ENGINEERING REPORT - MECHANICAL / ELECTRICAL / PLUMBING
|
|
- Neal Stokes
- 5 years ago
- Views:
Transcription
1 Mechanical Systems Information The mechanical system at Reed Middle School is comprised of seventy six Trane DX/Gas rooftop units (RTUs). The recommended useful life for DX equipment is 15 years. Seventy two of the RTUs were installed in This equipment is in poor condition and has reached the end of its useful life. The four remaining RTUs were installed in 2004 and serve the 700 hall addition. These units are in moderate condition and should have some useful life left. It appears that a majority of the condensate piping has been removed, causing condensate to fall directly to the roof. The gas and refrigerant piping is in good to moderate condition. The field house is served by two Trane Dx split systems and two Trane Dx/Gas rooftop units. These units were manufactured in 2002/2003 and are approaching the end of their useful life. The mechanical system at the Muldrew Gym consists of eleven Trane DX/Gas rooftop units. There are two 20- ton units, seven 5-ton units, and two 6-ton units. All of these RTUs were installed in 2003 and are in moderate condition. There are also two Bard wall pack air conditioning units on site serving the office/locker room areas located beneath the bleachers. It is being recommended that the mechanical equipment serving the field house and the Muldrew Gym be replaced within the next five years. Electrical Systems Information The electrical system at Reed Middle School is comprised of Square D distribution equipment. There are three 480/277 volt service entries for the facility, with main switchgears located in Room 411, Room 408C, and outside the auditorium. The MSB located in room 411 is a 2000 amp switchgear that is in moderate condition. The MSB in room 408C is an 800 amp switchgear that is in poor condition. It has reached the end of its useful life and may need to be replaced in the near future. The exterior MSB was inaccessible at the time of visit. It appears to be in moderate to poor condition. The facility s computer panels have been equipped with TVSS protection. The housing for electrical equipment on the roof is beginning to rust. There does not appear to be enough space on the current system to accommodate future expansions. Overall, the system is in moderate to poor condition, and some equipment has reached the end of its useful life. There is a 208/120 volt service for the Reed MS field house. The building s electrical equipment is manufactured by Square D and is good condition. The electrical system at the Muldrew gym is a 208/120 volt system that is comprised of Square D, ITE, and Siemens distribution equipment. All panels in the gym and print shop areas are in good to moderate condition and should have some useful life left. Plumbing Systems Information The plumbing system consists of wall mounted water closets, urinals, lavatories, and water coolers. The water closets and urinals throughout the facility are manufactured by American Standard and are in good condition. The flush valves are primarily manufactured by Sloan and Zurn and are in moderate condition. A majority of the lavatory faucets throughout the building are manual and are in moderate condition. Multi-person wash stations are utilized in some gang restrooms. These wash stations are in moderate to poor condition. Overall, the systems are in moderate condition. The facility s electric water coolers are, for the most part, in good to
2 moderate condition. Several water coolers, however, have reached the end of their useful life. These units are being recommended for replacement. The facility s flush valves and faucets do not comply with current water conservation standards. There are four domestic water heaters that serve the facility. In 1996, a 77 gallon Rheem Ruud gas water heater was installed in room 40. This unit is in moderate to poor condition and is being recommended for replacement. The kitchen water heater is a gas-fired Bradford White unit equipped with a 75 gallon tank. It is in good condition. There is a 15 gallon A.O. Smith electric water heater located in the library addition. This unit is in moderate condition. In room 562A, a Rheem electric water heater with a 19.9 gallon tank was installed in This unit is in poor condition and is being recommended for replacement. The field house water closets, urinals, lavatories, and electric water coolers are wall mounted units. The flush valves were manufactured by Sloan and are not low consumption fixtures. The lavatory faucets were manufactured by Delta and Speakman. The electric water coolers were manufactured by Halsey Taylor. The showers were manufactured by Speakman. Overall, the field house fixtures are in moderate condition and do not meet current water conservation