1 ACWORTH ES (OLD) ACWORTH INTERMEDIATE Construction projects not done due to school replacement Land Acquisition, 61 IU Replacement Elementary School Access Controls, Temperature monitors for walk in coolers & freezers, Install ringers on all manager's telephones, ADA Exterior Ramp, Add HVAC to gym & school lettering to building, Replace carpet & Tile in selected areas Buzz in Intercom), Asphalt Paving, Landscape/Repair/Erosion, Walking Track 1 ADDISON ES ADULT EDUCATION CENTER Painting, Flooring, Roofing, Security System Upgrade, Doors and Window Upgrade, Gutters, New Covered Play Area, Add Curb Cuts and Walkways, Playscape Upgrades and Walkways, Restroom Renovations Roofing, Flooring, Painting, UHF Communications System, Safety/Security Communication Systems Upgrade Access Controls, Add 1 IU PE Gymnasium with restrooms,modify existing gym to accommodate Guidance & Administration, Food services upgrades, HVAC/PE gym, Canopy for bus lane, Locks on exterior doors CCTV surveillance cameras, Main switchgear & Panel upgrades Buzz in Intercom), Driveway Modification, Lighting Retrofit, Front Window Replacement, New Playground Equipment, Emergency Generator, Emergency Lighting, Site Lighting Door Front Entrance, Intercom ALLATOONA HS Land, New 98 IU HS CCTV Surveillance System Replacement, Security Fencing, Classroom Door Added, ADA Sound System Equip. for Hearing Impaired, Band Tower Purchased & Installed Incl. Concrete Slab ADA Accessibility, Gym floor replacement, Clarkdale ES Replacement also includes funding from self insurance, Travelers Insurance, FEMA/GEMA. 1 of 61

2 ARGYLE ES Classroom Electrical Outlets, Upgrade Fire Alarms for Portables, Upgrade Restrooms old section, Drainage Improvements, Add Exterior Lighting, Playscape Upgrades and Walkways Access Controls, Carpeting, HVAC Installation, Painting/Roof coating in portables, Temperature Monitors in Walk in coolers and freezers, Grease traps, Door Bells & Drain, Install ringers on all Manager's Telephones, Fencing, Food Services upgrades, Main switchgear & Panel upgrades, HVAC Main gym, Painting, Replace Carpet. Add staff restroom Buzz in Intercom), New Playground Equipment, Cooler/Freezer Replacement, Electrical Upgrades in Kitchen, Walkway Enclosed Between Main Building & Gym for Safety Purposes, Concrete Paving, Canopies, Sprinkler (Fire Suppression), Marker Boards, Toilet Partitions, Clock, Lighting Retrofit 6 AUSTELL ES (OLD) AUSTELL ES (formerly Austell Primary) Construction projects not done due to school replacement New 36 IU Primary School Startup Access Controls, Land, 36 IU Primary School Buzz in Intercom), Ceiling Replacement, Landscaping/Erosion, Stage Flooring 3 Clarkdale ES Replacement also includes funding from self insurance, Travelers Insurance, FEMA/GEMA. 2 of 61

3 AWTREY MS Paint Repair, Roofing, Security System Upgrade, CCTV Surveillance System, Food Service Space Upgrade, Repaving, Playground Upgrade, ADA Restroom Modifications Temperature Monitors for Walk in Coolers & Freezers, Grease Traps, Door Bells, Fencing, Food service small equipment, ADA curb cut & painting of Existing curb visibilty, Main switchgear & Panel upgrades, Replace HVAC in office, gym, media center & theater, Roofing for sections of building, CCTV Surveillance System, Re conditioning/metal roof replacement for covered play area, Whiteboards, Add window front office Access Controls, ADA Sink w/hot Water, ADA Door Access, Enclose Existing Walkways & Add Enclosed Walkways, Asphalt Paving, Sewer/Utilities, Toilet Partitions/Accessories, Basketball Goal Retractors, Music Casework, Water Heaters, Piping, Sprinkler (Fire Suppression), Lighting Retrofit, Theater Lighting, Flooring, Painting, ADA Ramp detectable warning at bus drop off, 1 BAKER ES BAKER ROAD BUS SHOP BARBER MS BARNES ED CENTER Painting, Flooring, Roof Repair, Landscaping Upgrade, Playscape Upgrades, ADA Access to Playground, Stage, Restroom Fixtures, Gravel Paths, Hot Water ADA Restroom & Handrail Modifications Access Controls, Temperature monitors for walk in coolers & freezers, Door Bells, Install ringers on all manger's telephones, ADA sidewalks, HVAC in main gym, Parking lot & Bus lane re paving,canopy for front & bus area, Fencing & Gated entrance New 71 IU, CCTV Surveillance Systems, Food service small equipment, Temperature monitors for walking/coolers & freezers, drains & door bells, Install ringers on all manager's telephones, Provide Access control at Entrance, Main switchgear & Panel upgrades, Buzz in Intercom), New Playground Equip., Asphalt Paving, HVAC, Marker Boards, Toilet Partitions, Window Blinds, Emergency Generator Access Controls, Painting, Fencing, Landscaping Gym floor replacement, 1 1 Clarkdale ES Replacement also includes funding from self insurance, Travelers Insurance, FEMA/GEMA. 3 of 61

4 BELLS FERRY ES Flooring, Roofing, HVAC Upgrade, Security System Upgrade, Intercom System Upgrade, Emergency Callback Buttons, Fire Alarm Upgrade, Expand Food Service Space, Playscape Upgrade and Walkways, ADA Curb Cuts and Walkways, ADA Restroom Renovations Food service Door Bells, Upgrade temperature monitor, HVAC Main gym, Main switchgear panel upgrades, Painting, Bus Lane Re Paving, Re Conditioning / Metal Roof Replacement for covered play area, Access Controls, Add Restroom in the Pre Kindergarten Hall, Build Canopy over sidewalk, Upgrade Playground Access Control Enhancement (Front Door Buzz in Intercom), Addition/Modification includes CCTV Surveillance System, Cafeteria & Kitchen, Fire Suppression System, Ceiling Replacement, Addition for Admin & Pupil Personnel Services, Modify Existing Admin Area, 14 IU's added, Modified Restrooms, Replaced Fixtures, Lighting, Finishes, Additional Parking, Playground Equip., Marker Boards, Clock, Fire Alarm, Lighting Retrofit, Kitchen Power & Power Upgrades 4 Clarkdale ES Replacement also includes funding from self insurance, Travelers Insurance, FEMA/GEMA. 4 of 61

5 BELMONT HILLS ES Classroom Addition 6 Classrooms, 1 Computer Lab, Water Piping, Fire Alarm Upgrade, Windows Upgrade, Renovate Food Service Space, Repave Driveways and Parking Lot, Roof Repair, Security System Upgrade, Emergency Callback Buttons, Electrical Wiring Upgrade, Add Security Fencing, Playscape Upgrade and Walkways, ADA Sink Install Ringers on all Manager's Telephones, ADA Restroom/Classroom Renovation, ADA Curb Cut & Ramp, ADA Carpet Workroom 110, Upgrade Temperature Monitors, ADA Handrails, Food Service Small Equipment, Replace exisitng Sidewalk at top of Bank, Add a new Sidewalk & Replace Wooden Ramp at lower Playfield, Replace HVAC System, Main switchgear/panel, HVAC PE Main Gym, Food Service Temperature Monitors, Replace Water Piping, Plumbing Fixtures & outside hose Bibs, Re Conditioning/Metal Roof Replacement for covered Play Area, Access Controls, Replace carpet, Landscape Buzz in Intercoms), Modify Lobby Wall (Provide View Window from Office), Sprinkler (Fire Suppression), Fencing, Painting, Marker Boards, Canopies, Café Stage Curtain, Water Coolers, Lighting Retrofit Gym floor replacement, 2 Clarkdale ES Replacement also includes funding from self insurance, Travelers Insurance, FEMA/GEMA. 5 of 61

6 BIG SHANTY ES Emergency Callback Buttons, Replace Flooring in Classrooms and New Addition, Roof Replacment, Fire Alarm Upgrade, Add Exterior Lighting in Front of Building, Add Fencing, Repaving, ADA Door Replacement Temperature Monitors for Walk in Coolers & Freezers, Door Bells & Grease Traps, Upgrade Electrical Capacity & Re Roof Walk in Cooler, Install Ringers on all Manager's Telephones, Main Switchgear & Panel Upgrades, Replace HVAC System, includes HVAC in Main gym, Painting, Replace Water Piping, Plumbing fixtures & outside hose bibs, Re Conditioning/Metal Roof Replacement for covered Play area, Access Controls, Build Outdoor storage unit, Whiteboards Buzz in Intercom), Converting Dishwashing Area to Storage, Provide New Furnishings & Equip., Repair Doors & Frames, & Refinish Area, Add'l Parking, Erosion Control, Sprinkler (Fire Suppression), Clock, Lighting Retrofit, Power Upgrade, Hazardous Materials (Abatement) ADA Flooring, ADA Stage Access, Gym floor replacement, 4 BIRNEY ES Classroom Addition 5 Classrooms, 1 Art Room, 1 Music Room, 1 Computer Lab, Workroom, Storage Rooms, Expansion of Parking and Driveways, Painting, Roofing, Renovate Food Service Space, Add Gates, Add Exterior Lighting, Security System Upgrade, Emergency Callback Buttons, ADA Playground Access, Playscape Upgrades, Visual Fire Alarms, Carpet Hearing Impaired Classroom Temperature Monitors for Walk in Coolers & Freezers, Door Bells, Install Ringers on all Manager's Telephones, Food Service Small equipment, ADA Clinic Renovations, Main Switchgear & Panel upgrades, Upgrade Toilets, Urinals, Sinks, Water Coolers & Valves, Re Conditioning/Metal Roof Replacement for covered Play Area, Access Control, Carpet Replacement, Install Lighting at Canopy Buzz in Intercom), New Playground Equip., HVAC, Sewer/Utilities, Ceilings, Marker Boards, Prefab Canopies, Water Coolers, Sprinklers (Fire Suppression), Fire Alarm, Lighting Retrofit, Hand Dryers Convert Staff Restroom for ADA compliance, ADA Sidewalk modifications, 2 Clarkdale ES Replacement also includes funding from self insurance, Travelers Insurance, FEMA/GEMA. 6 of 61

7 BLACKWELL ES Food Service Door Bells, Small equipment Install Ringers on all Manager's Telephones, Upgrade Temperature Monitors, Add 60' of Fence & 2 gates, Extend Fence to include the spacing outside of 2 MOID Classrooms, HVAC main gym, Access Controls, Plant Sod on area Leading to Primary Playground, Add Handrails at sidewalks Buzz in Intercom), Security Fencing, HVAC Kitchen, Fire Sprinkler Head Replacement, Concrete Paving, Marker Boards Playground replacement, 4 BROWN ES (Teasley Primary - SPLOST III) Painting, Flooring, HVAC Upgrade Original Building, Alarm System Upgrade, Emergency Callback Buttons, Plumbing Upgrades Original Building, Upgrade Doors and Windows, Enlarge and Renovate Food Service Space, Drainage Upgrade, Landscaping, Repave and Add Parking, Add Fencing and Gate, Add Exterior Lighting, Playscape Upgrades and Walkways, Wheelchair Lift, ADA Restroom Renovations, Roofing Food Service Door Bells & Traps, ADA Restroom Renovation/Sidewalk/Curb Cut, Upgrade Temperature Monitors, ADA Add Sidewalk to Connect Special Needs Classroom Ramp with Parking Lot, Main Switchgear & Panel upgrades, HVAC main gym, Re Conditioning/Metal Roof Replacement for Covered Play Area, Access Controls, Renovate Administration Offices for Security, Grade & Level Playground Area, Blacktop Playground, Add Sidewalk to Parking Lot. Buzz in Intercom), Replace Carpet Tile in 23 Classrooms, Replace Gym Floor w/snap Court Flooring, Painting 2 Clarkdale ES Replacement also includes funding from self insurance, Travelers Insurance, FEMA/GEMA. 7 of 61

