BASIS OF DESIGN Washington ES

Size: px
Start display at page:

Download "BASIS OF DESIGN Washington ES"

Transcription

1 BASIS OF DESIGN Washington ES Canon City CO

2 TABLE OF CONTENTS Table Of Contents REVISION HISTORY GENERAL MECHANICAL SYSTEMS PRIMARY DESIGN ASSUMPTIONS REDUNDANCY DIVERSITY OCCUPANCY OPERATIONS NARRATIVES SYSTEM SIZING CRITERIA MECHANICAL EQUIPMENT DUCTWORK HVAC Equipment BUILDING AUTOMATION SYSTEM PLUMBING SYSTEMS GENERAL DOMESTIC COLD WATER DOMESTIC HOT WATER WASTE AND VENT SYSTEMS STORM WATER DISPOSAL NATURAL GAS SYSTEM PLUMBING FIXTURES FIRE PROTECTION SYSTEMS GENERAL SYSTEM DESCRIPTION ELECTRICAL SYSTEMS GENERAL ANTICIPATED LOADS 24 2 BranchPattern.com

3 6.3 PRIMARY ELECTRICAL SERVICE NORMAL POWER DISTRIBUTION EMERGENCY POWER DISTRIBUTION GROUNDING INTERNAL LIGHTING AND CONTROLS INTERIOR LIGHTING SCHEME DESCRIPTION INTERIOR LIGHTING CONTROLS DESCRIPTION EXTERIOR LIGHTING AND CONTROLS EXTERIOR LIGHTING SCHEME DESCRIPTION FIRE ALARM AUXILIARY BUILDING SYSTEMS TECHNOLOGY SYSTEMS INCOMING SERVICE / OUTSIDE PLANT TELECOMMUNICATIONS Communications Cabling Infrastructure Equipment Room Backbone Cabling Horizontal Cabling Public Announcement Intercom System SECURITY SYSTEMS Intrusion System Video Surveillance System Access Control System Entry Door System OTHER TECHNOLOGY SYSTEMS Audiovisual Systems Classroom Sound Enhancement System Clocks Bidirectional Amplification System (BDA) BUILDING ENVELOPE SYSTEMS GENERAL [ARCHITECT TO INFILL] LEED GENERAL [ARCHITECT TO INFILL] 37 3 BranchPattern.com

4 4 BranchPattern.com

5 1.0 REVISION HISTORY Revision # Revision Date Description of Change Author /30/2018 Initial Document Matt Coulter, Omar Tlamcani - BranchPattern 5 BranchPattern.com

6 2.0 GENERAL The mechanical, electrical and plumbing systems shall be installed and or augment the base building systems to meet requirements of local and national codes and regulations as well as sound engineering practices, including but not limited to: Americans with Disabilities Act (ADA) ASHRAE ASHRAE Standard 62.1 ASHRAE Standard 55 ASHRAE Standard 9.9 IT temps 2015 International Building Code 2015 International Mechanical Code 2015 International Energy Conservation Code 2015 International Fuel Gas Code 2015 International Fire Code State and local amendments to the International Codes Standard for Emergency and Standby Power Systems, NFPA 110, 2009 Edition National Fire Alarm Code NFPA 72, 2009 Edition Life Safety Code NFPA 101, 2009 Edition National Electrical Code NFPA 70, 2017 Edition Safety Code for Elevators and Escalators ASME A17.1, 2007 Edition Illuminating Engineering Society of North America (IESNA) and applicable RP and DG publications Underwriters Laboratories, Inc (UL) LEED version 4 LEED Reference Guide for Green Building Design and Construction 2009 Edition Colorado Department of Health Rules and Regulations Governing Schools in the State of Colorado Colorado Department of Education, Capital Construction Guidelines Colorado B.E.S.T. Grant Program Rules and Resolutions 6 BranchPattern.com

7 3.0 MECHANICAL SYSTEMS PRIMARY DESIGN ASSUMPTIONS Climactic Design Conditions: ASHRAE 0.4% cooling and 99.6% heating design conditions for Colorado Springs, Colorado (nearest ASHRAE Weather Station to Canon City). Site elevation is 6181 feet above sea level. Summer Winter 90.9 F DB / 58.7 F WB 1.4 F Below are two graphics that indicate outdoor thermal temperatures. The chart on the left shows the months where outdoor air temperatures are comfortable. Green is comfortable, red is a hot stress, and blue is a cold stress. The inner ring is night time temperatures and the outer is daytime temperatures. The graphic on the right shows the number of hours the Canon City climate spends in each temperature range. Space Environmental Requirements: ASHRAE Standard 55 is used for selecting set points for occupied spaces. ASHRAE Standard 9.97 is used for selecting set points for IT closets and server rooms. Humidity is not controlled in the facility, including IT closets and server rooms, and indoor relative humidity will track ambient humidity levels. Summer Setpoint ( F) Winter Setpoint ( F) Occupied Set Point Unoccupied Set Point Kitchen Occupied Set Point IT Closet Server Rooms Mechanical and Electrical Space BranchPattern.com

8 Space Use (to be populated during DD) The total building area is 44,273 S.F. There are classrooms The gymnasium is S.F. The office space is S.F. The library is S.F. The cafeteria is S.F. The kitchen is S.F REDUNDANCY Heat pumps and energy recovery ventilators are not redundant. Failure of any one will result in loss of HVAC to the spaces it serves. The fluid-cooler and its associated pump and heat exchanger are also single points of failure. Failure of any one will result in loss of cooling to the building. There are 2 boilers, each sized for 66% of the heating load. Many of the heating season operating hours can be met with a boiler sized at 66% of the load. This reduces equipment cost and allows the boilers to operate more efficiently because smaller equipment better matches the load for most of the heating season. There are 2 heat pump water pumps. Each pump is sized for 100% flow and operating lead/lag. The lag pump is redundant and will start if the lead pump fails. Airside equipment such as rooftop units and energy recovery ventilators are not redundant. A loss of an RTU serving a single zone or VAV system will result in a loss of heating and cooling to those zones. A loss of an ERV will result in a loss of ventilation to the spaces served. 3.3 DIVERSITY Sum of peak occupancy is people. Actual expected occupancy is people, which results in a % diversity. (TBD during Design Development phase) Space Zoning Each classroom will be a dedicated zone. Hallways will be served from adjacent spaces. Conference rooms holding more than 15 people will be a dedicated zone. Conference rooms smaller than this will be served from adjacent spaces. Office spaces will be limited to 700 S.F. per zone, which will place up to 6 offices in a zone. Zones will be configured to group spaces with similar occupancies and exposures. The cafeteria, gymnasiums, locker rooms, and large public restrooms will each be dedicated zones. Individual restrooms on exterior walls will be provided with heating only. IT closets, server rooms, and elevator equipment rooms will be separately zoned and have dedicated HVAC systems. Mechanical and electrical spaces will be dedicated zones with heating and ventilation fans. 8 BranchPattern.com

9 3.4 - OCCUPANCY Mechanical ventilation rates are determined from Table of the IMC. Occupancy densities are summarized below. Occupancy Classification Occupant Density (#/1000 sf) People Outdoor Airflow Rate in Breathing Zone, Rp (cfm/person) Area Outdoor Airflow Rate in Breathing Zone, Ra (cfm/sf) Exhaust Airflow Rate (cfm/sf) Auditoriums Corridors Media Center Sports Locker Rooms Music/Theater/Dance Classrooms (age 5-8) Classrooms (age 9+) Art Classroom Science Laboratories Wood/Metal Shop Computer Lab Multiuse assembly Locker/Dressing Room Cafeteria Kitchen (cooking) Conference Room Office Space Reception Area Main Entry Lobby Shower Room (per /20 shower head) Private Toilet Room /50 Public Toilet Room /70 Copy/Printing Room Libraries OPERATIONS Ventilation air will be provided during occupied hours. Separate systems capable of independent occupancy schedules will be provide for the classrooms, offices, gymnasium and cafeteria. The classrooms and office spaces will be occupied 8 hours/day, 5 days/week, 36 weeks/ year. The Cafeteria and multi-use/study area can operate nights and weekends in occupied mode as required for sporting events NARRATIVES The target of this project is to provide energy savings above the baseline system to allow for up to 15 LEED points. With LEED Gold goal, the number of points to target is 18 points. The baseline system to 9 BranchPattern.com

10 compare against in the energy analysis, is a Variable Air Volume (VAV) system with hot water reheat and direct expansion (DX) cooling. In order to achieve 18 points, the energy savings of the entire building compared to the baseline must be 50% savings. The three systems presented as viable options to achieve savings over the baseline are: 1) VAV Hot Water Reheat with Chilled Water Cooling (Chiller/Cooling Tower System). 2) Water Source Heat Pumps with Geoexchange Field and Condensing Boilers and Cooling Towers. 3) Radiant Heating and Cooling Slab with Displacement Ventilation and Condensing Boilers and Cooling Towers. Estimated EUI Breakdown Energy Usage Intensity (EUI) Baseline VAV with Reheat + DX cooling VAV With Reheat + Water Cooled Chiller Ground Source Heat Pump Radiant Slab Cooling Heating Lighting Equipment Fans Hot Water 10 BranchPattern.com

11 $45, $40, $35, $30, $41, Utility Cost Breakdown $35, $25, $27, $20, $18, $15, $10, $5, $0.00 Baseline VAV with Reheat + DX cooling VAV With Reheat + Water Cooled Chiller Ground Source Heat Pump Electricity ($) Natural Gas ($) Radiant Slab The analysis indicates that Ground source heat pumps will have the highest energy savings potential compared to the baseline model, and the proposed VAV with reheat and chilled water will have the least. Here is a summary of LEED points anticipated with each system. System LEED Points Energy Savings (%) Baseline VAV Hot Water Reheat / DX Cooling - - System 1 VAV Hot Water Reheat / Chilled Water 4 points 15% Cooling System 2 Ground Source heat pumps with DOAS 18 points 55% system System 3 Radiant heating and Cooling with DOAS system 15 points 41% 11 BranchPattern.com