standards. The plumbing system at the Muldrew Gym consists of wall mounted water closets, urinals, lavatories, and water coolers. The flush valves throughout the facility are manufactured by Sloan and are in moderate to poor condition. A majority of the lavatory faucets throughout the building are manual. Overall, the systems are in moderate condition. The facility s electric water coolers are Elkay and Halsey Taylor units. All electric water coolers throughout the building are in moderate to poor condition. The showers are wall mounted hot and cold water fixtures and are in poor condition. The fixtures throughout the Reed facility do not comply with the current water conservation standards. The gym is served by a gas-fired Rheem domestic water heater that was installed in It is equipped with a 92 gallon tank and is in poor condition. Lighting Information The lighting system in good condition and is primarily composed of T8 lamps with electronic ballasts. There are both T8 electronic ballast fixtures and T12 magnetic ballast fixtures in the field house. The lighting system at the Muldrew Gym is in overall good condition and is primarily composed of T5HO high bay fluorescents lamps with electronic ballasts. Exterior lighting is insufficient and the installation of LED parking lot poles is being recommended for both the main building and the Muldrew Gym. Fire Alarm Information The fire alarm panel at Reed Middle School is a Cerberus MXL-1Q that was installed in The recommended useful life for fire alarm systems is 12 years. There are no smoke detectors in the classrooms, gym, and cafeteria. There are smoke detectors in the corridors and other common spaces. Strobes and sirens are installed
3 in the classrooms, gym, cafeteria, corridors, and other common spaces. The strobes, sirens, and smoke detectors are wall mounted. Smoke detectors have been installed in the locker rooms areas at the Muldrew gym. There are no smoke detectors present in the gymnasium area. Strobes and sirens are installed throughout the facility. Fire Sprinkler System Information Reed Middle School has a fire protection system in place. The facility is up to code. There is currently no fire protection system in place at the Muldrew Gym. Energy Management System Information The main building s EMCS is an Alerton control system that was installed in 2011 and is in good condition. The recommended useful life for DDC controls is 12 to 15 years. The Reed Muldrew Gym s EMCS is an Alerton control system that was installed in 2005 and is in good to moderate condition. The recommended useful life for DDC controls is 12 to 15 years. Deficiencies List Some of the water fountains are non-ada-compliant Broken urinal Condensate piping is in poor condition. Replace lighting fixtures that have magnetic ballasts. No fire protection system. Damage mechanical system.
4 Cerberus MXL-1Q Fire Alarm Panel Water Closet in poor condition Broken Urinal Panel CF in poor condition Panel CG in poor condition Transformer in poor condition
5 MSB in poor condition Panel CJ in poor condition Panel CH in poor condition Water Cooler in poor condition. Rooftop electrical housing showing rust. Alerton Cohesive Control Box
6 Exterior MSB Electrical Panel in poor condition. Electrical Panel in poor condition. Alerton Cohesive Control Box ADA compliant water fountain Wash station in poor condition.
7 Alerton Cohesive Controller in the Gymnasium s print shop Gymnasium Electric water coolers. Middle unit in poor condition. Gymnasium Exterior MSB Electrical Panel in the Gymnasium s print shop Computer Panel in the Gymnasium s print shop Nonfunctioning water closet in the print shop.
8 Old electric water cooler Poor condition water closet
ENGINEERING REPORT - MECHANICAL / ELECTRICAL / PLUMBING
Mechanical Systems Information The mechanical system at Duncanville High School is comprised entirely of DX/Gas rooftop units (RTUs) and DX split systems. A vast majority of the RTUs are Trane units that
More informationMOUNT PLEASANT MIDDLE SCHOOL HVAC. M-01 Heating Plant: M-02 Heating & Ventilating Systems: Livingston School District Mount Pleasant Middle School
MOUNT PLEASANT MIDDLE SCHOOL HVAC M-01 Heating Plant: The existing boilers have recently been upgraded. (3) steam boilers (8660 mbh each) manufactured by Weil- McLain have been installed. Newer hot water
More informationState College Area School District High School South Building EXISTING CONDITIONS ASSESSMENT
State College Area School District High School South Building Prepared by CenterPoint Engineering 08 February 2013 FACILITY ASSESSMENT SUMMARY PHYSICAL PLANT General HVAC This report is a snapshot of the
More information4. Plumbing fixtures. a) The plumbing fixtures are from the original building. They are appear old and not to comply with ADA requirements.
