1 Florida Farm North Environmental Statement Non-Technical Summary July /04/MW/PN Nathaniel Lichfield & Partners 3rd Floor One St James's Square Manchester M2 6DN
2 This document is formatted for double sided printing. Nathaniel Lichfield & Partners Ltd Trading as Nathaniel Lichfield & Partners. All Rights Reserved. Registered Office: 14 Regent's Wharf All Saints Street London N1 9RL All plans within this document produced by NLP are based upon Ordnance Survey mapping with the permission of Her Majesty s Stationery Office. Crown Copyright reserved. Licence number AL50684A
3 Contents 1.0 Introduction & Methodology 1 Purpose of the Document... 1 The EIA Process Site Description 2 Site Location... 2 Site Description... 2 The Surroundings Description of Development 4 Introduction... 4 Alternatives Considered... 4 Phasing of the Development Assessment of Environmental Impacts 6 Introduction... 6 Transport... 6 Dust & Air Quality... 6 Noise & Vibration... 7 Flood Risk, Hydrology & Drainage... 7 Ground Conditions & Contamination... 8 Ecology & Nature Conservation... 8 Landscape & Visual Impact... 9 Socio-Economics Summary of Residual Impacts Availability of the Environmental Statement 13
4
5 1.0 Introduction & Methodology Purpose of the Document 1.1 This document is a summary, in non-technical language, of an Environmental Statement [ES] prepared on behalf of Bericote Properties Limited [the Applicant]. It deals with the hybrid planning application submitted to St Helens Metropolitan Borough Council [MBC] for a proposed warehousing and logistics development on land at Florida Farm North, Haydock, St Helens. The EIA Process 1.1 Environmental Impact Assessment [EIA] considers the likely effects based on current knowledge of the site and surroundings, desk top assessment, survey and fieldwork and information available to the EIA team. Regard is given to relevant national and local planning policy as well as other legislation of relevance to individual topic areas. This topic specific guidance is considered within in detail within individual chapters of the ES. 1.2 The EIA has been completed with reference to best practice and relevant legislation and has addressed all those matters that could reasonably be required to assess the effects of the proposed development. This includes those arising from the scheme itself as well as those temporary effects arising during the construction phase. 1.3 The EIA addresses the following: 1 Transport; 2 Dust & Air Quality; 3 Noise & Vibration; 4 Hydrology & Drainage; 5 Ground Contamination; 6 Ecology & Nature Conservation; 7 Landscape & Visual Impact; and, 8 Socio-Economic Effects. 1.4 To enable an adequate assessment of the likely or main significant effects arising from the development to be identified at this stage, a maximum and minimum development envelope has been established and forms the basis of the EIA. 1.5 Consultation has also fed into the EIA process in relation to the methods by which the EIA has been carried out, as a means to seek environmental data, to review the effectiveness of any identified mitigation measures and as a means to keep interested bodies informed on the process of EIA undertaken. P1
6 2.0 Site Description Site Location 2.1 The Application Site is located immediately to the north of the A580 adjacent to the Haydock Industrial Estate, approximately 4km to the north-east of St Helens town centre. The site is an irregular shaped area of land extending to approximately 37ha. 2.2 The northern edge of Haydock lies a short distance beyond the A580 to the south. The site s north-western boundary runs roughly parallel to the A58 Liverpool Road, which lies approximately 150m beyond. It is illustrated on Figure 2.1. Figure 2.1 Application Site Location Source: UMC Architects Site Description 2.3 The Application Site rises up from the A580 frontage towards the north. There is a difference in the ground level of 15.25m between the southern and northern boundaries. It comprises predominantly agricultural land mostly in arable production. P2
7 2.4 There are five ponds within the Application Site, together with four small groups of trees. Field boundaries are marked by hedgerows with relatively few trees. There are no buildings within the Application Site. The Surroundings 2.5 The Application Site is bounded: 1 To the north-west by an existing watercourse, which meanders northeastwards from the junction of Slag Lane with the A580. This links up with some pond features on its course and a line of mature trees. Lying further to the west are agricultural fields and the residential properties fronting Liverpool Road (A58); 2 To north-east by hedges and fences with agricultural land beyond. A public footpath runs along the north-eastern boundary, as does a line of overhead power cables connecting Pewfall Park to the Haydock Industrial Estate; 3 To the south by the A580 (East Lancashire Road) beyond which lies Florida Farm South and the residential properties of Springfield Park; and, 4 To the east by the Haydock Industrial Estate, which comprises a range of industrial units; constructed from a variety of materials, but predominantly brickwork and metal / asbestos cladding systems. Clipsley Brook, an existing open watercourse, runs along the edge of the industrial estate, and defines the eastern boundary of the Application Site. P3
8 3.0 Description of Development Introduction 3.1 The hybrid planning application seeks permission for: Part A Outline planning permission for: 1 The creation of two commercial/industrial buildings providing up to 135,000 sq. m. of employment floorspace (Class B2/B8 uses with up to 10,000 sq. m. of ancillary office accommodation); and, 2 The provision of associated infrastructure (including roads, parking, footpaths, internal landscaping, noise mitigation measures, and Sustainable Urban Drainage Systems). All matters are reserved for subsequent approval apart from the access arrangements. Part B Full planning permission for the provision of a new access to the East Lancashire Road (A580), internal site access roads, regrading works and formation of development platforms and strategic boundary landscaping (including bund details). Alternatives Considered 3.2 As part of the EIA, alternatives to the proposals have been considered. This helps in clarifying the advantages of the current scheme, taking account of the environmental effects. 3.3 The no development scenario has been considered and discounted as failing to deliver the policy objectives set for the proposals. In essence, although the site could be retained for agricultural purposes, the land is suitable for a large scale logistics operation. Sites of this type are in short supply in the borough and this would be an underused resource. This is particularly the case for large scale logistics sites to meet the established employment land requirements for the borough and the need to support the local economy. C1.2 A detailed consideration of alternative sites has also been undertaken through an Alternative Sites Assessment study that accompanies the Planning Application. The assessment concludes that only Florida Farm North is capable of delivering the scheme in the short term and will have the least impact on the Green Belt. 3.4 The Applicants are promoting the Florida Farm North site for a large scale logistics development and therefore no alternative land use mix has been considered. P4