12 System Baseline For reference only (Do not include in pricing exercise). 12 BranchPattern.com

13 Option 1: VAV Reheat with Boilers All options include a condensing boiler plant with variable speed building pumping distributing hot water to terminal devices. Pumps are sized for 100% of flow and operate in a lead/standby configuration. Pumps are controlled with a differential pressure sensor. In option 1, the hot water serves VAV reheat coils, unit heaters, and cabinet unit heaters. Each zone of control includes a VAV reheat box with an air damper and reheat coil. Rooftop Units with DX cooling and gas-fired heat provide tempered primary air in a supply duct to the VAV boxes. 13 BranchPattern.com

14 Option 2: Water Source Heat Pump with ERV, Fluid Cooler, and Boilers This option includes a condensing gas boiler plant that provides heating energy to a central heat pump water loop. Boiler capacity is estimated at 1500 mbh each 66% of capacity. The heat pump water loop serves condenser water to the building heat pumps and modulates to maintain a differential pressure setpoint. Including a geoexchange system to utilize the constant temperature of the earth below grade will be considered as an alternative within this system type. This would allow the fluid cooler to be deleted and utilize a backup boiler. The ground loop would utilize its own set of pumps to circulate water through the geothermal piping and circuits. An ERV designed to be ducted into the return air ductwork of the zone level water source heat pumps (WSHP) will be sized for the calculated ventilation requirement. It will be a variable speed DOAS system that varies flow based on a static pressure sensor. Zone level VAV boxes will modulate ventilation air flow as a result of CO2 sensors located in the zones. 14 BranchPattern.com

15 Option 3: Radiantly heated and cooled slab with ERV, Air-Cooled Chiller, and Boilers This option provides heating and cooling through radiant tubing installed in the concrete slab. Each zone of control includes a radiant manifold header with 3-way control valves on the chilled and hot water piping routed to each zone. Each zone can change over from heating to cooling and each system includes a balancing valve for setting of the chilled and hot water flow rates. There is an air-cooled chiller sized for the building cooling capacity located on grade adjacent to the mechanical room. Two primary chilled water pumps are sized redundantly for 100% of flow of the chiller. This option includes a condensing gas boiler plant similar to option 1 with building distribution pumps. An ERV designed to be directly ducted into displacement ventilation diffusers will be sized for the calculated ventilation requirement. It will be a variable speed DOAS system that varies flow based on a static pressure sensor. Zone level VAV boxes will modulate ventilation air flow as a result of CO2 sensors located in the zones. Displacement ventilation provides an opportunity for a reduction of required ventilation air and size of ERV based on the improved efficiency with which ventilation air is delivered to the space SYSTEM SIZING CRITERIA HVAC systems are designed for current building area. No extra capacity is provided in central equipment or primary distribution systems to accommodate future expansion. A 10% safety factor is applied to all system selections. 15 BranchPattern.com

16 3.8 MECHANICAL EQUIPMENT DUCTWORK Select air terminal devices for NC 30. Supply diffusers in classrooms will have 8 necks and be sized for 350 CFM each. Each classroom will receive a 24x24 return grille. Supply diffusers in open offices will have 8 necks and be sized for 350 CFM each. Small single person offices will have a 6 supply diffuser. Each open office or single person office will have a 24x24 return grille. Return air will be plenum return with transfer ducts at wall penetrations. Supply, return, and exhaust ducts sized for 0.08 /100 pressure drop. Size transfer ducts for 500 FPM free area velocity. Kitchen grease ducts sized for 0.15 /100 pressure drop HVAC EQUIPMENT Size heat pumps, terminal heating devices, boilers, and closed-circuit cooling tower based on computer load calculations performed in IES-VE. Size ERVs based on ASHRAE Size general exhaust systems on IMC required ventilation rates and the requirements of LEED EA credits. Ductwork Line supply and return ducts within 10 of heat pumps and Energy Recovery Ventilators (ERVs) with 1 duct liner. Wrap all other supply ducts above ceilings with 1-1/2 duct wrap. Supply ducts exposed in spaces they serve will not be insulated. Return and exhaust ducts beyond 10 of the equipment they are connected to will not be insulated. Line transfer ducts with 1 duct liner. Transfer duct configuration will be 5 section of duct with capped ends and openings on top of each end equal to the internal dimensions of the transfer duct. Piping Hydronic Piping Size heat pump water, boiler water, and closed-circuit cooling tower water piping for 4 /100 pressure drop. Distribution system will be configured in a direct return design. Heat pump water supply and return piping will be steel pipe with threaded fittings or copper pipe with soldered fittings for 2 and smaller pipes. Pipes 2-1/2 and larger will be welded steel. Heat pump water piping will not be insulated. Water Source Heat Pumps Vertical or Horizontal water source heat pumps (WSHP) will serve all spaces except for the kitchen, gymnasium, IT closets, elevator machine room, and server room. 16 BranchPattern.com

17 Heat pumps will have MERV 8 filters. Heat Pumps: Climate Master Model TT30 Energy Recovery Ventilators Dedicated outdoor air systems (DOAS) will be provided ventilation with energy recovery ventilators. They will include supply and exhaust fans with variable speed drives and where applicable a toilet exhaust fan with a variable speed drive. Heating will be provided by an indirect gas burner. Cooling will be provided by direct expansion (dx) with multiple refrigerant circuits and a variable speed compressor on the lead compressor for tight discharge air temperature control for use with a displacement ventilation system. The cooling source for a DOAS system ducted into the return air ducts for a water source heat pump system will be indirect evaporative media in lieu of dx cooling. Plenum return will be used to get relief air back to the ERVs. Ducted exhaust will be used between the ERVs and janitor s closets, restrooms, locker rooms, copy rooms or other spaces requiring exhaust. Sensible only heat wheels with VFD driven motors will recover energy. Per LEED for school requirements the ERVs will have MERV 13 filters. Equipment : Annexair Central Hydronic Plant The heat pump water central plant has two variable volume pumps that circulate water through the building. Branch piping in the central plant allows for heat to be added or rejected from the heat pump water loop as required to maintain the loop supply set point. Condensing boilers with dedicated pumps connect in a side-stream configuration to the main heat pump water supply header. A plate and frame heat exchanger couples the closed-circuit cooling tower to the heat pump supply water header. A pump on the tower side of the heat exchanger circulates 40% propylene glycol through the closed-circuit cooling tower. A 3- way valve across the heat pump loop side of the heat exchanger allows the system to bypass the heat exchanger when heat rejection is not required. Equipment Boilers: Lochinvar Crest. Pumps: Bell & Gossett Series 1510 base-mounted pumps Heat Exchanger: Alfa-Laval SS plate and frame heat exchanger Closed Circuit Cooling Tower: BAC. Air Handling Units The gymnasium and cafeteria will be served by dedicated rooftop units. The units will have variable airflow, economizer, and CO2 demand control ventilation. Heating will be provided by indirect gas fired burners. Cooling will be provided by dx compressors. Equipment : Aaon 17 BranchPattern.com

18 Makeup Air Units The kitchen will be served by a rooftop makeup air unit with propane heat and evaporative cooling. Equipment : Greenheck Transfer Fans IT closets will be ventilated by transfer fans that use air from adjacent spaces. The fans will exhaust to the ceiling plenum. Equipment [i.e. the make/model number Packaged Rooftop Unit The server room will be conditioned by a packaged DX rooftop unit with fan powered economizer. Equipment [i.e. the make/model number Aaon Unit Heaters Electric unit heaters will be used in mechanical and electrical rooms. Equipment [i.e. the make/model number Trane Cabinet Unit Heaters Electric cabinet unit heaters will be used in vestibules Equipment [i.e. the make/model number Trane Destratification Fans Destratification fans will be used in each gymnasium Equipment [i.e. the make/model number Air Pear Grease Exhaust Fan A type-i up-blast grease exhaust fan will serve the kitchen hoods Equipment [i.e. the make/model number Greenheck Fume Hood Exhaust Fans Fume hoods in the science labs will be served by upblast spun aluminum ventilators Equipment [i.e. the make/model number 18 BranchPattern.com

19 Greenheck Insulation Insulation will meet ASHRAE Minimum Duct Insulation R-Value, Climate Zone 5 Exterior Unvented Unconditioned Buried Duct Attic Space Supply Duct Return Duct 3.5 None None None Minimum Pipe Insulation Thickness (inches), Climate Zone 5 Nominal Pipe Size (in.) ¾ to 1 1 to 1-½ 2 to 4 4 to 8 Heat Pump Loop Hot Water Systems Chilled Water Systems Domestic Hot Water & Recirculation Domestic Cold Water BUILDING AUTOMATION SYSTEM The building Automation System (BAS) will monitor major equipment and allow adjustment of system set points. Interface with the BAS will be available at a dedicated workstation in the school and remotely through the internet. Each zone will have a temperature sensor that will automatically switch between heating and cooling. The sensors will have adjustment that allows the user to change the space set point up or down by 3 degrees. Sensors will not display room temperature or set point. Mechanical equipment such as heat pumps, chillers, boilers, and air handling units will operate under their factory mounted controls. The factory controls will have a BACnet card to allow the BAS to remotely monitor set points and alarms on each piece of equipment. The BAS will control the pumps, heat exchanger and closed-circuit cooling tower in the central plant. The boilers will be enabled and monitored by the BAS but will operate under their factory installed controls. Unit heaters, cabinet unit heaters, and HVAC systems for IT closets and server rooms will operate on independent controls that are not connected to the BAS. Temperature sensors will be installed in IT closets and server rooms to monitor room temperature and generate an alarm if it becomes too high. The BAS will trend all points in the system and store 18 months of data. The user will be able to create graphs and tables of any combination of trended points through the central work station or remotely through the internet. 19 BranchPattern.com