From: Jian Zhang Sheet: 1 of 8 Date of Visit: 12/7/10 Coach House: Plumbing Systems b) All original building storm piping shows significant signs of aging. b) All original building sanitary piping shows
More informationNYC Department of Education
Asset: P.S. 86 ANNEX - BRONX, 124 EAMES PLACE, New York, 10468 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-04-05 1:03 PM 2018-04-27 1:35 PM Asset Data Are there fuel tanks? Total
More informationNYC Department of Education
Asset: I.S. 45 - BRONX, 2502 LORILLARD PLACE, New York, 10458 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2017-12-05 9:14 AM 2017-12-20 11:42 AM Asset Data Are there fuel tanks? Total
More informationNYC Department of Education
Asset: P.S. 128 - MANHATTAN, 560 WEST 169 STREET, New York, 10032 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2017-12-07 8:50 AM 2018-06-14 1:16 PM Asset Data Are there fuel tanks?
More informationNYC Department of Education
Asset: A. PHILLIP RANDOLPH HS - MANHATTAN, 443 WEST 135 STREET, New York, 10031 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-02-02 8:11 AM 2018-06-14 1:21 PM Asset Data Are there
More informationNYC Department of Education
Asset: P.S. 198 - BRONX, 1180 TINTON AVENUE, New York, 10456 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-01-24 8:14 AM 2018-01-24 9:32 PM Asset Data Are there fuel tanks? Total
More informationEdward Jenner Elementary Academy of the Arts
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationState College Area School District High School North Building EXISTING CONDITIONS ASSESSMENT
State College Area School District High School North Building Prepared by CenterPoint Engineering 08 February 2013 FACILITY ASSESSMENT SUMMARY PHYSICAL PLANT General HVAC This report is a snapshot of the
More informationFlorence High School / Middle School Page 1 of 3 Florence, WI
Florence High School / Middle School Page 1 of 3 Florence, WI Plumbing Systems Review: The following report is the result of a site visit by Tim Kehoe of Muermann Engineering, LLC that occurred on October
More informationNYC Department of Education
Asset: P.S. 22 - STATEN ISLAND, 1860 FOREST AVENUE, New York, 10303 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2017-12-08 8:51 AM 2017-12-18 4:14 PM Asset Data Are there fuel tanks?
More informationDESIGN AND CONSTRUCTION STANDARDS GENERAL DESIGN GUIDELINES
2.05 PLUMBING GENERAL DESIGN AND CONSTRUCTION STANDARDS GENERAL DESIGN GUIDELINES - 2.05 It is expected that the plumbing design professional will conform to accepted good engineering design practices.
More informationPLATTEVILLE MIDDLE SCHOOL
Architectural The building has aluminum clad wood awning windows in combination with aluminum fixed glass units. They appear to be exterior glazed with insulated glazing. See photo 2. Platteville Middle
More informationCharles W Earle Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationSprinkler: The building does not have a fire protection system installed. MECHANICAL / PLUMBING / SPRINKLER SYSTEMS RECOMMENDATIONS
EXISTING MECHANICAL CONDITIONS SUMMARY The items listed below are based on our site visit on Nov 10, 2016. Our review is based on current conditions and anticipated future use of these building. In the
More informationMUKWONAGO SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY
MUKWONAGO SCHOOL DISTRICT ARCHITECTURE PARK VIEW MIDDLE SCHOOL The original school building was dedicated in 1954 as the High School, with an addition in 1959, a library addition in 1970, and an addition/renovation
More informationELECTRICAL SYSTEMS ASSESSMENT Hanover High School
ELECTRICAL SYSTEMS ASSESSMENT Hanover High School ELECTRICAL DISTRIBUTION SYSTEM:?? The existing electrical service consists of an underground primary service originating at a utility pole on Cedar Street,
More informationCalmeca Academy of Fine Arts and Dual Language
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationDESIGN STANDARDS SECTION Toilet rooms and utility rooms to have floor drains at lowest point.