8 BRUMBY ES Roofing, Security System Upgrade, Drainage Upgrade, Add Covered Walkways, Landscaping, Add Exterior Lighting in Back of New Building Temperature Monitors for Walk in Coolers & freezers, Door Bells & Lids, Install Ringers on All Manager's Telephones, Remove 2 Old walking coolers & Replace with new larger one, Install 6 Hand Dryers in Restrooms, Main Switchgear & Panel upgrades, Replace Carpet, Replace HVAC System & HVAC in Main Gym, Replace exterior Sanitary Sewer Piping, Cleanouts & Associated manholes, Access Controls, Enclose Open IU in the Old Building, Paint interior of Building Buzz in Intercom), ADA Classroom/Restroom Modifications, Addition of Traffic Gates & Bollards, Security Fencing, Playground Equipment & Surfacing Replacement school (61 IU's), 6 BRYANT ES Painting, Flooring, Electrical Wiring Upgrades, Drainage Upgrade, ADA Access to Playground, Provide Hot Water to SID/PID Classroom Access Controls, Temperature Monitors for Walk in Coolers & Freezers, Door Bells, Install Ringers on all Manager's Telephones, Replace Walk in Cooler & Freezer, Main Switchgear & Panel upgrades, HVAC main gym, Bus Lane, Parking Lot Re Paving, Landscape, Correct Drainage Buzz in Intercom), ADA Playground Fencing, Carpet/Tile in SID/PID Classroom, Playground Fencing, Entry Drive Asphalt Paving, Fire Sprinkler Head Replacement, Lighting Retrofit, Kitchen Ceilings, Marker Boards, Prefab Canopies, Land Acquisitions Playground replacement, 3 BULLARD ES Land, New 61 IU Elementary School Food Service Door Bells, Upgrade Temperature Monitors, Fencing, HVAC Main Gym, Access Controls Buzz in Intercom), Playground Equipment, Add'l Parking, Blinds 1 Clarkdale ES Replacement also includes funding from self insurance, Travelers Insurance, FEMA/GEMA. 8 of 61

9 CAMPBELL HS Softball Field Lighting, Modify Facilities for Trade & Industry Programs, Painting, Add Security System, CCTV Surveillance System, Landscaping Upgrade Food Service small equipment, Door Bells, Install Ringers on All Manager's Telephones, Upgrade Temperature Monitors, ADA Ramp & Sidewalk for ROTC student, ADA Sidewalk improvements, Curb Cuts & a Ramp along the back of the school at the Art Hallway, ADA Classrooms/Restrooms Modifications, Add 18 IU Band, Choral, Graphic Arts, Culinary Arts, Drafting & Design Technology, Horticulture, Law Enforcement, 11 Typical Classrooms, Modify Existing undersized Band t Orchestra, Modify the undersized Choral to Drama, Renovate HVAC/PE gym, Su Switchgear/Panel, Auditorium, Paint Lockers, Whiteboards, Replace or Repair the existing Sports Lighting at the Football Field, Track Resurfacing/Track & Field Upgrades, CCTV Surveillance Systems CCTV Surveillance System Replacement, HVAC, Stadium Sound, New Security Fencing, Replacement Fencing, Auditorium Seating, Flooring, Ceiling, Painting, House Lighting, Sound System & Acoustical Baffles/Panels, Modify Gym to Raise Ceiling, Raise Duct Work & Sprinklers, Replace Lighting, Modify Kitchen, Irrigation, Marker Boards, Prefab Canopies, Toilet Partitions, Basketball Goal Retractors Interior & Exterior Painting, 2 Clarkdale ES Replacement also includes funding from self insurance, Travelers Insurance, FEMA/GEMA. 9 of 61

10 CAMPBELL MS Roofing, Security System Upgrade, CCTV Surveillance System, Gym Roof Replacement, Correct Mildew Problem in Technology Room, Replace Old Gym Flooring, Renovate Restrooms in Old Gym, Paving Repair in North Parking Lot, Add Safety Fencing in Front of School, Add Exterior LIghting, Landscaping Upgrades, Repair Track and Tennis Courts, Paint Old Gym Food Service Small Equipment, Restroom Renovations, Add 3,900 SQ. FT to the Admin & Pupil Personnel Service areas, Addition of 12 IU, 9 Typical classrooms, Drama, Business/Computer, Career Connections, Add 4,800 SQ. FT to the Media Center, Modify the Existing Admin Areas with the New Admin Addition, Modification & Renovation of Kitchen, Cafeteria & Replacement of the Food Service Equipment, Expansion of the Food Service Area, Media Center Modifications to Accomodate the new Addition, Renovations on HVAC/PE gym, Paving Bus & Parking Lot, Replace Bleachers, Lighting/Sound System, CCTV Surveillance Systems Access Controls, ADA Lift System, Fence Replacement, Ramp Door Improvement for Wheelchair Access, Addition/Modification to include new Band, Choral & Orchestra Classrooms, CCTV Surveillance System Replacement, Modify/Renovate Student Restrooms, Modify existing Band, Choral & Orchestra to be typical classrooms, Abatement of Hazardous Materials, Painting, Lockers, HVAC, Gym HVAC, Water coolers 2 CHALKER ES Add Classroom Door Locks, ADA Restroom Accessibility, Playscape Upgrades and Walkways Food Service Door Bells, Install Ringers on all Manager's Telephones, Upgrade Temperature Monitors, HVAC Main Gym, Access Controls, Whiteboards, Install hot water line Buzz in Intercoms), Security Fencing Around Retention Pond, Resurface Parking Areas & Bus Port, Flooring, Painting, Fire Sprinkler Head Replacement Playground replacement, 4 Clarkdale ES Replacement also includes funding from self insurance, Travelers Insurance, FEMA/GEMA. 10 of 61

11 CHEATHAM HILL ES Flooring, Add Classroom Door Locks, Playscape Upgrades and Walkways, Restroom Renovations Temperature Monitors for Walk in Coolers & Freezers, Install Ringers on all manager's Telephones, ADA Ramp at Portable, Food Service Small equipment, HVAC Main Gym, Fencing, Access Controls Access Control Enhancement (Front Door Buzz in Intercom), Addition/Modification to include 8 IU's Typical Classrooms, CCTV Surveillance System, Additional Parking, Sewer Upgrade, Painting, Café Sound, Gym Sound, Construction And/or Purchasing of Classroom Space, Including Portable Classrooms & Enhancement to Existing Portables, Fire Sprinkler Head Replacement 7 CLARKDALE ES (OLD) Painting, Flooring, Security System Upgrade, Add Emergency Callback Buttons, Electrical Outlets Upgrade, Repaving, Playscape Upgrades and Walkways Food Service small equipment, Temperature Monitors for Walk in Coolers & Freezers, Door Bells, Install Ringers on All Manager's Telephones, Main Switchgear & Panel Upgrades, Replace HVAC System for Classrooms, Media Center & main gym, Upgrade Toilets, Urinals, Sinks, Water Coolers & Valves, Replace Restroom Stalls & Doors, Replace Exterior Sanitary Sewer Piping, Cleanouts & Associated manholes, Roofing for entire building, Re Conditioning/Metal Roof Replacement for Covered Play area, Access Controls, Replace Front Sign, Admin Area Renovation, including Installation of Window & Clinic Enlargement 3 Clarkdale ES Replacement also includes funding from self insurance, Travelers Insurance, FEMA/GEMA. 11 of 61

12 CLARKDALE REPLACEMENT ES Land Acquisition Access Control Enhancement (Front Door Buzz in Intercom), Land Acquisitions, New Replacement School, ADA Garden Access 3 CLAY ES Add Emergency Callback Buttons, Flooring, Electrical and Plumbing Repairs, Upgrade Doors and Windows, Expand Dining Area, Drainage Upgrade, Repave and Add Parking, Landscaping Upgrades, Playscape Upgrades and Walkways Temperature Monitors for Walk in Coolers & Freezers, Door Bells, Fence Main Drive, Main Switchgear & Panel Upgrades, Replace HVAC Systems for Classrooms, Media Center & Cafeteria & Main Gym, Painting, Upgrade Toilets, Urinals, Sinks, Water coolers & Valves, Re Conditioning/Metal Roof Replacement for Covered Play Area, Access Controls, Place Intercom, Speakers in Playground & Parking Lot Areas, Install Sidewalk from gym to front Walk, Replace Cafeteria Blinds, Whiteboards. Buzz in Intercom), Lighting Retrofit, Drainage/PE, Fencing, Playground Equip., Playground Surfacing, Gym Flooring, Toilet Partitions 3 Clarkdale ES Replacement also includes funding from self insurance, Travelers Insurance, FEMA/GEMA. 12 of 61

13 COMPTON ES Drainage and Lanscaping Upgrades, Add Walkway to Dumpster, ADA Restroom Renovations, Food Service Renovations Temperature Monitors for Walk in Coolers & Freezers, Door Bells, & Grease Traps, Fence Front & Back & Right Side of Campus, Replace HVAC System For Main Building & Annex, HVAC/PE Gym, Switchgear/Panel Upgrades, Add Gravel in Rear of Building & Repainting Door Frames, Parking Lot, Bus Lane Re Paving, Upgrade Toilets, Sinks, Urinals, Water Coolers & Valves, Re Conditioning/Metal Roof Replacement for Covered Play Area, Access Controls, Carpet, Interior Painting, Replace Fencing, Add Locks to Classroom Doors in New Building, Build Canopy over Bus Lanes & Between Annex & Main Building, Add Restroom to Staff Lounge, Install Counter in Front Office, Landscaping At Front of Building Buzz in Intercom), ADA Restroom Modifications, Playground Equip., Roofing, Ceilings, Faucets, Piping, Sprinkler (Fire Suppression), Clocks, Electrical Upgrade 3 COOPER MS Land Acquisition, New 71 IU Middle School, ADA Curb Cuts and Restroom Renovations, CCTV Surveillance System Temperature Monitors for Walk in Coolers & freezers, Door Bells, Food Service Small Equipment, HVAC Main Gym, CCTV Surveillance Systems, Air Conditioning Kitchen Access Controls, ADA Ramp, Painting, Asphalt Paving, Window Replacement, Flooring, Toilet Partition/Accessories 3 Clarkdale ES Replacement also includes funding from self insurance, Travelers Insurance, FEMA/GEMA. 13 of 61

