Slide 2 NFPA 25: 2017

Size: px
Start display at page:

Download "Slide 2 NFPA 25: 2017"

Transcription

1 Slide 1 Changes for 2017 NFPA 25 Handbook Supplement 8 contains a table highlighting the significant technical changes to NFPA 25 for the 2017 edition, along with a brief comment regarding the reason for the change. For a complete record of all changes, along with the full committee statements for both editorial and technical changes, consult the NFPA 25 First Draft Report and Second Draft Report for the Annual 2016 Revision Cycle. These reports can be downloaded from the NFPA 25 document page at Slide 2 NFPA 25: 2017 Ch. 1: Administration Ch. 2: Referenced Publications Ch. 3: Definitions Ch. 4: General Requirements Ch. 5: Sprinkler Systems Ch. 6: Standpipe and Hose Systems Ch. 7: Private Fire Service Mains Ch. 8: Fire Pumps Ch. 9: Water Storage Tanks Ch. 10: Water Spray Fixed Systems Ch. 10: Water Spray Fixed Systems Ch. 11: Foam-Water Sprinkler Systems Ch. 12: Water Mist Systems Ch. 13: Valves, Valve Components, and Trim Ch. 14: Internal Piping Condition and Obstruction Investigation Ch. 15: Impairments Ch. 16: Special Requirements from Other NFPA Documents Annex A-F 2 Slide 3 NFPA 13 D Systems Unless required by Chapter 16, this standard shall not apply to sprinkler systems designed, installed, and maintained in accordance with NFPA 13D. This text was revised address the fact that the standard does not typically apply to NFPA 13D systems, however Chapter 16 was added last cycle to specifically handle these systems in very specific occupancies

2 Slide 4 Ch. 3: Definitions Maintenance. In water-based fire protection systems, work performed to keep equipment operable. Reference to repairs has been removed from the definition of maintenance. The term maintenance is broadly defined as including repair, nowhere in the standard is maintenance used in such a fashion. Repair is expressly identified as an individual action throughout the standard * 4 Slide Fire Pump Definitions No Flow (Churn, Shutoff). The condition of zero flow when the fire pump is running but the only water passing through the pump is a small flow that is discharged through the pump circulation relief valve or supplies the cooling for a diesel engine driver. [20, 2016] This section was revised to include additional definitions and to make current ones correlate better with NFPA * 5 Slide Fire Pump Definitions Peak Load. As pertains to acceptance testing in this standard is the maximum power required to drive the pump at any flow rate up to 150 percent of rated capacity (flow). [20, 2016] This section was revised to include additional definitions and to make current ones correlate better with NFPA * 6

3 Slide Fire Pump Definitions Pressure. Discharge Pressure. The total pressure available at the pump discharge flange. [20, 2016] No Flow This section was revised to include additional definitions and to make current ones correlate better with NFPA Slide Fire Pump Definitions Net Pressure (Differential Pressure). For vertical turbine fire pumps the total pressure at the pump discharge flange plus the total suction lift. For other fire pumps, the total pressure at the fire pump discharge flange minus the total pressure at the fire pump suction flange. [20, 2016] This section was revised to include additional definitions and to make current ones correlate better with NFPA * 8 Slide Fire Pump Definitions Rated Pressure. The net pressure (differential pressure) at rated flow and rated speed as marked on the manufacturer s nameplate. [20, 2016] This section was revised to include additional definitions and to make current ones correlate better with NFPA 20. Suction Pressure. The total pressure available at the pump suction flange. [20, 2016] &

4 Slide Fire Pump Definitions Rated Flow. The capacity of the pump at rated speed and rated pressure as marked on the manufacturer's name plate. [20, 2016] This section was revised to include additional definitions and to make current ones correlate better with NFPA Slide Fire Pump Definitions Unadjusted Field Test Curve. A fire pump discharge curve including churn, 100 percent rate flow, and maximum flow up to 150 percent of rated flow, based on discharge gauge readings without speed or velocity pressure adjustments. This section was revised to include additional definitions and to make current ones correlate better with NFPA Slide 12 Ch. 4: General Requirements The owner shall coordinate with the entity conducting the inspection, testing, and maintenance activities to minimize any water damage caused by the discharge of water. A *Water based systems rely on the adequacy and ongoing maintenance of drainage systems such as roof drains, storm drains and floor drains during flowing water as part of testing systems. These systems are often used for other purposes than fire system testing and are not part of the fire protection system. They are often designed and maintained as part of building plumbing systems. This section was added because it is the owner who should be aware of any potential drainage concerns that need to be considered when conducting ITM activities and they should discuss these concerns with the ITM service provider prior to conducting testing activities involving the discharge of water * 12

5 Slide 13 Ch. 4: General Requirements The property owner or designated representative shall correct or repair deficiencies or impairments Section has been revised to be more clear and require corrections any time a deficiency or impairment is identified as opposed to the assumption that it applies only when found during an inspection * 13 Slide 14 Ch. 4: General Requirements The evaluation shall consider factors that include, but are not limited to, the following: (1) Occupancy changes such as converting office or production space into warehousing (2) Process or material changes such as metal stamping to molded plastics (3) Building revisions such as relocated walls, added mezzanines, and ceilings added below sprinklers (4) Removal of heating systems in spaces with piping subject to freezing (5) Changes to the storage method, arrangement, height or commodities (6) Changes in water supplies Items (5) and (6) were added to the list of factors that should be included in the evaluation required by Both changes to storage and water supplies can have major implications on the adequacy of a fire protection system * 14 Slide 15 Ch. 4: General Requirements Antifreeze Information Sign. An antifreeze information sign shall be placed on the antifreeze system main valve, which indicates the manufacture type and brand of the antifreeze solution, the concentration by volume of the antifreeze solution used, and the volume of the antifreeze solution used in the system. This new requirement ensures that details of the antifreeze solution be posted at the antifreeze loop main valve, so that all parties can be aware of what is on hand within a system

6 Slide 16 Ch. 4: General Requirements When automated testing in accordance with is being utilized, the testing shall be observed at a minimum frequency of once every three years. These two sections have been added to ensure that testing of components in a system is observed at least once every three years, whether it is automated or done manually Where the automated testing cannot be visually observed, the testing shall be conducted manually at a minimum frequency of once every three years. 16 Slide 17 Ch. 4: General Requirements 4.6.6* Automated Inspection and Testing Automated inspection and testing procedures performed in accordance with the requirements in this standard shall be permitted to be used * Automated inspection equipment that meets the intent of a required visual inspection shall be permitted to replace the visual inspection. 17 Section has been added to provide requirements for automated inspection and testing. Devices are currently available that can be used to automate testing, but NFPA 25 previously did not provide any guidance. Such automated equipment could be used to reduce test frequency with minimal additional cost to the owner. This should result in identifying malfunctioning devices sooner, leading to system repairs, and may improve overall reliability. In addition automated devices can be incorporated into data collection systems to provide much needed statistics on equipment performance. The new language requires test devices to duplicate manual testing requirements, thereby assuring that the level of reliability will not be reduced. Additionally, the requirements recognize that verification that the automatic test is actually working is needed, and clarification that testing is required even when the automated testing is nonfunctional. Manually testing is not required where visual verification can be made.

7 Slide 18 Ch. 4: General Requirements Automated testing equipment shall produce the same action required by this standard to test a device The testing shall discharge water where required in this standard Automated testing equipment that flows water flow for a test shall be permitted to circulate water except as required in Slide 19 Ch. 4: General Requirements * The discharge shall be visually observed at a minimum frequency of once every three years Where required in this standard, personnel shall observe the testing and intervene in the testing procedures when necessary to prevent injury or property damage Automated test devices and equipment shall be listed for the purpose of the test being conducted. 19 Slide 20 Ch. 4: General Requirements Failure of the testing equipment shall not impair the operation of the system unless indicated by a supervisory signal in accordance with NFPA Failure of a component or system to pass an automated test shall result in an audible supervisory signal Failure of automated inspection and testing equipment shall result in a trouble signal in accordance with NFPA Failure of a component or system that impairs the system shall require that impairment procedures be followed. 20

8 Slide 21 Ch. 4: General Requirements The testing frequencies of this standard shall be maintained regardless of the functionality of the automated testing equipment A record of all inspections and testing shall be maintained in accordance with A Some devices, such as waterflow alarm devices, can be tested automatically. Some things to consider include the following: 1. Not all tests required by NFPA 25 are suitable for automatic testing. 2. Periodic visual inspection, including the use of video, should be performed 21 Slide 22 Ch. 4: General Requirements A Transducers, temperature sensors, automatic- and remotely-operated valves, including motorized valves, and solenoids are examples of some of the equipment that could be used in an automated inspection. The list of items above is a partial list and should not be considered an exclusive list of equipment and methodologies. A The visual observation should be coordinated with the automatic testing. Appropriate remote visual observation might satisfy this requirement. 22 Slide 23 Ch. 4: General Requirements Data Collection AHJ Approval Report & Analysis, Establish Goals 4.7* Performance-Based Compliance Programs. Components and systems shall be permitted to be inspected, tested, and maintained under an approved performancebased program * Performance-based programs shall have clearly identifiable goals and clearly define how the program meets those goals. 23 The prescriptive test and requirements contained in this standard are essentially qualitative, therefore, a qualitative performance based ITM program should be permissible until statistical data becomes available for quantitative. This is a necessary step to permit development of statistical data for different ITM frequencies. The modified language is intended to accommodate a qualitative performance based ITM program.

9 Slide 24 Ch. 4: General Requirements Compliance with an approved performancebased program shall be deemed as compliance with this standard The goals and goal achievement obtained with the approved performance-based program shall be reviewed a minimum of every three years and ITM frequencies adjusted to reflect current conditions and the historical record The historical record shall be available for review by the authority having jurisdiction. 24 Slide 25 Ch. 4: General Requirements 4.8 Maintenance. Maintenance shall be performed to keep the system equipment operable. Reference to repairs has been removed from this requirement. An ounce of prevention is worth a pound of cure 25 Slide 26 Table The revision to this table is one of a series of revisions intended to create a common structure to the ITM Summary tables at the beginning of each chapter. 26 This revision fundamentally does 3 things: 1) When sending the user outside of the chapter, the tables will simply reference the Chapter number rather than referencing a specific section. 2) Reorganizes the table alphabetically 3) Creates consistency throughout the tables.

10 Slide 27 Ch. 5: Sprinkler Systems Common Components and Valves. Common components and valves shall be inspected, tested, and maintained in accordance with Chapter The terminology used to reference the user to chapter 13 for valves and other system components was not all inclusive in previous editions. The NFPA 25 Reformatting Task Group reviewed each chapter and the system components addressed in Chapter 13 and created a revision to consider items such as trim, valve components, FDCs, BFPs and switches to be "common components". Each of the specific system chapters has been reformatted to use this term to provide consistent terminology when referring the user to Chapter 13 for ITM activities for this equipment. Slide 28 Ch. 5: Sprinkler Systems * Any sprinkler that shows signs of any of the following shall be replaced: (1) Leakage (2) Corrosion detrimental to sprinkler performance (3) Physical damage (4) Loss of fluid in the glass bulb heat-responsive element (5) Loading detrimental to sprinkler performance (6) Paint other than that applied by the sprinkler manufacturer Previously included sections have been deleted since it includes information that is redundant to and A Clarification and guidance for assessing sprinklers showing signs of corrosion or loading has been provided. Guidance for addressing situations where multiple, unwanted sprinkler operations have occurred in a facility has been also been included. 28 New annex text provides information and guidance regarding the potential loss of color in glass bulb heat responsive elements in field installation environments. Slide 29 Ch. 5: Sprinkler Systems Escutcheons and coverplates for recessed, flush, and concealed sprinklers shall be replaced with their listed escutcheon or coverplate if found missing during the inspection Where the listed escutcheon or coverplate from a listed assembly is missing and is no longer commercially available, the sprinkler shall be replaced. 29 These requirements have been revised to require that sprinklers with missing escutcheons and coverplates either be replaced with their listed escutcheon or coverplate or replace the entire sprinkler. Many times a "generic" escutcheon or coverplate is installed. This is improper and needs to be addressed in NFPA 25. Sprinklers do not need to be replaced unless the missing and unavailable coverplate is part of a listed assembly. The focus should be on the "listed assembly" as opposed to the listed coverplate.