20 4.0 PLUMBING SYSTEMS GENERAL This narrative provides a brief summary of the proposed plumbing systems. The information contained in this document will be used during the design process DOMESTIC COLD WATER A new 3 domestic water service line with be extended to a point 5-0 outside the building. Extension from this point to a 3 domestic water meter and tap will be coordinated by the Civil Engineer. This will likely require routing around the existing school to connect to the new school prior to demolition of the existing building. The 3 domestic water service line will enter the building adjacent to the exterior wall of the main mechanical room and will pass through a 4 reduced pressure backflow preventer (RPBP) prior to serving any building fixtures. Water pressure at hydrants adjacent to the building indicate that static pressure is 95 psi and residual pressure is 75 psi at 1400 gpm from a hydrant. The incoming water pressure exceeds 80 psi, therefore a pressure reducing valve station is required. The PRV station will be located downstream of the RPBP to regulate water pressure down to 80 psi or less. Domestic cold-water piping shall be Type L copper and will be insulated with fiberglass insulation with a vapor barrier service jacket. Insulation shall be ½ thick for piping sizes 1-1/4 and below and 1 thick for piping sizes 1-1/2 and above. Pipe joining method will be solder with cast copper fittings for pipe. Shut-off valves will be provided in all branch lines and for each gang of fixtures for maintenance. Exterior non-freeze wall hydrants will be located around the exterior face of the building no greater than 200 apart. Backflow preventers and/or vacuum breakers will be provided at all interconnections between the domestic water systems and points of possible contamination or crossflow DOMESTIC HOT WATER The domestic water heating system will consist of (1) commercial grade, high-efficiency, gas fired storage tank water heater, sized to produce 140 F hot water. The domestic water heaters will be located in the main mechanical room and will be sealed combustion type, thereby eliminating the requirements for mechanically provided combustion air in the mechanical room. An expansion tank will be located at the water heaters for protection against thermal expansion. Two separate hot water loops will be provided: one to serve food service areas and one to serve washing and bathing fixtures throughout the building. An ASSE 1017 listed thermostatic mixing valve, set at 140 F, will be provided for the food service hot water loop. A separate ASSE 1017 listing thermostatic mixing valve, set at 120 F, will be provided for the building service hot water loop. Additional thermostatic mixing valves will be located throughout the facility to limit hot water temperatures. Recirculation pumps, set on a 24 hour timeclock with an aqua-stat, will be provided for both loops and located in the main mechanical room. Domestic hot water piping shall be Type L copper and will be insulated with fiberglass insulation with a vapor barrier service jacket. Insulation shall be 1 thick for piping sizes 1-1/4 and below and 1-20 BranchPattern.com

21 1/2 thick for piping sizes 1-1/2 and above. Pipe joining method will be solder with cast copper fittings for pipe WASTE AND VENT SYSTEMS A 6 sanitary sewer line will be extended to a point 5-0 outside of the building, for continuation by the Civil Engineer. It is anticipated that the 6 sanitary building drain will exit to route around the existing elementary school building. Sanitary drain lines sloped for gravity flow will extend throughout the building, above and below slab, to serve plumbing fixtures, floor drains and mechanical equipment. Sanitary and vent stacks will be provided at various locations for collecting sanitary and vent discharge from the plumbing fixtures. Vent stacks will be extended through the roof areas at various locations. Floor and wall cleanouts will be provided throughout for rodding purposes. Above grade sanitary sewer and vent systems will be installed in service weight cast iron no-hub piping and sized appropriately for the connected loads. Below grade sanitary sewer systems will be installed in schedule 40 PVC piping with DWV fittings. Condensate drainage piping will be routed from equipment which may produce condensate in type L copper tubing. The condensate pipe will be insulated in areas where damage may occur to the finished building materials. Condensate will discharge over a sanitary receptacle through a code approved airgap. Discharge from science room and laboratory sinks will pass through acid dilution tanks located in the casework beneath each sink, before continuing on to the building sanitary system. Piping from sink drains to dilution tanks shall be CPVC with glued fittings. Floor drains and indirect waste receptors will be located in mechanical equipment rooms and in other locations throughout the building where needed to allow for the convenient drainage of the fixtures and equipment being served. A 6 floor sink will be provided beneath the RPBP at the water entry. Grease waste systems will be designed for kitchen areas that produce grease. An external grease interceptor will be designed to accommodate the connected loads and located in coordination with Civil and Architectural disciplines. The external grease interceptor will be sized per local wastewater district requirements and based on specific kitchen equipment fixtures to be determined by the Kitchen Design Consultant during the design development phase of the project. A separate vent system will return to the building from the grease interceptor and rise to a rooftop termination location. An elevator sump pump will be provided in each elevator shaft and equipped with an oil minder sensor to discontinue operation if oil is present. Elevator sump pumps will be sized to pump 50 gpm and discharge will be routed to a sanitary receptacle through a code approved airgap STORM WATER DISPOSAL Roof drains and overflow drains will be provided for the storm water drainage. Drains will be sized in accordance with the 2015 IPC. Roof drain leaders will be routed through the building and will offset below grade. Continuation to 5-0 outside of the building will be coordinated with the Civil Engineer during design development. The overflow drain piping will terminate approximately above finished grade through a lamb s tongue. 21 BranchPattern.com

22 Above ground storm drainage piping will be hubless cast iron with heavy duty bands Below grade storm drainage piping will be installed in schedule 40 DWV PVC with glued joints. Horizontal storm drainage piping, transitions to vertical, and drain bowls will be supplied with ½ fiberglass insulation, with a vapor barrier service jacket. Where primary or overflow roof drainage must discharge onto sidewalks or other walkways, catch basins will be provided with connections to the storm system coordinated by the Civil Engineer NATURAL GAS SYSTEM Gas service provided by the natural gas utility company will be extended to the building, metered, and reduced to 14 in. w.c. Gas piping will be extended from the meter location to all building gas fired equipment. A line sized plug valve will be provided downstream of the meter for entire building gas shut off. Natural gas piping will be schedule 40 black steel. Fittings for sizes 2-1/2 and above shall be welded malleable iron. Fittings for sizes 2 and under shall be threaded steel. The design and installation of natural gas distribution systems and equipment will be in conformance with manufacturer s recommendations and applicable sections of ASME B31.8 and NFPA 54. Connections to all equipment shall include gas cocks and dirt legs. Two-way solenoid valves with emergency shut-off switches will be provided in the natural gas piping to the main mechanical room, and science rooms PLUMBING FIXTURES Manufacturers of plumbing fixtures, faucets, and trim will be subject to approval by the Owner and will be standard commercial grade water-saving type and designed to meet the Americans with Disabilities Act (ADA) guidelines where required or indicated. All stainless steel sinks in break rooms, classrooms, and the like will be a provided in (18 gauge) thickness, minimum. All new plumbing fixtures will be a low-flow water conservation type to minimize water consumption. Water closets and urinals will be equipped with battery operated automatic sensor type flushometer valves. Lavatory <and classroom sink> faucets will be battery-operated automatic sensor type. Other fixtures (janitor sinks, water coolers, showers, etc.) will be located in the building as indicated by the architectural plans. An anticipated water savings of 40% is expected per LEED v4 credit template calculations. (Flow requirements) for fixtures will be as listed below with sustainability features: Water Closets: 1.28 GPF Urinals: GPF Lavatories: 0.5 GPM Sinks: 1.5 GPM Showers: 1.5 GPM 22 BranchPattern.com

23 5.0 FIRE PROTECTION SYSTEMS GENERAL Fire protection systems will be designed around a performance specification for deferred submittal by the Fire Protection Engineer and/or Contractor. Limited information will be placed on the contract drawings to facilitate bidding. The drawings will indicate the location of the fire protection backflow preventer and indicator valve. Any areas of special construction will be highlighted for coordination. Static and residual pressures will be obtained from local water utilities and shown on the drawings. 5.2 SYSTEM DESCRIPTION A 6 fire service line will be extended from a point 5-0 outside of the building. Extension to the exterior water main will be coordinated by the Civil Engineer. The 6 fire service will enter the building adjacent the exterior wall in the main mechanical room. A double check detector assembly will be provided prior to connection to any building sprinkler heads, valves, or standpipes. Fire sprinkler systems will be designed and installed with a wet-pipe system per NFPA 13 for Light or Ordinary Hazard classification areas as required. Dry pipe systems will be provided for overhangs and other freeze-risk areas for which exceed the coverage ability of dry sidewall sprinkler heads. 23 BranchPattern.com

24 6.0 ELECTRICAL SYSTEMS GENERAL The proposed electrical systems for this building attempt to balance occupant usage requirements with other factors such as budgets, first costs and operating costs. Electrical systems shall be installed and or augment the base building systems to meet requirements of local and national codes and regulations as well as sound engineering practices. Work shall consist of furnishing all labor, equipment, supplies, and materials, unless otherwise specified, necessary for the installation of a complete electrical system(s) as required by the system description, specifications, and drawings. The work shall include the completion of electrical work not mentioned or shown which is necessary for the successful operation of all electrical systems. Within this narrative, the electrical system characteristics for the building will be addressed. System design characteristics will include: Anticipated Loads Primary Electrical Service Normal Power Distribution Emergency Power Distribution Grounding System Interior Lighting and Controls Exterior Lighting and Controls Fire Alarm System Auxiliary Building Systems 6.2 ANTICIPATED LOADS The electrical power demand for the building has been estimated on a Watts per square foot (W/SF) basis as follows: LOAD TYPE W/SF Interior Lighting 0.5 Exterior Lighting 0.1 Receptacles 1.5 Miscellaneous 3.0 Mechanical Equipment 8.0 Load Total 13.1 Load Total w/ Spare Capacity (20%) BranchPattern.com

