1 Ponds of Ballantrae Part 1 of 2: The Report Prepared by the Ballantrae Community Development District Board of Supervisors September 2013

2 CDD Board implements pond management plan This two-page plan lays out the Ballantrae Community Development District (CDD) Board of Supervisors management and maintenance plan for the 37 lakes and ponds within the community. The Board s primary goals via this pond management plan are to [1] prevent flooding onto our streets and into our homes, [2] provide a positive habitat for fish and wildlife, [3] maintain the good health of our pond water, beds and shorelines, [4] properly operate our outflow units and [5] ensure the high quality of our storm water entering the regional watershed. The Board decided in 2012 that it should commit to writing its plans for the management and maintenance of lakes and ponds just as it has a detailed, written plan for the management of the community s 80-plus acres of mowed lawns and landscaping, The Board noted Ballantrae s natural resources are extensive: more than half the community s 436 acres consist of lakes and ponds plus wetlands and conservation areas. The Board obtained pond-by-pond management input from its district manager, engineer and pond maintenance vendor. The Board took the extra step of notifying residents, via the January-March 2013 edition of the Communicator newsletter, that it had posted that information in a draft pond report on the CDD website (ballantraecdd.org). The Board invited resident comment by Jan. 31, The Board considered all that input in its public discussions leading to this plan. Several vendors then spent months bringing most of the ponds up to the levels presented herein. Final, minor work on one pond (#4) and six littoral shelves (#s 7, 11, 17, 18, 28 and 31) await the dropping of water levels during the dry season. The remaining work is described on pages here for each of those seven ponds. This plan provides our district manager, engineer and pond vendor with pond management direction. It also provides residents with useful information on the pond(s) in their neighborhood and throughout the community. Key to this plan is the Board s decision to manage the species, extent and location of plants in each pond. The Board wants to restrict the areas of plant growths to help maintain the openness of ponds. That decision will advance several environmental goals, including: Planting beneficials by hand. Littoral shelves are raised areas in 17 otherwise deeper ponds. The shelves are designed to elevate beneficial plants to ensure they can grow above a pond s high ground water level. These plants also help clean water. Format for this report This pond plan consists of two parts. Both are posted at the Pond Management tab at the CDD website at ballantraecdd.org: This Report begins with a two-page management plan, that also includes: A map on page 4 that numbers and locates each of our 37 ponds. The next 37 pages generally describe the species, extent and location of plants desired in each pond in numerical order. The second part of this plan is The Aerials: Its 12 photos show the extent and location of plants after most pond clean up was completed, establishing a baseline for future pond management. For those viewing on line: The pond list adjacent to the map in this Report is linked to the page discussing each pond. The pond list adjacent to the map in The Aerials is linked to the zoomable aerial showing that pond. Factors the Board considered included, among others, the surface area size of each pond, its depth, the presence or absence of a littoral The beneficial vegetation planted on pond slopes (called aquascaping ) helps to reduce erosion, treat runoff from adjoining properties and help clean pond water by the oxygen that plants release into the water. Mechanical removal of invasive plants.

3 shelf, plus the extent and species of plant growth. The Board also adopted best practices for pond management. For more information on proper pond management, see the Southwest Florida Water Management District (SWFWMD) pamphlet, Stormwater Systems in Your Neighborhood, posted at the CDD s ballantraecdd.org website at the CDD Operations tab at Other Documents. Here s a quick summary on how changing water levels affect plants in many Florida ponds: Aquatic plants generally survive in water depths of three feet or less. When pond depths fall substantially below three feet during the dry season, plants grow and thrive on shorelines and pond bottoms. That can result in as much as a foot zone of plant material along some pond shorelines. Plants begin to die in the rainy season as water depth exceeds three feet in many of our ponds. That kills some of the plants along shorelines and pond bottoms that grew in shallow waters during the dry season. The Board doesn t usually remove excessive plant growth during the dry season, since the rise in water levels in the rainy season may eliminate it without cost to landowners. SWFWMD also allows ponds to be dug as shallow as only 12 inches below the seasonal high groundwater level. Natural plant growth could eventually cover the entire surface of some of these very shallow ponds. That s because their water level never rises above the three-foot depth necessary to kill any plants. The Board will remove excessive plants from the shallowest of these ponds behind residences. The Board allows plants to grow in some shallow ponds in non-residential areas (such as along Ballantrae and Mentmore boulevards). The Board believes excessive, nuisance or invasive plants Hand-pulling thick-growing beneficial plants to be transplanted elsewhere. are best managed by mechanical means, either via hand-pulling or machine-cutting and removal. The Board minimizes the use of chemicals to control plant growth, due to the long-term damage chemicals can do to pond waters and any desirable plant life or habitat in them. By law, pond management costs are shared by all landowners because the ponds [1] benefit all residents and [2] are the CDD s property and responsibility. In the fiscal year, the CDD s contract for a pond maintenance vendor totals $22,800, with another $30,000 available for lake/pond repairs plus $11,000 to purchase and install aquatic plants. Those appropriations paid the cost of the pond work detailed in this report. Many of the minor improvements at more than two dozen ponds were accomplished within the pond maintenance contract at no additional cost to landowners. Standard maintenance of all ponds continues to include, among other things, mowing banks and slopes, removal of certain excessive and invasive plants, treatment of algae and other nuisance surface vegetation, while monitoring pond conditions for any other needed treatment. It also includes maintaining the openness of outflow structures in 22 ponds. They foster the flow of water among ponds and the wetlands and facilitate seepage into the aquifer. Installing an aerator to help clean up a pond. Hand removal of tall, invasive plants.

4 Locate pond # on map, click on # below for pond evaluation: # Village/Street Location/Description 1 Ballantrae Blvd. Small pond on SE SR 54 entrance 2 Ballantrae Blvd. W main SR 54 entrance 2A Ballantrae Blvd. N of at NE corner of Pond 2 3 Straiton SW of Straiton on CDD border 4 Straiton Central pond 5 Ballantrae Blvd. S of Straiton entrance 6 Mentmore Blvd. NW of Straiton on CDD border 7 Ballantrae Blvd. W side, across from Ayrshire entrance 8 Mentmore Blvd. Across Mentmore Blvd. from clubhouse 9 Mentmore Blvd. S of Lintower at Mentmore Blvd. 10 Mentmore Blvd. N side at W end of CDD property 11 Lintower N of Lintower 12 Cunningham Along N&Wborders of Cunningham 13 Ballantrae Blvd. N E border of Ballantrae Blvd. at Castleway 14 Castleway Central pond in Castleway 15 Castleway N/W of Castleway 16 Castleway S of Souter Lane 17 Braemar NE of Braemar village 18 Braemar N of Braemar village 19 Braemar Central pond in Braemar 20 Braemar W of Barnweill 21 Braemar NW of Barnweill-Glenapp intersection 22 Ballantrae Blvd. S of Castleway entrance 23 Ballantrae Blvd. N of Braemar entrance 24 Mentmore Blvd. S of Braemar 25 Mentmore Blvd. S side, at E end of CDD property 26 Ayrshire N central horseshoe-shaped pond 27 Ballantrae Blvd. N of school property 28 Ayrshire E of Ayrshire N stormwater structure 29 Ayrshire Behind Cunningham Court 30 Ayrshire SE corner of Ayrshire-Downan intersection 31 Ayrshire S central pond 32 Ayrshire E side of E main pond #33 33 Ballantrae Blvd. E main SR 54 entrance 34 Castleway Extreme NE corner of CDD property 35 Ayrshire NE of E main pond, abutting Ayrshire Blvd. 36 Braemar Adjacent to Pond 17

5 Pond # 1 Village/Street: Ballantrae Blvd. Location: Small pond on SE SR 54 entrance View (single photo) above is a general view, #2 is N-S shore while #3 is E-W. (stormwater system) Pond 1 outflows to Pond 33. Due to occasional high water levels in Pond 33, the outflow weir can be under as much as 18 inches of water. This results in a water backup that temporarily prevents the landscape maintenance vendor from mowing the wet slope areas, or to plant an expansion of the aquatic plants into the wet area. Some pond areas overgrown with plants will see them die in this deeper water. (aquatic plantings) The shallow area along the eastern side is not a littoral shelf and, therefore, was not planted with Club Rush. Remaining perimeter is covered approximately 80% with Club Rush. Standard maintenance. Club Rush will fill in missing gaps over time. Do not recommend planting the shallow area with Club Rush. Approved.