14 DANIELL MS DAVIS ES Fine Arts Addition (Band, Choral, Orchestra) and Support Staff Space, Painting, Flooring, Roofing, HVAC Upgrades, Home Ed Safety Upgrades, Replace Lockers, Food Service Area Upgrades, Drainage Upgrades, Add Parking, Repaving, CCTV Surveillance System, Hall Lighting Upgrade Roofing, Painting, Flooring, Security System Upgrade, Drainage Upgrade Back Field, Fencing Upgrade Back Campus, Landscaping, Curb Cuts, Playscape Upgrades and Walkways, Restroom Renovations, ADA Sink Temperature Monitors for Walk in Coolers & Freezers, Door Bells, Modify Existing Classroom For MOID Program, Install Ringers on All Manager's Telephones & Add System, Food Service Small Equipment, Addition For Admin & Pupil Personnel, Add 5 IU, Add 3 Teacher's Team Planning Rooms, Modify Existing Admin Areas To Work with the New Admin Addition, Flooring/Gym, HVAC/PE, Metal Refinish, Canopy at Theater, Whiteboards, Lockers, Safety Mats, Stripe Parking Lot, CCTV Serveillance Systems Food Service Drains & Door Bells, Install Ringers on all Manager's Telephones, Upgrade Temperature Monitors, Food Service Small Equipment, Restrooms Renovations, HVAC Main Gym, Bus Lane & Parking Lot Re Paving, Access Controls, Fencing Upgrade (Back of Campus) Access Controls, Foyer Door Hardware Upgrade, Fencing & Gates, ADA Parking, Sidewalk & Athletic Bleachers, ADA Restroom Renovations, Cafeteria & Kitchen Addition and Modification to Existing Kitchen & Serving Lines, Add'l Parking, Irrigation, Bus Canopies, Music Casework, HVAC, Water Coolers, Flush Valves, Sprinkler (Fire Suppression), Lighting Retrofit, Theater Lighting Buzz in Intercom), Primary Playground, Painting, HVAC, Clock, Emergency Generator, Fire Alarm, Site Lighting, Electrical System Upgrade, Lighting Retrofit 4 5 Clarkdale ES Replacement also includes funding from self insurance, Travelers Insurance, FEMA/GEMA. 14 of 61

15 DICKERSON MS 13 IU Addition, New Cafeteria and Kitchen, Renovations for Technology Lab, Team Planning Rooms, Lockers, Special Ed, Pull out Programs, Painting, Flooring, Home Ed Range Hood, Exerior Lighting, Paving, Emergency Callback Buttons, Parking Lot Repaving, Roofing, CCTV Surveillance System Addition For Admin & Pupil Personnel Services, Addtion of 4 IU Typical Classrooms, HVAC Main Gym, Lockers, Drainage, Doors, Restrooms Floors, Theatre Lighting, Food Service Door Bells, Install Ringers on All Manager's Telephones, Upgrades Temperature Monitors, Food Service Small Equipment, ADA Accessible Faucets in Students Restrooms, & Renovations, CCTV Surveillance Systems Access Controls, ADA Sidewalks, Ramps & Curb Cuts, Door Controller@ Front Entrance, Kitchen Floor Replacement, Ceiling & Lighting Replacement, Shelving for Laundry, Painting, Theater Renovation (Incl.Carpet Replacement, Seats, Sound System, Stage Lighting, Ceiling, Stage Curtain, & Repaint), Schoolwide Painting & Flooring, Water Heaters 6 Clarkdale ES Replacement also includes funding from self insurance, Travelers Insurance, FEMA/GEMA. 15 of 61

16 DODGEN MS Roofing, Security System Upgrade, Fire Alarm Upgrade, Lighting Upgrade, Restroom Renovations, Add Lockers, Add Exterior Lighting, Drainage Upgrade, Landscaping, Repaving, CCTV Surveillance Cameras Addition For Admin & Pupil Personnel, Addition of 23 IU: 15 Classrooms, (3 Typical, 12 Science) 2 Sp.ED, 2 Business/Computer, Career Connections, Exploratory Technology, Band & Orchestra(Old Kitchen Modification) 22 New Construction, 1 from Modification, Add new Kitchen & Cafeteria, Modify 3 Common Areas For Teacher Planning Rooms, Modify the Choral Room to be Drama Classroom & the Existing Band Room to be Choral Classroom, 1 IU increase, Modify General Music to be Sp.Ed Classroom, Renovations includes: Switchgear Upgrade, HVAC Main Gym, Replace Gym Floor, Replace HVAC System, Enlarge Theatre Window, Entrance, Replace Carpet in Sp. Ed., Choral & Drama Rooms, Replace Carpet with VCT in Art Room, Food Service Small Equipment,CCTV Surveillance Systems Access Controls, Traffic Arrows & Exterior, ADA Projects (Classroom Projector, Restroom Modification for 7th & 8th Grades, Outdoor Learning Center Access to Pond), Addition/Modification to Theater (Stage Curtain, Lighting & Sound System), Toilet Partitions, Basketball Goals, Auditorium Seating, Flooring, Painting 6 Clarkdale ES Replacement also includes funding from self insurance, Travelers Insurance, FEMA/GEMA. 16 of 61

17 DOWELL ES DUE WEST ES DURHAM MS Painting, Flooring, Expand Food Service Serving Line Space, Add Fencing and Gate, Add Parking Lot Lighting, Landscaping Upgrade, Uprgrade and Repave Parking Area, Playscape Upgrades and Walkways, ADA Portable Stage Ramp, Visual Fire Alarms Add Emergency Callback Buttons, Painting, Replace Alarm System, Flooirng, Water Pipe Replacement, Upgrade Doors and Windows, Renovate Restrooms, Drainage Upgrade, Add Exterior Lighting and Ground Cover, Playscape Walkways New 71 IU Middle School, CCTV Surveillance System, Provide Handicapped Access to PE Field Access Controls, Temperature Monitors For Walk in Coolers & Freezers, Add 2 New Serving Lines, ADA Hearing Impaired, Food Service Small Equipment, HVAC Main Gym, Bus Lane & Parking Lot Re Paving, Access Controls, Build Canopy Over Bus Lanes, Upgrade Cafeteria Sound System, Hand Dryers in Student Restrooms Temperature monitors For Walk in Coolers & Freezers, Door Bells, Install Ringers on All Manager's Telephones, Provide Traffic Gate, 2 Gates at Bus Drive, Addition for Admin & Pupil Personnel Services, Increase size of Cafeteria, 12 Classrooms, Modify Existing Admin to work with the Admin Addition, Renovate Switchgear/Panel, HVAC, HVAC/PE Gym, Sprinkler, Roofing, Metal Roof Refinishing, Level Playground, School Sign, Access Controls Food Service Door Bells, Install Ringers on All Manager's Telephones, ADA Curb Cut, Install Air Conditioning in Food Service Area, Upgrade Temperature Monitors, HVAC Main Gym, CCTV Surveillance Cameras, New Sound System in Cafeteria Buzz in Intercom), Drainage Added to Bus Parking Lot, Playground Equip. incl. Fencing, Roofing, Lighting Retrofit, Emergency Generator, Fire Alarm, Coat Racks, Marker Boards Buzz in Intercom), ADA Access Controls on 3 Doors, Painting, Playground Equipment, Kitchen Flooring, School Flooring, Toilet Partitions, Asphalt Paving, Lighting Retrofit, Piping, Clock, Fire Alarm Access Controls, Painting, Window Replacement, Skylights, Flooring, Piping, HVAC, Fire Sprinkler Head Replacement Cooler/Freezer Replacement, Clarkdale ES Replacement also includes funding from self insurance, Travelers Insurance, FEMA/GEMA. 17 of 61

18 EAST COBB MS Painting, Flooring, Security System Upgrade, CCTV Surveillance System, Add Parking Lot Lighting, Upgrade Walkways, Repaving, ADA Restroom and Classroom Modifications Upgrade Temperature Monitors, Door Bells, & New Grease Trap unit Outside, Ringers on All Manager's Telephones, Food Service Small Equipment, Relocate Lift System From Lovinggood, Addition for Admin & Pupil Personnel Services, Add 8 IU's (Typical Classroom), Modify Existing Admin Areas to work with the new Admin Addition, Renovate Serving Line, ADA Ramp & Lobby Renovations, Switchgear/Panel HVAC/PE gym, Whiteboards, Upgrade Clocks, Gym Floor, Refinish Canopy, CCTV Surveillance Systems CCTV Surveillance System Replacement, Access Controls, Painting, Toilet Partitions & Accessories (ONLY PARTIAL) Completed one set Boys & Girls in only one location, HVAC, Kitchen HVAC, Fire Sprinkler Head Replacement 6 EAST SIDE ES (OLD) 6 IU Classroom Addition, Rework Bus Drive, Roofing, Electrical Upgrades, HVAC Upgrades, Correct Moisture Problem, Playscape Upgrades and Walkways, ADA Wheelchair Lift Food Service Temperature Monitors, Door Bells, Install Ringers on all Manager's Telephones, Fence, Main Switchgear &Panel Upgrades, Replace Carpet, Replace HVAC System, Re Conditioning/Metal Roof Replacement For Covered Play Area, Access Controls, Paint & Pressure Wash the School, Replace existing Canopy, Replace School Sign 5 Clarkdale ES Replacement also includes funding from self insurance, Travelers Insurance, FEMA/GEMA. 18 of 61

19 EAST SIDE REPLACEMENT ES EASTVALLEY ES FAIR OAKS ES 4 IU Classroom Addition, Painting, Flooring, Restroom Renovation, Exterior Lighting, Food Service Space Upgrades, Intercom, Alarm System, Front Door Replacement, Add View Windows at Front Office, Drainage Upgrade, ADA Access to Stage, Bathrooms, Curb Cuts, Playscape Upgrades and Walkways, ADA Restroom Renovations, Playfield Upgrades 12 IU Classroom Addition, HVAC Upgrade, Food Service Area Renovation, Fencing, Electrical Wiring Upgrade, Drainage Upgrade, Playscape Upgrade and Walkways Temperature Monitors for Walk in Coolers & Freezers, Door Bells, Drain, Install Ringers on all Manager's Telephones, Main Swtichgear/Panel Upgrades, Replace HVAC System, HVAC main Gym, Bus Line & Parking Lot Paving, Roofing, Access Controls, Roofing, Painting, Landscape Access Controls, Food Service Door Bells, ADA Manager Phone System, ADA Audiology Electrical Upgrades, & Shelving Improvement, Addition of 16 IU's, Upgrade Temperature Monitors, Re Roofing, Expand Audiology, Switchgear/Panel, HVAC/PE Gym, Metal Roof refinishing, Painting, New Marquee, Hand Dryers, School Name, Water Fountain, Grass/Playground Parking & Paving Access Control Enhancement (Front Door Buzz in Intercom), Replacement School Includes 61 IU's, CCTV Surveillance System, Demolition and Abatement of Site Buzz in Intercom), ADA Access Controls, Fencing, Sprinkler (Fire Suppression), Flush Valves, Water Heaters, Clock, Lighting Retrofit, Bus Canopies, Canopies to Portables Buzz in Intercom), ADA Garden Access, Remodel Student Restrooms in Older Building (Fixtures, Partitions, Ceilings), Sewer/Utilities, Lighting Retrofit, Fencing, Flooring, Painting, Fire Sprinkler Head Replacement 5 2 FITZHUGH LEE TLC ADA New Timeout Room and Ramp to Cafeteria, Add Fencing, Painting, Flooring Clarkdale ES Replacement also includes funding from self insurance, Travelers Insurance, FEMA/GEMA. 19 of 61