25 6.3 PRIMARY ELECTRICAL SERVICE Building electrical service will be provided by Black Hills Energy. The utility company will provide a new 480/277V, 3-phase, 4-wire pad-mounted transformer, a pre-cast pad, primary cabling, and primary terminations. The new transformer is anticipated to be located outside on grade along N. 10 th Street near the building. The existing pole mounted transformer will remain functional during construction of new building and removed once completed. The contractor shall provide a 10 x 10 pad site that is compacted and level. The contractor shall install (1) 4 schedule 40 PVC conduit for the primary service with capped 90-degree sweep elbows and (1) 5/8 by 8 copper ground rod. The electrical contractor will need to provide a customer connection cabinet on the secondary side of the transformer. The connection cabinet shall be furnished with a Black Hill compliant CT compartment and surface mounted utility meter on the side of the cabinet. The location of the utility meter will be coordinated with the utility company. The electrical contractor shall coordinate the installation of the primary electrical service with the utility company. The electrical contractor will install the secondary service from the new pad-mounted transformer to the building main switchboard. The anticipated NEC calculated demand load for the building, based on an anticipated square footage of 47,000 sq ft is anticipated to be 739kVA (889A). 6.4 NORMAL POWER DISTRIBUTION The main service entrance for the building will be 480/277V, 3-phase, 4-wire. The main switchboard MSB will be rated 1,000A, 65kAIC, 480/277V, 3-phase, 4-wire and shall be protected by a 1,000A ground fault protected main circuit breaker. All distribution circuit breakers will be provided with long time, short time, and instantaneous trip settings for device coordination. The MSB will have an externally mounted microprocessor-based customer metering and monitoring package. Spare circuit breakers and additional bussed space will be provided. Conductors will be terminated with two-hole compression lugs. Initial infrared scanning will be required to establish a base line for the distribution equipment. MSB will be freestanding type and installed on a raised 4 concrete housekeeping pad. A Type I internal Surge Protection Device (SDP) will be connected to the MSB by way of a circuit breaker disconnect. Aluminum bussing shall be permitted for MSB. Energy star compliant dry type transformers will be used throughout the facility. Transformer windings are permitted to be aluminum. All panelboards and sub-distribution panels are permitted to have aluminum bussing. All distribution and branch panel circuit breakers will be bolt-in molded case type. 25% spare breakers/breaker spaces will be provided in every panelboard and 20% spare load capacity. Reference the Preliminary Electrical One-Line Diagram for a complete depiction of the electrical infrastructure. All branch circuit conductors, motor circuit conductors and grounding electrode conductors shall be copper. Aluminum conductors are permitted for all feeders greater than 100A. Metal clad cable will be utilized only for under counter luminaires. All circuiting will be routed in conduit. Minimum conduit size shall be ¾. All above grade feeders and branch circuits will consist of THHN/THWN insulation and copper conductors in GRC or EMT conduit. All below grade feeders and branch circuits will consist of XHHW in PVC. Wire sizes for branch circuit power and lighting will be a minimum of #12 AWG. Separate neutral and ground conductors will be provided for each circuit. 25 BranchPattern.com

26 Conduits will be labeled every 10 on center with color coded labels corresponding to the electrical branch the conduit belongs to. All receptacles and switches shall have a printed self-adhesive label indicating which circuit is feeding that device. All panelboards, transformers, disconnect switches, etc. shall be labeled using an engraved nameplate. Tamper resistant receptacles shall be utilized in all public spaces and any additional spaces used by children who are age seven and younger. Short circuit analysis, protective device coordination studies, and arc flash hazard studies shall be provided by the electrical contractor. Devices will be coordinated down to 0.1 seconds. All protective devices shall be properly coordinated to provide selective tripping. Arc Flash analysis will yield proper labels for all electrical apparatus indicating available arc flash energy and proper PPE for working in and around energized electrical equipment. 6.5 EMERGENCY POWER DISTRIBUTION BASE SYSTEM: Fire Alarm Control Panel, Security System Alarm Panel, Access Control Panel and egress and emergency lighting fixtures will have individual battery backup. Owner provided small UPS units may be provided in MDF and IDF rooms to support communications and data equipment. Egress lighting in gym shall be connected to a 1000W emergency lighting inverter. ELECTRICAL - ALTERNATE STANDBY SYSTEM ONE CENTRAL BATTERY INVERTERS: Fire Alarm Control Panel, Security System Alarm Panel and Access Control Panel will have individual battery backup. Owner provided small UPS units may be provided in MDF and IDF rooms to support communications and data equipment. Egress lighting in the whole building shall be connected to a 2000W emergency lighting inverter. ELECTRICAL - ALTERNATE STANDBY SYSTEM TWO NATURAL GAS GENERATOR: One 75kW, 208V, 3-phase, 4-wire standby rated, Natural Gas emergency will be provided. The generator will be located outside the building in a weatherproof 75dB at 21 feet sound rated enclosure and will be equipped with a skid mounted radiator. The generator will be provided with a remote Annunciator panel and a remote start/stop. Reference the Electrical One-Line Diagram for a complete depiction of the emergency electrical infrastructure. 6.6 GROUNDING A grounding electrode system will be installed that will meet the requirements for a grounding system as outlined in the National Electric Code. A main ground bus bar located in the main electrical room will be bonded to the main switchboard frame and ground bus using a ground conductor sized in accordance with the NEC. The grounding system shall consist of a UFER ground installed in or below the building foundation, a grounding connection to the cold-water pipe at the 26 BranchPattern.com

27 service entrance, a grounding connection to the building steel, and a grounding connection to driven ground rods. Secondary ground bars will be provided in all electrical and communication rooms. 6.7 INTERNAL LIGHTING AND CONTROLS Electric Lighting systems, lighting control strategies, and daylight control strategies will be used on this project. The use of building space requires interior lighting system that provides adequate lighting levels and also provides for good visibility and comfortable surroundings. Lighting levels for each space will be designed to conform to the Illuminance Selection Tables appearing in the Illuminating Engineering Society (IES) Lighting Handbook. Specific influences of glare, task complexity, surface reflectance characteristics, ceiling brightness and user age will be considered when specifying lighting. Local codes will take precedence when they dictate the use of alternative procedures or require minimum lighting levels for specific areas. All lighting designs will be in keeping with the energy codes adopted locally. All interior lighting is required to be on lighting controls per the International Energy Conservation Code. Occupancy or Vacancy sensors shall be installed in spaces where automatic shutoff of electric lighting is appropriate. Sensor time-out shall be adjustable from 15 to 30 minutes. Automatic dimming/reduction of electric lighting associated with daylight harvesting shall be implemented in public spaces receiving adequate daylight. Multi-level lighting level control shall be provided in spaces as deemed appropriate to allow the level of electric lighting and energy consumption to be reduced to best suit the comfort level of the building occupants. Continuous dimming control of electric lighting shall be provided where appropriate. Electric lighting in public spaces that operate on a workday schedule shall be controlled by a networked lighting control system. Override switch capability will be provided for all common spaces controlled by the networked lighting control system. To accomplish adequate lighting levels and good visibility and comfortable surroundings, LED luminaire types will be provided (4000 K lamp temperature and minimum 80CRI Color Rendering Index) in all spaces INTERIOR LIGHTING SCHEME DESCRIPTION 27 BranchPattern.com

28 Space Type Footcandle Level Level Measured AFF Corridors / Circulation 15 0'-0" Lighting Scheme Description Corridors with lay-in ceilings shall have recessed LED luminaires. Recessed LED downlights with open reflector will be provided in dropped hard lid ceiling areas. Vestibules 15 0'-0" Recessed LED downlights with open reflectors. Stairwells 10 0'-0" Recessed LED downlights with open reflectors. Public Restrooms 15 2'-6" Recessed 1x4 LED luminaires with acrylic prismatic lens in open areas and recessed narrow slot LED strips along "wet" wall. Recessed LED downlights with open reflector at restroom entries. Private Restrooms 15 2'-6" Storage Rooms 10 0'-0" Wall mounted linear LED direct/indirect fixture located above vanity sink. Spaces with lay-in ceilings shall have recessed mounted low output LED luminaires. Spaces without ceilings shall have chain hung LED strip luminaires with wire guards. Equipment / Utility Rooms 10 0'-0" Chain hung LED strip luminaire with wire guard. IT Rooms 50 2'-6" Spaces with lay-in ceilings shall have recessed mounted LED luminaires. Spaces without ceilings shall have chain hung LED strip luminaires with wire guards. Administration, Offices and Teacher Collaboration Rooms 35 2'-6" Recessed 2x4 LED luminaires with medium output and dimming driver. Some 2x2 LED with medium output in work Rooms and recessed LED downlights with open reflectors above reception desk. Small Group Rooms 35 2'-6" Recessed 2x4 LED luminaires with dimming drivers. Clinic 50 2'-6" Recessed 2x4 LED luminaires with dimming drivers. Gymnasium and Aux Gym 50 0'-0" Sensory Room 30 0'-0" Locker Rooms 10 0'-0" Surface mounted 2x4 high output LED with dual level control, impact resistant lens and wire guard. Luminaires shall be installed using metal struts with bottom of luminaires level with bottom of structural metal joists. Recessed 2x4 LED with low output and dimming drivers. Surface mounted high abuse LED luminaires, damp location listing, clear heavy duty polycarbonate lens, heavy duty housing. Shower 15 0'-0" Surface mounted wet location vandal resistant LED 4ft luminaires Integrated Learning Center/Library Standard Classrooms 40 2'-6" 40(General), 5(A/V Mode) 2'-6" Commons Areas 30 2'-6" Art Classrooms 50 2'-6" Linear Pendant mounted high output Direct/Indirect LED luminaires with dimming drivers. Recessed 2x4 and 2x2 LED low output fixtures in areas with lay-in ceilings. Linear Pendant mounted high output Direct/Indirect LED luminaires with dimming drivers. Recessed 2x4 high output LED luminaires with dimming drivers. Linear Pendant mounted high output Direct/Indirect LED luminaires with dimming drivers. 28 BranchPattern.com

29 Kiln Room 50 2'-6" Recessed 2x4 LED luminaires. Curiosity Center 30 2'-6" Music, Choir and Band Classrooms Food Preparation / Concessions (Kitchen) 30 2'-6" Linear Pendant mounted high output Direct/Indirect LED luminaires with dimming drivers over Commons area. Recessed multi-head adjustable LED fixtures at front of stage with variety of spot, narrow flood & flood distributions and dimming drivers. Linear Pendant mounted high output Direct/Indirect LED luminaires with dimming drivers. 50 2'-6" Recessed 2x4 and 2x2 LED with high output. Dry Food Storage 20 2'-6" Recessed 2x4 and 2x2 LED with medium output. 29 BranchPattern.com