9 Phasing of the Development 3.5 As well as assessing the environmental effects of the proposed development once it has been built, the EIA has assessed the effects that may arise during the construction period. At this stage, no contractor has been appointed but the information and parameters assessed in the EIA will form part of the tender documentation to be issued and the appointed contractor will be required to comply with the outline methodology described, as well as in any relevant planning conditions. 3.6 Development phasing is driven by the requirement for demolition and remediation prior to the commencement of development and estimates that construction will take place over 2 years. 3.7 The programme for the construction works is to be confirmed once the contractor is appointed, However, works are envisaged to be undertaken in five discrete stages, comprising: 1 Investigation and treatment of mineshafts (19 known) and mineworkings; 2 Remediation of any land quality issues, if found necessary from the Ground Investigation to be undertaken; 3 Ground Improvement for any geotechnically unsuitable soils encountered in the Ground Investigation, for the redevelopment of the site; 4 Earthworks necessary for the development; and, 5 Construction Works for the Development. P5
10 4.0 Assessment of Environmental Impacts Introduction 4.1 The conclusions of each ES chapter covering a specific issue are summarised in turn below. Transport 4.2 This chapter assesses the potential effects of the proposed development on transportation. It assesses the travel demands associated with the development and considers whether they can be met in a sustainable manner and accommodated on the highway network. 4.3 The location of the site provides the opportunity for future employees of the development to access some local services by walking or cycling. It is also concluded that the site is located within reasonable walking distance of bus services that provide access to a wider range of services and employment opportunities. The location of the site therefore provides the opportunity for all employees and staff to access key local destinations and minimise single-car dependency. 4.4 The effect of the construction phase over a short-term period is considered to be of negligible significance, although mitigation measures will be provided through the use of a Construction Environment Management Plan [CEMP] to further reduce the effects of the construction phase. 4.5 Once operational, the development is forecast to have only a negligible impact on traffic flows, safety and delay due to the sustainable transport measures proposed as part of the development, which will include a Travel Plan to minimise single occupancy vehicle trips. 4.6 As set out in the TA, a HGV Delivery Management Plan must be prepared and implemented (secured by planning condition) by each occupier to ensure that the HGVs vehicles are routed via the A580 East Lancashire Road onto the strategic road Network reducing the impact of HGVs on the local highway network, in particular ensuring that no HGVs from Florida Farm travel to or from the site via Millfield Road to access J24 of the M6 to the north. 4.7 It is concluded that the development proposals are acceptable in highways and transportation terms and will not result in any significant negative impact on the environment. Dust & Air Quality 4.8 This chapter considers the ambient air quality within and near to the site and an assessment has been carried out with regard to the changes that may occur once the development is complete, and also during the demolition and construction phase. P6
11 4.9 For the construction phase dust control and exhaust emissions mitigation measures have been proposed and will be deployed reducing the potential effects. Following the implementation of the mitigation measures the residual impact significance of the construction phase is considered to be not significant For the operational phase of the development, the effects of air quality will not change significantly from existing conditions. The effects are predicted to be within the UK Air Quality Objectives. The residual impacts of the development are therefore considered to be not significant. Noise & Vibration 4.11 This chapter assesses the potential noise effects likely to arise during the construction of the development as well as after completion when the buildings become operational Construction noise can be controlled through the use of best practice measures and conformity with the CEMP for the development and once the site becomes operational, the assessments indicate that with the proposed acoustic mitigation in place the development will not have a significant impact with respect to noise in the surrounding area A tranquillity assessment indicated that there would not be a detrimental effect on the tranquillity of the area as a result of the development. Flood Risk, Hydrology & Drainage 4.14 This chapter assesses the potential hydrology, flood risk and drainage effects of the proposed development A Flood Risk Assessment [FRA] has been prepared which considers the potential receptors and assesses the likely effects of the proposed development on the water environment, specifically in terms of hydrology, drainage and flood risk and surface and groundwater quality Part of the site is located in Flood Zone 2 (medium risk probability) but the proposed positive drainage system will provide mitigation and the site is at low risk of flooding from tidal, groundwater, sewers and artificial sources Impacts from the construction and operational activities relate primarily to the increased surface water runoff from the proposed development, due to the larger impervious areas created by the commercial units, service yards, car parking areas and internal roads Detailed assessment has found that onsite Sustainable Drainage Systems [SuDS] will assist in retaining the runoff of both excess rainwater and pollutants from the site. Surface water runoff, as a result of the SuDS measures, will be reduced to greenfield runoff rates equivalent and thus will not increase flood risk to adjoining land and will provide a net benefit in terms of downstream flood risk for the extreme storms. The SuDS proposed within the development P7
