1 MECHANICAL DEPTH EXISTING MECHANICAL SYSTEM The need to maintain occupancy during the renovation and the strict NIH Design Guidelines were the main driving forces behind the design. The mechanical engineering group, Affiliated Engineers, Inc., worked closely with NIH beginning with schematic design and continuing through construction to develop the following design objectives and requirements, ensuring NIH Design Guidelines were followed. Design Objectives & Requirements The driving design objectives and requirements needed to ensure operability a state-of-the-art laboratory facility include: 1 Provide the facility with sufficient indoor conditions (thermal comfort, indoor air quality IAQ and safety so to maximize efficiency and productivity of the NIH-NCI employees. 2 Provide the facility with a system that integrates and successfully phases out the existing mechanical system with the new design in conjunction with the district heating and cooling systems. 3 Provide the facility with a system that strictly adheres to the NIH Design Guidelines. Table 1 Outdoor and Indoor Design Conditions NIH Building 37 is located on the Bethesda, Maryland campus, which is not listed in ASHRAE Fundamentals Climatic Design Information chapter, so the design conditions for Camp Springs, Maryland Andrews AFB were used. The cooling load for NIH Building 37 was calculated 11
2 using outdoor design conditions of 35ºC dry-bulb temperature and 26ºC wetbulb temperature, corresponding to ASHRAE 0.4% design conditions. Similarly, the heating load was calculated using outdoor design conditions of -23ºC, which is well below ASHRAE design conditions for the area. Based on design documents, indoor design conditions are set at 23ºC and 50% relative humidity. The outdoor design conditions are summarized in Table 1. The requirements for laboratory spaces and perimeter research offices do not differ from one another. Design Heating and Cooling Loads All of the heating and cooling in the building is being supplied by central plants on the NIH campus. The total heating load = MBH and the total cooling load = tons. There is also a cogeneration plant servicing the building through a turbine powered by natural gas that is coupled to an electric generator. The exhaust from the turbine flows through a boiler and produces steam at 100,000 lbs/hr which services all the buildings on the NIH campus. Mechanical System - Airside The airside mechanical system for NIH consists of eight packaged air-handling units supplying once-through 100% outdoor air through a zoned variable-air-volume system, to the occupied spaces at 23ºC. The eight AHUs range anywhere from 28,314 L/s to 29,258 L/s and are located in the mechanical penthouse, directly above the sixth floor. In the basement, where existing mechanical equipment is located, there are two packaged airhandling units; one supplying variable outdoor air with an economizer and one supplying constant volume variable outdoor air for cooling only to the transformer room. ariable-air-volume (A boxes with heating coils distribute air from the air-handling units to all of the occupied zones. Factory 12
3 assembled, horizontal, draw-through type fan coil units were used in some zones not being supplied to by the air-handling system. There are eight fume exhaust fans installed in parallel, all connected to a common fume exhaust plenum. Each fan has a capacity of 32,089 L/s and a schematic of the central fume exhaust flow can be viewed in Technical Assignment #3. In the analysis of the airside mechanical system, only the eight AHUs in the mechanical penthouse will be considered. Mechanical Systems Waterside Chilled water is provided by the NIH central chilled-water distribution system, and is supplied to the building at 6ºC and leaves at 16ºC. Roughly 2500 tons of water is distributed to Building 37 by three (constant speed tertiary pumps. All three pumps are sized at 50% capacity and are piped in parallel, with two pumps operating at any one time and the third acts as standby. Chilled water serves fan coil units, as well as cools process equipment located throughout the building. Steam is provided by large boilers at 165 psi, and then flows from the NIH central heating plant in Building 11 to various buildings on the campus. Approximately 20,000 lbs/hr of steam enters Building 37 to serve the heating coils in the AHUs. An underground tunnel system provides piping from the central plants to the various buildings on the NIH campus. 13
4 MECHANICAL DEPTH - MECHANICAL SYSTEM REDESIGN PROPOSAL & JUSTIFICATION Critique of Mechanical System After performing analyses, calculations and finally making assessments based on ASHRAE Standard Addendum n and ASHRAE Standard in Technical Assignments #1, #2 and #3, key features of the design and features not addressed in the design showed possible areas of improvement. Careful considerations and precautions were made during the design of the modernization of Building 37 to follow the strict design guidelines set forth by NIH. Laboratory/research facilities are inherent consumers of natural resources, with little or no heat/energy recovery, as is with Building 37. Based on Technical Assignment #2, it was estimated that the HAC energy usage per year for Building 37 = 75,673, kwh. Because of the high energy usage per year, the main goal in mind was to implement a low-energy design. Since this facility was designed for 100% OA with a minimum of six air changes per hour (ACH, the large volume of ventilation air required poses the opportunity to reduce the amount of energy required to condition ventilation air. The engineers for Building 37 did just this, as they designed for variableair-volume (A fume hoods, A supply with terminal reheat devices and hood exhaust systems. Also, in regards to the building envelope and its influence on the energy efficiency, existing windows were replaced with inoperable, low-emissive (low-e insulating glass, so not to compromise the mechanical system design. Occupancy controls are utilized in individual research offices, public areas where feasible, such as service corridors, large rooms and lavatories, using ultrasonic-type dual technology with passive infrared sensors. 14