30 INTERIOR LIGHTING CONTROLS DESCRIPTION Room Type Controls Description Corridors / Circulation Vestibules Stairwells Public Restrooms Private Restrooms Storage Rooms Equipment / Utility Rooms IT Rooms Administration, Offices and Teacher Collaboration Rooms Small Group Rooms Clinic Gymnasium and Aux Gym Sensory Room Locker Rooms Shower Normal hours - automatic ON/OFF, control through network lighting system controller. After hours - Manual override wall switch control of zones of lighting. In areas with access to daylighting, provide daylight 0-10V dimming control via daylight open-loop photo sensor. Ceiling mounted occupancy sensor On/Off with a hold-off light level option so that the lighting does not turn on when daylight is available. (Sensor coverage and detection technology shall be per the device manufacturer's recommendation.) Normal hours - automatic ON/OFF, control through network lighting system controller. After hours - Manual override wall switch control of zones of lighting. In areas with access to daylighting, provide daylight 0-10V dimming control via daylight open-loop photo sensor. Ceiling mounted occupancy sensor On/Off. (Sensor coverage and detection technology shall be per the device manufacturer's recommendation.) Wall mounted manual On switch with integral vacancy sensor. (Sensor coverage and detection technology shall be per the device manufacturer's recommendation.) Wall mounted switch with integral timer. A blink warning prior to off sweeps shall notify occupants that they must re-activate lighting in occupied spaces. Wall mounted switch with integral timer. A blink warning prior to off sweeps shall notify occupants that they must re-activate lighting in occupied spaces. Mechanical and Electrical rooms shall have manual on/off only (automatic controls not allowed per code). Wall mounted switch with integral timer. A blink warning prior to off sweeps shall notify occupants that they must re-activate lighting in occupied spaces. All Spaces: Wall mounted manual On/Off/Dim low voltage switch and ceiling mounted vacancy sensor. (Sensor coverage and detection technology shall be per the device manufacturer's recommendation.) Wall mounted manual On/Off/Dim low voltage switch and ceiling mounted vacancy sensor. (Sensor coverage and detection technology shall be per the device manufacturer's recommendation.) Wall mounted Dimmer switch for On/Off/Dim Automatic On/Off via control through network lighting system controller. After hours - periodic lighting control system sweeps. A blink warning prior to off sweeps shall notify occupants that they must re-activate lighting if the space is occupied. Dual level control of the lighting shall be provided via switches. After-hours override control will initiate a 3 hour override sequence. Manual On/Off/Dim at wall switch with automatic Off via ceiling mounted dual-technology vacancy sensors. Dimming level switching control shall be provided. Ceiling mounted occupancy sensor On/Off. (Sensor coverage and detection technology shall be per the device manufacturer's recommendation.) Ceiling mounted occupancy sensor On/Off. (Sensor coverage and detection technology shall be per the device manufacturer's recommendation.) 30 BranchPattern.com

31 Room Type Controls Description Integrated Learning Center/Library Standard Classrooms Commons Areas Art Classrooms Kiln Room Curiosity Center Music, Choir and Band Classrooms Food Preparation / Concessions (Kitchen) Dry Food Storage Normal hours - Manual On/Off/Dim controls via wall mounted switches. Automatic On/Off control via ceiling mounted occupancy sensors. Lighting luminaires located in day lit zones shall be connected via local daylight sensor so that lighting level is maintained at 30fc when daylight is available. Manual On/Off switching at entry door. Manual dimming control with On/Off switching at teaching wall. Ceiling mounted vacancy sensor coverage for Manual On, vacancy Off. (Sensor coverage and detection technology shall be per the device manufacturer's recommendation.) Lighting in day lit zones shall be dimmed to maintain 40fc at daylight sensor position based on the available daylight. Manual dimming shall be programmed such that maximum manual setting cannot exceed maintained foot candle level at daylight sensor. Manual On/Off switching at entry door. Manual dimming control with On/Off switching at teaching wall. Ceiling mounted vacancy sensor coverage for Manual On, vacancy Off. (Sensor coverage and detection technology shall be per the device manufacturer's recommendation.) Lighting in day lit zones shall be dimmed to maintain 40fc at daylight sensor position based on the available daylight. Manual dimming shall be programmed such that maximum manual setting cannot exceed maintained foot candle level at daylight sensor. Manual On/Off switching at entry door. Manual dimming control with On/Off switching at teaching wall. Ceiling mounted vacancy sensor coverage for Manual On, vacancy Off. (Sensor coverage and detection technology shall be per the device manufacturer's recommendation.) Lighting in day lit zones shall be dimmed to maintain 50fc at daylight sensor position based on the available daylight. Manual dimming shall be programmed such that maximum manual setting cannot exceed maintained foot candle level at daylight sensor. Manual On timer switch at exterior of door with blink warning. Manual On with automatic Off via ceiling mounted dual-technology vacancy sensors. Lighting luminaires located in day lit zones shall be connected via local daylight sensor so that lighting level is maintained at 20fc when daylight is available. For the stage lighting a minimum of two control zones; dimming and manual on / automatic-off control shall be provided. Manual On/Off switching at entry door. Manual dimming control with On/Off switching at teaching wall. Ceiling mounted vacancy sensor coverage for Manual On, vacancy Off. (Sensor coverage and detection technology shall be per the device manufacturer's recommendation.) Lighting in day lit zones shall be dimmed to maintain 40fc at daylight sensor position based on the available daylight. Manual dimming shall be programmed such that maximum manual setting cannot exceed maintained foot candle level at daylight sensor Normal hours - Manual On, Manual Off for Kitchen, Dishwashing and Prep areas. Wall mounted manual On/Off switch with integral occupancy sensor control in concession area. Wall mounted switch with integral timer. A blink warning prior to off sweeps shall notify occupants that they must re-activate lighting in occupied spaces. 6.8 EXTERIOR LIGHTING AND CONTROLS Exterior lighting will conform to the criteria recommended in the IESNA Guideline for Security Lighting for People, Property and Public Spaces. Exterior lighting shall be provided at all building entrances, pedestrian walkways, service yards and parking lot areas. 1-foot candle will be provided 31 BranchPattern.com

SECTION HVAC TABLE OF CONTENTS PART 1 - SYSTEM DESCRIPTION / OUTLINE SPECIFICATIONS FILED SUB BID PROJECT OVERVIEW...

SECTION HVAC TABLE OF CONTENTS PART 1 - SYSTEM DESCRIPTION / OUTLINE SPECIFICATIONS FILED SUB BID PROJECT OVERVIEW... SECTION 230001 TABLE OF CONTENTS SECTION 230001 PART 1 - SYSTEM DESCRIPTION / OUTLINE SPECIFICATIONS... 1 1.00 FILED SUB BID... 1 1.01 PROJECT OVERVIEW... 2 1.02 DESIGN CRITERIA... 4 1.03 CODE ISSUES...

More information

State College Area School District High School South Building EXISTING CONDITIONS ASSESSMENT

State College Area School District High School South Building EXISTING CONDITIONS ASSESSMENT State College Area School District High School South Building Prepared by CenterPoint Engineering 08 February 2013 FACILITY ASSESSMENT SUMMARY PHYSICAL PLANT General HVAC This report is a snapshot of the

More information

Florence High School / Middle School Page 1 of 3 Florence, WI

Florence High School / Middle School Page 1 of 3 Florence, WI Florence High School / Middle School Page 1 of 3 Florence, WI Plumbing Systems Review: The following report is the result of a site visit by Tim Kehoe of Muermann Engineering, LLC that occurred on October

More information

Mechanical System Description

Mechanical System Description 1. Building Description: Mechanical System Description The building is a Type-1B construction, 9-levels, non-high rise building with 67 affordable family housing units. The first level of the structure

More information

PLAN REVIEW SUBMITTAL GUIDE

PLAN REVIEW SUBMITTAL GUIDE PLAN REVIEW SUBMITTAL GUIDE Plans, specifications and other construction documentation for the initial plan review should be as complete as possible at the time of submittal. Use this convenient guide

More information

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS SECTION 23 09 93 SEQUENCE OF OPERATIONS FOR HVAC CONTROLS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes control sequences for HVAC systems, subsystems, and equipment. B. See Division 23 Section

More information

THIS IS A DESIGN GUIDE NOT A SPECIFICATION. Montgomery County Public Schools Facilities Guide DIVISION 15 MECHANICAL

THIS IS A DESIGN GUIDE NOT A SPECIFICATION. Montgomery County Public Schools Facilities Guide DIVISION 15 MECHANICAL SECTION 15100 PART 1 GENERAL THIS IS A DESIGN GUIDE NOT A SPECIFICATION Montgomery County Public Schools Facilities Guide DIVISION 15 MECHANICAL HVAC SYSTEMS APPLICATIONS 1.1 SCOPE: The intent of this

More information

Tighe&Bond. Groton Heights School Mechanical Evaluation. 1 Existing Conditions. 1.1 Water Service Entrance

Tighe&Bond. Groton Heights School Mechanical Evaluation. 1 Existing Conditions. 1.1 Water Service Entrance Groton Heights School Mechanical Evaluation TO: FROM: Amy Vaillancourt, Project Manager Harley Langford, Project Manger Jason Curtis, P.E. DATE: February 24, 2016; Revised May 31, 2016 On Monday, December

More information

MUKWONAGO AREA SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY

MUKWONAGO AREA SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY ARCHITECTURE ROLLING HILLS ELEMENTARY SCHOOL Rolling Hills Elementary was built in 1999 and is the newest addition to the Mukwonago Area School District. The building contains approximately 64,900 gross

More information

State College Area School District High School North Building EXISTING CONDITIONS ASSESSMENT

State College Area School District High School North Building EXISTING CONDITIONS ASSESSMENT State College Area School District High School North Building Prepared by CenterPoint Engineering 08 February 2013 FACILITY ASSESSMENT SUMMARY PHYSICAL PLANT General HVAC This report is a snapshot of the

More information

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS PART 1 - GENERAL SECTION 23 09 93 SEQUENCE OF OPERATIONS FOR HVAC CONTROLS 1.1 SUMMARY A. This Section includes control sequences for HVAC systems, subsystems, and other equipment. B. See Division 23 Section

More information

Construction Management at Risk Services. New North East Branch Library Project. August 3, 2018

Construction Management at Risk Services. New North East Branch Library Project. August 3, 2018 Construction Management at Risk Services New North East Branch Library Project ADDENDUM 01 August 3, 2018 1. The attendance sheets (4 pages) from the Pre-Bid Conference are attached. 2. The proposals may

More information

DESIGN AND CONSTRUCTION STANDARDS GENERAL DESIGN GUIDELINES

DESIGN AND CONSTRUCTION STANDARDS GENERAL DESIGN GUIDELINES 2.05 PLUMBING GENERAL DESIGN AND CONSTRUCTION STANDARDS GENERAL DESIGN GUIDELINES - 2.05 It is expected that the plumbing design professional will conform to accepted good engineering design practices.