11 Slide 30 Ch. 5: Sprinkler Systems * Pipe and fittings shall be free of mechanical damage, leakage, and corrosion. The term "in good condition" has been deleted to make the requirement more specific and enforceable. 30 Slide 31 Ch. 5: Sprinkler Systems 5.2.3* Hangers, Braces, and Supports. Sprinkler pipe hangers, braces, and supports shall be inspected annually from the floor level Hangers, braces, and supports shall not be damaged, loose, or unattached Hangers, braces, and supports that are damaged, loose, or unattached shall be replaced or refastened. 31 Since there are often occasions when a pipe needs to be braced, but not for seismic protection reasons, (for example, as when column sprinkler piping must be braced to position a column sprinkler a suitable distance from the web of a column), the more generic term braces is preferred to the more specific term seismic braces. Similarly, pipe stands, (such as those supporting a valve header up from the floor) should also be inspected, the same as hangers holding piping up near the ceiling structure. Slide 32 Ch. 5: Sprinkler Systems 5.2.5* Hydraulic Design Information Sign. The hydraulic design information sign shall be inspected annually to verify that it is provided, attached securely to the sprinkler riser, and is legible General Information Sign Antifreeze Information Sign. This revision brings the inspection requirements for the various signs into conformance with each other. The Information Sign in 5.2.8, the General Information Sign in and the new Antifreeze Information Sign in all have annual inspection frequencies. The Hydraulic Design Information Sign inspection frequency was quarterly. 32

12 Slide 33 Ch. 5: Sprinkler Systems Waterflow Alarm Devices Mechanical waterflow alarm devices including, but not limited to, water motor gongs, shall be tested quarterly * Vane-type and pressure switch type waterflow alarm devices shall be tested semiannually Testing of pressure switch type waterflow alarm devices on wet pipe systems shall be accomplished by opening the inspector s test This section has been revised to correlate with the automated testing revisions made in 4.6. This section has been broken into different requirements for vane type and pressure switch type waterflow alarm devices. 33 Slide 34 Ch. 5: Antifreeze Solutions Where freezing weather conditions or other circumstances prohibit use of the inspector s test connection, the bypass connection shall be permitted to be used Testing of vane-type waterflow alarm devices on wet pipe systems shall be accomplished by a flow of water equivalent to the flow out of the smallest single k-factor sprinkler (or smaller) past the flow switch The flow switch shall be tested by opening the inspector s test connection at a minimum frequency of once every three years Fire pumps shall not be taken out of service during testing unless constantly attended by qualified personnel or all impairment procedures contained in Chapter 15 are followed. This section has been revised to correlate with the automated testing revisions made in 4.6. This section has been broken into different requirements for vane type and pressure switch type waterflow alarm devices. 34 Slide 35 Ch. 5: Antifreeze Solutions 5.3.3* Antifreeze Systems. Annually, before the onset of freezing weather, the antifreeze solution shall be tested using the following procedure: (1) Using the antifreeze information sign required by , installation records, maintenance records, information from the owner, chemical tests, or other reliable sources of information, the type of antifreeze in the system shall be determined and (a) or (b) implemented if necessary: The revision reconfirms the committee s position originating from Tentative Interim Amendment (TIA 1068) issued by the Standards Council on August 9, 2012 but offers further editorial revision to present the various requirements and antifreeze concentrations in a different order, to provide better clarity. 35

13 Slide 36 Ch. 5: Antifreeze Solutions (a) If the antifreeze is found to be a type that is no longer permitted, the system shall be drained completely and the antifreeze replaced with an acceptable solution. (b) If the type of antifreeze cannot be reliably determined, the system shall be drained completely and the antifreeze replaced with an acceptable solution in accordance with Slide 37 Ch. 5: Antifreeze Solutions (2) If the antifreeze is not replaced in accordance with 5.3.3(1)(a) and 5.3.3(1)(b), test samples shall be taken at the top of each system and at the bottom of each system as follows: (a) If the most remote portion of the system is not near the top or the bottom of the system, an additional sample shall be taken at the most remote portion. (b) If the connection to the water supply piping is not near the top or the bottom of the system, an additional sample shall be taken at the connection to the water supply. 37 Slide 38 Ch. 5: Antifreeze Solutions (3) The specific gravity of each solution shall be checked using a hydrometer with a suitable scale or a refractometer having a scale calibrated for the antifreeze solution. (4) If any of the samples exhibits a concentration in excess of what is permitted by , the system shall be emptied and refilled with a new acceptable solution. (5) If a concentration greater than what is currently permitted by was necessary to keep the fluid from freezing, alternative methods for preventing the pipe from freezing shall be employed. 38

14 Slide 39 Ch. 5: Antifreeze Solutions The antifreeze solution shall be tested at its most remote portion and where it interfaces with the wet pipe system Where antifreeze systems have a capacity larger than 150 gal (568 L), tests at one additional point for every 100 gal (379 L) shall be made If the results indicate an incorrect freeze point at any point in the system, the system shall be drained and refilled with new premixed antifreeze. 39 Slide 40 Ch. 5: Antifreeze Solutions For premixed solutions, the manufacturer s instructions shall be permitted to be used with regard to the number of test points and the refill procedure The use of antifreeze solutions shall be in conformity with state and local health regulations * Listed CPVC sprinkler pipe and fittings shall be protected from freezing with glycerine only The use of diethylene, ethylene, or propylene glycols shall be specifically prohibited Except as permitted by and , all antifreeze systems shall utilize listed antifreeze solutions. 40 Slide 41 Ch. 5: Antifreeze Solutions * For systems installed prior to September 30, 2012, listed antifreeze solutions shall not be required until September 30, 2022, where one of the following conditions is met: (1) *The concentration of the antifreeze solution shall be limited to 30 percent propylene glycol by volume or 38 percent glycerine by volume. (2) *Antifreeze systems with concentrations in excess of 30 percent but not more than 40 percent propylene glycol by volume and 38 percent but not more than 50 percent glycerine by volume shall be permitted based upon an approved deterministic risk assessment prepared by a qualified person approved by the authority having jurisdiction. 41

15 Slide 42 Ch. 5: Antifreeze Solutions Newly introduced solutions shall be factory premixed antifreeze solutions (chemically pure or United States Pharmacopeia 96.5 percent) Premixed antifreeze solutions of propylene glycol exceeding 30 percent concentration by volume shall be permitted for use with ESFR sprinklers where the ESFR sprinklers are listed for such use in 42 Slide 43 Ch. 5: Sprinkler Systems * Where replacing residential sprinklers manufactured prior to 2003 that are no longer available from the manufacturer and are installed using a design density less than 0.05 gpm/ft 2 (204 mm/min), a residential sprinkler with an equivalent K-factor ( 5 percent) shall be permitted to be used provided the currently listed coverage area for the replacement sprinkler is not exceeded. 43 This new section has been added because in late 2002, the requirement for a minimum.05 density for listing of residential sprinklers and a minimum.10 density for NFPA 13 systems was added in the 2002 edition of NFPA 13. Prior to this time, there was no minimum density requirement. Many of those sprinklers are no longer manufactured. So when sprinklers need to be replaced, the owner needs an option. Many AHJ's are requiring that the system be recalculated with the new sprinkler listings and this means re-piping large portions of systems. Slide 44 Table5.5.1 Summary of Component Action Requirements Table has been revised to come into harmony with the requirements of NFPA 13 (2016) but only focuses on the NFPA 25 sprinkler replacement aspect of "modifications". This does not pick up modifying sprinkler piping. 44

16 Slide 45 Ch. 6: Standpipe & Hose Systems Table Summary of Standpipe and Hose Systems Inspection, Testing, and Maintenance 45 Reference to testing for hose storage devices has been deleted from the table. NFPA 1962 does not speak to the inspection or testing of standpipe system hose cabinets or hose storage devices such as pin racks or reels. Therefore, inspections for these components should fall under the requirement of Section and since there are no tests prescribed for these components elsewhere, the reference to testing them in Table has been deleted. In regard to Hose Connections, Chapter 13 only deals with the hose connections on pressure reducing valves, so Chapter 6 needs to address all other hose connections. All gauge requirements have been relocated to Ch 13. The references to sections outside of this chapter have been changed to simply reflect the chapter in which the requirement resides as opposed to the specific section. Slide 46 Ch. 6: Standpipe & Hose Systems Inspection, testing, and maintenance activities required by this chapter shall be followed to determine that components are free of corrosion, foreign material, physical damage, tampering, or other conditions that adversely affect system operation. This section has been revised by removing Table from the previous edition by converting the requirements contained in that table to text. This PI also creates consistency in the format of various chapters which do not use tables as the primary method of establishing requirements. [ 46

17 Slide 47 Ch. 6: Standpipe & Hose Systems Common components and valves shall be inspected, tested, and maintained in accordance with Chapter The terminology used to reference the user to chapter 13 for valves and other system components was not all inclusive in previous editions. The NFPA 25 Reformatting Task Group reviewed each chapter and the system components addressed in Chapter 13 and created a revision to consider items such as trim, valve components, FDCs, BFPs and switches to be "common components". Each of the specific system chapters has been reformatted to use this term to provide consistent terminology when referring the user to Chapter 13 for ITM activities for this equipment. Slide 48 Ch. 6: Standpipe & Hose Systems Hose Connections Piping Hose Hose Nozzle Hose Storage Device Cabinet. Each of these sections are a result of removing Table by converting these requirements to text. This also creates consistency in the format of various chapters which do not use tables as the primary method of establishing requirements. 48 Slide 49 Ch. 6: Standpipe & Hose Systems 6.3.1* Flow Tests * A flow test shall be conducted every 5 years on all automatic standpipe systems to verify that the required flow and pressure are available at the hydraulically most remote hose valve outlet(s) while flowing the standpipe system demand Where a flow test of the hydraulically most remote outlet(s) is not practical, the authority having jurisdiction shall be consulted for the appropriate location for the test. During the previous cycle changes made to the testing for standpipe systems resulted in the elimination of testing for Class II standpipe systems. The proposed change reinstates this requirement 49

18 Slide 50 Ch. 6: Standpipe & Hose Systems * Class I and Class III standpipe system demand shall include 500 gpm (1892 L/min) for the most remote standpipe and 250 gpm (946 L/min) for each additional standpipe until the total system demand is simultaneously flowing * The 250 gpm (946 L/min) required from each additional Class I and Class III standpipe shall be allowed to be flowed from the most convenient hose valve on that standpipe. 50 Slide 51 Ch. 6: Standpipe & Hose Systems * Where the 250 gpm (946 L/min) cannot be flowed from each additional Class I and Class III standpipe, the authority having jurisdiction shall determine where the additional flow can be taken Class II standpipe system demand shall include 100 gpm (379 L/min) for the most remote standpipe connection. 51 Slide 52 Table Summary of Private Fire Service Main Inspection, Testing, and Maintenance The table has been revised to change from referencing a specific section, when sending the user outside of Chapter 5, to simply reference the Chapter number and to create consistency throughout the table 52