12 itself will accommodate all increased runoff created by the increase in impervious paving and roofs, with hydrobrakes restricting the outflow As a result of the proposed attenuation and flood mitigation measures, the residual risk after completion of the development will be minor Foul water from the proposed development is to discharge into the public foul sewer in Haydock Lane at an unrestricted rate as agreed with United Utilities. Therefore, the residual impact is considered to be negligible. Ground Conditions & Contamination 4.21 This chapter assesses the potential effect of the proposed development on existing ground conditions All the potential environmental impacts from the land and soils conditions at the site have been considered for the construction and operational phases of the development. This has been done by considering all the potential sources of harm, namely the substances and unstable ground present, all the things which could be harmed (receptors) and the route or pathway by which the harm could impact the receptors. Several unmitigated potential adverse impacts of minor or greater significance were identified at the site However, mitigation measures are proposed to address these potential impacts. These are the use of appropriate design; prescribed methods of working in the construction phase (including safe working practices and codes of practice); and pre-construction identification of potential contamination by further ground investigation After implementation of mitigation measures there will be no significant residual risks of contamination once the development is operational. Ecology & Nature Conservation 4.25 This chapter considers the potential effects of the proposed development on ecology and identifies mitigation measures and assesses the residual ecological impacts A comprehensive set of survey work has established a robust baseline of ecological information for the site and surrounding area. The existing habitats on the site are used by a small range of common bat species and a number of notable breeding and wintering birds use the site. No other protected or notable fauna species were recorded. The notable species bluebell occurs within one woodland, which will be retained, and three non-native invasive species are present on the site: Japanese Knotweed; Himalayan Balsam; and Horsetail Good design has allowed for the retention of a number of important ecological features within the green space, predominantly within an area set aside for ecology, which will be buffered and protected from the main development areas. This area will include new woodland planting, grassland and wetland P8
13 habitat to mitigate losses where necessary and enhance the overall biodiversity of the site. Native landscape planting and buffers around the site will provide further biodiversity gains and provide enhanced habitat corridors around the site. A management plan will also be adopted detailing the conservation-led management of the retained and created habitats Adverse construction effects upon habitats and fauna will be managed by best practice measures, including the protection of retained features, the control of site drainage, management of accidental pollution events and suppression of construction dust. Where appropriate, the use of Natural England protected species licences, e.g. for bats will both ensure legal compliance and shall also maintain the conservation status of faunal species. The appropriate timing of clearance, supervision of works and / or sensitive management of vegetation and features will avoid disturbance to other fauna, including birds Significant habitat losses during each phase of development will be off-set through the re-creation and favourable management of woodland, scrub, trees, grassland and wetland features. These measures and the retention or replacement of features used by fauna, such as bat roosts will avoid significant effects upon the majority of dependant fauna The loss of arable fields will displace some specialist farmland birds, which cannot be mitigated for within the design and will be a minor residual effect at a local level Overall, the majority of impacts are not considered to be significant and any adverse effects associated with the development will be off-set in the mid- to long-term through the creation and favourable management of ecological features. Further gains will be achieved through the establishment of speciesrich grasslands and wetland features will also provide improved habitat for local fauna. Overall the development will lead to biodiversity gains, through the provision of more diverse habitats, in closer association with each other and with enhanced habitat corridors around and out of the site. Landscape & Visual Impact 4.32 This chapter assesses the potential effects of the proposed development on landscape character of the site and the surrounding area, and the visual impact of the proposals on sensitive visual receptors and key viewpoint locations The design proposals have been formulated through a lengthy iterative process involving environmental assessment and consultation. Careful attention has been paid to the design of the proposed development to mitigate and minimise the visual effects as far as practicable. This has entailed consideration of the building plot levels, heights and elevational design treatments; conservation and reinforcement of existing woodland and boundary planting and the use of perimeter mounding and associated woodland and structural planting. P9
14 4.34 There are no qualitative landscape designations that cover the site or its immediate context and the site and its immediate context has been assessed to be of Low / Medium landscape value Upon completion, the visual effects of the proposed development will vary from negligible and minor adverse for some receptors with restricted and/ or distant views of the proposed development up to major adverse for a limited number of receptors in close proximity to the site, however the overall number of residents and receptors experiencing the most significant visual effects is not extensive The proposed perimeter mounding and woodland planting will be effective in visually screening much of the lower level and active parts (e.g. service yards and car parking areas) of the proposed development from its completion. This visual screening will increase over time with the maturing and management of the existing and new woodland and planting areas. Consequently, whilst the proposed development will result in some initial significant visual effects these are largely localised. Where seen more distantly, the proposed development is likely to be viewed as part of an expansive and varied urban dominated landscape and alongside existing industrial development to the east on the rising and higher valley slopes Overall, the proposed development will result in some initial significant landscape and visual effects, yet these will be predominantly confined to the site landscape and local visual receptors close to the site. The most notable landscape effects will arise from direct changes to the landscape character of the site and visually the most notable effects will occur for properties on the A58 (Liverpool Rd) and close to the site and for a single short public footpath The residual landscape and visual effects of the proposed development following incorporation of the landscape design and mitigation measures and after 15 years will reduce the initial effects for these receptors. At this stage there will be no significant adverse landscape or visual effects arising from the proposed development. Socio-Economics 4.39 This chapter considers the potential socio-economic effects of the proposed development, including population structure, employment levels and the availability of local services and facilities No significant adverse effects are anticipated during the construction period and the magnitude of the beneficial impact felt in the main impact area of St Helens and Wigan could be increased by encouraging the use of local labour and supply chains. Implementation of appropriate travel plans, initiatives that encourage sustainable commuting patterns and other mitigation measures could further reduce any adverse commuting impacts generated by the proposed development. P10