5 Since Building 37 also supports other spaces such as conference rooms and office suites, which require significantly less stringent HAC requirements, as well as laboratory spaces, the integration of these dissimilar types of occupancies increases the potential for wasted energy. While the engineers and designers of Building 37 have implemented several design features to improve building energy performance, the modernization of Building 37 did not include any design for heat/energy recovery. With 100% OA being supplied, heat/energy recovery from exhaust air looks to be a viable option. Information on the waterside mechanical system of NIH Building 37 is unavailable. The National Institutes of Health will not disclose any information concerning the central chiller, central steam and cogeneration plants servicing the buildings on the NIH campus. Alternatives Considered Any proposal to redesign components of the central chiller, central steam or cogeneration plants were disregarded due to the inability to gain access to vital information. NIH has disclosed this sensitive information due to security issues. Other than any redesign ideas for the central plants, the only design alternatives that could be considered involved just the airside mechanical system in Building 37. Focus was turned to investigating several different energy recovery alternatives. The different alternative considered include a heat pipe, run-around coils and a total enthalpy wheel (taking into account both sensible and latent loads. The options are briefly outlined below. 15
6 Heat Pipe In a heat pipe system, supply and exhaust airstreams should be located next to each other to ensure proper operation. The basic mechanics of the heat pipe system uses the movement of boiling and condensing refrigerant inside a sealed pipe to act as the heat transfer medium. There is no mixing of the airstreams, and no power source is needed to drive the heat transfer process. According to ASHRAE Laboratory Design Guide, the efficiency of sensible heat transfer ranges between 45% and 65%. Run-around coils A run-around coil heat recovery system consists of a matched pair of coil heat exchangers, in which the two coils are piped together in a continuous loop for the heat transfer medium to flow. Since the unit is self-contained, there is no mixing of the airstreams Total enthalpy wheel Passive Desiccant Dehumidification Wheel In a desiccant dehumidification unit, it is necessary for the supply air and exhaust air streams to be located next to each other to ensure proper operation of the system. This close proximity to contaminated exhaust air Table 2 smallest virus 1000 angstroms > 3 angrstrom sieve water molecule 265 angstroms < 3 angstrom sieve raises serious questions of crosscontamination in laboratory facilities. In response to this concern, SEMCO manufactures a wheel (EXCLU- SIEE with a sieve of 3 angstroms (Å, prohibiting anything larger than this to absorb/transfer from the wheel. To gain a perspective on size, refer to Table 2. The EXCLU-SIEE wheel utilizes a 3Å molecular sieve desiccant coating to limit the risk of desiccant cross-contamination between the exhaust air stream and outdoor air stream. Molecular sieves are structurally stable, chemically inert and have a strong 16
7 affinity for water vapor and it is this strong affinity for water vapor which produces the high rate of adsorption resulting in superior latent transfer performance. In this type of system, typical heat transfer efficiency ranges between 50% and 85%, according to the AHSRAE Laboratory Design Guide. Redesign Proposal & Justification The driving factors behind the final redesign proposal for NIH Building 37 Modernization were finding a cost effective solution to the issue of heat recovery for the airside mechanical system. After contemplating the pros and cons of the other design alternatives, the final solution will incorporate a passive desiccant dehumidification system in the airside mechanical system to account for heat recovery. Due to the humid climate during the summer months of the facility, the need to dehumidify is necessary in any redesign proposal. The two primary loads in conventional air-conditioning are sensible and latent loads the sensible load taking into consideration the temperature component and the humidity portion being taken care of by the latent load. The only energy used by the desiccant dehumidification units is the fan energy required to move the air. Desiccant dehumidification is beneficial in all types of buildings by improving indoor air quality (IAQ, reducing the latent portion of the cooling load, reducing odor and decreasing operational costs of facilities. The process involves the removal of moisture from humid air with the aid of a desiccant material that absorbs the water vapor as opposed to condensing it. Although the desiccant system s first cost cannot compete with conventional air-conditioning, the conventional system can be reduced in size when configured to work with desiccant dehumidification units. 17
8 MECHANICAL DEPTH PASSIE DESICCANT DEHUMIDIFICATION Redesign Introduction The existing mechanical system in NIH Building 37 does not account for any heat or energy recovery. In research and laboratory facilities, where fume hoods are in place, the concern of cross contamination in air-to-air heat recovery is heightened. In NIH Building 37, the exhaust airstream ducts are located relatively close to the outdoor airstreams, so the proximity of the airstreams is not an issue for the redesign. This section goes into the calculations and simulation results from applying a passive desiccant dehumidification system to the existing mechanical system for NIH Building 37. Existing Loads Through Carrier s Hourly Analysis Program (HAP it was found that the total cooling coil load = tons and the total heating load = MBH. The loads contributed to each air-handling unit are summarized in Table 3. The annual cost to operate Building 37 is $858,756/year. Table 3 Total Cooling Coil Load (tons Total Heating Load (MBH AHU AHU AHU AHU AHU AHU AHU AHU Total Appendix I includes a complete printout of the HAP output from the simulation. SEMCO Model The SEMCO Energy Recovery Wheel Technical Guide and SEMCO TE Wheel Modeling Program were used to size and select an appropriate passive desiccant wheel. Both references were supplied by SEMCO Representative, Rick Caldwell. The design guide presents the SEMCO EXCLU-SIEE total energy (TE3 recovery wheel. The selection procedure in the technical guide was 18