19 Slide 53 Chapter 7: Private Fire Service Mains Common Components and Valves. Common components and valves shall be inspected, tested, and maintained in accordance with Chapter The terminology used to reference the user to chapter 13 for valves and other system components was not all inclusive in previous editions. The NFPA 25 Reformatting Task Group reviewed each chapter and the system components addressed in Chapter 13 and created a revision to consider items such as trim, valve components, FDCs, BFPs and switches to be "common components". Each of the specific system chapters has been reformatted to use this term to provide consistent terminology when referring the user to Chapter 13 for ITM activities for this equipment. Slide 54 Chapter 7: Private Fire Service Mains Exposed Piping * Mainline Strainers Dry Barrel and Wall Hydrants Wet Barrel Hydrants Monitor Nozzles Hose Houses. Each of these sections have been editorially revised by removing the various tables and converting these requirements to text. This also creates consistency in the format of various chapters which do not use tables as the primary method of establishing requirements. 54 Slide 55 Chapter 7: Private Fire Service Mains 7.3.1* Underground and Exposed Piping Flow Tests. Underground and exposed piping shall be flow tested at minimum 5-year intervals. The previous edition text made this section only apply to piping that serves hydrants. There was no requirement to flow any other systems such as those that only serve individual sprinkler systems, standpipe systems, etc. Therefore, the section has been revised to apply to all private fire service mains. 55

20 Slide 56 Chapter 8: Fire Pumps * The minimum frequency of inspection, testing, and maintenance shall be in accordance with the manufacturer s recommendations and Table Table Summary of Fire Pump Inspection, Testing, and Maintenance Table is now a combination of two tables from the previous edition. The revisions are intended to eliminate confusion between NFPA 25 requirements and manufacturer s recommendations. Numerous subsections were added to in order to maintain specific code language related to the frequencies specified in the Table. 56 Slide 57 Chapter 8: Fire Pumps Common Components and Valves. Common components and valves shall be inspected, tested, and maintained in accordance with Chapter Slide 58 Chapter 8: Fire Pumps 8.2.2* The pertinent visual observations specified in the following checklists shall be performed weekly: (1) Pump house conditions are determined as follows: (a) Heat is adequate, not less than 40 F (4.0 C) for pump room with electric motor or diesel engine driven pumps with engine heaters. (b) Heat is adequate, not less than 70 F (21 C) for pump room with diesel engine driven pumps without engine heaters. (c) Ventilating louvers are free to operate. (d) Excessive water does not collect on the floor. (e) Coupling guard is in place Electric driven fire pumps are now referenced under 8.2.2(1)(a) to correct an oversight. Items (d) and (e) were added under sub-part (1) to include important aspects of a pump house inspection. Item (g) under sub-part (2) was revised to include more complete check of valves that can effect pump conditions. 58

21 Slide 59 Chapter 8: Fire Pumps (2) Pump system conditions are determined as follows: (a) Pump suction and discharge and bypass valves are fully open. (b) Piping is free of leaks. (c) Suction line pressure gauge reading is within acceptable range. (d) System line pressure gauge reading is within acceptable range. (e) Suction reservoir has the required water level. (f) Wet pit suction screens are unobstructed and in place. (g) Waterflow test valves are in the closed position, the hose connection valve is closed, and the line to test valves is free of water. Item (g) under sub-part (2) was revised to include more complete check of valves that can effect pump conditions. 59 Slide 60 Chapter 8: Fire Pumps * A no-flow test shall be conducted for diesel engine driven fire pumps on a test frequency in accordance with or * A no-flow test shall be conducted for electric motor driven fire pumps on a test frequency in accordance with , , , or The requirements that the no-flow test be conducted without recirculating water back to the pump suction has been removed from both these section. Requiring that the churn test be performed without recirculating water back to suction doesn't allow for pumps to be tested they way they're installed. If the pump was installed before recirculating was disallowed there may be a relief valve piped back to suction. It's unreasonable to close the relief valve during the churn test and then have to reopen it and adjust the relief pressure after the test. Slide 61 Chapter 8: Fire Pumps The term high-rise was removed from item (1) because it is not defined in the standard Except as permitted in and , a weekly test frequency shall be required for the following electric fire pumps: (1) Fire pumps that serve fire protection systems in buildings that are beyond the pumping capacity of the fire department (2) Fire pumps with limited service controllers (3) Vertical turbine fire pumps (4) Fire pumps taking suction from ground level tanks or a water source that does not provide sufficient pressure to be of material value without the pump 61

22 Slide 62 Chapter 8: Fire Pumps 8.3.2* No-Flow Test A no-flow test of fire pump assemblies shall be conducted in accordance with Except as permitted in and , a main pressure relief valve (where installed) shall be permitted to weep but not discharge a significant quantity of water Except as required in , the circulation relief valve shall discharge a small flow of water The circulation relief valve shall not operate when the flow through the main pressure relief valve is greater than weeping. Additional language was provided to address the operation of pressure relief valve on positive displacement pumps and excessive flows through pressure relief valves. 62 Slide 63 Chapter 8: Fire Pumps For fire pump installations that were installed under a standard (1993 and earlier editions of NFPA 20) that did not prohibit a design that required operation of a pressure relief valve to keep the discharge pressure below the rating of the system components, the pressure relief valve shall be permitted to operate as designed during a no-flow test * The pressure readings on the discharge and suction gauges shall be recorded, and a pressure difference that is greater than 95 percent of the rated pump pressure shall be investigated and corrected. 63 Slide 64 Chapter 8: Fire Pumps * The discharge temperature of the water shall be monitored and the pump shut down if necessary to prevent exposing the pump and/or driver to excessive temperatures For positive displacement pumps, the pressure relief valve shall operate during a no-flow test Where the pressure relief valve is piped back to suction, the pump circulation relief valve shall not operate On electric motor and radiator cooled engine drives, a circulation pressure relief valve located downstream of the main pressure relief valve shall discharge sufficient water to prevent overheating of the pump. 64

23 Slide 65 Chapter 8: Fire Pumps Test Equipment Voltage and amperage readings on fire pump controllers that meet the following criteria shall be permitted in lieu of calibrated voltage and/or amperage meters: (1) The fire pump controller shall have been factory calibrated and adjusted to 3 percent. (2) The voltage reading shall be within 5 percent of the rated voltage Except as permitted in , calibrated test equipment shall be provided to determine net pump pressures, rate of flow through the pump, volts and ampere, and speed. New section on test equipment has been added to include calibration requirements for conducting the annual fire pump flow test. 65 Slide 66 Chapter 8: Fire Pumps Calibrated gauges, transducers, and other devices used for measurement during the test shall be used and bear a label with the latest date of calibration Gauges, transducers, and other devices, with the exception of flow meters, used for measurement during the test shall be calibrated a minimum of annually to an accuracy level of 1 percent Flow meters shall be calibrated annually to an accuracy level of 3 percent. 66 Slide 67 Chapter 8: Fire Pumps The annual test shall be conducted as follows: (1) The arrangement described in or shall be used at a minimum of every third year. (2) *The arrangement described in shall be permitted to be used two out of every three years. The test arrangements of have been restructured for clarity. This section has been added to explicitly state the intent to ensure that there is adequate water supply at the suction flange at least every 3 years. 67

24 Slide 68 Chapter 8: Fire Pumps For installations having an automatic transfer switch, the following test shall be performed to ensure that the overcurrent protective devices (i.e., fuses or circuit breakers) do not open: (1) Simulate a power failure condition while the pump is operating at peak load. (2) Verify that the transfer switch transfers power to the alternate power source. (3) While the pump is operating at peak load and alternate power, record the voltage, amperage, rpm, suction pressure, discharge pressure, and flow rate and include in the pump test results. (4) Verify that the pump continues to perform at peak horsepower load on the alternate power source for a minimum of 2 minutes. (5) Remove the power failure condition and verify that, after a time delay, the pump is reconnected to the normal power source. The test of the alternate power source at peak horsepower in item (4) was reduced to 2 minutes. While a full load test is preferable, an extended churn test is acceptable to reduce water usage. 68 Slide 69 Chapter 8: Fire Pumps Alarm conditions that require the controller to be opened in order to create or simulate the condition shall be tested by qualified personnel wearing appropriate protective equipment. New requirement was added recognizing the hazard associated with working on pump controllers, and defines that the test can be conducted with minimal risk by a licensed electrician in protective gea 69 Slide 70 Chapter 8: Fire Pumps Where utilized, fuel additives shall be used and maintained in accordance with the active fuel maintenance system manufacturer s recommendations. Previous language could have been read to require that fuel additives are always needed. The section has been revised to clarify that this is not the case but that when they are used that must be used and maintained properly 70

25 Slide 71 Chapter 8: Fire Pumps 8.4 Reports * A complete written report of the fire pump test results shall be prepared for and retained by the owner As a minimum, the report shall contain the following information: (1) All raw data necessary for a complete evaluation of the fire pump performance, including suction and discharge pressures, voltage and amperage readings, and pump speed at each flow rate tested (2) The fire protection system demand as furnished by the owner (3) Pump performance, whether satisfactory or unsatisfactory (4) Deficiencies noted during the testing and identified during analysis, with recommendations to address deficiencies as appropriate (5) Manufacturer s performance data, actual performance, and the available pump discharge curves required by this standard (6) Time delay intervals associated with the pump s starting, stopping, and energy source transfer (7) Where applicable, comparison with previous test results 71 Section was revised to specify minimum information that must be provided in reports. An annex note was added which includes a sample annual centrifugal pump test form Slide 72 Table Summary of Component Action Requirements Requirements to perform a 1-hr full load current test were revised within the table to require operating the pump for a minimum of one hour. A full load test for one-hour requires flowing 150% of rated flow for one-hour. NFPA 20 requires the pump to run for one-hour but it does not have to be under full load the entire time. The changes are consistent with NFPA 20 requiremen 72 Slide 73 Chapter 9: Water Storage Tanks The table was revised to indicate that it only steel tanks without corrosion protection that need to be inspected every 3 years and that it is all other tanks that have a 5 year frequency. This is consistent with the text of Chapter 9. 73

26 Slide 74 Chapter 9: Water Storage Tanks Common Components and Valves. Common components and valves shall be inspected, tested, and maintained in accordance with Chapter The terminology used to reference the user to chapter 13 for valves and other system components was not all inclusive in previous editions. The NFPA 25 Reformatting Task Group reviewed each chapter and the system components addressed in Chapter 13 and created a revision to consider items such as trim, valve components, FDCs, BFPs and switches to be "common components". Each of the specific system chapters has been reformatted to use this term to provide consistent terminology when referring the user to Chapter 13 for ITM activities for this equipment. Slide 75 Chapter 9: Water Storage Tanks Water Level * The water level in tanks equipped with supervised water level alarms that are supervised in accordance with NFPA 72 shall be inspected quarterly The water level in tanks not equipped with supervised water level alarms connected to a constantly attended location shall be inspected monthly. All tank inspection frequencies have been revised to quarterly where the components are supervised in accordance with NFPA 72. All frequencies for components not supervised in accordance with NFPA 72 have remained unchanged. 75 Slide 76 Chapter 9: Water Storage Tanks Heating System Tank heating systems installed on tanks equipped with low water temperature alarms supervised in accordance with NFPA 72, connected to a constantly attended location shall be inspected quarterly during the heating season Tank heating systems without a supervised low temperature alarm connected to a constantly attended location shall be inspected daily during the heating season. Section was revised to indicate that the inspections are only required during heating season, similar to what said in previous editions. 76