15 4.41 Beneficial impacts in relation to the following socio-economic indicators will be provided: 1 Construction employment; 2 Construction economic output; 3 Operational employment; 4 Operational economic output; 5 Fiscal impacts; 6 Deprivation impacts; 7 Commuting impacts; and, 8 Contribution to Wider Economic Objectives The proposed development at Florida Farm North, St Helens has the potential to generate up to 2,733 net additional FTE jobs by 2016 thereby assisting St Helens MBC and Liverpool City Region LEP to achieve their objective to support continued economic growth, particularly the growth of the regionally significant Logistics and Distribution employment sector Based on this assessment, the most significant socio-economic impacts of the proposed development on the local economy are likely to include: 1 Injection of approximately 150 million private sector investment into St Helens; 2 Creation of 1,667 person-years of temporary construction employment, equivalent to 167 FTE construction jobs at a range of skill levels; 3 Supporting a further 252 FTE spin-off jobs in services and other businesses from the wage spending of construction workers and supplier sourcing; 4 Generating 23 million of direct and indirect GVA per annum during the construction phase of the scheme; 5 Once the scheme is fully constructed and operational, it could potentially accommodate up to 2,119 direct FTE employees; 6 Generating around 140 million of direct GVA per annum overall once the scheme is operational; 7 Supporting 614 spin off jobs in services and other businesses locally, and 932 across the wider area; 8 Delivering circa. 2.2 million in business rate receipts per year for St Helens Council once the scheme is built-out and occupied; 9 Employment generated by the proposed development could help to improve the prosperity of St Helens by providing opportunities for those who currently face barriers to accessing employment and income, which could potentially lead to a reduction in net out-commuting from St Helens/Wigan; and, P11
16 10 Accordance with, and assistance in the delivery of regional economic development objectives in the Government s Northern Powerhouse Agenda, in addition to the Liverpool City Region LEP s support for logistics and distribution in association with Liverpool Superport. Summary of Residual Impacts 4.44 The proposed development may result in the creation of some adverse impacts. However, where relevant, mitigation measures have been proposed, none of the impacts are of such significance that they should prevent the development of this site. Furthermore, the overall scheme results in significant, positive environmental effects and overall sustainability benefits. P12
17 5.0 Availability of the Environmental Statement 5.1 A hard copy of the full Environment Statement (including appendices) is available for viewing at St Helens MBC Offices (St Helens Town Hall) during normal working hours. Any representations should be made in writing to the Council at the following address: Contact Centre, Wesley House, Corporation Street, St Helens, WA10 1HF 1.3 An electronic copy (CD) of the ES can be obtained for a cost of 5 by contacting Paul Nellist at Nathaniel Lichfield & Partners (3 rd Floor, One St James's Square, Manchester, M2 6DN). Paper copies of the ES are also available on request and subject to printing costs. P13
University Park, Worcester Non Technical Summary December 2011
University Park, Worcester Non Technical Summary December 2011 Introduction UW Wrenbridge LLP, a Joint Venture Company of the University of Worcester and Wrenbridge Land Ltd (the Applicants ) intend to
More informationLongbridge Town Centre Phase 2 Planning Application
Longbridge Town Centre Phase 2 Planning Application Non-Technical Summary of the Environmental Statement December 2013 Introduction A full application for Planning Permission has been submitted to Birmingham
More informationABBEY MANOR GROUP/SAINSBURY S SUPERMARKETS LTD
ABBEY MANOR GROUP/SAINSBURY S SUPERMARKETS LTD Mixed Use Development including Business Park and Foodstore Land at Bunford Park, Bunford Lane, Yeovil Environmental Statement: Non-Technical Report June
More informationEnvironmental Statement (Volume 1) Non Technical Summary
Environmental Statement (Volume 1) Non Technical Summary Prepared by: The Environment Partnership Haydock Point Environmental Statement (Volume 1): Non-Technical Summary March 2017 Contents 1. Introduction
More informationReplacement Golf Course Facilities and Residential Development, Churston. Environmental Statement Non-Technical Summary
Replacement Golf Course Facilities and Residential Development, Churston Environmental Statement Non-Technical Summary July 2011 Reproduced from the Ordnance Survey s map with the permission of the Controller
More informationGrantham Southern Quadrant Link Road Environmental Statement
Grantham Southern Quadrant Link Road Environmental Statement Non Technical Summary Introduction Lincolnshire County Council (LCC) is submitting a planning application for the proposed implementation of
More informationSouth Whitehaven, Cumbria EIA
South Whitehaven, Cumbria EIA Environmental Statement - Non Technical Summary June 2013 in association with 1. Introduction Story Homes is applying to Copeland Borough Council (CBC) for a new residential
More informationES 5. Drakelow Park. Environmental Statement. Volume 5: Non Technical Summary. Lead Author Waterman Energy, Environment and Design Ltd
Drakelow Park ES 5 Environmental Statement Volume 5: Non Technical Summary Lead Author Waterman Energy, Environment and Design Ltd April 2009 Environmental Statement Volume 5: Non-Technical Summary DRAKELOW
More informationLAND AT HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. March 2017 Our Ref: Q70433
LAND AT HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY March 2017 Our Ref: Q70433 Contents 1 INTRODUCTION AND SITE DESCRIPTION... 1 2 EIA METHODOLOGY... 5 3 ALTERNATIVES... 6 4 DESCRIPTION
More informationHaydock Point. Welcome
Welcome Peel Logistics Property, alongside Peel Land and Property, is preparing a planning application for Haydock Point, a high-quality logistics park east of Haydock. The purpose of this exhibition is
More informationCranbrook EXPANSION ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY PRODUCED BY DAVID LOCK ASSOCIATES
Cranbrook EXPANSION ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY PRODUCED BY DECEMBER 2014 CRANBROOK EXPANSION AREAS ENVIRONMENTAL STATEMENT NON TECHNICAL SUMMARY Submitted in support of Outline Planning
More informationLondon Road, Derker. Non Technical Summary. Introduction
London Road, Derker Non Technical Summary Introduction The Oldham Rochdale Housing Market Pathfinder was set up to tackle longstanding problems of poor quality housing and to provide the framework for
More informationFormer RAF Sealand Site EIA
Praxis (Holdings) Ltd. Former RAF Sealand Site EIA Environmental Statement - Non Technical Summary February 2012 in association with P a g e 1 1. Introduction Praxis (Holdings) Ltd. is applying to Flintshire
More informationLAND AT MIDDLETON STONEY ROAD AND HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY. June 2017 Our Ref: Q70433
LAND AT MIDDLETON STONEY ROAD AND HOWES LANE, BICESTER ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY June 2017 Our Ref: Q70433 Contents 1 INTRODUCTION... 2 2 SITE DESCRIPTION... 5 3 EIA METHODOLOGY...