9 followed to select the appropriate total energy recovery wheel, and then the modeling program was used to calculate an energy analysis and cost analysis. SEMCO ELCLU-SIEE 3Ǻ Molecular Sieve SEMCO s EXCLU-SIEE total energy recovery wheel provides features that optimize the sensible (temperature recovery of performance, and also provides latent (moisture recovery efficiencies that match the improved sensible values. This is accomplished through EXCLU-SIEE s 3Ǻ molecular sieve desiccant coating. The high rate of absorption allows for effective moisture transfer between the outdoor and exhaust airstreams. Picture 3 Molecular sieves are crystalline metal alumino-silicates, and a close up view can be seen in Picture 3. When it is combined with oxygen atoms, the threedimensional interconnecting network expands its internal surface area where passing liquids and gases in the airstreams are adsorbed. The 3Ǻ molecular sieve has the unique capability of limiting adsorption to materials that are smaller than approximately 3 angstroms. 19
10 SEMCO Technical Guide Calculations An excel worksheet was created following the design procedure. The complete printout of calculations for the unit selection can be found in Appendix II. The first step involved was selecting the wheel, based on airflow. Using Figure 2, EXCLU-SIEE TE3-70 model was determined to be suitable given all the airflows. Step 2 involved determining the unit effectiveness and the following equations were used. Figure 2 ε s = s min ( X 1 X 2 ( X X 1 3 ε r = r min ( X X 4 ( X X 1 3 X 2 = X 1 εs min s ( X X 1 3 X 4 = X 3 + εs min r ( X X 1 3 Step 3 involved the calculations of unit performance and these calculations can be found in Appendix II. 20
11 The purge volume was calculated in step 4 of the design procedure. A purge section is utilized to avoid carry-over of exhaust air into the supply air-stream. or all AHUs, the purge volume = 3800 cfm with a purge index setting = 4. A schematic for purge operation is shown in Figure 3. Figure 3 Step 5 calculated the reduction in required chiller and/or boiler capacity, and was estimated through the following equations. Chiller capacity = scfmh Boiler capacity = scfmh ( h IN ( h IN OUT OUT , ,000 Table 4 summarizes the wheel selection results given the required airflows for each AHU. Table 4 Face elocity Pressure Loss Effectiveness Unit Effectiveness Cooling Unit Effectivenss Heating Purge olume Chiller Reduction Capacity Boiler Reduction Capacity fpm in. wg % Supply Return Supply Return cfm tons boiler hp , ,04 21
12 Based on SEMCO Energy Recovery Wheel Technical Guide design procedure, SEMCO TE3-70 energy recovery wheel was selected, and Table 5 summarizes the performance data and unit dimensions, which are common for all eight AHUS. Figure 4 shows the dimensions of the wheel. The TE3-70 wheels add an additional 37,440 lbs of load in the mechanical penthouse. Table 5 Figure 4 Performance Data for TE3 Wheels elocity 900 fpm Wheel Efficiency 76 % Pressure Drop 0.94 in. wg Wheel Model Size 70 Airflow Rate 63,360 cfm Unit Dimensions A in. B 79.1 in. C 89.4 in. D 84.3 in. W 23.0 in. Net Wt lbs Flow Area/Side 70.4 ft 2 Nominal cfm cfm SEMCO TE Wheel Modeling Program This program was used to check the results of the excel worksheet derived results and also to compute cost analysis information. The complete printout of results from the simulation can be found in Appendix III. Table 6 summarizes the costs and also compares the cooling and heating loads for the new input capacities to the existing loads. Each unit is approximately $45,000 with a $22,500 installation cost. The first cost savings range between approximately $60,000 and $65,000 depending on the AHU. There is an immediate payback with positive present cash flow values ranging between $234,000 and $241,
13 Table 6 Equipment Installation First Cost Immediate Payback w/ Cooling Capacity Cooling Load from First Cost ($ Cost ($ Savings ($ Positive Present Cash alue of Input Required (tons Existing System (tons Heating Capacity Required (MBH Heating Load from Existing System (MBH AHU 1 45,000 22,500 60, , AHU 2 45,000 22,500 64, , AHU 3 45,000 22,500 64, , AHU 4 45,000 22,500 60, , AHU 5 45,000 22,500 60, , AHU 6 45,000 22,500 60, , AHU 7 45,000 22,500 64, , AHU 8 45,000 22,500 64, , Total 360, , ,568 1,900,
Mechanical System Redesign. Dedicated Outdoor Air System. Design Criteria
Mechanical System Redesign Dedicated Outdoor Air System Design Criteria The outdoor air conditions used were for Philadelphia, Pennsylvania IAP at a 0.4% occurrence. The supply air conditions were developed
More informationTechnical Assignment 3
0 David H. Koch Institute for Integrative Cancer Research Senior Capstone Mechanical Option Technical Assignment 3 Mechanical Systems and Existing Conditions Report David H. Koch Institute for Integrative
More information7. MECHANICAL SYSTEM DESIGN
7. MECHANICAL SYSTEM DESIGN The second primary topic of this thesis is to investigate the application of a dedicated outdoor air system (DOAS) to the SLCC. The stated goals for this thesis of improved
More informationPINNACLE SERIES DEDICATED OUTDOOR AIR SYSTEM ENERGY EFFICIENT DEHUMIDIFICATION
ENERGY EFFICIENT DEHUMIDIFICATION PINNACLE SERIES DEDICATED OUTDOOR AIR SYSTEM Provides a very high degree of latent cooling using only a minimal amount of conventional cooling input Substantial energy
More informationEU Air Handling Units with SEMCO EXCLU-SIEVE
EU Air Handling Units with SEMCO EXCLU-SIEVE The acquisition of US based Semco has given us the opportunity to include a new range of rotary heat exchangers in our EU air handling unit range. Hygienic
More informationExisting Mechanical System Operation
majority of the air handlers. There are louvers along the north side of the building that allow for outdoor air to come in and feed the air handlers. On levels 4-8 the research laboratories are variable
More informationSenior Thesis Centre Community Hospital East Wing Addition - Proposal Keith Beidel Mechanical Option 12/05/02 1
Table of Contents Page Number(s) Executive Summary 2 Project Background 3 Proposed Depth Alternatives 4 Proposed Depth Redesign 5-7 Justification of Proposed Depth Redesign 8 Proposed Breath Redesign 9
More informationEP SERIES PACKAGED ENERGY RECOVERY SYSTEM ENERGY EFFICIENT AIR COMFORT
ENERGY EFFICIENT AIR COMFORT EP SERIES PACKAGED ENERGY RECOVERY SYSTEM Certified total energy recovery performance (sensible and latent) up to 90% efficient. Double-wall panel construction eliminates exposed
More information4. OVERVIEW OF MECHANICAL SYSTEM
4. OVERVIEW OF MECHANICAL SYSTEM The 87,000 SF SLCC is served by six (6) Trane M-Series Climate Changer Air Handing Units (AHUs). Each unit serves a distinct zone within the facility that is unique in
More informationThe School District of Philadelphia Administration Headquarters Shell and Core Renovations 440 North Broad Street Philadelphia, PA
2.0 Depth Work - Alternative Mechanical Designs 2.1 Objectives The goal of designing alternative systems is to compare energy usage, system costs, emissions, lost rentable space, and constructability.