27 Slide 77 Chapter 9: Water Storage Tanks Water Temperature The temperature of water in tanks shall not be less than 40 F (4.0 C) The temperature of water in tanks with low temperature alarms supervised in accordance with NFPA 72, connected to a constantly attended location shall be inspected and recorded quarterly during the heating season when the mean temperature is less than 40 F (4.0 C) The temperature of water in tanks without low temperature alarms connected to a constantly attended location shall be inspected and recorded weekly during the heating season when the mean temperature is less than 40 F (4.0 C). 77 Slide 78 Chapter 9: Water Storage Tanks 9.3.3* Low water temperature signals, where provided, shall be tested prior to the heating season * High water temperature limit switches on tank heating systems, where provided, shall be tested prior to the heating season * High and low water level signals shall be tested annually. These tests have been changed from monthly (during cold weather) to annual tests. This change was made to be consistent with the NFPA 72 action to change all electrically connected water-based fire protection system initiating device supervisory alarm switches on an annual frequency. 78 Slide 79 Chapter 10: Water Spray Fixed Systems 79 Inspection frequencies of fittings were aligned with that for the associated pipe and to align the inspection of pipe supports with that for the associated hangers. Frequencies for inspecting rubber gasket fittings were revised to annually. Since the water-spray nozzles are only inspected annually, there is no reason to look at the gasketed fittings more often. Flushing was removed from the table because it is generally not part of the operational test of water spray fixed systems and the code reference was unclear.

28 Slide 80 Chapter 10: Water Spray Fixed Systems Common Components and Valves. Common components and valves shall be inspected, tested, and maintained in accordance with Chapter The terminology used to reference the user to chapter 13 for valves and other system components was not all inclusive in previous editions. The NFPA 25 Reformatting Task Group reviewed each chapter and the system components addressed in Chapter 13 and created a revision to consider items such as trim, valve components, FDCs, BFPs and switches to be "common components". Each of the specific system chapters has been reformatted to use this term to provide consistent terminology when referring the user to Chapter 13 for ITM activities for this equipment. ] Slide 81 Chapter 10: Water Spray Fixed Systems * Piping and Fittings. System piping and fittings shall be inspected for the following: (1) Mechanical damage (e.g., broken piping or cracked fittings) (2) External conditions (e.g., missing or damaged paint or coatings, rust, and corrosion) (3) Misalignment or trapped sections (4) Condition of low-point drains (automatic or manual) (5) Protection for rubber-gasketed fittings This section was revised to clarify that the intent of section item (4) is to inspect the condition of any installed low-point drains. As previously written this was not clear. Additionally, the protection of gaskets has been clarified and the intent would be consistent with the requirements of NFPA Slide 82 Chapter 10: Water Spray Fixed Systems * Hangers, Braces, and Supports. Hangers, braces, and supports shall be inspected for the following and repaired or replaced as necessary: (1) Condition (e.g., missing or damaged paint or coating, rust, and corrosion) (2) Secure attachment to structural supports and piping (3) Damaged or missing hangers, braces, and supports Braces have been added to this section. The inspection of seismic braces is required for sprinkler systems in Chapter 5 and should also be required for water spray systems. 82

29 Slide 83 Chapter 11: Foam-Water Systems References in the table have been revised to shift the ITM requirements for waterflow devices to Chapter 13. A new row for Gauges has been added because, as with all water-based systems, gauges should be inspected regularly, but were previously omitted from this table. 83 Slide 84 Chapter 11: Foam-Water Systems Other System Components. Fire pumps, water storage tanks, common components, and valves common to other types of waterbased fire protection systems shall be inspected, tested, and maintained in accordance with Chapters 8, 9, and 13, respectively, and as specified in Table The terminology used to reference the user to chapter 13 for valves and other system components was not all inclusive in previous editions. The NFPA 25 Reformatting Task Group reviewed each chapter and the system components addressed in Chapter 13 and created a revision to consider items such as trim, valve components, FDCs, BFPs and switches to be "common components". Each of the specific system chapters has been reformatted to use this term to provide consistent terminology when referring the user to Chapter 13 for ITM activities for this equipment. Slide 85 Chapter 11: Foam-Water Systems If during routine inspection and testing the foam-water sprinkler system is determined to have been altered or replaced (e.g., equipment replaced, relocated, or foam concentrate replaced), it shall be determined whether the system operates properly. Requirement that the inspector determine if the design intent has been altered has been removed from this section because the inspector is typically not qualified to determine whether the design intent has been altered and whether the system operates properly. 85

30 Slide 86 Chapter 11: Foam-Water Systems Hangers, Braces, and Supports. Hangers, braces, and supports shall be inspected for the following and repaired or replaced as necessary: (1) Condition (e.g., missing or damaged paint or coating, rust, and corrosion) (2) Secure attachment to structural supports and piping (3) Damaged or missing hangers, braces, and supports Braces have been added to this section. The inspection of seismic braces is required for sprinkler systems in Chapter 5 and should also be required for foam-water systems. 86 Slide 87 Chapter 11: Foam-Water Systems Strainers Mainline and individual discharge device strainers (basket or screen) shall be inspected every 5 years for damaged and corroded parts Other maintenance intervals shall be permitted, depending on the results of the visual inspection and operating tests Discharge device strainers shall be removed, inspected, and cleaned during the flushing procedure for the mainline strainer Foam concentrate strainers shall be inspected visually to ensure the blowdown valve is closed and plugged Baskets or screens shall be removed and inspected after each operation or flow test. The requirements for the ITM of strainers has been directly inserted into Chapter rather than referencing to Chapter 10. This is consistent with Chapters 7, 9 and Slide 88 Chapter 11: Foam-Water Systems It shall be permissible to test the full flow discharge from foam-water deluge systems using water only in lieu of foam. This new section is intended to simplify the annual full flow testing requirements for foam-water systems when discharging foam would be undesirable or impractical. 88

31 Slide 89 Chapter 11: Foam-Water Systems During the operational test, a foam sample shall be taken Where approved by the authority having jurisdiction, simulated foam concentrates or alternative test systems shall be permitted to be substituted for actual foam concentrate, but system pressures and flows shall remain as described above and meet manufacturer s system requirements and recommendations. [16: ] The testing requirements for foam water systems have been revised to allow for alternative methods to test the foam concentration level during the annual operational test. Some of the text was changed to use consistent terminology. The alternative method allowed by new is extracted from NFPA Slide 90 Chapter 12: Water Mist Systems Common Components and Valves. Common components and valves shall be inspected, tested, and maintained in accordance with Chapter This section has been added to consolidate several other sections that previously were located, inappropriately, in different location of the chapter. The terminology used to reference the user to chapter 13 for valves and other system components was not all inclusive in previous editions. The NFPA 25 Reformatting Task Group reviewed each chapter and the system components addressed in Chapter 13 and created a revision to consider items such as trim, valve components, FDCs, BFPs and switches to be "common components". Each of the specific system chapters has been reformatted to use this term to provide consistent terminology when referring the user to Chapter 13 for ITM activities for this equipment. Slide This chapter shall provide the minimum requirements for the routine inspection, testing, and maintenance of common components and valves. 91 The title of Chapter 13 has been revised since the chapter addresses common components that are not part of the valve or trim, such as BFPs and FDCs. The terminology used to reference the user to chapter 13 for valves and other system components was not all inclusive in previous editions. The NFPA 25 Reformatting Task Group reviewed each chapter and the system components addressed in Chapter 13 and created a revision to consider items such as trim, valve components, FDCs, BFPs and switches to be "common components". Each of the specific system chapters has been reformatted to use this term to provide consistent terminology when referring the user to Chapter 13 for ITM activities for this equipment.

32 Slide 92 To be consistent with the NFPA 72 inspection, testing and maintenance, all electrically connected water-based fire protection system initiating device supervisory alarm switches (control valve, air pressure, room temperature, water level and water temperature) to an annual frequency. 92 All of the gauge requirements have been relocated to section A row has been added to address the valve status test required by Because the deluge and preaction valve requirements were separated into two sections, the requirements in the table were also separated into two headings Slide 93 Care shall be taken to minimize any water damage caused by the water discharged during a test. Language has been modified to clarify that minimizing water damage is the important consideration of this requirement. Previous language focused on verifying proper drainage was provided. While new section makes this an owner responsibility this section makes the ITM service provider aware that responsibility is shared in practice Know where the water will flow before opening any valves or flowing any water! Slide 94 Waterflow Alarm Devices Mechanical Waterflow Alarm Devices, Including but not Limited to Water Motor Gongs Mechanical waterflow alarm devices shall be inspected quarterly to verify that they are free of physical damage Mechanical waterflow alarm devices shall be tested quarterly * 94 Waterflow alarm devices are installed on most of the waterbased systems covered by NFPA 25. Each chapter now refers to Chapter 13 for ITM requirements. Various chapters had handled these requirements in a different manner. The requirements have now been consolidated here in order to keep consistency. Additionally, alternative means of testing waterflow switches have been developed that do not introduce new or discharge existing water. If these alternative methods of testing are consistent with the automated testing requirements, they are now permitted.

33 Slide 95 Vane-type, Paddle-type, and Pressure Switch type Waterflow Devices Vane-type, paddle-type, and pressure switch-type waterflow alarm devices shall be inspected quarterly to verify that they are free of physical damage Vane-type, paddle-type, and pressure switch-type waterflow alarm devices shall be tested semiannually Testing waterflow alarm devices on wet pipe systems shall be accomplished by opening the inspector's test valve or by using the automated test equipment in accordance with Where freezing weather conditions or other circumstances prohibits the use of the inspector's test valve, the bypass connection shall be permitted to be used Fire pumps shall not be taken out of service during testing unless constantly attended by qualified personnel, or all impairment procedures contained in Chapter 15 are followed * Testing waterflow alarm devices on dry pipe, preaction, or deluge systems shall be accomplished by using the bypass connection Slide 96 Gauges * Inspections * Gauges shall be inspected monthly to verify that the gauge is operable and not physically damaged Gauges monitoring water pressure shall be inspected quarterly to verify that normal water supply pressure is being maintained Gauges monitoring air or nitrogen pressure shall be inspected monthly to verify that normal air or nitrogen pressure are being maintained The gauge on the quick-opening device, if provided, shall indicate the same pressure as the gauge on the system side of the dry pipe valve Where air pressure supervision is connected to a constantly attended location, gauges shall be inspected quarterly As a component common across all systems, all references to gauges have been relocated to Chapter 13. This will aid in the application and use of the standard. The references to gauges that have historically been associated with an individual system have been removed from the individual system chapters (CH 5-12) and relocated/modified here. See SR 59 for the global revision that deleted the various sections throughout the standard. The requirement in has been revised to delete term "in good condition" which has been revised to operable and not physically damaged in order to make the provision more specific and enforceable. Slide * For dry pipe or preaction systems protecting freezers with an air pressure gauge(s) on the air line(s) between the compressor and the dry pipe or preaction valve, the air pressure gauge near the compressor shall be compared monthly to the pressure gauge above the dry pipe or preaction valve When the gauge near the compressor is reading higher than the gauge near the dry pipe valve, the air line in service shall be taken out of service and the alternate air line shall be opened to equalize the pressure An air line taken out of service in accordance with shall be internally inspected, removed of all ice blockage, and reassembled for use as a future alternate air line * Gauges shall be replaced every 5 years or tested every 5 years by comparison with a calibrated gauge Gauges not accurate to within 3 percent of the full scale shall be recalibrated or replaced. 97