6 Pond # 2 Village/Street: Ballantrae Blvd. Location: W main SR 54 entrance Panoramic (multiple photos) above, #2 shows varying width of grasses. Assessment (stormwater system) Pond 2 does not contain an outflow control structure; it drains, via overland flow, into the wetland system on the south end and then into a culvert crossing under SR 54. It is also connected to Pond 33 via a culvert crossing under Ballantrae Blvd. The pond water level is susceptible to the same water back up condition in Pond 1 resulting in mowing issues around the pond. (aquatic plantings) 70% of Club Rush that was planted is gone. This is probably due to wake tear (waves). It is being replanted with Pickerel Weed as it overgrows in other ponds. Standard maintenance, allow Club Rush to fill in gaps naturally. Needs more aquatic plants to replace those that did not survive. Some pickerelweed was re-planted from other ponds by the end of May. Plants being replanted here from overgrowth of plants elsewhere. Plantings to be done so that they do not compete with exisiting Club Rush. Normal maintenance.

7 Pond # 2A Village/Street: Ballantrae Blvd. Location: N of weir at NE corner of Pond #2 (stormwater system) Pond 2A outflows into Pond 2 and it is functioning as designed. (aquatic plantings) 3 large clumps of Club Rush remain, due to treatment of invasive Torpedo Grass. Pond becomes dry in the winter. Club Rush will eventually cover all of the pond. Allow Club Rush to grow naturally Pond vendor has targeted full treatment to remove Torpedo Grass, most of which was completed in May. Minus the Torpedo Grass, there is now less browning of remaining grasses that are being allowed to grow naturally. Do not plant Pickerel since it would be taken over by fast-growing and aggressive Club Rush. Photo #1 Approved.

8 Pond # 3 Village/Street: Straiton Location: SW of Straiton on CDD border Panoramic above, #2 and #3 show extent of flowering plants and lilies, without many invasive grasses. (stormwater system) Pond 3 has a weir connected to the wetland on the east side. The drainage systems and pond water levels are functioning as designed. The wetland drains through a ditch to the same wetland into which Pond 2 drains. (aquatic plantings)this pond was not planted with Club Rush. Entire perimeter has Pickerel Weed and Arrowhead. Northern end has Fragrant Lilies. Some invasive growth within the Pickerel on northern end. Standard maintenance Approved

9 Pond # 4 Village/Street: Straiton Location: Central pond Panoramic above and #2 shows extensive grasses. #3 shows growth surrounding control structure. (stormwater system) Pond 4 was constructed six feet shallower than designed outside the littoral shelf, located on the south side of the pond. That has resulted in a shallow pond that sustains plant expansion across the entire pond surface, rather than just on the shelf as designed. Pond 4 outflows into the same wetland as Pond 3. The designed littoral shelf needs planting. (aquatic plantings) Club Rush covered nearly 100% of the perimeter. There was excessive algae growth on the shelf. Club and Spike Rush will continue to grow toward the middle of the pond. American Ecosystems used a boat to treat interior of pond. Options were discussed such as manual removal of some of the rush, and installation of aerators in the pond. It was noted that this pond was constructed shallower than designed and could be completely consumed by the Club and Spike Rush. These pond slopes are very close to the townhome structures. It is difficult to control algae, possibly due to chemiclas used in lawn treatment. Discuss lawn treatment options with Straiton HOA. $2,897 was approved in February for the purchase and installation of aeration equipment, which was completed in March. $3,000 was also approved to lower pond level to facilitate the removal of excessive Club and Spike Rush on the south and southeast sides of this pond. Vendors later recommended that, with the aerators cleaning up the balance of the pond, rush removal can await dry season drop in pond levels to avoid the cost of partial de-watering. Spike Rush and excessive Club Rush will be removed and Pickerelweed will then be planted on the littoral shelf and slopes. Straiton landscape vendor confirms it does not use chemicals on lawns adjoining CDD pond bank. All approved, with continued normal maintenance.

10 Pond # 5 Village/Street: Ballantrae Blvd. Location: S of Straiton entrance View above is an overview of small pond, #2 shows extent of grasses. (stormwater system) Pond 5 is connected to the same wetland as Pond 4 and is functioning as designed. (aquatic plantings) Invasive Spike Rush is growing on the southern side. Club Rush was planted on the three other sides. Invasive Dollar Weed growing on top of the Spike Rush. Keep the Southern end free of plants for the outflow structure. Floating surface vegetation is a nuisance and will be removed There are no residences near this pond. Grasses will be allowed to grow naturally in this pond. Otherwise, normal maintenance as needed.

11 Pond # 6 Village/Street: Straiton Location: NW of Straiton on CDD border Panoramic above, #2 shows scum and #3 extent of grass. (stormwater system) Pond 6 outflows into the wetland on the east side which outflows into Pond 4. It has a littoral shelf on the northeast side. Pond 6 is functioning as designed. (aquatic plantings) 100% of planted Club Rush remains. Some Dollar Weed is growing on the interior side of the Club Rush. Club Rush will eventually cover close to 100% of the pond. Standard maintenance Keep outflow free of vegetation Littoral shelf needs more plants. Approved without additional planting, with expectation that naturally-occuring vegetation will continue to spread across the littoral shelf.

12 Pond # 7 Village/Street: Ballantrae Blvd. Location: W side, across from Ayrshire entrance Panoramic above, #2 shows open area and #3 shows varying depths of grasses, plants. (stormwater system) Pond 7 outflows into the wetland on the west side and is functioning as designed. It has a littoral shelf on the northwest side. (aquatic plantings) Two sections of Club Rush have been removed to create fishing areas. The rest of the perimeter is covered with Club Rush and Pickerel Weed. Keep the open fishing access areas open. Littoral shelf needs planting. Standard maintenance. Approved, with expectation that naturally-occuring vegetation will continue to expand on littoral shelf. The Board in April approved the purchase of a total of 2,375 Pickerelweed plants at $1 each to be apportioned among the littoral shelves in Ponds # 7, 11, 17, 18, 28 and 31. All six shelves to be planted when water levels fall.

13 Pond # 8 Village/Street: Mentmore Blvd. Location:Across Mentmore Blvd. from clubhouse View above shows plantings dwarfed by grasses, #2 shows new grass growth, #3 open end of pond. (stormwater system) Pond 8 outflows into the wetland on the pond s south side and is functioning as designed. It has a littoral shelf on the northeast side. (aquatic plantings) Close to 100% of Club Rush remains. The littoral shelf has now been planted with Pickerel Weed. Small amount of algae are growing on the shelf. Allow the Pickerel Weed to grow. Keep the Club Rush from encroaching further across the pond and kill the algae. Algae has been treated with chemicals and being monitored for reappearance. Littoral shelf is deep enough that Pickerel growth should prevent expansion of Club Rush. If water levels do not allow that to occur, vendor will chemically control Club Rush.

14 Pond # 9 Village/Street: Mentmore Blvd. Location: W of clubhouse, N side of Mentmore Blvd. Panoramic above, #2 and #3 show extensive grass growth. (stormwater system) Pond 9 outflows into the abutting wetland which drains south through a culvert crossing under Mentmore Blvd. This pond is functioning as designed. (aquatic plantings) Close to 100% of planted Club Rush remains. Recently planted Pickerel Weed is doing great. Standard maintenance, Club Rush to be chemically treated as needed to control growth. Algae treated with chemicals and being monitored for reappearance. Littoral shelf is deep enough that Pickerel growth should prevent expansion of Club Rush. If water levels do not allow that to occur, vendor will chemically control Club Rush.

15 Pond # 10 Village/Street: Mentmore Blvd. Location: N side at W end of CDD property View above is an overview, #2 shows west side and #3 east side of pond. (stormwater system) Pond 10 outflows into the same wetland as Pond 9 and is functioning as designed. (aquatic plantings) 100% of perimeter is covered with Club Rush. Pond is clear of algae Standard maintenance. Approved.

16 Pond # 11 Village/Street: Lintower Location: N of Lintower Panoramic shows beneficial plantings as major growth around pond. (stormwater system) Pond 11 outflows off site to the northwest and is functioning as designed. It has a littoral shelf on the north side. (aquatic plantings) No signs that Club Rush was planted. Small areas of existing Pickerel Weed, small amounts of algae on shoreline. Littoral shelf has not been planted. Plant additional Pickerel Weed on shoreline. Littoral shelf needs planting with Pickerel. Littoral shelf and pond slope abutting homes to be planted with Pickerel. The Board in April approved the purchase of a total of 2,375 Pickerelweed plants at $1 each to be apportioned among the littoral shelves in Ponds # 7, 11, 17, 18, 28, and 31 when water levels fall.