More informationFAST AND ROBUST BUILDING SIMULATION SOFTWARE. Chilled Beam Performance: 1 Shelly Street, Sydney
FAST AND ROBUST BUILDING SIMULATION SOFTWARE Chilled Beam Performance: 1 Shelly Street, Sydney 3D Model Creation 1 Shelley Street, Sydney 3D Model Creation 1 Shelley Street, Sydney Daylight Analysis 1
More informationTechnical Report #3 Mechanical Systems Existing Conditions Evaluation
Mechanical Option Technical Report #3 Technical Report #3 Mechanical Systems Existing Conditions Evaluation Instructor: Dr. Bahnfleth 11.15.04 Building Sponsor: CCG Facilities Integration Table of Contents
More informationASHRAE Region VI CRC Track III: Session 3 Ventilation Energy Recovery. Steven T. Taylor, PE Principal Taylor Engineering
ASHRAE Region VI CRC Track III: Session 3 Ventilation Energy Recovery Steven T. Taylor, PE Principal Taylor Engineering This program is registered with the AIA/CES for continuing professional education.
More informationCHAPTER 4. HVAC DELIVERY SYSTEMS
CHAPTER 4. HVAC DELIVERY SYSTEMS 4.1 Introduction 4.2 Centralized System versus Individual System 4.3 Heat Transfer Fluids 4.4 CAV versus VAV Systems 4.5 Common Systems for Heating and Cooling 4.6 Economizer
More information4.0 Mechanical Redesign
4.0 Mechanical Redesign As my depth area of research, I have performed a detailed analysis of the existing air handling units and the existing conditions of the FIT Science Lab. After one semester of breaking
More informationThe Creative and Performing Arts High School (CAPA) Pittsburgh, PA 11/11/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma
Objectives and Requirements For the Creative and Performing Arts High School (CAPA), the main objective of the mechanical design is to provide an energy efficient system that is easily maintainable and
More informationState of the art building simulation software... Frenger Radiant chilled beam performance at 1 Shelly St - Sydney
Frenger Radiant chilled beam performance at 3D Model Creation Daylight Analysis Comparison of the performance of various HVAC systems at 1 Shelly St, Sydney VAV fancoil Active chilled beam Passive chilled
More informationTrane CDQ Desiccant Dehumidification
Engineering Bulletin Trane CDQ Desiccant Dehumidification September 2004 CLCH-PRB020-EN Preface This engineering bulletin presents the Trane CDQ desiccant dehumidification system. It explains the features
More informationMechanical Technical Report 3. Mechanical Systems Existing Conditions Evaluation
Mechanical Technical Report 3 Lutheran Theological Seminary at Philadelphia The New Learning Center Prepared For: William P. Bahnfleth, Ph.D., P.E. Department of Architectural Engineering Pennsylvania
More informationF.W. Olin Physical Science Laboratory
Mechanical Systems Existing Conditions Evaluation Presented on Page 1 of 16 Table of Contents Executive Summary Depth p.3 Executive Summary Breadth p.4 Introduction & Background p.5 Alternatives p.7 Breadth
More informationMT. AIRY MIDDLE SCHOOL CARROLL COUNTY PUBLIC SCHOOLS
CARROLL COUNTY PUBLIC SCHOOLS LIFE CYCLE COST ANALYSIS SUMMARY DGS PROCEDURES FOR THE IMPLEMENTATION OF LIFE CYCLE COST ANALYSIS AND ENERGY CONSERVATION OCTOBER, 2010 G.A.I.#09090 GIPE ASSOCIATES, INC.
More informationAppendices. Included in this section are
Appendices Included in this section are Appendix A Building Overview Appendix B Alternative Mechanical Designs Appendix C Integration of Structural System and Constructability 68 Appendix A Building Overview
More informationDehumidifying with Dedicated Outdoor Air
Dehumidifying with Dedicated Outdoor Air System Configurations Figure 71. Configurations for dedicated outdoor-air systems A dedicated outdoor-air handler separately filters, cools, dehumidifies, heats,
More informationEADQUARTERS. Technical Report One. Stephanie Kunkel Mechanical Option
EADQUARTERS 707 N. Calvert St. Technical Report One ASHRAE Standard 62.1 Ventilation ASHRAE Standard 90.1 Energy Design Stephanie Kunkel www.engr.psu.edu/ae/thesis/portfolios/2011/slk5061 Mechanical Option
More informationCase Study: Furman University Charles H. Townes Center for Science. Michael K. Mantai, PE, CCP President System WorCx
Case Study: Furman University Charles H. Townes Center for Science Michael K. Mantai, PE, CCP President System WorCx AIA Quality Assurance Learning Objectives 1. Case study example of Chilled Beam technology
More informationMechanical Systems Design
Mechanical Systems Design After much deliberation and a long process of brainstorming ideas for potential mechanical system designs for the, it was finally decided to design a central chilled water plant
More informationINTRODUCTION HVAC BASICS AND HVAC SYSTEM EFFICIENCY IMPROVEMENT SECTION O 4/19/2012
HVAC BASICS AND HVAC SYSTEM EFFICIENCY IMPROVEMENT SECTION O INTRODUCTION HVAC systems or Heating, Ventilating and Air-Conditioning systems control the environment for people and equipment in our facilities.