PART 1 - GENERAL 1.01 Toilet rooms and utility rooms to have floor drains at lowest point. 1.02 Utilize Exposed Flushometers. 1.03 Wall hung toilet room fixtures. Urinals for handicapped may be stall type.
More informationNYC Department of Education
Asset: P.S. 205B (ECF) - BRONX, 2375 SOUTHERN BLVD, New York, 10460 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-01-12 12:29 PM 2018-01-12 3:14 PM Asset Data Are there fuel tanks?
More informationOscar DePriest Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More information3. 21st Century Learning A. Districtwide Flexible Learning - Allowance for Flexible Furniture $600,000 Subtotal $600,000
1. Safety and Security A. Additional Cameras District Wide $382,000 B. Interior Locks Upgrades Allowance $300,000 C. Tilden Entrance Upgrades D. Door and Glass Improvements Allowance $500,000 E. Alert
More informationMassachusetts School Building Authority
Massachusetts School Building Authority School District Revere District Contact Paul Dakin TEL: (781) 286-8226 Name of School Submission Date 3/6/2007 The following Priorities have been included in the
More informationGenevieve Melody Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationDESIGN STANDARDS SECTION PLUMBING FIXTURES AND EQUIPMENT. 1.3 Wall hung toilet room fixtures. Urinals for handicapped may be stall type.
PART 1 - GENERAL 1.1 Toilet rooms and utility rooms to have floor drains at lowest point. 1.2 Utilize Exposed Flushometers. 1.3 Wall hung toilet room fixtures. Urinals for handicapped may be stall type.
More informationSCO # 1 & 2 PUNCLH LIST Project Name: VANCLEAVE UPPER ELEMENTARY CLA#: 13003
SCO # 1 & 2 PUNCLH LIST Project Name: VANCLEAVE UPPER ELEMENTARY CLA#: 13003 No. Discipline Sent to Name Item Date Noted Date Resolved How item was resolved SCO # 1Punch listed items were noted below on
More information2 Main Office Building BLDG-955A Building Purpose Building Area Administration offices. Training room 7,610 SF Inspection Date August 16, 2016 Inspect
1 Site Summary Address 7200 Bluff Springs Road Austin, TX 78744 Number of Permanent Campus Facilities 2 Original Year of Construction 2014 Total Campus Building Area (combined) 25,314 SF Introduction The
More informationAgustin Lara Elementary Academy
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationAshland School District Facility & Capacity Assessment Report 2005
Ashland School District Facility & Capacity Assessment Report 2005 Briscoe Elementary School (Closed Facility) Address: 265 N Main Street Area: 33,980 square feet Buildings: Original Building 1948 Music
More informationMechanical Inspection Plumbing
0811 Fixtures Sinks, drinking fountains, water closets, showers, etc. Classroom Sinks. Classroom sinks (19) are enameled cast iron self rimming side ledge with gooseneck faucet trim with index handles,
More informationNYC Department of Education
NYC Department of Education Building Assessment Survey 2017-2018 Asset: P.S. 131 - QUEENS, 170-45 84TH AVENUE, New York, 11432 Inspection Id Inspection Type Time In Last Edited EE : Electrical 2018-04-18
More informationNYC Department of Education
Asset: P.S. 188 - MANHATTAN, 442 EAST HOUSTON STREET, New York, 10002 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-03-08 8:52 AM 2018-06-13 5:06 PM Asset Data Are there fuel tanks?