20 FLOYD MS Fine Arts Addition (Band, Choral, Orchestra) and Support Staff Space, Exit Doors Upgrade, Repaving, Water Pipe Replacement, Security System Upgrade, CCTV Surveillance Systems, Plumbing Upgrade Upgrade Monitors, ADA Restroom and Changing Area, Addition to the Food Service Areas, 19 IU's, Addition to New Media Center, Modifications to old Music, Band & Choral, Switchgear Upgrade,HVAC RTUS, HVAC Main Gym, Upgrade Plumbing, Roofing, CCTV Surveillance Systems Access Controls, Add Concrete Path to Existing Asphalt, Flooring, Painting 2 FORD ES Roofing, Painting, Flooring, HVAC Upgrade, Security System Upgrade, Playground Upgrade, Fencing Food Service Door Bells, Upgrade Temperature Monitors, Install Ringers on All Manager's telephones, Food Service Small Equipment, HVAC Main Gym, Parking Lot & Bus Lane Paving, Access Controls Buzz in Intercom), Playground Equipment, Gym Flooring, HVAC, Emergency Generators, Fire Alarm, Lighting Retrofit 7 FREY ES Add Classroom Door Locks, Upgrade Food Service Space, Playscape Upgrades, Exterior Lighting Upgrade, ADA Curb Cuts and Walkways Food Service Door Bells, Install Ringers on all Manager's Telephones, Upgrade Temperature Monitors, HVAC Main Gym, Access Controls, Whiteboards, Landscaping & Additional Trees, Acoustical Panels in Gym Buzz in Intercom), ADA Fence Around Primary Playground, Flooring, Playground Equip., Painting, Classroom Casework, Water Coolers, Fire Sprinkler Head Replacement 1 Clarkdale ES Replacement also includes funding from self insurance, Travelers Insurance, FEMA/GEMA. 20 of 61

21 GARRETT MS Fine Arts Addition Band, Choral, Orchestra and Support Staff Office Space, Flooring, Alarm System Upgrade, Water Piping Upgrade, Light and Sound System, Locker Room Renovation, Add Exterior Lighting, Redesign Parking, Repave, Restroom Renovation, Roofing, CCTV Surveillance System, ADA Restroom Renovation, Restripe ADA Parking, Add Lockers Food service Drains, Door Bells & Grease Traps, Install Ringer's on All Manager's Telephones, ADA Restroom Modification, Upgrade Temperature Monitors, Food Service Small Equipment, Provide Ramp, Main Switchgear & Panel Upgrades, HVAC Main Gym, CCTV Surveillance Systems, Enclose Media Center & Add Security Gates, Add Covered Walkway, Replace Theater Seating, Lighting & Sound System Access Controls, Existing Exploratory Space Modified to be Cafeteria & Construct New Kitchen, Fire Suppression, Ceiling Replacement, Added 3 New Exploratory Classrooms, Added 9 New Science IU's, Modify/Renovate Restrooms (Replacement of Flooring, Partitions, Plumbing Fixtures, Ceilings, Lighting, Paint, Added Hand Dryers), Modify Existing Kitchen New Serving & Dining, Modify 3 Existing Commons Areas for Teacher Team Planning Rooms, Abatement of Hazardous Materials, Asphalt Paving, Add'l Parking, Flooring, Painting, Music Casework, Water Heaters, Fire Alarm CCTV Surveillance System Replacement (incluyded in construction), 3 Clarkdale ES Replacement also includes funding from self insurance, Travelers Insurance, FEMA/GEMA. 21 of 61

22 GARRISON MILL ES GREEN ACRES ES Painting, Flooring, Security System Upgrade, Restroom Renovation, Drainage Upgrade, Add Exterior Lighting, Stage Curtains and Blinds, Playscape Upgrades and Walkways Add Classroom Door Locks, ADA Ramps, Add Canopy, Fencing and Gate, Add Playground Temperature Monitors for Walk in Coolers & Freezers, Door Bells, Install Ringer's on all Manager's Telephones, Replacing Existing Emergency Generator, Connect Lights, Cooler, Freezer & Phone System to Emergency Generator, Upgrade Air Conditioning in Gym & Kitchen, Bus Lane & Parking Lot Re Paving, Increase Parking Spaces, Re Conditioning Metal/Roof Replacement for Covered Play Area, Access Controls, Callback Buttons for Every Classroom Food Service Door Bells, Install Ringer's on all Manager's Telephones, Upgrade Temperature Monitors, Food Service Small Equipment, HVAC Main Gym, Access Controls, Fix Drainage, Add Fencing Between Street & Portables, Increase Lighting in Parking Area & Back of Building, ADA Canopy from Entrance to Parking Area, Plant trees Buzz in Intercom), Playground Equip.,Gym Flooring, HVAC, Piping, Fire Alarm, Lighting Retrofit, Electrical System Upgrade, ADA Sidewalks & Handrails Constructed from Rear Entrance to each Playground & Track Surface Buzz in Intercom), Lighting Retrofit, Landscaping, Playground Equip., Flooring, Painting 5 2 Clarkdale ES Replacement also includes funding from self insurance, Travelers Insurance, FEMA/GEMA. 22 of 61

23 GRIFFIN MS Painting, Roofing, HVAC Upgrade, Home Economics Safety Code Upgrade, Security System Upgrade, CCTV Surveillance System, Drainage Upgrade, Repaving, Upgrade Doors Food Service Addition of Admin & Pupil Personnel Services, Addition of New Cafeteria & Kitchen, Addition of 14 IU's, Switchgear Upgrade, Replace HVAC, HVAC Main Gym, Metal Roof Refinish, Renovate Theatre, Flooring/Network Access, Covered Play Area, Restroom modifications Access Controls, Modify/Renovate Restrooms (Replacement of Fixtures, Partitions, Ceiling, Lighting & Painting), Concrete Loading Docks, Auditorium Seating, Media Casework, Electrical System Upgrades, Elevator, Water Coolers, Piping, Site Lighting, Theater Lighting 2 HARMONY LELAND ES Painting, Replace Alarm System, Add Emergency Callback Buttons, Flooring, Water Pipe Replacement, Renovate Restrooms, Drainage Upgrade, Add Parking Lot Lighting, Playscape Upgrades and Walkways, Repaving Upgrade Temperature Monitors for Walk in Coolers & Freezers & Grease Traps, Install Ringer's on All Manager's Telephones, ADA Provide 2 Restrooms Doors, ADA MOID & Special Needs Pre K Classroom Modifications, Add 250' fence, Addition of 10 IU's, Switchgear HVAC Upgrade, HVAC Main Gym, Roof Replacement, Metal Roof Re Conditioning, Replace Sign, Landscaping, Drainage Improvements, Whiteboards, Access Controls Buzz in Intercom), Playground Equip., Window Replacement, Add'l Parking, Retention Pond Drainage, Café Stage Curtain, Stage Lighting, Clock, Freezer Lighting, Lighting Retrofit 3 Clarkdale ES Replacement also includes funding from self insurance, Travelers Insurance, FEMA/GEMA. 23 of 61

24 HARRISON HS Band Room Addition, Roofing, Painting, Flooring, Renovations for CTAE Construction, Tennis Court and Track Resurfacing, Fire Alarm System Upgrade, Widows Upgrade, Drainage Upgrade, Repave Parking Lot, Add Exterior Lighting, Modify Facilities for T&I Programs Auto Tech, Computer Science, Culinary Arts, Law Enforcement, Telecommunications Lab, Add Girls' Softball Field, CCTV Surveillance Systems, Roof Repairs, Restroom Renovations, ADA Curb Cuts and Walkways, ADA Restroom Partition Renovation Temperature Monitors for Walk in Coolers & Freezers & Door Bells, Install Ringers on All Manager's Telephones, Food Service Small Equipment, Re Roofing, Replace Cooling Towers, CCTV Surveillance Systems, Pave Busport & Upper Parking Lot, Renovate Classrooms, Resurface Tennis Courts, Provide Additional Storage Area, Provide Additional Outdoor Area, Theater, Remove Arch, Add Acoustics, Curtains, Lighting, Add Motion Detectors ADA Classroom Modifications, ADA Automatic Door Openers, Broadcast Media Lab, Security Field, Gates & Bollards, Remediating Tennis Courts, Fence Repair, Pressbox Replacement, Cafeteria Addition (included in 9th grade center) Modify/Renovate Theater (Seating, Flooring, Painting, Ceiling & House Lights), Modify Space for Choral, New 9th Grade Center, Playfield Renovation, Track Resurfacing, Water/Utilities, Flooring, Emergency Generator, Electrical System Upgrade, Football Sports Lighting, Stadium Sound, CCTV Surveillance System Replacement (included in construction), Renovate existing rooms into a Marketing Events Management Suite, 7 HAVEN AT FITZHUGH LEE ADA Counselor's Suite ADA Restroom Renovations, ADA Restroom & Entry Modifications, Fencing, ADA TASB Office Modifications, CCTV Surveillance Systems, Provide Drop Ceiling with New Lighting, Main Switchgear & Panel Upgrades, Parking Lot & Bus Lane Paving, Re Roof Sections of Building Add'l Fence & Gates (Student Safety) 2 Clarkdale ES Replacement also includes funding from self insurance, Travelers Insurance, FEMA/GEMA. 24 of 61

25 HAVEN AT HAWTHORNE - HAVEN ADMINISTRATION (JUNE 2015) Replace Alarm System, Add Storage Vault for Special Ed Records, Drainage and Landscaping Upgrades, Upgrade Playground, Playscapes and Walkways, Timeout Room Modifications Temperature Monitors for Walk in Coolers & Freezers, Food Service Door Bells, CCTV Surveillance Systems, Main Switchgear & Panel Upgrades, Replace HVAC System, Painting, Re Conditioning/Metal Roof Replacement For Covered Play Area, Controls, Add'l Parking, 2 HAYES ES HENDRICKS ES (formerly AUSTELL INTERMEDIATE SCHOOL) Replace Carpet in Covered Play Area/Gym, Flooring, Upgrade Fire Alarm, Roof Repair, Drainage and Lanscaping Upgrades, Upgrade Playscapes and Walkways, ADA Curb Cuts and Walkways, Restroom Renovations 61 IU Replacement Elementary School, ADA Classroom Provide Hot Water Add 8 IU's, HVAC Main Gym, Access Controls, Enclose Walkway, Paint Interior & Exterior Install Ringers on All Manager's Telephones, Upgrade Temperature Monitors, Repair & replace Exterior School & Building Signage, Provide HVAC in Gym, Access Controls, Add Surveillance Cameras, Build Additional Outdoor Storage Area Buzz in Intercom), Entry Drive Modification, Paving (Add'l Parking), Playground Equip., Window Film, Kitchen Exhaust, Flooring, Athletic Flooring in Gym Buzz in Intercom), Gym Flooring, Painting, Flooring, Drainage Perimeter fencing between school & adjoining properties, 1 3 HIGHTOWER TRAIL MS Flooring, Home Economics Safety Code Upgrades, Security System Upgrade, CCTV Surveillance System, HVAC Repair, Painting, Drainage Upgrades, Walkways Upgrades, Add Exterior Lighting, Install Ringers on All Manager's Telephones, Upgrade Temperature Monitors, Food Service Small Equipment, Addition for Band & Orchestra, HVAC/PE Gym, Theatre Lighting, Replace Walls, Landscaping, Whiteboards, CCTV Surveillance Systems Access Controls, Modify Front Office & Lobby Windows, Modify Front Entry Doors, Modify Existing Offices to Teacher Planning Rooms, Auditorium Seating, HVAC, Lighting Retrofit Paving (bus, car, drive, fire lanes), add separate drive, add speed humps, 5 Clarkdale ES Replacement also includes funding from self insurance, Travelers Insurance, FEMA/GEMA. 25 of 61