More informationSustainability Statement. Whitby Business Park Area Action Plan
Sustainability Statement Whitby Business Park Area Action Plan November 2014 Contents Page 1. Introduction 1 2. Scoping 3 3. Sustainability Appraisal of Options 6 4. Assessment of Draft Area Action Plan
More informationƱ ± ªº Œª ºª ø ª ª ± ª
Ʊ ± ªº Œª ºª ø ª ª ± ª ø º Õ± ± ± Œ±øºÙ Õ ß Æª ø檺 ±Æ ƪ ø檺 æß Æ± Ʊ ª ø ø fl ª ª ± ê ø Õ øæß ª ª æªæ Ó ÔÌ Non-Technical Summary Introduction A planning application has been submitted to the Vale
More informationNon-technical summary
Non-technical summary Introduction NTS.1 is applying for outline planning permission for a residential development of up to 80 dwellings on land at Hambrook, on the northern fringe of Bristol. NTS.2 An
More informationThe Trustees of the Standen Estate Land South of Clitheroe Non-Technical Summary
1 The Trustees of the Standen Estate Land South of Clitheroe Non-Technical Summary 1. Introduction This report summarises the results of an assessment that has been undertaken to determine how a proposed
More informationStrategic Employment Site, on land to the East of the M5, south of Junction 6, west of Pershore Lane. Environmental Statement. Non Technical Summary
Strategic Employment Site, on land to the East of the M5, south of Junction 6, west of Pershore Lane Environmental Statement Non Technical Summary March 2010 Strategic Employment Site, on Land to the East
More informationMeridian Water Phase 1 Application
Meridian Water Phase 1 Application MW11 Environmental Statement Non-Technical Summary London Borough of Enfield March 2016 Contents 1 Introduction 1 2 The proposed development 2 3 Evolution of the proposed
More informationWelcome to our exhibition
Welcome to our exhibition The Homes & Communities Agency (HCA) welcomes you to this public exhibition explaining our proposals for the redevelopment of the former Lea Castle Hospital site. About the Homes
More informationLongbridge East : Site Wide and Phase One Development
Longbridge East : Site Wide and Phase One Development Non-Technical Summary of the August 2011 Introduction St Modwen Developments Ltd intend to submit a new outline planning application for Longbridge
More informationWyvern Park Skipton Environmental Statement. Non-technical Summary - April 2015
Wyvern Park Skipton Environmental Statement Non-technical Summary - April 2015 BWB Consulting Ltd Whitehall Waterfront 2 Riverside Way Leeds LS1 4EH Telephone: +44(0)113 233 8000 Copyright This Report
More informationDEFGH. Crystal Place Park. Environmental Impact Assessment (EIA) Elin Thomas and Emily Low Waterman Environmental
DEFGH Crystal Place Park Environmental Impact Assessment (EIA) Elin Thomas and Emily Low Waterman Environmental 10.12.07 EIA Presentation Content What is EIA? Legal Requirements Process Q&A Key Topics
More informationLONDON BRIDGE STATION ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY
LONDON BRIDGE STATION ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY June 2011 1 EXECUTIVE SUMMARY 2 INTRODUCTION CONTENTS Page 2.1 Introduction 4 2.2 The Site 4 3 THE DEVELOPMENT 3.1 What is it? 5 3.2
More informationWelcome to our exhibition
Welcome to our exhibition housing development A46 Wildmoor Alcester Road Canal Quarter A422 Town Centre housing development Warwickshire-based IM Properties, one of the UK s largest privately owned property
More informationCardiff International Sports Village Waterfront Development Volume IV : Non-Technical Summary of the Environmental Statement
Greenbank Partnerships Ltd October 2012 Cardiff International Sports Village Waterfront Development Volume IV : Non-Technical Summary of the Environmental Statement Environmental Statement - Non Technical
More informationPublic Consultation. Land at Monks Farm, North Grove. Welcome
Welcome Welcome to our public exhibition for development on Land at Monks Farm, orth Grove. Gallagher Estates and Gleeson Strategic Land are preparing an outline planning application for new homes, open
More informationLAND AT WEST YELLAND. Environmental Statement Non-Technical Summary Welbeck Strategic Land LLP
LAND AT WEST YELLAND Environmental Statement Non-Technical Summary Welbeck Strategic Land LLP May 2014 Quality Management Issue/revision Issue 1 Revision 1 Revision 2 Revision 3 Remarks Draft FINAL Date
More informationWELCOME GYPSY LANE. Wider Site Location plan. Proposals for the development of LAND OFF FOXLYDIATE LANE WEBHEATH. Proposals for the development of
WELCOME The developers are preparing an outline planning application for a residential led development and need the community s views in order to develop the proposals further WHAT IS PROPOSED? A high
More informationComments on the proposed scope are requested from WCC/NBBC officers to be provided to SLC Rail by 25 th March 2016 and sent to
Introduction WCC have indicated that in advance of the surveys and assessments being undertaken consultation should be undertaken with technical officers of both Warwickshire CC and Nuneaton and Bedworth
More informationLAND SECURITIES REDEVELOPMENT OF NEWNHAM COURT SHOPPING VILLAGE, MAIDSTONE
LAND SECURITIES REDEVELOPMENT OF NEWNHAM COURT SHOPPING VILLAGE, MAIDSTONE Land at Environmental Statement: Non-Technical Summary Introduction Land Securities plc is applying to Maidstone Borough Council
More informationMoat Lane Regeneration Project Environmental Statement
AECOM Environment Towcester Regeneration Ltd. October 2012 Moat Lane Regeneration Project Environmental Statement Non-Technical Summary Prepared by:... Checked by:... Sophie Collins Scott Wilson Environmental
More informationSouth Macclesfield Development Area Environmental Statement Non-Technical Summary March 2017
South Macclesfield Development Area Environmental Statement March 2017 Contents 1.0 Introduction... 2 1.1 Background... 2 1.2 Environmental Assessment... 2 1.3 Site Description... 2 2.0 The Proposals...
More informationLAND NORTH OF STAFFORD
REPORT N O 62000589-ESVOL3 LAND NORTH OF STAFFORD ENVIRONMENTAL STATEMENT VOLUME 3: NON-TECHNICAL SUMMARY JULY 2016 LAND NORTH OF STAFFORD ENVIRONMENTAL STATEMENT VOLUME 3: NON-TECHNICAL SUMMARY Akzo Nobel
More informationTown and Country Planning (Environmental Impact Assessment Regulations) 2011 SCOPING OPINION
Town and Country Planning (Environmental Impact Assessment Regulations) 2011 SCOPING OPINION Application Site and Description of Development Proposed new quarry at Culham, Oxfordshire Land and Mineral
More informationTaylor Wimpey UK Ltd Proposed Development at Haydock Grange, Hoyles Lane, Preston Non-Technical Summary Revision 1 October 2011
Taylor Wimpey UK Ltd Proposed Development at Haydock Grange, Hoyles Lane, Preston Non-Technical Summary Revision 1 October 2011 Introduction An application for outline planning permission has been submitted
More informationKilnw Envir ood Vale onmental Statement Volume 3: Non Technical Summary July 2010
Kilnwood Vale Environmental Statement Volume 3: Non Technical Summary July 2010 Kilnwood Vale Environmental Impact Assessment Environmental Statement Volume 3 KILNWOOD VALE ENVIRONMENTAL STATEMENT NON-TECHNICAL
More informationPeter Brett Associates LLP (PBA) act on behalf of db symmetry ltd in respect of the proposed symmetry park, Kettering development (the Site).