More informationJosefa Ortiz De Dominguez Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationNYC Department of Education
Asset: P.S. 104 - BROOKLYN, 9115 5TH AVENUE, New York, 11209 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-02-21 8:55 AM 2018-02-21 1:09 PM Asset Data Are there fuel tanks? Total
More informationNYC Department of Education
Asset: P.S. 146 - BRONX, 968 CAULDWELL AVENUE, New York, 10456 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2017-12-01 8:57 AM 2018-05-31 2:59 PM Asset Data Are there fuel tanks? Total
More informationVOTER BOND REFERENDUM 2018 SUMMARY OF WORK PROPOSED
Ashton Elementary School 1 Masonry Repair $ 42,781.50 2 Replace HVAC $ 375,000.00 3 Replace SAT @ Various Locations $ 92,364.00 3 Recoat & Resurface Exterior Paved Play Area $ 135,978.30 3 Various Technological
More informationNYC Department of Education
Asset: P.S. 160 - BROOKLYN, 5105 FORT HAMILTON PARKWAY, New York, 11219 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-04-03 8:01 AM 2018-05-18 1:45 PM Asset Data Are there fuel
More informationNYC Department of Education
Asset: AUTOMOTIVE TRADES VOC HS - K, 50 BEDFORD AVENUE, New York, 11222 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-05-01 8:09 AM 2018-05-10 2:18 PM Asset Data Are there fuel
More informationNYC Department of Education
Asset: P.S. 2 - MANHATTAN, 122 HENRY STREET, New York, 10002 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-01-05 9:21 AM 2018-01-16 12:15 PM Asset Data Are there fuel tanks? Total
More informationAppendix B. Facilities Assessment Report
Mile Lane Army Reserve Center Redevelopment Plan September 2008 Appendix B Facilities Assessment Report RKG Associates, Inc. Mile Lane Army Reserve Base Middletown, CT MEP System Evaluation For RKG Associates
More informationMARY CRAPO CENTER Miller Road, Swartz Creek, Michigan
MARY CRAPO CENTER 8197 Miller Road, Swartz Creek, Michigan MARY CRAPO CENTER 8197 Miller Road, Swartz Creek General Information: - Instructional, Child Care Development Center (West Wing) o (2) Infant/Toddler
More informationNYC Department of Education
Asset: LIBERTY HS - MANHATTAN, 250 WEST 18 STREET, New York, 10011 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-01-29 11:32 AM 2018-02-01 10:16 AM Asset Data Are there fuel tanks?
More informationMUKWONAGO AREA SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY
ARCHITECTURE ROLLING HILLS ELEMENTARY SCHOOL Rolling Hills Elementary was built in 1999 and is the newest addition to the Mukwonago Area School District. The building contains approximately 64,900 gross
More informationNYC Department of Education
Asset: I.S. 131 - BRONX, 885 BOLTON AVENUE, New York, 10473 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2017-10-17 8:54 AM 2017-12-05 5:41 PM Asset Data Are there fuel tanks? Total
More informationNYC Department of Education
Asset: ACHIEVEMENT FIRST ENDEAVOR CHARTER SCHOOL- BROOKLYN, 510 WAVERLY AVENUE, New York, 11238 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-03-14 8:42 AM 2018-03-23 10:17 AM
More informationNYC Department of Education
Asset: P.S. 7 - MANHATTAN, 160 EAST 120 STREET, New York, 10035 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-03-02 8:44 AM 2018-03-12 10:45 AM Asset Data Are there fuel tanks?
More informationPLUMBING DESIGN GUIDELINES SECTION DESIGN GUIDELINES DUVAL COUNTY PUBLIC SCHOOLS
The Design Guidelines, which follow, are intended to supplement the Educational Specifications and State Requirements for Educational Facilities (SREF). Note: All fittings shall be installed by no less
More informationRichard Henry Lee Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationGARCIA GALUSKA DESOUSA Consulting Engineers
L#58619/Page 1/November 1, 2017 PLUMBING Executive Summary: Presently, the Plumbing Systems serving the building are cold water, hot water, sanitary, waste and vent system, storm drain piping, and natural
More informationDESIGN STANDARDS SECTION Toilet rooms and utility rooms to have floor drains at lowest point.