26 HILLGROVE HS Land Acquisition New 98 IU's, ADA Renovate Restroom, ADA Restroom, Food Service Small Equipment, Install Sink, Baseball/Softball ADA Sidewalk, Practice Field Renovation. CCTV Surveillance Systems HOLLYDALE ES Replace Carpet, Replace Alarm System, Drainage Upgrade, Paving, ADA Accessibility to Playground, Upgrade Playscape and Walkways, ADA Plumbing/Restroom Renovations Upgrade Temperature Monitors, Install Ringers on All Manager's Telephones, Replace Walk in Cooler/Freezer, ADA Carpet Workroom. Food Service Small Equipment, Add 8 IU's, Main Swirchgear & Panel Upgrades, Replace HVAC System on Original Building and Main Gym. Painting, Upgrade Urinals, Toilets, Sinks, Water Coolers & Valves, Roofing for Front Canopy, Re Conditioning/Metal Roof Replacement for Covered Play Area, Access Controls, Install 3 Speed Bumps, Increase Electrical Outlets in Classrooms, Upgrade Intercom, Door Locks CCTV Surveillance System Replacement, Renovate ADA Transition Academy Kitchen, ADA Automatic Door Openers, Stadium Emergency Lights, Visitor Stand Fencing, Practice Field Fencing w/gates, Perimeter Fencing, Concrete Paving, Site Lighting Buzz in Intercom), Sprinkler (Fire Suppression), Lighting Retrofit, Security Lighting, Stage Lighting, Electrical System Upgrade, Playground Equip. Traffic queing improvements, drop off lane, 7 7 Clarkdale ES Replacement also includes funding from self insurance, Travelers Insurance, FEMA/GEMA. 26 of 61

27 KEHELEY ES KELL HS KEMP ES Replace Carpet, Replace Roof, Upgrade Secrity System, Upgrade Electrical Outlets, Drainage and Landscape Upgrade, Repair Playground, Upgrade Playscape and Walkways Land Acquisition, New 91 IU High School, CCTV Surveillance System Land Acquisition, New 61 IU Elementary School Temperature For Walk in Coolers & Freezers, Door Bells, Drains, & Grease Traps, Install Ringers on All Manager's Telephones, Air Conditioning for Covered Play Area, Access Controls, Repair & Restripe Parking Lot, Install Hand Dryers in each Restroom Food Services Door Bells, Upgrade Temperature Monitors, Food Service Small Equipment Food Service Door Bells, Upgrade Temperature Monitors, Provide Air Conditioning in the Gym, Access Controls, Fence Perimeter Buzz in Intercom), Fence Playground, Fire Door Hardware Replaced on 16 Doors, Enlarge Office to Lobby Viewing Window, Renovate Vault to be Fireproof, Renovate Staff Restrooms & Other Admin. Areas, Modify/Renovate All Restrooms (Fixtures, Partitions, Accessories, Finishes & Lighting), Playground Surfacing, Window Replacement, HVAC, Fire Alarm, Sprinkler (Fire Suppression), Site Lighting, Freezer Lighting CCTV Surveillance System Replacement, ADA Automatic Door Openers, ADA Flooring, Overhead Grill, Bus Canopy, Relocate Lockers, Theater Lighting Upgrade Buzz in Intercom), Security Bus Gravel Lot, Gym Flooring, Painting, Flooring ADA improvements (sidewalk, curb cuts for wheelechair access), painting handicap spaces, Gym floor replacement, Playground replacement, Clarkdale ES Replacement also includes funding from self insurance, Travelers Insurance, FEMA/GEMA. 27 of 61

28 KENNESAW ES Painting, Flooring, Exterior Lighting, Upgrade Playscapes and Walkways Temperature Monitors For Walk in Colers & Freezers & Door Bells, Install Ringers on All Manager's Telephones, ADA Hot Water, Fence Between Play Field & Retention Pond, Modify Restroom in Self Contained Classroom, HVAC Main Gym, Access Controls, Enclose Walkway between Buildings, Install Hand Dryers in Students Restrooms, Venetian Blinds in Classroom & Library, Annex Classroom Function Locks on Interior Doors Buzz in Intercom), Asphalt Paving, Site Lighting, Roofing, Lighting Retrofit, Fire Alarm, Window Replacement, New Ceilings (excluding Annex Building). Gym floor replacement, 1 KENNESAW MOUNTAIN HS New 91 IU High School, CTAE Equipment for Business Ed Labs, Drafting, Family and Consumer Science, Graphic Arts, Horticulture, Integrated Information Systems, Introduction to Technology, Law Enforcement, Marketing, TV Media, Modifications for Visually Impaired, ADA Flooring, CCTV Surveillance System Food Service Door Bells, Install Ringers on All Manager's Telephones, Upgrade Temperature Monitors, Add Gates At Bus Entrance and Driveway Leading to Sports Field, Food Service Small Equipment, ADA access to track, CCTV Surveillance Systems, Repave Road to Practice Field, Provide Exterior Lighting in the Parking Areas, Landscaping, Resurface Track CCTV Surveillance System Replacement, ADA Transition Academy Renovation, ADA Automatic Door Openers, ADA Restroom Modification, Incline Chair Lift (SE Stair), Roof Insulation, Pedestrian Gates, Flooring, Painting, Theater Lighting 1 KENNESAW WAREHOUSE Building Modifications Including Electrical Upgrade and Data Center Move Temperature Monitors for Walk in Coolers & freezers, ADA Audiology LAB, Food Service, Access Controls Food Service Equip. Upgrades, Add/Mod to Include Construction of 3,550 SqFt Cooler, Modify FNS Test Kitchen, Admin, Warehouse, & Classroom Areas, Equip. for Audiology Services Clarkdale ES Replacement also includes funding from self insurance, Travelers Insurance, FEMA/GEMA. 28 of 61

29 KINCAID ES Painting, Flooring, Add Emergency Callback Buttons, Air Condition PE Building, Renovate Restrooms, Renovate Open Space Classrooms, Upgrade Playscapes and Walkways, Curb Cuts, Walkways, Railing Temperature Monitors for Walk in Coolers & Freezers, Install Ringers on All Manager's Telephones, ADA Utensil Washer, Hood, & Booster Heater, ADA Restroom Renovations, ADA Special Needs Playscape, Replace Emergency Generator, Parking Lot & Bus Lane re paving, Roofing For sections of Building, Re Conditioning Roof Replacement for Covered Play Area, Access Controls, Gate At Main Entrance, Improve Drainage at Playgrounds, Sink in Art Room, Provide New Marquee Buzz in Intercom), Add/Mod Includes Equip. Storage Building & Student Toilets for PE, Renovate & Modify Kitchen, Add Walk In Freezer, Playfield Renovation, Playground Equip., Sprinkler (Fire Suppression), HVAC, Lighting Retrofit Replace temporary Annex Building w/new permanent wing, Gym electrical, Expand parking lot, bathroom modifications, 4 KING SPRINGS ES Add Emergency Callback Buttons, Incline Wheelchair Lift, Painting, Flooring, Roofing, HVAC Upgrade, Security System Upgrade, Upgrade Kitchen and Freezer Space, Repaving, Playground, Playscape and Walkway Upgrades, Stage Wheelchair Lift, ADA Restroom Renovations Temperature For Walk in Coolers & Freezers, Door Bells, Food Service Small Equipment, Main Switchgear & Panel Upgrades, HVAC Upgrades in Main Gym, Re Conditioning/Metal Roof Replacement for Covered Play Area, Access Controls, Callback Buttons Access Control Enhancement (Front Door Buzz in Intercom), Add/Mod to include Addition for Admin & Pupil Personnel, CCTV Surveillance System, Modify/Renovate Restrooms (Replace Tile Floor, Ceilings, Tile Wall Finish, Partitions, Plumbing Fixtures, Lighting & Re Paint), Gym Flooring, Flooring, HVAC, Water Coolers, Sprinkler (Fire Suppression), Clock, Fire Alarm, Site Lighting Reposition fence & add sidewalk leading to school, 2 Clarkdale ES Replacement also includes funding from self insurance, Travelers Insurance, FEMA/GEMA. 29 of 61

30 LABELLE ES Painting, Flooring, Roofing, Add Emergency Callback Buttons, Upgrade Restrooms, Drainage Upgrades, Paving, Playground, Playscape and Walkway Upgrades, Security System Upgrade Temperature Monitors for Walk in Coolers & Freezers, Door Bells, Install Ringers on All Manager's Telephones, ADA Restroom Improvements, Provide a Door from the Special Needs Classroom directly into the H/C Stall, Addition for Admin & Pupil Services, Addition of 10 IU's, Switchgear/Panel, HVAC/PE Gym, Metal Roof Refinishing, Security Lighting, Enclose Walkways, Whiteboards, Replace Existing Kitchen Exhaust, Access Controls, Security Cameras Buzz in Intercom), ADA Wheelchair Lift, Lighting Retrofit, Add/Mod to Include Kitchen Renovation (Replace Flooring in Storage Room & Office, Replace Ceiling & Lights, Add Staff Lockers, Painting), Hazardous Material Abatement, Add'l Parking, Playground Equip., Site Signs, Cafe Stage Curtains Gym floor replacement, 2 Clarkdale ES Replacement also includes funding from self insurance, Travelers Insurance, FEMA/GEMA. 30 of 61

31 LASSITER HS New Band Room, Replace Storm Water Line, Add Mezzanine Stair, Landing and Door, Add Fence and Gate, Paving, Painting, HVAC Upgrade, Resurface Tennis Courts, Drainage Upgrade, CCTV Surveillance System, Plumbing and Electrical Upgrades, Sound Wall, Upgrades for Visually Impaired, Restroom Renovations, ADA Curb Cuts, Toilet Stall Renovations and Automatic Door Holdopens Food Service Door Bells, & Drains, Install ringers on All Manager's Telephones, Upgrade Temperature Monitors, ADA Stadium improvements, Repair Cooler/Freezer, ADA Mat Table Repair, Food Service Small Equipment, repair the Emergency Generator, Main Switchgear/Panel Upgrades, Replace Carpet throughout & Add Carpet to the Choral Room, Replace Rubber Base in All Spaces including the Corridors, Replace Cooling Towers, Replace Gym Bleachers, Resurface Track, CCTV Surveillance System, Improve Drainage & Add Sidewalk, Repair & Replace Theater Seating CCTV Surveillance System Replacement, Security Fencing for Stadium, ADA HVAC, Fencing & Gates for Visitor Side of Stadium, Add/Mod to Include Theater for Performing Arts, Modify Existing Admin & Guidance/Pupil Personnel, Modify Existing Engineer & Tech Lab Facility to Meet GA DOE Facility Specs & Sq Footage, Kitchen & Cafeteria Renovation & Expansion (Cooler & Freezer Replacement, Flooring, Painting, Electrical Upgrade, Ceiling & Lighting), Modify Media Center & Replace Casework, Asphalt Paving, Tennis Courts Resurfacing, Water/Utilities, HVAC, Lighting Retrofit, Security Lighting, Football Sports Lighting, Softball Sports Lighting ADA Automatic Door replacement, 5 LEWIS ES Flooring, Drainage Upgrade, Add Exterior Lighting, Field Upgrades, Expand Physical Education Facility, Upgrade Playscapes and Walkways, ADA Curb Cuts, Walkways, and Restroom Renovations Temperature Monitors For Walk in Coolers & Freezers, Door Bells, Install Ringers on All Manager's Telephones, Add 1 IU PE Gymnasium with Restroom, Modify Existing PE Gym to Accommodate Guidance & Administration, HVAC/PE Gym, Paving Bus Lane & Parking Lot, Door Locks, Access Controls Buzz in Intercom), Traffic Bus Entrance, ADA Playground Fencing, Perimeter Fencing Behind School, Fire Sprinkler Head Replacement, Lighting Retrofit, Playground Equip., Sanitary Sewer Upgrade, Food Service Equip., Kitchen HVAC, Water Heaters, Emergency Generators, 1 Clarkdale ES Replacement also includes funding from self insurance, Travelers Insurance, FEMA/GEMA. 31 of 61