Our ref: 30062 2 nd August 2017 Kettering Borough Council Planning Department Municipal Offices Bowling Green Rd Kettering NN15 7QX 61 Oxford Street Manchester M1 6EQ T: +44 (0)161 245 8900 E: manchester@peterbrett.com
More informationManywells, Cullingworth
Introduction You may recall that planning permission was granted in 2010 for the redevelopment of Manywells Industrial Estate to provide a mix of employment and residential uses. Since that time, the country
More informationLand at BROOK STREET PROPERTIES TENCREEK FARM, LISKEARD. Environmental Statement: Non-Technical Summary
BROOK STREET PROPERTIES TENCREEK FARM, LISKEARD Land at Environmental Statement: Non-Technical Summary Introduction Brook Street Properties is applying to Cornwall Council for outline planning permission
More informationPlots 4 & 6, Prologis Park, Midpoint Way, Sutton Coldfield, Birmingham, B76 9EH
Committee Date: 19/03/2015 Application Number: 2015/00285/PA Accepted: 19/01/2015 Application Type: Full Planning Target Date: 20/04/2015 Ward: Sutton New Hall Plots 4 & 6, Prologis Park, Midpoint Way,
More informationWho Is Parkside Regeneration?
Who Is Parkside Regeneration? Parkside Regeneration is a joint venture between commercial developers Langtree and St Helens Council. Langtree is a commercial property company, active in property management,
More informationRequest for a Scoping Opinion by Provectus. Proposed Surface Mining of Coal on Land west off the A61, Hill Top Farm, Clay Cross, Derbyshire
Request for a Scoping Opinion by Provectus Proposed Surface Mining of Coal on Land west off the A61, Hill Top Farm, Clay Cross, Derbyshire January 2012 Contents 1 Introduction & Background... 1 2 Site
More informationFollingsby Park South Environmental Statement: Volume 1: Non Technical Summary (March 2018)
Follingsby Park South Environmental Statement: Volume 1: Non Technical Summary (March 2018) 1.0 Introduction and Methodology 1.1 This document is a summary in non-technical language of an Environmental
More information7 Scoping and Introduction to the Assessments
7 Scoping and Introduction to the Assessments 7.1 Scope of the assessments 7.1.1 Rule 8 of the TWR makes provision for an applicant to request a scoping opinion from the SoS indicating the information
More informationNON-TECHNICAL SUMMARY
Proposed Sand and Gravel Extraction and Associated Processing Operations with Restoration to a Mixture of Agriculture and Nature Conservation including Areas of Shallow Water at Hedgeley, Northumberland
More informationRe-location of Rugby Farmers Mart
Re-location of Rugby Farmers Mart LaSalle Investment Management Barberry Logo here Environmental Statement Non-Technical Summary August 2017 Re-location of Rugby Farmers Mart Non-Technical Summary Report
More informationintu Bromley Planning Summary Bringing more to Bromley February 2014
intu Bromley Planning Summary February 2014 Bringing more to Bromley Contents Introduction 1 Description of the Proposals 2 Economic Benefits 4 Planning Policy 6 Cinema and Catering Assessment 7 Design
More informationKings Road Industrial Development, Immingham. Environmental Impact Assessment. Non Technical Summary
Environmental Impact Assessment Non Technical Summary Report prepared by: Ecus Ltd. Brook Holt 3 Blackburn Road Sheffield S61 2DW 0114 266 9292 December 2013 Page left intentionally blank INTRODUCTION
More informationNON-TECHNICAL SUMMARY
NON-TECHNICAL SUMMARY THE HIDE, BISHOP AUCKLAND PROPOSED ECO CHALET DEVELOPMENT NON-TECHNICAL SUMMARY 1 Introduction 1.1.1 This non-technical summary for the (ES) prepared in relation to the proposed eco-chalet
More informationHounsome Fields, Basingstoke Environmental Statement Non- Technical Summary. For Wates Developments Ltd and Pellipar Investments Ltd
Hounsome Fields, Basingstoke Environmental Statement Non- Technical Summary For Wates Developments Ltd and Pellipar Investments Ltd December 2015 Contents 1 Introduction 3 2 The Proposals 8 3 Environmental
More informationLand at Rampton Road. Cottenham
Land at Rampton Road Cottenham Introduction TEP is preparing an outline planning application for 54 dwellings on 6.9 hectares of land adjacent to Rampton Road, Cottenham on behalf of the owners Cambridgeshire
More informationBloor Homes Stubbocks Walk North Hertfordshire ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY
Bloor Homes Stubbocks Walk North Hertfordshire ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY December 2016 Environmental Statement: Non-Technical Summary Stubbocks Walk, North Hertfordshire J S Bloor
More informationKier Infrastructure and Overseas Limited Greenburn Surface Mine, Dalgig Farm Site
Kier Infrastructure and Overseas Limited Greenburn Surface Mine, Dalgig Farm Site Planning application pursuant to s.42 Town and Country Planning (Scotland) Act 1997 to amend the restoration scheme Volume
More informationChapter 4. Route Window C12: Mile End Park and Eleanor Street Shafts
Chapter 4 Route Window C12: Mile End Park and Eleanor Street Shafts 48 Crossrail Amendment of Provisions 4 Route Window C12: Mile End Park and Eleanor Street Shafts Location plan of Mile End Park and Eleanor
More informationBlackley Mere Developments Limited Blackley Mere Redevelopment
Blackley Mere Developments Limited Blackley Mere Redevelopment Environmental Statement Non-Technical Summary Hyder Consulting (UK) Limited 2212959 Firecrest Court Centre Park Warrington WA1 1RG United
More informationNon-Technical Summary
Introduction The Brent Cross Cricklewood regeneration scheme is located in northwest London and comprises 151 hectares (ha) of land within the London Borough of Barnet (LBB) (the Site ). In July 2014,
More informationRochford District Council Allocations Development Plan Document: Discussion and Consultation Document Sustainability Appraisal
Option SWH1 Balanced Communities Option SWH1 1 To ensure the delivery of high quality sustainable communities where people want to live and work Will it ensure the phasing of infrastructure, including
More informationLand North of Hall Road, Rochford. Rochford District Council. Planning Application Index. Prepared on behalf of Bellway Homes Ltd
Land North of Hall Road, Rochford Rochford District Council Planning Application Index Prepared on behalf of Bellway Homes Ltd April 2010 Land North of Hall Road, Rochford Rochford District Council Scope
More informationBREEDON NORTHERN LIMITED
Non Technical Summary CONTENTS 1 INTRODUCTION... 1 2 SITE DESCRIPTION... 1 3 DESCRIPTION OF THE DEVELOPMENT... 6 4 NEED FOR THE DEVELOPMENT... 8 5 KEY ISSUES CONSIDERED IN THE ENVIRONMENTAL IMPACT ASSESSMENT...