More informationTechnical Assignment 1
0 Technical Assignment 1 ASHRAE Standard 62.1 Ventilation and Standard 90.1 Energy Design Evaluations Compliance Analysis David H. Koch Institute for Integrative Cancer Research Massachusetts Institute
More informationENGINEERING BULLETIN. Overview of Chilled Beam Technology. Purpose. Summary. Theory
Overview of Chilled Beam Technology Purpose Chilled beam technology is new to the United States but has been used in Europe since the 1950 s. Chilled beams can reduce energy costs, improve indoor air quality,
More informationMechanical Systems Thesis Proposal: Calvert Memorial Hospital Prince Frederick, MD Holly Mawritz
: Holly Mawritz Senior Thesis Project Proposal Penn State University Department of Architectural Engineering Mechanical Emphasis Faculty Consultant: Dr. Jim Freihaut 12-10-04 Table of Contents: Executive
More informationMechanical Redesign, Proposal Elizabeth C. Krauss Mechanical Option September 18, 2013
Mechanical Redesign, Proposal Elizabeth C. Mechanical Option September 18, 2013 State Institute of Rehabilitation T e c h n i c a l R e p o r t I 1 Mechanical Redesign, Proposal... 0 Executive Summary...
More informationTopic 2. ME 414/514 HVAC Systems Overview Topic 2. Equipment. Outline
ME 414/514 HVAC Systems Overview Equipment Outline 2-1 The Complete System 2-2 The Air-Conditioning and Distribution System 2-3 Mechanical Equipment Air-handling Equipment Heating Equipment Boilers Furnaces
More informationHumidity Control & Psychrometrics
Humidity Control & Psychrometrics Iowa Chapter of ASHRAE March 22, 2017 R. Mark Nunnelly, P.E., CxA, LEED AP Nunnelly & Associates, Inc. Commissioning & Humidity Control Consulting Birmingham, AL mnunnelly@nunnellyengineering.com
More informationB. Use UT Austin specifications and equipment schedule format for HVAC equipment where available.
PART 1: GENERAL 1.01 General Requirements A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the
More informationDEHUMIDIFICATION: Ice Arena Application & Product Guide. Design, construct and operate to control indoor humidity in ice rinks
DEHUMIDIFICATION: Ice Arena Application & Product Guide Design, construct and operate to control indoor humidity in ice rinks Munters is the world leader in dehumidification Munters is the largest manufacturer
More informationMaterial and rotor description.
Material and rotor description. Why we use aluminum series 8000? Due the very good manufacturing characteristics and resistance against corrosion AMARANT has chosen to use the 8000 series alloy both for
More informationDesign Considerations For Dedicated OA Systems BY HUGH CROWTHER, P.ENG, MEMBER ASHRAE; YI TENG MA, ASSOCIATE MEMBER ASHRAE
ASHRAE www.ashrae.org. Used with permission from ASHRAE Journal. This article may not be copied nor distributed in either paper or digital form without ASHRAE s permission. For more information about ASHRAE,
More informationINTRODUCTION TO: ASHRAE STANDARD 90.1, HVAC System Requirements for Reducing Energy Consumption in Commercial Buildings
INTRODUCTION TO: ASHRAE STANDARD 90.1, 2013 HVAC System Requirements for Reducing Energy Consumption in Commercial Buildings Rocky Mountain ASHRAE Technical Conference, April 29, 2016 SEAN BEILMAN, P.E.,
More informationENERGY EFFICIENCY WITH SUPERIOR INDOOR AIR QUALITY
SUPERIOR IAQ LOW FIRST COST BEST ROI ENERGY EFFICIENCY WITH SUPERIOR INDOOR AIR QUALITY Pinnacle manages 100% of a building s ventilation and indoor humidity load in a single package. Chilled beams have
More informationSIMULATION ANALYSIS OF BUILDING HUMIDITY CONTROL AND ENERGY CONSUMPTION FOR DIFFERENT SYSTEM CONFIGURATIONS USA
Ninth International IBPSA Conference Montréal, Canada August 15-18, 25 SIMULATION ANALYSIS OF BUILDING HUMIDITY CONTROL AND ENERGY CONSUMPTION FOR DIFFERENT SYSTEM CONFIGURATIONS Chaoqin Zhai 1, Xiaohong
More informationCARRIER edesign SUITE NEWS. Interpreting High (Low) Peak Design Airflow Sizing Results for HVAC. Equipment Selection.