34 Slide 98 This new section has been added because Table (and others) direct the user to Chapter 13 for the ITM of Supervisory Signal Devices (except valve supervisory Supervisory Signal Devices (except valve supervisory switches). switches), but the only comparable requirements previously Supervisory signal devices shall be inspected quarterly to verify that they are free of physical found in Chapter 13 were specific to only low pressure damage. switch testing for dry and preaction systems. This revision Supervisory signal devices shall be tested annually in accordance with the manufacturer s adds general requirements pertaining to other supervisory instructions. devices (ie. wet pipe system low or high pressure switches, etc.) Slide Valves that are electrically supervised shall be permitted to be inspected quarterly. This section has been added to allow for quarterly inspections where electric supervision is provided. This provides consistency with other inspections and tests. This change is intended to improve application and compliance with the standard. 99 Slide * A valve status test shall be conducted any time the control valve is closed and reopened at system riser. 100 The language has been revised to require a valve status test as opposed to a main drain test as was previously required. There are a number of ways in which a test can be conducted to ensure the valve has been reopened. Requiring a full main drain test on all systems annually would negate the allowance provided in the 2014 edition for a single main drain test for the water supply serving multiple systems, including every floor of a multi-story building with floor control valve assemblies.

35 Slide 101 Alarm valves and system riser check valves shall be externally inspected quarterly and shall verify the following: (1) The gauges indicate normal supply water pressure is being maintained. (2) The valves and trim are free of physical damage. (3) All valves are in the appropriate open or closed position. (4) The retarding chamber or alarm drains are not leaking. The frequency for inspection has been revised to quarterly rather than monthly, as was previously required. This change was made because damage is a rare event and failure is typically open. Additionally, item (2) was revised to specify that the trim is also intended to be inspected for physical damage * 101 Slide 102 Inspection. Valves shall be inspected internally every 5 years to verify that all of the valve s components operate correctly. The term in good condition was deleted to make the requirement more enforceable Slide Preaction Valves Deluge Valves. Section previously contained requirements for both preaction and deluge systems. These are different system types with distinctly different ITM activities. Therefore, they have been separated into two sections to make the standard easier to follow. 103 Additionally, when the requirements for preaction valves and deluge valves were split into two sections, there were a number of items related to the deluge valve trip testing that needed correction or clarification.

36 Slide 104 Records of dry pipe valve tripping time and water transit delivery time to the inspector's test connection shall be maintained for full flow trip tests Water transit delivery time has been added to this section. The full flow trip test methodology described in the annex and in the handbook suggest that two people should conduct this test so that both the valve trip test time and the water transit time are observed. While there is no pass/fail criteria for water transit time, longer transit times are an indicator of internal condition problems and should be recorded for comparison to past results. The previous requirement to only maintain the dry pipe valve trip test time encouraged the test to be performed by a single person. This change reinforces the need to observe both functions. Slide 105 Low air pressure alarms, if provided, shall be tested annually in accordance with the manufacturer s instructions. To be consistent with the NFPA 72 inspection, testing and maintenance, all electrically connected water-based fire protection system initiating device supervisory alarm switches have been changed to an annual frequency * 105 Slide 106 All valves shall be inspected quarterly to verify that the valves are in the following condition: (1) In the open position (2) Not leaking (3) Maintaining downstream pressures in accordance with the design criteria (4) Handwheels installed and unbroken The term "in good condition" has been deleted from item (4) to make the requirement more enforceable

37 Slide 107 Devices shall be inspected weekly to verify that the devices are in the following condition: (1) *Normal downstream pressures are maintained. (2) Normal supply pressure is maintained. (3) Devices and associated trim components are free of physical damage and are not leaking Requirement that devices be "in good condition" has been deleted to make the requirement more enforceable. Previous text that required checking the supply pressure being in accordance with the design criteria was revised to be an inspection that normal supply pressure is being maintained. It is not practical to expect that an ITM inspector knows the design criteria to which the pressure regulating device was set for. Additionally, item (3) was revised to ensure that the various trim components such as relief valves and the pressure gauges are also checked. Slide 108 Fire department connections shall be inspected quarterly to verify the following: (1) Fire department connections are visible and accessible. (2) Couplings or swivels are not damaged and rotate smoothly. (3) Plugs or caps are in place and undamaged. (4) Gaskets are in place. (5) Identification signs are in place. (6) Check valve is not leaking. (7) Automatic drain valve is in place and operating properly. (8) Fire department connection clapper(s) is in place and operating properly. (9) *Interior of the connection is inspected for obstructions. (10) Visible piping supplying the fire department connection is undamaged Item (10) has been added to require inspection of the piping supplying the FDC. Fire department connections are frequently located in areas that are subject to vehicular or other damage. This section of piping may not be under pressure as the check valve could be located back at the riser leaving a large length of piping unpressurized and without a visual indication (leak) if the pipe suplying the FDC has been compromised by a vehicle or other incident. A quick visual inspection of the piping will assist in determining if the piping supplying the FDC has been damaged rather than waiting for the five year pressure test. Additionally, the term "in good condition" has been deleted from item (4) to make the requirements more enforceable. Slide 109 Interior inspections shall be conducted annually if approved locking caps or locking plugs are installed. This has been added to extend the frequency from quarterly to annually where approved locking caps or locking plugs are installed. The presence of a locking cap on the FDC reduces the need for frequent interior inspections. This only applies to interior inspection. The caps or plugs do not protect the exterior of the connection from vehicular damage or other hazards

Quick Guide for Fire Sprinkler Inspection Requirements Key Deficiencies with NFPA References NFPA & NFPA 13/

Quick Guide for Fire Sprinkler Inspection Requirements Key Deficiencies with NFPA References NFPA & NFPA 13/ Quick Guide for Fire Sprinkler Inspection Requirements Key Deficiencies with NFPA References NFPA 25 2017 & NFPA 13/72 2016 The purpose of this guide is to help you determine if the system will work as

More information

MAINTENANCE AND TESTING OF FIRE SPRINKLER SYSTEMS

MAINTENANCE AND TESTING OF FIRE SPRINKLER SYSTEMS MAINTENANCE AND TESTING OF FIRE SPRINKLER SYSTEMS Introduction When properly installed and maintained, automatic fire sprinkler systems have proven to be the most effective means for protecting life and

More information

Module 3. Water-Based Suppression Systems (WBSS) Part II: Highlights of Code Requirements

Module 3. Water-Based Suppression Systems (WBSS) Part II: Highlights of Code Requirements Module 3 Water-Based Suppression Systems (WBSS) Part II: Highlights of Code Requirements 1 WATER-BASED SUPPRESSION SYSTEMS-PART TWO This module covers: 1. Ohio Building Code requirements and when and why

More information

2-SUPPRESSION REQUIREMENTS - CODE REQUIRED INSPECTIONS TEST Page 1 of 7

2-SUPPRESSION REQUIREMENTS - CODE REQUIRED INSPECTIONS TEST Page 1 of 7 WET SPRINKLER Monthly Wet Sprinkler 2-SUPPRESSION REQUIREMENTS - CODE REQUIRED INSPECTIONS TEST Page 1 of 7 VISUALS [per NFPA 25-1998 ed] 1. Gauge (Ck for Condition, Normal Pressure) [per 2-2.4.1] 2. Valves

More information

Service Requirements SEMI- ANNUAL ANNUALLY OTHER REF. REQUIREMENT

Service Requirements SEMI- ANNUAL ANNUALLY OTHER REF. REQUIREMENT 58 Fire protection equipment requires care and maintenance at scheduled intervals to assure it will operate properly and safely when needed. Only personnel who are trained and qualified to maintain the

More information

False Sense of Security???

False Sense of Security??? IS YOUR SPRINKLER SYSTEM GIVING YOU A FALSE SENSE OF SECURITY? Best Practices in Fire Safety An ASSE Virtual Symposium March 1 & 2, 2011 Walter S. Beattie CSP, CFPS, CSHM False Sense of Security??? Fire

More information

NFPA 25 and the Influence of Liability

NFPA 25 and the Influence of Liability NFPA 25 and the Influence of Liability NFPA 25 Summit Addison, IL Northern Illinois Fire Sprinkler Advisory Board/ Illinois Fire Inspectors Association Date: Speaker: July 28, 2017 Michael J Bosma Meet

More information

Koffel Associates, Inc.

Koffel Associates, Inc. NFPA 25: STANDARD FOR THE INSPECTION, TESTING, AND MAINTENANCE OF WATER BASED FIRE PROTECTION SYSTEMS William E. Koffel, P.E., FSFPE President Koffel Associates, Inc. www.koffel.com wkoffel@koffel.com

More information

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST July 1, 2010 SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST FIRE PUMP REVIEW Address: Permit #: Inspector: Date: Status: Inspector: Date: Status: A-Approved; AC-Approved w/comments;

More information

Second Revision No. 20-NFPA [ Section No. 1.4 ] Supplemental Information. Submitter Information Verification. Committee Statement

Second Revision No. 20-NFPA [ Section No. 1.4 ] Supplemental Information. Submitter Information Verification. Committee Statement Second Revision No. 20-NFPA 14-2015 [ Section No. 1.4 ] 1.4* Equivalency. Nothing in this standard is intended to prevent the use of systems, methods, or devices of equivalent or superior quality, strength,

More information

AUTOMATIC FIRE SPRINKLER SYSTEMS

AUTOMATIC FIRE SPRINKLER SYSTEMS MCKINNEY FIRE DEPARTMENT FIRE MARSHAL S OFFICE AUTOMATIC FIRE SPRINKLER SYSTEMS These guidelines are to be followed when a business, facility or organization installs an automatic fire sprinkler system

More information

System Test Report CLEAN AGENT

System Test Report CLEAN AGENT City of Black Hawk Fire Department 196 Clear Creek Street PO Box 68 Black Hawk, CO 80422-068 Office 303-582-0426 Fax 303-582-2229 www.cityofblackhawk.org System Test Report CLEAN AGENT Occupancy Information

More information

Understanding, Applying and Enforcing NFPA 25. James D. Lake NFSA Director of Training

Understanding, Applying and Enforcing NFPA 25. James D. Lake NFSA Director of Training Understanding, Applying and Enforcing NFPA 25 James D. Lake NFSA Director of Training When Sprinklers Are Ineffective Water did not reach fire 8% 7% 7% 5% 44% Not enough water released Damaged Component

More information

APPENDIX H (DESIGN SUBMISSION CRITERIA)

APPENDIX H (DESIGN SUBMISSION CRITERIA) APPENDIX H (DESIGN SUBMISSION CRITERIA) FIRE ALARM SYSTEM As per ACCORD standard Part 5, section 5.7 Fire Alarm System Design to be verified by ACCORD Chief Safety Inspector. Testing of the installation

