIGN PRESENTATION ADDITIONS & RENOVATIONS Greenville Independent School District Acknowledgments 2 Narrative 3-6 Crockett Elementary School 7-12 L.P. Waters Early Childhood Center

More information

Campus Middle School 4785 South Dayton Street Greenwood Village, Colorado 80111

Campus Middle School 4785 South Dayton Street Greenwood Village, Colorado 80111 Campus Middle School 4785 South Dayton Street Greenwood Village, Colorado 80111 Year Opened 1971 Current Square Footage 175,743 Site Acreage (included in CCHS) 87.22 campus.cherrycreekschools.org $2,441,170

More information

Monthly Report of Consultants June 1, 2011 through June 30, 2011

Monthly Report of Consultants June 1, 2011 through June 30, 2011 Monthly Report of Consultants CONSULTANTS Name School/Dept of Service PO# Total Amount Type of Service Bridges, Jeff Santaluces 08/01/11-12/31/11 Internal $ 6,920.90 Marching Band Help Federal/State Catapult

More information

SJLES IEQ Walkthrough Summary Spring Room Observations (Responses)

SJLES IEQ Walkthrough Summary Spring Room Observations (Responses) 01A. ODOR: Unusual or 4/28/2017 9:45:0offensive 19 Musty and dank 29837 5/5/2017 01B. TEMPERATURE: 4/28/2017 10:20: Uncomfortable 31 Etremely hot 03. FOOD: Unsealed, left in room, dirty lunch 4/28/2017

More information