Lisbona.Projects 12. Bar a Margem Lisbon, Portugal Falcão de Campos Arquitecto bar, pavilion, restaurant. Hotel Altis Belem.
|
|
- Ashlyn Long
- 6 years ago
- Views:
Transcription
1 Lisbona Projects 12 Created 28-Oct-16 By davide brembilla, bergamo, Italy Bar a Margem Lisbon, Falcão de Campos Arquitecto bar, pavilion, restaurant Gare do Oriente Station Pavilion of Hotel Altis Belem School of Music 4 Archaeological Site of Praca Nova 9 10 Lisbon, Joao Luis Carrilho da Graca museum 5 Champalimaud Center for the Unknown 11 Lisbon, Charles Correa Associates clinic, laboratorium Lisbon, Aires Mateus s auditorium, education, university Lisbon, Aires Mateus s commercial space, office Rectory of Universidade Nova de Lisboa 6 Central da Graca Optic Store 8 Lisbon, Joao Luis Carrilho da Graca education, music theatre Lisbon, Joao Luis Carrilho da Graca museum, pavilion 3 Lisbon, Alvaro Siza Vieira art, museum Pavilion of Knowledge Lisbon, Risco s hotel, spa Lisbon, Santiago Calatrava bus station, car park, commercial space, subway station, train station 2 7 Lisbon, Sousa Santos Arquitectos commercial space, shop EDP Headquarters Mar do Oriente Lisbon, Aires Mateus s office 1
2 photo: Roel Backaert photo: Roel Backaert Bar a Margem Bom Sucesso 1400 Lisbon Ricardo Vaz and Joao Pedro Falcao de Campos built a pavilion on the esplanade along the River Tejo with little more than white-painted, screwed-together steel sections and glass The steel sections (identical I-sections) are both supporting structure and 'façade cladding', since the building is not insulated Where the façades become roof the pattern changes and glass becomes steel and vice versa The result is an alternating rhythm of plane and relief, a play between closed and open That play is reinforced by the fact that the glass of the long elevations can be completely slid open between the top and bottom sections which extend beyond the volume, whereupon the pavilion becomes an outdoor bar Any functions that might detract from the openness and the pattern of profiles like the kitchen and toilets, have been tucked out of sight below the ground photo: Roel Backaert Main designer, Structural engineer Falcão de Campos Arquitecto José Ricardo Vaz Miguel Villar - Betar À Margem Kirsten_Hannema Sunday to Wednesday - From 10:00AM to 9:00PM Saturday - From 10:00AM to 00:00 Thurday to The bar is situated in the popular neighbourhood of Belém on the docks of Bom Sucesso, in a zone where a lot of bars and kiosks are situated 2
3 photo: Marcelo N photo: Nazar Leskiw Gare do Oriente Station Av D João II 1990 Lisbon As foreseen before the tender, the station created a physical barrier between the city and the river This was a barrier we did not want as we wanted to strengthen this connection and, at the same time, use the present dynamism as a catalyst for the creation of a new and higher quality of life in Lisbon The project is a challenge at various levels - in terms of town planning and architecturally - as it includes two new avenues created in order to connect the station to the city and also, an adjacent square which intends to accentuate and make the most of the longitudinal axis of the building This multi-modal platform centralizes transport structures for the different transport systems which will service the whole intervention zone and much more There are five main nuclei, each corresponding to the various systems, specifically the train station (with it's public areas) the metro station the underground car park and the underground gallery General consultant Santiago Calatrava Tecned Parque Expo JMMM photo: Rodrigo da Cunha Metro - Oriente Bus Train 3
4 photo: João Morgado photo: Ana N Pavilion of Alameda dos Oceanos 1990 Lisbon The architect's masterpiece, both for the tension he manages to create between a necessary, desired and difficult monumentality, and the delicate articulation - with the program and the location - both for daring of the solution and its intensive effect of a representative image symbol The palatial theme, which he used first in the school in Setúbal, is here taken to expressive heights, combining the 'colossal' arcade with it's reflection and sublimation in the waters of the quay The roof of the large ceremonial area is the finishing touch to the effect, which reminds us of Niemeyer and the most innovative of modern architecture and engineering in concrete and steel It is an enormous 'shell', appearing to throw off its supports (only visible as the skeleton, like armour), and the down-facing curvature (an 'anti-dome'), like a reinforced tent, ephemeral and paradoxically vulnerable, with apparent fragility, but an enormous plastic force photo: Andy M Project is not public! Alvaro Siza Vieira Parque Expo JMMM Metro - Oriente 4
5 photo: Cristian Richter e Maria Timóteo photo: Cristian Richter e Maria Timóteo Pavilion of Knowledge Alameda dos Oceanos Lote Lisbon wwwpavconhecimentopt The Pavilion of Knowledge - Ciência Viva is located next to the central broad walk and the dock It is made up fundamentally from a vertical volume - the ship which contains the vessels or fragments and which is the center off the exposition area - and from another horizontal block split by an access patio The horizontal block is virtually suspended, which allows the continuity of the public area between the broad walk and the dock The vertical volume and the suspended horizontal block cross each other like white concrete megaliths The access patio is square It rises up to the entrance by a ramp which accompanies the periphery of the square This patio and the ramps are lined with grit sandstone The ground is covered in water Some walls are covered in ivy photo: Cristian Richter e Maria Timóteo Joao Luis Carrilho da Graca Parque Expo JMMM Tuesday - Friday: 10 am to 6 pm; Weekends and bank holidays: 11 am to 7 pm; Latest group admission: 430 pm The Pavilion of Knowledge - Ciência Viva is located in Parque das Nações in the former Expo'98 zone in Lisbon It is easily recognised due to great volume of the main nave The nearest entrance to the Pavilion is the South Gate Parking facilities are nearby Underground station: Gare do Oriente Train station: Gare do Oriente Buses: 5, 10, 18, 19, 21, 25, 25a, 28, 44, 50, 68, 81, 82, 85, 114, 208,