PART 1 - GENERAL 1.01 Toilet rooms and utility rooms to have floor drains at lowest point. 1.02 Utilize Exposed Flushometers. 1.03 Utilize wall hung toilet room fixtures. Urinals for handicapped may be
More informationEXISTING CONDITIONS SUMMARY
SITE Fire alarm system does meet current requirements Accessible path of travel lacking throughout campus Announcer s booth at Football Field booth not ADA compliant Covered and non covered outdoor eating
More informationAlessandro Volta Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationSidney Sawyer Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationMID MICHIGAN COMMUNITY COLLEGE HARRISON CAMPUS Harrison, Michigan 2015 MASTER PLAN
MID MICHIGAN COMMUNITY COLLEGE HARRISON CAMPUS Harrison, Michigan 2015 MASTER PLAN September 30, 2015 PBA Project No. 2015.0140.00 PETER BASSO ASSOCIATES INC. CONSULTING ENGINEERS 5145 LIVERNOIS ROAD,
More informationTighe&Bond. Groton Heights School Mechanical Evaluation. 1 Existing Conditions. 1.1 Water Service Entrance
Groton Heights School Mechanical Evaluation TO: FROM: Amy Vaillancourt, Project Manager Harley Langford, Project Manger Jason Curtis, P.E. DATE: February 24, 2016; Revised May 31, 2016 On Monday, December
More informationGeorge B Swift Elementary Specialty School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationDEERFIELD SCHOOL DISTRICT REFERENDUM Committed to Excellence and Equity in Educating Our Students
DEERFIELD SCHOOL DISTRICT REFERENDUM Committed to Excellence and Equity in Educating Our Students FACILITY NEEDS THE CHALLENGE Deerfield Middle School/High School building has served the community for
More informationSHOE PALACE HUNTINGTON PARK M.200
M.200 SPLIT SYSTEM CONDENSING UNIT SCHEDULE MARK SERVICE MODEL NO. COOLING DIMENSIONS ELECTRICAL REMARKS CAPACITY AMBIENT DB REFRIGERANT LENGTH WIDTH HEIGHT WEIGHT VOLT/PHASE MCA MOP (MBH) (DEG F) (IN)
More informationDeWitt Clinton Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationNYC Department of Education
Asset: W.E.B. DUBOIS HS - BROOKLYN, 402 EASTERN PARKWAY, New York, 11225 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2017-12-04 1:02 PM 2017-12-27 4:16 PM Asset Data Are there fuel
More informationNYC Department of Education
Asset: I.S. 2 - BROOKLYN, 655 PARKSIDE AVE, New York, 11226 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-05-11 9:35 AM 2018-05-22 3:53 PM Asset Data Are there fuel tanks? Total
More informationNYC Department of Education
NYC Department of Education Building Assessment Survey 2017-2018 Asset: DIV. COMPUTER INFO-DATA CENTER-K, 2 METROTECH CENTER, New York, 11211 Inspection Id Inspection Type Time In Last Edited EE : Electrical
More informationNYC Department of Education
Asset: MORRISANIA SEC ED COMPLEX-X, 1365 FULTON AVENUE, New York, 10456 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2017-11-03 8:53 AM 2017-11-03 5:47 PM Asset Data Are there fuel
More informationNYC Department of Education
Asset: P.S. 199 ANNEX (@ ST. TERESA'S) - QUEENS, 50-15 44TH STREET, New York, 11377 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-04-18 11:39 AM 2018-05-14 12:27 PM Asset Data
More informationJohn Palmer Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationNYC Department of Education
Asset: P.S. 32 - BRONX, 690 EAST 183 STREET, New York, 10458 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2017-11-13 9:25 AM 2017-11-16 5:46 PM Asset Data Are there fuel tanks? Total
More informationDRAFT. Widen Elementary School Site Summary 74,523 SF. Introduction
1 Widen Elementary School Site Summary Address 5605 Nuckols Crossing Austin, TX 78744 Number of Permanent Campus Facilities 2 Original Year of Construction 1986 Total Campus Building Area (combined) 74,523
More informationMadeira City Schools Madeira, Ohio. HVAC Assessment. December 2011 (Revised February 2012)
Madeira City Schools Madeira, Ohio HVAC Assessment December 2011 (Revised February 2012) Prepared by: CMTA Engineering Consultants, Inc. 10411 Meeting Street Prospect, KY 40059 www.cmtaegrs.com (502) 326-3085
More informationDUKE UNIVERSITY CONSTRUCTION STANDARDS
1 22 40 00 Plumbing Fixtures 1. General A. Definitions 1. Section includes a. Water closets and urinals b. Lavatories, sinks, and service sinks c. Electric water coolers, drinking fountains, d. Showers
More informationNYC Department of Education
Asset: P.S. 19 - STATEN ISLAND, 780 POST AVENUE, New York, 10310 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2017-10-26 8:58 AM 2017-11-14 1:37 PM Asset Data Are there fuel tanks?