Volume 5, Issue 1 CARRIER edesign SUITE NEWS Interpreting High (Low) Peak Design Airflow Sizing Results for HVAC Equipment Selection A design challenge sometimes occurs when computing design loads using
More informationPharmaceutical Facility Design
PhEn-602 Pharmaceutical Facility Design J. Manfredi Notes 9A PhEn-602 J. Manfredi 1 Primary & Secondary HVAC units Primary Primary air handling unit arrangement: One unit is responsible for all of the
More information2 Existing Mechanical System
2 Existing Mechanical System 2.1 Design Objectives and Requirements The Gossett Field House project consists of a 25,000 sqft addition and a 40,000 sqft renovation of the existing facility for the University
More informationHeat pump and energy recovery systems
SBS5311 HVACR II http://ibse.hk/sbs5311/ Heat pump and energy recovery systems Ir. Dr. Sam C. M. Hui Faculty of Science and Technology E-mail: cmhui@vtc.edu.hk Oct 2017 Contents Basic concepts Air-to-air
More informationLiquid Desiccant Technology Delivers Energy Cost Reductions and Indoor Air Quality Improvements. White Paper
Liquid Desiccant Technology Delivers Energy Cost Reductions and Indoor Air Quality Improvements White Paper Abstract Cooling represents the third leading use of energy and source of carbon emissions in
More informationAIR-CONDITIONING SYSTEMS AND APPLICATIONS. Abdullah Nuhait Ph D. King Saud University
AIR-CONDITIONING SYSTEMS AND APPLICATIONS Abdullah Nuhait Ph D. King Saud University AIR-CONDITIONING SYSTEMS Earliest air conditioning system used only for heating (winter) Provided heated air for comfort
More informationHONORABLE MENTION: COMMERCIAL BUILDINGS, EXISTING
ASHRAE s BEST This article was published in ASHRAE Journal, November 2010. Copyright 2010 American Society of Heating, Refrigerating and -Conditioning Engineers, Inc. Reprinted here by permission from
More informationHumidity Control Design Tips. R. Mark Nunnelly, PE, CxA, LEED AP President
Humidity Control Design Tips R. Mark Nunnelly, PE, CxA, LEED AP President AIA Quality Assurance The Building Commissioning Association is a Registered Provider with The American Institute of Architects
More informationSOLAR AIR CONDITONING SYSTEM USING DESSICANTS
SOLAR AIR CONDITONING SYSTEM USING DESSICANTS Arjit Sharma Student, Mechanical Engineering Department Medicaps Institute Of Technology & Management arjit21sharma@gmail.com ABSTRACT- A new technology for
More informationBenefits Offered by Passive Dehumidification Wheel Speed Control
Benefits Offered by Passive Dehumidification Wheel Speed Control White paper By John Fischer Benefits Offered by Passive Dehumidification Wheel Speed Control The most significant advantage of the Pinnacle
More informationTwo essential attributes of mechanical systems intended to
This pairing can represent a great strategy if you choose your tactics wisely. When is passive or active the better desiccant approach? When is one out of the question? We ll discuss how to control the
More informationTECHNICAL REPORT III Mechanical Systems Existing Conditions
TECHNICAL REPORT III Mechanical Systems Existing Conditions TEMPLE UNIVERSITY TYLER SCHOOL OF ART Pennsylvania State University Architectural Engineering Mechanical Option Faculty Adviser: Dr. Jim Freihaut
More informationENGINEERING. Edition No. 13 October 2002
Edition No. 13 October 2002 ENGINEERING S Y S T E M S O L U T I O N S W e at McQuay are very proud of our tradition of producing industry leading water source heat pumps. Our heritage stretches back more
More informationUrbana Free Library HVAC Analysis. Prepared for the Urbana Free Library. Prepared by Paul Boland, P.E., and Nathan Alderman, E.I.T.
Urbana Free Library HVAC Analysis Prepared for the Urbana Free Library Prepared by Paul Boland, P.E., and Nathan Alderman, E.I.T. Report Dated August 8, 2016 1. Introduction The Urbana Free Library is
More informationCivil Engineering Building
Continuous Commissioning Report For the Civil Engineering Building Building 492 Submitted to: Utilities Energy Office Physical Plant Department Texas A&M University Prepared by: Energy Systems Laboratory
More informationTechnical Report Three
Technical Report Three Existing Conditions for Mechanical Systems Contents Executive Summary...2 Building Overview...2 Mechanical Systems Overview...2 Mechanical System...3 Outdoor & Indoor Design Conditions...3
More informationUNIVERSITY OF MISSOURI Heating Ventilating and Air-Conditioning (HVAC) 2016 Q1
GENERAL: This section provides general standards for overall sizing and design of Heating, Ventilating, and Air Conditioning (HVAC) systems. Other sections contain specific standards for each system per
More informationDescription of All Alternatives Considered-
Description of All Alternatives Considered- Energy efficiency is an area where the Tubman design can be improved. The design heating load is 1807.8 MBH and the design cooling load is 1702.2 MBH or 142
More informationAPPLICATION GUIDE BEAMS
BEAMS There is an increasing need for energy efficient air conditioning systems as energy codes become more stringent. Chilled beam systems are one such alternate to traditional all air conditioning systems.