17 Pond # 12 Village/Street: Cunningham Location: Along N&W borders of Cunningham View above is from S end looking N, #2 is from Ballantrae Blvd. looking W, #3 is from N end looking S. (stormwater system) Pond 12 outflows off site to the northwest and is function as designed. (aquatic plantings) It has a littoral shelf on the south side. Littoral shelf was recently planted with Pickerel Weed. Its abutting slope contains no fast-growing Club Rush, which tends to crowd out flowering Pickerel. So the littoral shelf should remain in its existing condition for natural expansion of the Pickerel. However, the fast-growing Club Rush on the east side of the pond will eventually takeover this narrow but long pond. Remove Club Rush on the eastern side. Replace with Pickerel. Approved: Mechanically cut and remove Club Rush on eastern side. Plant Pickerel as well as sodding along top of pond bank and slope to prevent erosion. Project cost $9,324, completed in August. Photo #4

18 Pond # 13 Village/Street: Ballantrae Blvd. Location: NE border of Ballantrae Castleway Panoramic view of pond showing growth mostly at S end. (stormwater system) Pond 13 receives drainage from the abutting wetland and drains west through a culvert crossing under Ballantrae Blvd into Pond 12. This pond is functioning as designed, but a portion of the weir has washed out. The exact extent of damage is unknown. (aquatic plantings) Southern end has small gaps of missing Club Rush. This is a deep pond, so Club Rush should only stay on the perimeter. Weir repairs awaited a drop in water levels. Some repair work was completed to the exposed section of the weir in late May at a cost of $10, Funds were allocated from the $25,000 set aside in October 2011 for repairs to this weir in the Asset Reserve Fund, which finances on-going capital construction and repairs. The weir will be monitored to determine if future work is needed to maintain the structure. If so, repairs will be financed under this Asset Reserve Fund appropriation. Standard maintenance. Approved

19 Pond # 14 Village/Street: Castleway Location: Central pond Panoramic above, #2 shows rows of grass off shore from beneficial plantings. (stormwater system) Pond 14 outfalls to the abutting wetland which outfalls west into the wetland that drains through Pond 13 and it is functioning as designed. (aquatic plantings) Pond does not appear to have been planted with Club Rush. Most of perimeter has juvenile Pickerel Weed. Monitor the growth of the Pickerel Weed to determine if additional should be planted when water level recedes. Approved.

20 Pond # 15 Village/Street: Castleway Location: N central Castleway, W of Duke Firth View above and #2 show varying degree of pond growth, scum. (stormwater system) Pond 15 outflows into the abutting wetland which drains into Pond 13. This pond is functioning as designed. (aquatic plantings) Eastern side of pond has lost most of the planted Club Rush, so Pickerel Weed has been planted on the perimeter. Allow the existing Pickerel Weed to grow. Standard maintenance. Approved

21 Pond # 16 Village/Street: Castleway Location: S of Souter Lane Panoramic shows nice beneficial growth on far shore, #2 shows nuisance shrubbery growing on residential shoreline. (stormwater system) Pond 16 outflows into the abutting wetland and drains north through a culvert crossing under Duke Firth Street into the wetland that discharges into Pond 13. It has a littoral shelf on the south central side. This pond is functioning as designed. (aquatic plantings) Most of pond is covered with Club Rush and Pickerel Weed. Some invasive plants started to grow on the southern end. Remove the invasive growth along the pond bank Standard maintenance. Approved, invasive growth has been removed. Normal maintenance.

22 Pond # 17 Village/Street: Braemar Location: NE of Braemar village Panoramic view shows little grass or beneficial growth. (stormwater system) Pond 17 outflows into the abutting wetland and is functioning as designed. It has a littoral shelf on the northwest side. (aquatic plantings) Doesn t appear it was planted with Club Rush. Juvenile Pickerel Weed is growing on the southern and western sides. Monitor the growth of the Pickerel Weed, standard maintenance. Littoral shelf needs planting. Approved, transfer and replanting of plants underway from other ponds with excessive plants. The Board in April approved the purchase of a total of 2,375 Pickerelweed plants at $1 each to be apportioned among the littoral shelves in Ponds # 7, 11, 17, 18, 28, and 31 when water levels fall.

23 Pond # 18 Village/Street: Braemar Location: N of Braemar village Panoramic view looks S to narrow neck, where #2 shows substantial grass growth. (stormwater system) Pond 18 outflows into the abutting wetland and is functioning as designed. It has a littoral shelf on the northeast side. (aquatic plantings) Small coverage of Pickerel Weed on the perimeter. Some Torpedo Grass has grown within the Pickerel, which has been treated to kill Torpedo Grass. Standard maintenance. Monitor Pickerel Weed growth to determine if more should be planted. Approved. The Board in April approved the purchase of a total of 2,375 Pickerelweed plants at $1 each to be apportioned among the littoral shelves in Ponds # 7, 11, 17, 18, 28, and 31 when water levels fall. Some brown/dying Torpedo Grass has also been removed, reducing browning among the Pickerel Weed.

24 Pond # 19 Village/Street: Braemar Location: Central pond View above shows varying degrees of grass growth, all three photos show beneficial plantings being choked by grasses. (stormwater system) Pond 19 outflows into the wetland west of the pond, and is functioning as designed. (aquatic plantings) Entire perimeter is covered with Club Rush and Pickerel Weed. Chemically maintain Club Rush and prevent it from encroaching into the deeper middle. It was noted that this pond did not contain a littoral shelf. This pond is deeper than many of the community ponds. That depth should naturally restrict the expansion of the Club Rush. In fact, amount of Club Rush has declined as water levels rose this summer. Approved, monitor and chemically treat any further expansion of Club Rush in this pond.

25 Pond # 20 Village/Street: Braemar Location: W of Barnweill St. Views above shows overgrowth of plants and grasses covering more than 90 percent of this pond. (stormwater system) Pond 20 outflows into the abutting wetland and is functioning as designed. It has a littoral shelf on the north side. (aquatic plantings ) Large amount of Pickerel Weed covers the pond. Hundreds of Pickerel Weed plants have been removed and transplanted to other ponds. Spike Rush and other invasives are beginning to grow alongside Pickerel where they were not removed completely. This pond is very shallow and parts will go dry in winter. It was noted that this pond, due to its size, is shallow and needs to be monitored so that it is not consumed by Pickerelweed. Remove vegetation manually south of the littoral shelf and transplant the material to the littoral shelves needing plants. Approved. Remove extensive dead plants along shoreline and south pond bed. Pickerel will be transplanted to Pond #2 and Galleon will be added thereafter to treat /remove Spike Rush. All work completed in May, with substantial amount of Pickerel Weed removed and transplanted to Pond 2. Continue to transplant excessive Pickerel from this pond to others needing more. There has been rapid reemergence of nuisance plants in south 60+ feet of pond that were not fully removed in May (). Plants to be removed before they grow and expand to re-clog the pond. Pickerelweed can again be transplanted elsewhere.

26 Pond # 21 Village/Street: Braemar Location: NW of Barnweill-Glenapp intersection Panoramic shows most of pond covered in grasses, while #2 shows beneficial plants being crowded out by grasses. (stormwater system) Pond 21 outflows into the abutting wetland and is functioning as designed. It has a littoral shelf on the north side. (aquatic plantings) North, east and west sides were planted with Club Rush. Pre-existing Pickerel Weed mixed within the Club Rush. The southern end was either not planted or it has lost the Club Rush. Littoral shelf is half the pond. Plant Pickerel on the shelf pond perimeter. Mechanically-remove the club rush on the eastern side of the pond, repair sod damaged between homes and around pond during removal. Approved. Project completed in July at a cost of $3,572.

27 Pond # 22 Village/Street: Ballantrae Blvd. Location: S of Castleway entrance Panoramic shows covered S end of pond, #2 shows open N end. (stormwater system) Pond 22 outflows into the abutting wetland and is functioning as designed. It has a littoral shelf on the south side. (aquatic plantings) Perimeter is completely full with Club Rush. Pickerel Weed is on the littoral shelf. Some cattail growth has started on the shelf. Hand pull the cattails. Standard maintenance. Approved. Cattails have been removed.

28 Pond # 23 Village/Street: Ballantrae Blvd. Location: N of Braemar entrance Panoramic shows varying degrees of grass growth surrounding beneficial plantings. (stormwater system) Pond 23 outflows into the abutting wetland and is functioning as designed. It has a littoral shelf on the east central side. (aquatic plantings) Entire perimeter is covered with planted Club Rush. Some pre-existing Pickerel Weed is growing within the Club Rush Standard maintenance Approved

29 Pond # 24 Village/Street: Mentmore Blvd. Location: S of Braemar This view shows most of the pond is open, but #2 shows thick grass extending from the east end of the pond. (stormwater system) Pond 24 outflows into the abutting wetland and is functioning as designed. (aquatic plantings) Entire perimeter is covered with planted Club Rush. Some shoreline Torpedo Grass has grown within the Club Rush. Standard maintenance after removal of some Torpedo Grass. Approved. Torpedo Grass has been sprayed, which has reduced browning by other surviving species.