More information

Inspection and Testing of Water-Based Systems

Inspection and Testing of Water-Based Systems Inspection and Testing of Water-Based Systems Standard Model/Computer-Based Testing Level II Content Outline The candidate for NICET certification at Level II in the Inspection and Testing of Water- Based

More information

Owner/Operator Guide for Successful Sprinkler and Fire Pump Systems

Owner/Operator Guide for Successful Sprinkler and Fire Pump Systems Owner/Operator Guide for Successful Sprinkler and Fire Pump Systems Adam Olomon, P.E. Associate Consultant Fire & Life Safety and Fire Protection Introduction Adam Olomon Licensed Professional Engineer

More information

Annual Water-Based Fire Protection Systems Inspection

Annual Water-Based Fire Protection Systems Inspection Annual Water-Based Fire Protection Systems Inspection 2425 Amann Drive Belleville, IL 62220 www.boyerfire.com Phone: 618-222-1500 Fax: 618-222-1502 Inspector: Steve Love Inspection date: 04/03/17 Inspection

More information

NFPA Edition Update

NFPA Edition Update NFPA 13 2013 Edition Update Session Agenda A2012 Code Cycle NFPA 13 Code Development Changes to NFPA 13 (NFPA 24) What Didn t Happen Next Steps 2 A2012 Code Cycle 800+ Proposal 500+ Comments TCC Meeting

More information

Fire Prevention Coffee Break Training. May 2017

Fire Prevention Coffee Break Training. May 2017 Fire Prevention Coffee Break Training May 2017 Agenda Introduction Submittals - Phelan Changes to NFPA 13 - Phelan Questions and Answers Open Forum Please welcome our S ummer Intern Charlie Poppe Small

More information

Annual Report of Inspection, Testing & Maintenance of Automatic Sprinkler System

Annual Report of Inspection, Testing & Maintenance of Automatic Sprinkler System Annual Report of Inspection, Testing & Maintenance of Automatic Sprinkler System Building/Business Name: Address of Property: Inspector Name: Joe Price THE CORNERSTONE 1425 NE 7TH AVENUE PORTLAND OR Date

More information

Fire Protection System Contractors and Systems. Submission of the Application for a Water-Based Fire Protection Inspector

Fire Protection System Contractors and Systems. Submission of the Application for a Water-Based Fire Protection Inspector NOTICE OF PROPOSED RULE DEVELOPMENT DEPARTMENT OF FINANCIAL SERVICES DIVISION OF STATE FIRE MARSHAL RULE CHAPTER: 69A-46, F.A.C. RULE: 69A-46.0165, F.A.C. RULE CHAPTER TITLE: Fire Protection System Contractors

More information

2015 National Fuel Gas Code Summary List of Revisions Updated: 04/24/14

2015 National Fuel Gas Code Summary List of Revisions Updated: 04/24/14 The following list contains a summary of the significant revisions in the 2015 National Fuel Gas Code approved by the National Fuel Gas Code Committee, ANSI ASC Z223 and NFPA 54. PIPING Various Brass REVISED

More information

D. The work addressed in this section consists of a fire protection system, which may include coordination with one or more of the following:

D. The work addressed in this section consists of a fire protection system, which may include coordination with one or more of the following: PART 1 GENERAL 1.01 Scope of Standard A. This standard provides general requirements of Sam Houston State University for the design and construction of standpipe systems to include combination standpipe

More information

Fire Protection System Contractors and Systems. Submission of the Application for a Water-Based Fire Protection Inspector Permit

Fire Protection System Contractors and Systems. Submission of the Application for a Water-Based Fire Protection Inspector Permit NOTICE OF PROPOSED RULE DEPARTMENT OF FINANCIAL SERVICES DIVISION OF STATE FIRE MARSHAL RULE CHAPTER: RULE CHAPTER TITLE: 69A-46, F.A.C. Fire Protection System Contractors and Systems RULE: RULE TITLE:

More information

The Antifreeze Fire Sprinkler System Dilemma Eliminating One Issue has Opened the Door to Another. Jennifer Poynter, Esq. Charles B.

The Antifreeze Fire Sprinkler System Dilemma Eliminating One Issue has Opened the Door to Another. Jennifer Poynter, Esq. Charles B. The Antifreeze Fire Sprinkler System Dilemma Eliminating One Issue has Opened the Door to Another Jennifer Poynter, Esq. Charles B. Sullivan Wide Spread Impact of Code Changes Based on information available

More information

FIRE SPRINKLER SYSTEMS POLICY

FIRE SPRINKLER SYSTEMS POLICY FIRE SPRINKLER SYSTEMS POLICY Revised 1/1/17 DESIGN AND SUBMITTAL REQUIREMENTS All new and existing fire sprinkler systems within the jurisdiction of the City Fire Department shall meet all of the applicable

More information

Chapter 4: Fire Protection Systems

Chapter 4: Fire Protection Systems Chapter 4: Fire Protection Systems Automatic Extinguishing Systems (Fire Sprinklers) One of the most important aspects of a storage warehouse inspection is ensuring that the automatic extinguishing system

More information

CHAPTER 61G15-32 RESPONSIBILITY RULES OF PROFESSIONAL ENGINEERS CONCERNING THE DESIGN OF FIRE PROTECTION SYSTEMS

CHAPTER 61G15-32 RESPONSIBILITY RULES OF PROFESSIONAL ENGINEERS CONCERNING THE DESIGN OF FIRE PROTECTION SYSTEMS CHAPTER 61G15-32 RESPONSIBILITY RULES OF PROFESSIONAL ENGINEERS CONCERNING THE DESIGN OF FIRE PROTECTION SYSTEMS 61G15-32.001 61G15-32.002 61G15-32.003 61G15-32.004 61G15-32.005 61G15-32.006 61G15-32.007

More information

Design & Construction Standards, Revised January

Design & Construction Standards, Revised January PART 1 GENERAL 1.01 Scope of Standard A. This standard provides general requirements of The University of Texas at Austin for the design and construction of standpipe systems to include combination standpipe

More information

ADDENDUM #1 ITB# Fire Protection Maintenance Services Responses to Clarification Questions 10/06/2015

ADDENDUM #1 ITB# Fire Protection Maintenance Services Responses to Clarification Questions 10/06/2015 ADDENDUM #1 ITB# 2015-09-002 Fire Protection Maintenance Services Responses to Clarification Questions 10/06/2015 1. Building #222, The UPS Building, has one (1) dry Sprinkler riser, valve. (This is a

More information

Sprinkler Permit Applications

Sprinkler Permit Applications REQUIREMENTS FOR NFPA 13 SYSTEM Building Inspections Sprinkler Permit Applications A complete application for a Sprinkler Permit will comply with the requirements of Chapter 8 of NFPA 13. Hydraulic calculations

More information

Antifreeze Solutions and Automatic Fire Sprinkler Systems. March 12, 2013

Antifreeze Solutions and Automatic Fire Sprinkler Systems. March 12, 2013 Antifreeze Solutions and Automatic Fire Sprinkler Systems March 12, 2013 Session Outline History of Antifreeze in the standards Science of Antifreeze Incidents involving i antifreeze in sprinklers Initial

More information

FIRE SPRINKLER SYSTEMS POLICY

FIRE SPRINKLER SYSTEMS POLICY FIRE SPRINKLER SYSTEMS POLICY VERSION 1.012/2015 FIRE SPRINKLER SYSTEMS Design and Submittal requirements All new and existing fire sprinkler systems within the jurisdiction of the City of San Mateo Fire

More information

A. Hydraulic calculations shall be prepared in accordance with Chapter 23 of NFPA 13 with the following exceptions:

A. Hydraulic calculations shall be prepared in accordance with Chapter 23 of NFPA 13 with the following exceptions: SECTION 21 13 13 WET-PIPE FIRE SPRINKLER SYSTEM PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section

More information

Fire Sprinkler Submittal Requirements and Acceptance Testing

Fire Sprinkler Submittal Requirements and Acceptance Testing Lubbock Fire Marshal s Office 1601 Mac Davis Lane Lubbock, Texas 79401 806-775-2646 Fax 806-775-3508 fireprevention@mylubbock.us Fire Sprinkler Submittal Requirements and Acceptance Testing To all Registered

More information

New Construction Fire Inspection Process

New Construction Fire Inspection Process New Construction Fire Inspection Process This document is intended to provide the Owner, Designer, and/or Contractor of new construction with an outline of required fire inspections and with the specific

More information

Course FP100 BACKFLOW PREVENTERS (BFPs) 101 FOR AUTOMATIC FIRE SPRINKLER SYSTEM M. Nabeel Waseem, M.Eng, PE, CFPS 2018

Course FP100 BACKFLOW PREVENTERS (BFPs) 101 FOR AUTOMATIC FIRE SPRINKLER SYSTEM M. Nabeel Waseem, M.Eng, PE, CFPS 2018 Course FP100 BACKFLOW PREVENTERS (BFPs) 101 FOR AUTOMATIC FIRE SPRINKLER SYSTEM M. Nabeel Waseem, M.Eng, PE, CFPS 2018 1 Introduction If you have ever been exposed to automatic fire sprinkler system, there

More information

CAN/ULC-S INTEGRATED SYSTEMS TESTING OF FIRE PROTECTION AND LIFE SAFETY SYSTEMS

CAN/ULC-S INTEGRATED SYSTEMS TESTING OF FIRE PROTECTION AND LIFE SAFETY SYSTEMS 2013 Randal Brown & Associates Engineering Ltd. 1 RANDAL BROWN & ASSOCIATES ENGINEERING LTD. CONSULTING ENGINEERS LIFE SAFETY & FIRE PROTECTION 105 6 LANSING SQUARE TORONTO, ONTARIO CAN/ULC-S1001-11 INTEGRATED

More information

CITY OF MADISON FIRE DEPARTMENT (MFD) FIRE PROTECTION SYSTEM PLANS

CITY OF MADISON FIRE DEPARTMENT (MFD) FIRE PROTECTION SYSTEM PLANS CITY OF MADISON FIRE DEPARTMENT (MFD) FIRE PROTECTION SYSTEM PLANS Fire Protection Systems includes the following: Alternate Fire Suppression Systems Atrium Fire Protection Systems Automatic Fire Sprinkler

More information

Changes for the New Edition. Senior Engineer, NFPA NFPA

Changes for the New Edition. Senior Engineer, NFPA NFPA Changes for the New Edition Denise Beach Senior Engineer, NFPA NFPA Overview NFPA 58-2014 Substantive Changes TIAs 2017 Edition NFPA 58-2014 Substantive Changes Bulk and Industrial Plants 3.3.10 Bulk Plant.

More information

Fire Sprinkler System Design and Installation Requirements

Fire Sprinkler System Design and Installation Requirements Fire Sprinkler System Design and Installation Requirements The Park City Fire Service District (PCFD) and Park City Municipal Corporation (PCMC) have made the following amendments to the State of Utah

More information

Update all extract references to NFPA documents (including NFPA 72) in Chapter 3 and related annex material to the latest editions.

Update all extract references to NFPA documents (including NFPA 72) in Chapter 3 and related annex material to the latest editions. 11/16/12 TerraView First Revision No. 15-NFPA 720-2012 [ Global Input ] Update all extract references to NFPA documents (including NFPA 72) in Chapter 3 and related annex material to the latest editions.