6 photo: Aires Mateus photo: Aires Mateus Rectory of Universidade Nova de Lisboa Travessa Estevão Pinto Lisbon The site used to be remote a land of farms and desolate ground is the location of the Campolide Campus of the Universidade Nova de Lisboa With the former Jesuit School, it creates a public square of imposing scale and provides a three-dimensional expression to the entrapped territory The program is divided into two distinct zones Administrative offices are located in a slender tower overlooking Monsanto Park Large scale foyers, meeting rooms and auditoriums are set at the base of the building, housed within a plinth that marks the difference in level between the public square and the school plateau The rising tower has the same height of the three-floor School building Its façades are clad in white stone with an abstract layout of fenestration concealing the many levels of the building The public square and grand steps leading up to it are clad in the same stone These more symbolic and formal spaces are carved and sculpted within the plinth photo: Aires Mateus 1998 Aires Mateus s Universidade Nova de Lisboa FMVB The Rectorate facilitates access to the building, however guided tours are not provided Visits must be scheduled with the Universidade NOVA de Lisboa s Rectorate at least 15 days in advance, otherwise they will not be authorized The building is located at the Campus of Universidade Nova de Lisboa: Campus de Campolide 6
7 photo: Fernando Guerra photo: Fernando Guerra Central da Graca Optic Store Rua da Penha de França 41 Lisbon The main idea of this project is the creation of a special element in MDF (medium density fiberboard) which will fill the entire store The display cases for the glasses have a strong form, formalized almost as acrylic honeycombs Sousa Santos Arquitectos Oculista Central da Graça ismael_prata photo: Fernando Guerra
8 photo: Fernando Guerra photo: Fernando Guerra Hotel Altis Belem Doca do Bom Sucesso Belem Lisbon The Hotel Altis Belém is on Lisbon s waterfront between Bom Sucesso Dock and the Folk Art Museum It's a 50-room, 5-star hotel with sailing facilities Its position at right angles to the Tagus offers fine views of the city sweeping down to the river and of the riverside areas from Belém Tower to the Padrão das Descobertas (monument to the Discoveries) The scale of the design establishes a relationship with the dock and creates a kind of aquatic piazza The hotel enters into a formal relationship with the Folk Art Museum building through the character of the eastern façade The design opens up the hotel functionally and formally to the riverside promenade with a ground level that is open to the public and houses shops, a restaurant, café and bar and an extensive open-air seating area The interior plans are the work of the FSSMGN studio photo: Fernando Guerra Floor area/size m² Main designer, Interior architect Risco s FSSMGN Altis,SA thecommunicationoffice 8
9 School of Music Campus de Benfica do IPL Lisbon The Escola Superior de Música is part of the Lisbon Polytechnic Institute, which comprises six schools (Education, Communication and Information Sciences, Theatre and Cinema, Dance, Music, Health Technologies) and two further institutes (Accounting and Administration and Engineering) The design of the school makes reference to the inner space of a cloister "The challenge of creating an inner external environment with acoustic and living characteristics and of a scale hardly reachable in the centre of the city led us to explore, up to its limits, the relation of the building as mass and volume, and the programmatic content thereof, with the empty space of the patio with a size of 100 x 40 m Beyond its use as a meeting area, this space will also be able to function as an extension of the classrooms and allow for the performance of small, open-air concerts In general, the area surrounding the patio has only one floor" photo: Naomi Schiphorst 2009 Joao Luis Carrilho da Graca Lisbon Polytechnic Institute MI_MOA From Monday to Thursday: 08h30-22h15 Fridays: 08h30-21h45 Weekends: 14h30-18h30 Subway: Colégio Militar: Linha azul (Gaivota) Bus: Calhariz de Benfica: 3, 16, 58, 64, 729, 746, 750, 767 Estrada de Benfica: 3, 16, 58, 729, 746, 750, 767 Estação de Benfica: 3, 24, 54, 64, 729, 750, 799 Linha de Sintra - Estação: Benfica 9
10 photo: Fernando guerra FG+SG fotografia de arquitectura photo: Fernando guerra FG+SG fotografia de arquitectura Archaeological Site of Praca Nova Rua Castelo de São Jorge Lisbon A discontinuous corten steel wall defines Archaeological Site of Praça Nova, and leaves a perimetric walkway next to the castle walls, the final limit of the plot Inside of the corten boundary a white shelter, elevated from the ground, houses the ruins Like a reinterpretation of the old construction the new white box follows the antiques lines of the walls, but not touches them Between the building and the ruins there is a long gap which allows to see the different textures and finishes of both constructions photo: Fernando guerra FG+SG fotografia de arquitectura Floor area/size m² Main designer, Landscape architect Joao Luis Carrilho da Graca João Gomes da Silva alemen Bus: 37 Eléctricos: 12,
11 photo: Rui Correia photo: Rui Correia Champalimaud Center for the Unknown Av de Brasília Lisbon The champalimaud Foundation supports individual researchers and research teams working at the cutting edge of medical science It aims to stimulate novel theoretical and practical methodologies by utilizing the experience of both research scientists and medical practitioners, connecting pure scientific investigation with applied clinical research The champalimaud foundation aims to maximize the work being done in the fields of cancer research and neuroscience, including stem cell research and its clinical applications for parkinson's and alzheimer's disease, diabetes and spinal injury photo: Rui Correia Public access unknown! 2010 Charles Correa Associates F Champalimaud Rui_Correia 11