30 Pond # 25 Village/Street: Mentmore Blvd. Location: S side at E end of CDD property View above shows grasses hug shoreline, #2 shows structure that needs to be cleaned out. (stormwater system) Pond 25 outflows south into the abutting wetland and is functioning as designed. It has a littoral shelf on the south central side. (aquatic plantings) Perimeter of pond is covered with planted Club Rush. The Club Rush on the western side is not maturing as quickly as the rest, probably due to poor soil conditions. The weir structures have growth in front and needs to be cleared. Because this is a deep pond, Club Rush should stay only on the perimeter. Treat the growth in front of the weirs. Standard maintenance. Approved. Weir has been cleared.

31 Pond # 26 Village/Street: Ayrshire Location: N central horseshoe-shaped pond View above shows beneficial plantings but little grass growth, although #2 shows more. (stormwater system) Pond 26 outflows into the abutting wetland and is functioning as designed. (aquatic plantings) Juvenile Pickerel Weed on the perimeter, small algae growth in the interior of the pond. Monitor the growth of the Pickerel Weed, treat for the algae. Approved. Algae has been treated, monitoring is on-going.

32 Pond # 27 Village/Street: Ballantrae Blvd. Location: N of school property View above and #2 show most of pond surface covered in grasses, #3 is supposed to detail thickness. (stormwater system) Pond 27 outflows into the abutting wetland and is functioning as designed. (aquatic plantings) Nearly 100% of this small shallow pond is covered with Club Rush. It will eventually cover 100%. Remove the internal Club Rush mechanically. It was noted that this pond, due to its shallow depth, could become completely consumed by the Club Rush. $$8, approved at June 3 Board meeting to remove Club Rush, plant Pickerall Weed and re-sod as necessary. Approved. Completed in July.

33 Pond # 28 Village/Street: Ayrshire Location: E. of Ayrshire N stormwater structure View above shows open channel but it and #2 show varying depth of grasses. (stormwater system) Pond 28 outflows into the abutting wetland and drains south. It has a littoral shelf on the northeast central side. The pond is functioning as designed. (aquatic plantings) Most of perimeter is covered with planted Club Rush. Needs more plantings on littoral shelf. Add Pickerel to littoral shelf. Standard maintenance. Approved The Board in April approved the purchase of a total of 2,375 Pickerelweed plants at $1 each to be apportioned among the littoral shelves in Ponds # 7, 11, 17, 18, 28, and 31 when water levels fall.

34 Pond # 29 Village/Street: Ayrshire Location: Behind Cunningham Court Panoramic shows grasses growing on shelf, as #2 shows grass growing in control structure. (stormwater system) Pond 29 outflows into the abutting wetland. It has a littoral shelf on the west side. The pond is functioning as designed. (aquatic plantings) Most of the perimeter is covered with planted Club Rush. The littoral shelf in the southwest corner has a few Pickerel Weed plus algae growth on it. Control structure needs to be cleared of growth. Keep a 2-foot plant-free opening in front of the control structure. Option 1: Manually remove the Club Rush on the western end of littoral shelf and plant the shelf with Pickerel Weed. Option 2: Allow the Club Rush to continue to grow on and fill in the littoral shelf Board in June chose Option 2, allowing Club Rush to expand on the littoral shelf. Can add some Pickerel Weed if needed later. Also monitor to ensure cleared control structure remains open. Approved.

35 Pond # 30 Village/Street: Ayrshire Location: SE corner of Ayrshire/Downan Pt. intersection Photo above is a panoramic of what used to be an open pond to the east and south, now covered in grass except at center, #2, showing pond scum. (stormwater system) Pond 30 outflows into the abutting wetland and is functioning as designed. (aquatic plantings) Western end of pond is nearly 100% covered with planted Club Rush, algae growth within open water area. Substantial Arrowhead growth was also noted. Option 1: Allow Club Rush to fill in all of the pond on the Western end. Option 2: Manually remove the Club Rush and plant with Pickerel Weed Option 3: Allow Arrowhead to emerge as a predominant plant in this pond. Approved Option 3 as follows: As Arrowhead continues to grow in pond, its flowers will become a dominant part of the pond landscape. Landscaping vendor also needs to do more mowing around this pond to clean it up and to help define it. Board will review in the future to determine if this plan improves appearance as desired.

36 Pond # 31 Village/Street: Ayrshire Location: S central pond Photo panoramic above shows grasses fairly consistent in depth and type while the central pond is clear. (stormwater system) Pond 31 outflows into the abutting wetland and is functioning as designed. It has a littoral shelf on the south central side. (aquatic plantings) Most of the perimeter is covered with planted Club Rush Littoral shelf needs planting Standard maintenance Approved. The Board in April approved the purchase of a total of 2,375 Pickerelweed plants at $1 each to be apportioned among the littoral shelves in Ponds # 7, 11, 17, 18, 28, and 31 when water levels fall.

37 Pond # 32 Village/Street: Ayrshire Location: E side of E main pond #33 View of pond #32 with NE corner of #33 running across top of photo. (stormwater system) Pond 32 outflows into the abutting wetland and into Pond 33. It is functioning as designed. Pond 32 is also the receiving sump for the large outfall structure that was repaired a few years ago. (aquatic plantings) Shallow pond is 75% covered with planted Club Rush. Option 1: Allow the Club Rush to fill in the pond Option 2: Manually remove the Club Rush No homes back up directly to this pond. Therefore, allow natural growth of grasses in this pond. Normal maintenance.

38 Pond # 33 Village/Street: Ballantrae Blvd. Location: E main SR 54 entrance Photo above shows offshore grasses but no plantings, #2 shows underwater growth and #3 shows emergence of new grasses. (stormwater system) Pond 33 is connected by culvert crossings under Ballantrae Blvd. to Pond 2. The pedestrian sidewalk runs along the north side of this pond. The sidewalk is designed at an elevation lower than the 25-year design, high water level of this pond. As a result, pond water levels can rise enough to flood the adjoining property and sidewalk. Flooding has also sometimes resulted in an inability to maintain the grass along the sidewalk, as well as delaying the vendor s ability to control the expansion of aquatic plants. (aquatic plantings) North, east and west sides of pond have been planted with Pickerel Weed. Torpedo Grass, Spike Rush and other invasives are growing on the northern side. Standard maintenance as water level allows. Monitor the growth of the Pickerel Weed to add more where needed, and control expansion of invasives. Approved. Gaps in Club Rush are being planted with Pickerel Weed.

39 Pond # 34 Village/Street: Castleway Location: Extreme NE corner of CDD property Panoramic showing beneficial plantings surrounding pond. (stormwater system) Pond 34 is controlled by groundwater conditions and a small drainage basin and has no outflow. This pond is functioning as designed. (aquatic plantings) Pickerel Weed on perimeter is doing well. Small amount of Club Rush, naturally growing in the middle of pond, should be removed. Remove sparse Club Rush by mechanical means, to prevent it from overtaking Pickerel Weed. Normal maintenance. Approved. Club Rush removed. Pickeral Weed being planted as required.

40 Pond # 35 Village/Street: Ayrshire Location: NE of E main pond abutting Ayrshire Blvd. View above shows open center but #2 shows grasses expanding. (stormwater system) Pond 35 was constructed for the conveyance of the outflow from the large stormwater drainage structure that was repaired a few years ago. (aquatic plantings) Perimeter is covered with planted Club Rush, small amount of algae growth Treat algae, standard maintenance Approved, algae treatment completed.

41 Pond # 36 Village/Street: Braemar Location: Adjacent to Pond #17 View of unmarked pond, with #2 showing a weir at end of pond. (stormwater system) Pond 36 is not shown on the drainage construction plans. (aquatic plantings) Therefore, this pond was not planted with Club Rush, and was not on vendor s treatment schedule. Juvenile Pickerel Weed exists. Begin treating on normal schedule, monitor growth of the Pickerel Weed. Approved

Ponds of. Ballantrae

Ponds of. Ballantrae Ponds of Ballantrae December 2012 Assessments & Recommendations for Pond Management Assessments and Recommendations for management of each pond were made to the CDD Board by its district engineer and pond

More information

Maintaining Your Sparkle. Maintenance Issues. by Kathy Danforth

Maintaining Your Sparkle. Maintenance Issues. by Kathy Danforth Maintaining Your Sparkle Maintenance Issues by Kathy Danforth Whether it s a natural feature or a constructed retention pond, many communities are endowed with bodies of water for which they are the caretakers.

More information

PORT OF THE ISLANDS CID

PORT OF THE ISLANDS CID PORT OF THE ISLANDS CID FIELD MANAGEMENT REPORT FOR NOVEMBER 2016 Christopher Pepin PREMIER DISTRICT MANAGEMENT 1922 VICTORIA AVE. UNIT B. FORT MYERS, FL 33901 WWW.CDDMANAGEMENT.COM 0 Port of the Islands

More information

Storm Water Quality and Shoreline Restoration Improvements - Grant Funding Request City of Mound Carlson Park Bolton & Menk Project No.