CAPITAL OUTLAY REQUEST - IDENTIFIED AND EMERGING PROJECTS - RANKED 3-Jun-14

CAPITAL OUTLAY REQUEST - IDENTIFIED AND EMERGING PROJECTS - RANKED 3-Jun-14 2014-2015 CAPITAL OUTLAY REQUEST - IDENTIFIED AND EMERGING PROJECTS - RANKED 3-Jun-14 School Item Amount a. Classroom A/R (Increase CR capacity to 804, add l Resource and tutoring spaces needed. Teacher

More information

Briar Crest Elementary

Briar Crest Elementary Promises Kept This document includes partial lists of major projects completed at Pattonville Schools since 1986 as part of past bond issues approved by the Pattonville community. Briar Crest Elementary

More information

Chariho Regional School District Five-Year Capital Facilities Improvement Plan (2/10/15)

Chariho Regional School District Five-Year Capital Facilities Improvement Plan (2/10/15) Chariho Regional School District Five-Year Capital Facilities Improvement Plan (2/10/15) School/Department FY 16 FY 17 FY18 FY19 FY20 Chariho Regional High School FY 16 FY 17 FY18 FY19 FY20 *Repair Bleachers

More information

S P L O S T I I I P r o g r a m P l a n 9/7/2010

S P L O S T I I I P r o g r a m P l a n 9/7/2010 S P L O S T P r o g r a m I I I P l a n 9/7/2010 SPLOST III Program Plan Table of Contents 1. Narrative 2. KSU Sales Tax Revenue Forecast 3. Budget Plan 4. Appendix A. Cash Flow Report Acceleration Option

More information

TIFT COUNTY SCHOOLS E-SPLOST HISTORY

TIFT COUNTY SCHOOLS E-SPLOST HISTORY TIFT COUNTY SCHOOLS E-SPLOST HISTORY July 1, 1997 June 30, 2002 $28,766,187.16 collected July 1, 2002 June 30, 2007 $39,025,830.10 collected July 1, 2007 June 30, 2012 $41,886,155.46 collected July 1,

More information

VOTER BOND REFERENDUM 2018 SUMMARY OF WORK PROPOSED

VOTER BOND REFERENDUM 2018 SUMMARY OF WORK PROPOSED Ashton Elementary School 1 Masonry Repair $ 42,781.50 2 Replace HVAC $ 375,000.00 3 Replace SAT @ Various Locations $ 92,364.00 3 Recoat & Resurface Exterior Paved Play Area $ 135,978.30 3 Various Technological

More information

3. 21st Century Learning A. Districtwide Flexible Learning - Allowance for Flexible Furniture $600,000 Subtotal $600,000

3. 21st Century Learning A. Districtwide Flexible Learning - Allowance for Flexible Furniture $600,000 Subtotal $600,000 1. Safety and Security A. Additional Cameras District Wide $382,000 B. Interior Locks Upgrades Allowance $300,000 C. Tilden Entrance Upgrades D. Door and Glass Improvements Allowance $500,000 E. Alert

More information

Master Facility Planning Update School Board Meeting May 26, 2016

Master Facility Planning Update School Board Meeting May 26, 2016 Master Facility Planning Update School Board Meeting May 26, 2016 Master Facilities Committee Overview Reflection of Committee Work Review of District Wide Facility Issues Identified District Wide Facility

More information

2014 Bond District-wide Facility Repairs

2014 Bond District-wide Facility Repairs Elementary Schools Aloha-Huber Park Fire Detector upgrade Replace electric backboard winches in gym Heating/cooling system controls upgrade Barnes Replace exterior windows Heating/cooling system and controls

More information

2014 Bond District-wide Facility Repairs

2014 Bond District-wide Facility Repairs Elementary Schools Aloha-Huber Park Fire Detector upgrade Replace electric backboard winches in gym Heating/cooling system controls upgrade Barnes Replace exterior windows Heating/cooling system and controls

More information

Master Project List Report

Master Project List Report Blue Hills Elementary School 01-8215 Site Utilities Replacement $52,835 01-8502 Modernization $3,135,933 01-8525 Exterior Painting $181,478 01-8552 Kindergarden Fencing $13,180 Install new backflow preventer.

More information

Oxford Hills School District Capital Renewal Plan Updated March 2017

Oxford Hills School District Capital Renewal Plan Updated March 2017 Color Coding Guide Recently Completed In Progress FY 2017 Budget in FY 2018 Future Budgets/Projects 3/20/17 Capital Renewal Plan Updated March 2017 Capital Renewal Plan - Harrison Elementary Harrison add

More information

School District of Milton 5- Year Capital Maintenance and Improvement Plan

School District of Milton 5- Year Capital Maintenance and Improvement Plan Updated - 02/21/17 School District of Milton 5- Year Capital Maintenance and Improvement Plan 101 East Elementary 1 Parking Lot/Traffic Flow Project 615,175 Includes Construction and Engineering 2 Bathroom

More information

2014 Bond Project Guide

2014 Bond Project Guide 2014 Bond Project Guide Bush Elementary School Page 1 Instructional Technology Computers, Projectors, Mobile Carts, Document Cameras and Printers Wireless Connectivity New Construction New Tech Center

More information

Tillamook High School Bond Projects

Tillamook High School Bond Projects Tillamook High School Bond Projects School Project Description All Buildings Upgrade fire alarm H&S All Buildings Add door lock capability from inside rooms Security All Buildings Install card lock entry

More information

Forest Hills Facilities Plan

Forest Hills Facilities Plan Forest Hills Facilities Plan Extensive updates to 8 of our 9 schools Replace Wilson Elementary Enhance learning environments across the district Build additional classrooms to accommodate gradual implementation

More information

New High School Concept

New High School Concept Approved Bond Projects for Alamance-Burlington Schools In November 2018, Alamance County citizens approved a $150 million bond project proposal. Bond funds will pay to construct a new high school and provide

More information

NYACK PUBLIC SCHOOLS CAPITAL IMPROVEMENT PLANNING PROCESS

NYACK PUBLIC SCHOOLS CAPITAL IMPROVEMENT PLANNING PROCESS NYACK PUBLIC SCHOOLS CAPITAL IMPROVEMENT PLANNING PROCESS DECEMBER 3, 2013 KEY QUESTIONS 1. What is the time sequence for available funding? (In what years will the funding be available?) 2. What is the

More information

Allisonville Elementary School Facilities Highlights Built: 1960 Last Major Renovation: 28 years ago Capacity: 650 Current Enrollment: 767

Allisonville Elementary School Facilities Highlights Built: 1960 Last Major Renovation: 28 years ago Capacity: 650 Current Enrollment: 767 Allisonville Elementary School Built: 1960 Last Major Renovation: 28 years ago Capacity: 650 Current Enrollment: 767 ADA improvements are Fire alarms need to be updated Playground equipment needs to be

More information

DEERFIELD SCHOOL DISTRICT REFERENDUM Committed to Excellence and Equity in Educating Our Students

DEERFIELD SCHOOL DISTRICT REFERENDUM Committed to Excellence and Equity in Educating Our Students DEERFIELD SCHOOL DISTRICT REFERENDUM Committed to Excellence and Equity in Educating Our Students FACILITY NEEDS THE CHALLENGE Deerfield Middle School/High School building has served the community for

More information

NAZARETH AREA SCHOOL DISTRICT MAINTENANCE DEPARTMENT 357 Tatamy Road, Nazareth, PA FAX

NAZARETH AREA SCHOOL DISTRICT MAINTENANCE DEPARTMENT 357 Tatamy Road, Nazareth, PA FAX NAZARETH AREA SCHOOL DISTRICT MAINTENANCE DEPARTMENT 357 Tatamy Road, Nazareth, PA 18064 610-759-1367 FAX 610-759-7028 TO: FROM: Dr. Riker, Superintendent of Schools Board of School Directors Lewis F.

More information

Greenwood Elementary School 5550 South Holly Street Greenwood Village, Colorado 80111

Greenwood Elementary School 5550 South Holly Street Greenwood Village, Colorado 80111 Greenwood Elementary School 5550 South Holly Street Greenwood Village, Colorado 80111 Year Opened 1958 Current Square Footage 50,504 Site Acreage 8.53 greenwood.cherrycreekschools.org $220,720 Electrical

More information

Design Presentation. Chief Operations Officer Willie Burroughs

Design Presentation. Chief Operations Officer Willie Burroughs Design Presentation Chief Operations Officer Willie Burroughs Agenda Introduction Community Feedback Project updates 2 Feedback Citizens Advisory Committee meetings Growth and Development meetings Community

More information

January 11, New benches installed. Paving of parking lot adjacent to piers and the canoe put-in. Near complete with clean up remaining.

January 11, New benches installed. Paving of parking lot adjacent to piers and the canoe put-in. Near complete with clean up remaining. Project Updates January 11, 2018 CENTERVILLE CHESAPEAKE ARBORETUM BELLS MILL CITY CREEKWOOD SOUTH DEEP CREEK LOCK WORK TO BE PERFORMED/UPDATES Improvements to the parking lot include installation of a

More information

MUKWONAGO AREA SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY

MUKWONAGO AREA SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY ARCHITECTURE ROLLING HILLS ELEMENTARY SCHOOL Rolling Hills Elementary was built in 1999 and is the newest addition to the Mukwonago Area School District. The building contains approximately 64,900 gross

More information

MUKWONAGO SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY

MUKWONAGO SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY MUKWONAGO SCHOOL DISTRICT ARCHITECTURE PARK VIEW MIDDLE SCHOOL The original school building was dedicated in 1954 as the High School, with an addition in 1959, a library addition in 1970, and an addition/renovation

More information

Encumbered Balance (E-D) Branham HVAC Implementation Complete 100% 03/04/19 07/19/19 $765, $635, $635, $130, $0.