More informationDeparture from the Development Plan. Town Council objection to a major application. DETERMINE
Item No. 9 APPLICATION NUMBER CB/17/01642/OUT LOCATION Land rear of 43 to 91 Silver Birch Avenue South of Alder Green and Aspen Gardens, Aspen Gardens, Stotfold PROPOSAL Outline application for up to 95
More informationBlenheim Lane. Nottingham Energy Park. Informal Planning Guidance January Approved By: Portfolio Holder for Planning & Transportation
Blenheim Lane Former Allotments Site Nottingham Energy Park Approved By: Portfolio Holder for Planning & Transportation Informal Planning Guidance January 2012 Cities Revealed Copyright by The Geoinformation
More informationHRA PLANNING Chartered Town Planning and Environmental Consultants
HRA PLANNING Chartered Town Planning and Environmental Consultants Screening Statement for the Purposes of Determining the need for Appropriate Assessment Proposed development of 74 no. residential units
More informationThe Place Solar Farm
The Place Solar Farm Environmental Statement Non-Technical Summary 28 August 2014 Produced for Prepared by St John s House Queen Street, Manchester M2 5JB Contents Contents... 2 1 Introduction... 3 1.1
More informationi.6 Under this Key Area of Change the Daresbury Strategic Site will deliver:
I.0 NON-TECHNICAL SUMMARY Introduction i.1 Redrow Homes NW Ltd is applying to Halton Borough Council for planning permission for the development of up to 300 high quality residential dwellings, including
More informationEnvironmental Statement - Non Technical Summary Land South of Atherton. March 2014
Environmental Statement - Non Technical Summary Land South of Atherton March 2014 Contents 1. Introduction 1 2. Site and Surroundings 2 3. Development Need and Alternatives 4 4. Proposed Development 5
More informationNON TECHNICAL SUMMARY
NON TECHNICAL SUMMARY INTRODUCTION NTS.1 CEMEX UK Properties Limited is applying for planning permission to South Cambridgeshire District Council (SCDC) for the redevelopment of the former CEMEX cement
More informationNON-TECHNICAL SUMMARY
Hybrid outline/detailed planning application comprising an outline planning application for 196 residential dwellings, landscaping, open space, estate roads and infrastructure, plus 4 permanent gypsy and
More informationXII IX VIII NON-TECHNICAL SUMMARY OF ENVIRONMENTAL STATEMENT. Redevelopment of the Laverstoke Mill Complex
Laverstoke Mill XI XII Redevelopment of the Laverstoke Mill Complex I X NON-TECHNICAL SUMMARY OF ENVIRONMENTAL STATEMENT November 29 IX VIII St James Group Ltd Berkeley House, 19 Portsmouth Road, Cobham,
More informationWelcome. Site/11/04. Site/11/03. Proposed Site. 11,400 new homes needed in east Cambs
Welcome Welcome to our consultation on our proposals for new homes on land north east of Soham Road, Fordham. Members of the project team are available to answer any questions you have and listen to feedback.
More informationVALLEY PARK, DIDCOT. Non-Technical Summary. December On behalf of Taylor Wimpey UK Limited, Persimmon Homes and Hallam Land Management Ltd.
VALLEY PARK, DIDCOT Non-Technical Summary December 2014 On behalf of Taylor Wimpey UK Limited, Persimmon Homes and Hallam Land Management Ltd. CONTENTS 1 Introduction... 2 2 The Proposed Development...
More informationWelcome to our Public Consultation
About our development This exhibition gives you the chance to view and comment on our emerging plans for a proposed residential development located on land to the West of Alwyn Road, Rugby. Welcome to
More informationDevelopment of land adjacent to Braggs Farm Lane and Rumbush Lane, Dickens Heath. Welcome. Today s exhibition. The proposal site
Welcome Welcome to this event to discuss the development of land adjacent to Braggs Farm Lane. is currently in the preliminary stages of designing proposals to sensitively develop this site with high-quality
More informationLand to the North of Main Road, Wybunbury
Land to the North of Main Road, Wybunbury Environmental Statement Non-Technical Summary November 2014 Land to the North of Main Road, Wybunbury Environmental Statement Non-Technical Summary Prepared on
More informationLand East of Cromwell Lane
Land East of Cromwell Lane VISION DOCUMENT AUGUST 2016 The proposals for Land East of Cromwell Lane will be defined by existing landscape features, ensuring that the development offers a quality place
More informationLAND AT PARK MILL FARM, PRINCES RISBOROUGH ENVIRONMENTAL STATEMENT SUPPLEMENT NON-TECHNICAL SUMMARY
LAND AT PARK MILL FARM, PRINCES RISBOROUGH ENVIRONMENTAL STATEMENT SUPPLEMENT NON-TECHNICAL SUMMARY May 2016 CONTENTS CONTENTS... i 1 Introduction... 1 2 The Proposed Development... 3 3 Need and Alternatives
More information1.0 INTRODUCTION. Brantham Industrial Area Regeneration - Factory Lane - Brantham
1.0 INTRODUCTION Welcome to this exhibition of our proposals for the regeneration of the Brantham Industrial Area located off Factory Lane in Brantham. This presentation will give you an opportunity to
More informationLand at Weymouth Gateway Proposed hotel and pub / restaurant Non-technical summary. Premier Inns Ltd February 2011
February 2011 Introduction NTS.1 In April 2007, New Look Retailers Ltd submitted an outline planning application to Weymouth and Portland Borough Council to redevelop the Mount Pleasant Business Park
More informationBarvills Solar Farm Environmental Statement Non-Technical Summary
Barvills Solar Farm Environmental Statement Non-Technical Summary 13 March 2015 Produced for Prepared by St John s House Queen Street, Manchester M2 5JB Contents Contents... 2 1 Introduction... 3 1.1 Development
More informationE16: MAINTENANCE OF LANDSCAPED AREAS
HIGH SPEED TWO INFORMATION PAPER E16: MAINTENANCE OF LANDSCAPED AREAS This paper outlines the proposed approach to the maintenance of landscaped areas created for HS2 Phase One. It will be of particular
More informationPERSIMMON HOMES (SW) LIMITED LAND AT ADDINGTON, LISKEARD ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY
PERSIMMON HOMES (SW) LIMITED LAND AT ADDINGTON, LISKEARD ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY APRIL 2010 INTRODUCTION This document is the Non-Technical Summary (NTS) of an Environmental Statement
More informationBurgess Hill, Land South of Freeks Farm Phase 1 of Burgess Hill Northern Arc East Environmental Statement Non-Technical Summary September 2016
Burgess Hill, Land South of Freeks Farm Phase 1 of Burgess Hill Northern Arc East Environmental Statement September 2016 Contents 1.0 Introduction... 1 1.1 Background... 1 1.2 Environmental Assessment...