12 photo: Nazar Leskiw photo: Nazar Leskiw EDP Headquarters Av 24 de Julho Lisbon Headquarter for EDP - Energias de ranks among Europe's major electricity operators The location, in a landfill site in the city s front line between the hill and the River, corresponded to an empty lot, where in the past a power plant operated The building is composed of 2 towers, connected by 2 ramped passes that create a shaded public square at street level The building s image came from the research of a system of lights and shadows This concept comes true through the repetition of vertical lines which are simultaneously the organization module of the office programme (120m); the structural solution (corresponding the steel columns); and through the façade that results from the geometric game created by the sequence of lines in full continuity from street-level, covering the roof and crossing the square to the other tower These also function as shade structures and create a dynamic effect, depending on the observer s position: sometimes opaque, sometimes transparent photo: Nazar Leskiw Floor area/size m² Main designer, Structural engineer Contractor Aires Mateus s FVarq AFA Consult Mota Engil Grupo EDP Energias de, SA Nazar 12
13 photo: Nazar Leskiw Mar do Oriente Alameda dos Oceanos Lisbon Over a platform, eight volumes are built, in which the significance of each volume is reinforced by repetition, not equal, but identical The buildings have the same distance between themselves, repeating their external image, their height and width The variation happens in their length and thus footprint on the platform photo: Nazar Leskiw 2008 Aires Mateus s Nazar 13
Lisbon.Projects 15. Bar a Margem Lisbon, Portugal Falcão de Campos Arquitecto bar, pavilion, restaurant. Vasco da Gama Bridge Lisbon, Portugal
Lisbon Projects 15 Created 21-Sep-16 By dana SHARABANI HEDVATI, tel aviv, Israel Bar a Margem Lisbon, Falcão de Campos Arquitecto bar, pavilion, restaurant Gare do Oriente Station Pavilion of Camoes Theatre
More informationcommercial space, housing, office 10 Lisbon, Portugal Joao Luis Carrilho da Graca museum, pavilion Manuel Salgado auditorium, music theatre, theatre
lisboa Projects 11 Created 14-Mar-08 By Pati Santos, Valencia, Spain Porto Cenário Bar Porto, José Carlos Nunes de Oliveira cafe, bar Casa da Musica Bar a Margem Atelier Siza, Souto de Moura, Fernando
More informationSantiago Calatrava bus station, car park, commercial space, subway station, train station
Lissabon Projects 22 Created 21-Jul-16 By Steven Baecke, Gent, Belgium Lisbon, Charles Correa Associates clinic, laboratorium Lisbon, Santiago Calatrava bus station, car park, commercial space, subway
More informationLissabon.Projects 22. Vasco da Gama Bridge. 13 Lisbon, Portugal. Bar a Margem Lisbon, Portugal Falcão de Campos Arquitecto bar, pavilion, restaurant
Lissabon Projects 22 Created 21-Jul-16 By Steven Baecke, Gent, Belgium Bar a Margem Lisbon, Falcão de Campos Arquitecto bar, pavilion, restaurant Alvalade XXI Stadium Estadio da Luz Atlantic Pavilion Gare
More informationSpatial planning instruments in Portugal: plans as regeneration tools
Spatial planning instruments in Portugal: plans as regeneration tools Portuguese Local Spatial Planning Tools Local Development Plan (municipality) Urban(isation) Plan (territory within the urban perimeter)
More informationURBAN PROJECT OF THE BENFICA STATION SURROUNDING AREA
URBAN PROJECT OF THE BENFICA STATION SURROUNDING AREA José Miguel Camilo de Matos Santos Pereira Extended Abstract INTRODUCTION The purpose of this report is to expose the strategies drawn to answer the
More informationCULTURAL IDENTITY AND SPATIAL SEGREGATION IN THE PUBLIC SPACES OF LISBON
CULTURAL IDENTITY AND SPATIAL SEGREGATION IN THE PUBLIC SPACES OF LISBON CRITERIA FOR THE EVALUATION OF PUBLIC SPACES FERNANDO NUNES DA SILVA (1) FRANCISCO M. SERDOURA (2) JOÃO PEDRO COSTA (3) ABSTRACT
More informationUrban Design from Torre de Belém to Foz do Jamor Rehabilitation of Doca de Pedrouços. Extended Abstract. Architecture. Examination committee
Urban Design from Torre de Belém to Foz do Jamor Rehabilitation of Doca de Pedrouços Extended Abstract Ana Rita Borralho Pereira Project Report to obtain the Master in Architecture Supervision: Professor
More informationhow to improve walking as
Impacts SUMITS Conference Vienna 2013 Redistribution of Public Space Impacts SUMITS Conference Vienna 2013 how to improve walking as a mode of transport in a hilly city MAY 13 Fernando Nunes da Silva Carlos
More informationURBAN PROJECT BELÉM TOWER TO JAMOR RIVER. Architecture
URBAN PROJECT BELÉM TOWER TO JAMOR RIVER Tejo Residential Centre MAFALDA MARIA FRANCO MADEIRA ALFARO CARDOSO Master Degree Thesis Architecture Supervisor: Prof. António Salvador de Matos Ricardo da Costa
More informationProject for the New Lisbon Congress Centre in Parque Eduardo VII. Architecture
Project for the New Lisbon Congress Centre in Parque Eduardo VII Extended Abstract Ana Cláudia de Sousa Ramos Project Report to obtain the Master of Science Degree in Architecture Supervisor: Professora
More informationPROJECT FOR THE NEW CONGRESS CENTER OF LISBON IN PARQUE EDUARDO VII
PROJECT FOR THE NEW CONGRESS CENTER OF LISBON IN PARQUE EDUARDO VII EXTENDED ABSTRACT Maria Catarina Ramos dos Santos Fuzeta da Ponte Student in Architecture, Instituto Superior Técnico, Lisbon, Portugal
More informationGrand Auditorium of the Maison De La Radio By AS Architecture Studio
Grand Auditorium of the Maison De La Radio By AS Architecture Studio January 13, 2015 Architecture On its 40th anniversary in 2003, the restructuring of the Maison de la Radio was programmed. The international
More information(DC1) Direct Development Control Provision DC1 Area 4
. General Purpose (DC) Direct Development Control Provision DC Area 4 The purpose of this Provision is to provide for an area of commercial office employment and residential development in support of the
More informationGUIDELINES TORONTO GENERAL HOSPITAL LOCATION. INTRODUCTION Existing College Wing Buildings and Site Plan - Figure 1A and Figure 1B.