Storm Water Quality and Shoreline Restoration Improvements - Grant Funding Request City of Mound Carlson Park Bolton & Menk Project No. September 15, 2016 Brett Eidem Cost Share Grant Administrator Minnehaha Creek Watershed District 15320 Minnetonka Boulevard Minnetonka, MN 55345 RE: Storm Water Quality and Shoreline Restoration Improvements

More information

continues in the watershed, additional flood control and water quality / natural system improvements may be required in the future.

continues in the watershed, additional flood control and water quality / natural system improvements may be required in the future. The Duck Pond Watershed is located in northern Hillsborough County in an area in which a number of land and water management issues are currently being addressed by citizen's action groups and state, regional

More information

Level 1 Downstream Analysis

Level 1 Downstream Analysis Level 1 Downstream Analysis Newcastle Way Apartments Newcastle, Washington King County April 14, 2014 Revised July 10, 2014 Prepared by: Dean A. Furr, P.E. Reviewed by: Donald Scarberry, P.E. Coffman Engineering,

More information

Design Considerations for Open Channel and Detention Pond Design. Howard Redfearn, City of Mansfield

Design Considerations for Open Channel and Detention Pond Design. Howard Redfearn, City of Mansfield Design Considerations for Open Channel and Detention Pond Design Howard Redfearn, City of Mansfield Previous Experience/Criteria/Maintenance Issues New Criteria Discussion Overview Where is Mansfield?

More information

Please find the latest bioassessment for your lake below. Key highlights of this update include:

Please find the latest bioassessment for your lake below. Key highlights of this update include: Greetings Bear Lake, Little Bear Lake and Cub Lake residents! Please find the latest bioassessment for your lake below. Key highlights of this update include: Fertilizer Ordinance update Submersed Aquatic

More information

Pasco County Watershed Meeting for Flood Impacted Areas Port Richey Watershed

Pasco County Watershed Meeting for Flood Impacted Areas Port Richey Watershed Pasco County Watershed Meeting for Flood Impacted Areas March 15, 2017 Regency Park Library, 9701 Little Road, New Port Richey, Pasco County The following is a summary of the meeting held on March 15,

More information

KENT COUNTY STORMWATER MAINTENANCE DISTRICT STORMWATER BMPs MAINTENANCE TASKS AND RESPONSIBILITIES GUIDANCE DOCUMENT BIO-RETENTION FACILITIES

KENT COUNTY STORMWATER MAINTENANCE DISTRICT STORMWATER BMPs MAINTENANCE TASKS AND RESPONSIBILITIES GUIDANCE DOCUMENT BIO-RETENTION FACILITIES BIO-RETENTION FACILITIES (for all basins / BMPs) Annually Prepare Operation and Maintenance Plan. Clearly outline how vegetation in the facility and its buffer area will be managed or harvested in the

More information

Lake Mansfield 2012 Aquatic Vegetation Survey

Lake Mansfield 2012 Aquatic Vegetation Survey Final Project Report: September 13, 2012 Lake Mansfield 2012 Aquatic Vegetation Survey ======== Prepared For: Town of Great Barrington Attn: Amanda Sewall, Conservation Agent Town Hall, 334 Main Street

More information

Maintaining Your Neighborhood Stormwater Facilities

Maintaining Your Neighborhood Stormwater Facilities Maintaining Your Neighborhood Stormwater Facilities How to identify stormwater facilities and keep them working Layout by the Thurston County Storm and Surface Water Utility with thanks to the Delaware

More information

Tentatively Selected Plan within Harlem River, East River and Western Long Island Sound Planning Region. First Level Costs. Federal Non-Federal Total

Tentatively Selected Plan within Harlem River, East River and Western Long Island Sound Planning Region. First Level Costs. Federal Non-Federal Total HARLEM RIVER, EAST RIVER AND WESTERN LONG ISLAND SOUND PLANNING REGION Flushing Bay and Creek Ecosystem Restoration Source Feasibility Study Background Study Resolution (1994), Reconnaissance Report (1996),

More information

SOUTH FOX MEADOW STORMWATER IMPROVEMENT PROJECT

SOUTH FOX MEADOW STORMWATER IMPROVEMENT PROJECT VILLAGE OF SCARSDALE WESTCHESTER COUNTY, NEW YORK COMPREHENSIVE STORM WATER MANAGEMENT SOUTH FOX MEADOW STORMWATER IMPROVEMENT PROJECT In association with WESTCHESTER COUNTY FLOOD MITIGATION PROGRAM Rob

More information

Leduc Industrial Outline Plan SE W4

Leduc Industrial Outline Plan SE W4 Leduc Industrial Outline Plan SE 1-50-25-W4 Within the North Leduc Industrial ASP Prepared for: Leduc Energy Park Ltd. Prepared by: Stantec Consulting Ltd. File No. 1161 104655 V5 Table of Contents 1.0

More information

PORT OF THE ISLANDS CID

PORT OF THE ISLANDS CID PORT OF THE ISLANDS CID FIELD MANAGEMENT REPORT FOR OCTOBER 2016 Christopher Pepin PREMIER DISTRICT MANAGEMENT 1922 VICTORIA AVE. UNIT B. FORT MYERS, FL 33901 WWW.CDDMANAGEMENT.COM 0 Port of the Islands

More information

HAZARD MITIGATION GOALS AND OBJECTIVES

HAZARD MITIGATION GOALS AND OBJECTIVES SEWRPC Community Assistance Planning Report No. 282, 2nd Edition CITY OF MILWAUKEE ALL HAZARDS MITIGATION PLAN UPDATE Chapter IV HAZARD MITIGATION GOALS AND OBJECTIVES [NOTE: Throughout this plan update

More information

Storm Water Management Workshop

Storm Water Management Workshop Storm Water Management Workshop The following questions were asked during the breakout sessions for the Storm Water Management Workshops held on February 26, 2018 and March 2, 2018. Wildlife / Vegetation

More information

Fertilizer Setback Zones

Fertilizer Setback Zones Contents Acronyms... 1 Algae Management... 1 Chemical control... 2 Harvesting... 2 An ounce of prevention... 2 Shade... 3 Aeration... 3 Biological control... 3 Education... 3 Green lawns, Blue ponds...

More information

Module 1 ~ Silent Invaders (MS/HS) Emersed Plants Reading Activity

Module 1 ~ Silent Invaders (MS/HS) Emersed Plants Reading Activity Name: Class Period: Date: Directions: Read the passage and use the information you ve learned to answer the questions below using complete sentences. Emersed plants are rooted in shallow water with much

More information

GENERAL INFORMATION What is Stormwater? What is a stormwater utility? What is an impervious surface?

GENERAL INFORMATION What is Stormwater? What is a stormwater utility? What is an impervious surface? GENERAL INFORMATION What is Stormwater? Stormwater is rain or snowmelt that falls on streets, parking areas, rooftops, and other developed land and either flows directly into nearby streams or travels

More information

When planning stormwater management facilities, the following principles shall be applied where possible.

When planning stormwater management facilities, the following principles shall be applied where possible. 2.0 Principles When planning stormwater management facilities, the following principles shall be applied where possible. 2.0.1 Drainage is a regional phenomenon that does not respect the boundaries between

More information

Description of Preferred Alternative

Description of Preferred Alternative Chapter 2 Description of Preferred Alternative 2.1 Introduction This chapter of the programmatic Sammamish Town Center Sub-area Plan Final EIS provides a more detailed description of the Preferred Alternative

More information

Mosquito Control Guidelines

Mosquito Control Guidelines Appendix F Mosquito Control Guidelines This appendix presents guidance from the Countywide Program s Vector Control Plan for designing and maintaining stormwater treatment measures to control mosquitoes.