More information

B. Use UT Austin specifications and equipment schedule format for HVAC equipment where available.

B. Use UT Austin specifications and equipment schedule format for HVAC equipment where available. PART 1: GENERAL 1.01 General Requirements A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the

More information

Brown University Revised June 29, 2012 Facilities Design & Construction Standards SECTION ELECTRICAL DESIGN CRITERIA

Brown University Revised June 29, 2012 Facilities Design & Construction Standards SECTION ELECTRICAL DESIGN CRITERIA PART 1 - GENERAL 1.1 Background SECTION 26 00 10- ELECTRICAL DESIGN CRITERIA A. Brown University maintains it own campus electrical distribution system which serves the majority of the buildings and facilities

More information

PLATTEVILLE MIDDLE SCHOOL

PLATTEVILLE MIDDLE SCHOOL Architectural The building has aluminum clad wood awning windows in combination with aluminum fixed glass units. They appear to be exterior glazed with insulated glazing. See photo 2. Platteville Middle

More information

UNIVERSITY OF MISSOURI Heating Ventilating and Air-Conditioning (HVAC) 2016 Q1

UNIVERSITY OF MISSOURI Heating Ventilating and Air-Conditioning (HVAC) 2016 Q1 GENERAL: This section provides general standards for overall sizing and design of Heating, Ventilating, and Air Conditioning (HVAC) systems. Other sections contain specific standards for each system per

More information

GARCIA GALUSKA DESOUSA Consulting Engineers

GARCIA GALUSKA DESOUSA Consulting Engineers L#57297 /Page 1/July 21, 2017 ELECTRICAL SYSTEMS NARRATIVE REPORT The following is the Electrical Systems narrative, which defines the scope of work and capacities of the Power and Lighting systems, as

More information

C. ASSE 1013: Performance Requirements for Reduced Pressure Principle Backflow Preventers.

C. ASSE 1013: Performance Requirements for Reduced Pressure Principle Backflow Preventers. SECTION 22 10 00 PLUMBING PIPING AND PUMPS PART 1 - GENERAL 1.1 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design.

More information

MID MICHIGAN COMMUNITY COLLEGE HARRISON CAMPUS Harrison, Michigan 2015 MASTER PLAN

MID MICHIGAN COMMUNITY COLLEGE HARRISON CAMPUS Harrison, Michigan 2015 MASTER PLAN MID MICHIGAN COMMUNITY COLLEGE HARRISON CAMPUS Harrison, Michigan 2015 MASTER PLAN September 30, 2015 PBA Project No. 2015.0140.00 PETER BASSO ASSOCIATES INC. CONSULTING ENGINEERS 5145 LIVERNOIS ROAD,

More information

A. Base Bid: 1. Heating Contractor provide: a. Control sequences for HVAC systems, subsystems, and equipment.

A. Base Bid: 1. Heating Contractor provide: a. Control sequences for HVAC systems, subsystems, and equipment. SECTION 23 09 93 - SEQUENCE OF OPERATIONS FOR HVAC CONTROLS PART 1 - GENERAL 1 WORK INCLUDES A. Base Bid: Heating Contractor provide: Control sequences for HVAC systems, subsystems, and equipment. B. Alternate

More information

FAARM-Underground Facility. Conceptual Design Review. Mechanical Systems. Dunham Associates, Inc.

FAARM-Underground Facility. Conceptual Design Review. Mechanical Systems. Dunham Associates, Inc. FAARM-Underground Facility Conceptual Design Review Mechanical Systems Prepared by: Dunham Associates, Inc. April 17, 2012 Dunham Project Number: 0412145-000-00 Dunham Associates Inc. Page 1 of 8 Mechanical

More information

COBB COUNTY SCHOOLS /S&A % BID DOCUMENTS 2/18/11 SECTION SPRINKLER SYSTEM

COBB COUNTY SCHOOLS /S&A % BID DOCUMENTS 2/18/11 SECTION SPRINKLER SYSTEM SECTION 21 10 00 PART 1 - GENERAL 1.1 CODES A. Work shall conform to NFPA 13 Sprinkler Systems, 2002 Edition and NFPA 24 Outside Protection, 2002 Edition. NFPA 14 Standpipe Systems, 2000 Edition and International

More information

Dear Concessionaire,

Dear Concessionaire, Dear Concessionaire, In order to provide a comprehensive review & inspection of the Vendor application please review the following as guidance to a complete application and preparedness for inspection.

More information

August 15, 2013 Page 1 of 19

August 15, 2013 Page 1 of 19 Section C401 Application Compliance with C402, C403, C404 and C405 AND (either C406.2, C406.3 or C406.4) Compliance with C402, C403, C404 or C405 Section C402 Building Envelope (Climate Zone 5A) Space-Conditioning

More information

Related Sections: TBD. Effective Date: January 1, 2016

Related Sections: TBD. Effective Date: January 1, 2016 Description: The purpose of the section is to highlight the current applicable UMCP Design Standards for the design, selection and, installation of lighting fixtures within buildings. Related Sections:

More information

DIVISION 15 MECHANICAL

DIVISION 15 MECHANICAL DIVISION 15 MECHANICAL A. GENERAL DESIGN CONDITIONS 1. Design occupied spaces to maintain 72 F and a space dew point temperature not to exceed 55 F. 2. Design classroom and office space buildings with

More information

ICP Plumbing Exam. Name: Carefully read each question and then circle the letter of the best answer.

ICP Plumbing Exam. Name: Carefully read each question and then circle the letter of the best answer. ICP Plumbing Exam Name: Date: Score: Carefully read each question and then circle the letter of the best answer. 1. A 1 inch diameter faucet, where the inside edge of the spout opening is 2.5 inches away

More information

RE: Phase 2 Improvements DATE: July 1, 2016 New Administration Building Wernle Youth & Family Treatment Center 2000 Wernle Road Richmond, Indiana

RE: Phase 2 Improvements DATE: July 1, 2016 New Administration Building Wernle Youth & Family Treatment Center 2000 Wernle Road Richmond, Indiana ADDENDUM NO. 2 RE: Phase 2 Improvements DATE: July 1, 2016 New Administration Building Wernle Youth & Family Treatment Center 2000 Wernle Road Richmond, Indiana TO: All Bidders Gentlemen: This Addendum

More information

1.1 This section applies to air handling units for HVAC Systems.

1.1 This section applies to air handling units for HVAC Systems. AIR HANDLING UNITS GENERAL INFORMATION 1.1 This section applies to air handling units for HVAC Systems. DESIGN REQUIREMENTS 2.1 Design Criteria a. The decision to use modular central station air handling

More information

DOMESTIC WATER PACKAGED BOOSTER PUMPS

DOMESTIC WATER PACKAGED BOOSTER PUMPS DIVISION 22 PLUMBING 22 11 16 DOMESTIC WATER PIPING 22 11 19 DOMESTIC WATER PIPING SPECIALTIES 1. To facilitate landscape and other maintenance operations, exterior hose bibs shall be provided at 150 foot

More information

COMcheck Software Version Mechanical Compliance Certificate

COMcheck Software Version Mechanical Compliance Certificate COMcheck Software Version 3.8.2 Mechanical Compliance Certificate 90.1 (2007) Standard Section 1: Project Information Project Type: New Construction Project Title : Rudy's Star Motors Construction Site:

More information

Appendix B. Facilities Assessment Report

Appendix B. Facilities Assessment Report Mile Lane Army Reserve Center Redevelopment Plan September 2008 Appendix B Facilities Assessment Report RKG Associates, Inc. Mile Lane Army Reserve Base Middletown, CT MEP System Evaluation For RKG Associates

More information

MOUNT PLEASANT MIDDLE SCHOOL HVAC. M-01 Heating Plant: M-02 Heating & Ventilating Systems: Livingston School District Mount Pleasant Middle School

MOUNT PLEASANT MIDDLE SCHOOL HVAC. M-01 Heating Plant: M-02 Heating & Ventilating Systems: Livingston School District Mount Pleasant Middle School MOUNT PLEASANT MIDDLE SCHOOL HVAC M-01 Heating Plant: The existing boilers have recently been upgraded. (3) steam boilers (8660 mbh each) manufactured by Weil- McLain have been installed. Newer hot water

More information

NC State University Design and Construction Guidelines Division 23 Basic Mechanical Requirements

NC State University Design and Construction Guidelines Division 23 Basic Mechanical Requirements 1.0 Purpose A. These guidelines provide requirements for designers to incorporate into bid documents for mechanical and plumbing systems. 2.0 General Requirements A. Warranty and Guarantee 1. Specifications

More information

LIGHTING CONTROLS

LIGHTING CONTROLS 260923 LIGHTING CONTROLS PART 1: GENERAL 1.01 SUMMARY COMMENTS A. CU has developed this lighting control guideline to direct design professionals toward standard solutions that meet the University s performance

More information

Richard Henry Lee Elementary School

Richard Henry Lee Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

SECTION LIGHTING CONTROLS

SECTION LIGHTING CONTROLS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 09 23 LIGHTING CONTROLS SPEC WRITER NOTE: 1. Delete between //----// if not applicable to project. Also, delete any other item or paragraph not applicable to

More information

GARCIA GALUSKA DESOUSA Consulting Engineers

GARCIA GALUSKA DESOUSA Consulting Engineers L#57295/Page 1/July 21, 2017 HVAC SYSTEMS NARRATIVE REPORT The following is the HVAC system narrative, which defines the scope of work and capacities of the HVAC system as well as the Basis of Design.