GENERAL HOSPITAL Development in the south-east quandrant of University Avenue and College Street will be consistent with the following urban design guidelines. LOCATION Lands owned by the Toronto General
More informationEdward VII Park: Congress Center in Lisbon
Edward VII Park: Congress Center in Lisbon Zhen Wu Professor: António Salvador de Matos Ricardo da Costa Abstract This report aims to present and explain an urban project developed throughout the academic
More informationHighland Village Green Design Guidelines
Highland Village Green Design Guidelines Publishing Information Title Highland Village Green Design Guidelins Author The City of Calgary Status DRAFT - Proposed document subject to changes Additional Copies
More informationPolicies and Code Intent Sections Related to Town Center
Policies and Code Intent Sections Related to Town Center The Town Center Vision is scattered throughout the Comprehensive Plan, development code and the 1994 Town Center Plan. What follows are sections
More informationEXTENDED ABSTRACT URBAN PROJET IN VILA VIÇOSA ARCHITECTURE, HERITAGE AND LANDSCAPE IN THE CONTEXT OF PAÇO DUCAL ANA CATARINA DA SILVA ANTUNES
EXTENDED ABSTRACT URBAN PROJET IN VILA VIÇOSA ARCHITECTURE, HERITAGE AND LANDSCAPE IN THE CONTEXT OF PAÇO DUCAL ANA CATARINA DA SILVA ANTUNES CHAIRPERSON: PROFESSOR MARIA ALEXANDRA DE LACERDA NAVE ALEGRE
More information13. New Construction. Context & Character
13. New Construction Context & Character While historic districts convey a sense of time and place which is retained through the preservation of historic buildings and relationships, these areas continue
More informationIntervention in the historical center of São Paulo
EXTENDED ABSTRACT Intervention in the historical center of São Paulo Place Between Places João Infante Lisbon November 2013 The present work was developed within the project subjects performed during the
More informationREPORT BACK BROADSHEET 3 May 2016
Paddington Place REPORT BACK BROADSHEET May 06 Architects and planners should work with the community first and then thinking about developers profits second. - Quote from participant at Paddington Place
More informationTHE NEW LISBON CONGRESS CENTRE ARCHITECTURE
THE NEW LISBON CONGRESS CENTRE PARQUE EDUARDO VII Extended Abstract João Miguel Caramujo Ramos Endrenço Project Report to obtain the Master of Science Degree in ARCHITECTURE Supervisor: Teacher Teresa
More informationFinal Master Plan and Development Control Regulations
1. INTRODUCTION CHECK LIST a. Introduction b. Table of contents c. Definitions. d. scope of works. 2. FINAL OVERALL MASTER PLAN a. SITE ANALYSIS and OVERVIEW: i. Existing and Proposed Site Plan Levels.
More informationJosé M P Sánchez finished his architectural studies (Bachelor + Master) in 2011, both at Lisbon's Technical University, been awarded with the Top 20
finished his architectural studies (Bachelor + Master) in 2011, both at Lisbon's Technical University, been awarded with the Top 20 Master students price. During his studies he spent an erasmus year in
More informationAROUND THE BLOCK INSIDE OUT
AROUND THE BLOCK INSIDE OUT APPROACH TO THE SITE The Badel block is one of the largest blocks of the lower town of Zagreb, but in contrast to the other blocks, it is not accessible for public purposes.
More informationLecture 8 OPENINGS &ORGANIZATION OF FORM AND SPACE
Islamic University-Gaza Faculty of Engineering Architecture Department Principles of Architectural and Environmental Design EARC 2417 Lecture 8 OPENINGS &ORGANIZATION OF FORM AND SPACE Instructor: Dr.