More information

Operation & Maintenance of Stormwater Management Facilities

Operation & Maintenance of Stormwater Management Facilities Operation & Maintenance of Stormwater Management Facilities Page 2 Operation & Maintenance Plan The Operation and Maintenance Plan outlines the specific operating procedures including routine maintenance

More information

QUESTIONS AND ANSWERS Windsor Woods, Princess Anne Plaza & The Lakes Combined Drainage Project

QUESTIONS AND ANSWERS Windsor Woods, Princess Anne Plaza & The Lakes Combined Drainage Project QUESTIONS AND ANSWERS Windsor Woods, Princess Anne Plaza & The Lakes Combined Drainage Project PROJECT OVERVIEW Windsor Woods, Princess Anne Plaza and The Lakes are neighborhoods located in what was once

More information

Dam Management. Must be managed No trees allowed

Dam Management. Must be managed No trees allowed Bank Management Vegetation managed or wild? Watch out for: multiflora rose, Russian olive, Japanese knotweed, honeysuckle, Purple loosestrife in particular Ky 31 fescue and lespedezas are considered invasive

More information

Best Management Practices

Best Management Practices Best Management Practices Urban Areas Aquatic Areas Natural Areas Best Management Practices Urban Areas Green Industry Best Management Practices Fertilizer Label Nitrogen Applications Phosphorous Applications

More information

Triangle Land Conservancy Conservation Area Monitoring Report Carolina North

Triangle Land Conservancy Conservation Area Monitoring Report Carolina North Triangle Land Conservancy Conservation Area Monitoring Report Carolina North Property Name: Bolin Creek West Conservation Area Date of visit: 2.18.13, 2.18.13, 3.13.13, and 6.10.13 County: Orange Property

More information

Town of Essex Small Site Erosion Control Guide

Town of Essex Small Site Erosion Control Guide Town of Essex Small Site Erosion Control Guide Why do we need to protect against erosion? Water Quality: Erosion and the transport of sediment and pollutants impacts the water quality of nearby streams

More information

AWR Engineering, LLC

AWR Engineering, LLC AWR Engineering, LLC Alaska Water Resources Memorandum To: Kirsti Bischofberger, Watershed Manager, Municipality of Anchorage From: Janie Dusel, PE Date: February 3, 2017 Re: 2016 Low Impact Development/Green

More information

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT NOT WELL 800 - Urban Stormwater Wetlands A constructed system of shallow pools that create growing conditions for wetland plants to lessen the impacts of stormwater quality and quantity in urban areas.

More information

Attachment 1. Letter from OMCA HOA

Attachment 1. Letter from OMCA HOA Attachment 1 Letter from OMCA HOA Olney Mill Community Association September 29, 2011 Montgomery County Planning Board The Maryland National Capital Park and Planning Commission 8787 Georgia Avenue Silver

More information

Response to Comments (July 28, 2010 Oregon City Determination of Application Completeness Memo)

Response to Comments (July 28, 2010 Oregon City Determination of Application Completeness Memo) Environmental Science & Assessment, LLC MEMORANDUM DATE: August 13, 2010 TO: Oregon City Planning CC: Jill Long Lane Powell FROM: RE: Jack Dalton Response to Comments (July 28, 2010 Oregon City Determination

More information

Welcome to Proper Maintenance of

Welcome to Proper Maintenance of Welcome to Proper Maintenance of Stormwater Management Facilities [SMF] May 17, 2006 Repp Glaettli This presentation was designed for owners and maintainers of stormwater management facilities. The background

More information

Berkshire Regional Planning Commission Clearinghouse Review Report

Berkshire Regional Planning Commission Clearinghouse Review Report August 19, 2013 SUBJECT: Reconstruction of Housatonic Street, Dalton, MA EOEA#: 15083 LOCATION: Dalton ESTIMATED COST: $8.1 million REVIEW TYPE: ENF PROPONENT: MassDOT and Town of Dalton COMMENTS DUE:

More information

VALLEY VIEW POND Q&A. This item will be discussed under the First Reading portion of the agenda at the July 17, 2012 Village Council meeting.

VALLEY VIEW POND Q&A. This item will be discussed under the First Reading portion of the agenda at the July 17, 2012 Village Council meeting. VALLEY VIEW POND Q&A This item will be discussed under the First Reading portion of the agenda at the July 17, 2012 Village Council meeting. 1. Please provide a history of the pond including Village maintenance

More information

City of Grande Prairie Development Services Department KENNEDY DEVELOPMENTS LTD. OUTLINE PLAN OP-09-01

City of Grande Prairie Development Services Department KENNEDY DEVELOPMENTS LTD. OUTLINE PLAN OP-09-01 City of Grande Prairie Development Services Department KENNEDY DEVELOPMENTS LTD. OUTLINE PLAN OP-09-01 July 27, 2009 TABLE OF CONTENTS 1.0 Introduction... 1 1.1 Plan Area Location & Context... 1 1.2 Ownership

More information

WET PONDS INSPECTION & MAINTENANCE CHECKLIST

WET PONDS INSPECTION & MAINTENANCE CHECKLIST WET PONDS INSPECTION & MAINTENANCE CHECKLIST INTRODUCTION Once construction is completed, periodic site inspections are essential in order to monitor the effectiveness and to anticipate the maintenance

More information

Benefits of Native Vegetation. Presented by: Mary Beth Falsey DuPage County Senior Wetland Technician

Benefits of Native Vegetation. Presented by: Mary Beth Falsey DuPage County Senior Wetland Technician Benefits of Native Vegetation Presented by: Mary Beth Falsey DuPage County Senior Wetland Technician Turf to Prairie-why would I do that? Improved water quality Soil stabilization and absorption Goose

More information

Conservation in South Jersey Being Creative with Restoration

Conservation in South Jersey Being Creative with Restoration Conservation in South Jersey Being Creative with Restoration Stewardship on a Shoestring: Public Land Management in Fiscally Constrained Times November, 30, 2011 Conservation and Restoration for Open Space

More information

There are 11 different micro-ecosystems that are found in 76 different areas throughout Stoneybrook. They are divided into three major groups.

There are 11 different micro-ecosystems that are found in 76 different areas throughout Stoneybrook. They are divided into three major groups. by Larry Eichert There are 11 different micro-ecosystems that are found in 76 different areas throughout Stoneybrook. They are divided into three major groups. Wetlands Upland Mitigated sections (a term

More information

Lake and Stream Restoration Project

Lake and Stream Restoration Project Pre-project Fact Sheet May 2012 Toledo Botanical Garden (TBG) is a 60 acre public garden visited by more than 120,000 people annually. It is located in Toledo, Ohio in the Ottawa River watershed within

More information

OYSTER LAKE RESTORATION PROJECT

OYSTER LAKE RESTORATION PROJECT Photo courtesy of Scott Jackson, PhotosFlorida. com Sarah Kalinoski, Choctawhatchee Basin Alliance OYSTER LAKE RESTORATION PROJECT OVERVIEW What? Where? Who? COASTAL DUNE LAKES Walton County, Florida Found

More information

STORM WATER UTILITY FREQUENTLY ASKED QUESTIONS

STORM WATER UTILITY FREQUENTLY ASKED QUESTIONS STORM WATER UTILITY FREQUENTLY ASKED QUESTIONS In 2007, the City Council adopted Ordinance No. 1155 establishing a storm water utility in the City. No fee structure was adopted at that time. The idea of

More information

Floating Wetlands Pilot Project:

Floating Wetlands Pilot Project: Floating Wetlands Pilot Project: Investigating the Potential for a New Stormwater BMP Karen Duhring Virginia Institute of Marine Science Center for Coastal Resources Management May 24, 2012 Floating Wetlands

More information

Outline. Tampa Bay. Using Social Marketing Research to Foster Behavior Change Among Residents on Stormwater Ponds

Outline. Tampa Bay. Using Social Marketing Research to Foster Behavior Change Among Residents on Stormwater Ponds Using Social Marketing Research to Foster Behavior Change Among Residents on Stormwater Ponds Paul Monaghan Emily Ott Maria Morera UF/IFAS Urban Landscape Summit Outline 1. Urban stormwater and water quality

More information

Kittson Parkway / Watershed Park Parking Lot

Kittson Parkway / Watershed Park Parking Lot Kittson Parkway / Watershed Park Parking Lot Date Constructed: Summer 2005 Site Location / Description: Kittson Parkway, North Delta, British Columbia. Permeable parking lot adjacent to Watershed Park;

More information

Targeting Specific Audiences with Community Based Social Marketing to Improve Neighborhood Stormwater Ponds

Targeting Specific Audiences with Community Based Social Marketing to Improve Neighborhood Stormwater Ponds Targeting Specific Audiences with Community Based Social Marketing to Improve Neighborhood Stormwater Ponds Paul Monaghan, Gail Hansen, Amanda Concha Holmes, Michelle Atkinson, Shangchun Hu, Emily Ott

More information

2

2 1 2 3 4 5 6 7 The goal of modern stormwater management techniques is to increase infiltration, or the amount of water that soaks into the ground. In natural areas like you see on the left, about half of

More information

USF System Campus Master Plan Updates Goals, Objectives and Policies

USF System Campus Master Plan Updates Goals, Objectives and Policies 2015-2025 USF System Campus Master Plan Updates Goals, Objectives and Policies Tampa Goals, Objectives, and Policies Table of Contents Executive Summary 2015 2025 USF Campus Master Plan Update Introduction

More information

Neighborhood Districts

Neighborhood Districts NEIGHBORHOOD DISTRICTS SEVEN MAIN DISTRICTS Neighborhood Districts While the Development Plan provides a broad-scale overview of the neighborhood, this section focuses on uses and relationships at the