More information

Understanding and Applying NFPA 25

Understanding and Applying NFPA 25 Understanding and Applying NFPA 25 Texas Edition Learning Objectives Describe the scope of NFPA 25. Distinguish between sprinkler system problems that fall within the scope of NFPA 25 and those that do

More information

University of Houston Master Construction Specifications Insert Project Name SECTION DRY-PIPE FIRE SPRINKLER SYSTEM PART 1 - GENERAL

University of Houston Master Construction Specifications Insert Project Name SECTION DRY-PIPE FIRE SPRINKLER SYSTEM PART 1 - GENERAL SECTION 21 13 16 DRY-PIPE FIRE SPRINKLER SYSTEM PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section

More information

Table EXIT ACCESS TRAVEL DISTANCE a OCCUPANCY SYSTEM SYSTEM. A, E, F-1, I-1, M, b,d R, S-1. B c. F-2, S-2, U c

Table EXIT ACCESS TRAVEL DISTANCE a OCCUPANCY SYSTEM SYSTEM. A, E, F-1, I-1, M, b,d R, S-1. B c. F-2, S-2, U c Table 1015.1 EXIT ACCESS TRAVEL DISTANCE a WITHOUT SPRINKLER WITH SPRINKLER OCCUPANCY SYSTEM SYSTEM A, E, F-1, I-1, M, 200 250 b,d R, S-1 B 200 300 c F-2, S-2, U 300 400 c No Change to Other Entries in

More information

CAN/ULC S Integrated Systems Testing of Fire Protection and Life Safety Systems and Fire Protection Commissioning

CAN/ULC S Integrated Systems Testing of Fire Protection and Life Safety Systems and Fire Protection Commissioning CAN/ULC S1001-11 Integrated Systems Testing of Fire Protection and Life Safety Systems and Fire Protection Commissioning Presentation To: Canadian Fire Alarm Association (CFAA) National Capital Region

More information

SECTION WET-PIPE SPRINKLER SYSTEMS EASY RISER CHECK VALVE

SECTION WET-PIPE SPRINKLER SYSTEMS EASY RISER CHECK VALVE SECTION 21 1313 WET-PIPE SPRINKLER SYSTEMS PART 1 GENERAL 1.01 SECTION INCLUDES A. Wet-pipe sprinkler system. B. System design, installation, and certification. C. Fire department connections. 1.02 RELATED

More information

SECTION WET-PIPE SPRINKLER SYSTEMS

SECTION WET-PIPE SPRINKLER SYSTEMS SECTION 21 13 13 WET-PIPE SPRINKLER SYSTEMS PART 1 - GENERAL 1.1 SCOPE OF WORK A. Design, installation and testing shall be in accordance with NFPA 13 except for specified exceptions. B. The demolition

More information

DIVISION 21 FIRE SUPPRESSION FIRE SUPRESSION

DIVISION 21 FIRE SUPPRESSION FIRE SUPRESSION DIVISION 21 FIRE SUPPRESSION 21 00 00 FIRE SUPRESSION 21 01 00 Operation and Maintenance of Fire Suppression 21 01 10 Operation and Maintenance of Water Based Fire Suppression Systems 21 01 20 Operation

More information

Fire Sprinkler Plan Submittal Form

Fire Sprinkler Plan Submittal Form Contents Fire Sprinkler Plan Submittal Form... 2 Standpipe Plan Review Submittals... 4 Fire Pump Plan Submittal Requirements... 6 Fire Alarm Plan Submittal Form... 8 Kitchen Hood Wet Chemical Submittal...10

More information

Page 1 of 12 Input No. 62-NFPA 409-2013 [ Section No. 3.3.9 ] 3.3.9 Hangar Building Cluster. A group of buildings with more than one area for the storage and servicing of aircraft and all attached or contiguous

More information

Report on First Revision June 2014 NFPA 5000

Report on First Revision June 2014 NFPA 5000 5000- Log #12 BLD-BSF Final Action: (55.2 (New) ) NOTE: This proposal appeared as Comment 5000-168 (Log #86) which was held from the A11 ROC on Proposal 5000-239. Submitter: Technical Correlating Committee

More information

CLARK COUNTY FIRE DEPARTMENT Fire Prevention Bureau

CLARK COUNTY FIRE DEPARTMENT Fire Prevention Bureau CLARK COUNTY FIRE DEPARTMENT Fire Prevention Bureau 575 E. Flamingo Road, Las Vegas, NV 89119 (702) 455-7316 FAX (702) 455-7347 Permit Type: 105.7.13 Control Number: A.0 Effective Date: 11/15/11 TITLE:

More information

Delayed Action Closer. Mechanical self-closing device that incorporates an adjustable delay prior to the initiation of closing.

Delayed Action Closer. Mechanical self-closing device that incorporates an adjustable delay prior to the initiation of closing. 9/20/2016 2:27 PM Second Revision No. 5006-NFPA 101-2016 [ Section No. 3.3.56 ] 3.3.56 Delayed Action Closer. Self-closing device that incorporates a delay prior to the initiation of closing. Mechanical

More information

Self Inspection Program

Self Inspection Program Self Inspection Program Munich Re Self Inspection Program Inspection and testing of fire protection systems Introduction Engineered fire protection systems are a vital factor in the reduction of potential

More information

Changes in NFPA

Changes in NFPA Changes in NFPA 72-2002 2002 Oregon Fire Code Committee November 25, 2003 Michael B. Baker, SET Automatic Fire Alarm Association MikeBaker@afaa.org 2003 Michael B. Baker 1 Table of Contents 1. Administration

More information

Recommended Amendments to the 2015 International Existing Building Code North Central Texas Council of Governments Region

Recommended Amendments to the 2015 International Existing Building Code North Central Texas Council of Governments Region Recommended Amendments to the 2015 International Existing Building Code North Central Texas Council of Governments Region The following sections, paragraphs, and sentences of the 2015 International Existing

More information

Montgomery County Government Building and Codes Department 350 Pageant Lane, Suite 309 Clarksville, TN 37040

Montgomery County Government Building and Codes Department 350 Pageant Lane, Suite 309 Clarksville, TN 37040 Montgomery County Government Building and Codes Department 350 Pageant Lane, Suite 309 Clarksville, TN 37040 SPRINKLER SHOP DRAWINGS 2007 NFPA 13 and 2007 NFPA 24 Project: Listed items require sprinkler

More information

FIRE SAFETY SYSTEMS MAINTENANCE INFORMATION

FIRE SAFETY SYSTEMS MAINTENANCE INFORMATION FIRE SAFETY SYSTEMS MAINTENANCE INFORMATION To be kept in school administration office Crown Copyright, Province of Nova Scotia 2004 Prepared by Nova Scotia Department of Education No part of this document

More information

UBC Technical Guidelines Section Edition Fire Protection General Requirements Page 1 of 6

UBC Technical Guidelines Section Edition Fire Protection General Requirements Page 1 of 6 Page 1 of 6 1.0 GENERAL 1.1 Related UBC Guidelines.1 Section 20 00 05 Mechanical - General Requirements.2 Section 22 05 00 Plumbing - General Requirements.3 UBC Standard Fire Hydrant Drawings.4 Section

More information

SECTION ELECTRIC-DRIVEN, FIRE PUMPS

SECTION ELECTRIC-DRIVEN, FIRE PUMPS SECTION 21 30 13 ELECTRIC-DRIVEN, FIRE PUMPS PART 1 - GENERAL 1.1 DESCRIPTION SPEC WRITER NOTES: 1. Delete between // --- // if not applicable to the project. Also delete any other item or paragraph including

More information

EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD

EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD Installation of Residential Fire Sprinkler Systems STANDARD #C-002 EFFECTIVE 03-19-2009 PURPOSE: To ensure that sprinkler plans submitted for review contain

More information

CAN/ULC-S1001, INTEGRATED SYSTEMS TEST OF FIRE PROTECTION AND LIFE SAFETY SYSTEMS

CAN/ULC-S1001, INTEGRATED SYSTEMS TEST OF FIRE PROTECTION AND LIFE SAFETY SYSTEMS RANDAL BROWN & ASSOCIATES ENGINEERING LTD. CONSULTING ENGINEERS LIFE SAFETY & FIRE PROTECTION 105 6 LANSING SQUARE TORONTO, ONTARIO CAN/ULC-S1001, INTEGRATED SYSTEMS TEST OF FIRE PROTECTION AND LIFE SAFETY

More information

Division 21: FIRE SUPRESSION WET-PIPE SPRINKLER PROTECTION SYSTEM. The Academy Sept Table of Contents 1 Division 21

Division 21: FIRE SUPRESSION WET-PIPE SPRINKLER PROTECTION SYSTEM. The Academy Sept Table of Contents 1 Division 21 Division 21: FIRE SUPRESSION 21 1313 WET-PIPE SPRINKLER PROTECTION SYSTEM Table of Contents 1 Division 21 SECTION 21 1313 WET-PIPE SPRINKLER PROTECTION SYSTEM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A.

More information

Deluge/Preaction Systems Annotated Instructor s Guide

Deluge/Preaction Systems Annotated Instructor s Guide Deluge/Preaction Systems Annotated Instructor s Guide Module 18301-07 Module Overview This module covers different types of preaction and deluge systems. It discusses deluge valves, auxiliary detection

More information

Life Safety Code NFPA 10 NFPA 13 NFPA 25 NFPA 72 NFPA 90A NFPA 110 NFPA 99 THE 2012 EDITION OF THE LIFE SAFETY CODE HOSPITAL EDITION SESSION #7

Life Safety Code NFPA 10 NFPA 13 NFPA 25 NFPA 72 NFPA 90A NFPA 110 NFPA 99 THE 2012 EDITION OF THE LIFE SAFETY CODE HOSPITAL EDITION SESSION #7 THE 2012 EDITION OF THE LIFE SAFETY CODE HOSPITAL EDITION SESSION #7 AGENDA: Life Safety Code Referenced Publications Overview Life Safety Code NFPA 10 NFPA 13 NFPA 25 NFPA 72 NFPA 90A NFPA 110 NFPA 99

More information

Deluge/Preaction Systems Annotated Instructor s Guide

Deluge/Preaction Systems Annotated Instructor s Guide Deluge/Preaction Systems Annotated Instructor s Guide Module 18301-13 Module Overview This module covers different types of preaction and deluge systems. It discusses deluge valves, auxiliary detection

More information

REVISION RECORD FOR THE STATE OF CALIFORNIA EMERGENCY SUPPLEMENT

REVISION RECORD FOR THE STATE OF CALIFORNIA EMERGENCY SUPPLEMENT REVISION RECORD FOR THE STATE OF CALIFORNIA EMERGENCY SUPPLEMENT January 1, 2011 2010 Title 24, Part 9, California Fire Code PLEASE NOTE: The date of this supplement is for identification purposes only.