More informationURBAN REQUALIFICATION OF CARNIDE The urban continuity in a contrasting territory
URBAN REQUALIFICATION OF CARNIDE The urban continuity in a contrasting territory Catarina Albuquerque Durão Barroso EXTENDED ABSTRACT OCTOBER 2012 0 INTRODUCTION This document intends to summarize the
More informationUrban Planning Belem Tower to Foz do Jamor. Architecture
Urban Planning Belem Tower to Foz do Jamor Isabel Maria Pimentel Fontes de Castro e Silva Thesis to obtain the Master of Science Degree in Architecture Supervisor: Prof. António Salvador de Matos Ricardo
More informationHealth Sciences City The available land area, although limited, combined with the unique partnership between the primary institutions and the supporting partnerships of the development interests within
More informationB L A C K D I A M O N D D E S I G N G U I D E L I N E S for Multi-family Development
B L A C K D I A M O N D D E S I G N G U I D E L I N E S for Multi-family Development Adopted June 18, 2009 This section of the Design and focuses on site planning and design guidance for new multi-family
More informationPART AOTEA PRECINCT
CONTENTS... PAGE AOTEA PRECINCT...4 14.5.1 INTRODUCTION...4 14.5.2 RESOURCE MANAGEMENT ISSUES...4 14.5.3 RESOURCE MANAGEMENT OBJECTIVES AND POLICIES... 4 14.5.4 RESOURCE MANAGEMENT STRATEGY...5 14.5.5
More informationBuildings may be set back to create small plazas provided that these setbacks do not substantially disrupt the street wall s continuity.
6-22 Community Design Street Walls and Street-front Setbacks The siting of buildings will play a critical role in establishing the character and sense of place for the District. Siting buildings at the
More informationNu Skin Innovation Center. Location: Provo, Utah Lot Size: 435,600 GSF Building Size: 168,000 GSF Project Type: Commercial LEED Gold Certified
Nu Skin Innovation Center Location: Provo, Utah Lot Size: 435,600 GSF Building Size: 168,000 GSF Project Type: Commercial LEED Gold Certified The Nu Skin Innovation Center transforms Nu Skin Enterprises
More informationWINDSOR GLEN DESIGN GUIDELINES
WINDSOR GLEN DESIGN GUIDELINES Adopted by Council, 2006 WINDSOR GLEN REDEVELOPMENT DESIGN GUIDELINES August 2006 1.0 Master Plan Organization For this area of the Coquitlam Town Centre, a mix of high,
More informationTHE CITY, THE FOREST AND THE CENTER: MANAUS CONFIGURATIONAL ANALISYS
THE CITY, THE FOREST AND THE CENTER: MANAUS CONFIGURATIONAL ANALISYS Authors: Graciete Guerra da Costa Valério Augusto Soares de Medeiros Universidade de Brasília UnB/BRASIL e-mail: gdacosta@terra.com.br
More informationWide asphalt driveway abutting school property. garage built with incompatible materials, too close to park. incompatible fencing materials
Wide asphalt driveway abutting school property incompatible fencing materials garage built with incompatible materials, too close to park Lack of plantings as a buffer between private property and open
More informationSection 4 - Public Realm & Landscape proposals Landscape Masterplan. Section 4 52
- Public Realm & Landscape proposals Landscape Masterplan 52 Proposed Masterplan - Green Infrastructure Strategy District Park 4.33 Ha to provide Passive and active recreation with a large play area which
More informationCommunity Design Plan
Gardena General Plan 2006 Authority While the is not a required element of a General Plan, it is included because improving the community appearance and image is paramount to the overall quality of life
More informationGUIDELINES EXHIBITION PLACE LOCATION: OBJECTIVES. Structure Plan URBAN DESIGN GUIDELINES
Development in the Exhibition Place lands will be consistent with the following urban design guidelines. They provide a framework for new development of the lands and are to be read in conjunction with
More informationTauranga City Centre Spatial Framework
Tauranga City Centre Spatial Framework Stakeholder Engagement Workshop 15 October 2015 Project Design Team Beca & LandLAB Our team Henry Crothers (LandLab) Landscape Architect/Urban Designer Urban and
More informationVIEW SHAFTS. Figure 32: Existing view shafts which are to be protected and enhanced and desirable new view shafts ANNEX 2
VIEW SHAFTS 2.9.1 Sight lines, both from within the Viaduct Harbour area, and into the area from without, are a vital component of the character of the area. They are also an invaluable means by which
More informationArlington County. Envision Courthouse Square Planning and Urban Design Study 21 May 2014
Arlington County Envision Courthouse Square Planning and Urban Design Study 21 May 2014 Cooper, Robertson & Partners Architecture, Urban Design with Buro Happold, HR&A, Kimley Horn, Nelson Nygaard, & Tactical
More informationHistoric Yonge Street HCD Study Public Meeting #2
Historic Yonge Street HCD Study Public Meeting #2 March 26, 2014 Archaeological Services Inc. Philip Goldsmith Architect Agenda: 7:00 p.m. Open House 7:30 p.m. Welcome and Presentation 8:00 p.m. Questions
More informationName José Castro Caldas. Born 29 0f April 1981 Lisbon/Portugal. Masters in Architecture 2007 in UAL (Universidade Autónma de Lisboa)
Name José Castro Caldas Born 29 0f April 98 Lisbon/Portugal Masters in Architecture 2007 in UAL (Universidade Autónma de Lisboa) Work experience: Eugénio Castro Caldas office Manuel Vicente office (2006)
More informationTABLE OF CONTENTS 1.0 INTRODUCTION... 3
TABLE OF CONTENTS 1.0 INTRODUCTION... 3 1.1. BACKGROUND... 3 1.2. THE PROPOSAL... 5 2.0 EXISTING POLICY FRAMEWORK... 5 2.1. PROVINCIAL POLICY STATEMENT (PPS)... 5 2.2. CITY OF LONDON OFFICIAL PLAN (OP)...