More informationH O B O K E N R E S I D E N T I A L
Proposal 1: Open Loop Geothermal for Water Source Packaged Terminal Heat Pumps and Heat Recovery Ventilation and Humidifier Heating and Cooling System Schematic Ventilation Schematic Proposal 1 System
More informationChristopher Kelly Technical Report Three
Christopher Kelly Technical Report Three Mechanical Systems and Existing Conditions Evaluation SALK HALL ADDITION The University of Pittsburgh, Pittsburgh Christopher Kelly, Mechanical Option Professor
More informationHEALTHCARE SURGERY VENTILATION HUMIDITY CONTROL
EFFECTIVE LOW DEW POINT EFFICIENT HEALTHCARE SURGERY VENTILATION HUMIDITY CONTROL HVAC systems have a major impact on: Specialized solution for the high demands of healthcare applications HVAC systems
More informationSession: HVAC 101 HVAC 101. Steve Sain Sain Engineering Associates, Inc. August 9, Rhode Island Convention Center Providence, Rhode Island
Session: HVAC 101 HVAC 101 Steve Sain Sain Engineering Associates, Inc. August 9, 2016 Rhode Island Convention Center Providence, Rhode Island Why? 2 Acknowledgements 3 Disclaimer I m gonna shoot down
More informationEnergy Recovery Ventilation
Published on Business Energy Advisor (https://oncor.bizenergyadvisor.com) Home > Energy Recovery Ventilation Energy Recovery Ventilation Proper ventilation is essential for maintaining good indoor-air
More informationPRODUCT SERIES. VPR Series VPRX Series VPRE Series VPRP Series VPRC Series
PRODUCT SERIES VPR Series VPRX Series VPRE Series VPRP Series VPRC Series Valent Air Management Products Valent Air Management Systems designs and manufactures reliable, high-outdoor-air ventilators. Our
More informationASHRAE Standard 90.1 Energy Requirements Wrap-Around Heat Pipes
ASHRAE Standard 90.1 Energy Requirements Wrap-Around Heat Pipes In Humid Climates BY DAVID A. JOHN, P.E., MEMBER ASHRAE; DREW ELSBERRY, MEMBER ASHRAE Designing g a building s HVAC system requires designers
More informationMechanical Technical Report 1. ASHRAE Standard 62.1 Ventilation Compliance Evaluation
Mechanical Technical Report 1 Standard 62.1 Ventilation Compliance Evaluation Lutheran Theological Seminary at Philadelphia The New Learning Center Prepared For: William P. Bahnfleth, Ph.D., P.E. Department
More informationRedesign of Bennett Hall HVAC System
MEE 488 April 18, 2006 Redesign of Bennett Hall HVAC System Greg Andreasen Michael Chicoine Florent Hohxa Jason Jacobe Mechanical Engineering, University of Maine, Orono ME 04473, USA ABSTRACT Our task
More informationDADANCO Technical Paper
DADANCO Technical Paper 260 North Elm Street Westfield, MA 01085 Phone: (413) 564-5657 Fax: (413) 568-2969 March 2013 CLASSROOM SOLUTION USING ACTIVE CHILLED BEAMS (Note: This technical paper assumes the
More informationElement D Services Heating, Ventilating, and Air Conditioning
Air Handling Distribution PART 1 - GENERAL 1.01 OVERVIEW A. This section describes criteria for design of facility air handling distribution systems, including air handlers, ductwork, ductwork accessories,
More informationSummary Comparison of Simulation Program Features
Summary Comparison of Simulation Program Features FEATURE DOE2.2 equest TRACE 700 HAP Public/Proprietary Public Domain Proprietary Proprietary Proprietary Simulation Method 8760 hours 8760 hours 8760 hours
More informationComfort and health-indoor air quality
Comfort and health-indoor air quality 1 The human body has a complicated regulating system to maintain the human body temperature constant most of the time, which is 98.6 F (36.9 C) regardless of the environmental
More informationCARRIER edesign SUITE NEWS. Modeling 100% OA Constant Volume Air Systems. Volume 6, Issue 1. Page 1 Modeling 100% OA Constant Volume Air Systems
Volume 6, Issue 1 CARRIER edesign SUITE NEWS Modeling 100% OA Constant Volume Air Systems This article provides an overview of how to model a stand-alone constant air volume (CAV) 100% OA system in HAP.
More informationRaised Access Floor - (AE Breadth Area)
Raised Access Floor - (AE Breadth Area) Currently, the Plaza has a raised access flooring system on both the 7 th and 8 th floors. The 8 th floor is designed with an independent HVAC system utilizing an
More informationHeat Recovery Units. Heat Recovery 1
Heat Recovery Units Heat Recovery 1 Heat Recovery Unit Why? A heat recovery unit (HRU) can help make mechanical ventilation more cost effective by reclaiming energy from exhaust airflows. HRUs use air-to-air
More informationMethod to test HVAC equipment at part load conditions
IPLV Method to test HVAC equipment at part load conditions For water cooled chillers: 100% load ( % hrs) + 75% ( Hrs ) + 50% ( Hrs ) + 25% ( Hrs ) = IPLV value Manufacturer can favor this number by tweaking
More informationDES CHAMPS PRODUCTS. Specializing in: -- Air-to-Air Energy Recovery -- Conditioning Outdoor Air -- Controlling IAQ -- Indirect Evaporative Cooling
DES CHAMPS PRODUCTS Specializing in: -- Air-to-Air Energy Recovery -- Conditioning Outdoor Air -- Controlling IAQ -- Indirect Evaporative Cooling DES CHAMPS PRODUCTS Packaged Heat Recovery Systems Micro-Z
More informationUnderfloor Air Distribution:
Underfloor Air Distribution: An underfloor air distribution system utilizes a plenum space between the structural slab and the underside of a raised floor to distribute the conditioned air to the room.