More information

Alternatives Analysis Summary Memorandum

Alternatives Analysis Summary Memorandum F 16253 Swingley Ridge Rd, Suite 100, St. Louis, MO 63017 636-777-3000 P 314.432.5812 F Alternatives Analysis Summary Memorandum To: City of Creve Coeur, Missouri By: Mark Meyer, PE Date: 09-25-2013 Re:

More information

Lake Nokomis Shoreline Enhancement Project

Lake Nokomis Shoreline Enhancement Project Lake Nokomis Shoreline Enhancement Project Community Meeting 2 February 13, 2018 Agenda Current Problems Project Goals Project Status Existing Conditions Community Input Draft Schematic Design Long-term

More information

City of Sun Prairie Wetland Buffer Reduction Request

City of Sun Prairie Wetland Buffer Reduction Request City of Sun Prairie Wetland Buffer Reduction Request Westside Development Area January 9, 2017 Prepared by: City of Sun Prairie 300 E. Main Street Sun Prairie, WI 53590 BACKGROUND The City of Sun Prairie

More information

REQUEST FOR COUNCIL ACTION 6A AGENDA ITEM

REQUEST FOR COUNCIL ACTION 6A AGENDA ITEM DATE REQUEST FOR COUNCIL ACTION 6A AGENDA ITEM ORIGINATING DEPT. AGENDA ITEM CITY ADMINISTRATOR APPROVAL Community Development PUD Concept & Development Stage Plan Preliminary Plat & Final Plat PREVIOUS

More information

Your Yard and Pond are Connected RYAN RYCZEK ENVIRONMENTAL SPECIALIST II

Your Yard and Pond are Connected RYAN RYCZEK ENVIRONMENTAL SPECIALIST II Your Yard and Pond are Connected RYAN RYCZEK ENVIRONMENTAL SPECIALIST II Pollution In Water Results In. Increased aquatic plant and algal growth Lower oxygen levels Harm to aquatic life Sedimentation Impaired

More information

Fertilizing Your Lawn for Healthy Plants and Clean Water

Fertilizing Your Lawn for Healthy Plants and Clean Water We all want a home landscape that is attractive but did you know that some of our common landscape management practices can cause pollution? The improper use of lawn fertilizers has the potential to harm

More information

Mosquito Control Guidelines

Mosquito Control Guidelines Appendix F Mosquito Control Guidelines This appendix presents guidance from the Countywide Program s Vector Control Plan for designing and maintaining stormwater treatment measures to control mosquitoes.

More information

Invasive Plant Removal, Slope Stabilization, and Native Planting Manual

Invasive Plant Removal, Slope Stabilization, and Native Planting Manual Invasive Plant Removal, Slope Stabilization, and Native Planting Manual Stockton Street Phillipsburg Warren County New Jersey July 2018 Contents Rain Garden Description 1 Responsible Owner Information

More information

Mosquito Control Guidelines

Mosquito Control Guidelines Appendix F Mosquito Control Guidelines The Santa Clara Vector Control District (SCC VCD) has the responsibility for providing enforcement of mosquito control measures when public health is threatened.

More information

PrairieWalk Pond Lisle, IL

PrairieWalk Pond Lisle, IL PrairieWalk Pond Lisle, IL Hybrid of Native Vegetation and Traditional Landscape Design Scott Kuykendall, Planning Resources Inc. Awards 2011 Chicago Wilderness Conservation & Native Landscaping Award

More information

Construction Management & Engineering Division. Understanding Swales

Construction Management & Engineering Division. Understanding Swales Construction Management & Engineering Division Understanding Swales The Florida hydrological cycle it all starts and ends here. Rainfall becomes stormwater when it can no longer soak into the ground and

More information

Triangle Land Conservancy Conservation Area Monitoring Report Carolina North

Triangle Land Conservancy Conservation Area Monitoring Report Carolina North Triangle Land Conservancy Conservation Area Monitoring Report Carolina North Property Name: Bolin Creek West Conservation Area Date of first visit: 3.12.14 County: Orange Date of second visit: 6.5.14 Property

More information

Public Meeting May 20, 2014

Public Meeting May 20, 2014 Public Meeting May 20, 2014 Overview Study Purpose Study Area Overview Strategies Potential Opportunities Implementation and Discussion Skeo Solutions Raleigh Walkable Watershed Pilot 2 Purpose Develop

More information

Stormwater Retrofitting: The Art of Opportunity. Presented by the Center for Watershed Protection

Stormwater Retrofitting: The Art of Opportunity. Presented by the Center for Watershed Protection Stormwater Retrofitting: The Art of Opportunity Presented by the Center for Watershed Protection What Are Stormwater Retrofits? Retrofits are stormwater management measures inserted in an urban or ultra-urban

More information

THREE-YEAR CAPITAL IMPROVEMENT PLAN FY

THREE-YEAR CAPITAL IMPROVEMENT PLAN FY THREE-YEAR CAPITAL IMPROVEMENT PLAN FY2016 2018 Annual CIP Development Process Public Works & Engineering Divisions Prepare List of Capital Needs and Recommended Deferred Maintenance Public Works & Engineering

More information

Riverwood CDD. Severn Trent Services Field Management Report Site Inspection

Riverwood CDD. Severn Trent Services Field Management Report Site Inspection Riverwood CDD Severn Trent Services Field Management Report Site Inspection 03.08.2017 1. Lake Management: Water levels continue to recede. Overall clarity is good. No algae issues. Exotic and nuisance

More information

Placido Bayou Community Association Waterway Inspection Report 8/13/14 Management Summary To the Pond and Lake Committee of Placido Bayou, We sincerely applaud your efforts thus far to improve the water

More information

Recent Tidal Creek Restoration Efforts in Tampa Bay

Recent Tidal Creek Restoration Efforts in Tampa Bay Recent Tidal Creek Restoration Efforts in Tampa Bay Ed Sherwood Tampa Bay Estuary Program Co-Authors: Brandt Henningsen, SWFWMD, SWIM Overview Tampa Bay Watershed & Tidal Creek Overview Habitat Restoration

More information

OP Council Resolution June 16, Planning and Development Services

OP Council Resolution June 16, Planning and Development Services OP-08-01 Council Resolution June 16, 2008 Planning and Development Services Kingsgate Landing Outline Plan Table of Contents 1.0 Introduction 1 1.1 Purpose of Plan 1 1.2 Plan Area Location 1 1.3 Ownership

More information

Plants for Rain Gardens and Pond Edges

Plants for Rain Gardens and Pond Edges Plants for Rain Gardens and Pond Edges Marina D Abreau UF-IFAS Hillsborough County Extension Florida Extension Master Gardener Continued Training Conference October 26, 2010, 1:45 pm Outline for Today

More information

BEST MANAGEMENT PRACTICES Spurge Laurel(Daphne laureola) (Family Thymelaeaceae Daphne Family)

BEST MANAGEMENT PRACTICES Spurge Laurel(Daphne laureola) (Family Thymelaeaceae Daphne Family) JEFFERSON COUNTY NOXIOUS WEED CONTROL BOARD 380 Jefferson Street, Port Townsend WA 98368 360 379-5610 Ext. 205 noxiousweeds@co.jefferson.wa.us BEST MANAGEMENT PRACTICES Spurge Laurel(Daphne laureola) (Family

More information

ARTICLE IV: DEVELOPMENT STANDARDS 404 MASTER PLANNING

ARTICLE IV: DEVELOPMENT STANDARDS 404 MASTER PLANNING IV 13 404 MASTER PLANNING Master Planning through the Site Analysis (Master Planning Site Analysis) or Planned Development (Master Planning Planned Development) is provided to encourage development which

More information

MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS

MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS May 2007 SECTION 1 Responsibility of Applicant TABLE OF CONTENTS A. Stormwater Management Plan Required Information

More information

IPM Fun with Insects, Weeds and the Environment. Lesson #3 Weed IPM. The New York State Integrated Pest Management Program

IPM Fun with Insects, Weeds and the Environment. Lesson #3 Weed IPM. The New York State Integrated Pest Management Program IPM Fun with Insects, Weeds and the Environment Lesson #3 Weed IPM The New York State Integrated Pest Management Program Learn how you can use the 6 steps of integrated pest management to help protect

More information

Town of Hague Stormwater Outfall Evaluation Report

Town of Hague Stormwater Outfall Evaluation Report Town of Hague Stormwater Outfall Evaluation Report Prepared by the Warren County Soil and Water Conservation District For the Town of Hague and the Lake George Park Commission November 2012 Table of Contents

More information

Worksheet #14 Water Runoff Management

Worksheet #14 Water Runoff Management Water Runoff Management Use this worksheet to assess how well your property minimizes the potential for water runoff and property damage.. Why should you be concerned? What can you do? Rural runoff, also

More information

Natural Shorelines. for Inland Lakes. A Landowner s Guide to using. to STABLIZE SHORELINES, Michigan s inland lakeshore.