More informationWELLINGTON HOSPITAL DESIGN GUIDE TABLE OF CONTENTS
WELLINGTON HOSPITAL DESIGN GUIDE TABLE OF CONTENTS 1.0 Introduction Page 2 The Place of Wellington Hospital 2 The Future of the Hospital 2 2.0 The Intention of the Design Guide 3 3.0 Analysis 4 General
More informationPROPOSED WATERFRONT DISTRICT DESIGN STANDARDS
PROPOSED WATERFRONT DISTRICT DESIGN STANDARDS 20.25 DESIGN REVIEW. 20.25.080 WATERFRONT DISTRICT A. Purpose. This section is intended to implement The Waterfront District Subarea Plan by: 1. Creating a
More informationVision for Irvine: a self-confident town where people aspire to live and work and which they are proud to call home
Vision for Irvine: a self-confident town where people aspire to live and work and which they are proud to call home Stunning view out to the harbourside Artist s impression of how the Bridgegate area could
More informationFRUITVALE TRANSIT VILLAGE (Phase 2) Residential Project
FRUITVALE TRANSIT VILLAGE (Phase 2) Residential Project DEVELOPER: SIGNATURE PROPERTIES ARCHITECT: HKIT ARCHITECTS April 23, 2010 TABLE OF CONTENTS 3 Vision 4 Description of Site 5 Guiding Concepts 6
More informationVigo.Projects. Rector Office at Vigo University Campus Vigo, Spain Enric Miralles & Benedetta Tagliabue EMBT office, university
Vigo Projects Created 17-Jun-1 By Taka Yone, Tokyo, Japan Rector Office at Vigo University Campus Vigo, office, university Vigo University Campus 2 Maritime Museum of Galicia Vigo, César Portela aquarium,
More information4. INDUSTRIAL 53 CASTLE ROCK DESIGN
4. INDUSTRIAL 53 CASTLE ROCK DESIGN CASTLE ROCK DESIGN 54 4. INDUSTRIAL Overview Well-designed and attractive industrial centers are the product of blending economic realities with both functional and
More informationBel-Air Lexus Automobile Service Station
Bel-Air Lexus Automobile Service Station Design Brief 443-447 McArthur Avenue Ottawa April 30, 2015 14-1299-MCA Site Details Application: Site Plan Control Legal Description and Municipal Addresses: 443
More informationWELCOME. Spend a little Live a lot. View of store entrance, overlooking the adjacent park - bonded warehouse detailing
WELCOME View of store entrance, overlooking the adjacent park - bonded warehouse detailing Aldi is pleased to be bringing forward a planning application to develop a new discount foodstore on Commercial
More information3.3. Urban Structure Defining a New Hierarchy of Routes and Spaces >Images
Section 3.0 I The Masterplan Framework 18 >Images Examples of high quality routes and spaces 3.3. Urban Structure The success of any masterplan lies in a clear definition of the future urban structure
More informationTALL BUILDING GUIDELINES
TALL BUILDING GUIDELINES Urban Design Guidance for the Site Planning and Design of Tall Buildings in Milton May, 2018 A Place of Possibility Contents 1.0 INTRODUCTION 1 1.1 What is a Tall Building? 2
More informationExploring a new student life through the buildings in Bovisa. Zahra Ziaee Lorzad. Mc. Politecnico di Milano, 2014
Exploring a new student life through the buildings in Bovisa By Zahra Ziaee Lorzad Mc. Politecnico di Milano, 2014 1 Problem statement The thesis questions the role and mutation of architecture in the
More information3.1.1 Heuston Square. heuston gateway: regeneration strategy and development framework plan. Heuston Gateway: public domain: Heuston Square location
3.1.1 Heuston Square The space to the front of the Headquarters Building of the Great Western Railway is considered to be in the centre of the Heuston Gateway. All destinations in the area radiate from
More informationAn Honors Thesis (Arch 402)
Art + Architecture An application of art and culture from around the world An Honors Thesis (Arch 402) by Kathleen Strigle Thesis Advisor Rod underwood ) BaU State University Muncie, Indiana May 2014 Expected
More information4.0 Design Guidelines For The Village Centre. South fields Community Architectural Design Guidelines Town of Caledon
4.0 Design Guidelines For The Village Centre 4.0 Design Guidelines for the Village Centre The Village Centre is the focal point of the entire South Fields Community and is designed as a traditional commercial
More information242 neighborhoods NEIGHBORHOOD 4: JORDAN AVENUE CORRIDOR
NEIGHBORHOOD 4: JORDAN AVENUE CORRIDOR Aerial View of Jordan Avenue Corridor EXISTING CHARACTER The Jordan Avenue Corridor is the portion of North Jordan Avenue that extends north from East Third Street
More informationbordeaux.projects 5 Maison Bordeaux PUSG School for Management Bordeaux, France Lacaton Vassal university Gironde Management Center
bordeaux Projects 5 Created 11-Jul-16 By Dirk Deceuninck, Gent, Belgium PUSG School for Management Bordeaux, Lacaton Vassal university Palais de Justice de Bordeaux Bibliothèque du Grand-parc Maison Bordeaux
More informationchapter DESIGN GUIDELINES NEW RIVER MASTER PLAN REPORT
chapter DESIGN GUIDELINES NEW RIVER MASTER PLAN REPORT .76 DESIGN GUIDELINES An Overview design guidelines NEW RIVER MASTER PLAN Design Guidelines can transform the image of a city. Specific, design-based
More informationSierra Springs Regional Commercial Master Site Plan Airdrie, Alberta Hopewell Development Corporation Project No May 26, 2010