More informationEnergy Recovery with Cooling and Heating
Energy Recovery with Cooling and Heating VersiVent - Model VER Commercial Institutional 2,000-10,000 cfm 3.0 in. wg external static pressure Configurable September 2008 Page The VersiVent Header Model
More informationComputing Services Center
Continuous Commissioning Report for the Computing Services Center Building #516 Submitted to: Utilities Energy Office Physical Plant Department Texas A&M University Prepared by: Energy Systems Laboratory
More informationEarthWise System Seminar
EarthWise System Seminar Tim Gasper, P.E. Solutions Engineer Brady-Trane Services, Inc. EarthWise Systems? Energy Efficiency Emissions Buildings use 39% of the Primary Energy Consumed in the United States
More informationPrinciples of Active Desiccant Operation. Presented by Tom Peterson, CEO and Founder. Climate by Design International
Principles of Active Desiccant Operation Presented by Tom Peterson, CEO and Founder Climate by Design International www.cdihvac.com Owatonna, MN 507-451-2198 4 02/2014 1 Dehumidification CDI is the Premier
More information» WITH REGASORP ROTARY HEAT EXCHANGER
AIR TREATMENT eq AIR HANDLING UNITS REGASORP» WITH REGASORP ROTARY HEAT EXCHANGER eq WITH REGASORP ROTARY HEAT EXCHANGER REDUCES COST UP TO 50% Two of the most important factors affecting indoor air climate
More informationTECHNICAL REPORT 3 Mechanical Systems and Existing Conditions Northfield Mental Healthcare Center Northfield, Ohio
Technical Report 3 Northfield Mental Healthcare Center Dr. Stephen Treado Ji Won Park Mechanical Option Fall 2012 TECHNICAL REPORT 3 Mechanical Systems and Existing Conditions Northfield Mental Healthcare
More informationHigh Efficiency Dehumidification System (HEDS)
Advanced HVAC Technologies High Efficiency Dehumidification System (HEDS) Scot Duncan, P.E., Jim Meacham, P.E. Conservant Systems, Inc. August 16, 2017 Tampa Convention Center Tampa, Florida Why Was HEDS
More informationFeasibility of Controlling Heat and Enthalpy Wheel Effectiveness to Achieve Optimal Closed DOAS Operation
Purdue University Purdue e-pubs International Refrigeration and Air Conditioning Conference School of Mechanical Engineering July 2018 Feasibility of Controlling Heat and Enthalpy Wheel Effectiveness to
More informationCOMcheck Software Version Mechanical Compliance Certificate
COMcheck Software Version 3.8.2 Mechanical Compliance Certificate 90.1 (2007) Standard Section 1: Project Information Project Type: New Construction Project Title : Rudy's Star Motors Construction Site:
More informationArmstrong Cool-Fog Systems
Armstrong Cool-Fog Systems Armstrong International, Inc. is a leading supplier of hydropneumatic fogging systems used for both humidification and evaporative cooling. Its systems were first developed in
More informationAdsorption Chillers Energysmart Green Cooling
Adsorption Chillers Energysmart Green Cooling New Partners in innovation Leaders in Dehumidification... Worldwide Power Partner Inc USA www.bryair.com Recover Low Grade Process Waste Heat For Energy Smart
More informationRetrocommissioning Findings Summary: Building X #1 Priority: Major Comfort/Control Problems
IMPORTANT NOTICE: This sample document is provided for instructional purposes only. CCC is not rendering advice concerning any commission project or practices. This document is neither approved nor intended
More informationTechnical Assignment 3 11/15/04. Executive Summary
Executive Summary This report is an analysis of the existing systems within the Outreach Innovation Building in University Park, PA. One significant design criteria was a lower than average noise criteria
More informationRecent Advances in Energy, Environment and Economic Development
Experimental Investigation of Solar Hybrid Desiccant Cooling System in Hot and Humid Weather of Malaysia MM SALEHI DEZFOULI, Z HASHIM, MH RUSLAN, B BAKHTYAR, K SOPIAN, A ZAHARIM, S MAT, A RACHMAN, Solar
More informationFor an ideal gas mixture, Dalton s law states that the sum of the partial pressures of the individual components is equal to the total pressure.
1 PSYCHROMETICS Psychrometry is the study of the characteristics of moist air. We will see soon that evaporation of moisture from the skin can have a significant impact on thermal comfort. The rate of
More informationTechnical Assignment 3. Mechanical Systems Existing Conditions Evaluation
Technical Assignment 3 Mechanical Systems Existing Conditions Evaluation The Milton Hershey School New Supply Center Prepared for: William P. Bahnfleth, Ph.D., P.E., Professor Department of Architectural
More informationBill McCullough. Director ERV Products. Dallas, TX
Bill McCullough Director ERV Products Dallas, TX TOPICS 1. ERV Definition & Benefit 2. Indoor Air Quality 3. Energy Efficiency 4. ERV Technology & Operation 5. Stand-Alone ERVs 6. Compact ERVs What is
More informationBy Thomas H. Durkin, P.E., Member ASHRAE, and James B. (Burt) Rishel, P.E., Fellow/Life Member ASHRAE
By Thomas H. Durkin, P.E., Member ASHRAE, and James B. (Burt) Rishel, P.E., Fellow/Life Member ASHRAE T he advent of the small scroll or screw chiller, capable of producing condenser water as high as 140
More informationEconomical, Flexible, Advanced Performance. Ventilation and Dehumidification for Healthy IAQ
Economical, Flexible, Advanced Performance Ventilation and Dehumidification for Healthy IAQ CompleVent the Energy Conserving, Cost-Efficient Way to Meet ASHRAE Standards Today s focus on indoor air quality
More informationASHRAE Illinois Chapter 2015 Excellence in Engineering Awards
ASHRAE Illinois Chapter 2015 Excellence in Engineering Awards PROJECT Chicago Vocational Career Academy Chicago, Illinois OWNER Chicago Public Schools PREPARED FOR American Society of Heating Refrigerating
More informationAdding More Fan Power Can Be a Good Thing
This article was published in ASHE Journal, May 14. Copyright 14 ASHE. Posted at www.ashrae.org. This article may not be copied and/or distributed electronically or in paper form without permission of
More informationAHRI 920 Performance Rating and Comparisons of DX-DOAS Unit Efficiency
Application Note 24 AHRI 920 Performance Rating and Comparisons I NTRODUCTION In 2015, the Air-Conditioning, Heating, and Refrigeration Institute (AHRI) introduced a performance rating for dedicated outside
More information