Natural Shorelines. for Inland Lakes. A Landowner s Guide to using. to STABLIZE SHORELINES, Michigan s inland lakeshore. Natural Shorelines for Inland Lakes A Landowner s Guide to using NATURAL MATERIALS to STABLIZE SHORELINES, IMPROVE WATER QUALITY and ENHANCE WILDLIFE HABITAT along Michigan s inland lakeshore. Natural

More information

Ben Powell, Clemson Extension

Ben Powell, Clemson Extension Ben Powell, Clemson Extension The Nuts and Bolts Identify the need Define stormwater, BMPs, management concerns Describe the solutions BMPs (structural and behavioral) Improving efficiency and reducing

More information

The Development of Riparian Stream Buffers in Greensboro, NC

The Development of Riparian Stream Buffers in Greensboro, NC The Development of Riparian Stream Buffers in Greensboro, NC Why our stream banks have grown up? Presented by: Peter Schneider, Water Quality Supervisor City of Greensboro Stormwater Management Division

More information

Stormwater and Your Rain Garden

Stormwater and Your Rain Garden Stormwater and Your Rain Garden When rain falls on natural areas, such as a forest or meadow, it is slowed down, filtered by soil and plants, and allowed to soak back into the ground. When rain falls on

More information

OPERATIONS & MAINTENANCE MANUAL FOR POST CONSTRUCTION MEASURES

OPERATIONS & MAINTENANCE MANUAL FOR POST CONSTRUCTION MEASURES OPERATIONS & MAINTENANCE MANUAL FOR POST CONSTRUCTION MEASURES THE CARMONY BUILDING PARAGON REALTY NORTH GREEN STREET BROWNSBURG, HENDRICKS COUNTY INDIANA 8365 Keystone Crossing, Suite 201 Indianapolis,

More information

Fertilize yard. We all want a home landscape that is attractive but did you know that some of our

Fertilize yard. We all want a home landscape that is attractive but did you know that some of our HOMEOWNER S GUIDE TO: Fertilizing Your Lawn and Garden XCM-222 We all want a home landscape that is attractive but did you know that some of our common landscape management practices can cause pollution?

More information

THE VILLAGE OF LOMBARD TERRACE VIEW POND STORMWATER IMPROVEMENTS FEASIBILITY STUDY

THE VILLAGE OF LOMBARD TERRACE VIEW POND STORMWATER IMPROVEMENTS FEASIBILITY STUDY THE VILLAGE OF LOMBARD TERRACE VIEW POND STORMWATER IMPROVEMENTS FEASIBILITY STUDY Prepared by: Christopher B. Burke Engineering, Ltd. 9575 W. Higgins Road, Suite 600 Rosemont, IL 60018 847.823.0500 Date:

More information

Riverwood CDD. 3/29/2017 Field Management Report Country Lakes Drive (239) Fort Myers, FL 33905

Riverwood CDD. 3/29/2017 Field Management Report Country Lakes Drive   (239) Fort Myers, FL 33905 Riverwood CDD 3/29/2017 Field Management Report 5911 Country Lakes Drive www.severntrentms.com (239) 245-7118 Fort Myers, FL 33905 1. Lake Management The water levels in the lakes continue to be down significantly

More information

Red Fox Commercial Outline Plan

Red Fox Commercial Outline Plan Red Fox Commercial Outline Plan City of Cold Lake, Alberta Prepared by Durrance Projects Ltd and Ross W. Sharp & Associates Ltd October 2014 Rupert 1 Table of Contents 1. PURPOSE...3 1.1. Location...4

More information

Pike River Restoration Adaptive Design: Restoring Structure and Function in an Urban Floodplain - from cabbages to cordgrass

Pike River Restoration Adaptive Design: Restoring Structure and Function in an Urban Floodplain - from cabbages to cordgrass Pike River Restoration Adaptive Design: Restoring Structure and Function in an Urban Floodplain - from cabbages to cordgrass Alice Thompson, PWS & Heather Patti, PWS Pike River Re-imaginedfrom Cabbage

More information

Asbury Chapel Subdivision Sketch Plan

Asbury Chapel Subdivision Sketch Plan Asbury Chapel Subdivision Sketch Plan PART 1: PROJECT SUMMARY Applicant: NVR Inc. Project Size: +/- 76.13 acres Parcel Numbers: 02101112,02116101,02116112, 02116113 Current Zoning: Transitional Residential

More information

How Lawns Grow- Growing Your Lawn and Not the Bay! Chuck Schuster Extension Educator University of Maryland Extension

How Lawns Grow- Growing Your Lawn and Not the Bay! Chuck Schuster Extension Educator University of Maryland Extension How Lawns Grow- Growing Your Lawn and Not the Bay! Chuck Schuster Extension Educator University of Maryland Extension 301-590-2807 cfs@umd.edu You Are The Experts! Nothing has changed in the last 50 years

More information

Vaughan Metropolitan Centre (VMC) Black Creek Renewal CLASS ENVIRONMENTAL ASSESSMENT

Vaughan Metropolitan Centre (VMC) Black Creek Renewal CLASS ENVIRONMENTAL ASSESSMENT PUBLIC INFORMATION CENTRE Vaughan Metropolitan Centre (VMC) Black Creek Renewal Wednesday, May 10, 2017 6:00 p.m. to 8:00 p.m. Add photo Project Management, Environmental Assessment, Stormwater Management

More information

GATEWAY SERVICES COMMUNITY DEVELOPMENT DISTRICT (GSCDD) SURFACE WATER SYSTEM MAINTENANCE STANDARDS

GATEWAY SERVICES COMMUNITY DEVELOPMENT DISTRICT (GSCDD) SURFACE WATER SYSTEM MAINTENANCE STANDARDS GATEWAY SERVICES COMMUNITY DEVELOPMENT DISTRICT (GSCDD) SURFACE WATER SYSTEM MAINTENANCE STANDARDS Prepared jointly by: Pelican Preserve Ponds Workshop Group Gateway Ponds Workshop Group Severn Trent Management

More information

Raingardens. Conserving and Protecting Water L

Raingardens. Conserving and Protecting Water L L-5482 08-08 Raingardens Justin Mechell, Extension Assistant, and Bruce Lesikar, Extension Program Leader for Biological and Agricultural Engineering,The Texas A&M University System A raingarden is an

More information

Summer Public Education and Outreach Campaign Toolkit

Summer Public Education and Outreach Campaign Toolkit Summer Public Education and Outreach Campaign Toolkit ABOUT THIS TOOLKIT The communications tools and messages included in this toolkit were developed by Bluestem Communications for the Lower DuPage River

More information

C ity of Grande Prairie Development Services Department

C ity of Grande Prairie Development Services Department C ity of Grande Prairie Development Services Department FAIRWAY DEVELOPMENT OUTLINE PLAN OP 08 09 Approved April 6, 2009 Prepared by: Focus Corporation Table of Contents 1.0. Introduction 2 3 1.1. Plan

More information

TOWNSHIP OF LOWER MERION. Public Works Committee. Issue Briefing

TOWNSHIP OF LOWER MERION. Public Works Committee. Issue Briefing Exhibit E TOWNSHIP OF LOWER MERION Public Works Committee Issue Briefing Topic: Prepared By: Idris Road Planting Don Cannon Date: March 28, 2016 I. Action To Be Considered By The Board: Provide $30,000

More information

Palisades Outline Plan

Palisades Outline Plan NE ¼ 25 36 28 W4 Town of Penhold Approved August 13, 2012 Contents Figures & Tables... 2 Introduction... 1 Overview... 1 Purpose... 1 Development Area... 3 Ownership... 3 Topography... 3 Existing & Surrounding

More information

A Review of Green Infrastructure Projects Implemented in the Grand Traverse Region

A Review of Green Infrastructure Projects Implemented in the Grand Traverse Region A Review of Green Infrastructure Projects Implemented in the Grand Traverse Region Sarah U Ren Program Director The Watershed Center of Grand Traverse Bay 231-935-1514, suren@gtbay.org Our Mission: The

More information

Point-No-Point Tide-Gate & Outfall Replacement Project. Briefing Memo 2013

Point-No-Point Tide-Gate & Outfall Replacement Project. Briefing Memo 2013 Point-No-Point Tide-Gate & Outfall Replacement Project Briefing Memo 2013 This memo provides an initial outline of the proposed Point-No-Point (PNP) Tide-Gate and Outfall replacement project. The current

More information

City of Dade City AMEC Project No Dade City Stormwater Master Plan September 2012 Page 32

City of Dade City AMEC Project No Dade City Stormwater Master Plan September 2012 Page 32 Page 32 3.0 MAJOR DRAINAGE SYSTEMS The 1965 Master Plan Report for Storm Drainage Facilities ( 1965 Master Plan ) identified six primary subwatersheds within the Dade City study area. Each of these areas

More information