Sierra Springs Regional Commercial Master Site Plan Airdrie, Alberta Hopewell Development Corporation Project No. 205-077 May 26, 2010 TABLE OF CONTENTS Purpose... 2 Master Site Plan Guidelines... 3 Overall
More informationCOPENHAGEN.Projects 7
COPENHAGEN Projects 7 Created 14-Aug-17 By simona cerolini, civitanova marche, Italy The Royal Library Copenhagen, library Louis Poulsen Factory Birkerød Sports and Leisure Centre 3 Nykredit Headquarters
More informationFRAMEWORK OF DESIGN REVIEW:
Introduction FRAMEWORK OF DESIGN REVIEW: All projects promote Superior Design by exhibiting thoughtful relationships in the following areas: Site; Architecture; Landscaping; Placemaking / Livability; and
More informationARCHITECTURAL ANALYSIS
ARCHITECTURAL ANALYSIS YR12 GRAPHICS WHANGAREI GIRLS HIGH SCHOOL INFORMATION TO HELP WITH DESIGN PROCESS, NOTATIONS, & DESIGN HISTORY ARCHITECTURAL ANALYSIS When we analyse a building, we begin by scanning
More informationWATERFRONT DISTRICT DESIGN STANDARDS
WATERFRONT DISTRICT DESIGN STANDARDS 20.25.080 WATERFRONT DISTRICT A. Purpose. This section is intended to implement The Waterfront District Subarea Plan by: 1. Creating a safe, vibrant mixed-use urban
More informationURBAN PROJECT CARNIDE AV. LUSÍADA BENFICA
URBAN PROJECT CARNIDE AV. LUSÍADA BENFICA Infrastructure, Public Space, Urban Continuity José Rafael Garcia dos Santos Rosa Capelão Extended Abstract ARQUITECTURE October 2012 01 INTRODUCTION 01.01 Aims
More information1. Avoid extensive blank walls that would detract from the experience and appearance of an active streetscape.
08 ARCHITECTURAL DETAIL Once a building s massing and street wall have been defined, architectural details, including façade variation, materials and window treatment, shape a building s visual identity.
More informationTSAWWASSEN TOWN CENTRE REDEVELOPMENT BLOCK A 004
Current Context The context for the project includes storey multi-family residential to the northwest, a TD bank immediately north, highway oriented commercial to the east, a surface parking lot to the
More informationYonge Eglinton Centre Urban Design Guidelines
Yonge Eglinton Centre Urban Design Guidelines City Planning Urban Design January 2009 YONGE EGLINTON CENTRE INTRODUCTION.................................................... 1 GENERAL SITE PLAN OBJECTIVES......................................
More informationRIVERSIDE DESIGN CD-1 GUIDELINES. Adopted by City Council August 9, 1983
$1 City of Vancouver Land Use and Development Policies and Guidelines Community Services, 453 W. 12th Ave Vancouver, BC V5Y 1V4 F 604.873.7344 fax 873.7060 planning@city.vancouver.bc.ca RIVERSIDE DESIGN
More informationEXISTING CONDITIONS 41. Existing Conditions
EXISTING CONDITIONS 41 Existing Conditions The Existing Analysis phase of the planning process involved a study of the existing conditions on the campus in order to identify key planning issues to be addressed
More informationVilnius, Lithuania.Projects 11
Projects 11 Created 29-Jan-09 By Ole Küpers, Bonn, Germany Europa Shopping Centre Audrius Ambrasas s mall VICTORIA Office Building Litexpo Pavilion King Mindaugas Commerce and Apartment Centre The Barricades
More informationMIXED-USE ZONING DISTRICT DESIGN GUIDELINES
MIXED-USE ZONING DISTRICT DESIGN GUIDELINES In addition to the development regulations contained in the Mixed-Use Zoning District, design guidelines are presented here to provide an added level of definition
More informationPLANNING STATEMENT. Market House Market Place Kingston upon Thames KT1 1JS
PLANNING STATEMENT To support planning and listed building consent applications for change of use from Class A1 shop and Class A3 cafe to Class A3 restaurant at: Market House Market Place Kingston upon
More informationTHE PORT OF IPSWICH FROM RICHES TO RAGS AND BACK AGAIN An Illustrated talk given by John Field notes by Bob Allen
IPSWICH BUILDING PRESERVATION TRUST AGM 28/10/15 THE PORT OF IPSWICH FROM RICHES TO RAGS AND BACK AGAIN An Illustrated talk given by John Field notes by Bob Allen After the formal business of the AGM was
More informationHistory of the Foundation Buildings and Landscapes
CORNER HOUSE 1 FOUNDATION HOUSE LONG HOUSE History of the Foundation Buildings and Landscapes The Fourth Corner Foundation s name derives from occupying one corner of the intersection of Windham Four Corners,
More informationURBAN DESIGN BRIEF Gordon Street City of Guelph. Prepared on behalf of Ontario Inc. March 25, Project No. 1507
URBAN DESIGN BRIEF 1131 Gordon Street City of Guelph Prepared on behalf of 1876698 Ontario Inc. March 25, 2016 Project No. 1507 423 Woolwich Street, Suite 201, Guelph, Ontario, N1H 3X3 Phone (519) 836-7526
More informationProposals for the regeneration of Standard Quay, Faversham, Kent
Proposals for the regeneration of Standard Quay, Faversham, Kent The purpose of this information is to explain the progress in regenerating Standard Quay and to outline proposals with indicative timescales
More information3.1 Existing Land Use
3.0 Land Use This strategy has been developed taking into account the position of the Town of Sidney as the economic center of the Saanich Peninsula. It acknowledges existing land use patterns in the downtown