More information

Agustin Lara Elementary Academy

Agustin Lara Elementary Academy Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Calmeca Academy of Fine Arts and Dual Language

Calmeca Academy of Fine Arts and Dual Language Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

4. OVERVIEW OF MECHANICAL SYSTEM

4. OVERVIEW OF MECHANICAL SYSTEM 4. OVERVIEW OF MECHANICAL SYSTEM The 87,000 SF SLCC is served by six (6) Trane M-Series Climate Changer Air Handing Units (AHUs). Each unit serves a distinct zone within the facility that is unique in

More information

Please refer to the drawing and notes for each particular plan view. Site Plan S1-1 Site Drawing. Electrical E1-1 Main Electrical Drawing

Please refer to the drawing and notes for each particular plan view. Site Plan S1-1 Site Drawing. Electrical E1-1 Main Electrical Drawing The property that I discuss is an actual property that I helped to build. My position was as the Facility/Project Manager while the building was under construction. I worked very closely with the Senior

More information

Technical Report #3 Mechanical Systems Existing Conditions Evaluation

Technical Report #3 Mechanical Systems Existing Conditions Evaluation Mechanical Option Technical Report #3 Technical Report #3 Mechanical Systems Existing Conditions Evaluation Instructor: Dr. Bahnfleth 11.15.04 Building Sponsor: CCG Facilities Integration Table of Contents

More information

HOLUM EDUCATION CENTER. Architectural. January 13, 2014 DeForest Area School District

HOLUM EDUCATION CENTER. Architectural. January 13, 2014 DeForest Area School District HOLUM EDUCATION CENTER Architectural The existing building has approximately 41,823 square feet and sets on a lot about 4.14 acres in size. Parking lots are located along the east and west sides of the

More information

Lincoln Public Schools

Lincoln Public Schools Lincoln Public Schools School Building Committee Meeting February 13, 2019 Today s Agenda 1. Review Updated Site Plan 2. Review and Approve OPR 3. Review MEP Systems 4. Review Progress Energy Model Review

More information

Electrical Design Guidelines Table of Contents

Electrical Design Guidelines Table of Contents C: Compliant Rev. 3 Dated June 13 11 NC: Non-Compliant NA: Not Applicable Page1 16.1 General 16.2 Single Line Diagrams 16.3 Electric Motor Equipment and Controls 16.4 Lighting 16.5 Emergency Lighting 16.6

More information

MT. AIRY MIDDLE SCHOOL CARROLL COUNTY PUBLIC SCHOOLS

MT. AIRY MIDDLE SCHOOL CARROLL COUNTY PUBLIC SCHOOLS CARROLL COUNTY PUBLIC SCHOOLS LIFE CYCLE COST ANALYSIS SUMMARY DGS PROCEDURES FOR THE IMPLEMENTATION OF LIFE CYCLE COST ANALYSIS AND ENERGY CONSERVATION OCTOBER, 2010 G.A.I.#09090 GIPE ASSOCIATES, INC.

More information

2016 Plumbing Supplemental Plan Review List

2016 Plumbing Supplemental Plan Review List Building Division 555 Santa Clara Street Vallejo CA 94590 707.648.4374 2016 Plumbing Supplemental Plan Review List POTABLE WATER SYSTEM P1. Specify which fixtures are for private use and which are for

More information

21. Plumbing fixture mixing valves, PRV, electronic faucets and flush valve(excluding batteries)optional Cost proposal to include these device

21. Plumbing fixture mixing valves, PRV, electronic faucets and flush valve(excluding batteries)optional Cost proposal to include these device DIVISION 23800 APPENDIX A ASHTABULA CAMPUS: 1. Air Handling Equipment And Appurtenances 2. Exhaust Fans 3. Fume Hood Exhaust Fans 4. Fume Hood monitoring devices and annual certification of face velocity

More information

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS SECTION

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS SECTION SECTION 237433, PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to

More information

Element D Services Electrical

Element D Services Electrical PART 1 - GENERAL 1.01 OVERVIEW A. This Section includes design standards and requirements for electrical service and distribution. This is a design standard and is not intended to be used as a Specification.

More information

NYC Department of Education

NYC Department of Education Asset: P.S. 86 ANNEX - BRONX, 124 EAMES PLACE, New York, 10468 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-04-05 1:03 PM 2018-04-27 1:35 PM Asset Data Are there fuel tanks? Total

More information

FINAL REPORT INFRASTRUCTURE MASTER PLAN UPDATE. Harper College. Palatine, Illinois

FINAL REPORT INFRASTRUCTURE MASTER PLAN UPDATE. Harper College. Palatine, Illinois FINAL REPORT INFRASTRUCTURE MASTER PLAN UPDATE Palatine, Illinois Grumman/Butkus Associates Energy Efficiency Consultants and Sustainable Design Engineers 820 Davis Street, Suite 300 Evanston, Illinois

More information

Edward Jenner Elementary Academy of the Arts

Edward Jenner Elementary Academy of the Arts Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

DESIGN GUIDELINES SECTION HVAC

DESIGN GUIDELINES SECTION HVAC 3/15/17 Cooling Methodology Chiller Plants Configurations monitoring Preferred DESIGN GUIDELINES SECTION 15700 HVAC Air-cooled chillers < or = 300 tons; water-cooled chillers > 300 tons Variable volume

More information

Air Flow Diagram. Orange County Sanitation District SP-194 Section 05 Conceptual Design

Air Flow Diagram. Orange County Sanitation District SP-194 Section 05 Conceptual Design Orange County Sanitation District SP-194 Section 05 Conceptual Design Air Flow Diagram Two options are being analyzed for air distribution and temperature control within the building: Conditioned air shall

More information

SECTION DUCTWORK

SECTION DUCTWORK PART 1 GENERAL 1.1 REFERENCES SECTION 23 31 00 DUCTWORK A. ASHRAE - Handbook, Duct Design B. ASHRAE - Handbook, Duct Construction C. ASTM A90/A90M - Standard Test Method for Weight (Mass) of Coating on

More information

C. ASME Compliance: Fabricate and label water chiller heat exchangers to comply with ASME Boiler and Pressure Vessel Code: Section VIII, Division 1.

C. ASME Compliance: Fabricate and label water chiller heat exchangers to comply with ASME Boiler and Pressure Vessel Code: Section VIII, Division 1. SECTION 236426 - ROTARY-SCREW WATER CHILLERS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes packaged, water cooled or air cooled as scheduled, electric-motor-driven, rotary-screw water chillers

More information

Cook - Wissahickon Elementary School

Cook - Wissahickon Elementary School Cook - Wissahickon Elementary School 201 E. Salaignac St., Philadelphia, PA 19128 HVAC Replacement Project Scope Determination Report May 10, 2018 Prepared by: G.P. Lamina, Jr., P.E., MBA School District

More information

DESIGN AND CONSTRUCTION STANDARDS GENERAL DESIGN GUIDELINES

DESIGN AND CONSTRUCTION STANDARDS GENERAL DESIGN GUIDELINES 2.07 ELECTRICAL GENERAL DESIGN AND CONSTRUCTION STANDARDS GENERAL DESIGN GUIDELINES - 2.07 It is expected that the electrical design professional will conform to accepted good engineering design practices.

More information

8 5.11: Finned-Tube Coils and Heat Exchangers : Humidifiers and Water Spray Systems : Access for Inspection, Cleaning, and Maintenance

8 5.11: Finned-Tube Coils and Heat Exchangers : Humidifiers and Water Spray Systems : Access for Inspection, Cleaning, and Maintenance Table of Contents 3 Executive Summary 4 Building Overview 5 Mechanical Systems Overview 6 ASHRAE Standard 62.1 2013 Evaluation 6 Section 5: Systems and Equipment 6 5.1: Ventilation Air Distribution 6 5.2:

More information

Gil Rossmiller. In the construction industry for over 30 years. ICC IRC Plumbing & Mechanical Code Development Committee

Gil Rossmiller. In the construction industry for over 30 years. ICC IRC Plumbing & Mechanical Code Development Committee Gil Rossmiller In the construction industry for over 30 years ICC IRC Plumbing & Mechanical Code Development Committee ICC- IECC Commercial Energy Code Development Committee Building Official Parker, Colorado

More information

UNIVERSITY OF MISSOURI Fire Protection System Design 2016 Q1

UNIVERSITY OF MISSOURI Fire Protection System Design 2016 Q1 GENERAL: 1. All fire protection systems shall be installed in accordance with the International Fire Code and applicable NFPA standards. This guideline provides additional requirements for the design and

More information

Element Z General Design Requirements Existing Facilities Information

Element Z General Design Requirements Existing Facilities Information Charles M. LeMaistre PART 1 - INTRODUCTION 1.01 OVERVIEW A. This Section provides general information for building systems and components. B. Refer to the Owner s Design Guideline Elements A though G and

More information

M001. Revenue Services ISSUED FOR CONSTRUCTION SEPTEMBER. 2, East State Parkway Schaumburg, Illinois Do Not Scale Drawings

M001. Revenue Services ISSUED FOR CONSTRUCTION SEPTEMBER. 2, East State Parkway Schaumburg, Illinois Do Not Scale Drawings 1 T Consultant: NOTES, SYMBOLS & ABBREVIATIONS - MECHANICAL Number Description M001 Vestibule 117 LAN/IT Coffee 115 116 Mail Room 118 114 113 112 Scanning 119 Open Office 101 FIRST FLOOR PLAN - MECHANICAL

More information

SECTION PACKAGED, OUTDOOR, CENTRAL-STATION AIR-HANDLING UNITS

SECTION PACKAGED, OUTDOOR, CENTRAL-STATION AIR-HANDLING UNITS SECTION 237413 - PACKAGED, OUTDOOR, CENTRAL-STATION AIR-HANDLING UNITS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes packaged, outdoor, central-station air-handling units (rooftop units) with the

More information

Inspection Phase Three. Mechanical, Electrical & Plumbing Section 503

Inspection Phase Three. Mechanical, Electrical & Plumbing Section 503 Inspection Phase Three Mechanical, Electrical & Plumbing Section 503 COMCheck Mechanical Field Inspection Checklist Mechanical Mechanical, Electrical & Plumbing Equipment Efficiencies But a lot ore too

More information

2016 CALIFORNIA CODES KITCHEN, BATH & LAUNDRY REMODEL REQUIREMENTS

2016 CALIFORNIA CODES KITCHEN, BATH & LAUNDRY REMODEL REQUIREMENTS City of Redwood City Community Development Department Building and Inspection Department 1017 Middlefield Road Redwood City, CA 94063 Phone (650) 780-7350 2016 CALIFORNIA CODES KITCHEN, BATH & LAUNDRY

More information

ELECTRICAL Seminar. B A L A Consulting Engineers, Inc. Edward J. Lynch, PE Vice President, Electrical Department Manager.