Encumbered Balance (E-D) Branham HVAC Implementation Complete 100% 03/04/19 07/19/19 $765, $635, $635, $130, $0. Branham High School Budget Remaining 1 906030 Branham HVAC Implementation Complete 100% 03/04/19 07/19/19 $765,473.00 $635,342.00 $635,342.00 $130,131.00 $0.00 2 970205 Branham Interim Housing - 12 Portable

More information

REPORT CARD TO THE COMMUNITY MAY 15, 2018

REPORT CARD TO THE COMMUNITY MAY 15, 2018 REPORT CARD TO THE COMMUNITY MAY 15, 2018 O On May 10, 2014 voters in Greenville ISD approved a $72,275,000 bond election. BOND PROPOSAL PROJECT BOND AMOUNT CONSTRUCT A NEW BOWIE ELEMENTARY SCHOOL $17,600,000

More information

Sagebrush Elementary School East Temple Place Aurora, Colorado 80015

Sagebrush Elementary School East Temple Place Aurora, Colorado 80015 Sagebrush Elementary School 14700 East Temple Place Aurora, Colorado 80015 Year Opened 1977 Current Square Footage 57,100 Site Acreage 7.66 sagebrush.cherrycreekschools.org Asphalt and concrete work; electrical

More information

Ichabod Crane Central School District 2018 Capital Project Preliminary Estimate

Ichabod Crane Central School District 2018 Capital Project Preliminary Estimate Health & Safety 1,399,000 Academics & Program 17,140,800 Physical Education & Athletics 5,922,000 Building Infrastructure 3,103,800 Site Infrastructure 1,049,600 TOTAL SCOPE OF WORK 28,615,200 PROPOSED

More information

Facilities Management Services

Facilities Management Services Facilities Management Services Operating Budget Facilities Management (FM) receives an Operating Budget each year predicated on funding the routine, predictable costs of cleaning, maintaining,, and repairing,

More information

LINCOLN HIGH SCHOOL MODERNIZATION BEX IV COMMUNITY MEETING JUNE 23, 2016

LINCOLN HIGH SCHOOL MODERNIZATION BEX IV COMMUNITY MEETING JUNE 23, 2016 LINCOLN HIGH SCHOOL MODERNIZATION BEX IV COMMUNITY MEETING JUNE 23, 2016 PROJECT OVERVIEW PROJECT OVERVIEW + PRE-DESIGN BEGAN IN FALL OF 2015 + EXISTING CONDITIONS ANALYSIS + PROJECTED GROWTH IN HIGH SCHOOL

More information

ALLISON ELEMENTARY SCHOOL 4315 Don Julio Blvd., North Highlands, CA 95660

ALLISON ELEMENTARY SCHOOL 4315 Don Julio Blvd., North Highlands, CA 95660 ALLISON ELEMENTARY SCHOOL 4315 Don Julio Blvd., North Highlands, CA 95660 Year Built 1960 // Age 58 years Building Area 31,688 Square Feet Student Capacity 389 Current Enrollment (2017-2018) 466 Priority

More information

Campus Middle School 4785 South Dayton Street Greenwood Village, Colorado 80111

Campus Middle School 4785 South Dayton Street Greenwood Village, Colorado 80111 Campus Middle School 4785 South Dayton Street Greenwood Village, Colorado 80111 Year Opened 1971 Current Square Footage 175,743 Site Acreage (included in CCHS) 87.22 campus.cherrycreekschools.org $2,441,170

More information

Edward Jenner Elementary Academy of the Arts

Edward Jenner Elementary Academy of the Arts Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Meadow Point Elementary School East Grand Avenue Aurora, Colorado 80015

Meadow Point Elementary School East Grand Avenue Aurora, Colorado 80015 Meadow Point Elementary School 17901 East Grand Avenue Aurora, Colorado 80015 Year Opened 1982 Current Square Footage 53,100 Site Acreage 7.48 meadowpoint.cherrycreekschools.org $2,081,600 Electrical system,

More information

2015 Building Condition Survey Summary Mosaic Associates Architects 02/19/16

2015 Building Condition Survey Summary Mosaic Associates Architects 02/19/16 1. General: This summary is offered as a supplement to the 2015 Building Condition Survey being filed with SED on behalf of the District. All cost estimates are preliminary, and should be re-evaluated

More information

Richard Henry Lee Elementary School

Richard Henry Lee Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

NYC Department of Education

NYC Department of Education Asset: NEW UTRECHT AF - BROOKLYN, 1601 80 STREET, New York, 11214 Inspection Id Inspection Type Time In Last Edited SA : Architectural - Senior 2017-10-31 4:06 PM 2018-06-13 10:51 AM AA : Architectural

More information

Ohlone College Measure G Project Scope Revisions

Ohlone College Measure G Project Scope Revisions Scope Revisions Current Title Revised Title Current Scope Revised Scope 6101 Relocated Baseball Field Athletic Fields Create new sustainable baseball field with synthetic turf, bleacher seating and batting

More information

EXISTING CONDITIONS SUMMARY

EXISTING CONDITIONS SUMMARY SITE Fire alarm system does meet current requirements Accessible path of travel lacking throughout campus Announcer s booth at Football Field booth not ADA compliant Covered and non covered outdoor eating

More information

NEIGHBORS SOUTHWEST NEIGHBORHOOD MEETING December 17, 2014 BEAVERTON SCHOOL DISTRICT SOUTH COOPER MOUNTAIN HIGH SCHOOL

NEIGHBORS SOUTHWEST NEIGHBORHOOD MEETING December 17, 2014 BEAVERTON SCHOOL DISTRICT SOUTH COOPER MOUNTAIN HIGH SCHOOL NEIGHBORS SOUTHWEST NEIGHBORHOOD MEETING December 17, 2014 AGENDA NEIGHBORHOOD MEETING Design Criteria Review 3 Concepts Discussion Q&A DESIGN CRITERIA NEIGHBORHOOD MEETING IMAGE & IDENTITY CIVIC PRESENCE

More information

Kerrville ISD has called for a bond election in the amount of $88,960,000 for November 6, 2018

Kerrville ISD has called for a bond election in the amount of $88,960,000 for November 6, 2018 Kerrville ISD has called for a bond election in the amount of $88,960,000 for November 6, 2018 WHAT IS A BOND ELECTION? Provide communities an opportunity to vote to give the Board of Trustees authority

More information

29 Bella Fontaine Park

29 Bella Fontaine Park 29 Bella Fontaine Park 9565 Bellefontaine Road St. Louis County Parks Master Plan Planning Zone 2 Visit Date: July 2016 Page 1 129 Bella Fontaine Park 9565 Bellefontaine Road St. Louis County Parks Master

More information

Josefa Ortiz De Dominguez Elementary School

Josefa Ortiz De Dominguez Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Emergency Management Resource Guide. Appendix A: Crime Prevention Through Environmental Design CPTED Principles Checklist for Kentucky Public Schools

Emergency Management Resource Guide. Appendix A: Crime Prevention Through Environmental Design CPTED Principles Checklist for Kentucky Public Schools Appendix A: Crime Prevention Through Environmental Design CPTED Principles Checklist for Kentucky Public Schools 143 Crime Prevention Through Environmental Design CPTED Principles Checklist for Kentucky

More information

FORT ERIE SECONDARY SCHOOL FACILITY INFORMATION. Lake Erie Corridor Secondary Schools Accommodation Review

FORT ERIE SECONDARY SCHOOL FACILITY INFORMATION. Lake Erie Corridor Secondary Schools Accommodation Review FORT ERIE SECONDARY SCHOOL FACILITY INFORMATION Lake Erie Corridor Secondary Schools Accommodation Review November 2012 LAKE ERIE CORRIDOR SECONDARY SCHOOLS ACCOMMODATION REVIEW Fort Erie Secondary School

More information

SCHOOL DISTRICT PALM BEACH COUNTY BUILDING DEPARTMENT PLAN REVIEW CHECK LIST -- ELECTRICAL

SCHOOL DISTRICT PALM BEACH COUNTY BUILDING DEPARTMENT PLAN REVIEW CHECK LIST -- ELECTRICAL SCHOOL DISTRICT PALM BEACH COUNTY BUILDING DEPARTMENT PLAN REVIEW CHECK LIST -- ELECTRICAL 3300 SUMMIT BOULEVARD WEST PALM BEACH, FLORIDA 33406 TEL (561) 688-7687 FAX (561) 688-7654 http://www.palmbeach.k12.fl.us/fm/bd/index.htm

More information

Genevieve Melody Elementary School

Genevieve Melody Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Oscar DePriest Elementary School

Oscar DePriest Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

5 Year Capital Improvement Plan Update

5 Year Capital Improvement Plan Update 5 Year Capital Improvement Plan Update Board Approved May 10, 2016 Collierville Schools Board of Education Wanda Chism Wright Cox Mark Hansen, Chairman Cathy Messerly Kevin Vaughan Superintendent John

More information

NYC Department of Education

NYC Department of Education Architectural Inspection Building Assessment Survey 2017-2018 Asset: LEHMAN AF - BRONX, 3000 EAST TREMONT AVENUE, New York, 10461 Inspection Id Inspection Type Time In Last Edited SA : Architectural -

More information

EDUCATIONAL SPECIFICATIONS NEW CONSTRUCTION TO: Oxford Middle School Location to be determined November 4, 2016 Approved by BOE on November 29, 2016

EDUCATIONAL SPECIFICATIONS NEW CONSTRUCTION TO: Oxford Middle School Location to be determined November 4, 2016 Approved by BOE on November 29, 2016 EDUCATIONAL SPECIFICATIONS NEW CONSTRUCTION TO: Oxford Middle School Location to be determined November 4, 2016 Approved by BOE on November 29, 2016 Educational Specifications Page 1 Project Overview:

More information

Florence High School / Middle School Page 1 of 3 Florence, WI

Florence High School / Middle School Page 1 of 3 Florence, WI Florence High School / Middle School Page 1 of 3 Florence, WI Plumbing Systems Review: The following report is the result of a site visit by Tim Kehoe of Muermann Engineering, LLC that occurred on October

More information

HVAC / Boilers / Hot Water. Expected Life Span. very rough estimates Condition/Issue Age. Athletics / Gyms

HVAC / Boilers / Hot Water. Expected Life Span. very rough estimates Condition/Issue Age. Athletics / Gyms $4,013,500.00 $4,013,500.00 $ 1,155,000.00 $ 1,000,000.00 $ 205,000.00 $ 275,000.00 $ 300,000.00 $ 360,000.00 $ 438,500.00 $ 280,000.00 School Status Item HS Boilers boiler controls replaced 2017 2002

More information

WILLIAM & MARY CUSTODIAL TASK & FREQUENCY LIST. PUBLIC SPACE: ENTRANCES, LOBBIES, AND CORRIDORS Daily Weekly Monthly Quarterly Yearly

WILLIAM & MARY CUSTODIAL TASK & FREQUENCY LIST. PUBLIC SPACE: ENTRANCES, LOBBIES, AND CORRIDORS Daily Weekly Monthly Quarterly Yearly WILLIAM & MARY CUSTODIAL TASK & FREQUENCY LIST PUBLIC SPACE: ENTRANCES, LOBBIES, AND CORRIDORS Daily Weekly Monthly Quarterly Yearly Collect & properly dispose of recycling as needed Dust, or wipe all

More information

Washington Irving Elementary School

Washington Irving Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

E-SPLOST V. Facts and Information. August 2018

E-SPLOST V. Facts and Information. August 2018 E-SPLOST V Facts and Information August 2018 Education Special Purpose Local Option Sales Tax What is E-SPLOST? It is a one penny sales tax that allows for shared contribution to education, including visitors

More information

Number of persons with a disability that live with a disability in your community?