More informationNYC Department of Education
Asset: LEARNING SUPPORT CENTER - K, 1665 ST. MARKS AVENUE, New York, 11233 Inspection Id Inspection Type Time In Last Edited EE : Electrical 2018-05-07 1:06 PM 2018-05-10 12:20 PM Asset Data Type of Service
More informationFrancis M McKay Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationS AGE E NGINEERING A SSOCIATES, LLP
S AGE E NGINEERING A SSOCIATES, LLP 1211 Western Avenue Albany, NY (518) 453 6091 F (518) 453 6092 Kingston Library Mechanical and Electrical Systems Field Report Date of Visits: Mechanical - September
More informationNORTH CENTRAL MICHIGAN COLLEGE PETOSKEY CAMPUS. Facilities Conditions Assessment Mechanical And Electrical Petoskey, Michigan
NORTH CENTRAL MICHIGAN COLLEGE PETOSKEY CAMPUS Facilities Conditions Assessment Mechanical And Electrical Petoskey, Michigan PBA Project No. 2014.0137.00 Prepared By: Wayne Kerbelis Terry Cleis September
More informationNYC Department of Education
Asset: P.S. 69 - STATEN ISLAND, 144 KEATING PLACE, New York, 10314 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-01-19 8:39 AM 2018-01-23 4:33 PM Asset Data Are there fuel tanks?
More informationNYC Department of Education
Asset: J. K. ONASSIS HS FOR INT CAREERS-M, 120 WEST 46 STREET, New York, 10036 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2017-12-11 11:37 AM 2017-12-26 12:18 PM Asset Data Are there
More informationNYC Department of Education
Asset: P.S. 4 - MANHATTAN, 500 WEST 160TH STREET, New York, 10032 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2017-12-08 8:29 AM 2017-12-08 3:44 PM Asset Data Are there fuel tanks?
More informationMaster Facility Planning Update School Board Meeting May 26, 2016
Master Facility Planning Update School Board Meeting May 26, 2016 Master Facilities Committee Overview Reflection of Committee Work Review of District Wide Facility Issues Identified District Wide Facility
More informationNYC Department of Education
NYC Department of Education Building Assessment Survey 2017-2018 Asset: P.S. 80 AX(PETR COMPL-BLDG E)-S.I., 715 OCEAN TERRACE, New York, 10301 Inspection Id Inspection Type Time In Last Edited EE : Electrical
More informationCustom Report // Priorities 1+2
Custom Report // Priorities + All costs are shown in 08 dollars. The cost of all work items after this date should be adjusted accordingly. Print Date: 4/3/08 Foothill High School DESCRIPTION Building
More informationNYC Department of Education
Asset: P.S. 78 - QUEENS, 48-09 CENTER BLVD., New York, 11109 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-04-02 11:40 AM 2018-04-19 9:04 AM Asset Data Are there fuel tanks? Total
More informationCommunity Unit School District 200 Facilities
Community Unit School District 200 Facilities Committee of the Whole Presentation February 27, 2013 Community Unit School District 200 Facilities Update The purpose of this CUSD 200 Facilities update is
More informationNYC Department of Education
Building Assessment Survey 2017-2018 Asset: NEW SCH FOR ARTS AND SCIENCE - X, 965 LONGWOOD AVENUE, New York, 10459 Inspection Id Inspection Type Time In Last Edited EE : Electrical 2017-12-01 8:13 AM 2017-12-01
More informationNYC Department of Education
Asset: HS FOR MATH, SCI & ENGINEERING-M, 240 CONVENT AVENUE, New York, 10031 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2017-12-20 12:04 PM 2018-01-05 5:32 PM Asset Data Are there
More informationF. GENERAL REQUIREMENTS Electrical Design Criteria 2006 Edition 4/3/06 School District Palm Beach County Page-1 of 15
ELECTRICAL DESIGN CRITERIA TABLE OF CONTENTS I GENERAL...2 II CRITERIA...2 A. POWER DISTRIBUTION SYSTEMS...2 1. NORMAL POWER:...2 2. EMERGENCY POWER...3 B. LIGHTING...4 1. GENERAL...4 2. AVERAGE MAINTAINED
More informationNYC Department of Education
Asset: P.S./I.S. 194 - BRONX, 2365 WATERBURY AVENUE, New York, 10462 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-01-24 8:34 AM 2018-02-01 10:02 AM Asset Data Are there fuel tanks?