More information

International Fire Code 2006 Requirements for Construction Plan Reviews of Commercial and Multi-Family Structures

International Fire Code 2006 Requirements for Construction Plan Reviews of Commercial and Multi-Family Structures International Fire Code 2006 Requirements for Construction Plan Reviews of Commercial and Multi-Family Structures Please note this is not an all-inclusive list. The type and complexity of your project

More information

Environmental Health & Safety

Environmental Health & Safety Environmental Health & Safety Oklahoma State University FIRE SPRINKLER SYSTEM STANDARD Environmental Health and Safety University Health Services Suite 002 Stillwater, OK 74078 (405) 744-7241 www.ehs.okstate.edu

More information

Freezing of Water-Based Fire Protection Systems

Freezing of Water-Based Fire Protection Systems Risk Solutions Freezing of Water-Based Fire Protection Systems Freezing of water in fire protection piping can seriously compromise a property s fire protection. This report provides information on methods

More information

Sprinkler System Installer Level 2

Sprinkler System Installer Level 2 Sprinkler System Installer Level 2 Sprinkler System Installer Unit: A8 Electrical Principles* Level: Two Duration: 17 hours Theory: Practical: 14 hours 3 hours Overview: Upon completion of this unit the

More information

PLAN REVIEW CHECKLIST

PLAN REVIEW CHECKLIST PLAN REVIEW CHECKLIST Date Documents Submitted: Log No.: File No.: Property Information Building Name: Building Address: Owner s Name: Owner s Address: Owner s Phone: Fax: E-mail: System Designer/Contractor

More information

CAN/ULC-S1001, INTEGRATED SYSTEMS TESTING OF FIRE PROTECTION & LIFE SAFETY SYSTEMS Simon Crosby, LEL, CET, CFPS October 21, 2015

CAN/ULC-S1001, INTEGRATED SYSTEMS TESTING OF FIRE PROTECTION & LIFE SAFETY SYSTEMS Simon Crosby, LEL, CET, CFPS October 21, 2015 CAN/ULC-S1001, INTEGRATED SYSTEMS TESTING OF FIRE PROTECTION & LIFE SAFETY SYSTEMS Simon Crosby, LEL, CET, CFPS October 21, 2015 Fire Commissioning in Canadian Codes and Standards BACKGROUND Why Commissioning?

More information

Inspection, testing, and maintenance (ITM) Fixed fire protection and detection July 2016

Inspection, testing, and maintenance (ITM) Fixed fire protection and detection July 2016 July 2016 Author: Global Risk Engineering Technical Center Property Cover photo source: Rich Gallagher, Zurich Table of contents 1. Executive Summary... 1 1.1 Are systems in service?... 1 1.2 Are systems

More information

PROPOSED CODE CHANGES FOR REVIEW BY THE FIRE CODE ACTION COMMITTEE

PROPOSED CODE CHANGES FOR REVIEW BY THE FIRE CODE ACTION COMMITTEE PROPOSED CODE CHANGES FOR REVIEW BY THE FIRE CODE ACTION COMMITTEE Developed by the Midwestern Regional Work Group CONTENTS Item 15 Limited area sprinkler systems Item 20 Scope of IFC Ch 7 Item 21 Fire-resistance-rated

More information

UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY

UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY Revision No.: 3 Page 1 of 6 I. PURPOSE This procedure establishes guidelines for the weekly or monthly inspection and testing of all fire pumps within the University of Rochester by representatives of

More information

SECTION FIRE-SUPPRESSION STANDPIPES

SECTION FIRE-SUPPRESSION STANDPIPES PART 1 - GENERAL 1.1 DESCRIPTION Fire-suppression wet and manual dry standpipes. 1.2 SCOPE OF WORK SECTION 21 12 00 A. Design, installation and testing shall be in accordance with NFPA 14 except for specified

More information

NFPA 80 Overview January 21, 2016

NFPA 80 Overview January 21, 2016 NFPA 80 Overview January 21, 2016 Kristin Bigda, P.E. Senior Fire Protection Engineer National Fire Protection Association Presenter Kristin Bigda, P.E. Senior Fire Protection Engineer, NFPA Building Fire

More information

UNIVERSITY OF MISSOURI Fire Protection System Design 2016 Q1

UNIVERSITY OF MISSOURI Fire Protection System Design 2016 Q1 GENERAL: 1. All fire protection systems shall be installed in accordance with the International Fire Code and applicable NFPA standards. This guideline provides additional requirements for the design and

More information

FIRE & LIFE SAFTEY STANDARD

FIRE & LIFE SAFTEY STANDARD Title: Effective Date: 01/01/14 Revised Date: 1/1/14 Code References: Title 16, Chapter 16.16 of the Roseville Municipal Code, NFPA 72 Note: This standard is a summary of Fire Department clarifications

More information

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Union County Vocational - Technical Schools Scotch Plains, New Jersey SECTION 230593 - TESTING, ADJUSTING, AND BALANCING FOR HVAC PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Balancing Air Systems: a. Constant-volume air systems. b. Variable-air-volume systems. 2.

More information

9/15/ Cantara Lane Vista, CA (760)

9/15/ Cantara Lane Vista, CA (760) 28 th Annual AHCA/FHEA SEMINAR Sprinkler System Inspection, Testing & Maintenance 1 Speaker Information: Bob Caputo, CFPS, CET Vice President Fire & Life Safety America 657 Cantara Lane Vista, CA 92081

More information

CubeSmart Gulf Breeze Storage AUTOMATIC FIRE SPRINKLER SYSTEM

CubeSmart Gulf Breeze Storage AUTOMATIC FIRE SPRINKLER SYSTEM SECTION 21 0000 AUTOMATIC FIRE SPRINKLER SYSTEM PART 1 GENERAL 1.1 QUALITY ASSURANCE A. Codes and Standards: 1. FBC (Florida Building Code 2015) 2. FBC (Florida Fire Code 2015) 3. NFPA #13R (Standard for

More information

INSIDE NFPA NEWS. Committee Leadership Conference. Comments Sought on Proposed Tentative Interim Amendments. Volume 14 Number 14 December 2010

INSIDE NFPA NEWS. Committee Leadership Conference. Comments Sought on Proposed Tentative Interim Amendments. Volume 14 Number 14 December 2010 Volume 14 Number 14 December 2010 Committee Leadership Conference The Committee Leadership Conference will be held on Sunday, June 12, 2011, at the NFA Conference and Expo at the Boston Convention & Exhibition

More information

National Fire Protection Association M E M O R A N D U M. Technical Committee on Testing and Maintenance of Fire Alarm and Signaling Systems

National Fire Protection Association M E M O R A N D U M. Technical Committee on Testing and Maintenance of Fire Alarm and Signaling Systems National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: Technical Committee on Testing and Maintenance

More information

Report of Inspection/Test

Report of Inspection/Test Report of Inspection/Test 4616-2 West Howard Lane Suite 4 Austin, Texas 78727 Phone: 512-833-8 Fax: 512-833-7862 Inspection Type: Pump - Annual Inspection Date: 2/24/217 1::2 AM Building Address:88 South

More information

SECTION DRY PIPE SPRINKLER SYSTEMS MODEL G SERIES DRY VALVE

SECTION DRY PIPE SPRINKLER SYSTEMS MODEL G SERIES DRY VALVE SECTION 21 1316 DRY PIPE SPRINKLER SYSTEMS MODEL G SERIES DRY VALVE PART 1 GENERAL 1.01 SECTION INCLUDES A. Dry-pipe sprinkler system. B. System design, installation, and certification. C. Fire department

More information

NFPA 96, 2017 REVIEW SUMMARY

NFPA 96, 2017 REVIEW SUMMARY NFPA 96, 2017 REVIEW SUMMARY 1) NFPA 96 REVISION SUMMARY NFPA 96 Standard for Ventilation Control and Fire Protection of Commercial Cooking Operations The 2017 edition adds a new normative annex on mobile

More information

9/10/12. NFPA Consumer Alert Antifreeze sprinkler systems. Dear Fire Sprinkler System Owner,

9/10/12. NFPA Consumer Alert Antifreeze sprinkler systems. Dear Fire Sprinkler System Owner, 9/10/12 Subject: NFPA Consumer Alert Antifreeze sprinkler systems Dear Fire Sprinkler System Owner, Recent events have led the National Fire Protection Association (NFPA) to issue Tentative Interim Amendments

More information

STATE FIRE MARSHAL S REQUIRED FIRE PROTECTION SYSTEMS NARRATIVE REPORT

STATE FIRE MARSHAL S REQUIRED FIRE PROTECTION SYSTEMS NARRATIVE REPORT STATE FIRE MARSHAL S REQUIRED FIRE PROTECTION SYSTEMS NARRATIVE REPORT The interaction of fire protection systems can be extremely complex. The detection of a fire in a building by an automatic device

More information

26 of 128 9/23/2014 9:25 AM

26 of 128 9/23/2014 9:25 AM 26 of 128 9/23/2014 9:25 AM Second Revision No. 105-NFPA 72-2014 [ Global Comment ] Revise the Annex F figures that include a smoke detector symbol (hexagon with a whisp of smoke) so that the new smoke

More information

AUTOMATIC FIRE SPRINKLER SYSTEM STANDARDS Development Standard #4.1 (Commercial Installations)

AUTOMATIC FIRE SPRINKLER SYSTEM STANDARDS Development Standard #4.1 (Commercial Installations) AUTOMATIC FIRE SPRINKLER SYSTEM STANDARDS Development Standard #4.1 (Commercial Installations) This standard applies to the design and installation of automatic fire sprinkler systems in conjunction with

More information

Alarm. A warning of danger. An indication of the existence of a condition that requires immediate action. (SIG-FUN)

Alarm. A warning of danger. An indication of the existence of a condition that requires immediate action. (SIG-FUN) 4 of 326 11/21/2013 1:03 PM First Revision No. 161-NFPA 72-2013 [ Section No. 3.3.11 ] 3.3.11 Alarm. A warning of danger. An indication of the existence of a condition that requires immediate action. (SIG-FUN)

More information

SECTION DRY PIPE SPRINKLER SYSTEMS MODEL F SERIES DRY VALVE

SECTION DRY PIPE SPRINKLER SYSTEMS MODEL F SERIES DRY VALVE SECTION 21 1316 DRY PIPE SPRINKLER SYSTEMS MODEL F SERIES DRY VALVE PART 1 GENERAL 1.01 SECTION INCLUDES A. Dry-pipe sprinkler system. B. System design, installation, and certification. C. Fire department

More information

Port of St Helens SIA Aircraft Hanger Scappoose, OR

Port of St Helens SIA Aircraft Hanger Scappoose, OR Port of St Helens SIA Aircraft Hanger Scappoose, OR AUTOMATIC FIRE SPRINKLER SYSTEM REVISION 2 MARCH 12, 2018 Scope: Furnish and install foam and water fire protection system including underground entrance

More information

NFPA 72 Code Changes vs 2013

NFPA 72 Code Changes vs 2013 NFPA 72 Code Changes - 2010 vs 2013 AFAA-NE Westborough, MA February 7, 2018 Richard Roux NFPA 72 National Fire Alarm and Signaling Code Overview and 2013 Changes NFPA 72 1993 Edition Aug 20, 1993 1996

More information

Report on First Revisions with Statement June 2014 NFPA 101

Report on First Revisions with Statement June 2014 NFPA 101 101 FR7040 SAF-MER (36.1.1.4) 36.1.1.4 The provisions of this chapter shall apply to life safety requirements for all new mercantile buildings. Specific requirements shall apply to suboccupancy groups,

More information

CITY OF PASADENA FIRE DEPARTMENT

CITY OF PASADENA FIRE DEPARTMENT Page 1 of 8 CITY OF PASADENA FIRE DEPARTMENT INSTALLATION OF COMMERCIAL SPRINKLERS (Revised 12/10/2014) SCOPE: This standard applies to the design and installation of automatic fire sprinkler systems in

More information

SECTION Fire Pumps

SECTION Fire Pumps SECTION 21 30 00 Fire Pumps PART 1 GENERAL 1.1 WORK INCLUDED A. Furnish, install and test a motor-driven fire pump, jockey pump, and controllers in the space provided and as shown in the contract drawings.

More information