ELECTRICAL Seminar. B A L A Consulting Engineers, Inc. Edward J. Lynch, PE Vice President, Electrical Department Manager. B A L A Consulting Engineers, Inc. PECO Line 13.2kV Incoming Service No. 1 Utility/Generator Medium Voltage Switchgear PECO Line 13.2kV Incoming Service No. 2 Unit Substation ELECTRICAL Seminar HVAC Equip.

More information

ELECTRICAL SYSTEMS ASSESSMENT Hanover High School

ELECTRICAL SYSTEMS ASSESSMENT Hanover High School ELECTRICAL SYSTEMS ASSESSMENT Hanover High School ELECTRICAL DISTRIBUTION SYSTEM:?? The existing electrical service consists of an underground primary service originating at a utility pole on Cedar Street,

More information

Level I Chapter 1 Worksheet

Level I Chapter 1 Worksheet Chapter 1 Worksheet 1. For applicability requirements of the Plumbing Code, refer to: a. Building Code b. Administration and Enforcement Code c. Plumbing Code d. Residential Code 2. The provisions of the

More information

Washington Irving Elementary School

Washington Irving Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

CONNECTICUT. Downloaded

CONNECTICUT. Downloaded Housekeeping/Laundry/Maintenance J. Laundry. CONNECTICUT Downloaded 01.15.11 (1) This service, if provided, shall be used exclusively for laundry and shall be remote from resident and food service areas,

More information

Charles W Earle Elementary School

Charles W Earle Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Revitalize Building Mechanical Systems (4619)

Revitalize Building Mechanical Systems (4619) SECTION 235216 FIRE-TUBE CONDENSING BOILERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

Summary of BBS Proposed Ohio Plumbing Code Rule Changes October 2016

Summary of BBS Proposed Ohio Plumbing Code Rule Changes October 2016 Summary of BBS Proposed Ohio Plumbing Code Rule Changes October 2016 Ohio Administrative Code Rule Number OPC Section IPC origin Reason for proposed 4101:3-2-01 Alternate on-site 2015 Added definition

More information

Direct Gas-Fired Make-Up Air

Direct Gas-Fired Make-Up Air Direct Gas-Fired Make-Up Air Model TSU Heavy Duty, High Airflow Applications Manufacturing and Industrial Facilities Up to 64,000 cfm August 2012 Products Model TSU Direct Gas-Fired Make-Up Air Unit The

More information

COMMERCIAL PERMIT APPLICATION AND CHECKLIST. Depending on the scope of your project, the following submittal requirements will apply:

COMMERCIAL PERMIT APPLICATION AND CHECKLIST. Depending on the scope of your project, the following submittal requirements will apply: Planning/Building Department 115 Ramsdell Street Fircrest WA 98466 (253) 564-8902 COMMERCIAL PERMIT APPLICATION AND CHECKLIST Depending on the scope of your project, the following submittal requirements

More information

Dehumidifying with Dedicated Outdoor Air

Dehumidifying with Dedicated Outdoor Air Dehumidifying with Dedicated Outdoor Air System Configurations Figure 71. Configurations for dedicated outdoor-air systems A dedicated outdoor-air handler separately filters, cools, dehumidifies, heats,

More information

EXHAUST FAN SCHEDULE

EXHAUST FAN SCHEDULE DUCTWORK SCHEDULE CONCEALED SUPPLY AIR RECTANGULAR, RTU CONCEALED SUPPLY AIR RECTANGULAR, ERV CONCEALED SUPPLY AIR ROUND, RTU CONCEALED SUPPLY AIR ROUND, ERV EXPOSED SUPPLY AIR ROUND RUNOUTS RETURN AIR

More information

Florida Department of Transportation

Florida Department of Transportation Page 1 of 7 RICK SCOTT GOVERNOR Florida Department of Transportation 1109 S. Marion Avenue Lake City, Florida 32025 ANANTH PRASAD SECRETARY September 27, 2011 To: Proposal Holders Addendum No: 1, E2Q23,

More information

COHASSET, MA March 6, The following is the HVAC outline specifications, which defines the scope of work of the HVAC system.

COHASSET, MA March 6, The following is the HVAC outline specifications, which defines the scope of work of the HVAC system. 23 00 00 HEATING, VENTILATING & AIR-CONDITIONING The following is the HVAC outline specifications, which defines the scope of work of the HVAC system. PART 1 GENERAL 1.1 CODES A. All work installed under

More information

PITTSBURG STATE UNIVERSITY. HVAC and BUILDING AUTOMATION SYSTEM STANDARDS

PITTSBURG STATE UNIVERSITY. HVAC and BUILDING AUTOMATION SYSTEM STANDARDS PITTSBURG STATE UNIVERSITY HVAC and BUILDING AUTOMATION SYSTEM STANDARDS CHILLERS In new construction, liquid-cooled models are preferred for systems larger than 100 ton. o Trane, York and McQuay brands

More information

DOCUMENT TABLE OF CONTENTS

DOCUMENT TABLE OF CONTENTS DOCUMENT 00003 June 16, 2005 TABLE OF CONTENTS DOCUMENT NO. INTRODUCTORY INFORMATION DOCUMENT 00003 TABLE OF CONTENTS DIVISION 1 GENERAL REQUIREMENTS SECTION 01011 SECTION 01025 SSP21.1-1 SECTION 01026

More information

Basic Hood Considerations The design process for a successful kitchen ventilation system starts when the engineering design HVAC team receives

Basic Hood Considerations The design process for a successful kitchen ventilation system starts when the engineering design HVAC team receives Design Considerations for Commercial Kitchen Ventilation By John A. Clark, P.E., Member ASHRAE Commercial kitchen ventilation (CKV) design must consider everything needed to be coordinated to form a system

More information

NYC Department of Education

NYC Department of Education Asset: P.S./I.S. 194 - BRONX, 2365 WATERBURY AVENUE, New York, 10462 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-01-24 8:34 AM 2018-02-01 10:02 AM Asset Data Are there fuel tanks?

More information

LABORATORY AIR COMPRESSORS AND VACUUM PUMPING SYSTEMS

LABORATORY AIR COMPRESSORS AND VACUUM PUMPING SYSTEMS SECTION 22 20 00 LABORATORY AIR COMPRESSORS AND VACUUM PUMPING SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements",

More information

Joseph Brennemann Elementary School

Joseph Brennemann Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Sanitary Drainage Systems

Sanitary Drainage Systems 11.1 MATERIALS See Section 3.1. Sanitary Drainage Systems 11.2 BUILDING SEWERS AND BUILDING DRAINS 11.2.1 Sewer or Drain in Filled Ground Chapter 11 Building sewers or building drains that are installed

More information

S AGE E NGINEERING A SSOCIATES, LLP

S AGE E NGINEERING A SSOCIATES, LLP S AGE E NGINEERING A SSOCIATES, LLP 1211 Western Avenue Albany, NY (518) 453 6091 F (518) 453 6092 Kingston Library Mechanical and Electrical Systems Field Report Date of Visits: Mechanical - September

More information

Direct Fired Heater Model AD Specification

Direct Fired Heater Model AD Specification Direct Fired Heater Model AD Specification Description A Direct-fired gas heating and ventilating unit(s), as indicated on the drawings shall be furnished. Unit(s) shall be tested in accordance with ANSI

More information

Josefa Ortiz De Dominguez Elementary School

Josefa Ortiz De Dominguez Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

TABLE OF CONTENTS. Part I Administrative... 1

TABLE OF CONTENTS. Part I Administrative... 1 Part I Administrative............................ 1 CHAPTER 1 ADMINISTRATION............... 1 R101 Title, Scope and Purpose.................... 1 R102 Applicability.............................. 1 R103

More information

NYC Department of Education

NYC Department of Education Asset: P.S. 22 - STATEN ISLAND, 1860 FOREST AVENUE, New York, 10303 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2017-12-08 8:51 AM 2017-12-18 4:14 PM Asset Data Are there fuel tanks?

More information

Siemens Building Technology MEP Existing Conditions

Siemens Building Technology MEP Existing Conditions Electrical Existing Conditions Report Executive Summary: The electrical systems for the are generally of the original vintage. The site is primary metered with the meter located in the main Electric Room.

More information

CHAPTER 4. HVAC DELIVERY SYSTEMS

CHAPTER 4. HVAC DELIVERY SYSTEMS CHAPTER 4. HVAC DELIVERY SYSTEMS 4.1 Introduction 4.2 Centralized System versus Individual System 4.3 Heat Transfer Fluids 4.4 CAV versus VAV Systems 4.5 Common Systems for Heating and Cooling 4.6 Economizer

More information

Building Division 201 SE 3 rd STREET (Second Floor) OCALA, FL Phone: (352) BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS

Building Division 201 SE 3 rd STREET (Second Floor) OCALA, FL Phone: (352) BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS Building Code compliance is the obligation of design professionals and/or contractors. Plan Review and Inspection Guidelines are intended to be used

More information

2009 IECC Commercial Mechanical Requirements

2009 IECC Commercial Mechanical Requirements BUILDING ENERGY CODES UNIVERSITY 2009 IECC Commercial Mechanical Requirements Ken Baker PNNL-SA-66171 Learning(Objec-ves(( ( 1. Find(minimum(equipment(efficiency(requirements( and(recite(at(least(3(common(terms(for(measuring(

More information

FIRE ALARM: BY OTHERS, IF REQUIRED.

FIRE ALARM: BY OTHERS, IF REQUIRED. x x x x x x OS LIGHTING S FLUORESCENT LIGHT FIXTURE, SEE LIGHT FIXTURE SCHEDULE FOR SIZE AND MOUNTING. FLUORESCENT STRIP LIGHT FIXTURE, SEE LIGHT FIXTURE SCHEDULE FOR SIZE AND MOUNTING. WALL BRACKET FLUORESCENT

More information