More information5A Appearance and Compatibility. 5B Mass and Scale. 5C Articulation. 5D Fenestration and Detailing. 5E Active Ground Floors
5A Appearance and Compatibility 5B Mass and Scale 5C Articulation 5D Fenestration and Detailing 5E Active Ground Floors 5F Sustainable Building Elements 5G Design for Active Living GUIDELINES FOR DEVELOPMENT
More information4.00 STAKEHOLDERS. urbanprojects
4.00 STAKEHOLDERS 94 heuston gateway: regeneration strategy and development framework plan 95 The Heuston Gateway presents one of the greatest concentrations of brown field development sites located adjacent
More informationProject introduction and relevance:
Project introduction and relevance: Every city has a central area or district where, most of the social and commercial activity within the city is concentrated. Norzin Lam is in the process of becoming
More informationSign System Recommendations
4.1 Sign System Recommendations 4.2 Recommended sign types required for a complete wayfinding system on the TCNJ campus are described below. Detailed sign messages and their typical locations are included
More informationFormer Keighley College Buildings, North Street
Introduction The Vision To create a high quality, mixed-use destination that will lead to the successful redevelopment of the site and contribute to the wider regeneration of the town centre The Opportunity
More informationFrom April 19 th to 22 nd. April 20 th - Friday. April 20 th, 26 th and May 4 th
19-13 April May April 19 th to May 13 th Avenida Arriaga central walkways: - Flower carpets and decorations - Flower market and regional cuisine - Colourful Waltz - Young women dressed as flower pageants
More informationCreating an integrated waterfront. Recommendations
Creating an integrated waterfront Recommendations Railway Square Post Office + Shell Station Post Office Square Civic Square Ilot Green Wakefield St Wakefield St (Tory Cars) Wakefield St (New World Supermarket)
More informationdesign & access statement Proposed Erection of 68 Bedroom Hotel and Restaurant with Associated Landscaping
Proposed Erection of 68 Bedroom Hotel and Restaurant with Associated Landscaping Promenade, design & access statement lawrencemcphersonassociates 6 new road, ayr, ka8 8ex On Behalf of July 2015 CONTENTS
More informationSouth th E ast Communit ity Centre (SECC)
South East Community Centre (SECC) 1 New Park Design & Community Centre Update Thursday, February 8, 2018 Public Open House Thank you for attending this Open House! The town and the Consulting Team will
More informationPEDESTRIAN ROUTE. Fig 202. Route to entrance of building
PEDESTRIAN ROUTE The prospect of a pedestrian entrance directly from the north, from the public transport node, was also considered. However, it was decided that this configuration was too conventional
More information2.11 PARAPETS AND CORNICES
2.11 PARAPETS AND CORNICES Parapets and cornices mark the transition between buildings and the sky; they cap the building and conceal the roof. Parapets often extend well above the roof to create an illusion
More informationColston Hall - Transformation of. Main Hall and Historic Foyer Public Consultation, February 2017
Colston Hall - Transformation of 1 Main Hall and Historic Foyer Public Consultation, February 2017 Pop/Rock concert in the transformed main hall Welcome to the public consultation around Colston Hall s
More informationOEIRAS MASTERPLAN: A METHODOLOGY TO APPROACH URBAN
OEIRAS MASTERPLAN: A METHODOLOGY TO APPROACH URBAN DESIGN TO SUSTAINABLE DEVELOPMENT M.P. Amado 1 ; Francesca Poggi 2 ; 1: Civil Engineering Department, Faculdade de Ciências e Tecnologia da Universidade
More informationCITY OF MERCER ISLAND DESIGN COMMISSION STAFF REPORT
CITY OF MERCER ISLAND DESIGN COMMISSION STAFF REPORT Agenda Item: 2 March 9, 2011 Project: Description: Applicant: DSR11-004 The applicant is requesting approval to replace the existing exterior wood framed
More informationOPTION 1 CITY CENTER New Library at Soldiers Square Soldiers Square Ramp Site The proposed project is an eight-story vertical mixed-use development that integrates the Library as the main feature in this
More informationAPPENDIX MATAKANA COMMERCIAL URBAN DESIGN GUIDELINES
APPENDIX MATAKANA COMMERCIAL URBAN DESIGN GUIDELINES 1.0 INTRODUCTION The following urban design guidelines are to be utilised by landowners, planners and other persons involved in development at early
More informationShah s Residence, Bharuch. Dipen Gada & Associates. Client: Mr. Vinay Shah Area: 6856 Sq. Ft. Photo Credits: Mr. Tejas Shah Year Of Completion: 2015
Shah s Residence, Bharuch Dipen Gada & Associates Client: Mr. Vinay Shah Area: 6856 Sq. Ft. Photo Credits: Mr. Tejas Shah Year Of Completion: 2015 The Shah residence is a vibrant and vivacious five bedroom
More informationResponse to the London Bridge Area Vision and Site Allocations within the New Southwark Plan
1 Melior Place London SE1 3SZ 020 7407 4701 teamlondonbridge.co.uk info@teamlondonbridge.co.uk 28 April 2017 Response to the London Bridge Area Vision and Site Allocations within the New Southwark Plan
More information