More informationUTT/17/2075/FUL - (BERDEN) (Referred to Committee by Councillor Janice Loughlin. Reason: In the Public Interest)
UTT/17/2075/FUL - (BERDEN) (Referred to Committee by Councillor Janice Loughlin. Reason: In the Public Interest) PROPOSAL: LOCATION: APPLICANT: Amendments to the design of a scheme for a 49.99MW battery
More informationLAND EAST OF SUDBURY ROAD, HALSTEAD PUBLIC CONSULTATION. Proposed Residential Development
LAND EAST OF SUDBURY ROAD, HALSTEAD PUBLIC CONSULTATION Proposed Residential Development YOUR VIEW MATTERS TO US PROPOSED RESIDENTIAL DEVELOPMENT AREA Thank you for taking the time to read this information
More informationCauseway Farm, Petersfield Environmental Statement Non-Technical Summary October 2015
Causeway Farm, Petersfield Environmental Statement October 2015 2 Contents 1.0 Introduction... 1 1.1 Background... 1 1.2 Environmental Assessment... 1 1.3 Site Description... 3 2.0 The Proposals... 6 2.1
More informationPANSHANGER QUARRY, Hertfordshire
PANSHANGER QUARRY, Hertfordshire Proposed enhanced restoration of Phases F & H Briefing Note 1 March 2015 INERT (INACTIVE) RESTORATION MATERIALS, CONTROLS AND OPERATIONS 1 Introduction This briefing note
More information11. ISLINGTON ROUTE SECTION ENVIRONMENTAL BASELINE AND ASSESSMENT OF IMPACTS OVERVIEW OF ISLINGTON ROUTE SECTION... 2
11. ISLINGTON ROUTE SECTION ENVIRONMENTAL BASELINE AND ASSESSMENT OF IMPACTS... 2 11.1 OVERVIEW OF ISLINGTON ROUTE SECTION... 2 11.2 POLICIES RELEVANT TO ALL WORKSITES IN ISLINGTON... 3 11.3 FARRINGDON
More informationLAND OFF TOLLBAR WAY, HEDGE END PUBLIC CONSULTATION. Proposed Residential Development
LAND OFF TOLLBAR WAY, HEDGE END PUBLC CONSULTATON Proposed Residential Development YOUR VEW MATTERS TO US PROPOSED STE AREA Thank you for taking the time to read this information leaflet regarding a proposed
More informationThornton Road, Pickering Environmental Statement Non-Technical Summary. January 2016
Thornton Road, Pickering Environmental Statement Non-Technical Summary January 2016 EIA Quality This Environmental Statement, and the Environmental Impact Assessment (EIA) carried out to identify the significant
More informationPINEWOODS HOLIDAY PARK: HORSE PADDOCK. Non-Technical Summary
PINEWOODS HOLIDAY PARK: HORSE PADDOCK June 2014 1 Introduction 1.1 The existing Pinewoods Holiday Park is located approximately 1 km to the north of Wells-nextthe-Sea on the north Norfolk coast. Pinewoods
More informationWard: Southbourne. Outline application with all matters reserved. Erection of 5 no. dwellings and associated works.
Parish: Southbourne Ward: Southbourne SB/16/00205/OUT Proposal Site Outline application with all matters reserved. Erection of 5 no. dwellings and associated works. Dunkirk South Lane Southbourne Emsworth
More informationWELCOME. Land North of STEVENAGE. We would like to thank you for attending our public exhibition today.
WELCOME We would like to thank you for attending our public exhibition today. The purpose of this event is to share our proposals and hear your thoughts on our ideas. Members of the project team are on
More informationEnvironmental Impact Assessment
Environmental Impact Assessment Environmental impact assessment (EIA) is the process of systematically drawing together an assessment of the likely significant environmental effects of a development project.
More informationCA//16/00504/FUL. Canterbury City Council Military Road Canterbury Kent CT1 1YW. Crown copyright and database rights 2016 Ordnance Survey
O Scale 1:1,250 Map Dated: 09/05/2016 CA//16/00504/FUL Crown copyright and database rights 2016 Ordnance Survey 100019614 Canterbury City Council Military Road Canterbury Kent CT1 1YW AGENDA ITEM NO 13
More informationSPG 1. * the northern and western sections which are open fields used for pasture and grazing;
SPG 1 1.0 INTRODUCTION This development brief is based on the allocation of the Priors Hall site for employment and countryside recreational purposes in the Corby Borough Local Plan. The brief is intended
More informationLAND NORTH OF NETHERHOUSE COPSE, FLEET
REPORT N O 70020067 LAND NORTH OF NETHERHOUSE COPSE, FLEET ENVIRONMENTAL STATEMENT VOLUME 3:NON-TECHNICAL SUMMARY OF THE ENVIRONMENTAL STATEMENT PUBLIC JUNE 2016 LAND NORTH OF NETHERHOUSE COPSE, FLEET
More informationThe Town and Country Planning (Environmental Impact Assessment) (Wales) Regulations 2016, Regulation 13 Scoping Opinion
Mr Graham Clark Berrys Newchurch Farm Kinnersley Hereford HR3 6QQ BY EMAIL The Town and Country Planning (Environmental Impact Assessment) (Wales) Regulations 2016, Regulation 13 Scoping Opinion SC/2017/0001
More informationEIA Scoping Opinion Land at West Kingsford (North of the A944 Road)
EIA Scoping Opinion Land at West Kingsford (North of the A944 Road) Page EIA Scoping Report page 10 page 13 Section 4.2.3 Cumulative Impacts 5. Proposed Scope AWPR, Prime four and other development areas
More informationPeterhouse Technology Park Expansion
Peterhouse Technology Park Expansion Environmental Statement Volume 1: Non-Technical Summary April 2015 1.0 Introduction & Methodology 1.1 This document is a summary in non-technical language of an Environmental