Number of persons with a disability that live with a disability in your community? Building name: re Dame Location: Owen Sound Assessment by: Cathy Smart Date: August 25, 2003 Total number of students: 378 Number of students living with a disability? Deaf/Hard of hearing Blind/Low vision

More information

2 Main Office Building BLDG-955A Building Purpose Building Area Administration offices. Training room 7,610 SF Inspection Date August 16, 2016 Inspect

2 Main Office Building BLDG-955A Building Purpose Building Area Administration offices. Training room 7,610 SF Inspection Date August 16, 2016 Inspect 1 Site Summary Address 7200 Bluff Springs Road Austin, TX 78744 Number of Permanent Campus Facilities 2 Original Year of Construction 2014 Total Campus Building Area (combined) 25,314 SF Introduction The

More information

Calmeca Academy of Fine Arts and Dual Language

Calmeca Academy of Fine Arts and Dual Language Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

NYC Department of Education

NYC Department of Education Asset: COLUMBUS AF - BRONX, 925 ASTOR AVENUE, New York, 10469 Inspection Id Inspection Type Time In Last Edited SA : Architectural - Senior 2017-10-31 9:21 AM 2017-11-29 8:45 AM AA : Architectural - Associate

More information

MOUNT PLEASANT MIDDLE SCHOOL HVAC. M-01 Heating Plant: M-02 Heating & Ventilating Systems: Livingston School District Mount Pleasant Middle School

MOUNT PLEASANT MIDDLE SCHOOL HVAC. M-01 Heating Plant: M-02 Heating & Ventilating Systems: Livingston School District Mount Pleasant Middle School MOUNT PLEASANT MIDDLE SCHOOL HVAC M-01 Heating Plant: The existing boilers have recently been upgraded. (3) steam boilers (8660 mbh each) manufactured by Weil- McLain have been installed. Newer hot water

More information

Cherry Hill Public Schools BUILDING A SOLID FUTURE

Cherry Hill Public Schools BUILDING A SOLID FUTURE Cherry Hill Public Schools BUILDING A SOLID FUTURE Who We Are The Cherry Hill School District is the 12 th largest in the state, serving 11,500 students 19 Locations 2 High Schools, 3 Middle Schools, 12

More information

John Palmer Elementary School

John Palmer Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Alessandro Volta Elementary School

Alessandro Volta Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Francis M McKay Elementary School

Francis M McKay Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

PROCTOR TERRACE ELEMENTARY SCHOOL

PROCTOR TERRACE ELEMENTARY SCHOOL SCHL DAA Address: Bryden Lane Santa Rosa, CA 95404 Established: 50 Permanent Classrooms: 3 Portable Classrooms: 9 Building Area: Site Area: 40, sq ft 5 acres Students in 5: 484 Students in (Projected):

More information

Beaufort County Community College. Maintenance and House Keeping Plan

Beaufort County Community College. Maintenance and House Keeping Plan Beaufort County Community College Maintenance and House Keeping Plan Summary: The College s facility management is handled by the Maintenance Department. The Director of Plant and Maintenance Operations

More information

FOOD SERVICE May 6, 2016

FOOD SERVICE May 6, 2016 FOOD SERVICE May 6, 2016 I. PROGRAM REQUIREMENTS Refer to the project-specific Schedule of Spaces for student stations, square footage, and for any requirements that may differ from the prototype requirements

More information

Joseph Brennemann Elementary School

Joseph Brennemann Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

SITE SYSTEMS: FANNIE MAE EXPECTED USEFUL LIFE TABLES (FMEUL)

SITE SYSTEMS: FANNIE MAE EXPECTED USEFUL LIFE TABLES (FMEUL) SITE SYSTEMS: FANNIE MAE EXPECTED USEFUL LIFE TABLES (FMEUL) Basketball Courts 15 25 Built Improvements Playgrounds, Site Furniture, etc. 20 20 Catch Basin 40 40 Cold Water Lines 40 40 Compactors DHW Supply

More information

DeWitt Clinton Elementary School

DeWitt Clinton Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Mechanical Inspection Plumbing

Mechanical Inspection Plumbing 0811 Fixtures Sinks, drinking fountains, water closets, showers, etc. Classroom Sinks. Classroom sinks (19) are enameled cast iron self rimming side ledge with gooseneck faucet trim with index handles,

More information

Agustin Lara Elementary Academy

Agustin Lara Elementary Academy Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Charles W Earle Elementary School

Charles W Earle Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

PLAN REVIEW SUBMITTAL GUIDE

PLAN REVIEW SUBMITTAL GUIDE PLAN REVIEW SUBMITTAL GUIDE Plans, specifications and other construction documentation for the initial plan review should be as complete as possible at the time of submittal. Use this convenient guide

More information

MADISON ELEMENTARY SCHOOL

MADISON ELEMENTARY SCHOOL TWIN RIVERS UNIFIED SCHOOL DISTRICT MADISON ELEMENTARY SCHOOL 54 HARRISON STREET NORTH HIGHLANDS, CALIFORNIA 95660 ORIGINAL BUILDING COMPLETED: 96, 67 BUILDING AREA: 45,69 SITE ACREAGE: 0 BUILDING CAPACITY:

More information

LAMPETER-STRASBURG SCHOOL DISTRICT Lampeter, Pennsylvania 17537

LAMPETER-STRASBURG SCHOOL DISTRICT Lampeter, Pennsylvania 17537 LAMPETER-STRASBURG SCHOOL DISTRICT Lampeter, Pennsylvania 17537 Buildings and Grounds Committee Minutes March 20, 2017 The meeting was called to order at 6:30 p.m. PRESENT: Board Members, Mr. Jeffrey A.

More information

Warren County Schools Plant and Operations

Warren County Schools Plant and Operations Warren County Schools Plant and Operations Buildings/Facilities/Energy Strategic Plan September 28, 2017 (Updated January 18, 2018) Donnie Caldwell; Facilities Director One Team, One Goal, High Levels

More information

Michigan State University Barrier-Free/Accessibility Project Status Summary March 2017

Michigan State University Barrier-Free/Accessibility Project Status Summary March 2017 Projects Completed FY14, FY15 and FY16 (arranged alphabetically) Abrams Planetarium Install automatic door opener on main doors of the Planetarium. Completed: Summer 2016 Cost: $13,000 Akers Hall Renovations

More information

George B Swift Elementary Specialty School

George B Swift Elementary Specialty School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

30% Design Community Meeting

30% Design Community Meeting Monday, September 17, 2018 30% Design Community Meeting Site 85-E-W-4 Please sign in on your mobile device: http//communitymeeting.ocps.net/ Site 85-E-W-4 Meeting Agenda September 17, 2018, 6:45PM Welcome

More information

BURLEIGH MANOR MIDDLE SCHOOL HOWARD COUNTY PUBLIC SCHOOL SYSTEM

BURLEIGH MANOR MIDDLE SCHOOL HOWARD COUNTY PUBLIC SCHOOL SYSTEM BURLEIGH MANOR MIDDLE SCHOOL HOWARD COUNTY PUBLIC SCHOOL SYSTEM Built in 1992 108, 407 Square Feet 771 Student Population 91 Staff Population 2 Building Supervisors, 3 Custodians 102, 663 Square Feet of

More information

FOOD SERVICE May 6, 2016

FOOD SERVICE May 6, 2016 FOOD SERVICE May 6, 2016 I. PROGRAM REQUIREMENTS Refer to the project-specific Schedule of Spaces for student stations, square footage, and any requirements that may differ from the prototype requirements

More information

FACILITIES CONDITION ASSESSMENT WAGNER RANCH ELEMENTARY SCHOOL. Orinda Union School District Facilities Master Plan

FACILITIES CONDITION ASSESSMENT WAGNER RANCH ELEMENTARY SCHOOL. Orinda Union School District Facilities Master Plan FACILITIES CNDITIN ASSESSMENT WAGNE ANCH ELEMENTAY SCHL 0 0 60 0 AT MAE CL SCI SP INT IT BASC BASC LIB INCLUSIN SPECIALIST MU FW FL IT U ADMIN C MP IT Property line shown is estimated. CE Core Curriculum

More information

Sidney Sawyer Elementary School

Sidney Sawyer Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Facilities Management State-Funded and Billable Services

Facilities Management State-Funded and Billable Services Facilities Management State-Funded and Billable Services Facilities Management receives funding to provide maintenance in eligible state-supported areas only, per UCOP guidelines. State-supported areas,

More information

ESUHSD Measure G Bond Program Update: November 1, Alterations to Student Services Building and Streetscape Building 1200 (Gym) Modernization

ESUHSD Measure G Bond Program Update: November 1, Alterations to Student Services Building and Streetscape Building 1200 (Gym) Modernization James Lick Track & Field Improvements Bleacher Replacement Alterations to Student Services Building and Streetscape Building 1200 (Gym) Modernization Design Mt Pleasant Bleacher Replacement New Performing

More information

Vendor Application Form

Vendor Application Form Vendor Application Form DIRECTIONS: Fill out this form as completely as possible. Forms that are incomplete will be discarded without notification. If you encounter an error, use the "Back" function in

More information

Custom Report // Priorities 1+2

Custom Report // Priorities 1+2 Custom Report // Priorities + All costs are shown in 08 dollars. The cost of all work items after this date should be adjusted accordingly. Print Date: 4/3/08 Foothill High School DESCRIPTION Building

More information

HOLUM EDUCATION CENTER. Architectural. January 13, 2014 DeForest Area School District

HOLUM EDUCATION CENTER. Architectural. January 13, 2014 DeForest Area School District HOLUM EDUCATION CENTER Architectural The existing building has approximately 41,823 square feet and sets on a lot about 4.14 acres in size. Parking lots are located along the east and west sides of the

More information

F. GENERAL REQUIREMENTS Electrical Design Criteria 2006 Edition 4/3/06 School District Palm Beach County Page-1 of 15

F. GENERAL REQUIREMENTS Electrical Design Criteria 2006 Edition 4/3/06 School District Palm Beach County Page-1 of 15 ELECTRICAL DESIGN CRITERIA TABLE OF CONTENTS I GENERAL...2 II CRITERIA...2 A. POWER DISTRIBUTION SYSTEMS...2 1. NORMAL POWER:...2 2. EMERGENCY POWER...3 B. LIGHTING...4 1. GENERAL...4 2. AVERAGE MAINTAINED

More information

Ashland School District Facility & Capacity Assessment Report 2005

Ashland School District Facility & Capacity Assessment Report 2005 Ashland School District Facility & Capacity Assessment Report 2005 Briscoe Elementary School (Closed Facility) Address: 265 N Main Street Area: 33,980 square feet Buildings: Original Building 1948 Music

More information

Binghamton University Construction SUMMER 2012 HIGHLIGHTS

Binghamton University Construction SUMMER 2012 HIGHLIGHTS Binghamton University Construction SUMMER 2012 HIGHLIGHTS Binghamton University Construction Summer 2012 Large and small construction projects were completed during the summer 2012 construction season.

More information

Douglas Unified School District No. 27 Administrative Offices th Street, Douglas, Arizona (520) Fax: (520)

Douglas Unified School District No. 27 Administrative Offices th Street, Douglas, Arizona (520) Fax: (520) Douglas Unified School District No. 27 Administrative Offices 1132 12th Street, Douglas, Arizona 85607 (520) 364-2447 Fax: (520) 224-2427 Ron Aguallo Superintendent Cesar Soto Business Manager Vendor Information

More information

1354 CHECKLIST for Project Closeout

1354 CHECKLIST for Project Closeout 1354 CHECKLIST for Project Closeout PROJECT NUMBER: BUILDING NUMBER: DESCRIPTION OF PROJECT: Describe description of work; i.e., New Construction, Addition, Modification, Renovation, etc DRAWING NUMBER

More information

MARY CRAPO CENTER Miller Road, Swartz Creek, Michigan

MARY CRAPO CENTER Miller Road, Swartz Creek, Michigan MARY CRAPO CENTER 8197 Miller Road, Swartz Creek, Michigan MARY CRAPO CENTER 8197 Miller Road, Swartz Creek General Information: - Instructional, Child Care Development Center (West Wing) o (2) Infant/Toddler

More information

MEDIA CENTER September 30, 2010

MEDIA CENTER September 30, 2010 MEDIA CENTER September 30, 2010 I. PROGRAM REQUIREMENTS Refer to the project-specific Schedule of Spaces for student stations, square footage, and for any requirements that may differ from the prototype

More information

Rockwell/Johnson School Renovations Project. Existing Conditions September, 2016

Rockwell/Johnson School Renovations Project. Existing Conditions September, 2016 Rockwell/Johnson School Renovations Project Existing Conditions September, 2016 Rockwell School Conditions RS - Custodial Closet Shared w/ Book Room. RS - Aging Telephone Switch Gear/No Growth for Additional

More information