More informationDUFFERIN-PEEL CATHOLIC DISTRICT SCHOOL BOARD
DUFFERIN-PEEL CATHOLIC DISTRICT SCHOOL BOARD LIGHTING FIXTURES AND CIRCUITRY & SWITCHING SECONDARY SCHOOLS 1. GENERAL 1.1.1. Consultants MUST prepare a Summary of Fixtures which will include catalogue
More informationNYC Department of Education
Asset: LEARNING SUPPORT CENTER - M, 333 7TH AVENUE, New York, 10001 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-01-23 8:46 AM 2018-01-30 10:47 AM Asset Data Are there fuel tanks?
More informationUniversity of Rochester October 17, 2008 Brooks Landing Business Center
SECTION 224200 COMMERCIAL PLUMBING FIXTURES PART 1 - GENERAL 1.1 WORK INCLUDED A. Provide all labor, materials, equipment and services to perform operations required for the complete installation and related
More informationNYC Department of Education
Asset: P.S. 163 - BRONX, 2075 WEBSTER AVENUE, New York, 10457 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-03-22 8:33 AM 2018-03-22 3:13 PM Asset Data Are there fuel tanks? Total
More informationYale University Design Standards
Change History Date Description of Change Pages / Sections Modified Change Approver Initials 3/26/13 Add text encouraging discussion of innovation in 2 15410, A (Summary) SO newly available products. 3/26/13
More informationWashington Irving Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationNYC Department of Education
Asset: PRE-K CENTER @ 7401 FORT HAMILTON PARKWAY - BROOKLYN, 7401 FORT HAMILTON PARKWAY, New York, 11228 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2017-11-27 11:12 AM 2017-11-27
More informationChariho Regional School District Five-Year Capital Facilities Improvement Plan (2/10/15)
Chariho Regional School District Five-Year Capital Facilities Improvement Plan (2/10/15) School/Department FY 16 FY 17 FY18 FY19 FY20 Chariho Regional High School FY 16 FY 17 FY18 FY19 FY20 *Repair Bleachers
More informationF. GENERAL REQUIREMENTS Electrical Design Criteria 2009 Edition 11/23/2009 School District Palm Beach County Page-1 of 17
ELECTRICAL DESIGN CRITERIA TABLE OF CONTENTS I GENERAL...2 II CRITERIA...2 A. POWER DISTRIBUTION SYSTEMS...2 1. NORMAL POWER:... 2 2. EMERGENCY POWER... 3 B. LIGHTING...4 1. GENERAL... 4 2. AVERAGE MAINTAINED
More informationNYC Department of Education
NYC Department of Education Building Assessment Survey 2017-2018 Asset: P.S. 59 ANNEX - BRONX, 2120 QUARRY RD, New York, 10457 Inspection Id Inspection Type Time In Last Edited EE : Electrical 2018-02-12
More informationHWC NOTES: CONTRACTOR SHALL REFER TO ARCHITECTURAL DRAWINGS FOR MOUNT HEIGHTS AND SPECIAL MOUNTING INSTRUCTION AND LIMITATIONS.
ELECTRIC WATER HEATER SCHEDULE DESIGNATION MODEL MANUFACTURER STORAGE RECOVERY TEMPERATURE LEAVING ELECTRICAL CHARACTERISTICS REMARKS/SPECIAL INSTRUCTIONS NUMBER GALLONS RATE RISE WATER K.W. VOLTAGE PHASE
More informationLincoln Public Schools
Lincoln Public Schools School Building Committee Meeting February 13, 2019 Today s Agenda 1. Review Updated Site Plan 2. Review and Approve OPR 3. Review MEP Systems 4. Review Progress Energy Model Review
More information